{{#Wiki_filter:FACILITY NAME: Turkey Point             Section 5 REPORT NUMBER: 2009-302 DRAFT SIM/IN-PLANT JPMS CONTENTS:
{{#Wiki_filter:FACILITY NAME: Turkey Point Section 5 REPORT NUMBER: 2009-302 DRAFT SIM/IN-PLANT JPMS CONTENTS:
E:J'braft SIMULATOR liN-PLANT JPMs Location of Electronic Files:
E:J'braft SIMULATOR liN-PLANT JPMs Location of Electronic Files:
Submitted By By: Ul~ tjw#
Submitted By: Ul~ tjw# Verified By '11oJ J' ~
idJm     ~I       Verified By     !oJ J' ~
FACILITY NAME: Turkey Point Section 5 REPORT NUMBER: 2009-302 DRAFT SIM/IN-PLANT JPMS CONTENTS:
                                            ''111oJ
E:J'braft SIMULATOR liN-PLANT JPMs Location of Electronic Files:
Submitted By idJm ~I Verified By '1! oJ J' ~  
 
Appendix C Facility:
Task
 
==Title:==
KIA
 
==Reference:==
Examinee:
Facility Evaluator:
Method of testing:
Job Performance Measure Worksheet Turkey Point Task No:
Place Unit 4 Post Accident Hydrogen Monitor In Service JPM No:
028 A2.02 {3.5/3.9}
NRC Examiner:
Date:
In Plant Simulated Performance X
Classroom Simulator Read to the examinee:
Form ES-C-1 24094001501 NRC-25-IP-JPM-1 Plant X I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
: 1. Unit 4 has experienced a valid Safety Injection signal.
: 2. All applicable prerequisites listed in Section 3.0 are satisfied.
: 3. Post Accident Hydrogen Monitoring system is in normal standby alignment.
Task Standard:
: 1. PAHMS Alignment Completed per Section 7.1 of 4-0P-094,"Containment Post-Accident Monitoring Systems."
Required Materials:
: 1. Two way radio (optional communications device)
: 2. 4-0P-094, "Containment Post-Accident Monitoring Systems"
: 3. "A" key
: 4. Valve Operating Handle (located in Aux Bldg EIW hallway)
General


Appendix C                                   Job Performance Measure                                  Form ES-C-1 Worksheet Facility:               Turkey Point                      Task No:            24094001501 Place Unit 4 Post Accident Task
==References:==
: 1. 4-0P-094, "Containment Post-Accident Monitoring Systems" NUREG 1021 Rev 9 Appendix C Appendix C Facility:
Task


==Title:==
==Title:==
Hydrogen Monitor In Service        JPM No:              NRC-25-IP-JPM-1 KIA  
KIA  


==Reference:==
==Reference:==
Examinee:
Facility Evaluator:
Method of testing:
Job Performance Measure Worksheet Turkey Point Task No:
Place Unit 4 Post Accident Hydrogen Monitor In Service JPM No:
028 A2.02 {3.5/3.9}
028 A2.02 {3.5/3.9}
Examinee:                                                    NRC Examiner:
NRC Examiner:
Facility Evaluator:                                          Date:
Date:
Method of testing:        In Plant Simulated Performance           X
In Plant Simulated Performance X  
                                ~-------------
~-------------
Classroom - - - - - - - -                    Simulator - - - - - - -                    Plant -  X- - - - - - -
Classroom Simulator -------
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Form ES-C-1 24094001501 NRC-25-IP-JPM-1 Plant X I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
: 1. Unit 4 has experienced a valid Safety Injection signal.
: 1. Unit 4 has experienced a valid Safety Injection signal.
: 2. All applicable prerequisites listed in Section 3.0 are satisfied.
: 2. All applicable prerequisites listed in Section 3.0 are satisfied.
: 3. Post Accident Hydrogen Monitoring system is in normal standby alignment.
: 3. Post Accident Hydrogen Monitoring system is in normal standby alignment.
* Task Standard:
Task Standard:
: 1. PAHMS Alignment Completed per Section 7.1 of 4-0P-094,"Containment Post-Accident Monitoring Systems."
: 1. PAHMS Alignment Completed per Section 7.1 of 4-0P-094,"Containment Post-Accident Monitoring Systems."
Required Materials:
Required Materials:
Line 51: Line 90:


==References:==
==References:==
: 1. 4-0P-094, "Containment Post-Accident Monitoring Systems"
: 1. 4-0P-094, "Containment Post-Accident Monitoring Systems" NUREG 1021 Rev 9 Appendix C  
* NUREG 1021 Rev 9 Appendix C


Appendix C                                   Page 2 of 12                               Form ES-C-1 Initiating Cue:
Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
: 1. You have been directed by the RO to place the Post Accident Hydrogen Monitor in service in
: 1. You have been directed by the RO to place the Post Accident Hydrogen Monitor in service in accordance with 4-0P-094, Section 7.1.
* accordance with 4-0P-094, Section 7.1.
Time Critical Task: YES (30 min)
Time Critical Task: YES (30 min)
Validation Time:   15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIME!
Validation Time:
* NUREG 1021 Rev 9 Appendix C
15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIME!
NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
: 1. You have been directed by the RO to place the Post Accident Hydrogen Monitor in service in accordance with 4-0P-094, Section 7.1.
Time Critical Task: YES (30 min)
Validation Time:
15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIME!
NUREG 1021 Rev 9 Appendix C  


I Appendix C                               Page 3 of 12               Form ES-C-1 I SIMULATOR SETUP Reset to IC #
I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #
* N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A
N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A NUREG 1021 Rev 9 Appendix C I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #
* NUREG 1021 Rev 9 Appendix C
N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A NUREG 1021 Rev 9 Appendix C  


Appendix C                                 Page 4 of 12                             Form ES-C-1 Denote critical steps with a check mark( I)
Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( I)
Start Time Obtain Required Materials STEP    1                                                                          - - SAT
Start Time STEP 1
                                                                                      - - UNSAT
Obtain Required Materials SAT UNSAT
: 1. Obtains a copy of 4-0P-094, Post Accident Monitoring System.
: 1.
: 2. Verifies latest revision and no outstanding OTSCs.
Obtains a copy of 4-0P-094, Post Accident Monitoring System.
Standard:
: 2.
Verifies latest revision and no outstanding OTSCs.
: 3.
Begins review of section: 7.1 Post Accident H2 Monitor Startup.
Evaluator may choose to require the candidate to obtain procedure section.
Cue When the correct procedure is identified & verified, provide the operator with the procedure.
Comment NOTE Hydrogen Monitors should be in service within 30 minutes of a valid SI NOTE:
signal.
NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( I)
Start Time STEP 1
Obtain Required Materials SAT UNSAT
: 1.
Obtains a copy of 4-0P-094, Post Accident Monitoring System.
Standard:
Standard:
: 3. Begins review of section: 7.1 Post Accident H2 Monitor Startup.
: 2.
Verifies latest revision and no outstanding OTSCs.
: 3.
Begins review of section: 7.1 Post Accident H2 Monitor Startup.
Evaluator may choose to require the candidate to obtain procedure section.
Evaluator may choose to require the candidate to obtain procedure section.
Cue When the correct procedure is identified & verified, provide the operator with the procedure.
Cue When the correct procedure is identified & verified, provide the operator with the procedure.
Comment NOTE Hydrogen Monitors should be in service within 30 minutes of a valid SI NOTE:   signal.
Comment NOTE Hydrogen Monitors should be in service within 30 minutes of a valid SI NOTE:
* NUREG 1021 Rev 9 Appendix C
signal.
NUREG 1021 Rev 9 Appendix C  


I Appendix C                               Page 5 of 12                                   Form ES-C-1 I NOTE
I Appendix C Page 5 of 12 Form ES-C-1 I NOTE STEP 2
*                                                                                            - - SAT STEP     2 Hydrogen Monitors should be in seNice within 30 minutes of a valid SI signal.
Hydrogen Monitors should be in seNice within 30 minutes of a valid SI signal.
7.1.1 Initial Conditions                                                     - - UNSAT
SAT 7.1.1 Initial Conditions UNSAT
_ _ 1. All applicable prerequisites listed in Section 3.0 are satisfied.
__ 1. All applicable prerequisites listed in Section 3.0 are satisfied.
: 1. Reviews Note prior to step 7.1.1. Notes that the task must be completed within 30 minutes of the safety injection signal.
: 1.
Standard: 2. Determines prerequisites met from JPM Briefing Sheet Initial Conditions (thus procedure initial conditions complete).
Reviews Note prior to step 7.1.1. Notes that the task must be completed within 30 minutes of the safety injection signal.
Cue                                     N/A Comment NOTE:
Standard:
* NUREG 1021 Rev 9 Appendix C
: 2.
Determines prerequisites met from JPM Briefing Sheet Initial Conditions (thus procedure initial conditions complete).
Cue N/A Comment NOTE:
NUREG 1021 Rev 9 Appendix C I Appendix C Page 5 of 12 Form ES-C-1 I NOTE STEP 2
Hydrogen Monitors should be in seNice within 30 minutes of a valid SI signal.
SAT 7.1.1 Initial Conditions UNSAT
__ 1. All applicable prerequisites listed in Section 3.0 are satisfied.
: 1.
Reviews Note prior to step 7.1.1. Notes that the task must be completed within 30 minutes of the safety injection signal.
Standard:
: 2.
Determines prerequisites met from JPM Briefing Sheet Initial Conditions (thus procedure initial conditions complete).
Cue N/A Comment NOTE:
NUREG 1021 Rev 9 Appendix C  


Appendix C                                     Page 6 of 12                               Form ES-C-1 7.1.2 Procedure Steps STEP     3                                                                                 - - SAT NOTES
Appendix C Page 6 of 12 Form ES-C-1 7.1.2 Procedure Steps STEP 3
          ..j
NOTES SAT  
* Valves PASS-4-008, 4-001 A, 4-001 B, 4-002A and 4-002B are located in the   - - UNSAT floor at the junction of the north/south hallway.
..j UNSAT
* Valves PASS-4-008, 4-001 A, 4-001 B, 4-002A and 4-002B are located in the floor at the junction of the north/south hallway.
* Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur.
* Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur.
: 1. Remove the floor caps AND open the following valves using the reach rods located in the Auxiliary Building.
: 1. Remove the floor caps AND open the following valves using the reach rods located in the Auxiliary Building.
__ a. Post Accident Sampling System Return Line Isolation Valve, PASS-4-008 (2 turns)
__ a. Post Accident Sampling System Return Line Isolation Valve, PASS-4-008 (2 turns)
__ b. H2Analyzer 4A Outlet Isol, PAHM-4-001A (3 turns)
__ b. H2Analyzer 4A Outlet Isol, PAHM-4-001A (3 turns)
_ _ c. H2Analyzer Outlet Isol, PAHM-4-001B (6 turns)
__ c. H2Analyzer Outlet Isol, PAHM-4-001B (6 turns)
: d. PACV Vent and Sample System to PAHM Header Isolation Valve (RR), PAHM-4-002A (6 turns)
: d. P ACV Vent and Sample System to P AHM Header Isolation Valve (RR), PAHM-4-002A (6 turns)
__ e. PACV Vent and Sample System to PAHM Header Isolation Valve (RR), PAHM-4-002B (6 turns)
__ e. PACV Vent and Sample System to PAHM Header Isolation Valve (RR), PAHM-4-002B (6 turns)
Proceeds to the Aux Bldg east-west hallway and describes how to unlock and obtain a T-handle tool from the rack.
Proceeds to the Aux Bldg east-west hallway and describes how to unlock and obtain a T-handle tool from the rack.
Simulates removing floor caps by engaging the T-handle tool into each cap and rotating them counter clockwise. Then simulates opening the following valves by engaging the T -handle tool to the valve operator and turning the operator the specified number of turns counter Standard: clockwise:
Simulates removing floor caps by engaging the T-handle tool into each cap and rotating them counter clockwise. Then simulates opening the following valves by engaging the T -handle tool to the valve operator and turning the operator the specified number of turns counter Standard:
clockwise:
: a. PASS-4-008 (2 turns).
: a. PASS-4-008 (2 turns).
: b. PAHM-4-001A (3 turns).
: b. PAHM-4-001A (3 turns).
Line 109: Line 185:
NOTE:
NOTE:
* Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur.
* Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur.
NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 7.1.2 Procedure Steps STEP 3
NOTES SAT
..j UNSAT
* Valves PASS-4-008, 4-001 A, 4-001 B, 4-002A and 4-002B are located in the floor at the junction of the north/south hallway.
* Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur.
: 1. Remove the floor caps AND open the following valves using the reach rods located in the Auxiliary Building.
__ a. Post Accident Sampling System Return Line Isolation Valve, PASS-4-008 (2 turns)
__ b. H2Analyzer 4A Outlet Isol, PAHM-4-001A (3 turns)
__ c. H2Analyzer Outlet Isol, PAHM-4-001B (6 turns)
: d. P ACV Vent and Sample System to P AHM Header Isolation Valve (RR), PAHM-4-002A (6 turns)
__ e. PACV Vent and Sample System to PAHM Header Isolation Valve (RR), PAHM-4-002B (6 turns)
Proceeds to the Aux Bldg east-west hallway and describes how to unlock and obtain a T-handle tool from the rack.
Simulates removing floor caps by engaging the T-handle tool into each cap and rotating them counter clockwise. Then simulates opening the following valves by engaging the T -handle tool to the valve operator and turning the operator the specified number of turns counter Standard:
clockwise:
: a. PASS-4-008 (2 turns).
: b. PAHM-4-001A (3 turns).
: c. PAHM-4-001 B (6 turns).
: d. PAHM-4-002A (6 turns).
: e. PAHM-4-002B (6 turns).
For each of the valves listed above, when applicant correctly identifies how to remove floor cap, state, "The floor cap is removed."
Cue When applicant correctly demonstrates how to operate valve in the open direction, state, "The valve operator has been rotated the applicable number of turns".
Comment NOTES
* Valves PASS-4-008, 4-001A, 4-001 B, 4-002A and 4-002B are located in the floor at the junction of the north/south hallway.
NOTE:
* Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur.
NUREG 1021 Rev 9 Appendix C  


I Appendix C                                 Page 7 of 12                           Form ES-C-1 I 7.1.2 (Cont'd)
I Appendix C Page 7 of 12 Form ES-C-1 I 7.1.2 (Cont'd)
STEP   4                                                                         - - SAT
STEP 4
*          ..j _ _ 2. Unlock and open PACVS Isol Vlv Penet 51, HV-4-3, outside the Unit 4 Pipe and Valve Room. (An A key is required for this lock.) --
SAT  
UNSAT Removes lock from HV-4-3 remote operator handwheel (South end of Standard: Aux Bldg 18' elevation N/S hallway outside U4 P&V Room) using an A key, then opens valve using remote operator handwheel.
..j
Cue     When candidate simulates turning valve handwheel counterclockwise, point to open indicator to show valve is open.
__ 2. Unlock and open PACVS Isol Vlv Penet 51, HV-4-3, outside UNSAT the Unit 4 Pipe and Valve Room. (An A key is required for this lock.)
Comment NOTE:   Although not specified in the procedure, candidate may reinstall lock on valve. This is not required for this JPM .
Removes lock from HV-4-3 remote operator handwheel (South end of Standard:
NUREG 1021 Rev 9 Appendix C
Aux Bldg 18' elevation N/S hallway outside U4 P&V Room) using an A key, then opens valve using remote operator handwheel.
Cue When candidate simulates turning valve handwheel counterclockwise, point to open indicator to show valve is open.
Comment NOTE:
Although not specified in the procedure, candidate may reinstall lock on valve. This is not required for this JPM.
NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 12 Form ES-C-1 I 7.1.2 (Cont'd)
STEP 4
SAT
..j
__ 2. Unlock and open PACVS Isol Vlv Penet 51, HV-4-3, outside UNSAT the Unit 4 Pipe and Valve Room. (An A key is required for this lock.)
Removes lock from HV-4-3 remote operator handwheel (South end of Standard:
Aux Bldg 18' elevation N/S hallway outside U4 P&V Room) using an A key, then opens valve using remote operator handwheel.
Cue When candidate simulates turning valve handwheel counterclockwise, point to open indicator to show valve is open.
Comment NOTE:
Although not specified in the procedure, candidate may reinstall lock on valve. This is not required for this JPM.
NUREG 1021 Rev 9 Appendix C  


I Appendix C                               Page 9 of 12                             Form ES-C-1 I Request the Unit 4 RO perform step 7.1.2.4 STEP     6                                                                       --
I Appendix C Page 9 of 12 Form ES-C-1 I STEP 6
SAT UNSAT Standard: Simulates request for Unit 4 RO to perform step 7.1.2.4 of 4-0P-094
Request the Unit 4 RO perform step 7.1.2.4 SAT UNSAT Standard:
: 1. As Unit 4 RO acknowledge request to perform step 7.1.2.4 of 4-0P-094 (Control Room Portion)
Simulates request for Unit 4 RO to perform step 7.1.2.4 of 4-0P-094
Cue
: 1. As Unit 4 RO acknowledge request to perform step 7.1.2.4 of Cue 4-0P-094 (Control Room Portion)
: 2. As Unit 4 RO, tell candidate step 7.1.2.4 has been completed.
Direct candidate to continue with step 7.1.2.5.
Comment NOTE:
Candidate may attempt to use a communication device or simulate communication directly to the evaluator.
NUREG 1021 Rev 9 Appendix C I Appendix C Page 9 of 12 Form ES-C-1 I STEP 6
Request the Unit 4 RO perform step 7.1.2.4 SAT UNSAT Standard:
Simulates request for Unit 4 RO to perform step 7.1.2.4 of 4-0P-094
: 1. As Unit 4 RO acknowledge request to perform step 7.1.2.4 of Cue 4-0P-094 (Control Room Portion)
: 2. As Unit 4 RO, tell candidate step 7.1.2.4 has been completed.
: 2. As Unit 4 RO, tell candidate step 7.1.2.4 has been completed.
Direct candidate to continue with step 7.1.2.5.
Direct candidate to continue with step 7.1.2.5.
Comment NOTE:   Candidate may attempt to use a communication device or simulate communication directly to the evaluator.
Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
Candidate may attempt to use a communication device or simulate communication directly to the evaluator.
NUREG 1021 Rev 9 Appendix C  


Appendix C                                 Page 10 of 12                         Form ES-C-1
Appendix C Page 10 of 12 Form ES-C-1
__ 5. At the area outside the Unit 3 BA Evap Room, remove floor STEP     7                                                                       - - SAT cap AND close WHT Waste Transfer Pump Discharge to Rad Waste
__ 5. At the area outside the Unit 3 BA Evap Room, remove floor STEP 7
          ..J Building, MPAS-001,(1I4 tum) .
cap AND close WHT Waste Transfer Pump Discharge to Rad Waste SAT
OR                               - - UNSAT
..J Building, MPAS-001,(1I4 tum).
UNSAT OR
__ At the Waste Evaporator Feed Pump Room in the Radwaste Bldg, close Aux Bldg WHT valve to Radwaste Bldg WHT, 1731.
__ At the Waste Evaporator Feed Pump Room in the Radwaste Bldg, close Aux Bldg WHT valve to Radwaste Bldg WHT, 1731.
: 1. Attempts to remove the floor cap for MPAS-001.
: 1. Attempts to remove the floor cap for MPAS-001.
: 2. When MPAS-001 floor cap determined to be jammed in place, Standard:     leaves the Aux Building and proceeds to the Waste Evaporator Feed Pump room in the Radwaste Building.
: 2. When MPAS-001 floor cap determined to be jammed in place, Standard:
leaves the Aux Building and proceeds to the Waste Evaporator Feed Pump room in the Radwaste Building.
: 3. Closes valve 1731 (Rotates handwheel fully clockwise until the valve stem is fully inserted.)
: 3. Closes valve 1731 (Rotates handwheel fully clockwise until the valve stem is fully inserted.)
: 1. When candidate attempts to remove MPAS-001 floor cap, state that it is jammed and cannot be removed Cue     2. When candidate identifies 1731 handwheel has been rotated fully clockwise and valve stem inserted, confirm this indication.
: 1. When candidate attempts to remove MPAS-001 floor cap, state that it is jammed and cannot be removed Cue
Comment
: 2. When candidate identifies 1731 handwheel has been rotated fully clockwise and valve stem inserted, confirm this indication.
* NOTE:
Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1
__ 5. At the area outside the Unit 3 BA Evap Room, remove floor STEP 7
cap AND close WHT Waste Transfer Pump Discharge to Rad Waste SAT
..J Building, MPAS-001,(1I4 tum).
UNSAT OR
__ At the Waste Evaporator Feed Pump Room in the Radwaste Bldg, close Aux Bldg WHT valve to Radwaste Bldg WHT, 1731.
: 1. Attempts to remove the floor cap for MPAS-001.
: 2. When MPAS-001 floor cap determined to be jammed in place, Standard:
leaves the Aux Building and proceeds to the Waste Evaporator Feed Pump room in the Radwaste Building.
: 3. Closes valve 1731 (Rotates handwheel fully clockwise until the valve stem is fully inserted.)
: 1. When candidate attempts to remove MPAS-001 floor cap, state that it is jammed and cannot be removed Cue
: 2. When candidate identifies 1731 handwheel has been rotated fully clockwise and valve stem inserted, confirm this indication.
Comment NOTE:
NUREG 1021 Rev 9 Appendix C  


I Appendix C                                 Page 11 of 12                                   Form ES-C-1 NOTE STEP     8   The following valves are located on the Auxiliary Building roof near the Unit 4 - - SAT
I Appendix C Page 11 of 12 Form ES-C-1 NOTE STEP 8
*            ..j containment wall.
The following valves are located on the Auxiliary Building roof near the Unit 4 SAT
..j containment wall.
UNSAT
: 6. Perfonn the following:
__ a. Unlock and open Isol Vlv from WHT Pp Back, MP AS-4-004 (an A key is required).
: 1. Proceeds to Auxiliary Building roof near Unit 4 Containment wall.
Standard:
: 2. Unlocks MPAS-4-004 handwheel with an A key, then opens valve.
(Rotates handwheel fully counterclockwise until valve stem fully withdrawn.)
When candidate identifies handwheel has been rotated fully Cue counterclockwise and valve stem withdrawn, confirm this indication Comment NOTE:
Although not specified in the procedure, candidate may reinstall lock on valve.
NUREG 1021 Rev 9 Appendix C I Appendix C Page 11 of 12 Form ES-C-1 NOTE STEP 8
The following valves are located on the Auxiliary Building roof near the Unit 4 SAT  
..j containment wall.
UNSAT
: 6. Perfonn the following:
: 6. Perfonn the following:
__ a. Unlock and open Isol Vlv from WHT Pp Back, MPAS-4-004 (an A key is required).
__ a. Unlock and open Isol Vlv from WHT Pp Back, MP AS-4-004 (an A key is required).
                                                                                                - - UNSAT
: 1. Proceeds to Auxiliary Building roof near Unit 4 Containment wall.
: 1. Proceeds to Auxiliary Building roof near Unit 4 Containment wall.
Standard: 2. Unlocks MPAS-4-004 handwheel with an A key, then opens valve.
Standard:
: 2. Unlocks MPAS-4-004 handwheel with an A key, then opens valve.
(Rotates handwheel fully counterclockwise until valve stem fully withdrawn.)
(Rotates handwheel fully counterclockwise until valve stem fully withdrawn.)
When candidate identifies handwheel has been rotated fully Cue     counterclockwise and valve stem withdrawn, confirm this indication Comment NOTE:     Although not specified in the procedure, candidate may reinstall lock on valve.
When candidate identifies handwheel has been rotated fully Cue counterclockwise and valve stem withdrawn, confirm this indication Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
Although not specified in the procedure, candidate may reinstall lock on valve.
NUREG 1021 Rev 9 Appendix C  


Appendix C                                 Page 12 of 12                       Form ES-C-1
Appendix C Page 12 of 12 Form ES-C-1 STEP 9
* STEP     9 V
__ b. Close Isol Vlv MPAS to Purge Air Rtn, MPAS-4-00S.
_ _ b. Close Isol Vlv MPAS to Purge Air Rtn, MPAS-4-00S.
SAT V
                                                                                  - - SAT
UNSAT Standard:
                                                                                  - - UNSAT Standard: Simulates Closing MPAS-4-005. (Rotates handwheel fully clockwise until the valve stem is fully inserted.)
Simulates Closing MPAS-4-005. (Rotates handwheel fully clockwise until the valve stem is fully inserted.)
: 1. When candidate identifies handwheel has been rotated fully clockwise and valve stem inserted, confirm that valve travel Cue       has stopped and stem is inserted.
: 1. When candidate identifies handwheel has been rotated fully clockwise and valve stem inserted, confirm that valve travel Cue has stopped and stem is inserted.
: 2. Tell candidate another operator will perform step 7.1.2.7 Comment NOTE:
Termination Operator returns JPM briefing sheet when informed step 7.1.2.7 STOP Cue:
will be performed by another operator.
Stop Time ----
NUREG 1021 Rev 9 Appendix C Appendix C Page 12 of 12 Form ES-C-1 STEP 9
__ b. Close Isol Vlv MPAS to Purge Air Rtn, MPAS-4-00S.
SAT V
UNSAT Standard:
Simulates Closing MPAS-4-005. (Rotates handwheel fully clockwise until the valve stem is fully inserted.)
: 1. When candidate identifies handwheel has been rotated fully clockwise and valve stem inserted, confirm that valve travel Cue has stopped and stem is inserted.
: 2. Tell candidate another operator will perform step 7.1.2.7 Comment NOTE:
: 2. Tell candidate another operator will perform step 7.1.2.7 Comment NOTE:
* Termination Cue:
Termination Operator returns JPM briefing sheet when informed step 7.1.2.7 STOP Cue:
Operator returns JPM briefing sheet when informed step 7.1.2.7 will be performed by another operator.
will be performed by another operator.
Stop Time STOP
Stop Time ----
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


I Appendix C                                   Page 13 of 12               Form ES-C-1 I Verification of Completion
I Appendix C Page 13 of 12 Form ES-C-1 I Verification of Completion Job Performance Measure No.
* Job Performance Measure No.
NRC-25-IP-JPM-1 Examinee's Name:
Examinee's Name:
Examiner's Name:
NRC-25-IP-JPM-1 Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
 
===Response===
Result:
Satisfactory/Unsatisfactory Examiner's signature and date: ________________ _
NUREG 1021 Rev 9 Appendix C I Appendix C Page 13 of 12 Form ES-C-1 I Verification of Completion Job Performance Measure No.
NRC-25-IP-JPM-1 Examinee's Name:
Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 173: Line 349:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:  


===Response===
===Response===
Result:   Satisfactory/Unsatisfactory
Result:
* Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Satisfactory/Unsatisfactory Examiner's signature and date: ________________ _
NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Line 189: Line 365:
You are the Primary Operator and you have been directed by the Unit 4 RO to place the Post Accident Hydrogen Monitor in service per 4-0P-094 section 7.1.
You are the Primary Operator and you have been directed by the Unit 4 RO to place the Post Accident Hydrogen Monitor in service per 4-0P-094 section 7.1.
This is a Simulate JPM. No plant equipment is to be manipulated during the performance of this task.
This is a Simulate JPM. No plant equipment is to be manipulated during the performance of this task.
HAND THIS PAPER BACK TO YOUR EVALUATOR
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
* WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
* NUREG 1021 Rev 9 Appendix C
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
: 1. Unit 4 has experienced a valid Safety Injection signal.
: 2. All applicable procedure prerequisites are satisfied.
: 3. Post Accident Hydrogen Monitoring system is in NORMAL STANDBY ALIGNMENT.
INITIA TlNG CUE:
You are the Primary Operator and you have been directed by the Unit 4 RO to place the Post Accident Hydrogen Monitor in service per 4-0P-094 section 7.1.
This is a Simulate JPM. No plant equipment is to be manipulated during the performance of this task.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
NUREG 1021 Rev 9 Appendix C  


Appendix C                                   Job Performance Measure                                  Form ES-C-1 Worksheet Facility:                Turkey Point                        Task No:
Appendix C Facility:
TRIP and RESET AFW Pump Task
Task


==Title:==
==Title:==
"A" T&T Valve, MOV-6459A            JPM No:            NRC-25-IP-JPM-J 061-K4.07 Turbine trip, including overspeed 3. 1/3.3 KIA  
KIA  


==Reference:==
==Reference:==
Examinee:
Facility Evaluator:
Method of testing:
Job Performance Measure Worksheet Turkey Point Task No:
TRIP and RESET AFW Pump "A" T&T Valve, MOV-6459A JPM No:
061-K4.07 Turbine trip, including overspeed 3. 1/3.3 NRC Examiner:
Date:
Form ES-C-1 NRC-25-IP-JPM-J Simulated Performance X
Actual Performance
~--------------
Classroom --------
Simulator -------
Plant X Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
: 1. 3-0P-075, Auxiliary Feedwater System, Section 7.8, Auxiliary Feedwater Pump A Manual Start is in progress.
: 2. 3-0P-075, Auxiliary Feedwater System has been completed up to Section 7.8.7 by another NPO.
: 3. The Unit 3 Unit Supervisor has directed the NPO to perform steps 7.8.8 through 7.8.10 of 3-OP-075, Auxiliary Feedwater System.
Task Standard:
AFW Pump "A" T&T Valve, MOV-6459A, is TRIPPED.in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8.
AFW Pump "A" T& T Valve, MOV-6459A is RESET, in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8.
Required Materials:
Applicable Personal Protective Equipment 3-0P-075, Auxiliary Feedwater System General
==References:==
3-0P-075, Auxiliary Feedwater System NUREG 1021 Rev 9 Appendix C Appendix C Facility:
Task
==Title:==
KIA


Examinee:                                                    NRC Examiner:
==Reference:==
Facility Evaluator:                                          Date:
Examinee:
Facility Evaluator:
Method of testing:
Method of testing:
Simulated Performance          X                            Actual Performance
Job Performance Measure Worksheet Turkey Point Task No:
                                ~--------------                                    ---------------------
TRIP and RESET AFW Pump "A" T&T Valve, MOV-6459A JPM No:
Classroom - - - - - - - -                      Simulator                                  Plant   X Read to the examinee:
061-K4.07 Turbine trip, including overspeed 3. 1/3.3 NRC Examiner:
Date:
Form ES-C-1 NRC-25-IP-JPM-J Simulated Performance X
Actual Performance
~--------------
Classroom --------
Simulator -------
Plant X Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
Line 213: Line 436:
: 3. The Unit 3 Unit Supervisor has directed the NPO to perform steps 7.8.8 through 7.8.10 of 3-OP-075, Auxiliary Feedwater System.
: 3. The Unit 3 Unit Supervisor has directed the NPO to perform steps 7.8.8 through 7.8.10 of 3-OP-075, Auxiliary Feedwater System.
Task Standard:
Task Standard:
* AFW Pump "A" T&T Valve, MOV-6459A, is TRIPPED.in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8.
AFW Pump "A" T&T Valve, MOV-6459A, is TRIPPED.in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8.
* AFW Pump "A" T& T Valve, MOV-6459A is RESET, in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8.
AFW Pump "A" T& T Valve, MOV-6459A is RESET, in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8.
Required Materials:
Required Materials:
* Applicable Personal Protective Equipment
Applicable Personal Protective Equipment 3-0P-075, Auxiliary Feedwater System General  
* 3-0P-075, Auxiliary Feedwater System General  


==References:==
==References:==
* 3-0P-075, Auxiliary Feedwater System
3-0P-075, Auxiliary Feedwater System NUREG 1021 Rev 9 Appendix C  
* NUREG 1021 Rev 9 Appendix C


Appendix C                                     Page 2 of 12                               Form ES-C-1 Initiating Cue: You have been directed to perform steps 7.8.8 through 7.8.10 of3-0P-075, Auxiliary Feedwater System to TRIP and RESET AFW Pump "A" T&T Valve, MOV-6459A.
Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue: You have been directed to perform steps 7.8.8 through 7.8.10 of3-0P-075, Auxiliary Feedwater System to TRIP and RESET AFW Pump "A" T&T Valve, MOV-6459A.
* Time Critical Task: No Validation Time:     15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
Time Critical Task: No Validation Time:
* NUREG 1021 Rev 9 Appendix C
15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue: You have been directed to perform steps 7.8.8 through 7.8.10 of3-0P-075, Auxiliary Feedwater System to TRIP and RESET AFW Pump "A" T&T Valve, MOV-6459A.
Time Critical Task: No Validation Time:
15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
NUREG 1021 Rev 9 Appendix C  


I Appendix C                               Page 3 of 12               Form ES-C-1 I SIMULATOR SETUP Reset to IC #
I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #
* N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A
N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A NUREG 1021 Rev 9 Appendix C I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #
* NUREG 1021 Rev 9 Appendix C
N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A NUREG 1021 Rev 9 Appendix C  


Appendix C                                 Page 4 of 12                           Form ES-C-1 Denote critical steps with a check mark( I)
Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( I)
Start Time Trip AFW Pump A T&T Valve, MOV-6459A.
STEP 1
SAT
..J UNSAT 7.8.8 Push the mechanical trip button for the AFW Pump AT&T Standard:
Valve, MOV-6459A Cue Once NPO identifies Mechanical Trip Button and simulates depressing the button, confirm Trip Button has been depressed.
Comment NOTE:
NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( I)
Start Time Trip AFW Pump A T&T Valve, MOV-6459A.
Start Time Trip AFW Pump A T&T Valve, MOV-6459A.
STEP       1                                                                       - - SAT
STEP 1
          ..J
SAT  
                                                                                    - - UNSAT 7.8.8 Push the mechanical trip button for the AFW Pump AT&T Standard: Valve, MOV-6459A Cue     Once NPO identifies Mechanical Trip Button and simulates depressing the button, confirm Trip Button has been depressed.
..J UNSAT 7.8.8 Push the mechanical trip button for the AFW Pump AT&T Standard:
Valve, MOV-6459A Cue Once NPO identifies Mechanical Trip Button and simulates depressing the button, confirm Trip Button has been depressed.
Comment NOTE:
Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


I Appendix C                               Page 5 of 12                           Form ES-C-1 I NPO verifies AFW Pump A T&T Valve, MOV-6459A, is closed.
I Appendix C Page 5 of 12 Form ES-C-1 I NPO verifies AFW Pump A T&T Valve, MOV-6459A, is closed.
STEP     2
STEP 2
                                                                                    - - SAT UNSAT then verify the following:
SAT UNSAT then verify the following:
Standard:
: 1. AFW Pump A T&T Valve, MOV-6459A, is closed.
: 1. AFW Pump A T&T Valve, MOV-6459A, is closed.
: 2. Control Room mechanical trip light is ON.
: 1. If operator verifies MOV-6459A CLOSED by valve stem moving downward and stopping, confirm CLOSED.
Cue
: 2. When NPO simulates contacting Control Room confirm that Control Room mechanical trip light is On and valve indicates CLOSED.
Comment NOTE:
Evaluator may act as Control Room Operator to simulate communications.
NUREG 1021 Rev 9 Appendix C I Appendix C Page 5 of 12 Form ES-C-1 I NPO verifies AFW Pump A T&T Valve, MOV-6459A, is closed.
STEP 2
SAT UNSAT then verify the following:
Standard:
Standard:
: 1. AFW Pump A T&T Valve, MOV-6459A, is closed.
: 2. Control Room mechanical trip light is ON.
: 2. Control Room mechanical trip light is ON.
: 1. If operator verifies MOV-6459A CLOSED by valve stem moving downward and stopping, confirm CLOSED.
: 1. If operator verifies MOV-6459A CLOSED by valve stem moving downward and stopping, confirm CLOSED.
Cue       2. When NPO simulates contacting Control Room confirm that Control Room mechanical trip light is On and valve indicates CLOSED.
Cue
Comment NOTE:   Evaluator may act as Control Room Operator to simulate communications.
: 2. When NPO simulates contacting Control Room confirm that Control Room mechanical trip light is On and valve indicates CLOSED.
* NUREG 1021 Rev 9 Appendix C
Comment NOTE:
Evaluator may act as Control Room Operator to simulate communications.
NUREG 1021 Rev 9 Appendix C  


Appendix C                                 Page 6 of 12                           Form ES-C-1 NPO confirms Local Test Panel Mechanical Trip Light is on.
Appendix C Page 6 of 12 Form ES-C-1 NPO confirms Local Test Panel Mechanical Trip Light is on.
*                                                                                    - - SAT STEP     3
STEP 3
                                                                                      - - UNSAT Local Test Panel mechanical trip light is On.
SAT UNSAT Standard:
Standard:
Local Test Panel mechanical trip light is On.
Cue   When NPO identifies Local Test Panel mechanical trip light tell the NPO that the RED light is OFF and the GREEN light is on.
Cue When NPO identifies Local Test Panel mechanical trip light tell the NPO that the RED light is OFF and the GREEN light is on.
Comment NOTE:   Local Test Panel Mechanical Trip Light is AMBER.
Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
Local Test Panel Mechanical Trip Light is AMBER.
NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 NPO confirms Local Test Panel Mechanical Trip Light is on.
STEP 3
SAT UNSAT Standard:
Local Test Panel mechanical trip light is On.
Cue When NPO identifies Local Test Panel mechanical trip light tell the NPO that the RED light is OFF and the GREEN light is on.
Comment NOTE:
Local Test Panel Mechanical Trip Light is AMBER.
NUREG 1021 Rev 9 Appendix C  


I Appendix C                                   Page 7 of 12                               Form ES-C-1 Reset AFW Pump A T&T Valve, MOV-6459A STEP     4                                                                               --
I Appendix C Page 7 of 12 Form ES-C-1 STEP 4
SAT
Reset AFW Pump A T&T Valve, MOV-6459A SAT
            ..j UNSAT CAUTION When releasing the mechanical trip rod, ensure the rod does not snap back towards the turbine. This could damage the turbine overspeed tappet shaft.
..j UNSAT CAUTION When releasing the mechanical trip rod, ensure the rod does not snap back towards the turbine. This could damage the turbine overspeed Standard:
Standard:
tappet shaft.
7.8.9 Reset AFW Pump A T&T Valve, MOV-6459A, by pulling the mechanical trip rod approximately one inch.
When NPO describes operating mechanical trip rod tell operator that the Cue mechanical trip rod will travel no further and does not snap back to the tripped position.
Comment NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 12 Form ES-C-1 STEP 4
Reset AFW Pump A T&T Valve, MOV-6459A SAT  
..j UNSAT CAUTION When releasing the mechanical trip rod, ensure the rod does not snap back towards the turbine. This could damage the turbine overspeed Standard:
tappet shaft.
7.8.9 Reset AFW Pump A T&T Valve, MOV-6459A, by pulling the mechanical trip rod approximately one inch.
7.8.9 Reset AFW Pump A T&T Valve, MOV-6459A, by pulling the mechanical trip rod approximately one inch.
When NPO describes operating mechanical trip rod tell operator that the Cue     mechanical trip rod will travel no further and does not snap back to the tripped position.
When NPO describes operating mechanical trip rod tell operator that the Cue mechanical trip rod will travel no further and does not snap back to the tripped position.
Comment
Comment NUREG 1021 Rev 9 Appendix C  
* NUREG 1021 Rev 9 Appendix C


Appendix C                                     Page 8 of 12                             Form ES-C-1 LEVER_
Appendix C NOTE:
HEAD LEVER
Page 8 of 12 HEAD LEVER_
                                                                              ]APPET NUT SCRIBE MARK HEAD BRACKET NOTE:     GUIDE SPRING*
SCRIBE MARK GUIDE SPRING -
SPRING -
TAPPET ASSEMBL Y_- -----
TAPPET ASSEMBL Y.-  Y_- ... --
TRIP HEAD LEVER CORRECT POSITION
SCRlB" MA.~K
]APPET NUT HEAD BRACKET TRIP HEAD LEVER INCORRECT POSITION ( HELD BY TAPPET)
                            " f----.>,.,..""'-:
Form ES-C-1 NUREG 1021 Rev 9 Appendix C Appendix C NOTE:
TRIP HEAD LEVER                     TRIP HEAD LEVER INCORRECT CORRECT POSITION                      POSITION ( HELD BY TAPPET)
Page 8 of 12 HEAD LEVER SCRIBE MARK GUIDE SPRING*
* NUREG 1021 Rev 9 Appendix C
TAPPET ASSEMBL Y.-... --
SCRlB" MA.~K f----.>,.,..""'-:
TRIP HEAD LEVER CORRECT POSITION
]APPET NUT HEAD BRACKET TRIP HEAD LEVER INCORRECT POSITION ( HELD BY TAPPET)
Form ES-C-1 NUREG 1021 Rev 9 Appendix C  


I Appendix C                                 Page 9 of 12                               Form ES-C-1 I Verify the limit switch arm roller is properly positioned.
I Appendix C STEP 5
STEP    5                                                                                  SAT
Standard:
                                                                                          - - UNSAT 7.8.10 Verify the limit switch arm roller is on the North side of the roller plate AND the tappet nut is contacting the head lever below the Standard: scribe mark.
Cue Comment NOTE:
Cue    When operator describes the correct standard, confirm that the limit switch arm roller is properly positioned.
Terminating Cue:
Comment NOTE:
Page 9 of 12 Verify the limit switch arm roller is properly positioned.
* Terminating Cue:
7.8.10 Verify the limit switch arm roller is on the North side of the roller plate AND the tappet nut is contacting the head lever below the scribe mark.
When operator describes the correct standard, confirm that the limit switch arm roller is properly positioned.
The task is complete when the Examinee returns the cue sheet to the examiner.
Stop Time Form ES-C-1 I SAT UNSAT STOP NUREG 1021 Rev 9 Appendix C I Appendix C STEP 5
Standard:
Cue Comment NOTE:
Terminating Cue:
Page 9 of 12 Verify the limit switch arm roller is properly positioned.
7.8.10 Verify the limit switch arm roller is on the North side of the roller plate AND the tappet nut is contacting the head lever below the scribe mark.
When operator describes the correct standard, confirm that the limit switch arm roller is properly positioned.
The task is complete when the Examinee returns the cue sheet to the examiner.
The task is complete when the Examinee returns the cue sheet to the examiner.
Stop Time STOP
Stop Time Form ES-C-1 I SAT UNSAT STOP NUREG 1021 Rev 9 Appendix C  
* NUREG 1021 Rev 9 Appendix C


Appendix C                                   Page 10 of 12               Form ES-C-1 Verification of Completion
Appendix C Page 10 of 12 Form ES-C-1 Verification of Completion Job Performance Measure No.
* Job Performance Measure No.
NRC-25-1 P-JPM-J Examinee's Name:
Examinee's Name:
Examiner'S Name:
NRC-25-1 P-JPM-J Examiner'S Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
 
===Response===
Result:
Satisfactory/Unsatisfactory Examiner's signature and date: _________________ _
NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 Verification of Completion Job Performance Measure No.
NRC-25-1 P-JPM-J Examinee's Name:
Examiner'S Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 296: Line 579:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:  


===Response===
===Response===
Result:   Satisfactory/Unsatisfactory
Result:
* Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Satisfactory/Unsatisfactory Examiner's signature and date: _________________ _
NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
* INITIAL CONDITIONS:
INITIAL CONDITIONS:
I. 3-0P-075, Auxiliary Feedwater System, Section 7.8, Auxiliary Feedwater Pump A Manual Start is in progress.
I. 3-0P-075, Auxiliary Feedwater System, Section 7.8, Auxiliary Feedwater Pump A Manual Start is in progress.
: 2. 3-0P-075, Auxiliary Feedwater System has been completed up to Section 7.8.7 by another NPO.
: 2. 3-0P-075, Auxiliary Feedwater System has been completed up to Section 7.8.7 by another NPO.
Line 313: Line 596:
Acknowledge to the examiner when you are ready to begin.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
I. 3-0P-075, Auxiliary Feedwater System, Section 7.8, Auxiliary Feedwater Pump A Manual Start is in progress.
: 2. 3-0P-075, Auxiliary Feedwater System has been completed up to Section 7.8.7 by another NPO.
: 3. The Unit 3 Unit Supervisor has directed the NPO to perform steps 7.8.8 through 7.8.10 of 3-0P-075, Auxiliary Feedwater System.
INITIA TlNG CUE:
You have been directed to perform steps 7.8.8 through 7.8.10 of 3-0P-075, Auxiliary Feedwater System to TRIP and RESET AFW Pump "A" T& T Valve, MOV-6459A.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
NUREG 1021 Rev 9 Appendix C  


Appendix C                                   Job Performance Measure                                  Form ES-C-1 Worksheet
Appendix C Facility:
* Facility:
Task
Task


Line 323: Line 615:


==Reference:==
==Reference:==
Examinee:
Facility Evaluator:
Method of testing:
Job Performance Measure Worksheet Turke}" Point Task No:
Transfer Vital Loads Between Job Performance Inverters Measure No:
062-A4.04 {2.6/2.71 NRC Examiner:
Date:
In Plant Simulated Performance X
Actual Performance Form ES-C-1 NRC-25-IP-JPM-K Classroom -------------
Simulator ----------
Plant X Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
: 1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY.
: 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
Task Standard:
: 1. Transfer load to the correct inverter.
Required Materials:
: 1. 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM (12/08)
General
==References:==
: 1. 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM (12/08)
NUREG 1021 Rev 9 Appendix C Appendix C Facility:
Task
==Title:==
KJA


Turke}" Point Transfer Vital Loads Between Inverters 062-A4.04 {2.6/2.71 Task No:
==Reference:==
Job Performance Measure No:          NRC-25-IP-JPM-K Examinee:                                                    NRC Examiner:
Examinee:
Facility Evaluator:                                          Date:
Facility Evaluator:
Method of testing:        In Plant Simulated Performance           X                           Actual Performance Classroom -   -------------
Method of testing:
                  --------                    Simulator --- ----- -- -----  ---          Plant X- - - - - - - -
Job Performance Measure Worksheet Turke}" Point Task No:
Read to the examinee:
Transfer Vital Loads Between Job Performance Inverters Measure No:
062-A4.04 {2.6/2.71 NRC Examiner:
Date:
In Plant Simulated Performance X
Actual Performance Form ES-C-1 NRC-25-IP-JPM-K Classroom Simulator Plant X Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
: 1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY.
: 1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY.
: 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
: 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
* Task Standard:
Task Standard:
: 1. Transfer load to the correct inverter.
: 1. Transfer load to the correct inverter.
Required Materials:
Required Materials:
Line 342: Line 666:
==References:==
==References:==
: 1. 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM (12/08)
: 1. 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM (12/08)
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


Appendix C                                   Page 2 of 17                                 Form ES-C-1 Initiating Cue:
Appendix C Page 2 of 17 Form ES-C-1 Initiating Cue:
* In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 48 (4Y02) Inverter to the 8 SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1.
In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 48 (4Y02) Inverter to the 8 SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1.
Time Critical Task: No Validation Time:     18 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
Time Critical Task: No Validation Time:
* NUREG 1021 Rev 9 Appendix C
18 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 17 Form ES-C-1 Initiating Cue:
In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 48 (4Y02) Inverter to the 8 SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1.
Time Critical Task: No Validation Time:
18 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
NUREG 1021 Rev 9 Appendix C  


I Appendix C                               Page 3 of 17               Form ES-C-1 I SIMULATOR SETUP Reset to IC #
I Appendix C Page 3 of 17 SIMULATOR SETUP Reset to IC #
N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A
N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A Form ES-C-1 I NUREG 1021 Rev 9 Appendix C I Appendix C Page 3 of 17 SIMULATOR SETUP Reset to IC #
* NUREG 1021 Rev 9 Appendix C
N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A Form ES-C-1 I NUREG 1021 Rev 9 Appendix C  


Appendix C                                     Page 4 of 17                               Form ES-C-1 INSTRUCTIONS TO OPERA TOR
Appendix C Page 4 of 17 Form ES-C-1 INSTRUCTIONS TO OPERA TOR HAND JPM BRIEFING SHEET TO OPERATOR A T THIS TIME!
* INITIAL CONDITIONS:
INITIAL CONDITIONS:
HAND JPM BRIEFING SHEET TO OPERATOR A T THIS TIME!
: 1. Two inverters in service, B SPARE (4Y04) in standby and 4B (4Y02) supplying load.
: 1. Two inverters in service, B SPARE (4Y04) in standby and 4B (4Y02) supplying load.
: 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
: 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
Line 368: Line 696:
: 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
: 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
NOTE: This is a SIMULATE JPM. Tell candidate that NO plant equipment is to be manipulated during the performance of this task.
NOTE: This is a SIMULATE JPM. Tell candidate that NO plant equipment is to be manipulated during the performance of this task.
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 17 Form ES-C-1 INSTRUCTIONS TO OPERA TOR HAND JPM BRIEFING SHEET TO OPERATOR A T THIS TIME!
INITIAL CONDITIONS:
: 1. Two inverters in service, B SPARE (4Y04) in standby and 4B (4Y02) supplying load.
: 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
INITIA TlNG CUE:
In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 4B (4Y02) Inverter to the B SPARE (4Y04) Inverter.
TERMINA TlON CUE:
When you feel that you have satisfactorily completed the assigned task, hand your JPM Briefing Sheet back to me.
Do you have any questions?
You may begin.
NOTES TO EVALUATOR:
: 1. Two inverters in service, B SPARE (4Y04) in standby and 4B (4Y02) supplying load.
: 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
NOTE: This is a SIMULATE JPM. Tell candidate that NO plant equipment is to be manipulated during the performance of this task.
NUREG 1021 Rev 9 Appendix C  


I Appendix C                                     Page 5 of 17                                 Form ES-C-1 Denote critical steps with a check mark (I)
I Appendix C Page 5 of 17 Form ES-C-1 Denote critical steps with a check mark (I)
Start Time 7.0 INFREQUENT OPERATIONS STEP    1        7.1 Transfer of Bus Load from Normal to Spare Inverter (Normal                   SAT Transfer)
STEP 1
UNSAT INIT      Transfer from Inverter- - - - -
STANDARD:
Date/Time Started: ------~--------
CUES:
                                                  -----------~------
Comment NOTE:
                                                                    /
Start Time 7.0 INFREQUENT OPERATIONS 7.1 Transfer of Bus Load from Normal to Spare Inverter (Normal Transfer)
IN IT Transfer from Inverter -----
Date/Time Started:  
/
-----------~------
7.1.1 Initial Conditions
7.1.1 Initial Conditions
__ 1. All applicable prerequisites listed in Section 3.0 are satisfied.
__ 1. All applicable prerequisites listed in Section 3.0 are satisfied.
__ 2. The applicable Spare Inverter is in Standby in accordance with Subsection 5.1 of this procedure.
__ 2. The applicable Spare Inverter is in Standby in accordance with Subsection 5.1 of this procedure.
1.0btains copy of 0-OP-003.3, 120V VITAL INSTRUMENT AC STANDARD:        SYSTEM.
1.0btains copy of 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM.
2Verifies procedure is current with no outstanding OTSCs.
2Verifies procedure is current with no outstanding OTSCs.
: 1. Provide copy of procedure once operator has located & verified 0-OP-003.3, or require candidate to obtain procedure.
: 1. Provide copy of procedure once operator has located & verified 0-OP-003.3, or require candidate to obtain procedure.
: 2. Inform operator that Sections 3.0 and 5. 1 conditions have been
: 2. Inform operator that Sections 3.0 and 5. 1 conditions have been met.
* CUES:
met.
: 3. Candidate should proceed to Control Room, ask permission to enter and go to the Inverter Room.
: 3. Candidate should proceed to Control Room, ask permission to enter and go to the Inverter Room.
Once candidate has identified need to go to the Control Room tell the candidate to insure that the specific task to be performed is not re/aved to Control Room personnel.
Once candidate has identified need to go to the Control Room tell the candidate to insure that the specific task to be performed is not re/aved to Control Room personnel.
Comment NOTE Enclosure 1 provides a reference for Typical Normal Vital AC Inverter Switch Location, or NOTE:       Enclosure 2 provides a reference for Typical Spare Vital AC Inverter Switch Location as applicable.
NOTE provides a reference for Typical Normal Vital AC Inverter Switch Location, or provides a reference for Typical Spare Vital AC Inverter Switch Location as applicable.
* NUREG 1021 Rev 9 Appendix C
SAT UNSAT NUREG 1021 Rev 9 Appendix C I Appendix C Page 5 of 17 Form ES-C-1 Denote critical steps with a check mark (I)
STEP 1
STANDARD:
CUES:
Comment NOTE:
Start Time 7.0 INFREQUENT OPERATIONS 7.1 Transfer of Bus Load from Normal to Spare Inverter (Normal Transfer)
IN IT Transfer from Inverter -----
Date/Time Started:
/
------~--------
7.1.1 Initial Conditions
__ 1. All applicable prerequisites listed in Section 3.0 are satisfied.
__ 2. The applicable Spare Inverter is in Standby in accordance with Subsection 5.1 of this procedure.
1.0btains copy of 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM.
2Verifies procedure is current with no outstanding OTSCs.
: 1. Provide copy of procedure once operator has located & verified 0-OP-003.3, or require candidate to obtain procedure.
: 2. Inform operator that Sections 3.0 and 5. 1 conditions have been met.
: 3. Candidate should proceed to Control Room, ask permission to enter and go to the Inverter Room.
Once candidate has identified need to go to the Control Room tell the candidate to insure that the specific task to be performed is not re/aved to Control Room personnel.
NOTE provides a reference for Typical Normal Vital AC Inverter Switch Location, or provides a reference for Typical Spare Vital AC Inverter Switch Location as applicable.
SAT UNSAT NUREG 1021 Rev 9 Appendix C  


Appendix C                                   Page 6 of 17                                       Form ES-C-1 (procedure step 7.1.2.1)
Appendix C Page 6 of 17 Form ES-C-1 (procedure step 7.1.2.1)
*                                                                                                 - - SAT STEP   2
STEP 2
        ~   __ 1. Place the Alternate Source Transfer Switch to the position indicated in                                                                         - - UNSAT Table 2, TABLE 2                                     I I
SAT
Pia,..
~
Wbon          for ALITR"AIT
__ 1. Place the Alternate Source Transfer Switch to the position UNSAT indicated in Table 2, TABLE 2 I I Wbon for Pia,..
                ~ub')tituting [\'SERYICE SOCRCE               T() Position (LOCKED)       I~TI SPARE       :,\OR\lU TRA.'\SFER D.I:RTER     J:\,I:RTER SWITCH AS (3Y04)     3A(3Y01)   .\YOIB     BACKL? TO SPARE I).,*ERTER (3Y04) AS AS (3Y041     4A(W01)     4YOIB     BACKL? TO SPARE I).,'ERTER (3Y04) AS BS(W04)       3B13Y02)   3Y02B     BACKL? TO SPARE IXVERTER (W04) BS BS (W04)     .JB (4Y02)   4Y028     BACKL? TO SPARE J:\,'ERTER (W04) BS C$ (3YOti)   3C (W05)   3YOSE     BACKe? TO SPARE I).YERTER (WOO) CS CS OY06)     4UW05)       4YOSE     BACKeP TO SPARE Th:YERTER (3Y06) CS DS(W06\       3D (WOn     3Y07B     BACKL? TO SPARE Th:YERTER (4Y06) DS DS(4Y06)     4D(.JY07)   4Y07B     BACKe? TO SPARE lNYERTER 14Y(6) DS
ALITR"AIT
~ub')tituting
[\\'SERYICE SOCRCE T() Position (LOCKED)
I~TI SPARE
:,\\OR\\lU TRA.'\\SFER D.I:RTER J:\\,I:RTER SWITCH AS (3Y04) 3A(3Y01)
.\\YOIB BACKL? TO SPARE I).,*ERTER (3Y04) AS AS (3Y041 4A(W01) 4YOIB BACKL? TO SPARE I).,'ERTER (3Y04) AS BS(W04) 3B13Y02) 3Y02B BACKL? TO SPARE IXVERTER (W04) BS BS (W04)
.JB (4Y02) 4Y028 BACKL? TO SPARE J:\\,'ERTER (W04) BS C$ (3YOti) 3C (W05) 3YOSE BACKe? TO SPARE I). YERTER (WOO) CS CS OY06) 4UW05) 4YOSE BACKeP TO SPARE Th:YERTER (3Y06) CS DS(W06\\
3D (WOn 3Y07B BACKL? TO SPARE Th:YERTER (4Y06) DS DS(4Y06) 4D(.JY07) 4Y07B BACKe? TO SPARE lNYERTER 14Y(6) DS
: 1. Selects correct switch (4Y02B) and unlocks operating handle.
STANDARD:
: 2. Repositions switch 4Y02B to BACKUP TO SPARE INVERTER (4Y04) BS and re-installs lock.
: 1. Once candidate locates switch, correctly describes how to remove lock from operating handle and simulates repositioning switch CUES:
handle, confirm these operations.
: 2. When candidate correctly describes how to re-installiock on switch handle, confirm this operation.
Comment NOTE:
NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 17 Form ES-C-1 (procedure step 7.1.2.1)
STEP 2
SAT
~
__ 1. Place the Alternate Source Transfer Switch to the position UNSAT indicated in Table 2, TABLE 2 I I Wbon for Pia,..
ALITR"AIT  
~ub')tituting
[\\'SERYICE SOCRCE T() Position (LOCKED)
I~TI SPARE
:,\\OR\\lU TRA.'\\SFER D.I:RTER J:\\,I:RTER SWITCH AS (3Y04) 3A(3Y01)  
.\\YOIB BACKL? TO SPARE I).,*ERTER (3Y04) AS AS (3Y041 4A(W01) 4YOIB BACKL? TO SPARE I).,'ERTER (3Y04) AS BS(W04) 3B13Y02) 3Y02B BACKL? TO SPARE IXVERTER (W04) BS BS (W04)  
.JB (4Y02) 4Y028 BACKL? TO SPARE J:\\,'ERTER (W04) BS C$ (3YOti) 3C (W05) 3YOSE BACKe? TO SPARE I). YERTER (WOO) CS CS OY06) 4UW05) 4YOSE BACKeP TO SPARE Th:YERTER (3Y06) CS DS(W06\\
3D (WOn 3Y07B BACKL? TO SPARE Th:YERTER (4Y06) DS DS(4Y06) 4D(.JY07) 4Y07B BACKe? TO SPARE lNYERTER 14Y(6) DS
: 1. Selects correct switch (4Y02B) and unlocks operating handle.
: 1. Selects correct switch (4Y02B) and unlocks operating handle.
STANDARD: 2. Repositions switch 4Y02B to BACKUP TO SPARE INVERTER (4Y04) BS and re-installs lock.
STANDARD:
: 1. Once candidate locates switch, correctly describes how to remove lock from operating handle and simulates repositioning switch CUES:       handle, confirm these operations.
: 2. Repositions switch 4Y02B to BACKUP TO SPARE INVERTER (4Y04) BS and re-installs lock.
: 1. Once candidate locates switch, correctly describes how to remove lock from operating handle and simulates repositioning switch CUES:
handle, confirm these operations.
: 2. When candidate correctly describes how to re-installiock on switch handle, confirm this operation.
: 2. When candidate correctly describes how to re-installiock on switch handle, confirm this operation.
Comment NOTE:
Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


I Appendix C                               Page 7 of 17                                 Form ES-C-1 I DO NOT ALLOW THE BS INVERTER STEP    3                                                                                  SAT 4 DOOR TO BE OPENED                                                               UNSAT (procedure step 7.1.2.2)
I Appendix C Page 7 of 17 Form ES-C-1 I STEP 3
DO NOT ALLOW THE BS INVERTER SAT 4
DOOR TO BE OPENED UNSAT (procedure step 7.1.2.2)
: 2. Place the Sync Reference Selector Switch (SW-2) inside the applicable SPARE inverter to NORMAL (DOWN) position.
: 2. Place the Sync Reference Selector Switch (SW-2) inside the applicable SPARE inverter to NORMAL (DOWN) position.
STANDARD:
: 1. Operator identifies the B SPARE (4Y04) inverter.
: 1. Operator identifies the B SPARE (4Y04) inverter.
: 2. Simulates positioning switch SW-2 to NORMAL (DOWN) position.
: 1. When candidate identifies B SPARE (4Y04)inverter and states that the switch is inside the inverter requiring door opening to operate, CUE:
tell the operator to simulate going inside the inverter to pOSition the switch.
: 2. When SW-2 operation properly described, confirm re-positioning.
Comment DO NOT ALLOW THE BS INVERTER NOTE:
DOOR TO BE OPENED NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 17 Form ES-C-1 I STEP 3
DO NOT ALLOW THE BS INVERTER SAT 4
DOOR TO BE OPENED UNSAT (procedure step 7.1.2.2)
: 2. Place the Sync Reference Selector Switch (SW-2) inside the applicable SPARE inverter to NORMAL (DOWN) position.
STANDARD:
STANDARD:
: 1. Operator identifies the B SPARE (4Y04) inverter.
: 2. Simulates positioning switch SW-2 to NORMAL (DOWN) position.
: 2. Simulates positioning switch SW-2 to NORMAL (DOWN) position.
: 1. When candidate identifies B SPARE (4Y04)inverter and states that the switch is inside the inverter requiring door opening to operate, CUE:       tell the operator to simulate going inside the inverter to pOSition the switch.
: 1. When candidate identifies B SPARE (4Y04)inverter and states that the switch is inside the inverter requiring door opening to operate, CUE:
tell the operator to simulate going inside the inverter to pOSition the switch.
: 2. When SW-2 operation properly described, confirm re-positioning.
: 2. When SW-2 operation properly described, confirm re-positioning.
Comment DO NOT ALLOW THE BS INVERTER
Comment DO NOT ALLOW THE BS INVERTER NOTE:
* NOTE:
DOOR TO BE OPENED NUREG 1021 Rev 9 Appendix C  
DOOR TO BE OPENED
* NUREG 1021 Rev 9 Appendix C


Appendix C                               Page 8 of 17                           Form ES-C-1 (procedure step 7.1.2.3)
Appendix C Page 8 of 17 Form ES-C-1 (procedure step 7.1.2.3)
STEP   4                                                                         - - SAT
STEP 4
SAT
: 3. Verify the following at the SPARE inverter:
UNSAT
__ a. The IN SYNC light is ON.
__ b. The AL T SOURCE A V AIL light is ON.
__ c. The SYNC REFERENCE NORMAL light is ON.
STANDARD:
Determines the B SPARE (4Y04) inverter lights listed above are all ON.
CUE:
When each light properly identified, state light is ON.
Comment NOTE:
NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 17 Form ES-C-1 (procedure step 7.1.2.3)
STEP 4
SAT
: 3. Verify the following at the SPARE inverter:
: 3. Verify the following at the SPARE inverter:
__ a. The IN SYNC light is ON.                                         - - UNSAT
UNSAT
__ b. The AL T SOURCE A VAIL light is ON.
__ a. The IN SYNC light is ON.
_ _ c. The SYNC REFERENCE NORMAL light is ON.
__ b. The AL T SOURCE A V AIL light is ON.
STANDARD: Determines the B SPARE (4Y04) inverter lights listed above are all ON.
__ c. The SYNC REFERENCE NORMAL light is ON.
CUE:   When each light properly identified, state light is ON.
STANDARD:
Determines the B SPARE (4Y04) inverter lights listed above are all ON.
CUE:
When each light properly identified, state light is ON.
Comment NOTE:
Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


I Appendix C                               Page 9 of 17                               Form ES-C-1 I DO NOT ALLOW THE 4B(4Y02)
I Appendix C Page 9 of 17 Form ES-C-1 I STEP 5
STEP    5                                                                                SAT
DO NOT ALLOW THE 4B(4Y02)
          ..j INVERTER DOOR TO BE OPENED                                                     UNSAT (procedure step 7.1.2.4)
SAT  
..j INVERTER DOOR TO BE OPENED UNSAT (procedure step 7.1.2.4)
: 4. Place the Sync Reference Selector Switch (SW-2) inside the applicable INSERVICE NORMAL inverter to the EXTERNAL (UP) position
: 4. Place the Sync Reference Selector Switch (SW-2) inside the applicable INSERVICE NORMAL inverter to the EXTERNAL (UP) position
: 1. Operator identifies 48 (4Y02) inverter.
: 1. Operator identifies 48 (4Y02) inverter.
STANDARD: 2. Simulates positioning switch SW-2 to EXTERNAL (UP) position.
STANDARD:
: 1. When candidate identifies 48 (4Y02)inverter and states that the switch is inside the inverter requiring door opening to operate, tell CUE:       the operator to simulate going inside the inverter to position the switch.
: 2. Simulates positioning switch SW-2 to EXTERNAL (UP) position.
: 1. When candidate identifies 48 (4Y02)inverter and states that the switch is inside the inverter requiring door opening to operate, tell CUE:
the operator to simulate going inside the inverter to position the switch.
: 2. When SW-2 operation properly described, confirm re-positioning.
: 2. When SW-2 operation properly described, confirm re-positioning.
Comment
Comment DO NOT ALLOW THE 4B(4Y02)
* NOTE:
NOTE:
INVERTER DOOR TO BE OPENED NUREG 1021 Rev 9 Appendix C I Appendix C Page 9 of 17 Form ES-C-1 I STEP 5
DO NOT ALLOW THE 4B(4Y02)
DO NOT ALLOW THE 4B(4Y02)
INVERTER DOOR TO BE OPENED
SAT
* NUREG 1021 Rev 9 Appendix C
..j INVERTER DOOR TO BE OPENED UNSAT (procedure step 7.1.2.4)
: 4. Place the Sync Reference Selector Switch (SW-2) inside the applicable INSERVICE NORMAL inverter to the EXTERNAL (UP) position
: 1. Operator identifies 48 (4Y02) inverter.
STANDARD:
: 2. Simulates positioning switch SW-2 to EXTERNAL (UP) position.
: 1. When candidate identifies 48 (4Y02)inverter and states that the switch is inside the inverter requiring door opening to operate, tell CUE:
the operator to simulate going inside the inverter to position the switch.
: 2. When SW-2 operation properly described, confirm re-positioning.
Comment DO NOT ALLOW THE 4B(4Y02)
NOTE:
INVERTER DOOR TO BE OPENED NUREG 1021 Rev 9 Appendix C  


Appendix C                               Page 10 of 17                           Form ES-C-1 (procedure step 7.1.2.5)
Appendix C Page 10 of 17 Form ES-C-1 (procedure step 7.1.2.5)
*                                                                                  - - SAT STEP   6
STEP 6
SAT
: 5. Verify the following at the INSERVICE NORMAL inverter:
UNSAT
__ a. The IN SYNC Light is ON.
__ b. The SYNC REFERENCE EXTERNAL light is ON.
STANDARD:
Determines the 48 (4Y02)inverter lights listed above are all ON.
CUE:
When each light properly identified, state light is ON.
Comment:
NOTE:
NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 17 Form ES-C-1 (procedure step 7.1.2.5)
STEP 6
SAT
: 5. Verify the following at the INSERVICE NORMAL inverter:
: 5. Verify the following at the INSERVICE NORMAL inverter:
__ a. The IN SYNC Light is ON.                                         - - UNSAT
UNSAT
__ a. The IN SYNC Light is ON.
__ b. The SYNC REFERENCE EXTERNAL light is ON.
__ b. The SYNC REFERENCE EXTERNAL light is ON.
STANDARD: Determines the 48 (4Y02)inverter lights listed above are all ON.
STANDARD:
CUE:   When each light properly identified, state light is ON.
Determines the 48 (4Y02)inverter lights listed above are all ON.
CUE:
When each light properly identified, state light is ON.
Comment:
Comment:
NOTE:
NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


  , Appendix C                                   Page 11 of 17                             Form ES-C-1 (procedure step 7.1.2.6)
, Appendix C Page 11 of 17 Form ES-C-1 (procedure step 7.1.2.6)
STEP     7                                                                               - - SAT
STEP 7
          ..J __ 6. Using Table 3, determine which Instrument AC Selector Switch should be used AND record:                                             - - UNSAT TABLE 3 For Plart When Substitutiug ~SER\'ICE                     ToSt1'PLY
SAT  
                                                    ~STRnlL'\"I AC               I:\TTIALS SPARE I:\T£RTIR     :-;OR.'L.u.                   Posltion SELECTOR S"TICH I:\YERTER AS (3Y04)       3A(3YOJ)           3P07A     AC LI:\1:
..J
AS OY(4)       4A(-lYOl)         4P07A     AC u:-.1:
__ 6. Using Table 3, determine which Instrument AC Selector Switch should be used AND record:
BS (4Y04)       3B (3YO~)         3P08A     AC u:-.1:
UNSAT TABLE 3 For Plart When Substitutiug  
BS (4Y04)       4B 14Y02,         4POSA     ACLDo1:
~SER\\'ICE  
CS (3Y06)
~STRnlL'\\"I AC ToSt1'PLY I:\\TTIALS SPARE I:\\T£RTIR
OY06)       3C (3Y')5)         3P06A     AC ID1:
:-;OR.'L.u.
(W06)
SELECTOR S"TICH Posltion I:\\YERTER AS (3Y04) 3A(3YOJ) 3P07A AC LI:\\1:
CS (W061        4C  (WO))
AS OY(4) 4A(-lYOl) 4P07A AC u:-.1:
4C(-tYO))         4POM       AC u:-.1:
BS (4Y04) 3B (3YO~)
D<; i4'{(6)     3D (3Y07)         3P09A     AC ID1:
3P08A AC u:-.1:
DS (~Y06)       4D (4YO!)         4P09A     ACLI:\1:
BS (4Y04) 4B 14Y02, 4POSA ACLDo1:
STANDARD: Using Table 3, identifies 4P08A as the correct Selector Switch to use.
CS OY06) 3C (3Y')5) 3P06A AC ID1:
CUE:   N/A Comment
CS (W06) 4C(-tYO))
* NOTE:
4POM AC u:-.1:
* NUREG 1021 Rev 9 Appendix C
D<; i4'{(6) 3D (3Y07) 3P09A AC ID1:
DS (~Y06) 4D (4YO!)
4P09A ACLI:\\1:
STANDARD:
Using Table 3, identifies 4P08A as the correct Selector Switch to use.
CUE:
N/A Comment NOTE:
NUREG 1021 Rev 9 Appendix C
, Appendix C Page 11 of 17 Form ES-C-1 (procedure step 7.1.2.6)
STEP 7
SAT
..J
__ 6. Using Table 3, determine which Instrument AC Selector Switch should be used AND record:
UNSAT TABLE 3 For Plart When Substitutiug
~SER\\'ICE
~STRnlL'\\"I AC ToSt1'PLY I:\\TTIALS SPARE I:\\T&#xa3;RTIR
:-;OR.'L.u.
SELECTOR S"TICH Posltion I:\\YERTER AS (3Y04) 3A(3YOJ) 3P07A AC LI:\\1:
AS OY(4) 4A(-lYOl) 4P07A AC u:-.1:
BS (4Y04) 3B (3YO~)
3P08A AC u:-.1:
BS (4Y04) 4B 14Y02, 4POSA ACLDo1:
CS (3Y06) 3C (3Y')5) 3P06A AC ID1:
CS (W061 4C (WO))
4POM AC u:-.1:
D<; i4'{(6) 3D (3Y07) 3P09A AC ID1:
DS (~Y06) 4D (4YO!)
4P09A ACLI:\\1:
STANDARD:
Using Table 3, identifies 4P08A as the correct Selector Switch to use.
CUE:
N/A Comment NOTE:
NUREG 1021 Rev 9 Appendix C  


Appendix C                             Page 12 of 17                             Form ES-C-1 (procedure step 7.1.2. 7.a)
Appendix C Page 12 of 17 Form ES-C-1 STEP 8
*                                                                                    - - SAT STEP   8
(procedure step 7.1.2. 7.a)
SAT
: 7. Perform the following steps at the appropriate Instrument AC Selector Switch panel in the Cable Spreading Room:
UNSAT
__ a. Verify that the Alternate Power Available light is ON.
STANDARD:
Verifies 4P08A alternate power available light ON CUE:
When 4P08A alternate power available light correctly identified, tell candidate that light is ON.
Comment NOTE:
NUREG 1021 Rev 9 Appendix C Appendix C Page 12 of 17 Form ES-C-1 STEP 8
(procedure step 7.1.2. 7.a)
SAT
: 7. Perform the following steps at the appropriate Instrument AC Selector Switch panel in the Cable Spreading Room:
: 7. Perform the following steps at the appropriate Instrument AC Selector Switch panel in the Cable Spreading Room:
                                                                                    - - UNSAT
UNSAT
_ _ a. Verify that the Alternate Power Available light is ON.
__ a. Verify that the Alternate Power Available light is ON.
Verifies 4P08A alternate power available light ON STANDARD:
STANDARD:
CUE:    When 4P08A alternate power available light correctly identified, tell candidate that light is ON.
Verifies 4P08A alternate power available light ON CUE:
When 4P08A alternate power available light correctly identified, tell candidate that light is ON.
Comment NOTE:
Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


I Appendix C                             Page 13 of 17                                 Form ES-C-1 I (procedure step 7.1.2. 7.b)
I Appendix C Page 13 of 17 Form ES-C-1 I STEP 9
*                                                                                        - - SAT STEP    9
(procedure step 7.1.2. 7.b)
SAT
: b. Test the Sync Verification Light as follows:
: b. Test the Sync Verification Light as follows:
_ _ (1) Position the Sync Switch to SYNCH LAMP TEST.
__ (1) Position the Sync Switch to SYNCH LAMP TEST.
                                                                                          - - UNSAT
UNSAT
_ _ (2) Verify lamp comes ON.
__ (2) Verify lamp comes ON.
STANDARD:
: 1. Positions 4P08A SYNC switch to SYNCH LAMP TEST.
: 1. Positions 4P08A SYNC switch to SYNCH LAMP TEST.
: 2. Verifies 4P08A SYNC Verification Light ON.
: 1. When SYNC switch identified and operation correctly described, CUE:
confirm switch manipulation.
: 2. When Sync Verification Light correctly identified, tell candidate light is ON.
Comment NOTE:
NUREG 1021 Rev 9 Appendix C I Appendix C Page 13 of 17 Form ES-C-1 I STEP 9
(procedure step 7.1.2. 7.b)
SAT
: b. Test the Sync Verification Light as follows:
__ (1) Position the Sync Switch to SYNCH LAMP TEST.
UNSAT
__ (2) Verify lamp comes ON.
STANDARD:
STANDARD:
: 1. Positions 4P08A SYNC switch to SYNCH LAMP TEST.
: 2. Verifies 4P08A SYNC Verification Light ON.
: 2. Verifies 4P08A SYNC Verification Light ON.
: 1. When SYNC switch identified and operation correctly described, confirm switch manipulation.
: 1. When SYNC switch identified and operation correctly described, CUE:
CUE:
confirm switch manipulation.
: 2. When Sync Verification Light correctly identified, tell candidate light is ON.
: 2. When Sync Verification Light correctly identified, tell candidate light is ON.
Comment NOTE:
Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


Appendix C                                 Page 14 of 17                                           Form ES-C-1 (procedure step 7.1.2. 7.c)
Appendix C Page 14 of 17 Form ES-C-1 (procedure step 7.1.2. 7.c)
STEP   10                                                                                           - - SAT NOTE In the following Substeps 7.1.2. 7.c. (1) and 7.1.2. 7.c. (2) the bright light will go   - - UNSAT OFF, but a slight glow is expected. This is acceptable.
STEP 10 SAT NOTE In the following Substeps 7.1.2. 7.c. (1) and 7.1.2. 7.c. (2) the bright light will go UNSAT OFF, but a slight glow is expected. This is acceptable.
: c. Perform a synch check as follows:
__ (1) Position the Sync Switch to SYNCH CHECK PUSH.
__ (2) Depress and hold the Sync Switch.
__ (3) Verify that the Sync Verification Light stays OFF.
: 1.
Positions 4P08A SYNC Switch to SYNCH CHECK PUSH.
STANDARD:
: 2.
Depresses & holds 4P08A SYNC Switch.
: 3.
Verifies 4P08A Sync Verification Ught stays OFF.
: 4.
Releases 4P08A SYNC Switch.
: 1. When SYNC switch identified and operation correctly described, CUE:
confirm switch manipulations.
: 2. When Sync Verification Ught correctly identified, tell candidate light is OFF.
Comment NOTE NOTE:
In the following Substeps 7. 1.2.7. c. (1) and 7. 1.2.7. c. (2) the bright light will go OFF, but a slight glow is expected. This is acceptable.
NUREG 1021 Rev 9 Appendix C Appendix C Page 14 of 17 Form ES-C-1 (procedure step 7.1.2. 7.c)
STEP 10 SAT NOTE In the following Substeps 7.1.2. 7.c. (1) and 7.1.2. 7.c. (2) the bright light will go UNSAT OFF, but a slight glow is expected. This is acceptable.
: c. Perform a synch check as follows:
: c. Perform a synch check as follows:
__ (1) Position the Sync Switch to SYNCH CHECK PUSH.
__ (1) Position the Sync Switch to SYNCH CHECK PUSH.
_ _ (2) Depress and hold the Sync Switch.
__ (2) Depress and hold the Sync Switch.
_ _ (3) Verify that the Sync Verification Light stays OFF.
__ (3) Verify that the Sync Verification Light stays OFF.
: 1. Positions 4P08A SYNC Switch to SYNCH CHECK PUSH.
: 1.
: 2. Depresses & holds 4P08A SYNC Switch.
Positions 4P08A SYNC Switch to SYNCH CHECK PUSH.
STANDARD:
STANDARD:
: 3. Verifies 4P08A Sync Verification Ught stays OFF.
: 2.
: 4. Releases 4P08A SYNC Switch.
Depresses & holds 4P08A SYNC Switch.
: 1. When SYNC switch identified and operation correctly described, confirm switch manipulations.
: 3.
CUE:
Verifies 4P08A Sync Verification Ught stays OFF.
: 4.
Releases 4P08A SYNC Switch.
: 1. When SYNC switch identified and operation correctly described, CUE:
confirm switch manipulations.
: 2. When Sync Verification Ught correctly identified, tell candidate light is OFF.
: 2. When Sync Verification Ught correctly identified, tell candidate light is OFF.
* Comment NOTE:
Comment NOTE NOTE:
NOTE In the following Substeps 7. 1.2.7. c. (1) and 7. 1.2.7. c. (2) the bright light will go OFF, but a slight glow is expected. This is acceptable.
In the following Substeps 7. 1.2.7. c. (1) and 7. 1.2.7. c. (2) the bright light will go OFF, but a slight glow is expected. This is acceptable.
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


I Appendix C                                           Page 15 of 17                                     Form ES-C-1
I Appendix C Page 15 of 17 Form ES-C-1
_ _ d. Place the Instrument AC Selector Switch to the position
__ d. Place the Instrument AC Selector Switch to the position STEP 11 indicated in Table 3.
*                                                                                                           - - SAT STEP   11   indicated in Table 3.
SAT
            ~                                               NOTE Initials should be entered for the applicable inverter. NIA should be entered               - - UNSAT for all others.
~
NOTE Initials should be entered for the applicable inverter. NIA should be entered UNSAT for all others.
TABLE.'
For Place Wb~n Sub,tituting I~SERYICE
[\\,STRc\\!E~T AC To st'PPLY L'"ITLUS SPARE I!'-TERTER
:-;OR\\L\\L SELE( TOR SWITCH Po,ition L"\\"ERTER AS '3Y041 3A(3YC]1 3PO-";
ACrn.:E AS f3Y(4) 4.40 (':'Y01)
~P07A
.4.(' Ln,:::
:as (4Yi}~)
38 {3Y02\\
3P83A ACrn,:::
3-'3 (*P{IJ"':}
4B (4"i")J~l "P~SA ACrn,:::
CS (:Y'OC:
3C (;::05')
3Pc'6A ACLn,""E CS (3\\1J&#xa2;\\
4C (4\\1:5)
"])06A AC Ln'::::
DS (4YO~)
3D ~3YO')
3P09A AC lJ}.;E DS (4YOo)
"D ("YO:',
4P09A AC lJ}.;:::
STANDARD:
: 1.
Selects correct switch (4P08A).
: 2.
Positions 4P08A Instrument AC Selector Switch to AC LINE.
CUE:
When 4P08A Instrument AC Selector Switch identified and operation correctly described, confirm switch manipulation.
Comment NOTE NOTE:
Initials should be entered for the applicable inverter. NIA should be entered for all others.
Tell candidate that another operator will continue with step 7. 1.2.8 Terminating The task is complete when the Examinee returns the cue sheet to the STOP Cue:
examiner.
NUREG 1021 Rev 9 Appendix C I Appendix C Page 15 of 17 Form ES-C-1
__ d. Place the Instrument AC Selector Switch to the position STEP 11 indicated in Table 3.
SAT
~
NOTE Initials should be entered for the applicable inverter. NIA should be entered UNSAT for all others.
TABLE.'
TABLE.'
For               Place Wb~n Sub,tituting I~SERYICE                             To st'PPLY
For Place Wb~n Sub,tituting I~SERYICE
[\,STRc\!E~T AC                     L'"ITLUS SPARE I!'-TERTER     :-;OR\L\L                             Po,ition SELE( TOR SWITCH L"\"ERTER A5(31"04)
[\\,STRc\\!E~T AC To st'PPLY L'"ITLUS SPARE I!'-TERTER
AS  '3Y041      3A(3YC]1 3A  t3YC] 1         3PO-";         ACrn.:E AS f3Y(4)       4.40 (':'Y01)         ~P07A           .4.(' Ln,:::
:-;OR\\L\\L SELE( TOR SWITCH Po,ition L"\\"ERTER A5(31"04) 3A t3YC] 1 3PO-";
:as (4Yi}~)     38 {3Y02\             3P83A           ACrn,:::
ACrn.:E AS f3Y(4) 4.40 (':'Y01)  
3-'3 (*P{IJ"':} 4B (4"i")J~l         "P~SA           ACrn,:::
~P07A  
CS (:Y'OC:       3C (;::05')           3Pc'6A         ACLn,""E CS (3\1J&#xa2;\       4C (4\1:5)           "])06A         AC Ln'::::
.4.(' Ln,:::
DS (4YO~)            ~3YO')
:as (4Yi}~)
3D (3YO')             3P09A           AC lJ}.;E DS (4YOo)       "D ("YO:',           4P09A           AC lJ}.;:::
38 {3Y02\\
: 1. Selects correct switch (4P08A).
3P83A ACrn,:::
3-'3 (*P{IJ"':}
4B (4"i")J~l "P~SA ACrn,:::
CS (:Y'OC:
3C (;::05')
3Pc'6A ACLn,""E CS (3\\1J&#xa2;\\
4C (4\\1:5)  
"])06A AC Ln'::::
DS (4YO~)
3D (3YO')
3P09A AC lJ}.;E DS (4YOo)  
"D ("YO:',
4P09A AC lJ}.;:::
STANDARD:
STANDARD:
: 2. Positions 4P08A Instrument AC Selector Switch to AC LINE.
: 1.
CUE:     When 4P08A Instrument AC Selector Switch identified and operation correctly described, confirm switch manipulation.
Selects correct switch (4P08A).
Comment NOTE Initials should be entered for the applicable inverter. NIA should be entered NOTE:    for all others.
: 2.
Tell candidate that another operator    op_erator will continue with step 7. 1.2.8 Terminating The task is complete when the Examinee returns the cue sheet to the STOP Cue:   examiner.
Positions 4P08A Instrument AC Selector Switch to AC LINE.
* NUREG 1021 Rev 9 Appendix C
CUE:
When 4P08A Instrument AC Selector Switch identified and operation correctly described, confirm switch manipulation.
Comment NOTE NOTE:
Initials should be entered for the applicable inverter. NIA should be entered for all others.
Tell candidate that another op_erator will continue with step 7. 1.2.8 Terminating The task is complete when the Examinee returns the cue sheet to the STOP Cue:
examiner.
NUREG 1021 Rev 9 Appendix C  
 
Appendix C Page 16 of 17 Form ES-C-1 Verification of Completion Job Performance Measure No.
NRC-25-IP-JPM-K Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:


Appendix C                                   Page 16 of 17                 Form ES-C-1 Verification of Completion
===Response===
* Job Performance Measure No.
Result:
Examinee's Name:
Satisfactory/Unsatisfactory Examiner's signature and date: _________________ _
NRC-25-IP-JPM-K Examiner's Name:
NUREG 1021 Rev 9 Appendix C Appendix C Page 16 of 17 Form ES-C-1 Verification of Completion Job Performance Measure No.
NRC-25-IP-JPM-K Examinee's Name:
Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 543: Line 1,148:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:  


===Response===
===Response===
Result:   Satisfactory/Unsatisfactory
Result:
* Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Satisfactory/Unsatisfactory Examiner's signature and date: _________________ _
NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


JPM BRIEFING SHEET
JPM BRIEFING SHEET THIS IS A SIMULATED PLANT JPM. DO NOT OPERATE ANY PLANT EQUIPMENT.
* THIS IS A SIMULATED PLANT JPM. DO NOT OPERATE ANY PLANT EQUIPMENT.
Initial Conditions:
: 1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY.
: 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
!NITIA TlNG CUE:
In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 4B (4Y02) Inverter to the B SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET THIS IS A SIMULATED PLANT JPM. DO NOT OPERATE ANY PLANT EQUIPMENT.
Initial Conditions:
Initial Conditions:
: 1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY.
: 1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY.
: 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
: 2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.  
  !NITIA TlNG CUE:
!NITIA TlNG CUE:
In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 4B (4Y02) Inverter to the B SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1.
In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 4B (4Y02) Inverter to the B SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


Appendix C                                         Job Performance Measure                             Form ES-C-1 Worksheet
Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:
* Facility:               _T_ur_k_e-"-y_P_o_in_t
_T_ur_k_e-"-y_P_o_in_t _____ Task No:
__                    _ _ _ _ _Task No:
Respond to Turbine Runback, Rods Fail to NRC SIM-1PM-A Task
T-ur-k-e-L-y-P-o-in-t-:------Task Respond to Turbine Runback, Rods Fail to                                   NRC   Task


==Title:==
==Title:==
Insert                           JPM No:             SIM-1PM-A 045 K4.12 Automatic turbine runback 3.3/3.6 KIA  
Insert JPM No:
045 K4.12 Automatic turbine runback 3.3/3.6 KIA  


==Reference:==
==Reference:==
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance Actual Performance X
Classroom SimulatorX Plant -------------
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Unit 3 is operating at 60% power and stable Unit 3 is preparing to return to 100% power.
** No equipment is out of service.
Task Standard:
3-0NOP-089, Turbine Runback actions have been performed correctly.
Tavgrrref within 4&deg;F in accordance with 0-ONOP-089, Turbine Runback (Match Tavg-Tref), 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage (Tavg-Tref within 4&deg; F during a transient)
Required Materials:
0-ONOP-089, Turbine Runback 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage General
==References:==
0-ADM-211, Emergency and Off-Normal Operating Procedure Usage 0-ONOP-089, Turbine Runback NUREG 1021 Rev 9 Appendix C Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:
__ T-ur-k-e-L-y-P-o-in-t-:------Task No:
Respond to Turbine Runback, Rods Fail to NRC SIM-1PM-A Task


==Title:==
Insert JPM No:
045 K4.12 Automatic turbine runback 3.3/3.6 KIA
==Reference:==
Examinee:
Examinee:
                            -------------------NRC Examiner:
NRC Examiner:
Facility Evaluator:                                       Date:
Facility Evaluator:
Date:
Method of testing:
Method of testing:
Simulated Performance
Simulated Performance Actual Performance x
                                    -------------------      Actual Performance xX Classroom                                           SimulatorX         Plant------------
Classroom SimulatorX Plant ------------
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
* Unit 3 is operating at 60% power and stable
Unit 3 is operating at 60% power and stable Unit 3 is preparing to return to 100% power.  
* Unit 3 is preparing to return to 100% power.
** No equipment is out of service.
*
* No equipment is out of service.
Task Standard:
Task Standard:
* 3-0NOP-089, Turbine Runback actions have been performed correctly.
3-0NOP-089, Turbine Runback actions have been performed correctly.
* Tavgrrref within 4&deg;F in accordance with 0-ONOP-089, Turbine Runback (Match Tavg-Tref), 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage (Tavg-Tref within 4&deg; F during a transient)
Tavgrrref within 4&deg;F in accordance with 0-ONOP-089, Turbine Runback (Match Tavg-Tref), 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage (Tavg-Tref within 4&deg; F during a transient)
Required Materials:
Required Materials:
* 0-ONOP-089, Turbine Runback
0-ONOP-089, Turbine Runback 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage General  
* 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage General  


==References:==
==References:==
* 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage
0-ADM-211, Emergency and Off-Normal Operating Procedure Usage 0-ONOP-089, Turbine Runback NUREG 1021 Rev 9 Appendix C  
* 0-ONOP-089, Turbine Runback
* NUREG 1021 Rev 9 Appendix C


Appendix C                                 Page 2 of 12                     Form ES-C-1 Initiating Cue:
Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
* You have been directed to Respond to Plant Conditions
You have been directed to Respond to Plant Conditions Time Critical Task: No Validation Time:
* Time Critical Task: No Validation Time Time:: 10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT         A T THIS TIMEI TIMEt
10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEt NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
* NUREG 1021 Rev 9 Appendix C
You have been directed to Respond to Plant Conditions Time Critical Task: No Validation Time:
10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEI NUREG 1021 Rev 9 Appendix C  


  ~ppendix C                                 Page 3 of 12                           Form ES-C-1!
~ppendix C Page 3 of 12 Form ES-C-1!
SIMULATOR SETUP Reset to IC #
SIMULATOR SETUP Reset to IC #
* 16 Instructor Facility Operator Actions
16 Instructor Facility Operator Actions
: 1. Verify Reset to IC 24
: 1. Verify Reset to IC 24
: 2. Schema>> Reactor>> Rod Control/Rod Position>> SC408 Rod Motion Failures & Controls>>
: 2. Schema>> Reactor>> Rod Control/Rod Position>> SC408 Rod Motion Failures & Controls>>
Line 614: Line 1,249:


==SUMMARY==
==SUMMARY==
>> PENDING>> Right click on TVFABP1 B >> TRIGGER
>> PENDING>> Right click on TVFABP1 B >> TRIGGER NUREG 1021 Rev 9 Appendix C
* NUREG 1021 Rev 9 Appendix C
~ppendix C Page 3 of 12 Form ES-C-1!
SIMULATOR SETUP Reset to IC #
16 Instructor Facility Operator Actions
: 1. Verify Reset to IC 24
: 2. Schema>> Reactor>> Rod Control/Rod Position>> SC408 Rod Motion Failures & Controls>>
TFL 10101:L 1-SC408 Rods Fail to Move Auto>> TRUE>> INSERT
: 3. Verify RED SQUARE framing SC408.
: 4. Schema>> Feedwater >> FIW Main>> Condensate Polishing Demineralizers >> Feedwater Pumps>>
3P1B (B Feedwater Pump) >>TVFABP1B:FA-3P1B Bearing>> Selected 1.0>> Pending>> Verify ORANGE SQUARE framing 3P1 B.
Ensure Simulator Operator Checklist is complete Instructor Facility Operator Actions (Cont)
: 5. Go to RUN.
: 6. Go to
 
==SUMMARY==
>> PENDING>> Right click on TVFABP1 B >> TRIGGER NUREG 1021 Rev 9 Appendix C  


Appendix C                               Page 4 of 12                             Form ES-C-1 Denote critical steps with a check mark.O Start Time Recognition by Operator that Turbine Runback is occurring.
Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time ----
STEP    1                                                                       - -SAT
STEP 1
                                                                                    - -UNSAT Standard: Operator recognizes the Turbine Runback and identifies the need to respond in accordance with 3-0NOP-089, Turbine Runback.
Recognition by Operator that Turbine Runback is occurring.
Cue   Provided by Simulator response.
SAT UNSAT Standard:
Comment NOTE:   Operator may identify that 38 Feedwater Pump is degrading and trip the 38 Feedwater Pump .
Operator recognizes the Turbine Runback and identifies the need to respond in accordance with 3-0NOP-089, Turbine Runback.
* NUREG 1021 Rev 9 Appendix C
Cue Provided by Simulator response.
Comment NOTE:
Operator may identify that 38 Feedwater Pump is degrading and trip the 38 Feedwater Pump.
NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time ----
STEP 1
Recognition by Operator that Turbine Runback is occurring.
SAT UNSAT Standard:
Operator recognizes the Turbine Runback and identifies the need to respond in accordance with 3-0NOP-089, Turbine Runback.
Cue Provided by Simulator response.
Comment NOTE:
Operator may identify that 38 Feedwater Pump is degrading and trip the 38 Feedwater Pump.
NUREG 1021 Rev 9 Appendix C  


  ~ppendiX C                                   Page 5 of 12                                 Form ES-C-1!
~ppendiX C Page 5 of 12 Form ES-C-1!
* STEP     2
STEP 2
          ~
14.0 IMMEDIATE OPERA TOR ACTIONS SAT
              ~.O IMMEDIATE OPERA TOR ACTIONS 14.0 4.1 Verify the automatic actions listed in Section 3.0 are functioning to
~
              ~tabilize and maintain plant conditions, or assume manual control.
UNSAT 4.1 Verify the automatic actions listed in Section 3.0 are functioning to --
iStabilize
iStabilize and maintain plant conditions, or assume manual control.
                                                                                          - -SAT
Standard:
                                                                                          - -UNSAT Standard: Used 3-0NOP-089, Turbine Runback to verify Immediate Operator
Used 3-0NOP-089, Turbine Runback to verify Immediate Operator
              ~ctions have been completed.
~ctions have been completed.
Cue
: 1. Provided by Simulator response.
~. Terminate JPM after Operator matches Tavg-Trefwithin 4&deg; F.
Comment Operator may choose at any time to address the lack of Control Rod
'nsertion and take manual action in accordance with Elements 6, 7, and
: 8.
NOTE:
Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
NUREG 1021 Rev 9 Appendix C
~ppendiX C Page 5 of 12 Form ES-C-1!
STEP 2
~.O IMMEDIATE OPERA TOR ACTIONS SAT  
~
UNSAT 4.1 Verify the automatic actions listed in Section 3.0 are functioning to --
~tabilize and maintain plant conditions, or assume manual control.
Standard:
Used 3-0NOP-089, Turbine Runback to verify Immediate Operator  
~ctions have been completed.
Cue
: 1. Provided by Simulator response.
: 1. Provided by Simulator response.
Cue
              ~.
: 2. Terminate JPM after Operator matches Tavg-Trefwithin 4&deg; F.
: 2. Terminate JPM after Operator matches Tavg-Trefwithin 4&deg; F.
Comment Operator may choose at any time to address the lack of Control Rod
Comment Operator may choose at any time to address the lack of Control Rod  
              'nsertion and take manual action in accordance with Elements 6, 7, and 8.
'nsertion and take manual action in accordance with Elements 6, 7, and
NOTE:   Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
: 8.
* Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
NOTE:
* NUREG 1021 Rev 9 Appendix C
Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
NUREG 1021 Rev 9 Appendix C  


Appendix C                                 Page 6 of 12                             Form ES-C-1
Appendix C Page 6 of 12 Form ES-C-1 3.1 Main Turbine Control Valves and the Reheat Intercept Valves STEP 3
* 3.1 Main Turbine Control Valves and the Reheat Intercept Valves STEP   3 Imodulate closed upon receipt of a runback signal from the Generator   - -SAT lGovernor/Speed povernorlSpeed Changer.
Imodulate closed upon receipt of a runback signal from the Generator SAT lGovernor/Speed Changer.
                                                                                      - -UNSAT Standard:
UNSAT Standard:
IV erified Main Turbine Control Valves and the Reheat Intercept Valves Imodulate closed Cue     Provided by Simulator response.
IV erified Main Turbine Control Valves and the Reheat Intercept Valves Imodulate closed Cue Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod
Comment Operator may choose at any time to address the lack of Control Rod  
* NOTE:
'nsertion and take manual action in accordance with Elements 6,7, and
                'nsertion and take manual action in accordance with Elements 6,7, and 8.
: 8.
NOTE:
Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 3.1 Main Turbine Control Valves and the Reheat Intercept Valves STEP 3
Imodulate closed upon receipt of a runback signal from the Generator SAT povernorlSpeed Changer.
UNSAT Standard:
IV erified Main Turbine Control Valves and the Reheat Intercept Valves Imodulate closed Cue Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod
'nsertion and take manual action in accordance with Elements 6,7, and
: 8.
NOTE:
Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


IAppendix C                                 Page 7 of 12                               Form ES-C-11 3.2 Steam Dump Valves ann and open to relieve excess steam to the STEP     4 1C0ndenser condenser due to the load rejection and subsequent Tavg/Tref           - -SAT
IAppendix C Page 7 of 12 Form ES-C-11 3.2 Steam Dump Valves ann and open to relieve excess steam to the STEP 4
* Standard:
1C0ndenser due to the load rejection and subsequent Tavg/Tref SAT Imismatch.
Imismatch.
UNSAT Standard:
mismatch.
lVerified Steam Dump Valves are armed and opened if needed.
lVerified Verified Steam Dump Valves are armed and opened if needed.
Cue Provided by Simulator response.
                                                                                        - -UNSAT Cue   Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod
Comment Operator may choose at any time to address the lack of Control Rod
'nsertion and take manual action in accordance with Elements 6, 7, and
                'nsertion and take manual action in accordance with Elements 6, 7, and
: 8.
                !insertion 8.
NOTE:
NOTE:   Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.
Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the Isubsequent subsequent actions after verifying Automatic Actions w/3-0NOP-089.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C IAppendix C Page 7 of 12 Form ES-C-11 3.2 Steam Dump Valves ann and open to relieve excess steam to the STEP 4
condenser due to the load rejection and subsequent Tavg/Tref SAT mismatch.
UNSAT Standard:
Verified Steam Dump Valves are armed and opened if needed.
Cue Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod  
!insertion and take manual action in accordance with Elements 6, 7, and
: 8.
NOTE:
Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the Isubsequent actions after verifying Automatic Actions w/3-0NOP-089.
NUREG 1021 Rev 9 Appendix C  


Appendix C                                 Page 8 of 12                               Form ES-C-1 G.3 3.3 Automatic Rod Insertion Control adjusts core reactivity to match STEP   5   Tavg with Tref.
Appendix C Page 8 of 12 Form ES-C-1 G.3 Automatic Rod Insertion Control adjusts core reactivity to match STEP 5
iTavg                                                                  - -SAT
iTavg with Tref.
* Standard: Operator recognizes that Control Rods did not insert as required and
SAT UNSAT Standard:
                                                                                      - -UNSAT inserts Control Rods to match Tavg within 4 degrees F.
Operator recognizes that Control Rods did not insert as required and inserts Control Rods to match Tavg within 4 degrees F.
Cue     Provided by Simulator response.
Cue Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod iinsertion and take manual action in accordance with Elements 6, 7, and linsertion a.
Comment Operator may choose at any time to address the lack of Control Rod linsertion and take manual action in accordance with Elements 6, 7, and
NOTE:   Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
: a.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOp-Oa9 .
NOTE:
* NUREG 1021 Rev 9 Appendix C
Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOp-Oa9.
NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 3.3 Automatic Rod Insertion Control adjusts core reactivity to match STEP 5
Tavg with Tref.
SAT UNSAT Standard:
Operator recognizes that Control Rods did not insert as required and inserts Control Rods to match Tavg within 4 degrees F.
Cue Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod iinsertion and take manual action in accordance with Elements 6, 7, and
: a.
NOTE:
Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOp-Oa9.
NUREG 1021 Rev 9 Appendix C  


IAppendiX C                                 Page 9 of 12                               Form ES-C-11 Operator places Rod Control Selector Switch to MANUAL.
IAppendiX C Page 9 of 12 Form ES-C-11 STEP 6
STEP   6                                                                             SAT
Operator places Rod Control Selector Switch to MANUAL.
            ..j                                                                               UNS AT Standard: Operator placed Rod Control Selector Switch to MANUAL.
SAT
Cue     Provided by Simulator response.
..j UNS AT Standard:
Comment Operator may choose at any time to address the lack of Control Rod
Operator placed Rod Control Selector Switch to MANUAL.
                  *nsertion and take manual action in accordance with Elements 6, 7, and iinsertion 8.
Cue Provided by Simulator response.
NOTE:     Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Comment Operator may choose at any time to address the lack of Control Rod iinsertion and take manual action in accordance with Elements 6, 7, and
: 8.
NOTE:
Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
NUREG 1021 Rev 9 Appendix C IAppendiX C Page 9 of 12 Form ES-C-11 STEP 6
Operator places Rod Control Selector Switch to MANUAL.
SAT  
..j UNS AT Standard:
Operator placed Rod Control Selector Switch to MANUAL.
Cue Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod  
*nsertion and take manual action in accordance with Elements 6, 7, and
: 8.
NOTE:
Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


Appendix C                                 Page 10 of 12                               Form ES-C-1 Insertion Control Rods to adjusts core reactivity to match Tavg with STEP   7   Tref.
Appendix C Page 10 of 12 Form ES-C-1 Insertion Control Rods to adjusts core reactivity to match Tavg with STEP 7
iTref.                                                                 - -SAT
iTref.
*          ..j Standard:
SAT  
Operator places IN-HOLD-OUT Switch to IN to insert Control Rods to match Tavg with Tref within 4 [] F.
..j UNSAT Operator places IN-HOLD-OUT Switch to IN to insert Control Rods to Standard:
                                                                                        - -UNSAT Cue     Provided by Simulator response.
match Tavg with Tref within 4 [] F.
Comment Operator may choose at any time to address the lack of Control Rod
Cue Provided by Simulator response.
                'nsertion and take manual action in accordance with Elements 6, 7, and 8.
Comment Operator may choose at any time to address the lack of Control Rod  
NOTE:     Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
'nsertion and take manual action in accordance with Elements 6, 7, and
: 8.
NOTE:
Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 Insertion Control Rods to adjusts core reactivity to match Tavg with STEP 7
Tref.
SAT
..j UNSAT Operator places IN-HOLD-OUT Switch to IN to insert Control Rods to Standard:
match Tavg with Tref within 4 [] F.
Cue Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod
'nsertion and take manual action in accordance with Elements 6, 7, and
: 8.
NOTE:
Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
NUREG 1021 Rev 9 Appendix C  


  !Appendix C                                 Page 11 of 12                             Form ES-C-11 Tavg and Tref are matched.
!Appendix C Page 11 of 12 Form ES-C-11 STEP 8
:ravg STEP    8                                                                         - -SAT
:ravg and Tref are matched.
*            ~
SAT
Standard:
~
UNS AT n-avg Tavg and Tref are within 4&deg;F.
UNS AT Standard:
Cue     Provided by Simulator response.
n-avg and Tref are within 4&deg;F.
Comment Operator may choose at any time to address the lack of Control Rod "nsertion and take manual action in accordance with Elements 6, 7, and iinsertion 8.
Cue Provided by Simulator response.
NOTE:     Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Comment Operator may choose at any time to address the lack of Control Rod iinsertion and take manual action in accordance with Elements 6, 7, and
Inserting rods to match Tavg and Tref may be delayed until the
: 8.
                !Subsequent
NOTE:
                !subsequent actions after verifying Automatic Actions w/3-0NOP-089.
Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
* NUREG 1021 Rev 9 Appendix C
Inserting rods to match Tavg and Tref may be delayed until the
!subsequent actions after verifying Automatic Actions w/3-0NOP-089.
NUREG 1021 Rev 9 Appendix C
!Appendix C Page 11 of 12 Form ES-C-11 STEP 8
Tavg and Tref are matched.
SAT  
~
UNS AT Standard:
Tavg and Tref are within 4&deg;F.
Cue Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod "nsertion and take manual action in accordance with Elements 6, 7, and
: 8.
NOTE:
Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the  
!Subsequent actions after verifying Automatic Actions w/3-0NOP-089.
NUREG 1021 Rev 9 Appendix C  


Appendix C                                 Page 12 of 12                             Form ES-C-1 3.4 Verifies Main Feedwater Control Valves open or close in STEP   9 programmed response to steamflow/feedflow mismatch and level input     - -SAT signals, to maintain steam generator levels at program.
Appendix C Page 12 of 12 Form ES-C-1 3.4 Verifies Main Feedwater Control Valves open or close in STEP 9
                                                                                      - -UNSAT
programmed response to steamflow/feedflow mismatch and level input SAT signals, to maintain steam generator levels at program.
              ~erified Verified that Main Feedwater Control Valves responded properly to steamflow/feedflow mismatch and level input signals, to maintain
UNSAT Verified that Main Feedwater Control Valves responded properly to steamflow/feedflow mismatch and level input signals, to maintain Standard:
              !Steamflow/feedflow Standard: steam generator levels at program.
steam generator levels at program.
              !Steam Cue     Provided by Simulator response.
Cue Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod
Comment Operator may choose at any time to address the lack of Control Rod linsertion and take manual action in accordance with Elements 6, 7, and
                'nsertion and take manual action in accordance with Elements 6, 7, and linsertion 8.
: 8.
NOTE:     Operator may choose to review a/l Automatic Actions prior to addressing lack of Control Rod insertion.
NOTE:
Inserting rods to match Tavg and Tref may be delayed until the
Operator may choose to review a/l Automatic Actions prior to addressing lack of Control Rod insertion.
              !Subsequent subsequent actions after verifying Automatic Actions w/3-0NOP-089.
Inserting rods to match Tavg and Tref may be delayed until the
* NUREG 1021 Rev 9 Appendix C
!Subsequent actions after verifying Automatic Actions w/3-0NOP-089.
NUREG 1021 Rev 9 Appendix C Appendix C Page 12 of 12 Form ES-C-1 3.4 Verifies Main Feedwater Control Valves open or close in STEP 9
programmed response to steamflow/feedflow mismatch and level input SAT signals, to maintain steam generator levels at program.
UNSAT
~erified that Main Feedwater Control Valves responded properly to Standard:
!Steamflow/feedflow mismatch and level input signals, to maintain
!Steam generator levels at program.
Cue Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod  
'nsertion and take manual action in accordance with Elements 6, 7, and
: 8.
NOTE:
Operator may choose to review a/l Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
NUREG 1021 Rev 9 Appendix C  


  !Appendix C I         Page 13 of 12 I                 Form ES-C-11 3.5 Verify Pressurizer Level Controller and Pressurizer Pressure STEP   10 Controller vary charging pumps speed and Heater/Spray actuation to     - -SAT Imaintain maintain the programmed level and pressure, as required for the
!Appendix C I
                ~hanging changing values of Tavg.                                               - -UNSAT
Page 13 of 12 I
                ~erifies Verifies that Pressurizer Level Controller and Pressurizer Pressure
Form ES-C-11 3.5 Verify Pressurizer Level Controller and Pressurizer Pressure STEP 10 Controller vary charging pumps speed and Heater/Spray actuation to SAT maintain the programmed level and pressure, as required for the UNSAT changing values of Tavg.
[controller Controller maintaining the programmed level and pressure, as required Standard: ~or
Verifies that Pressurizer Level Controller and Pressurizer Pressure Controller maintaining the programmed level and pressure, as required Standard:
                -"or the changing values of Tavg.
-"or the changing values of Tavg.
Cue   Provided by Simulator response.
Cue Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod
Comment Operator may choose at any time to address the lack of Control Rod
                'nsertion and take manual action in accordance with Elements 6, 7, and 8.
'nsertion and take manual action in accordance with Elements 6, 7, and
NOTE:   Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.
: 8.
NOTE:
Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
NUREG 1021 Rev 9 Appendix C
!Appendix C I
Page 13 of 12 I
Form ES-C-11 3.5 Verify Pressurizer Level Controller and Pressurizer Pressure STEP 10 Controller vary charging pumps speed and Heater/Spray actuation to SAT Imaintain the programmed level and pressure, as required for the UNSAT
~hanging values of Tavg.  
~erifies that Pressurizer Level Controller and Pressurizer Pressure
[controller maintaining the programmed level and pressure, as required Standard:  
~or the changing values of Tavg.
Cue Provided by Simulator response.
Comment Operator may choose at any time to address the lack of Control Rod  
'nsertion and take manual action in accordance with Elements 6, 7, and
: 8.
NOTE:
Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


Appendix C                                   Page 14 of 12                             Form ES-C-1
Appendix C Page 14 of 12 Form ES-C-1  
                $UBSEQUENT SUBSEQUENT OPERA TOR ACTIONS STEP   11   5.1 Determine the cause of the runback initiation AND refer to the   - -SAT
$UBSEQUENT OPERA TOR ACTIONS STEP 11 5.1 Determine the cause of the runback initiation AND refer to the SAT  
            ~   ~ppropriate appropriate ONOP for specific recovery instructions.
~  
5.2 Verify the following conditions:                                 - -UNSAT 5.2.1 Stearn generator levels and pressures stabilized.
~ppropriate ONOP for specific recovery instructions.
UNSAT 5.2 Verify the following conditions:
5.2.1 Stearn generator levels and pressures stabilized.
5.2.2 Stearn dumps closed.
5.2.2 Stearn dumps closed.
5.2.3 Tavg matches Tref.
5.2.3 Tavg matches Tref.
5.2.4 Pressurizer levels and pressures stabilized.
5.2.4 Pressurizer levels and pressures stabilized.
5.2 Verify the following conditions:
5.2 Verify the following conditions:
5.2.1 Stearn generator levels and pressures stabilized.
Standard:
5.2.2 Stearn dumps closed.
~.2.3 Tavg matches Trefwithin 4&deg; F.
5.2.4 Pressurizer levels and pressures stabilized.
Cue Terminate JPM after Operator matches Tavg-Trefwithin 4&deg; F.
Comment NOTE:
Critical Step: 5.2.3 Tavg matches Trefwithin 4&deg; F.
Terminating The task is complete when the Examinee returns the cue sheet to STOP Cue:
.. he examiner.
Stop Time ___ _
NUREG 1021 Rev 9 Appendix C Appendix C Page 14 of 12 Form ES-C-1 SUBSEQUENT OPERA TOR ACTIONS SAT STEP 11 5.1 Determine the cause of the runback initiation AND refer to the
~
appropriate ONOP for specific recovery instructions.
UNSAT 5.2 Verify the following conditions:
5.2.1 Stearn generator levels and pressures stabilized.
5.2.1 Stearn generator levels and pressures stabilized.
5.2.2 Stearn dumps closed.
5.2.2 Stearn dumps closed.
5.2.3 Tavg matches Tref.
5.2.4 Pressurizer levels and pressures stabilized.
5.2 Verify the following conditions:
5.2.1 Stearn generator levels and pressures stabilized.
Standard:
Standard:
                ~.2.3 5.2.3 Tavg matches Trefwithin 4&deg; F.
5.2.2 Stearn dumps closed.
5.2.3 Tavg matches Trefwithin 4&deg; F.
5.2.4 Pressurizer levels and pressures stabilized.
5.2.4 Pressurizer levels and pressures stabilized.
Cue     Irerminate Terminate JPM after Operator matches Tavg-Trefwithin 4&deg; F.
Cue Irerminate JPM after Operator matches Tavg-Trefwithin 4&deg; F.
Comment
Comment NOTE:
* NOTE:     Critical Step: 5.2.3 Tavg matches Trefwithin 4&deg; F.
Critical Step: 5.2.3 Tavg matches Trefwithin 4&deg; F.
Terminating [The The task is complete when the Examinee returns the cue sheet to Cue:                                                                               STOP
Terminating [The task is complete when the Examinee returns the cue sheet to STOP Cue:  
                ~he
~he examiner.
                ..he examiner.
Stop Time ----
Stop Time -
NUREG 1021 Rev 9 Appendix C  
* NUREG 1021 Rev 9 Appendix C
 
/Appendix C Page 15 of 12 Form ES-C-11 Verification of Completion Job Performance Measure No.
NRC-25-SIM-JPM-A Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:


  /Appendix C                                 Page 15 of 12               Form ES-C-11 Verification of Completion
===Response===
* Job Performance Measure No.
Result:
Examinee's Name:
Satisfactory/Unsatisfactory Examiner's signature and date:
NUREG 1021 Rev 9 Appendix C
/Appendix C Page 15 of 12 Form ES-C-11 Verification of Completion Job Performance Measure No.
NRC-25-SIM-JPM-A Examinee's Name:
Examiner's Name:
Examiner's Name:
NRC-25-SIM-JPM-A Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:  


===Response===
===Response===
Result:   Satisfactory/Unsatisfactory
Result:
* Examiner's signature and date:
Satisfactory/Unsatisfactory Examiner's signature and date:
NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* Unit 3 is operating at 60% power and stable
Unit 3 is operating at 60% power and stable Unit 3 is preparing to return to 100% power.
* Unit 3 is preparing to return to 100% power.
No equipment is out of service.
* No equipment is out of service.
INITIA TlNG CUE:
INITIA TlNG CUE:
You have been directed to respond to plant conditions.
You have been directed to respond to plant conditions.
Acknowledge to the examiner when you are ready to begin.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
Unit 3 is operating at 60% power and stable Unit 3 is preparing to return to 100% power.
No equipment is out of service.
INITIA TlNG CUE:
You have been directed to respond to plant conditions.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
NUREG 1021 Rev 9 Appendix C  


Appendix C                                                                         Job Performance Measure                          Form ES-C-1 Worksheet Facility:              _T-.:.-u=:;r:..:..:k:..::.eLy-'-P--'
Appendix C Facility:
_T...:.-=.ur:..:..k:..::.eLy-'  P-"o:..:..:i o:..:..inn:..:..t=--_
Task
                                                                        ...:..:t'--__________
_ _ _ _ _ Task No:
Pressurizer Level Control Task


==Title:==
==Title:==
Channel Fails Low                                                      JPM No:          NRC-25-SIM-JPM-8 APE 028 AA2.01 PZR level indicators and alarms 3.4 13.6 KJA  
KJA  


==Reference:==
==Reference:==
Examinee:
Facility Evaluator:
Method of testing:
Job Performance Measure Worksheet
_T-.:.-u=:;r:..:..:k:..::.eLy-'-P-"o:..:..:in...:..:t'--__________ Task No:
Pressurizer Level Control Channel Fails Low APE 028 AA2.01 PZR level indicators and alarms 3.4 13.6 JPM No:
NRC Examiner:
Date:
Form ES-C-1 NRC-25-SIM-JPM-8 Simulated Performance Actual Performance X
Classroom ------------
Simulator -=====-:::::!.X~ __
Plant ----------
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Unit 3 is at 100% and stable No equipment is out of service Task Standard:
Unit 3 is at 100% and stable.
Pressurizer level stable and returning to programmed level.
Letdown has been returned to service.
Required Materials:
3-0NOP-041.6, Pressurizer Level Control Malfunction General


Examinee:                                                                                          NRC Examiner:
==References:==
Facility Evaluator:                                                                                Date:
3-0NOP-041.6, Pressurizer Level Control Malfunction NUREG 1021 Rev 9 Appendix C Appendix C Facility:
Task
 
==Title:==
KJA
 
==Reference:==
Examinee:
Facility Evaluator:
Method of testing:
Method of testing:
Simulated Performance
Job Performance Measure Worksheet
                                            ---------------                                          Actual Performance             xX Classroom
_T...:.-=.ur:..:..k:..::.eLy-'-P--'o:..:..in:..:..t=--______ Task No:
                ------------                                                                  -=====-=!.X~_ _
Pressurizer Level Control Channel Fails Low APE 028 AA2.01 PZR level indicators and alarms 3.4 13.6 JPM No:
Simulator -=====-:::::!.X~            Plant - - - - - - - - - -
NRC Examiner:
Date:
Form ES-C-1 NRC-25-SIM-JPM-8 Simulated Performance Actual Performance x
Classroom Simulator -=====-=!.X~ __
Plant ----------
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
* Unit 3 is at 100% and stable
Unit 3 is at 100% and stable No equipment is out of service Task Standard:
* No equipment is out of service
Unit 3 is at 100% and stable.
* Task Standard:
Pressurizer level stable and returning to programmed level.
* Unit 3 is at 100% and stable.
Letdown has been returned to service.
* Pressurizer level stable and returning to programmed level.
* Letdown has been returned to service.
Required Materials:
Required Materials:
* 3-0NOP-041.6, Pressurizer Level Control Malfunction General  
3-0NOP-041.6, Pressurizer Level Control Malfunction General  


==References:==
==References:==
* 3-0NOP-041.6, Pressurizer Level Control Malfunction
3-0NOP-041.6, Pressurizer Level Control Malfunction NUREG 1021 Rev 9 Appendix C  
* NUREG 1021 Rev 9 Appendix C


Appendix C                                 Page 2 of 12                     Form ES-C-1 Initiating Cue:
Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
* You have been directed to respond to plant conditions.
You have been directed to respond to plant conditions.
* Time Critical Task: No Validation Time:   XX minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT TH/STIMEI
Time Critical Task: No Validation Time:
* NUREG 1021 Rev 9 Appendix C
XX minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT TH/STIMEI NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
You have been directed to respond to plant conditions.
Time Critical Task: No Validation Time:
XX minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT TH/STIMEI NUREG 1021 Rev 9 Appendix C  


I Appendix C                               Page 3 of 12                           Form ES-C-1 I SIMULATOR SETUP Reset to IC #
I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #
* IC-1: 100% Power MOL Ensure Simulator Operator Checklist is complete Simulator Operator Instructions
IC-1: 100% Power MOL Ensure Simulator Operator Checklist is complete Simulator Operator Instructions
: 1. Verify IC-1
: 1. Verify IC-1
: 2. Place Simulator to RUN
: 2. Place Simulator to RUN
: 3. Schema>> Reactor Coolant System>> Pressurizer>> L-459 >> LT-459 >> TFH1TV59:H1-L T-459 Transmitter Fail Low>> TRUE>> INSERT
: 3. Schema>> Reactor Coolant System>> Pressurizer>> L-459 >> L T-459 >> TFH1TV59:H1-L T-459 Transmitter Fail Low>> TRUE>> INSERT NUREG 1021 Rev 9 Appendix C I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #
* NUREG 1021 Rev 9 Appendix C
IC-1: 100% Power MOL Ensure Simulator Operator Checklist is complete Simulator Operator Instructions
: 1. Verify IC-1
: 2. Place Simulator to RUN
: 3. Schema>> Reactor Coolant System>> Pressurizer>> L-459 >> L T-459 >> TFH1TV59:H1-L T-459 Transmitter Fail Low>> TRUE>> INSERT NUREG 1021 Rev 9 Appendix C  


Appendix C                             Page 4 of 12                               Form ES-C-1 Denote critical steps with a check mark( /)
Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( /)
Start Time Respond to Pressurizer Level Control Channel 459 fails low.
Start Time STEP 1
STEP    1                                                                        - - SAT
Respond to Pressurizer Level Control Channel 459 fails low.
                                                                                    - - UNSAT Standard:
SAT UNSAT Standard:
* Operator refers to 3-0NOP-041.6 Pressurizer Level Control Malfunction.
Operator refers to 3-0NOP-041.6 Pressurizer Level Control Malfunction.
Cue Comment NOTE:   Operator may choose to refer to ARP prior to entering ONOP.
Cue Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
Operator may choose to refer to ARP prior to entering ONOP.
NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( /)
Start Time STEP 1
Respond to Pressurizer Level Control Channel 459 fails low.
SAT UNSAT Standard:
Operator refers to 3-0NOP-041.6 Pressurizer Level Control Malfunction.
Cue Comment NOTE:
Operator may choose to refer to ARP prior to entering ONOP.
NUREG 1021 Rev 9 Appendix C  


I Appendix C                                 Page 5 of 12                       Form ES-C-1 I Verify automatic actions occur.
I Appendix C Page 5 of 12 Form ES-C-1 I STEP 2
STEP    2                                                                     - - SAT
Verify automatic actions occur.
                                                                                  - - UNSAT Operator verifies the following:
SAT UNSAT Operator verifies the following:
: 1. High Pressure LTON Isolation Valve LCV-3-460 CLOSES.
: 1. High Pressure L TON Isolation Valve LCV-3-460 CLOSES.
: 2. LTON Orifice Isolation Valves, CV-3-200A, CV-3-200B AND CV       Standard:
Standard:
200C CLOSE.
: 2. L TON Orifice Isolation Valves, CV-3-200A, CV-3-200B AND CV 200C CLOSE.
: 3. All Pressurizer Heaters turn OFF.
: 4. Charging flow INCREASES.
Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C I Appendix C Page 5 of 12 Form ES-C-1 I STEP 2
Verify automatic actions occur.
SAT UNSAT Operator verifies the following:
: 1. High Pressure L TON Isolation Valve LCV-3-460 CLOSES.
Standard:
: 2. L TON Orifice Isolation Valves, CV-3-200A, CV-3-200B AND CV 200C CLOSE.
: 3. All Pressurizer Heaters turn OFF.
: 3. All Pressurizer Heaters turn OFF.
: 4. Charging flow INCREASES.
: 4. Charging flow INCREASES.
Cue Comment NOTE:
Cue Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


Appendix C                               Page 6 of 12                           Form ES-C-1 Check pressurizer level indicators LI-3-459A, LI-3-460 AND LI-3-461,
Appendix C Page 6 of 12 Form ES-C-1 Check pressurizer level indicators LI-3-459A, LI-3-460 AND LI-3-461, STEP 3
* STEP     3 Identifies Channel 459 as failed low.
SAT UNSAT Identifies Channel 459 as failed low.
                                                                                    - - SAT
Standard:
                                                                                    - - UNSAT Standard:
Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 Check pressurizer level indicators LI-3-459A, LI-3-460 AND LI-3-461, STEP 3
SAT UNSAT Identifies Channel 459 as failed low.
Standard:
Cue Comment NOTE:
Cue Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


I Appendix C                         Page 7 of 12                     Form ES-C-1 I Place CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch STEP     4   in position 2 or 3.                                     -
I Appendix C Page 7 of 12 Form ES-C-1 I Place CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch STEP 4
SAT
in position 2 or 3.
            ..j UNSAT Standard: Places CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch in position 2 or 3.
SAT
..j UNSAT Standard:
Places CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch in position 2 or 3.
Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 12 Form ES-C-1 I Place CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch STEP 4
in position 2 or 3.
SAT  
..j UNSAT Standard:
Places CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch in position 2 or 3.
Cue Comment NOTE:
Cue Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


Appendix C                             Page 8 of 12                       Form ES-C-1 Place MASTER CHARGING PUMP CONTROLLER, LC-3-459G in
Appendix C Page 8 of 12 Form ES-C-1 Place MASTER CHARGING PUMP CONTROLLER, LC-3-459G in STEP 5
* STEP     5
MANUAL.
          ..j MANUAL.                                                     - - SAT
SAT
                                                                            - - UNSAT
..j UNSAT
: 1. Placed MASTER CHARGING PUMP CONTROLLER, LC-3-459G Standard:     in MANUAL
: 1. Placed MASTER CHARGING PUMP CONTROLLER, LC-3-459G Standard:
in MANUAL
: 2. Maintain programmed level per Enclosure 1.
Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 Place MASTER CHARGING PUMP CONTROLLER, LC-3-459G in STEP 5
MANUAL.
SAT  
..j UNSAT
: 1. Placed MASTER CHARGING PUMP CONTROLLER, LC-3-459G Standard:
in MANUAL
: 2. Maintain programmed level per Enclosure 1.
: 2. Maintain programmed level per Enclosure 1.
Cue Comment NOTE:
Cue Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


I, Appendix C                               Page 9 of 12                           Form ES-C-1 I,
, Appendix C Page 9 of 12 Form ES-C-1,
* STEP    6 IF LR-3-459 is selected to a defective channel, THEN place CHANNEL SELECT PRESSURIZER LEVEL RECORDER in another position.
IF LR-3-459 is selected to a defective channel, THEN place STEP 6
                                                                                      - - SAT
CHANNEL SELECT PRESSURIZER LEVEL RECORDER in another SAT position.
                                                                                      - - UNSAT Placed CHANNEL SELECT PRESSURIZER LEVEL RECORDER in Standard: position other than Channel 459.
UNSAT Placed CHANNEL SELECT PRESSURIZER LEVEL RECORDER in Standard:
position other than Channel 459.
Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C I Appendix C Page 9 of 12 Form ES-C-1 I IF LR-3-459 is selected to a defective channel, THEN place STEP 6
CHANNEL SELECT PRESSURIZER LEVEL RECORDER in another SAT position.
UNSAT Placed CHANNEL SELECT PRESSURIZER LEVEL RECORDER in Standard:
position other than Channel 459.
Cue Comment NOTE:
Cue Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


Appendix C                                 Page 10 of 12                             Form ES-C-1 Re-establish Letdown flow
Appendix C Page 10 of 12 Form ES-C-1 Re-establish Letdown flow STEP 6
* STEP     6
SAT
          ~
~
: 1. Throttle Low Pressure LTON Controller, PCV-3-145, as necessary SAT
UNSAT
                                                                                      - - UNSAT to prevent LTON relief valve from lifting, (approximately 50 percent open).
: 1. Throttle Low Pressure L TON Controller, PCV-3-145, as necessary to prevent L TON relief valve from lifting, (approximately 50 percent open).
: 2. Manually control Low Pressure Letdown Control Valve, PCV                   145, to limit pressure spike.
: 2. Manually control Low Pressure Letdown Control Valve, PCV 145, to limit pressure spike.
: 3. OPEN High Pressure UO Isol Vlv from Loop B Cold Leg LCV     Standard:     460.
: 3. OPEN High Pressure UO Isol Vlv from Loop B Cold Leg LCV Standard:
460.
: 4. OPEN UO Isolation Valves, CV-3-200 A, B OR C as required to restore pressurizer level to programmed level.
: 5. Return Lower Pressure Letdown Control Valve, PCV-3-145 to automatic.
Cue Tell operator that another operator will perform the remainder of the procedure.
Comment
* NOTE:
Steps 1, 2, and 5 are not critical steps.
Terminating The task is complete when the Examinee returns the cue sheet to STOP Cue:
the examiner.
Stop Time ----
NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 Re-establish Letdown flow STEP 6
SAT  
~
UNSAT
: 1. Throttle Low Pressure L TON Controller, PCV-3-145, as necessary to prevent L TON relief valve from lifting, (approximately 50 percent open).
: 2. Manually control Low Pressure Letdown Control Valve, PCV 145, to limit pressure spike.
: 3. OPEN High Pressure UO Isol Vlv from Loop B Cold Leg LCV Standard:
460.
: 4. OPEN UO Isolation Valves, CV-3-200 A, B OR C as required to restore pressurizer level to programmed level.
: 4. OPEN UO Isolation Valves, CV-3-200 A, B OR C as required to restore pressurizer level to programmed level.
: 5. Return Lower Pressure Letdown Control Valve, PCV-3-145 to automatic.
: 5. Return Lower Pressure Letdown Control Valve, PCV-3-145 to automatic.
Cue   Tell operator that another operator will perform the remainder of the procedure.
Cue Tell operator that another operator will perform the remainder of the procedure.
Comment
Comment
* NOTE:   Steps 1, 2, and 5 are not critical steps.
* NOTE:
Terminating The task is complete when the Examinee returns the cue sheet to Cue:                                                                               STOP the examiner.
Steps 1, 2, and 5 are not critical steps.
Stop Time _ _ __
Terminating The task is complete when the Examinee returns the cue sheet to STOP Cue:
* NUREG 1021 Rev 9 Appendix C
the examiner.
Stop Time ___ _
NUREG 1021 Rev 9 Appendix C  
 
I Appendix C Page 11 of 12 Form ES-C-1 I Verification of Completion Job Performance Measure No.
NRC-25-SIM-JPM-8
~~~~~~~~------------------------------------
Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:


I Appendix C                                 Page 11 of 12               Form ES-C-1 I Verification of Completion
===Response===
* Job Performance Measure No.
Result:
Satisfactory/Unsatisfactory Examiner's signature and date: _____________________ __
NUREG 1021 Rev 9 Appendix C I Appendix C Page 11 of 12 Form ES-C-1 I Verification of Completion Job Performance Measure No.
NRC-25-SIM-JPM-8
~~~~~~~~------------------------------------
Examinee's Name:
Examinee's Name:
NRC-25-SIM-JPM-8
                                    ~~~~~~~~------------------------------------
Examiner's Name:
Examiner's Name:
Date Performed:
Date Performed:
Line 906: Line 1,849:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:  


===Response===
===Response===
Result:   Satisfactory/Unsatisfactory
Result:
* Examiner's signature and date: _________________________
Satisfactory/Unsatisfactory Examiner's signature and date: _________________________ _
NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* Unit 3 is at 100% and stable
Unit 3 is at 100% and stable No equipment is out of service INITIA TlNG CUE:
* No equipment is out of service INITIA TlNG CUE:
You have been directed to respond to plant conditions.
* You have been directed to respond to plant conditions.
Acknowledge to the examiner when you are ready to begin.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
Unit 3 is at 100% and stable No equipment is out of service INITIA TlNG CUE:
You have been directed to respond to plant conditions.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
NUREG 1021 Rev 9 Appendix C  


Appendix C                                                                             Job Performance Measure                     Form ES-C-1 Worksheet Facility:              T--'
Appendix C Facility:
                            --'. .T--u-'-,-,-ur_k.
Job Performance Measure Worksheet  
                                            '-r_k..:...ey"------P..:...o_i
--'...T-,-,-ur_k..c:...e,,--Y _P..c:...o_in..c:...t _______ Task No:
                                                  .c:. .e, --Y_P..c:. .o_inn. c..:...t
ALIGN SAFETY INJECTION FOR HOT LEG RECIRC Form ES-C-1 Task
:. .t_ _ _ _ _ _ _Task No:
* Task


==Title:==
==Title:==
ALIGN SAFETY INJECTION FOR HOT LEG RECIRC
JPM No:
                            --------~--------
NRC-25-SIM-JPM -C
011 EK3.13 Hot-leg injection/recirculation 3.8 14.2 JPM No:      NRC-25-SIM-JPM -C KJA  
--------~--------
011 EK3.13 Hot-leg injection/recirculation 3.8 14.2 KJA  


==Reference:==
==Reference:==
Examinee:
NRC Examiner:
Facility Evaluator:
Method of testing:
Simulated Performance Classroom Read to the examinee:
Date:
Actual Performance Simulator====-:!.X~ __
x Plant -------
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
UNIT ON COLD LEG RECIRCULATION (RHR LOOP A) 12 HOURS HAVE ELAPSED SINCE EVENT INITIATION IDLE RHR TRAIN AVAILABLE (RHR LOOP B)
POWER AVAILABLE TO BOTH 4 KV BUSSES 3A HHSI PUMP IS RUNNING RHR SUPPLYING COLD LEG RECIRCULATION ALL CCW HEAT EXCHANGERS ARE IN SERVICE STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant. IS IN PROGRESS 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED.
Task Standard:
S.1. FLOW SUPPLIED TO HOT LEGS Required Materials:
3-EOP-ES-1.4, TRANSFER TO HOT LEG RECIRCULATION 3-EOP-E-1, Loss of Reactor or Secondary Coolant General
==References:==
3-EOP-ES-l.4, TRANSFER TO HOT LEG RECIRCULATION 3-EOP-E-1, Loss of Reactor or Secondary Coolant NUREG 1021 Rev 9 Appendix C Appendix C Facility:
Job Performance Measure Worksheet T--'--u-'-'-r_k..:...ey"------P..:...o_in..:...t _______ Task No:
ALIGN SAFETY INJECTION FOR HOT LEG RECIRC Form ES-C-1 Task
==Title:==
JPM No:
NRC-25-SIM-JPM -C
--------~--------
011 EK3.13 Hot-leg injection/recirculation 3.8 14.2 KJA


==Reference:==
Examinee:
Examinee:
                            -------------------- NRC Examiner: -
NRC Examiner:
Facility Evaluator:                                                                                Date:
Facility Evaluator:
Method of testing:
Method of testing:
Actual Simulated Performance                                                                             Performance              x Classroom                                                                             Simulator====-:!.X~_
Simulated Performance Classroom Read to the examinee:
Simulator====~X~   _____      Plant-Read to the examinee:
Date:
Actual Performance Simulator====~X~ __ _
x Plant ---------
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
* UNIT ON COLD LEG RECIRCULATION (RHR LOOP A) 12 HOURS HAVE ELAPSED SINCE EVENT INITIATION IDLE RHR TRAIN AVAILABLE (RHR LOOP B)
UNIT ON COLD LEG RECIRCULATION (RHR LOOP A) 12 HOURS HAVE ELAPSED SINCE EVENT INITIATION IDLE RHR TRAIN AVAILABLE (RHR LOOP B)
POWER AVAILABLE TO BOTH 4 KV BUSSES 3A HHSI PUMP IS RUNNING RHR SUPPLYING COLD LEG RECIRCULATION
POWER AVAILABLE TO BOTH 4 KV BUSSES 3A HHSI PUMP IS RUNNING RHR SUPPLYING COLD LEG RECIRCULATION ALL CCW HEAT EXCHANGERS ARE IN SERVICE STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant. IS IN PROGRESS 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED.
* ALL CCW HEAT EXCHANGERS ARE IN SERVICE
* STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant. IS IN PROGRESS
* 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED.
Task Standard:
Task Standard:
* S.1. FLOW SUPPLIED TO HOT LEGS Required Materials:
S.1. FLOW SUPPLIED TO HOT LEGS Required Materials:
* 3-EOP-ES-1.4, TRANSFER TO HOT LEG RECIRCULATION
3-EOP-ES-1.4, TRANSFER TO HOT LEG RECIRCULATION 3-EOP-E-1, Loss of Reactor or Secondary Coolant General  
* 3-EOP-E-1, Loss of Reactor or Secondary Coolant General  


==References:==
==References:==
3-EOP-ES-l.4, TRANSFER TO HOT LEG RECIRCULATION 3-EOP-E-1, Loss of Reactor or Secondary Coolant NUREG 1021 Rev 9 Appendix C


3-EOP-ES-l.4, TRANSFER TO HOT LEG RECIRCULATION 3-EOP-E-1, Loss of Reactor or Secondary Coolant NUREG 1021 Rev 9 Appendix C
Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
 
You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant.
Appendix C                                 Page 2 of 12                     Form ES-C-1
Time Critical Task: NO Validation Time:
* Initiating Cue:
15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEI NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant.
You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant.
Time Critical Task: NO Validation Time:     15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEI
Time Critical Task: NO Validation Time:
* NUREG 1021 Rev 9 Appendix C
15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEI NUREG 1021 Rev 9 Appendix C  


jAppendix C                               Page 3 of 12                 Form ES-C-11 SIMULATOR SETUP Reset to IC # 58
jAppendix C Page 3 of 12 Form ES-C-11 SIMULATOR SETUP Reset to IC # 58 Load Lesson
* Load Lesson LOADAND EXECUTE LESSON: JPM Ol062012501.LSN TRIGGER "MOV-3-869 CLOSED" OPEN MOV 863A & MOY 863B
* LOADAND EXECUTE LESSON: JPM Ol062012501.LSN
* TRIGGER "MOV-3-869 CLOSED"
* OPEN MOV 863A & MOY 863B
* Unfreeze simulator.
* Unfreeze simulator.
Ensure Simulator Operator Checklist is complete
Ensure Simulator Operator Checklist is complete NUREG 1021 Rev 9 Appendix C jAppendix C Page 3 of 12 Form ES-C-11 SIMULATOR SETUP Reset to IC # 58 Load Lesson
* NUREG 1021 Rev 9 Appendix C
* LOADAND EXECUTE LESSON: JPM Ol062012501.LSN
* TRIGGER "MOV-3-869 CLOSED"
* OPEN MOV 863A & MOY 863B
* Unfreeze simulator.
Ensure Simulator Operator Checklist is complete NUREG 1021 Rev 9 Appendix C  


Appendix C                               Page 4 of 12                                 Form ES-C-1 Denote critical steps with a check mark.O Start Time
Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time STEP 1
* STEP
jrRANSITION AS REQUIRED BY STEP 32 OF 3-EOP-E-1 SAT
          ..J 1 jrRANSITION AS REQUIRED BY STEP 32 OF 3-EOP-E-1                         - -SAT
..J UNSAT Standard:
                                                                                        - -UNSAT Standard: ITRANSITION MADE TO 3-EOP-ES-1.4, TRANSFER TO HOT LEG
ITRANSITION MADE TO 3-EOP-ES-1.4, TRANSFER TO HOT LEG RECIRCULATION Cue Comment NOTE:
                !TRANSITION RECIRCULATION Cue Comment NOTE:     Candidate should place a mark through circled step 32 prior to transition.
Candidate should place a mark through circled step 32 prior to transition.
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time STEP 1
jrRANSITION AS REQUIRED BY STEP 32 OF 3-EOP-E-1 SAT  
..J UNSAT Standard:  
!TRANSITION MADE TO 3-EOP-ES-1.4, TRANSFER TO HOT LEG RECIRCULATION Cue Comment NOTE:
Candidate should place a mark through circled step 32 prior to transition.
NUREG 1021 Rev 9 Appendix C  


  !Appendix C I         Page 5 of 12 I                 Form ES-C-11 STEP     2 Check High-Head SI Pumps - ANY                                       SAT RUNNING
!Appendix C I
                                                                                -    UNSAT Standard:
Page 5 of 12 I
Form ES-C-11 STEP 2
Check High-Head SI Pumps - ANY SAT RUNNING UNSAT Standard:
* Candidate recognizes that 3A HHSI Pump is running Cue Comment NOTE:
* Candidate recognizes that 3A HHSI Pump is running Cue Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C
!Appendix C I
Page 5 of 12 I
Form ES-C-11 STEP 2
Check High-Head SI Pumps - ANY SAT RUNNING UNSAT Standard:
* Candidate recognizes that 3A HHSI Pump is running Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C  


Appendix C                             Page 6 of 12                           Form ES-C-1 Verify RHR Heat Exchanger CCW Outlet Valve On Operating RHR STEP   3 Train - OPEN MOV-3-749A for train A                                 SAT UNSAT MOV-3-749A, RHR Heat Exchanger CCW Outlet Valve VERIFIED Standard: OPEN Cue Comment NOTE:
Appendix C Page 6 of 12 Form ES-C-1 Verify RHR Heat Exchanger CCW Outlet Valve On Operating RHR STEP 3
* NUREG 1021 Rev 9 Appendix C
Train - OPEN MOV-3-749A for train A SAT UNSAT MOV-3-749A, RHR Heat Exchanger CCW Outlet Valve VERIFIED Standard:
OPEN Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 Verify RHR Heat Exchanger CCW Outlet Valve On Operating RHR STEP 3
Train - OPEN MOV-3-749A for train A SAT UNSAT MOV-3-749A, RHR Heat Exchanger CCW Outlet Valve VERIFIED Standard:
OPEN Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C  


jAppendix C                                   Page 7 of 12                               Form ES-C-1!
jAppendix C Page 7 of 12 Form ES-C-1!
STEP     4                                                                             - -SAT 3 Verify Safety Injection To Hot Leg Isolation Valve, MOV-3-869 -
STEP 4
            ..J OPEN
SAT 3 Verify Safety Injection To Hot Leg Isolation Valve, MOV-3-869 -
                                                                                          - -UNSAT 1.MOV-3-869 ATTEMPTED TO BE VERIFIED OPEN. (Candidate Standard: IShould attempt to open valve prior to transitioning to Att. 1 )
..J OPEN UNSAT 1.MOV-3-869 ATTEMPTED TO BE VERIFIED OPEN. (Candidate Standard:
Ishould I2.Candidate i2.Candidate transitions to to ATTACHMENT 1.
IShould attempt to open valve prior to transitioning to Att. 1 )
Cue     If candidate calls to locally open MOV-3-869 tell candidate that valve is inaccessible.
i2.Candidate transitions to to ATTACHMENT 1.
Comment MOV-3-869 is closed and cannot be opened. Operator should attemp o open valve prior to transitioning to Att. 1 NOTE:
Cue If candidate calls to locally open MOV-3-869 tell candidate that valve is inaccessible.
* NUREG 1021 Rev 9 Appendix C
Comment MOV-3-869 is closed and cannot be opened. Operator should attemp NOTE:
o open valve prior to transitioning to Att. 1 NUREG 1021 Rev 9 Appendix C jAppendix C Page 7 of 12 Form ES-C-1!
STEP 4
SAT 3 Verify Safety Injection To Hot Leg Isolation Valve, MOV-3-869 -
..J OPEN UNSAT 1.MOV-3-869 ATTEMPTED TO BE VERIFIED OPEN. (Candidate Standard:
Ishould attempt to open valve prior to transitioning to Att. 1 )
I2.Candidate transitions to to ATTACHMENT 1.
Cue If candidate calls to locally open MOV-3-869 tell candidate that valve is inaccessible.
Comment MOV-3-869 is closed and cannot be opened. Operator should attemp NOTE:
o open valve prior to transitioning to Att. 1 NUREG 1021 Rev 9 Appendix C  


Appendix C                               Page 8 of 12                       Form ES-C-1
Appendix C Page 8 of 12 Form ES-C-1 STEP 4
* STEP   4
ESTABLISH ALTERNATE HOT LEG INJECTION FLOWPATH (ATT.
            -J ESTABLISH ALTERNATE HOT LEG INJECTION FLOWPATH (ATT.
SAT
1)
-J
: 1. TRANSITIONED TO ATTACHMENT 1 OF 3-EOP-ES-1.4 SAT UNSAT
: 1)
UNSAT
: 1. TRANSITIONED TO ATTACHMENT 1 OF 3-EOP-ES-1.4
: 2. Primary Operator DIRECTED TO CLOSE 3-752A AND 3-752B Standard:
: 2. Primary Operator DIRECTED TO CLOSE 3-752A AND 3-752B Standard:
: 3. RHR LOOP VALVES MOV-3-750 AND MOV-3-751 OPENED BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR
: 3. RHR LOOP VALVES MOV-3-750 AND MOV-3-751 OPENED BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR  
              !TRIGGER ITRIGGER "CLOSE 3-752A1B",
!TRIGGER "CLOSE 3-752A1B",
Cue I.F. OPERATOR REPORTS COMPLETION OF TASK.
Cue I.F. OPERATOR REPORTS COMPLETION OF TASK.
Comment
Comment NOTE:
* NOTE:
NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 STEP 4
* NUREG 1021 Rev 9 Appendix C
ESTABLISH ALTERNATE HOT LEG INJECTION FLOWPATH (ATT.
SAT
-J
: 1)
UNSAT
: 1. TRANSITIONED TO ATTACHMENT 1 OF 3-EOP-ES-1.4
: 2. Primary Operator DIRECTED TO CLOSE 3-752A AND 3-752B Standard:
: 3. RHR LOOP VALVES MOV-3-750 AND MOV-3-751 OPENED BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR ITRIGGER "CLOSE 3-752A1B",
Cue I.F. OPERATOR REPORTS COMPLETION OF TASK.
Comment NOTE:
NUREG 1021 Rev 9 Appendix C  


  !Appendix C                         Page 9 of 12                         Form ES-C-1j STEP     5                                                               SAT VERIFY THE POSITION OF THE RHR HEAT EXCHANGER OUTLET     -
!Appendix C Page 9 of 12 Form ES-C-1j STEP 5
VALVE                                                         UNSAT SNPO DIRECTED TO VERIFY THAT 3-759A IS OPEN Standard:
SAT VERIFY THE POSITION OF THE RHR HEAT EXCHANGER OUTLET VALVE UNSAT SNPO DIRECTED TO VERIFY THAT 3-759A IS OPEN Standard:
Cue   BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR REPORT 3-759A OPEN Comment NOTE:
Cue BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR REPORT 3-759A OPEN Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C
!Appendix C Page 9 of 12 Form ES-C-1j STEP 5
SAT VERIFY THE POSITION OF THE RHR HEAT EXCHANGER OUTLET VALVE UNSAT SNPO DIRECTED TO VERIFY THAT 3-759A IS OPEN Standard:
Cue BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR REPORT 3-759A OPEN Comment NOTE:
NUREG 1021 Rev 9 Appendix C  


Appendix C                         Page 10 of 12                     Form ES-C-1 STEP   6                                                               SAT REMOVE THE HHSI PUMPS AND CONTAINMENT SPRAY PUMPS     -
Appendix C Page 10 of 12 Form ES-C-1 STEP 6
            ..j FROM SERVICE                                               UNSAT CONTROL SWITCHES FOR ALL HHSI PUMPS ALIGNED TO UNIT 3 Standard: RWST AND THE UNIT 3 CONTAINMENT SPRAY PUMPS POSITIONED TO PULL-TO-LOCK Cue Comment NOTE:
SAT REMOVE THE HHSI PUMPS AND CONTAINMENT SPRAY PUMPS  
* NUREG 1021 Rev 9 Appendix C
..j FROM SERVICE UNSAT CONTROL SWITCHES FOR ALL HHSI PUMPS ALIGNED TO UNIT 3 Standard:
RWST AND THE UNIT 3 CONTAINMENT SPRAY PUMPS POSITIONED TO PULL-TO-LOCK Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 STEP 6
SAT REMOVE THE HHSI PUMPS AND CONTAINMENT SPRAY PUMPS
..j FROM SERVICE UNSAT CONTROL SWITCHES FOR ALL HHSI PUMPS ALIGNED TO UNIT 3 Standard:
RWST AND THE UNIT 3 CONTAINMENT SPRAY PUMPS POSITIONED TO PULL-TO-LOCK Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C  


  !Appendix C                         Page 11 of 12 I                 Form ES-C-11 STEP     7                                                               SAT
!Appendix C Page 11 of 12 I
                ~ERIFY RHR COLD LEG INJECTION ISOLATION VALVE OPEN       -
Form ES-C-11 STEP 7  
* Standard:
~ERIFY RHR COLD LEG INJECTION ISOLATION VALVE OPEN SAT UNSAT MOV-3-744A AND/OR MOV-3-744B VERIFIED OPEN Standard:
MOV-3-744A AND/OR MOV-3-744B VERIFIED OPEN UNSAT Cue Comment NOTE:
Cue Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C
!Appendix C Page 11 of 12 I
Form ES-C-11 STEP 7
~ERIFY RHR COLD LEG INJECTION ISOLATION VALVE OPEN SAT UNSAT MOV-3-744A AND/OR MOV-3-744B VERIFIED OPEN Standard:
Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C  


Appendix C                           Page 12 of 12                       Form ES-C-1 STEP   8   ISOLATE THE RHRALTERNATE DISCHARGE FLOW-PATH             -
Appendix C Page 12 of 12 Form ES-C-1 STEP 8
SAT
ISOLATE THE RHRALTERNATE DISCHARGE FLOW-PATH SAT UNSAT
                                                                        -   UNSAT
* MOV-3-863A, RHR ALTERNATE DISCHARGE VALVE, CLOSED Standard:
* MOV-3-863B, RHR ALTERNATE DISCHARGE VALVE, CLOSED Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C Appendix C Page 12 of 12 Form ES-C-1 STEP 8
ISOLATE THE RHRALTERNATE DISCHARGE FLOW-PATH SAT UNSAT
* MOV-3-863A, RHR ALTERNATE DISCHARGE VALVE, CLOSED Standard:
* MOV-3-863A, RHR ALTERNATE DISCHARGE VALVE, CLOSED Standard:
* MOV-3-863B, RHR ALTERNATE DISCHARGE VALVE, CLOSED Cue Comment NOTE:
* MOV-3-863B, RHR ALTERNATE DISCHARGE VALVE, CLOSED Cue Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


  ~ppendix C                         Page 13 of 12                         Form ES-C-1!
~ppendix C Page 13 of 12 Form ES-C-1!
STEP     9   ALIGN THE RHR RECIRCULATION FLOWPATH                     -
STEP 9
SAT
ALIGN THE RHR RECIRCULATION FLOWPATH SAT
            ..j UNSAT SNPO DIRECTED TO OPEN 3-741A, RHR RECIRC ISOLATION Standard: ~ALVE VALVE Cue     BOOTH OPERATOR TRIGGERS "OPEN 3-741A" AND REPORT STATUS TO OPERATOR 1-2 MINUTES AFTER ORDER WAS GIVEN Comment NOTE:
..j UNSAT SNPO DIRECTED TO OPEN 3-741A, RHR RECIRC ISOLATION Standard:
* NUREG 1021 Rev 9 Appendix C
~ALVE Cue BOOTH OPERATOR TRIGGERS "OPEN 3-741A" AND REPORT STATUS TO OPERATOR 1-2 MINUTES AFTER ORDER WAS GIVEN Comment NOTE:
NUREG 1021 Rev 9 Appendix C
~ppendix C Page 13 of 12 Form ES-C-1!
STEP 9
ALIGN THE RHR RECIRCULATION FLOWPATH SAT  
..j UNSAT SNPO DIRECTED TO OPEN 3-741A, RHR RECIRC ISOLATION Standard:
VALVE Cue BOOTH OPERATOR TRIGGERS "OPEN 3-741A" AND REPORT STATUS TO OPERATOR 1-2 MINUTES AFTER ORDER WAS GIVEN Comment NOTE:
NUREG 1021 Rev 9 Appendix C  


Appendix C                         Page 14 of 12                       Form ES-C-1
Appendix C Page 14 of 12 Form ES-C-1 VERIFY STATUS OF CORE EXIT THERMOCOUPLES STEP 10 SAT
                ~ERIFY VERIFY STATUS OF CORE EXIT THERMOCOUPLES STEP   10                                                               SAT
.,j UNSAT CORE EXIT TEMPERATURES VERIFIED STABLE OR Standard:
            .,j UNSAT CORE EXIT TEMPERATURES VERIFIED STABLE OR Standard: DECREASING Cue Comment NOTE:
DECREASING Cue Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C Appendix C Page 14 of 12 Form ES-C-1  
~ERIFY STATUS OF CORE EXIT THERMOCOUPLES STEP 10 SAT  
.,j UNSAT CORE EXIT TEMPERATURES VERIFIED STABLE OR Standard:
DECREASING Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C  


[Appendix C 1       Page 15 of 12 I                 Form ES-C-11
[Appendix C 1
                ~ONTINUE CONTINUE LONG-TERM RECOVERY ACTIONS STEP   11                                                               SAT
Page 15 of 12 I
*
Form ES-C-11 CONTINUE LONG-TERM RECOVERY ACTIONS STEP 11 SAT UNSAT
* RESTORATION OF NORMAL HOT LEG RECIRCULATION ATTEMPTED AS DIRECTED BY THE TSC STAFF
* INJECTION TO BOTH HOT LEGS AND COLD LEGS Standard:
VERIFIED
* RHR PUMP INJECTION TO HOT AND COLD LEGS MAINTAINED UNTIL NORMAL HOT LEG RECIRCULATION LINEUP IS ESTABLISHED BOOTH OPERATOR RESPOND AS TSC AND CONFIRM PLAN IS Cue IN PROGRESS TO RESTORE NORMAL HOT LEG INJECTION Comment OPERA TOR SHOULD USE ERDADS SCREEN TO CONFIRM NOTE:
AL TERNA TE RHR FLOW NUREG 1021 Rev 9 Appendix C
[Appendix C 1
Page 15 of 12 I
Form ES-C-11  
~ONTINUE LONG-TERM RECOVERY ACTIONS STEP 11 SAT UNSAT
* RESTORATION OF NORMAL HOT LEG RECIRCULATION ATTEMPTED AS DIRECTED BY THE TSC STAFF
* RESTORATION OF NORMAL HOT LEG RECIRCULATION ATTEMPTED AS DIRECTED BY THE TSC STAFF
                                                                        -    UNSAT
* INJECTION TO BOTH HOT LEGS AND COLD LEGS Standard:
* INJECTION TO BOTH HOT LEGS AND COLD LEGS Standard:       VERIFIED
VERIFIED
* RHR PUMP INJECTION TO HOT AND COLD LEGS MAINTAINED UNTIL NORMAL HOT LEG RECIRCULATION LINEUP IS ESTABLISHED BOOTH OPERATOR RESPOND AS TSC AND CONFIRM PLAN IS Cue     IN PROGRESS TO RESTORE NORMAL HOT LEG INJECTION Comment OPERA  TOR SHOULD USE OPERATOR                  ERDADS SCREEN   TO CONFIRM AL TERNA TE RHR FLOW NOTE:
* RHR PUMP INJECTION TO HOT AND COLD LEGS MAINTAINED UNTIL NORMAL HOT LEG RECIRCULATION LINEUP IS ESTABLISHED BOOTH OPERATOR RESPOND AS TSC AND CONFIRM PLAN IS Cue IN PROGRESS TO RESTORE NORMAL HOT LEG INJECTION Comment OPERATOR SHOULD USE ERDADS SCREEN TO CONFIRM NOTE:
* NUREG 1021 Rev 9 Appendix C
AL TERNA TE RHR FLOW NUREG 1021 Rev 9 Appendix C  


Appendix C                               Page 16 of 12                           Form ES-C-1 Return To Procedure And Step In Effect STEP   12                                                                       - -SAT
Appendix C Page 16 of 12 Form ES-C-1 STEP 12 Return To Procedure And Step In Effect SAT UNSAT RETURNED TO 3-EOP-E-1, Loss of Reactor or Secondary Coolant, Standard:
* Standard:
STEP 15.
RETURNED TO 3-EOP-E-1, Loss of Reactor or Secondary Coolant, STEP 15.
Cue Comment NOTE:
                                                                                    - -UNSAT Cue Comment NOTE:
Terminating [The task is complete when the Examinee returns the cue sheet to the STOP Cue:
Terminating [The                                                                  STOP The task is complete when the Examinee returns the cue sheet to the Cue:     ~xaminer.
~xaminer.
Stop Time NUREG 1021 Rev 9 Appendix C Appendix C Page 16 of 12 Form ES-C-1 STEP 12 Return To Procedure And Step In Effect SAT UNSAT RETURNED TO 3-EOP-E-1, Loss of Reactor or Secondary Coolant, Standard:
STEP 15.
Cue Comment NOTE:
Terminating The task is complete when the Examinee returns the cue sheet to the STOP Cue:
examiner.
examiner.
Stop Time
Stop Time NUREG 1021 Rev 9 Appendix C  
* NUREG 1021 Rev 9 Appendix C


  !AppendiX C                                 Page 17 of 12                   Form ES-C-11 Verification of Completion
!AppendiX C Page 17 of 12 Form ES-C-11 Verification of Completion  
~ JobPe~rmanceMeasureNo.
~
JobPe~rmanceMeasureNo.N          N~R_C_-_25_-_S_IM~~_P_M_-_C~~~~~~~~~~~~~~~~~_
JobPe~rmanceMeasureNo. N~R_C_-_25_-_S_IM~~_P_M_-_C~~~~~~~~~~~~~~~~~_
__R_C_-_25_-_S_I~~~_P_~_-_C~~~~~~~~~~~~~~~~~_
Examinee's Name:
Examinee's Name:
Examiner's Name:
Examiner's Name:
Line 1,070: Line 2,129:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:  
~
 
===Response===
Result:
Satisfactory/Unsatisfactory Examiner's signature and date:
NUREG 1021 Rev 9 Appendix C
!AppendiX C Page 17 of 12 Form ES-C-11 Verification of Completion
~
~
JobPe~rmanceMeasureNo.N R_C_-_25_-_S_I~~~_P_~_-_C~~~~~~~~~~~~~~~~~_
Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
~


===Response===
===Response===
Result:   Satisfactory/Unsatisfactory
Result:
* Examiner's signature and date:
Satisfactory/Unsatisfactory Examiner's signature and date:
NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
* UNIT ON COLD LEG RECIRCULATION (RHR LOOP A)
UNIT ON COLD LEG RECIRCULATION (RHR LOOP A) 12 HOURS HAVE ELAPSED SINCE EVENT INITIATION IDLE RHR TRAIN AVAILABLE (RHR LOOP B)
* 12 HOURS HAVE ELAPSED SINCE EVENT INITIATION
POWER AVAILABLE TO BOTH 4 KV BUSSES 3A HHSI PUMP IS RUNNING RHR SUPPLYING COLD LEG RECIRCULATION ALL CCW HEAT EXCHANGERS ARE IN SERVICE STEP 32 OF 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS IN PROGRESS 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED.
* IDLE RHR TRAIN AVAILABLE (RHR LOOP B)
INITIA TlNG CUE:
* POWER AVAILABLE TO BOTH 4 KV BUSSES
You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant.
* 3A HHSI PUMP IS RUNNING
Acknowledge to the examiner when you are ready to begin.
* RHR SUPPLYING COLD LEG RECIRCULATION
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
* ALL CCW HEAT EXCHANGERS ARE IN SERVICE
NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
* STEP 32 OF 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS IN PROGRESS
When you complete the task successfully, the objective for this job performance measure will be satisfied.
* 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED.
Initial Conditions:
UNIT ON COLD LEG RECIRCULATION (RHR LOOP A) 12 HOURS HAVE ELAPSED SINCE EVENT INITIATION IDLE RHR TRAIN AVAILABLE (RHR LOOP B)
POWER AVAILABLE TO BOTH 4 KV BUSSES 3A HHSI PUMP IS RUNNING RHR SUPPLYING COLD LEG RECIRCULATION ALL CCW HEAT EXCHANGERS ARE IN SERVICE STEP 32 OF 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS IN PROGRESS 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED.
INITIA TlNG CUE:
INITIA TlNG CUE:
You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant.
You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant.
* Acknowledge to the examiner when you are ready to begin.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


Appendix C                                 Job Performance Measure                                  Form ES-C-1 Worksheet Facility:              Turkey Point                      Task No:
Appendix C Facility:
Respond to a Source Range Nuclear Instrument Malfunction Job Performance Task
Task


==Title:==
==Title:==
(MODE 6)                           Measure No:               NRC-2S-SIM-JPM-D KIA  
Job Performance Measure Worksheet Turkey Point Task No:
Respond to a Source Range Nuclear Instrument Malfunction Job Performance (MODE 6)
Measure No:
KIA  


==Reference:==
==Reference:==
015 A2.02 (3.1/3.5)
015 A2.02 (3.1/3.5)
Examinee:                                                   NRC Examiner:
Examinee:
Facility Evaluator:                                         Date:
NRC Examiner:
Method of testing:       Simulator / Control Room Simulated Performance                                       Actual Performance                    Yes Classroom                                     Simulator- - -Yes                         Plant._ _ _ _ _ __
Facility Evaluator:
Plant Read to the examinee:
Date:
Method of testing:
Simulator / Control Room Actual Performance Simulated Performance Classroom Simulator Yes Read to the examinee:
Form ES-C-1 NRC-2S-SIM-JPM-D Yes Plant. ______ _
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
Line 1,113: Line 2,197:
: 2. Refueling activities are in progress.
: 2. Refueling activities are in progress.
: 3. NIS Source Ranges N-31 and N-32 are both in service.
: 3. NIS Source Ranges N-31 and N-32 are both in service.
* 4. Both Gamma Metrics Channels are OOS for maintenance.
: 4. Both Gamma Metrics Channels are OOS for maintenance.
Task Standard:
Task Standard:
: 1. N-32 selected for audio count rate.
: 1. N-32 selected for audio count rate.
Line 1,121: Line 2,205:


==References:==
==References:==
3-0NOP-059.5, Source Range Nuclear Instrumentation Malfunction Initiating Cue:
Respond to plant conditions.
Time Critical Task: No Validation Time:
10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIMEI Appendix C Facility:
Task


==Title:==
Job Performance Measure Worksheet Turkey Point Task No:
Respond to a Source Range Nuclear Instrument Malfunction Job Performance (MODE 6)
Measure No:
KIA
==Reference:==
015 A2.02 (3.1/3.5)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulator / Control Room Simulated Performance Classroom Simulator Actual Performance Yes Read to the examinee:
Form ES-C-1 NRC-2S-SIM-JPM-D Yes Plant -------
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
: 1. Unit 3 is in Mode 6.
: 2. Refueling activities are in progress.
: 3. NIS Source Ranges N-31 and N-32 are both in service.
: 4. Both Gamma Metrics Channels are OOS for maintenance.
Task Standard:
: 1. N-32 selected for audio count rate.
: 2. Core alterations suspended.
Required Materials:
3-0NOP-059.5, Source Range Nuclear Instrumentation Malfunction General
==References:==
3-0NOP-059.5, Source Range Nuclear Instrumentation Malfunction Initiating Cue:
3-0NOP-059.5, Source Range Nuclear Instrumentation Malfunction Initiating Cue:
Respond to plant conditions.
Respond to plant conditions.
Time Critical Task: No Validation Time:         10 minutes
Time Critical Task: No Validation Time:
* HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIMEI
10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIMEI  


Appendix C                                   Page 2 of 7                                 Form ES-C-1 INITIAL CONDITIONS:
Appendix C Page 2 of 7 Form ES-C-1 INITIAL CONDITIONS:
: 1. Unit 3 is in Mode 6.
: 1. Unit 3 is in Mode 6.
: 2. Refueling activities are in progress.
: 2. Refueling activities are in progress.
: 3. NIS Source Ranges are both in service.
: 3. NIS Source Ranges are both in service.
: 4. Both Gamma Metrics are OOS for maintenance.
: 4. Both Gamma Metrics are OOS for maintenance.  
  /NITIA TlNG CUE:
/NITIA TlNG CUE:
Respond to plant conditions.
Respond to plant conditions.
TERMINA TlON CUE:
TERMINA TlON CUE:
Line 1,138: Line 2,255:
Do you have any questions?
Do you have any questions?
You may begin.
You may begin.
Appendix C Page 2 of 7 Form ES-C-1 INITIAL CONDITIONS:
: 1. Unit 3 is in Mode 6.
: 2. Refueling activities are in progress.
: 3. NIS Source Ranges are both in service.
: 4. Both Gamma Metrics are OOS for maintenance.
/NITIA TlNG CUE:
Respond to plant conditions.
TERMINA TlON CUE:
When you feel that you have satisfactorily completed the assigned task, hand your JPM briefing sheet back to me.
Do you have any questions?
You may begin.


  !AppendiX C                                 Page 3 of 7                               Form ES-C-11 NOTES TO EVALUATOR AND BOOTH OPERATOR:
!AppendiX C Page 3 of 7 Form ES-C-11 NOTES TO EVALUATOR AND BOOTH OPERATOR:
: 1. Reset to IC 117 Cavity Drain Pre-Req's Complete
: 2. Place both channels of Gamma-Metrics O.O.S.:
: a. Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #90 TFN1WAFL NEB01A DETECTOR FAIL LOW 0 TRUE then INSERT
: b. Detector #100 TFN1WBFL NEB01B DETECTOR FAIL LOW 0 TRUE then INSERT
: c.
Place both Gamma-Metric Block Switches to BLOCK on console
: 3. Select N-31 for Audio Count Rate; Select N-31/N-32 and N-35/N-36 on console NIS Recorder
: 4. Place CSD Placards on Vertical Panels.
: 5. Update console placard to read RCS BORON = 2000 ppm
: 6. Adjust Boric Acid and Primary Water Auto Makeup flow controller potentiometers for 2000 ppm boron concentration (HIC-3-114 = 4.0, FC-3-113 = B.O)
: 7. Change ERDADS screen on VPA to P-T display.
B. Provide an extra Operator to acknowledge annunciators and maintain stable plant conditions.
: 9. When Operator has received a turnover of plant status, fail Source Range NI N-31 HIGH:
Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #1 0 TFN1SAFH NE101N31 DETECTOR FAIL HIGH 0 TRUE then INSERT
!AppendiX C Page 3 of 7 Form ES-C-11 NOTES TO EVALUATOR AND BOOTH OPERATOR:
: 1. Reset to IC 117 Cavity Drain Pre-Req's Complete
: 1. Reset to IC 117 Cavity Drain Pre-Req's Complete
: 2. Place both channels of Gamma-Metrics O.O.S.:
: 2. Place both channels of Gamma-Metrics O.O.S.:
: a. Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #90 TFN1WAFL NEB01A DETECTOR FAIL LOW 0 TRUE then INSERT
: a. Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #90 TFN1WAFL NEB01A DETECTOR FAIL LOW 0 TRUE then INSERT
: b. Detector #100 TFN1WBFL NEB01B DETECTOR FAIL LOW 0 TRUE then INSERT
: b. Detector #100 TFN1WBFL NEB01B DETECTOR FAIL LOW 0 TRUE then INSERT
: c. Place both Gamma-Metric Block Switches to BLOCK on console
: c.
Place both Gamma-Metric Block Switches to BLOCK on console
: 3. Select N-31 for Audio Count Rate; Select N-31/N-32 and N-35/N-36 on console NIS Recorder
: 3. Select N-31 for Audio Count Rate; Select N-31/N-32 and N-35/N-36 on console NIS Recorder
: 4. Place CSD Placards on Vertical Panels.
: 4. Place CSD Placards on Vertical Panels.
: 5.                                             =
: 5. Update console placard to read RCS BORON = 2000 ppm
Update console placard to read RCS BORON 2000 ppm
: 6. Adjust Boric Acid and Primary Water Auto Makeup flow controller potentiometers for 2000 ppm boron concentration (HIC-3-114 = 4.0, FC-3-113 = B.O)
: 6. Adjust Boric Acid and Primary Water Auto Makeup flow controller potentiometers for 2000 ppm boron
                              =              =
concentration (HIC-3-114 4.0, FC-3-113 B.O)
: 7. Change ERDADS screen on VPA to P-T display.
: 7. Change ERDADS screen on VPA to P-T display.
B. Provide an extra Operator to acknowledge annunciators and maintain stable plant conditions.
B. Provide an extra Operator to acknowledge annunciators and maintain stable plant conditions.
: 9. When Operator has received a turnover of plant status, fail Source Range NI N-31 HIGH:
: 9. When Operator has received a turnover of plant status, fail Source Range NI N-31 HIGH:
Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #1 0 TFN1SAFH NE101N31 DETECTOR FAIL HIGH 0 TRUE then INSERT
Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #1 0 TFN1SAFH NE101N31 DETECTOR FAIL HIGH 0 TRUE then INSERT  


Appendix C                                         Page 4 of7                               Form ES-C-1 Denote critical steps with a check mark.O Start Time - - - -
Appendix C Page 4 of7 Form ES-C-1 Denote critical steps with a check mark.O Start Time ----
* STEP     1
* STEP 1
          ..j Perform Immediate actions of 3-0NOP-059.5, SOURCE RANGE NUCLEAR INSTRUMENTATION MALFUNCTION.
Perform Immediate actions of 3-0NOP-059.5, SOURCE RANGE SAT NUCLEAR INSTRUMENTATION MALFUNCTION.  
14.0 14.0 IMMEDIATE ACTIONS
..j 14.0 IMMEDIATE ACTIONS UNSAT 14.5 Mode 6 - Refueling 14.5.1 Malfunction of ONE channel:
                                                                                            - - SAT UNSAT 14.5 r.5 Mode 6 - Refueling 14.5.1 f4..5.1 Malfunction of ONE channel:
: 1. Switch the AUDIO COUNT RATE CHANNEL SELECTOR to the operable source range.
: 1. Switch the AUDIO COUNT RATE CHANNEL SELECTOR to the operable source range.
: 2. Verify at least 2 out of 4 Source Range and Backup NIS (Gamma Metrics) channels are operable, with one Source Range having audible count rate in the Control Room and Containment.
: 2. Verify at least 2 out of 4 Source Range and Backup NIS (Gamma Metrics) channels are operable, with one Source Range having audible count rate in the Control Room and Containment.
: a. IF the above requirement is not met, THEN suspend all operations involving core alterations OR positive reactivity changes.
: a. IF the above requirement is not met, THEN suspend all operations involving core alterations OR positive reactivity changes.
* STANDARD:
: 3. IF applicable, THEN notify plant personnel of erroneous Containment Evacuation Alarm.
: 3. IF applicable, THEN notify plant personnel of erroneous Containment Evacuation Alarm.
STANDARD:
: 1. Switches AUDIO COUNT RATE CHANNEL SELECTOR from N-31 to N-32.
~. Suspends all operations involving core alterations since only one of four source range Nls are operable. *
: 3. Notifies plant personnel of erroneous Containment Evacuation Alarm Operator may reference procedure to verify I perform actions.
Respond as Refueling SRO and/or Reactor Engineer/STA if notified to CUE:
stop refueling activities and store fuel assemblies in a safe location.
Report that refueling has stopped and fuel assemblies are all safely oeated.
Comment NOTE:
Source Range N-31 has failed HIGH.
Appendix C Page 4 of7 Form ES-C-1 Denote critical steps with a check mark.O Start Time ----
* STEP 1
Perform Immediate actions of 3-0NOP-059.5, SOURCE RANGE SAT NUCLEAR INSTRUMENTATION MALFUNCTION.
..j 14.0 IMMEDIATE ACTIONS UNSAT r.5 Mode 6 - Refueling f4..5.1 Malfunction of ONE channel:
: 1. Switch the AUDIO COUNT RATE CHANNEL SELECTOR to the operable source range.
: 2. Verify at least 2 out of 4 Source Range and Backup NIS (Gamma Metrics) channels are operable, with one Source Range having audible count rate in the Control Room and Containment.
: a. IF the above requirement is not met, THEN suspend all operations involving core alterations OR positive reactivity changes.
: 3. IF applicable, THEN notify plant personnel of erroneous Containment Evacuation Alarm.
STANDARD:
: 1. Switches AUDIO COUNT RATE CHANNEL SELECTOR from N-31 to N-32.
: 1. Switches AUDIO COUNT RATE CHANNEL SELECTOR from N-31 to N-32.
                  ~.
: 2. Suspends all operations involving core alterations since only one of four source range Nls are operable. *
: 2. Suspends all operations involving core alterations since only one of four source range Nls are operable. *
: 3. Notifies plant personnel of erroneous Containment Evacuation Alarm Operator may reference procedure to verify I perform actions.
: 3. Notifies plant personnel of erroneous Containment Evacuation Alarm Operator may reference procedure to verify I perform actions.
Respond as Refueling SRO and/or Reactor Engineer/STA if notified to stop refueling activities and store fuel assemblies in a safe location.
Respond as Refueling SRO and/or Reactor Engineer/STA if notified to CUE:
CUE:        Report that refueling has stopped and fuel assemblies are all safely oeated.
stop refueling activities and store fuel assemblies in a safe location.
Comment
Report that refueling has stopped and fuel assemblies are all safely oeated.
* NOTE:       Source Range N-31 has failed HIGH.
Comment NOTE:
Source Range N-31 has failed HIGH.  


  !AppendiX C                               Page 5 of 7           Form ES-C-11
!AppendiX C Page 5 of 7 Form ES-C-11 STEP 2
* Operator obtains copy of 3-0NOP-059.5.
Operator obtains copy of 3-0NOP-059.5.
STEP   2                                                     - -SAT
SAT UNSAT STANDARD: 1. Operator obtains Simulator copy of 3-0NOP-059.5  
                                                                  - -UNSAT
~. Operator verifies Immediate Actions are correct.
: 1. Operator obtains Simulator copy of 3-0NOP-059.5 STANDARD:
Cue Comment NOTE:
              ~. Operator verifies Immediate Actions are correct.
!AppendiX C Page 5 of 7 Form ES-C-11 STEP 2
Cue Comment NOTE:
Operator obtains copy of 3-0NOP-059.5.
SAT UNSAT STANDARD: 1. Operator obtains Simulator copy of 3-0NOP-059.5  
~. Operator verifies Immediate Actions are correct.
Cue Comment NOTE:  


Appendix C                                   Page 6 of7                               Form ES-C-1 5.0 SUBSEQUENT ACTIONS STEP     3 5.5 Mode 6 - Refueling                                                   - -SAT
Appendix C Page 6 of7 Form ES-C-1 5.0 SUBSEQUENT ACTIONS STEP 3
          ..J 5.5.1 Malfunction of ONE channel:                                       - -UNSAT
5.5 Mode 6 - Refueling SAT  
..J UNSAT 5.5.1 Malfunction of ONE channel:
: 1. Place LEVEL TRIP switch on failed channel in BYPASS position.
: 1. Place LEVEL TRIP switch on failed channel in BYPASS position.
: 2. Place HIGH FLUX AT SHUTDOWN switch on failed channel in BLOCK position.
: 2. Place HIGH FLUX AT SHUTDOWN switch on failed channel in BLOCK position.
Line 1,191: Line 2,352:
: 4. IF one Source Range having audible count rate in the Control Room and Containment, AND 2 out of 4 NIS (NSSS Source Range and Gamma Metrics) Channels are not operable, THEN verify RCS boron concentration is greater than or equal to the required boron concentration at least once per 12 hours.
: 4. IF one Source Range having audible count rate in the Control Room and Containment, AND 2 out of 4 NIS (NSSS Source Range and Gamma Metrics) Channels are not operable, THEN verify RCS boron concentration is greater than or equal to the required boron concentration at least once per 12 hours.
: 5. Notify I&C.
: 5. Notify I&C.
: 6. Monitor Backup NIS (Gamma Metric) Source Range Count Rate .
: 6. Monitor Backup NIS (Gamma Metric) Source Range Count Rate.
* STANDARD: Operator removes N-31 from service.
STANDARD: Operator removes N-31 from service.
: 1. Positions LEVEL TRIP switch to BYPASS.
: 1. Positions LEVEL TRIP switch to BYPASS.
              ~.
: 2. Positions HIGH FLUX AT SHUTDOWN switch to BLOCK.
: 2. Positions HIGH FLUX AT SHUTDOWN switch to BLOCK.
: 3. Verifies N-32 displayed on console NIS recorder.
: 3. Verifies N-32 displayed on console NIS recorder.
: 4. Contacts Chemistry determines Boron concentration:::: 1950 ppm.
: 4. Contacts Chemistry determines Boron concentration:::: 1950 ppm.
f4.
: 5. Notifies I&C of N-31 failure.
: 5. Notifies I&C of N-31 failure.
              ~.
: 6. Determines both backup NIS (Gamma-Metric) channels OOS.
: 6. Determines both backup NIS (Gamma-Metric) channels OOS.
1.lf called as Reactor Engineering, state that the required RCS Boron
1.lf called as Reactor Engineering, state that the required RCS Boron jeoncentration is> 1950 ppm.
              ~oncentration is> 1950 ppm.
CUES:
jeoncentration
12.lf called as Chemistry, confirm Boron concentration is 2000 ppm.
              ~.If called as Chemistry, confirm Boron concentration is 2000 ppm.
12.lf CUES:
3.Respond as I&C if notified of N-31 failure.
3.Respond as I&C if notified of N-31 failure.
14.
: 14. Inform the applicant that another operator will continue from this ipoint.
f4.lnform Inform the applicant that another operator will continue from this ipoint.
Comment NOTE:
Comment
Only Standards 1 and 2 are critical.
* NOTE:         Only Standards 1 and 2 are critical.
Appendix C Page 6 of7 Form ES-C-1 5.0 SUBSEQUENT ACTIONS STEP 3
5.5 Mode 6 - Refueling SAT
..J UNSAT 5.5.1 Malfunction of ONE channel:
: 1. Place LEVEL TRIP switch on failed channel in BYPASS position.
: 2. Place HIGH FLUX AT SHUTDOWN switch on failed channel in BLOCK position.
: 3. Switch an NIS RECORDER to the operable source range.
: 4. IF one Source Range having audible count rate in the Control Room and Containment, AND 2 out of 4 NIS (NSSS Source Range and Gamma Metrics) Channels are not operable, THEN verify RCS boron concentration is greater than or equal to the required boron concentration at least once per 12 hours.
: 5. Notify I&C.
: 6. Monitor Backup NIS (Gamma Metric) Source Range Count Rate.
STANDARD: Operator removes N-31 from service.
: 1. Positions LEVEL TRIP switch to BYPASS.
~. Positions HIGH FLUX AT SHUTDOWN switch to BLOCK.
: 3. Verifies N-32 displayed on console NIS recorder.
f4. Contacts Chemistry determines Boron concentration:::: 1950 ppm.
: 5. Notifies I&C of N-31 failure.
~. Determines both backup NIS (Gamma-Metric) channels OOS.
1.lf called as Reactor Engineering, state that the required RCS Boron
~oncentration is> 1950 ppm.
CUES:
~.If called as Chemistry, confirm Boron concentration is 2000 ppm.
3.Respond as I&C if notified of N-31 failure.
f4.lnform the applicant that another operator will continue from this ipoint.
Comment NOTE:
Only Standards 1 and 2 are critical.  


  \Appendix C                                 Page 7 of 7                               Form ES-C-11 iApplicant Applicant should return JPM Initial Condition sheet and state that STEP   4                                                                             - -SAT pperator operator actions are complete.
\\Appendix C Page 7 of 7 Form ES-C-11 STEP 4
                                                                                        - -UNSAT Terminating If operator attempts any other compensatory actions beyond this point     STOP CUE:     ell operator that JPM has been completed.
iApplicant should return JPM Initial Condition sheet and state that SAT pperator actions are complete.
UNSAT Terminating If operator attempts any other compensatory actions beyond this point STOP CUE:
ell operator that JPM has been completed.
Stop Time ----
\\Appendix C Page 7 of 7 Form ES-C-11 STEP 4
Applicant should return JPM Initial Condition sheet and state that SAT operator actions are complete.
UNSAT Terminating If operator attempts any other compensatory actions beyond this point STOP CUE:
ell operator that JPM has been completed.
Stop Time ----
Stop Time ----


Appendix C                                                                     Page 8 of7                                         Form ES-C-1 Verification of Completion
Appendix C Page 8 of7 Form ES-C-1 Verification of Completion  
*~ Job JobPe~rmanceMeasuffiNo.N Performance Measure No.N      ~=R~C~-~2~5-~S=IM~~~P=M~-D~~~~~~~~~~~~~~~~~_
~
                                    =-:..:..R:..;:C=---=.2=-5-...::S:..:..IM:..:..=--J:.:P-=.M.:..=-..:-D=---_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
JobPe~rmanceMeasuffiNo.N  
~=R~C~-~2~5-~S=IM~~~P=M~-D~~~~~~~~~~~~~~~~~_
Examinee's Name:
Examinee's Name:
Examiner's Name:
Examiner's Name:
Line 1,227: Line 2,414:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:  
*~
~  


===Response===
===Response===
Result:   Satisfactory/Unsatisfactory
Result:
*~
Satisfactory/Unsatisfactory  
~
Examiner's signature and date:
Examiner's signature and date:
Appendix C Page 8 of7 Form ES-C-1 Verification of Completion Job Performance Measure No.N
=-:..:..R:..;:C=---=.2=-5-...::S:..:..IM:..:..=--J:.:P-=.M.:..=-..:-D=---________________
Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:


  ~ppendix C Page 9 of 7 Form ES-C-11
===Response===
Result:
Satisfactory/Unsatisfactory Examiner's signature and date:


JPM BRIEFING SHEET
~ppendix C Page 9 of 7 Form ES-C-11
* INITIAL CONDITIONS:
~ppendix C Page 9 of 7 Form ES-C-11
 
JPM BRIEFING SHEET INITIAL CONDITIONS:
: 1. Unit 3 is in Mode 6.
: 2. Refueling activities are in progress.
: 3. NIS Source Ranges are both in service.
: 4. Both Gamma Metrics are OOS for maintenance.
!NITIA TlNG CUE:
Respond to plant conditions.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
JPM BRIEFING SHEET INITIAL CONDITIONS:
: 1. Unit 3 is in Mode 6.
: 1. Unit 3 is in Mode 6.
: 2. Refueling activities are in progress.
: 2. Refueling activities are in progress.
: 3. NIS Source Ranges are both in service.
: 3. NIS Source Ranges are both in service.
: 4. Both Gamma Metrics are OOS for maintenance.
: 4. Both Gamma Metrics are OOS for maintenance.  
  !NITIA TlNG CUE:
!NITIA TlNG CUE:
Respond to plant conditions.
Respond to plant conditions.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK .
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.  


Appendix C                                         Job Performance Measure                               Form ES-C-1 Worksheet Facility:              _T_u_rk_e___y_P_o_in_t T_ur_k_e-'-y_P_o_in_t_ _ _ _ _ _ _Task No:
Appendix C Facility:
* Task
Job Performance Measure Worksheet T_ur_k_e-'-y_P_o_in_t _______ Task No:
Purging the PR T to Reduce Oxygen or Hydrogen Concentration (Major Gas Volume)
Form ES-C-1 Task


==Title:==
==Title:==
Purging the PRT to Reduce Oxygen or Hydrogen Concentration (Major Gas Volume) 007 Kl.04 Nitrogen 2.1/2.3 JPM No:          NRC-25-SIM-JPM-E KIA  
JPM No:
NRC-25-SIM-JPM-E 007 Kl.04 Nitrogen 2.1/2.3 KIA  


==Reference:==
==Reference:==
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance Actual Performance x
Classroom SimulatorX Plant Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume Unit 3 is in Mode 1 at 100% Power with no equipment out of service.
3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the off-going shift You are the oncoming Reactor Operator and have been briefed on the evolution.
PRT Level is at 80%.
Task Standard:
Purge the PRT to Reduce Oxygen Concentration to within required specifications.
Required Materials:
3-NOP-041.3, Pressurizer Relief Tank General
==References:==
3-NOP-041.3, Pressurizer Relief Tank NUREG 1021 Rev 9 Appendix C Appendix C Facility:
Job Performance Measure Worksheet
_T_u_rk_e ___ y_P_o_in_t _______ Task No:
Purging the PR T to Reduce Oxygen or Hydrogen Concentration (Major Gas Volume)
Form ES-C-1 Task
==Title:==
JPM No:
NRC-25-SIM-JPM-E 007 Kl.04 Nitrogen 2.1/2.3 KIA


==Reference:==
Examinee:
Examinee:
                            ----------------------NRC Examiner:
NRC Examiner:
Facility Evaluator:                                           Date:
Facility Evaluator:
Date:
Method of testing:
Method of testing:
Simulated Performance                                         Actual Performance                   x Classroom                                         SimulatorX                             Plant Read to the examinee:
Simulated Performance Actual Performance x
Classroom SimulatorX Plant Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
* Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume
Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume Unit 3 is in Mode 1 at 100% Power with no equipment out of service.
* Unit 3 is in Mode 1 at 100% Power with no equipment out of service.
3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the off-going shift You are the oncoming Reactor Operator and have been briefed on the evolution.
* 3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the off-
PRT Level is at 80%.
* going shift
* You are the oncoming Reactor Operator and have been briefed on the evolution.
* PRT Level is at 80%.
Task Standard:
Task Standard:
* Purge the PRT to Reduce Oxygen Concentration to within required specifications.
Purge the PRT to Reduce Oxygen Concentration to within required specifications.
Required Materials:
Required Materials:
* 3-NOP-041.3, Pressurizer Relief Tank General  
3-NOP-041.3, Pressurizer Relief Tank General  


==References:==
==References:==
* 3-NOP-041.3, Pressurizer Relief Tank
3-NOP-041.3, Pressurizer Relief Tank NUREG 1021 Rev 9 Appendix C  
* NUREG 1021 Rev 9 Appendix C


Appendix C                                   Page 2 of 12                               Form ES-C-1 Initiating Cue:
Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
* You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11.
You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11.
*
All prerequisites have been satisfied.
* All prerequisites have been satisfied.
You are continuing 3-NOP-041.3 after a turnover from the off-going shift.
* You are continuing 3-NOP-041.3 after a turnover from the off-going shift.
Time Critical Task: No Validation Time:
Time Critical Task: No Validation Time:     10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11.
All prerequisites have been satisfied.
You are continuing 3-NOP-041.3 after a turnover from the off-going shift.
Time Critical Task: No Validation Time:
10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
NUREG 1021 Rev 9 Appendix C  


  !AppendiX C                               Page 3 of 12                 Form ES-C-1!
!AppendiX C Page 3 of 12 Form ES-C-1!
SIMULATOR SETUP Reset to IC #
Load saved IC on Flash Drive XR-043.dat Load Lesson Ensure Simulator Operator Checklist is complete CLOSE Gas waste Disposal V4658A & B NUREG 1021 Rev 9 Appendix C
!AppendiX C Page 3 of 12 Form ES-C-1!
SIMULATOR SETUP Reset to IC #
SIMULATOR SETUP Reset to IC #
* Load saved IC on Flash Drive XR-043.dat Load Lesson Ensure Simulator Operator Checklist is complete CLOSE Gas waste Disposal V4658A & B
Load saved IC on Flash Drive XR-043.dat Load Lesson Ensure Simulator Operator Checklist is complete CLOSE Gas waste Disposal V4658A & B NUREG 1021 Rev 9 Appendix C  
* NUREG 1021 Rev 9 Appendix C


Appendix C                                   Page 4 of 12                           Form ES-C-1 Denote critical steps with a check mark,O Start Time - - - -
Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark,O Start Time ----
* STEP    1
: 11. ENSURE CV-3-549, PRT VENT, is OPEN STEP 1
          ..J
SAT  
: 11. ENSURE CV-3-549, PRT VENT, is OPEN SAT UNSAT
..J UNSAT
: 1. Placed PRT Vent Valve, CV-3-S49 switch to open.
: 1. Placed PRT Vent Valve, CV-3-S49 switch to open.
Standard:
Standard:
: 2. Verified PRT Vent Valve, CV-3-S49 Red Ught ON Green Ught OFF.
: 2. Verified PRT Vent Valve, CV-3-S49 Red Ught ON Green Ught OFF.
Cue Comment NOTE:       Standard #2 is not critical.
Cue Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
Standard #2 is not critical.
NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark,O Start Time ----
: 11. ENSURE CV-3-549, PRT VENT, is OPEN STEP 1
SAT
..J UNSAT
: 1. Placed PRT Vent Valve, CV-3-S49 switch to open.
Standard:
: 2. Verified PRT Vent Valve, CV-3-S49 Red Ught ON Green Ught OFF.
Cue Comment NOTE:
Standard #2 is not critical.
NUREG 1021 Rev 9 Appendix C  


  !Appendix C                               Page 5 of 12                           Form ES-C-1!
!Appendix C Page 5 of 12 Form ES-C-1!
: 13. OPEN CV-3-519B, PRT PRIMARY WATER MAKE UP.
STEP 2
SAT UNSAT
: 1. Placed PRT Vent Valve, CV-3-5198 switch to open.
Standard:
~. Verified PRT Vent Valve, CV-3-5198 Red Light ON Green Light OFF.
Cue Comment NOTE:
Standard #2 is not critical.
NUREG 1021 Rev 9 Appendix C
!Appendix C Page 5 of 12 Form ES-C-1!
: 13. OPEN CV-3-519B, PRT PRIMARY WATER MAKE UP.
: 13. OPEN CV-3-519B, PRT PRIMARY WATER MAKE UP.
STEP     2                                                                         SAT UNSAT
STEP 2
SAT UNSAT
: 1. Placed PRT Vent Valve, CV-3-5198 switch to open.
: 1. Placed PRT Vent Valve, CV-3-5198 switch to open.
Standard:
Standard:
                ~.
: 2. Verified PRT Vent Valve, CV-3-5198 Red Light ON Green Light OFF.
: 2. Verified PRT Vent Valve, CV-3-5198 Red Light ON Green Light OFF.
Cue Comment NOTE:   Standard #2 is not critical.
Cue Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
Standard #2 is not critical.
NUREG 1021 Rev 9 Appendix C  


Appendix C                                   Page 6 of 12                       Form ES-C-1 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP   3 ~oncentration                                                         SAT Concentration (Major Gas Volume) (continued)                     -
Appendix C Page 6 of 12 Form ES-C-1 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP 3  
            ~
~oncentration (Major Gas Volume) (continued)
SAT
~
UNSAT
UNSAT
: 14. WHEN any of the following conditions exists:                 -
: 14. WHEN any of the following conditions exists:
* PRT level approaches 95% on LI-3-470, PRZR RELIEF TK LEVEL
* PRT level approaches 95% on LI-3-470, PRZR RELIEF TK LEVEL
* PRT pressure approaches 10 psig on PI-3-472, PRZR RELIEF TK PRESSURE THEN CLOSE CV-3-519B, PRT PRIMARY
* PRT pressure approaches 10 psig on PI-3-472, PRZR RELIEF TK PRESSURE THEN CLOSE CV-3-519B, PRT PRIMARY WATER MAKE UP.
              ~ATER WATER MAKE UP.
: 1. When PRT level approaches 95% placed PRT Vent Valve, CV Standard:
: 1. When PRT level approaches 95% placed PRT Vent Valve, CV                   5198 switch to close.
5198 switch to close.
Standard:
              ~.
: 2. Verified PRT Vent Valve, CV-3-5198 Red light OFF Green light ON Cue Comment
: 2. Verified PRT Vent Valve, CV-3-5198 Red light OFF Green light ON Cue Comment
: 1. Standard #2 is not critical.
: 1. Standard #2 is not critical.
NOTE:
NOTE:
NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP 3
Concentration (Major Gas Volume) (continued)
SAT
~
UNSAT
: 14. WHEN any of the following conditions exists:
* PRT level approaches 95% on LI-3-470, PRZR RELIEF TK LEVEL
* PRT pressure approaches 10 psig on PI-3-472, PRZR RELIEF TK PRESSURE THEN CLOSE CV-3-519B, PRT PRIMARY
~ATER MAKE UP.
: 1. When PRT level approaches 95% placed PRT Vent Valve, CV Standard:
5198 switch to close.
~. Verified PRT Vent Valve, CV-3-5198 Red light OFF Green light ON Cue Comment
: 1. Standard #2 is not critical.
NOTE:
NUREG 1021 Rev 9 Appendix C  


jAppendix C                                 Page 7 of 12                             Form ES-C-1!
jAppendix C Page 7 of 12 Form ES-C-1!
: 15. MAINTAIN PRT level at 90 to 95% for 25 to 35 minutes.
: 15. MAINTAIN PRT level at 90 to 95% for 25 to 35 minutes.
STEP     4                                                                           SAT UNSAT Standard:
STEP 4
SAT UNSAT Standard:
: 1. Tell operator that 35 minutes have elapsed.
: 1. Tell operator that 35 minutes have elapsed.
Cue   ~.
Cue
: 2. Tell operator that 3-NOP-041.3 steps 16,17, and 18 have been completed.
: 2. Tell operator that 3-NOP-041.3 steps 16,17, and 18 have been completed.
Comment NOTE:
Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C jAppendix C Page 7 of 12 Form ES-C-1!
: 15. MAINTAIN PRT level at 90 to 95% for 25 to 35 minutes.
STEP 4
SAT UNSAT Standard:
: 1. Tell operator that 35 minutes have elapsed.
Cue
~. Tell operator that 3-NOP-041.3 steps 16,17, and 18 have been completed.
Comment NOTE:
NUREG 1021 Rev 9 Appendix C  


Appendix C   Page 8 of 12                 Form ES-C-1 STEP   5                                 SAT UNSAT Standard:
Appendix C Page 8 of 12 Form ES-C-1 STEP 5
SAT UNSAT Standard:
Cue Comment NOTE:
Cue Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 STEP 5
SAT UNSAT Standard:
Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C  


jAppendix C                                 Page 9 of 12                             Form ES-C-11 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP     6   Concentration (Major                                                     SAT
jAppendix C Page 9 of 12 Form ES-C-11 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP 6
            .,j Gas Volume) (continued)
Concentration (Major SAT  
.,j Gas Volume) (continued)
UNSAT
UNSAT
: 19. WHEN PRT pressure indicated on PI-3-472 has lowered to approximately 6 psig, as controlled by nitrogen supply regulator, THEN CLOSE CV-3-549, PRT VENT.
: 19. WHEN PRT pressure indicated on PI-3-472 has lowered to approximately 6 psig, as controlled by nitrogen supply regulator, THEN CLOSE CV-3-549, PRT VENT.
ITHEN
: 1. Placed PRT Vent Valve, CV-3-549 switch to close.
: 1. Placed PRT Vent Valve, CV-3-549 switch to close.
Standard: ~.
Standard:
: 2. Verified PRT Vent Valve, CV-3-549 Red Light OFF Green Light ON Tell operator that Chemistry informs Reactor Operator that PRT trell Cue     oxygen reading is less than 2 percent oxygen by volume.
: 2. Verified PRT Vent Valve, CV-3-549 Red Light OFF Green Light ON Tell operator that Chemistry informs Reactor Operator that PRT Cue oxygen reading is less than 2 percent oxygen by volume.
Comment Standard #2 is not critical.
NOTE:
NUREG 1021 Rev 9 Appendix C jAppendix C Page 9 of 12 Form ES-C-11 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP 6
Concentration (Major SAT
.,j Gas Volume) (continued)
UNSAT
: 19. WHEN PRT pressure indicated on PI-3-472 has lowered to approximately 6 psig, as controlled by nitrogen supply regulator, ITHEN CLOSE CV-3-549, PRT VENT.
: 1. Placed PRT Vent Valve, CV-3-549 switch to close.
Standard:
~. Verified PRT Vent Valve, CV-3-549 Red Light OFF Green Light ON trell operator that Chemistry informs Reactor Operator that PRT Cue oxygen reading is less than 2 percent oxygen by volume.
Comment Standard #2 is not critical.
Comment Standard #2 is not critical.
NOTE:
NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


Appendix C                                   Page 10 of 12                             Form ES-C-1
Appendix C Page 10 of 12 Form ES-C-1  
                ~1. WHEN Chemistry reports PRT oxygen reading less than 2%
~1. WHEN Chemistry reports PRT oxygen reading less than 2%
121.
STEP 7
STEP   7         by volume, THEN:                                                 - -SAT
by volume, THEN:
            ..j IA.
SAT  
                'A. CLOSE CV-3-519A, PRT VENT.                                         - -UNSAT
..j UNSAT
: 1. CV-3-519A, Primary Water to Containment Isolation switch Standard:           taken to close.
'A. CLOSE CV-3-519A, PRT VENT.
: 1. CV-3-519A, Primary Water to Containment Isolation switch Standard:
taken to close.
: 2. Veriified CV-3-519A Green Light ON, Red Light OFF.
: 2. Veriified CV-3-519A Green Light ON, Red Light OFF.
Cue     ~fter After standard #2 has been completed, inform the Reactor Operator hat another operator will perform the remainder of the procedure.
Cue After standard #2 has been completed, inform the Reactor Operator hat another operator will perform the remainder of the procedure.
Comment NOTE:
Comment NOTE:
Standard #2 is not critical.
Standard #2 is not critical.
Terminating Cue:                                                                               STOP
Terminating STOP Cue:  
                'The task is complete when the Examinee returns the cue sheet to IThe
'The task is complete when the Examinee returns the cue sheet to the examiner.
                ~he the examiner.
Stop Time ----
Stop Time _ _ __
NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 121. WHEN Chemistry reports PRT oxygen reading less than 2%
NUREG 1021 Rev 9 Appendix C
STEP 7
by volume, THEN:
SAT
..j UNSAT IA. CLOSE CV-3-519A, PRT VENT.
: 1. CV-3-519A, Primary Water to Containment Isolation switch Standard:
taken to close.
: 2. Veriified CV-3-519A Green Light ON, Red Light OFF.
Cue
~fter standard #2 has been completed, inform the Reactor Operator hat another operator will perform the remainder of the procedure.
Comment NOTE:
Standard #2 is not critical.
Terminating STOP Cue:
IThe task is complete when the Examinee returns the cue sheet to
~he examiner.
Stop Time ___ _
NUREG 1021 Rev 9 Appendix C  
 
jAppendix C Page 11 of 12 Form ES-C-11 Verification of Completion Job Performance Measure No. NRC-2S-SIM-JPM-E
~~~~~~~~-------------------------------------
Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:


jAppendix C                               Page 11 of 12                   Form ES-C-11 Verification of Completion
===Response===
* Job Performance Measure No. NRC-2S-SIM-JPM-E Examinee's Name:
Result:
Satisfactory/Unsatisfactory Examiner's signature and date:
NUREG 1021 Rev 9 Appendix C jAppendix C Page 11 of 12 Form ES-C-11 Verification of Completion Job Performance Measure No. NRC-2S-SIM-JPM-E  
~~~~~~~~-------------------------------------
Examinee's Name:
Examiner's Name:
Examiner's Name:
                                    ~~~~~~~~-------------------------------------
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,376: Line 2,712:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:  


===Response===
===Response===
Result:   Satisfactory/Unsatisfactory
Result:
* Examiner's signature and date:
Satisfactory/Unsatisfactory Examiner's signature and date:
NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied .
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
* Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume
Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume Unit 3 is in Mode 1 at 100% Power with no equipment out of service.
* Unit 3 is in Mode 1 at 100% Power with no equipment out of service.
3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the off-going shift You are the oncoming Reactor Operator and have been briefed on the evolution.
* 3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the off-going shift
PRT Level is at 80%.
* You are the oncoming Reactor Operator and have been briefed on the evolution.
* PRT Level is at 80%.
Initiating Cue:
Initiating Cue:
* You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11.
You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11.
* All prerequisites have been satisfied.
All prerequisites have been satisfied.
* You are continuing 3-NOP-041.3 after a turnover from the off-going shift.
You are continuing 3-NOP-041.3 after a turnover from the off-going shift.
Acknowledge to the examiner when you are ready to begin.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK .
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume Unit 3 is in Mode 1 at 100% Power with no equipment out of service.
3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the off-going shift You are the oncoming Reactor Operator and have been briefed on the evolution.
PRT Level is at 80%.
Initiating Cue:
You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11.
All prerequisites have been satisfied.
You are continuing 3-NOP-041.3 after a turnover from the off-going shift.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
NUREG 1021 Rev 9 Appendix C  


Appendix C                                     Job Performance Measure                                 Form ES-C-1 Worksheet Facility:              T_u_r_k~eY,---P_oi_nt Turkey      Point_ _ _ _ _ _ _Task No:
Appendix C Facility:
                            --~~---------------
Job Performance Measure Worksheet T_u_r_k~eY,---P_oi_nt _______ Task No:
INITIATE CONTAINMENT PURGE Task
INITIATE CONTAINMENT PURGE Form ES-C-1 Task


==Title:==
==Title:==
NRC-25-SIM-JPM-F
JPM No:
                            -  - - - - - - - - - - - -JPM No:
NRC-25-SIM-JPM-F 029 A4.01 Containment purge flow rate 2.5/2.5 KIA  
029 A4.01 Containment purge flow rate 2.5/2.5 KIA  


==Reference:==
==Reference:==
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance Classroom Actual Performance SimulatorX --------
Read to the examinee:
x Plant ---------
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.
UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.
CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.
3-NOP-053, CONTAINMENT PURGE SYSTEM IS SIGNED OFF AND COMPLETED UP TO STEP 4.1.1.1l.
Task Standard:
ISOLATION VALVES OPEN AND PURGE FANS RUNNING IN ACCORDANCE WITH 3NOP-053, CONTAINMENT PURGE SYSTEM Required Materials:
3-NOP-053, CONTAINMENT PURGE SYSTEM APPROVED CONTAINMENT PURGE RELEASE PERMIT General


==References:==
3-NOP-053, CONTAINMENT PURGE SYSTEM NUREG 1021 Rev 9 Appendix C Appendix C Facility:
Job Performance Measure Worksheet Turkey Point Task No:
--~~---------------
INITIATE CONTAINMENT PURGE Form ES-C-1 Task
==Title:==
JPM No:
NRC-25-SIM-JPM-F 029 A4.01 Containment purge flow rate 2.5/2.5 KIA
==Reference:==
Examinee:
Examinee:
                            ---------------------NRC Examiner:
NRC Examiner:
Facility Evaluator:                                         Date:
Facility Evaluator:
Date:
Method of testing:
Method of testing:
Simulated Performance                                       Actual Performance                     x Classroom                                      SimulatorX                               Plant-Read to the examinee:
Simulated Performance Classroom Actual Performance SimulatorX --------
Read to the examinee:
x Plant -------
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
* UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.
UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.
* UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
* UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED .
UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
* ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.
ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.
* CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.
CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.
* 3-NOP-053, CONTAINMENT PURGE SYSTEM IS SIGNED OFF AND COMPLETED UP TO STEP 4.1.1.1l.
3-NOP-053, CONTAINMENT PURGE SYSTEM IS SIGNED OFF AND COMPLETED UP TO STEP 4.1.1.1l.
Task Standard:
Task Standard:
* ISOLATION VALVES OPEN AND PURGE FANS RUNNING IN ACCORDANCE WITH 3NOP-053, CONTAINMENT PURGE SYSTEM Required Materials:
ISOLATION VALVES OPEN AND PURGE FANS RUNNING IN ACCORDANCE WITH 3NOP-053, CONTAINMENT PURGE SYSTEM Required Materials:
* 3-NOP-053, CONTAINMENT PURGE SYSTEM
3-NOP-053, CONTAINMENT PURGE SYSTEM APPROVED CONTAINMENT PURGE RELEASE PERMIT General  
* APPROVED CONTAINMENT PURGE RELEASE PERMIT General  


==References:==
==References:==
* 3-NOP-053, CONTAINMENT PURGE SYSTEM
3-NOP-053, CONTAINMENT PURGE SYSTEM NUREG 1021 Rev 9 Appendix C  
* NUREG 1021 Rev 9 Appendix C


Appendix C                                     Page 2 of 12                             Form ES-C-1 Initiating Cue:
Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
* 1. A satisfactory shift turnover has been completed.
: 1. A satisfactory shift turnover has been completed.
: 2. You have been directed to continue with Step 4.1.1.12 of3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.
Time Critical Task: No Validation Time:
10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEl NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
: 1. A satisfactory shift turnover has been completed.
: 2. You have been directed to continue with Step 4.1.1.12 of3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.
: 2. You have been directed to continue with Step 4.1.1.12 of3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.
Time Critical Task: No Validation Time:     10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEl NUREG 1021 Rev 9 Appendix C
Time Critical Task: No Validation Time:
10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEl NUREG 1021 Rev 9 Appendix C  


  ~ppendix C                                 Page 3 of 12                     Form ES-C-1!
~ppendix C Page 3 of 12 Form ES-C-1!
SIMULATOR SETUP Reset to IC #
Mode 5 IC with Containment Purge Valves CLOSED and Fans OFF Load Lesson Ensure Simulator Operator Checklist is complete NUREG 1021 Rev 9 Appendix C
~ppendix C Page 3 of 12 Form ES-C-1!
SIMULATOR SETUP Reset to IC #
SIMULATOR SETUP Reset to IC #
* Mode 5 IC with Containment Purge Valves CLOSED and Fans OFF Load Lesson Ensure Simulator Operator Checklist is complete
Mode 5 IC with Containment Purge Valves CLOSED and Fans OFF Load Lesson Ensure Simulator Operator Checklist is complete NUREG 1021 Rev 9 Appendix C  
* NUREG 1021 Rev 9 Appendix C


Appendix C                               Page 4 of 12                               Form ES-C-1 Denote critical steps with a check marI(O Start Time
Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check marI(O Start Time ----
              ~.1.1.12 4.1.1.12 STEP   1                                                                         - -SAT
~.1.1.12 STEP 1
          ~   Open the following valves:
SAT  
: 1. Containment Purge Exhaust Isol (O.C.), POV-3-2602                   - -UNSAT
~
              ~.
Open the following valves:
: 2. Containment Purge Exhaust Isol (I.c.),
UNSAT
(I.e.), POV 2603
: 1. Containment Purge Exhaust Isol (O.C.), POV-3-2602  
~. Containment Purge Exhaust Isol (I.e.), POV 2603
: 1. Containment Purge Exhaust Isol (O.C.), POV-3-2602 switch placed to Open
: 1. Containment Purge Exhaust Isol (O.C.), POV-3-2602 switch placed to Open
: 2. Verified Containment Purge Exhaust Isol (O.C.), POV-3-2602 Red Standard:
: 2. Verified Containment Purge Exhaust Isol (O.C.), POV-3-2602 Red Standard:
Light On, Green Light Off.
Light On, Green Light Off.
: 3. Containment Purge Exhaust Isol (I.C.), POV-3-2603 switch placed to Open
: 3. Containment Purge Exhaust Isol (I.C.), POV-3-2603 switch placed to Open
              ~.
: 4. Verified Containment Purge Exhaust Isol (O.e.), POV-3-2603 Red Light On, Green Light Off.
: 4. Verified Containment Purge Exhaust Isol (O.c.),
Cue Comment NOTE:
(O.e.), POV-3-2603 Red Light On, Green Light Off.
Standards #2 and #4 not critical NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check marI(O Start Time ----
Cue Comment
4.1.1.12 STEP 1
* NOTE:   Standards #2 and #4 not critical
SAT
* NUREG 1021 Rev 9 Appendix C
~
Open the following valves:
UNSAT
: 1. Containment Purge Exhaust Isol (O.C.), POV-3-2602
: 2. Containment Purge Exhaust Isol (I.c.), POV 2603
: 1. Containment Purge Exhaust Isol (O.C.), POV-3-2602 switch placed to Open
: 2. Verified Containment Purge Exhaust Isol (O.C.), POV-3-2602 Red Standard:
Light On, Green Light Off.
: 3. Containment Purge Exhaust Isol (I.C.), POV-3-2603 switch placed to Open
~. Verified Containment Purge Exhaust Isol (O.c.), POV-3-2603 Red Light On, Green Light Off.
Cue Comment NOTE:
Standards #2 and #4 not critical NUREG 1021 Rev 9 Appendix C  


  ~ppendix C                                   Page 5 of 12                           Form ES-C-11
~ppendix C Page 5 of 12 Form ES-C-11 STEP 2
                ~.1.1.13 4.1.1.13 STEP    2                                                                        - -SAT
4.1.1.13 SAT Prepare to open Containment Purge Supply Isolation Valves UNSAT If both conditions are met then both Unit 3 Containment Purge Supply lValves will be open.
* Prepare to open Containment Purge Supply Isolation Valves
Standard:
                !prepare If both conditions are met then both Unit 3 Containment Purge Supply
                ;Valves will be open.
lValves
                                                                                      - -UNSAT Standard:
: 1. Verified Containment Doors/Hatches closed to atmosphere.
: 1. Verified Containment Doors/Hatches closed to atmosphere.
p.2. Verified on opposite Unit that Purge Supply Valves closed or Doors/Hatches are closed to atmosphere Repeat applicable initial conditions if asked:
: p. Verified on opposite Unit that Purge Supply Valves closed or Doors/Hatches are closed to atmosphere Repeat applicable initial conditions if asked:
* UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
* UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
Cue
Cue
* UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
* UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
Comment NOTE:   [This This information is covered in the Initial Conditions
Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
This information is covered in the Initial Conditions NUREG 1021 Rev 9 Appendix C
~ppendix C Page 5 of 12 Form ES-C-11 STEP 2
~.1.1.13 SAT
!prepare to open Containment Purge Supply Isolation Valves UNSAT If both conditions are met then both Unit 3 Containment Purge Supply
;Valves will be open.
Standard:
: 1. Verified Containment Doors/Hatches closed to atmosphere.
: 2. Verified on opposite Unit that Purge Supply Valves closed or Doors/Hatches are closed to atmosphere Repeat applicable initial conditions if asked:
* UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
Cue
* UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
Comment NOTE:
[This information is covered in the Initial Conditions NUREG 1021 Rev 9 Appendix C  


Appendix C                                 Page 6 of 12                             Form ES-C-1
Appendix C Page 6 of 12 Form ES-C-1 STEP 3
              ~.1.1.13 4.1.1.13 (contd.)'
4.1.1.13 (contd.)'
STEP    3                                                                            SAT Open the following valves:
SAT Open the following valves:
            ~
~
: 1. Containment Purge Supply Isol (O.C.), POV-3-2600                   -
: 1. Containment Purge Supply Isol (O.C.), POV-3-2600 UNSAT t2. Containment Purge Supply Isol (I.C.), POV 2601
UNSAT t2.Q. Containment Purge Supply Isol (I.C.), POV 2601
: 1. Containment Purge Supply Isol (O.C.), POV 2600 switch placed to Open.
~. Verified Containment Purge Supply Isol (O.C.), POV-3-2600 Red Standard:
Light On, Green Light Off.
: b. Containment Purge Supply Isol (I.C.), POV 2601 switch placed to Open.
~. Verified Containment Purge Supply Isol (O.C.), POV-3-2601 Red Light On, Green Light Off.
Cue Comment NOTE:
Standards #2 and #4 not critical NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 STEP 3
~.1.1.13 (contd.)'
SAT Open the following valves:  
~
: 1. Containment Purge Supply Isol (O.C.), POV-3-2600 UNSAT Q. Containment Purge Supply Isol (I.C.), POV 2601
: 1. Containment Purge Supply Isol (O.C.), POV 2600 switch placed to Open.
: 1. Containment Purge Supply Isol (O.C.), POV 2600 switch placed to Open.
              ~.
: 2. Verified Containment Purge Supply Isol (O.C.), POV-3-2600 Red Standard:
: 2. Verified Containment Purge Supply Isol (O.C.), POV-3-2600 Red Standard:       Light On, Green Light Off.
Light On, Green Light Off.
b.
: 3. Containment Purge Supply Isol (I.C.), POV 2601 switch placed to Open.
: 3. Containment Purge Supply Isol (I.C.), POV 2601 switch placed to Open.
              ~.
: 4. Verified Containment Purge Supply Isol (O.C.), POV-3-2601 Red Light On, Green Light Off.
: 4. Verified Containment Purge Supply Isol (O.C.), POV-3-2601 Red Light On, Green Light Off.
Cue Comment NOTE:   Standards #2 and #4 not critical NUREG 1021 Rev 9 Appendix C
Cue Comment NOTE:
Standards #2 and #4 not critical NUREG 1021 Rev 9 Appendix C  


jAppendiX C                                 Page 7 of 12                                 Form ES-C-1!
jAppendiX C Page 7 of 12 Form ES-C-1!
fl.1.1.14 4.1.1.14 STEP     4                                                                           - -SAT
fl.1.1.14 STEP 4
*            ~ Start 3V20: Unit 3 Containment Purge Exhaust Fan .
SAT
: 1. Control Switch Positioned to Run
~
                                                                                          - -UNSAT
Start 3V20: Unit 3 Containment Purge Exhaust Fan.
                ~.
UNSAT
: 2. Verified Fan Red Light On and Green Light Off Standard:
: 1. Control Switch Positioned to Run Standard:
: 3. Verified Damper Red Light On Green Light Off If candidate attempts to have 4V20: Unit 4 Containment Purge Exhaust Cue   Fan, tell candidate that the Unit Supervisor desires the Unit 3 Fan to be started.
~. Verified Fan Red Light On and Green Light Off
Comment NOTE:   Standards 2,3, and 4 are not critical
: 3. Verified Damper Red Light On Green Light Off If candidate attempts to have 4V20: Unit 4 Containment Purge Exhaust Cue Fan, tell candidate that the Unit Supervisor desires the Unit 3 Fan to be started.
* NUREG 1021 Rev 9 Appendix C
Comment NOTE:
Standards 2,3, and 4 are not critical NUREG 1021 Rev 9 Appendix C jAppendiX C Page 7 of 12 Form ES-C-1!
4.1.1.14 STEP 4
SAT  
~
Start 3V20: Unit 3 Containment Purge Exhaust Fan.
UNSAT
: 1. Control Switch Positioned to Run Standard:
: 2. Verified Fan Red Light On and Green Light Off
: 3. Verified Damper Red Light On Green Light Off If candidate attempts to have 4V20: Unit 4 Containment Purge Exhaust Cue Fan, tell candidate that the Unit Supervisor desires the Unit 3 Fan to be started.
Comment NOTE:
Standards 2,3, and 4 are not critical NUREG 1021 Rev 9 Appendix C  


Appendix C                                   Page 8 of 12                               Form ES-C-1
Appendix C Page 8 of 12 Form ES-C-1 STEP 5
                ~.1.1.15 14*1.1.15 STEP    5                                                                            - -SAT
~.1.1.15 SAT Start 3V9: Unit 3 Containment Purge Supply Fan.  
*            ..J Start 3V9: Unit 3 Containment Purge Supply Fan.
..J UNSAT
: 1. Verify POV-3-2600 and POV-3-2601, Containment Purge Supply Isolations are open.
: 1. Verify POV-3-2600 and POV-3-2601, Containment Purge Supply Isolations are open.
                                                                                        - -UNSAT
: 2. Control Switch Positioned to Run Standard:
                ~.
: 3. Verified Fan Red Light On and Green Light Off
: 2. Control Switch Positioned to Run Standard:   3. Verified Fan Red Light On and Green Light Off
                ~.
: 4. Verified Damper Red Light On Green Light Off
: 4. Verified Damper Red Light On Green Light Off
: 5. Ensures MO-3-3421, Unit 3 Containment Purge Exhaust Damper is OPEN.
: 5. Ensures MO-3-3421, Unit 3 Containment Purge Exhaust Damper is OPEN.
Cue     rrell Tell candidate that another operator will complete the remainder of the procedure.
Cue Tell candidate that another operator will complete the remainder of the procedure.
Comment NOTE:
Standards #2 and #3not critical
* Terminating The task is complete when the Examinee returns the cue sheet to STOP Cue:
the examiner.
Stop Time NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 STEP 5
14*1.1.15 SAT Start 3V9: Unit 3 Containment Purge Supply Fan.
..J UNSAT
: 1. Verify POV-3-2600 and POV-3-2601, Containment Purge Supply Isolations are open.
~. Control Switch Positioned to Run Standard:
: 3. Verified Fan Red Light On and Green Light Off
~. Verified Damper Red Light On Green Light Off
: 5. Ensures MO-3-3421, Unit 3 Containment Purge Exhaust Damper is OPEN.
Cue rrell candidate that another operator will complete the remainder of the procedure.
Comment NOTE:
Comment NOTE:
Standards #2 and #3not critical Terminating The task is complete when the Examinee returns the cue sheet to             STOP Cue:     the examiner.
Standards #2 and #3not critical
Stop Time NUREG 1021 Rev 9 Appendix C
* Terminating The task is complete when the Examinee returns the cue sheet to STOP Cue:
the examiner.
Stop Time NUREG 1021 Rev 9 Appendix C  
 
~ppendix C Page 9 of 12 Form ES-C-1!
Verification of Completion
~
JobPe~rmanceMeasureNo.N
_~R_C~-~2_5_-S~I_~_-_~_~~-_F~~~~~~~~~~~~~~~~~~
Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
~


  ~ppendix C                                 Page 9 of 12                     Form ES-C-1!
===Response===
Verification of Completion
Result:
~ JobPe~rmanceMeasureNo.N            _~R_C~-~2_5_-S~I_~_-_~_~~-_F~~~~~~~~~~~~~~~~~~
Satisfactory/Unsatisfactory Examiner's signature and date:
NUREG 1021 Rev 9 Appendix C
~ppendix C Page 9 of 12 Form ES-C-1!
Verification of Completion  
~
JobPe~rmanceMeasureNo. N~R_C_-_2_5-_S_I_~_-_~_~~-F~~~~~~~~~~~~~~~~~~
JobPe~rmanceMeasureNo. N~R_C_-_2_5-_S_I_~_-_~_~~-F~~~~~~~~~~~~~~~~~~
Examinee's Name:
Examinee's Name:
Line 1,527: Line 2,982:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:  
~
~  


===Response===
===Response===
Result:   Satisfactory/Unsatisfactory
Result:
* Examiner's signature and date:
Satisfactory/Unsatisfactory Examiner's signature and date:
NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied .
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
* UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.
UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.
* UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
* UNIT 4 IS IN MODE 1 WITH ALL PURGE V ALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
UNIT 4 IS IN MODE 1 WITH ALL PURGE V ALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
* ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.
ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.
* CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.
CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.
* 3-NOP-053, CONTAINMENT PURGE SYSTEM IS SIGNED OFF AND COMPLETED UP TO STEP 4.1.l.11.
3-NOP-053, CONTAINMENT PURGE SYSTEM IS SIGNED OFF AND COMPLETED UP TO STEP 4.1.l.11.  
  !NITIA TlNG CUE:
!NITIA TlNG CUE:
You have been directed to commence with Step 4.1.1.12 of 3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.
UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
UNIT 4 IS IN MODE 1 WITH ALL PURGE V ALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.
CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.
3-NOP-053, CONTAINMENT PURGE SYSTEM IS SIGNED OFF AND COMPLETED UP TO STEP 4.1.l.11.
!NITIA TlNG CUE:
You have been directed to commence with Step 4.1.1.12 of 3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.
You have been directed to commence with Step 4.1.1.12 of 3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.
Acknowledge to the examiner when you are ready to begin.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK .
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


Appendix C                                                                                       Job Performance Measure                              Form ES-C-1 Worksheet Facility:              T_ur_k_e.Ly_P_o_in_t Turkey                        Point_ _ _ _ _ _ _Task No:
Appendix C Facility:
                          ----~----------
Task
                          -:Fill    -II:-3.:.3A                                                                                        NRC-25-SIM-JPM-G Task


==Title:==
==Title:==
- : -Fi: --        .-
KIA  
006 A 1.13 Accumulator
                                                      -Accumulator
:. .A--=---Ac::-cc.-
:. ,u:.-
:. -m.:. .-
:. .u=l=at-
: . : .o.-
:. .:. .r_
                                                                                                                    -JPM No:
pressure (level, boron concentration )3.5/3.7 KIA  


==Reference:==
==Reference:==
Examinee:
Facility Evaluator:
Method of testing:
Job Performance Measure Worksheet Turkey Point Task No:
----~----------
Fill 3A Accumulator JPM No:
006 A 1.13 Accumulator pressure (level, boron concentration )3.5/3.7
-------------NRC Examiner:
Date:
Form ES-C-1 NRC-25-SIM-JPM-G Simulated Performance Actual Performance x
Classroom Simulator----.....,X~
Plant ----------
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
7.1.2.2.b,c, and d are marked N/A.
It is desired to use the 3A HHSI Pump for this task Task Standard:
Make-up to the 3A Safety Injection Accumulator to 6600 +/- 20 gallons.
Required Materials:
3-0P-064 Safety Injection Accumulators General


==References:==
3-0P-064 Safety Injection Accumulators NUREG 1021 Rev 9 Appendix C Appendix C Facility:
Task
==Title:==
KIA
==Reference:==
Examinee:
Examinee:
                          - - - - - - - - - - - - -NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                                                                                Date:
Method of testing:
Method of testing:
Simulated Performance                                                                                               Actual Performance             x Classroom                                                                                             Simulator======~X~_ _
Job Performance Measure Worksheet T_ur_k_e.Ly_P_o_in_t _______ Task No:
Simulator----.....,X~                Plant Read to the examinee:
-:::-Fi::--II:-3.:...:...A--=---Ac::-cc.:..,u:.:..-m.:...:...u=l=at::..::.o.:...:...r ____ JPM No:
006 A 1.13 Accumulator pressure (level, boron concentration )3.5/3.7 NRC Examiner:
Date:
Form ES-C-1 NRC-25-SIM-JPM-G Simulated Performance Actual Performance x
Classroom Simulator======~X~ __
Plant -------
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
* 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
* 7.1.2.2.b,c, and d are marked N/A.
7.1.2.2.b,c, and d are marked N/A.
* It is desired to use the 3A HHSI Pump for this task Task Standard:
It is desired to use the 3A HHSI Pump for this task Task Standard:
* Make-up to the 3A Safety Injection Accumulator to 6600 +/- 20 gallons.
Make-up to the 3A Safety Injection Accumulator to 6600 +/- 20 gallons.
Required Materials:
Required Materials:
* 3-0P-064 Safety Injection Accumulators General  
3-0P-064 Safety Injection Accumulators General  


==References:==
==References:==
* 3-0P-064 Safety Injection Accumulators
3-0P-064 Safety Injection Accumulators NUREG 1021 Rev 9 Appendix C  
* NUREG 1021 Rev 9 Appendix C


Appendix C                                               Page 2 of 12                                     Form ES-C-1 Initiating Initi ating Cue:
Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
You have been directed to raise 3A     JA Accumulator Level to 6600 +/- 20 gallons gall ons using 3A SAFETY INJECT ION PUMP INJECTION          PUM P starting at step:  7. 1.2.2.3.
You have been directed to raise 3A Accumulator Level to 6600 +/- 20 gallons using 3A SAFETY INJECTION PUMP starting at step: 7.1.2.2.3.
step: 7.1.2.2 .3.
3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
* 3-0  P- 064 Safety Injection Accumulators, Section 3-0P-064                                          Sec tion 7.1,
7.1.2.2.b,c, and d are marked N/A.
: 7. 1, Adding Make-up to the Safety Injection Injecti on Accumulators up to 7.1.2.2.2.a
Time Critical Task: NO Validation Time:
: 7. 1.2.2.2.a has been completed.
15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT TID TIME!
compl eted.
NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
* 77.1.2.2.b,c,                      NIA.
You have been directed to raise JA Accumulator Level to 6600 +/- 20 gallons using 3A SAFETY INJECTION PUMP starting at step: 7. 1.2.2.3.
        . 1.2.2.b,c, and d are marked N/A.
3-0 P-064 Safety Injection Accumulators, Section 7. 1, Adding Make-up to the Safety Injection Accumulators up to 7. 1.2.2.2.a has been completed.
Ti me Critical Time    Cri tica l Task: NO Va lidati on Time:
7.1.2.2.b,c, and d are marked NI A.
Validation                15 minutes HAND Jl'M JPM BRIEFING SHEET T          TOO EXAMINEE AT TID          T BlS TIME!
Time Critical Task: NO Validation Time:
TI ME!
15 minutes HAND Jl'M BRIEFING SHEET TO EXAMINEE AT T BlS TIME!
NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


  ~ppendiX C                                     Page 3 of 12                                   Form ES-C-1!
~ppendiX C Page 3 of 12 Form ES-C-1!
SIMULATOR SETUP Reset to IC # 1
SIMULATOR SETUP Reset to IC # 1 Load Lesson Open SI Pump 3A and 3B Test Recirc Isolation, 3-899L.
* Load Lesson
Open SI Pump 3A Test Recirc Isolation, 3-899K.
* Open SI Pump 3A and 3B Test Recirc Isolation, 3-899L.
Ensure Simulator Operator Checklist is complete Ensure marked up copy of 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed. Steps 7.1.2.2.b,c, and d are marked NI A. Step 7.1.2.3 is circled.
* Open SI Pump 3A Test Recirc Isolation, 3-899K.
NUREG 1021 Rev 9 Appendix C
~ppendiX C Page 3 of 12 Form ES-C-1!
SIMULATOR SETUP Reset to IC # 1 Load Lesson Open SI Pump 3A and 3B Test Recirc Isolation, 3-899L.
Open SI Pump 3A Test Recirc Isolation, 3-899K.
Ensure Simulator Operator Checklist is complete Ensure marked up copy of 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed. Steps 7.1.2.2.b,c, and d are marked NI A. Step 7.1.2.3 is circled.
Ensure Simulator Operator Checklist is complete Ensure marked up copy of 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed. Steps 7.1.2.2.b,c, and d are marked NI A. Step 7.1.2.3 is circled.
NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


Appendix C                                 Page 4 of 12                         Form ES-C-1 Denote critical steps with a check mark.O Start Time - - - -
Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time ----
* STEP     1
Open the Accumulator Makeup Valve for Accumulator A, CV-3-851A STEP 1
          ..j Open the Accumulator Makeup Valve for Accumulator A, CV-3-851A
SAT
                                                                                  - -SAT
..j UNSAT
                                                                                  - -UNSAT
: 1. Placed Control Switch to Open for Accumulator A, CV-3-851A
: 2. Verified Red OPEN light ON Standard:
: 3. Verified Green CLOSED light OFF Cue Comment NOTE:
Standards 2 and 3 are not critical.
NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time ----
Open the Accumulator Makeup Valve for Accumulator A, CV-3-851A STEP 1
SAT  
..j UNSAT
: 1. Placed Control Switch to Open for Accumulator A, CV-3-851A
: 1. Placed Control Switch to Open for Accumulator A, CV-3-851A
: 2. Verified Red OPEN light ON Standard: 3. Verified Green CLOSED light OFF Cue Comment NOTE:   Standards 2 and 3 are not critical.
: 2. Verified Red OPEN light ON Standard:
* NUREG 1021 Rev 9 Appendix C
: 3. Verified Green CLOSED light OFF Cue Comment NOTE:
Standards 2 and 3 are not critical.
NUREG 1021 Rev 9 Appendix C
 
!AppendiX C Page 5 of 12 Form ES-C-1!
Start the 3A Safety Injection Pump document the start time on QA STEP 2
!Record Page SAT
~
UNSAT
: 1. 3A HHSI Pump Control Switch turned to START Standard:
~. 3A HHSI Pump Red Run light is ON l3. 3A HHSI Pump Green Stop light is OFF Cue Comment NOTE:
Standards 2 and 3 are not critical.
NUREG 1021 Rev 9 Appendix C
!AppendiX C Page 5 of 12 Form ES-C-1!
Start the 3A Safety Injection Pump document the start time on QA STEP 2
!Record Page SAT
~
UNSAT
: 1. 3A HHSI Pump Control Switch turned to START Standard:
~. 3A HHSI Pump Red Run light is ON l3. 3A HHSI Pump Green Stop light is OFF Cue Comment NOTE:
Standards 2 and 3 are not critical.
NUREG 1021 Rev 9 Appendix C  


  !AppendiX C                                 Page 5 of 12                             Form ES-C-1!
Appendix C Page 6 of 12 Form ES-C-1 Open the Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 to STEP 3
Start the 3A Safety Injection Pump document the start time on QA STEP    2 !Record Page                                                         - -SAT
establish flow to the accumulator.
*            ~
SAT
..j UNSAT I. Opens the Loop 3A and 3B Hot Leg SI Isolation, MOV 869.
Standard:
: 2. MOV-3-869 Red OPEN light is ON.
: 3. MOV-3-869 Green CLOSED light is OFF.
Cue
~f Operator asks for the use of another operator tell operator that the  
!evaluator/designated operator will serve in this capacity.
Comment IA second operator may be utilized to operate MOV-3-869 to allow sufficient time to perform the self-checking process.
NOTE:
Standards 2 and 3 are not critical.
NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 Open the Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 to STEP 3
establish flow to the accumulator.
SAT  
..j UNSAT I. Opens the Loop 3A and 3B Hot Leg SI Isolation, MOV 869.
Standard:
Standard:
: 1. 3A HHSI Pump Control Switch turned to START
: 2. MOV-3-869 Red OPEN light is ON.
                ~. 3A HHSI Pump Red Run light is ON
                                                                                      - -UNSAT l3. 3A HHSI Pump Green Stop light is OFF Cue Comment NOTE:    Standards 2 and 3 are not critical.
* NUREG 1021 Rev 9 Appendix C
 
Appendix C                                  Page 6 of 12                                Form ES-C-1 Open the Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 to STEP    3                                                                            - -SAT establish flow to the accumulator.
            ..j
                                                                                        - -UNSAT I. Opens the Loop 3A and 3B Hot Leg SI Isolation, MOV 869.
Standard:  2. MOV-3-869 Red OPEN light is ON.
: 3. MOV-3-869 Green CLOSED light is OFF.
: 3. MOV-3-869 Green CLOSED light is OFF.
                ~f Operator asks for the use of another operator tell operator that the Cue
Cue
                !evaluator/designated operator will serve in this capacity.
~f Operator asks for the use of another operator tell operator that the  
!evaluator/designated operator will serve in this capacity.
Comment IA second operator may be utilized to operate MOV-3-869 to allow sufficient time to perform the self-checking process.
Comment IA second operator may be utilized to operate MOV-3-869 to allow sufficient time to perform the self-checking process.
NOTE:
NOTE:
Standards 2 and 3 are not critical.
Standards 2 and 3 are not critical.
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


  !Appendix C                                 Page 7 of 12                       Form ES-C-1!
!Appendix C Page 7 of 12 Form ES-C-1!
WHEN accumulator level has increased to 6600 +/- 20 gallons, THEN STEP     4 close Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869.             - -SAT
WHEN accumulator level has increased to 6600 +/- 20 gallons, THEN STEP 4
*            -j
close Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869.
SAT  
-j UNSAT
: l. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 switch has been taken to CLOSE
: l. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 switch has been taken to CLOSE
                                                                                  - -UNSAT
: 2. Loop 3A and 3B Hot Leg SI Isolation, MOV 869 CLOSE Green Standard:
: 2. Loop 3A and 3B Hot Leg SI Isolation, MOV 869 CLOSE Green Light is ON.
Light is ON.
Standard:
: 3. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 OPEN RED Light is OFF.
Cue Comment NOTE:
Standards 2 and 3 are not critical.
NUREG 1021 Rev 9 Appendix C
!Appendix C Page 7 of 12 Form ES-C-1!
WHEN accumulator level has increased to 6600 +/- 20 gallons, THEN STEP 4
close Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869.
SAT
-j UNSAT
: l. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 switch has been taken to CLOSE
: 2. Loop 3A and 3B Hot Leg SI Isolation, MOV 869 CLOSE Green Standard:
Light is ON.
: 3. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 OPEN RED Light is OFF.
: 3. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 OPEN RED Light is OFF.
Cue Comment
Cue Comment NOTE:
* NOTE:   Standards 2 and 3 are not critical.
Standards 2 and 3 are not critical.
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


Appendix C                                 Page 8 of 12                           Form ES-C-1 STEP   5 ~perator Stops the 3A Safety Injection Pump AND verifies the control - -SAT
Appendix C Page 8 of 12 Form ES-C-1 STEP 5  
*          "  switch is in the mid position.
~perator Stops the 3A Safety Injection Pump AND verifies the control SAT switch is in the mid position.
: 1. 3A HHSI Pump Control Switch turned to Stop and released to Mid
UNSAT
                                                                                    - -UNSAT Standard: 2. 3A HHSI Pump Red Run light is OFF
: 1. 3A HHSI Pump Control Switch turned to Stop and released to Mid Standard:
: 3. 3A HHSI Pump Green Stop light is ON Cue Comment NOTE:   Standards 2 and 3 are not Critical to this step.
: 2. 3A HHSI Pump Red Run light is OFF
NUREG 1021 Rev 9 Appendix C
: 3. 3A HHSI Pump Green Stop light is ON Cue Comment NOTE:
Standards 2 and 3 are not Critical to this step.
NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 STEP 5
~perator Stops the 3A Safety Injection Pump AND verifies the control SAT switch is in the mid position.
UNSAT
: 1. 3A HHSI Pump Control Switch turned to Stop and released to Mid Standard:
: 2. 3A HHSI Pump Red Run light is OFF
: 3. 3A HHSI Pump Green Stop light is ON Cue Comment NOTE:
Standards 2 and 3 are not Critical to this step.
NUREG 1021 Rev 9 Appendix C  


  !Appendix C                                 Page 9 of 12                               Form ES-C-11 STEP     6 iCLOSE the Accumulator Makeup Valve for Accumulator A, CV             - -SAT
!Appendix C Page 9 of 12 Form ES-C-11 STEP 6
*          ~   851A
iCLOSE the Accumulator Makeup Valve for Accumulator A, CV SAT  
: 1. Placed CV-3-851A Control Switch to CLOSE and released to MID
~
                ~. Verified CV-3-851A RED Open light OFF
851A UNSAT
                                                                                        - -UNSAT Standard: 3. Verified CV-3-851A GREEN CLOSED Light ON Cue   pnce Operator has verified CV-3-851A is CLOSED, tell the operator hat the JPM is terminated.
: 1. Placed CV-3-851A Control Switch to CLOSE and released to MID  
Comment NOTE:   Standards 2 and 3 are not Critical to this step.
~. Verified CV-3-851A RED Open light OFF Standard:
Terminating !The task is complete when the Examinee returns the cue sheet to the Cue:                                                                               STOP
: 3. Verified CV-3-851A GREEN CLOSED Light ON Cue pnce Operator has verified CV-3-851A is CLOSED, tell the operator hat the JPM is terminated.
                !examiner.
Comment NOTE:
* Stop Time _ _ __
Standards 2 and 3 are not Critical to this step.
* NUREG 1021 Rev 9 Appendix C
Terminating !The task is complete when the Examinee returns the cue sheet to the STOP Cue:
!examiner.
Stop Time ___ _
NUREG 1021 Rev 9 Appendix C
!Appendix C Page 9 of 12 Form ES-C-11 STEP 6
iCLOSE the Accumulator Makeup Valve for Accumulator A, CV SAT
~
851A UNSAT
: 1. Placed CV-3-851A Control Switch to CLOSE and released to MID
~. Verified CV-3-851A RED Open light OFF Standard:
: 3. Verified CV-3-851A GREEN CLOSED Light ON Cue pnce Operator has verified CV-3-851A is CLOSED, tell the operator hat the JPM is terminated.
Comment NOTE:
Standards 2 and 3 are not Critical to this step.
Terminating !The task is complete when the Examinee returns the cue sheet to the STOP Cue:  
!examiner.
Stop Time ___ _
NUREG 1021 Rev 9 Appendix C  
 
rr Appendix C Page 10 of 12 Form ES-C-1 Verification of Completion Job Performance Measure No.
:..:N:..:.-R.:..::C::..---~25:::.---=S:..:.:IM..::-.-:::J:.:..P..:.::M-=--.::::G~ ________________ _
Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:


Appendix C                                                               Page 10 of 12                                                   Form ES-C-1 Verification of Completion
===Response===
*~ JobPertormanceMeasureNo.           ~N~R~C~-=25~-~S~IM~~~P~M~-~G~~~~~~~~~~~~~~~~~~
Result:
Job Performance Measure No. :..:N:..:.-R.:..::C::..---~25:::.---=S:..:.:IM..::-.-:::J:.:..P..:.::M-=--.::::G~ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Satisfactory/Unsatisfactory Examiner's signature and date:
NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 Verification of Completion  
~
JobPertormanceMeasureNo. ~N~R~C~-=25~-~S~IM~~~P~M~-~G~~~~~~~~~~~~~~~~~~
Examinee's Name:
Examinee's Name:
Examiner's Name:
Examiner's Name:
Date Pertormed:
Date Pertormed:
Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:  
*~
~  


===Response===
===Response===
Result:   Satisfactory/Unsatisfactory
Result:
* Examiner's signature and date:
Satisfactory/Unsatisfactory Examiner's signature and date:
NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
* 7.1.2.2.b,c, and d are marked N/A.
7.1.2.2.b,c, and d are marked N/A.
* It is desired to use the 3A HHSI Pump for this task INITIATING CUE:
It is desired to use the 3A HHSI Pump for this task INITIATING CUE:
You have been directed to raise 3A Accumulator Level to 6600 +/- 20 gallons using 3A SAFETY INJECTION PUMP starting at step: 7.1.2.2.3.
You have been directed to raise 3A Accumulator Level to 6600 +/- 20 gallons using 3A SAFETY INJECTION PUMP starting at step: 7.1.2.2.3.
* 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
* 7.1.2.2.b,c, and d are marked N/A.
7.1.2.2.b,c, and d are marked N/A.
Acknowledge to the examiner when you are ready to begin.
Acknowledge to the examiner when you are ready to begin.
* HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
7.1.2.2.b,c, and d are marked N/A.
It is desired to use the 3A HHSI Pump for this task INITIATING CUE:
You have been directed to raise 3A Accumulator Level to 6600 +/- 20 gallons using 3A SAFETY INJECTION PUMP starting at step: 7.1.2.2.3.
3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
7.1.2.2.b,c, and d are marked N/A.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
NUREG 1021 Rev 9 Appendix C  


Appendix C                                                                           Job Performance Measure                        Form ES-C-1 Worksheet
Appendix C Facility:
* Facility:
Task
Task


Line 1,710: Line 3,299:


==Reference:==
==Reference:==
Job Performance Measure Worksheet
_T-'-u.:.:.:r-'...:kc::.eYL..:.-P...:::.o..:.:..in.:..:.t _______ Task No:
Perfonn EDG Nonnal Start Test (Alternate Path)
JPM No:
---~---~~~=---
064 A2.05 Loading the EDIG 3.1/3.2 Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Form ES-C-1 NRC-25-SIM-JPM-H Method of testing:
_S=-I:.:..:*m~u:.:..la=:.:t:.:::o.:...r _________________________ _
Simulated Performance __________ Actual Performance _____
....:X-.:......... ____ _
Classroom -------
Simulator -=====-:!.X~ __ _
Plant _________ _
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
You are the Unit 3 RCO. 3-0SP-023.1, Diesel Generator Operability Test, has been satisfactorily completed through 7.1.2.30.
Task Standard:
: 1.
The EDG will be synchronized to the Bus in accordance with 3-0SP-023.1.
: 2.
The EDG is placed to Emergency Stop when required.
Required Materials:
: 1.
3-0SP-023.1, "Diesel Generator Operability Test" General
==References:==
: 1.
3-0SP-023.1, "Diesel Generator Operability Test" NUREG 1021 Rev 9 Appendix C Appendix C Facility:
Task


_T_u_r_k_ey"--P__.o_in_t
==Title:==
_T-' -u.:.:.:r-'. .:kc::.eYL..:.-P.. : :.o. :.:. in.:. :.t_ _ _ _ _ _ _ Task No:
KIA
 
==Reference:==
Job Performance Measure Worksheet
_T_u_r_k_ey"--P__.o_in_t _______ Task No:
Perfonn EDG Nonnal Start Test (Alternate Path)
Perfonn EDG Nonnal Start Test (Alternate Path)
                          --~----~----
JPM No:
                          ---~---~~~=---
--~----~----
064 A2.05 Loading the EDIG 3.1/3.2 JPM No:        NRC-25-SIM-JPM-H Examinee:                                                                                         NRC Examiner:
064 A2.05 Loading the EDIG 3.1/3.2 Examinee:
Facility Evaluator:                                                                               Date:
NRC Examiner:
Method of testing:         Simulator _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Facility Evaluator:
_S=-I:.:..:*m~u:.:..la=:.:t:.:::o.:...r
Date:
                          ~~~~-----------------------------------------------
Form ES-C-1 NRC-25-SIM-JPM-H Method of testing:
Simulated Performance _ _ _ _ _ _ _ _ _ _ Actual Performance _ _ _ _ _. . :X                                                   X-.:. . . . ._ _ _ __
Simulator  
                                                -------------------                                                  ---------~~--------
~~~~-----------------------------------------------
Classroom -    -----------
Simulated Performance Actual Performance X  
                    ------                                                                                x
---------~~--------
                                                                                                -=====-:!.X~_ __
Classroom Simulator x
Simulator -----------            Plant __________
Plant Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
You are the Unit 3 RCO. 3-0SP-023.1, Diesel Generator Operability Test, has been satisfactorily completed through 7.1.2.30 .
You are the Unit 3 RCO. 3-0SP-023.1, Diesel Generator Operability Test, has been satisfactorily completed through 7.1.2.30.
* Task Standard:
Task Standard:
1.
: 1.
2.
The EDG will be synchronized to the Bus in accordance with 3-0SP-023.1.
The EDG will be synchronized to the Bus in accordance with 3-0SP-023 .1.
: 2.
The EDG is placed to Emergency Stop when required.
The EDG is placed to Emergency Stop when required.
Required Materials:
Required Materials:
: 1.       3-0SP-023.1, "Diesel Generator Operability Test" General  
: 1.
3-0SP-023.1, "Diesel Generator Operability Test" General  


==References:==
==References:==
: 1.       3-0SP-023.1, "Diesel Generator Operability Test" NUREG 1021 Rev 9 Appendix C
: 1.
3-0SP-023.1, "Diesel Generator Operability Test" NUREG 1021 Rev 9 Appendix C  


Appendix C                                 Page 2 of 12                               Form ES-C-1 Initiating Cue:
Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
* You have been directed to continue the Monthly EDG Normal Start Test (3A EDG) starting at step 7.1.2.31. 3-0SP-023.1.
You have been directed to continue the Monthly EDG Normal Start Test (3A EDG) starting at step 7.1.2.31. 3-0SP-023.1.
Time Critical Task: No Validation Time:   15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
Time Critical Task: No Validation Time:
* NUREG 1021 Rev 9 Appendix C
15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:
You have been directed to continue the Monthly EDG Normal Start Test (3A EDG) starting at step 7.1.2.31. 3-0SP-023.1.
Time Critical Task: No Validation Time:
15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
NUREG 1021 Rev 9 Appendix C  


I Appendix C                               Page 3 of 12                   Form ES-C-1 I SIMULATOR SETUP Reset to IC #
I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #
* Reset to IC-1.
Reset to IC-1.
Load Lesson
Load Lesson
: 1. Open lesson JPM 01 023006201.lsn and execute.
: 1. Open lesson JPM 01 023006201.lsn and execute.
: 2. Ensure 3A EDG has been started and in stable operation.
: 2. Ensure 3A EDG has been started and in stable operation.
Ensure Simulator Operator Checklist is complete
Ensure Simulator Operator Checklist is complete NUREG 1021 Rev 9 Appendix C I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #
* NUREG 1021 Rev 9 Appendix C
Reset to IC-1.
Load Lesson
: 1. Open lesson JPM 01 023006201.lsn and execute.
: 2. Ensure 3A EDG has been started and in stable operation.
Ensure Simulator Operator Checklist is complete NUREG 1021 Rev 9 Appendix C  


Appendix C                                 Page 4 of 12                         Form ES-C-1 Place the EDG Bkr 3AA20 Synchronizing switch to ON.
Appendix C Page 4 of 12 Form ES-C-1 Place the EDG Bkr 3AA20 Synchronizing switch to ON.
* STEP     1
STEP 1
          ..j
SAT
..j UNSAT
: 1. Placed the EDG Bkr 3AA20 Synchronizing switch to ON.
: 2. Check that the WHITE synchronizing lights are cycling ON.
Standard:
Cue Comment NOTE:
Standard #2 is not Critical to this step.
NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Place the EDG Bkr 3AA20 Synchronizing switch to ON.
STEP 1
SAT
..j UNSAT
: 1. Placed the EDG Bkr 3AA20 Synchronizing switch to ON.
: 1. Placed the EDG Bkr 3AA20 Synchronizing switch to ON.
                                                                                  - - SAT
                                                                                  - - UNSAT
: 2. Check that the WHITE synchronizing lights are cycling ON.
: 2. Check that the WHITE synchronizing lights are cycling ON.
Standard:
Standard:
Cue Comment NOTE:     Standard #2 is not Critical to this step.
Cue Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
Standard #2 is not Critical to this step.
NUREG 1021 Rev 9 Appendix C  


I Appendix C                                 Page 5 of 12                             Form ES-C-1 I
I Appendix C Page 5 of 12 Form ES-C-1 I STEP 2
* STEP     2 Using the A Diesel Oen Volt Regulator, adjust Incoming voltage to match Running indicated voltage .
Using the A Diesel Oen Volt Regulator, adjust Incoming voltage to SAT match Running indicated voltage.
Using the voltage adjust control switch, adjusted the generator voltage
UNSAT Using the voltage adjust control switch, adjusted the generator voltage Standard:
                                                                                          - - SAT UNSAT Standard:   on the Bus Voltage Incoming indicator to match the voltage on the Bus Voltage Running indicator.
on the Bus Voltage Incoming indicator to match the voltage on the Bus Voltage Running indicator.
Cue Comment NOTE:
Cue Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C I Appendix C Page 5 of 12 Form ES-C-1 I STEP 2
Using the A Diesel Oen Volt Regulator, adjust Incoming voltage to SAT match Running indicated voltage.
UNSAT Using the voltage adjust control switch, adjusted the generator voltage Standard:
on the Bus Voltage Incoming indicator to match the voltage on the Bus Voltage Running indicator.
Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C  


Appendix C                               Page 6 of 12                             Form ES-C-1 Using the A Diesel Gen Speed Changer, adjust engine speed so that the
Appendix C Page 6 of 12 Form ES-C-1 Using the A Diesel Gen Speed Changer, adjust engine speed so that the STEP 3
*                                                                                    - - SAT STEP     3   pointer on the Synchroscope is rotating slowly in the FAST direction .
pointer on the Synchroscope is rotating slowly in the FAST direction.
          ..j
SAT
                                                                                      - - UNSAT Adjusted engine speed so that the pointer on the synchroscope is Standard: rotating slowly in the FAST direction.
..j UNSAT Adjusted engine speed so that the pointer on the synchroscope is Standard:
rotating slowly in the FAST direction.
Cue Comment NOTE:
Cue Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 Using the A Diesel Gen Speed Changer, adjust engine speed so that the STEP 3
pointer on the Synchroscope is rotating slowly in the FAST direction.
SAT
..j UNSAT Adjusted engine speed so that the pointer on the synchroscope is Standard:
rotating slowly in the FAST direction.
Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C  


I Appendix C                                 Page 7 of 12                             Form ES-C-1 I STEP     4   Using the A Diesel Gen Volt Regulator, adjust Incoming voltage         - - SAT
I Appendix C Page 7 of 12 Form ES-C-1 I STEP 4
*            ..j Standard:
Using the A Diesel Gen Volt Regulator, adjust Incoming voltage SAT  
slightly higher than Running voltage .
..j slightly higher than Running voltage.
Using the voltage adjust control switch, adjusted the generator voltage on the Bus Voltage Incoming indicator to match the voltage on the Bus
UNSAT Using the voltage adjust control switch, adjusted the generator voltage Standard:
                                                                                        - - UNSAT Voltage Running indicator.
on the Bus Voltage Incoming indicator to match the voltage on the Bus Voltage Running indicator.
Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 12 Form ES-C-1 I STEP 4
Using the A Diesel Gen Volt Regulator, adjust Incoming voltage SAT
..j slightly higher than Running voltage.
UNSAT Using the voltage adjust control switch, adjusted the generator voltage Standard:
on the Bus Voltage Incoming indicator to match the voltage on the Bus Voltage Running indicator.
Cue Comment NOTE:
Cue Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


Appendix C                               Page 8 of 12                           Form ES-C-1 STEP     5                                                                       - - SAT Using the A Diesel Kilovolts indicator and 3A 4KV Bus Voltmeter, verify voltages are approximately equal between the 3A Diesel Generator output and the 3A 4KV Bus for all three phases.           - - UNSAT Standard: Verified voltages are approximately equal.
Appendix C Page 8 of 12 Form ES-C-1 STEP 5
Using the A Diesel Kilovolts indicator and 3A 4KV Bus Voltmeter, SAT verify voltages are approximately equal between the 3A Diesel UNSAT Generator output and the 3A 4KV Bus for all three phases.
Standard:
Verified voltages are approximately equal.
Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 STEP 5
Using the A Diesel Kilovolts indicator and 3A 4KV Bus Voltmeter, SAT verify voltages are approximately equal between the 3A Diesel UNSAT Generator output and the 3A 4KV Bus for all three phases.
Standard:
Verified voltages are approximately equal.
Cue Comment NOTE:
Cue Comment NOTE:
* NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


I Appendix C                             Page 9 of 12                             Form ES-C-1 I Verify 3A Diesel Generator frequency is between 58.8 and 61.2 Hz on STEP     6                                                                       - - SAT the Gen Frequency indicator
I Appendix C Page 9 of 12 Form ES-C-1 I Verify 3A Diesel Generator frequency is between 58.8 and 61.2 Hz on STEP 6
                                                                                    - - UNSAT Verified 3A Diesel Generator frequency is between 58.8 and 61.2 Hz Standard: on the Gen Frequency indicator Cue Comment NOTE:
the Gen Frequency indicator SAT UNSAT Verified 3A Diesel Generator frequency is between 58.8 and 61.2 Hz Standard:
NUREG 1021 Rev 9 Appendix C
on the Gen Frequency indicator Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C I Appendix C Page 9 of 12 Form ES-C-1 I Verify 3A Diesel Generator frequency is between 58.8 and 61.2 Hz on STEP 6
the Gen Frequency indicator SAT UNSAT Verified 3A Diesel Generator frequency is between 58.8 and 61.2 Hz Standard:
on the Gen Frequency indicator Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C  


Appendix C                                 Page 10 of 12                           Form ES-C-1 WHEN the synchroscope pointer is at 12 o'clock position, THEN STEP     9                                                                         - - SAT close the diesel generator breaker by placing the EDG Bkr 3AA20
Appendix C Page 10 of 12 Form ES-C-1 WHEN the synchroscope pointer is at 12 o'clock position, THEN STEP 9
          ..j Control Switch to the CLOSE position (spring return to nonnal).
close the diesel generator breaker by placing the EDG Bkr 3AA20 SAT
                                                                                      - - UNSAT
..j Control Switch to the CLOSE position (spring return to nonnal).
: 1.     Closed the diesel generator breaker by placing the EDG Bkr 3AA20 Control Switch to the CLOSE position WHEN the synchroscope pointer reached the12 o'clock position.
UNSAT
: 1.
Closed the diesel generator breaker by placing the EDG Bkr 3AA20 Control Switch to the CLOSE position WHEN the synchroscope pointer reached the12 o'clock position.
Standard:
Standard:
: 2.     Verified the Diesel Generator Breaker 3AA20 has closed (Breaker GREEN light is OFF and RED light is ON).
: 2.
Cue Comment NOTE:     Standard #2 is not Critical to this step.
Verified the Diesel Generator Breaker 3AA20 has closed (Breaker GREEN light is OFF and RED light is ON).
* NUREG 1021 Rev 9 Appendix C
Cue Comment NOTE:
Standard #2 is not Critical to this step.
NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 WHEN the synchroscope pointer is at 12 o'clock position, THEN STEP 9
close the diesel generator breaker by placing the EDG Bkr 3AA20 SAT
..j Control Switch to the CLOSE position (spring return to nonnal).
UNSAT
: 1.
Closed the diesel generator breaker by placing the EDG Bkr 3AA20 Control Switch to the CLOSE position WHEN the synchroscope pointer reached the12 o'clock position.
Standard:
: 2.
Verified the Diesel Generator Breaker 3AA20 has closed (Breaker GREEN light is OFF and RED light is ON).
Cue Comment NOTE:
Standard #2 is not Critical to this step.
NUREG 1021 Rev 9 Appendix C  


I Appendix C                           Page 11 of 12                           Form ES-C-1 I Place the EDG Bkr 3AA20 Synchronizing switch to OFF STEP   10
I Appendix C Page 11 of 12 Form ES-C-1 I Place the EDG Bkr 3AA20 Synchronizing switch to OFF STEP 10 SAT  
                                                                                  - - SAT
..J UNSAT Standard:
            ..J
Placed the EDG Bkr 3AA20 Synchronizing switch to OFF Cue Comment NOTE:
                                                                                  - - UNSAT Placed the EDG Bkr 3AA20 Synchronizing switch to OFF Standard:
NUREG 1021 Rev 9 Appendix C I Appendix C Page 11 of 12 Form ES-C-1 I Place the EDG Bkr 3AA20 Synchronizing switch to OFF STEP 10 SAT
Cue Comment NOTE:
..J UNSAT Standard:
NUREG 1021 Rev 9 Appendix C
Placed the EDG Bkr 3AA20 Synchronizing switch to OFF Cue Comment NOTE:
NUREG 1021 Rev 9 Appendix C  


Appendix Ap pend ix C                                       Page 12 of 12                                     Form ES-C-l ES-C-1 Turn                                                u...
Appendix C Page 12 of 12 Form ES-C-1 Tum the A EDG Speed Changer in the RAISE direction and slowly
Tum the A EDG Speed Changerr in the RAISE. directionLand          and ,.  ..,
~
slowly SAT STEP     11     : increase diesel generator load to approximately 1000 KW.      KW .
STEP 11 increase diesel generator load to approximately 1000 KW.
~
SAT
                                                                                                        ~-
..J UNSAT I. Turned the Governor Control Switch AND slowly loaded diesel generator to approximately 1000 KW.
            .J..J
Standard:
                                                                                                        - - UNSAT
: 2. Operator recognizes EDG problem and places EDG to Emergency Stop.
                                                                                                        ~-
: 1. If candidate asks tell candidate that vendor has cleared generator power increase to 1000 kw.
t umed the Governor Control Switch,AND I. Turned                                    AND slowly loadedI diesel approximatelyy 1000 KW.
: 2. When the 3A EDG Voltage Regulator is taken to RAISE, SIM OPERATOR initiates a continuous increase in Voltage Regulator setting up to the point where increasing oscillations in Voltage/Load begin.
generator to approximatel            KW.
Cue
Standard Standard::         22. Operator recognizes recognizes EDG problem and places EDG to Emergency SlOp.Stop.
: 3. When Operator places EDG to Emergency Stop or EDG trips tell operator that another operator will take over.
: 1. If candidate asks tell candidate that vendor has cleared generator power increase to 1000 kw. kw.
: 4. Tell operator that JPM is complete.  
: 2. When the 3A EDG Voltage Regulator is taken to RAISE.          RAISE, 81M SIM OPERATOR initiates a continuous increase in Voltage Regulator setting up to the point where Voltage/Load begin.
~
increasing oscillations in Voltage/load Cue
: 3. When Operator places EDG to Emergency Stop or EDG trips tell operator that another operator will trips                                        wi ll take over.
over.
: 4. Tell operator that JPM is  is complete.
a~
Comment NOTE:
Comment NOTE:
Terminating Term  inating                                                                                          STOP The task is complete when the Examinee returns the cue sheet to the Cue:
Terminating The task is complete when the Examinee returns the cue sheet to the STOP Cue:
Cue:         examiner.
examiner.
Stop Time ----
NUREG 1021 Rev 9 Appendix C Appendix C Page 12 of 12 Form ES-C-l Turn the A EDG Speed r in the
. u...
Land,...,
11 SAT
: increase diesel generator load to approximately 1000 KW.
~-
.J UNSAT
~-
I.
t umed the
,AND I diesel generator to approximatel y 1000 KW.
Standard:
2 Operator recognizes EDG problem and places EDG to Emergency SlOp.
: 1. If candidate asks tell candidate that vendor has cleared generator power increase to 1000 kw.
: 2. When the 3A EDG Voltage Regulator is taken to RAISE.
81M OPERATOR initiates a continuous increase in Voltage Regulator setting up to the point where increasing oscillations in Voltage/load begin.
Cue
: 3. When Operator places EDG to Emergency Stop or EDG trips tell operator that another operator wi ll take over.
: 4. Tell operator that JPM is complete.
a Comment NOTE:
Terminating The task is complete when the Examinee returns the cue sheet to the STOP Cue:
examiner.
Stop Time _~~~
Stop Time _~~~
NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C  


I Appendix C                                 Page 13 of 12               Form ES-C-1 I Verification of Completion e   Job Performance Measure No.       NRC-25-SIM-JPM-H Examinee's Name:
I Appendix C Page 13 of 12 Form ES-C-1 I Verification of Completion e Job Performance Measure No.
NRC-25-SIM-JPM-H Examinee's Name:
Examiner's Name:
Examiner's Name:
Date Performed:
Date Performed:
Line 1,844: Line 3,554:
Question Documentation:
Question Documentation:
Question:
Question:
e _______________________
e ______________________ _


===Response===
===Response===
Result:   Satisfactory/Unsatisfactory
Result:
* Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Satisfactory/Unsatisfactory Examiner's signature and date: ________________ _
NUREG 1021 Rev 9 Appendix C
NUREG 1021 Rev 9 Appendix C I Appendix C Page 13 of 12 Form ES-C-1 I Verification of Completion e Job Performance Measure No.
NRC-25-SIM-JPM-H Examinee's Name:
Examiner's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
e ______________________ _


JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, discuss, and provide initiating cues.
===Response===
When you complete the task successfully, successfully, the objective for this job performance measure will be satisfied.
Result:
satisfied .
Satisfactory/Unsatisfactory Examiner's signature and date: ________________ _
NUREG 1021 Rev 9 Appendix C
 
JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
You are the Unit 3 RCO. 3-0SP-023.1, Diesel Generator Operability Test, has been satisfactorily completed through 7.1.2.30.
INITIA TlNG CUE:
You have been directed to continue the Monthly EDG Normal Start Test (3A EDG) starting at step 7.1.2.31.
3-0SP-023.1.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are the Unit 3 RCO . 3-0SP-023.1, 3-0SP-023.1, Diesel Generator Operability Test Test,, has been satisfactorily completed through 7.1.2.30.
You are the Unit 3 RCO. 3-0SP-023.1, Diesel Generator Operability Test, has been satisfactorily completed through 7.1.2.30.
INITIA TlNG CUE:
INITIA TlNG CUE:
You have been directed to continue the Monthly EDG Normal Start Test (3A EDG) starting at step 7.1.2.31     7.1.2.31..
You have been directed to continue the Monthly EDG Normal Start Test (3A EDG) starting at step 7.1.2.31.
3-0SP-023.1.
3-0SP-023.1.
Acknowledge to the examiner when you are ready to begin.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
NUREG 1021 Rev 9 Appendix C}}
NUREG 1021 Rev 9 Appendix C}}

Latest revision as of 06:13, 14 January 2025

Initial Exam 2009-302 Draft Sim/In-Plant JPMs
ML100670500
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/11/2009
From:
NRC/RGN-II
To:
Florida Power & Light Co
References
50-250/09-302, 50-251/09-302 50-250/09-302, 50-251/09-302
Download: ML100670500 (156)


Text

FACILITY NAME: Turkey Point Section 5 REPORT NUMBER: 2009-302 DRAFT SIM/IN-PLANT JPMS CONTENTS:

E:J'braft SIMULATOR liN-PLANT JPMs Location of Electronic Files:

Submitted By: Ul~ tjw# Verified By '11oJ J' ~

FACILITY NAME: Turkey Point Section 5 REPORT NUMBER: 2009-302 DRAFT SIM/IN-PLANT JPMS CONTENTS:

E:J'braft SIMULATOR liN-PLANT JPMs Location of Electronic Files:

Submitted By idJm ~I Verified By '1! oJ J' ~

Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Job Performance Measure Worksheet Turkey Point Task No:

Place Unit 4 Post Accident Hydrogen Monitor In Service JPM No:

028 A2.02 {3.5/3.9}

NRC Examiner:

Date:

In Plant Simulated Performance X

Classroom Simulator Read to the examinee:

Form ES-C-1 24094001501 NRC-25-IP-JPM-1 Plant X I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. Unit 4 has experienced a valid Safety Injection signal.
2. All applicable prerequisites listed in Section 3.0 are satisfied.
3. Post Accident Hydrogen Monitoring system is in normal standby alignment.

Task Standard:

1. PAHMS Alignment Completed per Section 7.1 of 4-0P-094,"Containment Post-Accident Monitoring Systems."

Required Materials:

1. Two way radio (optional communications device)
2. 4-0P-094, "Containment Post-Accident Monitoring Systems"
3. "A" key
4. Valve Operating Handle (located in Aux Bldg EIW hallway)

General

References:

1. 4-0P-094, "Containment Post-Accident Monitoring Systems" NUREG 1021 Rev 9 Appendix C Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Job Performance Measure Worksheet Turkey Point Task No:

Place Unit 4 Post Accident Hydrogen Monitor In Service JPM No:

028 A2.02 {3.5/3.9}

NRC Examiner:

Date:

In Plant Simulated Performance X

~-------------

Classroom Simulator -------

Read to the examinee:

Form ES-C-1 24094001501 NRC-25-IP-JPM-1 Plant X I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. Unit 4 has experienced a valid Safety Injection signal.
2. All applicable prerequisites listed in Section 3.0 are satisfied.
3. Post Accident Hydrogen Monitoring system is in normal standby alignment.

Task Standard:

1. PAHMS Alignment Completed per Section 7.1 of 4-0P-094,"Containment Post-Accident Monitoring Systems."

Required Materials:

1. Two way radio (optional communications device)
2. 4-0P-094, "Containment Post-Accident Monitoring Systems"
3. "A" key
4. Valve Operating Handle (located in Aux Bldg EIW hallway)

General

References:

1. 4-0P-094, "Containment Post-Accident Monitoring Systems" NUREG 1021 Rev 9 Appendix C

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

1. You have been directed by the RO to place the Post Accident Hydrogen Monitor in service in accordance with 4-0P-094, Section 7.1.

Time Critical Task: YES (30 min)

Validation Time:

15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIME!

NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

1. You have been directed by the RO to place the Post Accident Hydrogen Monitor in service in accordance with 4-0P-094, Section 7.1.

Time Critical Task: YES (30 min)

Validation Time:

15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIME!

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #

N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A NUREG 1021 Rev 9 Appendix C I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #

N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A NUREG 1021 Rev 9 Appendix C

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( I)

Start Time STEP 1

Obtain Required Materials SAT UNSAT

1.

Obtains a copy of 4-0P-094, Post Accident Monitoring System.

Standard:

2.

Verifies latest revision and no outstanding OTSCs.

3.

Begins review of section: 7.1 Post Accident H2 Monitor Startup.

Evaluator may choose to require the candidate to obtain procedure section.

Cue When the correct procedure is identified & verified, provide the operator with the procedure.

Comment NOTE Hydrogen Monitors should be in service within 30 minutes of a valid SI NOTE:

signal.

NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( I)

Start Time STEP 1

Obtain Required Materials SAT UNSAT

1.

Obtains a copy of 4-0P-094, Post Accident Monitoring System.

Standard:

2.

Verifies latest revision and no outstanding OTSCs.

3.

Begins review of section: 7.1 Post Accident H2 Monitor Startup.

Evaluator may choose to require the candidate to obtain procedure section.

Cue When the correct procedure is identified & verified, provide the operator with the procedure.

Comment NOTE Hydrogen Monitors should be in service within 30 minutes of a valid SI NOTE:

signal.

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 5 of 12 Form ES-C-1 I NOTE STEP 2

Hydrogen Monitors should be in seNice within 30 minutes of a valid SI signal.

SAT 7.1.1 Initial Conditions UNSAT

__ 1. All applicable prerequisites listed in Section 3.0 are satisfied.

1.

Reviews Note prior to step 7.1.1. Notes that the task must be completed within 30 minutes of the safety injection signal.

Standard:

2.

Determines prerequisites met from JPM Briefing Sheet Initial Conditions (thus procedure initial conditions complete).

Cue N/A Comment NOTE:

NUREG 1021 Rev 9 Appendix C I Appendix C Page 5 of 12 Form ES-C-1 I NOTE STEP 2

Hydrogen Monitors should be in seNice within 30 minutes of a valid SI signal.

SAT 7.1.1 Initial Conditions UNSAT

__ 1. All applicable prerequisites listed in Section 3.0 are satisfied.

1.

Reviews Note prior to step 7.1.1. Notes that the task must be completed within 30 minutes of the safety injection signal.

Standard:

2.

Determines prerequisites met from JPM Briefing Sheet Initial Conditions (thus procedure initial conditions complete).

Cue N/A Comment NOTE:

NUREG 1021 Rev 9 Appendix C

Appendix C Page 6 of 12 Form ES-C-1 7.1.2 Procedure Steps STEP 3

NOTES SAT

..j UNSAT

  • Valves PASS-4-008, 4-001 A, 4-001 B, 4-002A and 4-002B are located in the floor at the junction of the north/south hallway.
  • Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur.
1. Remove the floor caps AND open the following valves using the reach rods located in the Auxiliary Building.

__ a. Post Accident Sampling System Return Line Isolation Valve, PASS-4-008 (2 turns)

__ b. H2Analyzer 4A Outlet Isol, PAHM-4-001A (3 turns)

__ c. H2Analyzer Outlet Isol, PAHM-4-001B (6 turns)

d. P ACV Vent and Sample System to P AHM Header Isolation Valve (RR), PAHM-4-002A (6 turns)

__ e. PACV Vent and Sample System to PAHM Header Isolation Valve (RR), PAHM-4-002B (6 turns)

Proceeds to the Aux Bldg east-west hallway and describes how to unlock and obtain a T-handle tool from the rack.

Simulates removing floor caps by engaging the T-handle tool into each cap and rotating them counter clockwise. Then simulates opening the following valves by engaging the T -handle tool to the valve operator and turning the operator the specified number of turns counter Standard:

clockwise:

a. PASS-4-008 (2 turns).
b. PAHM-4-001A (3 turns).
c. PAHM-4-001 B (6 turns).
d. PAHM-4-002A (6 turns).
e. PAHM-4-002B (6 turns).

For each of the valves listed above, when applicant correctly identifies how to remove floor cap, state, "The floor cap is removed."

Cue When applicant correctly demonstrates how to operate valve in the open direction, state, "The valve operator has been rotated the applicable number of turns".

Comment NOTES

  • Valves PASS-4-008, 4-001A, 4-001 B, 4-002A and 4-002B are located in the floor at the junction of the north/south hallway.

NOTE:

  • Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur.

NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 7.1.2 Procedure Steps STEP 3

NOTES SAT

..j UNSAT

  • Valves PASS-4-008, 4-001 A, 4-001 B, 4-002A and 4-002B are located in the floor at the junction of the north/south hallway.
  • Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur.
1. Remove the floor caps AND open the following valves using the reach rods located in the Auxiliary Building.

__ a. Post Accident Sampling System Return Line Isolation Valve, PASS-4-008 (2 turns)

__ b. H2Analyzer 4A Outlet Isol, PAHM-4-001A (3 turns)

__ c. H2Analyzer Outlet Isol, PAHM-4-001B (6 turns)

d. P ACV Vent and Sample System to P AHM Header Isolation Valve (RR), PAHM-4-002A (6 turns)

__ e. PACV Vent and Sample System to PAHM Header Isolation Valve (RR), PAHM-4-002B (6 turns)

Proceeds to the Aux Bldg east-west hallway and describes how to unlock and obtain a T-handle tool from the rack.

Simulates removing floor caps by engaging the T-handle tool into each cap and rotating them counter clockwise. Then simulates opening the following valves by engaging the T -handle tool to the valve operator and turning the operator the specified number of turns counter Standard:

clockwise:

a. PASS-4-008 (2 turns).
b. PAHM-4-001A (3 turns).
c. PAHM-4-001 B (6 turns).
d. PAHM-4-002A (6 turns).
e. PAHM-4-002B (6 turns).

For each of the valves listed above, when applicant correctly identifies how to remove floor cap, state, "The floor cap is removed."

Cue When applicant correctly demonstrates how to operate valve in the open direction, state, "The valve operator has been rotated the applicable number of turns".

Comment NOTES

  • Valves PASS-4-008, 4-001A, 4-001 B, 4-002A and 4-002B are located in the floor at the junction of the north/south hallway.

NOTE:

  • Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur.

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 7 of 12 Form ES-C-1 I 7.1.2 (Cont'd)

STEP 4

SAT

..j

__ 2. Unlock and open PACVS Isol Vlv Penet 51, HV-4-3, outside UNSAT the Unit 4 Pipe and Valve Room. (An A key is required for this lock.)

Removes lock from HV-4-3 remote operator handwheel (South end of Standard:

Aux Bldg 18' elevation N/S hallway outside U4 P&V Room) using an A key, then opens valve using remote operator handwheel.

Cue When candidate simulates turning valve handwheel counterclockwise, point to open indicator to show valve is open.

Comment NOTE:

Although not specified in the procedure, candidate may reinstall lock on valve. This is not required for this JPM.

NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 12 Form ES-C-1 I 7.1.2 (Cont'd)

STEP 4

SAT

..j

__ 2. Unlock and open PACVS Isol Vlv Penet 51, HV-4-3, outside UNSAT the Unit 4 Pipe and Valve Room. (An A key is required for this lock.)

Removes lock from HV-4-3 remote operator handwheel (South end of Standard:

Aux Bldg 18' elevation N/S hallway outside U4 P&V Room) using an A key, then opens valve using remote operator handwheel.

Cue When candidate simulates turning valve handwheel counterclockwise, point to open indicator to show valve is open.

Comment NOTE:

Although not specified in the procedure, candidate may reinstall lock on valve. This is not required for this JPM.

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 9 of 12 Form ES-C-1 I STEP 6

Request the Unit 4 RO perform step 7.1.2.4 SAT UNSAT Standard:

Simulates request for Unit 4 RO to perform step 7.1.2.4 of 4-0P-094

1. As Unit 4 RO acknowledge request to perform step 7.1.2.4 of Cue 4-0P-094 (Control Room Portion)
2. As Unit 4 RO, tell candidate step 7.1.2.4 has been completed.

Direct candidate to continue with step 7.1.2.5.

Comment NOTE:

Candidate may attempt to use a communication device or simulate communication directly to the evaluator.

NUREG 1021 Rev 9 Appendix C I Appendix C Page 9 of 12 Form ES-C-1 I STEP 6

Request the Unit 4 RO perform step 7.1.2.4 SAT UNSAT Standard:

Simulates request for Unit 4 RO to perform step 7.1.2.4 of 4-0P-094

1. As Unit 4 RO acknowledge request to perform step 7.1.2.4 of Cue 4-0P-094 (Control Room Portion)
2. As Unit 4 RO, tell candidate step 7.1.2.4 has been completed.

Direct candidate to continue with step 7.1.2.5.

Comment NOTE:

Candidate may attempt to use a communication device or simulate communication directly to the evaluator.

NUREG 1021 Rev 9 Appendix C

Appendix C Page 10 of 12 Form ES-C-1

__ 5. At the area outside the Unit 3 BA Evap Room, remove floor STEP 7

cap AND close WHT Waste Transfer Pump Discharge to Rad Waste SAT

..J Building, MPAS-001,(1I4 tum).

UNSAT OR

__ At the Waste Evaporator Feed Pump Room in the Radwaste Bldg, close Aux Bldg WHT valve to Radwaste Bldg WHT, 1731.

1. Attempts to remove the floor cap for MPAS-001.
2. When MPAS-001 floor cap determined to be jammed in place, Standard:

leaves the Aux Building and proceeds to the Waste Evaporator Feed Pump room in the Radwaste Building.

3. Closes valve 1731 (Rotates handwheel fully clockwise until the valve stem is fully inserted.)
1. When candidate attempts to remove MPAS-001 floor cap, state that it is jammed and cannot be removed Cue
2. When candidate identifies 1731 handwheel has been rotated fully clockwise and valve stem inserted, confirm this indication.

Comment NOTE:

NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1

__ 5. At the area outside the Unit 3 BA Evap Room, remove floor STEP 7

cap AND close WHT Waste Transfer Pump Discharge to Rad Waste SAT

..J Building, MPAS-001,(1I4 tum).

UNSAT OR

__ At the Waste Evaporator Feed Pump Room in the Radwaste Bldg, close Aux Bldg WHT valve to Radwaste Bldg WHT, 1731.

1. Attempts to remove the floor cap for MPAS-001.
2. When MPAS-001 floor cap determined to be jammed in place, Standard:

leaves the Aux Building and proceeds to the Waste Evaporator Feed Pump room in the Radwaste Building.

3. Closes valve 1731 (Rotates handwheel fully clockwise until the valve stem is fully inserted.)
1. When candidate attempts to remove MPAS-001 floor cap, state that it is jammed and cannot be removed Cue
2. When candidate identifies 1731 handwheel has been rotated fully clockwise and valve stem inserted, confirm this indication.

Comment NOTE:

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 11 of 12 Form ES-C-1 NOTE STEP 8

The following valves are located on the Auxiliary Building roof near the Unit 4 SAT

..j containment wall.

UNSAT

6. Perfonn the following:

__ a. Unlock and open Isol Vlv from WHT Pp Back, MP AS-4-004 (an A key is required).

1. Proceeds to Auxiliary Building roof near Unit 4 Containment wall.

Standard:

2. Unlocks MPAS-4-004 handwheel with an A key, then opens valve.

(Rotates handwheel fully counterclockwise until valve stem fully withdrawn.)

When candidate identifies handwheel has been rotated fully Cue counterclockwise and valve stem withdrawn, confirm this indication Comment NOTE:

Although not specified in the procedure, candidate may reinstall lock on valve.

NUREG 1021 Rev 9 Appendix C I Appendix C Page 11 of 12 Form ES-C-1 NOTE STEP 8

The following valves are located on the Auxiliary Building roof near the Unit 4 SAT

..j containment wall.

UNSAT

6. Perfonn the following:

__ a. Unlock and open Isol Vlv from WHT Pp Back, MP AS-4-004 (an A key is required).

1. Proceeds to Auxiliary Building roof near Unit 4 Containment wall.

Standard:

2. Unlocks MPAS-4-004 handwheel with an A key, then opens valve.

(Rotates handwheel fully counterclockwise until valve stem fully withdrawn.)

When candidate identifies handwheel has been rotated fully Cue counterclockwise and valve stem withdrawn, confirm this indication Comment NOTE:

Although not specified in the procedure, candidate may reinstall lock on valve.

NUREG 1021 Rev 9 Appendix C

Appendix C Page 12 of 12 Form ES-C-1 STEP 9

__ b. Close Isol Vlv MPAS to Purge Air Rtn, MPAS-4-00S.

SAT V

UNSAT Standard:

Simulates Closing MPAS-4-005. (Rotates handwheel fully clockwise until the valve stem is fully inserted.)

1. When candidate identifies handwheel has been rotated fully clockwise and valve stem inserted, confirm that valve travel Cue has stopped and stem is inserted.
2. Tell candidate another operator will perform step 7.1.2.7 Comment NOTE:

Termination Operator returns JPM briefing sheet when informed step 7.1.2.7 STOP Cue:

will be performed by another operator.

Stop Time ----

NUREG 1021 Rev 9 Appendix C Appendix C Page 12 of 12 Form ES-C-1 STEP 9

__ b. Close Isol Vlv MPAS to Purge Air Rtn, MPAS-4-00S.

SAT V

UNSAT Standard:

Simulates Closing MPAS-4-005. (Rotates handwheel fully clockwise until the valve stem is fully inserted.)

1. When candidate identifies handwheel has been rotated fully clockwise and valve stem inserted, confirm that valve travel Cue has stopped and stem is inserted.
2. Tell candidate another operator will perform step 7.1.2.7 Comment NOTE:

Termination Operator returns JPM briefing sheet when informed step 7.1.2.7 STOP Cue:

will be performed by another operator.

Stop Time ----

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 13 of 12 Form ES-C-1 I Verification of Completion Job Performance Measure No.

NRC-25-IP-JPM-1 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date: ________________ _

NUREG 1021 Rev 9 Appendix C I Appendix C Page 13 of 12 Form ES-C-1 I Verification of Completion Job Performance Measure No.

NRC-25-IP-JPM-1 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date: ________________ _

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 4 has experienced a valid Safety Injection signal.
2. All applicable procedure prerequisites are satisfied.
3. Post Accident Hydrogen Monitoring system is in NORMAL STANDBY ALIGNMENT.

INITIA TlNG CUE:

You are the Primary Operator and you have been directed by the Unit 4 RO to place the Post Accident Hydrogen Monitor in service per 4-0P-094 section 7.1.

This is a Simulate JPM. No plant equipment is to be manipulated during the performance of this task.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 4 has experienced a valid Safety Injection signal.
2. All applicable procedure prerequisites are satisfied.
3. Post Accident Hydrogen Monitoring system is in NORMAL STANDBY ALIGNMENT.

INITIA TlNG CUE:

You are the Primary Operator and you have been directed by the Unit 4 RO to place the Post Accident Hydrogen Monitor in service per 4-0P-094 section 7.1.

This is a Simulate JPM. No plant equipment is to be manipulated during the performance of this task.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C

Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Job Performance Measure Worksheet Turkey Point Task No:

TRIP and RESET AFW Pump "A" T&T Valve, MOV-6459A JPM No:

061-K4.07 Turbine trip, including overspeed 3. 1/3.3 NRC Examiner:

Date:

Form ES-C-1 NRC-25-IP-JPM-J Simulated Performance X

Actual Performance

~--------------

Classroom --------

Simulator -------

Plant X Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. 3-0P-075, Auxiliary Feedwater System, Section 7.8, Auxiliary Feedwater Pump A Manual Start is in progress.
2. 3-0P-075, Auxiliary Feedwater System has been completed up to Section 7.8.7 by another NPO.
3. The Unit 3 Unit Supervisor has directed the NPO to perform steps 7.8.8 through 7.8.10 of 3-OP-075, Auxiliary Feedwater System.

Task Standard:

AFW Pump "A" T&T Valve, MOV-6459A, is TRIPPED.in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8.

AFW Pump "A" T& T Valve, MOV-6459A is RESET, in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8.

Required Materials:

Applicable Personal Protective Equipment 3-0P-075, Auxiliary Feedwater System General

References:

3-0P-075, Auxiliary Feedwater System NUREG 1021 Rev 9 Appendix C Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Job Performance Measure Worksheet Turkey Point Task No:

TRIP and RESET AFW Pump "A" T&T Valve, MOV-6459A JPM No:

061-K4.07 Turbine trip, including overspeed 3. 1/3.3 NRC Examiner:

Date:

Form ES-C-1 NRC-25-IP-JPM-J Simulated Performance X

Actual Performance

~--------------

Classroom --------

Simulator -------

Plant X Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. 3-0P-075, Auxiliary Feedwater System, Section 7.8, Auxiliary Feedwater Pump A Manual Start is in progress.
2. 3-0P-075, Auxiliary Feedwater System has been completed up to Section 7.8.7 by another NPO.
3. The Unit 3 Unit Supervisor has directed the NPO to perform steps 7.8.8 through 7.8.10 of 3-OP-075, Auxiliary Feedwater System.

Task Standard:

AFW Pump "A" T&T Valve, MOV-6459A, is TRIPPED.in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8.

AFW Pump "A" T& T Valve, MOV-6459A is RESET, in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8.

Required Materials:

Applicable Personal Protective Equipment 3-0P-075, Auxiliary Feedwater System General

References:

3-0P-075, Auxiliary Feedwater System NUREG 1021 Rev 9 Appendix C

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue: You have been directed to perform steps 7.8.8 through 7.8.10 of3-0P-075, Auxiliary Feedwater System to TRIP and RESET AFW Pump "A" T&T Valve, MOV-6459A.

Time Critical Task: No Validation Time:

15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue: You have been directed to perform steps 7.8.8 through 7.8.10 of3-0P-075, Auxiliary Feedwater System to TRIP and RESET AFW Pump "A" T&T Valve, MOV-6459A.

Time Critical Task: No Validation Time:

15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #

N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A NUREG 1021 Rev 9 Appendix C I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #

N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A NUREG 1021 Rev 9 Appendix C

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( I)

Start Time Trip AFW Pump A T&T Valve, MOV-6459A.

STEP 1

SAT

..J UNSAT 7.8.8 Push the mechanical trip button for the AFW Pump AT&T Standard:

Valve, MOV-6459A Cue Once NPO identifies Mechanical Trip Button and simulates depressing the button, confirm Trip Button has been depressed.

Comment NOTE:

NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( I)

Start Time Trip AFW Pump A T&T Valve, MOV-6459A.

STEP 1

SAT

..J UNSAT 7.8.8 Push the mechanical trip button for the AFW Pump AT&T Standard:

Valve, MOV-6459A Cue Once NPO identifies Mechanical Trip Button and simulates depressing the button, confirm Trip Button has been depressed.

Comment NOTE:

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 5 of 12 Form ES-C-1 I NPO verifies AFW Pump A T&T Valve, MOV-6459A, is closed.

STEP 2

SAT UNSAT then verify the following:

Standard:

1. AFW Pump A T&T Valve, MOV-6459A, is closed.
2. Control Room mechanical trip light is ON.
1. If operator verifies MOV-6459A CLOSED by valve stem moving downward and stopping, confirm CLOSED.

Cue

2. When NPO simulates contacting Control Room confirm that Control Room mechanical trip light is On and valve indicates CLOSED.

Comment NOTE:

Evaluator may act as Control Room Operator to simulate communications.

NUREG 1021 Rev 9 Appendix C I Appendix C Page 5 of 12 Form ES-C-1 I NPO verifies AFW Pump A T&T Valve, MOV-6459A, is closed.

STEP 2

SAT UNSAT then verify the following:

Standard:

1. AFW Pump A T&T Valve, MOV-6459A, is closed.
2. Control Room mechanical trip light is ON.
1. If operator verifies MOV-6459A CLOSED by valve stem moving downward and stopping, confirm CLOSED.

Cue

2. When NPO simulates contacting Control Room confirm that Control Room mechanical trip light is On and valve indicates CLOSED.

Comment NOTE:

Evaluator may act as Control Room Operator to simulate communications.

NUREG 1021 Rev 9 Appendix C

Appendix C Page 6 of 12 Form ES-C-1 NPO confirms Local Test Panel Mechanical Trip Light is on.

STEP 3

SAT UNSAT Standard:

Local Test Panel mechanical trip light is On.

Cue When NPO identifies Local Test Panel mechanical trip light tell the NPO that the RED light is OFF and the GREEN light is on.

Comment NOTE:

Local Test Panel Mechanical Trip Light is AMBER.

NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 NPO confirms Local Test Panel Mechanical Trip Light is on.

STEP 3

SAT UNSAT Standard:

Local Test Panel mechanical trip light is On.

Cue When NPO identifies Local Test Panel mechanical trip light tell the NPO that the RED light is OFF and the GREEN light is on.

Comment NOTE:

Local Test Panel Mechanical Trip Light is AMBER.

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 7 of 12 Form ES-C-1 STEP 4

Reset AFW Pump A T&T Valve, MOV-6459A SAT

..j UNSAT CAUTION When releasing the mechanical trip rod, ensure the rod does not snap back towards the turbine. This could damage the turbine overspeed Standard:

tappet shaft.

7.8.9 Reset AFW Pump A T&T Valve, MOV-6459A, by pulling the mechanical trip rod approximately one inch.

When NPO describes operating mechanical trip rod tell operator that the Cue mechanical trip rod will travel no further and does not snap back to the tripped position.

Comment NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 12 Form ES-C-1 STEP 4

Reset AFW Pump A T&T Valve, MOV-6459A SAT

..j UNSAT CAUTION When releasing the mechanical trip rod, ensure the rod does not snap back towards the turbine. This could damage the turbine overspeed Standard:

tappet shaft.

7.8.9 Reset AFW Pump A T&T Valve, MOV-6459A, by pulling the mechanical trip rod approximately one inch.

When NPO describes operating mechanical trip rod tell operator that the Cue mechanical trip rod will travel no further and does not snap back to the tripped position.

Comment NUREG 1021 Rev 9 Appendix C

Appendix C NOTE:

Page 8 of 12 HEAD LEVER_

SCRIBE MARK GUIDE SPRING -

TAPPET ASSEMBL Y_- -----

TRIP HEAD LEVER CORRECT POSITION

]APPET NUT HEAD BRACKET TRIP HEAD LEVER INCORRECT POSITION ( HELD BY TAPPET)

Form ES-C-1 NUREG 1021 Rev 9 Appendix C Appendix C NOTE:

Page 8 of 12 HEAD LEVER SCRIBE MARK GUIDE SPRING*

TAPPET ASSEMBL Y.-... --

SCRlB" MA.~K f----.>,.,..""'-:

TRIP HEAD LEVER CORRECT POSITION

]APPET NUT HEAD BRACKET TRIP HEAD LEVER INCORRECT POSITION ( HELD BY TAPPET)

Form ES-C-1 NUREG 1021 Rev 9 Appendix C

I Appendix C STEP 5

Standard:

Cue Comment NOTE:

Terminating Cue:

Page 9 of 12 Verify the limit switch arm roller is properly positioned.

7.8.10 Verify the limit switch arm roller is on the North side of the roller plate AND the tappet nut is contacting the head lever below the scribe mark.

When operator describes the correct standard, confirm that the limit switch arm roller is properly positioned.

The task is complete when the Examinee returns the cue sheet to the examiner.

Stop Time Form ES-C-1 I SAT UNSAT STOP NUREG 1021 Rev 9 Appendix C I Appendix C STEP 5

Standard:

Cue Comment NOTE:

Terminating Cue:

Page 9 of 12 Verify the limit switch arm roller is properly positioned.

7.8.10 Verify the limit switch arm roller is on the North side of the roller plate AND the tappet nut is contacting the head lever below the scribe mark.

When operator describes the correct standard, confirm that the limit switch arm roller is properly positioned.

The task is complete when the Examinee returns the cue sheet to the examiner.

Stop Time Form ES-C-1 I SAT UNSAT STOP NUREG 1021 Rev 9 Appendix C

Appendix C Page 10 of 12 Form ES-C-1 Verification of Completion Job Performance Measure No.

NRC-25-1 P-JPM-J Examinee's Name:

Examiner'S Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date: _________________ _

NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 Verification of Completion Job Performance Measure No.

NRC-25-1 P-JPM-J Examinee's Name:

Examiner'S Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date: _________________ _

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

I. 3-0P-075, Auxiliary Feedwater System, Section 7.8, Auxiliary Feedwater Pump A Manual Start is in progress.

2. 3-0P-075, Auxiliary Feedwater System has been completed up to Section 7.8.7 by another NPO.
3. The Unit 3 Unit Supervisor has directed the NPO to perform steps 7.8.8 through 7.8.10 of 3-0P-075, Auxiliary Feedwater System.

INITIA TlNG CUE:

You have been directed to perform steps 7.8.8 through 7.8.10 of 3-0P-075, Auxiliary Feedwater System to TRIP and RESET AFW Pump "A" T& T Valve, MOV-6459A.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

I. 3-0P-075, Auxiliary Feedwater System, Section 7.8, Auxiliary Feedwater Pump A Manual Start is in progress.

2. 3-0P-075, Auxiliary Feedwater System has been completed up to Section 7.8.7 by another NPO.
3. The Unit 3 Unit Supervisor has directed the NPO to perform steps 7.8.8 through 7.8.10 of 3-0P-075, Auxiliary Feedwater System.

INITIA TlNG CUE:

You have been directed to perform steps 7.8.8 through 7.8.10 of 3-0P-075, Auxiliary Feedwater System to TRIP and RESET AFW Pump "A" T& T Valve, MOV-6459A.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C

Appendix C Facility:

Task

Title:

KJA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Job Performance Measure Worksheet Turke}" Point Task No:

Transfer Vital Loads Between Job Performance Inverters Measure No:

062-A4.04 {2.6/2.71 NRC Examiner:

Date:

In Plant Simulated Performance X

Actual Performance Form ES-C-1 NRC-25-IP-JPM-K Classroom -------------

Simulator ----------

Plant X Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY.
2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.

Task Standard:

1. Transfer load to the correct inverter.

Required Materials:

1. 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM (12/08)

General

References:

1. 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM (12/08)

NUREG 1021 Rev 9 Appendix C Appendix C Facility:

Task

Title:

KJA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Job Performance Measure Worksheet Turke}" Point Task No:

Transfer Vital Loads Between Job Performance Inverters Measure No:

062-A4.04 {2.6/2.71 NRC Examiner:

Date:

In Plant Simulated Performance X

Actual Performance Form ES-C-1 NRC-25-IP-JPM-K Classroom Simulator Plant X Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY.
2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.

Task Standard:

1. Transfer load to the correct inverter.

Required Materials:

1. 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM (12/08)

General

References:

1. 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM (12/08)

NUREG 1021 Rev 9 Appendix C

Appendix C Page 2 of 17 Form ES-C-1 Initiating Cue:

In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 48 (4Y02) Inverter to the 8 SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1.

Time Critical Task: No Validation Time:

18 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 17 Form ES-C-1 Initiating Cue:

In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 48 (4Y02) Inverter to the 8 SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1.

Time Critical Task: No Validation Time:

18 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 3 of 17 SIMULATOR SETUP Reset to IC #

N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A Form ES-C-1 I NUREG 1021 Rev 9 Appendix C I Appendix C Page 3 of 17 SIMULATOR SETUP Reset to IC #

N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A Form ES-C-1 I NUREG 1021 Rev 9 Appendix C

Appendix C Page 4 of 17 Form ES-C-1 INSTRUCTIONS TO OPERA TOR HAND JPM BRIEFING SHEET TO OPERATOR A T THIS TIME!

INITIAL CONDITIONS:

1. Two inverters in service, B SPARE (4Y04) in standby and 4B (4Y02) supplying load.
2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.

INITIA TlNG CUE:

In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 4B (4Y02) Inverter to the B SPARE (4Y04) Inverter.

TERMINA TlON CUE:

When you feel that you have satisfactorily completed the assigned task, hand your JPM Briefing Sheet back to me.

Do you have any questions?

You may begin.

NOTES TO EVALUATOR:

1. Two inverters in service, B SPARE (4Y04) in standby and 4B (4Y02) supplying load.
2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.

NOTE: This is a SIMULATE JPM. Tell candidate that NO plant equipment is to be manipulated during the performance of this task.

NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 17 Form ES-C-1 INSTRUCTIONS TO OPERA TOR HAND JPM BRIEFING SHEET TO OPERATOR A T THIS TIME!

INITIAL CONDITIONS:

1. Two inverters in service, B SPARE (4Y04) in standby and 4B (4Y02) supplying load.
2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.

INITIA TlNG CUE:

In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 4B (4Y02) Inverter to the B SPARE (4Y04) Inverter.

TERMINA TlON CUE:

When you feel that you have satisfactorily completed the assigned task, hand your JPM Briefing Sheet back to me.

Do you have any questions?

You may begin.

NOTES TO EVALUATOR:

1. Two inverters in service, B SPARE (4Y04) in standby and 4B (4Y02) supplying load.
2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.

NOTE: This is a SIMULATE JPM. Tell candidate that NO plant equipment is to be manipulated during the performance of this task.

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 5 of 17 Form ES-C-1 Denote critical steps with a check mark (I)

STEP 1

STANDARD:

CUES:

Comment NOTE:

Start Time 7.0 INFREQUENT OPERATIONS 7.1 Transfer of Bus Load from Normal to Spare Inverter (Normal Transfer)

IN IT Transfer from Inverter -----

Date/Time Started:

/


~------

7.1.1 Initial Conditions

__ 1. All applicable prerequisites listed in Section 3.0 are satisfied.

__ 2. The applicable Spare Inverter is in Standby in accordance with Subsection 5.1 of this procedure.

1.0btains copy of 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM.

2Verifies procedure is current with no outstanding OTSCs.

1. Provide copy of procedure once operator has located & verified 0-OP-003.3, or require candidate to obtain procedure.
2. Inform operator that Sections 3.0 and 5. 1 conditions have been met.
3. Candidate should proceed to Control Room, ask permission to enter and go to the Inverter Room.

Once candidate has identified need to go to the Control Room tell the candidate to insure that the specific task to be performed is not re/aved to Control Room personnel.

NOTE provides a reference for Typical Normal Vital AC Inverter Switch Location, or provides a reference for Typical Spare Vital AC Inverter Switch Location as applicable.

SAT UNSAT NUREG 1021 Rev 9 Appendix C I Appendix C Page 5 of 17 Form ES-C-1 Denote critical steps with a check mark (I)

STEP 1

STANDARD:

CUES:

Comment NOTE:

Start Time 7.0 INFREQUENT OPERATIONS 7.1 Transfer of Bus Load from Normal to Spare Inverter (Normal Transfer)

IN IT Transfer from Inverter -----

Date/Time Started:

/


~--------

7.1.1 Initial Conditions

__ 1. All applicable prerequisites listed in Section 3.0 are satisfied.

__ 2. The applicable Spare Inverter is in Standby in accordance with Subsection 5.1 of this procedure.

1.0btains copy of 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM.

2Verifies procedure is current with no outstanding OTSCs.

1. Provide copy of procedure once operator has located & verified 0-OP-003.3, or require candidate to obtain procedure.
2. Inform operator that Sections 3.0 and 5. 1 conditions have been met.
3. Candidate should proceed to Control Room, ask permission to enter and go to the Inverter Room.

Once candidate has identified need to go to the Control Room tell the candidate to insure that the specific task to be performed is not re/aved to Control Room personnel.

NOTE provides a reference for Typical Normal Vital AC Inverter Switch Location, or provides a reference for Typical Spare Vital AC Inverter Switch Location as applicable.

SAT UNSAT NUREG 1021 Rev 9 Appendix C

Appendix C Page 6 of 17 Form ES-C-1 (procedure step 7.1.2.1)

STEP 2

SAT

~

__ 1. Place the Alternate Source Transfer Switch to the position UNSAT indicated in Table 2, TABLE 2 I I Wbon for Pia,..

ALITR"AIT

~ub')tituting

[\\'SERYICE SOCRCE T() Position (LOCKED)

I~TI SPARE

,\\OR\\lU TRA.'\\SFER D.I:RTER J:\\,I:RTER SWITCH AS (3Y04) 3A(3Y01)

.\\YOIB BACKL? TO SPARE I).,*ERTER (3Y04) AS AS (3Y041 4A(W01) 4YOIB BACKL? TO SPARE I).,'ERTER (3Y04) AS BS(W04) 3B13Y02) 3Y02B BACKL? TO SPARE IXVERTER (W04) BS BS (W04)

.JB (4Y02) 4Y028 BACKL? TO SPARE J:\\,'ERTER (W04) BS C$ (3YOti) 3C (W05) 3YOSE BACKe? TO SPARE I). YERTER (WOO) CS CS OY06) 4UW05) 4YOSE BACKeP TO SPARE Th:YERTER (3Y06) CS DS(W06\\

3D (WOn 3Y07B BACKL? TO SPARE Th:YERTER (4Y06) DS DS(4Y06) 4D(.JY07) 4Y07B BACKe? TO SPARE lNYERTER 14Y(6) DS

1. Selects correct switch (4Y02B) and unlocks operating handle.

STANDARD:

2. Repositions switch 4Y02B to BACKUP TO SPARE INVERTER (4Y04) BS and re-installs lock.
1. Once candidate locates switch, correctly describes how to remove lock from operating handle and simulates repositioning switch CUES:

handle, confirm these operations.

2. When candidate correctly describes how to re-installiock on switch handle, confirm this operation.

Comment NOTE:

NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 17 Form ES-C-1 (procedure step 7.1.2.1)

STEP 2

SAT

~

__ 1. Place the Alternate Source Transfer Switch to the position UNSAT indicated in Table 2, TABLE 2 I I Wbon for Pia,..

ALITR"AIT

~ub')tituting

[\\'SERYICE SOCRCE T() Position (LOCKED)

I~TI SPARE

,\\OR\\lU TRA.'\\SFER D.I:RTER J:\\,I:RTER SWITCH AS (3Y04) 3A(3Y01)

.\\YOIB BACKL? TO SPARE I).,*ERTER (3Y04) AS AS (3Y041 4A(W01) 4YOIB BACKL? TO SPARE I).,'ERTER (3Y04) AS BS(W04) 3B13Y02) 3Y02B BACKL? TO SPARE IXVERTER (W04) BS BS (W04)

.JB (4Y02) 4Y028 BACKL? TO SPARE J:\\,'ERTER (W04) BS C$ (3YOti) 3C (W05) 3YOSE BACKe? TO SPARE I). YERTER (WOO) CS CS OY06) 4UW05) 4YOSE BACKeP TO SPARE Th:YERTER (3Y06) CS DS(W06\\

3D (WOn 3Y07B BACKL? TO SPARE Th:YERTER (4Y06) DS DS(4Y06) 4D(.JY07) 4Y07B BACKe? TO SPARE lNYERTER 14Y(6) DS

1. Selects correct switch (4Y02B) and unlocks operating handle.

STANDARD:

2. Repositions switch 4Y02B to BACKUP TO SPARE INVERTER (4Y04) BS and re-installs lock.
1. Once candidate locates switch, correctly describes how to remove lock from operating handle and simulates repositioning switch CUES:

handle, confirm these operations.

2. When candidate correctly describes how to re-installiock on switch handle, confirm this operation.

Comment NOTE:

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 7 of 17 Form ES-C-1 I STEP 3

DO NOT ALLOW THE BS INVERTER SAT 4

DOOR TO BE OPENED UNSAT (procedure step 7.1.2.2)

2. Place the Sync Reference Selector Switch (SW-2) inside the applicable SPARE inverter to NORMAL (DOWN) position.

STANDARD:

1. Operator identifies the B SPARE (4Y04) inverter.
2. Simulates positioning switch SW-2 to NORMAL (DOWN) position.
1. When candidate identifies B SPARE (4Y04)inverter and states that the switch is inside the inverter requiring door opening to operate, CUE:

tell the operator to simulate going inside the inverter to pOSition the switch.

2. When SW-2 operation properly described, confirm re-positioning.

Comment DO NOT ALLOW THE BS INVERTER NOTE:

DOOR TO BE OPENED NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 17 Form ES-C-1 I STEP 3

DO NOT ALLOW THE BS INVERTER SAT 4

DOOR TO BE OPENED UNSAT (procedure step 7.1.2.2)

2. Place the Sync Reference Selector Switch (SW-2) inside the applicable SPARE inverter to NORMAL (DOWN) position.

STANDARD:

1. Operator identifies the B SPARE (4Y04) inverter.
2. Simulates positioning switch SW-2 to NORMAL (DOWN) position.
1. When candidate identifies B SPARE (4Y04)inverter and states that the switch is inside the inverter requiring door opening to operate, CUE:

tell the operator to simulate going inside the inverter to pOSition the switch.

2. When SW-2 operation properly described, confirm re-positioning.

Comment DO NOT ALLOW THE BS INVERTER NOTE:

DOOR TO BE OPENED NUREG 1021 Rev 9 Appendix C

Appendix C Page 8 of 17 Form ES-C-1 (procedure step 7.1.2.3)

STEP 4

SAT

3. Verify the following at the SPARE inverter:

UNSAT

__ a. The IN SYNC light is ON.

__ b. The AL T SOURCE A V AIL light is ON.

__ c. The SYNC REFERENCE NORMAL light is ON.

STANDARD:

Determines the B SPARE (4Y04) inverter lights listed above are all ON.

CUE:

When each light properly identified, state light is ON.

Comment NOTE:

NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 17 Form ES-C-1 (procedure step 7.1.2.3)

STEP 4

SAT

3. Verify the following at the SPARE inverter:

UNSAT

__ a. The IN SYNC light is ON.

__ b. The AL T SOURCE A V AIL light is ON.

__ c. The SYNC REFERENCE NORMAL light is ON.

STANDARD:

Determines the B SPARE (4Y04) inverter lights listed above are all ON.

CUE:

When each light properly identified, state light is ON.

Comment NOTE:

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 9 of 17 Form ES-C-1 I STEP 5

DO NOT ALLOW THE 4B(4Y02)

SAT

..j INVERTER DOOR TO BE OPENED UNSAT (procedure step 7.1.2.4)

4. Place the Sync Reference Selector Switch (SW-2) inside the applicable INSERVICE NORMAL inverter to the EXTERNAL (UP) position
1. Operator identifies 48 (4Y02) inverter.

STANDARD:

2. Simulates positioning switch SW-2 to EXTERNAL (UP) position.
1. When candidate identifies 48 (4Y02)inverter and states that the switch is inside the inverter requiring door opening to operate, tell CUE:

the operator to simulate going inside the inverter to position the switch.

2. When SW-2 operation properly described, confirm re-positioning.

Comment DO NOT ALLOW THE 4B(4Y02)

NOTE:

INVERTER DOOR TO BE OPENED NUREG 1021 Rev 9 Appendix C I Appendix C Page 9 of 17 Form ES-C-1 I STEP 5

DO NOT ALLOW THE 4B(4Y02)

SAT

..j INVERTER DOOR TO BE OPENED UNSAT (procedure step 7.1.2.4)

4. Place the Sync Reference Selector Switch (SW-2) inside the applicable INSERVICE NORMAL inverter to the EXTERNAL (UP) position
1. Operator identifies 48 (4Y02) inverter.

STANDARD:

2. Simulates positioning switch SW-2 to EXTERNAL (UP) position.
1. When candidate identifies 48 (4Y02)inverter and states that the switch is inside the inverter requiring door opening to operate, tell CUE:

the operator to simulate going inside the inverter to position the switch.

2. When SW-2 operation properly described, confirm re-positioning.

Comment DO NOT ALLOW THE 4B(4Y02)

NOTE:

INVERTER DOOR TO BE OPENED NUREG 1021 Rev 9 Appendix C

Appendix C Page 10 of 17 Form ES-C-1 (procedure step 7.1.2.5)

STEP 6

SAT

5. Verify the following at the INSERVICE NORMAL inverter:

UNSAT

__ a. The IN SYNC Light is ON.

__ b. The SYNC REFERENCE EXTERNAL light is ON.

STANDARD:

Determines the 48 (4Y02)inverter lights listed above are all ON.

CUE:

When each light properly identified, state light is ON.

Comment:

NOTE:

NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 17 Form ES-C-1 (procedure step 7.1.2.5)

STEP 6

SAT

5. Verify the following at the INSERVICE NORMAL inverter:

UNSAT

__ a. The IN SYNC Light is ON.

__ b. The SYNC REFERENCE EXTERNAL light is ON.

STANDARD:

Determines the 48 (4Y02)inverter lights listed above are all ON.

CUE:

When each light properly identified, state light is ON.

Comment:

NOTE:

NUREG 1021 Rev 9 Appendix C

, Appendix C Page 11 of 17 Form ES-C-1 (procedure step 7.1.2.6)

STEP 7

SAT

..J

__ 6. Using Table 3, determine which Instrument AC Selector Switch should be used AND record:

UNSAT TABLE 3 For Plart When Substitutiug

~SER\\'ICE

~STRnlL'\\"I AC ToSt1'PLY I:\\TTIALS SPARE I:\\T£RTIR

-;OR.'L.u.

SELECTOR S"TICH Posltion I:\\YERTER AS (3Y04) 3A(3YOJ) 3P07A AC LI:\\1:

AS OY(4) 4A(-lYOl) 4P07A AC u:-.1:

BS (4Y04) 3B (3YO~)

3P08A AC u:-.1:

BS (4Y04) 4B 14Y02, 4POSA ACLDo1:

CS OY06) 3C (3Y')5) 3P06A AC ID1:

CS (W06) 4C(-tYO))

4POM AC u:-.1:

D<; i4'{(6) 3D (3Y07) 3P09A AC ID1:

DS (~Y06) 4D (4YO!)

4P09A ACLI:\\1:

STANDARD:

Using Table 3, identifies 4P08A as the correct Selector Switch to use.

CUE:

N/A Comment NOTE:

NUREG 1021 Rev 9 Appendix C

, Appendix C Page 11 of 17 Form ES-C-1 (procedure step 7.1.2.6)

STEP 7

SAT

..J

__ 6. Using Table 3, determine which Instrument AC Selector Switch should be used AND record:

UNSAT TABLE 3 For Plart When Substitutiug

~SER\\'ICE

~STRnlL'\\"I AC ToSt1'PLY I:\\TTIALS SPARE I:\\T£RTIR

-;OR.'L.u.

SELECTOR S"TICH Posltion I:\\YERTER AS (3Y04) 3A(3YOJ) 3P07A AC LI:\\1:

AS OY(4) 4A(-lYOl) 4P07A AC u:-.1:

BS (4Y04) 3B (3YO~)

3P08A AC u:-.1:

BS (4Y04) 4B 14Y02, 4POSA ACLDo1:

CS (3Y06) 3C (3Y')5) 3P06A AC ID1:

CS (W061 4C (WO))

4POM AC u:-.1:

D<; i4'{(6) 3D (3Y07) 3P09A AC ID1:

DS (~Y06) 4D (4YO!)

4P09A ACLI:\\1:

STANDARD:

Using Table 3, identifies 4P08A as the correct Selector Switch to use.

CUE:

N/A Comment NOTE:

NUREG 1021 Rev 9 Appendix C

Appendix C Page 12 of 17 Form ES-C-1 STEP 8

(procedure step 7.1.2. 7.a)

SAT

7. Perform the following steps at the appropriate Instrument AC Selector Switch panel in the Cable Spreading Room:

UNSAT

__ a. Verify that the Alternate Power Available light is ON.

STANDARD:

Verifies 4P08A alternate power available light ON CUE:

When 4P08A alternate power available light correctly identified, tell candidate that light is ON.

Comment NOTE:

NUREG 1021 Rev 9 Appendix C Appendix C Page 12 of 17 Form ES-C-1 STEP 8

(procedure step 7.1.2. 7.a)

SAT

7. Perform the following steps at the appropriate Instrument AC Selector Switch panel in the Cable Spreading Room:

UNSAT

__ a. Verify that the Alternate Power Available light is ON.

STANDARD:

Verifies 4P08A alternate power available light ON CUE:

When 4P08A alternate power available light correctly identified, tell candidate that light is ON.

Comment NOTE:

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 13 of 17 Form ES-C-1 I STEP 9

(procedure step 7.1.2. 7.b)

SAT

b. Test the Sync Verification Light as follows:

__ (1) Position the Sync Switch to SYNCH LAMP TEST.

UNSAT

__ (2) Verify lamp comes ON.

STANDARD:

1. Positions 4P08A SYNC switch to SYNCH LAMP TEST.
2. Verifies 4P08A SYNC Verification Light ON.
1. When SYNC switch identified and operation correctly described, CUE:

confirm switch manipulation.

2. When Sync Verification Light correctly identified, tell candidate light is ON.

Comment NOTE:

NUREG 1021 Rev 9 Appendix C I Appendix C Page 13 of 17 Form ES-C-1 I STEP 9

(procedure step 7.1.2. 7.b)

SAT

b. Test the Sync Verification Light as follows:

__ (1) Position the Sync Switch to SYNCH LAMP TEST.

UNSAT

__ (2) Verify lamp comes ON.

STANDARD:

1. Positions 4P08A SYNC switch to SYNCH LAMP TEST.
2. Verifies 4P08A SYNC Verification Light ON.
1. When SYNC switch identified and operation correctly described, CUE:

confirm switch manipulation.

2. When Sync Verification Light correctly identified, tell candidate light is ON.

Comment NOTE:

NUREG 1021 Rev 9 Appendix C

Appendix C Page 14 of 17 Form ES-C-1 (procedure step 7.1.2. 7.c)

STEP 10 SAT NOTE In the following Substeps 7.1.2. 7.c. (1) and 7.1.2. 7.c. (2) the bright light will go UNSAT OFF, but a slight glow is expected. This is acceptable.

c. Perform a synch check as follows:

__ (1) Position the Sync Switch to SYNCH CHECK PUSH.

__ (2) Depress and hold the Sync Switch.

__ (3) Verify that the Sync Verification Light stays OFF.

1.

Positions 4P08A SYNC Switch to SYNCH CHECK PUSH.

STANDARD:

2.

Depresses & holds 4P08A SYNC Switch.

3.

Verifies 4P08A Sync Verification Ught stays OFF.

4.

Releases 4P08A SYNC Switch.

1. When SYNC switch identified and operation correctly described, CUE:

confirm switch manipulations.

2. When Sync Verification Ught correctly identified, tell candidate light is OFF.

Comment NOTE NOTE:

In the following Substeps 7. 1.2.7. c. (1) and 7. 1.2.7. c. (2) the bright light will go OFF, but a slight glow is expected. This is acceptable.

NUREG 1021 Rev 9 Appendix C Appendix C Page 14 of 17 Form ES-C-1 (procedure step 7.1.2. 7.c)

STEP 10 SAT NOTE In the following Substeps 7.1.2. 7.c. (1) and 7.1.2. 7.c. (2) the bright light will go UNSAT OFF, but a slight glow is expected. This is acceptable.

c. Perform a synch check as follows:

__ (1) Position the Sync Switch to SYNCH CHECK PUSH.

__ (2) Depress and hold the Sync Switch.

__ (3) Verify that the Sync Verification Light stays OFF.

1.

Positions 4P08A SYNC Switch to SYNCH CHECK PUSH.

STANDARD:

2.

Depresses & holds 4P08A SYNC Switch.

3.

Verifies 4P08A Sync Verification Ught stays OFF.

4.

Releases 4P08A SYNC Switch.

1. When SYNC switch identified and operation correctly described, CUE:

confirm switch manipulations.

2. When Sync Verification Ught correctly identified, tell candidate light is OFF.

Comment NOTE NOTE:

In the following Substeps 7. 1.2.7. c. (1) and 7. 1.2.7. c. (2) the bright light will go OFF, but a slight glow is expected. This is acceptable.

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 15 of 17 Form ES-C-1

__ d. Place the Instrument AC Selector Switch to the position STEP 11 indicated in Table 3.

SAT

~

NOTE Initials should be entered for the applicable inverter. NIA should be entered UNSAT for all others.

TABLE.'

For Place Wb~n Sub,tituting I~SERYICE

[\\,STRc\\!E~T AC To st'PPLY L'"ITLUS SPARE I!'-TERTER

-;OR\\L\\L SELE( TOR SWITCH Po,ition L"\\"ERTER AS '3Y041 3A(3YC]1 3PO-";

ACrn.:E AS f3Y(4) 4.40 (':'Y01)

~P07A

.4.(' Ln,:::

as (4Yi}~)

38 {3Y02\\

3P83A ACrn,:::

3-'3 (*P{IJ"':}

4B (4"i")J~l "P~SA ACrn,:::

CS (:Y'OC:

3C (;::05')

3Pc'6A ACLn,""E CS (3\\1J¢\\

4C (4\\1:5)

"])06A AC Ln'::::

DS (4YO~)

3D ~3YO')

3P09A AC lJ}.;E DS (4YOo)

"D ("YO:',

4P09A AC lJ}.;:::

STANDARD:

1.

Selects correct switch (4P08A).

2.

Positions 4P08A Instrument AC Selector Switch to AC LINE.

CUE:

When 4P08A Instrument AC Selector Switch identified and operation correctly described, confirm switch manipulation.

Comment NOTE NOTE:

Initials should be entered for the applicable inverter. NIA should be entered for all others.

Tell candidate that another operator will continue with step 7. 1.2.8 Terminating The task is complete when the Examinee returns the cue sheet to the STOP Cue:

examiner.

NUREG 1021 Rev 9 Appendix C I Appendix C Page 15 of 17 Form ES-C-1

__ d. Place the Instrument AC Selector Switch to the position STEP 11 indicated in Table 3.

SAT

~

NOTE Initials should be entered for the applicable inverter. NIA should be entered UNSAT for all others.

TABLE.'

For Place Wb~n Sub,tituting I~SERYICE

[\\,STRc\\!E~T AC To st'PPLY L'"ITLUS SPARE I!'-TERTER

-;OR\\L\\L SELE( TOR SWITCH Po,ition L"\\"ERTER A5(31"04) 3A t3YC] 1 3PO-";

ACrn.:E AS f3Y(4) 4.40 (':'Y01)

~P07A

.4.(' Ln,:::

as (4Yi}~)

38 {3Y02\\

3P83A ACrn,:::

3-'3 (*P{IJ"':}

4B (4"i")J~l "P~SA ACrn,:::

CS (:Y'OC:

3C (;::05')

3Pc'6A ACLn,""E CS (3\\1J¢\\

4C (4\\1:5)

"])06A AC Ln'::::

DS (4YO~)

3D (3YO')

3P09A AC lJ}.;E DS (4YOo)

"D ("YO:',

4P09A AC lJ}.;:::

STANDARD:

1.

Selects correct switch (4P08A).

2.

Positions 4P08A Instrument AC Selector Switch to AC LINE.

CUE:

When 4P08A Instrument AC Selector Switch identified and operation correctly described, confirm switch manipulation.

Comment NOTE NOTE:

Initials should be entered for the applicable inverter. NIA should be entered for all others.

Tell candidate that another op_erator will continue with step 7. 1.2.8 Terminating The task is complete when the Examinee returns the cue sheet to the STOP Cue:

examiner.

NUREG 1021 Rev 9 Appendix C

Appendix C Page 16 of 17 Form ES-C-1 Verification of Completion Job Performance Measure No.

NRC-25-IP-JPM-K Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date: _________________ _

NUREG 1021 Rev 9 Appendix C Appendix C Page 16 of 17 Form ES-C-1 Verification of Completion Job Performance Measure No.

NRC-25-IP-JPM-K Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date: _________________ _

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET THIS IS A SIMULATED PLANT JPM. DO NOT OPERATE ANY PLANT EQUIPMENT.

Initial Conditions:

1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY.
2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.

!NITIA TlNG CUE:

In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 4B (4Y02) Inverter to the B SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET THIS IS A SIMULATED PLANT JPM. DO NOT OPERATE ANY PLANT EQUIPMENT.

Initial Conditions:

1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY.
2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.

!NITIA TlNG CUE:

In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 4B (4Y02) Inverter to the B SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C

Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:

_T_ur_k_e-"-y_P_o_in_t _____ Task No:

Respond to Turbine Runback, Rods Fail to NRC SIM-1PM-A Task

Title:

Insert JPM No:

045 K4.12 Automatic turbine runback 3.3/3.6 KIA

Reference:

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance Actual Performance X

Classroom SimulatorX Plant -------------

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

Unit 3 is operating at 60% power and stable Unit 3 is preparing to return to 100% power.

    • No equipment is out of service.

Task Standard:

3-0NOP-089, Turbine Runback actions have been performed correctly.

Tavgrrref within 4°F in accordance with 0-ONOP-089, Turbine Runback (Match Tavg-Tref), 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage (Tavg-Tref within 4° F during a transient)

Required Materials:

0-ONOP-089, Turbine Runback 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage General

References:

0-ADM-211, Emergency and Off-Normal Operating Procedure Usage 0-ONOP-089, Turbine Runback NUREG 1021 Rev 9 Appendix C Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:

__ T-ur-k-e-L-y-P-o-in-t-:------Task No:

Respond to Turbine Runback, Rods Fail to NRC SIM-1PM-A Task

Title:

Insert JPM No:

045 K4.12 Automatic turbine runback 3.3/3.6 KIA

Reference:

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance Actual Performance x

Classroom SimulatorX Plant ------------

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

Unit 3 is operating at 60% power and stable Unit 3 is preparing to return to 100% power.

    • No equipment is out of service.

Task Standard:

3-0NOP-089, Turbine Runback actions have been performed correctly.

Tavgrrref within 4°F in accordance with 0-ONOP-089, Turbine Runback (Match Tavg-Tref), 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage (Tavg-Tref within 4° F during a transient)

Required Materials:

0-ONOP-089, Turbine Runback 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage General

References:

0-ADM-211, Emergency and Off-Normal Operating Procedure Usage 0-ONOP-089, Turbine Runback NUREG 1021 Rev 9 Appendix C

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

You have been directed to Respond to Plant Conditions Time Critical Task: No Validation Time:

10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEt NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

You have been directed to Respond to Plant Conditions Time Critical Task: No Validation Time:

10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEI NUREG 1021 Rev 9 Appendix C

~ppendix C Page 3 of 12 Form ES-C-1!

SIMULATOR SETUP Reset to IC #

16 Instructor Facility Operator Actions

1. Verify Reset to IC 24
2. Schema>> Reactor>> Rod Control/Rod Position>> SC408 Rod Motion Failures & Controls>>

TFL 10101:L 1-SC408 Rods Fail to Move Auto>> TRUE>> INSERT

3. Verify RED SQUARE framing SC408.
4. Schema>> Feedwater >> FIW Main>> Condensate Polishing Demineralizers >> Feedwater Pumps>>

3P1B (B Feedwater Pump) >>TVFABP1B:FA-3P1B Bearing>> Selected 1.0>> Pending>> Verify ORANGE SQUARE framing 3P1 B.

Ensure Simulator Operator Checklist is complete Instructor Facility Operator Actions (Cont)

5. Go to RUN.
6. Go to

SUMMARY

>> PENDING>> Right click on TVFABP1 B >> TRIGGER NUREG 1021 Rev 9 Appendix C

~ppendix C Page 3 of 12 Form ES-C-1!

SIMULATOR SETUP Reset to IC #

16 Instructor Facility Operator Actions

1. Verify Reset to IC 24
2. Schema>> Reactor>> Rod Control/Rod Position>> SC408 Rod Motion Failures & Controls>>

TFL 10101:L 1-SC408 Rods Fail to Move Auto>> TRUE>> INSERT

3. Verify RED SQUARE framing SC408.
4. Schema>> Feedwater >> FIW Main>> Condensate Polishing Demineralizers >> Feedwater Pumps>>

3P1B (B Feedwater Pump) >>TVFABP1B:FA-3P1B Bearing>> Selected 1.0>> Pending>> Verify ORANGE SQUARE framing 3P1 B.

Ensure Simulator Operator Checklist is complete Instructor Facility Operator Actions (Cont)

5. Go to RUN.
6. Go to

SUMMARY

>> PENDING>> Right click on TVFABP1 B >> TRIGGER NUREG 1021 Rev 9 Appendix C

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time ----

STEP 1

Recognition by Operator that Turbine Runback is occurring.

SAT UNSAT Standard:

Operator recognizes the Turbine Runback and identifies the need to respond in accordance with 3-0NOP-089, Turbine Runback.

Cue Provided by Simulator response.

Comment NOTE:

Operator may identify that 38 Feedwater Pump is degrading and trip the 38 Feedwater Pump.

NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time ----

STEP 1

Recognition by Operator that Turbine Runback is occurring.

SAT UNSAT Standard:

Operator recognizes the Turbine Runback and identifies the need to respond in accordance with 3-0NOP-089, Turbine Runback.

Cue Provided by Simulator response.

Comment NOTE:

Operator may identify that 38 Feedwater Pump is degrading and trip the 38 Feedwater Pump.

NUREG 1021 Rev 9 Appendix C

~ppendiX C Page 5 of 12 Form ES-C-1!

STEP 2

14.0 IMMEDIATE OPERA TOR ACTIONS SAT

~

UNSAT 4.1 Verify the automatic actions listed in Section 3.0 are functioning to --

iStabilize and maintain plant conditions, or assume manual control.

Standard:

Used 3-0NOP-089, Turbine Runback to verify Immediate Operator

~ctions have been completed.

Cue

1. Provided by Simulator response.

~. Terminate JPM after Operator matches Tavg-Trefwithin 4° F.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6, 7, and

8.

NOTE:

Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

NUREG 1021 Rev 9 Appendix C

~ppendiX C Page 5 of 12 Form ES-C-1!

STEP 2

~.O IMMEDIATE OPERA TOR ACTIONS SAT

~

UNSAT 4.1 Verify the automatic actions listed in Section 3.0 are functioning to --

~tabilize and maintain plant conditions, or assume manual control.

Standard:

Used 3-0NOP-089, Turbine Runback to verify Immediate Operator

~ctions have been completed.

Cue

1. Provided by Simulator response.
2. Terminate JPM after Operator matches Tavg-Trefwithin 4° F.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6, 7, and

8.

NOTE:

Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

NUREG 1021 Rev 9 Appendix C

Appendix C Page 6 of 12 Form ES-C-1 3.1 Main Turbine Control Valves and the Reheat Intercept Valves STEP 3

Imodulate closed upon receipt of a runback signal from the Generator SAT lGovernor/Speed Changer.

UNSAT Standard:

IV erified Main Turbine Control Valves and the Reheat Intercept Valves Imodulate closed Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6,7, and

8.

NOTE:

Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 3.1 Main Turbine Control Valves and the Reheat Intercept Valves STEP 3

Imodulate closed upon receipt of a runback signal from the Generator SAT povernorlSpeed Changer.

UNSAT Standard:

IV erified Main Turbine Control Valves and the Reheat Intercept Valves Imodulate closed Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6,7, and

8.

NOTE:

Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

NUREG 1021 Rev 9 Appendix C

IAppendix C Page 7 of 12 Form ES-C-11 3.2 Steam Dump Valves ann and open to relieve excess steam to the STEP 4

1C0ndenser due to the load rejection and subsequent Tavg/Tref SAT Imismatch.

UNSAT Standard:

lVerified Steam Dump Valves are armed and opened if needed.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6, 7, and

8.

NOTE:

Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

NUREG 1021 Rev 9 Appendix C IAppendix C Page 7 of 12 Form ES-C-11 3.2 Steam Dump Valves ann and open to relieve excess steam to the STEP 4

condenser due to the load rejection and subsequent Tavg/Tref SAT mismatch.

UNSAT Standard:

Verified Steam Dump Valves are armed and opened if needed.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

!insertion and take manual action in accordance with Elements 6, 7, and

8.

NOTE:

Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the Isubsequent actions after verifying Automatic Actions w/3-0NOP-089.

NUREG 1021 Rev 9 Appendix C

Appendix C Page 8 of 12 Form ES-C-1 G.3 Automatic Rod Insertion Control adjusts core reactivity to match STEP 5

iTavg with Tref.

SAT UNSAT Standard:

Operator recognizes that Control Rods did not insert as required and inserts Control Rods to match Tavg within 4 degrees F.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod linsertion and take manual action in accordance with Elements 6, 7, and

a.

NOTE:

Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOp-Oa9.

NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 3.3 Automatic Rod Insertion Control adjusts core reactivity to match STEP 5

Tavg with Tref.

SAT UNSAT Standard:

Operator recognizes that Control Rods did not insert as required and inserts Control Rods to match Tavg within 4 degrees F.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod iinsertion and take manual action in accordance with Elements 6, 7, and

a.

NOTE:

Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOp-Oa9.

NUREG 1021 Rev 9 Appendix C

IAppendiX C Page 9 of 12 Form ES-C-11 STEP 6

Operator places Rod Control Selector Switch to MANUAL.

SAT

..j UNS AT Standard:

Operator placed Rod Control Selector Switch to MANUAL.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod iinsertion and take manual action in accordance with Elements 6, 7, and

8.

NOTE:

Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

NUREG 1021 Rev 9 Appendix C IAppendiX C Page 9 of 12 Form ES-C-11 STEP 6

Operator places Rod Control Selector Switch to MANUAL.

SAT

..j UNS AT Standard:

Operator placed Rod Control Selector Switch to MANUAL.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

  • nsertion and take manual action in accordance with Elements 6, 7, and
8.

NOTE:

Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

NUREG 1021 Rev 9 Appendix C

Appendix C Page 10 of 12 Form ES-C-1 Insertion Control Rods to adjusts core reactivity to match Tavg with STEP 7

iTref.

SAT

..j UNSAT Operator places IN-HOLD-OUT Switch to IN to insert Control Rods to Standard:

match Tavg with Tref within 4 [] F.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6, 7, and

8.

NOTE:

Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 Insertion Control Rods to adjusts core reactivity to match Tavg with STEP 7

Tref.

SAT

..j UNSAT Operator places IN-HOLD-OUT Switch to IN to insert Control Rods to Standard:

match Tavg with Tref within 4 [] F.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6, 7, and

8.

NOTE:

Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

NUREG 1021 Rev 9 Appendix C

!Appendix C Page 11 of 12 Form ES-C-11 STEP 8

ravg and Tref are matched.

SAT

~

UNS AT Standard:

n-avg and Tref are within 4°F.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod iinsertion and take manual action in accordance with Elements 6, 7, and

8.

NOTE:

Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the

!subsequent actions after verifying Automatic Actions w/3-0NOP-089.

NUREG 1021 Rev 9 Appendix C

!Appendix C Page 11 of 12 Form ES-C-11 STEP 8

Tavg and Tref are matched.

SAT

~

UNS AT Standard:

Tavg and Tref are within 4°F.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod "nsertion and take manual action in accordance with Elements 6, 7, and

8.

NOTE:

Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the

!Subsequent actions after verifying Automatic Actions w/3-0NOP-089.

NUREG 1021 Rev 9 Appendix C

Appendix C Page 12 of 12 Form ES-C-1 3.4 Verifies Main Feedwater Control Valves open or close in STEP 9

programmed response to steamflow/feedflow mismatch and level input SAT signals, to maintain steam generator levels at program.

UNSAT Verified that Main Feedwater Control Valves responded properly to steamflow/feedflow mismatch and level input signals, to maintain Standard:

steam generator levels at program.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod linsertion and take manual action in accordance with Elements 6, 7, and

8.

NOTE:

Operator may choose to review a/l Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the

!Subsequent actions after verifying Automatic Actions w/3-0NOP-089.

NUREG 1021 Rev 9 Appendix C Appendix C Page 12 of 12 Form ES-C-1 3.4 Verifies Main Feedwater Control Valves open or close in STEP 9

programmed response to steamflow/feedflow mismatch and level input SAT signals, to maintain steam generator levels at program.

UNSAT

~erified that Main Feedwater Control Valves responded properly to Standard:

!Steamflow/feedflow mismatch and level input signals, to maintain

!Steam generator levels at program.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6, 7, and

8.

NOTE:

Operator may choose to review a/l Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

NUREG 1021 Rev 9 Appendix C

!Appendix C I

Page 13 of 12 I

Form ES-C-11 3.5 Verify Pressurizer Level Controller and Pressurizer Pressure STEP 10 Controller vary charging pumps speed and Heater/Spray actuation to SAT maintain the programmed level and pressure, as required for the UNSAT changing values of Tavg.

Verifies that Pressurizer Level Controller and Pressurizer Pressure Controller maintaining the programmed level and pressure, as required Standard:

-"or the changing values of Tavg.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6, 7, and

8.

NOTE:

Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

NUREG 1021 Rev 9 Appendix C

!Appendix C I

Page 13 of 12 I

Form ES-C-11 3.5 Verify Pressurizer Level Controller and Pressurizer Pressure STEP 10 Controller vary charging pumps speed and Heater/Spray actuation to SAT Imaintain the programmed level and pressure, as required for the UNSAT

~hanging values of Tavg.

~erifies that Pressurizer Level Controller and Pressurizer Pressure

[controller maintaining the programmed level and pressure, as required Standard:

~or the changing values of Tavg.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6, 7, and

8.

NOTE:

Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

NUREG 1021 Rev 9 Appendix C

Appendix C Page 14 of 12 Form ES-C-1

$UBSEQUENT OPERA TOR ACTIONS STEP 11 5.1 Determine the cause of the runback initiation AND refer to the SAT

~

~ppropriate ONOP for specific recovery instructions.

UNSAT 5.2 Verify the following conditions:

5.2.1 Stearn generator levels and pressures stabilized.

5.2.2 Stearn dumps closed.

5.2.3 Tavg matches Tref.

5.2.4 Pressurizer levels and pressures stabilized.

5.2 Verify the following conditions:

5.2.1 Stearn generator levels and pressures stabilized.

Standard:

5.2.2 Stearn dumps closed.

~.2.3 Tavg matches Trefwithin 4° F.

5.2.4 Pressurizer levels and pressures stabilized.

Cue Terminate JPM after Operator matches Tavg-Trefwithin 4° F.

Comment NOTE:

Critical Step: 5.2.3 Tavg matches Trefwithin 4° F.

Terminating The task is complete when the Examinee returns the cue sheet to STOP Cue:

.. he examiner.

Stop Time ___ _

NUREG 1021 Rev 9 Appendix C Appendix C Page 14 of 12 Form ES-C-1 SUBSEQUENT OPERA TOR ACTIONS SAT STEP 11 5.1 Determine the cause of the runback initiation AND refer to the

~

appropriate ONOP for specific recovery instructions.

UNSAT 5.2 Verify the following conditions:

5.2.1 Stearn generator levels and pressures stabilized.

5.2.2 Stearn dumps closed.

5.2.3 Tavg matches Tref.

5.2.4 Pressurizer levels and pressures stabilized.

5.2 Verify the following conditions:

5.2.1 Stearn generator levels and pressures stabilized.

Standard:

5.2.2 Stearn dumps closed.

5.2.3 Tavg matches Trefwithin 4° F.

5.2.4 Pressurizer levels and pressures stabilized.

Cue Irerminate JPM after Operator matches Tavg-Trefwithin 4° F.

Comment NOTE:

Critical Step: 5.2.3 Tavg matches Trefwithin 4° F.

Terminating [The task is complete when the Examinee returns the cue sheet to STOP Cue:

~he examiner.

Stop Time ----

NUREG 1021 Rev 9 Appendix C

/Appendix C Page 15 of 12 Form ES-C-11 Verification of Completion Job Performance Measure No.

NRC-25-SIM-JPM-A Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C

/Appendix C Page 15 of 12 Form ES-C-11 Verification of Completion Job Performance Measure No.

NRC-25-SIM-JPM-A Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

Unit 3 is operating at 60% power and stable Unit 3 is preparing to return to 100% power.

No equipment is out of service.

INITIA TlNG CUE:

You have been directed to respond to plant conditions.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

Unit 3 is operating at 60% power and stable Unit 3 is preparing to return to 100% power.

No equipment is out of service.

INITIA TlNG CUE:

You have been directed to respond to plant conditions.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C

Appendix C Facility:

Task

Title:

KJA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Job Performance Measure Worksheet

_T-.:.-u=:;r:..:..:k:..::.eLy-'-P-"o:..:..:in...:..:t'--__________ Task No:

Pressurizer Level Control Channel Fails Low APE 028 AA2.01 PZR level indicators and alarms 3.4 13.6 JPM No:

NRC Examiner:

Date:

Form ES-C-1 NRC-25-SIM-JPM-8 Simulated Performance Actual Performance X

Classroom ------------

Simulator -=====-:::::!.X~ __

Plant ----------

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

Unit 3 is at 100% and stable No equipment is out of service Task Standard:

Unit 3 is at 100% and stable.

Pressurizer level stable and returning to programmed level.

Letdown has been returned to service.

Required Materials:

3-0NOP-041.6, Pressurizer Level Control Malfunction General

References:

3-0NOP-041.6, Pressurizer Level Control Malfunction NUREG 1021 Rev 9 Appendix C Appendix C Facility:

Task

Title:

KJA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Job Performance Measure Worksheet

_T...:.-=.ur:..:..k:..::.eLy-'-P--'o:..:..in:..:..t=--______ Task No:

Pressurizer Level Control Channel Fails Low APE 028 AA2.01 PZR level indicators and alarms 3.4 13.6 JPM No:

NRC Examiner:

Date:

Form ES-C-1 NRC-25-SIM-JPM-8 Simulated Performance Actual Performance x

Classroom Simulator -=====-=!.X~ __

Plant ----------

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

Unit 3 is at 100% and stable No equipment is out of service Task Standard:

Unit 3 is at 100% and stable.

Pressurizer level stable and returning to programmed level.

Letdown has been returned to service.

Required Materials:

3-0NOP-041.6, Pressurizer Level Control Malfunction General

References:

3-0NOP-041.6, Pressurizer Level Control Malfunction NUREG 1021 Rev 9 Appendix C

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

You have been directed to respond to plant conditions.

Time Critical Task: No Validation Time:

XX minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT TH/STIMEI NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

You have been directed to respond to plant conditions.

Time Critical Task: No Validation Time:

XX minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT TH/STIMEI NUREG 1021 Rev 9 Appendix C

I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #

IC-1: 100% Power MOL Ensure Simulator Operator Checklist is complete Simulator Operator Instructions

1. Verify IC-1
2. Place Simulator to RUN
3. Schema>> Reactor Coolant System>> Pressurizer>> L-459 >> L T-459 >> TFH1TV59:H1-L T-459 Transmitter Fail Low>> TRUE>> INSERT NUREG 1021 Rev 9 Appendix C I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #

IC-1: 100% Power MOL Ensure Simulator Operator Checklist is complete Simulator Operator Instructions

1. Verify IC-1
2. Place Simulator to RUN
3. Schema>> Reactor Coolant System>> Pressurizer>> L-459 >> L T-459 >> TFH1TV59:H1-L T-459 Transmitter Fail Low>> TRUE>> INSERT NUREG 1021 Rev 9 Appendix C

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( /)

Start Time STEP 1

Respond to Pressurizer Level Control Channel 459 fails low.

SAT UNSAT Standard:

Operator refers to 3-0NOP-041.6 Pressurizer Level Control Malfunction.

Cue Comment NOTE:

Operator may choose to refer to ARP prior to entering ONOP.

NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( /)

Start Time STEP 1

Respond to Pressurizer Level Control Channel 459 fails low.

SAT UNSAT Standard:

Operator refers to 3-0NOP-041.6 Pressurizer Level Control Malfunction.

Cue Comment NOTE:

Operator may choose to refer to ARP prior to entering ONOP.

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 5 of 12 Form ES-C-1 I STEP 2

Verify automatic actions occur.

SAT UNSAT Operator verifies the following:

1. High Pressure L TON Isolation Valve LCV-3-460 CLOSES.

Standard:

2. L TON Orifice Isolation Valves, CV-3-200A, CV-3-200B AND CV 200C CLOSE.
3. All Pressurizer Heaters turn OFF.
4. Charging flow INCREASES.

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C I Appendix C Page 5 of 12 Form ES-C-1 I STEP 2

Verify automatic actions occur.

SAT UNSAT Operator verifies the following:

1. High Pressure L TON Isolation Valve LCV-3-460 CLOSES.

Standard:

2. L TON Orifice Isolation Valves, CV-3-200A, CV-3-200B AND CV 200C CLOSE.
3. All Pressurizer Heaters turn OFF.
4. Charging flow INCREASES.

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

Appendix C Page 6 of 12 Form ES-C-1 Check pressurizer level indicators LI-3-459A, LI-3-460 AND LI-3-461, STEP 3

SAT UNSAT Identifies Channel 459 as failed low.

Standard:

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 Check pressurizer level indicators LI-3-459A, LI-3-460 AND LI-3-461, STEP 3

SAT UNSAT Identifies Channel 459 as failed low.

Standard:

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 7 of 12 Form ES-C-1 I Place CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch STEP 4

in position 2 or 3.

SAT

..j UNSAT Standard:

Places CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch in position 2 or 3.

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 12 Form ES-C-1 I Place CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch STEP 4

in position 2 or 3.

SAT

..j UNSAT Standard:

Places CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch in position 2 or 3.

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

Appendix C Page 8 of 12 Form ES-C-1 Place MASTER CHARGING PUMP CONTROLLER, LC-3-459G in STEP 5

MANUAL.

SAT

..j UNSAT

1. Placed MASTER CHARGING PUMP CONTROLLER, LC-3-459G Standard:

in MANUAL

2. Maintain programmed level per Enclosure 1.

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 Place MASTER CHARGING PUMP CONTROLLER, LC-3-459G in STEP 5

MANUAL.

SAT

..j UNSAT

1. Placed MASTER CHARGING PUMP CONTROLLER, LC-3-459G Standard:

in MANUAL

2. Maintain programmed level per Enclosure 1.

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

, Appendix C Page 9 of 12 Form ES-C-1,

IF LR-3-459 is selected to a defective channel, THEN place STEP 6

CHANNEL SELECT PRESSURIZER LEVEL RECORDER in another SAT position.

UNSAT Placed CHANNEL SELECT PRESSURIZER LEVEL RECORDER in Standard:

position other than Channel 459.

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C I Appendix C Page 9 of 12 Form ES-C-1 I IF LR-3-459 is selected to a defective channel, THEN place STEP 6

CHANNEL SELECT PRESSURIZER LEVEL RECORDER in another SAT position.

UNSAT Placed CHANNEL SELECT PRESSURIZER LEVEL RECORDER in Standard:

position other than Channel 459.

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

Appendix C Page 10 of 12 Form ES-C-1 Re-establish Letdown flow STEP 6

SAT

~

UNSAT

1. Throttle Low Pressure L TON Controller, PCV-3-145, as necessary to prevent L TON relief valve from lifting, (approximately 50 percent open).
2. Manually control Low Pressure Letdown Control Valve, PCV 145, to limit pressure spike.
3. OPEN High Pressure UO Isol Vlv from Loop B Cold Leg LCV Standard:

460.

4. OPEN UO Isolation Valves, CV-3-200 A, B OR C as required to restore pressurizer level to programmed level.
5. Return Lower Pressure Letdown Control Valve, PCV-3-145 to automatic.

Cue Tell operator that another operator will perform the remainder of the procedure.

Comment

  • NOTE:

Steps 1, 2, and 5 are not critical steps.

Terminating The task is complete when the Examinee returns the cue sheet to STOP Cue:

the examiner.

Stop Time ----

NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 Re-establish Letdown flow STEP 6

SAT

~

UNSAT

1. Throttle Low Pressure L TON Controller, PCV-3-145, as necessary to prevent L TON relief valve from lifting, (approximately 50 percent open).
2. Manually control Low Pressure Letdown Control Valve, PCV 145, to limit pressure spike.
3. OPEN High Pressure UO Isol Vlv from Loop B Cold Leg LCV Standard:

460.

4. OPEN UO Isolation Valves, CV-3-200 A, B OR C as required to restore pressurizer level to programmed level.
5. Return Lower Pressure Letdown Control Valve, PCV-3-145 to automatic.

Cue Tell operator that another operator will perform the remainder of the procedure.

Comment

  • NOTE:

Steps 1, 2, and 5 are not critical steps.

Terminating The task is complete when the Examinee returns the cue sheet to STOP Cue:

the examiner.

Stop Time ___ _

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 11 of 12 Form ES-C-1 I Verification of Completion Job Performance Measure No.

NRC-25-SIM-JPM-8

~~~~~~~~------------------------------------

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date: _____________________ __

NUREG 1021 Rev 9 Appendix C I Appendix C Page 11 of 12 Form ES-C-1 I Verification of Completion Job Performance Measure No.

NRC-25-SIM-JPM-8

~~~~~~~~------------------------------------

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date: _________________________ _

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

Unit 3 is at 100% and stable No equipment is out of service INITIA TlNG CUE:

You have been directed to respond to plant conditions.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

Unit 3 is at 100% and stable No equipment is out of service INITIA TlNG CUE:

You have been directed to respond to plant conditions.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C

Appendix C Facility:

Job Performance Measure Worksheet

--'...T-,-,-ur_k..c:...e,,--Y _P..c:...o_in..c:...t _______ Task No:

ALIGN SAFETY INJECTION FOR HOT LEG RECIRC Form ES-C-1 Task

Title:

JPM No:

NRC-25-SIM-JPM -C


~--------

011 EK3.13 Hot-leg injection/recirculation 3.8 14.2 KJA

Reference:

Examinee:

NRC Examiner:

Facility Evaluator:

Method of testing:

Simulated Performance Classroom Read to the examinee:

Date:

Actual Performance Simulator====-:!.X~ __

x Plant -------

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

UNIT ON COLD LEG RECIRCULATION (RHR LOOP A) 12 HOURS HAVE ELAPSED SINCE EVENT INITIATION IDLE RHR TRAIN AVAILABLE (RHR LOOP B)

POWER AVAILABLE TO BOTH 4 KV BUSSES 3A HHSI PUMP IS RUNNING RHR SUPPLYING COLD LEG RECIRCULATION ALL CCW HEAT EXCHANGERS ARE IN SERVICE STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant. IS IN PROGRESS 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED.

Task Standard:

S.1. FLOW SUPPLIED TO HOT LEGS Required Materials:

3-EOP-ES-1.4, TRANSFER TO HOT LEG RECIRCULATION 3-EOP-E-1, Loss of Reactor or Secondary Coolant General

References:

3-EOP-ES-l.4, TRANSFER TO HOT LEG RECIRCULATION 3-EOP-E-1, Loss of Reactor or Secondary Coolant NUREG 1021 Rev 9 Appendix C Appendix C Facility:

Job Performance Measure Worksheet T--'--u-'-'-r_k..:...ey"------P..:...o_in..:...t _______ Task No:

ALIGN SAFETY INJECTION FOR HOT LEG RECIRC Form ES-C-1 Task

Title:

JPM No:

NRC-25-SIM-JPM -C


~--------

011 EK3.13 Hot-leg injection/recirculation 3.8 14.2 KJA

Reference:

Examinee:

NRC Examiner:

Facility Evaluator:

Method of testing:

Simulated Performance Classroom Read to the examinee:

Date:

Actual Performance Simulator====~X~ __ _

x Plant ---------

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

UNIT ON COLD LEG RECIRCULATION (RHR LOOP A) 12 HOURS HAVE ELAPSED SINCE EVENT INITIATION IDLE RHR TRAIN AVAILABLE (RHR LOOP B)

POWER AVAILABLE TO BOTH 4 KV BUSSES 3A HHSI PUMP IS RUNNING RHR SUPPLYING COLD LEG RECIRCULATION ALL CCW HEAT EXCHANGERS ARE IN SERVICE STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant. IS IN PROGRESS 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED.

Task Standard:

S.1. FLOW SUPPLIED TO HOT LEGS Required Materials:

3-EOP-ES-1.4, TRANSFER TO HOT LEG RECIRCULATION 3-EOP-E-1, Loss of Reactor or Secondary Coolant General

References:

3-EOP-ES-l.4, TRANSFER TO HOT LEG RECIRCULATION 3-EOP-E-1, Loss of Reactor or Secondary Coolant NUREG 1021 Rev 9 Appendix C

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant.

Time Critical Task: NO Validation Time:

15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEI NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant.

Time Critical Task: NO Validation Time:

15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEI NUREG 1021 Rev 9 Appendix C

jAppendix C Page 3 of 12 Form ES-C-11 SIMULATOR SETUP Reset to IC # 58 Load Lesson

  • LOADAND EXECUTE LESSON: JPM Ol062012501.LSN
  • TRIGGER "MOV-3-869 CLOSED"
  • OPEN MOV 863A & MOY 863B
  • Unfreeze simulator.

Ensure Simulator Operator Checklist is complete NUREG 1021 Rev 9 Appendix C jAppendix C Page 3 of 12 Form ES-C-11 SIMULATOR SETUP Reset to IC # 58 Load Lesson

  • LOADAND EXECUTE LESSON: JPM Ol062012501.LSN
  • TRIGGER "MOV-3-869 CLOSED"
  • OPEN MOV 863A & MOY 863B
  • Unfreeze simulator.

Ensure Simulator Operator Checklist is complete NUREG 1021 Rev 9 Appendix C

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time STEP 1

jrRANSITION AS REQUIRED BY STEP 32 OF 3-EOP-E-1 SAT

..J UNSAT Standard:

ITRANSITION MADE TO 3-EOP-ES-1.4, TRANSFER TO HOT LEG RECIRCULATION Cue Comment NOTE:

Candidate should place a mark through circled step 32 prior to transition.

NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time STEP 1

jrRANSITION AS REQUIRED BY STEP 32 OF 3-EOP-E-1 SAT

..J UNSAT Standard:

!TRANSITION MADE TO 3-EOP-ES-1.4, TRANSFER TO HOT LEG RECIRCULATION Cue Comment NOTE:

Candidate should place a mark through circled step 32 prior to transition.

NUREG 1021 Rev 9 Appendix C

!Appendix C I

Page 5 of 12 I

Form ES-C-11 STEP 2

Check High-Head SI Pumps - ANY SAT RUNNING UNSAT Standard:

  • Candidate recognizes that 3A HHSI Pump is running Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

!Appendix C I

Page 5 of 12 I

Form ES-C-11 STEP 2

Check High-Head SI Pumps - ANY SAT RUNNING UNSAT Standard:

  • Candidate recognizes that 3A HHSI Pump is running Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

Appendix C Page 6 of 12 Form ES-C-1 Verify RHR Heat Exchanger CCW Outlet Valve On Operating RHR STEP 3

Train - OPEN MOV-3-749A for train A SAT UNSAT MOV-3-749A, RHR Heat Exchanger CCW Outlet Valve VERIFIED Standard:

OPEN Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 Verify RHR Heat Exchanger CCW Outlet Valve On Operating RHR STEP 3

Train - OPEN MOV-3-749A for train A SAT UNSAT MOV-3-749A, RHR Heat Exchanger CCW Outlet Valve VERIFIED Standard:

OPEN Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

jAppendix C Page 7 of 12 Form ES-C-1!

STEP 4

SAT 3 Verify Safety Injection To Hot Leg Isolation Valve, MOV-3-869 -

..J OPEN UNSAT 1.MOV-3-869 ATTEMPTED TO BE VERIFIED OPEN. (Candidate Standard:

IShould attempt to open valve prior to transitioning to Att. 1 )

i2.Candidate transitions to to ATTACHMENT 1.

Cue If candidate calls to locally open MOV-3-869 tell candidate that valve is inaccessible.

Comment MOV-3-869 is closed and cannot be opened. Operator should attemp NOTE:

o open valve prior to transitioning to Att. 1 NUREG 1021 Rev 9 Appendix C jAppendix C Page 7 of 12 Form ES-C-1!

STEP 4

SAT 3 Verify Safety Injection To Hot Leg Isolation Valve, MOV-3-869 -

..J OPEN UNSAT 1.MOV-3-869 ATTEMPTED TO BE VERIFIED OPEN. (Candidate Standard:

Ishould attempt to open valve prior to transitioning to Att. 1 )

I2.Candidate transitions to to ATTACHMENT 1.

Cue If candidate calls to locally open MOV-3-869 tell candidate that valve is inaccessible.

Comment MOV-3-869 is closed and cannot be opened. Operator should attemp NOTE:

o open valve prior to transitioning to Att. 1 NUREG 1021 Rev 9 Appendix C

Appendix C Page 8 of 12 Form ES-C-1 STEP 4

ESTABLISH ALTERNATE HOT LEG INJECTION FLOWPATH (ATT.

SAT

-J

1)

UNSAT

1. TRANSITIONED TO ATTACHMENT 1 OF 3-EOP-ES-1.4
2. Primary Operator DIRECTED TO CLOSE 3-752A AND 3-752B Standard:
3. RHR LOOP VALVES MOV-3-750 AND MOV-3-751 OPENED BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR

!TRIGGER "CLOSE 3-752A1B",

Cue I.F. OPERATOR REPORTS COMPLETION OF TASK.

Comment NOTE:

NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 STEP 4

ESTABLISH ALTERNATE HOT LEG INJECTION FLOWPATH (ATT.

SAT

-J

1)

UNSAT

1. TRANSITIONED TO ATTACHMENT 1 OF 3-EOP-ES-1.4
2. Primary Operator DIRECTED TO CLOSE 3-752A AND 3-752B Standard:
3. RHR LOOP VALVES MOV-3-750 AND MOV-3-751 OPENED BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR ITRIGGER "CLOSE 3-752A1B",

Cue I.F. OPERATOR REPORTS COMPLETION OF TASK.

Comment NOTE:

NUREG 1021 Rev 9 Appendix C

!Appendix C Page 9 of 12 Form ES-C-1j STEP 5

SAT VERIFY THE POSITION OF THE RHR HEAT EXCHANGER OUTLET VALVE UNSAT SNPO DIRECTED TO VERIFY THAT 3-759A IS OPEN Standard:

Cue BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR REPORT 3-759A OPEN Comment NOTE:

NUREG 1021 Rev 9 Appendix C

!Appendix C Page 9 of 12 Form ES-C-1j STEP 5

SAT VERIFY THE POSITION OF THE RHR HEAT EXCHANGER OUTLET VALVE UNSAT SNPO DIRECTED TO VERIFY THAT 3-759A IS OPEN Standard:

Cue BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR REPORT 3-759A OPEN Comment NOTE:

NUREG 1021 Rev 9 Appendix C

Appendix C Page 10 of 12 Form ES-C-1 STEP 6

SAT REMOVE THE HHSI PUMPS AND CONTAINMENT SPRAY PUMPS

..j FROM SERVICE UNSAT CONTROL SWITCHES FOR ALL HHSI PUMPS ALIGNED TO UNIT 3 Standard:

RWST AND THE UNIT 3 CONTAINMENT SPRAY PUMPS POSITIONED TO PULL-TO-LOCK Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 STEP 6

SAT REMOVE THE HHSI PUMPS AND CONTAINMENT SPRAY PUMPS

..j FROM SERVICE UNSAT CONTROL SWITCHES FOR ALL HHSI PUMPS ALIGNED TO UNIT 3 Standard:

RWST AND THE UNIT 3 CONTAINMENT SPRAY PUMPS POSITIONED TO PULL-TO-LOCK Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

!Appendix C Page 11 of 12 I

Form ES-C-11 STEP 7

~ERIFY RHR COLD LEG INJECTION ISOLATION VALVE OPEN SAT UNSAT MOV-3-744A AND/OR MOV-3-744B VERIFIED OPEN Standard:

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

!Appendix C Page 11 of 12 I

Form ES-C-11 STEP 7

~ERIFY RHR COLD LEG INJECTION ISOLATION VALVE OPEN SAT UNSAT MOV-3-744A AND/OR MOV-3-744B VERIFIED OPEN Standard:

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

Appendix C Page 12 of 12 Form ES-C-1 STEP 8

ISOLATE THE RHRALTERNATE DISCHARGE FLOW-PATH SAT UNSAT

  • MOV-3-863A, RHR ALTERNATE DISCHARGE VALVE, CLOSED Standard:
  • MOV-3-863B, RHR ALTERNATE DISCHARGE VALVE, CLOSED Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C Appendix C Page 12 of 12 Form ES-C-1 STEP 8

ISOLATE THE RHRALTERNATE DISCHARGE FLOW-PATH SAT UNSAT

  • MOV-3-863A, RHR ALTERNATE DISCHARGE VALVE, CLOSED Standard:
  • MOV-3-863B, RHR ALTERNATE DISCHARGE VALVE, CLOSED Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

~ppendix C Page 13 of 12 Form ES-C-1!

STEP 9

ALIGN THE RHR RECIRCULATION FLOWPATH SAT

..j UNSAT SNPO DIRECTED TO OPEN 3-741A, RHR RECIRC ISOLATION Standard:

~ALVE Cue BOOTH OPERATOR TRIGGERS "OPEN 3-741A" AND REPORT STATUS TO OPERATOR 1-2 MINUTES AFTER ORDER WAS GIVEN Comment NOTE:

NUREG 1021 Rev 9 Appendix C

~ppendix C Page 13 of 12 Form ES-C-1!

STEP 9

ALIGN THE RHR RECIRCULATION FLOWPATH SAT

..j UNSAT SNPO DIRECTED TO OPEN 3-741A, RHR RECIRC ISOLATION Standard:

VALVE Cue BOOTH OPERATOR TRIGGERS "OPEN 3-741A" AND REPORT STATUS TO OPERATOR 1-2 MINUTES AFTER ORDER WAS GIVEN Comment NOTE:

NUREG 1021 Rev 9 Appendix C

Appendix C Page 14 of 12 Form ES-C-1 VERIFY STATUS OF CORE EXIT THERMOCOUPLES STEP 10 SAT

.,j UNSAT CORE EXIT TEMPERATURES VERIFIED STABLE OR Standard:

DECREASING Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C Appendix C Page 14 of 12 Form ES-C-1

~ERIFY STATUS OF CORE EXIT THERMOCOUPLES STEP 10 SAT

.,j UNSAT CORE EXIT TEMPERATURES VERIFIED STABLE OR Standard:

DECREASING Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

[Appendix C 1

Page 15 of 12 I

Form ES-C-11 CONTINUE LONG-TERM RECOVERY ACTIONS STEP 11 SAT UNSAT

  • RESTORATION OF NORMAL HOT LEG RECIRCULATION ATTEMPTED AS DIRECTED BY THE TSC STAFF
  • INJECTION TO BOTH HOT LEGS AND COLD LEGS Standard:

VERIFIED

  • RHR PUMP INJECTION TO HOT AND COLD LEGS MAINTAINED UNTIL NORMAL HOT LEG RECIRCULATION LINEUP IS ESTABLISHED BOOTH OPERATOR RESPOND AS TSC AND CONFIRM PLAN IS Cue IN PROGRESS TO RESTORE NORMAL HOT LEG INJECTION Comment OPERA TOR SHOULD USE ERDADS SCREEN TO CONFIRM NOTE:

AL TERNA TE RHR FLOW NUREG 1021 Rev 9 Appendix C

[Appendix C 1

Page 15 of 12 I

Form ES-C-11

~ONTINUE LONG-TERM RECOVERY ACTIONS STEP 11 SAT UNSAT

  • RESTORATION OF NORMAL HOT LEG RECIRCULATION ATTEMPTED AS DIRECTED BY THE TSC STAFF
  • INJECTION TO BOTH HOT LEGS AND COLD LEGS Standard:

VERIFIED

  • RHR PUMP INJECTION TO HOT AND COLD LEGS MAINTAINED UNTIL NORMAL HOT LEG RECIRCULATION LINEUP IS ESTABLISHED BOOTH OPERATOR RESPOND AS TSC AND CONFIRM PLAN IS Cue IN PROGRESS TO RESTORE NORMAL HOT LEG INJECTION Comment OPERATOR SHOULD USE ERDADS SCREEN TO CONFIRM NOTE:

AL TERNA TE RHR FLOW NUREG 1021 Rev 9 Appendix C

Appendix C Page 16 of 12 Form ES-C-1 STEP 12 Return To Procedure And Step In Effect SAT UNSAT RETURNED TO 3-EOP-E-1, Loss of Reactor or Secondary Coolant, Standard:

STEP 15.

Cue Comment NOTE:

Terminating [The task is complete when the Examinee returns the cue sheet to the STOP Cue:

~xaminer.

Stop Time NUREG 1021 Rev 9 Appendix C Appendix C Page 16 of 12 Form ES-C-1 STEP 12 Return To Procedure And Step In Effect SAT UNSAT RETURNED TO 3-EOP-E-1, Loss of Reactor or Secondary Coolant, Standard:

STEP 15.

Cue Comment NOTE:

Terminating The task is complete when the Examinee returns the cue sheet to the STOP Cue:

examiner.

Stop Time NUREG 1021 Rev 9 Appendix C

!AppendiX C Page 17 of 12 Form ES-C-11 Verification of Completion

~

JobPe~rmanceMeasureNo. N~R_C_-_25_-_S_IM~~_P_M_-_C~~~~~~~~~~~~~~~~~_

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

~

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C

!AppendiX C Page 17 of 12 Form ES-C-11 Verification of Completion

~

JobPe~rmanceMeasureNo.N R_C_-_25_-_S_I~~~_P_~_-_C~~~~~~~~~~~~~~~~~_

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

~

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

UNIT ON COLD LEG RECIRCULATION (RHR LOOP A) 12 HOURS HAVE ELAPSED SINCE EVENT INITIATION IDLE RHR TRAIN AVAILABLE (RHR LOOP B)

POWER AVAILABLE TO BOTH 4 KV BUSSES 3A HHSI PUMP IS RUNNING RHR SUPPLYING COLD LEG RECIRCULATION ALL CCW HEAT EXCHANGERS ARE IN SERVICE STEP 32 OF 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS IN PROGRESS 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED.

INITIA TlNG CUE:

You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

UNIT ON COLD LEG RECIRCULATION (RHR LOOP A) 12 HOURS HAVE ELAPSED SINCE EVENT INITIATION IDLE RHR TRAIN AVAILABLE (RHR LOOP B)

POWER AVAILABLE TO BOTH 4 KV BUSSES 3A HHSI PUMP IS RUNNING RHR SUPPLYING COLD LEG RECIRCULATION ALL CCW HEAT EXCHANGERS ARE IN SERVICE STEP 32 OF 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS IN PROGRESS 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED.

INITIA TlNG CUE:

You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C

Appendix C Facility:

Task

Title:

Job Performance Measure Worksheet Turkey Point Task No:

Respond to a Source Range Nuclear Instrument Malfunction Job Performance (MODE 6)

Measure No:

KIA

Reference:

015 A2.02 (3.1/3.5)

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulator / Control Room Actual Performance Simulated Performance Classroom Simulator Yes Read to the examinee:

Form ES-C-1 NRC-2S-SIM-JPM-D Yes Plant. ______ _

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. Unit 3 is in Mode 6.
2. Refueling activities are in progress.
3. NIS Source Ranges N-31 and N-32 are both in service.
4. Both Gamma Metrics Channels are OOS for maintenance.

Task Standard:

1. N-32 selected for audio count rate.
2. Core alterations suspended.

Required Materials:

3-0NOP-059.5, Source Range Nuclear Instrumentation Malfunction General

References:

3-0NOP-059.5, Source Range Nuclear Instrumentation Malfunction Initiating Cue:

Respond to plant conditions.

Time Critical Task: No Validation Time:

10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIMEI Appendix C Facility:

Task

Title:

Job Performance Measure Worksheet Turkey Point Task No:

Respond to a Source Range Nuclear Instrument Malfunction Job Performance (MODE 6)

Measure No:

KIA

Reference:

015 A2.02 (3.1/3.5)

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulator / Control Room Simulated Performance Classroom Simulator Actual Performance Yes Read to the examinee:

Form ES-C-1 NRC-2S-SIM-JPM-D Yes Plant -------

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. Unit 3 is in Mode 6.
2. Refueling activities are in progress.
3. NIS Source Ranges N-31 and N-32 are both in service.
4. Both Gamma Metrics Channels are OOS for maintenance.

Task Standard:

1. N-32 selected for audio count rate.
2. Core alterations suspended.

Required Materials:

3-0NOP-059.5, Source Range Nuclear Instrumentation Malfunction General

References:

3-0NOP-059.5, Source Range Nuclear Instrumentation Malfunction Initiating Cue:

Respond to plant conditions.

Time Critical Task: No Validation Time:

10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIMEI

Appendix C Page 2 of 7 Form ES-C-1 INITIAL CONDITIONS:

1. Unit 3 is in Mode 6.
2. Refueling activities are in progress.
3. NIS Source Ranges are both in service.
4. Both Gamma Metrics are OOS for maintenance.

/NITIA TlNG CUE:

Respond to plant conditions.

TERMINA TlON CUE:

When you feel that you have satisfactorily completed the assigned task, hand your JPM briefing sheet back to me.

Do you have any questions?

You may begin.

Appendix C Page 2 of 7 Form ES-C-1 INITIAL CONDITIONS:

1. Unit 3 is in Mode 6.
2. Refueling activities are in progress.
3. NIS Source Ranges are both in service.
4. Both Gamma Metrics are OOS for maintenance.

/NITIA TlNG CUE:

Respond to plant conditions.

TERMINA TlON CUE:

When you feel that you have satisfactorily completed the assigned task, hand your JPM briefing sheet back to me.

Do you have any questions?

You may begin.

!AppendiX C Page 3 of 7 Form ES-C-11 NOTES TO EVALUATOR AND BOOTH OPERATOR:

1. Reset to IC 117 Cavity Drain Pre-Req's Complete
2. Place both channels of Gamma-Metrics O.O.S.:
a. Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #90 TFN1WAFL NEB01A DETECTOR FAIL LOW 0 TRUE then INSERT
b. Detector #100 TFN1WBFL NEB01B DETECTOR FAIL LOW 0 TRUE then INSERT
c.

Place both Gamma-Metric Block Switches to BLOCK on console

3. Select N-31 for Audio Count Rate; Select N-31/N-32 and N-35/N-36 on console NIS Recorder
4. Place CSD Placards on Vertical Panels.
5. Update console placard to read RCS BORON = 2000 ppm
6. Adjust Boric Acid and Primary Water Auto Makeup flow controller potentiometers for 2000 ppm boron concentration (HIC-3-114 = 4.0, FC-3-113 = B.O)
7. Change ERDADS screen on VPA to P-T display.

B. Provide an extra Operator to acknowledge annunciators and maintain stable plant conditions.

9. When Operator has received a turnover of plant status, fail Source Range NI N-31 HIGH:

Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #1 0 TFN1SAFH NE101N31 DETECTOR FAIL HIGH 0 TRUE then INSERT

!AppendiX C Page 3 of 7 Form ES-C-11 NOTES TO EVALUATOR AND BOOTH OPERATOR:

1. Reset to IC 117 Cavity Drain Pre-Req's Complete
2. Place both channels of Gamma-Metrics O.O.S.:
a. Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #90 TFN1WAFL NEB01A DETECTOR FAIL LOW 0 TRUE then INSERT
b. Detector #100 TFN1WBFL NEB01B DETECTOR FAIL LOW 0 TRUE then INSERT
c.

Place both Gamma-Metric Block Switches to BLOCK on console

3. Select N-31 for Audio Count Rate; Select N-31/N-32 and N-35/N-36 on console NIS Recorder
4. Place CSD Placards on Vertical Panels.
5. Update console placard to read RCS BORON = 2000 ppm
6. Adjust Boric Acid and Primary Water Auto Makeup flow controller potentiometers for 2000 ppm boron concentration (HIC-3-114 = 4.0, FC-3-113 = B.O)
7. Change ERDADS screen on VPA to P-T display.

B. Provide an extra Operator to acknowledge annunciators and maintain stable plant conditions.

9. When Operator has received a turnover of plant status, fail Source Range NI N-31 HIGH:

Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #1 0 TFN1SAFH NE101N31 DETECTOR FAIL HIGH 0 TRUE then INSERT

Appendix C Page 4 of7 Form ES-C-1 Denote critical steps with a check mark.O Start Time ----

  • STEP 1

Perform Immediate actions of 3-0NOP-059.5, SOURCE RANGE SAT NUCLEAR INSTRUMENTATION MALFUNCTION.

..j 14.0 IMMEDIATE ACTIONS UNSAT 14.5 Mode 6 - Refueling 14.5.1 Malfunction of ONE channel:

1. Switch the AUDIO COUNT RATE CHANNEL SELECTOR to the operable source range.
2. Verify at least 2 out of 4 Source Range and Backup NIS (Gamma Metrics) channels are operable, with one Source Range having audible count rate in the Control Room and Containment.
a. IF the above requirement is not met, THEN suspend all operations involving core alterations OR positive reactivity changes.
3. IF applicable, THEN notify plant personnel of erroneous Containment Evacuation Alarm.

STANDARD:

1. Switches AUDIO COUNT RATE CHANNEL SELECTOR from N-31 to N-32.

~. Suspends all operations involving core alterations since only one of four source range Nls are operable. *

3. Notifies plant personnel of erroneous Containment Evacuation Alarm Operator may reference procedure to verify I perform actions.

Respond as Refueling SRO and/or Reactor Engineer/STA if notified to CUE:

stop refueling activities and store fuel assemblies in a safe location.

Report that refueling has stopped and fuel assemblies are all safely oeated.

Comment NOTE:

Source Range N-31 has failed HIGH.

Appendix C Page 4 of7 Form ES-C-1 Denote critical steps with a check mark.O Start Time ----

  • STEP 1

Perform Immediate actions of 3-0NOP-059.5, SOURCE RANGE SAT NUCLEAR INSTRUMENTATION MALFUNCTION.

..j 14.0 IMMEDIATE ACTIONS UNSAT r.5 Mode 6 - Refueling f4..5.1 Malfunction of ONE channel:

1. Switch the AUDIO COUNT RATE CHANNEL SELECTOR to the operable source range.
2. Verify at least 2 out of 4 Source Range and Backup NIS (Gamma Metrics) channels are operable, with one Source Range having audible count rate in the Control Room and Containment.
a. IF the above requirement is not met, THEN suspend all operations involving core alterations OR positive reactivity changes.
3. IF applicable, THEN notify plant personnel of erroneous Containment Evacuation Alarm.

STANDARD:

1. Switches AUDIO COUNT RATE CHANNEL SELECTOR from N-31 to N-32.
2. Suspends all operations involving core alterations since only one of four source range Nls are operable. *
3. Notifies plant personnel of erroneous Containment Evacuation Alarm Operator may reference procedure to verify I perform actions.

Respond as Refueling SRO and/or Reactor Engineer/STA if notified to CUE:

stop refueling activities and store fuel assemblies in a safe location.

Report that refueling has stopped and fuel assemblies are all safely oeated.

Comment NOTE:

Source Range N-31 has failed HIGH.

!AppendiX C Page 5 of 7 Form ES-C-11 STEP 2

Operator obtains copy of 3-0NOP-059.5.

SAT UNSAT STANDARD: 1. Operator obtains Simulator copy of 3-0NOP-059.5

~. Operator verifies Immediate Actions are correct.

Cue Comment NOTE:

!AppendiX C Page 5 of 7 Form ES-C-11 STEP 2

Operator obtains copy of 3-0NOP-059.5.

SAT UNSAT STANDARD: 1. Operator obtains Simulator copy of 3-0NOP-059.5

~. Operator verifies Immediate Actions are correct.

Cue Comment NOTE:

Appendix C Page 6 of7 Form ES-C-1 5.0 SUBSEQUENT ACTIONS STEP 3

5.5 Mode 6 - Refueling SAT

..J UNSAT 5.5.1 Malfunction of ONE channel:

1. Place LEVEL TRIP switch on failed channel in BYPASS position.
2. Place HIGH FLUX AT SHUTDOWN switch on failed channel in BLOCK position.
3. Switch an NIS RECORDER to the operable source range.
4. IF one Source Range having audible count rate in the Control Room and Containment, AND 2 out of 4 NIS (NSSS Source Range and Gamma Metrics) Channels are not operable, THEN verify RCS boron concentration is greater than or equal to the required boron concentration at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
5. Notify I&C.
6. Monitor Backup NIS (Gamma Metric) Source Range Count Rate.

STANDARD: Operator removes N-31 from service.

1. Positions LEVEL TRIP switch to BYPASS.
2. Positions HIGH FLUX AT SHUTDOWN switch to BLOCK.
3. Verifies N-32 displayed on console NIS recorder.
4. Contacts Chemistry determines Boron concentration:::: 1950 ppm.
5. Notifies I&C of N-31 failure.
6. Determines both backup NIS (Gamma-Metric) channels OOS.

1.lf called as Reactor Engineering, state that the required RCS Boron jeoncentration is> 1950 ppm.

CUES:

12.lf called as Chemistry, confirm Boron concentration is 2000 ppm.

3.Respond as I&C if notified of N-31 failure.

14. Inform the applicant that another operator will continue from this ipoint.

Comment NOTE:

Only Standards 1 and 2 are critical.

Appendix C Page 6 of7 Form ES-C-1 5.0 SUBSEQUENT ACTIONS STEP 3

5.5 Mode 6 - Refueling SAT

..J UNSAT 5.5.1 Malfunction of ONE channel:

1. Place LEVEL TRIP switch on failed channel in BYPASS position.
2. Place HIGH FLUX AT SHUTDOWN switch on failed channel in BLOCK position.
3. Switch an NIS RECORDER to the operable source range.
4. IF one Source Range having audible count rate in the Control Room and Containment, AND 2 out of 4 NIS (NSSS Source Range and Gamma Metrics) Channels are not operable, THEN verify RCS boron concentration is greater than or equal to the required boron concentration at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
5. Notify I&C.
6. Monitor Backup NIS (Gamma Metric) Source Range Count Rate.

STANDARD: Operator removes N-31 from service.

1. Positions LEVEL TRIP switch to BYPASS.

~. Positions HIGH FLUX AT SHUTDOWN switch to BLOCK.

3. Verifies N-32 displayed on console NIS recorder.

f4. Contacts Chemistry determines Boron concentration:::: 1950 ppm.

5. Notifies I&C of N-31 failure.

~. Determines both backup NIS (Gamma-Metric) channels OOS.

1.lf called as Reactor Engineering, state that the required RCS Boron

~oncentration is> 1950 ppm.

CUES:

~.If called as Chemistry, confirm Boron concentration is 2000 ppm.

3.Respond as I&C if notified of N-31 failure.

f4.lnform the applicant that another operator will continue from this ipoint.

Comment NOTE:

Only Standards 1 and 2 are critical.

\\Appendix C Page 7 of 7 Form ES-C-11 STEP 4

iApplicant should return JPM Initial Condition sheet and state that SAT pperator actions are complete.

UNSAT Terminating If operator attempts any other compensatory actions beyond this point STOP CUE:

ell operator that JPM has been completed.

Stop Time ----

\\Appendix C Page 7 of 7 Form ES-C-11 STEP 4

Applicant should return JPM Initial Condition sheet and state that SAT operator actions are complete.

UNSAT Terminating If operator attempts any other compensatory actions beyond this point STOP CUE:

ell operator that JPM has been completed.

Stop Time ----

Appendix C Page 8 of7 Form ES-C-1 Verification of Completion

~

JobPe~rmanceMeasuffiNo.N

~=R~C~-~2~5-~S=IM~~~P=M~-D~~~~~~~~~~~~~~~~~_

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

~

Response

Result:

Satisfactory/Unsatisfactory

~

Examiner's signature and date:

Appendix C Page 8 of7 Form ES-C-1 Verification of Completion Job Performance Measure No.N

=-:..:..R:..;:C=---=.2=-5-...::S:..:..IM:..:..=--J:.:P-=.M.:..=-..:-D=---________________

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date:

~ppendix C Page 9 of 7 Form ES-C-11

~ppendix C Page 9 of 7 Form ES-C-11

JPM BRIEFING SHEET INITIAL CONDITIONS:

1. Unit 3 is in Mode 6.
2. Refueling activities are in progress.
3. NIS Source Ranges are both in service.
4. Both Gamma Metrics are OOS for maintenance.

!NITIA TlNG CUE:

Respond to plant conditions.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

JPM BRIEFING SHEET INITIAL CONDITIONS:

1. Unit 3 is in Mode 6.
2. Refueling activities are in progress.
3. NIS Source Ranges are both in service.
4. Both Gamma Metrics are OOS for maintenance.

!NITIA TlNG CUE:

Respond to plant conditions.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Appendix C Facility:

Job Performance Measure Worksheet T_ur_k_e-'-y_P_o_in_t _______ Task No:

Purging the PR T to Reduce Oxygen or Hydrogen Concentration (Major Gas Volume)

Form ES-C-1 Task

Title:

JPM No:

NRC-25-SIM-JPM-E 007 Kl.04 Nitrogen 2.1/2.3 KIA

Reference:

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance Actual Performance x

Classroom SimulatorX Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume Unit 3 is in Mode 1 at 100% Power with no equipment out of service.

3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the off-going shift You are the oncoming Reactor Operator and have been briefed on the evolution.

PRT Level is at 80%.

Task Standard:

Purge the PRT to Reduce Oxygen Concentration to within required specifications.

Required Materials:

3-NOP-041.3, Pressurizer Relief Tank General

References:

3-NOP-041.3, Pressurizer Relief Tank NUREG 1021 Rev 9 Appendix C Appendix C Facility:

Job Performance Measure Worksheet

_T_u_rk_e ___ y_P_o_in_t _______ Task No:

Purging the PR T to Reduce Oxygen or Hydrogen Concentration (Major Gas Volume)

Form ES-C-1 Task

Title:

JPM No:

NRC-25-SIM-JPM-E 007 Kl.04 Nitrogen 2.1/2.3 KIA

Reference:

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance Actual Performance x

Classroom SimulatorX Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume Unit 3 is in Mode 1 at 100% Power with no equipment out of service.

3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the off-going shift You are the oncoming Reactor Operator and have been briefed on the evolution.

PRT Level is at 80%.

Task Standard:

Purge the PRT to Reduce Oxygen Concentration to within required specifications.

Required Materials:

3-NOP-041.3, Pressurizer Relief Tank General

References:

3-NOP-041.3, Pressurizer Relief Tank NUREG 1021 Rev 9 Appendix C

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11.

All prerequisites have been satisfied.

You are continuing 3-NOP-041.3 after a turnover from the off-going shift.

Time Critical Task: No Validation Time:

10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11.

All prerequisites have been satisfied.

You are continuing 3-NOP-041.3 after a turnover from the off-going shift.

Time Critical Task: No Validation Time:

10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

NUREG 1021 Rev 9 Appendix C

!AppendiX C Page 3 of 12 Form ES-C-1!

SIMULATOR SETUP Reset to IC #

Load saved IC on Flash Drive XR-043.dat Load Lesson Ensure Simulator Operator Checklist is complete CLOSE Gas waste Disposal V4658A & B NUREG 1021 Rev 9 Appendix C

!AppendiX C Page 3 of 12 Form ES-C-1!

SIMULATOR SETUP Reset to IC #

Load saved IC on Flash Drive XR-043.dat Load Lesson Ensure Simulator Operator Checklist is complete CLOSE Gas waste Disposal V4658A & B NUREG 1021 Rev 9 Appendix C

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark,O Start Time ----

11. ENSURE CV-3-549, PRT VENT, is OPEN STEP 1

SAT

..J UNSAT

1. Placed PRT Vent Valve, CV-3-S49 switch to open.

Standard:

2. Verified PRT Vent Valve, CV-3-S49 Red Ught ON Green Ught OFF.

Cue Comment NOTE:

Standard #2 is not critical.

NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark,O Start Time ----

11. ENSURE CV-3-549, PRT VENT, is OPEN STEP 1

SAT

..J UNSAT

1. Placed PRT Vent Valve, CV-3-S49 switch to open.

Standard:

2. Verified PRT Vent Valve, CV-3-S49 Red Ught ON Green Ught OFF.

Cue Comment NOTE:

Standard #2 is not critical.

NUREG 1021 Rev 9 Appendix C

!Appendix C Page 5 of 12 Form ES-C-1!

13. OPEN CV-3-519B, PRT PRIMARY WATER MAKE UP.

STEP 2

SAT UNSAT

1. Placed PRT Vent Valve, CV-3-5198 switch to open.

Standard:

~. Verified PRT Vent Valve, CV-3-5198 Red Light ON Green Light OFF.

Cue Comment NOTE:

Standard #2 is not critical.

NUREG 1021 Rev 9 Appendix C

!Appendix C Page 5 of 12 Form ES-C-1!

13. OPEN CV-3-519B, PRT PRIMARY WATER MAKE UP.

STEP 2

SAT UNSAT

1. Placed PRT Vent Valve, CV-3-5198 switch to open.

Standard:

2. Verified PRT Vent Valve, CV-3-5198 Red Light ON Green Light OFF.

Cue Comment NOTE:

Standard #2 is not critical.

NUREG 1021 Rev 9 Appendix C

Appendix C Page 6 of 12 Form ES-C-1 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP 3

~oncentration (Major Gas Volume) (continued)

SAT

~

UNSAT

14. WHEN any of the following conditions exists:
  • PRT level approaches 95% on LI-3-470, PRZR RELIEF TK LEVEL
  • PRT pressure approaches 10 psig on PI-3-472, PRZR RELIEF TK PRESSURE THEN CLOSE CV-3-519B, PRT PRIMARY WATER MAKE UP.
1. When PRT level approaches 95% placed PRT Vent Valve, CV Standard:

5198 switch to close.

2. Verified PRT Vent Valve, CV-3-5198 Red light OFF Green light ON Cue Comment
1. Standard #2 is not critical.

NOTE:

NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP 3

Concentration (Major Gas Volume) (continued)

SAT

~

UNSAT

14. WHEN any of the following conditions exists:
  • PRT level approaches 95% on LI-3-470, PRZR RELIEF TK LEVEL
  • PRT pressure approaches 10 psig on PI-3-472, PRZR RELIEF TK PRESSURE THEN CLOSE CV-3-519B, PRT PRIMARY

~ATER MAKE UP.

1. When PRT level approaches 95% placed PRT Vent Valve, CV Standard:

5198 switch to close.

~. Verified PRT Vent Valve, CV-3-5198 Red light OFF Green light ON Cue Comment

1. Standard #2 is not critical.

NOTE:

NUREG 1021 Rev 9 Appendix C

jAppendix C Page 7 of 12 Form ES-C-1!

15. MAINTAIN PRT level at 90 to 95% for 25 to 35 minutes.

STEP 4

SAT UNSAT Standard:

1. Tell operator that 35 minutes have elapsed.

Cue

2. Tell operator that 3-NOP-041.3 steps 16,17, and 18 have been completed.

Comment NOTE:

NUREG 1021 Rev 9 Appendix C jAppendix C Page 7 of 12 Form ES-C-1!

15. MAINTAIN PRT level at 90 to 95% for 25 to 35 minutes.

STEP 4

SAT UNSAT Standard:

1. Tell operator that 35 minutes have elapsed.

Cue

~. Tell operator that 3-NOP-041.3 steps 16,17, and 18 have been completed.

Comment NOTE:

NUREG 1021 Rev 9 Appendix C

Appendix C Page 8 of 12 Form ES-C-1 STEP 5

SAT UNSAT Standard:

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 STEP 5

SAT UNSAT Standard:

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

jAppendix C Page 9 of 12 Form ES-C-11 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP 6

Concentration (Major SAT

.,j Gas Volume) (continued)

UNSAT

19. WHEN PRT pressure indicated on PI-3-472 has lowered to approximately 6 psig, as controlled by nitrogen supply regulator, THEN CLOSE CV-3-549, PRT VENT.
1. Placed PRT Vent Valve, CV-3-549 switch to close.

Standard:

2. Verified PRT Vent Valve, CV-3-549 Red Light OFF Green Light ON Tell operator that Chemistry informs Reactor Operator that PRT Cue oxygen reading is less than 2 percent oxygen by volume.

Comment Standard #2 is not critical.

NOTE:

NUREG 1021 Rev 9 Appendix C jAppendix C Page 9 of 12 Form ES-C-11 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP 6

Concentration (Major SAT

.,j Gas Volume) (continued)

UNSAT

19. WHEN PRT pressure indicated on PI-3-472 has lowered to approximately 6 psig, as controlled by nitrogen supply regulator, ITHEN CLOSE CV-3-549, PRT VENT.
1. Placed PRT Vent Valve, CV-3-549 switch to close.

Standard:

~. Verified PRT Vent Valve, CV-3-549 Red Light OFF Green Light ON trell operator that Chemistry informs Reactor Operator that PRT Cue oxygen reading is less than 2 percent oxygen by volume.

Comment Standard #2 is not critical.

NOTE:

NUREG 1021 Rev 9 Appendix C

Appendix C Page 10 of 12 Form ES-C-1

~1. WHEN Chemistry reports PRT oxygen reading less than 2%

STEP 7

by volume, THEN:

SAT

..j UNSAT

'A. CLOSE CV-3-519A, PRT VENT.

1. CV-3-519A, Primary Water to Containment Isolation switch Standard:

taken to close.

2. Veriified CV-3-519A Green Light ON, Red Light OFF.

Cue After standard #2 has been completed, inform the Reactor Operator hat another operator will perform the remainder of the procedure.

Comment NOTE:

Standard #2 is not critical.

Terminating STOP Cue:

'The task is complete when the Examinee returns the cue sheet to the examiner.

Stop Time ----

NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 121. WHEN Chemistry reports PRT oxygen reading less than 2%

STEP 7

by volume, THEN:

SAT

..j UNSAT IA. CLOSE CV-3-519A, PRT VENT.

1. CV-3-519A, Primary Water to Containment Isolation switch Standard:

taken to close.

2. Veriified CV-3-519A Green Light ON, Red Light OFF.

Cue

~fter standard #2 has been completed, inform the Reactor Operator hat another operator will perform the remainder of the procedure.

Comment NOTE:

Standard #2 is not critical.

Terminating STOP Cue:

IThe task is complete when the Examinee returns the cue sheet to

~he examiner.

Stop Time ___ _

NUREG 1021 Rev 9 Appendix C

jAppendix C Page 11 of 12 Form ES-C-11 Verification of Completion Job Performance Measure No. NRC-2S-SIM-JPM-E

~~~~~~~~-------------------------------------

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C jAppendix C Page 11 of 12 Form ES-C-11 Verification of Completion Job Performance Measure No. NRC-2S-SIM-JPM-E

~~~~~~~~-------------------------------------

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume Unit 3 is in Mode 1 at 100% Power with no equipment out of service.

3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the off-going shift You are the oncoming Reactor Operator and have been briefed on the evolution.

PRT Level is at 80%.

Initiating Cue:

You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11.

All prerequisites have been satisfied.

You are continuing 3-NOP-041.3 after a turnover from the off-going shift.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume Unit 3 is in Mode 1 at 100% Power with no equipment out of service.

3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the off-going shift You are the oncoming Reactor Operator and have been briefed on the evolution.

PRT Level is at 80%.

Initiating Cue:

You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11.

All prerequisites have been satisfied.

You are continuing 3-NOP-041.3 after a turnover from the off-going shift.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C

Appendix C Facility:

Job Performance Measure Worksheet T_u_r_k~eY,---P_oi_nt _______ Task No:

INITIATE CONTAINMENT PURGE Form ES-C-1 Task

Title:

JPM No:

NRC-25-SIM-JPM-F 029 A4.01 Containment purge flow rate 2.5/2.5 KIA

Reference:

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance Classroom Actual Performance SimulatorX --------

Read to the examinee:

x Plant ---------

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.

UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.

UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.

ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.

CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.

3-NOP-053, CONTAINMENT PURGE SYSTEM IS SIGNED OFF AND COMPLETED UP TO STEP 4.1.1.1l.

Task Standard:

ISOLATION VALVES OPEN AND PURGE FANS RUNNING IN ACCORDANCE WITH 3NOP-053, CONTAINMENT PURGE SYSTEM Required Materials:

3-NOP-053, CONTAINMENT PURGE SYSTEM APPROVED CONTAINMENT PURGE RELEASE PERMIT General

References:

3-NOP-053, CONTAINMENT PURGE SYSTEM NUREG 1021 Rev 9 Appendix C Appendix C Facility:

Job Performance Measure Worksheet Turkey Point Task No:

--~~---------------

INITIATE CONTAINMENT PURGE Form ES-C-1 Task

Title:

JPM No:

NRC-25-SIM-JPM-F 029 A4.01 Containment purge flow rate 2.5/2.5 KIA

Reference:

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testing:

Simulated Performance Classroom Actual Performance SimulatorX --------

Read to the examinee:

x Plant -------

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.

UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.

UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.

ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.

CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.

3-NOP-053, CONTAINMENT PURGE SYSTEM IS SIGNED OFF AND COMPLETED UP TO STEP 4.1.1.1l.

Task Standard:

ISOLATION VALVES OPEN AND PURGE FANS RUNNING IN ACCORDANCE WITH 3NOP-053, CONTAINMENT PURGE SYSTEM Required Materials:

3-NOP-053, CONTAINMENT PURGE SYSTEM APPROVED CONTAINMENT PURGE RELEASE PERMIT General

References:

3-NOP-053, CONTAINMENT PURGE SYSTEM NUREG 1021 Rev 9 Appendix C

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

1. A satisfactory shift turnover has been completed.
2. You have been directed to continue with Step 4.1.1.12 of3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.

Time Critical Task: No Validation Time:

10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEl NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

1. A satisfactory shift turnover has been completed.
2. You have been directed to continue with Step 4.1.1.12 of3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.

Time Critical Task: No Validation Time:

10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEl NUREG 1021 Rev 9 Appendix C

~ppendix C Page 3 of 12 Form ES-C-1!

SIMULATOR SETUP Reset to IC #

Mode 5 IC with Containment Purge Valves CLOSED and Fans OFF Load Lesson Ensure Simulator Operator Checklist is complete NUREG 1021 Rev 9 Appendix C

~ppendix C Page 3 of 12 Form ES-C-1!

SIMULATOR SETUP Reset to IC #

Mode 5 IC with Containment Purge Valves CLOSED and Fans OFF Load Lesson Ensure Simulator Operator Checklist is complete NUREG 1021 Rev 9 Appendix C

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check marI(O Start Time ----

~.1.1.12 STEP 1

SAT

~

Open the following valves:

UNSAT

1. Containment Purge Exhaust Isol (O.C.), POV-3-2602

~. Containment Purge Exhaust Isol (I.e.), POV 2603

1. Containment Purge Exhaust Isol (O.C.), POV-3-2602 switch placed to Open
2. Verified Containment Purge Exhaust Isol (O.C.), POV-3-2602 Red Standard:

Light On, Green Light Off.

3. Containment Purge Exhaust Isol (I.C.), POV-3-2603 switch placed to Open
4. Verified Containment Purge Exhaust Isol (O.e.), POV-3-2603 Red Light On, Green Light Off.

Cue Comment NOTE:

Standards #2 and #4 not critical NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check marI(O Start Time ----

4.1.1.12 STEP 1

SAT

~

Open the following valves:

UNSAT

1. Containment Purge Exhaust Isol (O.C.), POV-3-2602
2. Containment Purge Exhaust Isol (I.c.), POV 2603
1. Containment Purge Exhaust Isol (O.C.), POV-3-2602 switch placed to Open
2. Verified Containment Purge Exhaust Isol (O.C.), POV-3-2602 Red Standard:

Light On, Green Light Off.

3. Containment Purge Exhaust Isol (I.C.), POV-3-2603 switch placed to Open

~. Verified Containment Purge Exhaust Isol (O.c.), POV-3-2603 Red Light On, Green Light Off.

Cue Comment NOTE:

Standards #2 and #4 not critical NUREG 1021 Rev 9 Appendix C

~ppendix C Page 5 of 12 Form ES-C-11 STEP 2

4.1.1.13 SAT Prepare to open Containment Purge Supply Isolation Valves UNSAT If both conditions are met then both Unit 3 Containment Purge Supply lValves will be open.

Standard:

1. Verified Containment Doors/Hatches closed to atmosphere.
p. Verified on opposite Unit that Purge Supply Valves closed or Doors/Hatches are closed to atmosphere Repeat applicable initial conditions if asked:
  • UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.

Cue

  • UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.

Comment NOTE:

This information is covered in the Initial Conditions NUREG 1021 Rev 9 Appendix C

~ppendix C Page 5 of 12 Form ES-C-11 STEP 2

~.1.1.13 SAT

!prepare to open Containment Purge Supply Isolation Valves UNSAT If both conditions are met then both Unit 3 Containment Purge Supply

Valves will be open.

Standard:

1. Verified Containment Doors/Hatches closed to atmosphere.
2. Verified on opposite Unit that Purge Supply Valves closed or Doors/Hatches are closed to atmosphere Repeat applicable initial conditions if asked:
  • UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.

Cue

  • UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.

Comment NOTE:

[This information is covered in the Initial Conditions NUREG 1021 Rev 9 Appendix C

Appendix C Page 6 of 12 Form ES-C-1 STEP 3

4.1.1.13 (contd.)'

SAT Open the following valves:

~

1. Containment Purge Supply Isol (O.C.), POV-3-2600 UNSAT t2. Containment Purge Supply Isol (I.C.), POV 2601
1. Containment Purge Supply Isol (O.C.), POV 2600 switch placed to Open.

~. Verified Containment Purge Supply Isol (O.C.), POV-3-2600 Red Standard:

Light On, Green Light Off.

b. Containment Purge Supply Isol (I.C.), POV 2601 switch placed to Open.

~. Verified Containment Purge Supply Isol (O.C.), POV-3-2601 Red Light On, Green Light Off.

Cue Comment NOTE:

Standards #2 and #4 not critical NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 STEP 3

~.1.1.13 (contd.)'

SAT Open the following valves:

~

1. Containment Purge Supply Isol (O.C.), POV-3-2600 UNSAT Q. Containment Purge Supply Isol (I.C.), POV 2601
1. Containment Purge Supply Isol (O.C.), POV 2600 switch placed to Open.
2. Verified Containment Purge Supply Isol (O.C.), POV-3-2600 Red Standard:

Light On, Green Light Off.

3. Containment Purge Supply Isol (I.C.), POV 2601 switch placed to Open.
4. Verified Containment Purge Supply Isol (O.C.), POV-3-2601 Red Light On, Green Light Off.

Cue Comment NOTE:

Standards #2 and #4 not critical NUREG 1021 Rev 9 Appendix C

jAppendiX C Page 7 of 12 Form ES-C-1!

fl.1.1.14 STEP 4

SAT

~

Start 3V20: Unit 3 Containment Purge Exhaust Fan.

UNSAT

1. Control Switch Positioned to Run Standard:

~. Verified Fan Red Light On and Green Light Off

3. Verified Damper Red Light On Green Light Off If candidate attempts to have 4V20: Unit 4 Containment Purge Exhaust Cue Fan, tell candidate that the Unit Supervisor desires the Unit 3 Fan to be started.

Comment NOTE:

Standards 2,3, and 4 are not critical NUREG 1021 Rev 9 Appendix C jAppendiX C Page 7 of 12 Form ES-C-1!

4.1.1.14 STEP 4

SAT

~

Start 3V20: Unit 3 Containment Purge Exhaust Fan.

UNSAT

1. Control Switch Positioned to Run Standard:
2. Verified Fan Red Light On and Green Light Off
3. Verified Damper Red Light On Green Light Off If candidate attempts to have 4V20: Unit 4 Containment Purge Exhaust Cue Fan, tell candidate that the Unit Supervisor desires the Unit 3 Fan to be started.

Comment NOTE:

Standards 2,3, and 4 are not critical NUREG 1021 Rev 9 Appendix C

Appendix C Page 8 of 12 Form ES-C-1 STEP 5

~.1.1.15 SAT Start 3V9: Unit 3 Containment Purge Supply Fan.

..J UNSAT

1. Verify POV-3-2600 and POV-3-2601, Containment Purge Supply Isolations are open.
2. Control Switch Positioned to Run Standard:
3. Verified Fan Red Light On and Green Light Off
4. Verified Damper Red Light On Green Light Off
5. Ensures MO-3-3421, Unit 3 Containment Purge Exhaust Damper is OPEN.

Cue Tell candidate that another operator will complete the remainder of the procedure.

Comment NOTE:

Standards #2 and #3not critical

  • Terminating The task is complete when the Examinee returns the cue sheet to STOP Cue:

the examiner.

Stop Time NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 STEP 5

14*1.1.15 SAT Start 3V9: Unit 3 Containment Purge Supply Fan.

..J UNSAT

1. Verify POV-3-2600 and POV-3-2601, Containment Purge Supply Isolations are open.

~. Control Switch Positioned to Run Standard:

3. Verified Fan Red Light On and Green Light Off

~. Verified Damper Red Light On Green Light Off

5. Ensures MO-3-3421, Unit 3 Containment Purge Exhaust Damper is OPEN.

Cue rrell candidate that another operator will complete the remainder of the procedure.

Comment NOTE:

Standards #2 and #3not critical

  • Terminating The task is complete when the Examinee returns the cue sheet to STOP Cue:

the examiner.

Stop Time NUREG 1021 Rev 9 Appendix C

~ppendix C Page 9 of 12 Form ES-C-1!

Verification of Completion

~

JobPe~rmanceMeasureNo.N

_~R_C~-~2_5_-S~I_~_-_~_~~-_F~~~~~~~~~~~~~~~~~~

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

~

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C

~ppendix C Page 9 of 12 Form ES-C-1!

Verification of Completion

~

JobPe~rmanceMeasureNo. N~R_C_-_2_5-_S_I_~_-_~_~~-F~~~~~~~~~~~~~~~~~~

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

~

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.

UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.

UNIT 4 IS IN MODE 1 WITH ALL PURGE V ALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.

ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.

CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.

3-NOP-053, CONTAINMENT PURGE SYSTEM IS SIGNED OFF AND COMPLETED UP TO STEP 4.1.l.11.

!NITIA TlNG CUE:

You have been directed to commence with Step 4.1.1.12 of 3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.

UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.

UNIT 4 IS IN MODE 1 WITH ALL PURGE V ALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.

ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.

CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.

3-NOP-053, CONTAINMENT PURGE SYSTEM IS SIGNED OFF AND COMPLETED UP TO STEP 4.1.l.11.

!NITIA TlNG CUE:

You have been directed to commence with Step 4.1.1.12 of 3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C

Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Job Performance Measure Worksheet Turkey Point Task No:


~----------

Fill 3A Accumulator JPM No:

006 A 1.13 Accumulator pressure (level, boron concentration )3.5/3.7


NRC Examiner:

Date:

Form ES-C-1 NRC-25-SIM-JPM-G Simulated Performance Actual Performance x

Classroom Simulator----.....,X~

Plant ----------

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.

7.1.2.2.b,c, and d are marked N/A.

It is desired to use the 3A HHSI Pump for this task Task Standard:

Make-up to the 3A Safety Injection Accumulator to 6600 +/- 20 gallons.

Required Materials:

3-0P-064 Safety Injection Accumulators General

References:

3-0P-064 Safety Injection Accumulators NUREG 1021 Rev 9 Appendix C Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Job Performance Measure Worksheet T_ur_k_e.Ly_P_o_in_t _______ Task No:

-:::-Fi::--II:-3.:...:...A--=---Ac::-cc.:..,u:.:..-m.:...:...u=l=at::..::.o.:...:...r ____ JPM No:

006 A 1.13 Accumulator pressure (level, boron concentration )3.5/3.7 NRC Examiner:

Date:

Form ES-C-1 NRC-25-SIM-JPM-G Simulated Performance Actual Performance x

Classroom Simulator======~X~ __

Plant -------

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.

7.1.2.2.b,c, and d are marked N/A.

It is desired to use the 3A HHSI Pump for this task Task Standard:

Make-up to the 3A Safety Injection Accumulator to 6600 +/- 20 gallons.

Required Materials:

3-0P-064 Safety Injection Accumulators General

References:

3-0P-064 Safety Injection Accumulators NUREG 1021 Rev 9 Appendix C

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

You have been directed to raise 3A Accumulator Level to 6600 +/- 20 gallons using 3A SAFETY INJECTION PUMP starting at step: 7.1.2.2.3.

3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.

7.1.2.2.b,c, and d are marked N/A.

Time Critical Task: NO Validation Time:

15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT TID TIME!

NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

You have been directed to raise JA Accumulator Level to 6600 +/- 20 gallons using 3A SAFETY INJECTION PUMP starting at step: 7. 1.2.2.3.

3-0 P-064 Safety Injection Accumulators, Section 7. 1, Adding Make-up to the Safety Injection Accumulators up to 7. 1.2.2.2.a has been completed.

7.1.2.2.b,c, and d are marked NI A.

Time Critical Task: NO Validation Time:

15 minutes HAND Jl'M BRIEFING SHEET TO EXAMINEE AT T BlS TIME!

NUREG 1021 Rev 9 Appendix C

~ppendiX C Page 3 of 12 Form ES-C-1!

SIMULATOR SETUP Reset to IC # 1 Load Lesson Open SI Pump 3A and 3B Test Recirc Isolation, 3-899L.

Open SI Pump 3A Test Recirc Isolation, 3-899K.

Ensure Simulator Operator Checklist is complete Ensure marked up copy of 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed. Steps 7.1.2.2.b,c, and d are marked NI A. Step 7.1.2.3 is circled.

NUREG 1021 Rev 9 Appendix C

~ppendiX C Page 3 of 12 Form ES-C-1!

SIMULATOR SETUP Reset to IC # 1 Load Lesson Open SI Pump 3A and 3B Test Recirc Isolation, 3-899L.

Open SI Pump 3A Test Recirc Isolation, 3-899K.

Ensure Simulator Operator Checklist is complete Ensure marked up copy of 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed. Steps 7.1.2.2.b,c, and d are marked NI A. Step 7.1.2.3 is circled.

NUREG 1021 Rev 9 Appendix C

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time ----

Open the Accumulator Makeup Valve for Accumulator A, CV-3-851A STEP 1

SAT

..j UNSAT

1. Placed Control Switch to Open for Accumulator A, CV-3-851A
2. Verified Red OPEN light ON Standard:
3. Verified Green CLOSED light OFF Cue Comment NOTE:

Standards 2 and 3 are not critical.

NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time ----

Open the Accumulator Makeup Valve for Accumulator A, CV-3-851A STEP 1

SAT

..j UNSAT

1. Placed Control Switch to Open for Accumulator A, CV-3-851A
2. Verified Red OPEN light ON Standard:
3. Verified Green CLOSED light OFF Cue Comment NOTE:

Standards 2 and 3 are not critical.

NUREG 1021 Rev 9 Appendix C

!AppendiX C Page 5 of 12 Form ES-C-1!

Start the 3A Safety Injection Pump document the start time on QA STEP 2

!Record Page SAT

~

UNSAT

1. 3A HHSI Pump Control Switch turned to START Standard:

~. 3A HHSI Pump Red Run light is ON l3. 3A HHSI Pump Green Stop light is OFF Cue Comment NOTE:

Standards 2 and 3 are not critical.

NUREG 1021 Rev 9 Appendix C

!AppendiX C Page 5 of 12 Form ES-C-1!

Start the 3A Safety Injection Pump document the start time on QA STEP 2

!Record Page SAT

~

UNSAT

1. 3A HHSI Pump Control Switch turned to START Standard:

~. 3A HHSI Pump Red Run light is ON l3. 3A HHSI Pump Green Stop light is OFF Cue Comment NOTE:

Standards 2 and 3 are not critical.

NUREG 1021 Rev 9 Appendix C

Appendix C Page 6 of 12 Form ES-C-1 Open the Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 to STEP 3

establish flow to the accumulator.

SAT

..j UNSAT I. Opens the Loop 3A and 3B Hot Leg SI Isolation, MOV 869.

Standard:

2. MOV-3-869 Red OPEN light is ON.
3. MOV-3-869 Green CLOSED light is OFF.

Cue

~f Operator asks for the use of another operator tell operator that the

!evaluator/designated operator will serve in this capacity.

Comment IA second operator may be utilized to operate MOV-3-869 to allow sufficient time to perform the self-checking process.

NOTE:

Standards 2 and 3 are not critical.

NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 Open the Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 to STEP 3

establish flow to the accumulator.

SAT

..j UNSAT I. Opens the Loop 3A and 3B Hot Leg SI Isolation, MOV 869.

Standard:

2. MOV-3-869 Red OPEN light is ON.
3. MOV-3-869 Green CLOSED light is OFF.

Cue

~f Operator asks for the use of another operator tell operator that the

!evaluator/designated operator will serve in this capacity.

Comment IA second operator may be utilized to operate MOV-3-869 to allow sufficient time to perform the self-checking process.

NOTE:

Standards 2 and 3 are not critical.

NUREG 1021 Rev 9 Appendix C

!Appendix C Page 7 of 12 Form ES-C-1!

WHEN accumulator level has increased to 6600 +/- 20 gallons, THEN STEP 4

close Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869.

SAT

-j UNSAT

l. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 switch has been taken to CLOSE
2. Loop 3A and 3B Hot Leg SI Isolation, MOV 869 CLOSE Green Standard:

Light is ON.

3. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 OPEN RED Light is OFF.

Cue Comment NOTE:

Standards 2 and 3 are not critical.

NUREG 1021 Rev 9 Appendix C

!Appendix C Page 7 of 12 Form ES-C-1!

WHEN accumulator level has increased to 6600 +/- 20 gallons, THEN STEP 4

close Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869.

SAT

-j UNSAT

l. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 switch has been taken to CLOSE
2. Loop 3A and 3B Hot Leg SI Isolation, MOV 869 CLOSE Green Standard:

Light is ON.

3. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 OPEN RED Light is OFF.

Cue Comment NOTE:

Standards 2 and 3 are not critical.

NUREG 1021 Rev 9 Appendix C

Appendix C Page 8 of 12 Form ES-C-1 STEP 5

~perator Stops the 3A Safety Injection Pump AND verifies the control SAT switch is in the mid position.

UNSAT

1. 3A HHSI Pump Control Switch turned to Stop and released to Mid Standard:
2. 3A HHSI Pump Red Run light is OFF
3. 3A HHSI Pump Green Stop light is ON Cue Comment NOTE:

Standards 2 and 3 are not Critical to this step.

NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 STEP 5

~perator Stops the 3A Safety Injection Pump AND verifies the control SAT switch is in the mid position.

UNSAT

1. 3A HHSI Pump Control Switch turned to Stop and released to Mid Standard:
2. 3A HHSI Pump Red Run light is OFF
3. 3A HHSI Pump Green Stop light is ON Cue Comment NOTE:

Standards 2 and 3 are not Critical to this step.

NUREG 1021 Rev 9 Appendix C

!Appendix C Page 9 of 12 Form ES-C-11 STEP 6

iCLOSE the Accumulator Makeup Valve for Accumulator A, CV SAT

~

851A UNSAT

1. Placed CV-3-851A Control Switch to CLOSE and released to MID

~. Verified CV-3-851A RED Open light OFF Standard:

3. Verified CV-3-851A GREEN CLOSED Light ON Cue pnce Operator has verified CV-3-851A is CLOSED, tell the operator hat the JPM is terminated.

Comment NOTE:

Standards 2 and 3 are not Critical to this step.

Terminating !The task is complete when the Examinee returns the cue sheet to the STOP Cue:

!examiner.

Stop Time ___ _

NUREG 1021 Rev 9 Appendix C

!Appendix C Page 9 of 12 Form ES-C-11 STEP 6

iCLOSE the Accumulator Makeup Valve for Accumulator A, CV SAT

~

851A UNSAT

1. Placed CV-3-851A Control Switch to CLOSE and released to MID

~. Verified CV-3-851A RED Open light OFF Standard:

3. Verified CV-3-851A GREEN CLOSED Light ON Cue pnce Operator has verified CV-3-851A is CLOSED, tell the operator hat the JPM is terminated.

Comment NOTE:

Standards 2 and 3 are not Critical to this step.

Terminating !The task is complete when the Examinee returns the cue sheet to the STOP Cue:

!examiner.

Stop Time ___ _

NUREG 1021 Rev 9 Appendix C

rr Appendix C Page 10 of 12 Form ES-C-1 Verification of Completion Job Performance Measure No.

..:N:..:.-R.:..::C::..---~25:::.---=S:..:.:IM..::-.-:::J:.:..P..:.::M-=--.::::G~ ________________ _

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 Verification of Completion

~

JobPertormanceMeasureNo. ~N~R~C~-=25~-~S~IM~~~P~M~-~G~~~~~~~~~~~~~~~~~~

Examinee's Name:

Examiner's Name:

Date Pertormed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

~

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.

7.1.2.2.b,c, and d are marked N/A.

It is desired to use the 3A HHSI Pump for this task INITIATING CUE:

You have been directed to raise 3A Accumulator Level to 6600 +/- 20 gallons using 3A SAFETY INJECTION PUMP starting at step: 7.1.2.2.3.

3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.

7.1.2.2.b,c, and d are marked N/A.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.

7.1.2.2.b,c, and d are marked N/A.

It is desired to use the 3A HHSI Pump for this task INITIATING CUE:

You have been directed to raise 3A Accumulator Level to 6600 +/- 20 gallons using 3A SAFETY INJECTION PUMP starting at step: 7.1.2.2.3.

3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.

7.1.2.2.b,c, and d are marked N/A.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C

Appendix C Facility:

Task

Title:

KIA

Reference:

Job Performance Measure Worksheet

_T-'-u.:.:.:r-'...:kc::.eYL..:.-P...:::.o..:.:..in.:..:.t _______ Task No:

Perfonn EDG Nonnal Start Test (Alternate Path)

JPM No:

---~---~~~=---

064 A2.05 Loading the EDIG 3.1/3.2 Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Form ES-C-1 NRC-25-SIM-JPM-H Method of testing:

_S=-I:.:..:*m~u:.:..la=:.:t:.:::o.:...r _________________________ _

Simulated Performance __________ Actual Performance _____

....:X-.:......... ____ _

Classroom -------

Simulator -=====-:!.X~ __ _

Plant _________ _

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

You are the Unit 3 RCO. 3-0SP-023.1, Diesel Generator Operability Test, has been satisfactorily completed through 7.1.2.30.

Task Standard:

1.

The EDG will be synchronized to the Bus in accordance with 3-0SP-023.1.

2.

The EDG is placed to Emergency Stop when required.

Required Materials:

1.

3-0SP-023.1, "Diesel Generator Operability Test" General

References:

1.

3-0SP-023.1, "Diesel Generator Operability Test" NUREG 1021 Rev 9 Appendix C Appendix C Facility:

Task

Title:

KIA

Reference:

Job Performance Measure Worksheet

_T_u_r_k_ey"--P__.o_in_t _______ Task No:

Perfonn EDG Nonnal Start Test (Alternate Path)

JPM No:

--~----~----

064 A2.05 Loading the EDIG 3.1/3.2 Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Form ES-C-1 NRC-25-SIM-JPM-H Method of testing:

Simulator

~~~~-----------------------------------------------

Simulated Performance Actual Performance X


~~--------

Classroom Simulator x

Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

You are the Unit 3 RCO. 3-0SP-023.1, Diesel Generator Operability Test, has been satisfactorily completed through 7.1.2.30.

Task Standard:

1.

The EDG will be synchronized to the Bus in accordance with 3-0SP-023.1.

2.

The EDG is placed to Emergency Stop when required.

Required Materials:

1.

3-0SP-023.1, "Diesel Generator Operability Test" General

References:

1.

3-0SP-023.1, "Diesel Generator Operability Test" NUREG 1021 Rev 9 Appendix C

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

You have been directed to continue the Monthly EDG Normal Start Test (3A EDG) starting at step 7.1.2.31. 3-0SP-023.1.

Time Critical Task: No Validation Time:

15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

NUREG 1021 Rev 9 Appendix C Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

You have been directed to continue the Monthly EDG Normal Start Test (3A EDG) starting at step 7.1.2.31. 3-0SP-023.1.

Time Critical Task: No Validation Time:

15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #

Reset to IC-1.

Load Lesson

1. Open lesson JPM 01 023006201.lsn and execute.
2. Ensure 3A EDG has been started and in stable operation.

Ensure Simulator Operator Checklist is complete NUREG 1021 Rev 9 Appendix C I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #

Reset to IC-1.

Load Lesson

1. Open lesson JPM 01 023006201.lsn and execute.
2. Ensure 3A EDG has been started and in stable operation.

Ensure Simulator Operator Checklist is complete NUREG 1021 Rev 9 Appendix C

Appendix C Page 4 of 12 Form ES-C-1 Place the EDG Bkr 3AA20 Synchronizing switch to ON.

STEP 1

SAT

..j UNSAT

1. Placed the EDG Bkr 3AA20 Synchronizing switch to ON.
2. Check that the WHITE synchronizing lights are cycling ON.

Standard:

Cue Comment NOTE:

Standard #2 is not Critical to this step.

NUREG 1021 Rev 9 Appendix C Appendix C Page 4 of 12 Form ES-C-1 Place the EDG Bkr 3AA20 Synchronizing switch to ON.

STEP 1

SAT

..j UNSAT

1. Placed the EDG Bkr 3AA20 Synchronizing switch to ON.
2. Check that the WHITE synchronizing lights are cycling ON.

Standard:

Cue Comment NOTE:

Standard #2 is not Critical to this step.

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 5 of 12 Form ES-C-1 I STEP 2

Using the A Diesel Oen Volt Regulator, adjust Incoming voltage to SAT match Running indicated voltage.

UNSAT Using the voltage adjust control switch, adjusted the generator voltage Standard:

on the Bus Voltage Incoming indicator to match the voltage on the Bus Voltage Running indicator.

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C I Appendix C Page 5 of 12 Form ES-C-1 I STEP 2

Using the A Diesel Oen Volt Regulator, adjust Incoming voltage to SAT match Running indicated voltage.

UNSAT Using the voltage adjust control switch, adjusted the generator voltage Standard:

on the Bus Voltage Incoming indicator to match the voltage on the Bus Voltage Running indicator.

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

Appendix C Page 6 of 12 Form ES-C-1 Using the A Diesel Gen Speed Changer, adjust engine speed so that the STEP 3

pointer on the Synchroscope is rotating slowly in the FAST direction.

SAT

..j UNSAT Adjusted engine speed so that the pointer on the synchroscope is Standard:

rotating slowly in the FAST direction.

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C Appendix C Page 6 of 12 Form ES-C-1 Using the A Diesel Gen Speed Changer, adjust engine speed so that the STEP 3

pointer on the Synchroscope is rotating slowly in the FAST direction.

SAT

..j UNSAT Adjusted engine speed so that the pointer on the synchroscope is Standard:

rotating slowly in the FAST direction.

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 7 of 12 Form ES-C-1 I STEP 4

Using the A Diesel Gen Volt Regulator, adjust Incoming voltage SAT

..j slightly higher than Running voltage.

UNSAT Using the voltage adjust control switch, adjusted the generator voltage Standard:

on the Bus Voltage Incoming indicator to match the voltage on the Bus Voltage Running indicator.

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C I Appendix C Page 7 of 12 Form ES-C-1 I STEP 4

Using the A Diesel Gen Volt Regulator, adjust Incoming voltage SAT

..j slightly higher than Running voltage.

UNSAT Using the voltage adjust control switch, adjusted the generator voltage Standard:

on the Bus Voltage Incoming indicator to match the voltage on the Bus Voltage Running indicator.

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

Appendix C Page 8 of 12 Form ES-C-1 STEP 5

Using the A Diesel Kilovolts indicator and 3A 4KV Bus Voltmeter, SAT verify voltages are approximately equal between the 3A Diesel UNSAT Generator output and the 3A 4KV Bus for all three phases.

Standard:

Verified voltages are approximately equal.

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C Appendix C Page 8 of 12 Form ES-C-1 STEP 5

Using the A Diesel Kilovolts indicator and 3A 4KV Bus Voltmeter, SAT verify voltages are approximately equal between the 3A Diesel UNSAT Generator output and the 3A 4KV Bus for all three phases.

Standard:

Verified voltages are approximately equal.

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 9 of 12 Form ES-C-1 I Verify 3A Diesel Generator frequency is between 58.8 and 61.2 Hz on STEP 6

the Gen Frequency indicator SAT UNSAT Verified 3A Diesel Generator frequency is between 58.8 and 61.2 Hz Standard:

on the Gen Frequency indicator Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C I Appendix C Page 9 of 12 Form ES-C-1 I Verify 3A Diesel Generator frequency is between 58.8 and 61.2 Hz on STEP 6

the Gen Frequency indicator SAT UNSAT Verified 3A Diesel Generator frequency is between 58.8 and 61.2 Hz Standard:

on the Gen Frequency indicator Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

Appendix C Page 10 of 12 Form ES-C-1 WHEN the synchroscope pointer is at 12 o'clock position, THEN STEP 9

close the diesel generator breaker by placing the EDG Bkr 3AA20 SAT

..j Control Switch to the CLOSE position (spring return to nonnal).

UNSAT

1.

Closed the diesel generator breaker by placing the EDG Bkr 3AA20 Control Switch to the CLOSE position WHEN the synchroscope pointer reached the12 o'clock position.

Standard:

2.

Verified the Diesel Generator Breaker 3AA20 has closed (Breaker GREEN light is OFF and RED light is ON).

Cue Comment NOTE:

Standard #2 is not Critical to this step.

NUREG 1021 Rev 9 Appendix C Appendix C Page 10 of 12 Form ES-C-1 WHEN the synchroscope pointer is at 12 o'clock position, THEN STEP 9

close the diesel generator breaker by placing the EDG Bkr 3AA20 SAT

..j Control Switch to the CLOSE position (spring return to nonnal).

UNSAT

1.

Closed the diesel generator breaker by placing the EDG Bkr 3AA20 Control Switch to the CLOSE position WHEN the synchroscope pointer reached the12 o'clock position.

Standard:

2.

Verified the Diesel Generator Breaker 3AA20 has closed (Breaker GREEN light is OFF and RED light is ON).

Cue Comment NOTE:

Standard #2 is not Critical to this step.

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 11 of 12 Form ES-C-1 I Place the EDG Bkr 3AA20 Synchronizing switch to OFF STEP 10 SAT

..J UNSAT Standard:

Placed the EDG Bkr 3AA20 Synchronizing switch to OFF Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C I Appendix C Page 11 of 12 Form ES-C-1 I Place the EDG Bkr 3AA20 Synchronizing switch to OFF STEP 10 SAT

..J UNSAT Standard:

Placed the EDG Bkr 3AA20 Synchronizing switch to OFF Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

Appendix C Page 12 of 12 Form ES-C-1 Tum the A EDG Speed Changer in the RAISE direction and slowly

~

STEP 11 increase diesel generator load to approximately 1000 KW.

SAT

..J UNSAT I. Turned the Governor Control Switch AND slowly loaded diesel generator to approximately 1000 KW.

Standard:

2. Operator recognizes EDG problem and places EDG to Emergency Stop.
1. If candidate asks tell candidate that vendor has cleared generator power increase to 1000 kw.
2. When the 3A EDG Voltage Regulator is taken to RAISE, SIM OPERATOR initiates a continuous increase in Voltage Regulator setting up to the point where increasing oscillations in Voltage/Load begin.

Cue

3. When Operator places EDG to Emergency Stop or EDG trips tell operator that another operator will take over.
4. Tell operator that JPM is complete.

~

Comment NOTE:

Terminating The task is complete when the Examinee returns the cue sheet to the STOP Cue:

examiner.

Stop Time ----

NUREG 1021 Rev 9 Appendix C Appendix C Page 12 of 12 Form ES-C-l Turn the A EDG Speed r in the

. u...

Land,...,

11 SAT

increase diesel generator load to approximately 1000 KW.

~-

.J UNSAT

~-

I.

t umed the

,AND I diesel generator to approximatel y 1000 KW.

Standard:

2 Operator recognizes EDG problem and places EDG to Emergency SlOp.

1. If candidate asks tell candidate that vendor has cleared generator power increase to 1000 kw.
2. When the 3A EDG Voltage Regulator is taken to RAISE.

81M OPERATOR initiates a continuous increase in Voltage Regulator setting up to the point where increasing oscillations in Voltage/load begin.

Cue

3. When Operator places EDG to Emergency Stop or EDG trips tell operator that another operator wi ll take over.
4. Tell operator that JPM is complete.

a Comment NOTE:

Terminating The task is complete when the Examinee returns the cue sheet to the STOP Cue:

examiner.

Stop Time _~~~

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 13 of 12 Form ES-C-1 I Verification of Completion e Job Performance Measure No.

NRC-25-SIM-JPM-H Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

e ______________________ _

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date: ________________ _

NUREG 1021 Rev 9 Appendix C I Appendix C Page 13 of 12 Form ES-C-1 I Verification of Completion e Job Performance Measure No.

NRC-25-SIM-JPM-H Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

e ______________________ _

Response

Result:

Satisfactory/Unsatisfactory Examiner's signature and date: ________________ _

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

You are the Unit 3 RCO. 3-0SP-023.1, Diesel Generator Operability Test, has been satisfactorily completed through 7.1.2.30.

INITIA TlNG CUE:

You have been directed to continue the Monthly EDG Normal Start Test (3A EDG) starting at step 7.1.2.31.

3-0SP-023.1.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

You are the Unit 3 RCO. 3-0SP-023.1, Diesel Generator Operability Test, has been satisfactorily completed through 7.1.2.30.

INITIA TlNG CUE:

You have been directed to continue the Monthly EDG Normal Start Test (3A EDG) starting at step 7.1.2.31.

3-0SP-023.1.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C