| title = Reactor Building Tendon Surveillance Report
| title = Reactor Building Tendon Surveillance Report
| author name = Libra R W
| author name = Libra R
| author affiliation = Exelon Nuclear
| author affiliation = Exelon Nuclear
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ExeIon.Nuclear Three Mile Island Unit 1 Telephone 717-948-8000 Route 441 South, P.O. Box 480 Middletown, PA 17057 TMI-11-055 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 THREE MILE ISLAND UNIT 1 (TMI-1)OPERATING LICENSE NO. DPR-50 DOCKET NO. 50-289  
{{#Wiki_filter:ExeIon.
Nuclear Three Mile Island Unit 1 Telephone 717-948-8000 Route 441 South, P.O. Box 480 Middletown, PA 17057 TMI-11-055 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 THREE MILE ISLAND UNIT 1 (TMI-1)
OPERATING LICENSE NO. DPR-50 DOCKET NO. 50-289


==SUBJECT:==
==SUBJECT:==
REACTOR BUILDING TENDON SURVEILLANCE REPORT Enclosed is "Topical Report Number 204, "2010 Augmented Reactor Building (IWL) In-Service Inspection", Revision 0, provides a report on the inspection results of the Post-Tensioning System and containment surface. These activities were performed in accordance with ASME Section Xl, Subsection IWL, and Technical Specification 4.4.2.The report is required, by Technical Specification 4.4.2.1.6, to be submitted to the NRC within 3 months of completion.
REACTOR BUILDING TENDON SURVEILLANCE REPORT Enclosed is "Topical Report Number 204, "2010 Augmented Reactor Building (IWL) In-Service Inspection", Revision 0, provides a report on the inspection results of the Post-Tensioning System and containment surface.
These activities were performed in accordance with ASME Section Xl, Subsection IWL, and Technical Specification 4.4.2.
The report is required, by Technical Specification 4.4.2.1.6, to be submitted to the NRC within 3 months of completion.
No new regulatory commitments are established by this submittal.
No new regulatory commitments are established by this submittal.
If any additional information is needed, please contact Mike Fitzwater at (717) 948-8228 Sincerely, Richard W. Libra Plant Manager RWL/mdf Attachments cc: TMI-1 Senior Resident Inspector Administrator, Region I TMI-1 Project Manager}}
If any additional information is needed, please contact Mike Fitzwater at (717) 948-8228 Sincerely, Richard W. Libra Plant Manager RWL/mdf Attachments cc:
TMI-1 Senior Resident Inspector Administrator, Region I TMI-1 Project Manager}}

Latest revision as of 07:07, 13 January 2025

Reactor Building Tendon Surveillance Report
ML11105A163
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/15/2011
From: Libra R
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TMI-11-055
Download: ML11105A163 (1)


Text

ExeIon.

Nuclear Three Mile Island Unit 1 Telephone 717-948-8000 Route 441 South, P.O. Box 480 Middletown, PA 17057 TMI-11-055 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 THREE MILE ISLAND UNIT 1 (TMI-1)

OPERATING LICENSE NO. DPR-50 DOCKET NO. 50-289

SUBJECT:

REACTOR BUILDING TENDON SURVEILLANCE REPORT Enclosed is "Topical Report Number 204, "2010 Augmented Reactor Building (IWL) In-Service Inspection", Revision 0, provides a report on the inspection results of the Post-Tensioning System and containment surface.

These activities were performed in accordance with ASME Section Xl, Subsection IWL, and Technical Specification 4.4.2.

The report is required, by Technical Specification 4.4.2.1.6, to be submitted to the NRC within 3 months of completion.

No new regulatory commitments are established by this submittal.

If any additional information is needed, please contact Mike Fitzwater at (717) 948-8228 Sincerely, Richard W. Libra Plant Manager RWL/mdf Attachments cc:

TMI-1 Senior Resident Inspector Administrator, Region I TMI-1 Project Manager