{{#Wiki_filter:JPM     a PAGE 1 OF 14 OPERATOR:
{{#Wiki_filter:JPM a
RO___         SRO                   DATE:________
PAGE 1
JPM NUMBER:         a TASK NUMBER:         U-085-AB-03 TASK TITLE: CRD Pump Trip at <900 psig Reactor Pressure K!A NUMBER: 201001 A2.01                     KJA RATING: RO 3.2 SRO 3.3 TASK STANDARD: Withdraws Control Rod, if withdrawn to position 48; performs a coupling check, ranges IRIVIs to prevent a full scram signal, and inserts a manual scram; when unable to restore CRD drive water pressure >940 psig.
OF 14 OPERATOR:
LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 2-01-85 and 2-AOI-85-3 VALIDATION TiME: 15 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
RO___
SRO DATE:________
JPM NUMBER:
a TASK NUMBER:
U-085-AB-03 TASK TITLE: CRD Pump Trip at <900 psig Reactor Pressure K!A NUMBER: 201001 A2.01 KJA RATING: RO 3.2 SRO 3.3 TASK STANDARD: Withdraws Control Rod, ifwithdrawn to position 48; performs a coupling check, ranges IRIVIs to prevent a full scram signal, and inserts a manual scram; when unable to restore CRD drive water pressure >940 psig.
LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED:
2-01-85 and 2-AOI-85-3 VALIDATION TiME:
15 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
PERFORMANCE TIME:
PERFORMANCE TIME:
COMMENTS:
COMMENTS:
Additional comment sheets attached? YES         NO RESULTS:     SATISFACTORY___               UNSATISFACTORY SIGNATURE:                                         DATE:
Additional comment sheets attached? YES NO RESULTS:
SATISFACTORY___
UNSATISFACTORY SIGNATURE:
DATE:
EXAMINER
EXAMINER


Line 30: Line 41:
The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30-35. Rod Out Notch Override is authorized, complete the withdrawal of group 12 and then continue with group 13.
The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30-35. Rod Out Notch Override is authorized, complete the withdrawal of group 12 and then continue with group 13.


JPM a PAGE 3 OF 14 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
JPM a
PAGE 3
OF 14 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 3 8-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.
You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 3 8-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.
Line 37: Line 50:
NRC Examinei Siep, I through 9 are for Continuous ithi1ra1, st&#xe7;ps 10 tlg9ugh 14 ar&#xe7;f Notch withdrawaL
NRC Examinei Siep, I through 9 are for Continuous ithi1ra1, st&#xe7;ps 10 tlg9ugh 14 ar&#xe7;f Notch withdrawaL


JPM   a PAGE 4 OF 14 START TIME____
JPM a
Performance Step 1:                                             Critical X Not Critical 6.6.4 Continuous Rod Withdrawal
PAGE 4
[1]   SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.
OF 14 START TIME____
Performance Step 1:
Critical X Not Critical 6.6.4 Continuous Rod Withdrawal
[1]
SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.
Standard:
Standard:
Selects Control Rod 30-35 by depressing 30-35 pushbutton.
Selects Control Rod 30-35 by depressing 30-35 pushbutton.
SAT     UNSAT     N/A     COMMENTS:___________________________
SAT UNSAT N/A COMMENTS:___________________________
Performance Step 2:                                             Critical Not Critical X
Performance Step 2:
[2]   OBSERVE the following for selected control rod:
Critical
* CRD ROD SELECT pushbutton is brightly ILLUMINATED.
- Not Critical X
* White light on the Full Core Display ILLUMiNATED.
[2]
* Rod Out Permit light ILLUMiNATED.
OBSERVE the following for selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED.
White light on the Full Core Display ILLUMiNATED.
Rod Out Permit light ILLUMiNATED.
Standard:
Standard:
Observes the above indications.
Observes the above indications.
SAT     UNSAT       N/A     COMMENTS:
SAT UNSAT N/A COMMENTS:


JPM a PAGE 5 OF 14 Performance Step 3:                                               Critical Not Critical
JPM a
[3]   VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.
PAGE 5
OF 14 Performance Step 3:
Critical Not Critical
[3]
VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.
Standard:
Standard:
Verifies Rod Worth Minimizer responded correctly.
Verifies Rod Worth Minimizer responded correctly.
SAT     UNSAT       N/A     COMMENTS:______________________________
SAT UNSAT N/A COMMENTS:______________________________
Performance Step 4:                                               Critical Not Critical X
Performance Step 4:
[4]   VERIFY Control Rod is being withdrawn to a position greater than three notches.
Critical Not Critical X
[4]
VERIFY Control Rod is being withdrawn to a position greater than three notches.
Standard:
Standard:
Verifies Control Rod 30-35 is going from position 16 to 48.
Verifies Control Rod 30-35 is going from position 16 to 48.
SAT_ UNSAT         N/A     COMMENTS:______________________________
SAT_ UNSAT N/A COMMENTS:______________________________


JPM   a PAGE 6 OF 14 Performance Step 5:                                                 Critical X Not Critical NOTE When continuously withdrawing a control rod to position 48, the control rod coupling integrity check can be performed by one of the two following methods:
JPM a
: 1)     Coupling integrity check while maintaining the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position. If this method is selected, perform Step 6.6.4[6] and N/A Step 6.6.4[7].
PAGE 6
: 2)     Coupling integrity check after releasing the CRD Notch Override Switch and the CRD Control Switch. If this method is selected, perform Step 6.6.4[7] and N/A Step 6.6.4[6].
OF 14 Performance Step 5:
[6]     IF continuously withdrawing the control rod to position 48 and performing the control rod coupling integrity check in conjunction with withdrawal, THEN PERFORM the following: (Otherwise N/A)
Critical X Not Critical NOTE When continuously withdrawing a control rod to position 48, the control rod coupling integrity check can be performed by one of the two following methods:
[6.1] PLACE and HOLD CRD NOTCH OVERRIDE, 2-HS-85-47, in NOTCH OVERRRIDE.
1)
[6.2] PLACE and HOLD CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH.
Coupling integrity check while maintaining the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position. If this method is selected, perform Step 6.6.4[6] and N/A Step 6.6.4[7].
2)
Coupling integrity check after releasing the CRD Notch Override Switch and the CRD Control Switch. If this method is selected, perform Step 6.6.4[7] and N/A Step 6.6.4[6].
[6]
IF continuously withdrawing the control rod to position 48 and performing the control rod coupling integrity check in conjunction with withdrawal, THEN PERFORM the following: (Otherwise N/A)
[6.1]
PLACE and HOLD CRD NOTCH OVERRIDE, 2-HS-85-47, in NOTCH OVERRRIDE.
[6.2]
PLACE and HOLD CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH.
Standard:
Standard:
Continuously withdraws Control Rod 30-35 by holding switch, 2-HS-85-47, in Notch Override and, 2-HS-85-48, in Rod Out Notch.
Continuously withdraws Control Rod 30-35 by holding switch, 2-HS-85-47, in Notch Override and, 2-HS-85-48, in Rod Out Notch.
SAT     UNSAT       N/A     COMMENTS:_____________________________
SAT UNSAT N/A COMMENTS:_____________________________
Drivei: When coupling check complete for control rod 30-35, trip operating CRD Pump.
Drivei: When coupling check complete for control rod 30-35, trip operating CRD Pump.


JPM   a PAGE 7 OF 14 Performance Step 6:                                                           X Not Critical
JPM a
        *[63] MAINTAIN the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position, with the control rod at position 48.
PAGE 7
[6.4]   CHECK control rod coupled by observing the following:
OF 14 Performance Step 6:
* Four rod display digital readout AND the full core display digital readout AND background light remain illuminated.
X Not Critical
* CONTROL ROD OVERTRAVEL annunciator, 2-XA-55-5A, Window 14, does NOT alarm.
*[63] MAINTAIN the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position, with the control rod at position 48.
[6.5]   RELEASE both CRD NOTCH OVERRIDE, 2-HS-85-47, and CRD CONTROL SWITCH, 2-HS-85-48.
[6.4]
[6.6]   CHECK control rod settles into position 48 and ROD SETTLE light extinguishes.
CHECK control rod coupled by observing the following:
Four rod display digital readout AND the full core display digital readout AND background light remain illuminated.
CONTROL ROD OVERTRAVEL annunciator, 2-XA-55-5A, Window 14, does NOT alarm.
[6.5]
RELEASE both CRD NOTCH OVERRIDE, 2-HS-85-47, and CRD CONTROL SWITCH, 2-HS-85-48.
[6.6]
CHECK control rod settles into position 48 and ROD SETTLE light extinguishes.
Standard:
Standard:
If control rod is withdrawn to position 48, performs a coupling check.
If control rod is withdrawn to position 48, performs a coupling check.
SAT     UNSAT       N/A     COMMENTS:__________________________
SAT UNSAT N/A COMMENTS:__________________________
Driver: When coupling check complete fr control rod 30-35, trip operating CRD Pump.
Driver: When coupling check complete fr control rod 30-35, trip operating CRD Pump.


JPM   a PAGE 8 OF 14 N[CNCTEth&#xe7;s&#xe7;arecontingency Conpling Check Performance Step 7:                                                 Critical X Not Critical
JPM a
[7]     IF continuously withdrawing the control rod to position 48, the control rod coupling integrity check will be performed after the CRD NOTCH OVERRIDE, 2-HS-85-47, and CRD CONTROL SWITCH, 2-HS-85-48 are to be released. THEN PERFORM control rod coupling integrity check as follows (otherwise N/A):
PAGE 8
[7.1]   PLACE AND HOLD CRD NOTCH OVERRIDE, 2-HS-85-47, in NOTCH OVERRRIDE.
OF 14 N[CNCTEth&#xe7;s&#xe7;arecontingency Conpling Check Performance Step 7:
[7.2]   PLACE AND HOLD CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH.
Critical X Not Critical
[7]
IF continuously withdrawing the control rod to position 48, the control rod coupling integrity check will be performed after the CRD NOTCH OVERRIDE, 2-HS-85-47, and CRD CONTROL SWITCH, 2-HS-85-48 are to be released. THEN PERFORM control rod coupling integrity check as follows (otherwise N/A):
[7.1]
PLACE AND HOLD CRD NOTCH OVERRIDE, 2-HS-85-47, in NOTCH OVERRRIDE.
[7.2]
PLACE AND HOLD CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH.
Standard:
Standard:
Continuously withdraws Control Rod 30-35 by holding switch, 2-HS-85-47, in Notch Override and, 2-HS-85-48, in Rod Out Notch.
Continuously withdraws Control Rod 30-35 by holding switch, 2-HS-85-47, in Notch Override and, 2-HS-85-48, in Rod Out Notch.
SAT       UNSAT       N/A     COMMENTS:_______________________________
SAT UNSAT N/A COMMENTS:_______________________________
Performance Step 8:                                                 *Critical X Not Critical
Performance Step 8:
[7.3]   WHEN position 48 is reached, THEN RELEASE CRD NOTCH OVERRIDE, 2-HS-85-47, and CRD CONTROL SWITCH, 2-HS-85-48.
*Critical X Not Critical
        *[7.4] VERIFY control rod settles into position 48.
[7.3]
WHEN position 48 is reached, THEN RELEASE CRD NOTCH OVERRIDE, 2-HS-85-47, and CRD CONTROL SWITCH, 2-HS-85-48.
*[7.4] VERIFY control rod settles into position 48.
Standard:
Standard:
Stops withdraw of Control Rod 30-35 at position 48 by releasing hand switches and verifies rod settles at position 48.
Stops withdraw of Control Rod 30-35 at position 48 by releasing hand switches and verifies rod settles at position 48.
SAT_ UNSAT             N/A     COMMENTS:______________________________
SAT_ UNSAT N/A COMMENTS:______________________________


JPM     a PAGE 9 OF 14 Performance Step 9:                                                 *Critjcal X Not Critical
JPM a
      *[7.5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.
PAGE 9
[7.6]   CHECK control rod coupled by observing the following:
OF 14 Performance Step 9:
* Four rod display digital readout AND full core display digital readout AND background light will remain illuminated.
*Critjcal X Not Critical
* CONTROL ROD OVERTRAVEL annunciator (2-XA-55-5A, Window
*[7.5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.
[7.6]
CHECK control rod coupled by observing the following:
Four rod display digital readout AND full core display digital readout AND background light will remain illuminated.
CONTROL ROD OVERTRAVEL annunciator (2-XA-55-5A, Window
: 14) does NOT alarm.
: 14) does NOT alarm.
[7.7]   CHECK control rod settles into position 48 and ROD SETTLE light extinguishes.
[7.7]
CHECK control rod settles into position 48 and ROD SETTLE light extinguishes.
Standard:
Standard:
If control rod is withdrawn to position 48, performs a coupling check.
If control rod is withdrawn to position 48, performs a coupling check.
SAT     UNSAT       N/A _COMMENTS:_____________________________
SAT UNSAT N/A _COMMENTS:_____________________________
Driver: When coupling check complete for control rod 30-3 5, trip operating CRD Pump.
Driver: When coupling check complete for control rod 30-35, trip operating CRD Pump.


JPM   a PAGE 10 OF 14 9jiifeps Performance Step 10:                                               Critical Not Critical X 6.6.3 Control Rod Notch Withdrawal
JPM a
[1]     SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.
PAGE 10 OF 14 9jiifeps Performance Step 10:
Critical Not Critical X 6.6.3 Control Rod Notch Withdrawal
[1]
SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.
Standard:
Standard:
Selects Control Rod 3 8-43 by depressing 3 8-43 pushbutton.
Selects Control Rod 38-43 by depressing 3 8-43 pushbutton.
SAT_ UNSAT         N/A     COMMENTS:_____________________________
SAT_ UNSAT N/A COMMENTS:_____________________________
Performance Step 11:                                               Critical Not Critical X
Performance Step 11:
[2]   OBSERVE the following for selected control rod:
Critical
* CRD ROD SELECT pushbutton is brightly ILLUMINATED.
- Not Critical X
* White light on the Full Core Display ILLUMiNATED.
[2]
* Rod Out Permit light ILLUMINATED.
OBSERVE the following for selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED.
White light on the Full Core Display ILLUMiNATED.
Rod Out Permit light ILLUMINATED.
Standard:
Standard:
Observes the above indications.
Observes the above indications.
SAT_ UNSAT         N/A     COMMENTS:
SAT_ UNSAT N/A COMMENTS:


JPM   a PAGE 11 OF 14 Performance Step 12:                                             Critical Not Critical X
JPM a
[3]   VERIFY ROD WORTH M11fIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.
PAGE 11 OF 14 Performance Step 12:
Critical Not Critical X
[3]
VERIFY ROD WORTH M11fIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.
Standard:
Standard:
Verifies Rod Worth Minimizer responded correctly and verified Control Rod 3 8-43 is going from position 16 to 48.
Verifies Rod Worth Minimizer responded correctly and verified Control Rod 38-43 is going from position 16 to 48.
SAT     UNSAT       N/A   COMMENTS:______________________________
SAT UNSAT N/A COMMENTS:______________________________
Performance Step 13:
Performance Step 13:
* Critical X Not Critical
*Critical X Not Critical
*[4]   PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.
*[4]
[5]   OBSERVE the control rod settles into the desired position and the ROD SEHLE light extinguishes.
PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.
[5]
OBSERVE the control rod settles into the desired position and the ROD SEHLE light extinguishes.
Standard:
Standard:
Withdraws control rod 3 8-43.
Withdraws control rod 38-43.
SAT     UNSAT       N/A   COMMENTS:____________________________
SAT UNSAT N/A COMMENTS:____________________________


JPM a PAGE 12 OF 14 Performance Step 14:                                               *Critical X Not Critical
JPM a
[6]   IF control rod is notch withdrawn to rod notch Position 48, THEN PERFORM control rod coupling integrity check as follows:
PAGE 12 OF 14 Performance Step 14:
        *[6.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.
*Critical X Not Critical
[6.2] CHECK control rod coupled by observing the following:
[6]
* Four rod display digital readout AND the full cores display digital readout AND background light remain illuminated.
IF control rod is notch withdrawn to rod notch Position 48, THEN PERFORM control rod coupling integrity check as follows:
* CONTROL ROD OVERTRAVEL annunciator, 2-XA-55-5A, Window 14, does NOT alarm.
*[6.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.
[6.3]   CHECK the control rod settles into Position 48 and the ROD SETTLE light extinguishes.
[6.2]
CHECK control rod coupled by observing the following:
Four rod display digital readout AND the full cores display digital readout AND background light remain illuminated.
CONTROL ROD OVERTRAVEL annunciator, 2-XA-55-5A, Window 14, does NOT alarm.
[6.3]
CHECK the control rod settles into Position 48 and the ROD SETTLE light extinguishes.
Standard:
Standard:
If Control Rod is withdrawn to position 48, performs a coupling check.
If Control Rod is withdrawn to position 48, performs a coupling check.
SAT     UNSAT       N/A     COMMENTS:______________________________
SAT UNSAT N/A COMMENTS:______________________________
Driver: When coupling check complete for control rod 30-35, trip operating CR]) Pump.
Driver: When coupling check complete for control rod 30-35, trip operating CR]) Pump.


JPM   a PAGE 13 OF 14 Performance Step 15:                                               Critical X Not Critical Operator Ranges IRMs as necessary; to maintain greater than the downscale reading of 7.5/1 25 and less than the upscale reading of 90/1 25.
JPM a
PAGE 13 OF 14 Performance Step 15:
Critical X Not Critical Operator Ranges IRMs as necessary; to maintain greater than the downscale reading of 7.5/1 25 and less than the upscale reading of 90/1 25.
Note: the High-High of 116.4/125 will produce a scram signal.
Note: the High-High of 116.4/125 will produce a scram signal.
Standard:
Standard:
Ranges IRMs to clear or prevent a Rod Block signal.
Ranges IRMs to clear or prevent a Rod Block signal.
Note: A Full Scram signal from IRMs while withdrawing control rods wifi be a failure.
Note: A Full Scram signal from IRMs while withdrawing control rods wifi be a failure.
SAT_ UNSAT           N/A     COMMENTS:______________________________
SAT_ UNSAT N/A COMMENTS:______________________________
Performance Step 16:                                               Critical Not Critical X 4.1 Immediate Actions
Performance Step 16:
[1]     IF operating CRD PUMP has failed AND the standby CRD Pump is available, THEN PERFORM the following at Panel 2-9-5:
Critical Not Critical X 4.1 Immediate Actions
[1.1]   PLACE CRD SYSTEM FLOW CONTROL, 2-FIC-85-11, in MAN at minimum setting.
[1]
IF operating CRD PUMP has failed AND the standby CRD Pump is available, THEN PERFORM the following at Panel 2-9-5:
[1.1]
PLACE CRD SYSTEM FLOW CONTROL, 2-FIC-85-11, in MAN at minimum setting.
Standard:
Standard:
Places CRD System Flow Control in Manual and at Minimum setting.
Places CRD System Flow Control in Manual and at Minimum setting.
SAT     UNSAT       N/A _COMMENTS:______________________________
SAT UNSAT N/A _COMMENTS:______________________________


JPM   a PAGE 14 OF 14 Performance Step 17:                                                   Critical Not Critical X
JPM a
[1.2]   START associated standby CRD Pump using one of the following:
PAGE 14 OF 14 Performance Step 17:
Critical Not Critical X
[1.2]
START associated standby CRD Pump using one of the following:
* CRD Pump 1B, using 2-HS-85-2A
* CRD Pump 1B, using 2-HS-85-2A
* CRD Pump 2A, using 2-HS-85-1A Standard:
* CRD Pump 2A, using 2-HS-85-1A Standard:
Attempts to start standby CR1) Pump and may also attempt to start tripped CRD Pump.
Attempts to start standby CR1) Pump and may also attempt to start tripped CRD Pump.
SAT     UNSAT         N/A     COMMENTS:______________________________
SAT UNSAT N/A COMMENTS:______________________________
Performance Step 18:                                                 Critical X Not Critical
Performance Step 18:
[2]     IF Reactor Pressure is less than 900 PSIG and either of the following conditions exists:
Critical X Not Critical
* In-service CRD Pump tripped and neither CRD Pump can be started, OR
[2]
* Charging Water Pressure can NOT be restored and maintained above 940 PSIG, THEN PERFORM the following:
IF Reactor Pressure is less than 900 PSIG and either of the following conditions exists:
[2.1]   MANUALLY SCRAM Reactor, IMMEDIATELY PLACE the reactor mode switch in the SHUTDOWN position.
In-service CRD Pump tripped and neither CRD Pump can be started, OR Charging Water Pressure can NOT be restored and maintained above 940 PSIG, THEN PERFORM the following:
[2.1]
MANUALLY SCRAM Reactor, IMMEDIATELY PLACE the reactor mode switch in the SHUTDOWN position.
Standard:
Standard:
Insert a Manual Scram and places Mode Switch in Shutdown.
Insert a Manual Scram and places Mode Switch in Shutdown.
SAT     UNSAT         N/A     COMMENTS:_______________________________
SAT UNSAT N/A COMMENTS:_______________________________
CUE:           After Scram report anothex operator will continue in 2-AOI-100-1.
CUE:
After Scram report anothex operator will continue in 2-AOI-100-1.
END OF TASK STOP TIME
END OF TASK STOP TIME


JPM a PAGE 1 OF 14 OPERATOR:
JPM a
RO           SRO                   DATE:_______
PAGE 1
JPM NUMBER:         a TASK NUMBER:         U-085-AB-03 TASK TITLE: CRD Pump Trip at <900 psig Reactor Pressure KIA NUMBER: 201001 A2.01                   KIA RATING: RO 3.2 SRO 3.3 TASK STANDARD: Withdraws Control Rod, if withdrawn to position 48; perfonris a coupling check, ranges IRMs to prevent a full scram signal, and inserts a manual scram; when unable to restore CRD drive water pressure >940 psig.
OF 14 OPERATOR:
LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 3-01-85 and 3-AOI-85-3 VALIDATION TIME: 15 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
RO SRO DATE:_______
JPM NUMBER:
a TASK NUMBER:
U-085-AB-03 TASK TITLE: CRD Pump Trip at <900 psig Reactor Pressure KIA NUMBER: 201001 A2.01 KIA RATING: RO 3.2 SRO 3.3 TASK STANDARD: Withdraws Control Rod, ifwithdrawn to position 48; perfonris a coupling check, ranges IRMs to prevent a full scram signal, and inserts a manual scram; when unable to restore CRD drive water pressure >940 psig.
LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED:
3-01-85 and 3-AOI-85-3 VALIDATION TIME:
15 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
PERFORMANCE TIME:
PERFORMANCE TIME:
COMMENTS:_____________________________
COMMENTS:_____________________________
Additional comment sheets attached? YES       NO RESULTS:     SATISFACTORY___             UNSATISFACTORY SIGNATURE:                                         DATE:
Additional comment sheets attached? YES NO RESULTS:
SATISFACTORY___
UNSATISFACTORY SIGNATURE:
DATE:
EXAMINER
EXAMINER


Line 193: Line 283:
You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 3 8-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.
You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 3 8-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.
INITIATING CUE:
INITIATING CUE:
The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30-35. Rod Out Notch Override is authorized, complete the withdrawal of group 12 and then continue with group 13.
The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30-35. Rod Out Notch Override is authorized, complete the withdrawal ofgroup 12 and then continue with group 13.


JPM a PAGE 3 OF 14 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
JPM a
PAGE 3
OF 14 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 3 8-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.
You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 3 8-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.
INITIATING CUE:
INITIATING CUE:
The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30-35. Rod Out Notch Override is authorized, complete the withdrawal of group 12 and then continue with group 13.
The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30-35. Rod Out Notch Override is authorized, complete the withdrawal of group 12 and then continue with group 13.
W
W
%RC ?Examner Steps I through 9 are for Continuous withdval, steps 1Qtbroiigh 14 ate fot Notch vithdrawaI.
%RC?Examner Steps I through9 are for Continuous withdval, steps 1Qtbroiigh 14 ate fot Notch vithdrawaI.


JPM   a PAGE 4 OF 14 START TIME____
JPM a
Performance Step 1:                                             Critical X Not Critical 6.6.4 Continuous Rod Withdrawal
PAGE 4
[1]   SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3 -XS-85-40.
OF 14 START TIME____
Performance Step 1:
Critical X Not Critical 6.6.4 Continuous Rod Withdrawal
[1]
SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3 -XS-85-40.
Standard:
Standard:
Selects Control Rod 30-35 by depressing 30-35 pushbutton.
Selects Control Rod 30-35 by depressing 30-35 pushbutton.
SAT     UNSAT     N/A     COMMENTS:____________________________
SAT UNSAT N/A COMMENTS:____________________________
Performance Step 2:                                             Critical - Not Critical X
Performance Step 2:
[2]   OBSERVE the following for selected control rod:
Critical
* CRD ROD SELECT pushbutton is brightly ILLUMINATED.
- Not Critical X
* White light on the Full Core Display ILLUMINATED.
[2]
* Rod Out Permit light ILLUMINATED.
OBSERVE the following for selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED.
White light on the Full Core Display ILLUMINATED.
Rod Out Permit light ILLUMINATED.
Standard:
Standard:
Observes the above indications.
Observes the above indications.
SAT     UNSAT       N/A     COMMENTS:
SAT UNSAT N/A COMMENTS:


JPM   a PAGE 5 OF 14 Performance Step 3:                                               Critical Not Critical
JPM a
[3]   VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.
PAGE 5
OF 14 Performance Step 3:
Critical Not Critical
[3]
VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.
Standard:
Standard:
Verifies Rod Worth Minimizer responded correctly.
Verifies Rod Worth Minimizer responded correctly.
SAT     UNSAT       N/A     COMMENTS:_____________________________
SAT UNSAT N/A COMMENTS:_____________________________
Performance Step 4:                                               Critical Not Critical
Performance Step 4:
[4]   VERIFY Control Rod is being withdrawn to a position greater than three notches.
Critical Not Critical
[4]
VERIFY Control Rod is being withdrawn to a position greater than three notches.
Standard:
Standard:
Verifies Control Rod 30-35 is going from position 16 to 48.
Verifies Control Rod 30-35 is going from position 16 to 48.
SAT_ U1SAT         N/A     COMMENTS:_______________________________
SAT_ U1SAT N/A COMMENTS:_______________________________


JPM   a PAGE 6 OF 14 Performance Step 5:                                                 Critical X Not Critical NOTE When continuously withdrawing a control rod to position 48, the control rod coupling integrity check can be performed by one of the two following methods:
JPM a
: 1)     Coupling integrity check while maintaining the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position. If this method is selected, perform Step 6.6.4[6] and N/A Step 6.6.4[7].
PAGE 6
: 2)     Coupling integrity check after releasing the CRD Notch Override Switch and the CRD Control Switch. If this method is selected, perform Step 6.6.4[7] and N/A Step 6.6.4[61.
OF 14 Performance Step 5:
[6]     IF continuously withdrawing the control rod to position 48 and performing the control rod coupling integrity check in conjunction with withdrawal, THEN PERFORM the following: (Otherwise N/A)
Critical X Not Critical NOTE When continuously withdrawing a control rod to position 48, the control rod coupling integrity check can be performed by one of the two following methods:
[6.1] PLACE and HOLD CRD NOTCH OVERRIDE, 3-HS-85-47, in NOTCH OVERRRIDE.
1)
[6.2] PLACE and HOLD CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH.
Coupling integrity check while maintaining the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position. If this method is selected, perform Step 6.6.4[6] and N/A Step 6.6.4[7].
2)
Coupling integrity check after releasing the CRD Notch Override Switch and the CRD Control Switch. If this method is selected, perform Step 6.6.4[7] and N/A Step 6.6.4[61.
[6]
IF continuously withdrawing the control rod to position 48 and performing the control rod coupling integrity check in conjunction with withdrawal, THEN PERFORM the following: (Otherwise N/A)
[6.1]
PLACE and HOLD CRD NOTCH OVERRIDE, 3-HS-85-47, in NOTCH OVERRRIDE.
[6.2]
PLACE and HOLD CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH.
Standard:
Standard:
Continuously withdraws Control Rod 30-35 by holding switch, 3-HS-85-47, in Notch Override and, 3-HS-85-48, in Rod Out Notch.
Continuously withdraws Control Rod 30-35 by holding switch, 3-HS-85-47, in Notch Override and, 3-HS-85-48, in Rod Out Notch.
SAT_ UNSAT           N/A _COMMENTS:___________________________
SAT_ UNSAT N/A _COMMENTS:___________________________
Driver: When coupling che&#xf3;k complete for control rod 30-3 5, trip operating CRD Pump.
Driver: When coupling che&#xf3;k complete for control rod 30-35, trip operating CRD Pump.


JPM a PAGE 7 OF 14 Performance Step 6:                                                 Critical X Not Critical
JPM a
[6.3] MAINTAIN the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position, with the control rod at position 48.
PAGE 7
      *[6.4] CHECK control rod coupled by observing the following:
OF 14 Performance Step 6:
* Four rod display digital readout AND the full core display digital readout AND background light remain illuminated.
Critical X Not Critical
* CONTROL ROD OVERTRAVEL annunciator, 3-XA-55-5A, Window 14, does NOT alarm.
[6.3]
[6.5]   RELEASE both CRD NOTCH OVERRIDE, 3-HS-85-47, and CRD CONTROL SWITCH, 3-HS-85-48.
MAINTAIN the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position, with the control rod at position 48.
      *[6.6] CHECK control rod settles into position 48 and ROD SETTLE light extinguishes.
*[6.4] CHECK control rod coupled by observing the following:
Four rod display digital readout AND the full core display digital readout AND background light remain illuminated.
CONTROL ROD OVERTRAVEL annunciator, 3-XA-55-5A, Window 14, does NOT alarm.
[6.5]
RELEASE both CRD NOTCH OVERRIDE, 3-HS-85-47, and CRD CONTROL SWITCH, 3-HS-85-48.
*[6.6] CHECK control rod settles into position 48 and ROD SETTLE light extinguishes.
Standard:
Standard:
If control rod is withdrawn to position 48, performs a coupling check.
If control rod is withdrawn to position 48, performs a coupling check.
SAT     UNSAT       N/A     COMMENTS:___________________
SAT UNSAT N/A COMMENTS:___________________


JPM a PAGE 8 OF 14 NRC 11OTE tkci co                 cyoupiiug &ck Performance Step 7:                                                 Critical X Not Critical
JPM a
[7]     IF continuously withdrawing the control rod to position 48, the control rod coupling integrity check will be performed after the CRD NOTCH OVERRIDE, 3-HS-85-47, and CRD CONTROL SWITCH, 3-HS-85-48 are to be released. THEN PERFORM control rod coupling integrity check as follows (otherwise N/A):
PAGE 8
[7.1]   PLACE AND HOLD CRD NOTCH OVERRIDE, 3-HS-85-47, in NOTCH OVERRRIDE.
OF 14 NRC 11OTEtkci co cyoupiiug &ck Performance Step 7:
[7.2]   PLACE AND HOLD CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH.
Critical X Not Critical
[7]
IF continuously withdrawing the control rod to position 48, the control rod coupling integrity check will be performed after the CRD NOTCH OVERRIDE, 3-HS-85-47, and CRD CONTROL SWITCH, 3-HS-85-48 are to be released. THEN PERFORM control rod coupling integrity check as follows (otherwise N/A):
[7.1]
PLACE AND HOLD CRD NOTCH OVERRIDE, 3-HS-85-47, in NOTCH OVERRRIDE.
[7.2]
PLACE AND HOLD CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH.
Standard:
Standard:
Continuously withdraws Control Rod 30-35 by holding switch, 3-HS-85-47, in Notch Override and 3-HS-85-48, in Rod Out Notch.
Continuously withdraws Control Rod 30-35 by holding switch, 3-HS-85-47, in Notch Override and 3-HS-85-48, in Rod Out Notch.
SAT_ UNSAT             N/A     COMMENTS:_______________________________
SAT_ UNSAT N/A COMMENTS:_______________________________
Performance Step 8:                                                 *Critical   Not Critical X
Performance Step 8:
        *[7.3] WHEN position 48 is reached, THEN RELEASE CRD NOTCH OVERRIDE, 3-HS-85-47, and CRD CONTROL SWITCH, 3-HS-85-48.
*Critical Not Critical X
[7.4]   VERIFY control rod settles into position 48.
*[7.3] WHEN position 48 is reached, THEN RELEASE CRD NOTCH OVERRIDE, 3-HS-85-47, and CRD CONTROL SWITCH, 3-HS-85-48.
[7.4]
VERIFY control rod settles into position 48.
Standard:
Standard:
Stops withdraw of Control Rod 30-35 at position 48 by releasing hand switches and verifies rod settles at position 48.
Stops withdraw of Control Rod 30-35 at position 48 by releasing hand switches and verifies rod settles at position 48.
SAT       UNSAT       N/A _COMMENTS:_____________________________
SAT UNSAT N/A _COMMENTS:_____________________________


JPM     a PAGE 9 OF 14 Performance Step 9:                                                 *Critical X Not Critical
JPM a
      *[7.5] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.
PAGE 9
[7.6]   CHECK control rod coupled by observing the following:
OF 14 Performance Step 9:
* Four rod display digital readout AND full core display digital readout AND background light will remain illuminated.
*Critical X Not Critical
* CONTROL ROD OVERTRAVEL annunciator (3-XA-55-5A, Window
*[7.5] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.
[7.6]
CHECK control rod coupled by observing the following:
Four rod display digital readout AND full core display digital readout AND background light will remain illuminated.
CONTROL ROD OVERTRAVEL annunciator (3-XA-55-5A, Window
: 14) does NOT alarm.
: 14) does NOT alarm.
[7.7]   CHECK control rod settles into position 48 and ROD SEYILE light extinguishes.
[7.7]
CHECK control rod settles into position 48 and ROD SEYILE light extinguishes.
Standard:
Standard:
If control rod is withdrawn to position 48, performs a coupling check.
If control rod is withdrawn to position 48, performs a coupling check.
SAT_U1SAT           N/A     COMMENTS:
SAT_U1SAT N/A COMMENTS:
Driver: When coupling check complete for control rod 30-35, trip operating CRD Pump;
Driver: When coupling check complete for control rod 30-35, trip operating CRD Pump;


JPM   a PAGE 10 OF 14 NRfE             WotcdraiISeps Performance Step 10:                                               Critical X Not Critical 6.6.3 Control Rod Notch Withdrawal
JPM a
[1]     SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.
PAGE 10 OF 14 NRfE WotcdraiISeps Performance Step 10:
Critical X Not Critical 6.6.3 Control Rod Notch Withdrawal
[1]
SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.
Standard:
Standard:
Selects Control Rod 30-3 5 by depressing 30-3 5 pushbutton.
Selects Control Rod 30-3 5 by depressing 30-3 5 pushbutton.
SAT     UNSAT     N/A     COMMENTS:_______________________________
SAT UNSAT N/A COMMENTS:_______________________________
Performance Step 11:                                               Critical Not Critical X
Performance Step 11:
[2]   OBSERVE the following for selected control rod:
Critical
* CRD ROD SELECT pushbutton is brightly ILLUMINATED.
- Not Critical X
* White light on the Full Core Display ILLUMINATED.
[2]
* Rod Out Permit light ILLUMINATED.
OBSERVE the following for selected control rod:
CRD ROD SELECT pushbutton is brightly ILLUMINATED.
White light on the Full Core Display ILLUMINATED.
Rod Out Permit light ILLUMINATED.
Standard:
Standard:
Observes the above indications.
Observes the above indications.
SAT     UNSAT       N/A     COMMENTS:
SAT UNSAT N/A COMMENTS:


JPM   a PAGE 11 OF 14 Performance Step 12:                                             Critical Not Critical X
JPM a
[3]   VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.
PAGE 11 OF 14 Performance Step 12:
Critical Not Critical X
[3]
VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.
Standard:
Standard:
Verifies Rod Worth Minimizer responded correctly and verified Control Rod 30-35 is going from position 16 to 48.
Verifies Rod Worth Minimizer responded correctly and verified Control Rod 30-35 is going from position 16 to 48.
SAT_ UNSAT             N/A _COMMENTS:_____________________________
SAT_ UNSAT N/A _COMMENTS:_____________________________
Performance Step 13:
Performance Step 13:
* Critical X Not Critical
*Critical X Not Critical
*[4]   PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.
*[4]
[5]   OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.
[5]
OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
Standard:
Standard:
Withdraws control rod 30-35.
Withdraws control rod 30-35.
SAT     UNSAT           N/A     COMMENTS:____________________________
SAT UNSAT N/A COMMENTS:____________________________


JPM a PAGE 12 OF 14 Performance Step 14:                                               *Critical X Not Critical
JPM a
[6]     IF control rod is notch withdrawn to rod notch Position 48, THEN PERFORM control rod coupling integrity check as follows:
PAGE 12 OF 14 Performance Step 14:
        *[6.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.
*Critical X Not Critical
[6.2]   CHECK control rod coupled by observing the following:
[6]
* Four rod display digital readout AND the full cores display digital readout AND background light remain illuminated.
IF control rod is notch withdrawn to rod notch Position 48, THEN PERFORM control rod coupling integrity check as follows:
* CONTROL ROD OVERTRAVEL annunciator, 3-XA-55-5A, Window 14, does NOT alarm.
*[6.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.
[6.3]   CHECK the control rod settles into Position 48 and the ROD SETTLE light extinguishes.
[6.2]
CHECK control rod coupled by observing the following:
Four rod display digital readout AND the full cores display digital readout AND background light remain illuminated.
CONTROL ROD OVERTRAVEL annunciator, 3-XA-55-5A, Window 14, does NOT alarm.
[6.3]
CHECK the control rod settles into Position 48 and the ROD SETTLE light extinguishes.
Standard:
Standard:
If Control Rod is withdrawn to position 48, performs a coupling check.
If Control Rod is withdrawn to position 48, performs a coupling check.
SAT_ UNSAT           N/A     COMMENTS:_______________________________
SAT_ UNSAT N/A COMMENTS:_______________________________
Driver: When coupling check complete for control rod 30-35, trip operating CRD Pump.
Driver: When coupling check complete for control rod 30-35, trip operating CRD Pump.


JPM   a PAGE 13 OF 14 Performance Step 15:                                               Critical X Not Critical Operator Ranges IRMs as necessary; to maintain greater than the downscale reading of 7.5/125 and less than the upscale reading of 104.6/125.
JPM a
PAGE 13 OF 14 Performance Step 15:
Critical X Not Critical Operator Ranges IRMs as necessary; to maintain greater than the downscale reading of 7.5/125 and less than the upscale reading of 104.6/125.
Note: the High-High of 116.4/125 will produce a scram signal.
Note: the High-High of 116.4/125 will produce a scram signal.
Standard:
Standard:
Ranges IRMs to clear or prevent a Rod Block signal.
Ranges IRMs to clear or prevent a Rod Block signal.
Note: A Full Scram signal from IRMs while withdrawing control rods wifi be a failure.
Note: A Full Scram signal from IRMs while withdrawing control rods wifi be a failure.
SAT     UNSAT       N/A     COMMENTS:_____________________________
SAT UNSAT N/A COMMENTS:_____________________________
Performance Step 16:                                               Critical   Not Critical 4.1 Immediate Actions
Performance Step 16:
[1]   IF operating CRD PUMP has failed AND the standby CRD Pump is available, THEN PERFORM the following at Panel 3-9-5:
Critical Not Critical 4.1 Immediate Actions
[1.1]   PLACE CRD SYSTEM FLOW CONTROL, 3-FIC-85-11, in MAN at minimum setting.
[1]
IF operating CRD PUMP has failed AND the standby CRD Pump is available, THEN PERFORM the following at Panel 3-9-5:
[1.1]
PLACE CRD SYSTEM FLOW CONTROL, 3-FIC-85-11, in MAN at minimum setting.
Standard:
Standard:
Places CRD System Flow Control in Manual and at Minimum setting.
Places CRD System Flow Control in Manual and at Minimum setting.
SAT     UNSAT_ N/A           COMMENTS:_____________________________
SAT UNSAT_ N/A COMMENTS:_____________________________


JPM   a PAGE 14 OF 14 Performance Step 17:                                                 Critical Not Critical
JPM a
[1.2]   START associated standby CRD Pump using one of the following:
PAGE 14 OF 14 Performance Step 17:
Critical Not Critical
[1.2]
START associated standby CRD Pump using one of the following:
* CRD Pump 3B, using 3-HS-85-2A
* CRD Pump 3B, using 3-HS-85-2A
* CRD Pump 3A, using 3-HS-85-1A Standard:
* CRD Pump 3A, using 3-HS-85-1A Standard:
Attempts to start standby CRD Pump and may also attempt to start tripped CRD Pump.
Attempts to start standby CRD Pump and may also attempt to start tripped CRD Pump.
SAT_ UNSAT             N/A _COMMENTS:______________________________
SAT_ UNSAT N/A _COMMENTS:______________________________
Performance Step 18:                                                 Critical   Not Critical
Performance Step 18:
[2]     IF Reactor Pressure is less than 900 PSIG and either of the following conditions exists:
Critical Not Critical
* In-service CRD Pump tripped and neither CRD Pump can be started, OR
[2]
* Charging Water Pressure can NOT be restored and maintained above 940 PSIG, THEN PERFORM the following:
IF Reactor Pressure is less than 900 PSIG and either of the following conditions exists:
[2.1]   MANUALLY SCRAM Reactor, IMMEDIATELY PLACE the reactor mode switch in the SHUTDOWN position.
In-service CRD Pump tripped and neither CRD Pump can be started, OR Charging Water Pressure can NOT be restored and maintained above 940 PSIG, THEN PERFORM the following:
[2.1]
MANUALLY SCRAM Reactor, IMMEDIATELY PLACE the reactor mode switch in the SHUTDOWN position.
Standard:
Standard:
Insert a Manual Scram and places Mode Switch in Shutdown.
Insert a Manual Scram and places Mode Switch in Shutdown.
SAT_ UNSAT             N/A     COMMENTS:_______________________________
SAT_ UNSAT N/A COMMENTS:_______________________________
CUE:           After Scram report another operator will continue in 3-AOI-100-I.
CUE:
After Scram report another operator will continue in 3-AOI-100-I.
END OF TASK STOP TIME
END OF TASK STOP TIME


JPM b PAGE 1 OF 5 OPERATOR:_______________________
JPM b
RO___         SRO___               DATE:
PAGE 1
JPM NUMBER:         b TASK NUMBER:         U-003-AL-16 TASK TITLE: RFPT Trip recovery K/A NUMBER: 259001 A2.01                 K/A RATING: RO 3.7 SRO 3.7 TASK STANDARD: RFPT Recovered and restoring Reactor Level prior to an automatic Reactor Scram on Level.
OF 5
LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 2-AOI 1 VALIDATION TIME: 15 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
OPERATOR:_______________________
RO___
SRO___
DATE:
JPM NUMBER:
b TASK NUMBER:
U-003-AL-16 TASK TITLE: RFPT Trip recovery K/A NUMBER: 259001 A2.01 K/A RATING: RO 3.7 SRO 3.7 TASK STANDARD: RFPT Recovered and restoring Reactor Level prior to an automatic Reactor Scram on Level.
LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED:
2-AOI 1 VALIDATION TIME:
15 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
PERFORMANCE TIME:
PERFORMANCE TIME:
COMMENTS:_____________________________
COMMENTS:_____________________________
Additional comment sheets attached? YES   NO RESULTS:     SATISFACTORY___           UNSATISFACTORY SIGNATURE:                                     DATE:
Additional comment sheets attached? YES NO RESULTS:
SATISFACTORY___
UNSATISFACTORY SIGNATURE:
DATE:
EXAMINER
EXAMINER


Line 358: Line 530:
You are a Reactor Operator. Plant startup is in progress. RFPT C has tripped and it is needed to maintain level.
You are a Reactor Operator. Plant startup is in progress. RFPT C has tripped and it is needed to maintain level.
INITIATING CUE:
INITIATING CUE:
The Unit Supervisor directs you to restore RFPT C for level control using Manual Governor Control in accordance with 2-AOI 1, Loss of Reactor Feedwater or Reactor Water Level High/Low starting at step 8. Level band is the normal operating band.
The Unit Supervisor directs you to restore RFPT C for level control using Manual Governor Control in accordance with 2-AOI-3-1, Loss of Reactor Feedwater or Reactor Water Level High/Low starting at step 8. Level band is the normal operating band.


JPM b PAGE 3 OF 5 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
JPM b
PAGE 3
OF 5
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are a Reactor Operator. Plant startup is in progress. RFPT C has tripped and it is needed to maintain level.
You are a Reactor Operator. Plant startup is in progress. RFPT C has tripped and it is needed to maintain level.
INITIATING CUE:
INITIATING CUE:
The Unit Supervisor directs you to restore RFPT C for level control using Manual Governor Control in accordance with 2-AOI 1, Loss of Reactor Feedwater or Reactor Water Level High/Low starting at step 8. Level band is the normal operating band.
The Unit Supervisor directs you to restore RFPT C for level control using Manual Governor Control in accordance with 2-AOI-3-1, Loss of Reactor Feedwater or Reactor Water Level High/Low starting at step 8. Level band is the normal operating band.


JPM b PAGE 4 OF 5 START TIME____
JPM b
Performance Step 1:                                             *Critjcal X Not Critical
PAGE 4 OF 5
[8]     IF RFPT has tripped and needed to maintain level, THEN PERFORM the following:
START TIME____
[8.1] OBTAIN SRO permission to restart RFPT.
Performance Step 1:
        *[8.2] RESET trip by using pushbutton.
*Critjcal X Not Critical
[8]
IF RFPT has tripped and needed to maintain level, THEN PERFORM the following:
[8.1]
OBTAIN SRO permission to restart RFPT.
*[8.2] RESET trip by using pushbutton.
Standard:
Standard:
Resets trip by depressing reset pushbutton for RFPT C SAT     UNSAT       N/A     COMMENTS:_____________________________
Resets trip by depressing reset pushbutton for RFPT C SAT UNSAT N/A COMMENTS:_____________________________
Performance Step 2:                                             Critical X Not Critical
Performance Step 2:
[8.3]   DEPRESS RFPT Speed Control Raise/Lower switch to MANUAL GOVERNOR position.
Critical X Not Critical
[8.3]
DEPRESS RFPT Speed Control Raise/Lower switch to MANUAL GOVERNOR position.
Standard:
Standard:
Depresses RFPT C Speed Control Raise/Lower switch to Manual Governor position.
Depresses RFPT C Speed Control Raise/Lower switch to Manual Governor position.
SAT_ UNSAT           N/A     COMMENTS:____________________________
SAT_ UNSAT N/A COMMENTS:____________________________
Performance Step 3:                                           Critical X Not Critical
Performance Step 3:
[8.4]   PLACE RFPT StartlLocal enable switch to START.
Critical X Not Critical
[8.4]
PLACE RFPT StartlLocal enable switch to START.
Standard:
Standard:
Places RFPT C Start/Local enable switch to Start.
Places RFPT C Start/Local enable switch to Start.
SAT_ USAT           N/A     COMMENTS:______________________________
SAT_ USAT N/A COMMENTS:______________________________


JPM b PAGE 5 OF 5 Performance Step 4:                                             Critical Not Critical X
JPM b
[8.5] VERIFY RFPT accelerates to approximately 600 rpm.
PAGE 5
OF 5
Performance Step 4:
Critical Not Critical X
[8.5]
VERIFY RFPT accelerates to approximately 600 rpm.
Standard:
Standard:
Verifies RFPT C accelerates SAT_ UNSAT           N/A   COMMENTS:_____________________________
Verifies RFPT C accelerates SAT_ UNSAT N/A COMMENTS:_____________________________
Performance Step 5:                                             Critical   Not Critical
Performance Step 5:
[8.7]   For Slow Recovery of RFPT in MANUAL GOVERNOR, RAISE RFPT speed using RFPT Speed Control Raise/Lower switch until desired flow is obtained.
Critical Not Critical
[8.7]
For Slow Recovery of RFPT in MANUAL GOVERNOR, RAISE RFPT speed using RFPT Speed Control Raise/Lower switch until desired flow is obtained.
Standard:
Standard:
Raises speed of RFPT C using RFPT Speed Control switch and restores and maintains Reactor Level SAT_ UNSAT         N/A   COMMENTS:_______
Raises speed of RFPT C using RFPT Speed Control switch and restores and maintains Reactor Level SAT_ UNSAT N/A COMMENTS:_______
END OF TASK STOP TiME
END OF TASK STOP TiME


JPM b PAGE 1 OF 5 OPERATOR:_______________________
JPM b
RO___         SRO___               DATE:________
PAGE 1
JPM NUMBER:           b TASK NUMBER:         U-003-AL-16 TASK TITLE: RFPT Trip recovery K/A NUMBER: 259001 A2.01                 K/A RATING: RO 3.7 SRO 3.7 TASK STANDARD: RFPT Recovered and restoring Reactor Level prior to an automatic Reactor Scram on Level.
OF 5
LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 3-AOI 1 VALIDATION TIME: 15 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
OPERATOR:_______________________
RO___
SRO___
DATE:________
JPM NUMBER:
b TASK NUMBER:
U-003-AL-16 TASK TITLE: RFPT Trip recovery K/A NUMBER: 259001 A2.01 K/A RATING: RO 3.7 SRO 3.7 TASK STANDARD: RFPT Recovered and restoring Reactor Level prior to an automatic Reactor Scram on Level.
LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED:
3-AOI 1 VALIDATION TIME:
15 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
PERFORMANCE TIME:
PERFORMANCE TIME:
COMMENTS:_____________________________
COMMENTS:_____________________________
Additional connuent sheets attached? YES   NO RESULTS:     SATISFACTORY___           UNSATISFACTORY SIGNATURE:                                     DATE:
Additional connuent sheets attached? YES NO RESULTS:
SATISFACTORY___
UNSATISFACTORY SIGNATURE:
DATE:
EXAMiNER
EXAMiNER


Line 406: Line 610:
You are a Reactor Operator. Plant startup is in progress. RFPT C has tripped and it is needed to maintain level.
You are a Reactor Operator. Plant startup is in progress. RFPT C has tripped and it is needed to maintain level.
INITIATING CUE:
INITIATING CUE:
The Unit Supervisor directs you to restore RFPT C for level control using Manual Governor Control in accordance with 3-AOI-3-l, Loss of Reactor Feedwater or Reactor Water Level HighlLow starting at step 11. Level Band is the normal operating band.
The Unit Supervisor directs you to restore RFPT C for level control using Manual Governor Control in accordance with 3-AOI-3-l, Loss ofReactor Feedwater or Reactor Water Level HighlLow starting at step 11. Level Band is the normal operating band.


JPM b PAGE 3 OF 5 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
JPM b
PAGE 3
OF 5
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are a Reactor Operator. Plant startup is in progress. RFPT C has tripped and it is needed to maintain level.
You are a Reactor Operator. Plant startup is in progress. RFPT C has tripped and it is needed to maintain level.
Line 414: Line 621:
The Unit Supervisor directs you to restore RFPT C for level control using Manual Governor Control in accordance with 3-AOI 1, Loss of Reactor Feedwater or Reactor Water Level High/Low starting at step 11. Level Band is the normal operating band.
The Unit Supervisor directs you to restore RFPT C for level control using Manual Governor Control in accordance with 3-AOI 1, Loss of Reactor Feedwater or Reactor Water Level High/Low starting at step 11. Level Band is the normal operating band.


JPM b PAGE 4 OF 5 START TIME____
JPM b
PAGE 4
OF 5
START TIME____
Performance Step 1:
Performance Step 1:
* Critical X Not Critical
* Critical X Not Critical
[11]   IF RFPT has tripped and it is needed to maintain level, THEN PERFORM the following:
[11]
IF RFPT has tripped and it is needed to maintain level, THEN PERFORM the following:
[11.11 OBTAIN Unit Supervisor permission to restart RFPT.
[11.11 OBTAIN Unit Supervisor permission to restart RFPT.
        *[1 1.2] RESET trip by using pushbutton.
*[1 1.2] RESET trip by using pushbutton.
Standard:
Standard:
Resets trip by depressing reset pushbutton for RFPT C SAT     UNSAT       N/A     COMMENTS:____________________________
Resets trip by depressing reset pushbutton for RFPT C SAT UNSAT N/A COMMENTS:____________________________
Performance Step 2:                                               Critical X Not Critical
Performance Step 2:
Critical X Not Critical
[11.3] DEPRESS RFPT Speed Control Raise/Lower switch to MANUAL GOVERNOR position.
[11.3] DEPRESS RFPT Speed Control Raise/Lower switch to MANUAL GOVERNOR position.
Standard:
Standard:
Depresses RFPT C Speed Control Raise/Lower switch to Manual Governor position.
Depresses RFPT C Speed Control Raise/Lower switch to Manual Governor position.
SAT     UNSAT         N/A   COMMENTS:_______________________________
SAT UNSAT N/A COMMENTS:_______________________________
Performance Step 3:                                               Critical X Not Critical
Performance Step 3:
Critical X Not Critical
[11.4] PLACE RFPT Start/Local enable switch to START.
[11.4] PLACE RFPT Start/Local enable switch to START.
Standard:
Standard:
Places RFPT C Start/Local enable switch to Start.
Places RFPT C Start/Local enable switch to Start.
SAT     UNSAT         N/A   COMMENTS:____________________________
SAT UNSAT N/A COMMENTS:____________________________


JPM b PAGE 5 OF 5 Performance Step 4:                                             Critical Not Critical X
JPM b
PAGE 5
OF 5
Performance Step 4:
Critical Not Critical X
[11.5] VERIFY RFPT accelerates to approximately 600 rpm.
[11.5] VERIFY RFPT accelerates to approximately 600 rpm.
Standard:
Standard:
Verifies RFPT C accelerates SAT     UNSAT       N/A     COMMENTS:_______________________________
Verifies RFPT C accelerates SAT UNSAT N/A COMMENTS:_______________________________
Performance Step 5:                                           Critical   Not Critical
Performance Step 5:
Critical Not Critical
[11.7] IF Slow Recovery of RFPT in MANUAL GOVERNOR is desired, THEN RAISE RFPT speed using RFPT Speed Control Raise/Lower switch until desired flow is obtained.
[11.7] IF Slow Recovery of RFPT in MANUAL GOVERNOR is desired, THEN RAISE RFPT speed using RFPT Speed Control Raise/Lower switch until desired flow is obtained.
Standard:
Standard:
Raises speed of RFPT C using RFPT Speed Control switch and restores and maintains Reactor Level SAT_ UNSAT         N/A _COMMENTS:_______
Raises speed of RFPT C using RFPT Speed Control switch and restores and maintains Reactor Level SAT_ UNSAT N/A _COMMENTS:_______
END OF TASK STOP TIME
END OF TASK STOP TIME


JPM   c PAGE 1 OF 7 OPERATOR:_____________________
JPM c
RO___         SRO___         DATE:
PAGE 1
JPM NUMBER:         c TASK NUMBER:         U-000-EM-50 TASK TITLE:         2-EOI APPENDIX-i 1D Alternate RPV Pressure control Systems-Main Steamline Drains and/or Turbine and RFPT Drains K/A NUMBER:         239001 A1.08 K/A RATING: RO 3.8 SRO 3.8 TASK STANDARD: Establish alternate pressure control with Main Steamline drains, Turbine and RFPT draifs LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 2-EOI APPENDIX-i 1D VALIDATION TIME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
OF 7
OPERATOR:_____________________
RO___
SRO___
DATE:
JPM NUMBER:
c TASK NUMBER:
U-000-EM-50 TASK TITLE:
2-EOI APPENDIX-i 1D Alternate RPV Pressure control Systems-Main Steamline Drains and/or Turbine and RFPT Drains K/A NUMBER:
239001 A1.08 K/A RATING: RO 3.8 SRO 3.8 TASK STANDARD: Establish alternate pressure control with Main Steamline drains, Turbine and RFPT draifs LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED:
2-EOI APPENDIX-i 1D VALIDATION TIME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
PERFORMANCE TIME:
PERFORMANCE TIME:
COMMENTS:______________________________
COMMENTS:______________________________
Additional comment sheets attached? YES       NO RESULTS:     SATISFACTORY___               UNSATISFACTORY SIGNATURE:                                         DATE:
Additional comment sheets attached? YES NO RESULTS:
SATISFACTORY___
UNSATISFACTORY SIGNATURE:
DATE:
EXAMINER
EXAMINER


INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are a Unit 2 Operator. Unit 2 reactor has scrammed. Emergency depressurization is not required but alternate means of pressure control is required. Turbine Bypass valves are NOT available. EOI- 1 has been followed to RC/P- 11. Another Operator is assigned Reactor Level Control.
You are a Unit 2 Operator. Unit 2 reactor has scrammed. Emergency depressurization is not required but alternate means ofpressure control is required. Turbine Bypass valves are NOT available. EOI-1 has been followed to RC/P-11. Another Operator is assigned Reactor Level Control.
INITIATING CUE:
INITIATING CUE:
The Unit Supervisor directs you to establish alternate pressure control as directed by 2-EOI Appendix liD Alternate RPV Pressure control Systems-Main Steamline Drains and/or Turbine and RFPT Drains and maintain Reactor Pressure 700 to 900 psig.
The Unit Supervisor directs you to establish alternate pressure control as directed by 2-EOI Appendix liD Alternate RPV Pressure control Systems-Main Steamline Drains and/or Turbine and RFPT Drains and maintain Reactor Pressure 700 to 900 psig.


JPM c PAGE 3 OF 7 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say my task is complete and I will acknowledge that your task is complete.
JPM c
PAGE 3
OF 7
IN-SIMULATOR:
I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say my task is complete and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are a Unit 2 Operator. Unit 2 reactor has scrammed. Emergency depressurization is not required but alternate means of pressure control is required. Turbine Bypass valves are NOT available. EOI-1 has been followed to RC/P-l 1. Another Operator is assigned Reactor Level Control.
You are a Unit 2 Operator. Unit 2 reactor has scrammed. Emergency depressurization is not required but alternate means ofpressure control is required. Turbine Bypass valves are NOT available. EOI-1 has been followed to RC/P-l 1. Another Operator is assigned Reactor Level Control.
INITIATING CUE:
INITIATING CUE:
The Unit Supervisor directs you to establish alternate pressure control as directed by 2-EOI Appendix liD Alternate RPV Pressure control Systems-Main Steamline Drains and/or Turbine and RFPT Drains and maintain Reactor Pressure 700 to 900 psig.
The Unit Supervisor directs you to establish alternate pressure control as directed by 2-EOI Appendix liD Alternate RPV Pressure control Systems-Main Steamline Drains and/or Turbine and RFPT Drains and maintain Reactor Pressure 700 to 900 psig.


3PM c PAGE 4 OF 7 START TIME____
3PM c
Performance Step 1:                                               Critical Not Critical
PAGE 4 OF 7
: 1. IF BOTH of the following exist:
START TIME____
* Emergency RPV Depressurization is required, AND
Performance Step 1:
* Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 1 1H.
Critical Not Critical 1.
IF BOTH ofthe following exist:
Emergency RPV Depressurization is required, AND Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 1 1H.
Standard:
Standard:
Given in initial conditions, does not exit procedure SAT     UNSAT       N/A     COMMENTS:____________________________
Given in initial conditions, does not exit procedure SAT UNSAT N/A COMMENTS:____________________________
Performance Step 2:                                               Critical   Not Critical X
Performance Step 2:
: 2.     VERIFY hotwell pressure below -7 in. Hg.
Critical Not Critical X 2.
VERIFY hotwell pressure below -7 in. Hg.
Standard:
Standard:
Verifies hotwell pressure less than -7 in. Hg.
Verifies hotwell pressure less than -7 in. Hg.
SAT     UNSAT       N/A     COMMENTS:____________________________
SAT UNSAT N/A COMMENTS:____________________________


JPM   c PAGE 5 OF 7 Performance Step 3:                                         Critical Not Critical X
JPM c
: 3. CONTROL RPV pressure with Main Steam line drains as follows:
PAGE 5
: a. VERIFY PCIS reset.
OF 7
Performance Step 3:
Critical Not Critical X 3.
CONTROL RPV pressure with Main Steam line drains as follows:
a.
VERIFY PCIS reset.
Standard:
Standard:
Verifies PCIS Reset SAT     UNSAT     N/A   COMMENTS:__________________________
Verifies PCIS Reset SAT UNSAT N/A COMMENTS:__________________________
Performance Step 4:                                         Critical X Not Critical
Performance Step 4:
: b. OPEN the following valves (Panel 9-3):
Critical X Not Critical b.
* 2-FCV-l-55, MN STM LThJE DRAIN INBD ISOLATION VLV
OPEN the following valves (Panel 9-3):
* 2-FCV-l-56, MN STM LINE DRAIN OUTBD ISOLATION VLV
2-FCV-l-55, MN STM LThJE DRAIN INBD ISOLATION VLV 2-FCV-l-56, MN STM LINE DRAIN OUTBD ISOLATION VLV 2-FCV-1-58, UPSTREAM MSL DRAIN TO CONDENSER Standard:
* 2-FCV-1-58, UPSTREAM MSL DRAIN TO CONDENSER Standard:
Opens 2-FCV-1-55, 2-FCV-1-56, and 2-FCV-l-58 SAT UNSAT N/A _COMMENTS:________
Opens 2-FCV-1-55, 2-FCV-1-56, and 2-FCV-l-58 SAT     UNSAT       N/A _COMMENTS:________


JPM   c PAGE 6 OF 7 Performance Step 5:                                                 Critical   Not Critical
JPM c
: 4.     THROTTLE 2-FCV-l-59, DOWNSTREAM MSL DRAIN TO CONDENSER, as necessary to control cooldown rate.
PAGE 6
OF 7
Performance Step 5:
Critical Not Critical 4.
THROTTLE 2-FCV-l-59, DOWNSTREAM MSL DRAIN TO CONDENSER, as necessary to control cooldown rate.
Standard:
Standard:
Throttles 2-FCV-l-59 open and control cooldown rate SAT_ UNSAT           N/A     COMMENTS:___________
Throttles 2-FCV-l-59 open and control cooldown rate SAT_ UNSAT N/A COMMENTS:___________
CITE:           Iiecessary when 2FCV-1-59 is<IhII opex, DireeI Oeratorthat AdditioiiaI RPVPrsureConto1 is neeessarf Performance Step 6:                                                 Critical X Not Critical
CITE:
: 5.     IF At least one main steam line is open AND EITHER of the following exist:
Iiecessary when2FCV-1-59is<IhII opex, DireeI OeratorthatAdditioiiaI RPVPrsureConto1 isneeessarf Performance Step 6:
Critical X Not Critical 5.
IF At least one main steam line is open AND EITHER of the following exist:
Turbine bypass valves are NOT available, OR Additional RPV pressure control is necessary, THEN CONTROL RPV pressure with Main Turbine and RFPT drains as follows:
Turbine bypass valves are NOT available, OR Additional RPV pressure control is necessary, THEN CONTROL RPV pressure with Main Turbine and RFPT drains as follows:
: a.     OPEN the following Main Turbine Drain valves (Panel 9-7):
a.
* 2-FCV-6-100, STOP VALVE 1 BEFORE         SEAT DR VLV
OPEN the following Main Turbine Drain valves (Panel 9-7):
* 2-FCV-6-1O1, STOP VALVE 2 BEFORE         SEAT DR VLV
2-FCV-6-100, STOP VALVE 1 BEFORE SEAT DR VLV 2-FCV-6-1O1, STOP VALVE 2 BEFORE SEAT DR VLV 2-FCV-6-102, STOP VALVE 3 BEFORE SEAT DR VLV 2-FCV-6-103, STOP VALVE 4 BEFORE SEAT DR VLV Standard:
* 2-FCV-6-102, STOP VALVE 3 BEFORE         SEAT DR VLV
Opens 2-FCV-6-100, 2-FCV-6-1O1, 2-FCV-6-102, and 2-FCV-6-103 SAT_ UNSAT N/A COMMENTS:
* 2-FCV-6-103, STOP VALVE 4 BEFORE         SEAT DR VLV Standard:
Opens 2-FCV-6-100, 2-FCV-6-1O1, 2-FCV-6-102, and 2-FCV-6-103 SAT_ UNSAT           N/A     COMMENTS:


JPM   c PAGE 7 OF 7 Performance Step 7:                                             Critical X Not Critical
JPM c
: b. OPEN the following RFPT drain valves (Panel 9-6):
PAGE 7
* 2-FCV-6-122, RFPT 2A HP STOP VLV ABOVE SEAT DR
OF 7
* 2-FCV-6-127, RFPT 2B HP STOP VLV ABOVE SEAT DR
Performance Step 7:
* 2-FCV-6-l32, RFPT 2C HP STOP VLV ABOVE SEAT DR Standard:
Critical X Not Critical b.
Opens 2-FCV-6-122, 2-FCV-6-l27, and 2-FCV-6-132 SAT     UNSAT       N/A     COMMENTS:_________
OPEN the following RFPT drain valves (Panel 9-6):
CUE:           Another Operator is working on other means ofPressure ContrOl END OF TASK STOP TIME____
2-FCV-6-122, RFPT 2A HP STOP VLV ABOVE SEAT DR 2-FCV-6-127, RFPT 2B HP STOP VLV ABOVE SEAT DR 2-FCV-6-l32, RFPT 2C HP STOP VLV ABOVE SEAT DR Standard:
Opens 2-FCV-6-122, 2-FCV-6-l27, and 2-FCV-6-132 SAT UNSAT N/A COMMENTS:_________
CUE:
Another Operator is working on other means ofPressure ContrOl END OF TASK STOP TIME____


JPM   c PAGE 1 OF 7 OPERATOR:_____________________
JPM c
RO___         SRO             DATE:
PAGE 1
JPM NUMBER:         c TASK NUMBER:         U-000-EM-50 TASK TITLE:         3-EOI APPENDIX-i 1D Alternate RPV Pressure control Systems-Main Steamline Drains and/or Turbine and RFPT Drains K/A NUMBER:         239001 Ai.08     K/A RATING: RO 3.8 SRO 3.8 TASK STANDARD: Establish alternate pressure control with Main Steamline drains, Turbine and RFPT drains LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED:                 3-EOI APPENDIX-i 1D VALIDATION TIME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
OF 7
OPERATOR:_____________________
RO___
SRO DATE:
JPM NUMBER:
c TASK NUMBER:
U-000-EM-50 TASK TITLE:
3-EOI APPENDIX-i 1D Alternate RPV Pressure control Systems-Main Steamline Drains and/or Turbine and RFPT Drains K/A NUMBER:
239001 Ai.08 K/A RATING: RO 3.8 SRO 3.8 TASK STANDARD: Establish alternate pressure control with Main Steamline drains, Turbine and RFPT drains LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED:
3-EOI APPENDIX-i 1D VALIDATION TIME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
PERFORMANCE TIME:
PERFORMANCE TIME:
COMMENTS:______________________________
COMMENTS:______________________________
Additional comment sheets attached? YES       NO RESULTS:     SATISFACTORY___               UNSATISFACTORY SIGNATURE:                                         DATE:
Additional comment sheets attached? YES NO RESULTS:
SATISFACTORY___
UNSATISFACTORY SIGNATURE:
DATE:
EXAMINER
EXAMINER


INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are a Unit 3 Operator. Unit 3 reactor has scrammed. Emergency depressurization is not required but alternate means of pressure control is required. Turbine Bypass valves are NOT available. EOI- 1 has been followed to RC/P- 11. Another Operator is assigned Reactor Level Control.
You are a Unit 3 Operator. Unit 3 reactor has scrammed. Emergency depressurization is not required but alternate means ofpressure control is required. Turbine Bypass valves are NOT available. EOI-1 has been followed to RC/P-11. Another Operator is assigned Reactor Level Control.
INITIATING CUE:
INITIATING CUE:
The Unit Supervisor directs you to establish alternate pressure control as directed by 3-EOI Appendix-i 1D Alternate RPV Pressure Control Systems Main Steam Line Drains and/or Turbine and RFPT Drains and maintain Reactor Pressure 700 to 900 psig.
The Unit Supervisor directs you to establish alternate pressure control as directed by 3-EOI Appendix-i 1D Alternate RPV Pressure Control Systems Main Steam Line Drains and/or Turbine and RFPT Drains and maintain Reactor Pressure 700 to 900 psig.


JPM c PAGE 3 OF 7 IN-S1M1JLATOR:         I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say my task is complete and I will acknowledge that your task is complete.
JPM c
PAGE 3
OF 7
IN-S1M1JLATOR:
I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say my task is complete and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are a Unit 3 Operator. Unit 3 reactor has scrammed. Emergency depressurization is not required but alternate means of pressure control is required. Turbine Bypass valves are NOT available. EOI- 1 has been followed to RC/P- 11. Another Operator is assigned Reactor Level Control.
You are a Unit 3 Operator. Unit 3 reactor has scrammed. Emergency depressurization is not required but alternate means ofpressure control is required. Turbine Bypass valves are NOT available. EOI-1 has been followed to RC/P-11. Another Operator is assigned Reactor Level Control.
INITIATiNG CUE:
INITIATiNG CUE:
The Unit Supervisor directs you to establish alternate pressure control as directed by 3-EOI Appendix-i 1D Alternate RPV Pressure Control Systems Main Steam Line Drains and/or Turbine and RFPT Drains and maintain Reactor Pressure 700 to 900 psig.
The Unit Supervisor directs you to establish alternate pressure control as directed by 3-EOI Appendix-i 1D Alternate RPV Pressure Control Systems Main Steam Line Drains and/or Turbine and RFPT Drains and maintain Reactor Pressure 700 to 900 psig.


JPM   c PAGE 4 OF 7 START TIME____
JPM c
Performance Step 1:                                               Critical Not Critical X
PAGE 4 OF 7
: 1. IF BOTH of the following exist:
START TIME____
* Emergency RPV Depressurization is required, AND
Performance Step 1:
* Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 1 1H.
Critical Not Critical X 1.
IF BOTH ofthe following exist:
Emergency RPV Depressurization is required, AND Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 1 1H.
Standard:
Standard:
Given in initial conditions, does not exit procedure SAT     UNSAT       N/A     COMMENTS:_______________________________
Given in initial conditions, does not exit procedure SAT UNSAT N/A COMMENTS:_______________________________
Performance Step 2:                                               Critical Not Critical
Performance Step 2:
: 2.     VERIFY hotwell pressure below -7 in. Hg.
Critical Not Critical 2.
VERIFY hotwell pressure below -7 in. Hg.
Standard:
Standard:
Verifies hotwell pressure less than -7 in. Hg.
Verifies hotwell pressure less than -7 in. Hg.
SAT     UNSAT       N/A     COMMENTS:_______________________________
SAT UNSAT N/A COMMENTS:_______________________________


JPM   c PAGE 5 OF 7 Performance Step 3:                                           Critical Not Critical
JPM c
: 3. CONTROL RPV pressure with Main Steam line drains as follows:
PAGE 5
: a. VERIFY PCIS reset.
OF 7
Performance Step 3:
Critical Not Critical 3.
CONTROL RPV pressure with Main Steam line drains as follows:
a.
VERIFY PCIS reset.
Standard:
Standard:
Verifies PCIS Reset SAT     UNSAT     N/A     COMMENTS:__________________________
Verifies PCIS Reset SAT UNSAT N/A COMMENTS:__________________________
Performance Step 4:                                           Critical X Not Critical
Performance Step 4:
: b.     OPEN the following valves (Panel 3-9-3):
Critical X Not Critical b.
* 3-FCV-1-55, MN STM LINE DRAIN INBD ISOLATION VLV
OPEN the following valves (Panel 3-9-3):
* 3-FCV-l-56, MN STM LINE DRAIN OUTBD ISOLATION VLV
3-FCV-1-55, MN STM LINE DRAIN INBD ISOLATION VLV 3-FCV-l-56, MN STM LINE DRAIN OUTBD ISOLATION VLV 3-FCV-l-58, UPSTREAM MSL DRAIN TO CONDENSER Standard:
* 3-FCV-l-58, UPSTREAM MSL DRAIN TO CONDENSER Standard:
Opens 3-FCV-l -55, 3-FCV-l -56, and 3-FCV-l -58 SAT_ UNSAT N/A _COMMENTS:_______
Opens 3-FCV-l -55, 3-FCV-l -56, and 3-FCV-l -58 SAT_ UNSAT         N/A _COMMENTS:_______


JPM   c PAGE 6 OF 7 Performance Step 5:                                     V           Critical X Not Critical
JPM c
: 4.     THROTTLE 3-FCV-1-59, DOWNSTREAM MSL DRAIN TO CONDENSER, as necessary to control cooldown rate.
PAGE 6
OF 7
Performance Step 5:
V Critical X Not Critical 4.
THROTTLE 3-FCV-1-59, DOWNSTREAM MSL DRAIN TO CONDENSER, as necessary to control cooldown rate.
Standard:
Standard:
Throttles 3-FCV-1-59 open and control cooldown rate SAT_ UNSAT           N/A       COMMENTS:__________
Throttles 3-FCV-1-59 open and control cooldown rate SAT_ UNSAT N/A COMMENTS:__________
fViiecsrywhen 3-VFO1-$9 is full cpex, Direct Operator Iiat Additiona1.
ECUE V
V ECUE j                 RPVJress ControIi&#xe7;iccessaiy         V Performance Step 6:                                                 Critical   Not Critical
fViiecsrywhen 3-VFO1-$9 is full cpex,Direct Operator IiatAdditiona1.
: 5.     IF At least one main steam line is open AND EITHER of the following exist:
j RPVJressControIi&#xe7;iccessaiy V
Performance Step 6:
Critical Not Critical 5.
IF At least one main steam line is open AND EITHER of the following exist:
Turbine bypass valves are NOT available, OR Additional RPV pressure control is necessary, THEN CONTROL RPV pressure with Main Turbine and RFPT drains as follows:
Turbine bypass valves are NOT available, OR Additional RPV pressure control is necessary, THEN CONTROL RPV pressure with Main Turbine and RFPT drains as follows:
: a.     OPEN the following Main Turbine Drain valves (Panel 3-9-7):
a.
* 3-FCV-6-lOO, STOP VALVE 1 BEFORE         SEAT DR VLV
OPEN the following Main Turbine Drain valves (Panel 3-9-7):
* 3-FCV-6-1O1, STOP VALVE 2 BEFORE         SEAT DRVLV
3-FCV-6-lOO, STOP VALVE 1 BEFORE SEAT DR VLV 3-FCV-6-1O1, STOP VALVE 2 BEFORE SEAT DRVLV 3-FCV-6-102, STOP VALVE 3 BEFORE SEAT DR VLV 3-FCV-6-103, STOP VALVE 4 BEFORE SEAT DR VLV Standard:
* 3-FCV-6-102, STOP VALVE 3 BEFORE         SEAT DR VLV
Opens 3-FCV-6-100, 3-FCV-6-1O1, 3-FCV-6-102, and 3-FCV-6-103 SAT_ UNSAT N/A COMMENTS:____________________________
* 3-FCV-6-103, STOP VALVE 4 BEFORE         SEAT DR VLV Standard:
Opens 3-FCV-6-100, 3-FCV-6-1O1, 3-FCV-6-102, and 3-FCV-6-103 SAT_ UNSAT           N/A     COMMENTS:____________________________


JPM   c PAGE 7 OF 7 Performance Step 7:                                             Critical X Not Critical
JPM c
: b.     OPEN the following RFPT drain valves (Panel 3-9-6):
PAGE 7
* 3-FCV-6-122, RFPT 3A HP STOP VLV ABOVE SEAT DR
OF 7
* 3-FCV-6-127, RFPT 3B HP STOP VLV ABOVE SEAT DR
Performance Step 7:
* 3-FCV-6-132, RFPT 3C HP STOP VLV ABOVE SEAT DR Standard:
Critical X Not Critical b.
Opens 3-FCV-6-122, 3-FCV-6-127, and 3-FCV-6-132 SAT_ UNSAT         N/A     COMMENTS:_________
OPEN the following RFPT drain valves (Panel 3-9-6):
CUE:           Ailother Qperatoris working on other means ofPressure Control END OF TASK STOP TIME____
3-FCV-6-122, RFPT 3A HP STOP VLV ABOVE SEAT DR 3-FCV-6-127, RFPT 3B HP STOP VLV ABOVE SEAT DR 3-FCV-6-132, RFPT 3C HP STOP VLV ABOVE SEAT DR Standard:
Opens 3-FCV-6-122, 3-FCV-6-127, and 3-FCV-6-132 SAT_ UNSAT N/A COMMENTS:_________
CUE:
Ailother Qperatoris working on othermeans ofPressure Control END OF TASK STOP TIME____


JPM d PAGE 1 of9 OPERATOR:
JPM d
RO___         SRO                   DATE:
PAGE 1 of9 OPERATOR:
JPM NUMBER:           d TASK NUMBER:         U-000-EM-50 TASK TITLE:         2-EOI-APPENDIX-8F Restore Reactor and Refuel Zone Ventilation Fans following a Group 6 Isolation KIA NUMBER: 295032 EA1 .03                 K/A RATING: RO 3.7 SRO 3.7 TASK STANDARD: Restore Reactor and Refuel Zone Ventilation Fans following a Group 6 Isolation PERFORMANCE LOCATION:               Simulator REFERENCES/PROCEDURES NEEDED: 2-EOI-Appendix-8F VALIDATION TIME: 10 minutes MAX. TIME ALLOWED:
RO___
SRO DATE:
JPM NUMBER:
d TASK NUMBER:
U-000-EM-50 TASK TITLE:
2-EOI-APPENDIX-8F Restore Reactor and Refuel Zone Ventilation Fans following a Group 6 Isolation KIA NUMBER: 295032 EA1.03 K/A RATING: RO 3.7 SRO 3.7 TASK STANDARD: Restore Reactor and Refuel Zone Ventilation Fans following a Group 6 Isolation PERFORMANCE LOCATION:
Simulator REFERENCES/PROCEDURES NEEDED: 2-EOI-Appendix-8F VALIDATION TIME: 10 minutes MAX. TIME ALLOWED:
PERFORMANCE TIME:
PERFORMANCE TIME:
COMMENTS:______________________________
COMMENTS:______________________________
Additional comment sheets attached? YES       NO RESULTS:     SATISFACTORY___             UNSATISFACTORY SIGNATURE:                                         DATE:
Additional comment sheets attached? YES NO RESULTS:
SATISFACTORY___
UNSATISFACTORY SIGNATURE:
DATE:
EXAMINER
EXAMINER


Line 589: Line 878:
The Unit Supervisor directs you to restore reactor and refuel zone ventilation as directed by 2-EOI Appendix-8F. SGTS is required for Operation and fast speed operation is desired for Reactor and Refuel Zone Ventilation.
The Unit Supervisor directs you to restore reactor and refuel zone ventilation as directed by 2-EOI Appendix-8F. SGTS is required for Operation and fast speed operation is desired for Reactor and Refuel Zone Ventilation.


JPM d PAGE 3 of 9 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfiilly, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
JPM d
PAGE 3 of 9 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfiilly, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are an Operator. Unit 2 reactor has scrammed and a Group 6 isolation has occurred from RPV low level. EOI-l has been entered and followed to RC/P-8. The US wants the reactor and refueling zone ventilation systems restored. No other Group 6 isolation signals exist. Appendix 8E, Bypassing Group 6 RPV Low Level and High Drywell Pressure Isolation Interlocks, has been completed.
You are an Operator. Unit 2 reactor has scrammed and a Group 6 isolation has occurred from RPV low level. EOI-l has been entered and followed to RC/P-8. The US wants the reactor and refueling zone ventilation systems restored. No other Group 6 isolation signals exist. Appendix 8E, Bypassing Group 6 RPV Low Level and High Drywell Pressure Isolation Interlocks, has been completed.
Line 595: Line 885:
The Unit Supervisor directs you to restore reactor and refuel zone ventilation as directed by 2-EOI Appendix-8F. SGTS is required for Operation and fast speed operation is desired for Reactor and Refuel Zone Ventilation.
The Unit Supervisor directs you to restore reactor and refuel zone ventilation as directed by 2-EOI Appendix-8F. SGTS is required for Operation and fast speed operation is desired for Reactor and Refuel Zone Ventilation.


JPM d PAGE 4 of 9 START TIME____
JPM d
Performance Step 1:                                             Critical X Not Critical
PAGE 4 of 9 START TIME____
: 1. VERIFY PCIS Reset.
Performance Step 1:
Critical X Not Critical 1.
VERIFY PCIS Reset.
Standard:
Standard:
Resets PCIS SAT     UNSAT       N/A _COMMENTS:_______________________________
Resets PCIS SAT UNSAT N/A _COMMENTS:_______________________________
Performance Step 2:                                           Critical   Not Critical
Performance Step 2:
: 2. PLACE Refuel Zone Ventilation in service as follows (Panel 2-9-25):
Critical Not Critical 2.
: a.     VERIFY 2-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch is in OFF.
PLACE Refuel Zone Ventilation in service as follows (Panel 2-9-25):
a.
VERIFY 2-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch is in OFF.
Standard:
Standard:
Places 2-HS-64-3A in the Off position.
Places 2-HS-64-3A in the Offposition.
SAT     UNSAT       N/A _COMMENTS:________________________________
SAT UNSAT N/A _COMMENTS:________________________________
Performance Step 3:                                           Critical X Not Critical
Performance Step 3:
: b.     PLACE 2-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch to SLOW A (SLOW B).
Critical X Not Critical b.
PLACE 2-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch to SLOW A (SLOW B).
Standard:
Standard:
Places 2-HS-64-3A to SLOW A or SLOW B position.
Places 2-HS-64-3A to SLOW A or SLOW B position.
SAT     UNSAT       N/A   COMMENTS:_______________________________
SAT UNSAT N/A COMMENTS:_______________________________


JPM d PAGE 5 of 9 Performance Step 4:                                                 Critical Not Critical
JPM d
: c.     CHECK two SPLY/EXH A(B) green lights above 2-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch extinguish and two SPLY/EXH A(B) red lights illuminate.
PAGE 5 of 9 Performance Step 4:
Critical Not Critical c.
CHECK two SPLY/EXH A(B) green lights above 2-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch extinguish and two SPLY/EXH A(B) red lights illuminate.
Standard:
Standard:
Verifies proper combination of lights On and Off above 2-HS-64-3A.
Verifies proper combination of lights On and Off above 2-HS-64-3A.
SAT     UNSAT     N/A _COMMENTS:______________________________
SAT UNSAT N/A _COMMENTS:______________________________
Performance Step 5:                                                 Critical   Not Critical X
Performance Step 5:
: d.     VERIFY OPEN the following dampers:
Critical Not Critical X d.
* 2-FCO-64-5, REFUEL ZONE SPLY OUTBD ISOL DMPR
VERIFY OPEN the following dampers:
* 2-FCO-64-6, REFUEL ZONE SPLY INBD ISOL DMPR
2-FCO-64-5, REFUEL ZONE SPLY OUTBD ISOL DMPR 2-FCO-64-6, REFUEL ZONE SPLY INBD ISOL DMPR 2-FCO-64-9, REFUEL ZONE EXH OUTBD ISOL DMPR 2-FCO-64-1O, REFUEL ZONE EXH 11BD ISOL DMPR Standard:
* 2-FCO-64-9, REFUEL ZONE EXH OUTBD ISOL DMPR
Verifies Red position indicating lamps On for dampers listed above SAT_ UNSAT N/A COMMENTS:_________________
* 2-FCO-64-1O, REFUEL ZONE EXH 11BD ISOL DMPR Standard:
Verifies Red position indicating lamps On for dampers listed above SAT_ UNSAT         N/A     COMMENTS:_________________


JPM d PAGE 6 of 9 Performance Step 6:                                           Critical   Not Critical
JPM d
: 3. PLACE Reactor Zone Ventilation in service as follows (Panel 2-9-25):
PAGE 6 of 9 Performance Step 6:
: a.     VERIFY 2-HS-64-l 1A, REACTOR ZONE FANS AND DAMPERS, control switch is in OFF.
Critical Not Critical 3.
PLACE Reactor Zone Ventilation in service as follows (Panel 2-9-25):
a.
VERIFY 2-HS-64-l 1A, REACTOR ZONE FANS AND DAMPERS, control switch is in OFF.
Standard:
Standard:
Places 2-HS-64-l 1A in the Off position.
Places 2-HS-64-l 1A in the Off position.
SAT     UNSAT       N/A _COMMENTS:______________________________
SAT UNSAT N/A _COMMENTS:______________________________
Performance Step 7:                                           Critical X Not Critical
Performance Step 7:
: b. PLACE 2-HS-64-l 1A, REACTOR ZONE FANS AND DAMPERS, control switch in SLOW A (SLOW B).
Critical X Not Critical b.
PLACE 2-HS-64-l 1A, REACTOR ZONE FANS AND DAMPERS, control switch in SLOW A (SLOW B).
Standard:
Standard:
Places 2-HS-64-l 1A to SLOW A or SLOW B position.
Places 2-HS-64-l 1A to SLOW A or SLOW B position.
SAT     UNSAT       N/A _COMMENTS:____________
SAT UNSAT N/A _COMMENTS:____________


JPM d PAGE 7 of 9 Performance Step 8:                                                 Critical Not Critical
JPM d
: c.     CHECK two SPLY/EXH A(B) green lights above 2-HS-64-l 1A, REACTOR ZONE FANS AND DAMPERS, control switch extinguish and two SPLY/EXH A(B) red lights illuminate.
PAGE 7 of 9 Performance Step 8:
Critical Not Critical c.
CHECK two SPLY/EXH A(B) green lights above 2-HS-64-l 1A, REACTOR ZONE FANS AND DAMPERS, control switch extinguish and two SPLY/EXH A(B) red lights illuminate.
Standard:
Standard:
Verifies proper combination of lights On and Off above 2-HS-64-3A.
Verifies proper combination of lights On and Off above 2-HS-64-3A.
SAT     UNSAT     N/A     COMMENTS:______________________________
SAT UNSAT N/A COMMENTS:______________________________
Performance Step 9:                                                 Critical   Not Critical
Performance Step 9:
: d.     VERIFY OPEN the following dampers:
Critical Not Critical d.
* 2-FCO-64-13, REACTOR ZONE SPLY OUTBD ISOL DMPR
VERIFY OPEN the following dampers:
* 2-FCO-64-14, REACTOR ZONE SPLY INBD ISOL DMPR
2-FCO-64-13, REACTOR ZONE SPLY OUTBD ISOL DMPR 2-FCO-64-14, REACTOR ZONE SPLY INBD ISOL DMPR 2-FCO-64-42, REACTOR ZONE EXH INBD ISOL DMPR 2-FCO-64-43, REACTOR ZONE EXH OUTBD ISOL DMPR Standard:
* 2-FCO-64-42, REACTOR ZONE EXH INBD ISOL DMPR
Verifies Red position indicating lamps On for dampers listed above SAT UNSAT N/A COMMENTS:_________________
* 2-FCO-64-43, REACTOR ZONE EXH OUTBD ISOL DMPR Standard:
Verifies Red position indicating lamps On for dampers listed above SAT     UNSAT       N/A     COMMENTS:_________________


JPM d PAGE 8 of 9 Performance Step 10:                                               Critical Not Critical X
JPM d
: 4.     IF SGTS is NOT required for operation, THEN SECURE SGTS as follows:
PAGE 8 of 9 Performance Step 10:
Critical Not Critical X 4.
IF SGTS is NOT required for operation, THEN SECURE SGTS as follows:
Standard:
Standard:
Given in Initial conditions that SGTS is required.
Given in Initial conditions that SGTS is required.
SAT     UNSAT       N/A     COMMENTS:_______________________________
SAT UNSAT N/A COMMENTS:_______________________________
Performance Step 11:                                               Critical Not Critical
Performance Step 11:
: 5.     IF Reactor Zone Fan fast speed is desired following 5 minutes of slow speed operation, THEN PLACE 2-HS-64-l 1A, REACTOR ZONE FANS AND DAMPERS, control switch in FAST A (FAST B).
Critical Not Critical 5.
IF Reactor Zone Fan fast speed is desired following 5 minutes of slow speed operation, THEN PLACE 2-HS-64-l 1A, REACTOR ZONE FANS AND DAMPERS, control switch in FAST A (FAST B).
Standard:
Standard:
Places 2-HS-64-1 1A in either FAST A or FAST B position in accordance with which set of fans were started in slow SAT     UNSAT       N/A     COMMENTS:________________________________
Places 2-HS-64-1 1A in either FAST A or FAST B position in accordance with which set of fans were started in slow SAT UNSAT N/A COMMENTS:________________________________
CUE: Five Minutes has elapsed
CUE: Five Minutes has elapsed


JPM d PAGE 9 of 9 Performance Step 12:                                               Critical Not Critical
JPM d
: 6. IF Refuel Zone Fan fast speed is desired following 5 minutes of slow speed operation, THEN PLACE 2-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch in FAST A (FAST B).
PAGE 9 of 9 Performance Step 12:
Critical Not Critical 6.
IF Refuel Zone Fan fast speed is desired following 5 minutes of slow speed operation, THEN PLACE 2-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch in FAST A (FAST B).
Standard:
Standard:
Places 2-HS-64-3A in either FAST A or FAST B position in accordance with which set of fans were started in slow.
Places 2-HS-64-3A in either FAST A or FAST B position in accordance with which set of fans were started in slow.
SAT     UNSAT       N/A     COMMENTS:
SAT UNSAT N/A COMMENTS:
[CUE: Five Minutes has elapsed END OF TASK STOP TIME:
[CUE: Five Minutes has elapsed END OF TASK STOP TIME:


JPM d PAGE 1 of 9 OPERATOR:
JPM d
RO           SRO                   DATE:_____
PAGE 1 of 9 OPERATOR:
JPM NUMBER:         d TASK NUMBER:         U-000-EM-50 TASK TITLE:   3-EOI APPENDIX-8F Restore Reactor and Refuel Zone Ventilation Fans following a Group 6 Isolation K/A NUMBER: 295032 EA1 .03                 KJA RATING: RO 3.7 SRO 3.7 TASK STANDARD: Restore Reactor and Refuel Zone Ventilation Fans following a Group 6 Isolation PERFORMANCE LOCATION:               Simulator REFERENCES/PROCEDURES NEEDED: 3-EOI Appendix-8F VALIDATION TIME: 10 minutes MAX. TIME ALLOWED:
RO SRO DATE:_____
JPM NUMBER:
d TASK NUMBER:
U-000-EM-50 TASK TITLE:
3-EOI APPENDIX-8F Restore Reactor and Refuel Zone Ventilation Fans following a Group 6 Isolation K/A NUMBER: 295032 EA1.03 KJA RATING: RO 3.7 SRO 3.7 TASK STANDARD: Restore Reactor and Refuel Zone Ventilation Fans following a Group 6 Isolation PERFORMANCE LOCATION:
Simulator REFERENCES/PROCEDURES NEEDED: 3-EOI Appendix-8F VALIDATION TIME: 10 minutes MAX. TIME ALLOWED:
PERFORMANCE TIME:
PERFORMANCE TIME:
COMMENTS:______________________________
COMMENTS:______________________________
Additional comment sheets attached? YES       NO RESULTS:     SATISFACTORY___             UNSATISFACTORY SIGNATURE:                                         DATE:
Additional comment sheets attached? YES NO RESULTS:
SATISFACTORY___
UNSATISFACTORY SIGNATURE:
DATE:
EXAMINER
EXAMINER


Line 681: Line 993:
The Unit Supervisor directs you to restore reactor and refuel zone ventilation as directed by 3-EOI Appendix-8F. SGTS is required for Operation and fast speed operation is desired for Reactor and Refuel Zone Ventilation.
The Unit Supervisor directs you to restore reactor and refuel zone ventilation as directed by 3-EOI Appendix-8F. SGTS is required for Operation and fast speed operation is desired for Reactor and Refuel Zone Ventilation.


JPM d PAGE 3 of 9 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
JPM d
PAGE 3 of 9 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are an Operator. Unit 3 reactor has scrammed and a Group 6 isolation has occurred from RPV low level. EOI-l has been entered and followed to RC!P-8. The US wants the reactor and refueling zone ventilation systems restored. No other Group 6 isolation signals exist. Appendix 8E, Bypassing Group 6 RPV Low Level and High Drywell Pressure Isolation Interlocks, has been completed.
You are an Operator. Unit 3 reactor has scrammed and a Group 6 isolation has occurred from RPV low level. EOI-l has been entered and followed to RC!P-8. The US wants the reactor and refueling zone ventilation systems restored. No other Group 6 isolation signals exist. Appendix 8E, Bypassing Group 6 RPV Low Level and High Drywell Pressure Isolation Interlocks, has been completed.
Line 687: Line 1,000:
The Unit Supervisor directs you to restore reactor and refuel zone ventilation as directed by 3-EOI Appendix-8F. SGTS is required for Operation and fast speed operation is desired for Reactor and Refuel Zone Ventilation.
The Unit Supervisor directs you to restore reactor and refuel zone ventilation as directed by 3-EOI Appendix-8F. SGTS is required for Operation and fast speed operation is desired for Reactor and Refuel Zone Ventilation.


JPM d PAGE 4 of 9 START TIME____
JPM d
Performance Step 1:                                             Critical X Not Critical
PAGE 4 of 9 START TIME____
: 1. VERIFY PCIS Reset.
Performance Step 1:
Critical X Not Critical 1.
VERIFY PCIS Reset.
Standard:
Standard:
Resets PCIS SAT     UNSAT       N/A _COMMENTS:_______________________________
Resets PCIS SAT UNSAT N/A _COMMENTS:_______________________________
Performance Step 2:                                           Critical X Not Critical
Performance Step 2:
: 2. PLACE Refuel Zone Ventilation in service as follows (Panel 3-9-25):
Critical X Not Critical 2.
: a. VERIFY 3-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch is in OFF.
PLACE Refuel Zone Ventilation in service as follows (Panel 3-9-25):
a.
VERIFY 3-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch is in OFF.
Standard:
Standard:
Places 3-HS-64-3A in the Off position.
Places 3-HS-64-3A in the Offposition.
SAT     UNSAT       N/A   COMMENTS:______________________________
SAT UNSAT N/A COMMENTS:______________________________
Performance Step 3:                                           Critical X Not Critical
Performance Step 3:
: b.     PLACE 3-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch to SLOW A (SLOW B).
Critical X Not Critical b.
PLACE 3-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch to SLOW A (SLOW B).
Standard:
Standard:
Places 3-HS-64-3A to SLOW A or SLOW B position.
Places 3-HS-64-3A to SLOW A or SLOW B position.
SAT_ UNSAT           N/A   COMMENTS:_______________________________
SAT_ UNSAT N/A COMMENTS:_______________________________


JPM d PAGE5of9 Performance Step 4:                                                 Critical Not Critical X
JPM d
: c.     CHECK two SPLY/EXH A(B) green lights above 3-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch extinguish and two SPLY/EXH A(B) red lights illuminate.
PAGE5of9 Performance Step 4:
Critical Not Critical X c.
CHECK two SPLY/EXH A(B) green lights above 3-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch extinguish and two SPLY/EXH A(B) red lights illuminate.
Standard:
Standard:
Verifies proper combination of lights On and Off above 3-HS-64-3A.
Verifies proper combination of lights On and Off above 3-HS-64-3A.
SAT     UNSAT     N/A     COMMENTS:______________________________
SAT UNSAT N/A COMMENTS:______________________________
Performance Step 5:                                                 Critical   Not Critical X
Performance Step 5:
: d.     VERIFY OPEN the following dampers:
Critical Not Critical X d.
* 3-FCO-64-5, REFUEL ZONE SPLY OUTBD ISOL DMPR
VERIFY OPEN the following dampers:
* 3-FCO-64-6, REFUEL ZONE SPLY INBD ISOL DMPR
3-FCO-64-5, REFUEL ZONE SPLY OUTBD ISOL DMPR 3-FCO-64-6, REFUEL ZONE SPLY INBD ISOL DMPR 3-FCO-64-9, REFUEL ZONE EXH OUTBD ISOL DMPR 3-FCO-64-1O, REFUEL ZONE EXH lNBD ISOL DMPR Standard:
* 3-FCO-64-9, REFUEL ZONE EXH OUTBD ISOL DMPR
Verifies Red position indicating lamps On for dampers listed above SAT_ UNSAT N/A COMMENTS:_________________
* 3-FCO-64-1O, REFUEL ZONE EXH lNBD ISOL DMPR Standard:
Verifies Red position indicating lamps On for dampers listed above SAT_ UNSAT         N/A     COMMENTS:_________________


JPM d PAGE 6 of 9 Performance Step 6:                                             Critical X Not Critical
JPM d
: 3.     PLACE Reactor Zone Ventilation in service as follows (Panel 3-9-25):
PAGE 6 of 9 Performance Step 6:
: a. VERIFY 3-HS-64-l 1A, REACTOR ZONE FANS AND DAMPERS, control switch is in OFF.
Critical X Not Critical 3.
PLACE Reactor Zone Ventilation in service as follows (Panel 3-9-25):
a.
VERIFY 3-HS-64-l 1A, REACTOR ZONE FANS AND DAMPERS, control switch is in OFF.
Standard:
Standard:
Places 3-HS-64-11A in the Off position.
Places 3-HS-64-11A in the Offposition.
SAT     UNSAT     N/A     COMMENTS:______________________________
SAT UNSAT N/A COMMENTS:______________________________
Performance Step 7:                                             Critical X Not Critical
Performance Step 7:
: b. PLACE 3-HS-64-1 1A, REACTOR ZONE FANS AND DAMPERS, control switch in SLOW A (SLOW B).
Critical X Not Critical b.
PLACE 3-HS-64-1 1A, REACTOR ZONE FANS AND DAMPERS, control switch in SLOW A (SLOW B).
Standard:
Standard:
Places 3-HS-64-l lA to SLOW A or SLOW B position.
Places 3-HS-64-l lA to SLOW A or SLOW B position.
SAT     U1SAT_ N/A         COMMENTS:___________
SAT U1SAT_ N/A COMMENTS:___________


JPM d PAGE 7 of 9 Performance Step 8:                                                 Critical Not Critical X
JPM d
: c.       CHECK two SPLY/EXH A(B) green lights above 3-HS-64-l 1A, REACTOR ZONE FANS AND DAMPERS, control switch extinguish and two SPLY/EXH A(B) red lights illuminate.
PAGE 7 of 9 Performance Step 8:
Critical Not Critical X c.
CHECK two SPLY/EXH A(B) green lights above 3-HS-64-l 1A, REACTOR ZONE FANS AND DAMPERS, control switch extinguish and two SPLY/EXH A(B) red lights illuminate.
Standard:
Standard:
Verifies proper combination of lights On and Off above 3-HS-64-3A.
Verifies proper combination of lights On and Off above 3-HS-64-3A.
SAT     U14SAT_ N/A         COMMENTS:______________________________
SAT U14SAT_ N/A COMMENTS:______________________________
Performance Step 9:                                                 Critical   Not Critical
Performance Step 9:
: d.     VERIFY OPEN the following dampers:
Critical Not Critical d.
* 3-FCO-64-13,   REACTOR ZONE     SPLY OUTBD ISOL DMPR
VERIFY OPEN the following dampers:
* 3-FCO-64-14,   REACTOR ZONE     SPLY INBD ISOL DMPR
3-FCO-64-13, REACTOR ZONE SPLY OUTBD ISOL DMPR 3-FCO-64-14, REACTOR ZONE SPLY INBD ISOL DMPR 3-FCO-64-42, REACTOR ZONE EXH INBD ISOL DMPR 3-FCO-64-43, REACTOR ZONE EXH OUTBD ISOL DMPR Standard:
* 3-FCO-64-42,   REACTOR ZONE     EXH INBD ISOL DMPR
Verifies Red position indicating lamps On for dampers listed above SAT_ UNSAT N/A _COMMENTS:_________________
* 3-FCO-64-43,   REACTOR ZONE     EXH OUTBD ISOL DMPR Standard:
Verifies Red position indicating lamps On for dampers listed above SAT_ UNSAT         N/A _COMMENTS:_________________


JPM d PAGE 8 of 9 Performance Step 10:                                             Critical Not Critical X
JPM d
: 4.     IF SGTS is NOT required for operation, THEN SECURE SGTS as follows:
PAGE 8 of 9 Performance Step 10:
Critical Not Critical X 4.
IF SGTS is NOT required for operation, THEN SECURE SGTS as follows:
Standard:
Standard:
Given in Initial conditions that SGTS is required.
Given in Initial conditions that SGTS is required.
SAT     UNSAT       N/A _COMMENTS:_______________________________
SAT UNSAT N/A _COMMENTS:_______________________________
Performance Step 11:                                             Critical Not Critical
Performance Step 11:
: 5. IF Reactor Zone Fan fast speed is desired following 5 minutes of slow speed operation, THEN PLACE 3-HS-64-1 1A, REACTOR ZONE FANS AND DAMPERS, control switch in FAST A (FAST B).
Critical Not Critical 5.
IF Reactor Zone Fan fast speed is desired following 5 minutes of slow speed operation, THEN PLACE 3-HS-64-1 1A, REACTOR ZONE FANS AND DAMPERS, control switch in FAST A (FAST B).
Standard:
Standard:
Places 3-HS-64-11A in either FAST A or FAST B position in accordance with which set of fans were started in slow SAT     UNSAT       N/A _COMMENTS:______________________________
Places 3-HS-64-11A in either FAST A or FAST B position in accordance with which set of fans were started in slow SAT UNSAT N/A _COMMENTS:______________________________
CUB Five Minutes has elpsed
CUB Five Minutes has elpsed


JPM d PAGE 9 of 9 Performance Step 12:                                             Critical Not Critical X
JPM d
: 6. IF Refuel Zone Fan fast speed is desired following 5 minutes of slow speed operation, THEN PLACE 3-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch in FAST A (FAST B).
PAGE 9 of 9 Performance Step 12:
Critical Not Critical X 6.
IF Refuel Zone Fan fast speed is desired following 5 minutes of slow speed operation, THEN PLACE 3-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch in FAST A (FAST B).
Standard:
Standard:
Places 3-HS-64-3A in either FAST A or FAST B position in accordance with which set of fans were started in slow.
Places 3-HS-64-3A in either FAST A or FAST B position in accordance with which set of fans were started in slow.
SAT     UNSAT       N/A_COMMENTS:________
SAT UNSAT N/A_COMMENTS:________
CUE: Five Minutes has elapsed END OF TASK STOP TIME:
CUE: Five Minutes has elapsed END OF TASK STOP TIME:


JPM   e PAGE 1 OF 9 OPERATOR:______________________
JPM e
RO___         SRO             DATE:
PAGE 1
JPM NUMBER:         e TASK NUMBER:         U-000-SS-25 TASK TITLE:         Energize 4 KV SD BDs A, C, and D from Unit 3 DGs KJA NUMBER: 264000 A4.04           K/A RATING: RO 3.7 SRO 3.7 TASK STANDARD: 4 KV SD BDs A and C energized from Unit 3 DGs during a Unit 1 and 2 Diesel Generator Building Fire. DG D Emergency Shutdown due to Low Lube Oil Pressure LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 0-SSI-20 VALIDATION TIME: 15 minutes MAX. TIME ALLOWED: NOT TIME CRITICAL Alternate Path PERFORMANCE TIME:
OF 9
OPERATOR:______________________
RO___
SRO DATE:
JPM NUMBER:
e TASK NUMBER:
U-000-SS-25 TASK TITLE:
Energize 4 KV SD BDs A, C, and D from Unit 3 DGs KJA NUMBER: 264000 A4.04 K/A RATING: RO 3.7 SRO 3.7 TASK STANDARD: 4 KV SD BDs A and C energized from Unit 3 DGs during a Unit 1 and 2 Diesel Generator Building Fire. DG D Emergency Shutdown due to Low Lube Oil Pressure LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED:
0-SSI-20 VALIDATION TIME: 15 minutes MAX. TIME ALLOWED: NOT TIME CRITICAL Alternate Path PERFORMANCE TIME:
COMMENTS:_____________________________
COMMENTS:_____________________________
Additional comment sheets attached? YES       NO RESULTS:     SATISFACTORY___             UNSATISFACTORY SIGNATURE:                                       DATE:
Additional comment sheets attached? YES NO RESULTS:
SATISFACTORY___
UNSATISFACTORY SIGNATURE:
DATE:
EXAMINER
EXAMINER


Line 773: Line 1,112:
Time Critical
Time Critical


JPM   e PAGE 3 OF 9 iN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
JPM e
PAGE 3
OF 9
iN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are an Operator on Unit 3, the plant is operating in 0-S 51-20 Unit 1 and 2 Diesel Generator Building fire. All three units have been scrammed. An Assistant Unit Operator has been dispatched to the DGs.
You are an Operator on Unit 3, the plant is operating in 0-S51-20 Unit 1 and 2 Diesel Generator Building fire. All three units have been scrammed. An Assistant Unit Operator has been dispatched to the DGs.
INITIATING CUE:
INITIATING CUE:
The Unit Supervisor directs you to complete attachment 6, Unit 3 Panel 9-23 Actions of 0-SSI-20.
The Unit Supervisor directs you to complete attachment 6, Unit 3 Panel 9-23 Actions of 0-SSI-20.
Time Critical
Time Critical


JPM   e PAGE 4 OF 9 START TIME Performance Step 1:                                               Critical   Not Critical 1.0 ENERGIZING 4KV SHUTDOWN BOARDS A, C, AND D FROM UNIT 3 DIESEL GENERATORS 3A, 3C, AND 3D USING UNIT INTERTIE (20 Mm)
JPM e
PAGE 4
OF 9
START TIME Performance Step 1:
Critical Not Critical 1.0 ENERGIZING 4KV SHUTDOWN BOARDS A, C, AND D FROM UNIT 3 DIESEL GENERATORS 3A, 3C, AND 3D USING UNIT INTERTIE (20 Mm)
NOTE The following steps will energize 4KV Shutdown Boards A, C, and D from Unit 3 Diesel Generators as the only source.
NOTE The following steps will energize 4KV Shutdown Boards A, C, and D from Unit 3 Diesel Generators as the only source.
[1]   Notification has been received from the Unit 2 Unit Supervisor to perform this section.
[1]
[2]   PROCEED TO Panel 3-9-23, AND PERFORM the following to align Shutdown Board 3EA:
Notification has been received from the Unit 2 Unit Supervisor to perform this section.
[2.1]   VERIFY DG 3A CONTROL switch, 3-HS-82-3AJ1A, in START.
[2]
PROCEED TO Panel 3-9-23, AND PERFORM the following to align Shutdown Board 3EA:
[2.1]
VERIFY DG 3A CONTROL switch, 3-HS-82-3AJ1A, in START.
Standard:
Standard:
Starts DG 3A SAT_ U1JSAT       N/A     COMMENTS:_______________________________
Starts DG 3A SAT_ U1JSAT N/A COMMENTS:_______________________________
Performance Step 2:                                               Critical X Not Critical
Performance Step 2:
[2.2]   VERIFY 4KV SD BD 3EA AUTO TO MANUAL TRIP pushbutton, 3-HS-21 1-3EA, in MANUAL.
Critical X Not Critical
[2.2]
VERIFY 4KV SD BD 3EA AUTO TO MANUAL TRIP pushbutton, 3-HS-21 1-3EA, in MANUAL.
Standard:
Standard:
Depresses 3-HS-21 1-3EA SAT_ UNSAT         N/A     COMMENTS:_____________________________
Depresses 3-HS-21 1-3EA SAT_ UNSAT N/A COMMENTS:_____________________________
NRC NOTE Trip to Manual allows the ]orinal 1?eeder 1&#xe7;aker to Open, ifnot in Manual N9mLi!c4cnLQpe!1JI1 next step
NRC NOTE Trip to Manual allows the]orinal1?eeder 1&#xe7;aker to Open, ifnot in Manual N9mLi!c4cnLQpe!1JI1 next step


JPM   e PAGE 5 OF 9 Performance Step 3:                                     Critical X Not Critical
JPM e
[2.3] VERIFY 4KV SD BD 3EA NORM FDR BKR 1334, 3-HS-21 1-3EA/7A, in TRIP.
PAGE 5
OF 9
Performance Step 3:
Critical X Not Critical
[2.3]
VERIFY 4KV SD BD 3EA NORM FDR BKR 1334, 3-HS-21 1-3EA/7A, in TRIP.
Standard:
Standard:
Trips Normal Feeder Breaker 1334 SAT_ UNSAT         N/A     COMMENTS:______________________________
Trips Normal Feeder Breaker 1334 SAT_ UNSAT N/A COMMENTS:______________________________
Performance Step 4:                                     Critical Not Critical X
Performance Step 4:
[2.4]   VERIFY DG 3A BKR 1838 CLOSED.
Critical Not Critical X
[2.4]
VERIFY DG 3A BKR 1838 CLOSED.
Standard:
Standard:
Verifies DG Breaker 1838 closes SAT_ UNSAT         N/A     COMMENTS:______________________________
Verifies DG Breaker 1838 closes SAT_ UNSAT N/A COMMENTS:______________________________
Performance Step 5:                                   Critical X Not Critical
Performance Step 5:
[2.5]   PLACE 4KV SD BD 3EA EMER FDR BKR 1844, 3-HS-21 1-3EAJ1A, in CLOSE.
Critical X Not Critical
[2.5]
PLACE 4KV SD BD 3EA EMER FDR BKR 1844, 3-HS-21 1-3EAJ1A, in CLOSE.
Standard:
Standard:
Closes Emergency Feeder Breaker 1844 SAT     UNSAT       N/A     COMMENTS:_____________________________
Closes Emergency Feeder Breaker 1844 SAT UNSAT N/A COMMENTS:_____________________________


JPM   e PAGE 6 OF 9 Performance Step 6:                                       Critical X Not Critical
JPM e
[3]     PERFORM the following to align 4KV Shutdown Board 3EC:
PAGE 6
[3.1] VERIFY DG 3C CONTROL switch, 3-HS-82-3C/1A, in START.
OF 9
Performance Step 6:
Critical X Not Critical
[3]
PERFORM the following to align 4KV Shutdown Board 3EC:
[3.1]
VERIFY DG 3C CONTROL switch, 3-HS-82-3C/1A, in START.
Standard:
Standard:
StartsDG3C SAT_ UNSAT           N/A   COMMENTS:_______________________________
StartsDG3C SAT_ UNSAT N/A COMMENTS:_______________________________
Performance Step 7:                                       Critical   Not Critical
Performance Step 7:
[3.2]   VERIFY 4KV SD BD 3EC AUTO TO MANUAL TRIP pushbutton, 3-HS-21 1-3EC, in MANUAL.
Critical Not Critical
[3.2]
VERIFY 4KV SD BD 3EC AUTO TO MANUAL TRIP pushbutton, 3-HS-21 1-3EC, in MANUAL.
Standard:
Standard:
Depresses 3-HS-21 1-3EC SAT_ UNSAT         N/A _COMMENTS:______________________________
Depresses 3-HS-21 1-3EC SAT_ UNSAT N/A _COMMENTS:______________________________
Performance Step 8:                                       Critical X Not Critical
Performance Step 8:
[3.3]   VERIFY 4KV SD BD 3EC NORM FDR BKR 1338, 3-HS-21 1-3EC/12A, in TRIP.
Critical X Not Critical
[3.3]
VERIFY 4KV SD BD 3EC NORM FDR BKR 1338, 3-HS-21 1-3EC/12A, in TRIP.
Standard:
Standard:
Trips Normal Feeder Breaker 1338 SAT     UNSAT       N/A _COMMENTS:______________________________
Trips Normal Feeder Breaker 1338 SAT UNSAT N/A _COMMENTS:______________________________


JPM   e PAGE 7 OF 9 Performance Step 9:                                   Critical Not Critical X
JPM e
[3.4]   VERIFY DG 3C BKR 1832 CLOSED.
PAGE 7
OF 9
Performance Step 9:
Critical Not Critical X
[3.4]
VERIFY DG 3C BKR 1832 CLOSED.
Standard:
Standard:
Verifies DG Breaker 1832 closes SAT_ UNSAT         N/A   COMMENTS:_______________________________
Verifies DG Breaker 1832 closes SAT_ UNSAT N/A COMMENTS:_______________________________
Performance Step 10:                                 Critical X Not Critical
Performance Step 10:
[3.5]   PLACE 4KV SD BD 3EC EMER FDR BKR 1834, 3-HS-211-3EC/6A, in CLOSE.
Critical X Not Critical
[3.5]
PLACE 4KV SD BD 3EC EMER FDR BKR 1834, 3-HS-211-3EC/6A, in CLOSE.
Standard:
Standard:
Closes Emergency Feeder Breaker 1834 SAT_ UNSAT         N/A _COMMENTS:______________________________
Closes Emergency Feeder Breaker 1834 SAT_ UNSAT N/A _COMMENTS:______________________________


JPM e PAGE 8 OF 9 Performance Step 11:                                           Critical   Not Critical
JPM e
[4]   PERFORM the following to align 4KV Shutdown Board 3ED:
PAGE 8
[4.1]   VERIFY DG 3D CONTROL switch, 3-HS-82-3D/1A, in START.
OF 9
Performance Step 11:
Critical Not Critical
[4]
PERFORM the following to align 4KV Shutdown Board 3ED:
[4.1]
VERIFY DG 3D CONTROL switch, 3-HS-82-3D/1A, in START.
Standard:
Standard:
Starts DG 3D SAT_ UNSAT           N/A _COMMENTS:_______________________________
Starts DG 3D SAT_ UNSAT N/A _COMMENTS:_______________________________
:PjJVER: aft&#xe7;riXjs spir4ente frigr1 for LjA&#xe7;iPressure Performance Step 12:                                           Critical   Not Critical RESPONDS to the Alarm 9-23D WIN 4 (DIESEL GEN D LUBE OIL ABNORMAL) and notices the AMBER LIGHT (LOW LOW OIL PRESSURE)
:PjJVER: aft&#xe7;riXjs spir4ente frigr1 for LjA&#xe7;iPressure Performance Step 12:
Critical Not Critical RESPONDS to the Alarm 9-23D WIN 4 (DIESEL GEN D LUBE OIL ABNORMAL) and notices the AMBER LIGHT (LOW LOW OIL PRESSURE)
Standard:
Standard:
Responds per the ARP and Verifies the AMBER LIGHT is lit.
Responds per the ARP and Verifies the AMBER LIGHT is lit.
SAT     UNSAT_ N/A         COMMENTS:______________________________
SAT UNSAT_ N/A COMMENTS:______________________________
CiJ If Assistant thiit Operatoris callcd, After Lub oil presure alarm is received t1 9-23, report lube oil pressure low at5psig and Lube Oil is spraying ontoIa damaged.
CiJ If Assistant thiit Operatoris callcd, After Lub oil presure alarm is received t1 9-23, report lube oil pressure low at5psig and Lube Oil is spraying ontoIa damaged.


JPM e PAGE 9 OF 9 Performance Step 13:                                             Critical   Not Critical DIESEL GEN 3D LUBE OIL ABNORMAL Window 4 SHUT DOWN the DG by Emergency Stop Pushbutton Standard:
JPM e
PAGE 9 OF 9
Performance Step 13:
Critical Not Critical DIESEL GEN 3D LUBE OIL ABNORMAL Window 4 SHUT DOWN the DG by Emergency Stop Pushbutton Standard:
Shuts Down the DG with the Emergency Stop Pushbutton.
Shuts Down the DG with the Emergency Stop Pushbutton.
SAT_ UNSAT           N/A _COMMENTS:_____________________________
SAT_ UNSAT N/A _COMMENTS:_____________________________
tdonnicfDGHsnot abJiie1yecessary Examiner note: ALARM on 9-23D win 4 DG D LUBE OIL ABNORMAL will alarm and LOW LOW OIL PRESSURE LIGHT for D DG will illuminate, the operator should respond per the ARP.
tdonnicfDGHsnotabJiie1yecessary Examiner note: ALARM on 9-23D win 4 DG D LUBE OIL ABNORMAL will alarm and LOW LOW OIL PRESSURE LIGHT for D DG will illuminate, the operator should respond per the ARP.
Performance Step 15:                                             Critical   Not Critical X
Performance Step 15:
Critical Not Critical X
[5] NOTIFY Unit 2 Unit Supervisor of the completion of this section.
[5] NOTIFY Unit 2 Unit Supervisor of the completion of this section.
[6] PROCEED TO 480V RMOV Board 3C in preparation of performing Section 2.0.
[6] PROCEED TO 480V RMOV Board 3C in preparation ofperforming Section 2.0.
Standard:
Standard:
Notifies Unit Supervisor SAT     UNSAT       N/A _COMMENTS:______________________________
Notifies Unit Supervisor SAT UNSAT N/A _COMMENTS:______________________________
CUE::         Rmain in Control Room another Operator has beeii dispatched to 480V RMOV Board3C.JPMComplete END OF TASK STOP TIME
CUE::
Rmain in Control Room another Operator has beeii dispatched to 480V RMOV Board3C.JPMComplete END OF TASK STOP TIME


JPM f PAGE 1 OF 9 OPERATOR:
JPM f
RO___         SRO___               DATE:_______
PAGE 1 OF 9
JPM NUMBER:           f TASK NUMBER:         0-74-AB-Ol TASK TITLE: Loss of Shutdown Cooling K/ANUMBER: 295021 AA1.02             K/A RATING: R03.5 SRO3.5 TASK STANDARD: Restores shutdown cooling following an inadvertent RPS actuation, will restore shutdown cooling with RHR Pump 2A and establish a cooldown JAW 2-AOI 1.
OPERATOR:
LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 2-AOI 1 VALIDATION TJME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
RO___
SRO___
DATE:_______
JPM NUMBER:
f TASK NUMBER:
0-74-AB-Ol TASK TITLE: Loss of Shutdown Cooling K/ANUMBER: 295021 AA1.02 K/A RATING: R03.5 SRO3.5 TASK STANDARD: Restores shutdown cooling following an inadvertent RPS actuation, will restore shutdown cooling with RHR Pump 2A and establish a cooldown JAW 2-AOI 1.
LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED:
2-AOI 1 VALIDATION TJME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
PERFORMANCE TIME:
PERFORMANCE TIME:
COMMENTS:______________________________
COMMENTS:______________________________
Additional comment sheets attached? YES     NO RESULTS:     SATISFACTORY               UNSATISFACTORY SIGNATURE:                                     DATE:
Additional comment sheets attached? YES NO RESULTS:
SATISFACTORY UNSATISFACTORY SIGNATURE:
DATE:
EXAMINER
EXAMINER


Line 865: Line 1,264:
INITIATING CUES: The Unit Supervisor directs you to restore shutdown cooling using 2A RHR pump in accordance with 2-AOI-74-1 starting at step 12.
INITIATING CUES: The Unit Supervisor directs you to restore shutdown cooling using 2A RHR pump in accordance with 2-AOI-74-1 starting at step 12.


JPM     f PAGE 3 OF 9 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Coffect. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
JPM f
PAGE 3
OF 9
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Coffect. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
INITIAL CONDITIONS: You are a Unit 2 operator. Unit 2 is in Mode 3 (Recirc Loop B temp
INITIAL CONDITIONS: You are a Unit 2 operator. Unit 2 is in Mode 3 (Recirc Loop B temp
> 2 12&deg;F) heading towards cold conditions for a refueling outage. RHR Loop I using 2A RHR Pump was in shutdown cooling. Unit 1 is carrying 2000 gpm for RHRSW Pumps A2 and C2.
> 2 12&deg;F) heading towards cold conditions for a refueling outage. RHR Loop I using 2A RHR Pump was in shutdown cooling. Unit 1 is carrying 2000 gpm for RHRSW Pumps A2 and C2.
Line 871: Line 1,273:
INITIATING CUES: The Unit Supervisor directs you to restore shutdown cooling using 2A RHR pump in accordance with 2-AOI-74-1 starting at step 12.
INITIATING CUES: The Unit Supervisor directs you to restore shutdown cooling using 2A RHR pump in accordance with 2-AOI-74-1 starting at step 12.


JPM   f PAGE 4 OF 9 START TIME Performance Step 1:                                               Critical   Not Critical
JPM f
[12]   IF the loss of Shutdown Cooling is due to Group 2 PCIS isolation, THEN (Otherwise N/A)
PAGE 4 OF 9
START TIME Performance Step 1:
Critical Not Critical
[12]
IF the loss of Shutdown Cooling is due to Group 2 PCIS isolation, THEN (Otherwise N/A)
WHEN conditions permit resetting Group 2 PCIS isolation are met, PERFORM the following:
WHEN conditions permit resetting Group 2 PCIS isolation are met, PERFORM the following:
[12.1] RESET Group 2 isolation by momentarily PLACING PCIS DIV I RESET, 2-HS-64-16A-S32, and PCIS DIV II RESET, 2-HS-64-16A-S33, in reset.
[12.1] RESET Group 2 isolation by momentarily PLACING PCIS DIV I RESET, 2-HS-64-16A-S32, and PCIS DIV II RESET, 2-HS-64-16A-S33, in reset.
Standard:
Standard:
On Panel 2-9-4, RESETS Group 2 isolation by momentarily PLACING PCIS DIV I RESET, 2-HS-64-16A-S32, in reset and PCIS Div II RESET, 2-HS-64-16A-S33 to reset.
On Panel 2-9-4, RESETS Group 2 isolation by momentarily PLACING PCIS DIV I RESET, 2-HS-64-16A-S32, in reset and PCIS Div II RESET, 2-HS-64-16A-S33 to reset.
SAT_ U14SAT         N/A     COMMENTS:______________________________
SAT_ U14SAT N/A COMMENTS:______________________________
Performance Step 2:                                               Critical   Not Critical X
Performance Step 2:
Critical Not Critical X
[12.2] MOMENTARILY DEPRESS RHR SYS 1(11) SD CLG INBD INJECT ISOL RESET, 2-XS-74-126 and 2-XS-74-132. VERIFY 2-IL-74-126 and 2-IL-74-1 32 extinguished.
[12.2] MOMENTARILY DEPRESS RHR SYS 1(11) SD CLG INBD INJECT ISOL RESET, 2-XS-74-126 and 2-XS-74-132. VERIFY 2-IL-74-126 and 2-IL-74-1 32 extinguished.
Standard:
Standard:
Momentarily Depresses RHR SYS I SD CLG INBD INJECT ISOL RESET, 2-XS-74-132 and verifies 2-IL-74-132 extinguished.
Momentarily Depresses RHR SYS I SD CLG INBD INJECT ISOL RESET, 2-XS-74-132 and verifies 2-IL-74-132 extinguished.
SAT     ITh4SAT       N/A     COMMENTS:_____________________________
SAT ITh4SAT N/A COMMENTS:_____________________________


JPM   f PAGE 5 OF 9 Performance Step 3:                                                   Critical   Not Critical X
JPM f
[13]   IF the loss of Shutdown Cooling is due to Group 2 PCIS AND the isolation signal fails to reset, or remain reset due to invalid and/or sporadic signals, THEN (Otherwise N/A)
PAGE 5
OF 9
Performance Step 3:
Critical Not Critical X
[13]
IF the loss of Shutdown Cooling is due to Group 2 PCIS AND the isolation signal fails to reset, or remain reset due to invalid and/or sporadic signals, THEN (Otherwise N/A)
Standard:
Standard:
N/As all Step 4.2[13], the PCIS signal is reset in step 12.
N/As all Step 4.2[13], the PCIS signal is reset in step 12.
SAT_ UNSAT         N/A       COMMENTS:_______________________________
SAT_ UNSAT N/A COMMENTS:_______________________________
Performance Step 4:                                                   Critical X   Not Critical
Performance Step 4:
[14]   IF the Group 2 PCIS Isolation has been reset, THEN (otherwise N/A)
Critical X Not Critical
[14]
IF the Group 2 PCIS Isolation has been reset, THEN (otherwise N/A)
RETURN the affected ioop of RHR to Shutdown Cooling as follows:
RETURN the affected ioop of RHR to Shutdown Cooling as follows:
[14.1] CLOSE RHR SYS I LPCI OUTBD INJECT VALVE, 2-FCV-74-52.
[14.1] CLOSE RHR SYS I LPCI OUTBD INJECT VALVE, 2-FCV-74-52.
Standard:
Standard:
Closes 2-FCV-74-52 SAT     U14SAT     N/A       COMMENTS:____________________________
Closes 2-FCV-74-52 SAT U14SAT N/A COMMENTS:____________________________
Performance Step 5:                                                   Critical   Not Critical
Performance Step 5:
Critical Not Critical
[14.2] OPEN RHR SYS I LPCI INBD INJECT VALVE, 2-FCV-74-53.
[14.2] OPEN RHR SYS I LPCI INBD INJECT VALVE, 2-FCV-74-53.
Standard:
Standard:
Opens 2-FCV-74-53 SAT_ UNSAT_ N/A               COMMENTS:______________________________
Opens 2-FCV-74-53 SAT_ UNSAT_ N/A COMMENTS:______________________________


JPM f PAGE 6 OF 9 Performance Step 6:                                   Critical   Not Critical
JPM f
PAGE 6 OF 9
Performance Step 6:
Critical Not Critical
[14.3] VERIFY RHR SYSTEM I MIN FLOW iNHIBIT switch, 2-HS-74-148 in INHIBIT Standard:
[14.3] VERIFY RHR SYSTEM I MIN FLOW iNHIBIT switch, 2-HS-74-148 in INHIBIT Standard:
Verifies 2-HS-74-148 in INHIBIT.
Verifies 2-HS-74-148 in INHIBIT.
SAT     UNSAT         N/A   COMMENTS:_______________________________
SAT UNSAT N/A COMMENTS:_______________________________
Performance Step 7:                                   Critical   Not Critical X
Performance Step 7:
Critical Not Critical X
[14.4] VERIFY CLOSED RHR SYSTEM I MN FLOW VALVE, 2-FCV-74-7.
[14.4] VERIFY CLOSED RHR SYSTEM I MN FLOW VALVE, 2-FCV-74-7.
Standard:
Standard:
Verifies 2-FCV-74-7 is closed.
Verifies 2-FCV-74-7 is closed.
SAT     UNSAT       N/A   COMMENTS:_______________________________
SAT UNSAT N/A COMMENTS:_______________________________
Performance Step 8:                                   Critical   Not Critical
Performance Step 8:
Critical Not Critical
[14.5] VERIFY CLOSED RHR PUMP 2A and 2C SUPPR POOL SUCT VLVs, 2-FCV-74-1 and 2-FCV-74-12.
[14.5] VERIFY CLOSED RHR PUMP 2A and 2C SUPPR POOL SUCT VLVs, 2-FCV-74-1 and 2-FCV-74-12.
Standard:
Standard:
Verifies 2-FCV-74-l & 12 are closed.
Verifies 2-FCV-74-l & 12 are closed.
SAT     UNSAT       N/A   COMMENTS:
SAT UNSAT N/A COMMENTS:


JPM f PAGE 7 OF 9 Performance Step 9:                                               Critical   Not Critical
JPM f
PAGE 7
OF 9
Performance Step 9:
Critical Not Critical
[14.6] VERIFY OPEN RHR PUMP 2A and 2C SD COOLING SUCT VLVs, 2-FCV-74-2 and 2-FCV 13.
[14.6] VERIFY OPEN RHR PUMP 2A and 2C SD COOLING SUCT VLVs, 2-FCV-74-2 and 2-FCV 13.
Standard:
Standard:
Verifies 2-FCV-74-2 & 13 are open.
Verifies 2-FCV-74-2 & 13 are open.
SAT     UNSAT         N/A   COMMENTS:_______________________________
SAT UNSAT N/A COMMENTS:_______________________________
Performance Step 10:                                             *Critical X   Not Critical
Performance Step 10:
*Critical X Not Critical
[14.7] OPEN RHR SHUTDOWN COOLING SUCT OUTBD and INBD ISOL VLVs, 2-FCV-74-47 and 2-FCV-74-48.
[14.7] OPEN RHR SHUTDOWN COOLING SUCT OUTBD and INBD ISOL VLVs, 2-FCV-74-47 and 2-FCV-74-48.
Standard:
Standard:
Opens *2.Hs7447 and verifies 2-FCV-74-48 open.
Opens *2.Hs7447 and verifies 2-FCV-74-48 open.
SAT_ UNSAT           N/A     COMMENTS:_______________________________
SAT_ UNSAT N/A COMMENTS:_______________________________
Performance Step 11:                                             Critical     Not Critical
Performance Step 11:
Critical Not Critical
[14.8] IF the tripped pump has been determined to be in operating condition and with Unit Supervisor permission, THEN: RESTART tripped RHR pump(s) RHR PUMP 2A using 2-HS-74-5A Standard:
[14.8] IF the tripped pump has been determined to be in operating condition and with Unit Supervisor permission, THEN: RESTART tripped RHR pump(s) RHR PUMP 2A using 2-HS-74-5A Standard:
Starts 2A RHR Pump SAT_ UNSAT           N/A _COMMENTS:________________________
Starts 2A RHR Pump SAT_ UNSAT N/A _COMMENTS:________________________
teTijiay Q                            tjjijjtie ptindItionJ, RHR Pump Start Time
teTijiayQ tjjijjtieptindItionJ, RHR Pump Start Time


JPM f PAGE 8 OF 9 Performance Step 12:                                           Critical X Not Critical
JPM f
[14.9] THROTTLE RHR           SYS I LPCI OUTBD INJECT VALVE, 2-FCV-74-52, to establish and maintain RHR flow as indicated by 2-FI-74-50, RHR SYS I FLOW, as follows:
PAGE 8
RIIR   Pumps in                       1                           2 Operation Loop Flow               7,000 to 10,000 gpm         14,000 to 20,000 gpm Loop Flow (1 or more fuel             6,000 to 6,500 gpm                   N/A bundles removed from_core)
OF 9
Performance Step 12:
Critical X Not Critical
[14.9] THROTTLE RHR SYS I LPCI OUTBD INJECT VALVE, 2-FCV-74-52, to establish and maintain RHR flow as indicated by 2-FI-74-50, RHR SYS I FLOW, as follows:
RIIR Pumps in 1
2 Operation Loop Flow 7,000 to 10,000 gpm 14,000 to 20,000 gpm Loop Flow (1 or more fuel 6,000 to 6,500 gpm N/A bundles removed from_core)
Standard:
Standard:
Manipulates 2-HS-74-52 to obtain     RHR   System I Loop flow between 7,000 and 10,000 gpm on 2-FI-74-50.
Manipulates 2-HS-74-52 to obtain RHR System I Loop flow between 7,000 and 10,000 gpm on 2-FI-74-50.
SAT     UNSAT         N/A     COMMENTS:______________________
SAT UNSAT N/A COMMENTS:______________________
RHR Flow Established Time kYSmmvkwGdance rT iiiiiimize syste ibaiion,RH1pima peiaio                 o4d6e mniedbeIo QQgp           abo         QQQgpfqr ipqrean3 thiuj                       nfjq
RHR Flow Established Time kYSmmvkwGdance rT iiiiiimize syste ibaiion,RH1pima peiaio o4d6e mniedbeIo QQgp abo QQQgpfqripqrean3 thiuj nfjq


JPM   t PAGE 9 OF 9 Performance Step 13:                                               Critical   Not Critical X
JPM t
PAGE 9
OF 9
Performance Step 13:
Critical Not Critical X
[14.101 WHEN time permits after RHR pump is started, THEN VERIFY RHR Pump Breaker charging spring recharged by observing amber breaker spring charged light is on and closing spring target indicates charged.
[14.101 WHEN time permits after RHR pump is started, THEN VERIFY RHR Pump Breaker charging spring recharged by observing amber breaker spring charged light is on and closing spring target indicates charged.
Standard:
Standard:
Dispatched personnel to verify RHR Pump 2A breaker closing spring recharged.
Dispatched personnel to verify RHR Pump 2A breaker closing spring recharged.
SAT_ UNSAT           N/A _COMMENTS:_______________________________
SAT_ UNSAT N/A _COMMENTS:_______________________________
CUE: If.eqnested,         oJdg&#xe7;jindstate9pcratoiJn put&#xe9;.
CUE: If.eqnested, oJdg&#xe7;jindstate9pcratoiJnput&#xe9;.
Performance Step 14:                                               Critical X   Not Critical
Performance Step 14:
Critical X Not Critical
[14.11] SLOWLY THROTTLE RHR HX 2A RHRSW OUTLET VALVE, 2-FCV-23-34, to obtain desired cooldown rate.
[14.11] SLOWLY THROTTLE RHR HX 2A RHRSW OUTLET VALVE, 2-FCV-23-34, to obtain desired cooldown rate.
Standard:
Standard:
Throttles 2-FCV-23-34 open to commence cooldown SAT_ UNSAT         N/A _COMMENTS:________________________________
Throttles 2-FCV-23-34 open to commence cooldown SAT_ UNSAT N/A _COMMENTS:________________________________
I CUE:   That completes this task.
I CUE: That completes this task.
END OF TASK STOP TIME:
END OF TASK STOP TIME:


JPM f PAGE 1 OF 9 OPERATOR:
JPM f
RO             SRO                 DATE:
PAGE 1
JPM NUMBER:           f TASK NUMBER:         0-74-AB-Ol TASK TiTLE: Loss of Shutdown Cooling KJA NUMBER: 295021 AA1.02           KJA RATING: RO 3.5 SRO 3.5 TASK STANDARD: Restores shutdown cooling following an inadvertent RPS actuation, will restore shutdown cooling with RHR Pump 3A and establish a cooldown JAW 3-AOI-74-l.
OF 9
OPERATOR:
RO SRO DATE:
JPM NUMBER:
f TASK NUMBER:
0-74-AB-Ol TASK TiTLE: Loss of Shutdown Cooling KJA NUMBER: 295021 AA1.02 KJA RATING: RO 3.5 SRO 3.5 TASK STANDARD: Restores shutdown cooling following an inadvertent RPS actuation, will restore shutdown cooling with RHR Pump 3A and establish a cooldown JAW 3-AOI-74-l.
LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 3-AOI I VALIDATION TIME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 3-AOI I VALIDATION TIME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
PERFORMANCE TIME:
PERFORMANCE TIME:
COMMENTS:______________________________
COMMENTS:______________________________
Additional comment sheets attached? YES     NO RESULTS:     SATISFACTORY               UNSATISFACTORY SIGNATURE:                                     DATE:
Additional comment sheets attached? YES NO RESULTS:
SATISFACTORY UNSATISFACTORY SIGNATURE:
DATE:
EXAMINER
EXAMINER


Line 965: Line 1,408:
INITIATING CUES: The Unit Supervisor directs you to restore shutdown cooling using 3A RHR pump in accordance with 3-AOI-74-1 starting at step 9.
INITIATING CUES: The Unit Supervisor directs you to restore shutdown cooling using 3A RHR pump in accordance with 3-AOI-74-1 starting at step 9.


JPM     f PAGE 3 OF 9 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
JPM f
PAGE 3
OF 9
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
INITIAL CONDITIONS: You are a Unit 3 operator. Unit 3 is in Mode 3 (Recirc Loop B temp
INITIAL CONDITIONS: You are a Unit 3 operator. Unit 3 is in Mode 3 (Recirc Loop B temp
> 2 12&deg;F) heading towards cold conditions for a refueling outage. RHR Loop I using 3A RHR Pump was in shutdown cooling. Unit 1 is carrying 2000 gpm for RHRSW Pumps A2 and C2.
> 2 12&deg;F) heading towards cold conditions for a refueling outage. RHR Loop I using 3A RHR Pump was in shutdown cooling. Unit 1 is carrying 2000 gpm for RHRSW Pumps A2 and C2.
An inadvertent loss of 3B RPS bus resulted in a partial isolation of RHR shutdown cooling. RPS 3B has been restored on the alternate supply. Another operator is assisting with recovery from the loss of 3B RPS. An Auxiliary Operator is standing by for 3A RHR Pump start.
An inadvertent loss of 3B RPS bus resulted in a partial isolation of RHR shutdown cooling. RPS 3B has been restored on the alternate supply. Another operator is assisting with recovery from the loss of 3B RPS. An Auxiliary Operator is standing by for 3A RHR Pump start.
INITIATING CUES: The Unit Supervisor directs you to restore shutdown cooling using 3A RHR pump in accordance with 3-AOI-74-1 starting at step 9.
INITIATING CUES: The Unit Supervisor directs you to restore shutdown cooling using 3A RHR pump in accordance with 3-AOI-74-1 starting at step 9.


JPM   f PAGE 4 OF 9 START TIME Performance Step 1:                                               Critical   Not Critical X
JPM f
[9]     IF the loss of Shutdown Cooling is due to Group 2 PCIS isolation, THEN (Otherwise N/A)
PAGE 4
OF 9
START TIME Performance Step 1:
Critical Not Critical X
[9]
IF the loss of Shutdown Cooling is due to Group 2 PCIS isolation, THEN (Otherwise N/A)
WHEN conditions permit resetting Group 2 PCIS isolation are met, PERFORM the following:
WHEN conditions permit resetting Group 2 PCIS isolation are met, PERFORM the following:
[9.1]   RESET Group 2 isolation by momentarily PLACING PCIS DIV I RESET, 3-HS-64-16A-S32, and PCIS DIV II RESET, 3-HS-64-16A-S33, in reset.
[9.1]
RESET Group 2 isolation by momentarily PLACING PCIS DIV I RESET, 3-HS-64-16A-S32, and PCIS DIV II RESET, 3-HS-64-16A-S33, in reset.
Standard:
Standard:
On Panel 3-9-4, RESETS Group 2 isolation by momentarily PLACING PCIS DIV I RESET, 3-HS-64-16A-S32, in reset and PCIS Div II RESET, 3-HS-64-16A-S33 to reset.
On Panel 3-9-4, RESETS Group 2 isolation by momentarily PLACING PCIS DIV I RESET, 3-HS-64-16A-S32, in reset and PCIS Div II RESET, 3-HS-64-16A-S33 to reset.
SAT     UNSAT       N/A     COMMENTS:_____________________________
SAT UNSAT N/A COMMENTS:_____________________________
Performance Step 2:                                               Critical   Not Critical X
Performance Step 2:
[9.2]   MOMENTARILY DEPRESS RHR SYS 1(11) SD CLG INBD INJECT ISOL RESET, 3-XS-74-126 and 3-XS-74-132. VERIFY 3-IL-74-126 and 3-IL-74-l 32 extinguished.
Critical Not Critical X
[9.2]
MOMENTARILY DEPRESS RHR SYS 1(11) SD CLG INBD INJECT ISOL RESET, 3-XS-74-126 and 3-XS-74-132. VERIFY 3-IL-74-126 and 3-IL-74-l 32 extinguished.
Standard:
Standard:
Momentarily Depresses RHR SYS I SD CLG INBD INJECT ISOL RESET, 3-XS-74-132 and verifies 3-IL-74-132 extinguished.
Momentarily Depresses RHR SYS I SD CLG INBD INJECT ISOL RESET, 3-XS-74-132 and verifies 3-IL-74-132 extinguished.
SAT_ UNSAT           N/A     COMMENTS:_____________________________
SAT_ UNSAT N/A COMMENTS:_____________________________


JPM   t PAGE 5 OF 9 Performance Step 3:                                                   Critical   Not Critical X
JPM t
[10]   IF the loss of Shutdown Cooling is due to Group 2 PCIS AND the isolation signal fails to reset, or remain reset due to invalid and/or sporadic signals, THEN (Otherwise N/A)
PAGE 5
OF 9
Performance Step 3:
Critical Not Critical X
[10]
IF the loss of Shutdown Cooling is due to Group 2 PCIS AND the isolation signal fails to reset, or remain reset due to invalid and/or sporadic signals, THEN (Otherwise N/A)
Standard:
Standard:
N/As all Step 4.2[10], the PCIS signal is reset in step 9.
N/As all Step 4.2[10], the PCIS signal is reset in step 9.
SAT     UNSAT     N/A       COMMENTS:____________________________
SAT UNSAT N/A COMMENTS:____________________________
Performance Step 4:                                                   Critical X   Not Critical
Performance Step 4:
[11]   IF the Group 2 PCIS Isolation has been reset, THEN (otherwise N/A)
Critical X Not Critical
[11]
IF the Group 2 PCIS Isolation has been reset, THEN (otherwise N/A)
RETURN the affected loop of RHR to Shutdown Cooling as follows:
RETURN the affected loop of RHR to Shutdown Cooling as follows:
[11.1] CLOSE RHR SYS I LPCI OUTBD iNJECT VALVE, 3-FCV-74-52.
[11.1] CLOSE RHR SYS I LPCI OUTBD iNJECT VALVE, 3-FCV-74-52.
Standard:
Standard:
Closes 3-FCV-74-52 SAT_ UNSAT         N/A _COMMENTS:_____________________________
Closes 3-FCV-74-52 SAT_ UNSAT N/A _COMMENTS:_____________________________
Performance Step 5:                                                   Critical   Not Critical X
Performance Step 5:
Critical Not Critical X
[11.2] OPEN RHR SYS I LPCI INBD iNJECT VALVE, 3-FCV-74-53.
[11.2] OPEN RHR SYS I LPCI INBD iNJECT VALVE, 3-FCV-74-53.
Standard:
Standard:
Opens 3-FCV-74-53 SAT     UNSAT       N/A       COMMENTS:_____________________________
Opens 3-FCV-74-53 SAT UNSAT N/A COMMENTS:_____________________________


JPM   f PAGE 6 OF 9 Performance Step 6:                                   Critical   Not Critical
JPM f
PAGE 6
OF 9
Performance Step 6:
Critical Not Critical
[11.3] VERIFY RHR SYSTEM I M1N FLOW INHIBIT switch, 3-HS-74-148 in iNHIBIT Standard:
[11.3] VERIFY RHR SYSTEM I M1N FLOW INHIBIT switch, 3-HS-74-148 in iNHIBIT Standard:
Verifies 3-HS-74-148 in INHIBIT.
Verifies 3-HS-74-148 in INHIBIT.
SAT     UNSAT         N/A   COMMENTS:________________________________
SAT UNSAT N/A COMMENTS:________________________________
Performance Step 7:                                   Critical   Not Critical X
Performance Step 7:
Critical Not Critical X
[11.4] VERIFY CLOSED RHR SYSTEM I MIN FLOW VALVE, 3-FCV-74-7.
[11.4] VERIFY CLOSED RHR SYSTEM I MIN FLOW VALVE, 3-FCV-74-7.
Standard:
Standard:
Verifies 3-FCV-74-7 is closed.
Verifies 3-FCV-74-7 is closed.
SAT     UNSAT       N/A   COMMENTS:_____________________________
SAT UNSAT N/A COMMENTS:_____________________________
Performance Step 8:                                   Critical   Not Critical
Performance Step 8:
Critical Not Critical
[11.5] VERIFY CLOSED RHR PUMP 3A and 3C SUPPR POOL SUCT VLVs, 3-FCV-74-1 and 3-FCV-74-12.
[11.5] VERIFY CLOSED RHR PUMP 3A and 3C SUPPR POOL SUCT VLVs, 3-FCV-74-1 and 3-FCV-74-12.
Standard:
Standard:
Verifies 3-FCV-74-1 & 12 are closed.
Verifies 3-FCV-74-1 & 12 are closed.
SAT_ UNSAT           N/A   COMMENTS:_____________________________
SAT_ UNSAT N/A COMMENTS:_____________________________


JPM f PAGE 7 OF 9 Performance Step 9:                                       Critical   Not Critical X
JPM f
PAGE 7
OF 9
Performance Step 9:
Critical Not Critical X
[11.6] VERIFY OPEN RHR PUMP 3A and 3C SD COOLING SUCT VLVs, 3-FCV-74-2 and 3-FCV-74-13.
[11.6] VERIFY OPEN RHR PUMP 3A and 3C SD COOLING SUCT VLVs, 3-FCV-74-2 and 3-FCV-74-13.
Standard:
Standard:
Verifies 3-FCV-74-2 & 13 are open.
Verifies 3-FCV-74-2 & 13 are open.
SAT     U1\TSAT       N/A   COMMENTS:_____________________________
SAT U1\\TSAT N/A COMMENTS:_____________________________
Performance Step 10:                                     *Critical X   Not Critical
Performance Step 10:
*Critical X Not Critical
[11.7] OPEN RHR SHUTDOWN COOLING SUCT OUTBD and INBD ISOL VLVs, 3-FCV-74-47 and 3-FCV-74-48.
[11.7] OPEN RHR SHUTDOWN COOLING SUCT OUTBD and INBD ISOL VLVs, 3-FCV-74-47 and 3-FCV-74-48.
Standard:
Standard:
Opens *3..Hs7447 and verifies 3-FCV-74-48 open.
Opens *3..Hs7447 and verifies 3-FCV-74-48 open.
SAT_ UNSAT           N/A   COMMENTS:______________________________
SAT_ UNSAT N/A COMMENTS:______________________________
Performance Step 11:                                     Critical X   Not Critical
Performance Step 11:
Critical X Not Critical
[11.8] RESTART RHR PUMP 3A using 3-HS-74-5A.
[11.8] RESTART RHR PUMP 3A using 3-HS-74-5A.
Standard:
Standard:
Starts 3A RHR Pump SAT     UNSAT       N/A   COMMENTS:
Starts 3A RHR Pump SAT UNSAT N/A COMMENTS:
RHR Pump Start Time
RHR Pump Start Time


JPM f PAGE 8 OF 9 Performance Step   12:                                           Critical X   Not Critical
JPM f
PAGE 8
OF 9
Performance Step 12:
Critical X Not Critical
[11.9] THROTTLE RHR SYS I LPCI OUTBD iNJECT VALVE, 3-FCV-74-52, to establish and maintain RHR flow as indicated by 3-FI-74-50, RHR SYS I FLOW, as follows:
[11.9] THROTTLE RHR SYS I LPCI OUTBD iNJECT VALVE, 3-FCV-74-52, to establish and maintain RHR flow as indicated by 3-FI-74-50, RHR SYS I FLOW, as follows:
RHR Pumps in                         1                             2 Operation Loop Flow             7,000 to 10,000 gpm           14,000 to 20,000 gpm Loop Flow (1 or more fuel         6,000 to 6,500 gpm                   N/A bundles removed from_core)
RHR Pumps in 1
2 Operation Loop Flow 7,000 to 10,000 gpm 14,000 to 20,000 gpm Loop Flow (1 or more fuel 6,000 to 6,500 gpm N/A bundles removed from_core)
Standard:
Standard:
Manipulates 3-HS-74-52 to obtain RHR System I Loop     flow between   7,000 and 10,000 gpm on 3-FI-74-50.
Manipulates 3-HS-74-52 to obtain RHR System I Loop flow between 7,000 and 10,000 gpm on 3-FI-74-50.
SAT     UNSAT       N/A     COMMENTS:______________________
SAT UNSAT N/A COMMENTS:______________________
RHR Flow Established Time RHR SYSTEM Mmimum. Flow Guidane Jo mihhiize systen vi ration3 RBRpuinp operatiot should be iiniized bebi 6
RHR Flow Established Time RHRSYSTEM Mmimum.Flow Guidane Jo mihhiizesystenvi 6
,Ogppot aovp1O                   rjr than 3 s4inwmfl&#xf3;
ration3 RBRpuinp operatiot shouldbe iiniizedbebi
,Ogppot aovp1O rjr than 3s4inwmfl&#xf3;


JPM   f PAGE 9 OF 9 Performance Step 13:                                               Critical   Not Critical
JPM f
PAGE 9
OF 9
Performance Step 13:
Critical Not Critical
[11.10] WHEN time permits after RHR pump is started, THEN VERIFY RHR Pump Breaker charging spring recharged by observing amber breaker spring charged light is on and closing spring target indicates charged.
[11.10] WHEN time permits after RHR pump is started, THEN VERIFY RHR Pump Breaker charging spring recharged by observing amber breaker spring charged light is on and closing spring target indicates charged.
Standard:
Standard:
Dispatched personnel to verify RHR Pump 3A breaker closing spring recharged.
Dispatched personnel to verify RHR Pump 3A breaker closing spring recharged.
SAT     UNSAT       N/A     COMMENTS:_______________________________
SAT UNSAT N/A COMMENTS:_______________________________
CUE. If requested, Acknowledge and state Operator inrut&#xe7; Performance Step 14:                                               Critical     Not Critical
CUE. Ifrequested, Acknowledge and state Operator inrut&#xe7; Performance Step 14:
Critical Not Critical
[11.11] SLOWLY THROTTLE RHR HX 3A RHRSW OUTLET VALVE, 3-FCV-23-34, to obtain desired cooldown rate.
[11.11] SLOWLY THROTTLE RHR HX 3A RHRSW OUTLET VALVE, 3-FCV-23-34, to obtain desired cooldown rate.
Standard:
Standard:
Throttles 3-FCV-23-34 open to commence cooldown SAT     UNSAT       N/A _COMMENTS:_____________________________
Throttles 3-FCV-23-34 open to commence cooldown SAT UNSAT N/A _COMMENTS:_____________________________
I CUE:   That completes this task.
I CUE: That completes this task.
END OF TASK STOP TIME:
END OF TASK STOP TIME:


JPM   g PAGE1OF8 OPERATOR:____________________
JPM g
RO___         SRO             DATE:
PAGE1OF8 OPERATOR:____________________
JPM NUMBER:         g TASK NUMBER:         U-000-EM-74 TASK TITLE:         Crosstie CAD to Drywell Control Air K/A NUMBER: 218000 A2.03             K/A RATING: RO 3.4 SRO: 3.6 TASK STANDARD: Align Containment Air Dilution systems A and B to the Drywell Air System and then isolates CAD System B.
RO___
LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 2-EOI Appendix-.8G VALIDATION TiME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
SRO DATE:
JPM NUMBER:
g TASK NUMBER:
U-000-EM-74 TASK TITLE:
Crosstie CAD to Drywell Control Air K/A NUMBER: 218000 A2.03 K/A RATING: RO 3.4 SRO: 3.6 TASK STANDARD: Align Containment Air Dilution systems A and B to the Drywell Air System and then isolates CAD System B.
LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED:
2-EOI Appendix-.8G VALIDATION TiME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
PERFORMANCE TIME:
PERFORMANCE TIME:
COMMENTS:
COMMENTS:
Additional comment sheets attached? YES     NO RESULTS:     SATISFACTORY               UNSATISFACTORY SIGNATURE:                                       DATE:
Additional comment sheets attached? YES NO RESULTS:
SATISFACTORY UNSATISFACTORY SIGNATURE:
DATE:
EXAMINER
EXAMINER


Line 1,064: Line 1,558:
INITIATING CUE: The Unit Supervisor has directed you to perfomi 2-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.
INITIATING CUE: The Unit Supervisor has directed you to perfomi 2-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.


JPM     g PAGE 3 OF 8 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
JPM g
PAGE 3
OF 8
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
INITIAL CONDITIONS: You are an Operator. The Unit 2 reactor has scrammed. EOI-1 has been followed to RC/P-8.
INITIAL CONDITIONS: You are an Operator. The Unit 2 reactor has scrammed. EOI-1 has been followed to RC/P-8.
INITIATING CUE: The Unit Supervisor has directed you to perform 2-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.
INITIATING CUE: The Unit Supervisor has directed you to perform 2-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.


JPM g PAGE 4 OF 8 START TIME____
JPM g
Performance Step 1:                                               Critical X Not Critical
PAGE 4 OF 8
: 1. OPEN the following valves:
START TIME____
* O-FCV-84-5, CAD SYSTEM AN2 SHUTOFF VALVE (Unit 1, Panel 9-54)
Performance Step 1:
* 0-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Unit 1, Panel 9-55)
Critical X Not Critical 1.
OPEN the following valves:
O-FCV-84-5, CAD SYSTEM AN2 SHUTOFF VALVE (Unit 1, Panel 9-54) 0-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Unit 1, Panel 9-55)
Standard:
Standard:
Opens 0-FCV-84-5 and 16 SAT     UNSAT       N/A     COMMENTS:_____________________________
Opens 0-FCV-84-5 and 16 SAT UNSAT N/A COMMENTS:_____________________________
Performance Step 2:                                               Critical Not Critical
Performance Step 2:
: 2.     VERIFY 0-PI-84-6, N2 VAPORIZER A OUTLET PRESSURE, and 0-PI-84-17, N2 VAPORIZER B OUTLET PRESSURE, indicate approximately 100 psig (Unit 1, Panel 9-54 and 9-55)
Critical Not Critical 2.
VERIFY 0-PI-84-6, N2 VAPORIZER A OUTLET PRESSURE, and 0-PI-84-17, N2 VAPORIZER B OUTLET PRESSURE, indicate approximately 100 psig (Unit 1, Panel 9-54 and 9-55)
Standard:
Standard:
Verifies 0-PI-84-6 and 0-PI-84-17 (Located on back of Unit 2 Panel 9-54 in simulator) indicating approximately 100 psig.
Verifies 0-PI-84-6 and 0-PI-84-17 (Located on back of Unit 2 Panel 9-54 in simulator) indicating approximately 100 psig.
SAT     UNSAT       N/A _COMMENTS:_____________________________
SAT UNSAT N/A _COMMENTS:_____________________________


JPM   g PAGE 5 OF 8 Performance Step 3:                                             *Critical   Not Critical
JPM g
*3*   PLACE keylock switch 2-HS-84-48, CAD A CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 2, Panel 9-54)
PAGE 5
: 4. CHECK OPEN 2-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR, (Unit 2, Panel 9-54)
OF 8
Performance Step 3:
*Critical Not Critical
*3*
PLACE keylock switch 2-HS-84-48, CAD A CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 2, Panel 9-54) 4.
CHECK OPEN 2-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR, (Unit 2, Panel 9-54)
Standard:
Standard:
Places keylock switch 2-HS-84-48 in Open and verifies 2-FSV-84-48 is open SAT_ UNSAT         N/A     COMMENTS:_____________________________
Places keylock switch 2-HS-84-48 in Open and verifies 2-FSV-84-48 is open SAT_ UNSAT N/A COMMENTS:_____________________________
Performance Step 4:                                             *Critical   Not Critical
Performance Step 4:
*5     PLACE keylock switch 2-HS-84-49, CAD B CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 2, Panel 9-55)
*Critical Not Critical
: 6. CHECK OPEN 2-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 2, Panel 9-55)
*5 PLACE keylock switch 2-HS-84-49, CAD B CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 2, Panel 9-55) 6.
CHECK OPEN 2-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 2, Panel 9-55)
Standard:
Standard:
Places keylock switch 2-HS-84-49 in Open and verifies 2-FSV-84-49 open SAT     UNSAT_ N/A         COMMENTS:______________________________
Places keylock switch 2-HS-84-49 in Open and verifies 2-FSV-84-49 open SAT UNSAT_ N/A COMMENTS:______________________________


JPM   g PAGE 6 OF 8 Performance Step 5:                                               Critical   Not Critical
JPM g
: 7.     CHECK MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 2-PA-32-31, alarm cleared (2-XA-5 5-3D, Window 18)
PAGE 6
OF 8
Performance Step 5:
Critical Not Critical 7.
CHECK MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 2-PA-32-31, alarm cleared (2-XA-55-3D, Window 18)
Standard:
Standard:
Recognizes MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW (2-XA-55-3D, Win. 18) still in Alarm (would Not clear) and continues with procedure.
Recognizes MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW (2-XA-55-3D, Win. 18) still in Alarm (would Not clear) and continues with procedure.
SAT     UNSAT       N/A _COMMENTS:_____________________________
SAT UNSAT N/A _COMMENTS:_____________________________
Performance Step 6:                                               Critical Not Critical X
Performance Step 6:
: 8.     IF MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 2-PA-32-31, annunciator is or remains in alarm (2-XA-55-3D, Window 18), THEN DETERMINE which Drywell Control Air header is depressurized as follows:
Critical Not Critical X 8.
: a.     DISPATCH personnel to Unit 2, RB, El 565 ft, to MONITOR the following indications for low pressure:
IF MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 2-PA-32-31, annunciator is or remains in alarm (2-XA-55-3D, Window 18), THEN DETERMINE which Drywell Control Air header is depressurized as follows:
* 2-PI-84-5 1, CAD N2 PRESSURE TO DWCA indicator, for CAD A (R-10 S-line, by Drywell Access Door)
a.
* 2-PI-84-50, DW CONT AIR N2 SUPPLY PRESS indicator, for CAD B (R-12 U-line, behind 480V RB Vent Board 2B)
DISPATCH personnel to Unit 2, RB, El 565 ft, to MONITOR the following indications for low pressure:
2-PI-84-5 1, CAD N2 PRESSURE TO DWCA indicator, for CAD A (R-10 S-line, by Drywell Access Door) 2-PI-84-50, DW CONT AIR N2 SUPPLY PRESS indicator, for CAD B (R-12 U-line, behind 480V RB Vent Board 2B)
Standard:
Standard:
Dispatches personnel to Reactor Building to monitor 2-PI-84-5 1 and 2-PI-84-50 for low pressure.
Dispatches personnel to Reactor Building to monitor 2-PI-84-5 1 and 2-PI-84-50 for low pressure.
SAT     UNSAT       N/A     COMMENTS:______________________________
SAT UNSAT N/A COMMENTS:______________________________
CUE: DO NOT Report Unless directed by NRC [reportj 2-PI-84-51, CAD N          2 Pressure to DWCA indicator, for CAD A is reading 110 psig. 2-PI-84-50 for CAD B is reading 5 psig.
CUE: DO NOT Report Unless directed by NRC [reportj 2-PI-84-51, CAD N2 Pressure to DWCA indicator, for CAD A is reading 110 psig. 2-PI-84-50 for CAD B is reading 5 psig.


JPM   g PAGE 7 OF 8 Performance Step 7:                                               Critical X Not Critical
JPM g
: b. MONITOR 0-FI-84-7(18), CAD LINE A(B) N2 FLOW, on Unit 1, Panel 1-9-54(55) for high flow.
PAGE 7
OF 8
Performance Step 7:
Critical X Not Critical b.
MONITOR 0-FI-84-7(18), CAD LINE A(B) N2 FLOW, on Unit 1, Panel 1-9-54(55) for high flow.
Standard:
Standard:
Recognizes 0-FI-84-7 flow 0 scfl and 0-FI 18 flow 90 scfi SAT     UNSAT     N/A     COMMENTS:_____________________________
Recognizes 0-FI-84-7 flow 0 scfl and 0-FI 18 flow 90 scfi SAT UNSAT N/A COMMENTS:_____________________________
NOTE CAD System A to Drywell Control Air supplies the following MSIVs:
NOTE CAD System A to Drywell Control Air supplies the following MSIVs:
* 2-FCV-1-14, MSIV LINE A INBOARD
2-FCV-1-14, MSIV LINE A INBOARD 2-FCV-1-26, MSIV LINE B INBOARD NOTE CAD System B to Drywell Control Air supplies the following MSIVs:
* 2-FCV-1-26, MSIV LINE B INBOARD NOTE CAD System B to Drywell Control Air supplies the following MSIVs:
2-FCV-1-37, MSIV LINE C INBOARD 2-FCV-1-51, MSIV LINE D INBOARD Performance Step 8:
* 2-FCV-1-37, MSIV LINE C INBOARD
Critical Not Critical X c.
* 2-FCV-1-51, MSIV LINE D INBOARD Performance Step 8:                                               Critical Not Critical X
MONITOR inboard MSIV indication status for valves drifting closed.
: c. MONITOR inboard MSIV indication status for valves drifting closed.
Standard:
Standard:
Recognizes 2-FCV-1-37 and 51 closed SAT     UNSAT       N/A     COMMENTS:_________________________________
Recognizes 2-FCV-1-37 and 51 closed SAT UNSAT N/A COMMENTS:_________________________________


JPM g PAGE 8 OF 8 Performance Step 9:                                           Critical Not Critical X
JPM g
: 9.     IF Drywell Control Air header supplied from CAD System A shows indications of being depressurized, THEN CLOSE the following valves:
PAGE 8
* 0-FCV-84-5, CAD SYSTEM A N2 SHUTOFF VALVE (Unit 1, Panel 9-54)
OF 8
* 2-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR (Unit 2, Panel 9-54)
Performance Step 9:
Critical Not Critical X 9.
IF Drywell Control Air header supplied from CAD System A shows indications ofbeing depressurized, THEN CLOSE the following valves:
0-FCV-84-5, CAD SYSTEM A N2 SHUTOFF VALVE (Unit 1, Panel 9-54) 2-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR (Unit 2, Panel 9-54)
Standard:
Standard:
N/A     No indications of being depressurized SAT     UNSAT       N/A _COMMENTS:_____________________________
N/A No indications ofbeing depressurized SAT UNSAT N/A _COMMENTS:_____________________________
Performance Step 10:                                           Critical   Not Critical
Performance Step 10:
: 10. IF Drywell Control Air header supplied from CAD B shows indications of being depressurized, THEN CLOSE the following valves:
Critical Not Critical 10.
* 0-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Unit 1, Panel 9-55)
IF Drywell Control Air header supplied from CAD B shows indications ofbeing depressurized, THEN CLOSE the following valves:
* 2-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 2, Panel 9-55)
0-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Unit 1, Panel 9-55) 2-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 2, Panel 9-55)
Standard:
Standard:
Closes 0-FCV-84-16 and 2-FSV-84-49 SAT_ UNSAT           N/A     COMMENTS:_____
Closes 0-FCV-84-16 and 2-FSV-84-49 SAT_ UNSAT N/A COMMENTS:_____
STOP TIME____
STOP TIME____
END OF TASK
END OF TASK


JPM g PAGE 1 OF 8 OPERATOR:____________________
JPM g
RO___         SRO             DATE:
PAGE 1 OF 8
JPM NUMBER:         g TASK NUMBER:         U-000-EM-74 TASK TITLE:         Crosstie CAD to Drywell Control Air K/A NUMBER: 218000 A2.03             K/A RATING: RO 3.4 SRO: 3.6 TASK STANDARD: Align Containment Air Dilution systems A and B to the Drywell Air System and then isolates CAD System B.
OPERATOR:____________________
LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 3-EOI Appendix-8G VALIDATION TIME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
RO___
SRO DATE:
JPM NUMBER:
g TASK NUMBER:
U-000-EM-74 TASK TITLE:
Crosstie CAD to Drywell Control Air K/A NUMBER: 218000 A2.03 K/A RATING: RO 3.4 SRO: 3.6 TASK STANDARD: Align Containment Air Dilution systems A and B to the Drywell Air System and then isolates CAD System B.
LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED:
3-EOI Appendix-8G VALIDATION TIME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
PERFORMANCE TIME:
PERFORMANCE TIME:
COMMENTS:______________________________
COMMENTS:______________________________
Additional comment sheets attached? YES       NO RESULTS:     SATISFACTORY                 UNSATISFACTORY SIGNATURE:                                       DATE:
Additional comment sheets attached? YES NO RESULTS:
SATISFACTORY UNSATISFACTORY SIGNATURE:
DATE:
EXAMINER
EXAMINER


Line 1,147: Line 1,674:
INITIATING CUE: The Unit Supervisor has directed you to perform 3-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.
INITIATING CUE: The Unit Supervisor has directed you to perform 3-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.


JPM     g PAGE 3 OF 8 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
JPM g
PAGE 3
OF 8
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
INITIAL CONDITIONS: You are an Operator. The Unit 3 reactor has scrammed. EOI-1 has been followed to RC/P-8.
INITIAL CONDITIONS: You are an Operator. The Unit 3 reactor has scrammed. EOI-1 has been followed to RC/P-8.
INITIATING CUE: The Unit Supervisor has directed you to perform 3-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.
INITIATING CUE: The Unit Supervisor has directed you to perform 3-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.


JPM   g PAGE 4 OF 8 START TIME Performance Step 1:                                               Critical   Not Critical
JPM g
: 1. OPEN the following valves:
PAGE 4
* 0-FCV-84-5, CAD SYSTEM A N2 SHUTOFF VALVE (Panel 3-9-54)
OF 8
* O-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Panel 3-9-55)
START TIME Performance Step 1:
Critical Not Critical 1.
OPEN the following valves:
0-FCV-84-5, CAD SYSTEM A N2 SHUTOFF VALVE (Panel 3-9-54)
O-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Panel 3-9-55)
Standard:
Standard:
Opens 0-FCV-84-5 and 16 SAT     UNSAT       N/A     COMMENTS:______________________________
Opens 0-FCV-84-5 and 16 SAT UNSAT N/A COMMENTS:______________________________
Performance Step 2:                                               Critical   Not Critical X
Performance Step 2:
: 2.     VERIFY 0-PI-84-6/3, VAPOR A OUTLET PRESS, and 0-PI-84-17/3, VAPOR B OUTLET PRESS, indicate approximately 100 psig (Unit 3, Panel 3-9-54 and 3-9-55)
Critical Not Critical X 2.
VERIFY 0-PI-84-6/3, VAPOR A OUTLET PRESS, and 0-PI-84-17/3, VAPOR B OUTLET PRESS, indicate approximately 100 psig (Unit 3, Panel 3-9-54 and 3-9-55)
Standard:
Standard:
Verified 0-PI-84-6/3 and 0-PI-84-17/3 (Located on Unit 3, Panel 3-9-54 and 3-9-55) indicating approximately 100 psig.
Verified 0-PI-84-6/3 and 0-PI-84-17/3 (Located on Unit 3, Panel 3-9-54 and 3-9-55) indicating approximately 100 psig.
SAT     UNSAT       N/A     COMMENTS:_____________________________
SAT UNSAT N/A COMMENTS:_____________________________


JPM g PAGE 5 OF 8 Performance Step 3:                                             *Critical Not Critical
JPM g
*3*   PLACE keylock switch 3-HS-84-48, CAD A CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 3, Panel 3-9-54)
PAGE 5 OF 8
: 4. CHECK OPEN 3-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR, (Unit 3, Panel 3-9-54)
Performance Step 3:
*Critical Not Critical
*3*
PLACE keylock switch 3-HS-84-48, CAD A CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 3, Panel 3-9-54) 4.
CHECK OPEN 3-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR, (Unit 3, Panel 3-9-54)
Standard:
Standard:
Places keylock switch 3-HS-84-48 in Open and verifies 3-FSV-84-48 open SAT     UNSAT       N/A _COMMENTS:____________________________
Places keylock switch 3-HS-84-48 in Open and verifies 3-FSV-84-48 open SAT UNSAT N/A _COMMENTS:____________________________
Performance Step 4:                                             *Critical Not Critical
Performance Step 4:
*5*   PLACE keylock switch 3-HS-84-49, CAD B CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 3, Panel 3-9-55)
*Critical Not Critical
: 6. CHECK OPEN 3-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AR (Unit 3, Panel 3-9-55)
*5*
PLACE keylock switch 3-HS-84-49, CAD B CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 3, Panel 3-9-55) 6.
CHECK OPEN 3-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AR (Unit 3, Panel 3-9-55)
Standard:
Standard:
Places keylock switch 3-HS-84-49 in Open and verifies 3-FSV-84-49 SAT     UNSAT       N/A _COMMENTS:_____________________________
Places keylock switch 3-HS-84-49 in Open and verifies 3-FSV-84-49 SAT UNSAT N/A _COMMENTS:_____________________________


JPM g PAGE 6 OF 8 Performance Step 5:                                               Critical   Not Critical
JPM g
: 7.     CHECK MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 3-PA-32-31, alarm cleared (3-XA-55-3D, Window 18)
PAGE 6 OF 8
Performance Step 5:
Critical Not Critical 7.
CHECK MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 3-PA-32-31, alarm cleared (3-XA-55-3D, Window 18)
Standard:
Standard:
Recognizes MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW (3-XA-55-3D, Win. 18) still in Alarm (would NOT clear) and continues with procedure.
Recognizes MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW (3-XA-55-3D, Win. 18) still in Alarm (would NOT clear) and continues with procedure.
SAT     UNSAT       N/A _COMMENTS:_______________________________
SAT UNSAT N/A _COMMENTS:_______________________________
Performance Step 6:                                               Critical Not Critical
Performance Step 6:
: 8.     IF MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 3-PA-32-31, annunciator is or remains in alarm (3-XA-55-3D, Window 18), THEN DETERMINE which Drywell Control Air header is depressurized as follows:
Critical Not Critical 8.
: a.     DISPATCH personnel to Unit 3, RB, El 565 ft, to MONITOR the following indications for low pressure:
IF MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 3-PA-32-31, annunciator is or remains in alarm (3-XA-55-3D, Window 18), THEN DETERMINE which Drywell Control Air header is depressurized as follows:
* 3-PI-84-51, CAD A CROSSTIE TO DWCA PRESS 1NDR, for CAD A (R-17 S-line, by Drywell Access Door)
a.
* 3-PI-84-50, DW CONT AIR N2 SUPPLY PRESS indicator, for CAD B
DISPATCH personnel to Unit 3, RB, El 565 ft, to MONITOR the following indications for low pressure:
3-PI-84-51, CAD A CROSSTIE TO DWCA PRESS 1NDR, for CAD A (R-17 S-line, by Drywell Access Door) 3-PI-84-50, DW CONT AIR N2 SUPPLY PRESS indicator, for CAD B
((R-19 U-line, behind 480V RB Vent Board 3B)
((R-19 U-line, behind 480V RB Vent Board 3B)
Standard:
Standard:
Dispatches personnel to Reactor Building to monitor 3-PI-84-51 and 3-PI-84-50 for low pressure.
Dispatches personnel to Reactor Building to monitor 3-PI-84-51 and 3-PI-84-50 for low pressure.
SAT_ UNSAT           N/A     COMMENTS:
SAT_ UNSAT N/A COMMENTS:
CUE: DO NOT Report Unless directed by NRC [reportj 3-PI-84-5 1, CAD N        2 Pressure to DWCA indicator, for CAD A is reading 110 psig and 3-PI-84-50 reading 5 psig.
CUE: DO NOT Report Unless directed by NRC [reportj 3-PI-84-5 1, CAD N2 Pressure to DWCA indicator, for CAD A is reading 110 psig and 3-PI-84-50 reading 5 psig.


JPM   g PAGE 7 OF 8 Performance Step 7:                                                 Critical   Not Critical
JPM g
: b. MONITOR 0-FI-84-7/3(1 8/3), CAD A(B) N2 SYSTEM FLOW, on Panel 3-9-54(55) for high flow.
PAGE 7
OF 8
Performance Step 7:
Critical Not Critical b.
MONITOR 0-FI-84-7/3(1 8/3), CAD A(B) N2 SYSTEM FLOW, on Panel 3-9-54(55) for high flow.
Standard:
Standard:
Recognizes 0-FI-84-7/3 flow is 0 scfrn and that 0-FI 18 flow is 50 scfm SAT_ UNSAT         N/A     COMMENTS:_______________________________
Recognizes 0-FI-84-7/3 flow is 0 scfrn and that 0-FI 18 flow is 50 scfm SAT_ UNSAT N/A COMMENTS:_______________________________
NOTE CAD System A to Drywell Control Air supplies the following MSIVs:
NOTE CAD System A to Drywell Control Air supplies the following MSIVs:
* 3-FCV-1-14, MSIV JJNE A INBOARD
3-FCV-1-14, MSIV JJNE A INBOARD 3-FCV-1-26, MSIV LINE B INBOARD NOTE CAD System B to Drywell Control Air supplies the following MSIVs:
* 3-FCV-1-26, MSIV LINE B INBOARD NOTE CAD System B to Drywell Control Air supplies the following MSIVs:
3-FCV-1-37, MSIV LINE C INBOARD 3-FCV-l-51, MSIV LINE D INBOARD Performance Step 8:
* 3-FCV-1-37, MSIV LINE C INBOARD
Critical Not Critical c.
* 3-FCV-l-51, MSIV LINE D INBOARD Performance Step 8:                                                 Critical Not Critical
MONITOR inboard MSIV indication status for valves drifting closed.
: c. MONITOR inboard MSIV indication status for valves drifting closed.
Standard:
Standard:
Recognizes 3-FCV-1-37 and 51 closed SAT_ UNSAT         N/A   COMMENTS:_______________________________
Recognizes 3-FCV-1-37 and 51 closed SAT_ UNSAT N/A COMMENTS:_______________________________


JPM   g PAGE 8 OF 8 Performance Step 9:                                           Critical Not Critical X
JPM g
: 9.     IF Drywell Control Air header supplied from CAD System A shows indications of being depressurized, THEN CLOSE the following valves:
PAGE 8
* 0-FCV-84-5, CAD SYSTEM A N2 SHUTOFF VALVE (Unit 3, Panel 3-9-54)
OF 8
* 3-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR (Unit 3, Panel 3-9-54)
Performance Step 9:
Critical Not Critical X 9.
IF Drywell Control Air header supplied from CAD System A shows indications ofbeing depressurized, THEN CLOSE the following valves:
0-FCV-84-5, CAD SYSTEM A N2 SHUTOFF VALVE (Unit 3, Panel 3-9-54) 3-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR (Unit 3, Panel 3-9-54)
Standard:
Standard:
N/A No indications of being depressurized SAT     UNSAT       N/A _COMMENTS:_____________________________
N/A - No indications ofbeing depressurized SAT UNSAT N/A _COMMENTS:_____________________________
Performance Step 10:                                           Critical X Not Critical
Performance Step 10:
: 10. IF Drywell Control Air header supplied from CAD B shows indications of being depressurized, THEN CLOSE the following valves:
Critical X Not Critical 10.
* 0-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Unit 3, Panel 3-9-55)
IF Drywell Control Air header supplied from CAD B shows indications ofbeing depressurized, THEN CLOSE the following valves:
* 3-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 3, Panel 3                 55)
0-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Unit 3, Panel 3-9-55) 3-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 3, Panel 3 55)
Standard:
Standard:
Closes 0-FCV-84-16 and 3-FSV-84-49 SAT     UNSAT       N/A     COMMENTS:_____
Closes 0-FCV-84-16 and 3-FSV-84-49 SAT UNSAT N/A COMMENTS:_____
STOP TIME____
STOP TIME____
END OF TASK
END OF TASK


JPM h PAGE 1 OF S OPERATOR:_______________________
JPM h
RO           SRO                   DATE:
PAGE 1
JPM NUMBER:         h TASK NUMBER:         U-090-NO-03 TASK TITLE:         Bypassing Radiation Monitors on Workstation Touch Screen K/A NUMBER:         272000 A4.02         K/A RATING: RO 3.0 SRO 3.0 TASK STANDARD: Radiation Monitors 3-RM-90-59 and 3-RM-90-51 bypassed lAW 3-01-90 section 6.3.10.
OF S
LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 3-01-90 VALIDATION TIME: 5 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
OPERATOR:_______________________
RO SRO DATE:
JPM NUMBER:
h TASK NUMBER:
U-090-NO-03 TASK TITLE:
Bypassing Radiation Monitors on Workstation Touch Screen K/A NUMBER:
272000 A4.02 K/A RATING: RO 3.0 SRO 3.0 TASK STANDARD: Radiation Monitors 3-RM-90-59 and 3-RM-90-51 bypassed lAW 3-01-90 section 6.3.10.
LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED:
3-01-90 VALIDATION TIME: 5 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
COMMENTS:_____________________________
COMMENTS:_____________________________
Additional comment sheets attached? YES     NO RESULTS:     SATISFACTORY                 UNSATISFACTORY SIGNATURE:                                     DATE:
Additional comment sheets attached? YES NO RESULTS:
SATISFACTORY UNSATISFACTORY SIGNATURE:
DATE:
EXAMINER
EXAMINER


Line 1,231: Line 1,793:
The Unit Supervisor directs you to bypass Radiation Monitors 3-RM-90-59 and 3-RM-90-51, in accordance with 3-01-90 Radiation Monitoring System section 6.3.10.
The Unit Supervisor directs you to bypass Radiation Monitors 3-RM-90-59 and 3-RM-90-51, in accordance with 3-01-90 Radiation Monitoring System section 6.3.10.


JPM h PAGE 3 OF 6 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
JPM h
PAGE 3
OF 6
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
You are a Unit Operator. The condition of alarms and indications on Radiation Monitors on the 3-MON-90-50 Workstation are being addressed by the Unit Supervisor.
You are a Unit Operator. The condition of alarms and indications on Radiation Monitors on the 3-MON-90-50 Workstation are being addressed by the Unit Supervisor.
Line 1,237: Line 1,802:
The Unit Supervisor directs you to bypass Radiation Monitors 3-RM-90-59 and 3-RM-90-51, in accordance with 3-01-90 Radiation Monitoring System section 6.3.10.
The Unit Supervisor directs you to bypass Radiation Monitors 3-RM-90-59 and 3-RM-90-51, in accordance with 3-01-90 Radiation Monitoring System section 6.3.10.


JPM h PAGE 4 OF 6 START TIME____
JPM h
Performance Step 1:                                                 Critical Not Critical X 6.3.10 Bypassing Radiation Monitors on Workstation Touch Screen
PAGE 4
[1]   NOTIFY Unit Supervisor of the radiation monitor(s) to be bypassed.
OF 6
START TIME____
Performance Step 1:
Critical Not Critical X 6.3.10 Bypassing Radiation Monitors on Workstation Touch Screen
[1]
NOTIFY Unit Supervisor of the radiation monitor(s) to be bypassed.
Standard:
Standard:
Notifies the Unit Supervisor which radiation monitors will be bypassed.
Notifies the Unit Supervisor which radiation monitors will be bypassed.
SAT_ UNSAT           N/A     COMMENTS:___________________
SAT_ UNSAT N/A COMMENTS:___________________
f CUE: AcknodgNoffiction I
f CUE: AcknodgNoffiction I
Performance Step 2:                                                 Critical Not Critical X
Performance Step 2:
[2]     REVIEW Precautions and Limitations listed in Section 3.0 Standard:
Critical Not Critical X
Reviews Precautions and Limitations SAT     UNSAT       N/A       COMMENTS:_____________________________
[2]
Performance Step 3:                                                 Critical Not Critical X
REVIEW Precautions and Limitations listed in Section 3.0 Standard:
[3]     IF 3-RM-90-256, Drywell Air Monitor, is being bypassed, THEN REFER to Technical Specifications 3.4.5, 3.4.4 and 3.6.1.3.
Reviews Precautions and Limitations SAT UNSAT N/A COMMENTS:_____________________________
Performance Step 3:
Critical Not Critical X
[3]
IF 3-RM-90-256, Drywell Air Monitor, is being bypassed, THEN REFER to Technical Specifications 3.4.5, 3.4.4 and 3.6.1.3.
Standard:
Standard:
Step is NA, 3-RM-90-256 is not being bypassed.
Step is NA, 3-RM-90-256 is not being bypassed.
SAT     UNSAT       N/A     COMMENTS:___________________________
SAT UNSAT N/A COMMENTS:___________________________


JPM h PAGE 5 OF 6 Performance Step 4:                                               Critical X Not Critical
JPM h
[4]   Using Air Particulate Monitor Controller, 3-MON-90-50, SELECT Bypass CAM(s).
PAGE 5
OF 6
Performance Step 4:
Critical X Not Critical
[4]
Using Air Particulate Monitor Controller, 3-MON-90-50, SELECT Bypass CAM(s).
Standard:
Standard:
Selects Bypass Cams on 3-MON-90-50 SAT_ UNSAT           N/A _COMMENTS:______________________________
Selects Bypass Cams on 3-MON-90-50 SAT_ UNSAT N/A _COMMENTS:______________________________
Performance Step 5:                                               Critical X Not Critical
Performance Step 5:
[5]     WHEN the Channel Bypass window appears, THEN use the toggle switches to place the desired CAM in BYPASS (red indicator will change to green).
Critical X Not Critical
[5]
WHEN the Channel Bypass window appears, THEN use the toggle switches to place the desired CAM in BYPASS (red indicator will change to green).
Standard:
Standard:
Selects radiation monitors 3-RM-90-59 and 3-RM-90-5 1 for Bypass SAT     UNSAT       N/A _COMMENTS:____________________________
Selects radiation monitors 3-RM-90-59 and 3-RM-90-5 1 for Bypass SAT UNSAT N/A _COMMENTS:____________________________
Performance Step 6:                                               Critical X Not Critical
Performance Step 6:
[6]     WHEN desired CAMS have been toggled to bypass, then SELECT Set Bypass Config.
Critical X Not Critical
[6]
WHEN desired CAMS have been toggled to bypass, then SELECT Set Bypass Config.
Standard:
Standard:
Selects Set Bypass Configuration SAT_ UNSAT           N/A   COMMENTS:____________________________
Selects Set Bypass Configuration SAT_ UNSAT N/A COMMENTS:____________________________


JPM h PAGE 6 OF 6 Performance Step 7:                                             Critical Not Critical X
JPM h
[7]   VERIFY the CAMs selected for bypass now have a beige border around the CAM on the main display screen.
PAGE 6
OF 6
Performance Step 7:
Critical Not Critical X
[7]
VERIFY the CAMs selected for bypass now have a beige border around the CAM on the main display screen.
Standard:
Standard:
Verifies radiation monitors 3-RM-90-59 and 3-RM-90-51 are bypassed SAT     UNSAT       N/A     COMMENTS:______________________________
Verifies radiation monitors 3-RM-90-59 and 3-RM-90-51 are bypassed SAT UNSAT N/A COMMENTS:______________________________
Performance Step 8:                                             Critical Not Critical X
Performance Step 8:
[8]   NOTIFY Chemistry and/or RADCON to begin sampling affected systems at the required frequency.
Critical Not Critical X
[8]
NOTIFY Chemistry and/or RADCON to begin sampling affected systems at the required frequency.
Standard:
Standard:
Notifies Radcon SAT     UNSAT       N/A _COMMENTS:_______________________________
Notifies Radcon SAT UNSAT N/A _COMMENTS:_______________________________
CUE;   AomowJedgeNtifieati9n END OF TASK STOP TIME
CUE; AomowJedgeNtifieati9n END OF TASK STOP TIME


JPM +/-
JPM
PAGE 1 OF 7 OPERATOR:________________________
+/-
RU___         SRO___               DATE:
PAGE 1
JPM NUMBER:         i TASK NUMBER:         U-000-EM-19 TASK TiTLE:         2-EOI Appendix-lA Removal of RPS SCRAM Fuses KJA NUMBER: 212000 A2.20                 KJA RATiNG: RU 4.1 SRO 4.2 TASK STANDARD: Simulate removal of SCRAM Fuses lAW 2-EOI Appendix-lA LOCATION OF PERFORMANCE: Plant REFERENCES/PROCEDURES NEEDED: 2-EOI Appendix-lA VALIDATION TIME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
OF 7
OPERATOR:________________________
RU___
SRO___
DATE:
JPM NUMBER:
i TASK NUMBER:
U-000-EM-19 TASK TiTLE:
2-EOI Appendix-lA Removal of RPS SCRAM Fuses KJA NUMBER: 212000 A2.20 KJA RATiNG: RU 4.1 SRO 4.2 TASK STANDARD: Simulate removal of SCRAM Fuses lAW 2-EOI Appendix-lA LOCATION OF PERFORMANCE:
Plant REFERENCES/PROCEDURES NEEDED:
2-EOI Appendix-lA VALIDATION TIME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
PERFORMANCE TIME:
PERFORMANCE TIME:
COMMENTS:
COMMENTS:
Additional comment sheets attached? YES     NO RESULTS:     SATISFACTORY___           UNSATISFACTORY SIGNATURE:                                     DATE:
Additional comment sheets attached? YES NO RESULTS:
SATISFACTORY___
UNSATISFACTORY SIGNATURE:
DATE:
EXAMINER
EXAMINER


INITIAL CONDITIONS: You are the Extra Operator. The Unit 2 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9-5 are still illuminated.
INITIAL CONDITIONS: You are the Extra Operator. The Unit 2 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9-5 are still illuminated.
EOI-1 has been entered and followed to RC/Q-23. The Scram Discharge Volume VenffDrain Valves indicate closed on panel 2-9-5.
EOI-1 has been entered and followed to RC/Q-23. The Scram Discharge Volume VenffDrain Valves indicate closed on panel 2-9-5.
INITIATING CUE: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 2-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.
INITIATING CUE: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 2-EOI Appendix 1A, Removal and Replacement ofRPS Scram Solenoid Fuses.
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!


JPM +/-
JPM
PAGE 3 OF 7 IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed.
+/-
PAGE 3
OF 7
IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats correct (or Thats incorrect, if applicable). When you have completed your assigned task, you will say, My task is complete and I will acknowledge that your task is complete.
When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats correct (or Thats incorrect, if applicable). When you have completed your assigned task, you will say, My task is complete and I will acknowledge that your task is complete.
INITIAL CONDITIONS: You are the Extra Operator. The Unit 2 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9-5 are still illuminated.
INITIAL CONDITIONS: You are the Extra Operator. The Unit 2 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9-5 are still illuminated.
Line 1,298: Line 1,904:
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!


JPM   +/-
JPM
PAGE 4 OF 7 START TIME____
+/-
Performance Step 1:                                             Critical Not Critical X
PAGE 4
: 1. VERIFY CLOSED Scram Discharge Volume Vent and Drain Valves at the SCRAM DISCHARGE VOLUME VENT/DRAIN VLVS display on panel 9-5.
OF 7
START TIME____
Performance Step 1:
Critical Not Critical X 1.
VERIFY CLOSED Scram Discharge Volume Vent and Drain Valves at the SCRAM DISCHARGE VOLUME VENT/DRAIN VLVS display on panel 9-5.
Standard:
Standard:
Given in initial conditions SAT_ UNSAT           N/A     COMMENTS:_______________________________
Given in initial conditions SAT_ UNSAT N/A COMMENTS:_______________________________
Performance Step 2:                                             Critical Not Critical X
Performance Step 2:
: 2. DISPATCH personnel to Unit 2 Auxiliary Instrument Room to perform the following:
Critical Not Critical X 2.
: a. REFER to Attachment 1 and OBTAIN fuse pullers from EOI Equipment Storage box.
DISPATCH personnel to Unit 2 Auxiliary Instrument Room to perform the following:
a.
REFER to Attachment 1 and OBTAIN fuse pullers from EOI Equipment Storage box.
Standard:
Standard:
Simulate unlocking EOI Equipment storage and obtaining fuse pullers SAT     UNSAT       N/A     COMMENTS:____________________________
Simulate unlocking EOI Equipment storage and obtaining fuse pullers SAT UNSAT N/A COMMENTS:____________________________


JPM   +/-
JPM
PAGE 5 OF 7 Performance Step 3:                                                 Critical X Not Critical
+/-
: b.       LOCATE Terminal Strip CC inside Panel 9-15, Bay 2, Rear.
PAGE 5
: c.       REMOVE the following fuses (located at bottom of terminal strip CC, Panel 9-15):
OF 7
RPS BUS A BLOCK                 NUMBER                 FUSE ID CC                     FOUR (4)             2-FU1-085-0037AA CC                     FIVE (5)               2-FU1-085-0039A/2 CC                     SIX (6)               2-FU1-085-0039A/3 CC                     SEVEN (7)             2-FU1-085-0039A/4 Standard:
Performance Step 3:
Identifies terminal strip and simulates removing listed fuses SAT     UNSAT       N/A _COMMENTS:____________
Critical X Not Critical b.
CUE:           Vien location ofjropefRuse is indicatea he Fuse has been removed
LOCATE Terminal Strip CC inside Panel 9-15, Bay 2, Rear.
c.
REMOVE the following fuses (located at bottom ofterminal strip CC, Panel 9-15):
RPS BUS A BLOCK NUMBER FUSE ID CC FOUR (4) 2-FU1-085-0037AA CC FIVE (5) 2-FU1-085-0039A/2 CC SIX (6) 2-FU1-085-0039A/3 CC SEVEN (7) 2-FU1-085-0039A/4 Standard:
Identifies terminal strip and simulates removing listed fuses SAT UNSAT N/A _COMMENTS:____________
CUE:
Vien location ofjropefRuse is indicateaheFusehas beenremoved


JPM   +/-
JPM
PAGE 6 OF 7 Performance Step 4:                                                 Critical X Not Critical
+/-
: d.       LOCATE Terminal Strip CC inside Panel 9-17, Bay 2, Rear.
PAGE 6
: e.       REMOVE the following fuses (located at bottom of tenninal strip CC, Panel 9-17):
OF 7
RPS BUS B BLOCK                 NUMBER                 FUSE ID CC                     FOUR (4)             2-FU1-085-0037BA CC                     FIVE (5)               2-FU1-085-0039B/2 CC                     SIX (6)               2-FU1-085-0039B/3 CC                     SEVEN (7)             2-FU1-085-0039B/4 Standard:
Performance Step 4:
Identifies terminal strip and simulates removing listed fuses SAT_ UNSAT           N/A       COMMENTS:____________
Critical X Not Critical d.
CUE:           W4in location ofproper1use is indicate&the Fiishas beenemoved
LOCATE Terminal Strip CC inside Panel 9-17, Bay 2, Rear.
e.
REMOVE the following fuses (located at bottom of tenninal strip CC, Panel 9-17):
RPS BUS B BLOCK NUMBER FUSE ID CC FOUR (4) 2-FU1-085-0037BA CC FIVE (5) 2-FU1-085-0039B/2 CC SIX (6) 2-FU1-085-0039B/3 CC SEVEN (7) 2-FU1-085-0039B/4 Standard:
Identifies terminal strip and simulates removing listed fuses SAT_ UNSAT N/A COMMENTS:____________
CUE:
W4inlocation ofproper1use is indicate&the Fiishas beenemoved


JPM   +/-
JPM
PAGE 7 OF 7 Performance Step 5:                                             Critical Not Critical
+/-
: f.     WHEN ALL fuses are removed, THEN NOTIFY Unit Operator.
PAGE 7
OF 7
Performance Step 5:
Critical Not Critical f.
WHEN ALL fuses are removed, THEN NOTIFY Unit Operator.
Standard:
Standard:
Notifies Unit 2 Operator All RPS Fuse removed SAT     UNSAT       N/A _COMMENTS:______
Notifies Unit 2 Operator All RPS Fuse removed SAT UNSAT N/A _COMMENTS:______
CUE:           Aeknoy)e4ge Notification, SRO Does not direct replacementoffus&#xe7;s END OF TASK STOP TIME____
CUE:
Aeknoy)e4ge Notification, SRO Does not direct replacementoffus&#xe7;s END OF TASK STOP TIME____


JPM   j PAGE 1 OF 9 OPERATOR:
JPM j
RO___         SRO___                 DATE:
PAGE 1
JPMN1JMBER:         j TASK NUMBER:         U-001-AL-06 TASK TITLE:         Field actions for stuck open SRV KIA NUMBER: 239002 A2.03             KIA RATING: RO 4.1 SRO 4.2 TASK STANDARD: Stuck Open SRV is closed when power is removed from the SRV by opening the breakers LOCATION OF PERFORMANCE: Plant REFERENCES/PROCEDURES NEEDED: 2-AOl- 1-1 VALIDATION TIME: 25 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
OF 9
OPERATOR:
RO___
SRO___
DATE:
JPMN1JMBER:
j TASK NUMBER:
U-001-AL-06 TASK TITLE:
Field actions for stuck open SRV KIA NUMBER: 239002 A2.03 KIA RATING: RO 4.1 SRO 4.2 TASK STANDARD: Stuck Open SRV is closed when power is removed from the SRV by opening the breakers LOCATION OF PERFORMANCE:
Plant REFERENCES/PROCEDURES NEEDED:
2-AOl-1-1 VALIDATION TIME: 25 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
PERFORMANCE TIME:
PERFORMANCE TIME:
COMMENTS:______________________________
COMMENTS:______________________________
Additional comment sheets attached? YES       NO RESULTS:     SATISFACTORY___               UNSATISFACTORY SIGNATURE:                                         DATE:
Additional comment sheets attached? YES NO RESULTS:
SATISFACTORY___
UNSATISFACTORY SIGNATURE:
DATE:
EXAMINER
EXAMINER


Line 1,345: Line 1,987:
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!


JPM     j PAGE 3 OF 9 IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SiMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed.
JPM j
PAGE 3
OF 9
IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SiMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats correct (or Thats incorrect, if applicable). When you have completed your assigned task, you will say, My task is complete and I will acknowledge that your task is complete.
When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats correct (or Thats incorrect, if applicable). When you have completed your assigned task, you will say, My task is complete and I will acknowledge that your task is complete.
INITIAL CONDITIONS: You are an Operator, the Unit Supervisor has entered 2-AOl-i-i Relief Valve Stuck Open. Control Room actions to close SRV 2-PCV-i-22 have been unsuccessful. Reactor Power is 85%.
INITIAL CONDITIONS: You are an Operator, the Unit Supervisor has entered 2-AOl-i-i Relief Valve Stuck Open. Control Room actions to close SRV 2-PCV-i-22 have been unsuccessful. Reactor Power is 85%.
Line 1,351: Line 1,996:
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!


JPM j PAGE 4 OF 9 START TIME____
JPM j
Performance Step 1:                                               Critical Not Critical X NOTES
PAGE 4
: 1)     2-PCV-l-22 is an ADS Valve
OF 9
: 2)     2-PCV-1-22 has two power supplies, it will auto transfer on loss of power and is Normal Seeking.
START TIME____
: 3)     Attachment 1 may be addressed for fuse and breaker information.
Performance Step 1:
[2]   IF 2-PCV-l-22 is NOT closed, THEN PERFORM the following:
Critical Not Critical X NOTES 1) 2-PCV-l-22 is an ADS Valve 2) 2-PCV-1-22 has two power supplies, it will auto transfer on loss ofpower and is Normal Seeking.
[2.1] On Panel 2-25-3 2 PLACE the associated transfer switch MAIN STM LINE B RELIEF VALVE XFR, 2-XS-1-22 in EMERG position.
: 3) may be addressed for fuse and breaker information.
[2]
IF 2-PCV-l-22 is NOT closed, THEN PERFORM the following:
[2.1]
On Panel 2-25-32 PLACE the associated transfer switch MAIN STM LINE B RELIEF VALVE XFR, 2-XS-1-22 in EMERG position.
Standard:
Standard:
Simulate placing 2-XS-l-22 in emergency SAT_ UNSAT         N/A   COMMENTS:___
Simulate placing 2-XS-l-22 in emergency SAT_ UNSAT N/A COMMENTS:___
CUE:         When iim&#xfc;lated 2-XS4-22 isin Emergency. When ControLRoom called SRV remains OPEN.
CUE:
When iim&#xfc;lated 2-XS4-22 isin Emergency. When ControLRoom called SRV remains OPEN.


JPM   j PAGE 5 OF 9 Performance Step 2:                                               Critical Not Critical X
JPM j
[2.2] IF the SRV does NOT close, THEN PERFORM the following while OBSERVING the indications for the 2-PCV-l-22 on the Acoustic Monitor:
PAGE 5
* CYCLE the MAIN STM LINE B RELIEF VALVE, 2-HS-1-22C to the following positions several times.
OF 9
Performance Step 2:
Critical Not Critical X
[2.2]
IF the SRV does NOT close, THEN PERFORM the following while OBSERVING the indications for the 2-PCV-l-22 on the Acoustic Monitor:
CYCLE the MAIN STM LINE B RELIEF VALVE, 2-HS-1-22C to the following positions several times.
CLOSE/AUTO to OPEN to CLOSE/AUTO Standard:
CLOSE/AUTO to OPEN to CLOSE/AUTO Standard:
Simulates cycling 2-HS-l-22C from CLOSE/AUTO to OPEN to CLOSE/AUTO SAT_ UNSAT           N/A     COMMENTS:______________________________
Simulates cycling 2-HS-l-22C from CLOSE/AUTO to OPEN to CLOSE/AUTO SAT_ UNSAT N/A COMMENTS:______________________________
f CUE:           The SkY remains opn Performance Step 3:                                               Critical Not Critical X
f CUE:
[2.3] IF the SRV does NOT close, THEN PERFORM the following:
The SkYremains opn Performance Step 3:
A.     VERIFY the MAIN STM LINE B RELIEF VALVE, 2-HS-l-22C, in the CLOSE/AUTO position.
Critical Not Critical X
B.     PLACE the associated transfer switch MAIN STM LINE B RELIEF VALVE XFR, 2-XS-l-22 in NORM position.
[2.3]
IF the SRV does NOT close, THEN PERFORM the following:
A.
VERIFY the MAIN STM LINE B RELIEF VALVE, 2-HS-l-22C, in the CLOSE/AUTO position.
B.
PLACE the associated transfer switch MAIN STM LINE B RELIEF VALVE XFR, 2-XS-l-22 in NORM position.
Standard:
Standard:
Simulates verifying 2-HS-1-22C is in Close/Auto and simulates placing 2-XS-l-22 in Norm SAT_ UNSAT           N/A     COMMENTS:_____________________________
Simulates verifying 2-HS-1-22C is in Close/Auto and simulates placing 2-XS-l-22 in Norm SAT_ UNSAT N/A COMMENTS:_____________________________
CUE:           2-XS-l -22 is in Norm                   -
CUE:
2-XS-l -22 is in Norm


JPM j PAGE 6 OF 9 NRC NOTE IF BREAKERS are USED Performance Step 4:                                             Critical X Not Critical
NRC NOTE IF BREAKERS are USED JPM j
[2.4] IF the SRV does NOT close, THEN REMOVE the power from 2-PCV-1--22 by performing one of the following: (Opening breakers are the preferred method)
PAGE 6
A.     OPEN the following breakers: (Preferred method) 2A 250V RMOV, Compartment 11 C2 CUE:         11C2 at 2A 250V RMOV is open.
OF 9
* 2B 250V RMOV, Compartment 1C1 CUE:         IC1 at 213 25OVRMOV is open.
Performance Step 4:
Critical X Not Critical
[2.4]
IF the SRV does NOT close, THEN REMOVE the power from 2-PCV-1--22 by performing one of the following: (Opening breakers are the preferred method)
A.
OPEN the following breakers: (Preferred method) 2A 250V RMOV, Compartment 11 C2 CUE:
11C2 at 2A 250V RMOV is open.
* 2B 250V RMOV, Compartment 1C1 CUE:
IC1 at 213 25OVRMOV is open.
SRV 1-22 is closed.
SRV 1-22 is closed.
17 Operator simu1ates 1oshg breakers breakers areclose4 SRS/is Open. 3PM Fabre Standard:
17Operatorsimu1ates 1oshgbreakers breakers areclose4 SRS/is Open. 3PM Fabre Standard:
Simulates opening Compartment 11C2 at 2A 250V RMOV and Compartment 1C1 at 2B 250V RMOV SAT     UNSAT       N/A     COMMENTS:
Simulates opening Compartment 11C2 at 2A 250V RMOV and Compartment 1C1 at 2B 250V RMOV SAT UNSAT N/A COMMENTS:


JPM   j PAGE 7 OF 9 Performance Step 5:                                           Critical Not Critical X
JPM j
[2.5] IF the valve does NOT close, THEN CLOSE the breakers or REINSTALL fuses removed in Step 4.2.3[2.4].
PAGE 7
CUE:         If Operator simulates closing breakers, breakers are closed. SRV 1-22 is Opeu. JPM Failure Standard:
OF 9
SRV Closed Operator does NOT close breaker, Step is NA SAT_ UNSAT         N/A     COMMENTS:_____________________________
Performance Step 5:
Critical Not Critical X
[2.5]
IF the valve does NOT close, THEN CLOSE the breakers or REINSTALL fuses removed in Step 4.2.3[2.4].
CUE:
If Operator simulates closing breakers, breakers are closed. SRV 1-22 is Opeu. JPM Failure Standard:
SRV Closed Operator does NOT close breaker, Step is NA SAT_ UNSAT N/A COMMENTS:_____________________________
IF BREAKERS ARE OPENED THAN THE JPM IS COMPLETE STOP TIME____
IF BREAKERS ARE OPENED THAN THE JPM IS COMPLETE STOP TIME____
END OF TASK
END OF TASK


JPM   j PAGE 8 OF 9 NRC NO1E                 are USJFD Performance Step 6:                                             Critical X Not Critical B. In Panel 2-25-32 PULL the following fuses as necessary
JPM j
PAGE 8
OF 9
NRC NO1E are USJFD Performance Step 6:
Critical X Not Critical B. In Panel 2-25-32 PULL the following fuses as necessary
* Fuse 2E-F6E (Block EE, F 15)
* Fuse 2E-F6E (Block EE, F 15)
* Fuse 2E-F4E (Block EE, F7)
* Fuse 2E-F4E (Block EE, F7)
CUE:           Fuse 2E-F6E is PULLED                                       -
CUE:
Fuse 2E-F4E is PULLED If Oeratox simitats installing fuse fuses are $nstalled. S1V. 1-22 is Open. 3PM Failure Standard:
Fuse 2E-F6E is PULLED Fuse 2E-F4E is PULLED If Oeratox simitats installing fuse fuses are $nstalled. S1V. 1-22 is Open. 3PM Failure Standard:
Simulates pulling fuses: Fuse 2E-F6E and Fuse 2E-F4E SAT     UNSAT       N/A _COMMENTS:___________
Simulates pulling fuses: Fuse 2E-F6E and Fuse 2E-F4E SAT UNSAT N/A _COMMENTS:___________


JPM j PAGE 9 OF 9 Performance Step 7:                                               Critical Not Critical
JPM j
[2.5] IF the valve does NOT close, THEN CLOSE the breakers or REINSTALL fuses removed in Step 4.2.3[2.4].
PAGE 9 OF 9
CUE:        If Operator simulates installing fuses, fuses are installed. SRV 1-22 is Open. JPM Failure Standard:
Performance Step 7:
SRV Closed Operator does NOT install fuses, Step is NA SAT_ UIJSAT         N/A     COMMENTS:_____________________________
Critical Not Critical
[2.5]
IF the valve does NOT close, THEN CLOSE the breakers or REINSTALL fuses removed in Step 4.2.3[2.4].
If Operator simulates installing fuses, fuses are installed. SRV 1-22 is Open.JPM Failure CUE:
Standard:
SRV Closed Operator does NOT install fuses, Step is NA SAT_ UIJSAT N/A COMMENTS:_____________________________
IF FUSES ARE REMOVED THAN THE JPM IS COMPLETE STOP TIME____
IF FUSES ARE REMOVED THAN THE JPM IS COMPLETE STOP TIME____
END OF TASK
END OF TASK


JPM k (16+/- op6)
JPM k
(16+/- op6)
PAGE1OF9 OPERATOR:______________________
PAGE1OF9 OPERATOR:______________________
RO___         SRO___               DATE:
RO___
JPM NUMBER:         k (16 op6)
SRO___
TASK NUMBER:         U-000-SS-08 TASK TITLE:         Align 480V RMOV BD 3B for a fire and Start RHR Pump 3A KJA NUMBER: 600000 AA2.16           K/A RATING: RO 10 SRO: 15 TASK STANDARD: Operator 6 Manual Actions 0-SSI-16 section 2.0 and 3.0 completed LOCATION OF PERFORMANCE: Plant REFERENCES/PROCEDURES NEEDED: 0-SSI-16 VALIDATION TIME: 15 minutes MAX. TIME ALLOWED: 20 minutes for section 2.0 and 120 minutes for section 3.0.
DATE:
JPM NUMBER:
k (16 op6)
TASK NUMBER:
U-000-SS-08 TASK TITLE:
Align 480V RMOV BD 3B for a fire and Start RHR Pump 3A KJA NUMBER: 600000 AA2.16 K/A RATING: RO 10 SRO: 15 TASK STANDARD: Operator 6 Manual Actions 0-SSI-16 section 2.0 and 3.0 completed LOCATION OF PERFORMANCE:
Plant REFERENCES/PROCEDURES NEEDED:
0-SSI-16 VALIDATION TIME: 15 minutes MAX. TIME ALLOWED: 20 minutes for section 2.0 and 120 minutes for section 3.0.
PERFORMANCE TIME:
PERFORMANCE TIME:
COMMENTS:_____________________________
COMMENTS:_____________________________
Additional comment sheets attached? YES     NO RESULTS:     SATISFACTORY___             UNSATISFACTORY SIGNATURE:                                     DATE:
Additional comment sheets attached? YES NO RESULTS:
SATISFACTORY___
UNSATISFACTORY SIGNATURE:
DATE:
EXAMINER
EXAMINER


Line 1,418: Line 2,113:
Time Critical CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
Time Critical CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!


JPM k (16 op6)
JPM k
PAGE 3 OF 9 IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIIvIIJLATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed.
(16 op6)
PAGE 3
OF 9
IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIIvIIJLATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats correct (or Thats incorrect, if applicable). When you have completed your assigned task, you will say, My task is complete and I will acknowledge that your task is complete.
When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats correct (or Thats incorrect, if applicable). When you have completed your assigned task, you will say, My task is complete and I will acknowledge that your task is complete.
INITIAL CONDITIONS: You are Operator 6, the plant is operating in 0-SSI-l6 Control Building Fire EL 593 Through EL 617. Operator 6 Manual Actions Section 1.0 is complete.
INITIAL CONDITIONS: You are Operator 6, the plant is operating in 0-SSI-l6 Control Building Fire EL 593 Through EL 617. Operator 6 Manual Actions Section 1.0 is complete.
Line 1,425: Line 2,123:
Time Critical CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
Time Critical CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!


JPM k (16 op6)
JPM k
PAGE 4 OF 9 START TIME____
(16 op6)
Performance Step 1:                                               Critical   Not Critical 2.0   480V REACTOR MOV BOARD 3B ALIGNMENT (20 Mm)
PAGE 4 OF 9
[1]   Notification has been received from the Unit 3 Unit Supervisor to perform this section.
START TIME____
[2]   PERFORM the following to align 480V Reactor MOV Board 3B:
Performance Step 1:
[2.1] PROCEED TO Compt 2A, AND PLACE NORMAL FEEDER CONTROL SWITCH, 3-HS-268B/2A-A, in TRIP.
Critical Not Critical 2.0 480V REACTOR MOV BOARD 3B ALIGNMENT (20 Mm)
j CUE:          3-HS.268BI2A-A is in Trip, Green light On Red light Off
[1]
[2.2] PROCEED TO Compt 16A, AND PLACE EMERGENCY FEEDER CONTROL SWITCH, 3-HS-268-B/16A-A, in CLOSE.
Notification has been received from the Unit 3 Unit Supervisor to perform this section.
CUE:           3-HS-268-BI16A-Ais in Close, Red light On Green Light Off Standard:
[2]
Simulates placing 3-HS-268B/2A-A in Trip and 3-HS-268-B/16A-A in Close SAT_ UNSAT           N/A   COMMENTS:_____________________________
PERFORM the following to align 480V Reactor MOV Board 3B:
[2.1]
PROCEED TO Compt 2A, AND PLACE NORMAL FEEDER CONTROL SWITCH, 3-HS-268B/2A-A, in TRIP.
3-HS.268BI2A-A is in Trip, Green light On Red light Off j CUE:
[2.2]
PROCEED TO Compt 16A, AND PLACE EMERGENCY FEEDER CONTROL SWITCH, 3-HS-268-B/16A-A, in CLOSE.
CUE:
3-HS-268-BI16A-Ais in Close, Red light On Green Light Off Standard:
Simulates placing 3-HS-268B/2A-A in Trip and 3-HS-268-B/16A-A in Close SAT_ UNSAT N/A COMMENTS:_____________________________


JPM k (16 op6)
JPM k
PAGE 5 OF 9 Performance Step 2:
(16 op6)
PAGE 5
OF 9
Performance Step 2:
* Critical X Not Critical
* Critical X Not Critical
[2.3] PROCEED TO Compt 1C, AND PERFORM the following:
[2.3]
              *[23l]         PLACE RCIC STM LiNE EMER TRANS SWITCH 3-XS-071-0002, in EMERG.
PROCEED TO Compt 1C, AND PERFORM the following:
[2.3.2]       VERIFY OPEN RCIC STM LINE 1NBD ISOL VALVE, 3-HS-071-0002B.
*[23l]
CUE:         3-XS-Q71-OOO2 is in Emergency and RCIC Stcanttine hiboard Isolation Valve has Red Light Oil, Green Light Off Standard:
PLACE RCIC STM LiNE EMER TRANS SWITCH 3-XS-071-0002, in EMERG.
Simulates placing 3-XS-071-0002 in Emergency and verifies RCIC STM LINE INBD ISOL VALVE Open SAT     UNSAT       N/A     COMMENTS:______________________________
[2.3.2]
Performance Step 3:                                             Critical X Not Critical
VERIFY OPEN RCIC STM LINE 1NBD ISOL VALVE, 3-HS-071-0002B.
[2.4] PROCEED TO Compt 4C, AND PLACE O-BKR-084-0016A CONTAINMENT ATMOSPHERE DILUTION SYSTEM B HEATER, breaker in OFF.
CUE:
j CUE:         O-BKR-084-0016A is in Off Standard:
3-XS-Q71-OOO2 is in Emergency and RCICStcanttine hiboard Isolation Valve has RedLight Oil, Green Light Off Standard:
Simulates placing O-BKR-084-0016A in Off SAT_ UNSAT         N/A     COMMENTS:_____
Simulates placing 3-XS-071-0002 in Emergency and verifies RCIC STM LINE INBD ISOL VALVE Open SAT UNSAT N/A COMMENTS:______________________________
Performance Step 3:
Critical X Not Critical
[2.4]
PROCEED TO Compt 4C, AND PLACE O-BKR-084-0016A CONTAINMENT ATMOSPHERE DILUTION SYSTEM B HEATER, breaker in OFF.
j CUE:
O-BKR-084-0016A is in Off Standard:
Simulates placing O-BKR-084-0016A in Off SAT_ UNSAT N/A COMMENTS:_____
STOP TiME____
STOP TiME____


JPM     k (16 op6)
JPM k
PAGE 6 OF 9 Performance Step 4:                                               Critical Not Critical X
(16 op6)
[3]   NOTIFY Unit 3 Unit Supervisor of completion of this section.
PAGE 6
[4]   PROCEED TO 4160V Shutdown Board 3EA in preparation of performing Section 3.0.
OF 9
Performance Step 4:
Critical Not Critical X
[3]
NOTIFY Unit 3 Unit Supervisor of completion of this section.
[4]
PROCEED TO 4160V Shutdown Board 3EA in preparation of performing Section 3.0.
Standard:
Standard:
Notifies Unit 3 Unit Supervisor and proceeds to 4160 SD BD 3EA SAT     UNSAT       N/A     COMMENTS:_____________________________
Notifies Unit 3 Unit Supervisor and proceeds to 4160 SD BD 3EA SAT UNSAT N/A COMMENTS:_____________________________
CUE;           Acknowledge notification arid Notify Operator to perform section 3.0
CUE; Acknowledge notification arid Notify Operator to perform section 3.0


JPM k (16 op6)
JPM k
PAGE 7 OF 9 START TIME____
(16 op6)
PAGE 7
OF 9
START TIME____
Performance Step 5:
Performance Step 5:
* Critical   Not Critical 3.0 RHR PUMP 3A LOCAL START (120 Mm)
* Critical Not Critical 3.0 RHR PUMP 3A LOCAL START (120 Mm)
[1]   Notification has been received from the Unit 3 Unit Supervisor to perform this section.
[1]
Notification has been received from the Unit 3 Unit Supervisor to perform this section.
NOTE If RHR pump fails to start, pushbutton on breaker must be used.
NOTE If RHR pump fails to start, pushbutton on breaker must be used.
[2]   PROCEED TO 4160V Shutdown Board 3EA, Compt 12, 3-BKR-074-0005 RHR PUMP 3A, AND PERFORM the following:
[2]
      *[2.1] PLACE RHR PUMP 3A TRANSFER, 3-43-074-0005, in EMERG.
PROCEED TO 4160V Shutdown Board 3EA, Compt 12, 3-BKR-074-0005 RHR PUMP 3A, AND PERFORM the following:
f CUE:         343-O74-OOO5 is in Emergency
*[2.1] PLACE RHR PUMP 3A TRANSFER, 3-43-074-0005, in EMERG.
[2.2] PLACE RHR PUMP 3A, 3-HS-074-0005C, in CLOSE.
f CUE:
[2.3] VERIFY RHR Pump 3A has started by observing breaker AMMETER indications.
343-O74-OOO5 is in Emergency
CUE:           3-HS-O74-O005Cis in CIos No AMPS are indieated Reduight OF, Green LigI On Yellow light remaineL On.
[2.2]
PLACE RHR PUMP 3A, 3-HS-074-0005C, in CLOSE.
[2.3]
VERIFY RHR Pump 3A has started by observing breaker AMMETER indications.
CUE:
3-HS-O74-O005Cis in CIos No AMPS are indieated Reduight OF, Green LigI On Yellow light remaineL On.
If asked No breaker trips ar inicated.,
If asked No breaker trips ar inicated.,
Standard:
Standard:
Simulates placing 3-43-074-0005 in Emergency and 3-HS-074-0005C in Close SAT_ UNSAT         N/A     COMMENTS:_____________________________
Simulates placing 3-43-074-0005 in Emergency and 3-HS-074-0005C in Close SAT_ UNSAT N/A COMMENTS:_____________________________


JPM k (16 op6)
JPM k
PAGE 8 OF 9 Performance Step 6:
(16 op6)
PAGE 8
OF 9
Performance Step 6:
* Critical Not Critical 3.0 RHR PUMP 3A LOCAL START (120 Mm)
* Critical Not Critical 3.0 RHR PUMP 3A LOCAL START (120 Mm)
                              *NOTE
*NOTE
*IfpJIR pump fails to start, pushbutton on breaker must be used.
*IfpJIR pump fails to start, pushbutton on breaker must be used.
CUE:         Breaker 3-BKR-074-0005 pushbutton is depressed
CUE:
[2]   PROCEED TO 4160V Shutdown Board 3EA, Compt 12, 3-BKR-074-0005 RHR PUMP 3A, AND PERFORM the following:
Breaker 3-BKR-074-0005 pushbutton is depressed
[2.3] VERIFY RHR Pump 3A has started by observing breaker AMMETER indications.
[2]
CUE:         AMPS pegged high, Red light ON and Green Light OFF Breaker CLOSED, current AMP reading is 180 AMPS Standard:
PROCEED TO 4160V Shutdown Board 3EA, Compt 12, 3-BKR-074-0005 RHR PUMP 3A, AND PERFORM the following:
Simulates depressing pushbutton on 3-BKR-074-0005 and verifies Amps SAT_ UNSAT_ N/A               COMMENTS:_____________________________
[2.3]
VERIFY RHR Pump 3A has started by observing breaker AMMETER indications.
CUE:
AMPS pegged high, Red light ON and Green Light OFF Breaker CLOSED, current AMP reading is 180 AMPS Standard:
Simulates depressing pushbutton on 3-BKR-074-0005 and verifies Amps SAT_ UNSAT_ N/A COMMENTS:_____________________________
STOP TIME____
STOP TIME____


JPM k (16 op6)
JPM k
PAGE 9 OF 9 Performance Step 7:                                             Critical Not Critical X
(16 op6)
[3]   NOTIFY Unit 3 Unit Supervisor of the completion of this section.
PAGE 9
[4]   PROCEED TO 4160 Shutdown Board A in preparation of performing Section 4.0.
OF 9
Performance Step 7:
Critical Not Critical X
[3]
NOTIFY Unit 3 Unit Supervisor ofthe completion of this section.
[4]
PROCEED TO 4160 Shutdown Board A in preparation ofperforming Section 4.0.
Standard:
Standard:
Notifies Unit 3 Unit Supervisor SAT_ UNSAT         N/A     COMMENTS:
Notifies Unit 3 Unit Supervisor SAT_ UNSAT N/A COMMENTS:
CUE:           Another Operator will continue with section 4.0 END OFTASK}}
CUE:
AnotherOperator will continue with section 4.0 END OFTASK}}

Latest revision as of 07:12, 13 January 2025

Initial Exam 2011-301 Final Sim-IN Plant JPMs
ML111010634
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/04/2011
From:
NRC/RGN-II/DRS/OLB
To:
Tennessee Valley Authority
References
50-259/11-301, 50-260/11-301, 50-296/11-301
Download: ML111010634 (150)


Text

JPM a

PAGE 1

OF 14 OPERATOR:

RO___

SRO DATE:________

JPM NUMBER:

a TASK NUMBER:

U-085-AB-03 TASK TITLE: CRD Pump Trip at <900 psig Reactor Pressure K!A NUMBER: 201001 A2.01 KJA RATING: RO 3.2 SRO 3.3 TASK STANDARD: Withdraws Control Rod, ifwithdrawn to position 48; performs a coupling check, ranges IRIVIs to prevent a full scram signal, and inserts a manual scram; when unable to restore CRD drive water pressure >940 psig.

LOCATION OF PERFORMANCE:

Simulator REFERENCES/PROCEDURES NEEDED:

2-01-85 and 2-AOI-85-3 VALIDATION TiME:

15 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)

PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES NO RESULTS:

SATISFACTORY___

UNSATISFACTORY SIGNATURE:

DATE:

EXAMINER

INITIAL CONDITIONS:

You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 3 8-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.

INITIATING CUE:

The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30-35. Rod Out Notch Override is authorized, complete the withdrawal of group 12 and then continue with group 13.

JPM a

PAGE 3

OF 14 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 3 8-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.

INITIATING CUE:

The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30-3 5. Rod Out Notch Override is authorized, complete the withdrawal of group 12 and then continue with group 13.

NRC Examinei Siep, I through 9 are for Continuous ithi1ra1, stçps 10 tlg9ugh 14 arçf Notch withdrawaL

JPM a

PAGE 4

OF 14 START TIME____

Performance Step 1:

Critical X Not Critical 6.6.4 Continuous Rod Withdrawal

[1]

SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.

Standard:

Selects Control Rod 30-35 by depressing 30-35 pushbutton.

SAT UNSAT N/A COMMENTS:___________________________

Performance Step 2:

Critical

- Not Critical X

[2]

OBSERVE the following for selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED.

White light on the Full Core Display ILLUMiNATED.

Rod Out Permit light ILLUMiNATED.

Standard:

Observes the above indications.

SAT UNSAT N/A COMMENTS:

JPM a

PAGE 5

OF 14 Performance Step 3:

Critical Not Critical

[3]

VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.

Standard:

Verifies Rod Worth Minimizer responded correctly.

SAT UNSAT N/A COMMENTS:______________________________

Performance Step 4:

Critical Not Critical X

[4]

VERIFY Control Rod is being withdrawn to a position greater than three notches.

Standard:

Verifies Control Rod 30-35 is going from position 16 to 48.

SAT_ UNSAT N/A COMMENTS:______________________________

JPM a

PAGE 6

OF 14 Performance Step 5:

Critical X Not Critical NOTE When continuously withdrawing a control rod to position 48, the control rod coupling integrity check can be performed by one of the two following methods:

1)

Coupling integrity check while maintaining the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position. If this method is selected, perform Step 6.6.4[6] and N/A Step 6.6.4[7].

2)

Coupling integrity check after releasing the CRD Notch Override Switch and the CRD Control Switch. If this method is selected, perform Step 6.6.4[7] and N/A Step 6.6.4[6].

[6]

IF continuously withdrawing the control rod to position 48 and performing the control rod coupling integrity check in conjunction with withdrawal, THEN PERFORM the following: (Otherwise N/A)

[6.1]

PLACE and HOLD CRD NOTCH OVERRIDE, 2-HS-85-47, in NOTCH OVERRRIDE.

[6.2]

PLACE and HOLD CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH.

Standard:

Continuously withdraws Control Rod 30-35 by holding switch, 2-HS-85-47, in Notch Override and, 2-HS-85-48, in Rod Out Notch.

SAT UNSAT N/A COMMENTS:_____________________________

Drivei: When coupling check complete for control rod 30-35, trip operating CRD Pump.

JPM a

PAGE 7

OF 14 Performance Step 6:

X Not Critical

  • [63] MAINTAIN the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position, with the control rod at position 48.

[6.4]

CHECK control rod coupled by observing the following:

Four rod display digital readout AND the full core display digital readout AND background light remain illuminated.

CONTROL ROD OVERTRAVEL annunciator, 2-XA-55-5A, Window 14, does NOT alarm.

[6.5]

RELEASE both CRD NOTCH OVERRIDE, 2-HS-85-47, and CRD CONTROL SWITCH, 2-HS-85-48.

[6.6]

CHECK control rod settles into position 48 and ROD SETTLE light extinguishes.

Standard:

If control rod is withdrawn to position 48, performs a coupling check.

SAT UNSAT N/A COMMENTS:__________________________

Driver: When coupling check complete fr control rod 30-35, trip operating CRD Pump.

JPM a

PAGE 8

OF 14 N[CNCTEthçsçarecontingency Conpling Check Performance Step 7:

Critical X Not Critical

[7]

IF continuously withdrawing the control rod to position 48, the control rod coupling integrity check will be performed after the CRD NOTCH OVERRIDE, 2-HS-85-47, and CRD CONTROL SWITCH, 2-HS-85-48 are to be released. THEN PERFORM control rod coupling integrity check as follows (otherwise N/A):

[7.1]

PLACE AND HOLD CRD NOTCH OVERRIDE, 2-HS-85-47, in NOTCH OVERRRIDE.

[7.2]

PLACE AND HOLD CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH.

Standard:

Continuously withdraws Control Rod 30-35 by holding switch, 2-HS-85-47, in Notch Override and, 2-HS-85-48, in Rod Out Notch.

SAT UNSAT N/A COMMENTS:_______________________________

Performance Step 8:

  • Critical X Not Critical

[7.3]

WHEN position 48 is reached, THEN RELEASE CRD NOTCH OVERRIDE, 2-HS-85-47, and CRD CONTROL SWITCH, 2-HS-85-48.

Standard:

Stops withdraw of Control Rod 30-35 at position 48 by releasing hand switches and verifies rod settles at position 48.

SAT_ UNSAT N/A COMMENTS:______________________________

JPM a

PAGE 9

OF 14 Performance Step 9:

  • Critjcal X Not Critical
  • [7.5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[7.6]

CHECK control rod coupled by observing the following:

Four rod display digital readout AND full core display digital readout AND background light will remain illuminated.

CONTROL ROD OVERTRAVEL annunciator (2-XA-55-5A, Window

14) does NOT alarm.

[7.7]

CHECK control rod settles into position 48 and ROD SETTLE light extinguishes.

Standard:

If control rod is withdrawn to position 48, performs a coupling check.

SAT UNSAT N/A _COMMENTS:_____________________________

Driver: When coupling check complete for control rod 30-35, trip operating CRD Pump.

JPM a

PAGE 10 OF 14 9jiifeps Performance Step 10:

Critical Not Critical X 6.6.3 Control Rod Notch Withdrawal

[1]

SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.

Standard:

Selects Control Rod 38-43 by depressing 3 8-43 pushbutton.

SAT_ UNSAT N/A COMMENTS:_____________________________

Performance Step 11:

Critical

- Not Critical X

[2]

OBSERVE the following for selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED.

White light on the Full Core Display ILLUMiNATED.

Rod Out Permit light ILLUMINATED.

Standard:

Observes the above indications.

SAT_ UNSAT N/A COMMENTS:

JPM a

PAGE 11 OF 14 Performance Step 12:

Critical Not Critical X

[3]

VERIFY ROD WORTH M11fIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.

Standard:

Verifies Rod Worth Minimizer responded correctly and verified Control Rod 38-43 is going from position 16 to 48.

SAT UNSAT N/A COMMENTS:______________________________

Performance Step 13:

  • Critical X Not Critical
  • [4]

PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[5]

OBSERVE the control rod settles into the desired position and the ROD SEHLE light extinguishes.

Standard:

Withdraws control rod 38-43.

SAT UNSAT N/A COMMENTS:____________________________

JPM a

PAGE 12 OF 14 Performance Step 14:

  • Critical X Not Critical

[6]

IF control rod is notch withdrawn to rod notch Position 48, THEN PERFORM control rod coupling integrity check as follows:

  • [6.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[6.2]

CHECK control rod coupled by observing the following:

Four rod display digital readout AND the full cores display digital readout AND background light remain illuminated.

CONTROL ROD OVERTRAVEL annunciator, 2-XA-55-5A, Window 14, does NOT alarm.

[6.3]

CHECK the control rod settles into Position 48 and the ROD SETTLE light extinguishes.

Standard:

If Control Rod is withdrawn to position 48, performs a coupling check.

SAT UNSAT N/A COMMENTS:______________________________

Driver: When coupling check complete for control rod 30-35, trip operating CR]) Pump.

JPM a

PAGE 13 OF 14 Performance Step 15:

Critical X Not Critical Operator Ranges IRMs as necessary; to maintain greater than the downscale reading of 7.5/1 25 and less than the upscale reading of 90/1 25.

Note: the High-High of 116.4/125 will produce a scram signal.

Standard:

Ranges IRMs to clear or prevent a Rod Block signal.

Note: A Full Scram signal from IRMs while withdrawing control rods wifi be a failure.

SAT_ UNSAT N/A COMMENTS:______________________________

Performance Step 16:

Critical Not Critical X 4.1 Immediate Actions

[1]

IF operating CRD PUMP has failed AND the standby CRD Pump is available, THEN PERFORM the following at Panel 2-9-5:

[1.1]

PLACE CRD SYSTEM FLOW CONTROL, 2-FIC-85-11, in MAN at minimum setting.

Standard:

Places CRD System Flow Control in Manual and at Minimum setting.

SAT UNSAT N/A _COMMENTS:______________________________

JPM a

PAGE 14 OF 14 Performance Step 17:

Critical Not Critical X

[1.2]

START associated standby CRD Pump using one of the following:

  • CRD Pump 1B, using 2-HS-85-2A
  • CRD Pump 2A, using 2-HS-85-1A Standard:

Attempts to start standby CR1) Pump and may also attempt to start tripped CRD Pump.

SAT UNSAT N/A COMMENTS:______________________________

Performance Step 18:

Critical X Not Critical

[2]

IF Reactor Pressure is less than 900 PSIG and either of the following conditions exists:

In-service CRD Pump tripped and neither CRD Pump can be started, OR Charging Water Pressure can NOT be restored and maintained above 940 PSIG, THEN PERFORM the following:

[2.1]

MANUALLY SCRAM Reactor, IMMEDIATELY PLACE the reactor mode switch in the SHUTDOWN position.

Standard:

Insert a Manual Scram and places Mode Switch in Shutdown.

SAT UNSAT N/A COMMENTS:_______________________________

CUE:

After Scram report anothex operator will continue in 2-AOI-100-1.

END OF TASK STOP TIME

JPM a

PAGE 1

OF 14 OPERATOR:

RO SRO DATE:_______

JPM NUMBER:

a TASK NUMBER:

U-085-AB-03 TASK TITLE: CRD Pump Trip at <900 psig Reactor Pressure KIA NUMBER: 201001 A2.01 KIA RATING: RO 3.2 SRO 3.3 TASK STANDARD: Withdraws Control Rod, ifwithdrawn to position 48; perfonris a coupling check, ranges IRMs to prevent a full scram signal, and inserts a manual scram; when unable to restore CRD drive water pressure >940 psig.

LOCATION OF PERFORMANCE:

Simulator REFERENCES/PROCEDURES NEEDED:

3-01-85 and 3-AOI-85-3 VALIDATION TIME:

15 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)

PERFORMANCE TIME:

COMMENTS:_____________________________

Additional comment sheets attached? YES NO RESULTS:

SATISFACTORY___

UNSATISFACTORY SIGNATURE:

DATE:

EXAMINER

IMTIAL CONDITIONS:

You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 3 8-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.

INITIATING CUE:

The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30-35. Rod Out Notch Override is authorized, complete the withdrawal ofgroup 12 and then continue with group 13.

JPM a

PAGE 3

OF 14 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 3 8-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.

INITIATING CUE:

The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30-35. Rod Out Notch Override is authorized, complete the withdrawal of group 12 and then continue with group 13.

W

%RC?Examner Steps I through9 are for Continuous withdval, steps 1Qtbroiigh 14 ate fot Notch vithdrawaI.

JPM a

PAGE 4

OF 14 START TIME____

Performance Step 1:

Critical X Not Critical 6.6.4 Continuous Rod Withdrawal

[1]

SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3 -XS-85-40.

Standard:

Selects Control Rod 30-35 by depressing 30-35 pushbutton.

SAT UNSAT N/A COMMENTS:____________________________

Performance Step 2:

Critical

- Not Critical X

[2]

OBSERVE the following for selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED.

White light on the Full Core Display ILLUMINATED.

Rod Out Permit light ILLUMINATED.

Standard:

Observes the above indications.

SAT UNSAT N/A COMMENTS:

JPM a

PAGE 5

OF 14 Performance Step 3:

Critical Not Critical

[3]

VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.

Standard:

Verifies Rod Worth Minimizer responded correctly.

SAT UNSAT N/A COMMENTS:_____________________________

Performance Step 4:

Critical Not Critical

[4]

VERIFY Control Rod is being withdrawn to a position greater than three notches.

Standard:

Verifies Control Rod 30-35 is going from position 16 to 48.

SAT_ U1SAT N/A COMMENTS:_______________________________

JPM a

PAGE 6

OF 14 Performance Step 5:

Critical X Not Critical NOTE When continuously withdrawing a control rod to position 48, the control rod coupling integrity check can be performed by one of the two following methods:

1)

Coupling integrity check while maintaining the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position. If this method is selected, perform Step 6.6.4[6] and N/A Step 6.6.4[7].

2)

Coupling integrity check after releasing the CRD Notch Override Switch and the CRD Control Switch. If this method is selected, perform Step 6.6.4[7] and N/A Step 6.6.4[61.

[6]

IF continuously withdrawing the control rod to position 48 and performing the control rod coupling integrity check in conjunction with withdrawal, THEN PERFORM the following: (Otherwise N/A)

[6.1]

PLACE and HOLD CRD NOTCH OVERRIDE, 3-HS-85-47, in NOTCH OVERRRIDE.

[6.2]

PLACE and HOLD CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH.

Standard:

Continuously withdraws Control Rod 30-35 by holding switch, 3-HS-85-47, in Notch Override and, 3-HS-85-48, in Rod Out Notch.

SAT_ UNSAT N/A _COMMENTS:___________________________

Driver: When coupling cheók complete for control rod 30-35, trip operating CRD Pump.

JPM a

PAGE 7

OF 14 Performance Step 6:

Critical X Not Critical

[6.3]

MAINTAIN the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position, with the control rod at position 48.

  • [6.4] CHECK control rod coupled by observing the following:

Four rod display digital readout AND the full core display digital readout AND background light remain illuminated.

CONTROL ROD OVERTRAVEL annunciator, 3-XA-55-5A, Window 14, does NOT alarm.

[6.5]

RELEASE both CRD NOTCH OVERRIDE, 3-HS-85-47, and CRD CONTROL SWITCH, 3-HS-85-48.

  • [6.6] CHECK control rod settles into position 48 and ROD SETTLE light extinguishes.

Standard:

If control rod is withdrawn to position 48, performs a coupling check.

SAT UNSAT N/A COMMENTS:___________________

JPM a

PAGE 8

OF 14 NRC 11OTEtkci co cyoupiiug &ck Performance Step 7:

Critical X Not Critical

[7]

IF continuously withdrawing the control rod to position 48, the control rod coupling integrity check will be performed after the CRD NOTCH OVERRIDE, 3-HS-85-47, and CRD CONTROL SWITCH, 3-HS-85-48 are to be released. THEN PERFORM control rod coupling integrity check as follows (otherwise N/A):

[7.1]

PLACE AND HOLD CRD NOTCH OVERRIDE, 3-HS-85-47, in NOTCH OVERRRIDE.

[7.2]

PLACE AND HOLD CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH.

Standard:

Continuously withdraws Control Rod 30-35 by holding switch, 3-HS-85-47, in Notch Override and 3-HS-85-48, in Rod Out Notch.

SAT_ UNSAT N/A COMMENTS:_______________________________

Performance Step 8:

  • Critical Not Critical X
  • [7.3] WHEN position 48 is reached, THEN RELEASE CRD NOTCH OVERRIDE, 3-HS-85-47, and CRD CONTROL SWITCH, 3-HS-85-48.

[7.4]

VERIFY control rod settles into position 48.

Standard:

Stops withdraw of Control Rod 30-35 at position 48 by releasing hand switches and verifies rod settles at position 48.

SAT UNSAT N/A _COMMENTS:_____________________________

JPM a

PAGE 9

OF 14 Performance Step 9:

  • Critical X Not Critical
  • [7.5] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[7.6]

CHECK control rod coupled by observing the following:

Four rod display digital readout AND full core display digital readout AND background light will remain illuminated.

CONTROL ROD OVERTRAVEL annunciator (3-XA-55-5A, Window

14) does NOT alarm.

[7.7]

CHECK control rod settles into position 48 and ROD SEYILE light extinguishes.

Standard:

If control rod is withdrawn to position 48, performs a coupling check.

SAT_U1SAT N/A COMMENTS:

Driver: When coupling check complete for control rod 30-35, trip operating CRD Pump;

JPM a

PAGE 10 OF 14 NRfE WotcdraiISeps Performance Step 10:

Critical X Not Critical 6.6.3 Control Rod Notch Withdrawal

[1]

SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.

Standard:

Selects Control Rod 30-3 5 by depressing 30-3 5 pushbutton.

SAT UNSAT N/A COMMENTS:_______________________________

Performance Step 11:

Critical

- Not Critical X

[2]

OBSERVE the following for selected control rod:

CRD ROD SELECT pushbutton is brightly ILLUMINATED.

White light on the Full Core Display ILLUMINATED.

Rod Out Permit light ILLUMINATED.

Standard:

Observes the above indications.

SAT UNSAT N/A COMMENTS:

JPM a

PAGE 11 OF 14 Performance Step 12:

Critical Not Critical X

[3]

VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.

Standard:

Verifies Rod Worth Minimizer responded correctly and verified Control Rod 30-35 is going from position 16 to 48.

SAT_ UNSAT N/A _COMMENTS:_____________________________

Performance Step 13:

  • Critical X Not Critical
  • [4]

PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[5]

OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.

Standard:

Withdraws control rod 30-35.

SAT UNSAT N/A COMMENTS:____________________________

JPM a

PAGE 12 OF 14 Performance Step 14:

  • Critical X Not Critical

[6]

IF control rod is notch withdrawn to rod notch Position 48, THEN PERFORM control rod coupling integrity check as follows:

  • [6.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[6.2]

CHECK control rod coupled by observing the following:

Four rod display digital readout AND the full cores display digital readout AND background light remain illuminated.

CONTROL ROD OVERTRAVEL annunciator, 3-XA-55-5A, Window 14, does NOT alarm.

[6.3]

CHECK the control rod settles into Position 48 and the ROD SETTLE light extinguishes.

Standard:

If Control Rod is withdrawn to position 48, performs a coupling check.

SAT_ UNSAT N/A COMMENTS:_______________________________

Driver: When coupling check complete for control rod 30-35, trip operating CRD Pump.

JPM a

PAGE 13 OF 14 Performance Step 15:

Critical X Not Critical Operator Ranges IRMs as necessary; to maintain greater than the downscale reading of 7.5/125 and less than the upscale reading of 104.6/125.

Note: the High-High of 116.4/125 will produce a scram signal.

Standard:

Ranges IRMs to clear or prevent a Rod Block signal.

Note: A Full Scram signal from IRMs while withdrawing control rods wifi be a failure.

SAT UNSAT N/A COMMENTS:_____________________________

Performance Step 16:

Critical Not Critical 4.1 Immediate Actions

[1]

IF operating CRD PUMP has failed AND the standby CRD Pump is available, THEN PERFORM the following at Panel 3-9-5:

[1.1]

PLACE CRD SYSTEM FLOW CONTROL, 3-FIC-85-11, in MAN at minimum setting.

Standard:

Places CRD System Flow Control in Manual and at Minimum setting.

SAT UNSAT_ N/A COMMENTS:_____________________________

JPM a

PAGE 14 OF 14 Performance Step 17:

Critical Not Critical

[1.2]

START associated standby CRD Pump using one of the following:

  • CRD Pump 3B, using 3-HS-85-2A
  • CRD Pump 3A, using 3-HS-85-1A Standard:

Attempts to start standby CRD Pump and may also attempt to start tripped CRD Pump.

SAT_ UNSAT N/A _COMMENTS:______________________________

Performance Step 18:

Critical Not Critical

[2]

IF Reactor Pressure is less than 900 PSIG and either of the following conditions exists:

In-service CRD Pump tripped and neither CRD Pump can be started, OR Charging Water Pressure can NOT be restored and maintained above 940 PSIG, THEN PERFORM the following:

[2.1]

MANUALLY SCRAM Reactor, IMMEDIATELY PLACE the reactor mode switch in the SHUTDOWN position.

Standard:

Insert a Manual Scram and places Mode Switch in Shutdown.

SAT_ UNSAT N/A COMMENTS:_______________________________

CUE:

After Scram report another operator will continue in 3-AOI-100-I.

END OF TASK STOP TIME

JPM b

PAGE 1

OF 5

OPERATOR:_______________________

RO___

SRO___

DATE:

JPM NUMBER:

b TASK NUMBER:

U-003-AL-16 TASK TITLE: RFPT Trip recovery K/A NUMBER: 259001 A2.01 K/A RATING: RO 3.7 SRO 3.7 TASK STANDARD: RFPT Recovered and restoring Reactor Level prior to an automatic Reactor Scram on Level.

LOCATION OF PERFORMANCE:

Simulator REFERENCES/PROCEDURES NEEDED:

2-AOI 1 VALIDATION TIME:

15 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)

PERFORMANCE TIME:

COMMENTS:_____________________________

Additional comment sheets attached? YES NO RESULTS:

SATISFACTORY___

UNSATISFACTORY SIGNATURE:

DATE:

EXAMINER

INITIAL CONDITIONS:

You are a Reactor Operator. Plant startup is in progress. RFPT C has tripped and it is needed to maintain level.

INITIATING CUE:

The Unit Supervisor directs you to restore RFPT C for level control using Manual Governor Control in accordance with 2-AOI-3-1, Loss of Reactor Feedwater or Reactor Water Level High/Low starting at step 8. Level band is the normal operating band.

JPM b

PAGE 3

OF 5

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are a Reactor Operator. Plant startup is in progress. RFPT C has tripped and it is needed to maintain level.

INITIATING CUE:

The Unit Supervisor directs you to restore RFPT C for level control using Manual Governor Control in accordance with 2-AOI-3-1, Loss of Reactor Feedwater or Reactor Water Level High/Low starting at step 8. Level band is the normal operating band.

JPM b

PAGE 4 OF 5

START TIME____

Performance Step 1:

  • Critjcal X Not Critical

[8]

IF RFPT has tripped and needed to maintain level, THEN PERFORM the following:

[8.1]

OBTAIN SRO permission to restart RFPT.

  • [8.2] RESET trip by using pushbutton.

Standard:

Resets trip by depressing reset pushbutton for RFPT C SAT UNSAT N/A COMMENTS:_____________________________

Performance Step 2:

Critical X Not Critical

[8.3]

DEPRESS RFPT Speed Control Raise/Lower switch to MANUAL GOVERNOR position.

Standard:

Depresses RFPT C Speed Control Raise/Lower switch to Manual Governor position.

SAT_ UNSAT N/A COMMENTS:____________________________

Performance Step 3:

Critical X Not Critical

[8.4]

PLACE RFPT StartlLocal enable switch to START.

Standard:

Places RFPT C Start/Local enable switch to Start.

SAT_ USAT N/A COMMENTS:______________________________

JPM b

PAGE 5

OF 5

Performance Step 4:

Critical Not Critical X

[8.5]

VERIFY RFPT accelerates to approximately 600 rpm.

Standard:

Verifies RFPT C accelerates SAT_ UNSAT N/A COMMENTS:_____________________________

Performance Step 5:

Critical Not Critical

[8.7]

For Slow Recovery of RFPT in MANUAL GOVERNOR, RAISE RFPT speed using RFPT Speed Control Raise/Lower switch until desired flow is obtained.

Standard:

Raises speed of RFPT C using RFPT Speed Control switch and restores and maintains Reactor Level SAT_ UNSAT N/A COMMENTS:_______

END OF TASK STOP TiME

JPM b

PAGE 1

OF 5

OPERATOR:_______________________

RO___

SRO___

DATE:________

JPM NUMBER:

b TASK NUMBER:

U-003-AL-16 TASK TITLE: RFPT Trip recovery K/A NUMBER: 259001 A2.01 K/A RATING: RO 3.7 SRO 3.7 TASK STANDARD: RFPT Recovered and restoring Reactor Level prior to an automatic Reactor Scram on Level.

LOCATION OF PERFORMANCE:

Simulator REFERENCES/PROCEDURES NEEDED:

3-AOI 1 VALIDATION TIME:

15 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)

PERFORMANCE TIME:

COMMENTS:_____________________________

Additional connuent sheets attached? YES NO RESULTS:

SATISFACTORY___

UNSATISFACTORY SIGNATURE:

DATE:

EXAMiNER

INITIAL CONDITIONS:

You are a Reactor Operator. Plant startup is in progress. RFPT C has tripped and it is needed to maintain level.

INITIATING CUE:

The Unit Supervisor directs you to restore RFPT C for level control using Manual Governor Control in accordance with 3-AOI-3-l, Loss ofReactor Feedwater or Reactor Water Level HighlLow starting at step 11. Level Band is the normal operating band.

JPM b

PAGE 3

OF 5

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are a Reactor Operator. Plant startup is in progress. RFPT C has tripped and it is needed to maintain level.

INITIATING CUE:

The Unit Supervisor directs you to restore RFPT C for level control using Manual Governor Control in accordance with 3-AOI 1, Loss of Reactor Feedwater or Reactor Water Level High/Low starting at step 11. Level Band is the normal operating band.

JPM b

PAGE 4

OF 5

START TIME____

Performance Step 1:

  • Critical X Not Critical

[11]

IF RFPT has tripped and it is needed to maintain level, THEN PERFORM the following:

[11.11 OBTAIN Unit Supervisor permission to restart RFPT.

  • [1 1.2] RESET trip by using pushbutton.

Standard:

Resets trip by depressing reset pushbutton for RFPT C SAT UNSAT N/A COMMENTS:____________________________

Performance Step 2:

Critical X Not Critical

[11.3] DEPRESS RFPT Speed Control Raise/Lower switch to MANUAL GOVERNOR position.

Standard:

Depresses RFPT C Speed Control Raise/Lower switch to Manual Governor position.

SAT UNSAT N/A COMMENTS:_______________________________

Performance Step 3:

Critical X Not Critical

[11.4] PLACE RFPT Start/Local enable switch to START.

Standard:

Places RFPT C Start/Local enable switch to Start.

SAT UNSAT N/A COMMENTS:____________________________

JPM b

PAGE 5

OF 5

Performance Step 4:

Critical Not Critical X

[11.5] VERIFY RFPT accelerates to approximately 600 rpm.

Standard:

Verifies RFPT C accelerates SAT UNSAT N/A COMMENTS:_______________________________

Performance Step 5:

Critical Not Critical

[11.7] IF Slow Recovery of RFPT in MANUAL GOVERNOR is desired, THEN RAISE RFPT speed using RFPT Speed Control Raise/Lower switch until desired flow is obtained.

Standard:

Raises speed of RFPT C using RFPT Speed Control switch and restores and maintains Reactor Level SAT_ UNSAT N/A _COMMENTS:_______

END OF TASK STOP TIME

JPM c

PAGE 1

OF 7

OPERATOR:_____________________

RO___

SRO___

DATE:

JPM NUMBER:

c TASK NUMBER:

U-000-EM-50 TASK TITLE:

2-EOI APPENDIX-i 1D Alternate RPV Pressure control Systems-Main Steamline Drains and/or Turbine and RFPT Drains K/A NUMBER:

239001 A1.08 K/A RATING: RO 3.8 SRO 3.8 TASK STANDARD: Establish alternate pressure control with Main Steamline drains, Turbine and RFPT draifs LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED:

2-EOI APPENDIX-i 1D VALIDATION TIME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)

PERFORMANCE TIME:

COMMENTS:______________________________

Additional comment sheets attached? YES NO RESULTS:

SATISFACTORY___

UNSATISFACTORY SIGNATURE:

DATE:

EXAMINER

INITIAL CONDITIONS:

You are a Unit 2 Operator. Unit 2 reactor has scrammed. Emergency depressurization is not required but alternate means ofpressure control is required. Turbine Bypass valves are NOT available. EOI-1 has been followed to RC/P-11. Another Operator is assigned Reactor Level Control.

INITIATING CUE:

The Unit Supervisor directs you to establish alternate pressure control as directed by 2-EOI Appendix liD Alternate RPV Pressure control Systems-Main Steamline Drains and/or Turbine and RFPT Drains and maintain Reactor Pressure 700 to 900 psig.

JPM c

PAGE 3

OF 7

IN-SIMULATOR:

I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say my task is complete and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are a Unit 2 Operator. Unit 2 reactor has scrammed. Emergency depressurization is not required but alternate means ofpressure control is required. Turbine Bypass valves are NOT available. EOI-1 has been followed to RC/P-l 1. Another Operator is assigned Reactor Level Control.

INITIATING CUE:

The Unit Supervisor directs you to establish alternate pressure control as directed by 2-EOI Appendix liD Alternate RPV Pressure control Systems-Main Steamline Drains and/or Turbine and RFPT Drains and maintain Reactor Pressure 700 to 900 psig.

3PM c

PAGE 4 OF 7

START TIME____

Performance Step 1:

Critical Not Critical 1.

IF BOTH ofthe following exist:

Emergency RPV Depressurization is required, AND Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 1 1H.

Standard:

Given in initial conditions, does not exit procedure SAT UNSAT N/A COMMENTS:____________________________

Performance Step 2:

Critical Not Critical X 2.

VERIFY hotwell pressure below -7 in. Hg.

Standard:

Verifies hotwell pressure less than -7 in. Hg.

SAT UNSAT N/A COMMENTS:____________________________

JPM c

PAGE 5

OF 7

Performance Step 3:

Critical Not Critical X 3.

CONTROL RPV pressure with Main Steam line drains as follows:

a.

VERIFY PCIS reset.

Standard:

Verifies PCIS Reset SAT UNSAT N/A COMMENTS:__________________________

Performance Step 4:

Critical X Not Critical b.

OPEN the following valves (Panel 9-3):

2-FCV-l-55, MN STM LThJE DRAIN INBD ISOLATION VLV 2-FCV-l-56, MN STM LINE DRAIN OUTBD ISOLATION VLV 2-FCV-1-58, UPSTREAM MSL DRAIN TO CONDENSER Standard:

Opens 2-FCV-1-55, 2-FCV-1-56, and 2-FCV-l-58 SAT UNSAT N/A _COMMENTS:________

JPM c

PAGE 6

OF 7

Performance Step 5:

Critical Not Critical 4.

THROTTLE 2-FCV-l-59, DOWNSTREAM MSL DRAIN TO CONDENSER, as necessary to control cooldown rate.

Standard:

Throttles 2-FCV-l-59 open and control cooldown rate SAT_ UNSAT N/A COMMENTS:___________

CITE:

Iiecessary when2FCV-1-59is<IhII opex, DireeI OeratorthatAdditioiiaI RPVPrsureConto1 isneeessarf Performance Step 6:

Critical X Not Critical 5.

IF At least one main steam line is open AND EITHER of the following exist:

Turbine bypass valves are NOT available, OR Additional RPV pressure control is necessary, THEN CONTROL RPV pressure with Main Turbine and RFPT drains as follows:

a.

OPEN the following Main Turbine Drain valves (Panel 9-7):

2-FCV-6-100, STOP VALVE 1 BEFORE SEAT DR VLV 2-FCV-6-1O1, STOP VALVE 2 BEFORE SEAT DR VLV 2-FCV-6-102, STOP VALVE 3 BEFORE SEAT DR VLV 2-FCV-6-103, STOP VALVE 4 BEFORE SEAT DR VLV Standard:

Opens 2-FCV-6-100, 2-FCV-6-1O1, 2-FCV-6-102, and 2-FCV-6-103 SAT_ UNSAT N/A COMMENTS:

JPM c

PAGE 7

OF 7

Performance Step 7:

Critical X Not Critical b.

OPEN the following RFPT drain valves (Panel 9-6):

2-FCV-6-122, RFPT 2A HP STOP VLV ABOVE SEAT DR 2-FCV-6-127, RFPT 2B HP STOP VLV ABOVE SEAT DR 2-FCV-6-l32, RFPT 2C HP STOP VLV ABOVE SEAT DR Standard:

Opens 2-FCV-6-122, 2-FCV-6-l27, and 2-FCV-6-132 SAT UNSAT N/A COMMENTS:_________

CUE:

Another Operator is working on other means ofPressure ContrOl END OF TASK STOP TIME____

JPM c

PAGE 1

OF 7

OPERATOR:_____________________

RO___

SRO DATE:

JPM NUMBER:

c TASK NUMBER:

U-000-EM-50 TASK TITLE:

3-EOI APPENDIX-i 1D Alternate RPV Pressure control Systems-Main Steamline Drains and/or Turbine and RFPT Drains K/A NUMBER:

239001 Ai.08 K/A RATING: RO 3.8 SRO 3.8 TASK STANDARD: Establish alternate pressure control with Main Steamline drains, Turbine and RFPT drains LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED:

3-EOI APPENDIX-i 1D VALIDATION TIME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)

PERFORMANCE TIME:

COMMENTS:______________________________

Additional comment sheets attached? YES NO RESULTS:

SATISFACTORY___

UNSATISFACTORY SIGNATURE:

DATE:

EXAMINER

INITIAL CONDITIONS:

You are a Unit 3 Operator. Unit 3 reactor has scrammed. Emergency depressurization is not required but alternate means ofpressure control is required. Turbine Bypass valves are NOT available. EOI-1 has been followed to RC/P-11. Another Operator is assigned Reactor Level Control.

INITIATING CUE:

The Unit Supervisor directs you to establish alternate pressure control as directed by 3-EOI Appendix-i 1D Alternate RPV Pressure Control Systems Main Steam Line Drains and/or Turbine and RFPT Drains and maintain Reactor Pressure 700 to 900 psig.

JPM c

PAGE 3

OF 7

IN-S1M1JLATOR:

I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say my task is complete and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are a Unit 3 Operator. Unit 3 reactor has scrammed. Emergency depressurization is not required but alternate means ofpressure control is required. Turbine Bypass valves are NOT available. EOI-1 has been followed to RC/P-11. Another Operator is assigned Reactor Level Control.

INITIATiNG CUE:

The Unit Supervisor directs you to establish alternate pressure control as directed by 3-EOI Appendix-i 1D Alternate RPV Pressure Control Systems Main Steam Line Drains and/or Turbine and RFPT Drains and maintain Reactor Pressure 700 to 900 psig.

JPM c

PAGE 4 OF 7

START TIME____

Performance Step 1:

Critical Not Critical X 1.

IF BOTH ofthe following exist:

Emergency RPV Depressurization is required, AND Group 1 Isolation Signal exists, THEN EXIT this procedure and ENTER EOI Appendix 1 1H.

Standard:

Given in initial conditions, does not exit procedure SAT UNSAT N/A COMMENTS:_______________________________

Performance Step 2:

Critical Not Critical 2.

VERIFY hotwell pressure below -7 in. Hg.

Standard:

Verifies hotwell pressure less than -7 in. Hg.

SAT UNSAT N/A COMMENTS:_______________________________

JPM c

PAGE 5

OF 7

Performance Step 3:

Critical Not Critical 3.

CONTROL RPV pressure with Main Steam line drains as follows:

a.

VERIFY PCIS reset.

Standard:

Verifies PCIS Reset SAT UNSAT N/A COMMENTS:__________________________

Performance Step 4:

Critical X Not Critical b.

OPEN the following valves (Panel 3-9-3):

3-FCV-1-55, MN STM LINE DRAIN INBD ISOLATION VLV 3-FCV-l-56, MN STM LINE DRAIN OUTBD ISOLATION VLV 3-FCV-l-58, UPSTREAM MSL DRAIN TO CONDENSER Standard:

Opens 3-FCV-l -55, 3-FCV-l -56, and 3-FCV-l -58 SAT_ UNSAT N/A _COMMENTS:_______

JPM c

PAGE 6

OF 7

Performance Step 5:

V Critical X Not Critical 4.

THROTTLE 3-FCV-1-59, DOWNSTREAM MSL DRAIN TO CONDENSER, as necessary to control cooldown rate.

Standard:

Throttles 3-FCV-1-59 open and control cooldown rate SAT_ UNSAT N/A COMMENTS:__________

ECUE V

fViiecsrywhen 3-VFO1-$9 is full cpex,Direct Operator IiatAdditiona1.

j RPVJressControIiçiccessaiy V

Performance Step 6:

Critical Not Critical 5.

IF At least one main steam line is open AND EITHER of the following exist:

Turbine bypass valves are NOT available, OR Additional RPV pressure control is necessary, THEN CONTROL RPV pressure with Main Turbine and RFPT drains as follows:

a.

OPEN the following Main Turbine Drain valves (Panel 3-9-7):

3-FCV-6-lOO, STOP VALVE 1 BEFORE SEAT DR VLV 3-FCV-6-1O1, STOP VALVE 2 BEFORE SEAT DRVLV 3-FCV-6-102, STOP VALVE 3 BEFORE SEAT DR VLV 3-FCV-6-103, STOP VALVE 4 BEFORE SEAT DR VLV Standard:

Opens 3-FCV-6-100, 3-FCV-6-1O1, 3-FCV-6-102, and 3-FCV-6-103 SAT_ UNSAT N/A COMMENTS:____________________________

JPM c

PAGE 7

OF 7

Performance Step 7:

Critical X Not Critical b.

OPEN the following RFPT drain valves (Panel 3-9-6):

3-FCV-6-122, RFPT 3A HP STOP VLV ABOVE SEAT DR 3-FCV-6-127, RFPT 3B HP STOP VLV ABOVE SEAT DR 3-FCV-6-132, RFPT 3C HP STOP VLV ABOVE SEAT DR Standard:

Opens 3-FCV-6-122, 3-FCV-6-127, and 3-FCV-6-132 SAT_ UNSAT N/A COMMENTS:_________

CUE:

Ailother Qperatoris working on othermeans ofPressure Control END OF TASK STOP TIME____

JPM d

PAGE 1 of9 OPERATOR:

RO___

SRO DATE:

JPM NUMBER:

d TASK NUMBER:

U-000-EM-50 TASK TITLE:

2-EOI-APPENDIX-8F Restore Reactor and Refuel Zone Ventilation Fans following a Group 6 Isolation KIA NUMBER: 295032 EA1.03 K/A RATING: RO 3.7 SRO 3.7 TASK STANDARD: Restore Reactor and Refuel Zone Ventilation Fans following a Group 6 Isolation PERFORMANCE LOCATION:

Simulator REFERENCES/PROCEDURES NEEDED: 2-EOI-Appendix-8F VALIDATION TIME: 10 minutes MAX. TIME ALLOWED:

PERFORMANCE TIME:

COMMENTS:______________________________

Additional comment sheets attached? YES NO RESULTS:

SATISFACTORY___

UNSATISFACTORY SIGNATURE:

DATE:

EXAMINER

INITIAL CONDITIONS:

You are an Operator. Unit 2 reactor has scrammed and a Group 6 isolation has occurred from RPV low level. EOI-1 has been entered and followed to RC/P-8. The US wants the reactor and refueling zone ventilation systems restored. No other Group 6 isolation signals exist. Appendix 8E, Bypassing Group 6 RPV Low Level and High Drywell Pressure Isolation Interlocks, has been completed.

INITIATING CUE:

The Unit Supervisor directs you to restore reactor and refuel zone ventilation as directed by 2-EOI Appendix-8F. SGTS is required for Operation and fast speed operation is desired for Reactor and Refuel Zone Ventilation.

JPM d

PAGE 3 of 9 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfiilly, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator. Unit 2 reactor has scrammed and a Group 6 isolation has occurred from RPV low level. EOI-l has been entered and followed to RC/P-8. The US wants the reactor and refueling zone ventilation systems restored. No other Group 6 isolation signals exist. Appendix 8E, Bypassing Group 6 RPV Low Level and High Drywell Pressure Isolation Interlocks, has been completed.

INITIATING CUE:

The Unit Supervisor directs you to restore reactor and refuel zone ventilation as directed by 2-EOI Appendix-8F. SGTS is required for Operation and fast speed operation is desired for Reactor and Refuel Zone Ventilation.

JPM d

PAGE 4 of 9 START TIME____

Performance Step 1:

Critical X Not Critical 1.

VERIFY PCIS Reset.

Standard:

Resets PCIS SAT UNSAT N/A _COMMENTS:_______________________________

Performance Step 2:

Critical Not Critical 2.

PLACE Refuel Zone Ventilation in service as follows (Panel 2-9-25):

a.

VERIFY 2-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch is in OFF.

Standard:

Places 2-HS-64-3A in the Offposition.

SAT UNSAT N/A _COMMENTS:________________________________

Performance Step 3:

Critical X Not Critical b.

PLACE 2-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch to SLOW A (SLOW B).

Standard:

Places 2-HS-64-3A to SLOW A or SLOW B position.

SAT UNSAT N/A COMMENTS:_______________________________

JPM d

PAGE 5 of 9 Performance Step 4:

Critical Not Critical c.

CHECK two SPLY/EXH A(B) green lights above 2-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch extinguish and two SPLY/EXH A(B) red lights illuminate.

Standard:

Verifies proper combination of lights On and Off above 2-HS-64-3A.

SAT UNSAT N/A _COMMENTS:______________________________

Performance Step 5:

Critical Not Critical X d.

VERIFY OPEN the following dampers:

2-FCO-64-5, REFUEL ZONE SPLY OUTBD ISOL DMPR 2-FCO-64-6, REFUEL ZONE SPLY INBD ISOL DMPR 2-FCO-64-9, REFUEL ZONE EXH OUTBD ISOL DMPR 2-FCO-64-1O, REFUEL ZONE EXH 11BD ISOL DMPR Standard:

Verifies Red position indicating lamps On for dampers listed above SAT_ UNSAT N/A COMMENTS:_________________

JPM d

PAGE 6 of 9 Performance Step 6:

Critical Not Critical 3.

PLACE Reactor Zone Ventilation in service as follows (Panel 2-9-25):

a.

VERIFY 2-HS-64-l 1A, REACTOR ZONE FANS AND DAMPERS, control switch is in OFF.

Standard:

Places 2-HS-64-l 1A in the Off position.

SAT UNSAT N/A _COMMENTS:______________________________

Performance Step 7:

Critical X Not Critical b.

PLACE 2-HS-64-l 1A, REACTOR ZONE FANS AND DAMPERS, control switch in SLOW A (SLOW B).

Standard:

Places 2-HS-64-l 1A to SLOW A or SLOW B position.

SAT UNSAT N/A _COMMENTS:____________

JPM d

PAGE 7 of 9 Performance Step 8:

Critical Not Critical c.

CHECK two SPLY/EXH A(B) green lights above 2-HS-64-l 1A, REACTOR ZONE FANS AND DAMPERS, control switch extinguish and two SPLY/EXH A(B) red lights illuminate.

Standard:

Verifies proper combination of lights On and Off above 2-HS-64-3A.

SAT UNSAT N/A COMMENTS:______________________________

Performance Step 9:

Critical Not Critical d.

VERIFY OPEN the following dampers:

2-FCO-64-13, REACTOR ZONE SPLY OUTBD ISOL DMPR 2-FCO-64-14, REACTOR ZONE SPLY INBD ISOL DMPR 2-FCO-64-42, REACTOR ZONE EXH INBD ISOL DMPR 2-FCO-64-43, REACTOR ZONE EXH OUTBD ISOL DMPR Standard:

Verifies Red position indicating lamps On for dampers listed above SAT UNSAT N/A COMMENTS:_________________

JPM d

PAGE 8 of 9 Performance Step 10:

Critical Not Critical X 4.

IF SGTS is NOT required for operation, THEN SECURE SGTS as follows:

Standard:

Given in Initial conditions that SGTS is required.

SAT UNSAT N/A COMMENTS:_______________________________

Performance Step 11:

Critical Not Critical 5.

IF Reactor Zone Fan fast speed is desired following 5 minutes of slow speed operation, THEN PLACE 2-HS-64-l 1A, REACTOR ZONE FANS AND DAMPERS, control switch in FAST A (FAST B).

Standard:

Places 2-HS-64-1 1A in either FAST A or FAST B position in accordance with which set of fans were started in slow SAT UNSAT N/A COMMENTS:________________________________

CUE: Five Minutes has elapsed

JPM d

PAGE 9 of 9 Performance Step 12:

Critical Not Critical 6.

IF Refuel Zone Fan fast speed is desired following 5 minutes of slow speed operation, THEN PLACE 2-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch in FAST A (FAST B).

Standard:

Places 2-HS-64-3A in either FAST A or FAST B position in accordance with which set of fans were started in slow.

SAT UNSAT N/A COMMENTS:

[CUE: Five Minutes has elapsed END OF TASK STOP TIME:

JPM d

PAGE 1 of 9 OPERATOR:

RO SRO DATE:_____

JPM NUMBER:

d TASK NUMBER:

U-000-EM-50 TASK TITLE:

3-EOI APPENDIX-8F Restore Reactor and Refuel Zone Ventilation Fans following a Group 6 Isolation K/A NUMBER: 295032 EA1.03 KJA RATING: RO 3.7 SRO 3.7 TASK STANDARD: Restore Reactor and Refuel Zone Ventilation Fans following a Group 6 Isolation PERFORMANCE LOCATION:

Simulator REFERENCES/PROCEDURES NEEDED: 3-EOI Appendix-8F VALIDATION TIME: 10 minutes MAX. TIME ALLOWED:

PERFORMANCE TIME:

COMMENTS:______________________________

Additional comment sheets attached? YES NO RESULTS:

SATISFACTORY___

UNSATISFACTORY SIGNATURE:

DATE:

EXAMINER

INITIAL CONDITIONS:

You are an Operator. Unit 3 reactor has scrammed and a Group 6 isolation has occurred from RPV low level. EOI-1 has been entered and followed to RC/P-8. The US wants the reactor and refueling zone ventilation systems restored. No other Group 6 isolation signals exist. Appendix 8E, Bypassing Group 6 RPV Low Level and High Drywell Pressure Isolation Interlocks, has been completed.

INITIATING CUE:

The Unit Supervisor directs you to restore reactor and refuel zone ventilation as directed by 3-EOI Appendix-8F. SGTS is required for Operation and fast speed operation is desired for Reactor and Refuel Zone Ventilation.

JPM d

PAGE 3 of 9 IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator. Unit 3 reactor has scrammed and a Group 6 isolation has occurred from RPV low level. EOI-l has been entered and followed to RC!P-8. The US wants the reactor and refueling zone ventilation systems restored. No other Group 6 isolation signals exist. Appendix 8E, Bypassing Group 6 RPV Low Level and High Drywell Pressure Isolation Interlocks, has been completed.

INITIATING CUE:

The Unit Supervisor directs you to restore reactor and refuel zone ventilation as directed by 3-EOI Appendix-8F. SGTS is required for Operation and fast speed operation is desired for Reactor and Refuel Zone Ventilation.

JPM d

PAGE 4 of 9 START TIME____

Performance Step 1:

Critical X Not Critical 1.

VERIFY PCIS Reset.

Standard:

Resets PCIS SAT UNSAT N/A _COMMENTS:_______________________________

Performance Step 2:

Critical X Not Critical 2.

PLACE Refuel Zone Ventilation in service as follows (Panel 3-9-25):

a.

VERIFY 3-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch is in OFF.

Standard:

Places 3-HS-64-3A in the Offposition.

SAT UNSAT N/A COMMENTS:______________________________

Performance Step 3:

Critical X Not Critical b.

PLACE 3-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch to SLOW A (SLOW B).

Standard:

Places 3-HS-64-3A to SLOW A or SLOW B position.

SAT_ UNSAT N/A COMMENTS:_______________________________

JPM d

PAGE5of9 Performance Step 4:

Critical Not Critical X c.

CHECK two SPLY/EXH A(B) green lights above 3-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch extinguish and two SPLY/EXH A(B) red lights illuminate.

Standard:

Verifies proper combination of lights On and Off above 3-HS-64-3A.

SAT UNSAT N/A COMMENTS:______________________________

Performance Step 5:

Critical Not Critical X d.

VERIFY OPEN the following dampers:

3-FCO-64-5, REFUEL ZONE SPLY OUTBD ISOL DMPR 3-FCO-64-6, REFUEL ZONE SPLY INBD ISOL DMPR 3-FCO-64-9, REFUEL ZONE EXH OUTBD ISOL DMPR 3-FCO-64-1O, REFUEL ZONE EXH lNBD ISOL DMPR Standard:

Verifies Red position indicating lamps On for dampers listed above SAT_ UNSAT N/A COMMENTS:_________________

JPM d

PAGE 6 of 9 Performance Step 6:

Critical X Not Critical 3.

PLACE Reactor Zone Ventilation in service as follows (Panel 3-9-25):

a.

VERIFY 3-HS-64-l 1A, REACTOR ZONE FANS AND DAMPERS, control switch is in OFF.

Standard:

Places 3-HS-64-11A in the Offposition.

SAT UNSAT N/A COMMENTS:______________________________

Performance Step 7:

Critical X Not Critical b.

PLACE 3-HS-64-1 1A, REACTOR ZONE FANS AND DAMPERS, control switch in SLOW A (SLOW B).

Standard:

Places 3-HS-64-l lA to SLOW A or SLOW B position.

SAT U1SAT_ N/A COMMENTS:___________

JPM d

PAGE 7 of 9 Performance Step 8:

Critical Not Critical X c.

CHECK two SPLY/EXH A(B) green lights above 3-HS-64-l 1A, REACTOR ZONE FANS AND DAMPERS, control switch extinguish and two SPLY/EXH A(B) red lights illuminate.

Standard:

Verifies proper combination of lights On and Off above 3-HS-64-3A.

SAT U14SAT_ N/A COMMENTS:______________________________

Performance Step 9:

Critical Not Critical d.

VERIFY OPEN the following dampers:

3-FCO-64-13, REACTOR ZONE SPLY OUTBD ISOL DMPR 3-FCO-64-14, REACTOR ZONE SPLY INBD ISOL DMPR 3-FCO-64-42, REACTOR ZONE EXH INBD ISOL DMPR 3-FCO-64-43, REACTOR ZONE EXH OUTBD ISOL DMPR Standard:

Verifies Red position indicating lamps On for dampers listed above SAT_ UNSAT N/A _COMMENTS:_________________

JPM d

PAGE 8 of 9 Performance Step 10:

Critical Not Critical X 4.

IF SGTS is NOT required for operation, THEN SECURE SGTS as follows:

Standard:

Given in Initial conditions that SGTS is required.

SAT UNSAT N/A _COMMENTS:_______________________________

Performance Step 11:

Critical Not Critical 5.

IF Reactor Zone Fan fast speed is desired following 5 minutes of slow speed operation, THEN PLACE 3-HS-64-1 1A, REACTOR ZONE FANS AND DAMPERS, control switch in FAST A (FAST B).

Standard:

Places 3-HS-64-11A in either FAST A or FAST B position in accordance with which set of fans were started in slow SAT UNSAT N/A _COMMENTS:______________________________

CUB Five Minutes has elpsed

JPM d

PAGE 9 of 9 Performance Step 12:

Critical Not Critical X 6.

IF Refuel Zone Fan fast speed is desired following 5 minutes of slow speed operation, THEN PLACE 3-HS-64-3A, REFUEL ZONE FANS AND DAMPERS, control switch in FAST A (FAST B).

Standard:

Places 3-HS-64-3A in either FAST A or FAST B position in accordance with which set of fans were started in slow.

SAT UNSAT N/A_COMMENTS:________

CUE: Five Minutes has elapsed END OF TASK STOP TIME:

JPM e

PAGE 1

OF 9

OPERATOR:______________________

RO___

SRO DATE:

JPM NUMBER:

e TASK NUMBER:

U-000-SS-25 TASK TITLE:

Energize 4 KV SD BDs A, C, and D from Unit 3 DGs KJA NUMBER: 264000 A4.04 K/A RATING: RO 3.7 SRO 3.7 TASK STANDARD: 4 KV SD BDs A and C energized from Unit 3 DGs during a Unit 1 and 2 Diesel Generator Building Fire. DG D Emergency Shutdown due to Low Lube Oil Pressure LOCATION OF PERFORMANCE:

Simulator REFERENCES/PROCEDURES NEEDED:

0-SSI-20 VALIDATION TIME: 15 minutes MAX. TIME ALLOWED: NOT TIME CRITICAL Alternate Path PERFORMANCE TIME:

COMMENTS:_____________________________

Additional comment sheets attached? YES NO RESULTS:

SATISFACTORY___

UNSATISFACTORY SIGNATURE:

DATE:

EXAMINER

INITIAL CONDITIONS:

You are an Operator on Unit 3, the plant is operating in O-SSI-20 Unit 1 and 2 Diesel Generator Building fire. All three units have been scrammed. An Assistant Unit Operator has been dispatched to the DGs.

INITIATING CUE:

The Unit Supervisor directs you to complete attachment 6, Unit 3 Panel 9-23 Actions of O-SSI-20.

Time Critical

JPM e

PAGE 3

OF 9

iN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are an Operator on Unit 3, the plant is operating in 0-S51-20 Unit 1 and 2 Diesel Generator Building fire. All three units have been scrammed. An Assistant Unit Operator has been dispatched to the DGs.

INITIATING CUE:

The Unit Supervisor directs you to complete attachment 6, Unit 3 Panel 9-23 Actions of 0-SSI-20.

Time Critical

JPM e

PAGE 4

OF 9

START TIME Performance Step 1:

Critical Not Critical 1.0 ENERGIZING 4KV SHUTDOWN BOARDS A, C, AND D FROM UNIT 3 DIESEL GENERATORS 3A, 3C, AND 3D USING UNIT INTERTIE (20 Mm)

NOTE The following steps will energize 4KV Shutdown Boards A, C, and D from Unit 3 Diesel Generators as the only source.

[1]

Notification has been received from the Unit 2 Unit Supervisor to perform this section.

[2]

PROCEED TO Panel 3-9-23, AND PERFORM the following to align Shutdown Board 3EA:

[2.1]

VERIFY DG 3A CONTROL switch, 3-HS-82-3AJ1A, in START.

Standard:

Starts DG 3A SAT_ U1JSAT N/A COMMENTS:_______________________________

Performance Step 2:

Critical X Not Critical

[2.2]

VERIFY 4KV SD BD 3EA AUTO TO MANUAL TRIP pushbutton, 3-HS-21 1-3EA, in MANUAL.

Standard:

Depresses 3-HS-21 1-3EA SAT_ UNSAT N/A COMMENTS:_____________________________

NRC NOTE Trip to Manual allows the]orinal1?eeder 1çaker to Open, ifnot in Manual N9mLi!c4cnLQpe!1JI1 next step

JPM e

PAGE 5

OF 9

Performance Step 3:

Critical X Not Critical

[2.3]

VERIFY 4KV SD BD 3EA NORM FDR BKR 1334, 3-HS-21 1-3EA/7A, in TRIP.

Standard:

Trips Normal Feeder Breaker 1334 SAT_ UNSAT N/A COMMENTS:______________________________

Performance Step 4:

Critical Not Critical X

[2.4]

VERIFY DG 3A BKR 1838 CLOSED.

Standard:

Verifies DG Breaker 1838 closes SAT_ UNSAT N/A COMMENTS:______________________________

Performance Step 5:

Critical X Not Critical

[2.5]

PLACE 4KV SD BD 3EA EMER FDR BKR 1844, 3-HS-21 1-3EAJ1A, in CLOSE.

Standard:

Closes Emergency Feeder Breaker 1844 SAT UNSAT N/A COMMENTS:_____________________________

JPM e

PAGE 6

OF 9

Performance Step 6:

Critical X Not Critical

[3]

PERFORM the following to align 4KV Shutdown Board 3EC:

[3.1]

VERIFY DG 3C CONTROL switch, 3-HS-82-3C/1A, in START.

Standard:

StartsDG3C SAT_ UNSAT N/A COMMENTS:_______________________________

Performance Step 7:

Critical Not Critical

[3.2]

VERIFY 4KV SD BD 3EC AUTO TO MANUAL TRIP pushbutton, 3-HS-21 1-3EC, in MANUAL.

Standard:

Depresses 3-HS-21 1-3EC SAT_ UNSAT N/A _COMMENTS:______________________________

Performance Step 8:

Critical X Not Critical

[3.3]

VERIFY 4KV SD BD 3EC NORM FDR BKR 1338, 3-HS-21 1-3EC/12A, in TRIP.

Standard:

Trips Normal Feeder Breaker 1338 SAT UNSAT N/A _COMMENTS:______________________________

JPM e

PAGE 7

OF 9

Performance Step 9:

Critical Not Critical X

[3.4]

VERIFY DG 3C BKR 1832 CLOSED.

Standard:

Verifies DG Breaker 1832 closes SAT_ UNSAT N/A COMMENTS:_______________________________

Performance Step 10:

Critical X Not Critical

[3.5]

PLACE 4KV SD BD 3EC EMER FDR BKR 1834, 3-HS-211-3EC/6A, in CLOSE.

Standard:

Closes Emergency Feeder Breaker 1834 SAT_ UNSAT N/A _COMMENTS:______________________________

JPM e

PAGE 8

OF 9

Performance Step 11:

Critical Not Critical

[4]

PERFORM the following to align 4KV Shutdown Board 3ED:

[4.1]

VERIFY DG 3D CONTROL switch, 3-HS-82-3D/1A, in START.

Standard:

Starts DG 3D SAT_ UNSAT N/A _COMMENTS:_______________________________

PjJVER: aftçriXjs spir4ente frigr1 for LjAçiPressure Performance Step 12:

Critical Not Critical RESPONDS to the Alarm 9-23D WIN 4 (DIESEL GEN D LUBE OIL ABNORMAL) and notices the AMBER LIGHT (LOW LOW OIL PRESSURE)

Standard:

Responds per the ARP and Verifies the AMBER LIGHT is lit.

SAT UNSAT_ N/A COMMENTS:______________________________

CiJ If Assistant thiit Operatoris callcd, After Lub oil presure alarm is received t1 9-23, report lube oil pressure low at5psig and Lube Oil is spraying ontoIa damaged.

JPM e

PAGE 9 OF 9

Performance Step 13:

Critical Not Critical DIESEL GEN 3D LUBE OIL ABNORMAL Window 4 SHUT DOWN the DG by Emergency Stop Pushbutton Standard:

Shuts Down the DG with the Emergency Stop Pushbutton.

SAT_ UNSAT N/A _COMMENTS:_____________________________

tdonnicfDGHsnotabJiie1yecessary Examiner note: ALARM on 9-23D win 4 DG D LUBE OIL ABNORMAL will alarm and LOW LOW OIL PRESSURE LIGHT for D DG will illuminate, the operator should respond per the ARP.

Performance Step 15:

Critical Not Critical X

[5] NOTIFY Unit 2 Unit Supervisor of the completion of this section.

[6] PROCEED TO 480V RMOV Board 3C in preparation ofperforming Section 2.0.

Standard:

Notifies Unit Supervisor SAT UNSAT N/A _COMMENTS:______________________________

CUE::

Rmain in Control Room another Operator has beeii dispatched to 480V RMOV Board3C.JPMComplete END OF TASK STOP TIME

JPM f

PAGE 1 OF 9

OPERATOR:

RO___

SRO___

DATE:_______

JPM NUMBER:

f TASK NUMBER:

0-74-AB-Ol TASK TITLE: Loss of Shutdown Cooling K/ANUMBER: 295021 AA1.02 K/A RATING: R03.5 SRO3.5 TASK STANDARD: Restores shutdown cooling following an inadvertent RPS actuation, will restore shutdown cooling with RHR Pump 2A and establish a cooldown JAW 2-AOI 1.

LOCATION OF PERFORMANCE:

Simulator REFERENCES/PROCEDURES NEEDED:

2-AOI 1 VALIDATION TJME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)

PERFORMANCE TIME:

COMMENTS:______________________________

Additional comment sheets attached? YES NO RESULTS:

SATISFACTORY UNSATISFACTORY SIGNATURE:

DATE:

EXAMINER

INITIAL CONDITIONS: You are a Unit 2 operator. Unit 2 is in Mode 3 (Recirc Loop B temp

> 2 12°F) heading towards cold conditions for a refueling outage. RHR Loop I using 2A RHR Pump was in shutdown cooling. Unit 1 is carrying 2000 gpm for RHRSW Pumps A2 and C2.

An inadvertent loss of 2B RPS bus resulted in a partial isolation of RHR shutdown cooling. RPS 2B has been restored on the alternate supply. Another operator is assisting with recovery from the loss of 2B RPS. An Auxiliary Operator is standing by for 2A RHR Pump start.

INITIATING CUES: The Unit Supervisor directs you to restore shutdown cooling using 2A RHR pump in accordance with 2-AOI-74-1 starting at step 12.

JPM f

PAGE 3

OF 9

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Coffect. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are a Unit 2 operator. Unit 2 is in Mode 3 (Recirc Loop B temp

> 2 12°F) heading towards cold conditions for a refueling outage. RHR Loop I using 2A RHR Pump was in shutdown cooling. Unit 1 is carrying 2000 gpm for RHRSW Pumps A2 and C2.

An inadvertent loss of 2B RPS bus resulted in a partial isolation of RHR shutdown cooling. RPS 2B has been restored on the alternate supply. Another operator is assisting with recovery from the loss of 2B RPS. An Auxiliary Operator is standing by for 2A RHR Pump start.

INITIATING CUES: The Unit Supervisor directs you to restore shutdown cooling using 2A RHR pump in accordance with 2-AOI-74-1 starting at step 12.

JPM f

PAGE 4 OF 9

START TIME Performance Step 1:

Critical Not Critical

[12]

IF the loss of Shutdown Cooling is due to Group 2 PCIS isolation, THEN (Otherwise N/A)

WHEN conditions permit resetting Group 2 PCIS isolation are met, PERFORM the following:

[12.1] RESET Group 2 isolation by momentarily PLACING PCIS DIV I RESET, 2-HS-64-16A-S32, and PCIS DIV II RESET, 2-HS-64-16A-S33, in reset.

Standard:

On Panel 2-9-4, RESETS Group 2 isolation by momentarily PLACING PCIS DIV I RESET, 2-HS-64-16A-S32, in reset and PCIS Div II RESET, 2-HS-64-16A-S33 to reset.

SAT_ U14SAT N/A COMMENTS:______________________________

Performance Step 2:

Critical Not Critical X

[12.2] MOMENTARILY DEPRESS RHR SYS 1(11) SD CLG INBD INJECT ISOL RESET, 2-XS-74-126 and 2-XS-74-132. VERIFY 2-IL-74-126 and 2-IL-74-1 32 extinguished.

Standard:

Momentarily Depresses RHR SYS I SD CLG INBD INJECT ISOL RESET, 2-XS-74-132 and verifies 2-IL-74-132 extinguished.

SAT ITh4SAT N/A COMMENTS:_____________________________

JPM f

PAGE 5

OF 9

Performance Step 3:

Critical Not Critical X

[13]

IF the loss of Shutdown Cooling is due to Group 2 PCIS AND the isolation signal fails to reset, or remain reset due to invalid and/or sporadic signals, THEN (Otherwise N/A)

Standard:

N/As all Step 4.2[13], the PCIS signal is reset in step 12.

SAT_ UNSAT N/A COMMENTS:_______________________________

Performance Step 4:

Critical X Not Critical

[14]

IF the Group 2 PCIS Isolation has been reset, THEN (otherwise N/A)

RETURN the affected ioop of RHR to Shutdown Cooling as follows:

[14.1] CLOSE RHR SYS I LPCI OUTBD INJECT VALVE, 2-FCV-74-52.

Standard:

Closes 2-FCV-74-52 SAT U14SAT N/A COMMENTS:____________________________

Performance Step 5:

Critical Not Critical

[14.2] OPEN RHR SYS I LPCI INBD INJECT VALVE, 2-FCV-74-53.

Standard:

Opens 2-FCV-74-53 SAT_ UNSAT_ N/A COMMENTS:______________________________

JPM f

PAGE 6 OF 9

Performance Step 6:

Critical Not Critical

[14.3] VERIFY RHR SYSTEM I MIN FLOW iNHIBIT switch, 2-HS-74-148 in INHIBIT Standard:

Verifies 2-HS-74-148 in INHIBIT.

SAT UNSAT N/A COMMENTS:_______________________________

Performance Step 7:

Critical Not Critical X

[14.4] VERIFY CLOSED RHR SYSTEM I MN FLOW VALVE, 2-FCV-74-7.

Standard:

Verifies 2-FCV-74-7 is closed.

SAT UNSAT N/A COMMENTS:_______________________________

Performance Step 8:

Critical Not Critical

[14.5] VERIFY CLOSED RHR PUMP 2A and 2C SUPPR POOL SUCT VLVs, 2-FCV-74-1 and 2-FCV-74-12.

Standard:

Verifies 2-FCV-74-l & 12 are closed.

SAT UNSAT N/A COMMENTS:

JPM f

PAGE 7

OF 9

Performance Step 9:

Critical Not Critical

[14.6] VERIFY OPEN RHR PUMP 2A and 2C SD COOLING SUCT VLVs, 2-FCV-74-2 and 2-FCV 13.

Standard:

Verifies 2-FCV-74-2 & 13 are open.

SAT UNSAT N/A COMMENTS:_______________________________

Performance Step 10:

  • Critical X Not Critical

[14.7] OPEN RHR SHUTDOWN COOLING SUCT OUTBD and INBD ISOL VLVs, 2-FCV-74-47 and 2-FCV-74-48.

Standard:

Opens *2.Hs7447 and verifies 2-FCV-74-48 open.

SAT_ UNSAT N/A COMMENTS:_______________________________

Performance Step 11:

Critical Not Critical

[14.8] IF the tripped pump has been determined to be in operating condition and with Unit Supervisor permission, THEN: RESTART tripped RHR pump(s) RHR PUMP 2A using 2-HS-74-5A Standard:

Starts 2A RHR Pump SAT_ UNSAT N/A _COMMENTS:________________________

teTijiayQ tjjijjtieptindItionJ, RHR Pump Start Time

JPM f

PAGE 8

OF 9

Performance Step 12:

Critical X Not Critical

[14.9] THROTTLE RHR SYS I LPCI OUTBD INJECT VALVE, 2-FCV-74-52, to establish and maintain RHR flow as indicated by 2-FI-74-50, RHR SYS I FLOW, as follows:

RIIR Pumps in 1

2 Operation Loop Flow 7,000 to 10,000 gpm 14,000 to 20,000 gpm Loop Flow (1 or more fuel 6,000 to 6,500 gpm N/A bundles removed from_core)

Standard:

Manipulates 2-HS-74-52 to obtain RHR System I Loop flow between 7,000 and 10,000 gpm on 2-FI-74-50.

SAT UNSAT N/A COMMENTS:______________________

RHR Flow Established Time kYSmmvkwGdance rT iiiiiimize syste ibaiion,RH1pima peiaio o4d6e mniedbeIo QQgp abo QQQgpfqripqrean3 thiuj nfjq

JPM t

PAGE 9

OF 9

Performance Step 13:

Critical Not Critical X

[14.101 WHEN time permits after RHR pump is started, THEN VERIFY RHR Pump Breaker charging spring recharged by observing amber breaker spring charged light is on and closing spring target indicates charged.

Standard:

Dispatched personnel to verify RHR Pump 2A breaker closing spring recharged.

SAT_ UNSAT N/A _COMMENTS:_______________________________

CUE: If.eqnested, oJdgçjindstate9pcratoiJnputé.

Performance Step 14:

Critical X Not Critical

[14.11] SLOWLY THROTTLE RHR HX 2A RHRSW OUTLET VALVE, 2-FCV-23-34, to obtain desired cooldown rate.

Standard:

Throttles 2-FCV-23-34 open to commence cooldown SAT_ UNSAT N/A _COMMENTS:________________________________

I CUE: That completes this task.

END OF TASK STOP TIME:

JPM f

PAGE 1

OF 9

OPERATOR:

RO SRO DATE:

JPM NUMBER:

f TASK NUMBER:

0-74-AB-Ol TASK TiTLE: Loss of Shutdown Cooling KJA NUMBER: 295021 AA1.02 KJA RATING: RO 3.5 SRO 3.5 TASK STANDARD: Restores shutdown cooling following an inadvertent RPS actuation, will restore shutdown cooling with RHR Pump 3A and establish a cooldown JAW 3-AOI-74-l.

LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 3-AOI I VALIDATION TIME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)

PERFORMANCE TIME:

COMMENTS:______________________________

Additional comment sheets attached? YES NO RESULTS:

SATISFACTORY UNSATISFACTORY SIGNATURE:

DATE:

EXAMINER

INITIAL CONDITIONS: You are a Unit 3 operator. Unit 3 is in Mode 3 (Recirc Loop B temp

> 2 12°F) heading towards cold conditions for a refueling outage. RHR Loop I using 3A RHR Pump was in shutdown cooling. Unit 1 is carrying 2000 gpm for RHRSW Pumps A2 and C2.

An inadvertent loss of 3B RPS bus resulted in a partial isolation of RHR shutdown cooling. RPS 3B has been restored on the alternate supply. Another operator is assisting with recovery from the loss of 3B RPS. An Auxiliary Operator is standing by for 3A RHR Pump start.

INITIATING CUES: The Unit Supervisor directs you to restore shutdown cooling using 3A RHR pump in accordance with 3-AOI-74-1 starting at step 9.

JPM f

PAGE 3

OF 9

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are a Unit 3 operator. Unit 3 is in Mode 3 (Recirc Loop B temp

> 2 12°F) heading towards cold conditions for a refueling outage. RHR Loop I using 3A RHR Pump was in shutdown cooling. Unit 1 is carrying 2000 gpm for RHRSW Pumps A2 and C2.

An inadvertent loss of 3B RPS bus resulted in a partial isolation of RHR shutdown cooling. RPS 3B has been restored on the alternate supply. Another operator is assisting with recovery from the loss of 3B RPS. An Auxiliary Operator is standing by for 3A RHR Pump start.

INITIATING CUES: The Unit Supervisor directs you to restore shutdown cooling using 3A RHR pump in accordance with 3-AOI-74-1 starting at step 9.

JPM f

PAGE 4

OF 9

START TIME Performance Step 1:

Critical Not Critical X

[9]

IF the loss of Shutdown Cooling is due to Group 2 PCIS isolation, THEN (Otherwise N/A)

WHEN conditions permit resetting Group 2 PCIS isolation are met, PERFORM the following:

[9.1]

RESET Group 2 isolation by momentarily PLACING PCIS DIV I RESET, 3-HS-64-16A-S32, and PCIS DIV II RESET, 3-HS-64-16A-S33, in reset.

Standard:

On Panel 3-9-4, RESETS Group 2 isolation by momentarily PLACING PCIS DIV I RESET, 3-HS-64-16A-S32, in reset and PCIS Div II RESET, 3-HS-64-16A-S33 to reset.

SAT UNSAT N/A COMMENTS:_____________________________

Performance Step 2:

Critical Not Critical X

[9.2]

MOMENTARILY DEPRESS RHR SYS 1(11) SD CLG INBD INJECT ISOL RESET, 3-XS-74-126 and 3-XS-74-132. VERIFY 3-IL-74-126 and 3-IL-74-l 32 extinguished.

Standard:

Momentarily Depresses RHR SYS I SD CLG INBD INJECT ISOL RESET, 3-XS-74-132 and verifies 3-IL-74-132 extinguished.

SAT_ UNSAT N/A COMMENTS:_____________________________

JPM t

PAGE 5

OF 9

Performance Step 3:

Critical Not Critical X

[10]

IF the loss of Shutdown Cooling is due to Group 2 PCIS AND the isolation signal fails to reset, or remain reset due to invalid and/or sporadic signals, THEN (Otherwise N/A)

Standard:

N/As all Step 4.2[10], the PCIS signal is reset in step 9.

SAT UNSAT N/A COMMENTS:____________________________

Performance Step 4:

Critical X Not Critical

[11]

IF the Group 2 PCIS Isolation has been reset, THEN (otherwise N/A)

RETURN the affected loop of RHR to Shutdown Cooling as follows:

[11.1] CLOSE RHR SYS I LPCI OUTBD iNJECT VALVE, 3-FCV-74-52.

Standard:

Closes 3-FCV-74-52 SAT_ UNSAT N/A _COMMENTS:_____________________________

Performance Step 5:

Critical Not Critical X

[11.2] OPEN RHR SYS I LPCI INBD iNJECT VALVE, 3-FCV-74-53.

Standard:

Opens 3-FCV-74-53 SAT UNSAT N/A COMMENTS:_____________________________

JPM f

PAGE 6

OF 9

Performance Step 6:

Critical Not Critical

[11.3] VERIFY RHR SYSTEM I M1N FLOW INHIBIT switch, 3-HS-74-148 in iNHIBIT Standard:

Verifies 3-HS-74-148 in INHIBIT.

SAT UNSAT N/A COMMENTS:________________________________

Performance Step 7:

Critical Not Critical X

[11.4] VERIFY CLOSED RHR SYSTEM I MIN FLOW VALVE, 3-FCV-74-7.

Standard:

Verifies 3-FCV-74-7 is closed.

SAT UNSAT N/A COMMENTS:_____________________________

Performance Step 8:

Critical Not Critical

[11.5] VERIFY CLOSED RHR PUMP 3A and 3C SUPPR POOL SUCT VLVs, 3-FCV-74-1 and 3-FCV-74-12.

Standard:

Verifies 3-FCV-74-1 & 12 are closed.

SAT_ UNSAT N/A COMMENTS:_____________________________

JPM f

PAGE 7

OF 9

Performance Step 9:

Critical Not Critical X

[11.6] VERIFY OPEN RHR PUMP 3A and 3C SD COOLING SUCT VLVs, 3-FCV-74-2 and 3-FCV-74-13.

Standard:

Verifies 3-FCV-74-2 & 13 are open.

SAT U1\\TSAT N/A COMMENTS:_____________________________

Performance Step 10:

  • Critical X Not Critical

[11.7] OPEN RHR SHUTDOWN COOLING SUCT OUTBD and INBD ISOL VLVs, 3-FCV-74-47 and 3-FCV-74-48.

Standard:

Opens *3..Hs7447 and verifies 3-FCV-74-48 open.

SAT_ UNSAT N/A COMMENTS:______________________________

Performance Step 11:

Critical X Not Critical

[11.8] RESTART RHR PUMP 3A using 3-HS-74-5A.

Standard:

Starts 3A RHR Pump SAT UNSAT N/A COMMENTS:

RHR Pump Start Time

JPM f

PAGE 8

OF 9

Performance Step 12:

Critical X Not Critical

[11.9] THROTTLE RHR SYS I LPCI OUTBD iNJECT VALVE, 3-FCV-74-52, to establish and maintain RHR flow as indicated by 3-FI-74-50, RHR SYS I FLOW, as follows:

RHR Pumps in 1

2 Operation Loop Flow 7,000 to 10,000 gpm 14,000 to 20,000 gpm Loop Flow (1 or more fuel 6,000 to 6,500 gpm N/A bundles removed from_core)

Standard:

Manipulates 3-HS-74-52 to obtain RHR System I Loop flow between 7,000 and 10,000 gpm on 3-FI-74-50.

SAT UNSAT N/A COMMENTS:______________________

RHR Flow Established Time RHRSYSTEM Mmimum.Flow Guidane Jo mihhiizesystenvi 6

ration3 RBRpuinp operatiot shouldbe iiniizedbebi

,Ogppot aovp1O rjr than 3s4inwmfló

JPM f

PAGE 9

OF 9

Performance Step 13:

Critical Not Critical

[11.10] WHEN time permits after RHR pump is started, THEN VERIFY RHR Pump Breaker charging spring recharged by observing amber breaker spring charged light is on and closing spring target indicates charged.

Standard:

Dispatched personnel to verify RHR Pump 3A breaker closing spring recharged.

SAT UNSAT N/A COMMENTS:_______________________________

CUE. Ifrequested, Acknowledge and state Operator inrutç Performance Step 14:

Critical Not Critical

[11.11] SLOWLY THROTTLE RHR HX 3A RHRSW OUTLET VALVE, 3-FCV-23-34, to obtain desired cooldown rate.

Standard:

Throttles 3-FCV-23-34 open to commence cooldown SAT UNSAT N/A _COMMENTS:_____________________________

I CUE: That completes this task.

END OF TASK STOP TIME:

JPM g

PAGE1OF8 OPERATOR:____________________

RO___

SRO DATE:

JPM NUMBER:

g TASK NUMBER:

U-000-EM-74 TASK TITLE:

Crosstie CAD to Drywell Control Air K/A NUMBER: 218000 A2.03 K/A RATING: RO 3.4 SRO: 3.6 TASK STANDARD: Align Containment Air Dilution systems A and B to the Drywell Air System and then isolates CAD System B.

LOCATION OF PERFORMANCE:

Simulator REFERENCES/PROCEDURES NEEDED:

2-EOI Appendix-.8G VALIDATION TiME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)

PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES NO RESULTS:

SATISFACTORY UNSATISFACTORY SIGNATURE:

DATE:

EXAMINER

INITIAL CONDITIONS: You are an Operator. The Unit 2 reactor has scrammed. EOI-1 has been followed to RC/P-8.

INITIATING CUE: The Unit Supervisor has directed you to perfomi 2-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.

JPM g

PAGE 3

OF 8

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are an Operator. The Unit 2 reactor has scrammed. EOI-1 has been followed to RC/P-8.

INITIATING CUE: The Unit Supervisor has directed you to perform 2-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.

JPM g

PAGE 4 OF 8

START TIME____

Performance Step 1:

Critical X Not Critical 1.

OPEN the following valves:

O-FCV-84-5, CAD SYSTEM AN2 SHUTOFF VALVE (Unit 1, Panel 9-54) 0-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Unit 1, Panel 9-55)

Standard:

Opens 0-FCV-84-5 and 16 SAT UNSAT N/A COMMENTS:_____________________________

Performance Step 2:

Critical Not Critical 2.

VERIFY 0-PI-84-6, N2 VAPORIZER A OUTLET PRESSURE, and 0-PI-84-17, N2 VAPORIZER B OUTLET PRESSURE, indicate approximately 100 psig (Unit 1, Panel 9-54 and 9-55)

Standard:

Verifies 0-PI-84-6 and 0-PI-84-17 (Located on back of Unit 2 Panel 9-54 in simulator) indicating approximately 100 psig.

SAT UNSAT N/A _COMMENTS:_____________________________

JPM g

PAGE 5

OF 8

Performance Step 3:

  • Critical Not Critical
  • 3*

PLACE keylock switch 2-HS-84-48, CAD A CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 2, Panel 9-54) 4.

CHECK OPEN 2-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR, (Unit 2, Panel 9-54)

Standard:

Places keylock switch 2-HS-84-48 in Open and verifies 2-FSV-84-48 is open SAT_ UNSAT N/A COMMENTS:_____________________________

Performance Step 4:

  • Critical Not Critical
  • 5 PLACE keylock switch 2-HS-84-49, CAD B CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 2, Panel 9-55) 6.

CHECK OPEN 2-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 2, Panel 9-55)

Standard:

Places keylock switch 2-HS-84-49 in Open and verifies 2-FSV-84-49 open SAT UNSAT_ N/A COMMENTS:______________________________

JPM g

PAGE 6

OF 8

Performance Step 5:

Critical Not Critical 7.

CHECK MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 2-PA-32-31, alarm cleared (2-XA-55-3D, Window 18)

Standard:

Recognizes MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW (2-XA-55-3D, Win. 18) still in Alarm (would Not clear) and continues with procedure.

SAT UNSAT N/A _COMMENTS:_____________________________

Performance Step 6:

Critical Not Critical X 8.

IF MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 2-PA-32-31, annunciator is or remains in alarm (2-XA-55-3D, Window 18), THEN DETERMINE which Drywell Control Air header is depressurized as follows:

a.

DISPATCH personnel to Unit 2, RB, El 565 ft, to MONITOR the following indications for low pressure:

2-PI-84-5 1, CAD N2 PRESSURE TO DWCA indicator, for CAD A (R-10 S-line, by Drywell Access Door) 2-PI-84-50, DW CONT AIR N2 SUPPLY PRESS indicator, for CAD B (R-12 U-line, behind 480V RB Vent Board 2B)

Standard:

Dispatches personnel to Reactor Building to monitor 2-PI-84-5 1 and 2-PI-84-50 for low pressure.

SAT UNSAT N/A COMMENTS:______________________________

CUE: DO NOT Report Unless directed by NRC [reportj 2-PI-84-51, CAD N2 Pressure to DWCA indicator, for CAD A is reading 110 psig. 2-PI-84-50 for CAD B is reading 5 psig.

JPM g

PAGE 7

OF 8

Performance Step 7:

Critical X Not Critical b.

MONITOR 0-FI-84-7(18), CAD LINE A(B) N2 FLOW, on Unit 1, Panel 1-9-54(55) for high flow.

Standard:

Recognizes 0-FI-84-7 flow 0 scfl and 0-FI 18 flow 90 scfi SAT UNSAT N/A COMMENTS:_____________________________

NOTE CAD System A to Drywell Control Air supplies the following MSIVs:

2-FCV-1-14, MSIV LINE A INBOARD 2-FCV-1-26, MSIV LINE B INBOARD NOTE CAD System B to Drywell Control Air supplies the following MSIVs:

2-FCV-1-37, MSIV LINE C INBOARD 2-FCV-1-51, MSIV LINE D INBOARD Performance Step 8:

Critical Not Critical X c.

MONITOR inboard MSIV indication status for valves drifting closed.

Standard:

Recognizes 2-FCV-1-37 and 51 closed SAT UNSAT N/A COMMENTS:_________________________________

JPM g

PAGE 8

OF 8

Performance Step 9:

Critical Not Critical X 9.

IF Drywell Control Air header supplied from CAD System A shows indications ofbeing depressurized, THEN CLOSE the following valves:

0-FCV-84-5, CAD SYSTEM A N2 SHUTOFF VALVE (Unit 1, Panel 9-54) 2-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR (Unit 2, Panel 9-54)

Standard:

N/A No indications ofbeing depressurized SAT UNSAT N/A _COMMENTS:_____________________________

Performance Step 10:

Critical Not Critical 10.

IF Drywell Control Air header supplied from CAD B shows indications ofbeing depressurized, THEN CLOSE the following valves:

0-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Unit 1, Panel 9-55) 2-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 2, Panel 9-55)

Standard:

Closes 0-FCV-84-16 and 2-FSV-84-49 SAT_ UNSAT N/A COMMENTS:_____

STOP TIME____

END OF TASK

JPM g

PAGE 1 OF 8

OPERATOR:____________________

RO___

SRO DATE:

JPM NUMBER:

g TASK NUMBER:

U-000-EM-74 TASK TITLE:

Crosstie CAD to Drywell Control Air K/A NUMBER: 218000 A2.03 K/A RATING: RO 3.4 SRO: 3.6 TASK STANDARD: Align Containment Air Dilution systems A and B to the Drywell Air System and then isolates CAD System B.

LOCATION OF PERFORMANCE:

Simulator REFERENCES/PROCEDURES NEEDED:

3-EOI Appendix-8G VALIDATION TIME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)

PERFORMANCE TIME:

COMMENTS:______________________________

Additional comment sheets attached? YES NO RESULTS:

SATISFACTORY UNSATISFACTORY SIGNATURE:

DATE:

EXAMINER

INITIAL CONDITIONS: You are an Operator. The Unit 3 reactor has scrammed. EOI-1 has been followed to RC/P-8.

INITIATING CUE: The Unit Supervisor has directed you to perform 3-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.

JPM g

PAGE 3

OF 8

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are an Operator. The Unit 3 reactor has scrammed. EOI-1 has been followed to RC/P-8.

INITIATING CUE: The Unit Supervisor has directed you to perform 3-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.

JPM g

PAGE 4

OF 8

START TIME Performance Step 1:

Critical Not Critical 1.

OPEN the following valves:

0-FCV-84-5, CAD SYSTEM A N2 SHUTOFF VALVE (Panel 3-9-54)

O-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Panel 3-9-55)

Standard:

Opens 0-FCV-84-5 and 16 SAT UNSAT N/A COMMENTS:______________________________

Performance Step 2:

Critical Not Critical X 2.

VERIFY 0-PI-84-6/3, VAPOR A OUTLET PRESS, and 0-PI-84-17/3, VAPOR B OUTLET PRESS, indicate approximately 100 psig (Unit 3, Panel 3-9-54 and 3-9-55)

Standard:

Verified 0-PI-84-6/3 and 0-PI-84-17/3 (Located on Unit 3, Panel 3-9-54 and 3-9-55) indicating approximately 100 psig.

SAT UNSAT N/A COMMENTS:_____________________________

JPM g

PAGE 5 OF 8

Performance Step 3:

  • Critical Not Critical
  • 3*

PLACE keylock switch 3-HS-84-48, CAD A CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 3, Panel 3-9-54) 4.

CHECK OPEN 3-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR, (Unit 3, Panel 3-9-54)

Standard:

Places keylock switch 3-HS-84-48 in Open and verifies 3-FSV-84-48 open SAT UNSAT N/A _COMMENTS:____________________________

Performance Step 4:

  • Critical Not Critical
  • 5*

PLACE keylock switch 3-HS-84-49, CAD B CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 3, Panel 3-9-55) 6.

CHECK OPEN 3-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AR (Unit 3, Panel 3-9-55)

Standard:

Places keylock switch 3-HS-84-49 in Open and verifies 3-FSV-84-49 SAT UNSAT N/A _COMMENTS:_____________________________

JPM g

PAGE 6 OF 8

Performance Step 5:

Critical Not Critical 7.

CHECK MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 3-PA-32-31, alarm cleared (3-XA-55-3D, Window 18)

Standard:

Recognizes MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW (3-XA-55-3D, Win. 18) still in Alarm (would NOT clear) and continues with procedure.

SAT UNSAT N/A _COMMENTS:_______________________________

Performance Step 6:

Critical Not Critical 8.

IF MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 3-PA-32-31, annunciator is or remains in alarm (3-XA-55-3D, Window 18), THEN DETERMINE which Drywell Control Air header is depressurized as follows:

a.

DISPATCH personnel to Unit 3, RB, El 565 ft, to MONITOR the following indications for low pressure:

3-PI-84-51, CAD A CROSSTIE TO DWCA PRESS 1NDR, for CAD A (R-17 S-line, by Drywell Access Door) 3-PI-84-50, DW CONT AIR N2 SUPPLY PRESS indicator, for CAD B

((R-19 U-line, behind 480V RB Vent Board 3B)

Standard:

Dispatches personnel to Reactor Building to monitor 3-PI-84-51 and 3-PI-84-50 for low pressure.

SAT_ UNSAT N/A COMMENTS:

CUE: DO NOT Report Unless directed by NRC [reportj 3-PI-84-5 1, CAD N2 Pressure to DWCA indicator, for CAD A is reading 110 psig and 3-PI-84-50 reading 5 psig.

JPM g

PAGE 7

OF 8

Performance Step 7:

Critical Not Critical b.

MONITOR 0-FI-84-7/3(1 8/3), CAD A(B) N2 SYSTEM FLOW, on Panel 3-9-54(55) for high flow.

Standard:

Recognizes 0-FI-84-7/3 flow is 0 scfrn and that 0-FI 18 flow is 50 scfm SAT_ UNSAT N/A COMMENTS:_______________________________

NOTE CAD System A to Drywell Control Air supplies the following MSIVs:

3-FCV-1-14, MSIV JJNE A INBOARD 3-FCV-1-26, MSIV LINE B INBOARD NOTE CAD System B to Drywell Control Air supplies the following MSIVs:

3-FCV-1-37, MSIV LINE C INBOARD 3-FCV-l-51, MSIV LINE D INBOARD Performance Step 8:

Critical Not Critical c.

MONITOR inboard MSIV indication status for valves drifting closed.

Standard:

Recognizes 3-FCV-1-37 and 51 closed SAT_ UNSAT N/A COMMENTS:_______________________________

JPM g

PAGE 8

OF 8

Performance Step 9:

Critical Not Critical X 9.

IF Drywell Control Air header supplied from CAD System A shows indications ofbeing depressurized, THEN CLOSE the following valves:

0-FCV-84-5, CAD SYSTEM A N2 SHUTOFF VALVE (Unit 3, Panel 3-9-54) 3-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR (Unit 3, Panel 3-9-54)

Standard:

N/A - No indications ofbeing depressurized SAT UNSAT N/A _COMMENTS:_____________________________

Performance Step 10:

Critical X Not Critical 10.

IF Drywell Control Air header supplied from CAD B shows indications ofbeing depressurized, THEN CLOSE the following valves:

0-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Unit 3, Panel 3-9-55) 3-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 3, Panel 3 55)

Standard:

Closes 0-FCV-84-16 and 3-FSV-84-49 SAT UNSAT N/A COMMENTS:_____

STOP TIME____

END OF TASK

JPM h

PAGE 1

OF S

OPERATOR:_______________________

RO SRO DATE:

JPM NUMBER:

h TASK NUMBER:

U-090-NO-03 TASK TITLE:

Bypassing Radiation Monitors on Workstation Touch Screen K/A NUMBER:

272000 A4.02 K/A RATING: RO 3.0 SRO 3.0 TASK STANDARD: Radiation Monitors 3-RM-90-59 and 3-RM-90-51 bypassed lAW 3-01-90 section 6.3.10.

LOCATION OF PERFORMANCE:

Simulator REFERENCES/PROCEDURES NEEDED:

3-01-90 VALIDATION TIME: 5 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)

COMMENTS:_____________________________

Additional comment sheets attached? YES NO RESULTS:

SATISFACTORY UNSATISFACTORY SIGNATURE:

DATE:

EXAMINER

INITIAL CONDITIONS:

You are a Unit Operator. The condition of alarms and indications on Radiation Monitors on the 3-MON-90-50 Workstation are being addressed by the Unit Supervisor.

INITIATING CUE:

The Unit Supervisor directs you to bypass Radiation Monitors 3-RM-90-59 and 3-RM-90-51, in accordance with 3-01-90 Radiation Monitoring System section 6.3.10.

JPM h

PAGE 3

OF 6

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats Correct. (OR Thats Incorrect, if applicable). When you have completed your assigned task, you will say, my task is complete and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are a Unit Operator. The condition of alarms and indications on Radiation Monitors on the 3-MON-90-50 Workstation are being addressed by the Unit Supervisor.

INITIATING CUE:

The Unit Supervisor directs you to bypass Radiation Monitors 3-RM-90-59 and 3-RM-90-51, in accordance with 3-01-90 Radiation Monitoring System section 6.3.10.

JPM h

PAGE 4

OF 6

START TIME____

Performance Step 1:

Critical Not Critical X 6.3.10 Bypassing Radiation Monitors on Workstation Touch Screen

[1]

NOTIFY Unit Supervisor of the radiation monitor(s) to be bypassed.

Standard:

Notifies the Unit Supervisor which radiation monitors will be bypassed.

SAT_ UNSAT N/A COMMENTS:___________________

f CUE: AcknodgNoffiction I

Performance Step 2:

Critical Not Critical X

[2]

REVIEW Precautions and Limitations listed in Section 3.0 Standard:

Reviews Precautions and Limitations SAT UNSAT N/A COMMENTS:_____________________________

Performance Step 3:

Critical Not Critical X

[3]

IF 3-RM-90-256, Drywell Air Monitor, is being bypassed, THEN REFER to Technical Specifications 3.4.5, 3.4.4 and 3.6.1.3.

Standard:

Step is NA, 3-RM-90-256 is not being bypassed.

SAT UNSAT N/A COMMENTS:___________________________

JPM h

PAGE 5

OF 6

Performance Step 4:

Critical X Not Critical

[4]

Using Air Particulate Monitor Controller, 3-MON-90-50, SELECT Bypass CAM(s).

Standard:

Selects Bypass Cams on 3-MON-90-50 SAT_ UNSAT N/A _COMMENTS:______________________________

Performance Step 5:

Critical X Not Critical

[5]

WHEN the Channel Bypass window appears, THEN use the toggle switches to place the desired CAM in BYPASS (red indicator will change to green).

Standard:

Selects radiation monitors 3-RM-90-59 and 3-RM-90-5 1 for Bypass SAT UNSAT N/A _COMMENTS:____________________________

Performance Step 6:

Critical X Not Critical

[6]

WHEN desired CAMS have been toggled to bypass, then SELECT Set Bypass Config.

Standard:

Selects Set Bypass Configuration SAT_ UNSAT N/A COMMENTS:____________________________

JPM h

PAGE 6

OF 6

Performance Step 7:

Critical Not Critical X

[7]

VERIFY the CAMs selected for bypass now have a beige border around the CAM on the main display screen.

Standard:

Verifies radiation monitors 3-RM-90-59 and 3-RM-90-51 are bypassed SAT UNSAT N/A COMMENTS:______________________________

Performance Step 8:

Critical Not Critical X

[8]

NOTIFY Chemistry and/or RADCON to begin sampling affected systems at the required frequency.

Standard:

Notifies Radcon SAT UNSAT N/A _COMMENTS:_______________________________

CUE; AomowJedgeNtifieati9n END OF TASK STOP TIME

JPM

+/-

PAGE 1

OF 7

OPERATOR:________________________

RU___

SRO___

DATE:

JPM NUMBER:

i TASK NUMBER:

U-000-EM-19 TASK TiTLE:

2-EOI Appendix-lA Removal of RPS SCRAM Fuses KJA NUMBER: 212000 A2.20 KJA RATiNG: RU 4.1 SRO 4.2 TASK STANDARD: Simulate removal of SCRAM Fuses lAW 2-EOI Appendix-lA LOCATION OF PERFORMANCE:

Plant REFERENCES/PROCEDURES NEEDED:

2-EOI Appendix-lA VALIDATION TIME: 10 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)

PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES NO RESULTS:

SATISFACTORY___

UNSATISFACTORY SIGNATURE:

DATE:

EXAMINER

INITIAL CONDITIONS: You are the Extra Operator. The Unit 2 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9-5 are still illuminated.

EOI-1 has been entered and followed to RC/Q-23. The Scram Discharge Volume VenffDrain Valves indicate closed on panel 2-9-5.

INITIATING CUE: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 2-EOI Appendix 1A, Removal and Replacement ofRPS Scram Solenoid Fuses.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

JPM

+/-

PAGE 3

OF 7

IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats correct (or Thats incorrect, if applicable). When you have completed your assigned task, you will say, My task is complete and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are the Extra Operator. The Unit 2 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9-5 are still illuminated.

EOI-l has been entered and followed to RC/Q-23. The Scram Discharge Volume Vent/Drain Valves indicate closed on panel 2-9-5.

INITIATING CUE: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 2-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

JPM

+/-

PAGE 4

OF 7

START TIME____

Performance Step 1:

Critical Not Critical X 1.

VERIFY CLOSED Scram Discharge Volume Vent and Drain Valves at the SCRAM DISCHARGE VOLUME VENT/DRAIN VLVS display on panel 9-5.

Standard:

Given in initial conditions SAT_ UNSAT N/A COMMENTS:_______________________________

Performance Step 2:

Critical Not Critical X 2.

DISPATCH personnel to Unit 2 Auxiliary Instrument Room to perform the following:

a.

REFER to Attachment 1 and OBTAIN fuse pullers from EOI Equipment Storage box.

Standard:

Simulate unlocking EOI Equipment storage and obtaining fuse pullers SAT UNSAT N/A COMMENTS:____________________________

JPM

+/-

PAGE 5

OF 7

Performance Step 3:

Critical X Not Critical b.

LOCATE Terminal Strip CC inside Panel 9-15, Bay 2, Rear.

c.

REMOVE the following fuses (located at bottom ofterminal strip CC, Panel 9-15):

RPS BUS A BLOCK NUMBER FUSE ID CC FOUR (4) 2-FU1-085-0037AA CC FIVE (5) 2-FU1-085-0039A/2 CC SIX (6) 2-FU1-085-0039A/3 CC SEVEN (7) 2-FU1-085-0039A/4 Standard:

Identifies terminal strip and simulates removing listed fuses SAT UNSAT N/A _COMMENTS:____________

CUE:

Vien location ofjropefRuse is indicateaheFusehas beenremoved

JPM

+/-

PAGE 6

OF 7

Performance Step 4:

Critical X Not Critical d.

LOCATE Terminal Strip CC inside Panel 9-17, Bay 2, Rear.

e.

REMOVE the following fuses (located at bottom of tenninal strip CC, Panel 9-17):

RPS BUS B BLOCK NUMBER FUSE ID CC FOUR (4) 2-FU1-085-0037BA CC FIVE (5) 2-FU1-085-0039B/2 CC SIX (6) 2-FU1-085-0039B/3 CC SEVEN (7) 2-FU1-085-0039B/4 Standard:

Identifies terminal strip and simulates removing listed fuses SAT_ UNSAT N/A COMMENTS:____________

CUE:

W4inlocation ofproper1use is indicate&the Fiishas beenemoved

JPM

+/-

PAGE 7

OF 7

Performance Step 5:

Critical Not Critical f.

WHEN ALL fuses are removed, THEN NOTIFY Unit Operator.

Standard:

Notifies Unit 2 Operator All RPS Fuse removed SAT UNSAT N/A _COMMENTS:______

CUE:

Aeknoy)e4ge Notification, SRO Does not direct replacementoffusçs END OF TASK STOP TIME____

JPM j

PAGE 1

OF 9

OPERATOR:

RO___

SRO___

DATE:

JPMN1JMBER:

j TASK NUMBER:

U-001-AL-06 TASK TITLE:

Field actions for stuck open SRV KIA NUMBER: 239002 A2.03 KIA RATING: RO 4.1 SRO 4.2 TASK STANDARD: Stuck Open SRV is closed when power is removed from the SRV by opening the breakers LOCATION OF PERFORMANCE:

Plant REFERENCES/PROCEDURES NEEDED:

2-AOl-1-1 VALIDATION TIME: 25 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)

PERFORMANCE TIME:

COMMENTS:______________________________

Additional comment sheets attached? YES NO RESULTS:

SATISFACTORY___

UNSATISFACTORY SIGNATURE:

DATE:

EXAMINER

IMTIAL CONDITIONS: You are an Operator, the Unit Supervisor has entered 2-AOl-i-i Relief Valve Stuck Open. Control Room actions to close SRV 2-PCV-i-22 have been unsuccessful. Reactor Power is 85%.

INITIATING CUE: The Unit Supervisor directs you to attempt to close SRV 2-PCV-l-22 from outside the Control Room in accordance with 2-AOl-i-i step 4.2.3[2].

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

JPM j

PAGE 3

OF 9

IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SiMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats correct (or Thats incorrect, if applicable). When you have completed your assigned task, you will say, My task is complete and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are an Operator, the Unit Supervisor has entered 2-AOl-i-i Relief Valve Stuck Open. Control Room actions to close SRV 2-PCV-i-22 have been unsuccessful. Reactor Power is 85%.

INITIATING CUE: The Unit Supervisor directs you to attempt to close SRV 2-PCV-i-22 from outside the Control Room in accordance with 2-AOl-i-i step 4.2.3[2].

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

JPM j

PAGE 4

OF 9

START TIME____

Performance Step 1:

Critical Not Critical X NOTES 1) 2-PCV-l-22 is an ADS Valve 2) 2-PCV-1-22 has two power supplies, it will auto transfer on loss ofpower and is Normal Seeking.

3) may be addressed for fuse and breaker information.

[2]

IF 2-PCV-l-22 is NOT closed, THEN PERFORM the following:

[2.1]

On Panel 2-25-32 PLACE the associated transfer switch MAIN STM LINE B RELIEF VALVE XFR, 2-XS-1-22 in EMERG position.

Standard:

Simulate placing 2-XS-l-22 in emergency SAT_ UNSAT N/A COMMENTS:___

CUE:

When iimülated 2-XS4-22 isin Emergency. When ControLRoom called SRV remains OPEN.

JPM j

PAGE 5

OF 9

Performance Step 2:

Critical Not Critical X

[2.2]

IF the SRV does NOT close, THEN PERFORM the following while OBSERVING the indications for the 2-PCV-l-22 on the Acoustic Monitor:

CYCLE the MAIN STM LINE B RELIEF VALVE, 2-HS-1-22C to the following positions several times.

CLOSE/AUTO to OPEN to CLOSE/AUTO Standard:

Simulates cycling 2-HS-l-22C from CLOSE/AUTO to OPEN to CLOSE/AUTO SAT_ UNSAT N/A COMMENTS:______________________________

f CUE:

The SkYremains opn Performance Step 3:

Critical Not Critical X

[2.3]

IF the SRV does NOT close, THEN PERFORM the following:

A.

VERIFY the MAIN STM LINE B RELIEF VALVE, 2-HS-l-22C, in the CLOSE/AUTO position.

B.

PLACE the associated transfer switch MAIN STM LINE B RELIEF VALVE XFR, 2-XS-l-22 in NORM position.

Standard:

Simulates verifying 2-HS-1-22C is in Close/Auto and simulates placing 2-XS-l-22 in Norm SAT_ UNSAT N/A COMMENTS:_____________________________

CUE:

2-XS-l -22 is in Norm

NRC NOTE IF BREAKERS are USED JPM j

PAGE 6

OF 9

Performance Step 4:

Critical X Not Critical

[2.4]

IF the SRV does NOT close, THEN REMOVE the power from 2-PCV-1--22 by performing one of the following: (Opening breakers are the preferred method)

A.

OPEN the following breakers: (Preferred method) 2A 250V RMOV, Compartment 11 C2 CUE:

11C2 at 2A 250V RMOV is open.

  • 2B 250V RMOV, Compartment 1C1 CUE:

IC1 at 213 25OVRMOV is open.

SRV 1-22 is closed.

17Operatorsimu1ates 1oshgbreakers breakers areclose4 SRS/is Open. 3PM Fabre Standard:

Simulates opening Compartment 11C2 at 2A 250V RMOV and Compartment 1C1 at 2B 250V RMOV SAT UNSAT N/A COMMENTS:

JPM j

PAGE 7

OF 9

Performance Step 5:

Critical Not Critical X

[2.5]

IF the valve does NOT close, THEN CLOSE the breakers or REINSTALL fuses removed in Step 4.2.3[2.4].

CUE:

If Operator simulates closing breakers, breakers are closed. SRV 1-22 is Opeu. JPM Failure Standard:

SRV Closed Operator does NOT close breaker, Step is NA SAT_ UNSAT N/A COMMENTS:_____________________________

IF BREAKERS ARE OPENED THAN THE JPM IS COMPLETE STOP TIME____

END OF TASK

JPM j

PAGE 8

OF 9

NRC NO1E are USJFD Performance Step 6:

Critical X Not Critical B. In Panel 2-25-32 PULL the following fuses as necessary

CUE:

Fuse 2E-F6E is PULLED Fuse 2E-F4E is PULLED If Oeratox simitats installing fuse fuses are $nstalled. S1V. 1-22 is Open. 3PM Failure Standard:

Simulates pulling fuses: Fuse 2E-F6E and Fuse 2E-F4E SAT UNSAT N/A _COMMENTS:___________

JPM j

PAGE 9 OF 9

Performance Step 7:

Critical Not Critical

[2.5]

IF the valve does NOT close, THEN CLOSE the breakers or REINSTALL fuses removed in Step 4.2.3[2.4].

If Operator simulates installing fuses, fuses are installed. SRV 1-22 is Open.JPM Failure CUE:

Standard:

SRV Closed Operator does NOT install fuses, Step is NA SAT_ UIJSAT N/A COMMENTS:_____________________________

IF FUSES ARE REMOVED THAN THE JPM IS COMPLETE STOP TIME____

END OF TASK

JPM k

(16+/- op6)

PAGE1OF9 OPERATOR:______________________

RO___

SRO___

DATE:

JPM NUMBER:

k (16 op6)

TASK NUMBER:

U-000-SS-08 TASK TITLE:

Align 480V RMOV BD 3B for a fire and Start RHR Pump 3A KJA NUMBER: 600000 AA2.16 K/A RATING: RO 10 SRO: 15 TASK STANDARD: Operator 6 Manual Actions 0-SSI-16 section 2.0 and 3.0 completed LOCATION OF PERFORMANCE:

Plant REFERENCES/PROCEDURES NEEDED:

0-SSI-16 VALIDATION TIME: 15 minutes MAX. TIME ALLOWED: 20 minutes for section 2.0 and 120 minutes for section 3.0.

PERFORMANCE TIME:

COMMENTS:_____________________________

Additional comment sheets attached? YES NO RESULTS:

SATISFACTORY___

UNSATISFACTORY SIGNATURE:

DATE:

EXAMINER

INITIAL CONDITIONS: You are Operator 6, the plant is operating in 0-SSI-16 Control Building Fire EL 593 Through EL 617. Operator 6 Manual Actions Section 1.0 is complete.

INITIATING CUE: The Unit Supervisor directs you as Operator 6 to continue Attachment 6 at section 2.0 of 0-SSI-16.

Time Critical CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

JPM k

(16 op6)

PAGE 3

OF 9

IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIIvIIJLATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge Thats correct (or Thats incorrect, if applicable). When you have completed your assigned task, you will say, My task is complete and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are Operator 6, the plant is operating in 0-SSI-l6 Control Building Fire EL 593 Through EL 617. Operator 6 Manual Actions Section 1.0 is complete.

INITIATING CUE: The Unit Supervisor directs you as Operator 6 to continue Attachment 6 at section 2.0 of 0-SSI-16.

Time Critical CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

JPM k

(16 op6)

PAGE 4 OF 9

START TIME____

Performance Step 1:

Critical Not Critical 2.0 480V REACTOR MOV BOARD 3B ALIGNMENT (20 Mm)

[1]

Notification has been received from the Unit 3 Unit Supervisor to perform this section.

[2]

PERFORM the following to align 480V Reactor MOV Board 3B:

[2.1]

PROCEED TO Compt 2A, AND PLACE NORMAL FEEDER CONTROL SWITCH, 3-HS-268B/2A-A, in TRIP.

3-HS.268BI2A-A is in Trip, Green light On Red light Off j CUE:

[2.2]

PROCEED TO Compt 16A, AND PLACE EMERGENCY FEEDER CONTROL SWITCH, 3-HS-268-B/16A-A, in CLOSE.

CUE:

3-HS-268-BI16A-Ais in Close, Red light On Green Light Off Standard:

Simulates placing 3-HS-268B/2A-A in Trip and 3-HS-268-B/16A-A in Close SAT_ UNSAT N/A COMMENTS:_____________________________

JPM k

(16 op6)

PAGE 5

OF 9

Performance Step 2:

  • Critical X Not Critical

[2.3]

PROCEED TO Compt 1C, AND PERFORM the following:

  • [23l]

PLACE RCIC STM LiNE EMER TRANS SWITCH 3-XS-071-0002, in EMERG.

[2.3.2]

VERIFY OPEN RCIC STM LINE 1NBD ISOL VALVE, 3-HS-071-0002B.

CUE:

3-XS-Q71-OOO2 is in Emergency and RCICStcanttine hiboard Isolation Valve has RedLight Oil, Green Light Off Standard:

Simulates placing 3-XS-071-0002 in Emergency and verifies RCIC STM LINE INBD ISOL VALVE Open SAT UNSAT N/A COMMENTS:______________________________

Performance Step 3:

Critical X Not Critical

[2.4]

PROCEED TO Compt 4C, AND PLACE O-BKR-084-0016A CONTAINMENT ATMOSPHERE DILUTION SYSTEM B HEATER, breaker in OFF.

j CUE:

O-BKR-084-0016A is in Off Standard:

Simulates placing O-BKR-084-0016A in Off SAT_ UNSAT N/A COMMENTS:_____

STOP TiME____

JPM k

(16 op6)

PAGE 6

OF 9

Performance Step 4:

Critical Not Critical X

[3]

NOTIFY Unit 3 Unit Supervisor of completion of this section.

[4]

PROCEED TO 4160V Shutdown Board 3EA in preparation of performing Section 3.0.

Standard:

Notifies Unit 3 Unit Supervisor and proceeds to 4160 SD BD 3EA SAT UNSAT N/A COMMENTS:_____________________________

CUE; Acknowledge notification arid Notify Operator to perform section 3.0

JPM k

(16 op6)

PAGE 7

OF 9

START TIME____

Performance Step 5:

  • Critical Not Critical 3.0 RHR PUMP 3A LOCAL START (120 Mm)

[1]

Notification has been received from the Unit 3 Unit Supervisor to perform this section.

NOTE If RHR pump fails to start, pushbutton on breaker must be used.

[2]

PROCEED TO 4160V Shutdown Board 3EA, Compt 12, 3-BKR-074-0005 RHR PUMP 3A, AND PERFORM the following:

  • [2.1] PLACE RHR PUMP 3A TRANSFER, 3-43-074-0005, in EMERG.

f CUE:

343-O74-OOO5 is in Emergency

[2.2]

PLACE RHR PUMP 3A, 3-HS-074-0005C, in CLOSE.

[2.3]

VERIFY RHR Pump 3A has started by observing breaker AMMETER indications.

CUE:

3-HS-O74-O005Cis in CIos No AMPS are indieated Reduight OF, Green LigI On Yellow light remaineL On.

If asked No breaker trips ar inicated.,

Standard:

Simulates placing 3-43-074-0005 in Emergency and 3-HS-074-0005C in Close SAT_ UNSAT N/A COMMENTS:_____________________________

JPM k

(16 op6)

PAGE 8

OF 9

Performance Step 6:

  • Critical Not Critical 3.0 RHR PUMP 3A LOCAL START (120 Mm)
  • NOTE
  • IfpJIR pump fails to start, pushbutton on breaker must be used.

CUE:

Breaker 3-BKR-074-0005 pushbutton is depressed

[2]

PROCEED TO 4160V Shutdown Board 3EA, Compt 12, 3-BKR-074-0005 RHR PUMP 3A, AND PERFORM the following:

[2.3]

VERIFY RHR Pump 3A has started by observing breaker AMMETER indications.

CUE:

AMPS pegged high, Red light ON and Green Light OFF Breaker CLOSED, current AMP reading is 180 AMPS Standard:

Simulates depressing pushbutton on 3-BKR-074-0005 and verifies Amps SAT_ UNSAT_ N/A COMMENTS:_____________________________

STOP TIME____

JPM k

(16 op6)

PAGE 9

OF 9

Performance Step 7:

Critical Not Critical X

[3]

NOTIFY Unit 3 Unit Supervisor ofthe completion of this section.

[4]

PROCEED TO 4160 Shutdown Board A in preparation ofperforming Section 4.0.

Standard:

Notifies Unit 3 Unit Supervisor SAT_ UNSAT N/A COMMENTS:

CUE:

AnotherOperator will continue with section 4.0 END OFTASK