ML103280246: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:WBN2Public Resource From:                     Darbali, Samir Sent:                     Wednesday, November 24, 2010 11:13 AM To:                       Poole, Justin
{{#Wiki_filter:1 WBN2Public Resource From:
Darbali, Samir Sent:
Wednesday, November 24, 2010 11:13 AM To:
Poole, Justin


==Subject:==
==Subject:==
FW: Update Action Item List Attachments:             20101111 Open Item List Master TVA Update 11-11-10.docx From: Garg, Hukam Sent: Tuesday, November 16, 2010 3:30 PM To: Darbali, Samir
FW: Update Action Item List Attachments:
20101111 Open Item List Master TVA Update 11-11-10.docx From: Garg, Hukam Sent: Tuesday, November 16, 2010 3:30 PM To: Darbali, Samir  


==Subject:==
==Subject:==
FW: Update Action Item List Samir; Here is the updated list. Please put in the g drive and inform everyone about it.
FW: Update Action Item List Samir; Here is the updated list. Please put in the g drive and inform everyone about it.
Hukam From: Clark, Mark Steven [mailto:msclark0@tva.gov]
Hukam From: Clark, Mark Steven [mailto:msclark0@tva.gov]
Sent: Tuesday, November 16, 2010 3:20 PM To: Garg, Hukam
Sent: Tuesday, November 16, 2010 3:20 PM To: Garg, Hukam  


==Subject:==
==Subject:==
Update Action Item List
Update Action Item List
: Regards, Steve Steve Clark Bechtel Power Corp.
: Regards, Steve Steve Clark Bechtel Power Corp.
Control Systems Watts Bar 2 Completion Project Phone: 423.365.1664 e-mail: msclark0@tva.gov 1
Control Systems Watts Bar 2 Completion Project Phone: 423.365.1664 e-mail: msclark0@tva.gov


Hearing Identifier:     Watts_Bar_2_Operating_LA_Public Email Number:           198 Mail Envelope Properties     (0046140293E11F408991442DB4FE25CA127DB4AEFE)
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
198 Mail Envelope Properties (0046140293E11F408991442DB4FE25CA127DB4AEFE)  


==Subject:==
==Subject:==
FW: Update Action Item List Sent Date:               11/24/2010 11:12:40 AM Received Date:           11/24/2010 11:12:44 AM From:                   Darbali, Samir Created By:             Samir.Darbali@nrc.gov Recipients:
FW: Update Action Item List Sent Date:
11/24/2010 11:12:40 AM Received Date:
11/24/2010 11:12:44 AM From:
Darbali, Samir Created By:
Samir.Darbali@nrc.gov Recipients:  
"Poole, Justin" <Justin.Poole@nrc.gov>
"Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None Post Office:             HQCLSTR01.nrc.gov Files                             Size                 Date & Time MESSAGE                           632                 11/24/2010 11:12:44 AM 20101111 Open Item List Master TVA Update 11-11-10.docx                     357786 Options Priority:                         Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Tracking Status: None Post Office:
Recipients Received:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 632 11/24/2010 11:12:44 AM 20101111 Open Item List Master TVA Update 11-11-10.docx 357786 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                     radBA627.docx                                                                               Open Items to be Resolved for SER Approval SE     FSAR     NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                       RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                    POC                              Issue                                            TVA Response(s)                      Y/N       Status/ Current Actions     Resolution Path   RAI No. & Date                             Comments Sec. Sec.                                                                                                                                                                                                            Date 001   All     All     B   (   The Watts Bar Nuclear Plant FSAR red-line for Unit 2       12/15/2009 Presentation Slides                   1. Y       Closed                       Closed             EICB RAI         3/12/2010       NNC 11/19/09: The FSAR (Agency wide Documents Access and Management                                                                                                                              ML093230343                      contains mostly description of 002   All     All     B   (   Are there I&C components and systems that have             12/15/2009 Presentation Slides                   2. Y       Closed                       Closed             EICB RAI         3/12/2010       NNC 11/19/09: The FSAR changed to a new or different digital technology                                                                                                                          ML093230343                      contains mostly description of 003   All     All     B   (   Because a digital I&C platform can be configured and       12/15/2009 Presentation Slides                   3. Y       Closed                       Closed             EICB RAI         3/12/2010       NNC 11/19/09: The FSAR programmed for different applications the review                                                                                                                          ML093230343                      contains mostly description of 004   All     All     B   (   Please identify the information that will be submitted     Responder: Webb       1/13/10 Public Meeting     4. Y       Closed                       Closed             EICB RAI         January 13,     NNC 11/19/09: LIC-110 Rev. 1 for each unreviewed digital I&C system and                                                                                                                                ML093230343      2010            Section 6 2 2 states: "Design 005 7.1.3.                 (
Date Comments 001 All All B
G   By letter date February 28, 2008 (Agencywide               Responder: Craig/Webb                           5. Y       Closed                       Closed             EICB RAI         TVA Letter 1                        Documents Access and Management System                                                                                                                                    ML093431118      dated 2/5/10 006                       (
(
G   Amendment 95 of the FSAR, Chapter 7.3, shows that         By letter dated February 5, 2010: TVA provided   6. Y       Closed                       Closed             EICB RAI         TVA Letter     NNC: WCAP-12096 Rev. 7 change 7 3-1 consists of updating a reference from        the Unit 2 setpoint methodology (WCAP-177044-                                                                  ML093431118      dated 2/5/10    (ML073460281) is in ADAMS 007 7.1.3.                 (
The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (Agency wide Documents Access and Management 12/15/2009 Presentation Slides
G   The setpoint methodology has been reviewed and             TVA Letter Dated March 12, 2010 (Enclosure 1,   7. Y      Closed                        Closed            EICB RAI        TVA Letter     TVA to provide Rev. 8 of the Unit 1                       approved by the NRC staff in Section 7 1 3 1 of            Item No 7 on Page 7 of 15): TVA responded to                   This item is reviewed in                        ML093431118     dated 3/12/10   1 document (which is the current 008  7.3                   (
: 1. Y Closed Closed EICB RAI ML093230343 3/12/2010 NNC 11/19/09: The FSAR contains mostly description of 002 All All B
G  There are several staff positions that provide guidance    TVA Letter Dated March 12, 2010 (Enclosure 1,    8. Y      Closed                        Closed            EICB RAI        TVA Letter on setpoint methodology (e g Reg Guide 1 105 BTP          Item No 8 on Page 7 of 15): TVA responded to                                                                   ML093431118     dated 3/12/10 009  7.3.2  5.6,    (
(
D a       Change 7.3-2, identified in Watts Bar Nuclear Plant        TVA Letter Dated March 12, 2010 (Enclosure 1,   9. Y       Closed                       Closed             EICB RAI         3/12/10, 635              FSAR red-line for Unit 2 (ADAMS Accession Number          Item No 9 on Page 8 of 15): TVA responded to                                                                    ML093431118      ML101680598 010  7.3     7.3     (
Are there I&C components and systems that have changed to a new or different digital technology 12/15/2009 Presentation Slides
D a       The original SER on Watts Bar (NUREG-0847)                TVA Letter Dated March 12, 2010 (Enclosure 1,   10. Y        Closed                        Closed            EICB RAI        3/12/10, documents that the scope of the review of FSAR            Item No 10 on Page 8 of 15): TVA responded to                                                                  ML093431118      ML101680598 011  7.3.2  5.6,    (
: 2. Y Closed Closed EICB RAI ML093230343 3/12/2010 NNC 11/19/09: The FSAR contains mostly description of 003 All All B
D a       NUREG-0847 Supplement No. 2 Section 7.3.2                  TVA Letter Dated March 12, 2010 (Enclosure 1,   11. Y        Closed                        Closed            EICB RAI        ML101680598, 635              includes an evaluation of a change in containment          Item No 11 on Page 13 of 15): TVA responded                                                                     ML093431118      Item 9 012  7.4      7.4    (
(
D a      The original SER on Watts Bar (NUREG-0847)                TVA Letter Dated March 12, 2010 (Enclosure 1,   12. Y         Closed                       Closed             EICB RAI         TVA Letter documents that the scope of the review of FSAR            Item No 12 on Page 13 of 15): TVA responded                                                                    ML093431118      dated 3/12/10 013 7.1.3.                 (
Because a digital I&C platform can be configured and programmed for different applications the review 12/15/2009 Presentation Slides
G  Chapter 7 and Chapter 16 of Amendment 95 to the           TVA Letter Dated March 12, 2010 (Enclosure 1,    13. Y         Closed                       Closed             EICB RAI        TVA Letter     TS have been docketed.
: 3. Y Closed Closed EICB RAI ML093230343 3/12/2010 NNC 11/19/09: The FSAR contains mostly description of 004 All All B
1                        FSAR do not include any setpoint values Please            Item No 13 on Page 14 of 15): TVA responded                                                                    ML093431118      dated 3/12/10 014  All      All    B  (  Provide the justification for any hardware and software    Date: 4/27/10                                    14. Y         Closed                       Closed             NRC Meeting     TVA Letter changes that have been made since the previous U S        Responder: TVA                                                                                                  Summary          dated 4/27/10 015                        (
(
G  Verify that the refurbishment of the power range           Date: 4/27/10                                   15. Y         Closed                       Closed             NRC Meeting     TVA Letter nuclear instrumentation drawers resulted in only like-    Responder: TVA                                                                                                  Summary          dated 4/27/10 016                  B C
Please identify the information that will be submitted for each unreviewed digital I&C system and Responder: Webb 1/13/10 Public Meeting
a(        Identify the precedents in license amendment requests      Date: 4/27/10                                   16. Y         Closed                       Closed             NRC Meeting     TVA Letter (LARs) if any for source range monitors or                Responder: TVA                                                                                                  Summary          dated 4/27/10 017  7.3.1  7.3.1,  (
: 4. Y Closed Closed EICB RAI ML093230343 January 13, 2010 NNC 11/19/09: LIC-110 Rev. 1 Section 6 2 2 states: "Design 005 7.1.3.
D a      Identify precedents in LARs, if any, for the solid state  Date: 4/27/10                                   17. Y        Closed                        Closed            NRC Meeting      TVA Letter 555              protection system Also identify any hardware                                                                                                                              Summary          dated 4/27/10 018                        (
1
G   Identify any changes made to any instrumentation and      Date: 4/27/10                                   18. Y         Closed                       Closed             NRC Meeting     TVA Letter control (I&C) system based on prior knowledge of          Responder: TVA                                                                                                  Summary          dated 4/27/10 019                        (
(
G   Verify that the containment purge isolation radiation      Date: 4/27/10                                   19. Y         Closed                       Closed             NRC Meeting     TVA Letter monitor is the same as used in Watts Bar Unit 1 or                                                                                                                        Summary          dated 4/27/10 020                        (
G By letter date February 28, 2008 (Agencywide Documents Access and Management System Responder: Craig/Webb
G  Provide environmental qualification information            Date: 4/27/10                                   20. Y        Closed                        Closed            NRC Meeting      TVA Letter      NNC 4/30/10: SRP Section 7.0 pursuant to Section 50 49 of Title 10 of the Code of      Responder: TVA                                                                                                  Summary          dated 4/27/10  states: "The organization 021           7.3         (
: 5. Y Closed Closed EICB RAI ML093431118 TVA Letter dated 2/5/10 006
G   For the Foxboro Spec 200 platform, identify any           Date: 5/25/10                                   21. Y         Closed                       Closed            NRC Meeting      TVA Letter      The resolution of this item will be changes in hardware from the precedent systems                                                                            The resolution of this item                      Summary          dated 6/18/10   covered by OI#288 022   7.3.2   5.6,     (
(
D a       Verify the auxiliary feedwater control refurbishment       Date: 4/27/10                                   22. Y         Closed                       Closed             NRC Meeting     TVA Letter 635              results in a like-for-like replacement and identify any                                                                                                                    Summary          dated 4/27/10 023                       (
G Amendment 95 of the FSAR, Chapter 7.3, shows that change 7 3-1 consists of updating a reference from By {{letter dated|date=February 5, 2010|text=letter dated February 5, 2010}}: TVA provided the Unit 2 setpoint methodology (WCAP-177044-
G   Provide environmental qualification (10 CFR 50.49)         Date: 4/27/10                                   23. Y         Closed                       Closed             NRC Meeting     TVA Letter     NNC 4/30/10: SRP Section 7.0 information for safety-related control transmitters and    Responder: TVA                                                                                                  Summary          dated 4/27/10  states: "The organization 024                       (
: 6. Y Closed Closed EICB RAI ML093431118 TVA Letter dated 2/5/10 NNC: WCAP-12096 Rev. 7 (ML073460281) is in ADAMS 007 7.1.3.
C   Provide a schedule by the January 13, 2010, meeting       During the January 13, 2010 meeting, TVA         24. Y         Closed                       Closed             NRC Meeting     N/A - Request   NNC 4/30/10: Carte to address for providing information in accordance with I&C          presented a schedule for completing various                                                                    Summary          for schedule    response with respect to PAMS 025   7.5.2   7.5.1   (
1
Si      For the containment radiation high radiation monitor,     Date: 4/27/10                                   25. Y         Closed                       Closed             NRC Meeting     ML101230248, verify that the information provided by TVA is                                                                                                                            Summary          Item 12 026                       (
(
G   Provide environmental qualification (10 CFR 50.49)         Date: 4/27/10                                   26. Y         Closed                       Closed             NRC Meeting     TVA Letter     NNC 4/30/10: SRP Section 7.0 information for safety-related monitoring transmitters    Responder: TVA                                                                                                  Summary          dated 4/27/10  states: "The organization 027 7.7.1.                 (
G The setpoint methodology has been reviewed and approved by the NRC staff in Section 7 1 3 1 of TVA Letter Dated March 12, 2010 (Enclosure 1, Item No 7 on Page 7 of 15): TVA responded to
C   For Foxboro I/A provide information regarding             Date: 4/27/10                                   27. Y         Closed                       Closed             NRC Meeting     TVA Letter 4                        safety/non-safety-related interaction common cause        Responder: TVA                                                                                                  Summary          dated 4/27/10 028                       (
: 7. Y Closed This item is reviewed in Closed EICB RAI ML093431118 TVA Letter dated 3/12/10 TVA to provide Rev. 8 of the Unit 1 document (which is the current 008 7.3
G   For the turbine control AEH system, verify that the       Responder: Mark Scansen                          28. Y        Closed                        Closed            NRC Meeting      TVA Letter refurbishment results in a like-for-like replacement       Date: 4/27/10                                                                                                   Summary         dated 10/5/10 029                       (
(
C   For the rod control system, verify that the                Date: 4/27/10                                    29. Y        Closed                        Closed            NRC Meeting      TVA Letter refurbishment results in a like-for-like replacement      Responder: TVA                                                                                                  Summary          dated 4/27/10
G There are several staff positions that provide guidance on setpoint methodology (e g Reg Guide 1 105 BTP TVA Letter Dated March 12, 2010 (Enclosure 1, Item No 8 on Page 7 of 15): TVA responded to
: 8. Y Closed Closed EICB RAI ML093431118 TVA Letter dated 3/12/10 009 7.3.2 5.6, 6 3 5
(
D a
Change 7.3-2, identified in Watts Bar Nuclear Plant FSAR red-line for Unit 2 (ADAMS Accession Number TVA Letter Dated March 12, 2010 (Enclosure 1, Item No 9 on Page 8 of 15): TVA responded to
: 9. Y Closed Closed EICB RAI ML093431118 3/12/10, ML101680598 010 7.3 7.3
(
D a
The original SER on Watts Bar (NUREG-0847) documents that the scope of the review of FSAR TVA Letter Dated March 12, 2010 (Enclosure 1, Item No 10 on Page 8 of 15): TVA responded to
: 10. Y Closed Closed EICB RAI ML093431118 3/12/10, ML101680598 011 7.3.2 5.6, 6 3 5
(
D a
NUREG-0847 Supplement No. 2 Section 7.3.2 includes an evaluation of a change in containment TVA Letter Dated March 12, 2010 (Enclosure 1, Item No 11 on Page 13 of 15): TVA responded
: 11. Y Closed Closed EICB RAI ML093431118 ML101680598, Item 9 012 7.4 7.4
(
D a
The original SER on Watts Bar (NUREG-0847) documents that the scope of the review of FSAR TVA Letter Dated March 12, 2010 (Enclosure 1, Item No 12 on Page 13 of 15): TVA responded
: 12. Y Closed Closed EICB RAI ML093431118 TVA Letter dated 3/12/10 013 7.1.3.
1
(
G Chapter 7 and Chapter 16 of Amendment 95 to the FSAR do not include any setpoint values Please TVA Letter Dated March 12, 2010 (Enclosure 1, Item No 13 on Page 14 of 15): TVA responded
: 13. Y Closed Closed EICB RAI ML093431118 TVA Letter dated 3/12/10 TS have been docketed.
014 All All B
(
Provide the justification for any hardware and software changes that have been made since the previous U S Date: 4/27/10 Responder: TVA
: 14. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 015
(
G Verify that the refurbishment of the power range nuclear instrumentation drawers resulted in only like-Date: 4/27/10 Responder: TVA
: 15. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 016 B
(
C a
Identify the precedents in license amendment requests (LARs) if any for source range monitors or Date: 4/27/10 Responder: TVA
: 16. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 017 7.3.1 7.3.1, 5 5 5
(
D a
Identify precedents in LARs, if any, for the solid state protection system Also identify any hardware Date: 4/27/10
: 17. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 018
(
G Identify any changes made to any instrumentation and control (I&C) system based on prior knowledge of Date: 4/27/10 Responder: TVA
: 18. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 019
(
G Verify that the containment purge isolation radiation monitor is the same as used in Watts Bar Unit 1 or Date: 4/27/10
: 19. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 020
(
G Provide environmental qualification information pursuant to Section 50 49 of Title 10 of the Code of Date: 4/27/10 Responder: TVA
: 20. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 NNC 4/30/10: SRP Section 7.0 states: "The organization 021 7.3
(
G For the Foxboro Spec 200 platform, identify any changes in hardware from the precedent systems Date: 5/25/10
: 21. Y Closed The resolution of this item Closed NRC Meeting Summary TVA Letter dated 6/18/10 The resolution of this item will be covered by OI#288 022 7.3.2 5.6, 6 3 5
(
D a
Verify the auxiliary feedwater control refurbishment results in a like-for-like replacement and identify any Date: 4/27/10
: 22. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 023
(
G Provide environmental qualification (10 CFR 50.49) information for safety-related control transmitters and Date: 4/27/10 Responder: TVA
: 23. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 NNC 4/30/10: SRP Section 7.0 states: "The organization 024
(
C Provide a schedule by the January 13, 2010, meeting for providing information in accordance with I&C During the January 13, 2010 meeting, TVA presented a schedule for completing various
: 24. Y Closed Closed NRC Meeting Summary N/A - Request for schedule NNC 4/30/10: Carte to address response with respect to PAMS 025 7.5.2 7.5.1
(
S i
For the containment radiation high radiation monitor, verify that the information provided by TVA is Date: 4/27/10
: 25. Y Closed Closed NRC Meeting Summary ML101230248, Item 12 026
(
G Provide environmental qualification (10 CFR 50.49) information for safety-related monitoring transmitters Date: 4/27/10 Responder: TVA
: 26. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 NNC 4/30/10: SRP Section 7.0 states: "The organization 027 7.7.1.
4
(
C For Foxboro I/A provide information regarding safety/non-safety-related interaction common cause Date: 4/27/10 Responder: TVA
: 27. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 028
(
G For the turbine control AEH system, verify that the refurbishment results in a like-for-like replacement Responder: Mark Scansen Date: 4/27/10
: 28. Y Closed Closed NRC Meeting Summary TVA Letter dated 10/5/10 029
(
C For the rod control system, verify that the refurbishment results in a like-for-like replacement Date: 4/27/10 Responder: TVA
: 29. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                 radBA627.docx                                                                             Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                     RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                            Issue                                          TVA Response(s)                    Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                             Comments Sec. Sec.                                                                                                                                                                                                      Date 030                       (
Date Comments 030
G   Regarding the refurbishment of I&C equipment,           Responder: Clark                               30. Y           Closed                     Closed             NRC Meeting     TVA Letter identify any component digital upgrades and if so                                                                                                                      Summary          dated 10/5/10 031                       (
(
C   For the rod position indication system (CERPI),         Date: 4/27/10                                 31. Y           Closed                     Closed             NRC Meeting     TVA Letter     CERPI is non-safety related.
G Regarding the refurbishment of I&C equipment, identify any component digital upgrades and if so Responder: Clark
provide information in accordance with ISG 4 Need to    Responder: TVA                                                                                                Summary          dated 4/27/10  Note: The issue of interlock with 032                       (
: 30. Y Closed Closed NRC Meeting Summary TVA Letter dated 10/5/10 031
C   For the process computer, need to consider cyber         Date: 4/27/10                                 32. Y           Closed                     Closed             NRC Meeting     TVA Letter     EICB will no longer consider security issues and emergency response data system      Responder: TVA                                                                                                Summary          dated 4/27/10   cyber issues 033                       (
(
C   For the loose parts monitoring system, provide           Date: 4/27/10                                 33. Y           Closed                     Closed             NRC Meeting     TVA Letter     The loose parts monitoring information regarding interactions with safety related  Responder: TVA                                                                                                Summary          dated 4/27/10   system is not connected to any 034                       (
C For the rod position indication system (CERPI),
G   2/4/2010                                                 Responder: TVA                                 34. Y           Closed                     Closed             N/A             TVA Letter Awaiting NRC evaluation of                                      dated 4/27/10 034.                 a r
provide information in accordance with ISG 4 Need to Date: 4/27/10 Responder: TVA
g        Chapter 7.1 - Introduction                                                                             35. Y           Close                     Closed             N/A             N/A 1                              Reactor Coolant System Flow Rate Measurement 034.                     (
: 31. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 CERPI is non-safety related.
G   Chapter 7.2 - Reactor Trip System                                                                     36. Y           Close                       Closed             N/A             N/A 2                              Deletion of Neutron Flux Negative Rate Trip 034. 7.3       7.3   (
Note: The issue of interlock with 032
D a       Chapter 7.3 - ESFAS                                                                                   37. Y           Closed                     Closed             N/A             N/A 3                              Design Basis Analysis Parameters 034. 7.5.1. 7.5.2   (
(
M a       Chapter 7.5 - Instrumentation Systems Important to                                                     38. Y           Closed                     Closed             N/A             N/A             Closed 4    1                      Safety 034. 7.5.1. 7.5.2   r c
C For the process computer, need to consider cyber security issues and emergency response data system Date: 4/27/10 Responder: TVA
u        Chapter 7.6 - All Other Systems Required for Safety                                                   39. Y           Closed                     Closed             N/A             N/A             Closed 5    1      767                Plant Process Computer Replacement 034.                 n g
: 32. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 EICB will no longer consider cyber issues 033
h        Chapter 7.7 Control Systems                                                                           40. Y           Closed                     Closed             N/A             N/A 6                              Alternate Means for Monitoring Control or 035                   (
(
Si      2/18/2010                                               Responder: Clark                               41. Y           Closed                     Closed             RAI No. 1       TVA Letter   LIC-110 Section 6.2.2 states:
C For the loose parts monitoring system, provide information regarding interactions with safety related Date: 4/27/10 Responder: TVA
ML102980005      dated 3/12/10 Design features and 036   7.5.2   7.5.1       (
: 33. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 The loose parts monitoring system is not connected to any 034
C   February 18, 2010                                       Date: 5/25/10                                 42. Y           Closed                     Closed             NRC Meeting                   NNC: Unit 2 FSAR Section Responder: Clark                                                                                              Summary                        7 5 1 Post Accident Monitoring 037 7.5.1. 7.5.2   (
(
M a       2/18/2010                                               Responder: Clark               Date: 5/25/10   43. Y           Closed                     Closed             N/A             TVA Letter   FSAR Amendment 100 provides 1                                                                                                                                                                          09/16/10                            dated 10/5/10 information 038 7.5.1. 7.5.2   (
G 2/4/2010 Responder: TVA
M a       2/18/2010                                               Responder: Clark           Date: 5/25/10     44. Y           Closed                     Closed             EICB RAI         TVA Letter   The slides presented at the 1                                                                                                                                                                                              ML102861885 dated 10/5/10 December 15 2010 meeting 039                       (
: 34. Y Closed Awaiting NRC evaluation of Closed N/A TVA Letter dated 4/27/10 034.
G   January 13, 2010                                         Responder: Clark                     Date:     45. Y           Closed                     Closed             EICB RAI         FSAR         The equation for the calculation 5/25/10                                                                                                      ML102910008 amendment 98 of the estimated average hot leg 040                       (
1 a
G   January 13, 2010                                         Responder: Clark                   Date:     46. Y           Closed                     Closed             EICB RAI EICB FSAR             The equation for the calculation 5/25/10                                                                                                      RAI              amendment 98 of the power fraction on page 042   All     All   B   (   February 25, 2010: Telecom                               Date: 5/25/10                                 47. Y           Closed                     Closed             EICB RAI         TVA Letter   The drawing provided did not Responder: Clark                                                                                              ML102910002 dated 6/18/10 have the identification numbers 044   7.5.2   7.5.1       (
r g
C   February 25, 2010                                       Date: 5/25/10                                 48. Y           Closed                     Closed             EICB RAI         TVA Letter Responder: Clark                                                                                              ML102910002 dated 6/18/10 045                       (
Chapter 7.1 - Introduction Reactor Coolant System Flow Rate Measurement
C   February 25, 2010                                       Date: 5/25/10                                 49. Y           Closed                     Closed             EICB RAI         TVA Letter Responder: Clark                                                                                              ML102910002 dated 7/30/10 046                       (
: 35. Y Close Closed N/A N/A 034.
C   February 25, 2010                                       Date: 5/25/10                                 50. Y           Closed                     Closed             N/A - Request N/A Responder: Clark                                                                                              for help finding 047   7.5.2   7.5.1       (
2
C   4/8/2010                                                 Responder: WEC/Hilmes             Date: 5/25/10 51. Y         Closed                     Closed             EICB RAI         TVA Letter ML102910002 dated 7/30/10 048   7.5.2   7.5.1       (
(
C   April 8, 2010                                           Date: 5/25/10                                 52. Y           Closed                     Closed             EICB RAI         TVA Letter Responder: WEC                                                                                                ML102910002 dated 6/18/10 049   7.5.2   7.5.1       (
G Chapter 7.2 - Reactor Trip System Deletion of Neutron Flux Negative Rate Trip
C   4/8/2010                                                 Responder: WEC             Date: 5/25/10       53. Y           Closed                     Closed             EICB RAI         TVA Letter ML102910002 dated 6/18/10 051                       (
: 36. Y Close Closed N/A N/A 034.
G   April 15, 2010                                           Date: 5/25/10                                 54. Y           Closed                     Closed             N/A             N/A           Review addressed by another Responder: Craig/Webb                                                                                                                        Open Item 052   7.5.2   7.5.1   (
3 7.3 7.3
Si      April 19, 2010                                           Date: 5/25/10                                 55. Y           Closed                     Closed             RAI No. 12 Responder: Slifer                                                                                            ML102980005 053   7.5.2   7.5.1   (
(
Si      April 19, 2010                                           Date: 5/25/10                                 56. Y           Closed                     Closed             RAI No. 13 Responder: Slifer                                                                                            ML102980005 056                   (
D a
Si      April 19, 2010                                           Date: 5/25/10                                 57. Y           Closed                     Closed             RAI No. 16       TVA Letter   Sorrento Radiation Monitoring Responder: Slifer                                                                                            ML102980005 dated 6/18/10 057   7.5.2   7.5.1   (
Chapter 7.3 - ESFAS Design Basis Analysis Parameters
Si      4/19/2010                                               Responder: TVA I&C Staff               Date:   58. Y           Closed                     Closed             RAI No. 17       TVA Letter 5/25/10                                                                                                      ML102980005 dated 6/18/10
: 37. Y Closed Closed N/A N/A 034.
4 7.5.1.
1 7.5.2
(
M a
Chapter 7.5 - Instrumentation Systems Important to Safety
: 38. Y Closed Closed N/A N/A Closed 034.
5 7.5.1.
1 7.5.2 7 6 7 r
c u
Chapter 7.6 - All Other Systems Required for Safety Plant Process Computer Replacement
: 39. Y Closed Closed N/A N/A Closed 034.
6 n
g h
Chapter 7.7 Control Systems Alternate Means for Monitoring Control or
: 40. Y Closed Closed N/A N/A 035
(
S i
2/18/2010 Responder: Clark
: 41. Y Closed Closed RAI No. 1 ML102980005 TVA Letter dated 3/12/10 LIC-110 Section 6.2.2 states:
Design features and 036 7.5.2 7.5.1
(
C February 18, 2010 Date: 5/25/10 Responder: Clark
: 42. Y Closed Closed NRC Meeting Summary NNC: Unit 2 FSAR Section 7 5 1 Post Accident Monitoring 037 7.5.1.
1 7.5.2
(
M a
2/18/2010 Responder: Clark Date: 5/25/10
: 43. Y Closed Closed 09/16/10 N/A TVA Letter dated 10/5/10 FSAR Amendment 100 provides information 038 7.5.1.
1 7.5.2
(
M a
2/18/2010 Responder: Clark Date: 5/25/10
: 44. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 The slides presented at the December 15 2010 meeting 039
(
G January 13, 2010 Responder: Clark Date:
5/25/10
: 45. Y Closed Closed EICB RAI ML102910008 FSAR amendment 98 The equation for the calculation of the estimated average hot leg 040
(
G January 13, 2010 Responder: Clark Date:
5/25/10
: 46. Y Closed Closed EICB RAI EICB RAI FSAR amendment 98 The equation for the calculation of the power fraction on page 042 All All B
(
February 25, 2010: Telecom Date: 5/25/10 Responder: Clark
: 47. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 6/18/10 The drawing provided did not have the identification numbers 044 7.5.2 7.5.1
(
C February 25, 2010 Date: 5/25/10 Responder: Clark
: 48. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 6/18/10 045
(
C February 25, 2010 Date: 5/25/10 Responder: Clark
: 49. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 7/30/10 046
(
C February 25, 2010 Date: 5/25/10 Responder: Clark
: 50. Y Closed Closed N/A - Request for help finding N/A 047 7.5.2 7.5.1
(
C 4/8/2010 Responder: WEC/Hilmes Date: 5/25/10 51. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 7/30/10 048 7.5.2 7.5.1
(
C April 8, 2010 Date: 5/25/10 Responder: WEC
: 52. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 6/18/10 049 7.5.2 7.5.1
(
C 4/8/2010 Responder: WEC Date: 5/25/10
: 53. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 6/18/10 051
(
G April 15, 2010 Date: 5/25/10 Responder: Craig/Webb
: 54. Y Closed Closed N/A N/A Review addressed by another Open Item 052 7.5.2 7.5.1
(
S i
April 19, 2010 Date: 5/25/10 Responder: Slifer
: 55. Y Closed Closed RAI No. 12 ML102980005 053 7.5.2 7.5.1
(
S i
April 19, 2010 Date: 5/25/10 Responder: Slifer
: 56. Y Closed Closed RAI No. 13 ML102980005 056
(
S i
April 19, 2010 Date: 5/25/10 Responder: Slifer
: 57. Y Closed Closed RAI No. 16 ML102980005 TVA Letter dated 6/18/10 Sorrento Radiation Monitoring 057 7.5.2 7.5.1
(
S i
4/19/2010 Responder: TVA I&C Staff Date:
5/25/10
: 58. Y Closed Closed RAI No. 17 ML102980005 TVA Letter dated 6/18/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                             radBA627.docx                                                                               Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                     RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                            Issue                                        TVA Response(s)                    Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                             Comments Sec. Sec.                                                                                                                                                                                                    Date 058   7.5.0   7.5   (
Date Comments 058 7.5.0 7.5
Si    April 19, 2010                                         Date: 5/25/10                                   59. Y         Closed                     Closed             RAI No. 18       TVA Letter Responder: Slifer                                                                                            ML102980005      dated 6/18/10 059   7.5.2   7.5.1   (
(
Si    April 19, 2010                                         Date:                                           60. Y         Closed                     Closed             RAI No. 19       TVA Letter Responder: Slifer                                                                                            ML102980005      dated 6/18/10 060   7.5.2   7.5.1   (
S i
C     April 19, 2010                                         Date: 5/25/10                                   61. Y         Closed                     Closed             N/A             N/A             Addressed by Open Item No. 47 Responder: Clark 061   7.5.2   7.5.1   (
April 19, 2010 Date: 5/25/10 Responder: Slifer
C     April 19, 2010                                         Date: 5/25/10                                   62. Y         Closed                     Closed             N/A             N/A             Addressed by Open Item No. 48 Responder: Clark 062   7.5.2   7.5.1   (
: 59. Y Closed Closed RAI No. 18 ML102980005 TVA Letter dated 6/18/10 059 7.5.2 7.5.1
C     April 19, 2010                                         Date: 5/25/10                                   63. Y         Closed                     Closed             N/A             N/A             Addressed by Open Item No. 49 Responder: Clark 063   7.5.2   7.5.1   (
(
C     April 19, 2010                                         Date: 5/25/10                                   64. Y         Closed                     Closed             N/A             N/A             Addressed by Open Item No. 50 Responder: Clark 064   7.5.2   7.5.1   (
S i
C     By letter dated March 12, 2010 TVA stated that the     Responder: Webb       Date: 4/8/2010             65. Y         Closed                     Closed             N/A - No         TVA Letter target submittal date for the D3 Analysis was April 2                                                                                                                question was    dated 10/5/10 066   7.5.2   7.5.1   (
April 19, 2010 Date:
C     By letter dated March 12, 2010 TVA stated that the     Responder: WEC                   Date: 5/25/10   66. Y         Closed                     Closed             N/A - No         TVA Letter target submittal date for the "Watts Bar 2 PAMS                                                                                                                      question was    dated 6/18/10 076   7.5.2   7.5.1   (
Responder: Slifer
C     By letter dated March 12, 2010 TVA stated that the     Responder: Clark             Date: 5/25/10     67. Y         Closed                     Closed             N/A - No         N/A target submittal date for the "Watts Bar 2 PAMS                                                                                                                      question was 077   7.5.2   7.5.1   (
: 60. Y Closed Closed RAI No. 19 ML102980005 TVA Letter dated 6/18/10 060 7.5.2 7.5.1
C     By letter dated March 12, 2010 TVA stated that the     Responder: WEC                   Date: 5/25/10   68. Y         Closed                     Closed             N/A - No         TVA Letter target submittal date for seven other documents was                                                                                                                  question was    dated 6/18/10 078                   (
(
G     4/26/2010                                               Responder: Clark                 Date: 5/25/10   69. Y         Closed                     Closed             EICB RAI         TVA Letter ML102910008      dated 10/5/10 079                   (
C April 19, 2010 Date: 5/25/10 Responder: Clark
G     4/26/2010                                               Responder: Clark                   Date: 5/25/10 70. Y         Closed                     Closed             EICB RAI         TVA Letter     Reviewed under Item 154 ML102910008      dated 10/5/10 080                   (
: 61. Y Closed Closed N/A N/A Addressed by Open Item No. 47 061 7.5.2 7.5.1
Si    4/26/2010                                               Responder: WEC                                   71. Y         Closed                     Closed             RAI No. 2       TVA Letter ML102980005      dated 7/30/10 083   7.5.2   7.5.1   (
(
C     May 6, 2010                                             Date: 6/18/10                                   72. Y         Closed                     Closed             EICB RAI         TVA Letter Responder: WEC                                                                                                ML102910002      dated 7/30/10 084   7.5.2   7.5.1 B C
C April 19, 2010 Date: 5/25/10 Responder: Clark
a(    May 6, 2010                                             Date: 6/18/10                                   73. Y         Closed                     Closed             EICB RAI         TVA Letter Responder: Clark                                                                                              ML102910002      dated 6/18/10 087   7.5.2   7.5.1   (
: 62. Y Closed Closed N/A N/A Addressed by Open Item No. 48 062 7.5.2 7.5.1
Si    May 6, 2010                                             Date: 5/24/10                                   74. Y         Closed                     Closed             RAI No. 20       TVA Letter Responder: Slifer                                                                                            ML102980005      dated 6/18/10 088   7.5.2   7.5.1   B S
(
in(    May 6, 2010                                             Date: 5/24/10                                   75. Y         Closed                     Closed             RAI No. 21       TVA Letter Responder: Slifer                                                                                            ML102980005      dated 6/18/10 089                   (
C April 19, 2010 Date: 5/25/10 Responder: Clark
C     5/6/2010                                               Responder: Clark                                 76. Y         Closed                     Closed             EICB RAI         TVA Letter     NNC: Docketed response states ML102910002      dated 3/12/10   that the applicable FSAR 090                   (
: 63. Y Closed Closed N/A N/A Addressed by Open Item No. 49 063 7.5.2 7.5.1
C     5/6/2010                                               Responder: Clark               Date: 5/25/10   77. Y         Closed                     Closed             EICB RAI         TVA Letter ML102910002      dated 3/12/10 091   7.4     7.4   (
(
D a     May 20, 2010                                           Date: 5/25/10                                   78. Y         Closed                     Closed             EICB RAI No.1   TVA Letter Responder: Clark                                                                                              ML102910017      dated 6/18/10 093                   (
C April 19, 2010 Date: 5/25/10 Responder: Clark
G     May 20, 2010                                           Date: 5/25/10                                   79. Y         Closed                     Closed             N/A             N/A             Will be reviewed under item 154 Responder: Knuettel 094                   (
: 64. Y Closed Closed N/A N/A Addressed by Open Item No. 50 064 7.5.2 7.5.1
G     5/20/2010                                               Responder: Clark                 Date: 5/25/10   80. Y         Closed                     Closed             N/A             N/A             Information was found in FSAR 095 7.8.1,     XX     (
(
D a     May 20, 2010                                           Date:                                           81. Y         Closed                     Closed             EICB RAI No. 2   TVA Letter 784                                                                            Responder:                                                                                                    ML102910017      dated 7/30/10 096 7.7.5     XX     (
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the D3 Analysis was April 2 Responder: Webb Date: 4/8/2010
D a     5/20/2010                                               Responder:                                       82. Y         Closed                     Closed             EICB RAI No.3   TVA Letter ML102910017      dated 7/30/10 097   7.4.2   7.4   (
: 65. Y Closed Closed N/A - No question was TVA Letter dated 10/5/10 066 7.5.2 7.5.1
D a     May 20, 2010                                           Date:                                           83. Y         Closed                     Closed             EICB RAI No.4   TVA Letter Responder:                                                                                                    ML102910017      dated 7/30/10 098   7.4.2   7.4   (
(
D a     May 25, 2010                                           Date:                                           84. Y         Closed                     Closed             EICB RAI No.5   TVA Letter Responder:                                                                                                    ML102910017      dated 7/30/10 099                   L B(    April 12, 2010                                         Date:                                           85. Y         Closed                     Closed                                             Closed to Item 129 Responder: WEC 100                   (
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the "Watts Bar 2 PAMS Responder: WEC Date: 5/25/10
C     5/20/2010                                               Responder: WEC                                   86. Y         Closed                     Closed             N/A - No         N/A question was 102                   (
: 66. Y Closed Closed N/A - No question was TVA Letter dated 6/18/10 076 7.5.2 7.5.1
C     May 24, 2010                                           Date: 5/24/10                                   87. Y         Closed                     Closed             N/A             TVA Letter     Request for schedule not Responder: WEC                                                                                                                dated 6/18/10   information
(
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the "Watts Bar 2 PAMS Responder: Clark Date: 5/25/10
: 67. Y Closed Closed N/A - No question was N/A 077 7.5.2 7.5.1
(
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for seven other documents was Responder: WEC Date: 5/25/10
: 68. Y Closed Closed N/A - No question was TVA Letter dated 6/18/10 078
(
G 4/26/2010 Responder: Clark Date: 5/25/10
: 69. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 079
(
G 4/26/2010 Responder: Clark Date: 5/25/10 70. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 Reviewed under Item 154 080
(
S i
4/26/2010 Responder: WEC
: 71. Y Closed Closed RAI No. 2 ML102980005 TVA Letter dated 7/30/10 083 7.5.2 7.5.1
(
C May 6, 2010 Date: 6/18/10 Responder: WEC
: 72. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 7/30/10 084 7.5.2 7.5.1 B
(
C a
May 6, 2010 Date: 6/18/10 Responder: Clark
: 73. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 6/18/10 087 7.5.2 7.5.1
(
S i
May 6, 2010 Date: 5/24/10 Responder: Slifer
: 74. Y Closed Closed RAI No. 20 ML102980005 TVA Letter dated 6/18/10 088 7.5.2 7.5.1 B
(
S in May 6, 2010 Date: 5/24/10 Responder: Slifer
: 75. Y Closed Closed RAI No. 21 ML102980005 TVA Letter dated 6/18/10 089
(
C 5/6/2010 Responder: Clark
: 76. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 3/12/10 NNC: Docketed response states that the applicable FSAR 090
(
C 5/6/2010 Responder: Clark Date: 5/25/10
: 77. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 3/12/10 091 7.4 7.4
(
D a
May 20, 2010 Date: 5/25/10 Responder: Clark
: 78. Y Closed Closed EICB RAI No.1 ML102910017 TVA Letter dated 6/18/10 093
(
G May 20, 2010 Date: 5/25/10 Responder: Knuettel
: 79. Y Closed Closed N/A N/A Will be reviewed under item 154 094
(
G 5/20/2010 Responder: Clark Date: 5/25/10
: 80. Y Closed Closed N/A N/A Information was found in FSAR 095 7.8.1, 7 8 4 XX
(
D a
May 20, 2010 Date:
Responder:
: 81. Y Closed Closed EICB RAI No. 2 ML102910017 TVA Letter dated 7/30/10 096 7.7.5 XX
(
D a
5/20/2010 Responder:
: 82. Y Closed Closed EICB RAI No.3 ML102910017 TVA Letter dated 7/30/10 097 7.4.2 7.4
(
D a
May 20, 2010 Date:
Responder:
: 83. Y Closed Closed EICB RAI No.4 ML102910017 TVA Letter dated 7/30/10 098 7.4.2 7.4
(
D a
May 25, 2010 Date:
Responder:
: 84. Y Closed Closed EICB RAI No.5 ML102910017 TVA Letter dated 7/30/10 099 L
(
B April 12, 2010 Date:
Responder: WEC
: 85. Y Closed Closed Closed to Item 129 100
(
C 5/20/2010 Responder: WEC
: 86. Y Closed Closed N/A - No question was N/A 102
(
C May 24, 2010 Date: 5/24/10 Responder: WEC
: 87. Y Closed Closed N/A TVA Letter dated 6/18/10 Request for schedule not information


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                     radBA627.docx                                                                             Open Items to be Resolved for SER Approval SE     FSAR     NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                       RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                    POC                    Issue                      TVA Response(s)                  Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                                 Comments Sec. Sec.                                                                                                                                                                            Date 103   7.4     7.4     (
Date Comments 103 7.4 7.4
D a     5/27/2010                   Responder: Ayala             Date: 5/27/10     88. Y           Closed                     Closed             EICB RAI No.1     TVA Letter       Submittal date is based on ML102910017        dated 10/29/10   current EDCR scheduled issue 104   7.4     7.4     (
(
D a     5/27/2010                   Responder: Merten             Date: 5/27/10   89. Y           Closed                     Closed             EICB RAI No.1     TVA Letter       Submittal date is based on ML102910017        dated 10/29/10   current EDCR scheduled issue 105                     (
D a
G     April 29, 2010             Date:                                         90. Y           Closed                     Closed             N/A               N/A             Will be reviewed under item 154.
5/27/2010 Responder: Ayala Date: 5/27/10
Responder: Langley 106                   B S
: 88. Y Closed Closed EICB RAI No.1 ML102910017 TVA Letter dated 10/29/10 Submittal date is based on current EDCR scheduled issue 104 7.4 7.4
in(    May 6, 2010                 Date: 5/25/10                                 91. Y           Closed                     Closed             RAI No. 9         TVA Letter Responder: Davies                                                                                              ML102980005        dated 6/18/10 107                   B S
(
in(    May 6, 2010                 Date: 5/28/10                                 92. Y           Closed                     Closed             RAI No. 22         TVA Letter Responder: Clark                                                                                              ML102980005        dated 6/18/10 108                     (
D a
G     May 6, 2010                 Date: 5/25/10                                 93. Y           Closed                     Closed             N/A               N/A             Will be reviewed under OI#154 Responder: Webb/Hilmes 109.                   (
5/27/2010 Responder: Merten Date: 5/27/10
C     5/6/2010                   Responder: N/A                                 94. Y           Closed                     Closed             N/A               N/A             Duplicate of another open Item.
: 89. Y Closed Closed EICB RAI No.1 ML102910017 TVA Letter dated 10/29/10 Submittal date is based on current EDCR scheduled issue 105
b 109. 7.8     XX     (
(
D a     5/6/2010                   Responder: N/A                                 95. Y           Closed                     Closed             N/A               N/A a
G April 29, 2010 Date:
110                    (
Responder: Langley
G     May 6, 2010                 Date:                                         96. Y           Closed                     Closed             N/A               N/A             Information was found.
: 90. Y Closed Closed N/A N/A Will be reviewed under item 154.
Responder: Clark 111                   B C
106 B
a(      May 6, 2010                 Date: 5/28/10                                 97. Y           Closed                     Closed             N/A               TVA Letter       Request to help find, not a Responder: Clark                                                                                                                  dated 6/18/10    request for information 112                   B G
(
a(      June 1, 2010               Date:                                         98. Y           Closed                     Closed             N/A               N/A             Information was received Responder: Clark 113                     (
S in May 6, 2010 Date: 5/25/10 Responder: Davies
G     6/1/2010                   Responder: Clark                               99. Y           Closed                     Closed             EICB RAI           TVA Letter ML102910008        dated 6/18/10 114   7.2     7.2     (
: 91. Y Closed Closed RAI No. 9 ML102980005 TVA Letter dated 6/18/10 107 B
G     6/1/2010                   Responder: WEC                                 100. Y           Close                       Closed             EICB RAI           TVA Letter ML102910008        dated 6/18/10 115                     (
(
C     2/25/2010                   Responder: Clark                               101. Y           Closed                     Closed             EICB RAI           TVA Letter ML102910002        dated 6/18/10 116                     (
S in May 6, 2010 Date: 5/28/10 Responder: Clark
G     6/3/2010                   Responder: WEC                                 102. Y           Closed                     Closed             EICB RAI           TVA Letter       Letter sent to Westinghouse ML102910008        dated 10/5/10   requesting the basis information 118   7.4     7.4     (
: 92. Y Closed Closed RAI No. 22 ML102980005 TVA Letter dated 6/18/10 108
D a     6/8/2010                   Responder: Merten                             103. Y           Closed                     Closed             EICB RAI No.1     TVA Letter       Submittal date is based on ML102910017        dated 10/29/10   current EDCR scheduled issue 119                     (
(
Si    June 10, 2010               Date:                                         104. Y           Closed                     Closed             RAI No. 23         TVA Letter Responder:                                                                                                    ML102980005        dated 7/30/10 120                     (
G May 6, 2010 Date: 5/25/10 Responder: Webb/Hilmes
C     5/6/2010                   Responder: Hilmes/Merten/Costley               105. Y           Closed                     Closed             EICB RAI           TVA Letter ML102910002        dated 7/30/10 121                     (
: 93. Y Closed Closed N/A N/A Will be reviewed under OI#154 109.
C     5/6/2010                   Responder: Webb/Webber                         106. Y           Closed                     Closed             EICB RAI           TVA Letter ML102980066        dated 7/30/10 122                     (
b
C     June 14, 2010               Date:                                         107. Y           Closed                     Closed             N/A - Request     N/A Responder: WEC                                                                                                for schedule not 123   7.7.3   7.4.1,   (
(
D a     6/14/2010                   Responder:                                     108. Y           Closed                     Closed             ML101720589,       TVA Letter 934                                                                                                                                                      RAIs 21 and 22     dated 7/30/10 124   7.7.5   XX     (
C 5/6/2010 Responder: N/A
D a     6/14/2010                   Responder:                                     109. Y           Closed                     Closed             ML101720589,       TVA Letter Item No 23         dated 7/30/10 125   7.7.8   7.7.1.   (
: 94. Y Closed Closed N/A N/A Duplicate of another open Item.
D a     6/14/2010                   Responder:                                     110. Y           Closed                     Closed             ML101720589,       TVA Letter 12                                                                                                                                                      Item No s 24       dated 7/30/10 126   7.8     7.8     (
109.
D a     June 14, 2010               Date:                                         111. Y           Closed                     Closed             ML101720589,       TVA Letter Responder:                                                                                                    Item No 26         dated 7/30/10 127   7.2     7.2     (
a 7.8 XX
G     6/16/2010                   Responder: WEC/Clark                           112. Y           Closed                     Closed             EICB RAI           TVA Letter ML102910008        dated 6/18/10 128   7.2     7.2     (
(
G     6/18/2010                   Responder: WEC Drake /TVA Craig               113. Y           Closed                     Closed             EICB RAI           TVA Letter     Track through SE open item ML102910008        dated 10/29/10 129                     (
D a
P o     6/12/2010                   Responder: WEC                                 114. Y           Closed                     Closed             N/A               TVA Letter dated 10/5/10 130                     (
5/6/2010 Responder: N/A
P o     6/28/2010                   Responder: Clark                               115. Y           Closed                     Closed             N/A               TVA Letter dated 10/5/10 131                     (
: 95. Y Closed Closed N/A N/A 110
P o     6/28/2010                   Responder: Clark                               116. Y           Closed                     Closed             N/A               TVA Letter dated 10/5/10
(
G May 6, 2010 Date:
Responder: Clark
: 96. Y Closed Closed N/A N/A Information was found.
111 B
(
C a
May 6, 2010 Date: 5/28/10 Responder: Clark
: 97. Y Closed Closed N/A TVA Letter dated 6/18/10 Request to help find, not a request for information 112 B
(
G a
June 1, 2010 Date:
Responder: Clark
: 98. Y Closed Closed N/A N/A Information was received 113
(
G 6/1/2010 Responder: Clark
: 99. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 6/18/10 114 7.2 7.2
(
G 6/1/2010 Responder: WEC 100. Y Close Closed EICB RAI ML102910008 TVA Letter dated 6/18/10 115
(
C 2/25/2010 Responder: Clark 101. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 6/18/10 116
(
G 6/3/2010 Responder: WEC 102. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 Letter sent to Westinghouse requesting the basis information 118 7.4 7.4
(
D a
6/8/2010 Responder: Merten 103. Y Closed Closed EICB RAI No.1 ML102910017 TVA Letter dated 10/29/10 Submittal date is based on current EDCR scheduled issue 119
(
S i
June 10, 2010 Date:
Responder:
104. Y Closed Closed RAI No. 23 ML102980005 TVA Letter dated 7/30/10 120
(
C 5/6/2010 Responder: Hilmes/Merten/Costley 105. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 7/30/10 121
(
C 5/6/2010 Responder: Webb/Webber 106. Y Closed Closed EICB RAI ML102980066 TVA Letter dated 7/30/10 122
(
C June 14, 2010 Date:
Responder: WEC 107. Y Closed Closed N/A - Request for schedule not N/A 123 7.7.3 7.4.1, 9 3 4
(
D a
6/14/2010 Responder:
108. Y Closed Closed ML101720589, RAIs 21 and 22 TVA Letter dated 7/30/10 124 7.7.5 XX
(
D a
6/14/2010 Responder:
109. Y Closed Closed ML101720589, Item No 23 TVA Letter dated 7/30/10 125 7.7.8 7.7.1.
12
(
D a
6/14/2010 Responder:
110. Y Closed Closed ML101720589, Item No s 24 TVA Letter dated 7/30/10 126 7.8 7.8
(
D a
June 14, 2010 Date:
Responder:
111. Y Closed Closed ML101720589, Item No 26 TVA Letter dated 7/30/10 127 7.2 7.2
(
G 6/16/2010 Responder: WEC/Clark 112. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 6/18/10 128 7.2 7.2
(
G 6/18/2010 Responder: WEC Drake /TVA Craig 113. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 10/29/10 Track through SE open item 129
(
P o
6/12/2010 Responder: WEC 114. Y Closed Closed N/A TVA Letter dated 10/5/10 130
(
P o
6/28/2010 Responder: Clark 115. Y Closed Closed N/A TVA Letter dated 10/5/10 131
(
P o
6/28/2010 Responder: Clark 116. Y Closed Closed N/A TVA Letter dated 10/5/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                 radBA627.docx                                                                           Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                   RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                            Issue                                            TVA Response(s)                  Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                           Comments Sec. Sec.                                                                                                                                                                                                    Date 132                   (
Date Comments 132
P o     6/28/2010                                                   Responder: Clark                             117. Y           Closed                     Closed             N/A           TVA Letter dated 10/5/10 133                   (
(
P o     6/28/2010                                                   Responder: Clark                             118. Y           Closed                     Closed                           TVA Letter dated 10/5/10 134                   (
P o
P o     6/28/2010                                                   Responder: Clark                             119. Y           Closed                     Closed                           TVA Letter dated 10/5/10 135   7.3.1   7.3.1   (
6/28/2010 Responder: Clark 117. Y Closed Closed N/A TVA Letter dated 10/5/10 133
D a     6/30/2010                                                   Responder: Clark                             120. Y           Closed                     Closed             RAI not       TVA Letter necessary      dated 10/5/10 136 7.3.2,   7.4,   (
(
D a     6/30/2010                                                   Responder: Clark                             121. Y           Closed                     Closed             RAI not       TVA Letter 74      56                                                                                                                                                                                    necessary      dated 10/5/10 137                   (
P o
C     Several WBN2 PAMS documents contain a table titled, Responder: WEC                                       122. Y           Closed                     Closed             ML101650255, TVA Letter Document Traceability & Compliance                                                                                                                                    Item No 1     dated 10/5/10 139                   (
6/28/2010 Responder: Clark 118. Y Closed Closed TVA Letter dated 10/5/10 134
C     The WBN2 PAMS System Requirements Specification Responder: WEC                                          123. Y          Closed                      Closed            ML101650255, TVA Letter        WBN2 PAMS System (WBN2 PAMS SysRS) contains a table (see page iii)                                                                                                                       Item No 3     dated 10/5/10   Requirements Specification 141                   (
(
C     Deleted by DORL                                     Date:                                               124. Y           Closed                     Closed             ML101650255,                   WBN2 PAMS System Responder:                                                                                                          Item No 5                      Requirements Specification 146                   (
P o
C     6/17/2010                                           Responder:                                           125. Y           Closed                     Closed             ML101650255,                   PAMS System Requirements Item No 10                      Specifications 147                   (
6/28/2010 Responder: Clark 119. Y Closed Closed TVA Letter dated 10/5/10 135 7.3.1 7.3.1
C     6/17/2010                                                   Responder:                                   126. Y           Closed                     Closed             ML101650255,                   PAMS System Requirements Item No 11                      Specifications 148                   (
(
C     6/17/2010                                                   Responder:                                   127. Y           Closed                     Closed             ML101650255,                   PAMS System Requirements Item No 12                      Specifications 149   7.2     7.2   (
D a
G     FSAR Section 7.1.1.2(2), Overtemperature delta T and       Responder: Tindell                           128. Y           Close                       Closed             ML101720589, TVA Letter Overpressure delta T equations have been simplified                                                                                                                      Item No 1     dated 10/5/10 150   7.2     7.2   (
6/30/2010 Responder: Clark 120. Y Closed Closed RAI not necessary TVA Letter dated 10/5/10 136 7.3.2, 7 4 7.4, 5 6
G     Many of the changes were based on the                       Responder: Clark                            129. Y          Close                      Closed            ML101720589, TVA Letter Westinghouse document N3-99-4003 Provide this                                                                             Response provided in letter                   Item No 2     dated 10/5/10 151   7.2     7.2   (
(
G     Provide the EDCR 52378 and 54504 which discusses           Responder: Clark                             130. Y           Close                       Closed             ML101720589, TVA Letter the basis for many changes to this FSAR section                                                                                                                          Item No 3     dated 10/5/10 152   7.2     7.2   (
D a
G     Deleted portion of FSAR section 7.2.3.3.4 and moved         Responder: Merten/Clark                     131. Y           Close                       Closed             ML101720589, TVA Letter to FSAR section 7 2 1 1 5 However the FSAR                                                                                                                              Item No 4     dated 10/5/10 153   7.2     7.2   (
6/30/2010 Responder: Clark 121. Y Closed Closed RAI not necessary TVA Letter dated 10/5/10 137
G     FSAR section 7.2.1.1.7 added the reference to FSAR         Responder: Craig/Webb                       132. Y           Close                       Closed             ML101720589, TVA Letter section 10 4 4 3 for exception to P-12 However                                                                                                                          Item No 5     dated 10/21/10 155   7.2     7.2   (
(
G     Summary of FSAR change document section 7.2                 Date:                                        133. Y          Closed                      Closed            ML101720589, states that sections 7 2 1 1 9 and 7 2 2 2(4) are           Responder: Stockton                                                                                         Item No 7 157   7.2     7.2   (
C Several WBN2 PAMS documents contain a table titled, Document Traceability & Compliance Responder: WEC 122. Y Closed Closed ML101650255, Item No 1 TVA Letter dated 10/5/10 139
G     FSAR section 7.2.2.1.1, fifth paragraph was deleted         Responder: Tindell                           134. Y           Close                       Closed             ML101720589, TVA Letter except for the last sentence The last sentence states                                                                                                                    Item No 9     dated 10/5/10 158   7.2     7.2   (
(
G     FSAR section 7.2.2.1.1, paragraph six was changed to       Responder: Tindell                           135. Y           Closed                     Closed             ML101720589, TVA Letter state that the design meets the requirements of                                                                                                                          Item No 10     dated 10/5/10 159   7.2     7.2   (
C The WBN2 PAMS System Requirements Specification (WBN2 PAMS SysRS) contains a table (see page iii)
G     FSAR section 7.2.2.1.2 discusses reactor coolant flow       Responder: Craig                             136. Y           Close                       closed             ML101720589, TVA Letter measurement by elbow taps However it further                                                                                                                            Item No 11     dated 10/5/10 160   7.2     7.2   (
Responder: WEC 123. Y Closed Closed ML101650255, Item No 3 TVA Letter dated 10/5/10 WBN2 PAMS System Requirements Specification 141
G     FSAR section 7.2.2.2(7) deleted text which has             Responder: Tindell                           137. Y           Close                       Closed             ML101720589, TVA Letter references 12 and 14 These references are not                                                                                                                            Item No 12     dated 10/5/10 161   7.2     7.2   (
(
G     FSAR section 7.2.2.3 states that changes to the             Responder: Clark                             138. Y           Closed                     Closed             ML101720589, TVA Letter control function description in this section are expected                                                                                                                Item No 13     dated 10/5/10 162   7.2     7.2   (
C Deleted by DORL Date:
G     FSAR section 7.2.2.2(14) states that bypass of a           Responder: Tindell                           139. Y           Closed                     Closed             ML101720589, TVA Letter protection channel during testing is indicated by an                                                                                                                    Item No 14     dated 10/5/10 163   7.2     7.2   (
Responder:
G     Deleted by DORL                                       Date:                                             140. Y           Closed                     Closed             ML101720589, Responder:                                                                                                        Item No 15 164 7.2       7.2   a r
124. Y Closed Closed ML101650255, Item No 5 WBN2 PAMS System Requirements Specification 146
gl    FSAR section 7.2.2.2(20) has been revised to include Responder: Perkins                                 141. Y           Closed                     Closed             ML101720589, TVA Letter        Item No. 8 sent to DORL 751                    the plant computer as a means to provide information                                                                                                                    Item No 16 and dated 10/5/10 165 7.2       7.2   (
(
G     FSAR section 7.2.2.3.2, last paragraph of this section Responder: Clark                                 142. Y           Closed                     Closed             ML101720589, TVA Letter has been deleted The basis for this deletion is that                                                                                                                    Item No 17     dated 10/5/10 166   7.2     7.2   (
C 6/17/2010 Responder:
G     Changes to FSAR section 7.2.2.2(20) are justified     Responder: Clark                                 143. Y           Closed                     Closed             ML101720589, TVA Letter based on the statement that the integrated computer                                                                                                                      Item No 18     dated 10/5/10 167   7.2     7.2   (
125. Y Closed Closed ML101650255, Item No 10 PAMS System Requirements Specifications 147
G     FSAR section 7.2.2.4, provide an analysis or reference Responder: Clark                                 144. Y           Close                       closed             ML101720589, TVA Letter to chapter 15 analysis which demonstrate that failure                                                                                                                    Item No 19     dated 10/5/10 168   7.2     7.2   (
(
G     FSAR table 7.2-4, item 9 deleted loss of offsite power Responder: Clark                                  145. Y          Close                      Closed            ML101720589, TVA Letter to station auxiliaries (station blackout) based on the                                                                   Response provided in letter                   Item No 20     dated 10/5/10
C 6/17/2010 Responder:
126. Y Closed Closed ML101650255, Item No 11 PAMS System Requirements Specifications 148
(
C 6/17/2010 Responder:
127. Y Closed Closed ML101650255, Item No 12 PAMS System Requirements Specifications 149 7.2 7.2
(
G FSAR Section 7.1.1.2(2), Overtemperature delta T and Overpressure delta T equations have been simplified Responder: Tindell 128. Y Close Closed ML101720589, Item No 1 TVA Letter dated 10/5/10 150 7.2 7.2
(
G Many of the changes were based on the Westinghouse document N3-99-4003 Provide this Responder: Clark 129. Y Close Response provided in letter Closed ML101720589, Item No 2 TVA Letter dated 10/5/10 151 7.2 7.2
(
G Provide the EDCR 52378 and 54504 which discusses the basis for many changes to this FSAR section Responder: Clark 130. Y Close Closed ML101720589, Item No 3 TVA Letter dated 10/5/10 152 7.2 7.2
(
G Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR section 7 2 1 1 5 However the FSAR Responder: Merten/Clark 131. Y Close Closed ML101720589, Item No 4 TVA Letter dated 10/5/10 153 7.2 7.2
(
G FSAR section 7.2.1.1.7 added the reference to FSAR section 10 4 4 3 for exception to P-12 However Responder: Craig/Webb 132. Y Close Closed ML101720589, Item No 5 TVA Letter dated 10/21/10 155 7.2 7.2
(
G Summary of FSAR change document section 7.2 states that sections 7 2 1 1 9 and 7 2 2 2(4) are Date:
Responder: Stockton 133. Y Closed Closed ML101720589, Item No 7 157 7.2 7.2
(
G FSAR section 7.2.2.1.1, fifth paragraph was deleted except for the last sentence The last sentence states Responder: Tindell 134. Y Close Closed ML101720589, Item No 9 TVA Letter dated 10/5/10 158 7.2 7.2
(
G FSAR section 7.2.2.1.1, paragraph six was changed to state that the design meets the requirements of Responder: Tindell 135. Y Closed Closed ML101720589, Item No 10 TVA Letter dated 10/5/10 159 7.2 7.2
(
G FSAR section 7.2.2.1.2 discusses reactor coolant flow measurement by elbow taps However it further Responder: Craig 136. Y Close closed ML101720589, Item No 11 TVA Letter dated 10/5/10 160 7.2 7.2
(
G FSAR section 7.2.2.2(7) deleted text which has references 12 and 14 These references are not Responder: Tindell 137. Y Close Closed ML101720589, Item No 12 TVA Letter dated 10/5/10 161 7.2 7.2
(
G FSAR section 7.2.2.3 states that changes to the control function description in this section are expected Responder: Clark 138. Y Closed Closed ML101720589, Item No 13 TVA Letter dated 10/5/10 162 7.2 7.2
(
G FSAR section 7.2.2.2(14) states that bypass of a protection channel during testing is indicated by an Responder: Tindell 139. Y Closed Closed ML101720589, Item No 14 TVA Letter dated 10/5/10 163 7.2 7.2
(
G Deleted by DORL Date:
Responder:
140. Y Closed Closed ML101720589, Item No 15 164 7.2 7 5 1 7.2 a
r g
l FSAR section 7.2.2.2(20) has been revised to include the plant computer as a means to provide information Responder: Perkins 141. Y Closed Closed ML101720589, Item No 16 and TVA Letter dated 10/5/10 Item No. 8 sent to DORL 165 7.2 7.2
(
G FSAR section 7.2.2.3.2, last paragraph of this section has been deleted The basis for this deletion is that Responder: Clark 142. Y Closed Closed ML101720589, Item No 17 TVA Letter dated 10/5/10 166 7.2 7.2
(
G Changes to FSAR section 7.2.2.2(20) are justified based on the statement that the integrated computer Responder: Clark 143. Y Closed Closed ML101720589, Item No 18 TVA Letter dated 10/5/10 167 7.2 7.2
(
G FSAR section 7.2.2.4, provide an analysis or reference to chapter 15 analysis which demonstrate that failure Responder: Clark 144. Y Close closed ML101720589, Item No 19 TVA Letter dated 10/5/10 168 7.2 7.2
(
G FSAR table 7.2-4, item 9 deleted loss of offsite power to station auxiliaries (station blackout) based on the Responder: Clark 145. Y Close Response provided in letter Closed ML101720589, Item No 20 TVA Letter dated 10/5/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                               radBA627.docx                                                                             Open Items to be Resolved for SER Approval SE     FSAR     NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                     RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                    POC                          Issue                                          TVA Response(s)                  Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                             Comments Sec. Sec.                                                                                                                                                                                                    Date 169                   (
Date Comments 169
G     6/18/2010                                               Responder: Clark                             146. Y           Closed                     Closed 170                   (
(
G     6/17/2010                                               Responder: Clark                             147. Y           Closed                     Closed 171   7.2     7.2     (
G 6/18/2010 Responder: Clark 146. Y Closed Closed 170
G     6/17/2010                                               Responder: Craig                             148. Y           Closed                     Closed             EICB RAI         TVA Letter     Closed to SE Open Item ML102910008      dated 10/21/10 172                   (
(
G     6/17/2010                                               Responder: Craig                             149. Y           Closed                     Closed             EICB RAI ML102910008 173   7.1     7.1     (
G 6/17/2010 Responder: Clark 147. Y Closed Closed 171 7.2 7.2
G     6/17/2010                                               Responder: Craig/Webb/Powers                 150. Y           Closed                     Closed             EICB RAI ML102910008 174                   (
(
G     6/28/2010                                               Responder: Hilmes/Craig                     151. Y           Closed                     Closed             EICB RAI ML102910008 175                   (
G 6/17/2010 Responder: Craig 148. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 10/21/10 Closed to SE Open Item 172
G     June 28, 2010                                           Responder:                                   152. Y           Closed                     Closed             EICB RAI ML102910008 176   7.1     7.1     (
(
G     6/28/2010                                               Responder: Craig/Webb                       153. Y           Closed                     Closed             EICB RAI ML102910008 177 7.5.2. 7.5.1   (
G 6/17/2010 Responder: Craig 149. Y Closed Closed EICB RAI ML102910008 173 7.1 7.1
M a     7/15/2010                                               Responder: Clark                             154. Y           Closed                     Closed             N/A             TVA Letter       RAI not required 1                                                                                                                                                                                                          dated 10/5/10 178 7.5.2. 7.5.1   (
(
M a     7/15/2010                                               Responder: Clark                             155. Y           Closed                     Closed             N/A             TVA Letter       RAI not required 1                                                                                                                                                                                                          dated 10/5/10 179                   (
G 6/17/2010 Responder: Craig/Webb/Powers 150. Y Closed Closed EICB RAI ML102910008 174
C     An emphasis is placed on traceability in System         Responder: WEC                               156. Y           Closed                     Closed             N/A - Closed to NA Requirements Specifications in the SRP in the                                                                                                                        Item No 142 180                   (
(
C     The SRP, BTP 7-14, Section B.3.3.1 states that         Responder: WEC                               157. Y           Closed                     Closed             N/A - Closed to NA Regulatory Guide 1 172 endorses with a few noted                                                                                                                    Item No 142 181                   (
G 6/28/2010 Responder: Hilmes/Craig 151. Y Closed Closed EICB RAI ML102910008 175
C     An emphasis is placed on traceability in System         Responder: WEC                               158. Y           Closed                     Closed             N/A - Closed to NA Requirements Specifications in the SRP in the                                                                                                                        Item No 142 182                   (
(
C     Characteristics that the SRP states that a Software     Responder: WEC                               159. Y           Closed                     Closed             N/A - Closed to NA Requirements Specifications should have include                                                                                                                      Item No 142 184                   (
G June 28, 2010 Responder:
C     7/15/2010                                               Responder: WEC                               160. Y           Closed                     Closed             N/A - Closed to N/A Item No 142 186   7.7.8   7.7.1.   (
152. Y Closed Closed EICB RAI ML102910008 176 7.1 7.1
D a     7/15/2010                                               Responder: Perkins/Clark                     161. Y           Closed                     Closed             EICB RAI No.6 TVA Letter 12                                                                                                                                                                                ML102910017 dated 10/5/10 188                   (
(
C     By letter dated June 30, 2010, TVA docketed,           Responder: Clark                             162. Y           Closed                     Closed             ML101970033, TVA Letter Tennessee Valley Authority (TVA) Watts Bar Unit 2                                                                                                                  Item No 3 & 4 dated 10/5/10 189           7.6.7   (
G 6/28/2010 Responder: Craig/Webb 153. Y Closed Closed EICB RAI ML102910008 177 7.5.2.
Si    7/20/2010                                               Responder: Clark                             163. Y           Closed                     Closed             RAI No. 3       TVA Letter ML102980005 dated 10/5/10 190   7.9             (
1 7.5.1
Si    FSAR Table 7.1-1 states: Regulatory Guide 1.133,       Responder: Clark                             164. Y           Closed                     Closed             RAI No. 4       TVA Letter       Closed to OI-331.
(
May 1981 Loose-Part Detection Program for the                                                                                                                      ML102980005 dated 10/5/10 191   7.9             (
M a
C     NUREG-0800 Chapter 7, Section 7.9, "Data               Responder: Jimmie Perkins                   165. Y           Closed                     Closed             ML10197016,     TVA Letter Communication Systems" contains review criteria for                                                                                                                  Item Nos 1-3   dated 10/5/10 192 7.5.1. 7.5.2   (
7/15/2010 Responder: Clark 154. Y Closed Closed N/A TVA Letter dated 10/5/10 RAI not required 178 7.5.2.
M a     The NRC Staff is using SRP (NUREG-0800) Chapter 7       Responder: Clark                             166. Y           Closed                     Closed             Item No. 1 sent TVA Letter       EICB RAI ML1028618855 sent 1                      Section 7 5 Instrumentation Systems Important to                                                                                                                    to DORL        dated 10/5/10     to DORL 193 7.5.1. 7.5.2   (
1 7.5.1
M a     The WBU2 FSAR, Section 7.5.2, Plant Computer           Responder: Clark                             167. Y           Closed                     Closed             Item No. 2 sent TVA Letter       EICB RAI ML1028618855 sent 1                      System  contains three subsections                                                                                                                                  to DORL        dated 10/5/10     to DORL 194 7.5.1. 7.5.2.   (
(
M a     The WBU2 FSAR Section 7.5.2.1, Safety Parameter       Responder: Costley/Norman                   168. Y           Closed                     Closed             Item No. 3 sent TVA Letter       EICB RAI ML1028618855 sent 11        1            Display System  contains a description of the Safety                                                                                                                to DORL        dated 10/5/10     to DORL 195 7.5.1. 7.5.2.   (
M a
M a     Bypassed and Inoperable Status Indication (BISI)       Responder: Costley/Norman                   169. Y           Closed                     Closed             Item No. 4 sent TVA Letter       EICB RAI ML1028618855 sent 12        2                                                                                                                                                                                to DORL        dated 10/5/10     to DORL 196 7.5.1. 7.5.2.   (
7/15/2010 Responder: Clark 155. Y Closed Closed N/A TVA Letter dated 10/5/10 RAI not required 179
M a     Bypassed and Inoperable Status Indication (BISI)       Responder: Costley/Norman                   170. Y           Closed                     Closed             Item No. 5 sent TVA Letter       EICB RAI ML1028618855 sent 12        2                                                                                                                                                                                to DORL        dated 10/5/10     to DORL 197                   X     Open Item 197 was never issued.                                                                     171. Y           Closed                     Closed 198 7.5.1. 7.5.2.   (
(
M a     SRP Section 7.5, Subsection III, Review Procedures Responder: Costley/Norman                       172. Y           Closed                     Closed             Item No. 6 sent   TVA Letter     EICB RAI ML1028618855 sent 12        2            states: Recommended review emphasis for BISI                                                                                                                        to DORL          dated 10/5/10   to DORL 199 7.5.1. 7.5.2.   (
C An emphasis is placed on traceability in System Requirements Specifications in the SRP in the Responder: WEC 156. Y Closed Closed N/A - Closed to Item No 142 NA 180
M a     The WBU2 FSAR Section 7.5.2.3, Technical Support Responder: Costley/Norman                         173. Y           Closed                     Closed             Item No. 7 sent   TVA Letter     Related SE Section 7.5.5.3 EICB 13        3            Center and Nuclear Data Links  contains a description                                                                                                              to DORL          dated 10/5/10  RAI ML1028618855 sent to 203 7.5.1. 7.5.2   (
(
M a     7/26/2010                                             Responder: Clark                             174. Y           Closed                     Closed             EICB RAI         TVA Letter     EICB RAI ML102861885 sent to 1                                                                                                                                                                                          ML102861885      dated 10/5/10   DORL
C The SRP, BTP 7-14, Section B.3.3.1 states that Regulatory Guide 1 172 endorses with a few noted Responder: WEC 157. Y Closed Closed N/A - Closed to Item No 142 NA 181
(
C An emphasis is placed on traceability in System Requirements Specifications in the SRP in the Responder: WEC 158. Y Closed Closed N/A - Closed to Item No 142 NA 182
(
C Characteristics that the SRP states that a Software Requirements Specifications should have include Responder: WEC 159. Y Closed Closed N/A - Closed to Item No 142 NA 184
(
C 7/15/2010 Responder: WEC 160. Y Closed Closed N/A - Closed to Item No 142 N/A 186 7.7.8 7.7.1.
12
(
D a
7/15/2010 Responder: Perkins/Clark 161. Y Closed Closed EICB RAI No.6 ML102910017 TVA Letter dated 10/5/10 188
(
C By {{letter dated|date=June 30, 2010|text=letter dated June 30, 2010}}, TVA docketed, Tennessee Valley Authority (TVA) Watts Bar Unit 2 Responder: Clark 162. Y Closed Closed ML101970033, Item No 3 & 4 TVA Letter dated 10/5/10 189 7.6.7
(
S i
7/20/2010 Responder: Clark 163. Y Closed Closed RAI No. 3 ML102980005 TVA Letter dated 10/5/10 190 7.9
(
S i
FSAR Table 7.1-1 states: Regulatory Guide 1.133, May 1981 Loose-Part Detection Program for the Responder: Clark 164. Y Closed Closed RAI No. 4 ML102980005 TVA Letter dated 10/5/10 Closed to OI-331.
191 7.9
(
C NUREG-0800 Chapter 7, Section 7.9, "Data Communication Systems" contains review criteria for Responder: Jimmie Perkins 165. Y Closed Closed ML10197016, Item Nos 1-3 TVA Letter dated 10/5/10 192 7.5.1.
1 7.5.2
(
M a
The NRC Staff is using SRP (NUREG-0800) Chapter 7 Section 7 5 Instrumentation Systems Important to Responder: Clark 166. Y Closed Closed Item No. 1 sent to DORL TVA Letter dated 10/5/10 EICB RAI ML1028618855 sent to DORL 193 7.5.1.
1 7.5.2
(
M a
The WBU2 FSAR, Section 7.5.2, Plant Computer System contains three subsections Responder: Clark 167. Y Closed Closed Item No. 2 sent to DORL TVA Letter dated 10/5/10 EICB RAI ML1028618855 sent to DORL 194 7.5.1.
1 1 7.5.2.
1
(
M a
The WBU2 FSAR Section 7.5.2.1, Safety Parameter Display System contains a description of the Safety Responder: Costley/Norman 168. Y Closed Closed Item No. 3 sent to DORL TVA Letter dated 10/5/10 EICB RAI ML1028618855 sent to DORL 195 7.5.1.
1 2 7.5.2.
2
(
M a
Bypassed and Inoperable Status Indication (BISI)
Responder: Costley/Norman 169. Y Closed Closed Item No. 4 sent to DORL TVA Letter dated 10/5/10 EICB RAI ML1028618855 sent to DORL 196 7.5.1.
1 2 7.5.2.
2
(
M a
Bypassed and Inoperable Status Indication (BISI)
Responder: Costley/Norman 170. Y Closed Closed Item No. 5 sent to DORL TVA Letter dated 10/5/10 EICB RAI ML1028618855 sent to DORL 197 X
Open Item 197 was never issued.
171. Y Closed Closed 198 7.5.1.
1 2 7.5.2.
2
(
M a
SRP Section 7.5, Subsection III, Review Procedures states: Recommended review emphasis for BISI Responder: Costley/Norman 172. Y Closed Closed Item No. 6 sent to DORL TVA Letter dated 10/5/10 EICB RAI ML1028618855 sent to DORL 199 7.5.1.
1 3 7.5.2.
3
(
M a
The WBU2 FSAR Section 7.5.2.3, Technical Support Center and Nuclear Data Links contains a description Responder: Costley/Norman 173. Y Closed Closed Item No. 7 sent to DORL TVA Letter dated 10/5/10 Related SE Section 7.5.5.3 EICB RAI ML1028618855 sent to 203 7.5.1.
1 7.5.2
(
M a
7/26/2010 Responder: Clark 174. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                   radBA627.docx                                                                             Open Items to be Resolved for SER Approval SE     FSAR     NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                     RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                    Issue                      TVA Response(s)                  Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                               Comments Sec. Sec.                                                                                                                                                                          Date 204 7.5.1. 7.5.2   (
Date Comments 204 7.5.1.
M a     7/26/2010                     Responder: Costley/Norman                   175. Y           Closed                     Closed             EICB RAI         TVA Letter     EICB RAI ML102861885 sent to 1                                                                                                                                            NRC to issue      ML102861885      dated 10/5/10   DORL 205                   (
1 7.5.2
G     7/26/2010                     Responder: Clark                           176. Y           Closed                     Closed             EICB RAI         TVA Letter     Question B related to prior NRC ML102910008      dated 10/5/10  approval of this system or 50 59 206 7.5.1. 7.5.2   (
(
M a     7/27/2010                     Responder: Clark                           177. Y           Closed                     Closed             EICB RAI         TVA Letter     EICB RAI ML102861885 sent to 1                                                                                                                                                              ML102861885      dated 10/5/10   DORL 207                   (
M a
C     July 27, 2010                 Date:                                       178. Y           Closed                     Closed Responder:
7/26/2010 Responder: Costley/Norman 175. Y Closed Closed NRC to issue EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 205
208 7.5.2. 7.5.1   (
(
M a     7/27/2010                     Responder: Clark                           179. Y           Closed                     Closed             EICB RAI         TVA Letter     EICB RAI ML102861885 sent to 1                                                                                                                                                              ML102861885      dated 10/5/10   DORL 209 7.5.2. 7.5.1   (
G 7/26/2010 Responder: Clark 176. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 Question B related to prior NRC approval of this system or 50 59 206 7.5.1.
M a     7/27/2010                     Responder: Clark                           180. Y           Closed                     Closed             EICB RAI         TVA Letter     EICB RAI ML102861885 sent to 1                                                                                                                                                              ML102861885      dated 10/5/10   DORL 210 7.5.2. 7.5.1   (
1 7.5.2
M a     7/27/2010                     Responder: Clark                           181. Y           Closed                     Closed             EICB RAI         TVA Letter     EICB RAI ML102861885 sent to 1                                                                                                                                                              ML102861885      dated 10/5/10   DORL 215                   (
(
P o     7/29/2010                     Responder: WEC                             182. Y           Closed                     Closed 216 7.5.1. 7.5.2   (
M a
M a     7/29/2010                     Responder: Clark                           183. Y           Closed                     Closed             EICB RAI         TVA Letter     EICB RAI ML102861885 sent to 1                                                                                                                                                              ML102861885      dated 10/5/10   DORL 217                   (
7/27/2010 Responder: Clark 177. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 207
G     7/6/2010                     Responder: Clark                           184. Y           Close                       Closed             EICB RAI         TVA Letter ML102910008      dated 7/30/10 218                   (
(
G     7/6/2010                     Responder: Clark                           185. Y           Closed                     Closed             EICB RAI         TVA Letter ML102910008      dated 7/30/10 219                   (
C July 27, 2010 Date:
G     8/4/2010                     Responder: TVA Licensing                   186. Y           Closed                     Closed             EICB RAI ML102910008 220                   (
Responder:
G     8/4/2010                     Responder: Ayala                           187. Y           Closed                     Closed             EICB RAI         TVA Letter ML102910008      dated 10/5/10 221 7.7.1. 7.7.1.   (
178. Y Closed Closed 208 7.5.2.
M a     8/4/2010                     Responder: Trelease                         188. Y           Closed                     Closed             EICB RAI         TVA Letter     EICB RAI ML102861885 sent to 2        3                                                                                                                                                      ML102861885      dated 10/5/10   DORL 222                   (
1 7.5.1
G     8/4/2010                     Responder: Clark                           189. Y           Close                       Closed             EICB RAI         TVA Letter ML102910008      dated 10/5/10 223                   (
(
G     8/4/2010                     Responder: Clark                           190. Y           Closed                     Closed             EICB RAI ML102910008 224 7.5.1. 7.5.2   (
M a
M a     8/4/2010                     Responder: Norman (TVA CEG)                 191. Y           Closed                     Closed             EICB RAI         TVA Letter     EICB RAI ML102861885 sent to 1                                                                                                                                                              ML102861885      dated 10/5/10   DORL 225                   (
7/27/2010 Responder: Clark 179. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 209 7.5.2.
G     8/4/2010                     Responder: Scansen                         192. Y           Close                       Closed             EICB RAI         TVA Letter ML102910008      dated 10/5/10 226                   (
1 7.5.1
C     8/4/2010                     Responder: TVA Licensing                   193. Y           Closed                     Closed             N/A -             TVA Letter     See also Open Item Nos. 41 &
(
Information      dated 8/11/10  270 227                   (
M a
G     8/4/2010                     Responder: Clark                           194. Y           Close                       Closed             EICB RAI         TVA Letter ML102910008      dated 10/5/10 228                   (
7/27/2010 Responder: Clark 180. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 210 7.5.2.
C     8/4/2010                     Responder: Clark                           195. Y           Closed                     Closed             EICB RAI         TVA Letter ML102980066      dated 10/5/10 229                   (
1 7.5.1
C     8/4/2010                     Responder: Clark                           196. Y           Closed                     Closed             EICB RAI         TVA Letter ML102980066      dated 10/5/10 230                   (
(
C     8/4/2010                     Responder: Webb                             197. Y           Closed                     Closed             EICB RAI         TVA Letter ML102980066      dated 10/5/10 231                   (
M a
G     8/4/2010                     Responder: Clark                           198. Y           Closed                     Closed             EICB RAI         TVA Letter ML102910008      dated 10/5/10 232                   (
7/27/2010 Responder: Clark 181. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 215
Si    8/4/2010                     Responder: Clark                           199. Y           Closed                     Closed             RAI No. 5         TVA Letter ML102980005      dated 10/5/10 233                   (
(
C     8/4/2010                     Responder: Clark                           200. Y           Closed                     Closed             EICB RAI         TVA Letter ML102980066      dated 10/5/10 234                   (
P o
C     8/4/2010                     Responder:                                 201. Y           Closed                     Closed             N/A - Duplicate   N/A Item 235                   (
7/29/2010 Responder: WEC 182. Y Closed Closed 216 7.5.1.
G     8/4/2010                     Responder: TVA Licensing                   202. Y           Closed                     Closed             N/A               N/A 236                   (
1 7.5.2
G     8/4/2010                     Responder: Clark                           203. Y           Close                       Closed             EICB RAI         TVA Letter ML102910008      dated 10/5/10
(
M a
7/29/2010 Responder: Clark 183. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 217
(
G 7/6/2010 Responder: Clark 184. Y Close Closed EICB RAI ML102910008 TVA Letter dated 7/30/10 218
(
G 7/6/2010 Responder: Clark 185. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 7/30/10 219
(
G 8/4/2010 Responder: TVA Licensing 186. Y Closed Closed EICB RAI ML102910008 220
(
G 8/4/2010 Responder: Ayala 187. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 221 7.7.1.
2 7.7.1.
3
(
M a
8/4/2010 Responder: Trelease 188. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 222
(
G 8/4/2010 Responder: Clark 189. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 223
(
G 8/4/2010 Responder: Clark 190. Y Closed Closed EICB RAI ML102910008 224 7.5.1.
1 7.5.2
(
M a
8/4/2010 Responder: Norman (TVA CEG) 191. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 225
(
G 8/4/2010 Responder: Scansen 192. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 226
(
C 8/4/2010 Responder: TVA Licensing 193. Y Closed Closed N/A -
Information TVA Letter dated 8/11/10 See also Open Item Nos. 41 &
270 227
(
G 8/4/2010 Responder: Clark 194. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 228
(
C 8/4/2010 Responder: Clark 195. Y Closed Closed EICB RAI ML102980066 TVA Letter dated 10/5/10 229
(
C 8/4/2010 Responder: Clark 196. Y Closed Closed EICB RAI ML102980066 TVA Letter dated 10/5/10 230
(
C 8/4/2010 Responder: Webb 197. Y Closed Closed EICB RAI ML102980066 TVA Letter dated 10/5/10 231
(
G 8/4/2010 Responder: Clark 198. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 232
(
S i
8/4/2010 Responder: Clark 199. Y Closed Closed RAI No. 5 ML102980005 TVA Letter dated 10/5/10 233
(
C 8/4/2010 Responder: Clark 200. Y Closed Closed EICB RAI ML102980066 TVA Letter dated 10/5/10 234
(
C 8/4/2010 Responder:
201. Y Closed Closed N/A - Duplicate Item N/A 235
(
G 8/4/2010 Responder: TVA Licensing 202. Y Closed Closed N/A N/A 236
(
G 8/4/2010 Responder: Clark 203. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/5/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                       radBA627.docx                                                                             Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                       RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                        Issue                                      TVA Response(s)                  Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                               Comments Sec. Sec.                                                                                                                                                                                              Date 237                   (
Date Comments 237
C     8/4/2010                                         Responder: Clark                             204. Y           Closed                     Closed             EICB RAI           TVA Letter ML102980066        dated 10/5/10 238                   (
(
C     8/4/2010                                         Responder: Webb/Hilmes                       205. Y           Closed                     Closed             N/A - Duplicate   N/A Item 239                   (
C 8/4/2010 Responder: Clark 204. Y Closed Closed EICB RAI ML102980066 TVA Letter dated 10/5/10 238
C     8/4/2010                                         Responder: Hilmes                           206. Y           Closed                     Closed             N/A - Meeting     N/A request 240                   (
(
G     8/4/2010                                         Responder: Clark                             207. Y           Close                       Closed             Ml102910008       TVA Letter Item#29           dated 10/5/10 241                   (
C 8/4/2010 Responder: Webb/Hilmes 205. Y Closed Closed N/A - Duplicate Item N/A 239
Si    8/4/2010                                         Responder: Davies                           208. Y           Closed                     Closed             RAI No. 10         TVA Letter ML102980005        dated 10/5/10 242                   (
(
G     8/4/2010                                         Responder: Hilmes                           209. Y           Close                       Closed             EICB RAI           TVA Letter ML102910008        dated 10/5/10 243                   (
C 8/4/2010 Responder: Hilmes 206. Y Closed Closed N/A - Meeting request N/A 240
C     8/3/2010                                         Responder: WEC                               210. Y           Closed                     Closed             N/A - Closed to   N/A Item No 142 249                   (
(
C     8/8/2010                                         Responder: WEC                               211. Y           Closed                     Closed                                                 LIC-101 Rev. 3 Appendix B Section 4 "Safety Evaluation" 253                   (
G 8/4/2010 Responder: Clark 207. Y Close Closed Ml102910008 Item#29 TVA Letter dated 10/5/10 241
C     8/8/2010                                         Responder: Clark                             212. Y           Closed                     Closed                               TVA Letter       Related to Open Item no. 83.
(
dated 10/5/10 254                   (
S i
C     8/10/2010                                         Responder: WEC                               213. Y           Closed                     Closed             N/A - Request     TVA Letter to make            dated 10/21/10 255                   (
8/4/2010 Responder: Davies 208. Y Closed Closed RAI No. 10 ML102980005 TVA Letter dated 10/5/10 242
C     8/10/2010                                         Responder: WEC                               214. Y           Closed                     Closed             N/A - Request     TVA Letter to make            dated 10/21/10 256                   (
(
C     8/10/2010                                         Responder: WEC                               215. Y           Closed                     Closed             N/A - Request     TVA Letter to make            dated 10/21/10 257                   (
G 8/4/2010 Responder: Hilmes 209. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 243
C     8/10/2010                                         Responder: WEC                               216. Y           Closed                     Closed             N/A - Request     N/A to make 258                   (
(
C     8/10/2010                                         Responder: WEC                               217. Y           Closed                     Closed             N/A - Request     N/A to make 259                   (
C 8/3/2010 Responder: WEC 210. Y Closed Closed N/A - Closed to Item No 142 N/A 249
C     8/10/2010                                         Responder: WEC                               218. Y           Closed                     Closed             N/A - Request     TVA Letter to make            dated 10/21/10 260                   (
(
C     8/10/2010                                         Responder: WEC                               219. Y           Closed                     Closed             N/A - Request     N/A to make 261                   (
C 8/8/2010 Responder: WEC 211. Y Closed Closed LIC-101 Rev. 3 Appendix B Section 4 "Safety Evaluation" 253
C     8/10/2010                                         Responder: WEC                               220. Y           Closed                     Closed             N/A - Closed to   TVA Letter       LIC-110 Rev. 1 Section 6.2.2 Item No 142        dated 8/20/10    states: "Design features and 262                   (
(
C     8/10/2010                                         Responder: WEC                               221. Y           Closed                     Closed             N/A - Request     N/A to make 263                   (
C 8/8/2010 Responder: Clark 212. Y Closed Closed TVA Letter dated 10/5/10 Related to Open Item no. 83.
C     8/11/2010                                           Responder: WEC                           222. Y           Closed                     Closed             ML101650255, Based on an examination of document available at the                                                                                                          Item No 2 264                   (
254
C     8/11/2010                                           Responder: WEC                           223. Y           Closed                     Closed             ML101650255, Item No 2 265                   (
(
C     8/11/2010                                         Responder: WEC                               224. Y           Closed                     Closed             ML101650255, Item No 2 269                   (
C 8/10/2010 Responder: WEC 213. Y Closed Closed N/A - Request to make TVA Letter dated 10/21/10 255
P o     8/20/2010                                         Responder: NRC                               225. Y           Closed                     Closed             N/A               N/A 270                   (
(
C     8/23/2010                                         Responder: Clark                             226. Y           Closed                     Closed                                                 See also Open Item Nod. 41 &
C 8/10/2010 Responder: WEC 214. Y Closed Closed N/A - Request to make TVA Letter dated 10/21/10 256
245 271                   (
(
C     8/23/2010                                         Responder: WEC                               227. Y           Closed                     Closed             N/A - Closed to   NA Item No 142 272 7.5.2. 7.5.1   (
C 8/10/2010 Responder: WEC 215. Y Closed Closed N/A - Request to make TVA Letter dated 10/21/10 257
M a     8/26/2010                                         Responder: Clark                             228. Y           Closed                     Closed             EICB RAI           TVA Letter       EICB RAI ML102861885 sent to 1                                                                                                                                                                                  ML102861885        dated 10/21/10   DORL 273 7.5.2. 7.5.1   (
(
M a     8/26/2010                                         Responder: Clark                             229. Y           Closed                     Closed             EICB RAI           TVA Letter       EICB RAI ML102861885 sent to 1                                                                                                                                                                                  ML102861885        dated 10/5/10   DORL 274. 7.5.2. 7.5.1   (
C 8/10/2010 Responder: WEC 216. Y Closed Closed N/A - Request to make N/A 258
M a     8/26/2010                                         Responder: Clark                             230. Y           Closed                     Closed             EICB RAI           TVA Letter       EICB RAI ML102861885 sent to a    1                                                                                                                                                                                  ML102861885        dated 10/21/10   DORL 275                   (
(
Si    8/27/2010                                         Responder: Clark                             231. Y           Closed                     Closed             Not Required       N/A Answer exists in 277   7.6     7.6.3   (
C 8/10/2010 Responder: WEC 217. Y Closed Closed N/A - Request to make N/A 259
G     8/27/2010                                         Responder: Clark                             232. Y           Close                       Closed             EICB RAI           TVA Letter ML102910008        dated 10/29/10
(
C 8/10/2010 Responder: WEC 218. Y Closed Closed N/A - Request to make TVA Letter dated 10/21/10 260
(
C 8/10/2010 Responder: WEC 219. Y Closed Closed N/A - Request to make N/A 261
(
C 8/10/2010 Responder: WEC 220. Y Closed Closed N/A - Closed to Item No 142 TVA Letter dated 8/20/10 LIC-110 Rev. 1 Section 6.2.2 states: "Design features and 262
(
C 8/10/2010 Responder: WEC 221. Y Closed Closed N/A - Request to make N/A 263
(
C 8/11/2010 Based on an examination of document available at the Responder: WEC 222. Y Closed Closed ML101650255, Item No 2 264
(
C 8/11/2010 Responder: WEC 223. Y Closed Closed ML101650255, Item No 2 265
(
C 8/11/2010 Responder: WEC 224. Y Closed Closed ML101650255, Item No 2 269
(
P o
8/20/2010 Responder: NRC 225. Y Closed Closed N/A N/A 270
(
C 8/23/2010 Responder: Clark 226. Y Closed Closed See also Open Item Nod. 41 &
245 271
(
C 8/23/2010 Responder: WEC 227. Y Closed Closed N/A - Closed to Item No 142 NA 272 7.5.2.
1 7.5.1
(
M a
8/26/2010 Responder: Clark 228. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/21/10 EICB RAI ML102861885 sent to DORL 273 7.5.2.
1 7.5.1
(
M a
8/26/2010 Responder: Clark 229. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 274.
a 7.5.2.
1 7.5.1
(
M a
8/26/2010 Responder: Clark 230. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/21/10 EICB RAI ML102861885 sent to DORL 275
(
S i
8/27/2010 Responder: Clark 231. Y Closed Closed Not Required Answer exists in N/A 277 7.6 7.6.3
(
G 8/27/2010 Responder: Clark 232. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/29/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                 radBA627.docx                                                                             Open Items to be Resolved for SER Approval SE     FSAR     NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                     RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                    POC                          Issue                                            TVA Response(s)                  Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                               Comments Sec. Sec.                                                                                                                                                                                                      Date 278   7.6    7.6.6    (
Date Comments 278 7.6 7.6.6
G    8/27/2010                                                Responder: Trelease                          233. Y          Close                      Closed            EICB RAI        TVA Letter ML102910008      dated 10/21/10 279  7.6    7.6.6    (
G    8/27/2010                                                Responder: Mather                            234. Y          Close                      Closed            EICB RAI        TVA Letter ML102910008      dated 10/21/10 280  7.6    7.6.6    (
G    8/27/2010                                                Responder: Trelease                          235. Y          Close                      Closed            EICB RAI        TVA Letter ML102910008      dated 10/21/10 282  7.6     7.6.9    (
G    8/27/2010                                                Responder: Trelease                          236. Y          Close                      Closed            EICB RAI        TVA Letter Response is acceptable                        ML102910008      dated 10/21/10 283  7.7.5    XX      (
D a    8/27/2010                                                Responder: Clark                            237. Y          Closed                      Closed            EICB RAI No.13  TVA Letter      This item is a follow-up question ML102910017      dated 10/29/10  to item 96 284  7.7.3  7.4.1    (
D a    8/27/2010                                                Responder: Webber                            238. Y          Closed                      Closed            EICB RAI No.14  TVA Letter      This item is a follow-up question ML102910017      dated 10/21/10  to item 123 285  7.3.3    7.3    (
D a    8/27/2010                                                Responder: McNeil                            239. Y          Closed                      Closed            EICB RAI No.15  TVA Letter      This item is a follow-up question ML102910017      dated 10/29/10  to item 22 286  7.7.3  9.3.4.  (
D a    8/27/2010                                                Responder: Webber                            240. Y          Closed                      Closed            EICB RAI No.16  TVA Letter 24                                                                                                                                                                                  ML102910017      dated 10/21/10 290            7.7    (
C    9/7/2010                                                  Responder: Clark                            241. Y          Closed                      Closed            N/A              N/A              This item is a duplicate of item 291 292  7.2.5    7.2    (
G    9/7/2010                                                  Responder: Craig                            242. Y          Closed                      Closed            EICB RAI      TVA Letter ML102910008    dated 10/21/10 293  7.7.4  7.2.2.  (
M a    9/8/2010                                                  Responder: Craig                            243. Y          Closed                      Closed            EICB RAI      TVA Letter        EICB RAI ML102861885 sent to 35                                                                                                                                                                                  ML102861885    dated 10/29/10    DORL 299                    (
C    Provide Common Q Software Requirements              Attachment 41 of the 10/5 letter contains the 244. Y              Closed                      Closed                            TVA Letter Specification Post Accident Monitoring System 00000- Common Q Software Requirements Specification                                                                                    dated 10/5/10 302 7.5.2. 7.5.1    (
M a    09/17/2010                                          Responder: Tindell                            245. Y              Closed                      Closed            EICB RAI      TVA Letter        EICB RAI ML102861885 sent to 1                                                                                                                                                                                            ML102861885 dated 10/29/10        DORL 303 7.5.2. 7.5.1    (
M a    09/17/2010                                                Responder: Tindell                          246. Y          Closed                      Closed            EICB RAI      TVA Letter        EICB RAI ML102861885 sent to 1                                                                                                                                                                                            ML102861885 dated 10/29/10        DORL 304 7.5.2. 7.5.1    (
M a    09/17/2010                                                Responder: Tindell                          247. Y          Closed                      Closed            EICB RAI      TVA Letter        EICB RAI ML102861885 sent to 1                                                                                                                                                                                            ML102861885 dated 10/29/10        DORL 305 7.5.2. 7.5.1    (
M a    09/17/2010                                                Responder: Tindell                          248. Y          Closed                      Closed            EICB RAI      TVA Letter        EICB RAI ML102861885 sent to 1                                                                                                                                                                                            ML102861885 dated 10/29/10        DORL 312            7.0    (
G    By letter dated September 10,2010, TVA provided the      Responder: Stockton                          249. Y          Close                      Closed            EICB RAI      TVA Letter summary evaluation of 50 59 reports which were                                                                                                                        ML102910008 dated 10/21/10 313  7.7.8  7.7.1.  (
D a    EDCR 52408 (installation of AMSAC in Unit 2) states      Responder: Ayala                            250. Y          Closed                      Closed            EICB RAI No.18 TVA Letter 12          that Design Criteria WB-DC-40-57 needs to be                                                                                                                          ML102910017 dated 10/29/10 314  7.3      7.3    (
D a    The following 50.59 changes were listed in the March      Responder: Stockton                          251. Y          Closed                      Closed            EICB RAI No. TVA Letter        Related to OI 10 12 RAI response letter (item 10) but were not included                                                                                                                19            dated 10/21/10 315  7.5.3  7.5.3    (
G    IE Bulletin 79-27 required that emergency operating      Responder: S. Smith (TVA Operations)        252. Y          Close                      Closed            EICB RAI      TVA Letter procedures to be used by control room operators to                                                                                                                    ML102910008 dated 10/21/10 316 7.5.2. 7.5    (
S i    TVA has provided various documents in support of          Responder: Temples/Mather                    253. Y          Closed                      Closed            RAI No. 26 3                      RM-1000 high range monitors for WBN2                                                                                                                                  ML102980005 317 7.5.2. 7.5    (
S i    TVA has provided a proprietary and a non-proprietary      Responder: Temples                          254. Y          Closed                      Closed            RAI No. 27    TVA Letter 3                      version of Technical Manual for RM-1000 Digital                                                                                                                        ML102980005 dated 10/29/10 320                    E I    Per Westinghouse letter WBT-D-2340, TENNESSEE            Responder: Clark                            255. Y          Closed                      Closed            N/A            N/A                Duplicate of item 156 VALLEY AUTHORITY WATTS BAR NUCLEAR 321                    E I      For the purposes of measuring reactor coolant flow for  Responder: Clark                            256. Y          Closed                      Closed            N/A              N/A              Duplicate of OI# 157 Reactor Protection functions elbow taps are used for 322          7.7.1.  (
C    Section 7.7.1.11 will be added to FSAR Amendment          Responder: Clark                            257. Y          Closed                      Closed 11          101 to provide a discussion of the Distributed Control 324                    (
M a    Per the NRC reviewer, the BISI calculation is not                                                      258. Y          Closed                      Closed required to be submitted 325                  B
(
(
G a       The Unit 2 loops in service for Unit 1 that are           Responder: TVA Startup Olson                 259. Y           Closed                     Closed                                               Closed to open item ?
G 8/27/2010 Responder: Trelease 233. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/21/10 279 7.6 7.6.6
scheduled to be transferred to the Foxboro Spec 200 332 7.5.2. 7.5.1   (
(
M a     10/26/2010                                                                                             260. Y           Closed                     Closed             ML103000105     TBD             EICB RAI ML103000105 sent to 1                                                                                                                                                                                            Item No 1                        DORL 333 7.5.2. 7.5.1   (
G 8/27/2010 Responder: Mather 234. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/21/10 280 7.6 7.6.6
M a     10/27/2010                                                                                             261. Y           Closed                     Closed             ML103000105     TBD             EICB RAI ML103000105 sent to 1                                                                                                                                                                                            Item No 2                        DORL
(
G 8/27/2010 Responder: Trelease 235. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/21/10 282 7.6 7.6.9
(
G 8/27/2010 Responder: Trelease 236. Y Close Response is acceptable Closed EICB RAI ML102910008 TVA Letter dated 10/21/10 283 7.7.5 XX
(
D a
8/27/2010 Responder: Clark 237. Y Closed Closed EICB RAI No.13 ML102910017 TVA Letter dated 10/29/10 This item is a follow-up question to item 96 284 7.7.3 7.4.1
(
D a
8/27/2010 Responder: Webber 238. Y Closed Closed EICB RAI No.14 ML102910017 TVA Letter dated 10/21/10 This item is a follow-up question to item 123 285 7.3.3 7.3
(
D a
8/27/2010 Responder: McNeil 239. Y Closed Closed EICB RAI No.15 ML102910017 TVA Letter dated 10/29/10 This item is a follow-up question to item 22 286 7.7.3 9.3.4.
2 4
(
D a
8/27/2010 Responder: Webber 240. Y Closed Closed EICB RAI No.16 ML102910017 TVA Letter dated 10/21/10 290 7.7
(
C 9/7/2010 Responder: Clark 241. Y Closed Closed N/A N/A This item is a duplicate of item 291 292 7.2.5 7.2
(
G 9/7/2010 Responder: Craig 242. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 10/21/10 293 7.7.4 7.2.2.
3 5
(
M a
9/8/2010 Responder: Craig 243. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/29/10 EICB RAI ML102861885 sent to DORL 299
(
C Provide Common Q Software Requirements Specification Post Accident Monitoring System 00000- 1 of the 10/5 letter contains the Common Q Software Requirements Specification 244. Y Closed Closed TVA Letter dated 10/5/10 302 7.5.2.
1 7.5.1
(
M a
09/17/2010 Responder: Tindell 245. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/29/10 EICB RAI ML102861885 sent to DORL 303 7.5.2.
1 7.5.1
(
M a
09/17/2010 Responder: Tindell 246. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/29/10 EICB RAI ML102861885 sent to DORL 304 7.5.2.
1 7.5.1
(
M a
09/17/2010 Responder: Tindell 247. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/29/10 EICB RAI ML102861885 sent to DORL 305 7.5.2.
1 7.5.1
(
M a
09/17/2010 Responder: Tindell 248. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/29/10 EICB RAI ML102861885 sent to DORL 312 7.0
(
G By {{letter dated|date=September 10, 2010|text=letter dated September 10,2010}}, TVA provided the summary evaluation of 50 59 reports which were Responder: Stockton 249. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/21/10 313 7.7.8 7.7.1.
12
(
D a
EDCR 52408 (installation of AMSAC in Unit 2) states that Design Criteria WB-DC-40-57 needs to be Responder: Ayala 250. Y Closed Closed EICB RAI No.18 ML102910017 TVA Letter dated 10/29/10 314 7.3 7.3
(
D a
The following 50.59 changes were listed in the March 12 RAI response letter (item 10) but were not included Responder: Stockton 251. Y Closed Closed EICB RAI No.
19 TVA Letter dated 10/21/10 Related to OI 10 315 7.5.3 7.5.3
(
G IE Bulletin 79-27 required that emergency operating procedures to be used by control room operators to Responder: S. Smith (TVA Operations) 252. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/21/10 316 7.5.2.
3 7.5
(
S i
TVA has provided various documents in support of RM-1000 high range monitors for WBN2 Responder: Temples/Mather 253. Y Closed Closed RAI No. 26 ML102980005 317 7.5.2.
3 7.5
(
S i
TVA has provided a proprietary and a non-proprietary version of Technical Manual for RM-1000 Digital Responder: Temples 254. Y Closed Closed RAI No. 27 ML102980005 TVA Letter dated 10/29/10 320 E
I Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR Responder: Clark 255. Y Closed Closed N/A N/A Duplicate of item 156 321 E
I For the purposes of measuring reactor coolant flow for Reactor Protection functions elbow taps are used for Responder: Clark 256. Y Closed Closed N/A N/A Duplicate of OI# 157 322 7.7.1.
11
(
C Section 7.7.1.11 will be added to FSAR Amendment 101 to provide a discussion of the Distributed Control Responder: Clark 257. Y Closed Closed 324
(
M a
Per the NRC reviewer, the BISI calculation is not required to be submitted 258. Y Closed Closed 325 B
(
G a
The Unit 2 loops in service for Unit 1 that are scheduled to be transferred to the Foxboro Spec 200 Responder: TVA Startup Olson 259. Y Closed Closed Closed to open item ?
332 7.5.2.
1 7.5.1
(
M a
10/26/2010 260. Y Closed Closed ML103000105 Item No 1 TBD EICB RAI ML103000105 sent to DORL 333 7.5.2.
1 7.5.1
(
M a
10/27/2010 261. Y Closed Closed ML103000105 Item No 2 TBD EICB RAI ML103000105 sent to DORL
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                        radBA627.docx                                                                                    Open Items to be Resolved for SER Approval SE      FSAR    NRC
===Response===
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
Date Comments 289
(
S i
9/2/2010 Responder: Faulkner 262. Y Closed Closed -


===Response===
===Response===
Acceptable                                                                        RAI Resp.
RAI No. 24 ML102980005 TVA Letter dated 10/21/10 054 7.5.2 7.5.1
No.                  POC                                    Issue                                          TVA Response(s)                          Y/N        Status/ Current Actions      Resolution Path  RAI No. & Date                              Comments Sec. Sec.                                                                                                                                                                                                                    Date 289                  (
(
Si            9/2/2010                                                Responder: Faulkner                                  262. Y        Closed                        Closed - RAI No. 24                 TVA Letter Response ML102980005                dated 10/21/10 054   7.5.2   7.5.1   (
S i
Si            4/19/2010                                               Responder: Slifer/Clark             Date: 5/25/10   263. Y Closed                               Closed-Response RAI No. 14                 TVA Letter acceptable ML102980005                dated 6/18/10 055   7.5.2   7.5.1   (
4/19/2010 Responder: Slifer/Clark Date: 5/25/10 263. Y Closed Closed-Response acceptable RAI No. 14 ML102980005 TVA Letter dated 6/18/10 055 7.5.2 7.5.1
Si            4/19/2010                                               Responder: Slifer/Clark           Date: 5/25/10     264. Y Closed                               Closed-Response RAI No. 15                 TVA Letter acceptable ML102980005                dated 6/18/10 319 7.5.2. 7.5   (
(
S i             TVA provided System Verification Test Results           Responder: Temples                                   265. Y Closed                               Closed-Response RAI No. 29                 TVA Letter 3                              04507007-1TR (July 1999) for Sequoyah to support                                                                                                          Acceptable ML102980005                dated 10/29/10 328 7.5.2. 7.5   (
S i
S i             Provide the model number for the four containment       Responder: Temples                                   266. Y Closed                               Closed-Response RAI No. 30                 TVA Letter 3                              high range area monitors RM-1000 and identify how                                                                                                        Acceptable ML102980005                dated 10/29/10 050 7.5.2     7.5.1                 4/8/2010                                                Responder: WEC                  Date: 5/25/10        1. Y Open                                  Open-NRC EICB RAI                  TVA Letter EICB (Carte)
4/19/2010 Responder: Slifer/Clark Date: 5/25/10 264. Y Closed Closed-Response acceptable RAI No. 15 ML102980005 TVA Letter dated 6/18/10 319 7.5.2.
ML102910002                dated 6/18/10 How should the "shall" statements outside of the       These sections are descriptive text and not                 TVA response is              Awaiting DORL to Item No. 8 bracketed requirements in Common Q requirements        requirements. The next revision of the Watts Bar           inconsistent (e.g., WNA-DS- Issue EICB RAI                                TVA Letter documents be interpreted?                              Unit 2 PAMS System Requirements Specification               01667-WBT Rev. 1 page 1- and TVA to                                      dated 10/29/10 will remove shall from the wording in those               1, Section 1.3.1 implies that respond to RAI                              Enclosure 1 sections. A date for completing the next revision           "SysRS Section ###" has      formally.                                  Item No. 1 of the System Requirements Specification will be           requirements. See also provided no later than August 31, 2010.                    SDS4.4.2.1-1 on page 4-32).
3 7.5
The System Requirements Specification will be revised by September 30, 2010 and submitted                       Is there a requirement on within two of receipt from Westinghouse.                           the shall referenced above??
(
TVA Revised Response Response is provided in Shall statements within the scope of the                           letter dated 10/29/10.
S i
System Requirements Specification (SysRS) and System Design Specification (SysDS)                           TVA Revised Response in were reviewed by Westinghouse. The                                 TVA Letter dated 10/29/10 Enclosure 1 Item No. 1 is statements were either relocated to the Acceptable numbered requirements section or the wording was changed to identify that it was not a requirement. This item is resolved by submittal of revision 2 of the SysRS and the SysDS (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10).
TVA provided System Verification Test Results 04507007-1TR (July 1999) for Sequoyah to support Responder: Temples 265. Y Closed Closed-Response Acceptable RAI No. 29 ML102980005 TVA Letter dated 10/29/10 328 7.5.2.
043  7.5.2  7.5.1                 2/19/2010                                              Responder: WEC                  Date: 5/25/10       2. N      Open                          Open-NRC           EICB RAI         TVA Letter       NNC 8/25/10: A CQ PAMS ISG6 EICB (Carte)
3 7.5
Review            ML102910002      dated 2/5/10    compliance matrix was docketed The PAMS ISG6 compliance matrix supplied as             The PAMS ISG6 compliance matrix supplied as                      Response is included in                          Item No. 2                        on: (1) February, 5 12010, (2)
(
Enclosure 1 to TVA letter dated February 5, 2010 is a Enclosure 1 to TVA letter dated February 5, 2010                     letter dated 10/5/10.          Due 12/1/10                        TVA Letter      March 12, 2010, & (3) June 18, first draft of the information needed. The shortcomings is a first draft of the information needed.                                                                                          dated 5/12/10    2010. The staff has expressed of the first three lines in the matrix are:                                                                               Revised compliance matrix                                                          issued with all of these By letter dated April 8, 2010 TVA provided the                    is unacceptable.                                                  TVA Letter      compliance evaluations. The Line 1: Section 11 of the Common Q topical report did PAMS Licensing Technical Report provided                                                                                                dated 6/18/10    staff is still waiting for a good include a commercial grade dedication program, but       additional information.                                          NNC 8/12/10: It is not quite                                                        compliance evaluation.
S i
this program was not approved in the associated SE.                                                                       enough to provide all of the                                      TVA Letter Westinghouse stated that this was the program and it Attachment 3 contains the revised Common Q                            documents requested.                                              dated 10/5/10 could now be reviewed. The NRC stated that TVA           PAMS ISG-6 Compliance Matrix, dated June 11,                      There are two possible routs should identified what they believe was previously       2010, that addresses these items (Reference 13).                  to review that the NRC can reviewed and approved.                                                                                                    undertake: (1) follow ISG6, By letter Dated June 18, 2010 (see Attachment 3)                  and (2) follow the CQ SPM.
Provide the model number for the four containment high range area monitors RM-1000 and identify how Responder: Temples 266. Y Closed Closed-Response Acceptable RAI No. 30 ML102980005 TVA Letter dated 10/29/10 050 7.5.2 7.5.1 EICB (Carte) 4/8/2010 How should the "shall" statements outside of the bracketed requirements in Common Q requirements documents be interpreted?
Line 2: TVA stated the D3 analysis was not applicable TVA provided a table, "Watts Bar 2 - Common Q                        The TVA response that was to PAMS, but provided no justification. The NRC         PAMS ISG-6 Compliance Matrix."                                    originally pursued was to asked for justification since SRP Chapter 7.5 identified                                                                   follow ISG6, but some of the SRM to SECV-93-087 Item II.Q as being SRP               It is TVAs understanding that this comment is                   compliance items for ISG6 acceptance criteria for PAMS.                            focused on the fact that there are documents that                 were addressed by NRC has requested that are currently listed as                   referencing the SPM. The
Responder: WEC Date: 5/25/10 These sections are descriptive text and not requirements. The next revision of the Watts Bar Unit 2 PAMS System Requirements Specification will remove shall from the wording in those sections. A date for completing the next revision of the System Requirements Specification will be provided no later than August 31, 2010.
The System Requirements Specification will be revised by September 30, 2010 and submitted within two of receipt from Westinghouse.
TVA Revised Response Shall statements within the scope of the System Requirements Specification (SysRS) and System Design Specification (SysDS) were reviewed by Westinghouse. The statements were either relocated to the numbered requirements section or the wording was changed to identify that it was not a requirement. This item is resolved by submittal of revision 2 of the SysRS and the SysDS (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10).
: 1. Y Open TVA response is inconsistent (e.g., WNA-DS-01667-WBT Rev. 1 page 1-1, Section 1.3.1 implies that "SysRS Section ###" has requirements. See also SDS4.4.2.1-1 on page 4-32).
Is there a requirement on the shall referenced above??
Response is provided in letter dated 10/29/10.
TVA Revised Response in TVA Letter dated 10/29/10 Item No. 1 is Acceptable Open-NRC Awaiting DORL to Issue EICB RAI and TVA to respond to RAI formally.
EICB RAI ML102910002 Item No. 8 TVA Letter dated 6/18/10 TVA Letter dated 10/29/10 Item No. 1 043 7.5.2 7.5.1 EICB (Carte) 2/19/2010 The PAMS ISG6 compliance matrix supplied as to TVA {{letter dated|date=February 5, 2010|text=letter dated February 5, 2010}} is a first draft of the information needed. The shortcomings of the first three lines in the matrix are:
Line 1: Section 11 of the Common Q topical report did include a commercial grade dedication program, but this program was not approved in the associated SE.
Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that TVA should identified what they believe was previously reviewed and approved.
Line 2: TVA stated the D3 analysis was not applicable to PAMS, but provided no justification. The NRC asked for justification since SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as being SRP acceptance criteria for PAMS.
Responder: WEC Date: 5/25/10 The PAMS ISG6 compliance matrix supplied as to TVA {{letter dated|date=February 5, 2010|text=letter dated February 5, 2010}} is a first draft of the information needed.
By {{letter dated|date=April 8, 2010|text=letter dated April 8, 2010}} TVA provided the PAMS Licensing Technical Report provided additional information.
contains the revised Common Q PAMS ISG-6 Compliance Matrix, dated June 11, 2010, that addresses these items (Reference 13).
By letter Dated June 18, 2010 (see Attachment 3)
TVA provided a table, "Watts Bar 2 - Common Q PAMS ISG-6 Compliance Matrix."
It is TVAs understanding that this comment is focused on the fact that there are documents that NRC has requested that are currently listed as
: 2. N Open Response is included in letter dated 10/5/10.
Revised compliance matrix is unacceptable.
NNC 8/12/10: It is not quite enough to provide all of the documents requested.
There are two possible routs to review that the NRC can undertake: (1) follow ISG6, and (2) follow the CQ SPM.
The TVA response that was originally pursued was to follow ISG6, but some of the compliance items for ISG6 were addressed by referencing the SPM. The Open-NRC Review Due 12/1/10 EICB RAI ML102910002 Item No. 2 TVA Letter dated 2/5/10 TVA Letter dated 5/12/10 TVA Letter dated 6/18/10 TVA Letter dated 10/5/10 NNC 8/25/10: A CQ PAMS ISG6 compliance matrix was docketed on: (1) February, 5 12010, (2)
March 12, 2010, & (3) June 18, 2010. The staff has expressed issued with all of these compliance evaluations. The staff is still waiting for a good compliance evaluation.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                             radBA627.docx                                                                                     Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                         RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                    Issue                                              TVA Response(s)                            Y/N       Status/ Current Actions         Resolution Path   RAI No. & Date                               Comments Sec. Sec.                                                                                                                                                                                                                            Date Line 3: TVA identified that the Design report for         being available for audit at the Westinghouse                        NRC approved the CQ TR computer integrity was completed as part of the           offices. For those Common Q PAMS documents                            and associated SPM; it may common Q topical report. The NRC noted that this           that are TVA deliverable documents from                              be more appropriate to report is applicable for a system in a plant, and the CQ   Westinghouse, TVA has agreed to provide those                         review the WBN2 PAMS topical report did no specifically address this PAMS      to NRC. Westinghouse documents that are not                           application to for adherence system at Watts Bar Unit 2.                                deliverable to TVA will be available for audit as                     to the SPM that to ISG6. In stated above. Requirements Traceability Matrix                       either path chosen, the NRC then concluded that TVA should go through and          issues will be tracked under NRC RAI Matrix                           applicant should provide provide a more complete and thorough compliance            Items 142 (Software Requirements Specification)                       documents and a matrix.                                                    and 145 (System Design Specification).                               justification for the Commercial Item Dedication issues will be                             acceptability of any tracked under NRC RAI Matrix Item 138. This                           deviation from the path item is considered closed.                                           chosen. For example, it appears that the Westinghouse's CDIs are commercial grade dedication plans, but Westinghouse maintains that they are commercial grade dedication reports; this apparent deviation should be justified or explained.
Date Comments Line 3: TVA identified that the Design report for computer integrity was completed as part of the common Q topical report. The NRC noted that this report is applicable for a system in a plant, and the CQ topical report did no specifically address this PAMS system at Watts Bar Unit 2.
065   7.5.2   7.5.1                 By letter dated March 12, 2010 TVA stated that the         Responder: WEC              Date: 5/25/10              3. N      Open                            Open-NRC          N/A - No        TVA Letter EICB (Carte) target submittal date for the FMEA was August 31,                                                                                                                 Review            question was    dated 10/5/10 2010.                                                      Attachment 37 to letter dated 10/5/10 contains the                                                                       asked. Item proprietary version of the Common Q PAMS                                                               Due 12/1/10        was opened to FMEA and the affidavit for withholding. A non-                                                                           track proprietary version will be provided at a later date.                                                                    comm8ittment made by applicant.
NRC then concluded that TVA should go through and provide a more complete and thorough compliance matrix.
101                                  4/12/2010                                                  Responder: Slifer                                      4. Y      Open                             Open-NRC           N/A                             TVA is working with the vendor DORL (Poole)
being available for audit at the Westinghouse offices. For those Common Q PAMS documents that are TVA deliverable documents from Westinghouse, TVA has agreed to provide those to NRC. Westinghouse documents that are not deliverable to TVA will be available for audit as stated above. Requirements Traceability Matrix issues will be tracked under NRC RAI Matrix Items 142 (Software Requirements Specification) and 145 (System Design Specification).
Review                                              to meet the 6/30 date, however The non-proprietary versions of the following RM-   The documents, and affidavits for withholding for                          Documents provided in letter                                                        there is the potential this will slip 1000, Containment High Range Post Accident           the listed documents were submitted to the NRC                              dated 07/15/10              Due 10/14/10                                            to 7/14.
Commercial Item Dedication issues will be tracked under NRC RAI Matrix Item 138. This item is considered closed.
Radiation Monitor documents will be provided by June on TVA letter to the NRC dated July 15, 2010.
NRC approved the CQ TR and associated SPM; it may be more appropriate to review the WBN2 PAMS application to for adherence to the SPM that to ISG6. In either path chosen, the applicant should provide documents and a justification for the acceptability of any deviation from the path chosen. For example, it appears that the Westinghouse's CDIs are commercial grade dedication plans, but Westinghouse maintains that they are commercial grade dedication reports; this apparent deviation should be justified or explained.
30, 2010.                                                                                                                                                        Confirm receipt.
065 7.5.2 7.5.1 EICB (Carte)
By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the FMEA was August 31, 2010.
Responder: WEC Date: 5/25/10 7 to letter dated 10/5/10 contains the proprietary version of the Common Q PAMS FMEA and the affidavit for withholding. A non-proprietary version will be provided at a later date.
: 3. N Open Open-NRC Review Due 12/1/10 N/A - No question was asked. Item was opened to track comm8ittment made by applicant.
TVA Letter dated 10/5/10 101 DORL (Poole) 4/12/2010 The non-proprietary versions of the following RM-1000, Containment High Range Post Accident Radiation Monitor documents will be provided by June 30, 2010.
: 1. V&V Report 04508006A
: 1. V&V Report 04508006A
: 2. System Description 04508100-1TM
: 2. System Description 04508100-1TM
: 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
: 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
: 4. Functional Testing Report 04507007-1TR 144                                  The WBN2 PAMS Software Requirements                        Responder: WEC                                          5. N      Open                             Open-NRC           ML101650255, TVA Letter          WBN2 PAMS Software EICB (Carte)
: 4. Functional Testing Report 04507007-1TR Responder: Slifer The documents, and affidavits for withholding for the listed documents were submitted to the NRC on TVA letter to the NRC dated July 15, 2010.
Specification (WBN2 PAMS SRS) contains a table                                                                                                                   Review            Item No. 8  dated 10/5/10      Requirements Specification (see page iii) titled, Document Traceability &           (a) The purpose of NABU-DP-00014-GEN                                 Response provided in letter Compliance, which states that the WBN2 PAMS SRS          document is to define the process for system level                   dated 10/5/10              Due 12/1/10                                              By letter dated April 8, 2010 was created to support the three documents identified      design, software design and implementation, and                                                                                                           (ML10101050203), TVA (two of these documents have been provided on the          hardware design and implementation for Common                         NRC Review and WEC to            Responses to                                        docketed WNA-SD-00239-WBT, docket).                                                  Q safety system development. This document                           complete response.              items a and e                                      Revision 1, "RRAS Watts Bar 2 supplements the Common Q SPM, WCAP-16096-                                                             provided. Need                                      NSSS Completion Program I&C (a) Please describe the third document (i.e., NABU-        NP-A. The scope of NABU-DP-00014-GEN                                 b-d to be addressed at           response to b-d.                                   Projects, Software Requirements DP-00014-GEN Revision 2, Design Process for              includes the design and implementation                                public meeting and audit.                                                            Specification for the Post Common Q Safety Systems).                                processes for the application development. For a                      Will require information to be                                                      Accident Monitoring System, fuller description of the design process described                    docketed.                                                                            dated February 2010 (b) Please describe the flow of information between        in NABU-DP-00014-GEN please refer to the                                                                                                                  (ML101050202).
: 4. Y Open Documents provided in letter dated 07/15/10 Open-NRC Review Due 10/14/10 Confirm receipt.
N/A TVA is working with the vendor to meet the 6/30 date, however there is the potential this will slip to 7/14.
144 EICB (Carte)
The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS) contains a table (see page iii) titled, Document Traceability &
Compliance, which states that the WBN2 PAMS SRS was created to support the three documents identified (two of these documents have been provided on the docket).
(a) Please describe the third document (i.e., NABU-DP-00014-GEN Revision 2, Design Process for Common Q Safety Systems).
(b) Please describe the flow of information between Responder: WEC (a) The purpose of NABU-DP-00014-GEN document is to define the process for system level design, software design and implementation, and hardware design and implementation for Common Q safety system development. This document supplements the Common Q SPM, WCAP-16096-NP-A. The scope of NABU-DP-00014-GEN includes the design and implementation processes for the application development. For a fuller description of the design process described in NABU-DP-00014-GEN please refer to the
: 5. N Open Response provided in letter dated 10/5/10 NRC Review and WEC to complete response.
b-d to be addressed at public meeting and audit.
Will require information to be docketed.
Open-NRC Review Due 12/1/10 Responses to items a and e provided. Need response to b-d.
ML101650255, Item No. 8 TVA Letter dated 10/5/10 WBN2 PAMS Software Requirements Specification By {{letter dated|date=April 8, 2010|text=letter dated April 8, 2010}} (ML10101050203), TVA docketed WNA-SD-00239-WBT, Revision 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, dated February 2010 (ML101050202).  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                     radBA627.docx                                                                                   Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                       RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                    Issue                                        TVA Response(s)                          Y/N       Status/ Current Actions   Resolution Path   RAI No. & Date                         Comments Sec. Sec.                                                                                                                                                                                                                  Date these three documents.                              Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket.
Date Comments these three documents.
(c) Does the PAMS SRS implement the requirements Since this is a Westinghouse process document in these three documents?                           that is not specifically referenced in the SRS, it will be removed in the next revision of the (d) Please describe if and how these three documents document.
(c) Does the PAMS SRS implement the requirements in these three documents?
are used in the development of the PAMS Software Design Description.                                   (b) - Closed to items 142 and 145 (e) Do the WBN2 V&V activities include verification     (c) - Closed 142                                                                                                (d) N/A -
(d) Please describe if and how these three documents are used in the development of the PAMS Software Design Description.
that the requirements of these three documents have                                                                                                                     Closed to Item been incorporated into the WBN2 PAMS SRS.               (d) - Closed to Item 142                                                                                        No. 142 (e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).
(e) Do the WBN2 V&V activities include verification that the requirements of these three documents have been incorporated into the WBN2 PAMS SRS.
IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.
Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket.
Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision of the document.
(b) - Closed to items 142 and 145 (c) - Closed 142 (d) - Closed to Item 142 (e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).
IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V-770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.
IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.
IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.
183                                7/15/2010                                              Responder: WEC                                      6. Y      Open                        Open-NRC          EICB RAI          TVA Letter EICB (Carte)
(d) N/A -
Review            ML102980066        dated 10/21/10 An emphasis is placed on traceability in System       The generic Software Requirements Specification                    Response provided in letter                    Item No. 9        Enclosure 1 Requirements Specifications in the SRP, in the         applies except as modified by the WBN Unit 2                      dated 10/21/10              Due 12/1/10                          Item No. 4 unmodified IEEE std 830-1993, and even more so         System Requirements Specification.
Closed to Item No. 142 183 EICB (Carte) 7/15/2010 An emphasis is placed on traceability in System Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word should to say Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies Responder: WEC The generic Software Requirements Specification applies except as modified by the WBN Unit 2 System Requirements Specification.
given the modifications to the standard listed in                                                                                                     NRC to issue RAI Regulatory Guide 1.172, which breaks with typical NRC use of the word should to say Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies
: 6. Y Open Response provided in letter dated 10/21/10 Open-NRC Review Due 12/1/10 NRC to issue RAI EICB RAI ML102980066 Item No. 9 TVA Letter dated 10/21/10 Item No. 4


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                         radBA627.docx                                                                             Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                   RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                      Issue                                          TVA Response(s)                        Y/N       Status/ Current Actions   Resolution Path   RAI No. & Date                             Comments Sec. Sec.                                                                                                                                                                                                                Date On page 1-2 of the Post Accident Monitoring Systems Software Requirements Specification in the background section, is the sentence Those sections of the above references that require modification from the generic PAMS are defined in the document referring purely to the changes from WNA-DS-01617-WBT Post Accident Monitoring System-System Requirements Specification or is it saying that there are additional changes beyond those and that the SRS defines them?
Date Comments On page 1-2 of the Post Accident Monitoring Systems Software Requirements Specification in the background section, is the sentence Those sections of the above references that require modification from the generic PAMS are defined in the document referring purely to the changes from WNA-DS-01617-WBT Post Accident Monitoring System-System Requirements Specification or is it saying that there are additional changes beyond those and that the SRS defines them?
If there are additional changes, what is their origin?
If there are additional changes, what is their origin?
200   7.2                           7/21/2010                                              Responder: Clark                                7.         Y      Open                        Open-NRC          EICB RAI        TVA Letter EICB (Carte) 7.3                                                                                    The statement in SER Section 7.5.1 is supported                                                Review            ML102980066      dated 10/5/10 7.5                            Amendment 99 of the Watts Bar Unit 2 FSAR Section by the following:                                                        Response provided in letter                  Item No. 2 7.7                            7.5, Instrumentation Systems Important to Safety,
200 7.2 7.3 7.5 7.7 EICB (Carte) 7/21/2010 Amendment 99 of the Watts Bar Unit 2 FSAR Section 7.5, Instrumentation Systems Important to Safety, does not include any description of instrumentation for normal operation; therefore, Section 7.5 of the FSAR does not support statements made in the SER Section 7.5; compare SER (ML072060490) Section 7.5.1 and FSAR Amendment 99 Section 7.5. Please identify where, in the docketed material, information exists to support the statements in the SER Section 7.5.1.
* I&C Systems for Normal Operation FSAR                            dated 10/5/10              Amendment 101 does not include any description of instrumentation for   Section                                                                                    Submitted normal operation; therefore, Section 7.5 of the FSAR
Responder: Clark The statement in SER Section 7.5.1 is supported by the following:
* Eagle 21 7.2                                                                                    10/29/10.
I&C Systems for Normal Operation FSAR Section Eagle 21 7.2 Neutron Monitoring 7.2 Foxboro Spec 200 7.3 (List of other sections in attachment 34)
does not support statements made in the SER Section
Foxboro I/A 7.7.11 (new section will be added by amendment 101) (other sections have been previously provided)
* Neutron Monitoring 7.2 7.5; compare SER (ML072060490) Section 7.5.1 and
Plant Computer 7.5.2 Rod Control 7.7.1.2 CERPI 7.7.1.2 Control Rod Drive 7.7.1.1 Incore Neutron Monitoring 7.7.1.9 Lose Part Detection/Monitoring 7.6.7 Vibration Monitoring RCP 5.5.1.2 Control Boards 7.1.1.10 RVLIS 7.5, 5.6
* Foxboro Spec 200 7.3 (List of other sections FSAR Amendment 99 Section 7.5. Please identify             in attachment 34) where, in the docketed material, information exists to
: 7. Y Open Response provided in letter dated 10/5/10 Open-NRC Review Amendment 101 Submitted 10/29/10.
* Foxboro I/A 7.7.11 (new section will be added support the statements in the SER Section 7.5.1.          by amendment 101) (other sections have been previously provided)
EICB RAI ML102980066 Item No. 2 TVA Letter dated 10/5/10 201 7.7.1.
* Plant Computer 7.5.2
1.1 7.7.11 EICB (Carte) 7/21/2010 Amendment 99, FSAR Section 7.7.1.1.1, "Reactor Control Input Signals (Unit 2 Only)," contains a description of functions performed uniquely for Unit 2.
* Rod Control 7.7.1.2
Please describe the equipment that performs this function (in sufficient detail to support a regulatory evaluation), and evaluate this equipment against the appropriate regulatory criteria.
* CERPI 7.7.1.2
Responder: Webb These functions are within the scope of the Foxboro I/A system. Section 7.7.11 will be added to the FSAR in amendment 101 to provide a discussion of the DCS.
* Control Rod Drive 7.7.1.1
: 8. Y Open Response provided in letter dated 10/5/10 Open-NRC Review Amendment 101 Submitted 10/29/10.
* Incore Neutron Monitoring 7.7.1.9
EICB RAI ML102980066 Item No. 3 TVA Letter dated 10/5/10 211 7.5.1.
* Lose Part Detection/Monitoring 7.6.7
1 7.5.2 7.6.1 EICB (Carte) 7/27/2010 FSA Table 7.1-1 shows: "The extent to which the recommendations of the applicable NRC regulatory Responder: Clark The WBN 2 FSAR Section 7.5 defines the following systems as important to safety
* Vibration Monitoring RCP 5.5.1.2
: 9. N Open Response included in letter dated 10/5/10 Open-NRC Review Amendment 101 EICB RAI ML102980066 Item No. 5 TVA Letter dated 10/5/10 Relates to SE Sections:
* Control Boards 7.1.1.10
7.5.5, Plant Computer 7.6.10, Loose Part Monitoring 7.7.1, Control System  
* RVLIS 7.5, 5.6 201 7.7.1. 7.7.11                   7/21/2010                                                Responder: Webb                                    8. Y      Open                        Open-NRC          EICB RAI        TVA Letter EICB (Carte) 1.1                                                                                                                                                                                    Review            ML102980066      dated 10/5/10 Amendment 99, FSAR Section 7.7.1.1.1, "Reactor           These functions are within the scope of the                      Response provided in letter                  Item No. 3 Control Input Signals (Unit 2 Only)," contains a         Foxboro I/A system. Section 7.7.11 will be added                dated 10/5/10              Amendment 101 description of functions performed uniquely for Unit 2. to the FSAR in amendment 101 to provide a                                                    Submitted Please describe the equipment that performs this         discussion of the DCS.                                                                      10/29/10.
function (in sufficient detail to support a regulatory evaluation), and evaluate this equipment against the appropriate regulatory criteria.
211 7.5.1.                           7/27/2010                                                Responder: Clark                                  9. N      Open                       Open-NRC         EICB RAI         TVA Letter     Relates to SE Sections:
1                EICB                                                                                                                                                                Review            ML102980066      dated 10/5/10   7.5.5, Plant Computer 7.5.2           (Carte)         FSA Table 7.1-1 shows: "The extent to which the           The WBN 2 FSAR Section 7.5 defines the                           Response included in letter                   Item No. 5                       7.6.10, Loose Part Monitoring 7.6.1                            recommendations of the applicable NRC regulatory          following systems as important to safety                      dated 10/5/10              Amendment 101                                      7.7.1, Control System


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                             radBA627.docx                                                                   Open Items to be Resolved for SER Approval SE   FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                         RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.              POC                          Issue                                          TVA Response(s)                    Y/N       Status/ Current Actions Resolution Path RAI No. & Date                         Comments Sec. Sec.                                                                                                                                                                                         Date 7.7.1              guides and IEEE standards are followed for the Class                                                                                           Submitted                                    Description 7.7.2              1E instrumentation and control systems is shown         1. Post Accident Monitoring including:                                                10/29/10.                                    7.7.2, Safety System Status 7.7.4              below. The symbol (F) indicates full compliance. Those a. Common Q Post Accident Monitoring System                                                                                        Monitoring System 7.9              which are not fully implemented are discussed in the   (Safety-Related)                                                                                                                    7.7.4, PZR & SG Overfill referenced sections of the FSAR and in the footnotes   i. Reactor Vessel Level                                                                                                            7.9, Data Communications as indicated."                                         ii. Core Exit Thermocouples iii. Subcooling Margin Monitor Please describe how systems that are important to       b. Eagle 21 indications (Safety-Related) safety, but not 1E, comply with 10 CFR 50.55a(a)1:     c. Foxboro Spec 200 indications (Safety-Related)
Date Comments 7.7.1 7.7.2 7.7.4 7.9 guides and IEEE standards are followed for the Class 1E instrumentation and control systems is shown below. The symbol (F) indicates full compliance. Those which are not fully implemented are discussed in the referenced sections of the FSAR and in the footnotes as indicated."
                        "Structures, systems, and components must be           d. Neutron Monitoring (Source and Intermediate designed, fabricated, erected, constructed, tested, and Range) (Safety-Related) inspected to quality standards commensurate with the e. Radiation Monitors (Safety-Related) importance of the safety function to be performed."     f. Unit 1 and Common shared indications (Safety-Related)
Please describe how systems that are important to safety, but not 1E, comply with 10 CFR 50.55a(a)1:  
"Structures, systems, and components must be designed, fabricated, erected, constructed, tested, and inspected to quality standards commensurate with the importance of the safety function to be performed."
: 1. Post Accident Monitoring including:
: a. Common Q Post Accident Monitoring System (Safety-Related)
: i. Reactor Vessel Level ii. Core Exit Thermocouples iii. Subcooling Margin Monitor
: b. Eagle 21 indications (Safety-Related)
: c. Foxboro Spec 200 indications (Safety-Related)
: d. Neutron Monitoring (Source and Intermediate Range) (Safety-Related)
: e. Radiation Monitors (Safety-Related)
: f. Unit 1 and Common shared indications (Safety-Related)
: g. Foxboro I/A indications (Non-Safety-Related)
: g. Foxboro I/A indications (Non-Safety-Related)
: h. Radiation Monitors (Non-Safety-Related)
: h. Radiation Monitors (Non-Safety-Related)
Line 451: Line 1,110:
Unit 2), Rev. 21
Unit 2), Rev. 21
: j. Integrated Computer System - Design Criteria Document WB-DC-30-29 Plant Integrated Computer System (ICS), Rev. 8 (Submitted under TVA to NRC letter dated August __, 2010)
: j. Integrated Computer System - Design Criteria Document WB-DC-30-29 Plant Integrated Computer System (ICS), Rev. 8 (Submitted under TVA to NRC letter dated August __, 2010)
: 2. Plant Computer (Integrated Computer System)
: 2. Plant Computer (Integrated Computer System)  
                                                                                - See Item j above.
- See Item j above.
The WBN 2 FSAR Section 7.6, defines the following non-safety-related systems as other systems required for safety
The WBN 2 FSAR Section 7.6, defines the following non-safety-related systems as other systems required for safety
: 1. Foxboro I/A - While not specifically described, functions performed by the system are described
: 1. Foxboro I/A - While not specifically described, functions performed by the system are described Submitted 10/29/10.
Description 7.7.2, Safety System Status Monitoring System 7.7.4, PZR & SG Overfill 7.9, Data Communications


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                           radBA627.docx                                                                                 Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                     RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                    Issue                                            TVA Response(s)                        Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                             Comments Sec. Sec.                                                                                                                                                                                                                    Date in this section. The qualify requirements are described above.
Date Comments in this section. The qualify requirements are described above.
: 2. Lose Part Monitoring System - Design Criteria Document WB-DC-30-31, Loose Parts Monitoring System, Rev. 4, provides the quality requirements for this system. A description of the distributed control system will be added as FSAR section 7.7.1.11 in FSAR Amendment 101.
: 2. Lose Part Monitoring System - Design Criteria Document WB-DC-30-31, Loose Parts Monitoring System, Rev. 4, provides the quality requirements for this system. A description of the distributed control system will be added as FSAR section 7.7.1.11 in FSAR Amendment 101.
Installation is performed in accordance with the quality requirements of either the Bechtel or TVA work order processes based on the quality classification of the equipment being installed.
Installation is performed in accordance with the quality requirements of either the Bechtel or TVA work order processes based on the quality classification of the equipment being installed.
Vendor testing is performed in accordance with procurement specification requirements which are based on the type and quality classification of the equipment. Preoperational testing is performed in accordance with Chapter 14 of the FSAR.
Vendor testing is performed in accordance with procurement specification requirements which are based on the type and quality classification of the equipment. Preoperational testing is performed in accordance with Chapter 14 of the FSAR.
213   7.5.2                         7/27/2010                                                 Responder: WEC                                        10. N        Open                        Open-NRC          EICB RAI EICB (Carte)
213 7.5.2 EICB (Carte) 7/27/2010 By {{letter dated|date=June 18, 2010|text=letter dated June 18, 2010}} (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Theory of Operation Description." The staff has reviewed these documents, and it is not clear how this is the case. The docketed material does not appear to contain the design basis information that is required to evaluate compliance with the Clause of IEEE 603.
Review            ML102980066 By letter dated June 18, 2010 (ML101940236) TVA           Conformance with IEEE 603 is documented in the                      Response is included in                        Item No. 18 stated (Enclosure 1, Attachment 3, Item No. 3) that the   revised Common Q PAMS Licensing Technical                          letter dated 10/25/10 PAMS system design specification and software             Report and the Common Q PAMS System Design                                                      Due 12/31/10 requirements specification contain information to         Specification.                                                      NNC to review and revise address the "Theory of Operation Description." The                                                                           this question after LTR R1is staff has reviewed these documents, and it is not clear   Attachment 1 contains the proprietary version of                    received.                    .
(1) Please provide the design basis (as described in IEEE 604 Clause 4) of the Common Q PAMS.
how this is the case. The docketed material does not     Westinghouse document Tennessee Valley appear to contain the design basis information that is   Authority (TVA), Watts Bar Unit 2 (WBN2), Post-required to evaluate compliance with the Clause of       Accident Monitoring System (PAMS), Licensing IEEE 603.                                                 Technical Report, Revision 1, WNA-LI-00058-(1) Please provide the design basis (as described in     WBT-P, Dated October 2010 IEEE 604 Clause 4) of the Common Q PAMS.
(2) Please provide a regulatory evaluation of how the PAMs complies with the applicable regulatory requirements for the theory of operation.
(2) Please provide a regulatory evaluation of how the     Attachment 8 contains the proprietary version of PAMs complies with the applicable regulatory             Westinghouse document Nuclear Automation requirements for the theory of operation.                 Watts Bar 2 NSSS Completion Program I&C For example: Regarding IEEE 603 Clause 5.8.4 (1)         Projects Post Accident Monitoring System -
For example: Regarding IEEE 603 Clause 5.8.4 (1)
What are the manually controlled protective actions?     System Design Specification, WNA-DS-01667-(2) How do the documents identified demonstrate          WBT, Rev. 2 dated September 2010.
What are the manually controlled protective actions?
compliance with this clause?
(2) How do the documents identified demonstrate compliance with this clause?
214                                  7/27/2010                                                Responder: WEC                                        11. N         Open                       Open-NRC           EICB RAI         TVA Letter EICB (Carte)
Responder: WEC Conformance with IEEE 603 is documented in the revised Common Q PAMS Licensing Technical Report and the Common Q PAMS System Design Specification.
Review            ML102980066      dated 10/5/10 By letter dated June 18, 2010 (ML101940236) TVA           According to "The Software Program Manual for                      Response provided in letter                    Item No. 11 stated (Enclosure 1, Attachment 3, Item No. 10) that     Common Q Systems," WCAP-16096-NP-1A, the                           dated 10/5/10              Due 12/1/10 the approved Common Q Topical Report contains            Software Safety Plan only applies to Protection information to address the "Safety Analysis." The        class software and PAMS is classified as                           WEC References Common Common Q SPM however states that a Preliminary            Important-to-safety. Exhibit 4-1 of the SPM                         Q PAMS preliminary Hazards Analysis Report and the V&V reports              shows that PAMS is classified as Important-to-                     hazards analysis is document the software hazards analysis. Please            Safety                                                              referenced in the SRS.
contains the proprietary version of Westinghouse document Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010 contains the proprietary version of Westinghouse document Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System -
Provide these documents.                                                                                                      WEC to delete.
System Design Specification, WNA-DS-01667-WBT, Rev. 2 dated September 2010.
244                                  8/3/2010                                                  Responder: WEC                                        12. N        Open                        Open-NRC           EICB RAI                         LIC-101 Rev. 3 Appendix B EICB (Carte)
: 10. N Open Response is included in letter dated 10/25/10 NNC to review and revise this question after LTR R1is received.
Review            ML102980066                      Section 4, "Safety Evaluation" Section 8.2.2 of the Common Q SPM (ML050350234)           The process related requirements have been                          Response is provided in                        Item No. 14                      states: "the information relied states that the Software Requirements Specification       removed from revision 2 of the Software                            letter dated 10/25/10.      Due 10/22/10                                        upon in the SE must be (SRS) shall be developed using IEEE 830 and RE           Requirements Specification (SRS).                                                                                                                  docketed correspondence."
Open-NRC Review Due 12/31/10 EICB RAI ML102980066 Item No. 18 214 EICB (Carte) 7/27/2010 By {{letter dated|date=June 18, 2010|text=letter dated June 18, 2010}} (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 10) that the approved Common Q Topical Report contains information to address the "Safety Analysis." The Common Q SPM however states that a Preliminary Hazards Analysis Report and the V&V reports document the software hazards analysis. Please Provide these documents.
1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS           Attachment 3 of letter dated 10/25/10 contains the                                                                                                 LIC-101 Rev. 3 states: "The should address the software product, not the process      proprietary version of Westinghouse document                                                                                                        safety analysis that supports the
Responder: WEC According to "The Software Program Manual for Common Q Systems," WCAP-16096-NP-1A, the Software Safety Plan only applies to Protection class software and PAMS is classified as Important-to-safety. Exhibit 4-1 of the SPM shows that PAMS is classified as Important-to-Safety
: 11. N Open Response provided in letter dated 10/5/10 WEC References Common Q PAMS preliminary hazards analysis is referenced in the SRS.
WEC to delete.
Open-NRC Review Due 12/1/10 EICB RAI ML102980066 Item No. 11 TVA Letter dated 10/5/10 244 EICB (Carte) 8/3/2010 Section 8.2.2 of the Common Q SPM (ML050350234) states that the Software Requirements Specification (SRS) shall be developed using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS should address the software product, not the process Responder: WEC The process related requirements have been removed from revision 2 of the Software Requirements Specification (SRS).
of letter dated 10/25/10 contains the proprietary version of Westinghouse document
: 12. N Open Response is provided in letter dated 10/25/10.
Open-NRC Review Due 10/22/10 EICB RAI ML102980066 Item No. 14 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                             radBA627.docx                                                                                 Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                   RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                      Issue                                              TVA Response(s)                      Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                           Comments Sec. Sec.                                                                                                                                                                                                                      Date of producing the software. In addition Section 4.3.2.1       Nuclear Automation, Watts Bar 2 NSSS                                                                                                          change requested should include of the SPM states "Any alternatives to the SPM               Completion Program, I&C Projects, Software                                                                                                      technical information in sufficient processes or additional project specific information for      Requirements Specification for the Post Accident                                                                                                detail to enable the NRC staff to the ...SCMP...shall be specified in the PQP.                 Monitoring System, WNA-SD-00239-WBT,                                                                                                          make an independent Revision 2, Dated September 2010.                                                                                                              assessment regarding the Contrary to these two statements in the SPM, the                                                                                                                                                             acceptability of the proposal in WBN2 PAMS SRS (ML101050202) contains many                                                                                                                                                                     terms of regulatory requirements process related requirements, for example all                                                                                                                                                                 and the protection of public seventeen requirements in Section 2.3.2,                                                                                                                                                                     health and safety."
Date Comments of producing the software. In addition Section 4.3.2.1 of the SPM states "Any alternatives to the SPM processes or additional project specific information for the...SCMP...shall be specified in the PQP.
                                    "Configuration Control," address process requirements for configuration control.
Contrary to these two statements in the SPM, the WBN2 PAMS SRS (ML101050202) contains many process related requirements, for example all seventeen requirements in Section 2.3.2, "Configuration Control," address process requirements for configuration control.
Please explain how the above meets the intent of the approved SPM.
Please explain how the above meets the intent of the approved SPM.
246                                8/3/2010                                                     Responder: WEC                                      13. N        Open                        Open-NRC           EICB RAI                      LIC-101 Rev. 3 Appendix B EICB (Carte)
Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, WNA-SD-00239-WBT, Revision 2, Dated September 2010.
Review            ML102980066                  Section 4, "Safety Evaluation" Section 4.3.2.1, "Initiation Phase" of the Common Q           As agreed ISG6 does not apply to the Common Q                      Response is provided in                        Item No. 15                  states: "the information relied SPM (ML050350234) requires that a Project Quality             PAMS platform. The information required to                        letter dated 10/25/10                                                        upon in the SE must be Plan (PQP) be developed. Many other section of the           address this question concerning the PQP and                                                  Due 10/22/10                                    docketed correspondence."
change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
SPM identify that this PQP should contain information         SPM has been added to compliance matrix in required by ISG6. Please provide the PQP. If "PQP"           revision 1 of the Licensing Technical Report.                                                                                                  LIC-101 Rev. 3 states: "The is not the name of the documentation produced,                                                                                                                                                               safety analysis that supports the please describe the documentation produced and               Attachment 1 of letter dated 10/25/10 contains the                                                                                             change requested should include provide the information that the SPM states should be        proprietary version of Westinghouse document                                                                                                   technical information in sufficient in the PQP.                                                  Tennessee Valley Authority (TVA), Watts Bar                                                                                                   detail to enable the NRC staff to Unit 2 (WBN2), Post-Accident Monitoring System                                                                                                 make an independent (PAMS), Licensing Technical Report, Revision 1,                                                                                                 assessment regarding the WNA-LI-00058-WBT-P, Dated October 2010                                                                                                         acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
246 EICB (Carte) 8/3/2010 Section 4.3.2.1, "Initiation Phase" of the Common Q SPM (ML050350234) requires that a Project Quality Plan (PQP) be developed. Many other section of the SPM identify that this PQP should contain information required by ISG6. Please provide the PQP. If "PQP" is not the name of the documentation produced, please describe the documentation produced and provide the information that the SPM states should be in the PQP.
247                                 8/8/2010                                                     Responder: WEC                                      14. N        Open                        Open-NRC          EICB RAI                      LIC-101 Rev. 3 Appendix B EICB (Carte)
Responder: WEC As agreed ISG6 does not apply to the Common Q PAMS platform. The information required to address this question concerning the PQP and SPM has been added to compliance matrix in revision 1 of the Licensing Technical Report.
Review            ML102980066                  Section 4, "Safety Evaluation" As part of the Common Q topical report development           The implementation documents required by the                      Response is provided in                        Item No. 16                  states: "the information relied effort, Westinghouse developed the Software Program           SPM are identified in the compliance matrix in                    letter dated 10/25/10                                                        upon in the SE must be Manual for Common Q Systems (ML050350234) to                 revision 1 of the Licensing Technical Report.                                                  Due 10/22/10.                                    docketed correspondence."
of letter dated 10/25/10 contains the proprietary version of Westinghouse document Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010
address software planning documentation. The NRC reviewed the SPM and concluded: the SPM specifies           Attachment 1 of letter dated 10/25/10 contains the                                                                                              LIC-101 Rev. 3 states: "The plans that will provide a quality software life cycle         proprietary version of Westinghouse document                                                                                                    safety analysis that supports the process, and that these plans commit to                       Tennessee Valley Authority (TVA), Watts Bar                                                                                                    change requested should include documentation of life cycle activities that will permit the   Unit 2 (WBN2), Post-Accident Monitoring System                                                                                                  technical information in sufficient staff or others to evaluate the quality of the design         (PAMS), Licensing Technical Report, Revision 1,                                                                                                detail to enable the NRC staff to features upon which the safety determination will be         WNA-LI-00058-WBT-P, Dated October 2010                                                                                                        make an independent based. The staff will review the Implementation of the                                                                                                                                                        assessment regarding the life cycle process and the software life cycle process                                                                                                                                                       acceptability of the proposal in design outputs for specific applications on a plant-                                                                                                                                                         terms of regulatory requirements specific basis. Please identify the implementation                                                                                                                                                           and the protection of public documentation produced as a result of following the                                                                                                                                                           health and safety."
: 13. N Open Response is provided in letter dated 10/25/10 Open-NRC Review Due 10/22/10 EICB RAI ML102980066 Item No. 15 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
SPM, and state what information will be docketed.
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
248                                8/8/2010                                                     Responder: WEC                                      15. N         Open                       Open-NRC                                         LIC-101 Rev. 3 Appendix B EICB (Carte)
247 EICB (Carte) 8/8/2010 As part of the Common Q topical report development effort, Westinghouse developed the Software Program Manual for Common Q Systems (ML050350234) to address software planning documentation. The NRC reviewed the SPM and concluded: the SPM specifies plans that will provide a quality software life cycle process, and that these plans commit to documentation of life cycle activities that will permit the staff or others to evaluate the quality of the design features upon which the safety determination will be based. The staff will review the Implementation of the life cycle process and the software life cycle process design outputs for specific applications on a plant-specific basis. Please identify the implementation documentation produced as a result of following the SPM, and state what information will be docketed.
Review                                          Section 4, "Safety Evaluation" As part of the Common Q topical report development           The documents are identified in the compliance                    Response is provided in                                                      states: "the information relied effort, Westinghouse developed the Software Program           matrix in revision 1 of the Licensing Technical                    letter dated 10/25/10                                                        upon in the SE must be Manual for Common Q Systems (ML050350234) to                 Report                                                                                        Due 10/22/10.                                    docketed correspondence."
Responder: WEC The implementation documents required by the SPM are identified in the compliance matrix in revision 1 of the Licensing Technical Report.
address software planning documentation. The NRC reviewed the SPM and concluded: the SPM specifies           Attachment 1 of the letter dated 10/25/10 contains                                                                                             LIC-101 Rev. 3 states: "The plans that will provide a quality software life cycle        the proprietary version of Westinghouse                                                                                                        safety analysis that supports the process, and that these plans commit to                      document Tennessee Valley Authority (TVA),                                                                                                    change requested should include
of letter dated 10/25/10 contains the proprietary version of Westinghouse document Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010
: 14. N Open Response is provided in letter dated 10/25/10 Open-NRC Review Due 10/22/10.
EICB RAI ML102980066 Item No. 16 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
248 EICB (Carte) 8/8/2010 As part of the Common Q topical report development effort, Westinghouse developed the Software Program Manual for Common Q Systems (ML050350234) to address software planning documentation. The NRC reviewed the SPM and concluded: the SPM specifies plans that will provide a quality software life cycle process, and that these plans commit to Responder: WEC The documents are identified in the compliance matrix in revision 1 of the Licensing Technical Report of the letter dated 10/25/10 contains the proprietary version of Westinghouse document Tennessee Valley Authority (TVA),
: 15. N Open Response is provided in letter dated 10/25/10 Open-NRC Review Due 10/22/10.
LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                 radBA627.docx                                                                                 Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                       RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                        Issue                                                TVA Response(s)                      Y/N           Status/ Current Actions     Resolution Path   RAI No. & Date                               Comments Sec. Sec.                                                                                                                                                                                                                            Date documentation of life cycle activities that will permit the   Watts Bar Unit 2 (WBN2), Post-Accident                                                                                                                technical information in sufficient staff or others to evaluate the quality of the design         Monitoring System (PAMS), Licensing Technical                                                                                                          detail to enable the NRC staff to features upon which the safety determination will be         Report, Revision 1, WNA-LI-00058-WBT-P, Dated                                                                                                          make an independent based. The staff will review the Implementation of the        October 2010                                                                                                                                          assessment regarding the life cycle process and the software life cycle process                                                                                                                                                               acceptability of the proposal in design outputs for specific applications on a plant-                                                                                                                                                                 terms of regulatory requirements specific basis. Please identify the design outputs                                                                                                                                                                 and the protection of public produced as a result of following the SPM, and state                                                                                                                                                                 health and safety."
Date Comments documentation of life cycle activities that will permit the staff or others to evaluate the quality of the design features upon which the safety determination will be based. The staff will review the Implementation of the life cycle process and the software life cycle process design outputs for specific applications on a plant-specific basis. Please identify the design outputs produced as a result of following the SPM, and state when what information will be docketed.
when what information will be docketed.
Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010 technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
266                                    8/11/2010                                                     Responder: Webb/Webber                              16. Y        Open                          Open-NRC                            TVA Letter EICB (Carte)
266 EICB (Carte) 8/11/2010 Please provide a high level description of the Foxboro IA equipment used at WBN2. This description should be more detailed than a brochure on the product line (or available on the web), and less detailed than a technical manual on each field replaceable unit. It is expected that such literature already exists.
Review                              dated 10/21/10 Please provide a high level description of the Foxboro       FSAR section 7.7.1.11 will be added in                            Response provided in letter                                        Enclosure 1 IA equipment used at WBN2. This description should           Amendment 101. In discussions with the NRC                        dated 10/21/10              Amendment 101                          Item No. 9 be more detailed than a brochure on the product line         reviewer on October 4, 2010 it was agreed that                                                Submitted (or available on the web), and less detailed than a           the new FSAR section along with previously                                                    10/29/10.
Responder: Webb/Webber FSAR section 7.7.1.11 will be added in Amendment 101. In discussions with the NRC reviewer on October 4, 2010 it was agreed that the new FSAR section along with previously submitted documents should be sufficient to address this request. The NRC reviewer will notify TVA if additional documentation is required.
technical manual on each field replaceable unit. It is       submitted documents should be sufficient to expected that such literature already exists.                 address this request. The NRC reviewer will notify TVA if additional documentation is required.
: 16. Y Open Response provided in letter dated 10/21/10 Open-NRC Review Amendment 101 Submitted 10/29/10.
267                                    8/11/2010                                                    Responder: WEC                                      17. N        Open                         Open-NRC EICB (Carte)
TVA Letter dated 10/21/10 Item No. 9 267 EICB (Carte) 8/11/2010 By {{letter dated|date=June 18, 2010|text=letter dated June 18, 2010}} (ML101940236) TVA stated that the software safety plan (SSP) was not applicable to PAMS applications (see Watts Bar 2 -
Review By letter dated June 18, 2010 (ML101940236) TVA               This is addressed in the Licensing Technical                      Response provided in letter stated that the software safety plan (SSP) was not           Report, Revision 1, WNA-LI-00058-WBT-P.                            dated 10/25/10 applicable to PAMS applications (see Watts Bar 2 -                                                                                                             Due 10/22/10 Common Q PAMS ISG-6 Compliance matrix Item No.               Attachment 1 of the letter dated 10/25/10 10); however, reference No. 30 of the SRS                     contains the Proprietary version of (ML101050202) is: 00000-ICE-37727, Rev. 0, "Post             Westinghouses document titled: Tennessee Accident Monitoring System Software Preliminary              Valley Authority (TVA), Watts Bar Unit 2 (WBN2),
Common Q PAMS ISG-6 Compliance matrix Item No.
Hazard Analysis for the Common Q PAMS Project." A            Post-Accident Monitoring System (PAMS),
10); however, reference No. 30 of the SRS (ML101050202) is: 00000-ICE-37727, Rev. 0, "Post Accident Monitoring System Software Preliminary Hazard Analysis for the Common Q PAMS Project." A Preliminary Hazard Analysis is required by the SSP.
Preliminary Hazard Analysis is required by the SSP.          Licensing Technical Report, Revision 1, WNA-LI-Please explain.                                              00058-WBT-P, Dated October 2010 291          7.7                      9/7/2010                                                      Responder: Clark                                    18. Y        Open                          Open-NRC                             TVA Letter EICB (Carte)
Please explain.
Review                              dated 10/21/10 The equation at the bottom of Amendment 100 page The errors in the terms within the equation for                                Response provided in letter                                        Enclosure 1 7.7-3 is wrong. There are two ways that this equation total rod speed error [TE] will be corrected in                           dated 10/21/10              Amendment 101                          Item No. 21 is inconsistent with the text above it.              FSAR Amendment 101 as shown below:                                                                     Submitted 10/29/10.
Responder: WEC This is addressed in the Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P.
1              1 1              1        1 1
of the letter dated 10/25/10 contains the Proprietary version of Westinghouses document titled: Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2),
092                                    5/20/2010                                                    Responder: Hilmes                                    19. N        Open                          Open-TVA DORL (Poole)          TVA to review Licensee Open Item list and determine          This item will close when we are no longer using                                                Continuous review which items are proprietary.                                  this document as a communications tool.                                                          as items are added 287  7.3    7.3-1                    8/27/2010                                                    Responder: Elton                                    20. Y        Open                          Open-TVA        ML102390538, EICB (Darbali)
Post-Accident Monitoring System (PAMS),
Item No. 1, In Amendment 95 of FSAR section 7.3.2.3 Further              Unit 2 FSAR Section 7.3 addresses Engineered                      Response included in next    Due 10/31/10. 9/10/10 and Considerations, the list of signals that would start the    Safety Features (ESF) Actuation System.                            TVA Licensing Formal RAI      Waiting for      EICB RAI No.17 auxiliary feedwater motor driven and turbine driven          AMSAC is non-safety, and thus non-ESF.                            Response Letter.              docketed version ML102910017, pumps was moved to table 7.3-1 item 3, Auxiliary              Therefore, it was correct to not include AMSAC                                                  to close item. 10/19/10 Feedwater. However, item (6) AMSAC was not                  when the initiating signals were relocated from included in table 7.3-1.                                      Unit 2 FSAR Section 7.3.2.3 to Table 7.3-1.                                                      Expected letter issue date is Please explain this omission or state your commitment                                                                                                          11/5/10 to correct this in a future amendment.
Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010
: 17. N Open Response provided in letter dated 10/25/10 Open-NRC Review Due 10/22/10 291 7.7 EICB (Carte) 9/7/2010 The equation at the bottom of Amendment 100 page 7.7-3 is wrong. There are two ways that this equation is inconsistent with the text above it.
Responder: Clark The errors in the terms within the equation for total rod speed error [TE] will be corrected in FSAR Amendment 101 as shown below:  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                   radBA627.docx                                                                             Open Items to be Resolved for SER Approval SE     FSAR     NRC
1 1
1 1 1
 
1
: 18. Y Open Response provided in letter dated 10/21/10 Open-NRC Review Amendment 101 Submitted 10/29/10.
TVA Letter dated 10/21/10 Item No. 21 092 DORL (Poole) 5/20/2010 TVA to review Licensee Open Item list and determine which items are proprietary.
Responder: Hilmes This item will close when we are no longer using this document as a communications tool.
: 19. N Open Open-TVA Continuous review as items are added 287 7.3 7.3-1 EICB (Darbali) 8/27/2010 In Amendment 95 of FSAR section 7.3.2.3 Further Considerations, the list of signals that would start the auxiliary feedwater motor driven and turbine driven pumps was moved to table 7.3-1 item 3, Auxiliary Feedwater. However, item (6) AMSAC was not included in table 7.3-1.
Please explain this omission or state your commitment to correct this in a future amendment.
Responder: Elton Unit 2 FSAR Section 7.3 addresses Engineered Safety Features (ESF) Actuation System.
AMSAC is non-safety, and thus non-ESF.
Therefore, it was correct to not include AMSAC when the initiating signals were relocated from Unit 2 FSAR Section 7.3.2.3 to Table 7.3-1.
: 20. Y Open Response included in next TVA Licensing Formal RAI Response Letter.
Open-TVA Due 10/31/10.
Waiting for docketed version to close item.
Expected letter issue date is 11/5/10 ML102390538, Item No. 1, 9/10/10 and EICB RAI No.17 ML102910017, 10/19/10
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                   RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                    POC                                        Issue                                                TVA Response(s)                      Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                     Comments Sec. Sec.                                                                                                                                                                                                                          Date 294   7.3   7.3.1.                     9/9/2010                                                     Responder: Elton                                      21. Y        Open                        Open-TVA          ML102390538, EICB (Darbali) 1.1                                                                                                                                                                                                        Item No. 2, In Amendment 95 of FSAR section 7.3.1.1.1 Function The information provided in Unit 2 FSAR Section                              Response included in next  Due 10/31/10.      9/10/10 Initiation, item (13) was arranged into paragraph form 7.3.1.1 is not meant to describe the specific                            TVA Licensing Formal RAI    Waiting for from what used to be a listing of items (a), (b) and (c). function of each item in detail; the descriptions                      Response Letter.            docketed version provided are a summary listing. The omitted                                                        to close item.
Date Comments 294 7.3 7.3.1.
The second bullet under item (c) was omitted in the       information provided information beyond the level new paragraph.                                           of detail provided for the other items in this                                                      Expected letter section.                                                                                            issue date is Initiates Phase B containment isolation of the                                                                                                               11/5/10 following:                                               The level of detail contained in item (13) of Unit 2
1.1 EICB (Darbali) 9/9/2010 In Amendment 95 of FSAR section 7.3.1.1.1 Function Initiation, item (13) was arranged into paragraph form from what used to be a listing of items (a), (b) and (c).
* Closure of the main steam isolation valves (MSIV) FSAR Section 7.3.1.1 is consistent with that to limit reactor coolant system cooldown for breaks contained in item 13. of Unit 1 UFSAR Section downstream of the MSIVs.                          7.3.1.1.
The second bullet under item (c) was omitted in the new paragraph.
Initiates Phase B containment isolation of the following:
Closure of the main steam isolation valves (MSIV) to limit reactor coolant system cooldown for breaks downstream of the MSIVs.
Please explain this omission or state your commitment to correct this in a future amendment.
Please explain this omission or state your commitment to correct this in a future amendment.
295  7.3   7.3.1.                     9/9/2010                                                      Responder: Elton                                      22. Y         Open                       Open-TVA           ML102390538, EICB (Darbali) 1.2                                                                                                                                                                                                        Item No. 3, In Amendment 95 of FSAR section 7.3.1.1.2 Process The level of detail is sufficient for this section                            Response included in next  Due 10/31/10.      9/10/10 Protection Circuitry, item (3), references to sections without the two removed references to other                              TVA Licensing Formal RAI    Waiting for 7.6 and 7.7 were removed.                              Sections.                                                                Response Letter.            docketed version to close item.
Responder: Elton The information provided in Unit 2 FSAR Section 7.3.1.1 is not meant to describe the specific function of each item in detail; the descriptions provided are a summary listing. The omitted information provided information beyond the level of detail provided for the other items in this section.
Please explain the reason for removal.                       The level of detail contained in item (3) of Unit 2 FSAR Section 7.3.1.1.2 is consistent with that                                                 Expected letter contained in item 3. of Unit 1 UFSAR Section                                                   issue date is 7.3.1.1.2.                                                                                     11/5/10 296   7.3   7.3.1.                     9/9/2010                                                     Responder: Elton                                      23. Y        Open                        Open-TVA          ML102390538, EICB (Darbali) 2.1                                                                                                                                                                                                        Item No. 4, In Amendment 95 of FSAR section 7.3.1.2.1             The information provided in Unit 2 FSAR Section                            Response included in next  Due 10/31/10.      9/10/10 Generating Station Conditions, the new paragraph   7.3.1.2.1 is not meant to provide detailed                                  TVA Licensing Formal RAI    Waiting for was arranged from what used to be a listing of items information describing what each condition                                  Response Letter.            docketed version (1.b), (1.c), and (2.b), leaving out items (1.a) and (2.a).
The level of detail contained in item (13) of Unit 2 FSAR Section 7.3.1.1 is consistent with that contained in item 13. of Unit 1 UFSAR Section 7.3.1.1.
includes. Deletion of the breaks described in                                                          to close item.
: 21. Y Open Response included in next TVA Licensing Formal RAI Response Letter.
Even if the paragraph contains the word include, theItems (1.a) and (2.a) is justified because they are breaks in items (1.a) and (2.a) should be listed. encompassed by the operating conditions primary                                                         Expected letter system breaks and secondary system breaks,                                                             issue date is Please explain this omission or state your commitment respectively.                                                                                          11/5/10 to correct this in a future amendment.
Open-TVA Due 10/31/10.
Waiting for docketed version to close item.
Expected letter issue date is 11/5/10 ML102390538, Item No. 2, 9/10/10 295 7.3 7.3.1.
1.2 EICB (Darbali) 9/9/2010 In Amendment 95 of FSAR section 7.3.1.1.2 Process Protection Circuitry, item (3), references to sections 7.6 and 7.7 were removed.
Please explain the reason for removal.
Responder: Elton The level of detail is sufficient for this section without the two removed references to other Sections.
The level of detail contained in item (3) of Unit 2 FSAR Section 7.3.1.1.2 is consistent with that contained in item 3. of Unit 1 UFSAR Section 7.3.1.1.2.
: 22. Y Open Response included in next TVA Licensing Formal RAI Response Letter.
Open-TVA Due 10/31/10.
Waiting for docketed version to close item.
Expected letter issue date is 11/5/10 ML102390538, Item No. 3, 9/10/10 296 7.3 7.3.1.
2.1 EICB (Darbali) 9/9/2010 In Amendment 95 of FSAR section 7.3.1.2.1 Generating Station Conditions, the new paragraph was arranged from what used to be a listing of items (1.b), (1.c), and (2.b), leaving out items (1.a) and (2.a).
Even if the paragraph contains the word include, the breaks in items (1.a) and (2.a) should be listed.
Please explain this omission or state your commitment to correct this in a future amendment.
Responder: Elton The information provided in Unit 2 FSAR Section 7.3.1.2.1 is not meant to provide detailed information describing what each condition includes. Deletion of the breaks described in Items (1.a) and (2.a) is justified because they are encompassed by the operating conditions primary system breaks and secondary system breaks, respectively.
The level of detail contained in Unit 2 FSAR Section 7.3.1.2.1 is consistent with that contained in Unit 1 UFSAR Section 7.3.1.2.1.
The level of detail contained in Unit 2 FSAR Section 7.3.1.2.1 is consistent with that contained in Unit 1 UFSAR Section 7.3.1.2.1.
297   7.3   7.3.1.                     9/9/2010                                                     Responder: Elton                                      24. Y        Open                        Open-TVA          ML102390538, EICB (Darbali) 2.2                                                                                                                                                                                                        Item No. 5, In Amendment 95 of FSAR section 7.3.1.2.2             Unit 2 FSAR Section 7.3 addresses Engineered                               Response included in next  Due 10/31/10.      9/10/10 Generating Station Variables, the following sentence Safety Features (ESF) Actuation System. Post                               TVA Licensing Formal RAI    Waiting for was erased:                                            accident monitoring is not an ESF; thus, a                                 Response Letter.            docketed version reference to it is not required in 7.3.1.2.2.                                                         to close item.
: 23. Y Open Response included in next TVA Licensing Formal RAI Response Letter.
Post accident monitoring requirements and variables are given in Tables 7.5-1 and 7.5-2.                                                                                                                         Expected letter issue date is Please explain the reason for removal.                                                                                                                        11/5/10 298   7.3     XX                         9/9/2010                                                     Responder: Clark                                      25. Y        Open                        Open-TVA          ML102390538, EICB                                                                                                                                                                                            Item No. 6, IE Bulletin 80-06 calls for review of engineered safety       A review of the schematic diagrams for the                          Response included in next  Due 10/31/10.      9/10/10 (Darbali)          features with the objective of ensuring that no device       WBN Unit 2 valves listed in SER 3 found the                         TVA Licensing Formal RAI   Waiting for will change position solely because of the reset            following:                                                          Response Letter.           docketed version action.                                                                                                                                                      to close item.
Open-TVA Due 10/31/10.
Waiting for docketed version to close item.
Expected letter issue date is 11/5/10 ML102390538, Item No. 4, 9/10/10 297 7.3 7.3.1.
2.2 EICB (Darbali) 9/9/2010 In Amendment 95 of FSAR section 7.3.1.2.2 Generating Station Variables, the following sentence was erased:
Post accident monitoring requirements and variables are given in Tables 7.5-1 and 7.5-2.
Please explain the reason for removal.
Responder: Elton Unit 2 FSAR Section 7.3 addresses Engineered Safety Features (ESF) Actuation System. Post accident monitoring is not an ESF; thus, a reference to it is not required in 7.3.1.2.2.
: 24. Y Open Response included in next TVA Licensing Formal RAI Response Letter.
Open-TVA Due 10/31/10.
Waiting for docketed version to close item.
Expected letter issue date is 11/5/10 ML102390538, Item No. 5, 9/10/10 298 7.3 XX EICB (Darbali) 9/9/2010 IE Bulletin 80-06 calls for review of engineered safety features with the objective of ensuring that no device will change position solely because of the reset action.
Responder: Clark A review of the schematic diagrams for the WBN Unit 2 valves listed in SER 3 found the following:
: 25. Y Open Response included in next TVA Licensing Formal RAI Response Letter.
Open-TVA Due 10/31/10.
Waiting for docketed version to close item.
ML102390538, Item No. 6, 9/10/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                         radBA627.docx                                                                                   Open Items to be Resolved for SER Approval SE     FSAR     NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                       RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                      Issue                                          TVA Response(s)                      Y/N           Status/ Current Actions       Resolution Path   RAI No. & Date                             Comments Sec. Sec.                                                                                                                                                                                                                      Date (1) For feedwater isolation valves (FCV-3-33, In Supplement 3 of NUREG-0847, section 7.3.5, the             FCV-3-47, FCV-3-87, and FCV-3-100),                                                           Expected letter staff approved the design modifications proposed by          feedwater check valve bypass valves (FCV-                                                     issue date is the applicant that would allow certain devices to            3-185, FCV-3-186, FCV-3-187, and FCV                                                       11/5/10 remain unchanged upon an ESF reset. The staff also            188), and upper tap main feedwater found acceptable the applicants justification for some      isolation valves (FCV 3-236, FCV-3-239, safety-related equipment that does not remain in its          FCV-3-242, and FCV-3-245), the Unit 2 emergency mode after an ESF reset.                            equivalent reset switch and a relay have been added for each steam generator loop.
Date Comments In Supplement 3 of NUREG-0847, section 7.3.5, the staff approved the design modifications proposed by the applicant that would allow certain devices to remain unchanged upon an ESF reset. The staff also found acceptable the applicants justification for some safety-related equipment that does not remain in its emergency mode after an ESF reset.
Please confirm whether or not the equipment that was          When the engineered safety feature (ESF) determined in NUREG-0847 and its supplements to              signal is reset, the individual valve will not remain unchanged upon an ESF reset will still remain          change state until both the loop and the unchanged in Unit 2.                                          ESF train reset switches have been reset.
Please confirm whether or not the equipment that was determined in NUREG-0847 and its supplements to remain unchanged upon an ESF reset will still remain unchanged in Unit 2.
(2) For steam generator blowdown isolation valves (FCV-43-54D, FCV-43-56D, FCV-43-59D, FCV-43-63D, FCV-43-55, FCV                                                                                                   58, FCV-43-61, and FCV-43-64), the ESF signal is sealed in by means of a seal in relay. The individual valve will not change state until a hand switch in the sample room is used to reopen the individual valve.
(1) For feedwater isolation valves (FCV-3-33, FCV-3-47, FCV-3-87, and FCV-3-100),
feedwater check valve bypass valves (FCV-3-185, FCV-3-186, FCV-3-187, and FCV 188), and upper tap main feedwater isolation valves (FCV 3-236, FCV-3-239, FCV-3-242, and FCV-3-245), the Unit 2 equivalent reset switch and a relay have been added for each steam generator loop.
When the engineered safety feature (ESF) signal is reset, the individual valve will not change state until both the loop and the ESF train reset switches have been reset.
(2) For steam generator blowdown isolation valves (FCV-43-54D, FCV-43-56D, FCV-43-59D, FCV-43-63D, FCV-43-55, FCV 58, FCV-43-61, and FCV-43-64), the ESF signal is sealed in by means of a seal in relay. The individual valve will not change state until a hand switch in the sample room is used to reopen the individual valve.
(3) For residual heat removal heat exchanger outlet flow control valves (FCV-74-16 and FCV-74-28), the ESF signal is sealed in by the limit switch. The Unit 2 equivalent reset switch has been added at the control room control board. When the ESF signal is reset, the individual valve will not change state until the individual reset switch has been reset.
(3) For residual heat removal heat exchanger outlet flow control valves (FCV-74-16 and FCV-74-28), the ESF signal is sealed in by the limit switch. The Unit 2 equivalent reset switch has been added at the control room control board. When the ESF signal is reset, the individual valve will not change state until the individual reset switch has been reset.
334   7     7                     FSAR Figure 7A-3 Mechanical Flow and Control             Responder: Stockton                                 26. Y         Open                           Open-TVA           RAI not         N/A             RAI not required because the EICB Diagram Symbols doesnt show the symbols for the                                                                                                                              required.                        figure is not part of any SE (Darbal first column of valves. Please correct this in a future                                                                      Figure will be corrected in    Due TBD                                              section.
Expected letter issue date is 11/5/10 334 7
i)
7 EICB (Darbal i)
FSAR amendment.                                                                                                              FSAR Amendment 102.
FSAR Figure 7A-3 Mechanical Flow and Control Diagram Symbols doesnt show the symbols for the first column of valves. Please correct this in a future FSAR amendment.
323                                  WCAP-13869 revision 1 was previously reviewed           Responder: Hilmes/Unit 1                              27. Y        Open                          Open-TVA Unit 1                    TVA Letter under WBN Unit 1 SER SSER 13 (Reference 8). Unit                                                                                                                                               dated 10/29/10 2 references revision 2. An analysis of the differences Attachment 12 contains the WCAP 13869                                Response is included in                                            Enclosure 1 and their acceptability will be submitted to the NRC by Revision 1 to Revision 2 Change Analysis.                           letter dated 10/29/10                                             Item No. 36 November 15, 2010 EICB(Garg)
Responder: Stockton
The staff is confused with the response since both units have reference leg not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 117   7.1     7.1                   6/3/2010                                                  Responder: Hilmes                                    28. Y        Open                          Open-TVA/A102      EICB RAI        TVA Letter EICB (Garg)
: 26. Y Open Figure will be corrected in FSAR Amendment 102.
ML102910008      dated 10/29/10 Does TVA use a single sided or double sided               Reactor Protection System (RPS) (comprised of                      Revised response is            Pending FSAR      Item#21          Enclosure 1 methodology for as-found and as-left instrument           Reactor Trip (RPS) and Engineered Safety                           included in letter dated      Amendment 102                      Item No. 7 setpoint values. (RIS2006-7)                              Features Actuation System (ESFAS)) setpoint                       10/29/10                      submittal values are monitored by periodic performance of surveillance tests in accordance with Technical                                                   Due 10/31/10 Specification requirements. TVA uses double-sided as-found and as-left tolerances for Reactor                                                 TVA needs to
Open-TVA Due TBD RAI not required.
N/A RAI not required because the figure is not part of any SE section.
323 EICB(Garg)
WCAP-13869 revision 1 was previously reviewed under WBN Unit 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An analysis of the differences and their acceptability will be submitted to the NRC by November 15, 2010 Responder: Hilmes/Unit 1 2 contains the WCAP 13869 Revision 1 to Revision 2 Change Analysis.
: 27. Y Open Response is included in letter dated 10/29/10 The staff is confused with the response since both units have reference leg not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 Open-TVA Unit 1 TVA Letter dated 10/29/10 Item No. 36 117 7.1 7.1 EICB (Garg) 6/3/2010 Does TVA use a single sided or double sided methodology for as-found and as-left instrument setpoint values. (RIS2006-7)
Responder: Hilmes Reactor Protection System (RPS) (comprised of Reactor Trip (RPS) and Engineered Safety Features Actuation System (ESFAS)) setpoint values are monitored by periodic performance of surveillance tests in accordance with Technical Specification requirements. TVA uses double-sided as-found and as-left tolerances for Reactor
: 28. Y Open Revised response is included in letter dated 10/29/10 Open-TVA/A102 Pending FSAR Amendment 102 submittal Due 10/31/10 TVA needs to EICB RAI ML102910008 Item#21 TVA Letter dated 10/29/10 Item No. 7


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                           radBA627.docx                                                                                   Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                         RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                    Issue                                              TVA Response(s)                      Y/N           Status/ Current Actions     Resolution Path     RAI No. & Date                             Comments Sec. Sec.                                                                                                                                                                                                                          Date Trip and ESFAS trip setpoint surveillance tests as                                               address that trip described in FSAR amendment 100.                                                                 setpoint and allowable value TVA Revised Response:                                                                           uncertainties are not reduced by For TSTF-493 parameters WBN Unit 2 uses only                                                     the reduction double sided correction factors. Attachment 3                                                   factor for the contains the revised FSAR section 7.1.2.1.9 that                                                 single sided will be included in FSAR Amendment 102 that                                                     reduction factor.
Date Comments Trip and ESFAS trip setpoint surveillance tests as described in FSAR amendment 100.
reflects this change.                                                                            TVA response not acceptable. TVA need to clarify if single sided methodology has been used in calculating trip setpoint and allowable value and if it is used then provide justifications.
TVA Revised Response:
154   7.2     7.2                 FSAR section 7.2.1.1.10, setpoints: NRC staff has           Responder: Craig/Webb                                29. Y        Open                          Open-TVA/A102        ML101720589,    TVA Letter      EICB RAI ML102861885 sent to EICB (Garg) issued RIS 2006-17 to provide guidance to the industry                                                                                                                             Item No. 6 and  dated 10/5/10    DORL regarding the instrument setpoint methodology which         (Q1) Refer to the response to letter item 13, RAI                  Response is not acceptable. Pending FSAR            EICB RAI complies with 10 CFR 50.36 requirements. Provide             Matrix Item 51.                                                    A revised response will be Amendment 102            ML102861885      TVA Letter the information on how the WBN2 setpoint                                                                                       submitted in the letter dated submittal.            Item No. 8      dated 10/29/10 methodology meets the guidance of RIS 2006-17 and           (Q2) EEB-TI-28's single sided methodology                          10/29/10.                                                            Enclosure 1 include this discussion in this section. Also, by letter     conforms with WBN's design basis commitment to                                                  FSAR AMD 100.                          Item No. 13 dated May 13, 2010, TVA provided Rev. 7 of EEB-TI-           ensure that 95% of the analyzed population is                                                    Since all the 28 to the staff. The staff noted that section 4.3.3.6 of     covered by the calculated tolerance limits as                                                    setpoint and EEB-TI-28 discusses the correction for setpoints with a     defined in NRC Reg Guide 1.105, Revision 2,                                                      allowable value single side of interest. It should be noted that the staff   1986 that was in affect during WBN Unit 1                                                        for Unit 2 is has not approved this aspect of setpoint methodology         licensing. The single sided methodology is not                                                  calculated and for Unit 1. The staff finds this reduction in               used for any TSTF-493 setpoints that use TI-28                                                  added to TS, TVA uncertainties is not justified unless it can be             methodology.                                                                                    needs to address demonstrated that the 95/95 criteria is met. Therefore,                                                                                                       the latest criteria either remove this reduction factor for single sided         TVA Revised Response:                                                                            and that include uncertainties or justify how you meet the 95/95 criteria                                                                                                     95/95 criteria.
For TSTF-493 parameters WBN Unit 2 uses only double sided correction factors. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
given in RG 1.105.                                           In order to respond to other NRC comments on                                                     Why the last the setpoint methodology discussion in FSAR                                                     sentence has Amendment 100, TVA reviewed the previous                                                         been modified by response to this RAI. This resulted in a complete                                               adding TI-28. It rewrite of the responses to this question as shown                                               was NRCs below. As a result, the response does not                                                       understanding specifically address the NRC Follow-up Request.                                                 that all setpoints However, the overall responses to all of the NRC                                                 have to meet TI-RAIs on setpoint methodology addresses this                                                     28 item.
address that trip setpoint and allowable value uncertainties are not reduced by the reduction factor for the single sided reduction factor.
(Q1)   WBN 2 implementation of TSTF-493, Rev. 4, Option A includes addition of a discussion of the WBN setpoint methodology in FSAR section 7.1.2.1.9.
TVA response not acceptable. TVA need to clarify if single sided methodology has been used in calculating trip setpoint and allowable value and if it is used then provide justifications.
(Q2)   Electrical Engineering Branch (EEB)
154 7.2 7.2 EICB (Garg)
FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS 2006-17 to provide guidance to the industry regarding the instrument setpoint methodology which complies with 10 CFR 50.36 requirements. Provide the information on how the WBN2 setpoint methodology meets the guidance of RIS 2006-17 and include this discussion in this section. Also, by {{letter dated|date=May 13, 2010|text=letter dated May 13, 2010}}, TVA provided Rev. 7 of EEB-TI-28 to the staff. The staff noted that section 4.3.3.6 of EEB-TI-28 discusses the correction for setpoints with a single side of interest. It should be noted that the staff has not approved this aspect of setpoint methodology for Unit 1. The staff finds this reduction in uncertainties is not justified unless it can be demonstrated that the 95/95 criteria is met. Therefore, either remove this reduction factor for single sided uncertainties or justify how you meet the 95/95 criteria given in RG 1.105.
Responder: Craig/Webb (Q1) Refer to the response to letter item 13, RAI Matrix Item 51.
(Q2) EEB-TI-28's single sided methodology conforms with WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986 that was in affect during WBN Unit 1 licensing. The single sided methodology is not used for any TSTF-493 setpoints that use TI-28 methodology.
TVA Revised Response:
In order to respond to other NRC comments on the setpoint methodology discussion in FSAR Amendment 100, TVA reviewed the previous response to this RAI. This resulted in a complete rewrite of the responses to this question as shown below. As a result, the response does not specifically address the NRC Follow-up Request.
However, the overall responses to all of the NRC RAIs on setpoint methodology addresses this item.
(Q1)
WBN 2 implementation of TSTF-493, Rev. 4, Option A includes addition of a discussion of the WBN setpoint methodology in FSAR section 7.1.2.1.9.
(Q2)
Electrical Engineering Branch (EEB)
: 29. Y Open Response is not acceptable.
A revised response will be submitted in the letter dated 10/29/10.
Open-TVA/A102 Pending FSAR Amendment 102 submittal.
FSAR AMD 100.
Since all the setpoint and allowable value for Unit 2 is calculated and added to TS, TVA needs to address the latest criteria and that include 95/95 criteria.
Why the last sentence has been modified by adding TI-28. It was NRCs understanding that all setpoints have to meet TI-28 ML101720589, Item No. 6 and EICB RAI ML102861885 Item No. 8 TVA Letter dated 10/5/10 TVA Letter dated 10/29/10 Item No. 13 EICB RAI ML102861885 sent to DORL


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                       radBA627.docx                                                                               Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                     RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                    Issue                                          TVA Response(s)                      Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                       Comments Sec. Sec.                                                                                                                                                                                                                Date Technical Instruction (TI) 28, Setpoint Calculations, single-sided methodology conforms to WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986, which was in effect during WBN Unit 1 licensing. Single-sided multipliers are not used for any TSTF-493 setpoints.
Date Comments Technical Instruction (TI) 28, Setpoint Calculations, single-sided methodology conforms to WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986, which was in effect during WBN Unit 1 licensing. Single-sided multipliers are not used for any TSTF-493 setpoints.
There are some areas where a 95%
There are some areas where a 95%
confidence level could not be achieved.
confidence level could not be achieved.
Some examples would be harsh environment instrumentation where only 2 or 3 devices were tested in the 10CFR50.49 program. In these situations, the Confidence is referred to as high..
Some examples would be harsh environment instrumentation where only 2 or 3 devices were tested in the 10CFR50.49 program. In these situations, the Confidence is referred to as high..
306   7.1     7.1                 FSAR amendment 100, page 7.1-12 provides the         Responder: Hilmes                                      30. Y        Open                        Open-TVA/A102      EICB RAI        TVA Letter definition of Allowable value which is not consistent                                                                                                                     ML102910008      dated 10/29/10 EICB (Garg) with TSTF-493 as allowable value is the value beyond The FSAR Allowable Value definition will be                           Response is included in    Due 10/31/10      Item#69          Enclosure 1 which instrument channel is declared inoperable.      revised to be consistent with the TSTF-493 in                       letter dated 10/29/10                                          Item No. 26 FSAR Amendment 102. Attachment 3 contains                                                       Pending FSAR the revised FSAR section 7.1.2.1.9 that will be                                                 Amendment 102 included in FSAR Amendment 102 that reflects                                                     submittal this change.
306 7.1 7.1 EICB (Garg)
307   7.1     7.1                 (1) FSAR amendment 100, Section 7.1, page 7.1-12, Responder: Hilmes                                        31. Y          Open                        Open-TVA/A102      EICB RAI        TVA Letter definition of Acceptable as found tolerance is not in                                                                                                                     ML102910008      dated 10/29/10 accordance with TSTF-493 as AAF is the limit beyond (1) The Acceptable As Found (AAF) definition will                      Response is included in                        Item#70          Enclosure 1 which the instrument channel is degraded but may be         be revised to be consistent with TSTF-493 in                  letter dated 10/29/10      Due 10/31/10                        Item No. 27 operable and its operability must be evaluated. (2)         FSAR Amendment 102. Attachment 3 Also it states that AAF is based on measurable             contains the revised FSAR section 7.1.2.1.9                                                Pending FSAR instrument channel uncertainties, such as drift,           that will be included in FSAR Amendment 102                                                Amendment 102 expected during the surveillance interval. These           that reflects this change.                                                                submittal wording should be revised to agree with the wording given in RIS2006-17 as these wordings are very         (2) Additional detail on the AAF methodology vague. (3) Also it states that RPS functions use double     was provided in sections 7.1.2.1.9.1, sided tolerance limits for the AAF. Since AAF is a         Westinghouse Setpoint Methodology, and band it will always be double sided and therefore, this     7.1.2.1.9.2, TVA Setpoint Methodology.
FSAR amendment 100, page 7.1-12 provides the definition of Allowable value which is not consistent with TSTF-493 as allowable value is the value beyond which instrument channel is declared inoperable.
EICB (Garg) clarification does not mean anything and it clouds the      These sections will be revised to clarify the issue.                                                      AAF calculations in FSAR Amendment 102.
Responder: Hilmes The FSAR Allowable Value definition will be revised to be consistent with the TSTF-493 in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
: 30. Y Open Response is included in letter dated 10/29/10 Open-TVA/A102 Due 10/31/10 Pending FSAR Amendment 102 submittal EICB RAI ML102910008 Item#69 TVA Letter dated 10/29/10 Item No. 26 307 7.1 7.1 EICB (Garg)
(1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of Acceptable as found tolerance is not in accordance with TSTF-493 as AAF is the limit beyond which the instrument channel is degraded but may be operable and its operability must be evaluated. (2)
Also it states that AAF is based on measurable instrument channel uncertainties, such as drift, expected during the surveillance interval. These wording should be revised to agree with the wording given in RIS2006-17 as these wordings are very vague. (3) Also it states that RPS functions use double sided tolerance limits for the AAF. Since AAF is a band it will always be double sided and therefore, this clarification does not mean anything and it clouds the issue.
Responder: Hilmes (1) The Acceptable As Found (AAF) definition will be revised to be consistent with TSTF-493 in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
(2) Additional detail on the AAF methodology was provided in sections 7.1.2.1.9.1, Westinghouse Setpoint Methodology, and 7.1.2.1.9.2, TVA Setpoint Methodology.
These sections will be revised to clarify the AAF calculations in FSAR Amendment 102. contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
(3) The statement about double sided limits addresses a TSTF requirement that the AAF tolerance consider errors in both the conservative and non-conservative directions and ensures that an as-found value which exceeds these limits, even in the conservative direction (away from the safety limit), will be evaluated. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
(3) The statement about double sided limits addresses a TSTF requirement that the AAF tolerance consider errors in both the conservative and non-conservative directions and ensures that an as-found value which exceeds these limits, even in the conservative direction (away from the safety limit), will be evaluated. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
: 31. Y Open Response is included in letter dated 10/29/10 Open-TVA/A102 Due 10/31/10 Pending FSAR Amendment 102 submittal EICB RAI ML102910008 Item#70 TVA Letter dated 10/29/10 Item No. 27 308 7.1 7.1
(
(
308  7.1    7.1    G             (1) FSAR Amendment 100, Section 7.1, page 7.1-13,       Responder: Hilmes                                   32. Y         Open                       Open-TVA/A102     EICB RAI         TVA Letter
G (1) FSAR Amendment 100, Section 7.1, page 7.1-13, Responder: Hilmes
: 32. Y Open Open-TVA/A102 EICB RAI TVA Letter  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                           radBA627.docx                                                                                 Open Items to be Resolved for SER Approval SE     FSAR     NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                     RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                    Issue                                            TVA Response(s)                          Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                       Comments Sec. Sec.                                                                                                                                                                                                                      Date definition of Acceptable as left tolerance is not in                                                                                                                           ML102910008      dated 10/29/10 accordance with TSTF-493 as it states that this may       (1) The statement about using calibration history                      Response is included in                        Item#71          Enclosure 1 take calibration history into consideration. This is very     to determine the Acceptable As Left (AAL) will                    letter dated 10/29/10      Due 10/31/10                        Item No. 28 vague and ambiguous. (2) Also it states that RPS             be deleted in FSAR Amendment 102.
Date Comments definition of Acceptable as left tolerance is not in accordance with TSTF-493 as it states that this may take calibration history into consideration. This is very vague and ambiguous. (2) Also it states that RPS functions use double sided tolerance limits. Since ALF is a band it will always be double sided and therefore, this clarification does not mean anything and clouds the issue.
functions use double sided tolerance limits. Since ALF       Attachment 3 contains the revised FSAR                                                        Pending FSAR is a band it will always be double sided and therefore,       section 7.1.2.1.9 that will be included in FSAR                                               Amendment 102 this clarification does not mean anything and clouds          Amendment 102 that reflects this change.                                                      submittal the issue.
(1) The statement about using calibration history to determine the Acceptable As Left (AAL) will be deleted in FSAR Amendment 102. contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
(2) See response to letter item 27 (NRC Matrix Item 307).
(2) See response to letter item 27 (NRC Matrix Item 307).
309   7.1   7.1.2.                 (1) FSAR amendment 100, Page 7.1-14,                     Responder: Hilmes                                  33. Y              Open                        Open-TVA/A102      EICB RAI        TVA Letter 1.9.1                  Westinghouse setpoint methodology, states that AAF                                                                                                                             ML102910008      dated 10/29/10 is the algebraic sum of the .. This is not acceptable. (1) The AAF calculation for Westinghouse                                Response is included in    Due 10/31/10      Item#72          Enclosure 1 As algebraic sum is non conservative compared to the         setpoint methodology calculations in TI-28 for                      letter dated 10/29/10                                          Item No. 29 EICB (Garg)
Response is included in letter dated 10/29/10 Due 10/31/10 Pending FSAR Amendment 102 submittal ML102910008 Item#71 dated 10/29/10 Item No. 28 309 7.1 7.1.2.
SRSS method and will mask the operability of the             TSTF-493 will be revised to use the Square                                                      Pending FSAR instrument channel and therefore, it is not acceptable       Root Sum of the Squares (SRSS) method.                                                          Amendment 102 to the staff. (2) It also make the statement that ALT                                                                                                       submittal may take calibration history into consideration which is (2) AAF definition will be revised to be consistent vague and ambiguous.                                        with TSTF-493 as discussed with the NRC Staff, in FSAR Amendment 102. Attachment 3 contains the revised FSAR Amendment 102 Change Markup that reflects this change.
1.9.1 EICB (Garg)
310   7.1   7.1.2.                 (1) FSAR amendment 100, Page 7.1-14, TVA setpoint Responder: Hilmes                                  34. Y                      Open                        Open-TVA/A102      EICB RAI        TVA Letter 1.9.2                  methodology, states that for AAF .and other                                                                                                                                   ML102910008      dated 10/29/10 measurable uncertainties as appropriate (i.e., those TVA Response:                                                              Response is included in    Due 10/31/10      Item#73          Enclosure 1 present during calibration.) should be changed to                                                                               letter dated 10/29/10                                          Item No. 30 present during normal operation (2) Also on page (1) The AAF definition will be revised in FSAR                                                            Pending FSAR 7.1-15, states that ALT may take calibration history   Amendment 102 to read:                                                                              Amendment 102 into consideration which is vague and ambiguous.                                                                                                             submittal A tolerance band on either side of the NTSP which defines the limits of acceptable instrument performance, beyond which the channel may be considered degraded and must be evaluated for operability prior to returning it to service. Channels which exceed the AAF will be entered into the Corrective Action Program for further evaluation and trending. The Acceptable As EICB (Garg)
(1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint methodology, states that AAF is the algebraic sum of the.. This is not acceptable.
Found tolerance is the SRSS combination of drift, maintenance and test equipment (M&TE) accuracy and readability, and calibration/reference accuracy. Other uncertainties may be included in the AAF if applicable.
As algebraic sum is non conservative compared to the SRSS method and will mask the operability of the instrument channel and therefore, it is not acceptable to the staff. (2) It also make the statement that ALT may take calibration history into consideration which is vague and ambiguous.
This revision eliminates the concern regarding uncertainties. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
Responder: Hilmes (1) The AAF calculation for Westinghouse setpoint methodology calculations in TI-28 for TSTF-493 will be revised to use the Square Root Sum of the Squares (SRSS) method.
(2) AAF definition will be revised to be consistent with TSTF-493 as discussed with the NRC Staff, in FSAR Amendment 102. Attachment 3 contains the revised FSAR Amendment 102 Change Markup that reflects this change.
: 33. Y Open Response is included in letter dated 10/29/10 Open-TVA/A102 Due 10/31/10 Pending FSAR Amendment 102 submittal EICB RAI ML102910008 Item#72 TVA Letter dated 10/29/10 Item No. 29 310 7.1 7.1.2.
1.9.2 EICB (Garg)
(1) FSAR amendment 100, Page 7.1-14, TVA setpoint methodology, states that for AAF.and other measurable uncertainties as appropriate (i.e., those present during calibration.) should be changed to present during normal operation (2) Also on page 7.1-15, states that ALT may take calibration history into consideration which is vague and ambiguous.
Responder: Hilmes TVA Response:
(1) The AAF definition will be revised in FSAR Amendment 102 to read:
A tolerance band on either side of the NTSP which defines the limits of acceptable instrument performance, beyond which the channel may be considered degraded and must be evaluated for operability prior to returning it to service. Channels which exceed the AAF will be entered into the Corrective Action Program for further evaluation and trending. The Acceptable As Found tolerance is the SRSS combination of drift, maintenance and test equipment (M&TE) accuracy and readability, and calibration/reference accuracy. Other uncertainties may be included in the AAF if applicable.
This revision eliminates the concern regarding uncertainties. Attachment 3 contained in the {{letter dated|date=October 29, 2010|text=October 29, 2010 letter}} provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
(2) The AAL definition will be revised in FSAR Amendment 102 to read:
(2) The AAL definition will be revised in FSAR Amendment 102 to read:
A tolerance band on either side of the NTSP within which an instrument or instrument loop is left after calibration or setpoint verification.
A tolerance band on either side of the NTSP within which an instrument or instrument loop is left after calibration or setpoint verification.
: 34. Y Open Response is included in letter dated 10/29/10 Open-TVA/A102 Due 10/31/10 Pending FSAR Amendment 102 submittal EICB RAI ML102910008 Item#73 TVA Letter dated 10/29/10 Item No. 30


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                       radBA627.docx                                                                                 Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                     RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                    Issue                                          TVA Response(s)                      Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                       Comments Sec. Sec.                                                                                                                                                                                                                Date The Acceptable As Left tolerance is equal to or less than the SRSS combination of reference accuracy, M&TE accuracy and M&TE readability. Other uncertainties may be included in the AAL if applicable.
Date Comments The Acceptable As Left tolerance is equal to or less than the SRSS combination of reference accuracy, M&TE accuracy and M&TE readability. Other uncertainties may be included in the AAL if applicable.
This revision eliminates the concern regarding calibration history. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
This revision eliminates the concern regarding calibration history. Attachment 3 contained in the {{letter dated|date=October 29, 2010|text=October 29, 2010 letter}} provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
311   7.1     7.1                   Both Westinghouse and TVA setpoint methodology do       Responder: Hilmes                                  35. Y        Open                        Open-TVA/A102      EICB RAI        TVA Letter not have any discussion on single sided calculation.                                                                                                                     ML102910008      dated 10/29/10 EICB (Garg)
311 7.1 7.1 EICB (Garg)
Please confirm that single sided calculation has not   A statement that single-sided corrections are not                Response is included in                        Item#74          Enclosure 1 been used for all setpoints with TSTF-493 and provide   used for TSTF-493 setpoints will be included in                   letter dated 10/29/10      Due 10/31/10                        Item No. 31 a statement to that effect in the FSAR.                FSAR Amendment 102. Attachment 3 contains                                                     Pending FSAR the revised FSAR section 7.1.2.1.9 that will be                                               Amendment 102 included in FSAR Amendment 102 that reflects                                                 submittal this change.
Both Westinghouse and TVA setpoint methodology do not have any discussion on single sided calculation.
326                                 TVA uses double-sided methodology for as-found and Responder: Webb                                          36. Y        Open October 22, 2010      Open-TVA/A102                        TVA Letter as-left Reactor Trip and ESFAS instrument setpoint                                                                                                                                         dated 10/29/10 EICB(Garg) values. The FSAR will be revised in a future       Attachment 3 contains the revised FSAR section                         Response is included in    Due 10/31/10                        Enclosure 1 amendment to reflect this methodology              7.1.2.1.9 that will be included in FSAR                               letter dated 10/29/10       Pending FSAR                         Item No. 37 Amendment 102 that reflects this change.                                                          Amendment 102 submittal 329   7.6.1   7.6.7                 Section 7.6.7 of the FSAR (Amendment 100) states       Responder: Clark                                    37. N        Open                        Open-TVA/A102      RAI No. 1        TVA Letter EICB (Singh) that, The DMIMS-DX' audio and visual alarm                                                                                                                               ML102980005      dated 10/29/10 capability will remain functional after an             The title of FSAR Section 3.10 is Seismic Design                  Response is included in    Pending FSAR        10/26/2010      Enclosure 1 Operating Basis Earthquake (OBE). All of the DMIMS-     of Category I Instrumentation and Electrical                     letter dated 10/29/10      Amendment 102                        Item No. 39 DX' components are qualified                            Equipment. Since the Loose Part Monitoring                                                   submittal.
Please confirm that single sided calculation has not been used for all setpoints with TSTF-493 and provide a statement to that effect in the FSAR.
for structural integrity during a Safe Shutdown        System is not a Category 1 system, it is not Earthquake (SSE) and will not                          included in the scope of 3.10. FSAR Section                                                   Due 10/31/10 mechanically impact any safety-related equipment.      7.6.7, Loose Parts Monitoring System (LPMS)
Responder: Hilmes A statement that single-sided corrections are not used for TSTF-493 setpoints will be included in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
System Description, identifies basic system                                                 TVA to confirm TVA to clarify the seismic qualification of the loose  seismic design criteria which are consistent with                                             that the parts monitoring system and include the appropriate    the requirements of TVA Design Criteria, WB-DC-                                               equipment has information in Table 3.10 (or another suitable section) 30-31, Loose Parts Monitoring System. As                                                     been seismically of the FSAR.                                            identified in FSAR Table 7.1-1, Watts Bar Nuclear                                             qualified as Plant NRC Regulatory Guide Conformance, the                                                   required and that system conforms to Reg. Guide 1.133 as modified                                               TVA reviewed and by Note 12. Reg. Guide 1.133 identifies the                                                   found the report seismic requirements and Note 12 does not                                                     acceptable.
: 35. Y Open Response is included in letter dated 10/29/10 Open-TVA/A102 Due 10/31/10 Pending FSAR Amendment 102 submittal EICB RAI ML102910008 Item#74 TVA Letter dated 10/29/10 Item No. 31 326 EICB(Garg)
contain any exception to the Regulatory Guide seismic requirements.                                                                         TVA response does not list the The Westinghouse LPMS seismic report, EQ-QR-                                                 seismic test 33-WBT, Revision 0, Seismic Evaluation of the                                                 document and its Digital Metal Impact Monitoring System (DMIMS-                                               acceptance by DXTM) for Watts Bar Unit 2, will be added as                                                 TVA. FSAR Reference 7 to FSAR section 7.6 in amendment                                                 should reference 102.                                                                                          the test document as the source document for tracking conformance.
TVA uses double-sided methodology for as-found and as-left Reactor Trip and ESFAS instrument setpoint values. The FSAR will be revised in a future amendment to reflect this methodology Responder: Webb contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
: 36. Y Open October 22, 2010 Response is included in letter dated 10/29/10 Open-TVA/A102 Due 10/31/10 Pending FSAR Amendment 102 submittal TVA Letter dated 10/29/10 Item No. 37 329 7.6.1 7.6.7 EICB (Singh)
Section 7.6.7 of the FSAR (Amendment 100) states that, The DMIMS-DX' audio and visual alarm capability will remain functional after an Operating Basis Earthquake (OBE). All of the DMIMS-DX' components are qualified for structural integrity during a Safe Shutdown Earthquake (SSE) and will not mechanically impact any safety-related equipment.
TVA to clarify the seismic qualification of the loose parts monitoring system and include the appropriate information in Table 3.10 (or another suitable section) of the FSAR.
Responder: Clark The title of FSAR Section 3.10 is Seismic Design of Category I Instrumentation and Electrical Equipment. Since the Loose Part Monitoring System is not a Category 1 system, it is not included in the scope of 3.10. FSAR Section 7.6.7, Loose Parts Monitoring System (LPMS)
System Description, identifies basic system seismic design criteria which are consistent with the requirements of TVA Design Criteria, WB-DC-30-31, Loose Parts Monitoring System. As identified in FSAR Table 7.1-1, Watts Bar Nuclear Plant NRC Regulatory Guide Conformance, the system conforms to Reg. Guide 1.133 as modified by Note 12. Reg. Guide 1.133 identifies the seismic requirements and Note 12 does not contain any exception to the Regulatory Guide seismic requirements.
The Westinghouse LPMS seismic report, EQ-QR-33-WBT, Revision 0, Seismic Evaluation of the Digital Metal Impact Monitoring System (DMIMS-DXTM) for Watts Bar Unit 2, will be added as Reference 7 to FSAR section 7.6 in amendment 102.
: 37. N Open Response is included in letter dated 10/29/10 Open-TVA/A102 Pending FSAR Amendment 102 submittal.
Due 10/31/10 TVA to confirm that the equipment has been seismically qualified as required and that TVA reviewed and found the report acceptable.
TVA response does not list the seismic test document and its acceptance by TVA. FSAR should reference the test document as the source document for tracking conformance.
RAI No. 1 ML102980005 10/26/2010 TVA Letter dated 10/29/10 Item No. 39
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                           radBA627.docx                                                                                  Open Items to be Resolved for SER Approval SE    FSAR    NRC
===Response===
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
Date Comments 156 7.2 7.2 EICB (Garg)
FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1-1designed to prevent exceeding 121% of power.The value of 121% is changed from 118%. The justification for this change states that this was done to bring the text of this section in agreement with section 4.3.2.2.5, 4.4.2.2.6 and table 4.1-1. However, Table 4.1-1 and section 4.3.2.2.5 still show this value as 118%. Justify the change.
Responder: WEC Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT UNIT 2 FSAR Markups Units I and 2 118% vs. 121 % and Correction to RAI Response SNPB 4.3.2-7, (Reference 17) the 118% value should be 121%. Depending on the use in the FSAR either 118% or 121% are the correct values. As a result of the question, Westinghouse reviewed all locations where either 118% or 121% are used and the context of use and provided a FSAR markup to reflect the correct value at the specific location. These changes will be incorporated in a future FSAR amendment.
: 38. N Open Response is included in letter dated 10/5/10 Open-TVA/Bechtel Amendment 101 Submitted 10/29/10.
TVA needs to justify why some places 121% is used and other places 118% is used. What does 121% or 118%
means.
ML101720589, Item No. 8 TVA Letter dated 10/5/10 Response on hold pending Westinghouse review.
274.
b EICB (Singh) 8/26/2010 Loose Parts Monitoring System: TR 3.3 refers to section 4.4.6 of the FSAR for description of the loose parts monitoring system. However, this section of the FSAR is not available. TVA to check the reference and respond.
Responder: Clark The reference will be changed to FSAR section 7.6.7 Loose Part Monitoring System (LPMS)
System Description in next revision of the Technical Requirements Manual as shown below:
: 1. Watts Bar FSAR, Section 7.6.7, Lose Part Monitoring System.
(Note: Bechtel I&C to submit TRM change package to TVA Licensing.)
: 39. Y Open Response provided in letter dated 10/21/10 Open-TVA/Bechtel Pending TRM amendment submittal.


===Response===
===Response===
Acceptable                                                                          RAI Resp.
acceptable. TVA to complete stated action.
No.                  POC                                    Issue                                            TVA Response(s)                    Y/N            Status/ Current Actions      Resolution Path      RAI No. & Date                            Comments Sec. Sec.                                                                                                                                                                                                                      Date 156    7.2    7.2                  FSAR section 7.2.2.1.1 states that dashed lines in      Responder: WEC                                  38. N            Open                          Open-                ML101720589, TVA Letter          Response on hold pending EICB (Garg)
Due 10/31/10 RAI No. 6 ML102980005 10/26/2010 TVA Letter dated 10/21/10 Item No. 12 276 7.6 7.6 EICB (Garg) 8/27/2010 In order for the staff to review the effects of multi control systems failure, provide the summary of the analyses documenting the effect on the plant based on the following events: (1) loss of power to all control systems powered by a single power supply; (2) failure of each instrument sensor which provides signal to two or more control systems; (3) Break of any sensor impulse line which is used for sensors providing signals to two or more control systems; and (4) failure of digital system based on the common cause software failure affecting two or more control systems. For each of these events, confirm that the consequences of these events will not be outside chapter 15 analyses or beyond the capability of operators or safety systems.
Figure 15.1-1designed to prevent exceeding                                                                                                            TVA/Bechtel          Item No. 8  dated 10/5/10        Westinghouse review.
Responder: Webb The NRC reviewer confirmed this question applies to non-safety systems.
121% of power.The value of 121% is changed            Per Westinghouse letter WBT-D-2340,                              Response is included in from 118%. The justification for this change states that TENNESSEE VALLEY AUTHORITY WATTS                                  letter dated 10/5/10         Amendment 101 this was done to bring the text of this section in      BAR NUCLEAR PLANT UNIT 2 FSAR Markups                                                          Submitted agreement with section 4.3.2.2.5, 4.4.2.2.6 and table Units I and 2 118% vs. 121 % and Correction to                                                    10/29/10.
The Distributed Control System (DCS) implemented using Foxboro I/A hardware, replaces most of the non-safety related control systems for WBN Unit 2. The other non-safety-related control systems within the scope of this question are:
4.1-1. However, Table 4.1-1 and section 4.3.2.2.5 still RAI Response SNPB 4.3.2-7, (Reference 17) the show this value as 118%. Justify the change.            118% value should be 121%. Depending on the                                                    TVA needs to use in the FSAR either 118% or 121% are the                                                    justify why some correct values. As a result of the question,                                                    places 121% is Westinghouse reviewed all locations where either                                                used and other 118% or 121% are used and the context of use                                                    places 118% is and provided a FSAR markup to reflect the                                                      used . What does correct value at the specific location. These                                                  121% or 118%
: a. Rod Control - Failures of this system are addressed in FSAR Chapter 15.
changes will be incorporated in a future FSAR                                                  means.
: b. Main Turbine Electro-Hydraulic Control System The following provides the requested summaries for the four events listed:
amendment.
(1) The (DCS) segmentation analysis submitted on TVA letter to NRC dated August 11, 2010, (Reference 7) demonstrates that the loss of any single power source does not result in a loss of any DCS function. The other systems within the scope of this
274.                                8/26/2010                                                Responder: Clark                                  39. Y        Open                          Open-                RAI No. 6       TVA Letter EICB (Singh) b                                                                                                                                                                                            TVA/Bechtel          ML102980005     dated 10/21/10 Loose Parts Monitoring System: TR 3.3 refers to          The reference will be changed to FSAR section                    Response provided in letter                        10/26/2010       Enclosure 1 section 4.4.6 of the FSAR for description of the loose    7.6.7 Loose Part Monitoring System (LPMS)                        dated 10/21/10             Pending TRM                              Item No. 12 parts monitoring system. However, this section of the    System Description in next revision of the                                                  amendment FSAR is not available. TVA to check the reference        Technical Requirements Manual as shown below:                                                submittal.
: 40. N Open Response provided in letter dated 10/21/10 Open-TVA/Bechtel TVA to Docket in 10/20 letter TVA to provide justification for non-safety system other than DCS.
and respond.
The statement that failure of sense line where more than one transmitter is connected would be bounded by the failure of a single transmitter does not make sense.
: 1. Watts Bar FSAR, Section 7.6.7, Lose Part                                                  Response Monitoring System.                                                                        acceptable. TVA to complete stated (Note: Bechtel I&C to submit TRM change                                                        action.
TVA needs to make a statement that all non-safety EICB RAI ML102910008 Item#60 TVA Letter dated 10/21/10 Item No. 13
package to TVA Licensing.)
Due 10/31/10 276   7.6     7.6                   8/27/2010                                                Responder: Webb                                    40. N        Open                          Open-                EICB RAI        TVA Letter EICB (Garg)
TVA/Bechtel          ML102910008      dated 10/21/10 In order for the staff to review the effects of multi                                                                     Response provided in letter                        Item#60          Enclosure 1 control systems failure, provide the summary of the       The NRC reviewer confirmed this question                        dated 10/21/10                                                      Item No. 13 analyses documenting the effect on the plant based on     applies to non-safety systems.                                                                TVA to Docket in the following events: (1) loss of power to all control                                                                                                   10/20 letter systems powered by a single power supply; (2) failure     The Distributed Control System (DCS) of each instrument sensor which provides signal to two   implemented using Foxboro I/A hardware,                                                        TVA to provide or more control systems; (3) Break of any sensor         replaces most of the non-safety related control                                                justification for impulse line which is used for sensors providing         systems for WBN Unit 2. The other non-safety-                                                  non-safety system signals to two or more control systems; and (4) failure   related control systems within the scope of this                                              other than DCS.
of digital system based on the common cause software     question are:
failure affecting two or more control systems. For                                                                                                       The statement each of these events, confirm that the consequences       a. Rod Control - Failures of this system are                                                  that failure of of these events will not be outside chapter 15 analyses     addressed in FSAR Chapter 15.                                                              sense line where or beyond the capability of operators or safety           b. Main Turbine Electro-Hydraulic Control                                                     more than one systems.                                                    System                                                                                     transmitter is connected would The following provides the requested summaries                                                 be bounded by for the four events listed:                                                                   the failure of a single transmitter (1) The (DCS) segmentation analysis submitted                                                 does not make on TVA letter to NRC dated August 11, 2010,                                               sense.
Enclosure 2 (Reference 7) demonstrates that the loss of any single power source does not                                               TVA needs to result in a loss of any DCS function. The                                                 make a statement other systems within the scope of this                                                     that all non-safety


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                       radBA627.docx                                                                                   Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                       RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                  Issue                                          TVA Response(s)                        Y/N           Status/ Current Actions   Resolution Path     RAI No. & Date                       Comments Sec. Sec.                                                                                                                                                                                                                    Date question are configured in the same manner                                                   control systems as Unit 1, with redundant power sources                                                     have been such that the failure of a single power source                                               evaluated against does not cause a loss of function.                                                           these criteria and have determined (2) Signals shared by more than one control                                                     that their failure function within the DCS are addressed in the                                                 does not have DCS segmentation analysis submitted on                                                       consequences TVA letter to NRC dated August 11, 2010,                                                     which will put the Enclosure 2 (Reference 7) which                                                             plant outside demonstrates that the loss of a single signal                                               chapter 15 does not cause a failure of any critical control                                             analyses.
Date Comments question are configured in the same manner as Unit 1, with redundant power sources such that the failure of a single power source does not cause a loss of function.
function. The impact of a loss of signal to the other systems within the scope of this question is bounded by the loss of that signal to the individual system and has the same effect as for Unit 1.
(2) Signals shared by more than one control function within the DCS are addressed in the DCS segmentation analysis submitted on TVA letter to NRC dated August 11, 2010, (Reference 7) which demonstrates that the loss of a single signal does not cause a failure of any critical control function. The impact of a loss of signal to the other systems within the scope of this question is bounded by the loss of that signal to the individual system and has the same effect as for Unit 1.
(3) Where feasible, the Unit 2 design includes separate sense lines for redundant transmitters, thereby eliminating multiple single point failures which are present in Unit
(3) Where feasible, the Unit 2 design includes separate sense lines for redundant transmitters, thereby eliminating multiple single point failures which are present in Unit
: 1. A review of the transmitter sense line database was performed to identify multiple sensors on a single sense line that had control functions (transmitters and switches).
: 1. A review of the transmitter sense line database was performed to identify multiple sensors on a single sense line that had control functions (transmitters and switches). provides the results of the review and an analysis of the functions impacted by a sense line failure.
Attachment 9 provides the results of the review and an analysis of the functions impacted by a sense line failure.
There are no transmitters on shared sense lines, such that a sense line failure would impact any combination of the DCS, Rod Control or Main Turbine Electro-Hydraulic Control Systems.
There are no transmitters on shared sense lines, such that a sense line failure would impact any combination of the DCS, Rod Control or Main Turbine Electro-Hydraulic Control Systems.
(4) Limiting DCS failures were addressed in the segmentation analysis, supplemented by Fault Handling in the I/A Series System, Revision 1, submitted on TVA letter to NRC dated October 5, 2010, Attachment 42 (Reference 1). The other systems within the scope of this question are analog and therefore this question is not applicable.
(4) Limiting DCS failures were addressed in the segmentation analysis, supplemented by Fault Handling in the I/A Series System, Revision 1, submitted on TVA letter to NRC dated October 5, 2010, Attachment 42 (Reference 1). The other systems within the scope of this question are analog and therefore this question is not applicable.
All non-safety control systems have been evaluated against these criteria and TVA has determined that their failure does not have consequences which will put the plant outside chapter 15 analyses.
All non-safety control systems have been evaluated against these criteria and TVA has determined that their failure does not have consequences which will put the plant outside chapter 15 analyses.
281   7.6   7.6.8                 8/27/2010                                              Responder: Webb                                        41. N        Open                        Open-                EICB RAI        TVA Letter EICB (Garg)
control systems have been evaluated against these criteria and have determined that their failure does not have consequences which will put the plant outside chapter 15 analyses.
TVA/Bechtel          ML102910008      dated 10/29/10 For FSAR Section 7.6.8 in amendment 96, redline         Attachment 5 contains the WBN Unit 2 FSAR                            Response provided in letter                      Item#65          Enclosure 1 version has completely rewritten this section of the   markup for Section 7.6.8, Interlocks for RCS                        dated 10/29/10              Provide the basis                    Item No. 16 FSAR, however, the staff is not able to determine any   Pressure Control During Low Temperature                                                          for the changes.
281 7.6 7.6.8 EICB (Garg) 8/27/2010 For FSAR Section 7.6.8 in amendment 96, redline version has completely rewritten this section of the FSAR, however, the staff is not able to determine any changes made to the section. Explain what changes have been made to this FSAR Section.
changes made to the section. Explain what changes       Operation, showing what was changed between                                                    Look at Foxboro have been made to this FSAR Section.                   Amendments 95 and 96.                                                                           I/A impact.
Responder: Webb contains the WBN Unit 2 FSAR markup for Section 7.6.8, Interlocks for RCS Pressure Control During Low Temperature Operation, showing what was changed between Amendments 95 and 96.
: 41. N Open Response provided in letter dated 10/29/10 Open-TVA/Bechtel Provide the basis for the changes.
Look at Foxboro I/A impact.
EICB RAI ML102910008 Item#65 TVA Letter dated 10/29/10 Item No. 16 288 7.3
(
(
288  7.3            G             9/2/2010                                               Responder: McNeil                                     42. Y         Open                       Open-               EICB RAI
G 9/2/2010 Responder: McNeil
: 42. Y Open Open-EICB RAI  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                       radBA627.docx                                                                         Open Items to be Resolved for SER Approval SE   FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                 RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.              POC                          Issue                                      TVA Response(s)                    Y/N         Status/ Current Actions   Resolution Path   RAI No. & Date                       Comments Sec. Sec.                                                                                                                                                                                          Date TVA/Bechtel        ML102910008 Can we add a section to chapter 7 giving a brief TVA Response:                                                                                                Item#67 overview of the Foxboro Spec 200 in Section 7.3?                                                               TVA committed to adding    Due TBD Reg. Guide 1.209, Guidelines for Environmental                 a description of the Qualification of Safety-Related Computer-Based                 Foxboro Spec 200          TVA should Instrumentation and Control Systems in Nuclear                 hardware at the 10/12 NRC  include the list of Power Plants, is not applicable to the analog                 Public Meeting.            all the functions Foxboro Spec 200 hardware.                                                               where Spec 200 is used and discuss The following new section and reference will be                                           differences added to the WBN Unit 2 FSAR as part of                                                   between unit 1 Amendment 102:                                                                           and unit2. This discussion should 7.3.1.1.3 Analog Instrumentation                                                         also include loop which are The miscellaneous safety-related analog process                                           currently used for Unit 1 operation If control and indication loops are made up of Spec 200 discrete analog modules that have been tested                                             components have and qualified for use in safety related systems.                                         also been The various components have been qualified to                                             qualified to RG IEEE Standard 323-1983 (R-1996) IEEE                                                     1.209, it should be Standard for Qualifying Class IE Equipment for                                           stated and if not Nuclear Power Generating Stations, IEEE                                                 why not.
Date Comments Can we add a section to chapter 7 giving a brief overview of the Foxboro Spec 200 in Section 7.3?
Standard 344-1987 (R-1993) IEEE Standard Recommended Practices for Seismic Qualification of Class IE Equipment for Nuclear Power Generating Stations, and IEEE Standard 384-1984 (R-1992) IEEE Standard Criteria for Independence of Class IE Equipment and Circuits. The modules are arranged in instrument loops to provide the safety functions listed below:
TVA Response:
* Turbine driven AFW Pump Flow Control
Reg. Guide 1.209, Guidelines for Environmental Qualification of Safety-Related Computer-Based Instrumentation and Control Systems in Nuclear Power Plants, is not applicable to the analog Foxboro Spec 200 hardware.
* Motor driven AFW pump differential pressure indication and recirculation valve control
The following new section and reference will be added to the WBN Unit 2 FSAR as part of Amendment 102:
* Steam generator AFW flow and level indication and control
7.3.1.1.3 Analog Instrumentation The miscellaneous safety-related analog process control and indication loops are made up of discrete analog modules that have been tested and qualified for use in safety related systems.
* Containment Pressure indication
The various components have been qualified to IEEE Standard 323-1983 (R-1996) IEEE Standard for Qualifying Class IE Equipment for Nuclear Power Generating Stations, IEEE Standard 344-1987 (R-1993) IEEE Standard Recommended Practices for Seismic Qualification of Class IE Equipment for Nuclear Power Generating Stations, and IEEE Standard 384-1984 (R-1992) IEEE Standard Criteria for Independence of Class IE Equipment and Circuits. The modules are arranged in instrument loops to provide the safety functions listed below:
* Upper and Lower Compartment Containment Ambient Temperature indication
Turbine driven AFW Pump Flow Control Motor driven AFW pump differential pressure indication and recirculation valve control Steam generator AFW flow and level indication and control Containment Pressure indication Upper and Lower Compartment Containment Ambient Temperature indication RHR Heat Exchanger CCS Supply Header Flow Sample Heat Exchanger Header CCS Differential Flow ERCW Strainer Differential Pressure, Backwash and Flush Control CCS Heat Exchanger B Inlet Pressure CCS Surge Tank Level Control CCS Heat Exchanger B Outlet Temperature Reactor Vessel Head Vent Throttle Manual Loading Station (Unit 2 Only)
* RHR Heat Exchanger CCS Supply Header Flow
EGTS Annulus Differential Pressure Control TVA committed to adding a description of the Foxboro Spec 200 hardware at the 10/12 NRC Public Meeting.
* Sample Heat Exchanger Header CCS Differential Flow
TVA/Bechtel Due TBD TVA should include the list of all the functions where Spec 200 is used and discuss differences between unit 1 and unit2. This discussion should also include loop which are currently used for Unit 1 operation If Spec 200 components have also been qualified to RG 1.209, it should be stated and if not why not.
* ERCW Strainer Differential Pressure, Backwash and Flush Control
ML102910008 Item#67
* CCS Heat Exchanger B Inlet Pressure
* CCS Surge Tank Level Control
* CCS Heat Exchanger B Outlet Temperature
* Reactor Vessel Head Vent Throttle Manual Loading Station (Unit 2 Only)
* EGTS Annulus Differential Pressure Control


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                         radBA627.docx                                                                                   Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                       RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                    Issue                                            TVA Response(s)                      Y/N           Status/ Current Actions   Resolution Path     RAI No. & Date                       Comments Sec. Sec.                                                                                                                                                                                                                      Date The components are physically arranged in the racks to meet the requirements of IEEE-279 and Watts Bar Design Criteria WB-DC-30-4, Separation/Isolation. (Unit 2 Only) Two IE analog modules are used to isolate IE to Non-IE signals.
Date Comments The components are physically arranged in the racks to meet the requirements of IEEE-279 and Watts Bar Design Criteria WB-DC-30-4, Separation/Isolation. (Unit 2 Only) Two IE analog modules are used to isolate IE to Non-IE signals.
These are the Contact Output Isolator and Voltage-to-Current Converter, both of which have the Input and Output signals isolated.
These are the Contact Output Isolator and Voltage-to-Current Converter, both of which have the Input and Output signals isolated.
EMI testing and acceptance by TVA of the Foxboro Spec 200 hardware is documented in Reference [8].
EMI testing and acceptance by TVA of the Foxboro Spec 200 hardware is documented in Reference [8].  


==References:==
==References:==
(8) Invensys Process Systems Document No.
(8) Invensys Process Systems Document No.
800063-1830, Electromagnetic Compatibility Test Reports, dated August 21, 2008, Rev. 0.
800063-1830, Electromagnetic Compatibility Test Reports, dated August 21, 2008, Rev. 0.
300                                 Need Radiation Monitoring System Description/Design Responder: Temples/Mather                         43. N                Open                        Open-                RAI No. 25      TVA Letter Criteria                                                                                                                                                TVA/Bechtel          ML102980005      dated 10/29/10 (1) The Radiation Monitoring Design Criteria                         Response is included in                          10/26/2010      Enclosure 1 Are detectors different from Unit 1. Describe any        Document, WB-DC-40-24, Revision 21 is                             letter dated 10/29/10      Due 10/31/10                          Item No. 20 differences.                                              contained in Attachment 6 to letter dated                                                     TVA to address October 31, 2010.                                                                             the following Are there any commercially dedicated parts in the RM-                                                                                                  comments:
300 EICB (Singh)
1000? If so, how are they dedicated?                  (2) Attachment 7 contains the General Atomics detector differences report. The containment                                                 (1) Is it Att. 5 or Please confirm that digital communication ports          high range radiation monitors are loops 271-                                                     Att. 6?
Need Radiation Monitoring System Description/Design Criteria Are detectors different from Unit 1. Describe any differences.
available in RM-1000 are not used.                        274.                                                                                          (2) Pl. confirm that HRRMs (3) For safety-related applications, General                                                       are loops 271-Atomics Electronic Systems, Inc. supplies the                                                   274.
Are there any commercially dedicated parts in the RM-1000? If so, how are they dedicated?
EICB (Singh)
Please confirm that digital communication ports available in RM-1000 are not used.
RM-1000 module assembly as a Basic                                                         (3) TVA to clarify Component. This assembly does contain                                                           that GA has a component parts that are Safety-Related                                                         commercial Commercial Grade Items (SRCGI). Because                                                         dedication these SRCGI components are assembled into                                                       program in the delivered Basic Component, they are                                                         place and that dedicated to the assembly by virtue of the                                                     GA is an acceptance test of the full RM-1000                                                             approved assembly. Safety-related commercial grade                                                       10CFR50, items are dedicated in accordance with                                                         App. B General Atomics approved 10 CFR 50                                                             supplier.
Responder: Temples/Mather (1) The Radiation Monitoring Design Criteria Document, WB-DC-40-24, Revision 21 is contained in Attachment 6 to {{letter dated|date=October 31, 2010|text=letter dated October 31, 2010}}.
Appendix B program.                                                                             App B does not address (4) The digital communications ports on the                                                         commercial safety-related RM-1000 radiation monitors                                                       grade are not used.                                                                                   dedication .
(2) Attachment 7 contains the General Atomics detector differences report. The containment high range radiation monitors are loops 271-274.
(3) For safety-related applications, General Atomics Electronic Systems, Inc. supplies the RM-1000 module assembly as a Basic Component. This assembly does contain component parts that are Safety-Related Commercial Grade Items (SRCGI). Because these SRCGI components are assembled into the delivered Basic Component, they are dedicated to the assembly by virtue of the acceptance test of the full RM-1000 assembly. Safety-related commercial grade items are dedicated in accordance with General Atomics approved 10 CFR 50 Appendix B program.
(4) The digital communications ports on the safety-related RM-1000 radiation monitors are not used.
: 43. N Open Response is included in letter dated 10/29/10 Open-TVA/Bechtel Due 10/31/10 TVA to address the following comments:
(1) Is it Att. 5 or Att. 6?
(2) Pl. confirm that HRRMs are loops 271-274.
(3) TVA to clarify that GA has a commercial dedication program in place and that GA is an approved
: 10CFR50, App. B supplier.
App B does not address commercial grade dedication.
(4) Response acceptable.
(4) Response acceptable.
318 7.5.2. 7.5                   TVA has provided the following documents for RM-       Responder: Temples                                    44. N        Open                        Open-                 RAI No. 28      TVA Letter 3              EICB          1000 equipment qualification:                                                                                                                           TVA/Bechtel          ML102980005      dated 10/29/10 (i)   Applicable to WBN Unit 2. 04508905-1QR                       Note check 04508905-1QR                          10/26/2010      Enclosure 1 (Singh)        (i)  Qualification Test Report for RM-1000 Processor        is applicable only in regards to the RM-1000,                 or QR. Staff version is QR                                        Item No. 34 Module and Current-To-Frequency Converter              with the exception of re-qualification of                     only.                     Due 10/31/10
RAI No. 25 ML102980005 10/26/2010 TVA Letter dated 10/29/10 Item No. 20 318 7.5.2.
3 7.5 EICB (Singh)
TVA has provided the following documents for RM-1000 equipment qualification:
(i)
Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter Responder: Temples (i)
Applicable to WBN Unit 2. 04508905-1QR is applicable only in regards to the RM-1000, with the exception of re-qualification of
: 44. N Open Note check 04508905-1QR or QR. Staff version is QR only.
Open-TVA/Bechtel Due 10/31/10 RAI No. 28 ML102980005 10/26/2010 TVA Letter dated 10/29/10 Item No. 34


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                             radBA627.docx                                                                         Open Items to be Resolved for SER Approval SE   FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                 RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.              POC                            Issue                                            TVA Response(s)                  Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                       Comments Sec. Sec.                                                                                                                                                                                                Date 04508905-QR (January 2001)                               certain RM-1000 equipment differences (ii) Qualification Test Report Supplement, RM-1000           covered in the -1SP report. The Current-to-           Response is included in    Response update Upgrades 04508905-1SP (June 2006)                        Frequency (I-F) converter module                       letter dated 10/29/10      required. It is (iii) Qualification Test Report Supplement, RM-1000            qualifications in the base report and the -                                       clear that Upgrades 04508905-2SP (June 2008)                        1SP report are not applicable to the RM-                                           04508903-2SP (iv) Qualification Test Report Supplement, RM-1000            1000s, and will be used later as references                                       and -3SP are not Upgrades 04508905-3SP (May 2008)                        in the WBN Unit 2 specific qualification                                           applicable. The reports.                                                                           response for Please clarify whether all of these are fully applicable (ii) Applicable to WBN Unit 2.                                                           applicability of to WBN2 or are they applicable with exceptions? If      (iii) Not applicable to WBN Unit 2                                                       04508905-QR and with exceptions, then please clarify what those are.    (iv) Not applicable to WBN Unit 2                                                       -1SP to RM-1000 and IF converter Supplement 3 was issued one month prior to              The 04508905-3SP report was prepared for                                                 is not clear.
Date Comments 04508905-QR (January 2001)
supplement 2. Please explain the reason for the          another TVA plant, as a monitor system-level same.                                                    report, where the system included equipment                                             Check page mostly based on the base report equipment items.                                         numbers of These two -2SP and -3SP supplement reports                                               Appendix F were essentially worked concurrently, but the -                                         (missing/duplicate 2SP document review/release process resulted in                                         pages).
(ii)
the release time difference.                                                             Check applicability of Appendix C to RM1000 instead of RM2300?
Qualification Test Report Supplement, RM-1000 Upgrades 04508905-1SP (June 2006)
(iii) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-2SP (June 2008)
(iv) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-3SP (May 2008)
Please clarify whether all of these are fully applicable to WBN2 or are they applicable with exceptions? If with exceptions, then please clarify what those are.
Supplement 3 was issued one month prior to supplement 2. Please explain the reason for the same.
certain RM-1000 equipment differences covered in the -1SP report. The Current-to-Frequency (I-F) converter module qualifications in the base report and the -
1SP report are not applicable to the RM-1000s, and will be used later as references in the WBN Unit 2 specific qualification reports.
(ii)
Applicable to WBN Unit 2.
(iii) Not applicable to WBN Unit 2 (iv) Not applicable to WBN Unit 2 The 04508905-3SP report was prepared for another TVA plant, as a monitor system-level report, where the system included equipment mostly based on the base report equipment items.
These two -2SP and -3SP supplement reports were essentially worked concurrently, but the -
2SP document review/release process resulted in the release time difference.
Response is included in letter dated 10/29/10 Response update required. It is clear that 04508903-2SP and -3SP are not applicable. The response for applicability of 04508905-QR and
-1SP to RM-1000 and IF converter is not clear.
Check page numbers of Appendix F (missing/duplicate pages).
Check applicability of Appendix C to RM1000 instead of RM2300?
All equipment qualification reports including supplements 2SP and 3SP have been reviewed as vendor drawings for WBN-2.
All equipment qualification reports including supplements 2SP and 3SP have been reviewed as vendor drawings for WBN-2.
Please explain the reason for applicability of one report and not the other.
Please explain the reason for applicability of one report and not the other.
Further all TVA/Bechtel reviews seems to be dispositioned as Code 4, Review not required. Work may proceed.
Further all TVA/Bechtel reviews seems to be dispositioned as Code 4, Review not required. Work may proceed.
The applicable reports should have been reviewed prior to dispositioning them. Please explain the apparent lack of review of WBN-2 applicable documents. Was appropriate review
The applicable reports should have been reviewed prior to dispositioning them. Please explain the apparent lack of review of WBN-2 applicable documents. Was appropriate review  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                             radBA627.docx                                                                               Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                   RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                        Issue                                            TVA Response(s)                        Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                     Comments Sec. Sec.                                                                                                                                                                                                                      Date guidance used?.
Date Comments guidance used?.
327                                   Attachment 36 contains Foxboro proprietary drawings Responder: Webber                                            45. N        Open                        Open-DORL            08F802403-SC-2001 sheets 1 through 6. An affidavit                                                                                                         TVA/Bechtel (Poole)          for withholding and non-proprietary versions of the Non-Prop drawings are available for submittal.
327 DORL (Poole) 6 contains Foxboro proprietary drawings 08F802403-SC-2001 sheets 1 through 6. An affidavit for withholding and non-proprietary versions of the drawings will be submitted by January 31, 2011.
drawings will be submitted by January 31, 2011.                                                                                                           Due 1/31/11 330   7.3     7.3                     Related to Item 298                                       Responder: Hilmes/Faulkner                            46. Y        Open                        Open-              EICB RAI No.20 TVA/Bechtel        ML102910017, The original response to IE Bulletin 80-06 for both IE Bulletin 80-06 calls for review of engineered safety                                                                       TVA to replace the word                        10/19/10 WBN Unit 1 and 2 was provided on TVA letter to features with the objective of ensuring that no device                                                                         Containment with          Due TBD will change position solely because of the reset the NRC dated March 11, 1982 (ML073530129)                                 Compartment in 1.c.
Responder: Webber Non-Prop drawings are available for submittal.
action.                                            (Reference 4). Subsequent design changes have impacted the original response such that some In Supplement 3 of NUREG-0847, section 7.3.5, the  equipment that originally changed state no longer staff approved the design modifications proposed by does so and some equipment has been deleted.
: 45. N Open Open-TVA/Bechtel Due 1/31/11 330 7.3 7.3 EICB (Darbali)
the applicant that would allow certain devices to  The following is the updated list of equipment remain unchanged upon an ESF reset. The staff also from the letter that changes state on ESF reset:
Related to Item 298 IE Bulletin 80-06 calls for review of engineered safety features with the objective of ensuring that no device will change position solely because of the reset action.
found acceptable the applicants justification for some safety-related equipment that does not          1. Unit 1 and 2 Equipment (prefix 1- (Unit 1) or remain in its emergency mode after an ESF reset.        2- (Unit 2)
In Supplement 3 of NUREG-0847, section 7.3.5, the staff approved the design modifications proposed by the applicant that would allow certain devices to remain unchanged upon an ESF reset. The staff also found acceptable the applicants justification for some safety-related equipment that does not remain in its emergency mode after an ESF reset.
Please list for Unit 1 and Unit 2 the safety-related          a. Auxiliary Feedwater Pump Turbine equipment that does not remain in its emergency                  Speed Control Valve, FCV-1-52 mode after an ESF reset.
Please list for Unit 1 and Unit 2 the safety-related equipment that does not remain in its emergency mode after an ESF reset.
Responder: Hilmes/Faulkner The original response to IE Bulletin 80-06 for both WBN Unit 1 and 2 was provided on TVA letter to the NRC dated March 11, 1982 (ML073530129)
(Reference 4). Subsequent design changes have impacted the original response such that some equipment that originally changed state no longer does so and some equipment has been deleted.
The following is the updated list of equipment from the letter that changes state on ESF reset:
: 1. Unit 1 and 2 Equipment (prefix 1- (Unit 1) or 2- (Unit 2)
: a. Auxiliary Feedwater Pump Turbine Speed Control Valve, FCV-1-52
: b. Auxiliary Feedwater (AFW) Level Control Valves as listed below:
: b. Auxiliary Feedwater (AFW) Level Control Valves as listed below:
: i. LCV-3-172 - SG3       - Level Control Valve ii. LCV-3-173 - SG2       - Level Control EICB (Darbali)
: i. LCV-3-172  
Valve iii. LCV-3-174 - SG1       - Level Control Valve iv. LCV-3-175 - SG4         - Level Control Valve
- SG3 - Level Control Valve ii. LCV-3-173  
: v. LIC-3-172     - SG3   - Level Indicating Controller vi. LIC-3-173     - SG2   - Level Indicating Controller vii. LIC-3-174     - SG1   - Level Indicating Controller viii. LIC-3-175     - SG4   - Level Indicating Controller ix. LCV-3-148 - SG3         - Level Valve
- SG2 - Level Control Valve iii. LCV-3-174  
: x. LCV-3-156 - SG2       - Level Valve xi. LCV-3-164 - SG1         - Level Valve xii. LCV-3-171 - SG4       - Level Valve xiii. LCV-3-148A - SG3       - Level Bypass Control Valve xiv. LCV-3-156A - SG2       - Level Bypass Control Valve xv. LCV-3-164A - SG1         - Level Bypass Control Valve xvi. LCV-3-171A - SG4       - Level Bypass Control Valve xvii. LIC-3-148     - SG3   - Controller xviii. LIC-3-156     - SG2   - Controller xix. LIC-3-164     - SG1   - Controller xx. LIC-3-171       - SG4   - Controller
- SG1 - Level Control Valve iv. LCV-3-175  
- SG4 - Level Control Valve
: v. LIC-3-172  
- SG3 - Level Indicating Controller vi. LIC-3-173  
- SG2 - Level Indicating Controller vii. LIC-3-174  
- SG1 - Level Indicating Controller viii. LIC-3-175  
- SG4 - Level Indicating Controller ix. LCV-3-148 - SG3 - Level Valve
: x. LCV-3-156 - SG2 - Level Valve xi. LCV-3-164 - SG1 - Level Valve xii. LCV-3-171 - SG4 - Level Valve xiii. LCV-3-148A - SG3 - Level Bypass Control Valve xiv. LCV-3-156A - SG2 - Level Bypass Control Valve xv. LCV-3-164A - SG1 - Level Bypass Control Valve xvi. LCV-3-171A - SG4 - Level Bypass Control Valve xvii. LIC-3-148  
- SG3 - Controller xviii. LIC-3-156  
- SG2 - Controller xix. LIC-3-164  
- SG1 - Controller xx. LIC-3-171  
- SG4 - Controller
: 46. Y Open TVA to replace the word Containment with Compartment in 1.c.
Open-TVA/Bechtel Due TBD EICB RAI No.20 ML102910017, 10/19/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                 radBA627.docx                                                                             Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                     RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                              Issue                                        TVA Response(s)                    Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                             Comments Sec. Sec.                                                                                                                                                                                                      Date
Date Comments
: c. Lower and Upper Compartment Cooler Fans and Control Rod Drive Mechanism Cooler Fan
: c. Lower and Upper Compartment Cooler Fans and Control Rod Drive Mechanism Cooler Fan
: d. Penetration Room Cooler Fans Elevations 737, 692 and 713
: d. Penetration Room Cooler Fans Elevations 737, 692 and 713
Line 718: Line 1,597:
: a. Shutdown Board Room A Pressurizing Fans
: a. Shutdown Board Room A Pressurizing Fans
: b. Control Building Ventilation Dampers as listed below:
: b. Control Building Ventilation Dampers as listed below:
: i. 0-FCO-31 Spreading Room Supply Fan Damper ii. 0-FCO-31-10       - Spreading Room Supply Fan Damper iii. 0-FCO-31-16       - Toilet a Locker Room Exhaust Fan Exhaust Damper iv. 0-FCO-31-17         - Toilet a Locker Room Exhaust Fan Exhaust Damper
: i. 0-FCO-31-9 - Spreading Room Supply Fan Damper ii. 0-FCO-31-10  
: v. 0-FCO-31 Main Control Room Isolation Damper vi. 0-FCO-31 Main Control Room Isolation Damper vii. 0-FCO-31-36         - Spreading Room Fresh Air Supply Damper viii. 0-FCO-31-37       - Spreading Room Fresh Air Supply Damper
- Spreading Room Supply Fan Damper iii. 0-FCO-31-16  
- Toilet a Locker Room Exhaust Fan Exhaust Damper iv. 0-FCO-31-17  
- Toilet a Locker Room Exhaust Fan Exhaust Damper
: v. 0-FCO-31-3 - Main Control Room Isolation Damper vi. 0-FCO-31-4 - Main Control Room Isolation Damper vii. 0-FCO-31-36  
- Spreading Room Fresh Air Supply Damper viii. 0-FCO-31-37  
- Spreading Room Fresh Air Supply Damper
: c. Cask Loading Exhaust Dampers as listed
: c. Cask Loading Exhaust Dampers as listed
: i. 0-FCO-30-122     - Cask Loading Area Exhaust Damper ii. 0-FCO-30-123     -Cask Loading Area Exhaust Damper
: i. 0-FCO-30-122  
- Cask Loading Area Exhaust Damper ii. 0-FCO-30-123  
-Cask Loading Area Exhaust Damper
: d. Auxiliary Building General Supply Exhaust Fans Elevation 737
: d. Auxiliary Building General Supply Exhaust Fans Elevation 737
: e. CCW and AFT Pump Space Cooler Fans
: e. CCW and AFT Pump Space Cooler Fans
: f. Spent Fuel Pit Pumps Space Coolers
: f.
Spent Fuel Pit Pumps Space Coolers
: g. EGTS Room Coolers
: g. EGTS Room Coolers
: h. Turbine Driven AFW and Boric Acid Space Coolers 331   7.6.1   7.6.7             As a follow up of OI 190, Staff has reviewed the     Responder: WEC/Harless/Clark                      47. N        Open                        Open-              RAI No. 8        TVA Letter    Follow-up of OI-190.
: h. Turbine Driven AFW and Boric Acid Space Coolers 331 7.6.1 7.6.7 EICB (Singh)
proprietary version of the DMIMS-DX system                                                                                                       TVA/Bechtel        ML102980005      dated 10/29/10 EICB      description to verify the conformance claims in the   TVA Partial Response:                                                                                          10/26/2010      Enclosure 1 FSAR. Staff has noted the following insufficiencies                                                                                               Pending FSAR                        Item No. 40 (Singh) and discrepancies between the FSAR and the           1) The source of the information is the DMIMS-                                             Amendment 102
As a follow up of OI 190, Staff has reviewed the proprietary version of the DMIMS-DX system description to verify the conformance claims in the FSAR. Staff has noted the following insufficiencies and discrepancies between the FSAR and the Responder: WEC/Harless/Clark TVA Partial Response:
: 1) The source of the information is the DMIMS-
: 47. N Open Open-TVA/Bechtel Pending FSAR Amendment 102 RAI No. 8 ML102980005 10/26/2010 TVA Letter dated 10/29/10 Item No. 40 Follow-up of OI-190.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                               radBA627.docx                                                                   Open Items to be Resolved for SER Approval SE   FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                           RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.              POC                            Issue                                          TVA Response(s)                    Y/N       Status/ Current Actions   Resolution Path RAI No. & Date                       Comments Sec. Sec.                                                                                                                                                                                          Date proprietary version of the system description for loose     DXTM Operations and Maintenance Manual,                                          submittal parts monitoring system provided by TVA.                    TS3176, Revision 0, dated August 2010.
Date Comments proprietary version of the system description for loose parts monitoring system provided by TVA.
Attachment 14 contains the revised system                                        TVA to reference
: 1) FSAR, Amendment 100, page 7.6-5 states, During baseline testing, the reactor vessel and steam generator are impacted three feet from each sensor with a force of 0.5 ft-lb. Loose parts detection is accomplished at a frequency of 1 kHz to 20 kHz, where background signals from the RCS are acceptable. Spurious alarming from control rod stepping is prevented by a module that detects CRDM motion commands and automatically inhibits alarms during control rod stepping.
: 1) FSAR, Amendment 100, page 7.6-5 states,                   description, Westinghouse DIMMS-DXTM                                            the DMIMS-DXTM During baseline testing, the reactor vessel and         Loose Part Detection System Description,                                        Operations steam generator are impacted three feet from             Revision 1. The Westinghouse DIMMS-DXTM                                          Manual in the each sensor with a force of 0.5 ft-lb. Loose parts       Loose Part Detection System Description,                                        FSAR as the detection is accomplished at a frequency of 1 kHz       Revision 1 will be added as Reference 9 to                                        source document to 20 kHz, where background signals from the             section 7.6 in FSAR Amendment 102.
The online sensitivity of the DMIMS-DX' is such that the system will detect a loose part that weighs from 0.25 to 30 Ib and impacts with a kinetic energy of 0.5 ft-lb on the inside surface of the RCS pressure boundary within 3 ft of a sensor.
RCS are acceptable. Spurious alarming from                                                                                                 TVA to reference control rod stepping is prevented by a module that 2) The source of the information is the DMIMS-                                          the source detects CRDM motion commands and                         DXTM seismic qualification report,                                                document for automatically inhibits alarms during control rod         Westinghouse report EQ-QR-33-WBT,                                                item# 4 per the stepping.                                                Revision 0, Seismic Evaluation of the Digital                                    response.
The source of this information is not cited nor is it described in the system description. TVA to provide the source of the information and update the system description as needed.
Metal Impact Monitoring System (DMIMS-The online sensitivity of the DMIMS-DX' is such         DXTM) for Watts Bar Unit 2. Attachment 14 that the system will detect a loose part that weighs     contains the revised system description, from 0.25 to 30 Ib and impacts with a kinetic           Westinghouse DIMMS-DXTM Loose Part energy of 0.5 ft-lb on the inside surface of the RCS     Detection System Description, Revision 1.
: 2) Regulatory Guide (RG) 1.133, rev.1, regulatory position C.1.g states that, Operability for Seismic and Environmental Conditions. Components of the loose-part detection system within containment should be designed and installed to perform their function following all seismic events that do not require plant shutdown, i.e., up to and including the Operating Basis Earthquake (OBE). Recording equipment need not function without maintenance following the specified seismic event provided the audio or visual alarm capability remains functional.
pressure boundary within 3 ft of a sensor.
The system should also be shown to be adequate by analysis, test, or combined analysis and test for the normal operating radiation, vibration, temperature, and humidity environment.
: 3) The entries for the following items in FSAR The source of this information is not cited nor is it    Section 7.6.7 will be modified in Amendment described in the system description. TVA to              102 as shown in Attachment 3 for draft provide the source of the information and update        revision to WBN Unit 2 FSAR Section 7.6.7, the system description as needed.                        Loose Part Monitoring System (LPMS)
FSAR, Amendment 100, page 7.6-5 states, The DMIMS-DX' audio and visual alarm capability will remain functional after an Operating Basis Earthquake (OBE). All of the DMIMS-DX' components are qualified for structural integrity during a Safe Shutdown Earthquake (SSE) and will not mechanically impact any safety-related equipment. Paragraphs 4.c and 4.d of the system description are not consistent with the seismic qualifications described in the FSAR. TVA to provide the source of the information contained in the FSAR and update the system description as needed.
: 3) The system description clearly describes the In-containment equipment and DIMMS-DX Cabinet equipment. The FSAR should be updated to DXTM Operations and Maintenance Manual, TS3176, Revision 0, dated August 2010. 4 contains the revised system description, Westinghouse DIMMS-DXTM Loose Part Detection System Description, Revision 1. The Westinghouse DIMMS-DXTM Loose Part Detection System Description, Revision 1 will be added as Reference 9 to section 7.6 in FSAR Amendment 102.
: 2) The source of the information is the DMIMS-DXTM seismic qualification report, Westinghouse report EQ-QR-33-WBT, Revision 0, Seismic Evaluation of the Digital Metal Impact Monitoring System (DMIMS-DXTM) for Watts Bar Unit 2. Attachment 14 contains the revised system description, Westinghouse DIMMS-DXTM Loose Part Detection System Description, Revision 1.
: 3) The entries for the following items in FSAR Section 7.6.7 will be modified in Amendment 102 as shown in Attachment 3 for draft revision to WBN Unit 2 FSAR Section 7.6.7, Loose Part Monitoring System (LPMS)
System Description.
System Description.
: 2) Regulatory Guide (RG) 1.133, rev.1, regulatory position C.1.g states that, Operability for Seismic    Sensors (In Containment) and Environmental Conditions. Components of the          Softline Cable (In Containment) loose-part detection system within containment          Preamplifier (In Containment) should be designed and installed to perform their function following all seismic events that do not        Attachment 3 contains the FSAR Amendment require plant shutdown, i.e., up to and including        102 Change Markups that reflect these the Operating Basis Earthquake (OBE). Recording          changes.
Sensors (In Containment)
equipment need not function without maintenance following the specified seismic event provided the 4) The source of the information is audio or visual alarm capability remains functional. Westinghouse Letter WBT-D-2580, The system should also be shown to be adequate          Tennessee Valley Authority Watts Bar by analysis, test, or combined analysis and test for    Nuclear Plant Unit 2 Response to NRC RAIs the normal operating radiation, vibration,              on LPMS (Reference 5). Attachment 14 temperature, and humidity environment.                  contains Westinghouse DIMMS-DXTM Loose Part Detection System Description, FSAR, Amendment 100, page 7.6-5 states, The            Revision 1.
Softline Cable (In Containment)
DMIMS-DX' audio and visual alarm capability will remain functional after an Operating Basis              In responding to Item 4, conflicting Earthquake (OBE). All of the DMIMS-DX'                  information was found between the components are qualified for structural integrity        Westinghouse-prepared FSAR section and during a Safe Shutdown Earthquake (SSE) and              various Westinghouse technical documents.
Preamplifier (In Containment) contains the FSAR Amendment 102 Change Markups that reflect these changes.
will not mechanically impact any safety-related          To fully respond to this item, a change to the equipment. Paragraphs 4.c and 4.d of the system        FSAR is required to change the minimum flat description are not consistent with the seismic          sensor frequency response from 5 Hz to 10 qualifications described in the FSAR. TVA to            Hz. Attachment 3 contains the FSAR provide the source of the information contained in      Amendment 102 Change Markups that reflect the FSAR and update the system description as            the revised frequency response of the sensor.
: 4) The source of the information is Westinghouse Letter WBT-D-2580, Tennessee Valley Authority Watts Bar Nuclear Plant Unit 2 Response to NRC RAIs on LPMS (Reference 5). Attachment 14 contains Westinghouse DIMMS-DXTM Loose Part Detection System Description, Revision 1.
needed.
In responding to Item 4, conflicting information was found between the Westinghouse-prepared FSAR section and various Westinghouse technical documents.
Westinghouse document 1TS3182, Revision
To fully respond to this item, a change to the FSAR is required to change the minimum flat sensor frequency response from 5 Hz to 10 Hz. Attachment 3 contains the FSAR Amendment 102 Change Markups that reflect the revised frequency response of the sensor.
: 3) The system description clearly describes the In-        0, Watts Bar Unit 2 DMIMS-DXTM System containment equipment and DIMMS-DX Cabinet            Validation Data Package, dated July 2010 equipment. The FSAR should be updated to                has been added as reference 8 to FSAR
Westinghouse document 1TS3182, Revision 0, Watts Bar Unit 2 DMIMS-DXTM System Validation Data Package, dated July 2010 has been added as reference 8 to FSAR submittal TVA to reference the DMIMS-DXTM Operations Manual in the FSAR as the source document TVA to reference the source document for item# 4 per the response.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                         radBA627.docx                                                                             Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                   RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                      Issue                                          TVA Response(s)                      Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                     Comments Sec. Sec.                                                                                                                                                                                                              Date reflect the equipment locations for clarification         Section 7.6 in amendment 102. Per purposes.                                                 Westinghouse letter WBT-D-2580, this document will be revised to reflect the 10Hz
Date Comments reflect the equipment locations for clarification purposes.
: 4) The information regarding frequency ranges of the         minimum frequency and provide the basis for sensors is included on page 7.6-6 of Amendment             the frequency response values in the FSAR.
: 4) The information regarding frequency ranges of the sensors is included on page 7.6-6 of Amendment 100 of the FSAR but the system description does not contain this information. Please provide the source of this information and update the system description to reflect the appropriate information.
100 of the FSAR but the system description does not contain this information. Please provide the   5) In-containment component qualification for source of this information and update the system       vibration as addressed in regulatory position description to reflect the appropriate information. C.1.g of RG 1.133, will be addressed in a future RAI response letter.
: 5) Please provide information as to how the in-containment components are qualified for vibration as addressed in regulatory position C.1.g of RG 1.133.
: 5) Please provide information as to how the in-containment components are qualified for vibration as addressed in regulatory position C.1.g of RG 1.133.
335   7.6.1   7.6.7                 LPMS: Reference to OI-331, sub item 2.                     Responder: WEC                                    48. N        Open                        Open-TVA/Bechtel Provide analysis, test, or combined analysis and test EICB (Singh) for normal operating radiation, temperature, and                                                                                                       Due TBD humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable.
Section 7.6 in amendment 102. Per Westinghouse letter WBT-D-2580, this document will be revised to reflect the 10Hz minimum frequency and provide the basis for the frequency response values in the FSAR.
336 7.5.2. 7.5                   Re: RM-1000 Report 04508905-QR                                                                               49. N        Open                        Open-EICB (Singh) 3                                                                                                                                                                                    TVA/Bechtel Please check the page numbering in Appendix F, Closed Nonconforming Material Reports. Pages 1 and 6 are missing and page 2 is included multiple times.
: 5) In-containment component qualification for vibration as addressed in regulatory position C.1.g of RG 1.133, will be addressed in a future RAI response letter.
335 7.6.1 7.6.7 EICB (Singh)
LPMS: Reference to OI-331, sub item 2.
Provide analysis, test, or combined analysis and test for normal operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable.
Responder: WEC
: 48. N Open Open-TVA/Bechtel Due TBD 336 7.5.2.
3 7.5 EICB (Singh)
Re: RM-1000 Report 04508905-QR Please check the page numbering in Appendix F, Closed Nonconforming Material Reports. Pages 1 and 6 are missing and page 2 is included multiple times.
Also identify which page number is the last page number.
Also identify which page number is the last page number.
337 7.5.2. 7.5                   Re: RM-1000 Report 04508905-QR                                                                               50. N        Open                        Open-EICB (Singh) 3                                                                                                                                                                                    TVA/Bechtel Appendix C is titled as Seismic Test Fixture for RM2300, See Drawing 04619028. Please verify whether or not it applies to RM-1000? If applicable, then please identify how it is applicable.
: 49. N Open Open-TVA/Bechtel 337 7.5.2.
338 7.5.2. 7.5                   In page 3-15 and appendix B of Qualification Test                                                           51. N        Open                        Open-3                              Report 04508905-QR, licensee described the                                                                                                             TVA/Bechtel selection of seismic required response spectra (RRS) and indicated Figure 3-2 (page 3-17), Figure 3-3 (page 3-18) are the RRSs used. The RRS curves used for actual testing are lower than the RRS curves EICB (Singh) that are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41). Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.
3 7.5 EICB (Singh)
Re: RM-1000 Report 04508905-QR Appendix C is titled as Seismic Test Fixture for RM2300, See Drawing 04619028. Please verify whether or not it applies to RM-1000? If applicable, then please identify how it is applicable.
: 50. N Open Open-TVA/Bechtel 338 7.5.2.
3 7.5 EICB (Singh)
In page 3-15 and appendix B of Qualification Test Report 04508905-QR, licensee described the selection of seismic required response spectra (RRS) and indicated Figure 3-2 (page 3-17), Figure 3-3 (page 3-18) are the RRSs used. The RRS curves used for actual testing are lower than the RRS curves that are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41). Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.
In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions.
In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions.
: 51. N Open Open-TVA/Bechtel


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                             radBA627.docx                                                                                     Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                       RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                      Issue                                              TVA Response(s)                      Y/N           Status/ Current Actions       Resolution Path   RAI No. & Date                             Comments Sec. Sec.                                                                                                                                                                                                                          Date 339 7.5.2. 7.5                   In the Qualification Test Report 04508905-QR, the                                                                 52. N        Open                          Open-EICB (Singh) 3                              licensee provided only eight Safe Shutdown                                                                                                                     TVA/Bechtel Earthquake (SSE) Test Response Spectra (TRS) as mentioned in the previous open item (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review.
Date Comments 339 7.5.2.
340 7.5.2. 7.5                   Provide test result curves for all EMI/RFI tests listed in                                                       53. N        Open                          Open-3                              Table 3.2.3 (page 3-8) of the Qualification Test Report                                                                                                       TVA/Bechtel EICB          04508905-QR. In addition, please provide the (Singh)        standards or the guidance documents used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B.
3 7.5 EICB (Singh)
041   7.5.2   7.5.1                   2/19/2010                                                    Responder: WEC                                      54. N        Open                          Open-TVA/WEC      NRC Meeting      TVA Letter      See also Open Item Nos. 226 &
In the Qualification Test Report 04508905-QR, the licensee provided only eight Safe Shutdown Earthquake (SSE) Test Response Spectra (TRS) as mentioned in the previous open item (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review.
EICB (Carte)
: 52. N Open Open-TVA/Bechtel 340 7.5.2.
Summary NRC      dated 6/18/10  270.
3 7.5 EICB (Singh)
Please provide the following Westinghouse                   Items (1) and (2) were docketed by TVA letter                      Partial Response is included  Due 12/7/10        Meeting documents:                                                   dated April 8, 2010.                                              in letter dated 10/5/10.                          Summary          TVA Letter (1) WNA-DS-01617-WBT Rev. 1, "PAMS System                                                                                       The SysRS and SRS              TVA to docket      ML093560019,    dated 10/5/10 Requirements Specification"                                 Item (3) will be addressed by Revision 2 of the                    incorporate requirements      information        Item No. 11 (2) WNA-DS-01667-WBT Rev. 0, "PAMS System                   Licensing Technical Report. Due 12/3/10                            from many other documents      indentified in Design Specification"                                                                                                           by reference.                  ISG6.
Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B.
(3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX                   Item (4) will be addressed by Westinghouse version 4.5g"                                               developing a WBN2 Specific Test Plan to                            NNC 8/25/10: (3) An earlier Please provide the following Westinghouse documents         compensate for the fact that the NRC                              version of this report was or pointers to where the material was reviewed and           disapproved WNA-PT-00058-GEN during the                            docketed for the Common Q approved in the CQ TR or SPM:                               original Common Q review. Due 12/7/10                              topical report; therefore, (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for                                                                               there should be no problem Common Q Safety systems"                                     Item (5) Procedures that are listed in the SPM                    to docket this version. (4)
: 53. N Open Open-TVA/Bechtel 041 7.5.2 7.5.1 EICB (Carte) 2/19/2010 Please provide the following Westinghouse documents:
(5) WNA-TP-00357-GEN Rev. 4, "Element Software               compliance table in the Licensing Technical                       Per ML091560352, the Test Procedure"                                              Report revision 1 supersede that test procedure                   testing process document WNA-TP-00357-GEN.Due 10/22/10                                     does not address the test plan requirements of the SPM. Please provide a test plan that implements the requirements of the SPM.
(1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements Specification" (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design Specification" (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" Please provide the following Westinghouse documents or pointers to where the material was reviewed and approved in the CQ TR or SPM:
067   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the   Responder: WEC                    Date: 5/25/10            55. N        Open                          Open-TVA/WEC      N/A - No        TVA Letter EICB (Carte) target submittal date for the "Commercial Grade                                                                                                                                   question was    dated 6/18/10 Dedication Instructions for AI687, AI688, Upgraded PC The following status is from the revised WB2                              This item is addressed in      Due 12/3/10        asked. Item node box and flat panels." was September 28, 2010. Common Q PAMS ISG-6 Compliance Matrix                                       Rev. 2 of the Licensing                          was opened to submitted in response to Item 43:                                         Technical Report                                  track comm8ittment
(4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test Procedure" Responder: WEC Items (1) and (2) were docketed by TVA {{letter dated|date=April 8, 2010|text=letter dated April 8, 2010}}.
: a. AI687, AI688 - Scheduled for September 28,                                                                       made by 2010                                                                                                                 applicant.
Item (3) will be addressed by Revision 2 of the Licensing Technical Report. Due 12/3/10 Item (4) will be addressed by Westinghouse developing a WBN2 Specific Test Plan to compensate for the fact that the NRC disapproved WNA-PT-00058-GEN during the original Common Q review. Due 12/7/10 Item (5) Procedures that are listed in the SPM compliance table in the Licensing Technical Report revision 1 supersede that test procedure WNA-TP-00357-GEN.Due 10/22/10
: b. Upgraded PC node box and flat panel displays
: 54. N Open Partial Response is included in letter dated 10/5/10.
                                                                                                  - Per Westinghouse letter WBT-D-2024 (Reference 7), these items are available for audit at the Westinghouse Rockville office.
The SysRS and SRS incorporate requirements from many other documents by reference.
NNC 8/25/10: (3) An earlier version of this report was docketed for the Common Q topical report; therefore, there should be no problem to docket this version. (4)
Per ML091560352, the testing process document does not address the test plan requirements of the SPM. Please provide a test plan that implements the requirements of the SPM.
Open-TVA/WEC Due 12/7/10 TVA to docket information indentified in ISG6.
NRC Meeting Summary NRC Meeting Summary ML093560019, Item No. 11 TVA Letter dated 6/18/10 TVA Letter dated 10/5/10 See also Open Item Nos. 226 &
270.
067 7.5.2 7.5.1 EICB (Carte)
By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the "Commercial Grade Dedication Instructions for AI687, AI688, Upgraded PC node box and flat panels." was September 28, 2010.
Responder: WEC Date: 5/25/10 The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:
: a. AI687, AI688 - Scheduled for September 28, 2010
: b. Upgraded PC node box and flat panel displays  
- Per Westinghouse letter WBT-D-2024 (Reference 7), these items are available for audit at the Westinghouse Rockville office.
: c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
: c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
To be addressed during 9/20-9/21 audit 068   7.5.2   7.5.1   C B
To be addressed during 9/20-9/21 audit
(C               By letter dated March 12, 2010 TVA stated that the           Responder: WEC                   Date: 5/25/10     56. N         Open                           Open-TVA/WEC       N/A - No         TVA Letter art              target submittal date for the "Summary Report on                                                                                                                                  question was    dated 6/18/10
: 55. N Open This item is addressed in Rev. 2 of the Licensing Technical Report Open-TVA/WEC Due 12/3/10 N/A - No question was asked. Item was opened to track comm8ittment made by applicant.
TVA Letter dated 6/18/10 068 7.5.2 7.5.1 C
B (C
art By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the "Summary Report on Responder: WEC Date: 5/25/10
: 56. N Open Open-TVA/WEC N/A - No question was TVA Letter dated 6/18/10  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                         radBA627.docx                                                                                 Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                       RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                    Issue                                          TVA Response(s)                      Y/N           Status/ Current Actions       Resolution Path   RAI No. & Date                     Comments Sec. Sec.                                                                                                                                                                                                                    Date acceptance of AI687, AI688, Upgraded PC node box,       The following status is from the revised WB2                      This item is addressed in      Due 12/3/10        asked. Item flat panels, and power supplies." was September 28,     Common Q PAMS ISG-6 Compliance Matrix                             Rev. 2 of the Licensing                          was opened to 2010.                                                  submitted in response to Item 43:                                 Technical Report                                  track comm8ittment
Date Comments acceptance of AI687, AI688, Upgraded PC node box, flat panels, and power supplies." was September 28, 2010.
: a. AI687, AI688 - Scheduled for September 28,                                                                       made by 2010                                                                                                                 applicant.
The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:
: a. AI687, AI688 - Scheduled for September 28, 2010
: b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
: d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
To be addressed during 9/20-9/21 audit 069   7.5.2   7.5.1                 By letter dated March 12, 2010 TVA stated that the     Responder: WEC                Date: 5/25/10        57. N        Open                          Open-TVA/WEC      N/A - No        N/A EICB (Carte) target submittal date for the "Watts Bar 2 PAMS                                                                                                                             question was Specific FAT Report" was October 2010.                                                                                     Awaiting for document to be Due 2/18/11           asked. Item docketed by TVA.                                  was opened to track comm8ittment made by applicant.
To be addressed during 9/20-9/21 audit This item is addressed in Rev. 2 of the Licensing Technical Report Due 12/3/10 asked. Item was opened to track comm8ittment made by applicant.
070   7.5.2   7.5.1                 By letter dated March 12, 2010 TVA stated that the     Responder: WEC                Date: 5/25/10        58. N        Open                          Open-TVA/WEC      N/A - No        TVA Letter EICB (Carte) target submittal date for the "Concept and Definition                                                                                                                       question was    dated 6/18/10 Phase V&V Report" was March 31, 2010.                   Per Westinghouse letter WBT-D-1961,                               Partial Response is included Due 12/21/10        asked. Item (Reference 8) this document is available for audit                 in letter dated 10/5/10.                          was opened to    TVA Letter at the Westinghouse Rockville office.                                                                               track            dated 8/20/10 Regulations require that the                      comm8ittment WNA-VR- 00283-WBT, Rev 0 was submitted on                         NRC review be based on                            made by          TVA Letter TVA letter to the NRC dated August 20, 2010                       docketed material. Awaiting                      applicant.      dated 10/5/10 (Reference 7).                                                    for document to be docketed by TVA.
069 7.5.2 7.5.1 EICB (Carte)
The submitted V&V did not address the Requirements Traceability Matrix and did not                       NNC 8/25/10:
By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the "Watts Bar 2 PAMS Specific FAT Report" was October 2010.
summarize anomalies. At the September 15th                         Requirements Phase SVVR public meeting, Westinghouse agreed to include                     provided by TVA letter dated the Concept and Definitions Phase Requirements                     8/20/10.
Responder: WEC Date: 5/25/10
Traceability Matrix (RTM) in the next IV&V report along with partial Design Phase updates to the RTM.
: 57. N Open Awaiting for document to be docketed by TVA.
Open-TVA/WEC Due 2/18/11 N/A - No question was asked. Item was opened to track comm8ittment made by applicant.
N/A 070 7.5.2 7.5.1 EICB (Carte)
By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the "Concept and Definition Phase V&V Report" was March 31, 2010.
Responder: WEC Date: 5/25/10 Per Westinghouse letter WBT-D-1961, (Reference 8) this document is available for audit at the Westinghouse Rockville office.
WNA-VR- 00283-WBT, Rev 0 was submitted on TVA letter to the NRC dated August 20, 2010 (Reference 7).
The submitted V&V did not address the Requirements Traceability Matrix and did not summarize anomalies. At the September 15th public meeting, Westinghouse agreed to include the Concept and Definitions Phase Requirements Traceability Matrix (RTM) in the next IV&V report along with partial Design Phase updates to the RTM.
TVA Revised Response:
TVA Revised Response:
TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in letter dated August 20, 2010 (Reference 6).
TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in {{letter dated|date=August 20, 2010|text=letter dated August 20, 2010}} (Reference 6).
The next Independent Verification and Validation (IV&V) report will include the Design Phase Requirements Traceability Matrix. The
The next Independent Verification and Validation (IV&V) report will include the Design Phase Requirements Traceability Matrix. The
: 58. N Open Partial Response is included in letter dated 10/5/10.
Regulations require that the NRC review be based on docketed material. Awaiting for document to be docketed by TVA.
NNC 8/25/10:
Requirements Phase SVVR provided by TVA letter dated 8/20/10.
Open-TVA/WEC Due 12/21/10 N/A - No question was asked. Item was opened to track comm8ittment made by applicant.
TVA Letter dated 6/18/10 TVA Letter dated 8/20/10 TVA Letter dated 10/5/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                         radBA627.docx                                                                                       Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                           RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                    Issue                                            TVA Response(s)                      Y/N             Status/ Current Actions         Resolution Path   RAI No. & Date                       Comments Sec. Sec.                                                                                                                                                                                                                        Date Design Phase IV&V Report will be submitted to NRC by February 11, 2011.
Date Comments Design Phase IV&V Report will be submitted to NRC by February 11, 2011.
071   7.5.2   7.5.1                 By letter dated March 12, 2010 TVA stated that the       Responder: WEC            Date: 5/25/10              59. N        Open                              Open-TVA/WEC      N/A - No        N/A EICB (Carte) target submittal date for the "Design Phase V&V                                                                                                                                   question was Report" was July 30, 2010.                                                                                                   Awaiting for document to be Due 12/21/10             asked. Item docketed by TVA.                                    was opened to track commitment made by applicant.
071 7.5.2 7.5.1 EICB (Carte)
072   7.5.2   7.5.1                 By letter dated March 12, 2010 TVA stated that the       Responder: WEC                Date: 5/25/10        60. N        Open                              Open-TVA/WEC      N/A - No        N/A EICB (Carte) target submittal date for the "Implementation Phase                                                                                                                               question was V&V Report" was September 30, 2010.                                                                                         Awaiting for document to be Due 12/21/10             asked. Item docketed by TVA.                                    was opened to track commitment made by applicant.
By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the "Design Phase V&V Report" was July 30, 2010.
073   7.5.2   7.5.1                 By letter dated March 12, 2010 TVA stated that the       Responder: WEC                Date: 5/25/10          61. N        Open                              Open-TVA/WEC      N/A - No        N/A EICB (Carte) target submittal date for the "Integration Phase V&V                                                                                                                             question was Report" was October 29, 2010.                                                                                               Awaiting for document to be Due 12/31/10             asked. Item docketed by TVA.                                    was opened to track commitment made by applicant.
Responder: WEC Date: 5/25/10
074   7.5.2   7.5.1                 By letter dated March 12, 2010 TVA stated that the       Responder: WEC               Date: 5/25/10           62. N         Open                             Open-TVA/WEC       N/A - No         N/A EICB (Carte) target submittal date for the "Final V&V Report" was                                                                                                                              question was November 30, 2010.                                                                                                          TVA to provide due date.          Due                asked. Item was opened to track commitment made by applicant.
: 59. N Open Awaiting for document to be docketed by TVA.
075   7.5.2   7.5.1                 By letter dated March 12, 2010 TVA stated that the       Responder: WEC              Date: 5/25/10          63. N        Open                              Open-TVA/WEC      N/A - No        N/A EICB (Carte) target submittal date for the "Watts Bar 2 PAMS                                                                                                                                   question was Specific FAT Procedure" was September 30, 2010.                                                                             Awaiting for document to be Due 11/24/20             asked. Item docketed by TVA.                                    was opened to track commitment made by applicant.
Open-TVA/WEC Due 12/21/10 N/A - No question was asked. Item was opened to track commitment made by applicant.
081   7.5.2   7.5.1                 5/6/2010                                                  Responder: Merten/WEC                                64. N        Open                              Open-TVA/WEC      EICB RAI        TVA Letter EICB (Carte)
N/A 072 7.5.2 7.5.1 EICB (Carte)
ML102910002      dated 6/18/10 The PAMS Licensing Technical Report (WNA-LI-             The codes and standards documents listed in                        ML101600092 Item No.1:            Due 12/31/10      Item No. 9 00058-WBT Rev. 0, Dated April 2010), in Section 7,       Section 7 of the Common Q PAMS Licensing                          There are three sets of lists codes and standards applicable to the Common Q     Technical Report are the documents that the                        regulatory criteria that relate  TVA to provide PAMS. This list contains references to old revisions of   Common Q platform was licensed to when the                        to a Common Q application        requested several regulatory documents, for example:               NRC approved the original topical report and                      (e.g. WBN2 PAMS):                information.
By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the "Implementation Phase V&V Report" was September 30, 2010.
(1) RG 1.29 - September 1978 vs. March 2007               issued the approved SER. The WBN Unit 2                            (a) Common Q platform (2) RG 1.53 - June 1973 vs. November 2003                 Common Q PAMS is designed in accordance with                      components - Common Q (a) IEEE 379-1994 vs. -2000                               the approved Common Q topical report and                          TR (3) RG 1.75 - September 1975 vs. February 2005           approved SER and the codes and standards on                        (b) Application Development (a) IEEE 384-1992 vs. -1992                               which the SER was based. Since the current                        Processes - Common Q (4) RG 1.100 - June 1988 vs. September 2009               versions referenced are not applicable to WBN                      SPM (a) IEEE 344-1987 vs. -2004                               Unit 2, there is no basis for a comparison review.                 (c) Application Specific -
Responder: WEC Date: 5/25/10
: 60. N Open Awaiting for document to be docketed by TVA.
Open-TVA/WEC Due 12/21/10 N/A - No question was asked. Item was opened to track commitment made by applicant.
N/A 073 7.5.2 7.5.1 EICB (Carte)
By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the "Integration Phase V&V Report" was October 29, 2010.
Responder: WEC Date: 5/25/10
: 61. N Open Awaiting for document to be docketed by TVA.
Open-TVA/WEC Due 12/31/10 N/A - No question was asked. Item was opened to track commitment made by applicant.
N/A 074 7.5.2 7.5.1 EICB (Carte)
By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the "Final V&V Report" was November 30, 2010.
Responder: WEC Date: 5/25/10
: 62. N Open TVA to provide due date.
Open-TVA/WEC Due N/A - No question was asked. Item was opened to track commitment made by applicant.
N/A 075 7.5.2 7.5.1 EICB (Carte)
By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the "Watts Bar 2 PAMS Specific FAT Procedure" was September 30, 2010.
Responder: WEC Date: 5/25/10
: 63. N Open Awaiting for document to be docketed by TVA.
Open-TVA/WEC Due 11/24/20 N/A - No question was asked. Item was opened to track commitment made by applicant.
N/A 081 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 7, lists codes and standards applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:
(1) RG 1.29 - September 1978 vs. March 2007 (2) RG 1.53 - June 1973 vs. November 2003 (a) IEEE 379-1994 vs. -2000 (3) RG 1.75 - September 1975 vs. February 2005 (a) IEEE 384-1992 vs. -1992 (4) RG 1.100 - June 1988 vs. September 2009 (a) IEEE 344-1987 vs. -2004 Responder: Merten/WEC The codes and standards documents listed in Section 7 of the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the codes and standards on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.
: 64. N Open ML101600092 Item No.1:
There are three sets of regulatory criteria that relate to a Common Q application (e.g. WBN2 PAMS):
(a) Common Q platform components - Common Q TR (b) Application Development Processes - Common Q SPM (c) Application Specific -
Open-TVA/WEC Due 12/31/10 TVA to provide requested information.
EICB RAI ML102910002 Item No. 9 TVA Letter dated 6/18/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                             radBA627.docx                                                                       Open Items to be Resolved for SER Approval SE   FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                               RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.              POC                            Issue                                          TVA Response(s)                  Y/N         Status/ Current Actions     Resolution Path RAI No. & Date                       Comments Sec. Sec.                                                                                                                                                                                              Date (5) RG 1.152 - January 1996 vs. January 2006                                                                         current regulatory criteria (a) IEEE 7-4.33.2-1993 vs. -2003                         Bechtel to develop a matrix and work with                  The Common Q Topical (6) RG 1.168 - September 1997 vs. February 2004           Westinghouse to provide justification.                      Report and associated (a) IEEE 1012-1986 vs. -1998                                                                                         appendices primarily (b) IEEE 1028-1988 vs. -1997                                                                                         addressed (a) and (b). The (7) IEEE 279-1991 vs. 603-1991                                                                                       Common Q SER states:
Date Comments (5) RG 1.152 - January 1996 vs. January 2006 (a) IEEE 7-4.33.2-1993 vs. -2003 (6) RG 1.168 - September 1997 vs. February 2004 (a) IEEE 1012-1986 vs. -1998 (b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 endorses 323-1974)
(8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 endorses 323-1974)                                                                                               Appendix 1, Post However, LIC-110, "Watts Bar Unit 2 License                                                                           Accident Monitoring Application Review," states: "Design features and                                                                     Systems, provides the administrative programs that are unique to Unit 2                                                                     functional requirements and should then be reviewed in accordance with the                                                                       conceptual design approach current staff positions." Please identify all differences                                                             for upgrading an existing between the versions referenced and the current staff                                                                 PAMS based on Common Q positions. Please provide a justification for the                                                                     components (page 58, acceptability PAMS with respect to these differences.                                                                 Section 4.4.1.1, Description)On the basis of the above review, the staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)
However, LIC-110, "Watts Bar Unit 2 License Application Review," states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions." Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences.
Bechtel to develop a matrix and work with Westinghouse to provide justification.
current regulatory criteria The Common Q Topical Report and associated appendices primarily addressed (a) and (b). The Common Q SER states:
Appendix 1, Post Accident Monitoring Systems, provides the functional requirements and conceptual design approach for upgrading an existing PAMS based on Common Q components (page 58, Section 4.4.1.1, Description)On the basis of the above review, the staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)
The NRC did not approve the proposed PAMS design.
The NRC did not approve the proposed PAMS design.
Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.
Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.
Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design.
Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design.
For example IEEE Std. 603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other Systems, contain application specific requirements that must be addressed by a PAMS system.
For example IEEE Std. 603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other Systems, contain application specific requirements that must be addressed by a PAMS system.
Awaiting TVA Response.
Awaiting TVA Response.  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                         radBA627.docx                                                                                     Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                         RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                    Issue                                          TVA Response(s)                        Y/N           Status/ Current Actions       Resolution Path     RAI No. & Date                       Comments Sec. Sec.                                                                                                                                                                                                                      Date 082   7.5.2   7.5.1                 5/6/2010                                                Responder: WEC                        Date:          65. N        Open                            Open-TVA/WEC        EICB RAI        TVA Letter EICB (Carte) 6/18/10                                                                                                                ML102910002      dated 7/30/10 The PAMS Licensing Technical Report (WNA-LI-                                                                               Regulations require that the Revision 1, Due        Item No. 10 00058-WBT Rev. 0, Dated April 2010), in Section 2.3,   These components can be found in the Summary                        NRC review be based on      10/22/10 lists hardware/software changes to the Common Q         Qualification Report Of Hardware Testing For                        docketed material. Awaiting PAMS previously reviewed by the NRC. However the       Common Q Applications, 00000-ICE-37764, Rev                        for document to be docketed Common Q ISG-6 Compliance Matrix does not contain       3 and                                                              by TVA.
Date Comments 082 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 2.3, lists hardware/software changes to the Common Q PAMS previously reviewed by the NRC. However the Common Q ISG-6 Compliance Matrix does not contain activities that address qualification of all changes specifically:
activities that address qualification of all changes   TWICE Qualification Status Report, WNAQR-specifically:                                          00011-SSP Per Westinghouse letter WBT-D-                           NNC 8/9/10: per telephone 2024, (Reference __) dated June 9, 2010, these                     conversation on 8/5/10, it is documents are available for audit at the                           not clear how Westinghouse Westinghouse Rockville Office.                                     Commercial Grade Dedication Plans and TVA provided information by letter dated July 30,                   Reports for Digital I&C.
Responder: WEC Date:
2010 (ML102160349) - See Enclosure 1 Item No.                       Westinghouse agree to
6/18/10 These components can be found in the Summary Qualification Report Of Hardware Testing For Common Q Applications, 00000-ICE-37764, Rev 3 and TWICE Qualification Status Report, WNAQR-00011-SSP Per Westinghouse letter WBT-D-2024, (Reference __) dated June 9, 2010, these documents are available for audit at the Westinghouse Rockville Office.
: 7.                                                                 present to the NRC in a public meeting on August Revision 1 of the Licensing Technical Report                        17, 2010, and explanation of provides additional detail on the platform specific                how their system addresses to WBN2 and references to the evaluation                            regulatory criteria for both documentation.                                                      commercial grade dedication and equipment qualification.
TVA provided information by {{letter dated|date=July 30, 2010|text=letter dated July 30, 2010}} (ML102160349) - See Enclosure 1 Item No.
: 7.
Revision 1 of the Licensing Technical Report provides additional detail on the platform specific to WBN2 and references to the evaluation documentation.
: 65. N Open Regulations require that the NRC review be based on docketed material. Awaiting for document to be docketed by TVA.
NNC 8/9/10: per telephone conversation on 8/5/10, it is not clear how Westinghouse Commercial Grade Dedication Plans and Reports for Digital I&C.
Westinghouse agree to present to the NRC in a public meeting on August 17, 2010, and explanation of how their system addresses regulatory criteria for both commercial grade dedication and equipment qualification.
NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and associated reports be docketed.
NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and associated reports be docketed.
085   7.5.2   7.5.1                 5/6/2010                                               Responder: WEC                                        66. N        Open                            Open-TVA/WEC        EICB RAI EICB (Carte)
Open-TVA/WEC Revision 1, Due 10/22/10 EICB RAI ML102910002 Item No. 10 TVA Letter dated 7/30/10 085 7.5.2 7.5.1 EICB (Carte) 5/6/2010 Please provide a detailed description of the PAMS MTP data link to the plant computer. This description should identify all equipment (model & version) and describe the functions that each piece of equipment performs. This description should be of sufficient detail for the NRC to independently evaluate the statements made in WNA-LI-00058-WBT Rev. 0, Section 5.3.
ML102910002 Please provide a detailed description of the PAMS       Is the WEC ISG4 evaluation inadequate?                              A response will be provided Due 11/24/10            Item No. 13 MTP data link to the plant computer. This description                                                                       by 10/31/10 should identify all equipment (model & version) and     Operation of the MTP as a barrier device. MTP                                                      Hardware is in describe the functions that each piece of equipment     Fails as a barrier device. Describe what prevents                  NNC 8/11/10: Design            Rev. 1 of the performs. This description should be of sufficient     a MTP failure from propagating to the AC160?                        information should be          Licensing detail for the NRC to independently evaluate the                                                                           available now. By letter        Technical Report statements made in WNA-LI-00058-WBT Rev. 0,             Node loss on the bus? Bus loss?                                     dated July 30, 2010            due 10/22.
Responder: WEC Is the WEC ISG4 evaluation inadequate?
Section 5.3.                                                                                                                (ML102160349) TVA stated Revise the ISG4 section of the Licensing                           that the MTP was connected NNC 8/25/10:
Operation of the MTP as a barrier device. MTP Fails as a barrier device. Describe what prevents a MTP failure from propagating to the AC160?
Technical Report (Rev. 2) to provide a more                         to a Red Hat Linux Server      Disagree with detailed description of the MTP as a barrier                       (see Enclosure 1, Item No. path forward input device.                                                            14 part b.). It is presumed by TVA above.
Node loss on the bus? Bus loss?
that this server is not safety- An explanation is related. IEEE 603-1991         about the design Clause 5.6.3(1) states,         is needed.
Revise the ISG4 section of the Licensing Technical Report (Rev. 2) to provide a more detailed description of the MTP as a barrier device.
                                                                                                                                                                "Isolation devices used to affect a safety system         FAT test boundary shall be classified procedure to as part of the safety           include data system."                       storm testing of the MTP Please describe how the         interface due MTP serves as the isolation 11/24/10 device.
: 66. N Open A response will be provided by 10/31/10 NNC 8/11/10: Design information should be available now. By {{letter dated|date=July 30, 2010|text=letter dated July 30, 2010}} (ML102160349) TVA stated that the MTP was connected to a Red Hat Linux Server (see Enclosure 1, Item No.
14 part b.). It is presumed that this server is not safety-related. IEEE 603-1991 Clause 5.6.3(1) states, "Isolation devices used to affect a safety system boundary shall be classified as part of the safety system."
Please describe how the MTP serves as the isolation device.
Open-TVA/WEC Due 11/24/10 Hardware is in Rev. 1 of the Licensing Technical Report due 10/22.
NNC 8/25/10:
Disagree with path forward input by TVA above.
An explanation is about the design is needed.
FAT test procedure to include data storm testing of the MTP interface due 11/24/10 EICB RAI ML102910002 Item No. 13 086 7.5.2 7.5.1
(
(
086  7.5.2  7.5.1                  5/6/2010                                               Responder: WEC                       Date: 5/24/10 67. N           Open                           Open-TVA/WEC       EICB RAI         TVA Letter C
C a
a
5/6/2010 Responder: WEC Date: 5/24/10 67. N Open Open-TVA/WEC EICB RAI TVA Letter  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                           radBA627.docx                                                                                   Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                       RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                      Issue                                            TVA Response(s)                      Y/N           Status/ Current Actions       Resolution Path   RAI No. & Date                           Comments Sec. Sec.                                                                                                                                                                                                                        Date ML102910002      dated 6/18/10 The PAMS Licensing Technical Report (WNA-LI-               The regulatory documents listed in the Common                      TVA to address with item      Due 12/31/10      Item No. 14 00058-WBT Rev. 0, Dated April 2010), in Section 6,         Q PAMS Licensing Technical Report are the                          OI 81.
Date Comments The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 6, lists references applicable to the Common Q PAMS.
lists references applicable to the Common Q PAMS.           documents that the Common Q platform was This list contains references to old revisions of several   licensed to when the NRC approved the original regulatory documents, for example:                         topical report and issued the approved SER. The (1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1           WBN Unit 2 Common Q PAMS is designed in (ML083310185)                                               accordance with the approved Common Q topical However, LIC-110, "Watts Bar Unit 2 License                 report and approved SER and the regulatory Application Review," states: "Design features and           documents on which the SER was based. Since administrative programs that are unique to Unit 2           the current versions referenced are not applicable should then be reviewed in accordance with the             to WBN Unit 2, there is no basis for a comparison current staff positions." Please identify all differences   review.
This list contains references to old revisions of several regulatory documents, for example:
between the versions referenced and the current staff positions. Please provide a justification for the           Rev 0 of the Licensing Technical Report acceptability PAMS with respect to these differences.       references Rev. 1 of ISG4 138                                 By letter dated February 3, 2010, Westinghouse             Responder: WEC                                      68. N        Open                          Open-TVA/WEC      ML101650255, EICB (Carte) informed TVA that certain PAMS documentation has                                                                                                                                 Item No. 2 been completed.                                             This item is used to track all Commercial                          TVA agreed to include a        To be addressed Grade Dedication issues.                                          description of the generic    by Rev. 2 of the (a) The draft ISG6 states that a commercial grade                                                                             Westinghouse hardware          Licensing dedication plan should be provided with an application                                                                         commercial grade              Technical Report for a Tier 2 review.                                                                                                          dedication process in the      due 12/3.
(1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 (ML083310185)
PAMS licensing technical By letter dated February 5, 2010, TVA stated that the                                                                         report. (see ML102920031      Due 12/3/10 commercial grade dedication plan was included in the                                                                           Item No 1)
However, LIC-110, "Watts Bar Unit 2 License Application Review," states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions." Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences.
Common Q Topical Report Section 11, Commercial Grade Dedication Program. Section 11 includes a                                                                               TVA agreed to include (in description of the Common Q Commercial Grade                                                                                   the PAMS licensing Dedication Program, and states: A detailed review                                                                             technical report) an plan is developed for each Common Q hardware or                                                                               evaluation of WBN2 critical software component that requires commercial grade                                                                             characteristics for dedication.                                                                                                                   commercial Westinghouse hardware components Please provide the commercial grade dedication plans                                                                           against the generic critical for each Common Q hardware or software component                                                                               characteristics. (see that has not been previously reviewed and approved                                                                             ML102920031 Item No 2) by the NRC.
The regulatory documents listed in the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the regulatory documents on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.
TVA agreed to include a (b) The draft ISG6 states that a commercial grade                                                                             description of the generic dedication report should be provided within 12 months                                                                         Westinghouse software of requested approval for a Tier 2 review.                                                                                     commercial grade dedication process in the (i) Please provide 00000-ICE-37722 Rev. 0,                                                                                     PAMS licensing technical Commercial Grade Dedication Report for the QNX                                                                               report. (see ML102920031 Operating System for Common Q Applications.                                                                                   Item No 3)
Rev 0 of the Licensing Technical Report references Rev. 1 of ISG4 TVA to address with item OI 81.
(ii) Please provide WNA-CD-00018-GEN Rev. 3,                                                                                   TVA agreed to include (in Commercial Dedication Report for QNX 4.25G for                                                                               the PAMS licensing Common Q Applications.                                                                                                       technical report) an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4)
Due 12/31/10 ML102910002 Item No. 14 dated 6/18/10 138 EICB (Carte)
By {{letter dated|date=February 3, 2010|text=letter dated February 3, 2010}}, Westinghouse informed TVA that certain PAMS documentation has been completed.
(a) The draft ISG6 states that a commercial grade dedication plan should be provided with an application for a Tier 2 review.
By {{letter dated|date=February 5, 2010|text=letter dated February 5, 2010}}, TVA stated that the commercial grade dedication plan was included in the Common Q Topical Report Section 11, Commercial Grade Dedication Program. Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: A detailed review plan is developed for each Common Q hardware or software component that requires commercial grade dedication.
Please provide the commercial grade dedication plans for each Common Q hardware or software component that has not been previously reviewed and approved by the NRC.
(b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval for a Tier 2 review.
(i) Please provide 00000-ICE-37722 Rev. 0, Commercial Grade Dedication Report for the QNX Operating System for Common Q Applications.
(ii) Please provide WNA-CD-00018-GEN Rev. 3, Commercial Dedication Report for QNX 4.25G for Common Q Applications.
Responder: WEC This item is used to track all Commercial Grade Dedication issues.
: 68. N Open TVA agreed to include a description of the generic Westinghouse hardware commercial grade dedication process in the PAMS licensing technical report. (see ML102920031 Item No 1)
TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial Westinghouse hardware components against the generic critical characteristics. (see ML102920031 Item No 2)
TVA agreed to include a description of the generic Westinghouse software commercial grade dedication process in the PAMS licensing technical report. (see ML102920031 Item No 3)
TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4)
Open-TVA/WEC To be addressed by Rev. 2 of the Licensing Technical Report due 12/3.
Due 12/3/10 ML101650255, Item No. 2 140
(
(
140                                The first requirement in the WBN2 PAMS SysRS (i.e., Responder: Clark                                             69. N         Open                           Open-TVA/WEC       ML101650255, TVA Letter         WBN2 PAMS System C
C a
a
The first requirement in the WBN2 PAMS SysRS (i.e., Responder: Clark
: 69. N Open Open-TVA/WEC ML101650255, TVA Letter WBN2 PAMS System  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                         radBA627.docx                                                                                   Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                         RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                    Issue                                            TVA Response(s)                    Y/N           Status/ Current Actions         Resolution Path   RAI No. & Date                           Comments Sec. Sec.                                                                                                                                                                                                                      Date R2.2-1) states: The PAMS shall be capable of                                                                                                                                   Item No. 4      dated 10/29/10 Requirements Specification operation during normal and abnormal environments         WBN Unit 2 FSAR Amendment 100 Section                            NNC 11/3/10: The origin of      to docket PAMS                      Enclosure 1 and plant operating modes. The rational for this         7.5.1.8, Post Accident Monitoring System                        the requirements in the          Licensing                          Item No. 10    TVA docketed WNA-DS-01617-requirement is that it is necessary to meet Regulatory     (PAMS) specifies the Reg. Guide 1.97 variables                 SysRS are not clearly            Technical Report                                  WBT Rev. 1, RRAS Watts Bar 2 Guide (RG) 1.97.                                          implemented in the Common Q based WBN Unit                       document. Rev. 1 of the         Rev. 2.                                            NSSS Completion Program I&C 2 PAMS                                                          Common Q PAMS Licensing                                                             Projects Post Accident What document specifies which RG 1.97 variables are                                                                        Technical Report contains                                                           Monitoring System- System implemented in the Common Q based WBN2 PAMS?                                                                                an open item that will be                                                           Requirements Specification, addressed in Rev. 2; this                                                           dated December 2009.
Date Comments R2.2-1) states: The PAMS shall be capable of operation during normal and abnormal environments and plant operating modes. The rational for this requirement is that it is necessary to meet Regulatory Guide (RG) 1.97.
open item is to include TVAs enhanced contract compliance matrix. It is expected that this matrix will address this open item.
What document specifies which RG 1.97 variables are implemented in the Common Q based WBN2 PAMS?
142                                The applicable regulatory guidance for reviewing the      Responder: WEC                                    70. N        Open                            Open-TVA/WEC      ML101650255,                   WBN2 PAMS System EICB (Carte)
WBN Unit 2 FSAR Amendment 100 Section 7.5.1.8, Post Accident Monitoring System (PAMS) specifies the Reg. Guide 1.97 variables implemented in the Common Q based WBN Unit 2 PAMS NNC 11/3/10: The origin of the requirements in the SysRS are not clearly document. Rev. 1 of the Common Q PAMS Licensing Technical Report contains an open item that will be addressed in Rev. 2; this open item is to include TVAs enhanced contract compliance matrix. It is expected that this matrix will address this open item.
WBN2 PAMS SysRS would be IEEE 830 as endorsed                                                                                                                                   Item No. 6                    Requirements Specification by Regulatory Guide 1.172 and BTP 7-14 Section             This item is used to track all traceability                      TVA/Westinghouse                To be addressed B.3.3.1, Requirements Activities - Software               issues with the Software Requirements                            agreed to include the            by Revision of                                    TVA docketed WNA-DS-01617-Requirements Specifications. IEEE 830-1994 Section       Specification (SRS).                                            V&V evaluation of their          the RTM, SRS,                                    WBT Rev. 1, RRAS Watts Bar 2 4.3.8, Traceable, states: A [requirements                                                                               reusable software                SysRS, and                                        NSSS Completion Program I&C specification] is traceable of the origin of each of its   At the September 15 public meeting in Rockville,                                                  SysDS.                                            Projects Post Accident element development requirements is clear                                   the following actions were agreed to. These                                                                                                        Monitoring System- System items address the traceability concerns with the                process in the V&V              Due 12/31/10.                                    Requirements Specification,
to docket PAMS Licensing Technical Report Rev. 2.
: 1. How did TVA ensure the traceability of each             Software Requirements Specification.                            design phase summary                                                              dated December 2009.
Item No. 4 dated 10/29/10 Item No. 10 Requirements Specification TVA docketed WNA-DS-01617-WBT Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Requirements Specification, dated December 2009.
requirement in the WBN2 PAMS SysRS.                                                                                     report. This evaluation
142 EICB (Carte)
: 1. Westinghouse will perform completed a                              would include an
The applicable regulatory guidance for reviewing the WBN2 PAMS SysRS would be IEEE 830 as endorsed by Regulatory Guide 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities - Software Requirements Specifications. IEEE 830-1994 Section 4.3.8, Traceable, states: A [requirements specification] is traceable of the origin of each of its requirements is clear
: 2. Explain the source(s) of the requirements present     review of the Requirements Traceability                            evaluation against the in the Post Accident Monitoring Systems Software     Matrix(RT), using the issues identified at the                    development process Requirements Specification. To clarify, many         9/15 public meeting as a guide (documented                        requirements. This documents have requirements that are                 below) and update the RTM as required.                            evaluation would also incorporated by reference into the SRS, but what                                                                         include an evaluation of served to direct the author to include those       2. The next issue of the IV&V report will include how the WBN2 specific various documents in the SRS or, if the               the Requirements phase review of the RTM requirement is based on the System                   and a partial review for the Design phase.                        requirements were Requirements Specification, what directed the                                                                            addressed by the author to include the requirement there?           3. Westinghouse will add a comments column in                        reusable software the Requirements Traceability Matrix (RTM)                        elements. (see
: 1. How did TVA ensure the traceability of each requirement in the WBN2 PAMS SysRS.
: 3. Clarify whether the unnumbered paragraphs in the     to address items not in the SRS or SysRS.                          ML102920031 Item No 5)
: 2. Explain the source(s) of the requirements present in the Post Accident Monitoring Systems Software Requirements Specification. To clarify, many documents have requirements that are incorporated by reference into the SRS, but what served to direct the author to include those various documents in the SRS or, if the requirement is based on the System Requirements Specification, what directed the author to include the requirement there?
Post Accident Monitoring Systems Software Requirements Specification, such as in the section 4. IEEE 830 says you shouldnt have planning headings, or are all such sections simply             information in the SRS. Westinghouse has considered to be informative?                         agreed to remove this information.
: 3. Clarify whether the unnumbered paragraphs in the Post Accident Monitoring Systems Software Requirements Specification, such as in the section headings, or are all such sections simply considered to be informative?
Does the same apply to documents referenced by 5. IEEE 830 says you shouldnt have process the SRS? Such as WCAP-16096-NP-A, Rev. 1A,           requirements in the SRS. Westinghouse has Software Program Manual for Common Q                 agreed to remove these requirements.
Does the same apply to documents referenced by the SRS? Such as WCAP-16096-NP-A, Rev. 1A, Software Program Manual for Common Q Systems, which is incorporated by reference in requirement R2.3-2 in the SRS.
Systems, which is incorporated by reference in requirement R2.3-2 in the SRS.                     6. Westinghouse will perform and document an evaluation of the SRS to ensure compliance R2.3-2 [The PAMS software shall comply with           with Reg. Guide 1.172 and justify any the requirements and guidelines defined in WCAP-       deviations.
R2.3-2 [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, Software Program Manual for Common Q Systems (reference 5).]
16096-NP-A, Software Program Manual for Common Q Systems (reference 5).]                   7. 25 issues identified by V&V where some requirements have not been included in the If any requirements are expressed in such              SDS (14) and SRS (11) at the revisions unnumbered paragraph form instead of individually      reviewed by V&V. Have these been identified requirements, please list them, describe    addressed? Yes. The next revisions of the why they satisfy the fundamental requirement of        SDS and SRS address these issues.
If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity, and describe how they were verified.
unambiguity, and describe how they were verified.
Responder: WEC This item is used to track all traceability issues with the Software Requirements Specification (SRS).
At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the traceability concerns with the Software Requirements Specification.
: 1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
: 2. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 3. Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.
: 4. IEEE 830 says you shouldnt have planning information in the SRS. Westinghouse has agreed to remove this information.
: 5. IEEE 830 says you shouldnt have process requirements in the SRS. Westinghouse has agreed to remove these requirements.
: 6. Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Reg. Guide 1.172 and justify any deviations.
: 7. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed? Yes. The next revisions of the SDS and SRS address these issues.
: 70. N Open TVA/Westinghouse agreed to include the V&V evaluation of their reusable software element development process in the V&V design phase summary report. This evaluation would include an evaluation against the development process requirements. This evaluation would also include an evaluation of how the WBN2 specific requirements were addressed by the reusable software elements. (see ML102920031 Item No 5)
Open-TVA/WEC To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.
Due 12/31/10.
ML101650255, Item No. 6 WBN2 PAMS System Requirements Specification TVA docketed WNA-DS-01617-WBT Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Requirements Specification, dated December 2009.  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                             radBA627.docx                                                                 Open Items to be Resolved for SER Approval SE   FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                         RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.              POC                            Issue                                          TVA Response(s)                  Y/N       Status/ Current Actions Resolution Path RAI No. & Date                       Comments Sec. Sec.                                                                                                                                                                                        Date
Date Comments
: 8. Some hardware requirements are contained
: 4. Are there any sources of requirements in parallel with the Post Accident Monitoring Systems Software Requirements Specification? Meaning does the SRS contain, explicitly or by reference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in any other source or document? If so, what are these sources or documents?
: 4. Are there any sources of requirements in parallel       in the SRS instead of the System Design with the Post Accident Monitoring Systems             Specification (SDS). These will be removed Software Requirements Specification? Meaning           from the SRS and incorporated into the next does the SRS contain, explicitly or by reference,       revision of the SDS.
: 5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification are various types of Reusable Software Element.
all the requirements that were used in the design phase for the application specific software, or do 9. RTM item R4.2-2 protection class software software design phase activities use requirements       set to 0. Needs to be fixed internally write found in any other source or document? If so,           CAPs to revise the application restrictions what are these sources or documents?                   document on AC160.
These references are used in the body of the SRS, for example:
: 5. References 12, 27, 29, and 31-44 in the Post       10. Westinghouse to improve the traceability of Accident Monitoring Systems Software                  the tests that are performed with the function Requirements Specification are various types of        enable (FE) switch in the ENABLE position.
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
Reusable Software Element.
They are also included via tables such as found in requirement R7.1.2-1
: 11. Westinghouse to revise documents to be These references are used in the body of the            consistent with referring to the FE switch in SRS, for example:                                      the ENABLE position R5.3.14-2 [The Addressable Constants CRC error 12. The flow of information is from the SysRS to signal shall be TRUE when any CAL CRC's                the SDS (hardware) and SRS (software).
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
respective ERROR terminal = TRUE (WNA-DS-              Describe how the documents are used.
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?
00315-GEN, "Reusable Software Element                  Describe in 1.1 of the SysRS. Need a good Document CRC for Calibration Data" [Reference          write up of how the process works.
: 8. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). These will be removed from the SRS and incorporated into the next revision of the SDS.
12]).]
: 9. RTM item R4.2-2 protection class software set to 0. Needs to be fixed internally write CAPs to revise the application restrictions document on AC160.
: 13. Westinghouse and TVA will develop a revised They are also included via tables such as found in      schedule for document submittals and requirement R7.1.2-1                                    provide it to the NRC no later than 9/30/10
: 10. Westinghouse to improve the traceability of the tests that are performed with the function enable (FE) switch in the ENABLE position.
[The Watts Bar 2 PAMS shall use the application- 14. TVA will update the Procurement Requisition specific type circuits and custom PC elements          Resolution Matrix and submit it to show how listed in Table 7.1-1.]                                the Common Q PAMS design meets the contract requirements.
: 11. Westinghouse to revise documents to be consistent with referring to the FE switch in the ENABLE position
Do the referenced reusable software element documents include requirements not explicitly stated in 15. Westinghouse to add the Software Design the SRS? If so what is their origin?                        Descriptions to the RTM
: 12. The flow of information is from the SysRS to the SDS (hardware) and SRS (software).
Describe how the documents are used.
Describe in 1.1 of the SysRS. Need a good write up of how the process works.
: 13. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no later than 9/30/10
: 14. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
: 15. Westinghouse to add the Software Design Descriptions to the RTM
: 16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
: 16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
: 17. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.
: 17. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.
Line 903: Line 1,935:
: a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
: a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
: b. What are the SDDs?
: b. What are the SDDs?
: c. PAMS is a delta document so how do we capture all the generic requirements for traceability.
: c. PAMS is a delta document so how do we capture all the generic requirements for traceability.  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                         radBA627.docx                                                                               Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                   RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                    Issue                                            TVA Response(s)                        Y/N           Status/ Current Actions   Resolution Path   RAI No. & Date                         Comments Sec. Sec.                                                                                                                                                                                                                  Date For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified using the Software Elements Test procedure under Appendix B program.
Date Comments For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified using the Software Elements Test procedure under Appendix B program.
Provide a summary of RSEDs generic WCAP.
Provide a summary of RSEDs generic WCAP.
Westinghouse to determine if the WCAP was docketed under the AP1000 RSED concept is not in the SPM. WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable.
Westinghouse to determine if the WCAP was docketed under the AP1000 RSED concept is not in the SPM. WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable.
RSEDs are listed in the SDD References.
RSEDs are listed in the SDD References.
143                                 The WBN2 PAMS Software Requirements                       Responder: WEC                                        71. N        Open                        Open-TVA/WEC      ML101650255,                WBN2 PAMS System EICB (Carte)
143 EICB (Carte)
Specification (WBN2 PAMS SRS - ML101050202)                                                                                                                                 Item No. 7                  Requirements Specification contains a table (see page iii) titled, Document         Addressed in the 9/15 public meeting and 9/20 -                                                To be addressed Traceability & Compliance, which states that the         9/21 audit. A detailed explanation will be                                                      by Revision of                                  TVA docketed WNA-DS-01617-WBN2 PAMS SRS was created to support the three           provided.                                                                                      the RTM, SRS,                                  WBT Rev. 1, RRAS Watts Bar 2 documents identified (one of which is the WBN2 PAMS                                                                                                       SysRS, and                                      NSSS Completion Program I&C SysRS). Section 1.1, Overview, of the WBN2 PAMS                                                                                                         SysDS.                                          Projects Post Accident SRS states: This document describes requirements                                                                                                                                                         Monitoring System- System for the major software components                                                                                                                       Due 12/31/10.                                  Requirements Specification, dated December 2009.
The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS - ML101050202) contains a table (see page iii) titled, Document Traceability & Compliance, which states that the WBN2 PAMS SRS was created to support the three documents identified (one of which is the WBN2 PAMS SysRS). Section 1.1, Overview, of the WBN2 PAMS SRS states: This document describes requirements for the major software components (a) Please list and describe each of the major software components. Please include a description of any NRC review for each of these components.
(a) Please list and describe each of the major software components. Please include a description of any NRC review for each of these components.
(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.
(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.
(c) What other documents contain the requirements for the other software components?
(c) What other documents contain the requirements for the other software components?
The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, Document Traceability & Compliance, which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, Purpose, of the WBN2 PAMS SDS states: The purpose of this document is to define the hardware design requirements (c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?
The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, Document Traceability & Compliance, which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, Purpose, of the WBN2 PAMS SDS states: The purpose of this document is to define the hardware design requirements (c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?
(d) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS.
(d) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS.
145                                The WBN2 PAMS System Design Specification                Responder: WEC                                       72. N         Open                       Open-TVA/WEC       ML101650255,                 WBN2 PAMS System Design EICB (Carte)
Responder: WEC Addressed in the 9/15 public meeting and 9/20 -
(WBN2 PAMS SDS) contains a table (see page iii)                                                                                                                             Item No. 9                  Specification titled, Document Traceability & Compliance, which       This item is used to track all traceability                        During the September 20-    To be addressed states that the WBN2 PAMS SDS was created to             issues with the System Design Specification                        21, 2010 audit at          by Revision of                                  TVA docketed WNA-DS-01667-support the WBN2 PAMS SysRS.                             (SDS).                                                              Westinghouse, it was        the RTM, SRS,                                  WBT Rev. 1, RRAS Watts Bar 2 acknowledged that          SysRS, and                                      NSSS Completion Program I&C (a) Does the WBN2 PAMS SDS implement all of the           At the September 15 public meeting in                                                          SysDS.                                          Projects Post Accident TVA/Westinghouse had hardware requirements in the WBN2 PAMS SysRS?             Rockville, the following actions were agreed                                                                                                   Monitoring System- System to. These items partially address the                               previously (in September   Due 12/31/10.                                   Design Specification, dated (b) Please briefly describe all of the documents that    traceability concerns with the System Design                       15, 2010 public meeting)                                                    December 2009.
9/21 audit. A detailed explanation will be provided.
implement the hardware requirements of the WBN2          Specification. This item will be updated with                      stated:
: 71. N Open Open-TVA/WEC To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.
Due 12/31/10.
ML101650255, Item No. 7 WBN2 PAMS System Requirements Specification TVA docketed WNA-DS-01617-WBT Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Requirements Specification, dated December 2009.
145 EICB (Carte)
The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, Document Traceability & Compliance, which states that the WBN2 PAMS SDS was created to support the WBN2 PAMS SysRS.
(a) Does the WBN2 PAMS SDS implement all of the hardware requirements in the WBN2 PAMS SysRS?
(b) Please briefly describe all of the documents that implement the hardware requirements of the WBN2 Responder: WEC This item is used to track all traceability issues with the System Design Specification (SDS).
At the September 15 public meeting in Rockville, the following actions were agreed to. These items partially address the traceability concerns with the System Design Specification. This item will be updated with
: 72. N Open During the September 20-21, 2010 audit at Westinghouse, it was acknowledged that TVA/Westinghouse had previously (in September 15, 2010 public meeting) stated:
Open-TVA/WEC To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.
Due 12/31/10.
ML101650255, Item No. 9 WBN2 PAMS System Design Specification TVA docketed WNA-DS-01667-WBT Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Design Specification, dated December 2009.  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                       radBA627.docx                                                                                   Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                     RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                    Issue                                          TVA Response(s)                      Y/N           Status/ Current Actions     Resolution Path   RAI No. & Date                       Comments Sec. Sec.                                                                                                                                                                                                                  Date PAMS SysRS.                                             the results of the September 20 and 21 Commercial Grade Dedication and SDS RTM                           TVA would provide the audit.                                                             RSED RTM. (see ML102920031 Item No 6)
Date Comments PAMS SysRS.
: 1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the                 TVA would revise and 9/15 public meeting as a guide (documented                     resubmit the PAMS RTM below) and update the RTM as required.                         to address all types of issues identified in the
the results of the September 20 and 21 Commercial Grade Dedication and SDS RTM audit.
: 2. Some hardware requirements are contained                       public meeting. (see in the SRS instead of the System Design                         ML102920031 Item No 7)
: 1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
Specification (SDS). These will be removed from the SRS and incorporated into the next                     TVA would revise and revision of the SDS.                                           resubmit the Software Verification and Validation
: 2. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). These will be removed from the SRS and incorporated into the next revision of the SDS.
: 3. 25 issues identified by V&V where some requirements have not been included in the                     phase summary report for SDS (14) and SRS (11) at the revisions                         the requirements phase reviewed by V&V. Have these been                               to document the addressed? Yes. The next revisions of the                      completion of the SDS and SRS address these issues.                               requirements phase review. (see
: 3. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed? Yes. The next revisions of the SDS and SRS address these issues.
: 4. TVA will update the Procurement Requisition                     ML102920031 Item No 8)
: 4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
: 5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 6. Westinghouse to provide the generic AC160 and flat panel specifications.
: 6. Westinghouse to provide the generic AC160 and flat panel specifications.
Line 941: Line 1,988:
Describe how the documents are used.
Describe how the documents are used.
Describe in 1.1 of the SysRS. Need a good write up of how the process works.
Describe in 1.1 of the SysRS. Need a good write up of how the process works.
185                                 7/15/2010                                               Responder: WEC                                      73. N        Open                          Open-TVA/WEC      EICB RAI EICB (Carte)
TVA would provide the RSED RTM. (see ML102920031 Item No 6)
ML102980066 An emphasis is placed on the traceability of           Steve Clark to look at how to combine traceability                                              Due 10/22/10      Item No. 17 requirements in Software Requirements Specifications   items.
TVA would revise and resubmit the PAMS RTM to address all types of issues identified in the public meeting. (see ML102920031 Item No 7)
in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard   Was addressed to during the 9/15 meeting and listed in Regulatory Guide 1.172, which breaks with     9/20 - 9/21 audit.
TVA would revise and resubmit the Software Verification and Validation phase summary report for the requirements phase to document the completion of the requirements phase review. (see ML102920031 Item No 8) 185 EICB (Carte) 7/15/2010 An emphasis is placed on the traceability of requirements in Software Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word should to say Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies Also the NRC considers that the SRS is the complete set of requirements used for the design of the software, whether it is contained within one document Responder: WEC Steve Clark to look at how to combine traceability items.
typical NRC use of the word should to say Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies Also the NRC considers that the SRS is the complete set of requirements used for the design of the software, whether it is contained within one document
Was addressed to during the 9/15 meeting and 9/20 - 9/21 audit.
: 73. N Open Open-TVA/WEC Due 10/22/10 EICB RAI ML102980066 Item No. 17


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                         radBA627.docx                                                                                   Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                       RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                    Issue                                            TVA Response(s)                      Y/N           Status/ Current Actions       Resolution Path   RAI No. & Date                             Comments Sec. Sec.                                                                                                                                                                                                                    Date or many. In order to evaluate an SRS against the guidance in the SRP the staff needs access to all the requirements.
Date Comments or many. In order to evaluate an SRS against the guidance in the SRP the staff needs access to all the requirements.
References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification are various types of Reusable Software Element.
References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification are various types of Reusable Software Element.
These references are used in the body of the SRS, for example:
These references are used in the body of the SRS, for example:
Line 957: Line 2,008:
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?
187                                 By letter dated June 18, 2010, TVA docketed               Responder: Merten                                  74. N        Open                          Open-TVA/WEC      ML101970033, TVA Letter          Are these connections already EICB (Carte) responses to NRC requests for information.                                                                                                                                   Item No. 1 & 2 dated 10/5/10    docketed?
187 EICB (Carte)
: 1) Please refer to the revised response to letter                  Partial Response provided      Revise Response
By {{letter dated|date=June 18, 2010|text=letter dated June 18, 2010}}, TVA docketed responses to NRC requests for information.
: 1) Enclosure 1, Item No. 33 of the TVA letter dated     dated 10/5/10 Item 18 (RAI Matrix item 115).                        in letter dated 10/5/10 June 18, 2010, did not identify any connection from the                                                                                                   Due 12/31 PAMS Operator Modules (OMs) to the plant computer and printers; however, Figure 2.1-1 of the PAMS         2) This is a duplicate of closed RAI Matrix Item                    NNC 8/25/10: Why did TVA System Requirements Specification (WNA-DS-01617- 45.                                                                        not catch this on the review WBT Rev. 1 - ML101680578) shows a TCP                                                                                       of the PAMS SysRS or connection from the OMs to the plant computer and                                                                           SRS? Does TVA check that printer. Please explain.                                                                                                   the CQ PAMS system meets the requirements in its
: 1) Enclosure 1, Item No. 33 of the TVA {{letter dated|date=June 18, 2010|text=letter dated June 18, 2010}}, did not identify any connection from the PAMS Operator Modules (OMs) to the plant computer and printers; however, Figure 2.1-1 of the PAMS System Requirements Specification (WNA-DS-01617-WBT Rev. 1 - ML101680578) shows a TCP connection from the OMs to the plant computer and printer. Please explain.
: 2) Please clarify whether any digital safety-related                                                                       purchase specifications?
: 2) Please clarify whether any digital safety-related systems or components have a digital communications path to non-safety-related systems or with safety related systems in another division. If so, NRC staff will need these paths identified on the docket.
systems or components have a digital communications path to non-safety-related systems or with safety related systems in another division. If so, NRC staff will need these paths identified on the docket.
Responder: Merten
202  7.5.2                         7/22/2010                                                Responder: WEC                                      75. N         Open                           Open-TVA/WEC       EICB RAI        TVA Letter EICB (Carte)
: 1) Please refer to the revised response to letter dated 10/5/10 Item 18 (RAI Matrix item 115).
ML102980066      dated 10/5/10 The letter (ML0003740165) which transmitted the           Revision 1 of the Licensing Technical Report will                Partial Response provided      Licensing          Item No. 4 Safety Evaluation for the Common Q topical report to     provide more detailed information on the changes                  in letter dated 10/5/10        Technical Report Westinghouse stated: "Should our criteria or             to the platform.                                                                                R2 Due 12/3 regulations change so that our conclusions as to the acceptability of the report are invalidated, CE Nuclear   Rev. 2 of the Licensing Technical Report will Power and/or the applicant referencing the topical       include the applicability of guidance.
: 2) This is a duplicate of closed RAI Matrix Item
report will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation." Question No 81 identified many criteria changes; please revise
: 45.
: 74. N Open Partial Response provided in letter dated 10/5/10 NNC 8/25/10: Why did TVA not catch this on the review of the PAMS SysRS or SRS? Does TVA check that the CQ PAMS system meets the requirements in its purchase specifications?
Open-TVA/WEC Revise Response Due 12/31 ML101970033, Item No. 1 & 2 TVA Letter dated 10/5/10 Are these connections already docketed?
202 7.5.2 EICB (Carte) 7/22/2010 The letter (ML0003740165) which transmitted the Safety Evaluation for the Common Q topical report to Westinghouse stated: "Should our criteria or regulations change so that our conclusions as to the acceptability of the report are invalidated, CE Nuclear Power and/or the applicant referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation." Question No 81 identified many criteria changes; please revise Responder: WEC Revision 1 of the Licensing Technical Report will provide more detailed information on the changes to the platform.
Rev. 2 of the Licensing Technical Report will include the applicability of guidance.
: 75. N Open Partial Response provided in letter dated 10/5/10 Open-TVA/WEC Licensing Technical Report R2 Due 12/3 EICB RAI ML102980066 Item No. 4 TVA Letter dated 10/5/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                           radBA627.docx                                                                                   Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                       RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                      Issue                                            TVA Response(s)                        Y/N           Status/ Current Actions     Resolution Path   RAI No. & Date                           Comments Sec. Sec.                                                                                                                                                                                                                      Date the respective documentation or submit justification for continued applicability of the topical report.
Date Comments the respective documentation or submit justification for continued applicability of the topical report.
212   7.5.2                         7/27/2010                                                 Responder: WEC                                        76. N        Open                        Open-TVA/WEC        EICB RAI EICB (Carte)
212 7.5.2 EICB (Carte) 7/27/2010 By {{letter dated|date=June 18, 2010|text=letter dated June 18, 2010}} (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Design Report on Computer Integrity, Test and Calibration..." The staff has reviewed these documents, and it is not clear how this is the case.
ML102980066 By letter dated June 18, 2010 (ML101940236) TVA           Application specific requirements for testing. This                                              Due 12/31/10        Item No. 10 stated (Enclosure 1, Attachment 3, Item No. 3) that the   cannot be addressed in a topical report.
PAMS system design specification and software             Evaluation of how the hardware meets the requirements specification contain information to         regulatory requirements.
address the "Design Report on Computer Integrity, Test and Calibration..." The staff has reviewed these     WEC to provide the information and determine documents, and it is not clear how this is the case.      where the information will be located.
(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.
(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.
(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.
(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.
245                                  8/3/2010                                                  Responder: WEC                                       77. N         Open                         Open-TVA/WEC       EICB RAI                       LIC-101 Rev. 3 Appendix B EICB (Carte)
Responder: WEC Application specific requirements for testing. This cannot be addressed in a topical report.
ML102980066                    Section 4, "Safety Evaluation" Section 5.8 of the Common Q SPM (ML050350234)         Relates to the commitment to provide the test                                                        Due 12/7/10        Item No. 119                  states: "the information relied identifies the required test documentation for systems plan and the SPM compliance matrix                                                                                                                      upon in the SE must be developed using the Common Q SPM. Please provide                                                                                                                                                               docketed correspondence."
Evaluation of how the hardware meets the regulatory requirements.
sufficient information for the NRC staff to independently assess whether the test plan for WBN2                                                                                                                                                           LIC-101 Rev. 3 states: "The PAMS, is as described in the SPM (e.g., Section                                                                                                                                                               safety analysis that supports the 5.8.1).                                                                                                                                                                                                       change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
WEC to provide the information and determine where the information will be located.
250                                 8/8/2010                                                   Responder: WEC                                        78. N        Open                        Open-TVA/WEC                                      LIC-101 Rev. 3 Appendix B EICB (Carte)
: 76. N Open Open-TVA/WEC Due 12/31/10 EICB RAI ML102980066 Item No. 10 245 EICB (Carte) 8/3/2010 Section 5.8 of the Common Q SPM (ML050350234) identifies the required test documentation for systems developed using the Common Q SPM. Please provide sufficient information for the NRC staff to independently assess whether the test plan for WBN2 PAMS, is as described in the SPM (e.g., Section 5.8.1).
Section 4, "Safety Evaluation" The SPM describes the software and documents that         Westinghouse develops Software Release                                                          Due 10/22/10                                      states: "the information relied will be created and placed under configuration control. Reports/Records and a Configuration                                                                                                                upon in the SE must be The SCMP (e.g., SPM Section 6, Software                   Management Release Report. Describe the                                                                                                            docketed correspondence."
Responder: WEC Relates to the commitment to provide the test plan and the SPM compliance matrix
Configuration Management Plan) describes the             documents and when they will be produced.
: 77. N Open Open-TVA/WEC Due 12/7/10 EICB RAI ML102980066 Item No. 119 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
implementation tasks that are to be carried out. The      Summarize guidance on how to produce these                                                                                                          LIC-101 Rev. 3 states: "The acceptance criterion for software CM implementation is     records, focus on project specific requirements in                                                                                                  safety analysis that supports the that the tasks in the SCMP have been carried out in       SPM etc.                                                                                                                                            change requested should include their entirety. Documentation should exist that shows                                                                                                                                                         technical information in sufficient that the configuration management tasks for that                                                                                                                                                               detail to enable the NRC staff to activity group have been successfully accomplished.                                                                                                                                                           make an independent Please provide information that shows that the CM                                                                                                                                                             assessment regarding the tasks have been successfully accomplished for each                                                                                                                                                             acceptability of the proposal in life cycle activity group.                                                                                                                                                                                     terms of regulatory requirements and the protection of public health and safety."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
251                                  8/8/2010                                                  Responder: WEC                                        79. N         Open                         Open-TVA/WEC                                       LIC-101 Rev. 3 Appendix B EICB (Carte)
250 EICB (Carte) 8/8/2010 The SPM describes the software and documents that will be created and placed under configuration control.
Section 4, "Safety Evaluation" The SPM describes the software testing and                The software testing performed and documents                        Partial response is provided Due 10/22/10.                                      states: "the information relied documents that will be created. The SPM also               created are addressed by the SPM Compliance                        in letter dated 10/25/10                                                        upon in the SE must be describes the testing tasks that are to be carried out. matrix contained in Revision 1 of the Licensing                                                 10/25/10 is a                                     docketed correspondence."
The SCMP (e.g., SPM Section 6, Software Configuration Management Plan) describes the implementation tasks that are to be carried out. The acceptance criterion for software CM implementation is that the tasks in the SCMP have been carried out in their entirety. Documentation should exist that shows that the configuration management tasks for that activity group have been successfully accomplished.
The acceptance criterion for software test                Technical Report.                                                                                partial response.
Please provide information that shows that the CM tasks have been successfully accomplished for each life cycle activity group.
Responder: WEC Westinghouse develops Software Release Reports/Records and a Configuration Management Release Report. Describe the documents and when they will be produced.
Summarize guidance on how to produce these records, focus on project specific requirements in SPM etc.
: 78. N Open Open-TVA/WEC Due 10/22/10 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
251 EICB (Carte) 8/8/2010 The SPM describes the software testing and documents that will be created. The SPM also describes the testing tasks that are to be carried out.
The acceptance criterion for software test Responder: WEC The software testing performed and documents created are addressed by the SPM Compliance matrix contained in Revision 1 of the Licensing Technical Report.
: 79. N Open Partial response is provided in letter dated 10/25/10 Open-TVA/WEC Due 10/22/10.
10/25/10 is a partial response.
LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                               radBA627.docx                                                                                 Open Items to be Resolved for SER Approval SE     FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                                       RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.                  POC                                      Issue                                                TVA Response(s)                      Y/N           Status/ Current Actions   Resolution Path     RAI No. & Date                               Comments Sec. Sec.                                                                                                                                                                                                                          Date implementation is that the tasks in the SPM have been                                                                                                         Still waiting on                                      LIC-101 Rev. 3 states: "The carried out in their entirety. Please provide         Attachment 1 of the letter dated 10/25/10 contains                                                     Software Test                                          safety analysis that supports the information that shows that testing been successfully the Proprietary version of Westinghouses                                                               Plan and all other                                    change requested should include accomplished.                                        document titled: Tennessee Valley Authority                                                           testing                                                technical information in sufficient (TVA), Watts Bar Unit 2 (WBN2), Post-Accident                                                           documentation.                                        detail to enable the NRC staff to Monitoring System (PAMS), Licensing Technical                                                                                                                 make an independent Report, Revision 1, WNA-LI-00058-WBT-P, Dated                                                                                                                 assessment regarding the October 2010                                                                                                                                                  acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
Date Comments implementation is that the tasks in the SPM have been carried out in their entirety. Please provide information that shows that testing been successfully accomplished.
252                                 8/8/2010                                                     Responder: WEC                                       80. N         Open                       Open-TVA/WEC                                           LIC-101 Rev. 3 Appendix B EICB (Carte)
of the letter dated 10/25/10 contains the Proprietary version of Westinghouses document titled: Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010 Still waiting on Software Test Plan and all other testing documentation.
Section 4, "Safety Evaluation" The SPM contain requirements for software                    Explain response to AP1000 audit report.                            Read ML091560352            RTM Revision due                                      states: "the information relied requirements traceability analysis and associated            RTM docketed NRC awaiting V&V evaluation of                                                    12/31                                                  upon in the SE must be documentation (see Section 5.4.5.3, Requirements            RTM.                                                                                                                                                  docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
Traceability Analysis). Please provide information that demonstrates that requirements traceability                                                                                                              Check on this                                          LIC-101 Rev. 3 states: "The analysis has been successfully accomplished.                                                                                                                  Hilmes                                                safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
252 EICB (Carte) 8/8/2010 The SPM contain requirements for software requirements traceability analysis and associated documentation (see Section 5.4.5.3, Requirements Traceability Analysis). Please provide information that demonstrates that requirements traceability analysis has been successfully accomplished.
268                                 8/19/2010                                                     Responder: WEC                                        81. N        Open                        Open-TVA/WEC EICB (Carte)
Responder: WEC Explain response to AP1000 audit report.
By letter dated March 12, 2010 (ML101680577), TVA Andy to see what can be done.                                                                              Due 12/31/10 stated that the application specific hardware and software architecture descriptions are addressed in the                                                                                                       HILMES Check on WBN2 PAMS System Design Specification                                                                                                                         This (ML101680579, ML102040481, & ML102040482) and Software Requirements Specification (ML101050202, ML102040486, & ML1022040487).
RTM docketed NRC awaiting V&V evaluation of RTM.
: 80. N Open Read ML091560352 Open-TVA/WEC RTM Revision due 12/31 Check on this Hilmes LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
268 EICB (Carte) 8/19/2010 By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} (ML101680577), TVA stated that the application specific hardware and software architecture descriptions are addressed in the WBN2 PAMS System Design Specification (ML101680579, ML102040481, & ML102040482) and Software Requirements Specification (ML101050202, ML102040486, & ML1022040487).
Neither of these documents contain a non-proprietary figure of the architecture that can be used in the SE.
Neither of these documents contain a non-proprietary figure of the architecture that can be used in the SE.
Please provide a non-proprietary figure of the architecture.
Please provide a non-proprietary figure of the architecture.
301                                1.TVA is requested to address the consequences of            Responder: WEC/Davies/Clark                          82. N         Open                       Open-TVA/WEC         RAI No. 11      TVA Letter software common cause failure including all potential                                                                                                                             ML102980005      dated 10/29/10 resulting failures (i.e. total loss of CERPI, system fail     TVA Partial Response:                                              Partial response in 10/29  Due TBD              10/26/2010      Enclosure 1 as-is).                                                                                                                           letter.                                                          Item No. 21 For all accidents analyzed in WBN Unit 2 FSAR,                                                  1) Please
Responder: WEC Andy to see what can be done.
: 2. In addition, address how the actions stipulated in the     Chapter 15, no credit is taken for the rod position                                                address how EICB (Singh) plant Technical Specifications will be taken when the         indication system. For all continuous rod                                                          fail-as-is is CERPI system indications are lost. Information notice         withdrawal accidents analyzed in WBN Unit 2                                                        detected i.e.
: 81. N Open Open-TVA/WEC Due 12/31/10 HILMES Check on This 301 EICB (Singh) 1.TVA is requested to address the consequences of software common cause failure including all potential resulting failures (i.e. total loss of CERPI, system fail as-is).
IN 2010-10 (ML100080281) addresses the need to               FSAR, Chapter 15, no credit is taken for any rod                                                  alarms, rod consider software failures and the actions required to       stop/block.                                                                                        position assure that the plant will stay within its licensing basis.                                                                                                     deviation (1) Technical Specification 3.1.8, Rod Position                                                   alarms, etc.
: 2. In addition, address how the actions stipulated in the plant Technical Specifications will be taken when the CERPI system indications are lost. Information notice IN 2010-10 (ML100080281) addresses the need to consider software failures and the actions required to assure that the plant will stay within its licensing basis.
: 3. Provide FMEA in support of your response.                    Indication, does not have an action for total                                               2) Response loss of indication; therefore, a total loss of                                                 acceptable.
: 3. Provide FMEA in support of your response.
: 4. FSAR Table 7.7-1, Plant Control System Interlocks              CERPI puts the plant into LCO 3.0.3 which                                                   3) Response lists interlock C-11 to block automatic rod withdrawal            states:                                                                                       acceptable.
: 4. FSAR Table 7.7-1, Plant Control System Interlocks lists interlock C-11 to block automatic rod withdrawal Responder: WEC/Davies/Clark TVA Partial Response:
For all accidents analyzed in WBN Unit 2 FSAR, Chapter 15, no credit is taken for the rod position indication system. For all continuous rod withdrawal accidents analyzed in WBN Unit 2 FSAR, Chapter 15, no credit is taken for any rod stop/block.
(1) Technical Specification 3.1.8, Rod Position Indication, does not have an action for total loss of indication; therefore, a total loss of CERPI puts the plant into LCO 3.0.3 which states:
: 82. N Open Partial response in 10/29 letter.
Open-TVA/WEC Due TBD
: 1) Please address how fail-as-is is detected i.e.
alarms, rod position deviation alarms, etc.
: 2) Response acceptable.
: 3) Response acceptable.
RAI No. 11 ML102980005 10/26/2010 TVA Letter dated 10/29/10 Item No. 21


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                 radBA627.docx                                                                     Open Items to be Resolved for SER Approval SE   FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                             RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.              POC                            Issue                                          TVA Response(s)                      Y/N       Status/ Current Actions   Resolution Path   RAI No. & Date                       Comments Sec. Sec.                                                                                                                                                                                                Date when 1/1 Control Bank D rod position is above                                                                                                     4) a. Response setpoint. This interlock capability would be lost in case     When an LCO is not met and the associated                                                acceptable.
Date Comments when 1/1 Control Bank D rod position is above setpoint. This interlock capability would be lost in case of total loss of CERPI. How is the rod block assured for this event?
of total loss of CERPI. How is the rod block assured         ACTIONS are not met, an associated                                                      b. Pl. address for this event?                                               ACTION is not provided, or if directed by the                                            failure mode associated ACTIONS the unit shall be placed                                              on fail-as-is.
: 5. How is automatic rod withdrawal affected in case of total loss of signals from the CERPI to the ICS? Is this interlock fail safe?
: 5. How is automatic rod withdrawal affected in case of       in a MODE or other specified condition in                                                5) Response total loss of signals from the CERPI to the ICS? Is this     which the LCO is not applicable. Action shall                                            acceptable.
6.FSAR chapter 15, Section 2.3.2.1states that the resolution of the rod position indicator channel is 5% of span (7.2 inches). The CERPI system accuracy specified in the CERPI System requirements Specification, WNDS-DS-00001_WBT, Rev. 2 is 12 steps or 5.19%. The specified system accuracy seems to be greater than the accuracy assumed in the FSAR Chapter 15. Please clarify this anomaly.
interlock fail safe?                                         be initiated within 1 hour to place the unit, as                                        6) Response applicable, in:                                                                          acceptable.
When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour to place the unit, as applicable, in:
6.FSAR chapter 15, Section 2.3.2.1states that the resolution of the rod position indicator channel is 5% of         MODE 3 within 7 hours;                                                          TVA to address span (7.2 inches). The CERPI system accuracy                       MODE 4 within 13 hours; and                                                    common cause specified in the CERPI System requirements                         MODE 5 within 37 hours.                                                        failure as stated Specification, WNDS-DS-00001_WBT, Rev. 2 is 12                                                                                                     under response steps or 5.19%. The specified system accuracy                 Exceptions to this Specification are stated in                                      item 2.
MODE 3 within 7 hours; MODE 4 within 13 hours; and MODE 5 within 37 hours.
seems to be greater than the accuracy assumed in the         the individual Specifications. Where FSAR Chapter 15. Please clarify this anomaly.                 corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.
Exceptions to this Specification are stated in the individual Specifications. Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.
(2) CERPI common mode software failure will be addressed in a future RAI response letter.
(2) CERPI common mode software failure will be addressed in a future RAI response letter.
(3) There is no FMEA for the CERPI system.
(3) There is no FMEA for the CERPI system.
Line 1,024: Line 2,107:
(5) The CERPI Maintenance and Test Panels are used to set the Rod Withdrawal Limit with output signal to ICS as a parallel path. As stated above, the relays are the controlling functions and loss of signal to ICS will not affect the capability of the control circuit to disable the Automatic Rod Withdrawal function. The C-11 interlock is fail safe with regards to loss of power.
(5) The CERPI Maintenance and Test Panels are used to set the Rod Withdrawal Limit with output signal to ICS as a parallel path. As stated above, the relays are the controlling functions and loss of signal to ICS will not affect the capability of the control circuit to disable the Automatic Rod Withdrawal function. The C-11 interlock is fail safe with regards to loss of power.
(6) The cycle-specific analyses for the static rod
(6) The cycle-specific analyses for the static rod
: 4) a. Response acceptable.
: b. Pl. address failure mode on fail-as-is.
: 5) Response acceptable.
: 6) Response acceptable.
TVA to address common cause failure as stated under response item 2.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                 radBA627.docx                                                                 Open Items to be Resolved for SER Approval SE   FSAR   NRC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
Acceptable                                                         RAI Resp.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.
No.              POC                      Issue                    TVA Response(s)                    Y/N       Status/ Current Actions Resolution Path RAI No. & Date                       Comments Sec. Sec.                                                                                                                                                            Date misalignment assume full misalignment of an individual rod from the bank position indicator(s). Such a misalignment exceeds that which is possible during plant operations when accounting for the most adverse combination of the rod deviation alarm and uncertainty of the rod position indicator (both 12 steps). For consistency of parameter (and units) with the deviation alarm and position indicator uncertainty, the WBN Unit 2 FSAR Chapter 15, Section 2.3.1 will be revised in Amendment 102 to read:
Date Comments misalignment assume full misalignment of an individual rod from the bank position indicator(s). Such a misalignment exceeds that which is possible during plant operations when accounting for the most adverse combination of the rod deviation alarm and uncertainty of the rod position indicator (both 12 steps). For consistency of parameter (and units) with the deviation alarm and position indicator uncertainty, the WBN Unit 2 FSAR Chapter 15, Section 2.3.1 will be revised in Amendment 102 to read:
The resolution of the rod position indicator channel is +/- 12 steps. Deviation of any RCCA from its group by twice this distance (24 steps) will not cause power distributions worse than the design limits. The deviation alarm alerts the operator to rod deviation with respect to group demand position in excess of 12 steps. If the rod deviation alarm is not operable, the operator is required to take action as required by the Technical Specifications.
The resolution of the rod position indicator channel is +/- 12 steps. Deviation of any RCCA from its group by twice this distance (24 steps) will not cause power distributions worse than the design limits. The deviation alarm alerts the operator to rod deviation with respect to group demand position in excess of 12 steps. If the rod deviation alarm is not operable, the operator is required to take action as required by the Technical Specifications.
This change is consistent with FSAR section 4.3.2.2.5, Limiting Power Distributions Page 4.3-13, which states the maximum deviation assumed is 12 steps.}}
This change is consistent with FSAR section 4.3.2.2.5, Limiting Power Distributions Page 4.3-13, which states the maximum deviation assumed is 12 steps.}}

Latest revision as of 01:12, 14 January 2025

OL - FW: Update Action Item List
ML103280246
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 11/24/2010
From:
Office of Nuclear Reactor Regulation
To:
Division of Operating Reactor Licensing
References
Download: ML103280246 (49)


Text

1 WBN2Public Resource From:

Darbali, Samir Sent:

Wednesday, November 24, 2010 11:13 AM To:

Poole, Justin

Subject:

FW: Update Action Item List Attachments:

20101111 Open Item List Master TVA Update 11-11-10.docx From: Garg, Hukam Sent: Tuesday, November 16, 2010 3:30 PM To: Darbali, Samir

Subject:

FW: Update Action Item List Samir; Here is the updated list. Please put in the g drive and inform everyone about it.

Hukam From: Clark, Mark Steven [1]

Sent: Tuesday, November 16, 2010 3:20 PM To: Garg, Hukam

Subject:

Update Action Item List

Regards, Steve Steve Clark Bechtel Power Corp.

Control Systems Watts Bar 2 Completion Project Phone: 423.365.1664 e-mail: msclark0@tva.gov

Hearing Identifier:

Watts_Bar_2_Operating_LA_Public Email Number:

198 Mail Envelope Properties (0046140293E11F408991442DB4FE25CA127DB4AEFE)

Subject:

FW: Update Action Item List Sent Date:

11/24/2010 11:12:40 AM Received Date:

11/24/2010 11:12:44 AM From:

Darbali, Samir Created By:

Samir.Darbali@nrc.gov Recipients:

"Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None Post Office:

HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 632 11/24/2010 11:12:44 AM 20101111 Open Item List Master TVA Update 11-11-10.docx 357786 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments 001 All All B

(

The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (Agency wide Documents Access and Management 12/15/2009 Presentation Slides

1. Y Closed Closed EICB RAI ML093230343 3/12/2010 NNC 11/19/09: The FSAR contains mostly description of 002 All All B

(

Are there I&C components and systems that have changed to a new or different digital technology 12/15/2009 Presentation Slides

2. Y Closed Closed EICB RAI ML093230343 3/12/2010 NNC 11/19/09: The FSAR contains mostly description of 003 All All B

(

Because a digital I&C platform can be configured and programmed for different applications the review 12/15/2009 Presentation Slides

3. Y Closed Closed EICB RAI ML093230343 3/12/2010 NNC 11/19/09: The FSAR contains mostly description of 004 All All B

(

Please identify the information that will be submitted for each unreviewed digital I&C system and Responder: Webb 1/13/10 Public Meeting

4. Y Closed Closed EICB RAI ML093230343 January 13, 2010 NNC 11/19/09: LIC-110 Rev. 1 Section 6 2 2 states: "Design 005 7.1.3.

1

(

G By letter date February 28, 2008 (Agencywide Documents Access and Management System Responder: Craig/Webb

5. Y Closed Closed EICB RAI ML093431118 TVA Letter dated 2/5/10 006

(

G Amendment 95 of the FSAR, Chapter 7.3, shows that change 7 3-1 consists of updating a reference from By letter dated February 5, 2010: TVA provided the Unit 2 setpoint methodology (WCAP-177044-

6. Y Closed Closed EICB RAI ML093431118 TVA Letter dated 2/5/10 NNC: WCAP-12096 Rev. 7 (ML073460281) is in ADAMS 007 7.1.3.

1

(

G The setpoint methodology has been reviewed and approved by the NRC staff in Section 7 1 3 1 of TVA Letter Dated March 12, 2010 (Enclosure 1, Item No 7 on Page 7 of 15): TVA responded to

7. Y Closed This item is reviewed in Closed EICB RAI ML093431118 TVA Letter dated 3/12/10 TVA to provide Rev. 8 of the Unit 1 document (which is the current 008 7.3

(

G There are several staff positions that provide guidance on setpoint methodology (e g Reg Guide 1 105 BTP TVA Letter Dated March 12, 2010 (Enclosure 1, Item No 8 on Page 7 of 15): TVA responded to

8. Y Closed Closed EICB RAI ML093431118 TVA Letter dated 3/12/10 009 7.3.2 5.6, 6 3 5

(

D a

Change 7.3-2, identified in Watts Bar Nuclear Plant FSAR red-line for Unit 2 (ADAMS Accession Number TVA Letter Dated March 12, 2010 (Enclosure 1, Item No 9 on Page 8 of 15): TVA responded to

9. Y Closed Closed EICB RAI ML093431118 3/12/10, ML101680598 010 7.3 7.3

(

D a

The original SER on Watts Bar (NUREG-0847) documents that the scope of the review of FSAR TVA Letter Dated March 12, 2010 (Enclosure 1, Item No 10 on Page 8 of 15): TVA responded to

10. Y Closed Closed EICB RAI ML093431118 3/12/10, ML101680598 011 7.3.2 5.6, 6 3 5

(

D a

NUREG-0847 Supplement No. 2 Section 7.3.2 includes an evaluation of a change in containment TVA Letter Dated March 12, 2010 (Enclosure 1, Item No 11 on Page 13 of 15): TVA responded

11. Y Closed Closed EICB RAI ML093431118 ML101680598, Item 9 012 7.4 7.4

(

D a

The original SER on Watts Bar (NUREG-0847) documents that the scope of the review of FSAR TVA Letter Dated March 12, 2010 (Enclosure 1, Item No 12 on Page 13 of 15): TVA responded

12. Y Closed Closed EICB RAI ML093431118 TVA Letter dated 3/12/10 013 7.1.3.

1

(

G Chapter 7 and Chapter 16 of Amendment 95 to the FSAR do not include any setpoint values Please TVA Letter Dated March 12, 2010 (Enclosure 1, Item No 13 on Page 14 of 15): TVA responded

13. Y Closed Closed EICB RAI ML093431118 TVA Letter dated 3/12/10 TS have been docketed.

014 All All B

(

Provide the justification for any hardware and software changes that have been made since the previous U S Date: 4/27/10 Responder: TVA

14. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 015

(

G Verify that the refurbishment of the power range nuclear instrumentation drawers resulted in only like-Date: 4/27/10 Responder: TVA

15. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 016 B

(

C a

Identify the precedents in license amendment requests (LARs) if any for source range monitors or Date: 4/27/10 Responder: TVA

16. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 017 7.3.1 7.3.1, 5 5 5

(

D a

Identify precedents in LARs, if any, for the solid state protection system Also identify any hardware Date: 4/27/10

17. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 018

(

G Identify any changes made to any instrumentation and control (I&C) system based on prior knowledge of Date: 4/27/10 Responder: TVA

18. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 019

(

G Verify that the containment purge isolation radiation monitor is the same as used in Watts Bar Unit 1 or Date: 4/27/10

19. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 020

(

G Provide environmental qualification information pursuant to Section 50 49 of Title 10 of the Code of Date: 4/27/10 Responder: TVA

20. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 NNC 4/30/10: SRP Section 7.0 states: "The organization 021 7.3

(

G For the Foxboro Spec 200 platform, identify any changes in hardware from the precedent systems Date: 5/25/10

21. Y Closed The resolution of this item Closed NRC Meeting Summary TVA Letter dated 6/18/10 The resolution of this item will be covered by OI#288 022 7.3.2 5.6, 6 3 5

(

D a

Verify the auxiliary feedwater control refurbishment results in a like-for-like replacement and identify any Date: 4/27/10

22. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 023

(

G Provide environmental qualification (10 CFR 50.49) information for safety-related control transmitters and Date: 4/27/10 Responder: TVA

23. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 NNC 4/30/10: SRP Section 7.0 states: "The organization 024

(

C Provide a schedule by the January 13, 2010, meeting for providing information in accordance with I&C During the January 13, 2010 meeting, TVA presented a schedule for completing various

24. Y Closed Closed NRC Meeting Summary N/A - Request for schedule NNC 4/30/10: Carte to address response with respect to PAMS 025 7.5.2 7.5.1

(

S i

For the containment radiation high radiation monitor, verify that the information provided by TVA is Date: 4/27/10

25. Y Closed Closed NRC Meeting Summary ML101230248, Item 12 026

(

G Provide environmental qualification (10 CFR 50.49) information for safety-related monitoring transmitters Date: 4/27/10 Responder: TVA

26. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 NNC 4/30/10: SRP Section 7.0 states: "The organization 027 7.7.1.

4

(

C For Foxboro I/A provide information regarding safety/non-safety-related interaction common cause Date: 4/27/10 Responder: TVA

27. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 028

(

G For the turbine control AEH system, verify that the refurbishment results in a like-for-like replacement Responder: Mark Scansen Date: 4/27/10

28. Y Closed Closed NRC Meeting Summary TVA Letter dated 10/5/10 029

(

C For the rod control system, verify that the refurbishment results in a like-for-like replacement Date: 4/27/10 Responder: TVA

29. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments 030

(

G Regarding the refurbishment of I&C equipment, identify any component digital upgrades and if so Responder: Clark

30. Y Closed Closed NRC Meeting Summary TVA Letter dated 10/5/10 031

(

C For the rod position indication system (CERPI),

provide information in accordance with ISG 4 Need to Date: 4/27/10 Responder: TVA

31. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 CERPI is non-safety related.

Note: The issue of interlock with 032

(

C For the process computer, need to consider cyber security issues and emergency response data system Date: 4/27/10 Responder: TVA

32. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 EICB will no longer consider cyber issues 033

(

C For the loose parts monitoring system, provide information regarding interactions with safety related Date: 4/27/10 Responder: TVA

33. Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 The loose parts monitoring system is not connected to any 034

(

G 2/4/2010 Responder: TVA

34. Y Closed Awaiting NRC evaluation of Closed N/A TVA Letter dated 4/27/10 034.

1 a

r g

Chapter 7.1 - Introduction Reactor Coolant System Flow Rate Measurement

35. Y Close Closed N/A N/A 034.

2

(

G Chapter 7.2 - Reactor Trip System Deletion of Neutron Flux Negative Rate Trip

36. Y Close Closed N/A N/A 034.

3 7.3 7.3

(

D a

Chapter 7.3 - ESFAS Design Basis Analysis Parameters

37. Y Closed Closed N/A N/A 034.

4 7.5.1.

1 7.5.2

(

M a

Chapter 7.5 - Instrumentation Systems Important to Safety

38. Y Closed Closed N/A N/A Closed 034.

5 7.5.1.

1 7.5.2 7 6 7 r

c u

Chapter 7.6 - All Other Systems Required for Safety Plant Process Computer Replacement

39. Y Closed Closed N/A N/A Closed 034.

6 n

g h

Chapter 7.7 Control Systems Alternate Means for Monitoring Control or

40. Y Closed Closed N/A N/A 035

(

S i

2/18/2010 Responder: Clark

41. Y Closed Closed RAI No. 1 ML102980005 TVA Letter dated 3/12/10 LIC-110 Section 6.2.2 states:

Design features and 036 7.5.2 7.5.1

(

C February 18, 2010 Date: 5/25/10 Responder: Clark

42. Y Closed Closed NRC Meeting Summary NNC: Unit 2 FSAR Section 7 5 1 Post Accident Monitoring 037 7.5.1.

1 7.5.2

(

M a

2/18/2010 Responder: Clark Date: 5/25/10

43. Y Closed Closed 09/16/10 N/A TVA Letter dated 10/5/10 FSAR Amendment 100 provides information 038 7.5.1.

1 7.5.2

(

M a

2/18/2010 Responder: Clark Date: 5/25/10

44. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 The slides presented at the December 15 2010 meeting 039

(

G January 13, 2010 Responder: Clark Date:

5/25/10

45. Y Closed Closed EICB RAI ML102910008 FSAR amendment 98 The equation for the calculation of the estimated average hot leg 040

(

G January 13, 2010 Responder: Clark Date:

5/25/10

46. Y Closed Closed EICB RAI EICB RAI FSAR amendment 98 The equation for the calculation of the power fraction on page 042 All All B

(

February 25, 2010: Telecom Date: 5/25/10 Responder: Clark

47. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 6/18/10 The drawing provided did not have the identification numbers 044 7.5.2 7.5.1

(

C February 25, 2010 Date: 5/25/10 Responder: Clark

48. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 6/18/10 045

(

C February 25, 2010 Date: 5/25/10 Responder: Clark

49. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 7/30/10 046

(

C February 25, 2010 Date: 5/25/10 Responder: Clark

50. Y Closed Closed N/A - Request for help finding N/A 047 7.5.2 7.5.1

(

C 4/8/2010 Responder: WEC/Hilmes Date: 5/25/10 51. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 7/30/10 048 7.5.2 7.5.1

(

C April 8, 2010 Date: 5/25/10 Responder: WEC

52. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 6/18/10 049 7.5.2 7.5.1

(

C 4/8/2010 Responder: WEC Date: 5/25/10

53. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 6/18/10 051

(

G April 15, 2010 Date: 5/25/10 Responder: Craig/Webb

54. Y Closed Closed N/A N/A Review addressed by another Open Item 052 7.5.2 7.5.1

(

S i

April 19, 2010 Date: 5/25/10 Responder: Slifer

55. Y Closed Closed RAI No. 12 ML102980005 053 7.5.2 7.5.1

(

S i

April 19, 2010 Date: 5/25/10 Responder: Slifer

56. Y Closed Closed RAI No. 13 ML102980005 056

(

S i

April 19, 2010 Date: 5/25/10 Responder: Slifer

57. Y Closed Closed RAI No. 16 ML102980005 TVA Letter dated 6/18/10 Sorrento Radiation Monitoring 057 7.5.2 7.5.1

(

S i

4/19/2010 Responder: TVA I&C Staff Date:

5/25/10

58. Y Closed Closed RAI No. 17 ML102980005 TVA Letter dated 6/18/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments 058 7.5.0 7.5

(

S i

April 19, 2010 Date: 5/25/10 Responder: Slifer

59. Y Closed Closed RAI No. 18 ML102980005 TVA Letter dated 6/18/10 059 7.5.2 7.5.1

(

S i

April 19, 2010 Date:

Responder: Slifer

60. Y Closed Closed RAI No. 19 ML102980005 TVA Letter dated 6/18/10 060 7.5.2 7.5.1

(

C April 19, 2010 Date: 5/25/10 Responder: Clark

61. Y Closed Closed N/A N/A Addressed by Open Item No. 47 061 7.5.2 7.5.1

(

C April 19, 2010 Date: 5/25/10 Responder: Clark

62. Y Closed Closed N/A N/A Addressed by Open Item No. 48 062 7.5.2 7.5.1

(

C April 19, 2010 Date: 5/25/10 Responder: Clark

63. Y Closed Closed N/A N/A Addressed by Open Item No. 49 063 7.5.2 7.5.1

(

C April 19, 2010 Date: 5/25/10 Responder: Clark

64. Y Closed Closed N/A N/A Addressed by Open Item No. 50 064 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal date for the D3 Analysis was April 2 Responder: Webb Date: 4/8/2010

65. Y Closed Closed N/A - No question was TVA Letter dated 10/5/10 066 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal date for the "Watts Bar 2 PAMS Responder: WEC Date: 5/25/10

66. Y Closed Closed N/A - No question was TVA Letter dated 6/18/10 076 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal date for the "Watts Bar 2 PAMS Responder: Clark Date: 5/25/10

67. Y Closed Closed N/A - No question was N/A 077 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal date for seven other documents was Responder: WEC Date: 5/25/10

68. Y Closed Closed N/A - No question was TVA Letter dated 6/18/10 078

(

G 4/26/2010 Responder: Clark Date: 5/25/10

69. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 079

(

G 4/26/2010 Responder: Clark Date: 5/25/10 70. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 Reviewed under Item 154 080

(

S i

4/26/2010 Responder: WEC

71. Y Closed Closed RAI No. 2 ML102980005 TVA Letter dated 7/30/10 083 7.5.2 7.5.1

(

C May 6, 2010 Date: 6/18/10 Responder: WEC

72. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 7/30/10 084 7.5.2 7.5.1 B

(

C a

May 6, 2010 Date: 6/18/10 Responder: Clark

73. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 6/18/10 087 7.5.2 7.5.1

(

S i

May 6, 2010 Date: 5/24/10 Responder: Slifer

74. Y Closed Closed RAI No. 20 ML102980005 TVA Letter dated 6/18/10 088 7.5.2 7.5.1 B

(

S in May 6, 2010 Date: 5/24/10 Responder: Slifer

75. Y Closed Closed RAI No. 21 ML102980005 TVA Letter dated 6/18/10 089

(

C 5/6/2010 Responder: Clark

76. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 3/12/10 NNC: Docketed response states that the applicable FSAR 090

(

C 5/6/2010 Responder: Clark Date: 5/25/10

77. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 3/12/10 091 7.4 7.4

(

D a

May 20, 2010 Date: 5/25/10 Responder: Clark

78. Y Closed Closed EICB RAI No.1 ML102910017 TVA Letter dated 6/18/10 093

(

G May 20, 2010 Date: 5/25/10 Responder: Knuettel

79. Y Closed Closed N/A N/A Will be reviewed under item 154 094

(

G 5/20/2010 Responder: Clark Date: 5/25/10

80. Y Closed Closed N/A N/A Information was found in FSAR 095 7.8.1, 7 8 4 XX

(

D a

May 20, 2010 Date:

Responder:

81. Y Closed Closed EICB RAI No. 2 ML102910017 TVA Letter dated 7/30/10 096 7.7.5 XX

(

D a

5/20/2010 Responder:

82. Y Closed Closed EICB RAI No.3 ML102910017 TVA Letter dated 7/30/10 097 7.4.2 7.4

(

D a

May 20, 2010 Date:

Responder:

83. Y Closed Closed EICB RAI No.4 ML102910017 TVA Letter dated 7/30/10 098 7.4.2 7.4

(

D a

May 25, 2010 Date:

Responder:

84. Y Closed Closed EICB RAI No.5 ML102910017 TVA Letter dated 7/30/10 099 L

(

B April 12, 2010 Date:

Responder: WEC

85. Y Closed Closed Closed to Item 129 100

(

C 5/20/2010 Responder: WEC

86. Y Closed Closed N/A - No question was N/A 102

(

C May 24, 2010 Date: 5/24/10 Responder: WEC

87. Y Closed Closed N/A TVA Letter dated 6/18/10 Request for schedule not information

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments 103 7.4 7.4

(

D a

5/27/2010 Responder: Ayala Date: 5/27/10

88. Y Closed Closed EICB RAI No.1 ML102910017 TVA Letter dated 10/29/10 Submittal date is based on current EDCR scheduled issue 104 7.4 7.4

(

D a

5/27/2010 Responder: Merten Date: 5/27/10

89. Y Closed Closed EICB RAI No.1 ML102910017 TVA Letter dated 10/29/10 Submittal date is based on current EDCR scheduled issue 105

(

G April 29, 2010 Date:

Responder: Langley

90. Y Closed Closed N/A N/A Will be reviewed under item 154.

106 B

(

S in May 6, 2010 Date: 5/25/10 Responder: Davies

91. Y Closed Closed RAI No. 9 ML102980005 TVA Letter dated 6/18/10 107 B

(

S in May 6, 2010 Date: 5/28/10 Responder: Clark

92. Y Closed Closed RAI No. 22 ML102980005 TVA Letter dated 6/18/10 108

(

G May 6, 2010 Date: 5/25/10 Responder: Webb/Hilmes

93. Y Closed Closed N/A N/A Will be reviewed under OI#154 109.

b

(

C 5/6/2010 Responder: N/A

94. Y Closed Closed N/A N/A Duplicate of another open Item.

109.

a 7.8 XX

(

D a

5/6/2010 Responder: N/A

95. Y Closed Closed N/A N/A 110

(

G May 6, 2010 Date:

Responder: Clark

96. Y Closed Closed N/A N/A Information was found.

111 B

(

C a

May 6, 2010 Date: 5/28/10 Responder: Clark

97. Y Closed Closed N/A TVA Letter dated 6/18/10 Request to help find, not a request for information 112 B

(

G a

June 1, 2010 Date:

Responder: Clark

98. Y Closed Closed N/A N/A Information was received 113

(

G 6/1/2010 Responder: Clark

99. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 6/18/10 114 7.2 7.2

(

G 6/1/2010 Responder: WEC 100. Y Close Closed EICB RAI ML102910008 TVA Letter dated 6/18/10 115

(

C 2/25/2010 Responder: Clark 101. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 6/18/10 116

(

G 6/3/2010 Responder: WEC 102. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 Letter sent to Westinghouse requesting the basis information 118 7.4 7.4

(

D a

6/8/2010 Responder: Merten 103. Y Closed Closed EICB RAI No.1 ML102910017 TVA Letter dated 10/29/10 Submittal date is based on current EDCR scheduled issue 119

(

S i

June 10, 2010 Date:

Responder:

104. Y Closed Closed RAI No. 23 ML102980005 TVA Letter dated 7/30/10 120

(

C 5/6/2010 Responder: Hilmes/Merten/Costley 105. Y Closed Closed EICB RAI ML102910002 TVA Letter dated 7/30/10 121

(

C 5/6/2010 Responder: Webb/Webber 106. Y Closed Closed EICB RAI ML102980066 TVA Letter dated 7/30/10 122

(

C June 14, 2010 Date:

Responder: WEC 107. Y Closed Closed N/A - Request for schedule not N/A 123 7.7.3 7.4.1, 9 3 4

(

D a

6/14/2010 Responder:

108. Y Closed Closed ML101720589, RAIs 21 and 22 TVA Letter dated 7/30/10 124 7.7.5 XX

(

D a

6/14/2010 Responder:

109. Y Closed Closed ML101720589, Item No 23 TVA Letter dated 7/30/10 125 7.7.8 7.7.1.

12

(

D a

6/14/2010 Responder:

110. Y Closed Closed ML101720589, Item No s 24 TVA Letter dated 7/30/10 126 7.8 7.8

(

D a

June 14, 2010 Date:

Responder:

111. Y Closed Closed ML101720589, Item No 26 TVA Letter dated 7/30/10 127 7.2 7.2

(

G 6/16/2010 Responder: WEC/Clark 112. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 6/18/10 128 7.2 7.2

(

G 6/18/2010 Responder: WEC Drake /TVA Craig 113. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 10/29/10 Track through SE open item 129

(

P o

6/12/2010 Responder: WEC 114. Y Closed Closed N/A TVA Letter dated 10/5/10 130

(

P o

6/28/2010 Responder: Clark 115. Y Closed Closed N/A TVA Letter dated 10/5/10 131

(

P o

6/28/2010 Responder: Clark 116. Y Closed Closed N/A TVA Letter dated 10/5/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments 132

(

P o

6/28/2010 Responder: Clark 117. Y Closed Closed N/A TVA Letter dated 10/5/10 133

(

P o

6/28/2010 Responder: Clark 118. Y Closed Closed TVA Letter dated 10/5/10 134

(

P o

6/28/2010 Responder: Clark 119. Y Closed Closed TVA Letter dated 10/5/10 135 7.3.1 7.3.1

(

D a

6/30/2010 Responder: Clark 120. Y Closed Closed RAI not necessary TVA Letter dated 10/5/10 136 7.3.2, 7 4 7.4, 5 6

(

D a

6/30/2010 Responder: Clark 121. Y Closed Closed RAI not necessary TVA Letter dated 10/5/10 137

(

C Several WBN2 PAMS documents contain a table titled, Document Traceability & Compliance Responder: WEC 122. Y Closed Closed ML101650255, Item No 1 TVA Letter dated 10/5/10 139

(

C The WBN2 PAMS System Requirements Specification (WBN2 PAMS SysRS) contains a table (see page iii)

Responder: WEC 123. Y Closed Closed ML101650255, Item No 3 TVA Letter dated 10/5/10 WBN2 PAMS System Requirements Specification 141

(

C Deleted by DORL Date:

Responder:

124. Y Closed Closed ML101650255, Item No 5 WBN2 PAMS System Requirements Specification 146

(

C 6/17/2010 Responder:

125. Y Closed Closed ML101650255, Item No 10 PAMS System Requirements Specifications 147

(

C 6/17/2010 Responder:

126. Y Closed Closed ML101650255, Item No 11 PAMS System Requirements Specifications 148

(

C 6/17/2010 Responder:

127. Y Closed Closed ML101650255, Item No 12 PAMS System Requirements Specifications 149 7.2 7.2

(

G FSAR Section 7.1.1.2(2), Overtemperature delta T and Overpressure delta T equations have been simplified Responder: Tindell 128. Y Close Closed ML101720589, Item No 1 TVA Letter dated 10/5/10 150 7.2 7.2

(

G Many of the changes were based on the Westinghouse document N3-99-4003 Provide this Responder: Clark 129. Y Close Response provided in letter Closed ML101720589, Item No 2 TVA Letter dated 10/5/10 151 7.2 7.2

(

G Provide the EDCR 52378 and 54504 which discusses the basis for many changes to this FSAR section Responder: Clark 130. Y Close Closed ML101720589, Item No 3 TVA Letter dated 10/5/10 152 7.2 7.2

(

G Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR section 7 2 1 1 5 However the FSAR Responder: Merten/Clark 131. Y Close Closed ML101720589, Item No 4 TVA Letter dated 10/5/10 153 7.2 7.2

(

G FSAR section 7.2.1.1.7 added the reference to FSAR section 10 4 4 3 for exception to P-12 However Responder: Craig/Webb 132. Y Close Closed ML101720589, Item No 5 TVA Letter dated 10/21/10 155 7.2 7.2

(

G Summary of FSAR change document section 7.2 states that sections 7 2 1 1 9 and 7 2 2 2(4) are Date:

Responder: Stockton 133. Y Closed Closed ML101720589, Item No 7 157 7.2 7.2

(

G FSAR section 7.2.2.1.1, fifth paragraph was deleted except for the last sentence The last sentence states Responder: Tindell 134. Y Close Closed ML101720589, Item No 9 TVA Letter dated 10/5/10 158 7.2 7.2

(

G FSAR section 7.2.2.1.1, paragraph six was changed to state that the design meets the requirements of Responder: Tindell 135. Y Closed Closed ML101720589, Item No 10 TVA Letter dated 10/5/10 159 7.2 7.2

(

G FSAR section 7.2.2.1.2 discusses reactor coolant flow measurement by elbow taps However it further Responder: Craig 136. Y Close closed ML101720589, Item No 11 TVA Letter dated 10/5/10 160 7.2 7.2

(

G FSAR section 7.2.2.2(7) deleted text which has references 12 and 14 These references are not Responder: Tindell 137. Y Close Closed ML101720589, Item No 12 TVA Letter dated 10/5/10 161 7.2 7.2

(

G FSAR section 7.2.2.3 states that changes to the control function description in this section are expected Responder: Clark 138. Y Closed Closed ML101720589, Item No 13 TVA Letter dated 10/5/10 162 7.2 7.2

(

G FSAR section 7.2.2.2(14) states that bypass of a protection channel during testing is indicated by an Responder: Tindell 139. Y Closed Closed ML101720589, Item No 14 TVA Letter dated 10/5/10 163 7.2 7.2

(

G Deleted by DORL Date:

Responder:

140. Y Closed Closed ML101720589, Item No 15 164 7.2 7 5 1 7.2 a

r g

l FSAR section 7.2.2.2(20) has been revised to include the plant computer as a means to provide information Responder: Perkins 141. Y Closed Closed ML101720589, Item No 16 and TVA Letter dated 10/5/10 Item No. 8 sent to DORL 165 7.2 7.2

(

G FSAR section 7.2.2.3.2, last paragraph of this section has been deleted The basis for this deletion is that Responder: Clark 142. Y Closed Closed ML101720589, Item No 17 TVA Letter dated 10/5/10 166 7.2 7.2

(

G Changes to FSAR section 7.2.2.2(20) are justified based on the statement that the integrated computer Responder: Clark 143. Y Closed Closed ML101720589, Item No 18 TVA Letter dated 10/5/10 167 7.2 7.2

(

G FSAR section 7.2.2.4, provide an analysis or reference to chapter 15 analysis which demonstrate that failure Responder: Clark 144. Y Close closed ML101720589, Item No 19 TVA Letter dated 10/5/10 168 7.2 7.2

(

G FSAR table 7.2-4, item 9 deleted loss of offsite power to station auxiliaries (station blackout) based on the Responder: Clark 145. Y Close Response provided in letter Closed ML101720589, Item No 20 TVA Letter dated 10/5/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments 169

(

G 6/18/2010 Responder: Clark 146. Y Closed Closed 170

(

G 6/17/2010 Responder: Clark 147. Y Closed Closed 171 7.2 7.2

(

G 6/17/2010 Responder: Craig 148. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 10/21/10 Closed to SE Open Item 172

(

G 6/17/2010 Responder: Craig 149. Y Closed Closed EICB RAI ML102910008 173 7.1 7.1

(

G 6/17/2010 Responder: Craig/Webb/Powers 150. Y Closed Closed EICB RAI ML102910008 174

(

G 6/28/2010 Responder: Hilmes/Craig 151. Y Closed Closed EICB RAI ML102910008 175

(

G June 28, 2010 Responder:

152. Y Closed Closed EICB RAI ML102910008 176 7.1 7.1

(

G 6/28/2010 Responder: Craig/Webb 153. Y Closed Closed EICB RAI ML102910008 177 7.5.2.

1 7.5.1

(

M a

7/15/2010 Responder: Clark 154. Y Closed Closed N/A TVA Letter dated 10/5/10 RAI not required 178 7.5.2.

1 7.5.1

(

M a

7/15/2010 Responder: Clark 155. Y Closed Closed N/A TVA Letter dated 10/5/10 RAI not required 179

(

C An emphasis is placed on traceability in System Requirements Specifications in the SRP in the Responder: WEC 156. Y Closed Closed N/A - Closed to Item No 142 NA 180

(

C The SRP, BTP 7-14, Section B.3.3.1 states that Regulatory Guide 1 172 endorses with a few noted Responder: WEC 157. Y Closed Closed N/A - Closed to Item No 142 NA 181

(

C An emphasis is placed on traceability in System Requirements Specifications in the SRP in the Responder: WEC 158. Y Closed Closed N/A - Closed to Item No 142 NA 182

(

C Characteristics that the SRP states that a Software Requirements Specifications should have include Responder: WEC 159. Y Closed Closed N/A - Closed to Item No 142 NA 184

(

C 7/15/2010 Responder: WEC 160. Y Closed Closed N/A - Closed to Item No 142 N/A 186 7.7.8 7.7.1.

12

(

D a

7/15/2010 Responder: Perkins/Clark 161. Y Closed Closed EICB RAI No.6 ML102910017 TVA Letter dated 10/5/10 188

(

C By letter dated June 30, 2010, TVA docketed, Tennessee Valley Authority (TVA) Watts Bar Unit 2 Responder: Clark 162. Y Closed Closed ML101970033, Item No 3 & 4 TVA Letter dated 10/5/10 189 7.6.7

(

S i

7/20/2010 Responder: Clark 163. Y Closed Closed RAI No. 3 ML102980005 TVA Letter dated 10/5/10 190 7.9

(

S i

FSAR Table 7.1-1 states: Regulatory Guide 1.133, May 1981 Loose-Part Detection Program for the Responder: Clark 164. Y Closed Closed RAI No. 4 ML102980005 TVA Letter dated 10/5/10 Closed to OI-331.

191 7.9

(

C NUREG-0800 Chapter 7, Section 7.9, "Data Communication Systems" contains review criteria for Responder: Jimmie Perkins 165. Y Closed Closed ML10197016, Item Nos 1-3 TVA Letter dated 10/5/10 192 7.5.1.

1 7.5.2

(

M a

The NRC Staff is using SRP (NUREG-0800) Chapter 7 Section 7 5 Instrumentation Systems Important to Responder: Clark 166. Y Closed Closed Item No. 1 sent to DORL TVA Letter dated 10/5/10 EICB RAI ML1028618855 sent to DORL 193 7.5.1.

1 7.5.2

(

M a

The WBU2 FSAR, Section 7.5.2, Plant Computer System contains three subsections Responder: Clark 167. Y Closed Closed Item No. 2 sent to DORL TVA Letter dated 10/5/10 EICB RAI ML1028618855 sent to DORL 194 7.5.1.

1 1 7.5.2.

1

(

M a

The WBU2 FSAR Section 7.5.2.1, Safety Parameter Display System contains a description of the Safety Responder: Costley/Norman 168. Y Closed Closed Item No. 3 sent to DORL TVA Letter dated 10/5/10 EICB RAI ML1028618855 sent to DORL 195 7.5.1.

1 2 7.5.2.

2

(

M a

Bypassed and Inoperable Status Indication (BISI)

Responder: Costley/Norman 169. Y Closed Closed Item No. 4 sent to DORL TVA Letter dated 10/5/10 EICB RAI ML1028618855 sent to DORL 196 7.5.1.

1 2 7.5.2.

2

(

M a

Bypassed and Inoperable Status Indication (BISI)

Responder: Costley/Norman 170. Y Closed Closed Item No. 5 sent to DORL TVA Letter dated 10/5/10 EICB RAI ML1028618855 sent to DORL 197 X

Open Item 197 was never issued.

171. Y Closed Closed 198 7.5.1.

1 2 7.5.2.

2

(

M a

SRP Section 7.5, Subsection III, Review Procedures states: Recommended review emphasis for BISI Responder: Costley/Norman 172. Y Closed Closed Item No. 6 sent to DORL TVA Letter dated 10/5/10 EICB RAI ML1028618855 sent to DORL 199 7.5.1.

1 3 7.5.2.

3

(

M a

The WBU2 FSAR Section 7.5.2.3, Technical Support Center and Nuclear Data Links contains a description Responder: Costley/Norman 173. Y Closed Closed Item No. 7 sent to DORL TVA Letter dated 10/5/10 Related SE Section 7.5.5.3 EICB RAI ML1028618855 sent to 203 7.5.1.

1 7.5.2

(

M a

7/26/2010 Responder: Clark 174. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments 204 7.5.1.

1 7.5.2

(

M a

7/26/2010 Responder: Costley/Norman 175. Y Closed Closed NRC to issue EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 205

(

G 7/26/2010 Responder: Clark 176. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 Question B related to prior NRC approval of this system or 50 59 206 7.5.1.

1 7.5.2

(

M a

7/27/2010 Responder: Clark 177. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 207

(

C July 27, 2010 Date:

Responder:

178. Y Closed Closed 208 7.5.2.

1 7.5.1

(

M a

7/27/2010 Responder: Clark 179. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 209 7.5.2.

1 7.5.1

(

M a

7/27/2010 Responder: Clark 180. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 210 7.5.2.

1 7.5.1

(

M a

7/27/2010 Responder: Clark 181. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 215

(

P o

7/29/2010 Responder: WEC 182. Y Closed Closed 216 7.5.1.

1 7.5.2

(

M a

7/29/2010 Responder: Clark 183. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 217

(

G 7/6/2010 Responder: Clark 184. Y Close Closed EICB RAI ML102910008 TVA Letter dated 7/30/10 218

(

G 7/6/2010 Responder: Clark 185. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 7/30/10 219

(

G 8/4/2010 Responder: TVA Licensing 186. Y Closed Closed EICB RAI ML102910008 220

(

G 8/4/2010 Responder: Ayala 187. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 221 7.7.1.

2 7.7.1.

3

(

M a

8/4/2010 Responder: Trelease 188. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 222

(

G 8/4/2010 Responder: Clark 189. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 223

(

G 8/4/2010 Responder: Clark 190. Y Closed Closed EICB RAI ML102910008 224 7.5.1.

1 7.5.2

(

M a

8/4/2010 Responder: Norman (TVA CEG) 191. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 225

(

G 8/4/2010 Responder: Scansen 192. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 226

(

C 8/4/2010 Responder: TVA Licensing 193. Y Closed Closed N/A -

Information TVA Letter dated 8/11/10 See also Open Item Nos. 41 &

270 227

(

G 8/4/2010 Responder: Clark 194. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 228

(

C 8/4/2010 Responder: Clark 195. Y Closed Closed EICB RAI ML102980066 TVA Letter dated 10/5/10 229

(

C 8/4/2010 Responder: Clark 196. Y Closed Closed EICB RAI ML102980066 TVA Letter dated 10/5/10 230

(

C 8/4/2010 Responder: Webb 197. Y Closed Closed EICB RAI ML102980066 TVA Letter dated 10/5/10 231

(

G 8/4/2010 Responder: Clark 198. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 232

(

S i

8/4/2010 Responder: Clark 199. Y Closed Closed RAI No. 5 ML102980005 TVA Letter dated 10/5/10 233

(

C 8/4/2010 Responder: Clark 200. Y Closed Closed EICB RAI ML102980066 TVA Letter dated 10/5/10 234

(

C 8/4/2010 Responder:

201. Y Closed Closed N/A - Duplicate Item N/A 235

(

G 8/4/2010 Responder: TVA Licensing 202. Y Closed Closed N/A N/A 236

(

G 8/4/2010 Responder: Clark 203. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/5/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments 237

(

C 8/4/2010 Responder: Clark 204. Y Closed Closed EICB RAI ML102980066 TVA Letter dated 10/5/10 238

(

C 8/4/2010 Responder: Webb/Hilmes 205. Y Closed Closed N/A - Duplicate Item N/A 239

(

C 8/4/2010 Responder: Hilmes 206. Y Closed Closed N/A - Meeting request N/A 240

(

G 8/4/2010 Responder: Clark 207. Y Close Closed Ml102910008 Item#29 TVA Letter dated 10/5/10 241

(

S i

8/4/2010 Responder: Davies 208. Y Closed Closed RAI No. 10 ML102980005 TVA Letter dated 10/5/10 242

(

G 8/4/2010 Responder: Hilmes 209. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 243

(

C 8/3/2010 Responder: WEC 210. Y Closed Closed N/A - Closed to Item No 142 N/A 249

(

C 8/8/2010 Responder: WEC 211. Y Closed Closed LIC-101 Rev. 3 Appendix B Section 4 "Safety Evaluation" 253

(

C 8/8/2010 Responder: Clark 212. Y Closed Closed TVA Letter dated 10/5/10 Related to Open Item no. 83.

254

(

C 8/10/2010 Responder: WEC 213. Y Closed Closed N/A - Request to make TVA Letter dated 10/21/10 255

(

C 8/10/2010 Responder: WEC 214. Y Closed Closed N/A - Request to make TVA Letter dated 10/21/10 256

(

C 8/10/2010 Responder: WEC 215. Y Closed Closed N/A - Request to make TVA Letter dated 10/21/10 257

(

C 8/10/2010 Responder: WEC 216. Y Closed Closed N/A - Request to make N/A 258

(

C 8/10/2010 Responder: WEC 217. Y Closed Closed N/A - Request to make N/A 259

(

C 8/10/2010 Responder: WEC 218. Y Closed Closed N/A - Request to make TVA Letter dated 10/21/10 260

(

C 8/10/2010 Responder: WEC 219. Y Closed Closed N/A - Request to make N/A 261

(

C 8/10/2010 Responder: WEC 220. Y Closed Closed N/A - Closed to Item No 142 TVA Letter dated 8/20/10 LIC-110 Rev. 1 Section 6.2.2 states: "Design features and 262

(

C 8/10/2010 Responder: WEC 221. Y Closed Closed N/A - Request to make N/A 263

(

C 8/11/2010 Based on an examination of document available at the Responder: WEC 222. Y Closed Closed ML101650255, Item No 2 264

(

C 8/11/2010 Responder: WEC 223. Y Closed Closed ML101650255, Item No 2 265

(

C 8/11/2010 Responder: WEC 224. Y Closed Closed ML101650255, Item No 2 269

(

P o

8/20/2010 Responder: NRC 225. Y Closed Closed N/A N/A 270

(

C 8/23/2010 Responder: Clark 226. Y Closed Closed See also Open Item Nod. 41 &

245 271

(

C 8/23/2010 Responder: WEC 227. Y Closed Closed N/A - Closed to Item No 142 NA 272 7.5.2.

1 7.5.1

(

M a

8/26/2010 Responder: Clark 228. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/21/10 EICB RAI ML102861885 sent to DORL 273 7.5.2.

1 7.5.1

(

M a

8/26/2010 Responder: Clark 229. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 274.

a 7.5.2.

1 7.5.1

(

M a

8/26/2010 Responder: Clark 230. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/21/10 EICB RAI ML102861885 sent to DORL 275

(

S i

8/27/2010 Responder: Clark 231. Y Closed Closed Not Required Answer exists in N/A 277 7.6 7.6.3

(

G 8/27/2010 Responder: Clark 232. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/29/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments 278 7.6 7.6.6

(

G 8/27/2010 Responder: Trelease 233. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/21/10 279 7.6 7.6.6

(

G 8/27/2010 Responder: Mather 234. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/21/10 280 7.6 7.6.6

(

G 8/27/2010 Responder: Trelease 235. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/21/10 282 7.6 7.6.9

(

G 8/27/2010 Responder: Trelease 236. Y Close Response is acceptable Closed EICB RAI ML102910008 TVA Letter dated 10/21/10 283 7.7.5 XX

(

D a

8/27/2010 Responder: Clark 237. Y Closed Closed EICB RAI No.13 ML102910017 TVA Letter dated 10/29/10 This item is a follow-up question to item 96 284 7.7.3 7.4.1

(

D a

8/27/2010 Responder: Webber 238. Y Closed Closed EICB RAI No.14 ML102910017 TVA Letter dated 10/21/10 This item is a follow-up question to item 123 285 7.3.3 7.3

(

D a

8/27/2010 Responder: McNeil 239. Y Closed Closed EICB RAI No.15 ML102910017 TVA Letter dated 10/29/10 This item is a follow-up question to item 22 286 7.7.3 9.3.4.

2 4

(

D a

8/27/2010 Responder: Webber 240. Y Closed Closed EICB RAI No.16 ML102910017 TVA Letter dated 10/21/10 290 7.7

(

C 9/7/2010 Responder: Clark 241. Y Closed Closed N/A N/A This item is a duplicate of item 291 292 7.2.5 7.2

(

G 9/7/2010 Responder: Craig 242. Y Closed Closed EICB RAI ML102910008 TVA Letter dated 10/21/10 293 7.7.4 7.2.2.

3 5

(

M a

9/8/2010 Responder: Craig 243. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/29/10 EICB RAI ML102861885 sent to DORL 299

(

C Provide Common Q Software Requirements Specification Post Accident Monitoring System 00000- 1 of the 10/5 letter contains the Common Q Software Requirements Specification 244. Y Closed Closed TVA Letter dated 10/5/10 302 7.5.2.

1 7.5.1

(

M a

09/17/2010 Responder: Tindell 245. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/29/10 EICB RAI ML102861885 sent to DORL 303 7.5.2.

1 7.5.1

(

M a

09/17/2010 Responder: Tindell 246. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/29/10 EICB RAI ML102861885 sent to DORL 304 7.5.2.

1 7.5.1

(

M a

09/17/2010 Responder: Tindell 247. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/29/10 EICB RAI ML102861885 sent to DORL 305 7.5.2.

1 7.5.1

(

M a

09/17/2010 Responder: Tindell 248. Y Closed Closed EICB RAI ML102861885 TVA Letter dated 10/29/10 EICB RAI ML102861885 sent to DORL 312 7.0

(

G By letter dated September 10,2010, TVA provided the summary evaluation of 50 59 reports which were Responder: Stockton 249. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/21/10 313 7.7.8 7.7.1.

12

(

D a

EDCR 52408 (installation of AMSAC in Unit 2) states that Design Criteria WB-DC-40-57 needs to be Responder: Ayala 250. Y Closed Closed EICB RAI No.18 ML102910017 TVA Letter dated 10/29/10 314 7.3 7.3

(

D a

The following 50.59 changes were listed in the March 12 RAI response letter (item 10) but were not included Responder: Stockton 251. Y Closed Closed EICB RAI No.

19 TVA Letter dated 10/21/10 Related to OI 10 315 7.5.3 7.5.3

(

G IE Bulletin 79-27 required that emergency operating procedures to be used by control room operators to Responder: S. Smith (TVA Operations) 252. Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/21/10 316 7.5.2.

3 7.5

(

S i

TVA has provided various documents in support of RM-1000 high range monitors for WBN2 Responder: Temples/Mather 253. Y Closed Closed RAI No. 26 ML102980005 317 7.5.2.

3 7.5

(

S i

TVA has provided a proprietary and a non-proprietary version of Technical Manual for RM-1000 Digital Responder: Temples 254. Y Closed Closed RAI No. 27 ML102980005 TVA Letter dated 10/29/10 320 E

I Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR Responder: Clark 255. Y Closed Closed N/A N/A Duplicate of item 156 321 E

I For the purposes of measuring reactor coolant flow for Reactor Protection functions elbow taps are used for Responder: Clark 256. Y Closed Closed N/A N/A Duplicate of OI# 157 322 7.7.1.

11

(

C Section 7.7.1.11 will be added to FSAR Amendment 101 to provide a discussion of the Distributed Control Responder: Clark 257. Y Closed Closed 324

(

M a

Per the NRC reviewer, the BISI calculation is not required to be submitted 258. Y Closed Closed 325 B

(

G a

The Unit 2 loops in service for Unit 1 that are scheduled to be transferred to the Foxboro Spec 200 Responder: TVA Startup Olson 259. Y Closed Closed Closed to open item ?

332 7.5.2.

1 7.5.1

(

M a

10/26/2010 260. Y Closed Closed ML103000105 Item No 1 TBD EICB RAI ML103000105 sent to DORL 333 7.5.2.

1 7.5.1

(

M a

10/27/2010 261. Y Closed Closed ML103000105 Item No 2 TBD EICB RAI ML103000105 sent to DORL

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments 289

(

S i

9/2/2010 Responder: Faulkner 262. Y Closed Closed -

Response

RAI No. 24 ML102980005 TVA Letter dated 10/21/10 054 7.5.2 7.5.1

(

S i

4/19/2010 Responder: Slifer/Clark Date: 5/25/10 263. Y Closed Closed-Response acceptable RAI No. 14 ML102980005 TVA Letter dated 6/18/10 055 7.5.2 7.5.1

(

S i

4/19/2010 Responder: Slifer/Clark Date: 5/25/10 264. Y Closed Closed-Response acceptable RAI No. 15 ML102980005 TVA Letter dated 6/18/10 319 7.5.2.

3 7.5

(

S i

TVA provided System Verification Test Results 04507007-1TR (July 1999) for Sequoyah to support Responder: Temples 265. Y Closed Closed-Response Acceptable RAI No. 29 ML102980005 TVA Letter dated 10/29/10 328 7.5.2.

3 7.5

(

S i

Provide the model number for the four containment high range area monitors RM-1000 and identify how Responder: Temples 266. Y Closed Closed-Response Acceptable RAI No. 30 ML102980005 TVA Letter dated 10/29/10 050 7.5.2 7.5.1 EICB (Carte) 4/8/2010 How should the "shall" statements outside of the bracketed requirements in Common Q requirements documents be interpreted?

Responder: WEC Date: 5/25/10 These sections are descriptive text and not requirements. The next revision of the Watts Bar Unit 2 PAMS System Requirements Specification will remove shall from the wording in those sections. A date for completing the next revision of the System Requirements Specification will be provided no later than August 31, 2010.

The System Requirements Specification will be revised by September 30, 2010 and submitted within two of receipt from Westinghouse.

TVA Revised Response Shall statements within the scope of the System Requirements Specification (SysRS) and System Design Specification (SysDS) were reviewed by Westinghouse. The statements were either relocated to the numbered requirements section or the wording was changed to identify that it was not a requirement. This item is resolved by submittal of revision 2 of the SysRS and the SysDS (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10).

1. Y Open TVA response is inconsistent (e.g., WNA-DS-01667-WBT Rev. 1 page 1-1, Section 1.3.1 implies that "SysRS Section ###" has requirements. See also SDS4.4.2.1-1 on page 4-32).

Is there a requirement on the shall referenced above??

Response is provided in letter dated 10/29/10.

TVA Revised Response in TVA Letter dated 10/29/10 Item No. 1 is Acceptable Open-NRC Awaiting DORL to Issue EICB RAI and TVA to respond to RAI formally.

EICB RAI ML102910002 Item No. 8 TVA Letter dated 6/18/10 TVA Letter dated 10/29/10 Item No. 1 043 7.5.2 7.5.1 EICB (Carte) 2/19/2010 The PAMS ISG6 compliance matrix supplied as to TVA letter dated February 5, 2010 is a first draft of the information needed. The shortcomings of the first three lines in the matrix are:

Line 1: Section 11 of the Common Q topical report did include a commercial grade dedication program, but this program was not approved in the associated SE.

Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that TVA should identified what they believe was previously reviewed and approved.

Line 2: TVA stated the D3 analysis was not applicable to PAMS, but provided no justification. The NRC asked for justification since SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as being SRP acceptance criteria for PAMS.

Responder: WEC Date: 5/25/10 The PAMS ISG6 compliance matrix supplied as to TVA letter dated February 5, 2010 is a first draft of the information needed.

By letter dated April 8, 2010 TVA provided the PAMS Licensing Technical Report provided additional information.

contains the revised Common Q PAMS ISG-6 Compliance Matrix, dated June 11, 2010, that addresses these items (Reference 13).

By letter Dated June 18, 2010 (see Attachment 3)

TVA provided a table, "Watts Bar 2 - Common Q PAMS ISG-6 Compliance Matrix."

It is TVAs understanding that this comment is focused on the fact that there are documents that NRC has requested that are currently listed as

2. N Open Response is included in letter dated 10/5/10.

Revised compliance matrix is unacceptable.

NNC 8/12/10: It is not quite enough to provide all of the documents requested.

There are two possible routs to review that the NRC can undertake: (1) follow ISG6, and (2) follow the CQ SPM.

The TVA response that was originally pursued was to follow ISG6, but some of the compliance items for ISG6 were addressed by referencing the SPM. The Open-NRC Review Due 12/1/10 EICB RAI ML102910002 Item No. 2 TVA Letter dated 2/5/10 TVA Letter dated 5/12/10 TVA Letter dated 6/18/10 TVA Letter dated 10/5/10 NNC 8/25/10: A CQ PAMS ISG6 compliance matrix was docketed on: (1) February, 5 12010, (2)

March 12, 2010, & (3) June 18, 2010. The staff has expressed issued with all of these compliance evaluations. The staff is still waiting for a good compliance evaluation.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments Line 3: TVA identified that the Design report for computer integrity was completed as part of the common Q topical report. The NRC noted that this report is applicable for a system in a plant, and the CQ topical report did no specifically address this PAMS system at Watts Bar Unit 2.

NRC then concluded that TVA should go through and provide a more complete and thorough compliance matrix.

being available for audit at the Westinghouse offices. For those Common Q PAMS documents that are TVA deliverable documents from Westinghouse, TVA has agreed to provide those to NRC. Westinghouse documents that are not deliverable to TVA will be available for audit as stated above. Requirements Traceability Matrix issues will be tracked under NRC RAI Matrix Items 142 (Software Requirements Specification) and 145 (System Design Specification).

Commercial Item Dedication issues will be tracked under NRC RAI Matrix Item 138. This item is considered closed.

NRC approved the CQ TR and associated SPM; it may be more appropriate to review the WBN2 PAMS application to for adherence to the SPM that to ISG6. In either path chosen, the applicant should provide documents and a justification for the acceptability of any deviation from the path chosen. For example, it appears that the Westinghouse's CDIs are commercial grade dedication plans, but Westinghouse maintains that they are commercial grade dedication reports; this apparent deviation should be justified or explained.

065 7.5.2 7.5.1 EICB (Carte)

By letter dated March 12, 2010 TVA stated that the target submittal date for the FMEA was August 31, 2010.

Responder: WEC Date: 5/25/10 7 to letter dated 10/5/10 contains the proprietary version of the Common Q PAMS FMEA and the affidavit for withholding. A non-proprietary version will be provided at a later date.

3. N Open Open-NRC Review Due 12/1/10 N/A - No question was asked. Item was opened to track comm8ittment made by applicant.

TVA Letter dated 10/5/10 101 DORL (Poole) 4/12/2010 The non-proprietary versions of the following RM-1000, Containment High Range Post Accident Radiation Monitor documents will be provided by June 30, 2010.

1. V&V Report 04508006A
2. System Description 04508100-1TM
3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
4. Functional Testing Report 04507007-1TR Responder: Slifer The documents, and affidavits for withholding for the listed documents were submitted to the NRC on TVA letter to the NRC dated July 15, 2010.
4. Y Open Documents provided in letter dated 07/15/10 Open-NRC Review Due 10/14/10 Confirm receipt.

N/A TVA is working with the vendor to meet the 6/30 date, however there is the potential this will slip to 7/14.

144 EICB (Carte)

The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS) contains a table (see page iii) titled, Document Traceability &

Compliance, which states that the WBN2 PAMS SRS was created to support the three documents identified (two of these documents have been provided on the docket).

(a) Please describe the third document (i.e., NABU-DP-00014-GEN Revision 2, Design Process for Common Q Safety Systems).

(b) Please describe the flow of information between Responder: WEC (a) The purpose of NABU-DP-00014-GEN document is to define the process for system level design, software design and implementation, and hardware design and implementation for Common Q safety system development. This document supplements the Common Q SPM, WCAP-16096-NP-A. The scope of NABU-DP-00014-GEN includes the design and implementation processes for the application development. For a fuller description of the design process described in NABU-DP-00014-GEN please refer to the

5. N Open Response provided in letter dated 10/5/10 NRC Review and WEC to complete response.

b-d to be addressed at public meeting and audit.

Will require information to be docketed.

Open-NRC Review Due 12/1/10 Responses to items a and e provided. Need response to b-d.

ML101650255, Item No. 8 TVA Letter dated 10/5/10 WBN2 PAMS Software Requirements Specification By letter dated April 8, 2010 (ML10101050203), TVA docketed WNA-SD-00239-WBT, Revision 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, dated February 2010 (ML101050202).

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments these three documents.

(c) Does the PAMS SRS implement the requirements in these three documents?

(d) Please describe if and how these three documents are used in the development of the PAMS Software Design Description.

(e) Do the WBN2 V&V activities include verification that the requirements of these three documents have been incorporated into the WBN2 PAMS SRS.

Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket.

Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision of the document.

(b) - Closed to items 142 and 145 (c) - Closed 142 (d) - Closed to Item 142 (e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).

IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V-770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.

IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.

(d) N/A -

Closed to Item No. 142 183 EICB (Carte) 7/15/2010 An emphasis is placed on traceability in System Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word should to say Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies Responder: WEC The generic Software Requirements Specification applies except as modified by the WBN Unit 2 System Requirements Specification.

6. Y Open Response provided in letter dated 10/21/10 Open-NRC Review Due 12/1/10 NRC to issue RAI EICB RAI ML102980066 Item No. 9 TVA Letter dated 10/21/10 Item No. 4

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments On page 1-2 of the Post Accident Monitoring Systems Software Requirements Specification in the background section, is the sentence Those sections of the above references that require modification from the generic PAMS are defined in the document referring purely to the changes from WNA-DS-01617-WBT Post Accident Monitoring System-System Requirements Specification or is it saying that there are additional changes beyond those and that the SRS defines them?

If there are additional changes, what is their origin?

200 7.2 7.3 7.5 7.7 EICB (Carte) 7/21/2010 Amendment 99 of the Watts Bar Unit 2 FSAR Section 7.5, Instrumentation Systems Important to Safety, does not include any description of instrumentation for normal operation; therefore, Section 7.5 of the FSAR does not support statements made in the SER Section 7.5; compare SER (ML072060490) Section 7.5.1 and FSAR Amendment 99 Section 7.5. Please identify where, in the docketed material, information exists to support the statements in the SER Section 7.5.1.

Responder: Clark The statement in SER Section 7.5.1 is supported by the following:

I&C Systems for Normal Operation FSAR Section Eagle 21 7.2 Neutron Monitoring 7.2 Foxboro Spec 200 7.3 (List of other sections in attachment 34)

Foxboro I/A 7.7.11 (new section will be added by amendment 101) (other sections have been previously provided)

Plant Computer 7.5.2 Rod Control 7.7.1.2 CERPI 7.7.1.2 Control Rod Drive 7.7.1.1 Incore Neutron Monitoring 7.7.1.9 Lose Part Detection/Monitoring 7.6.7 Vibration Monitoring RCP 5.5.1.2 Control Boards 7.1.1.10 RVLIS 7.5, 5.6

7. Y Open Response provided in letter dated 10/5/10 Open-NRC Review Amendment 101 Submitted 10/29/10.

EICB RAI ML102980066 Item No. 2 TVA Letter dated 10/5/10 201 7.7.1.

1.1 7.7.11 EICB (Carte) 7/21/2010 Amendment 99, FSAR Section 7.7.1.1.1, "Reactor Control Input Signals (Unit 2 Only)," contains a description of functions performed uniquely for Unit 2.

Please describe the equipment that performs this function (in sufficient detail to support a regulatory evaluation), and evaluate this equipment against the appropriate regulatory criteria.

Responder: Webb These functions are within the scope of the Foxboro I/A system. Section 7.7.11 will be added to the FSAR in amendment 101 to provide a discussion of the DCS.

8. Y Open Response provided in letter dated 10/5/10 Open-NRC Review Amendment 101 Submitted 10/29/10.

EICB RAI ML102980066 Item No. 3 TVA Letter dated 10/5/10 211 7.5.1.

1 7.5.2 7.6.1 EICB (Carte) 7/27/2010 FSA Table 7.1-1 shows: "The extent to which the recommendations of the applicable NRC regulatory Responder: Clark The WBN 2 FSAR Section 7.5 defines the following systems as important to safety

9. N Open Response included in letter dated 10/5/10 Open-NRC Review Amendment 101 EICB RAI ML102980066 Item No. 5 TVA Letter dated 10/5/10 Relates to SE Sections:

7.5.5, Plant Computer 7.6.10, Loose Part Monitoring 7.7.1, Control System

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments 7.7.1 7.7.2 7.7.4 7.9 guides and IEEE standards are followed for the Class 1E instrumentation and control systems is shown below. The symbol (F) indicates full compliance. Those which are not fully implemented are discussed in the referenced sections of the FSAR and in the footnotes as indicated."

Please describe how systems that are important to safety, but not 1E, comply with 10 CFR 50.55a(a)1:

"Structures, systems, and components must be designed, fabricated, erected, constructed, tested, and inspected to quality standards commensurate with the importance of the safety function to be performed."

1. Post Accident Monitoring including:
a. Common Q Post Accident Monitoring System (Safety-Related)
i. Reactor Vessel Level ii. Core Exit Thermocouples iii. Subcooling Margin Monitor
b. Eagle 21 indications (Safety-Related)
c. Foxboro Spec 200 indications (Safety-Related)
d. Neutron Monitoring (Source and Intermediate Range) (Safety-Related)
e. Radiation Monitors (Safety-Related)
f. Unit 1 and Common shared indications (Safety-Related)
g. Foxboro I/A indications (Non-Safety-Related)
h. Radiation Monitors (Non-Safety-Related)
i. CERPI (Non-Safety-Related)
j. Integrated Computer System (Non-Safety-Related)
k. Unit 1 and Common shared indications (Non-Safety-Related)

Post Accident Monitoring Instrumentation Design Criteria, WB-DC-30-7, Rev. 22, Appendix A provides the minimum quality requirements for each Category (1, 2 or 3) of variable. By definition, no Category 1 variable can be non-safety-related. Therefore, non-safety-related variables and the source equipment are limited to category 2 or 3. Since some variables are designated as having more than 1 category, the requirements of the highest category apply.

Additional design criteria information for specific systems is contained in:

g. Foxboro I/A - Site-Specific Engineering Specification WBN Unit 2 NSSS and BOP Controls Upgrade Specification Rev. 1 (Attachment 23)
h. CERPI - Rod Control System Description, N3-85-4003, Rev. 12 Section 2.2, Design Requirements
i. Radiation Monitors - Design Criteria Document WB-DC-40-24, Radiation Monitoring - (Unit 1 /

Unit 2), Rev. 21

j. Integrated Computer System - Design Criteria Document WB-DC-30-29 Plant Integrated Computer System (ICS), Rev. 8 (Submitted under TVA to NRC letter dated August __, 2010)
2. Plant Computer (Integrated Computer System)

- See Item j above.

The WBN 2 FSAR Section 7.6, defines the following non-safety-related systems as other systems required for safety

1. Foxboro I/A - While not specifically described, functions performed by the system are described Submitted 10/29/10.

Description 7.7.2, Safety System Status Monitoring System 7.7.4, PZR & SG Overfill 7.9, Data Communications

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments in this section. The qualify requirements are described above.

2. Lose Part Monitoring System - Design Criteria Document WB-DC-30-31, Loose Parts Monitoring System, Rev. 4, provides the quality requirements for this system. A description of the distributed control system will be added as FSAR section 7.7.1.11 in FSAR Amendment 101.

Installation is performed in accordance with the quality requirements of either the Bechtel or TVA work order processes based on the quality classification of the equipment being installed.

Vendor testing is performed in accordance with procurement specification requirements which are based on the type and quality classification of the equipment. Preoperational testing is performed in accordance with Chapter 14 of the FSAR.

213 7.5.2 EICB (Carte) 7/27/2010 By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Theory of Operation Description." The staff has reviewed these documents, and it is not clear how this is the case. The docketed material does not appear to contain the design basis information that is required to evaluate compliance with the Clause of IEEE 603.

(1) Please provide the design basis (as described in IEEE 604 Clause 4) of the Common Q PAMS.

(2) Please provide a regulatory evaluation of how the PAMs complies with the applicable regulatory requirements for the theory of operation.

For example: Regarding IEEE 603 Clause 5.8.4 (1)

What are the manually controlled protective actions?

(2) How do the documents identified demonstrate compliance with this clause?

Responder: WEC Conformance with IEEE 603 is documented in the revised Common Q PAMS Licensing Technical Report and the Common Q PAMS System Design Specification.

contains the proprietary version of Westinghouse document Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010 contains the proprietary version of Westinghouse document Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System -

System Design Specification, WNA-DS-01667-WBT, Rev. 2 dated September 2010.

10. N Open Response is included in letter dated 10/25/10 NNC to review and revise this question after LTR R1is received.

Open-NRC Review Due 12/31/10 EICB RAI ML102980066 Item No. 18 214 EICB (Carte) 7/27/2010 By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 10) that the approved Common Q Topical Report contains information to address the "Safety Analysis." The Common Q SPM however states that a Preliminary Hazards Analysis Report and the V&V reports document the software hazards analysis. Please Provide these documents.

Responder: WEC According to "The Software Program Manual for Common Q Systems," WCAP-16096-NP-1A, the Software Safety Plan only applies to Protection class software and PAMS is classified as Important-to-safety. Exhibit 4-1 of the SPM shows that PAMS is classified as Important-to-Safety

11. N Open Response provided in letter dated 10/5/10 WEC References Common Q PAMS preliminary hazards analysis is referenced in the SRS.

WEC to delete.

Open-NRC Review Due 12/1/10 EICB RAI ML102980066 Item No. 11 TVA Letter dated 10/5/10 244 EICB (Carte) 8/3/2010 Section 8.2.2 of the Common Q SPM (ML050350234) states that the Software Requirements Specification (SRS) shall be developed using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS should address the software product, not the process Responder: WEC The process related requirements have been removed from revision 2 of the Software Requirements Specification (SRS).

of letter dated 10/25/10 contains the proprietary version of Westinghouse document

12. N Open Response is provided in letter dated 10/25/10.

Open-NRC Review Due 10/22/10 EICB RAI ML102980066 Item No. 14 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments of producing the software. In addition Section 4.3.2.1 of the SPM states "Any alternatives to the SPM processes or additional project specific information for the...SCMP...shall be specified in the PQP.

Contrary to these two statements in the SPM, the WBN2 PAMS SRS (ML101050202) contains many process related requirements, for example all seventeen requirements in Section 2.3.2, "Configuration Control," address process requirements for configuration control.

Please explain how the above meets the intent of the approved SPM.

Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, WNA-SD-00239-WBT, Revision 2, Dated September 2010.

change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

246 EICB (Carte) 8/3/2010 Section 4.3.2.1, "Initiation Phase" of the Common Q SPM (ML050350234) requires that a Project Quality Plan (PQP) be developed. Many other section of the SPM identify that this PQP should contain information required by ISG6. Please provide the PQP. If "PQP" is not the name of the documentation produced, please describe the documentation produced and provide the information that the SPM states should be in the PQP.

Responder: WEC As agreed ISG6 does not apply to the Common Q PAMS platform. The information required to address this question concerning the PQP and SPM has been added to compliance matrix in revision 1 of the Licensing Technical Report.

of letter dated 10/25/10 contains the proprietary version of Westinghouse document Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010

13. N Open Response is provided in letter dated 10/25/10 Open-NRC Review Due 10/22/10 EICB RAI ML102980066 Item No. 15 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

247 EICB (Carte) 8/8/2010 As part of the Common Q topical report development effort, Westinghouse developed the Software Program Manual for Common Q Systems (ML050350234) to address software planning documentation. The NRC reviewed the SPM and concluded: the SPM specifies plans that will provide a quality software life cycle process, and that these plans commit to documentation of life cycle activities that will permit the staff or others to evaluate the quality of the design features upon which the safety determination will be based. The staff will review the Implementation of the life cycle process and the software life cycle process design outputs for specific applications on a plant-specific basis. Please identify the implementation documentation produced as a result of following the SPM, and state what information will be docketed.

Responder: WEC The implementation documents required by the SPM are identified in the compliance matrix in revision 1 of the Licensing Technical Report.

of letter dated 10/25/10 contains the proprietary version of Westinghouse document Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010

14. N Open Response is provided in letter dated 10/25/10 Open-NRC Review Due 10/22/10.

EICB RAI ML102980066 Item No. 16 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

248 EICB (Carte) 8/8/2010 As part of the Common Q topical report development effort, Westinghouse developed the Software Program Manual for Common Q Systems (ML050350234) to address software planning documentation. The NRC reviewed the SPM and concluded: the SPM specifies plans that will provide a quality software life cycle process, and that these plans commit to Responder: WEC The documents are identified in the compliance matrix in revision 1 of the Licensing Technical Report of the letter dated 10/25/10 contains the proprietary version of Westinghouse document Tennessee Valley Authority (TVA),

15. N Open Response is provided in letter dated 10/25/10 Open-NRC Review Due 10/22/10.

LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments documentation of life cycle activities that will permit the staff or others to evaluate the quality of the design features upon which the safety determination will be based. The staff will review the Implementation of the life cycle process and the software life cycle process design outputs for specific applications on a plant-specific basis. Please identify the design outputs produced as a result of following the SPM, and state when what information will be docketed.

Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010 technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

266 EICB (Carte) 8/11/2010 Please provide a high level description of the Foxboro IA equipment used at WBN2. This description should be more detailed than a brochure on the product line (or available on the web), and less detailed than a technical manual on each field replaceable unit. It is expected that such literature already exists.

Responder: Webb/Webber FSAR section 7.7.1.11 will be added in Amendment 101. In discussions with the NRC reviewer on October 4, 2010 it was agreed that the new FSAR section along with previously submitted documents should be sufficient to address this request. The NRC reviewer will notify TVA if additional documentation is required.

16. Y Open Response provided in letter dated 10/21/10 Open-NRC Review Amendment 101 Submitted 10/29/10.

TVA Letter dated 10/21/10 Item No. 9 267 EICB (Carte) 8/11/2010 By letter dated June 18, 2010 (ML101940236) TVA stated that the software safety plan (SSP) was not applicable to PAMS applications (see Watts Bar 2 -

Common Q PAMS ISG-6 Compliance matrix Item No.

10); however, reference No. 30 of the SRS (ML101050202) is: 00000-ICE-37727, Rev. 0, "Post Accident Monitoring System Software Preliminary Hazard Analysis for the Common Q PAMS Project." A Preliminary Hazard Analysis is required by the SSP.

Please explain.

Responder: WEC This is addressed in the Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P.

of the letter dated 10/25/10 contains the Proprietary version of Westinghouses document titled: Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2),

Post-Accident Monitoring System (PAMS),

Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010

17. N Open Response provided in letter dated 10/25/10 Open-NRC Review Due 10/22/10 291 7.7 EICB (Carte) 9/7/2010 The equation at the bottom of Amendment 100 page 7.7-3 is wrong. There are two ways that this equation is inconsistent with the text above it.

Responder: Clark The errors in the terms within the equation for total rod speed error [TE] will be corrected in FSAR Amendment 101 as shown below:

1 1

1 1 1

1

18. Y Open Response provided in letter dated 10/21/10 Open-NRC Review Amendment 101 Submitted 10/29/10.

TVA Letter dated 10/21/10 Item No. 21 092 DORL (Poole) 5/20/2010 TVA to review Licensee Open Item list and determine which items are proprietary.

Responder: Hilmes This item will close when we are no longer using this document as a communications tool.

19. N Open Open-TVA Continuous review as items are added 287 7.3 7.3-1 EICB (Darbali) 8/27/2010 In Amendment 95 of FSAR section 7.3.2.3 Further Considerations, the list of signals that would start the auxiliary feedwater motor driven and turbine driven pumps was moved to table 7.3-1 item 3, Auxiliary Feedwater. However, item (6) AMSAC was not included in table 7.3-1.

Please explain this omission or state your commitment to correct this in a future amendment.

Responder: Elton Unit 2 FSAR Section 7.3 addresses Engineered Safety Features (ESF) Actuation System.

AMSAC is non-safety, and thus non-ESF.

Therefore, it was correct to not include AMSAC when the initiating signals were relocated from Unit 2 FSAR Section 7.3.2.3 to Table 7.3-1.

20. Y Open Response included in next TVA Licensing Formal RAI Response Letter.

Open-TVA Due 10/31/10.

Waiting for docketed version to close item.

Expected letter issue date is 11/5/10 ML102390538, Item No. 1, 9/10/10 and EICB RAI No.17 ML102910017, 10/19/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments 294 7.3 7.3.1.

1.1 EICB (Darbali) 9/9/2010 In Amendment 95 of FSAR section 7.3.1.1.1 Function Initiation, item (13) was arranged into paragraph form from what used to be a listing of items (a), (b) and (c).

The second bullet under item (c) was omitted in the new paragraph.

Initiates Phase B containment isolation of the following:

Closure of the main steam isolation valves (MSIV) to limit reactor coolant system cooldown for breaks downstream of the MSIVs.

Please explain this omission or state your commitment to correct this in a future amendment.

Responder: Elton The information provided in Unit 2 FSAR Section 7.3.1.1 is not meant to describe the specific function of each item in detail; the descriptions provided are a summary listing. The omitted information provided information beyond the level of detail provided for the other items in this section.

The level of detail contained in item (13) of Unit 2 FSAR Section 7.3.1.1 is consistent with that contained in item 13. of Unit 1 UFSAR Section 7.3.1.1.

21. Y Open Response included in next TVA Licensing Formal RAI Response Letter.

Open-TVA Due 10/31/10.

Waiting for docketed version to close item.

Expected letter issue date is 11/5/10 ML102390538, Item No. 2, 9/10/10 295 7.3 7.3.1.

1.2 EICB (Darbali) 9/9/2010 In Amendment 95 of FSAR section 7.3.1.1.2 Process Protection Circuitry, item (3), references to sections 7.6 and 7.7 were removed.

Please explain the reason for removal.

Responder: Elton The level of detail is sufficient for this section without the two removed references to other Sections.

The level of detail contained in item (3) of Unit 2 FSAR Section 7.3.1.1.2 is consistent with that contained in item 3. of Unit 1 UFSAR Section 7.3.1.1.2.

22. Y Open Response included in next TVA Licensing Formal RAI Response Letter.

Open-TVA Due 10/31/10.

Waiting for docketed version to close item.

Expected letter issue date is 11/5/10 ML102390538, Item No. 3, 9/10/10 296 7.3 7.3.1.

2.1 EICB (Darbali) 9/9/2010 In Amendment 95 of FSAR section 7.3.1.2.1 Generating Station Conditions, the new paragraph was arranged from what used to be a listing of items (1.b), (1.c), and (2.b), leaving out items (1.a) and (2.a).

Even if the paragraph contains the word include, the breaks in items (1.a) and (2.a) should be listed.

Please explain this omission or state your commitment to correct this in a future amendment.

Responder: Elton The information provided in Unit 2 FSAR Section 7.3.1.2.1 is not meant to provide detailed information describing what each condition includes. Deletion of the breaks described in Items (1.a) and (2.a) is justified because they are encompassed by the operating conditions primary system breaks and secondary system breaks, respectively.

The level of detail contained in Unit 2 FSAR Section 7.3.1.2.1 is consistent with that contained in Unit 1 UFSAR Section 7.3.1.2.1.

23. Y Open Response included in next TVA Licensing Formal RAI Response Letter.

Open-TVA Due 10/31/10.

Waiting for docketed version to close item.

Expected letter issue date is 11/5/10 ML102390538, Item No. 4, 9/10/10 297 7.3 7.3.1.

2.2 EICB (Darbali) 9/9/2010 In Amendment 95 of FSAR section 7.3.1.2.2 Generating Station Variables, the following sentence was erased:

Post accident monitoring requirements and variables are given in Tables 7.5-1 and 7.5-2.

Please explain the reason for removal.

Responder: Elton Unit 2 FSAR Section 7.3 addresses Engineered Safety Features (ESF) Actuation System. Post accident monitoring is not an ESF; thus, a reference to it is not required in 7.3.1.2.2.

24. Y Open Response included in next TVA Licensing Formal RAI Response Letter.

Open-TVA Due 10/31/10.

Waiting for docketed version to close item.

Expected letter issue date is 11/5/10 ML102390538, Item No. 5, 9/10/10 298 7.3 XX EICB (Darbali) 9/9/2010 IE Bulletin 80-06 calls for review of engineered safety features with the objective of ensuring that no device will change position solely because of the reset action.

Responder: Clark A review of the schematic diagrams for the WBN Unit 2 valves listed in SER 3 found the following:

25. Y Open Response included in next TVA Licensing Formal RAI Response Letter.

Open-TVA Due 10/31/10.

Waiting for docketed version to close item.

ML102390538, Item No. 6, 9/10/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments In Supplement 3 of NUREG-0847, section 7.3.5, the staff approved the design modifications proposed by the applicant that would allow certain devices to remain unchanged upon an ESF reset. The staff also found acceptable the applicants justification for some safety-related equipment that does not remain in its emergency mode after an ESF reset.

Please confirm whether or not the equipment that was determined in NUREG-0847 and its supplements to remain unchanged upon an ESF reset will still remain unchanged in Unit 2.

(1) For feedwater isolation valves (FCV-3-33, FCV-3-47, FCV-3-87, and FCV-3-100),

feedwater check valve bypass valves (FCV-3-185, FCV-3-186, FCV-3-187, and FCV 188), and upper tap main feedwater isolation valves (FCV 3-236, FCV-3-239, FCV-3-242, and FCV-3-245), the Unit 2 equivalent reset switch and a relay have been added for each steam generator loop.

When the engineered safety feature (ESF) signal is reset, the individual valve will not change state until both the loop and the ESF train reset switches have been reset.

(2) For steam generator blowdown isolation valves (FCV-43-54D, FCV-43-56D, FCV-43-59D, FCV-43-63D, FCV-43-55, FCV 58, FCV-43-61, and FCV-43-64), the ESF signal is sealed in by means of a seal in relay. The individual valve will not change state until a hand switch in the sample room is used to reopen the individual valve.

(3) For residual heat removal heat exchanger outlet flow control valves (FCV-74-16 and FCV-74-28), the ESF signal is sealed in by the limit switch. The Unit 2 equivalent reset switch has been added at the control room control board. When the ESF signal is reset, the individual valve will not change state until the individual reset switch has been reset.

Expected letter issue date is 11/5/10 334 7

7 EICB (Darbal i)

FSAR Figure 7A-3 Mechanical Flow and Control Diagram Symbols doesnt show the symbols for the first column of valves. Please correct this in a future FSAR amendment.

Responder: Stockton

26. Y Open Figure will be corrected in FSAR Amendment 102.

Open-TVA Due TBD RAI not required.

N/A RAI not required because the figure is not part of any SE section.

323 EICB(Garg)

WCAP-13869 revision 1 was previously reviewed under WBN Unit 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An analysis of the differences and their acceptability will be submitted to the NRC by November 15, 2010 Responder: Hilmes/Unit 1 2 contains the WCAP 13869 Revision 1 to Revision 2 Change Analysis.

27. Y Open Response is included in letter dated 10/29/10 The staff is confused with the response since both units have reference leg not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 Open-TVA Unit 1 TVA Letter dated 10/29/10 Item No. 36 117 7.1 7.1 EICB (Garg) 6/3/2010 Does TVA use a single sided or double sided methodology for as-found and as-left instrument setpoint values. (RIS2006-7)

Responder: Hilmes Reactor Protection System (RPS) (comprised of Reactor Trip (RPS) and Engineered Safety Features Actuation System (ESFAS)) setpoint values are monitored by periodic performance of surveillance tests in accordance with Technical Specification requirements. TVA uses double-sided as-found and as-left tolerances for Reactor

28. Y Open Revised response is included in letter dated 10/29/10 Open-TVA/A102 Pending FSAR Amendment 102 submittal Due 10/31/10 TVA needs to EICB RAI ML102910008 Item#21 TVA Letter dated 10/29/10 Item No. 7

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments Trip and ESFAS trip setpoint surveillance tests as described in FSAR amendment 100.

TVA Revised Response:

For TSTF-493 parameters WBN Unit 2 uses only double sided correction factors. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

address that trip setpoint and allowable value uncertainties are not reduced by the reduction factor for the single sided reduction factor.

TVA response not acceptable. TVA need to clarify if single sided methodology has been used in calculating trip setpoint and allowable value and if it is used then provide justifications.

154 7.2 7.2 EICB (Garg)

FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS 2006-17 to provide guidance to the industry regarding the instrument setpoint methodology which complies with 10 CFR 50.36 requirements. Provide the information on how the WBN2 setpoint methodology meets the guidance of RIS 2006-17 and include this discussion in this section. Also, by letter dated May 13, 2010, TVA provided Rev. 7 of EEB-TI-28 to the staff. The staff noted that section 4.3.3.6 of EEB-TI-28 discusses the correction for setpoints with a single side of interest. It should be noted that the staff has not approved this aspect of setpoint methodology for Unit 1. The staff finds this reduction in uncertainties is not justified unless it can be demonstrated that the 95/95 criteria is met. Therefore, either remove this reduction factor for single sided uncertainties or justify how you meet the 95/95 criteria given in RG 1.105.

Responder: Craig/Webb (Q1) Refer to the response to letter item 13, RAI Matrix Item 51.

(Q2) EEB-TI-28's single sided methodology conforms with WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986 that was in affect during WBN Unit 1 licensing. The single sided methodology is not used for any TSTF-493 setpoints that use TI-28 methodology.

TVA Revised Response:

In order to respond to other NRC comments on the setpoint methodology discussion in FSAR Amendment 100, TVA reviewed the previous response to this RAI. This resulted in a complete rewrite of the responses to this question as shown below. As a result, the response does not specifically address the NRC Follow-up Request.

However, the overall responses to all of the NRC RAIs on setpoint methodology addresses this item.

(Q1)

WBN 2 implementation of TSTF-493, Rev. 4, Option A includes addition of a discussion of the WBN setpoint methodology in FSAR section 7.1.2.1.9.

(Q2)

Electrical Engineering Branch (EEB)

29. Y Open Response is not acceptable.

A revised response will be submitted in the letter dated 10/29/10.

Open-TVA/A102 Pending FSAR Amendment 102 submittal.

FSAR AMD 100.

Since all the setpoint and allowable value for Unit 2 is calculated and added to TS, TVA needs to address the latest criteria and that include 95/95 criteria.

Why the last sentence has been modified by adding TI-28. It was NRCs understanding that all setpoints have to meet TI-28 ML101720589, Item No. 6 and EICB RAI ML102861885 Item No. 8 TVA Letter dated 10/5/10 TVA Letter dated 10/29/10 Item No. 13 EICB RAI ML102861885 sent to DORL

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments Technical Instruction (TI) 28, Setpoint Calculations, single-sided methodology conforms to WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986, which was in effect during WBN Unit 1 licensing. Single-sided multipliers are not used for any TSTF-493 setpoints.

There are some areas where a 95%

confidence level could not be achieved.

Some examples would be harsh environment instrumentation where only 2 or 3 devices were tested in the 10CFR50.49 program. In these situations, the Confidence is referred to as high..

306 7.1 7.1 EICB (Garg)

FSAR amendment 100, page 7.1-12 provides the definition of Allowable value which is not consistent with TSTF-493 as allowable value is the value beyond which instrument channel is declared inoperable.

Responder: Hilmes The FSAR Allowable Value definition will be revised to be consistent with the TSTF-493 in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

30. Y Open Response is included in letter dated 10/29/10 Open-TVA/A102 Due 10/31/10 Pending FSAR Amendment 102 submittal EICB RAI ML102910008 Item#69 TVA Letter dated 10/29/10 Item No. 26 307 7.1 7.1 EICB (Garg)

(1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of Acceptable as found tolerance is not in accordance with TSTF-493 as AAF is the limit beyond which the instrument channel is degraded but may be operable and its operability must be evaluated. (2)

Also it states that AAF is based on measurable instrument channel uncertainties, such as drift, expected during the surveillance interval. These wording should be revised to agree with the wording given in RIS2006-17 as these wordings are very vague. (3) Also it states that RPS functions use double sided tolerance limits for the AAF. Since AAF is a band it will always be double sided and therefore, this clarification does not mean anything and it clouds the issue.

Responder: Hilmes (1) The Acceptable As Found (AAF) definition will be revised to be consistent with TSTF-493 in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

(2) Additional detail on the AAF methodology was provided in sections 7.1.2.1.9.1, Westinghouse Setpoint Methodology, and 7.1.2.1.9.2, TVA Setpoint Methodology.

These sections will be revised to clarify the AAF calculations in FSAR Amendment 102. contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

(3) The statement about double sided limits addresses a TSTF requirement that the AAF tolerance consider errors in both the conservative and non-conservative directions and ensures that an as-found value which exceeds these limits, even in the conservative direction (away from the safety limit), will be evaluated. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

31. Y Open Response is included in letter dated 10/29/10 Open-TVA/A102 Due 10/31/10 Pending FSAR Amendment 102 submittal EICB RAI ML102910008 Item#70 TVA Letter dated 10/29/10 Item No. 27 308 7.1 7.1

(

G (1) FSAR Amendment 100, Section 7.1, page 7.1-13, Responder: Hilmes

32. Y Open Open-TVA/A102 EICB RAI TVA Letter

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments definition of Acceptable as left tolerance is not in accordance with TSTF-493 as it states that this may take calibration history into consideration. This is very vague and ambiguous. (2) Also it states that RPS functions use double sided tolerance limits. Since ALF is a band it will always be double sided and therefore, this clarification does not mean anything and clouds the issue.

(1) The statement about using calibration history to determine the Acceptable As Left (AAL) will be deleted in FSAR Amendment 102. contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

(2) See response to letter item 27 (NRC Matrix Item 307).

Response is included in letter dated 10/29/10 Due 10/31/10 Pending FSAR Amendment 102 submittal ML102910008 Item#71 dated 10/29/10 Item No. 28 309 7.1 7.1.2.

1.9.1 EICB (Garg)

(1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint methodology, states that AAF is the algebraic sum of the.. This is not acceptable.

As algebraic sum is non conservative compared to the SRSS method and will mask the operability of the instrument channel and therefore, it is not acceptable to the staff. (2) It also make the statement that ALT may take calibration history into consideration which is vague and ambiguous.

Responder: Hilmes (1) The AAF calculation for Westinghouse setpoint methodology calculations in TI-28 for TSTF-493 will be revised to use the Square Root Sum of the Squares (SRSS) method.

(2) AAF definition will be revised to be consistent with TSTF-493 as discussed with the NRC Staff, in FSAR Amendment 102. Attachment 3 contains the revised FSAR Amendment 102 Change Markup that reflects this change.

33. Y Open Response is included in letter dated 10/29/10 Open-TVA/A102 Due 10/31/10 Pending FSAR Amendment 102 submittal EICB RAI ML102910008 Item#72 TVA Letter dated 10/29/10 Item No. 29 310 7.1 7.1.2.

1.9.2 EICB (Garg)

(1) FSAR amendment 100, Page 7.1-14, TVA setpoint methodology, states that for AAF.and other measurable uncertainties as appropriate (i.e., those present during calibration.) should be changed to present during normal operation (2) Also on page 7.1-15, states that ALT may take calibration history into consideration which is vague and ambiguous.

Responder: Hilmes TVA Response:

(1) The AAF definition will be revised in FSAR Amendment 102 to read:

A tolerance band on either side of the NTSP which defines the limits of acceptable instrument performance, beyond which the channel may be considered degraded and must be evaluated for operability prior to returning it to service. Channels which exceed the AAF will be entered into the Corrective Action Program for further evaluation and trending. The Acceptable As Found tolerance is the SRSS combination of drift, maintenance and test equipment (M&TE) accuracy and readability, and calibration/reference accuracy. Other uncertainties may be included in the AAF if applicable.

This revision eliminates the concern regarding uncertainties. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

(2) The AAL definition will be revised in FSAR Amendment 102 to read:

A tolerance band on either side of the NTSP within which an instrument or instrument loop is left after calibration or setpoint verification.

34. Y Open Response is included in letter dated 10/29/10 Open-TVA/A102 Due 10/31/10 Pending FSAR Amendment 102 submittal EICB RAI ML102910008 Item#73 TVA Letter dated 10/29/10 Item No. 30

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments The Acceptable As Left tolerance is equal to or less than the SRSS combination of reference accuracy, M&TE accuracy and M&TE readability. Other uncertainties may be included in the AAL if applicable.

This revision eliminates the concern regarding calibration history. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

311 7.1 7.1 EICB (Garg)

Both Westinghouse and TVA setpoint methodology do not have any discussion on single sided calculation.

Please confirm that single sided calculation has not been used for all setpoints with TSTF-493 and provide a statement to that effect in the FSAR.

Responder: Hilmes A statement that single-sided corrections are not used for TSTF-493 setpoints will be included in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

35. Y Open Response is included in letter dated 10/29/10 Open-TVA/A102 Due 10/31/10 Pending FSAR Amendment 102 submittal EICB RAI ML102910008 Item#74 TVA Letter dated 10/29/10 Item No. 31 326 EICB(Garg)

TVA uses double-sided methodology for as-found and as-left Reactor Trip and ESFAS instrument setpoint values. The FSAR will be revised in a future amendment to reflect this methodology Responder: Webb contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

36. Y Open October 22, 2010 Response is included in letter dated 10/29/10 Open-TVA/A102 Due 10/31/10 Pending FSAR Amendment 102 submittal TVA Letter dated 10/29/10 Item No. 37 329 7.6.1 7.6.7 EICB (Singh)

Section 7.6.7 of the FSAR (Amendment 100) states that, The DMIMS-DX' audio and visual alarm capability will remain functional after an Operating Basis Earthquake (OBE). All of the DMIMS-DX' components are qualified for structural integrity during a Safe Shutdown Earthquake (SSE) and will not mechanically impact any safety-related equipment.

TVA to clarify the seismic qualification of the loose parts monitoring system and include the appropriate information in Table 3.10 (or another suitable section) of the FSAR.

Responder: Clark The title of FSAR Section 3.10 is Seismic Design of Category I Instrumentation and Electrical Equipment. Since the Loose Part Monitoring System is not a Category 1 system, it is not included in the scope of 3.10. FSAR Section 7.6.7, Loose Parts Monitoring System (LPMS)

System Description, identifies basic system seismic design criteria which are consistent with the requirements of TVA Design Criteria, WB-DC-30-31, Loose Parts Monitoring System. As identified in FSAR Table 7.1-1, Watts Bar Nuclear Plant NRC Regulatory Guide Conformance, the system conforms to Reg. Guide 1.133 as modified by Note 12. Reg. Guide 1.133 identifies the seismic requirements and Note 12 does not contain any exception to the Regulatory Guide seismic requirements.

The Westinghouse LPMS seismic report, EQ-QR-33-WBT, Revision 0, Seismic Evaluation of the Digital Metal Impact Monitoring System (DMIMS-DXTM) for Watts Bar Unit 2, will be added as Reference 7 to FSAR section 7.6 in amendment 102.

37. N Open Response is included in letter dated 10/29/10 Open-TVA/A102 Pending FSAR Amendment 102 submittal.

Due 10/31/10 TVA to confirm that the equipment has been seismically qualified as required and that TVA reviewed and found the report acceptable.

TVA response does not list the seismic test document and its acceptance by TVA. FSAR should reference the test document as the source document for tracking conformance.

RAI No. 1 ML102980005 10/26/2010 TVA Letter dated 10/29/10 Item No. 39

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments 156 7.2 7.2 EICB (Garg)

FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1-1designed to prevent exceeding 121% of power.The value of 121% is changed from 118%. The justification for this change states that this was done to bring the text of this section in agreement with section 4.3.2.2.5, 4.4.2.2.6 and table 4.1-1. However, Table 4.1-1 and section 4.3.2.2.5 still show this value as 118%. Justify the change.

Responder: WEC Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT UNIT 2 FSAR Markups Units I and 2 118% vs. 121 % and Correction to RAI Response SNPB 4.3.2-7, (Reference 17) the 118% value should be 121%. Depending on the use in the FSAR either 118% or 121% are the correct values. As a result of the question, Westinghouse reviewed all locations where either 118% or 121% are used and the context of use and provided a FSAR markup to reflect the correct value at the specific location. These changes will be incorporated in a future FSAR amendment.

38. N Open Response is included in letter dated 10/5/10 Open-TVA/Bechtel Amendment 101 Submitted 10/29/10.

TVA needs to justify why some places 121% is used and other places 118% is used. What does 121% or 118%

means.

ML101720589, Item No. 8 TVA Letter dated 10/5/10 Response on hold pending Westinghouse review.

274.

b EICB (Singh) 8/26/2010 Loose Parts Monitoring System: TR 3.3 refers to section 4.4.6 of the FSAR for description of the loose parts monitoring system. However, this section of the FSAR is not available. TVA to check the reference and respond.

Responder: Clark The reference will be changed to FSAR section 7.6.7 Loose Part Monitoring System (LPMS)

System Description in next revision of the Technical Requirements Manual as shown below:

1. Watts Bar FSAR, Section 7.6.7, Lose Part Monitoring System.

(Note: Bechtel I&C to submit TRM change package to TVA Licensing.)

39. Y Open Response provided in letter dated 10/21/10 Open-TVA/Bechtel Pending TRM amendment submittal.

Response

acceptable. TVA to complete stated action.

Due 10/31/10 RAI No. 6 ML102980005 10/26/2010 TVA Letter dated 10/21/10 Item No. 12 276 7.6 7.6 EICB (Garg) 8/27/2010 In order for the staff to review the effects of multi control systems failure, provide the summary of the analyses documenting the effect on the plant based on the following events: (1) loss of power to all control systems powered by a single power supply; (2) failure of each instrument sensor which provides signal to two or more control systems; (3) Break of any sensor impulse line which is used for sensors providing signals to two or more control systems; and (4) failure of digital system based on the common cause software failure affecting two or more control systems. For each of these events, confirm that the consequences of these events will not be outside chapter 15 analyses or beyond the capability of operators or safety systems.

Responder: Webb The NRC reviewer confirmed this question applies to non-safety systems.

The Distributed Control System (DCS) implemented using Foxboro I/A hardware, replaces most of the non-safety related control systems for WBN Unit 2. The other non-safety-related control systems within the scope of this question are:

a. Rod Control - Failures of this system are addressed in FSAR Chapter 15.
b. Main Turbine Electro-Hydraulic Control System The following provides the requested summaries for the four events listed:

(1) The (DCS) segmentation analysis submitted on TVA letter to NRC dated August 11, 2010, (Reference 7) demonstrates that the loss of any single power source does not result in a loss of any DCS function. The other systems within the scope of this

40. N Open Response provided in letter dated 10/21/10 Open-TVA/Bechtel TVA to Docket in 10/20 letter TVA to provide justification for non-safety system other than DCS.

The statement that failure of sense line where more than one transmitter is connected would be bounded by the failure of a single transmitter does not make sense.

TVA needs to make a statement that all non-safety EICB RAI ML102910008 Item#60 TVA Letter dated 10/21/10 Item No. 13

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments question are configured in the same manner as Unit 1, with redundant power sources such that the failure of a single power source does not cause a loss of function.

(2) Signals shared by more than one control function within the DCS are addressed in the DCS segmentation analysis submitted on TVA letter to NRC dated August 11, 2010, (Reference 7) which demonstrates that the loss of a single signal does not cause a failure of any critical control function. The impact of a loss of signal to the other systems within the scope of this question is bounded by the loss of that signal to the individual system and has the same effect as for Unit 1.

(3) Where feasible, the Unit 2 design includes separate sense lines for redundant transmitters, thereby eliminating multiple single point failures which are present in Unit

1. A review of the transmitter sense line database was performed to identify multiple sensors on a single sense line that had control functions (transmitters and switches). provides the results of the review and an analysis of the functions impacted by a sense line failure.

There are no transmitters on shared sense lines, such that a sense line failure would impact any combination of the DCS, Rod Control or Main Turbine Electro-Hydraulic Control Systems.

(4) Limiting DCS failures were addressed in the segmentation analysis, supplemented by Fault Handling in the I/A Series System, Revision 1, submitted on TVA letter to NRC dated October 5, 2010, Attachment 42 (Reference 1). The other systems within the scope of this question are analog and therefore this question is not applicable.

All non-safety control systems have been evaluated against these criteria and TVA has determined that their failure does not have consequences which will put the plant outside chapter 15 analyses.

control systems have been evaluated against these criteria and have determined that their failure does not have consequences which will put the plant outside chapter 15 analyses.

281 7.6 7.6.8 EICB (Garg) 8/27/2010 For FSAR Section 7.6.8 in amendment 96, redline version has completely rewritten this section of the FSAR, however, the staff is not able to determine any changes made to the section. Explain what changes have been made to this FSAR Section.

Responder: Webb contains the WBN Unit 2 FSAR markup for Section 7.6.8, Interlocks for RCS Pressure Control During Low Temperature Operation, showing what was changed between Amendments 95 and 96.

41. N Open Response provided in letter dated 10/29/10 Open-TVA/Bechtel Provide the basis for the changes.

Look at Foxboro I/A impact.

EICB RAI ML102910008 Item#65 TVA Letter dated 10/29/10 Item No. 16 288 7.3

(

G 9/2/2010 Responder: McNeil

42. Y Open Open-EICB RAI

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments Can we add a section to chapter 7 giving a brief overview of the Foxboro Spec 200 in Section 7.3?

TVA Response:

Reg. Guide 1.209, Guidelines for Environmental Qualification of Safety-Related Computer-Based Instrumentation and Control Systems in Nuclear Power Plants, is not applicable to the analog Foxboro Spec 200 hardware.

The following new section and reference will be added to the WBN Unit 2 FSAR as part of Amendment 102:

7.3.1.1.3 Analog Instrumentation The miscellaneous safety-related analog process control and indication loops are made up of discrete analog modules that have been tested and qualified for use in safety related systems.

The various components have been qualified to IEEE Standard 323-1983 (R-1996) IEEE Standard for Qualifying Class IE Equipment for Nuclear Power Generating Stations, IEEE Standard 344-1987 (R-1993) IEEE Standard Recommended Practices for Seismic Qualification of Class IE Equipment for Nuclear Power Generating Stations, and IEEE Standard 384-1984 (R-1992) IEEE Standard Criteria for Independence of Class IE Equipment and Circuits. The modules are arranged in instrument loops to provide the safety functions listed below:

Turbine driven AFW Pump Flow Control Motor driven AFW pump differential pressure indication and recirculation valve control Steam generator AFW flow and level indication and control Containment Pressure indication Upper and Lower Compartment Containment Ambient Temperature indication RHR Heat Exchanger CCS Supply Header Flow Sample Heat Exchanger Header CCS Differential Flow ERCW Strainer Differential Pressure, Backwash and Flush Control CCS Heat Exchanger B Inlet Pressure CCS Surge Tank Level Control CCS Heat Exchanger B Outlet Temperature Reactor Vessel Head Vent Throttle Manual Loading Station (Unit 2 Only)

EGTS Annulus Differential Pressure Control TVA committed to adding a description of the Foxboro Spec 200 hardware at the 10/12 NRC Public Meeting.

TVA/Bechtel Due TBD TVA should include the list of all the functions where Spec 200 is used and discuss differences between unit 1 and unit2. This discussion should also include loop which are currently used for Unit 1 operation If Spec 200 components have also been qualified to RG 1.209, it should be stated and if not why not.

ML102910008 Item#67

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments The components are physically arranged in the racks to meet the requirements of IEEE-279 and Watts Bar Design Criteria WB-DC-30-4, Separation/Isolation. (Unit 2 Only) Two IE analog modules are used to isolate IE to Non-IE signals.

These are the Contact Output Isolator and Voltage-to-Current Converter, both of which have the Input and Output signals isolated.

EMI testing and acceptance by TVA of the Foxboro Spec 200 hardware is documented in Reference [8].

References:

(8) Invensys Process Systems Document No.

800063-1830, Electromagnetic Compatibility Test Reports, dated August 21, 2008, Rev. 0.

300 EICB (Singh)

Need Radiation Monitoring System Description/Design Criteria Are detectors different from Unit 1. Describe any differences.

Are there any commercially dedicated parts in the RM-1000? If so, how are they dedicated?

Please confirm that digital communication ports available in RM-1000 are not used.

Responder: Temples/Mather (1) The Radiation Monitoring Design Criteria Document, WB-DC-40-24, Revision 21 is contained in Attachment 6 to letter dated October 31, 2010.

(2) Attachment 7 contains the General Atomics detector differences report. The containment high range radiation monitors are loops 271-274.

(3) For safety-related applications, General Atomics Electronic Systems, Inc. supplies the RM-1000 module assembly as a Basic Component. This assembly does contain component parts that are Safety-Related Commercial Grade Items (SRCGI). Because these SRCGI components are assembled into the delivered Basic Component, they are dedicated to the assembly by virtue of the acceptance test of the full RM-1000 assembly. Safety-related commercial grade items are dedicated in accordance with General Atomics approved 10 CFR 50 Appendix B program.

(4) The digital communications ports on the safety-related RM-1000 radiation monitors are not used.

43. N Open Response is included in letter dated 10/29/10 Open-TVA/Bechtel Due 10/31/10 TVA to address the following comments:

(1) Is it Att. 5 or Att. 6?

(2) Pl. confirm that HRRMs are loops 271-274.

(3) TVA to clarify that GA has a commercial dedication program in place and that GA is an approved

10CFR50, App. B supplier.

App B does not address commercial grade dedication.

(4) Response acceptable.

RAI No. 25 ML102980005 10/26/2010 TVA Letter dated 10/29/10 Item No. 20 318 7.5.2.

3 7.5 EICB (Singh)

TVA has provided the following documents for RM-1000 equipment qualification:

(i)

Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter Responder: Temples (i)

Applicable to WBN Unit 2. 04508905-1QR is applicable only in regards to the RM-1000, with the exception of re-qualification of

44. N Open Note check 04508905-1QR or QR. Staff version is QR only.

Open-TVA/Bechtel Due 10/31/10 RAI No. 28 ML102980005 10/26/2010 TVA Letter dated 10/29/10 Item No. 34

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments 04508905-QR (January 2001)

(ii)

Qualification Test Report Supplement, RM-1000 Upgrades 04508905-1SP (June 2006)

(iii) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-2SP (June 2008)

(iv) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-3SP (May 2008)

Please clarify whether all of these are fully applicable to WBN2 or are they applicable with exceptions? If with exceptions, then please clarify what those are.

Supplement 3 was issued one month prior to supplement 2. Please explain the reason for the same.

certain RM-1000 equipment differences covered in the -1SP report. The Current-to-Frequency (I-F) converter module qualifications in the base report and the -

1SP report are not applicable to the RM-1000s, and will be used later as references in the WBN Unit 2 specific qualification reports.

(ii)

Applicable to WBN Unit 2.

(iii) Not applicable to WBN Unit 2 (iv) Not applicable to WBN Unit 2 The 04508905-3SP report was prepared for another TVA plant, as a monitor system-level report, where the system included equipment mostly based on the base report equipment items.

These two -2SP and -3SP supplement reports were essentially worked concurrently, but the -

2SP document review/release process resulted in the release time difference.

Response is included in letter dated 10/29/10 Response update required. It is clear that 04508903-2SP and -3SP are not applicable. The response for applicability of 04508905-QR and

-1SP to RM-1000 and IF converter is not clear.

Check page numbers of Appendix F (missing/duplicate pages).

Check applicability of Appendix C to RM1000 instead of RM2300?

All equipment qualification reports including supplements 2SP and 3SP have been reviewed as vendor drawings for WBN-2.

Please explain the reason for applicability of one report and not the other.

Further all TVA/Bechtel reviews seems to be dispositioned as Code 4, Review not required. Work may proceed.

The applicable reports should have been reviewed prior to dispositioning them. Please explain the apparent lack of review of WBN-2 applicable documents. Was appropriate review

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments guidance used?.

327 DORL (Poole) 6 contains Foxboro proprietary drawings 08F802403-SC-2001 sheets 1 through 6. An affidavit for withholding and non-proprietary versions of the drawings will be submitted by January 31, 2011.

Responder: Webber Non-Prop drawings are available for submittal.

45. N Open Open-TVA/Bechtel Due 1/31/11 330 7.3 7.3 EICB (Darbali)

Related to Item 298 IE Bulletin 80-06 calls for review of engineered safety features with the objective of ensuring that no device will change position solely because of the reset action.

In Supplement 3 of NUREG-0847, section 7.3.5, the staff approved the design modifications proposed by the applicant that would allow certain devices to remain unchanged upon an ESF reset. The staff also found acceptable the applicants justification for some safety-related equipment that does not remain in its emergency mode after an ESF reset.

Please list for Unit 1 and Unit 2 the safety-related equipment that does not remain in its emergency mode after an ESF reset.

Responder: Hilmes/Faulkner The original response to IE Bulletin 80-06 for both WBN Unit 1 and 2 was provided on TVA letter to the NRC dated March 11, 1982 (ML073530129)

(Reference 4). Subsequent design changes have impacted the original response such that some equipment that originally changed state no longer does so and some equipment has been deleted.

The following is the updated list of equipment from the letter that changes state on ESF reset:

1. Unit 1 and 2 Equipment (prefix 1- (Unit 1) or 2- (Unit 2)
a. Auxiliary Feedwater Pump Turbine Speed Control Valve, FCV-1-52
b. Auxiliary Feedwater (AFW) Level Control Valves as listed below:
i. LCV-3-172

- SG3 - Level Control Valve ii. LCV-3-173

- SG2 - Level Control Valve iii. LCV-3-174

- SG1 - Level Control Valve iv. LCV-3-175

- SG4 - Level Control Valve

v. LIC-3-172

- SG3 - Level Indicating Controller vi. LIC-3-173

- SG2 - Level Indicating Controller vii. LIC-3-174

- SG1 - Level Indicating Controller viii. LIC-3-175

- SG4 - Level Indicating Controller ix. LCV-3-148 - SG3 - Level Valve

x. LCV-3-156 - SG2 - Level Valve xi. LCV-3-164 - SG1 - Level Valve xii. LCV-3-171 - SG4 - Level Valve xiii. LCV-3-148A - SG3 - Level Bypass Control Valve xiv. LCV-3-156A - SG2 - Level Bypass Control Valve xv. LCV-3-164A - SG1 - Level Bypass Control Valve xvi. LCV-3-171A - SG4 - Level Bypass Control Valve xvii. LIC-3-148

- SG3 - Controller xviii. LIC-3-156

- SG2 - Controller xix. LIC-3-164

- SG1 - Controller xx. LIC-3-171

- SG4 - Controller

46. Y Open TVA to replace the word Containment with Compartment in 1.c.

Open-TVA/Bechtel Due TBD EICB RAI No.20 ML102910017, 10/19/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments

c. Lower and Upper Compartment Cooler Fans and Control Rod Drive Mechanism Cooler Fan
d. Penetration Room Cooler Fans Elevations 737, 692 and 713
e. Pipe Chase Cooler Fans
2. Common Equipment
a. Shutdown Board Room A Pressurizing Fans
b. Control Building Ventilation Dampers as listed below:
i. 0-FCO-31-9 - Spreading Room Supply Fan Damper ii. 0-FCO-31-10

- Spreading Room Supply Fan Damper iii. 0-FCO-31-16

- Toilet a Locker Room Exhaust Fan Exhaust Damper iv. 0-FCO-31-17

- Toilet a Locker Room Exhaust Fan Exhaust Damper

v. 0-FCO-31-3 - Main Control Room Isolation Damper vi. 0-FCO-31-4 - Main Control Room Isolation Damper vii. 0-FCO-31-36

- Spreading Room Fresh Air Supply Damper viii. 0-FCO-31-37

- Spreading Room Fresh Air Supply Damper

c. Cask Loading Exhaust Dampers as listed
i. 0-FCO-30-122

- Cask Loading Area Exhaust Damper ii. 0-FCO-30-123

-Cask Loading Area Exhaust Damper

d. Auxiliary Building General Supply Exhaust Fans Elevation 737
e. CCW and AFT Pump Space Cooler Fans
f.

Spent Fuel Pit Pumps Space Coolers

g. EGTS Room Coolers
h. Turbine Driven AFW and Boric Acid Space Coolers 331 7.6.1 7.6.7 EICB (Singh)

As a follow up of OI 190, Staff has reviewed the proprietary version of the DMIMS-DX system description to verify the conformance claims in the FSAR. Staff has noted the following insufficiencies and discrepancies between the FSAR and the Responder: WEC/Harless/Clark TVA Partial Response:

1) The source of the information is the DMIMS-
47. N Open Open-TVA/Bechtel Pending FSAR Amendment 102 RAI No. 8 ML102980005 10/26/2010 TVA Letter dated 10/29/10 Item No. 40 Follow-up of OI-190.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments proprietary version of the system description for loose parts monitoring system provided by TVA.

1) FSAR, Amendment 100, page 7.6-5 states, During baseline testing, the reactor vessel and steam generator are impacted three feet from each sensor with a force of 0.5 ft-lb. Loose parts detection is accomplished at a frequency of 1 kHz to 20 kHz, where background signals from the RCS are acceptable. Spurious alarming from control rod stepping is prevented by a module that detects CRDM motion commands and automatically inhibits alarms during control rod stepping.

The online sensitivity of the DMIMS-DX' is such that the system will detect a loose part that weighs from 0.25 to 30 Ib and impacts with a kinetic energy of 0.5 ft-lb on the inside surface of the RCS pressure boundary within 3 ft of a sensor.

The source of this information is not cited nor is it described in the system description. TVA to provide the source of the information and update the system description as needed.

2) Regulatory Guide (RG) 1.133, rev.1, regulatory position C.1.g states that, Operability for Seismic and Environmental Conditions. Components of the loose-part detection system within containment should be designed and installed to perform their function following all seismic events that do not require plant shutdown, i.e., up to and including the Operating Basis Earthquake (OBE). Recording equipment need not function without maintenance following the specified seismic event provided the audio or visual alarm capability remains functional.

The system should also be shown to be adequate by analysis, test, or combined analysis and test for the normal operating radiation, vibration, temperature, and humidity environment.

FSAR, Amendment 100, page 7.6-5 states, The DMIMS-DX' audio and visual alarm capability will remain functional after an Operating Basis Earthquake (OBE). All of the DMIMS-DX' components are qualified for structural integrity during a Safe Shutdown Earthquake (SSE) and will not mechanically impact any safety-related equipment. Paragraphs 4.c and 4.d of the system description are not consistent with the seismic qualifications described in the FSAR. TVA to provide the source of the information contained in the FSAR and update the system description as needed.

3) The system description clearly describes the In-containment equipment and DIMMS-DX Cabinet equipment. The FSAR should be updated to DXTM Operations and Maintenance Manual, TS3176, Revision 0, dated August 2010. 4 contains the revised system description, Westinghouse DIMMS-DXTM Loose Part Detection System Description, Revision 1. The Westinghouse DIMMS-DXTM Loose Part Detection System Description, Revision 1 will be added as Reference 9 to section 7.6 in FSAR Amendment 102.
2) The source of the information is the DMIMS-DXTM seismic qualification report, Westinghouse report EQ-QR-33-WBT, Revision 0, Seismic Evaluation of the Digital Metal Impact Monitoring System (DMIMS-DXTM) for Watts Bar Unit 2. Attachment 14 contains the revised system description, Westinghouse DIMMS-DXTM Loose Part Detection System Description, Revision 1.
3) The entries for the following items in FSAR Section 7.6.7 will be modified in Amendment 102 as shown in Attachment 3 for draft revision to WBN Unit 2 FSAR Section 7.6.7, Loose Part Monitoring System (LPMS)

System Description.

Sensors (In Containment)

Softline Cable (In Containment)

Preamplifier (In Containment) contains the FSAR Amendment 102 Change Markups that reflect these changes.

4) The source of the information is Westinghouse Letter WBT-D-2580, Tennessee Valley Authority Watts Bar Nuclear Plant Unit 2 Response to NRC RAIs on LPMS (Reference 5). Attachment 14 contains Westinghouse DIMMS-DXTM Loose Part Detection System Description, Revision 1.

In responding to Item 4, conflicting information was found between the Westinghouse-prepared FSAR section and various Westinghouse technical documents.

To fully respond to this item, a change to the FSAR is required to change the minimum flat sensor frequency response from 5 Hz to 10 Hz. Attachment 3 contains the FSAR Amendment 102 Change Markups that reflect the revised frequency response of the sensor.

Westinghouse document 1TS3182, Revision 0, Watts Bar Unit 2 DMIMS-DXTM System Validation Data Package, dated July 2010 has been added as reference 8 to FSAR submittal TVA to reference the DMIMS-DXTM Operations Manual in the FSAR as the source document TVA to reference the source document for item# 4 per the response.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments reflect the equipment locations for clarification purposes.

4) The information regarding frequency ranges of the sensors is included on page 7.6-6 of Amendment 100 of the FSAR but the system description does not contain this information. Please provide the source of this information and update the system description to reflect the appropriate information.
5) Please provide information as to how the in-containment components are qualified for vibration as addressed in regulatory position C.1.g of RG 1.133.

Section 7.6 in amendment 102. Per Westinghouse letter WBT-D-2580, this document will be revised to reflect the 10Hz minimum frequency and provide the basis for the frequency response values in the FSAR.

5) In-containment component qualification for vibration as addressed in regulatory position C.1.g of RG 1.133, will be addressed in a future RAI response letter.

335 7.6.1 7.6.7 EICB (Singh)

LPMS: Reference to OI-331, sub item 2.

Provide analysis, test, or combined analysis and test for normal operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable.

Responder: WEC

48. N Open Open-TVA/Bechtel Due TBD 336 7.5.2.

3 7.5 EICB (Singh)

Re: RM-1000 Report 04508905-QR Please check the page numbering in Appendix F, Closed Nonconforming Material Reports. Pages 1 and 6 are missing and page 2 is included multiple times.

Also identify which page number is the last page number.

49. N Open Open-TVA/Bechtel 337 7.5.2.

3 7.5 EICB (Singh)

Re: RM-1000 Report 04508905-QR Appendix C is titled as Seismic Test Fixture for RM2300, See Drawing 04619028. Please verify whether or not it applies to RM-1000? If applicable, then please identify how it is applicable.

50. N Open Open-TVA/Bechtel 338 7.5.2.

3 7.5 EICB (Singh)

In page 3-15 and appendix B of Qualification Test Report 04508905-QR, licensee described the selection of seismic required response spectra (RRS) and indicated Figure 3-2 (page 3-17), Figure 3-3 (page 3-18) are the RRSs used. The RRS curves used for actual testing are lower than the RRS curves that are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41). Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.

In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions.

51. N Open Open-TVA/Bechtel

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments 339 7.5.2.

3 7.5 EICB (Singh)

In the Qualification Test Report 04508905-QR, the licensee provided only eight Safe Shutdown Earthquake (SSE) Test Response Spectra (TRS) as mentioned in the previous open item (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review.

52. N Open Open-TVA/Bechtel 340 7.5.2.

3 7.5 EICB (Singh)

Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B.

53. N Open Open-TVA/Bechtel 041 7.5.2 7.5.1 EICB (Carte) 2/19/2010 Please provide the following Westinghouse documents:

(1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements Specification" (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design Specification" (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" Please provide the following Westinghouse documents or pointers to where the material was reviewed and approved in the CQ TR or SPM:

(4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test Procedure" Responder: WEC Items (1) and (2) were docketed by TVA letter dated April 8, 2010.

Item (3) will be addressed by Revision 2 of the Licensing Technical Report. Due 12/3/10 Item (4) will be addressed by Westinghouse developing a WBN2 Specific Test Plan to compensate for the fact that the NRC disapproved WNA-PT-00058-GEN during the original Common Q review. Due 12/7/10 Item (5) Procedures that are listed in the SPM compliance table in the Licensing Technical Report revision 1 supersede that test procedure WNA-TP-00357-GEN.Due 10/22/10

54. N Open Partial Response is included in letter dated 10/5/10.

The SysRS and SRS incorporate requirements from many other documents by reference.

NNC 8/25/10: (3) An earlier version of this report was docketed for the Common Q topical report; therefore, there should be no problem to docket this version. (4)

Per ML091560352, the testing process document does not address the test plan requirements of the SPM. Please provide a test plan that implements the requirements of the SPM.

Open-TVA/WEC Due 12/7/10 TVA to docket information indentified in ISG6.

NRC Meeting Summary NRC Meeting Summary ML093560019, Item No. 11 TVA Letter dated 6/18/10 TVA Letter dated 10/5/10 See also Open Item Nos. 226 &

270.

067 7.5.2 7.5.1 EICB (Carte)

By letter dated March 12, 2010 TVA stated that the target submittal date for the "Commercial Grade Dedication Instructions for AI687, AI688, Upgraded PC node box and flat panels." was September 28, 2010.

Responder: WEC Date: 5/25/10 The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:

a. AI687, AI688 - Scheduled for September 28, 2010
b. Upgraded PC node box and flat panel displays

- Per Westinghouse letter WBT-D-2024 (Reference 7), these items are available for audit at the Westinghouse Rockville office.

c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit

55. N Open This item is addressed in Rev. 2 of the Licensing Technical Report Open-TVA/WEC Due 12/3/10 N/A - No question was asked. Item was opened to track comm8ittment made by applicant.

TVA Letter dated 6/18/10 068 7.5.2 7.5.1 C

B (C

art By letter dated March 12, 2010 TVA stated that the target submittal date for the "Summary Report on Responder: WEC Date: 5/25/10

56. N Open Open-TVA/WEC N/A - No question was TVA Letter dated 6/18/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments acceptance of AI687, AI688, Upgraded PC node box, flat panels, and power supplies." was September 28, 2010.

The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:

a. AI687, AI688 - Scheduled for September 28, 2010
b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit This item is addressed in Rev. 2 of the Licensing Technical Report Due 12/3/10 asked. Item was opened to track comm8ittment made by applicant.

069 7.5.2 7.5.1 EICB (Carte)

By letter dated March 12, 2010 TVA stated that the target submittal date for the "Watts Bar 2 PAMS Specific FAT Report" was October 2010.

Responder: WEC Date: 5/25/10

57. N Open Awaiting for document to be docketed by TVA.

Open-TVA/WEC Due 2/18/11 N/A - No question was asked. Item was opened to track comm8ittment made by applicant.

N/A 070 7.5.2 7.5.1 EICB (Carte)

By letter dated March 12, 2010 TVA stated that the target submittal date for the "Concept and Definition Phase V&V Report" was March 31, 2010.

Responder: WEC Date: 5/25/10 Per Westinghouse letter WBT-D-1961, (Reference 8) this document is available for audit at the Westinghouse Rockville office.

WNA-VR- 00283-WBT, Rev 0 was submitted on TVA letter to the NRC dated August 20, 2010 (Reference 7).

The submitted V&V did not address the Requirements Traceability Matrix and did not summarize anomalies. At the September 15th public meeting, Westinghouse agreed to include the Concept and Definitions Phase Requirements Traceability Matrix (RTM) in the next IV&V report along with partial Design Phase updates to the RTM.

TVA Revised Response:

TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in letter dated August 20, 2010 (Reference 6).

The next Independent Verification and Validation (IV&V) report will include the Design Phase Requirements Traceability Matrix. The

58. N Open Partial Response is included in letter dated 10/5/10.

Regulations require that the NRC review be based on docketed material. Awaiting for document to be docketed by TVA.

NNC 8/25/10:

Requirements Phase SVVR provided by TVA letter dated 8/20/10.

Open-TVA/WEC Due 12/21/10 N/A - No question was asked. Item was opened to track comm8ittment made by applicant.

TVA Letter dated 6/18/10 TVA Letter dated 8/20/10 TVA Letter dated 10/5/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments Design Phase IV&V Report will be submitted to NRC by February 11, 2011.

071 7.5.2 7.5.1 EICB (Carte)

By letter dated March 12, 2010 TVA stated that the target submittal date for the "Design Phase V&V Report" was July 30, 2010.

Responder: WEC Date: 5/25/10

59. N Open Awaiting for document to be docketed by TVA.

Open-TVA/WEC Due 12/21/10 N/A - No question was asked. Item was opened to track commitment made by applicant.

N/A 072 7.5.2 7.5.1 EICB (Carte)

By letter dated March 12, 2010 TVA stated that the target submittal date for the "Implementation Phase V&V Report" was September 30, 2010.

Responder: WEC Date: 5/25/10

60. N Open Awaiting for document to be docketed by TVA.

Open-TVA/WEC Due 12/21/10 N/A - No question was asked. Item was opened to track commitment made by applicant.

N/A 073 7.5.2 7.5.1 EICB (Carte)

By letter dated March 12, 2010 TVA stated that the target submittal date for the "Integration Phase V&V Report" was October 29, 2010.

Responder: WEC Date: 5/25/10

61. N Open Awaiting for document to be docketed by TVA.

Open-TVA/WEC Due 12/31/10 N/A - No question was asked. Item was opened to track commitment made by applicant.

N/A 074 7.5.2 7.5.1 EICB (Carte)

By letter dated March 12, 2010 TVA stated that the target submittal date for the "Final V&V Report" was November 30, 2010.

Responder: WEC Date: 5/25/10

62. N Open TVA to provide due date.

Open-TVA/WEC Due N/A - No question was asked. Item was opened to track commitment made by applicant.

N/A 075 7.5.2 7.5.1 EICB (Carte)

By letter dated March 12, 2010 TVA stated that the target submittal date for the "Watts Bar 2 PAMS Specific FAT Procedure" was September 30, 2010.

Responder: WEC Date: 5/25/10

63. N Open Awaiting for document to be docketed by TVA.

Open-TVA/WEC Due 11/24/20 N/A - No question was asked. Item was opened to track commitment made by applicant.

N/A 081 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 7, lists codes and standards applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:

(1) RG 1.29 - September 1978 vs. March 2007 (2) RG 1.53 - June 1973 vs. November 2003 (a) IEEE 379-1994 vs. -2000 (3) RG 1.75 - September 1975 vs. February 2005 (a) IEEE 384-1992 vs. -1992 (4) RG 1.100 - June 1988 vs. September 2009 (a) IEEE 344-1987 vs. -2004 Responder: Merten/WEC The codes and standards documents listed in Section 7 of the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the codes and standards on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.

64. N Open ML101600092 Item No.1:

There are three sets of regulatory criteria that relate to a Common Q application (e.g. WBN2 PAMS):

(a) Common Q platform components - Common Q TR (b) Application Development Processes - Common Q SPM (c) Application Specific -

Open-TVA/WEC Due 12/31/10 TVA to provide requested information.

EICB RAI ML102910002 Item No. 9 TVA Letter dated 6/18/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments (5) RG 1.152 - January 1996 vs. January 2006 (a) IEEE 7-4.33.2-1993 vs. -2003 (6) RG 1.168 - September 1997 vs. February 2004 (a) IEEE 1012-1986 vs. -1998 (b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 endorses 323-1974)

However, LIC-110, "Watts Bar Unit 2 License Application Review," states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions." Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences.

Bechtel to develop a matrix and work with Westinghouse to provide justification.

current regulatory criteria The Common Q Topical Report and associated appendices primarily addressed (a) and (b). The Common Q SER states:

Appendix 1, Post Accident Monitoring Systems, provides the functional requirements and conceptual design approach for upgrading an existing PAMS based on Common Q components (page 58, Section 4.4.1.1, Description)On the basis of the above review, the staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)

The NRC did not approve the proposed PAMS design.

Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.

Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design.

For example IEEE Std. 603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other Systems, contain application specific requirements that must be addressed by a PAMS system.

Awaiting TVA Response.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments 082 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 2.3, lists hardware/software changes to the Common Q PAMS previously reviewed by the NRC. However the Common Q ISG-6 Compliance Matrix does not contain activities that address qualification of all changes specifically:

Responder: WEC Date:

6/18/10 These components can be found in the Summary Qualification Report Of Hardware Testing For Common Q Applications, 00000-ICE-37764, Rev 3 and TWICE Qualification Status Report, WNAQR-00011-SSP Per Westinghouse letter WBT-D-2024, (Reference __) dated June 9, 2010, these documents are available for audit at the Westinghouse Rockville Office.

TVA provided information by letter dated July 30, 2010 (ML102160349) - See Enclosure 1 Item No.

7.

Revision 1 of the Licensing Technical Report provides additional detail on the platform specific to WBN2 and references to the evaluation documentation.

65. N Open Regulations require that the NRC review be based on docketed material. Awaiting for document to be docketed by TVA.

NNC 8/9/10: per telephone conversation on 8/5/10, it is not clear how Westinghouse Commercial Grade Dedication Plans and Reports for Digital I&C.

Westinghouse agree to present to the NRC in a public meeting on August 17, 2010, and explanation of how their system addresses regulatory criteria for both commercial grade dedication and equipment qualification.

NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and associated reports be docketed.

Open-TVA/WEC Revision 1, Due 10/22/10 EICB RAI ML102910002 Item No. 10 TVA Letter dated 7/30/10 085 7.5.2 7.5.1 EICB (Carte) 5/6/2010 Please provide a detailed description of the PAMS MTP data link to the plant computer. This description should identify all equipment (model & version) and describe the functions that each piece of equipment performs. This description should be of sufficient detail for the NRC to independently evaluate the statements made in WNA-LI-00058-WBT Rev. 0, Section 5.3.

Responder: WEC Is the WEC ISG4 evaluation inadequate?

Operation of the MTP as a barrier device. MTP Fails as a barrier device. Describe what prevents a MTP failure from propagating to the AC160?

Node loss on the bus? Bus loss?

Revise the ISG4 section of the Licensing Technical Report (Rev. 2) to provide a more detailed description of the MTP as a barrier device.

66. N Open A response will be provided by 10/31/10 NNC 8/11/10: Design information should be available now. By letter dated July 30, 2010 (ML102160349) TVA stated that the MTP was connected to a Red Hat Linux Server (see Enclosure 1, Item No.

14 part b.). It is presumed that this server is not safety-related. IEEE 603-1991 Clause 5.6.3(1) states, "Isolation devices used to affect a safety system boundary shall be classified as part of the safety system."

Please describe how the MTP serves as the isolation device.

Open-TVA/WEC Due 11/24/10 Hardware is in Rev. 1 of the Licensing Technical Report due 10/22.

NNC 8/25/10:

Disagree with path forward input by TVA above.

An explanation is about the design is needed.

FAT test procedure to include data storm testing of the MTP interface due 11/24/10 EICB RAI ML102910002 Item No. 13 086 7.5.2 7.5.1

(

C a

5/6/2010 Responder: WEC Date: 5/24/10 67. N Open Open-TVA/WEC EICB RAI TVA Letter

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 6, lists references applicable to the Common Q PAMS.

This list contains references to old revisions of several regulatory documents, for example:

(1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 (ML083310185)

However, LIC-110, "Watts Bar Unit 2 License Application Review," states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions." Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences.

The regulatory documents listed in the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the regulatory documents on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.

Rev 0 of the Licensing Technical Report references Rev. 1 of ISG4 TVA to address with item OI 81.

Due 12/31/10 ML102910002 Item No. 14 dated 6/18/10 138 EICB (Carte)

By letter dated February 3, 2010, Westinghouse informed TVA that certain PAMS documentation has been completed.

(a) The draft ISG6 states that a commercial grade dedication plan should be provided with an application for a Tier 2 review.

By letter dated February 5, 2010, TVA stated that the commercial grade dedication plan was included in the Common Q Topical Report Section 11, Commercial Grade Dedication Program. Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: A detailed review plan is developed for each Common Q hardware or software component that requires commercial grade dedication.

Please provide the commercial grade dedication plans for each Common Q hardware or software component that has not been previously reviewed and approved by the NRC.

(b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval for a Tier 2 review.

(i) Please provide 00000-ICE-37722 Rev. 0, Commercial Grade Dedication Report for the QNX Operating System for Common Q Applications.

(ii) Please provide WNA-CD-00018-GEN Rev. 3, Commercial Dedication Report for QNX 4.25G for Common Q Applications.

Responder: WEC This item is used to track all Commercial Grade Dedication issues.

68. N Open TVA agreed to include a description of the generic Westinghouse hardware commercial grade dedication process in the PAMS licensing technical report. (see ML102920031 Item No 1)

TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial Westinghouse hardware components against the generic critical characteristics. (see ML102920031 Item No 2)

TVA agreed to include a description of the generic Westinghouse software commercial grade dedication process in the PAMS licensing technical report. (see ML102920031 Item No 3)

TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4)

Open-TVA/WEC To be addressed by Rev. 2 of the Licensing Technical Report due 12/3.

Due 12/3/10 ML101650255, Item No. 2 140

(

C a

The first requirement in the WBN2 PAMS SysRS (i.e., Responder: Clark

69. N Open Open-TVA/WEC ML101650255, TVA Letter WBN2 PAMS System

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments R2.2-1) states: The PAMS shall be capable of operation during normal and abnormal environments and plant operating modes. The rational for this requirement is that it is necessary to meet Regulatory Guide (RG) 1.97.

What document specifies which RG 1.97 variables are implemented in the Common Q based WBN2 PAMS?

WBN Unit 2 FSAR Amendment 100 Section 7.5.1.8, Post Accident Monitoring System (PAMS) specifies the Reg. Guide 1.97 variables implemented in the Common Q based WBN Unit 2 PAMS NNC 11/3/10: The origin of the requirements in the SysRS are not clearly document. Rev. 1 of the Common Q PAMS Licensing Technical Report contains an open item that will be addressed in Rev. 2; this open item is to include TVAs enhanced contract compliance matrix. It is expected that this matrix will address this open item.

to docket PAMS Licensing Technical Report Rev. 2.

Item No. 4 dated 10/29/10 Item No. 10 Requirements Specification TVA docketed WNA-DS-01617-WBT Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Requirements Specification, dated December 2009.

142 EICB (Carte)

The applicable regulatory guidance for reviewing the WBN2 PAMS SysRS would be IEEE 830 as endorsed by Regulatory Guide 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities - Software Requirements Specifications. IEEE 830-1994 Section 4.3.8, Traceable, states: A [requirements specification] is traceable of the origin of each of its requirements is clear

1. How did TVA ensure the traceability of each requirement in the WBN2 PAMS SysRS.
2. Explain the source(s) of the requirements present in the Post Accident Monitoring Systems Software Requirements Specification. To clarify, many documents have requirements that are incorporated by reference into the SRS, but what served to direct the author to include those various documents in the SRS or, if the requirement is based on the System Requirements Specification, what directed the author to include the requirement there?
3. Clarify whether the unnumbered paragraphs in the Post Accident Monitoring Systems Software Requirements Specification, such as in the section headings, or are all such sections simply considered to be informative?

Does the same apply to documents referenced by the SRS? Such as WCAP-16096-NP-A, Rev. 1A, Software Program Manual for Common Q Systems, which is incorporated by reference in requirement R2.3-2 in the SRS.

R2.3-2 [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, Software Program Manual for Common Q Systems (reference 5).]

If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity, and describe how they were verified.

Responder: WEC This item is used to track all traceability issues with the Software Requirements Specification (SRS).

At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the traceability concerns with the Software Requirements Specification.

1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
2. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
3. Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.
4. IEEE 830 says you shouldnt have planning information in the SRS. Westinghouse has agreed to remove this information.
5. IEEE 830 says you shouldnt have process requirements in the SRS. Westinghouse has agreed to remove these requirements.
6. Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Reg. Guide 1.172 and justify any deviations.
7. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed? Yes. The next revisions of the SDS and SRS address these issues.
70. N Open TVA/Westinghouse agreed to include the V&V evaluation of their reusable software element development process in the V&V design phase summary report. This evaluation would include an evaluation against the development process requirements. This evaluation would also include an evaluation of how the WBN2 specific requirements were addressed by the reusable software elements. (see ML102920031 Item No 5)

Open-TVA/WEC To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.

Due 12/31/10.

ML101650255, Item No. 6 WBN2 PAMS System Requirements Specification TVA docketed WNA-DS-01617-WBT Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Requirements Specification, dated December 2009.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments

4. Are there any sources of requirements in parallel with the Post Accident Monitoring Systems Software Requirements Specification? Meaning does the SRS contain, explicitly or by reference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in any other source or document? If so, what are these sources or documents?
5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification are various types of Reusable Software Element.

These references are used in the body of the SRS, for example:

R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]

They are also included via tables such as found in requirement R7.1.2-1

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]

Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?

8. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). These will be removed from the SRS and incorporated into the next revision of the SDS.
9. RTM item R4.2-2 protection class software set to 0. Needs to be fixed internally write CAPs to revise the application restrictions document on AC160.
10. Westinghouse to improve the traceability of the tests that are performed with the function enable (FE) switch in the ENABLE position.
11. Westinghouse to revise documents to be consistent with referring to the FE switch in the ENABLE position
12. The flow of information is from the SysRS to the SDS (hardware) and SRS (software).

Describe how the documents are used.

Describe in 1.1 of the SysRS. Need a good write up of how the process works.

13. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no later than 9/30/10
14. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
15. Westinghouse to add the Software Design Descriptions to the RTM
16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
17. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.
18. Westinghouse to resolve the following questions concerning SDDs
a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
b. What are the SDDs?
c. PAMS is a delta document so how do we capture all the generic requirements for traceability.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified using the Software Elements Test procedure under Appendix B program.

Provide a summary of RSEDs generic WCAP.

Westinghouse to determine if the WCAP was docketed under the AP1000 RSED concept is not in the SPM. WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable.

RSEDs are listed in the SDD References.

143 EICB (Carte)

The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS - ML101050202) contains a table (see page iii) titled, Document Traceability & Compliance, which states that the WBN2 PAMS SRS was created to support the three documents identified (one of which is the WBN2 PAMS SysRS). Section 1.1, Overview, of the WBN2 PAMS SRS states: This document describes requirements for the major software components (a) Please list and describe each of the major software components. Please include a description of any NRC review for each of these components.

(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.

(c) What other documents contain the requirements for the other software components?

The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, Document Traceability & Compliance, which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, Purpose, of the WBN2 PAMS SDS states: The purpose of this document is to define the hardware design requirements (c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?

(d) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS.

Responder: WEC Addressed in the 9/15 public meeting and 9/20 -

9/21 audit. A detailed explanation will be provided.

71. N Open Open-TVA/WEC To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.

Due 12/31/10.

ML101650255, Item No. 7 WBN2 PAMS System Requirements Specification TVA docketed WNA-DS-01617-WBT Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Requirements Specification, dated December 2009.

145 EICB (Carte)

The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, Document Traceability & Compliance, which states that the WBN2 PAMS SDS was created to support the WBN2 PAMS SysRS.

(a) Does the WBN2 PAMS SDS implement all of the hardware requirements in the WBN2 PAMS SysRS?

(b) Please briefly describe all of the documents that implement the hardware requirements of the WBN2 Responder: WEC This item is used to track all traceability issues with the System Design Specification (SDS).

At the September 15 public meeting in Rockville, the following actions were agreed to. These items partially address the traceability concerns with the System Design Specification. This item will be updated with

72. N Open During the September 20-21, 2010 audit at Westinghouse, it was acknowledged that TVA/Westinghouse had previously (in September 15, 2010 public meeting) stated:

Open-TVA/WEC To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.

Due 12/31/10.

ML101650255, Item No. 9 WBN2 PAMS System Design Specification TVA docketed WNA-DS-01667-WBT Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Design Specification, dated December 2009.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments PAMS SysRS.

the results of the September 20 and 21 Commercial Grade Dedication and SDS RTM audit.

1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
2. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). These will be removed from the SRS and incorporated into the next revision of the SDS.
3. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed? Yes. The next revisions of the SDS and SRS address these issues.
4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
6. Westinghouse to provide the generic AC160 and flat panel specifications.
7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
8. The flow of information is from the SysRS to the SDS (hardware) and SRS (software).

Describe how the documents are used.

Describe in 1.1 of the SysRS. Need a good write up of how the process works.

TVA would provide the RSED RTM. (see ML102920031 Item No 6)

TVA would revise and resubmit the PAMS RTM to address all types of issues identified in the public meeting. (see ML102920031 Item No 7)

TVA would revise and resubmit the Software Verification and Validation phase summary report for the requirements phase to document the completion of the requirements phase review. (see ML102920031 Item No 8) 185 EICB (Carte) 7/15/2010 An emphasis is placed on the traceability of requirements in Software Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word should to say Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies Also the NRC considers that the SRS is the complete set of requirements used for the design of the software, whether it is contained within one document Responder: WEC Steve Clark to look at how to combine traceability items.

Was addressed to during the 9/15 meeting and 9/20 - 9/21 audit.

73. N Open Open-TVA/WEC Due 10/22/10 EICB RAI ML102980066 Item No. 17

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments or many. In order to evaluate an SRS against the guidance in the SRP the staff needs access to all the requirements.

References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification are various types of Reusable Software Element.

These references are used in the body of the SRS, for example:

R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]

They are also included via tables such as found in requirement R7.1.2-1

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]

Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?

187 EICB (Carte)

By letter dated June 18, 2010, TVA docketed responses to NRC requests for information.

1) Enclosure 1, Item No. 33 of the TVA letter dated June 18, 2010, did not identify any connection from the PAMS Operator Modules (OMs) to the plant computer and printers; however, Figure 2.1-1 of the PAMS System Requirements Specification (WNA-DS-01617-WBT Rev. 1 - ML101680578) shows a TCP connection from the OMs to the plant computer and printer. Please explain.
2) Please clarify whether any digital safety-related systems or components have a digital communications path to non-safety-related systems or with safety related systems in another division. If so, NRC staff will need these paths identified on the docket.

Responder: Merten

1) Please refer to the revised response to letter dated 10/5/10 Item 18 (RAI Matrix item 115).
2) This is a duplicate of closed RAI Matrix Item
45.
74. N Open Partial Response provided in letter dated 10/5/10 NNC 8/25/10: Why did TVA not catch this on the review of the PAMS SysRS or SRS? Does TVA check that the CQ PAMS system meets the requirements in its purchase specifications?

Open-TVA/WEC Revise Response Due 12/31 ML101970033, Item No. 1 & 2 TVA Letter dated 10/5/10 Are these connections already docketed?

202 7.5.2 EICB (Carte) 7/22/2010 The letter (ML0003740165) which transmitted the Safety Evaluation for the Common Q topical report to Westinghouse stated: "Should our criteria or regulations change so that our conclusions as to the acceptability of the report are invalidated, CE Nuclear Power and/or the applicant referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation." Question No 81 identified many criteria changes; please revise Responder: WEC Revision 1 of the Licensing Technical Report will provide more detailed information on the changes to the platform.

Rev. 2 of the Licensing Technical Report will include the applicability of guidance.

75. N Open Partial Response provided in letter dated 10/5/10 Open-TVA/WEC Licensing Technical Report R2 Due 12/3 EICB RAI ML102980066 Item No. 4 TVA Letter dated 10/5/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments the respective documentation or submit justification for continued applicability of the topical report.

212 7.5.2 EICB (Carte) 7/27/2010 By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Design Report on Computer Integrity, Test and Calibration..." The staff has reviewed these documents, and it is not clear how this is the case.

(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.

(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.

Responder: WEC Application specific requirements for testing. This cannot be addressed in a topical report.

Evaluation of how the hardware meets the regulatory requirements.

WEC to provide the information and determine where the information will be located.

76. N Open Open-TVA/WEC Due 12/31/10 EICB RAI ML102980066 Item No. 10 245 EICB (Carte) 8/3/2010 Section 5.8 of the Common Q SPM (ML050350234) identifies the required test documentation for systems developed using the Common Q SPM. Please provide sufficient information for the NRC staff to independently assess whether the test plan for WBN2 PAMS, is as described in the SPM (e.g., Section 5.8.1).

Responder: WEC Relates to the commitment to provide the test plan and the SPM compliance matrix

77. N Open Open-TVA/WEC Due 12/7/10 EICB RAI ML102980066 Item No. 119 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

250 EICB (Carte) 8/8/2010 The SPM describes the software and documents that will be created and placed under configuration control.

The SCMP (e.g., SPM Section 6, Software Configuration Management Plan) describes the implementation tasks that are to be carried out. The acceptance criterion for software CM implementation is that the tasks in the SCMP have been carried out in their entirety. Documentation should exist that shows that the configuration management tasks for that activity group have been successfully accomplished.

Please provide information that shows that the CM tasks have been successfully accomplished for each life cycle activity group.

Responder: WEC Westinghouse develops Software Release Reports/Records and a Configuration Management Release Report. Describe the documents and when they will be produced.

Summarize guidance on how to produce these records, focus on project specific requirements in SPM etc.

78. N Open Open-TVA/WEC Due 10/22/10 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

251 EICB (Carte) 8/8/2010 The SPM describes the software testing and documents that will be created. The SPM also describes the testing tasks that are to be carried out.

The acceptance criterion for software test Responder: WEC The software testing performed and documents created are addressed by the SPM Compliance matrix contained in Revision 1 of the Licensing Technical Report.

79. N Open Partial response is provided in letter dated 10/25/10 Open-TVA/WEC Due 10/22/10.

10/25/10 is a partial response.

LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments implementation is that the tasks in the SPM have been carried out in their entirety. Please provide information that shows that testing been successfully accomplished.

of the letter dated 10/25/10 contains the Proprietary version of Westinghouses document titled: Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010 Still waiting on Software Test Plan and all other testing documentation.

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

252 EICB (Carte) 8/8/2010 The SPM contain requirements for software requirements traceability analysis and associated documentation (see Section 5.4.5.3, Requirements Traceability Analysis). Please provide information that demonstrates that requirements traceability analysis has been successfully accomplished.

Responder: WEC Explain response to AP1000 audit report.

RTM docketed NRC awaiting V&V evaluation of RTM.

80. N Open Read ML091560352 Open-TVA/WEC RTM Revision due 12/31 Check on this Hilmes LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

268 EICB (Carte) 8/19/2010 By letter dated March 12, 2010 (ML101680577), TVA stated that the application specific hardware and software architecture descriptions are addressed in the WBN2 PAMS System Design Specification (ML101680579, ML102040481, & ML102040482) and Software Requirements Specification (ML101050202, ML102040486, & ML1022040487).

Neither of these documents contain a non-proprietary figure of the architecture that can be used in the SE.

Please provide a non-proprietary figure of the architecture.

Responder: WEC Andy to see what can be done.

81. N Open Open-TVA/WEC Due 12/31/10 HILMES Check on This 301 EICB (Singh) 1.TVA is requested to address the consequences of software common cause failure including all potential resulting failures (i.e. total loss of CERPI, system fail as-is).
2. In addition, address how the actions stipulated in the plant Technical Specifications will be taken when the CERPI system indications are lost. Information notice IN 2010-10 (ML100080281) addresses the need to consider software failures and the actions required to assure that the plant will stay within its licensing basis.
3. Provide FMEA in support of your response.
4. FSAR Table 7.7-1, Plant Control System Interlocks lists interlock C-11 to block automatic rod withdrawal Responder: WEC/Davies/Clark TVA Partial Response:

For all accidents analyzed in WBN Unit 2 FSAR, Chapter 15, no credit is taken for the rod position indication system. For all continuous rod withdrawal accidents analyzed in WBN Unit 2 FSAR, Chapter 15, no credit is taken for any rod stop/block.

(1) Technical Specification 3.1.8, Rod Position Indication, does not have an action for total loss of indication; therefore, a total loss of CERPI puts the plant into LCO 3.0.3 which states:

82. N Open Partial response in 10/29 letter.

Open-TVA/WEC Due TBD

1) Please address how fail-as-is is detected i.e.

alarms, rod position deviation alarms, etc.

2) Response acceptable.
3) Response acceptable.

RAI No. 11 ML102980005 10/26/2010 TVA Letter dated 10/29/10 Item No. 21

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments when 1/1 Control Bank D rod position is above setpoint. This interlock capability would be lost in case of total loss of CERPI. How is the rod block assured for this event?

5. How is automatic rod withdrawal affected in case of total loss of signals from the CERPI to the ICS? Is this interlock fail safe?

6.FSAR chapter 15, Section 2.3.2.1states that the resolution of the rod position indicator channel is 5% of span (7.2 inches). The CERPI system accuracy specified in the CERPI System requirements Specification, WNDS-DS-00001_WBT, Rev. 2 is 12 steps or 5.19%. The specified system accuracy seems to be greater than the accuracy assumed in the FSAR Chapter 15. Please clarify this anomaly.

When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:

MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />; MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.

Exceptions to this Specification are stated in the individual Specifications. Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.

(2) CERPI common mode software failure will be addressed in a future RAI response letter.

(3) There is no FMEA for the CERPI system.

(4) Control Bank D Automatic Rod Withdrawal Limit would be assured by Operations and control circuitry by the following 2 methods:

a. A simultaneous failure of all indications of the Rod Position Indication System places the plant in LCO 3.0.3, since it would prevent compliance with actions in LCO 3.1.8.
b. CERPI cabinet relays A-KX-18 and B-KX-18 are the PLC controlled components of Rod Withdrawal Limit.

The relays are active low requiring power to activate the contacts in the control circuit. Total loss of CERPI will open the contacts and block Automatic Rod Withdrawal. Additionally, Annunciator window 64F will annunciate to show C-11 BANK D AUTO WITHDRAWAL BLOCKED.

(5) The CERPI Maintenance and Test Panels are used to set the Rod Withdrawal Limit with output signal to ICS as a parallel path. As stated above, the relays are the controlling functions and loss of signal to ICS will not affect the capability of the control circuit to disable the Automatic Rod Withdrawal function. The C-11 interlock is fail safe with regards to loss of power.

(6) The cycle-specific analyses for the static rod

4) a. Response acceptable.
b. Pl. address failure mode on fail-as-is.
5) Response acceptable.
6) Response acceptable.

TVA to address common cause failure as stated under response item 2.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radBA627.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp.

Date Comments misalignment assume full misalignment of an individual rod from the bank position indicator(s). Such a misalignment exceeds that which is possible during plant operations when accounting for the most adverse combination of the rod deviation alarm and uncertainty of the rod position indicator (both 12 steps). For consistency of parameter (and units) with the deviation alarm and position indicator uncertainty, the WBN Unit 2 FSAR Chapter 15, Section 2.3.1 will be revised in Amendment 102 to read:

The resolution of the rod position indicator channel is +/- 12 steps. Deviation of any RCCA from its group by twice this distance (24 steps) will not cause power distributions worse than the design limits. The deviation alarm alerts the operator to rod deviation with respect to group demand position in excess of 12 steps. If the rod deviation alarm is not operable, the operator is required to take action as required by the Technical Specifications.

This change is consistent with FSAR section 4.3.2.2.5, Limiting Power Distributions Page 4.3-13, which states the maximum deviation assumed is 12 steps.