ML091750368: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:July 1, 2009 LICENSEE:       Nebraska Public Power District FACILITY:       Cooper Nuclear Station
{{#Wiki_filter:July 1, 2009 LICENSEE:
Nebraska Public Power District FACILITY:
Cooper Nuclear Station  


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF REGULATORY AUDIT RELATED TO THE REVIEW OF THE LICENSE RENEWAL APPLICATION FOR COOPER NUCLEAR STATION (TAC NO. MD9763)
OF REGULATORY AUDIT RELATED TO THE REVIEW OF THE LICENSE RENEWAL APPLICATION FOR COOPER NUCLEAR STATION (TAC NO. MD9763)
Line 28: Line 29:
Enclosed is a list of NRC staff members and Nebraska Public Power District (NPPD) employees who participated in the regulatory audit.
Enclosed is a list of NRC staff members and Nebraska Public Power District (NPPD) employees who participated in the regulatory audit.
On Monday, June 15, 2009, the review team participated in an entrance meeting with NPPD representatives to discuss the purpose and agenda of the audit. During the remainder of the audit, the team members examined the supporting data used by NPPD in preparation of the LRA and also met with NPPD cognizant system personnel in smaller groups. Specifically, the review team reviewed the operating experience records for the CNS drywell and torus, containment leakage tests, and Class 1, 2, and 3 component supports. Break-out groups participated in discussions regarding CNS AMPs related to the American Society of Mechanical Engineers Section XI, Subsections IWE and IWF, and 10 CFR 50 Appendix J. The review team members also participated in a walk down of the torus structure.
On Monday, June 15, 2009, the review team participated in an entrance meeting with NPPD representatives to discuss the purpose and agenda of the audit. During the remainder of the audit, the team members examined the supporting data used by NPPD in preparation of the LRA and also met with NPPD cognizant system personnel in smaller groups. Specifically, the review team reviewed the operating experience records for the CNS drywell and torus, containment leakage tests, and Class 1, 2, and 3 component supports. Break-out groups participated in discussions regarding CNS AMPs related to the American Society of Mechanical Engineers Section XI, Subsections IWE and IWF, and 10 CFR 50 Appendix J. The review team members also participated in a walk down of the torus structure.
At the conclusion of the audit, the NRC staff summarized the status of the review with NPPD representatives during the exit meeting of June 17, 2009. Three items were discussed with the NPPD team: (1) the overall schedule of license renewal audits and upcoming regional inspection related to license renewal, (2) follow-up requests for additional information (RAIs) from the audit, and (3) the overall schedule for all RAIs.
At the conclusion of the audit, the NRC staff summarized the status of the review with NPPD representatives during the exit meeting of June 17, 2009. Three items were discussed with the NPPD team: (1) the overall schedule of license renewal audits and upcoming regional inspection related to license renewal, (2) follow-up requests for additional information (RAIs) from the audit, and (3) the overall schedule for all RAIs.  


Nebraska Public Power District               The NRC staff indicated that the review team did not identify any significant issues during its site visit. However, the NRC staff further indicated that the review was ongoing. The NRC staff and NPPD reached an agreement that extra focus will be provided to ensure completion of the RAIs and responses. The target date for issuance of the RAI from the regulatory audit is June 29, 2009. NPPD will respond within 30 days from the date of the requesting letter.
Nebraska Public Power District The NRC staff indicated that the review team did not identify any significant issues during its site visit. However, the NRC staff further indicated that the review was ongoing. The NRC staff and NPPD reached an agreement that extra focus will be provided to ensure completion of the RAIs and responses. The target date for issuance of the RAI from the regulatory audit is June 29, 2009. NPPD will respond within 30 days from the date of the requesting letter.  
                                            /RA/
/RA/
Tam Tran, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-298
Tam Tran, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-298  


==Enclosure:==
==Enclosure:==
As stated cc w/encl: See next page


As stated cc w/encl: See next page
ML091750368 OFFICE PM:RPB1:DLR LA:DLR PM:RPB1:DLR BC:RPB1:DLR PM:RPB1:DLR NAME TTran IKing ESayoc DPelton TTran (Signature)
 
DATE 06/25/09 06/25/09 06/30/09 06/30/09 07/01/09  
ML091750368 OFFICE PM:RPB1:DLR LA:DLR                   PM:RPB1:DLR       BC:RPB1:DLR       PM:RPB1:DLR TTran NAME     TTran             IKing           ESayoc             DPelton (Signature)
DATE     06/25/09         06/25/09       06/30/09           06/30/09         07/01/09


Memorandum to Nebraska Public Power District from Tam Tran dated July 01, 2009
Memorandum to Nebraska Public Power District from Tam Tran dated July 01, 2009  


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF REGULATORY AUDIT RELATED TO THE REVIEW OF THE LICENSE RENEWAL APPLICATION FOR COOPER NUCLEAR STATION (TAC NO. MD9763)
OF REGULATORY AUDIT RELATED TO THE REVIEW OF THE LICENSE RENEWAL APPLICATION FOR COOPER NUCLEAR STATION (TAC NO. MD9763)
Line 50: Line 49:
HARD COPY:
HARD COPY:
DLR RF E-MAIL:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource T. Tran E. Sayoc F. Lyon D. Roth (OGC)
-------------
T. Tran E. Sayoc F. Lyon D. Roth (OGC)
A. Jones (OGC)
A. Jones (OGC)
N. Taylor (RIV)
N. Taylor (RIV)
Line 64: Line 61:
G. Miller (RIV)
G. Miller (RIV)
G. Pick (RIV)
G. Pick (RIV)
S. Burnell (RIV)
S. Burnell (RIV)  


Cooper Nuclear Station cc:
Cooper Nuclear Station cc:
Mr. Ronald D. Asche                   Deputy Director for Policy President and Chief Executive Officer Missouri Department of Natural Resources Nebraska Public Power District       P.O. Box 176 1414 15th Street                     Jefferson City, MO 65102-0176 Columbus, NE 68601 Senior Resident Inspector Mr. Gene Mace                         U.S. Nuclear Regulatory Commission Nuclear Asset Manager                 P.O. Box 218 Nebraska Public Power District       Brownville, NE 68321 P.O. Box 98 Brownville, NE 68321                 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Mr. John C. McClure                  612 E. Lamar Blvd., Suite 400 Vice President and General Counsel    Arlington, TX 76011-4125 Nebraska Public Power District P.O. Box 499                          Director, Missouri State Emergency Columbus, NE 68602-0499                Management Agency P.O. Box 116 Mr. David Van Der Kamp                Jefferson City, MO 65102-0116 Licensing Manager Nebraska Public Power District        Chief, Radiation and Asbestos P.O. Box 98                            Control Section Brownville, NE 68321                  Kansas Department of Health and Environment Mr. Michael J. Linder, Director      Bureau of Air and Radiation Nebraska Department of Environmental  1000 SW Jackson, Suite 310 Quality                              Topeka, KS 66612-1366 P.O. Box 98922 Lincoln, NE 68509-8922                Ms. Melanie Rasmussen Radiation Control Program Director Chairman                              Bureau of Radiological Health Nemaha County Board of Commissioners  Iowa Department of Public Health Nemaha County Courthouse              Lucas State Office Building, 5th Floor 1824 N Street                        321 East 12th Street Auburn, NE 68305                      Des Moines, IA 50319 Ms. Julia Schmitt, Manager            Mr. Keith G. Henke, Planner Radiation Control Program            Division of Community and Public Health Nebraska Health & Human Services R&L  Office of Emergency Coordination Public Health Assurance              930 Wildwood Drive 301 Centennial Mall, South            P.O. Box 570 P.O. Box 95007                        Jefferson City, MO 65102 Lincoln, NE 68509-5007
Mr. Ronald D. Asche President and Chief Executive Officer Nebraska Public Power District 1414 15th Street Columbus, NE 68601 Mr. Gene Mace Nuclear Asset Manager Nebraska Public Power District P.O. Box 98 Brownville, NE 68321 Mr. John C. McClure Vice President and General Counsel Nebraska Public Power District P.O. Box 499 Columbus, NE 68602-0499 Mr. David Van Der Kamp Licensing Manager Nebraska Public Power District P.O. Box 98 Brownville, NE 68321 Mr. Michael J. Linder, Director Nebraska Department of Environmental Quality P.O. Box 98922 Lincoln, NE 68509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Auburn, NE 68305 Ms. Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services R&L Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Deputy Director for Policy Missouri Department of Natural Resources P.O. Box 176 Jefferson City, MO 65102-0176 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 218 Brownville, NE 68321 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Director, Missouri State Emergency Management Agency P.O. Box 116 Jefferson City, MO 65102-0116 Chief, Radiation and Asbestos Control Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366 Ms. Melanie Rasmussen Radiation Control Program Director Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA 50319 Mr. Keith G. Henke, Planner Division of Community and Public Health Office of Emergency Coordination 930 Wildwood Drive P.O. Box 570 Jefferson City, MO 65102  


Cooper Nuclear Station               cc:
Cooper Nuclear Station cc:
Mr. Art Zaremba, Director of Nuclear     Mr. Bill Victor Safety Assurance                       License Renewal Project Licensing Lead Nebraska Public Power District           Cooper Nuclear Station P.O. Box 98                             72676 - 648A Avenue Brownville, NE 68321                    Brownville, NE 68321 Mr. John F. McCann, Director             Mr. Jim Loynes Licensing, Entergy Nuclear Northeast     License Renewal Project Engineer Entergy Nuclear Operations, Inc.         Cooper Nuclear Station 440 Hamilton Avenue                      72676 - 648A Avenue White Plains, NY 10601-1813             Brownville, NE 68321 Mr. Stewart B. Minahan                   Mr. Garry Young Vice President                           License Renewal Manager Nuclear and Chief Nuclear Officer       Entergy Nuclear Cooper Nuclear Station                   1448 S.R. 333, N-GSB-45 72676 - 648A Avenue                      Russellville, AK 72802 Brownville, NE 68321 Mr. Alan Cox Mr. Mike Boyce                          License Renewal Technical Manager Cooper Strategic Initiatives Manager    Entergy Nuclear Cooper Nuclear Station                  1448 S.R. 333, N-GSB-45 72676 - 648A Avenue                      Russellville, AK 72802 Brownville, NE 68321 Mr. Dave Lach Mr. Dave Bremer                          LRP Entergy Project Manager License Renewal Project Manager          Entergy Nuclear Cooper Nuclear Station                  1448 S.R. 333, N-GSB-45 72676 - 648A Avenue                      Russellville, AK 72802 Brownville, NE 68321
Mr. Art Zaremba, Director of Nuclear Safety Assurance Nebraska Public Power District P.O. Box 98 Brownville, NE 68321 Mr. John F. McCann, Director Licensing, Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601-1813 Mr. Stewart B. Minahan Vice President Nuclear and Chief Nuclear Officer Cooper Nuclear Station 72676 - 648A Avenue Brownville, NE 68321 Mr. Mike Boyce Cooper Strategic Initiatives Manager Cooper Nuclear Station 72676 - 648A Avenue Brownville, NE 68321 Mr. Dave Bremer License Renewal Project Manager Cooper Nuclear Station 72676 - 648A Avenue Brownville, NE 68321 Mr. Bill Victor License Renewal Project Licensing Lead Cooper Nuclear Station 72676 - 648A Avenue Brownville, NE 68321 Mr. Jim Loynes License Renewal Project Engineer Cooper Nuclear Station 72676 - 648A Avenue Brownville, NE 68321 Mr. Garry Young License Renewal Manager Entergy Nuclear 1448 S.R. 333, N-GSB-45 Russellville, AK 72802 Mr. Alan Cox License Renewal Technical Manager Entergy Nuclear 1448 S.R. 333, N-GSB-45 Russellville, AK 72802 Mr. Dave Lach LRP Entergy Project Manager Entergy Nuclear 1448 S.R. 333, N-GSB-45 Russellville, AK 72802  


LIST OF PARTICIPANTS COOPER NUCLEAR STATION REGULATORY AUDIT JUNE 15, 2009 - JUNE 17, 2009 PARTICIPANT     AFFILIATION T. Tran         U.S. Nuclear Regulatory Commission (NRC)
ENCLOSURE LIST OF PARTICIPANTS COOPER NUCLEAR STATION REGULATORY AUDIT JUNE 15, 2009 - JUNE 17, 2009 PARTICIPANT AFFILIATION T. Tran U.S. Nuclear Regulatory Commission (NRC)
A. Sheik         NRC B. Lehman       NRC M. Sirca         NRC D. Bremer       Nebraska Public Power District (NPPD)
A. Sheik NRC B. Lehman NRC M. Sirca NRC D. Bremer Nebraska Public Power District (NPPD)
W. Victor       NPPD J. Loynes       NPPD R. Yantz         NPPD T. McClure       NPPD D. Lach         Entergy A. Ahrabli       Entergy ENCLOSURE}}
W. Victor NPPD J. Loynes NPPD R. Yantz NPPD T. McClure NPPD D. Lach Entergy A. Ahrabli Entergy}}

Latest revision as of 11:15, 14 January 2025

Summary of Regulatory Audit Related to the Review of the License Renewal Application for Cooper Nuclear Station
ML091750368
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/01/2009
From: Tam Tran
License Renewal Projects Branch 1
To:
Nebraska Public Power District (NPPD)
tran t, NRR/RPB1, 415-3617
References
TAC MD9763
Download: ML091750368 (7)


Text

July 1, 2009 LICENSEE:

Nebraska Public Power District FACILITY:

Cooper Nuclear Station

SUBJECT:

SUMMARY

OF REGULATORY AUDIT RELATED TO THE REVIEW OF THE LICENSE RENEWAL APPLICATION FOR COOPER NUCLEAR STATION (TAC NO. MD9763)

From June 15, 2009 to June 17, 2009, a review team consisting of four U.S. Nuclear Regulatory Commission (NRC) staff members participated in a regulatory audit at the Cooper Nuclear Station (CNS), related to the structural review of the CNS license renewal application (LRA).

The primary goal of the site visit was to review documentation and to gather information to ensure that the CNS aging management review and associated aging management program (AMP) requirements of license renewal as codified in Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54) were met.

Enclosed is a list of NRC staff members and Nebraska Public Power District (NPPD) employees who participated in the regulatory audit.

On Monday, June 15, 2009, the review team participated in an entrance meeting with NPPD representatives to discuss the purpose and agenda of the audit. During the remainder of the audit, the team members examined the supporting data used by NPPD in preparation of the LRA and also met with NPPD cognizant system personnel in smaller groups. Specifically, the review team reviewed the operating experience records for the CNS drywell and torus, containment leakage tests, and Class 1, 2, and 3 component supports. Break-out groups participated in discussions regarding CNS AMPs related to the American Society of Mechanical EngineersSection XI, Subsections IWE and IWF, and 10 CFR 50 Appendix J. The review team members also participated in a walk down of the torus structure.

At the conclusion of the audit, the NRC staff summarized the status of the review with NPPD representatives during the exit meeting of June 17, 2009. Three items were discussed with the NPPD team: (1) the overall schedule of license renewal audits and upcoming regional inspection related to license renewal, (2) follow-up requests for additional information (RAIs) from the audit, and (3) the overall schedule for all RAIs.

Nebraska Public Power District The NRC staff indicated that the review team did not identify any significant issues during its site visit. However, the NRC staff further indicated that the review was ongoing. The NRC staff and NPPD reached an agreement that extra focus will be provided to ensure completion of the RAIs and responses. The target date for issuance of the RAI from the regulatory audit is June 29, 2009. NPPD will respond within 30 days from the date of the requesting letter.

/RA/

Tam Tran, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-298

Enclosure:

As stated cc w/encl: See next page

ML091750368 OFFICE PM:RPB1:DLR LA:DLR PM:RPB1:DLR BC:RPB1:DLR PM:RPB1:DLR NAME TTran IKing ESayoc DPelton TTran (Signature)

DATE 06/25/09 06/25/09 06/30/09 06/30/09 07/01/09

Memorandum to Nebraska Public Power District from Tam Tran dated July 01, 2009

SUBJECT:

SUMMARY

OF REGULATORY AUDIT RELATED TO THE REVIEW OF THE LICENSE RENEWAL APPLICATION FOR COOPER NUCLEAR STATION (TAC NO. MD9763)

DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource T. Tran E. Sayoc F. Lyon D. Roth (OGC)

A. Jones (OGC)

N. Taylor (RIV)

E. Collins (RIV)

C. Casto (RIV)

B. Maier (RIV)

V. Dricks (RIV)

D. Chamberlain (RIV)

A. Vegel (RIV)

W. Walker (RIV)

G. Miller (RIV)

G. Pick (RIV)

S. Burnell (RIV)

Cooper Nuclear Station cc:

Mr. Ronald D. Asche President and Chief Executive Officer Nebraska Public Power District 1414 15th Street Columbus, NE 68601 Mr. Gene Mace Nuclear Asset Manager Nebraska Public Power District P.O. Box 98 Brownville, NE 68321 Mr. John C. McClure Vice President and General Counsel Nebraska Public Power District P.O. Box 499 Columbus, NE 68602-0499 Mr. David Van Der Kamp Licensing Manager Nebraska Public Power District P.O. Box 98 Brownville, NE 68321 Mr. Michael J. Linder, Director Nebraska Department of Environmental Quality P.O. Box 98922 Lincoln, NE 68509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Auburn, NE 68305 Ms. Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services R&L Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Deputy Director for Policy Missouri Department of Natural Resources P.O. Box 176 Jefferson City, MO 65102-0176 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 218 Brownville, NE 68321 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Director, Missouri State Emergency Management Agency P.O. Box 116 Jefferson City, MO 65102-0116 Chief, Radiation and Asbestos Control Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366 Ms. Melanie Rasmussen Radiation Control Program Director Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA 50319 Mr. Keith G. Henke, Planner Division of Community and Public Health Office of Emergency Coordination 930 Wildwood Drive P.O. Box 570 Jefferson City, MO 65102

Cooper Nuclear Station cc:

Mr. Art Zaremba, Director of Nuclear Safety Assurance Nebraska Public Power District P.O. Box 98 Brownville, NE 68321 Mr. John F. McCann, Director Licensing, Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601-1813 Mr. Stewart B. Minahan Vice President Nuclear and Chief Nuclear Officer Cooper Nuclear Station 72676 - 648A Avenue Brownville, NE 68321 Mr. Mike Boyce Cooper Strategic Initiatives Manager Cooper Nuclear Station 72676 - 648A Avenue Brownville, NE 68321 Mr. Dave Bremer License Renewal Project Manager Cooper Nuclear Station 72676 - 648A Avenue Brownville, NE 68321 Mr. Bill Victor License Renewal Project Licensing Lead Cooper Nuclear Station 72676 - 648A Avenue Brownville, NE 68321 Mr. Jim Loynes License Renewal Project Engineer Cooper Nuclear Station 72676 - 648A Avenue Brownville, NE 68321 Mr. Garry Young License Renewal Manager Entergy Nuclear 1448 S.R. 333, N-GSB-45 Russellville, AK 72802 Mr. Alan Cox License Renewal Technical Manager Entergy Nuclear 1448 S.R. 333, N-GSB-45 Russellville, AK 72802 Mr. Dave Lach LRP Entergy Project Manager Entergy Nuclear 1448 S.R. 333, N-GSB-45 Russellville, AK 72802

ENCLOSURE LIST OF PARTICIPANTS COOPER NUCLEAR STATION REGULATORY AUDIT JUNE 15, 2009 - JUNE 17, 2009 PARTICIPANT AFFILIATION T. Tran U.S. Nuclear Regulatory Commission (NRC)

A. Sheik NRC B. Lehman NRC M. Sirca NRC D. Bremer Nebraska Public Power District (NPPD)

W. Victor NPPD J. Loynes NPPD R. Yantz NPPD T. McClure NPPD D. Lach Entergy A. Ahrabli Entergy