ML11136A087: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:WBN2Public Resource From:                     Clark, Mark Steven [msclark0@tva.gov]
{{#Wiki_filter:1 WBN2Public Resource From:
Sent:                     Tuesday, April 19, 2011 11:58 AM To:                       Crouch, William D; Hilmes, Steven A Cc:                       Poole, Justin
Clark, Mark Steven [msclark0@tva.gov]
Sent:
Tuesday, April 19, 2011 11:58 AM To:
Crouch, William D; Hilmes, Steven A Cc:
Poole, Justin


==Subject:==
==Subject:==
20110415 Open Item List Master TVA Update 04-19-11.docx Attachments:             20110415 Open Item List Master TVA Update 04-19-11.docx Bill:
20110415 Open Item List Master TVA Update 04-19-11.docx Attachments:
20110415 Open Item List Master TVA Update 04-19-11.docx Bill:
Please forward the attached update to Justin. Not much of an update this week.
Please forward the attached update to Justin. Not much of an update this week.
: Regards, Steve Steve Clark Bechtel Power Corp.
: Regards, Steve Steve Clark Bechtel Power Corp.
Control Systems Watts Bar 2 Completion Project Phone: 423.365.3007 e-mail: msclark0@tva.gov 1
Control Systems Watts Bar 2 Completion Project Phone: 423.365.3007 e-mail: msclark0@tva.gov


Hearing Identifier:     Watts_Bar_2_Operating_LA_Public Email Number:           352 Mail Envelope Properties     (7AB41F650F76BD44B5BCAB7C0CCABFAF1816A07E)
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
352 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF1816A07E)  


==Subject:==
==Subject:==
20110415 Open Item List Master TVA Update 04-19-11.docx Sent Date:               4/19/2011 11:57:32 AM Received Date:           4/19/2011 11:57:43 AM From:                   Clark, Mark Steven Created By:             msclark0@tva.gov Recipients:
20110415 Open Item List Master TVA Update 04-19-11.docx Sent Date:
4/19/2011 11:57:32 AM Received Date:
4/19/2011 11:57:43 AM From:
Clark, Mark Steven Created By:
msclark0@tva.gov Recipients:  
"Poole, Justin" <Justin.Poole@nrc.gov>
"Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None "Hilmes, Steven A" <sahilmes@tva.gov>
Tracking Status: None "Hilmes, Steven A" <sahilmes@tva.gov>
Tracking Status: None Post Office:             TVANUCXVS2.main.tva.gov Files                           Size                   Date & Time MESSAGE                         321                     4/19/2011 11:57:43 AM 20110415 Open Item List Master TVA Update 04-19-11.docx                     500862 Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Tracking Status: None Post Office:
Recipients Received:
TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 321 4/19/2011 11:57:43 AM 20110415 Open Item List Master TVA Update 04-19-11.docx 500862 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                             radE4C39.docx                                                                           Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR          NRC No.                                                                          Issue                                                    TVA Response(s)                        Acceptable       Status/ Current Actions     Resolution Path     RAI No. & Date   RAI Resp. Date                   Comments Sec.      Sec.          POC                                                                                                                                              Y/N B         (
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 001 All All B
1.
(
001    All      All                A       The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (Agency         12/15/2009 Presentation Slides                                 Y      Closed                       Closed               EICB RAI           3/12/2010         NNC 11/19/09: The FSAR contains B         (
A The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (Agency 12/15/2009 Presentation Slides
2.
: 1.
002    All      All                A       Are there I&C components and systems that have changed to a           12/15/2009 Presentation Slides                                 Y       Closed                       Closed               EICB RAI           3/12/2010         NNC 11/19/09: The FSAR contains B         (
Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains 002 All All B
3.
(
003    All      All                A        Because a digital I&C platform can be configured and programmed 12/15/2009 Presentation Slides                                       Y       Closed                       Closed               EICB RAI           3/12/2010         NNC 11/19/09: The FSAR contains
A Are there I&C components and systems that have changed to a 12/15/2009 Presentation Slides
( ( ( (        B 004     All     All                         Please identify the information that will be submitted for each       Responder: Webb       1/13/10 Public Meeting             4. Y       Closed                       Closed               EICB RAI           January 13, 2010 NNC 11/19/09: LIC-110 Rev. 1 Section 005   7.1.3.                               By letter date February 28, 2008 (Agencywide Documents Access Responder: Craig/Webb                                             5. Y       Closed                       Closed               EICB RAI           TVA Letter dated 006                                         Amendment 95 of the FSAR, Chapter 7.3, shows that change 7.3-1 By letter dated February 5, 2010: TVA provided the Unit 2       6. Y       Closed                       Closed               EICB RAI           TVA Letter dated NNC: WCAP-12096 Rev. 7 D D D D 007   7.1.3.                               The setpoint methodology has been reviewed and approved by the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 7 7.           Y       Closed                       Closed               EICB RAI           TVA Letter dated TVA to provide Rev. 8 of the Unit 1
: 2.
(        ( ( ( (
Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains 003 All All B
008    7.3                                  There are several staff positions that provide guidance on setpoint TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 8 8.       Y       Closed                       Closed               EICB RAI           TVA Letter dated a a a a        (
(
009   7.3.2   5.6,                         Change 7.3-2, identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 9 9.         Y       Closed                       Closed               EICB RAI           3/12/10, G        G G G G 010     7.3     7.3                         The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 10 10.           Y       Closed                       Closed               EICB RAI           3/12/10, 011   7.3.2   5.6,                         NUREG-0847 Supplement No. 2 Section 7.3.2 includes an                 TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 11 11.           Closed                       Closed               EICB RAI           ML101680598, A
A Because a digital I&C platform can be configured and programmed 12/15/2009 Presentation Slides
Y 012     7.4     7.4                         The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 12 12.           Y       Closed                       Closed               EICB RAI           TVA Letter dated 013   7.1.3.                               Chapter 7 and Chapter 16 of Amendment 95 to the FSAR do not           TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 13 13. Y       Closed                       Closed               EICB RAI           TVA Letter dated TS have been docketed.
: 3.
(        (    B 014    All     All                         Provide the justification for any hardware and software changes       Date: 4/27/10                                             14. Y         Closed                       Closed               NRC Meeting       TVA Letter dated 015                                         Verify that the refurbishment of the power range nuclear             Date: 4/27/10                                             15. Y         Closed                       Closed               NRC Meeting       TVA Letter dated 016                                         Identify the precedents in license amendment requests (LARs), if     Date: 4/27/10                                             16. Y         Closed                       Closed               NRC Meeting       TVA Letter dated
Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains 004 All All B
(  D        D (
(
017   7.3.1   7.3.1,                       Identify precedents in LARs, if any, for the solid state protection   Date: 4/27/10                                             17. Y         Closed                       Closed               NRC Meeting       TVA Letter dated
A Please identify the information that will be submitted for each Responder: Webb 1/13/10 Public Meeting
(  ( ( ( (    (
: 4.
018                                          Identify any changes made to any instrumentation and control         Date: 4/27/10                                             18. Y         Closed                       Closed               NRC Meeting       TVA Letter dated 019                                         Verify that the containment purge isolation radiation monitor is the Date: 4/27/10                                             19. Y         Closed                       Closed               NRC Meeting       TVA Letter dated C  a        a C  (
Y Closed Closed EICB RAI January 13, 2010 NNC 11/19/09: LIC-110 Rev. 1 Section 005 7.1.3.
020                                          Provide environmental qualification information pursuant to Section Date: 4/27/10                                               20. Y         Closed                       Closed               NRC Meeting       TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
(
G  G G G G    G 021             7.3                         For the Foxboro Spec 200 platform, identify any changes in           Date: 5/25/10                                             21. Y         Closed                       Closed               NRC Meeting       TVA Letter dated The resolution of this item will be A
G By letter date February 28, 2008 (Agencywide Documents Access Responder: Craig/Webb
022   7.3.2   5.6,                         Verify the auxiliary feedwater control refurbishment results in a like- Date: 4/27/10                                           22. Y         Closed                       Closed               NRC Meeting       TVA Letter dated 023                                         Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10                                               23. Y         Closed                       Closed               NRC Meeting       TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
: 5.
024                                         Provide a schedule by the January 13, 2010, meeting for providing During the January 13, 2010 meeting, TVA presented a         24. Y         Closed                       Closed               NRC Meeting       N/A - Request for NNC 4/30/10: Carte to address
Y Closed Closed EICB RAI TVA Letter dated 006
( ( (  (  (  (
(
025   7.5.2   7.5.1                       For the containment radiation high radiation monitor, verify that the Date: 4/27/10                                             25. Y         Closed                       Closed               NRC Meeting       ML101230248, 026                                         Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10                                               26. Y         Closed                       Closed               NRC Meeting       TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
G Amendment 95 of the FSAR, Chapter 7.3, shows that change 7.3-1 By {{letter dated|date=February 5, 2010|text=letter dated February 5, 2010}}: TVA provided the Unit 2
(      (  (  (
: 6.
027   7.7.1.                               For Foxboro I/A provide information regarding safety/non-safety-     Date: 4/27/10                                             27. Y         Closed                       Closed               NRC Meeting       TVA Letter dated 028                                         For the turbine control AEH system, verify that the refurbishment     Responder: Mark Scansen                                   28. Y         Closed                       Closed               NRC Meeting       TVA Letter dated C C C  C  C  S 029                                          For the rod control system, verify that the refurbishment results in a Date: 4/27/10                                           29. Y         Closed                       Closed               NRC Meeting       TVA Letter dated G       G  G  G 030                                          Regarding the refurbishment of I&C equipment, identify any           Responder: Clark                                         30. Y         Closed                       Closed               NRC Meeting       TVA Letter dated 031                                         For the rod position indication system (CERPI), provide information Date: 4/27/10                                               31. Y         Closed                       Closed               NRC Meeting       TVA Letter dated CERPI is non-safety related.
Y Closed Closed EICB RAI TVA Letter dated NNC: WCAP-12096 Rev. 7 007 7.1.3.
i 032                                         For the process computer, need to consider cyber security issues     Date: 4/27/10                                             32. Y         Closed                       Closed               NRC Meeting       TVA Letter dated EICB will no longer consider cyber 033                                         For the loose parts monitoring system, provide information           Date: 4/27/10                                             33. Y         Closed                       Closed               NRC Meeting       TVA Letter dated The loose parts monitoring system is 034                                         2/4/2010                                                             Responder: TVA                                           34. Y         Closed                       Closed               N/A               TVA Letter dated 034.                       (                    Chapter 7.1 - Introduction                                                                                                   35. Y         Closed                       Closed               N/A               N/A
(
(     a 034.                      D                    Chapter 7.2 - Reactor Trip System                                                                                           36. Y         Closed                       Closed               N/A               N/A M  ( r 034. 7.3     7.3       a                   Chapter 7.3 - ESFAS                                                                                                         37. Y         Closed                       Closed               N/A               N/A a  G g 034. 7.5.1. 7.5.2                           Chapter 7.5 - Instrumentation Systems Important to Safety                                                                   38. Y         Closed                       Closed               N/A               N/A               Closed 034. 7.5.1. 7.5.2                           Chapter 7.6 - All Other Systems Required for Safety                                                                          39. Y        Closed                        Closed              N/A                N/A                Closed r
G The setpoint methodology has been reviewed and approved by the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 7 7.
Y Closed Closed EICB RAI TVA Letter dated TVA to provide Rev. 8 of the Unit 1 008 7.3
(
G There are several staff positions that provide guidance on setpoint TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 8 8.
Y Closed Closed EICB RAI TVA Letter dated 009 7.3.2 5.6,
(
D a
Change 7.3-2, identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 9 9.
Y Closed Closed EICB RAI 3/12/10, 010 7.3 7.3
(
D a
The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 10 10. Y Closed Closed EICB RAI 3/12/10, 011 7.3.2 5.6,
(
D a
NUREG-0847 Supplement No. 2 Section 7.3.2 includes an TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 11 11. Y Closed Closed EICB RAI ML101680598, 012 7.4 7.4
(
D a
The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 12 12. Y Closed Closed EICB RAI TVA Letter dated 013 7.1.3.
(
G Chapter 7 and Chapter 16 of Amendment 95 to the FSAR do not TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 13 13. Y Closed Closed EICB RAI TVA Letter dated TS have been docketed.
014 All All B
(
A Provide the justification for any hardware and software changes Date: 4/27/10
: 14. Y Closed Closed NRC Meeting TVA Letter dated 015
(
G Verify that the refurbishment of the power range nuclear Date: 4/27/10
: 15. Y Closed Closed NRC Meeting TVA Letter dated 016
(
C Identify the precedents in license amendment requests (LARs), if Date: 4/27/10
: 16. Y Closed Closed NRC Meeting TVA Letter dated 017 7.3.1 7.3.1,
(
D a
Identify precedents in LARs, if any, for the solid state protection Date: 4/27/10
: 17. Y Closed Closed NRC Meeting TVA Letter dated 018
(
G Identify any changes made to any instrumentation and control Date: 4/27/10
: 18. Y Closed Closed NRC Meeting TVA Letter dated 019
(
G Verify that the containment purge isolation radiation monitor is the Date: 4/27/10
: 19. Y Closed Closed NRC Meeting TVA Letter dated 020
(
G Provide environmental qualification information pursuant to Section Date: 4/27/10
: 20. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
021 7.3
(
G For the Foxboro Spec 200 platform, identify any changes in Date: 5/25/10
: 21. Y Closed Closed NRC Meeting TVA Letter dated The resolution of this item will be 022 7.3.2 5.6,
(
D a
Verify the auxiliary feedwater control refurbishment results in a like-Date: 4/27/10
: 22. Y Closed Closed NRC Meeting TVA Letter dated 023
(
G Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10
: 23. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
024
(
C Provide a schedule by the January 13, 2010, meeting for providing During the January 13, 2010 meeting, TVA presented a
: 24. Y Closed Closed NRC Meeting N/A - Request for NNC 4/30/10: Carte to address 025 7.5.2 7.5.1
(
S i
For the containment radiation high radiation monitor, verify that the Date: 4/27/10
: 25. Y Closed Closed NRC Meeting ML101230248, 026
(
G Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10
: 26. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
027 7.7.1.
(
C For Foxboro I/A provide information regarding safety/non-safety-Date: 4/27/10
: 27. Y Closed Closed NRC Meeting TVA Letter dated 028
(
G For the turbine control AEH system, verify that the refurbishment Responder: Mark Scansen
: 28. Y Closed Closed NRC Meeting TVA Letter dated 029
(
C For the rod control system, verify that the refurbishment results in a Date: 4/27/10
: 29. Y Closed Closed NRC Meeting TVA Letter dated 030
(
G Regarding the refurbishment of I&C equipment, identify any Responder: Clark
: 30. Y Closed Closed NRC Meeting TVA Letter dated 031
(
C For the rod position indication system (CERPI), provide information Date: 4/27/10
: 31. Y Closed Closed NRC Meeting TVA Letter dated CERPI is non-safety related.
032
(
C For the process computer, need to consider cyber security issues Date: 4/27/10
: 32. Y Closed Closed NRC Meeting TVA Letter dated EICB will no longer consider cyber 033
(
C For the loose parts monitoring system, provide information Date: 4/27/10
: 33. Y Closed Closed NRC Meeting TVA Letter dated The loose parts monitoring system is 034
(
G 2/4/2010 Responder: TVA
: 34. Y Closed Closed N/A TVA Letter dated 034.
a r
g Chapter 7.1 - Introduction
: 35. Y Closed Closed N/A N/A 034.
(
G Chapter 7.2 - Reactor Trip System
: 36. Y Closed Closed N/A N/A 034.
7.3 7.3
(
D a
Chapter 7.3 - ESFAS
: 37. Y Closed Closed N/A N/A 034.
7.5.1.
7.5.2
(
M a
Chapter 7.5 - Instrumentation Systems Important to Safety
: 38. Y Closed Closed N/A N/A Closed 034.
7.5.1.
7.5.2 r
c u
c u
034.                                           Chapter 7.7 Control Systems                                                                                                 40. Y         Closed                       Closed               N/A               N/A n
Chapter 7.6 - All Other Systems Required for Safety
g h
: 39. Y Closed Closed N/A N/A Closed 034.
                        /
n g
035                        (                2/18/2010                                                             Responder: Clark                                         41. Y         Closed                       Closed               RAI No. 1         TVA Letter dated LIC-110 Section 6.2.2 states: Design
h
( (
/
M 036   7.5.2   7.5.1       C S            February 18, 2010                                                     Date: 5/25/10                                             42. Y         Closed                       Closed               NRC Meeting                           NNC: Unit 2 FSAR Section 7.5.1, Post a
Chapter 7.7 Control Systems
i 037   7.5.1. 7.5.2                       2/18/2010                                                             Responder: Clark                 Date: 5/25/10           43. Y         Closed                       Closed               N/A               TVA Letter dated FSAR Amendment 100 provides
: 40. Y Closed Closed N/A N/A 035
(
S i
2/18/2010 Responder: Clark
: 41. Y Closed Closed RAI No. 1 TVA Letter dated LIC-110 Section 6.2.2 states: Design 036 7.5.2 7.5.1
(
C February 18, 2010 Date: 5/25/10
: 42. Y Closed Closed NRC Meeting NNC: Unit 2 FSAR Section 7.5.1, Post 037 7.5.1.
7.5.2
(
M a
2/18/2010 Responder: Clark Date: 5/25/10
: 43. Y Closed Closed N/A TVA Letter dated FSAR Amendment 100 provides  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                                 radE4C39.docx                                                                           Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR          NRC No.                                                                                Issue                                                    TVA Response(s)                      Acceptable       Status/ Current Actions     Resolution Path     RAI No. & Date     RAI Resp. Date                 Comments Sec.      Sec.        POC                                                                                                                                                    Y/N 038   7.5.1. 7.5.2        (                        2/18/2010                                                        Responder: Clark            Date: 5/25/10                44. Y        Closed                        Closed              EICB RAI            TVA Letter dated The slides presented at the December 039                      ( ( M                        January 13, 2010                                                  Responder: Clark                      Date: 5/25/10      45. Y        Closed                        Closed              EICB RAI            FSAR amendment The equation for the calculation of the G G a 040                                                  January 13, 2010                                                  Responder: Clark                      Date: 5/25/10      46. Y        Closed                        Closed              EICB RAI EICB RAI FSAR amendment The equation for the calculation of the B
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 038 7.5.1.
042    All      All                                  February 25, 2010: Telecom                                        Date: 5/25/10                                            47. Y        Closed                        Closed              EICB RAI            TVA Letter dated The drawing provided did not have the 044  7.5.2    7.5.1                                  February 25, 2010                                                Date: 5/25/10                                            48. Y        Closed                        Closed              EICB RAI            TVA Letter dated 045                                                  February 25, 2010                                                Date: 5/25/10                                            49. Y        Closed                        Closed              EICB RAI            TVA Letter dated 046                      ( ( ( ( ( ( (                February 25, 2010                                                Date: 5/25/10                                            50. Y        Closed                        Closed              N/A - Request for  N/A 047  7.5.2    7.5.1  (                              4/8/2010                                                          Responder: WEC/Hilmes              Date: 5/25/10        51. Y        Closed                        Closed              EICB RAI            TVA Letter dated C C C C C C C (
7.5.2
048  7.5.2    7.5.1                                  April 8, 2010                                                    Date: 5/25/10                                            52. Y        Closed                        Closed              EICB RAI            TVA Letter dated G
049  7.5.2    7.5.1                                 4/8/2010                                                          Responder: WEC            Date: 5/25/10                53. Y        Closed                        Closed              EICB RAI            TVA Letter dated A
050  7.5.2    7.5.1                                  4/8/2010                                                          Responder: WEC                  Date: 5/25/10          54. N        Closed                        Closed              EICB RAI            TVA Letter dated NNC 11/18/10: SysRS Rev. 2 contains 051                                                  April 15, 2010                                                    Date: 5/25/10                                            55. Y        Closed                        Closed              N/A                N/A                Review addressed by another Open
(
(
052  7.5.2   7.5.1                                  April 19, 2010                                                   Date: 5/25/10                                           56. Y         Closed                       Closed               RAI No. 12 S
M a
i
2/18/2010 Responder: Clark Date: 5/25/10
: 44. Y Closed Closed EICB RAI TVA Letter dated The slides presented at the December 039
(
(
053  7.5.2    7.5.1                                  April 19, 2010                                                   Date: 5/25/10                                           57. Y         Closed                       Closed               RAI No. 13 S
G January 13, 2010 Responder: Clark Date: 5/25/10
i
: 45. Y Closed Closed EICB RAI FSAR amendment The equation for the calculation of the 040
(
(
054  7.5.2    7.5.1                                  4/19/2010                                                         Responder: Slifer/Clark             Date: 5/25/10       58. Y         Closed                       Closed               RAI No. 14          TVA Letter dated S
G January 13, 2010 Responder: Clark Date: 5/25/10
i
: 46. Y Closed Closed EICB RAI EICB RAI FSAR amendment The equation for the calculation of the 042 All All B
(
(
055  7.5.2    7.5.1                                  4/19/2010                                                         Responder: Slifer/Clark            Date: 5/25/10         59. Y         Closed                       Closed               RAI No. 15          TVA Letter dated S
A February 25, 2010: Telecom Date: 5/25/10
i
: 47. Y Closed Closed EICB RAI TVA Letter dated The drawing provided did not have the 044 7.5.2 7.5.1
(
(
056                                                  April 19, 2010                                                   Date: 5/25/10                                           60. Y         Closed                       Closed               RAI No. 16          TVA Letter dated Sorrento Radiation Monitoring S
C February 25, 2010 Date: 5/25/10
i
: 48. Y Closed Closed EICB RAI TVA Letter dated 045
(
(
057  7.5.2    7.5.1                                  4/19/2010                                                         Responder: TVA I&C Staff                Date: 5/25/10   61. Y         Closed                       Closed               RAI No. 17          TVA Letter dated S
C February 25, 2010 Date: 5/25/10
i
: 49. Y Closed Closed EICB RAI TVA Letter dated 046
(
(
058  7.5.0    7.5                                  April 19, 2010                                                    Date: 5/25/10                                            62. Y        Closed                        Closed              RAI No. 18          TVA Letter dated S
C February 25, 2010 Date: 5/25/10
i
: 50. Y Closed Closed N/A - Request for N/A 047 7.5.2 7.5.1
( ( ( ( ( ( ( ( ( ( ( ( ( ( (
059  7.5.2    7.5.1                                  April 19, 2010                                                    Date:                                                    63. Y        Closed                        Closed              RAI No. 19          TVA Letter dated 060  7.5.2    7.5.1                                  April 19, 2010                                                   Date: 5/25/10                                           64. Y        Closed                        Closed              N/A                N/A                Addressed by Open Item No. 47 061  7.5.2    7.5.1                                  April 19, 2010                                                    Date: 5/25/10                                            65. Y        Closed                        Closed              N/A                N/A                Addressed by Open Item No. 48
( (
062  7.5.2    7.5.1                                  April 19, 2010                                                    Date: 5/25/10                                            66. Y        Closed                        Closed              N/A                N/A                Addressed by Open Item No. 49 063  7.5.2    7.5.1                                  April 19, 2010                                                    Date: 5/25/10                                            67. Y        Closed                        Closed              N/A                N/A                Addressed by Open Item No. 50 064  7.5.2    7.5.1                                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: Webb    Date: 4/8/2010                      68. Y         Closed                       Closed               N/A - No question  TVA Letter dated C C C C C C C C C C C C C C S 065  7.5.2    7.5.1                                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC            Date: 5/25/10                69. Y        Closed                        Closed              N/A - No question  TVA Letter dated 066  7.5.2   7.5.1                                 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                  Date: 5/25/10          70. Y        Closed                        Closed              N/A - No question  TVA Letter dated 070  7.5.2    7.5.1                                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC              Date: 5/25/10            71. N        Closed                        Closed              N/A - No question  TVA Letter dated NNC 11/23/10: The dues date in this G G 071  7.5.2    7.5.1                                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC          Date: 5/25/10                72. N        Closed                        Closed              N/A - No question  N/A                NNC 11/23/10: The dues date in this 072  7.5.2    7.5.1                                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC              Date: 5/25/10            73. Y        Closed                        Closed              N/A - No question  N/A i
073  7.5.2    7.5.1                                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC              Date: 5/25/10              74. N        Closed                        Closed              N/A - No question  N/A 075  7.5.2    7.5.1                                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC              Date: 5/25/10              75. N        Closed                        Closed              N/A - No question  N/A 076  7.5.2    7.5.1                                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: Clark            Date: 5/25/10            76. Y        Closed                        Closed              N/A - No question  N/A 077  7.5.2    7.5.1                                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                  Date: 5/25/10          77. Y        Closed                        Closed              N/A - No question  TVA Letter dated 078                                                  4/26/2010                                                        Responder: Clark                  Date: 5/25/10          78. Y        Closed                        Closed              EICB RAI            TVA Letter dated 079                                                  4/26/2010                                                        Responder: Clark                    Date: 5/25/10        79. Y        Closed                        Closed              EICB RAI            TVA Letter dated Reviewed under Item 154
( ( ( ( (
080                                                  4/26/2010                                                        Responder: WEC                                          80. Y        Closed                        Closed              RAI No. 2          TVA Letter dated 082  7.5.2    7.5.1                                  5/6/2010                                                          Responder: WEC                        Date: 6/18/10      81. N        Closed                        Closed              EICB RAI            TVA Letter dated NNC 11/18/10: See also Open Item No.
083  7.5.2    7.5.1      C C C C S                  May 6, 2010                                                      Date: 6/18/10                                            82. Y        Closed                        Closed              EICB RAI            TVA Letter dated 084  7.5.2    7.5.1                                  May 6, 2010                                                      Date: 6/18/10                                            83. Y        Closed                        Closed              EICB RAI            TVA Letter dated i
085  7.5.2    7.5.1                                  5/6/2010                                                          Responder: WEC                                          84. N        Closed                        Closed              EICB RAI
(
(
087  7.5.2   7.5.1                                 May 6, 2010                                                       Date: 5/24/10                                           85. Y         Closed                       Closed               RAI No. 20          TVA Letter dated S
C 4/8/2010 Responder: WEC/Hilmes Date: 5/25/10
i 088  7.5.2   7.5.1                                 May 6, 2010                                                       Date: 5/24/10                                           86. Y         Closed                       Closed               RAI No. 21          TVA Letter dated
: 51. Y Closed Closed EICB RAI TVA Letter dated 048 7.5.2 7.5.1
(
C April 8, 2010 Date: 5/25/10
: 52. Y Closed Closed EICB RAI TVA Letter dated 049 7.5.2 7.5.1
(
C 4/8/2010 Responder: WEC Date: 5/25/10
: 53. Y Closed Closed EICB RAI TVA Letter dated 050 7.5.2 7.5.1
(
C 4/8/2010 Responder: WEC Date: 5/25/10
: 54. N Closed Closed EICB RAI TVA Letter dated NNC 11/18/10: SysRS Rev. 2 contains 051
(
G April 15, 2010 Date: 5/25/10
: 55. Y Closed Closed N/A N/A Review addressed by another Open 052 7.5.2 7.5.1
(
S i
April 19, 2010 Date: 5/25/10
: 56. Y Closed Closed RAI No. 12 053 7.5.2 7.5.1
(
S i
April 19, 2010 Date: 5/25/10
: 57. Y Closed Closed RAI No. 13 054 7.5.2 7.5.1
(
S i
4/19/2010 Responder: Slifer/Clark Date: 5/25/10
: 58. Y Closed Closed RAI No. 14 TVA Letter dated 055 7.5.2 7.5.1
(
S i
4/19/2010 Responder: Slifer/Clark Date: 5/25/10
: 59. Y Closed Closed RAI No. 15 TVA Letter dated 056
(
S i
April 19, 2010 Date: 5/25/10
: 60. Y Closed Closed RAI No. 16 TVA Letter dated Sorrento Radiation Monitoring 057 7.5.2 7.5.1
(
S i
4/19/2010 Responder: TVA I&C Staff Date: 5/25/10
: 61. Y Closed Closed RAI No. 17 TVA Letter dated 058 7.5.0 7.5
(
S i
April 19, 2010 Date: 5/25/10
: 62. Y Closed Closed RAI No. 18 TVA Letter dated 059 7.5.2 7.5.1
(
(
S i
S i
April 19, 2010 Date:
: 63. Y Closed Closed RAI No. 19 TVA Letter dated 060 7.5.2 7.5.1
(
C April 19, 2010 Date: 5/25/10
: 64. Y Closed Closed N/A N/A Addressed by Open Item No. 47 061 7.5.2 7.5.1
(
C April 19, 2010 Date: 5/25/10
: 65. Y Closed Closed N/A N/A Addressed by Open Item No. 48 062 7.5.2 7.5.1
(
C April 19, 2010 Date: 5/25/10
: 66. Y Closed Closed N/A N/A Addressed by Open Item No. 49 063 7.5.2 7.5.1
(
C April 19, 2010 Date: 5/25/10
: 67. Y Closed Closed N/A N/A Addressed by Open Item No. 50 064 7.5.2 7.5.1
(
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: Webb Date: 4/8/2010
: 68. Y Closed Closed N/A - No question TVA Letter dated 065 7.5.2 7.5.1
(
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: WEC Date: 5/25/10
: 69. Y Closed Closed N/A - No question TVA Letter dated 066 7.5.2 7.5.1
(
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: WEC Date: 5/25/10
: 70. Y Closed Closed N/A - No question TVA Letter dated 070 7.5.2 7.5.1
(
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: WEC Date: 5/25/10
: 71. N Closed Closed N/A - No question TVA Letter dated NNC 11/23/10: The dues date in this 071 7.5.2 7.5.1
(
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: WEC Date: 5/25/10
: 72. N Closed Closed N/A - No question N/A NNC 11/23/10: The dues date in this 072 7.5.2 7.5.1
(
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: WEC Date: 5/25/10
: 73. Y Closed Closed N/A - No question N/A 073 7.5.2 7.5.1
(
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: WEC Date: 5/25/10
: 74. N Closed Closed N/A - No question N/A 075 7.5.2 7.5.1
(
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: WEC Date: 5/25/10
: 75. N Closed Closed N/A - No question N/A 076 7.5.2 7.5.1
(
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: Clark Date: 5/25/10
: 76. Y Closed Closed N/A - No question N/A 077 7.5.2 7.5.1
(
C By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal Responder: WEC Date: 5/25/10
: 77. Y Closed Closed N/A - No question TVA Letter dated 078
(
G 4/26/2010 Responder: Clark Date: 5/25/10
: 78. Y Closed Closed EICB RAI TVA Letter dated 079
(
G 4/26/2010 Responder: Clark Date: 5/25/10
: 79. Y Closed Closed EICB RAI TVA Letter dated Reviewed under Item 154 080
(
S i
4/26/2010 Responder: WEC
: 80. Y Closed Closed RAI No. 2 TVA Letter dated 082 7.5.2 7.5.1
(
C 5/6/2010 Responder: WEC Date: 6/18/10
: 81. N Closed Closed EICB RAI TVA Letter dated NNC 11/18/10: See also Open Item No.
083 7.5.2 7.5.1
(
C May 6, 2010 Date: 6/18/10
: 82. Y Closed Closed EICB RAI TVA Letter dated 084 7.5.2 7.5.1
(
C May 6, 2010 Date: 6/18/10
: 83. Y Closed Closed EICB RAI TVA Letter dated 085 7.5.2 7.5.1
(
C 5/6/2010 Responder: WEC
: 84. N Closed Closed EICB RAI 087 7.5.2 7.5.1
(
S i
May 6, 2010 Date: 5/24/10
: 85. Y Closed Closed RAI No. 20 TVA Letter dated 088 7.5.2 7.5.1
(
S i
May 6, 2010 Date: 5/24/10
: 86. Y Closed Closed RAI No. 21 TVA Letter dated


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                               radE4C39.docx                                                                               Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR            NRC No.                                                            Issue                      TVA Response(s)                    Acceptable       Status/ Current Actions     Resolution Path     RAI No. & Date       RAI Resp. Date                 Comments Sec.      Sec.          POC                                                                                              Y/N
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 089
( ( ( (    (
089                                           5/6/2010                Responder: Clark                                      87. Y        Closed                        Closed              EICB RAI              TVA Letter dated NNC: Docketed response states that 090                                            5/6/2010                Responder: Clark              Date: 5/25/10          88. Y        Closed                        Closed              EICB RAI              TVA Letter dated 091    7.4      7.4                          May 20, 2010            Date: 5/25/10                                        89. Y        Closed                        Closed              EICB RAI No.1        TVA Letter dated D D D D    D ( (
093                                            May 20, 2010            Date: 5/25/10                                        90. Y        Closed                        Closed              N/A                  N/A                Will be reviewed under item 154
( (
094                                            5/20/2010                Responder: Clark              Date: 5/25/10          91. Y        Closed                        Closed              N/A                  N/A                Information was found in FSAR a a a a    a C C 095    7.8.1,    XX                          May 20, 2010            Date:                                                92. Y        Closed                        Closed              EICB RAI No. 2        TVA Letter dated G G 096    7.7.5      XX                          5/20/2010                Responder:                                            93. Y        Closed                        Closed              EICB RAI No.3        TVA Letter dated 097    7.4.2      7.4                          May 20, 2010            Date:                                                94. Y        Closed                        Closed              EICB RAI No.4        TVA Letter dated 098    7.4.2      7.4                          May 25, 2010            Date:                                                95. Y        Closed                        Closed              EICB RAI No.5        TVA Letter dated 099                                            April 12, 2010          Date:                                                96. Y        Closed                        Closed                                                        Closed to Item 129
( (
(
(
100                                           5/20/2010               Responder: WEC                                       97. Y         Closed                       Closed               N/A - No question     N/A 102                         D D ( (            May 24, 2010             Date: 5/24/10                                         98. Y         Closed                       Closed               N/A                   TVA Letter dated Request for schedule not information.
C 5/6/2010 Responder: Clark
103     7.4       7.4     (         B          5/27/2010               Responder: Ayala           Date: 5/27/10             99. Y         Closed                       Closed               EICB RAI No.1         TVA Letter dated Submittal date is based on current a a C C G        a 104     7.4       7.4                         5/27/2010               Responder: Merten           Date: 5/27/10           100. Y       Closed                       Closed               EICB RAI No.1         TVA Letter dated Submittal date is based on current 105                                           April 29, 2010           Date:                                                 101. Y       Closed                       Closed               N/A                   N/A             Will be reviewed under item 154.
: 87. Y Closed Closed EICB RAI TVA Letter dated NNC: Docketed response states that 090
106                                           May 6, 2010             Date: 5/25/10                                         102. Y       Closed                       Closed               RAI No. 9             TVA Letter dated
(
C 5/6/2010 Responder: Clark Date: 5/25/10
: 88. Y Closed Closed EICB RAI TVA Letter dated 091 7.4 7.4
(
D a
May 20, 2010 Date: 5/25/10
: 89. Y Closed Closed EICB RAI No.1 TVA Letter dated 093
(
G May 20, 2010 Date: 5/25/10
: 90. Y Closed Closed N/A N/A Will be reviewed under item 154 094
(
G 5/20/2010 Responder: Clark Date: 5/25/10
: 91. Y Closed Closed N/A N/A Information was found in FSAR 095 7.8.1, XX
(
D a
May 20, 2010 Date:
: 92. Y Closed Closed EICB RAI No. 2 TVA Letter dated 096 7.7.5 XX
(
D a
5/20/2010 Responder:
: 93. Y Closed Closed EICB RAI No.3 TVA Letter dated 097 7.4.2 7.4
(
D a
May 20, 2010 Date:
: 94. Y Closed Closed EICB RAI No.4 TVA Letter dated 098 7.4.2 7.4
(
D a
May 25, 2010 Date:
: 95. Y Closed Closed EICB RAI No.5 TVA Letter dated 099
(
B a
April 12, 2010 Date:
: 96. Y Closed Closed Closed to Item 129 100
(
C 5/20/2010 Responder: WEC
: 97. Y Closed Closed N/A - No question N/A 102
(
C May 24, 2010 Date: 5/24/10
: 98. Y Closed Closed N/A TVA Letter dated Request for schedule not information.
103 7.4 7.4
(
D a
5/27/2010 Responder: Ayala Date: 5/27/10
: 99. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 104 7.4 7.4
(
D a
5/27/2010 Responder: Merten Date: 5/27/10 100. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 105
(
G April 29, 2010 Date:
101. Y Closed Closed N/A N/A Will be reviewed under item 154.
106
(
S i
May 6, 2010 Date: 5/25/10 102. Y Closed Closed RAI No. 9 TVA Letter dated 107
(
(
S i
S i
107                                            May 6, 2010             Date: 5/28/10                                         103. Y       Closed                       Closed               RAI No. 22           TVA Letter dated
May 6, 2010 Date: 5/28/10 103. Y Closed Closed RAI No. 22 TVA Letter dated 108
(                (
108                                           May 6, 2010              Date: 5/25/10                                        104. Y        Closed                        Closed              N/A                  N/A                Will be reviewed under OI#154 109.                                          5/6/2010                Responder: N/A                                        105. Y        Closed                        Closed              N/A                  N/A                Duplicate of another open Item.
109. 7.8      XX                          5/6/2010                Responder: N/A                                        106. Y        Closed                        Closed              N/A                  N/A D    (      (  D (  (
110                                            May 6, 2010              Date:                                                107. Y        Closed                        Closed              N/A                  N/A              Information was found.
( (  ( ( (  (    (
111                                            May 6, 2010              Date: 5/28/10                                        108. Y        Closed                        Closed              N/A                  TVA Letter dated Request to help find, not a request for 112                                            June 1, 2010            Date:                                                109. Y        Closed                        Closed              N/A                  N/A                Information was received a    C      C  a C  S 113                                            6/1/2010                Responder: Clark                                      110. Y        Closed                        Closed              EICB RAI              TVA Letter dated G G  G G G  G    G 114    7.2      7.2                          6/1/2010                Responder: WEC                                        111. Y        Close                        Closed              EICB RAI              TVA Letter dated 115                                            2/25/2010                Responder: Clark                                      112. Y        Closed                        Closed              EICB RAI              TVA Letter dated i
116                                            6/3/2010                Responder: WEC                                        113. Y        Closed                        Closed              EICB RAI              TVA Letter dated Letter sent to Westinghouse requesting 117    7.1      7.1                          6/3/2010                Responder: Hilmes                                    114. Y        Closed                        Closed              EICB RAI              TVA Letter dated 118    7.4      7.4                          6/8/2010                Responder: Merten                                    115. Y        Closed                        Closed              EICB RAI No.1        TVA Letter dated Submittal date is based on current
( ( ( (
119                                            June 10, 2010            Date:                                                116. Y        Closed                        Closed              RAI No. 23            TVA Letter dated 120                                            5/6/2010                Responder: Hilmes/Merten/Costley                      117. Y        Closed                        Closed              EICB RAI              TVA Letter dated 121                                            5/6/2010                Responder: Webb/Webber                                118. Y        Closed                        Closed              EICB RAI              TVA Letter dated D D D D ( ( ( (
122                                            June 14, 2010            Date:                                                119. Y        Closed                        Closed              N/A - Request for    N/A
( (
123    7.7.3    7.4.1,                        6/14/2010                Responder:                                            120. Y        Closed                        Closed              ML101720589,          TVA Letter dated a a a a C C C S 124    7.7.5      XX                          6/14/2010                Responder:                                            121. Y        Closed                        Closed              ML101720589, Item TVA Letter dated G G 125    7.7.8    7.7.1.12                      6/14/2010                Responder:                                            122. Y        Closed                        Closed              ML101720589, Item TVA Letter dated 126    7.8      7.8                          June 14, 2010            Date:                                                123. Y        Closed                        Closed              ML101720589, Item TVA Letter dated i
127    7.2      7.2                          6/16/2010                Responder: WEC/Clark                                  124. Y        Closed                        Closed              EICB RAI              TVA Letter dated 128    7.2      7.2                          6/18/2010                Responder: WEC Drake /TVA Craig                      125. Y        Closed                        Closed              EICB RAI              TVA Letter dated Track through SE open item
(
(
129                            P              6/12/2010                Responder: WEC                                        126. Y       Closed                       Closed               N/A                   TVA Letter dated
G May 6, 2010 Date: 5/25/10 104. Y Closed Closed N/A N/A Will be reviewed under OI#154 109.
(
(
130                            P              6/28/2010               Responder: Clark                                      127. Y       Closed                       Closed               N/A                   TVA Letter dated
C 5/6/2010 Responder: N/A 105. Y Closed Closed N/A N/A Duplicate of another open Item.
109.
7.8 XX
(
(
131                            P              6/28/2010               Responder: Clark                                      128. Y       Closed                       Closed               N/A                   TVA Letter dated
D a
5/6/2010 Responder: N/A 106. Y Closed Closed N/A N/A 110
(
(
132                             P             6/28/2010               Responder: Clark                                     129. Y       Closed                       Closed               N/A                   TVA Letter dated
G May 6, 2010 Date:
107. Y Closed Closed N/A N/A Information was found.
111
(
C May 6, 2010 Date: 5/28/10 108. Y Closed Closed N/A TVA Letter dated Request to help find, not a request for 112
(
G June 1, 2010 Date:
109. Y Closed Closed N/A N/A Information was received 113
(
G 6/1/2010 Responder: Clark 110. Y Closed Closed EICB RAI TVA Letter dated 114 7.2 7.2
(
G 6/1/2010 Responder: WEC 111. Y Close Closed EICB RAI TVA Letter dated 115
(
C 2/25/2010 Responder: Clark 112. Y Closed Closed EICB RAI TVA Letter dated 116
(
G 6/3/2010 Responder: WEC 113. Y Closed Closed EICB RAI TVA Letter dated Letter sent to Westinghouse requesting 117 7.1 7.1
(
G 6/3/2010 Responder: Hilmes 114. Y Closed Closed EICB RAI TVA Letter dated 118 7.4 7.4
(
D a
6/8/2010 Responder: Merten 115. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 119
(
S i
June 10, 2010 Date:
116. Y Closed Closed RAI No. 23 TVA Letter dated 120
(
C 5/6/2010 Responder: Hilmes/Merten/Costley 117. Y Closed Closed EICB RAI TVA Letter dated 121
(
C 5/6/2010 Responder: Webb/Webber 118. Y Closed Closed EICB RAI TVA Letter dated 122
(
C June 14, 2010 Date:
119. Y Closed Closed N/A - Request for N/A 123 7.7.3 7.4.1,
(
D a
6/14/2010 Responder:
120. Y Closed Closed ML101720589, TVA Letter dated 124 7.7.5 XX
(
D a
6/14/2010 Responder:
121. Y Closed Closed ML101720589, Item TVA Letter dated 125 7.7.8 7.7.1.12
(
D a
6/14/2010 Responder:
122. Y Closed Closed ML101720589, Item TVA Letter dated 126 7.8 7.8
(
D a
June 14, 2010 Date:
123. Y Closed Closed ML101720589, Item TVA Letter dated 127 7.2 7.2
(
G 6/16/2010 Responder: WEC/Clark 124. Y Closed Closed EICB RAI TVA Letter dated 128 7.2 7.2
(
G 6/18/2010 Responder: WEC Drake /TVA Craig 125. Y Closed Closed EICB RAI TVA Letter dated Track through SE open item 129
(
P 6/12/2010 Responder: WEC 126. Y Closed Closed N/A TVA Letter dated 130
(
P 6/28/2010 Responder: Clark 127. Y Closed Closed N/A TVA Letter dated 131
(
P 6/28/2010 Responder: Clark 128. Y Closed Closed N/A TVA Letter dated 132
(
P 6/28/2010 Responder: Clark 129. Y Closed Closed N/A TVA Letter dated  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                                   radE4C39.docx                                                                             Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR              NRC No.                                                                                            Issue                                                    TVA Response(s)            Acceptable       Status/ Current Actions     Resolution Path     RAI No. & Date     RAI Resp. Date               Comments Sec.       Sec.             POC                                                                                                                                                  Y/N
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 133
(
P 6/28/2010 Responder: Clark 130. Y Closed Closed TVA Letter dated 134
(
P 6/28/2010 Responder: Clark 131. Y Closed Closed TVA Letter dated 135 7.3.1 7.3.1
(
D a
6/30/2010 Responder: Clark 132. Y Closed Closed RAI not necessary TVA Letter dated 136 7.3.2, 7.4, 5.6,
(
D a
6/30/2010 Responder: Clark 133. Y Closed Closed RAI not necessary TVA Letter dated 137
(
C Several WBN2 PAMS documents contain a table titled, Document Responder: WEC 134. Y Closed Closed ML101650255, Item TVA Letter dated 139
(
C The WBN2 PAMS System Requirements Specification (WBN2 Responder: WEC 135. Y Closed Closed ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements 140
(
C The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1)
Responder: Clark 136. N Closed Closed ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements 141
(
C Deleted by DORL Date:
137. Y Closed Closed ML101650255, Item WBN2 PAMS System Requirements 146
(
C 6/17/2010 Responder:
138. Y Closed Closed ML101650255, Item PAMS System Requirements 147
(
C 6/17/2010 Responder:
139. Y Closed Closed ML101650255, Item PAMS System Requirements 148
(
C 6/17/2010 Responder:
140. Y Closed Closed ML101650255, Item PAMS System Requirements 149 7.2 7.2
(
G FSAR Section 7.1.1.2(2), Overtemperature delta T and Responder: Tindell 141. Y Close Closed ML101720589, Item TVA Letter dated 150 7.2 7.2
(
G Many of the changes were based on the Westinghouse document Responder: Clark 142. Y Close Closed ML101720589, Item TVA Letter dated 151 7.2 7.2
(
G Provide the EDCR 52378 and 54504 which discusses the basis for Responder: Clark 143. Y Close Closed ML101720589, Item TVA Letter dated 152 7.2 7.2
(
G Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR Responder: Merten/Clark 144. Y Close Closed ML101720589, Item TVA Letter dated 153 7.2 7.2
(
G FSAR section 7.2.1.1.7 added the reference to FSAR section Responder: Craig/Webb 145. Y Close Closed ML101720589, Item TVA Letter dated 154 7.2 7.2
(
G FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS Responder: Craig/Webb 146. Y Closed Closed ML101720589, Item TVA Letter dated EICB RAI ML102861885 sent to DORL 155 7.2 7.2
(
G Summary of FSAR change document section 7.2 states that Date:
147. Y Closed Closed ML101720589, Item 156 7.2 7.2
(
G FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1-Responder: WEC 148. Y Closed Closed ML101720589, Item TVA Letter dated Response on hold pending 157 7.2 7.2
(
G FSAR section 7.2.2.1.1, fifth paragraph was deleted except for the Responder: Tindell 149. Y Close Closed ML101720589, Item TVA Letter dated 158 7.2 7.2
(
(
133                            P                              6/28/2010                                                          Responder: Clark                              130. Y        Closed                        Closed                                  TVA Letter dated
G FSAR section 7.2.2.1.1, paragraph six was changed to state that Responder: Tindell 150. Y Closed Closed ML101720589, Item TVA Letter dated 159 7.2 7.2
( (
(
134                                                            6/28/2010                                                          Responder: Clark                              131. Y        Closed                        Closed                                  TVA Letter dated 135  7.3.1    7.3.1                                          6/30/2010                                                          Responder: Clark                              132. Y        Closed                        Closed              RAI not necessary TVA Letter dated 136  7.3.2,  7.4, 5.6,                                        6/30/2010                                                          Responder: Clark                              133. Y        Closed                        Closed              RAI not necessary TVA Letter dated 137                                                            Several WBN2 PAMS documents contain a table titled, Document Responder: WEC                                      134. Y        Closed                        Closed              ML101650255, Item TVA Letter dated
G FSAR section 7.2.2.1.2 discusses reactor coolant flow Responder: Craig 151. Y Close Closed ML101720589, Item TVA Letter dated 160 7.2 7.2
( ( ( ( ( ( ( D D (
(
139                                                            The WBN2 PAMS System Requirements Specification (WBN2              Responder: WEC                                135. Y        Closed                        Closed              ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements 140                                                            The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1)        Responder: Clark                              136. N        Closed                        Closed              ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements 141                                                            Deleted by DORL                                                    Date:                                          137. Y        Closed                        Closed              ML101650255, Item                      WBN2 PAMS System Requirements C C C C C C C a a P 146                                                            6/17/2010                                                          Responder:                                    138. Y        Closed                        Closed              ML101650255, Item                      PAMS System Requirements 147                                                            6/17/2010                                                          Responder:                                    139. Y        Closed                        Closed              ML101650255, Item                      PAMS System Requirements 148                                                            6/17/2010                                                          Responder:                                    140. Y        Closed                        Closed              ML101650255, Item                      PAMS System Requirements
G FSAR section 7.2.2.2(7) deleted text which has references 12 and Responder: Tindell 152. Y Close Closed ML101720589, Item TVA Letter dated 161 7.2 7.2
( ( ( ( ( ( ( ( ( ( ( ( ( ( (
(
149    7.2      7.2                                            FSAR Section 7.1.1.2(2), Overtemperature delta T and                Responder: Tindell                            141. Y        Close                        Closed              ML101720589, Item TVA Letter dated 150    7.2      7.2                                            Many of the changes were based on the Westinghouse document Responder: Clark                                      142. Y        Close                        Closed              ML101720589, Item TVA Letter dated 151    7.2      7.2                                            Provide the EDCR 52378 and 54504 which discusses the basis for Responder: Clark                                    143. Y        Close                        Closed              ML101720589, Item TVA Letter dated 152    7.2      7.2                                            Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR        Responder: Merten/Clark                        144. Y        Close                        Closed              ML101720589, Item TVA Letter dated 153    7.2      7.2                                            FSAR section 7.2.1.1.7 added the reference to FSAR section          Responder: Craig/Webb                          145. Y        Close                        Closed              ML101720589, Item TVA Letter dated 154    7.2      7.2                                            FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS        Responder: Craig/Webb                          146. Y        Closed                        Closed              ML101720589, Item TVA Letter dated EICB RAI ML102861885 sent to DORL 155    7.2      7.2                                            Summary of FSAR change document section 7.2 states that            Date:                                          147. Y        Closed                        Closed              ML101720589, Item 156    7.2      7.2                                            FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1-    Responder: WEC                                148. Y        Closed                        Closed              ML101720589, Item TVA Letter dated Response on hold pending G G G G G G G G G G G G G G G 157    7.2      7.2                                            FSAR section 7.2.2.1.1, fifth paragraph was deleted except for the Responder: Tindell                              149. Y        Close                        Closed              ML101720589, Item TVA Letter dated 158    7.2      7.2                                            FSAR section 7.2.2.1.1, paragraph six was changed to state that     Responder: Tindell                             150. Y       Closed                       Closed               ML101720589, Item TVA Letter dated 159   7.2       7.2                                           FSAR section 7.2.2.1.2 discusses reactor coolant flow               Responder: Craig                               151. Y       Close                         Closed               ML101720589, Item TVA Letter dated 160   7.2       7.2                                           FSAR section 7.2.2.2(7) deleted text which has references 12 and Responder: Tindell                               152. Y       Close                         Closed               ML101720589, Item TVA Letter dated 161   7.2       7.2                                           FSAR section 7.2.2.3 states that changes to the control function   Responder: Clark                               153. Y       Closed                       Closed               ML101720589, Item TVA Letter dated 162   7.2       7.2                                           FSAR section 7.2.2.2(14) states that bypass of a protection         Responder: Tindell                             154. Y       Closed                       Closed               ML101720589, Item TVA Letter dated 163   7.2       7.2                                           Deleted by DORL                                                     Date:                                         155. Y       Closed                       Closed               ML101720589, Item 164   7.2       7.2                                           FSAR section 7.2.2.2(20) has been revised to include the plant     Responder: Perkins                             156. Y       Closed                       Closed               ML101720589, Item TVA Letter dated Item No. 8 sent to DORL a
G FSAR section 7.2.2.3 states that changes to the control function Responder: Clark 153. Y Closed Closed ML101720589, Item TVA Letter dated 162 7.2 7.2
165   7.2       7.2                                           FSAR section 7.2.2.3.2, last paragraph of this section has been     Responder: Clark                               157. Y       Closed                       Closed               ML101720589, Item TVA Letter dated 166   7.2       7.2                                           Changes to FSAR section 7.2.2.2(20) are justified based on the     Responder: Clark                               158. Y       Closed                       Closed               ML101720589, Item TVA Letter dated
(
( (
G FSAR section 7.2.2.2(14) states that bypass of a protection Responder: Tindell 154. Y Closed Closed ML101720589, Item TVA Letter dated 163 7.2 7.2
167   7.2       7.2                                           FSAR section 7.2.2.4, provide an analysis or reference to chapter Responder: Clark                                 159. Y       Close                         Closed               ML101720589, Item TVA Letter dated 168   7.2       7.2                                           FSAR table 7.2-4, item 9 deleted loss of offsite power to station   Responder: Clark                               160. Y       Close                         Closed               ML101720589, Item TVA Letter dated
(
( (                            r 169                                                            6/18/2010                                                           Responder: Clark                               161. Y       Closed                       Closed 170                                                             6/17/2010                                                           Responder: Clark                               162. Y       Closed                       Closed M M ( ( ( ( ( ( ( ( ( ( ( (
G Deleted by DORL Date:
171   7.2       7.2                                           6/17/2010                                                           Responder: Craig                               163. Y       Closed                       Closed               EICB RAI           TVA Letter dated Closed to SE Open Item 172                                                             6/17/2010                                                           Responder: Craig                               164. Y       Closed                       Closed               EICB RAI C C                            g 173   7.1       7.1                                           6/17/2010                                                           Responder: Craig/Webb/Powers                   165. Y       Closed                       Closed               EICB RAI 174                                                             6/28/2010                                                           Responder: Hilmes/Craig                       166. Y       Closed                       Closed               EICB RAI a a G G G G G G G G G G G G 175                                                            June 28, 2010                                                       Responder:                                     167. Y       Closed                       Closed               EICB RAI 176   7.1       7.1                                           6/28/2010                                                           Responder: Craig/Webb                         168. Y       Closed                       Closed               EICB RAI l
155. Y Closed Closed ML101720589, Item 164 7.2 7.2 a
177   7.5.2. 7.5.1                                           7/15/2010                                                           Responder: Clark                               169. Y       Closed                       Closed               N/A                 TVA Letter dated RAI not required 178   7.5.2. 7.5.1                                           7/15/2010                                                           Responder: Clark                               170. Y       Closed                       Closed               N/A                 TVA Letter dated RAI not required 179                                                             An emphasis is placed on traceability in System Requirements       Responder: WEC                                 171. Y       Closed                       Closed               N/A - Closed to     NA 180                                                             The SRP, BTP 7-14, Section B.3.3.1 states that Regulatory Guide Responder: WEC                                     172. Y       Closed                       Closed               N/A - Closed to     NA
r g
l FSAR section 7.2.2.2(20) has been revised to include the plant Responder: Perkins 156. Y Closed Closed ML101720589, Item TVA Letter dated Item No. 8 sent to DORL 165 7.2 7.2
(
G FSAR section 7.2.2.3.2, last paragraph of this section has been Responder: Clark 157. Y Closed Closed ML101720589, Item TVA Letter dated 166 7.2 7.2
(
G Changes to FSAR section 7.2.2.2(20) are justified based on the Responder: Clark 158. Y Closed Closed ML101720589, Item TVA Letter dated 167 7.2 7.2
(
G FSAR section 7.2.2.4, provide an analysis or reference to chapter Responder: Clark 159. Y Close Closed ML101720589, Item TVA Letter dated 168 7.2 7.2
(
G FSAR table 7.2-4, item 9 deleted loss of offsite power to station Responder: Clark 160. Y Close Closed ML101720589, Item TVA Letter dated 169
(
G 6/18/2010 Responder: Clark 161. Y Closed Closed 170
(
G 6/17/2010 Responder: Clark 162. Y Closed Closed 171 7.2 7.2
(
G 6/17/2010 Responder: Craig 163. Y Closed Closed EICB RAI TVA Letter dated Closed to SE Open Item 172
(
G 6/17/2010 Responder: Craig 164. Y Closed Closed EICB RAI 173 7.1 7.1
(
G 6/17/2010 Responder: Craig/Webb/Powers 165. Y Closed Closed EICB RAI 174
(
G 6/28/2010 Responder: Hilmes/Craig 166. Y Closed Closed EICB RAI 175
(
G June 28, 2010 Responder:
167. Y Closed Closed EICB RAI 176 7.1 7.1
(
G 6/28/2010 Responder: Craig/Webb 168. Y Closed Closed EICB RAI 177 7.5.2.
7.5.1
(
M a
7/15/2010 Responder: Clark 169. Y Closed Closed N/A TVA Letter dated RAI not required 178 7.5.2.
7.5.1
(
M a
7/15/2010 Responder: Clark 170. Y Closed Closed N/A TVA Letter dated RAI not required 179
(
C An emphasis is placed on traceability in System Requirements Responder: WEC 171. Y Closed Closed N/A - Closed to NA 180
(
C The SRP, BTP 7-14, Section B.3.3.1 states that Regulatory Guide Responder: WEC 172. Y Closed Closed N/A - Closed to NA  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                     radE4C39.docx                                                                                 Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR            NRC No.                                                                              Issue                                                    TVA Response(s)            Acceptable       Status/ Current Actions     Resolution Path     RAI No. & Date       RAI Resp. Date                 Comments Sec.       Sec.           POC                                                                                                                                      Y/N
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 181
(
C An emphasis is placed on traceability in System Requirements Responder: WEC 173. Y Closed Closed N/A - Closed to NA 182
(
C Characteristics that the SRP states that a Software Requirements Responder: WEC 174. Y Closed Closed N/A - Closed to NA 184
(
C 7/15/2010 Responder: WEC 175. Y Closed Closed N/A - Closed to N/A 186 7.7.8 7.7.1.12
(
D a
7/15/2010 Responder: Perkins/Clark 176. Y Closed Closed EICB RAI No.6 TVA Letter dated 187
(
C By {{letter dated|date=June 18, 2010|text=letter dated June 18, 2010}}, TVA docketed responses to NRC Responder: Merten 177. N Closed Closed ML101970033, Item TVA Letter dated Are these connections already 188
(
C By {{letter dated|date=June 30, 2010|text=letter dated June 30, 2010}}, TVA docketed, Tennessee Valley Responder: Clark 178. Y Closed Closed ML101970033, Item TVA Letter dated 189 7.6.7
(
S i
7/20/2010 Responder: Clark 179. Y Closed Closed RAI No. 3 TVA Letter dated 190 7.9
(
S i
FSAR Table 7.1-1 states: Regulatory Guide 1.133, May 1981 Responder: Clark 180. Y Closed Closed RAI No. 4 TVA Letter dated Closed to OI-331.
191 7.9
(
C NUREG-0800 Chapter 7, Section 7.9, "Data Communication Responder: Jimmie Perkins 181. Y Closed Closed ML10197016, Item TVA Letter dated 192 7.5.1.
7.5.2
(
M a
The NRC Staff is using SRP (NUREG-0800) Chapter 7 Section Responder: Clark 182. Y Closed Closed Item No. 1 sent to TVA Letter dated EICB RAI ML1028618855 sent to 193 7.5.1.
7.5.2
(
M a
The WBU2 FSAR, Section 7.5.2, Plant Computer System, Responder: Clark 183. Y Closed Closed Item No. 2 sent to TVA Letter dated EICB RAI ML1028618855 sent to 194 7.5.1.
7.5.2.1
(
M a
The WBU2 FSAR Section 7.5.2.1, Safety Parameter Display Responder: Costley/Norman 184. Y Closed Closed Item No. 3 sent to TVA Letter dated EICB RAI ML1028618855 sent to 195 7.5.1.
7.5.2.2
(
M a
Bypassed and Inoperable Status Indication (BISI)
Responder: Costley/Norman 185. Y Closed Closed Item No. 4 sent to TVA Letter dated EICB RAI ML1028618855 sent to 196 7.5.1.
7.5.2.2
(
M a
Bypassed and Inoperable Status Indication (BISI)
Responder: Costley/Norman 186. Y Closed Closed Item No. 5 sent to TVA Letter dated EICB RAI ML1028618855 sent to 197 X
Open Item 197 was never issued.
187. Y Closed Closed 198 7.5.1.
7.5.2.2
(
M a
SRP Section 7.5, Subsection III, Review Procedures states:
Responder: Costley/Norman 188. Y Closed Closed Item No. 6 sent to TVA Letter dated EICB RAI ML1028618855 sent to 199 7.5.1.
7.5.2.3
(
M a
The WBU2 FSAR Section 7.5.2.3, Technical Support Center and Responder: Costley/Norman 189. Y Closed Closed Item No. 7 sent to TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200 7.2 7/21/2010 Responder: Clark 190. Y Closed Closed EICB RAI TVA Letter dated 201 7.7.1.
7.7.11
(
C 7/21/2010 Responder: Webb 191. Y Closed Closed EICB RAI TVA Letter dated 203 7.5.1.
7.5.2
(
M a
7/26/2010 Responder: Clark 192. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 204 7.5.1.
7.5.2
(
M a
7/26/2010 Responder: Costley/Norman 193. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 205
(
G 7/26/2010 Responder: Clark 194. Y Closed Closed EICB RAI TVA Letter dated Question B related to prior NRC 206 7.5.1.
7.5.2
(
M a
7/27/2010 Responder: Clark 195. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 207
(
C July 27, 2010 Date:
196. Y Closed Closed 208 7.5.2.
7.5.1
(
M a
7/27/2010 Responder: Clark 197. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 209 7.5.2.
7.5.1
(
M a
7/27/2010 Responder: Clark 198. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 210 7.5.2.
7.5.1
(
M a
7/27/2010 Responder: Clark 199. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 211 7.5.1.
(
C 7/27/2010 Responder: Clark 200. Y Closed Closed EICB RAI TVA Letter dated Relates to SE Sections:
214
(
C 7/27/2010 Responder: WEC 201. Y Closed Closed EICB RAI TVA Letter dated 215
(
P 7/29/2010 Responder: WEC 202. Y Closed Closed 216 7.5.1.
7.5.2
(
M a
7/29/2010 Responder: Clark 203. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 217
(
G 7/6/2010 Responder: Clark 204. Y Close Closed EICB RAI TVA Letter dated 218
(
G 7/6/2010 Responder: Clark 205. Y Closed Closed EICB RAI TVA Letter dated 219
(
G 8/4/2010 Responder: TVA Licensing 206. Y Closed Closed EICB RAI 220
(
G 8/4/2010 Responder: Ayala 207. Y Closed Closed EICB RAI TVA Letter dated 221 7.7.1.
7.7.1.3
(
M a
8/4/2010 Responder: Trelease 208. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 222
(
G 8/4/2010 Responder: Clark 209. Y Close Closed EICB RAI TVA Letter dated 223
(
G 8/4/2010 Responder: Clark 210. Y Closed Closed EICB RAI 224 7.5.1.
7.5.2
(
M a
8/4/2010 Responder: Norman (TVA CEG) 211. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 225
(
G 8/4/2010 Responder: Scansen 212. Y Close Closed EICB RAI TVA Letter dated 226
(
C 8/4/2010 Responder: TVA Licensing 213. Y Closed Closed N/A - Information TVA Letter dated See also Open Item Nos. 41 & 270.
227
(
(
181                                                An emphasis is placed on traceability in System Requirements    Responder: WEC                                  173. Y        Closed                        Closed              N/A - Closed to        NA 182                                                Characteristics that the SRP states that a Software Requirements Responder: WEC                                  174. Y        Closed                        Closed              N/A - Closed to        NA
G 8/4/2010 Responder: Clark 214. Y Close Closed EICB RAI TVA Letter dated 228
( ( D ( ( (
184                                                7/15/2010                                                        Responder: WEC                                  175. Y        Closed                        Closed              N/A - Closed to        N/A 186  7.7.8   7.7.1.12                            7/15/2010                                                       Responder: Perkins/Clark                       176. Y       Closed                        Closed               EICB RAI No.6          TVA Letter dated C C a C C C 187                                                By letter dated June 18, 2010, TVA docketed responses to NRC    Responder: Merten                              177. N        Closed                        Closed              ML101970033, Item TVA Letter dated Are these connections already 188                                                By letter dated June 30, 2010, TVA docketed, Tennessee Valley  Responder: Clark                                178. Y        Closed                        Closed              ML101970033, Item TVA Letter dated
(
(
189            7.6.7                              7/20/2010                                                        Responder: Clark                                179. Y        Closed                        Closed              RAI No. 3              TVA Letter dated S
C 8/4/2010 Responder: Clark 215. Y Closed Closed EICB RAI TVA Letter dated  
i
( ( ( ( (
190    7.9                                          FSAR Table 7.1-1 states: Regulatory Guide 1.133, May 1981      Responder: Clark                                180. Y        Closed                        Closed              RAI No. 4              TVA Letter dated Closed to OI-331.
( (
191    7.9                                          NUREG-0800 Chapter 7, Section 7.9, "Data Communication          Responder: Jimmie Perkins                      181. Y        Closed                        Closed              ML10197016, Item TVA Letter dated M M M M M 192  7.5.1. 7.5.2                              The NRC Staff is using SRP (NUREG-0800) Chapter 7 Section        Responder: Clark                                182. Y        Closed                        Closed              Item No. 1 sent to    TVA Letter dated EICB RAI ML1028618855 sent to C S 193  7.5.1. 7.5.2                              The WBU2 FSAR, Section 7.5.2, Plant Computer System,          Responder: Clark                                183. Y        Closed                        Closed              Item No. 2 sent to    TVA Letter dated EICB RAI ML1028618855 sent to a a a a a 194  7.5.1. 7.5.2.1                              The WBU2 FSAR Section 7.5.2.1, Safety Parameter Display        Responder: Costley/Norman                      184. Y        Closed                        Closed              Item No. 3 sent to    TVA Letter dated EICB RAI ML1028618855 sent to i
195  7.5.1. 7.5.2.2                              Bypassed and Inoperable Status Indication (BISI)                Responder: Costley/Norman                      185. Y        Closed                        Closed              Item No. 4 sent to    TVA Letter dated EICB RAI ML1028618855 sent to 196  7.5.1. 7.5.2.2                              Bypassed and Inoperable Status Indication (BISI)                Responder: Costley/Norman                      186. Y        Closed                        Closed              Item No. 5 sent to    TVA Letter dated EICB RAI ML1028618855 sent to 197                      ( (                      Open Item 197 was never issued.                                                                                  187. Y        Closed                        Closed 198  7.5.1. 7.5.2.2    M M X                    SRP Section 7.5, Subsection III, Review Procedures states:    Responder: Costley/Norman                      188. Y        Closed                        Closed              Item No. 6 sent to    TVA Letter dated EICB RAI ML1028618855 sent to a a 199  7.5.1. 7.5.2.3                              The WBU2 FSAR Section 7.5.2.3, Technical Support Center and Responder: Costley/Norman                          189. Y        Closed                        Closed              Item No. 7 sent to    TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200    7.2                                          7/21/2010                                                        Responder: Clark                                190. Y        Closed                        Closed              EICB RAI              TVA Letter dated
( ( (  (  ( (
201  7.7.1. 7.7.11                              7/21/2010                                                        Responder: Webb                                191. Y        Closed                        Closed              EICB RAI              TVA Letter dated 203  7.5.1. 7.5.2                              7/26/2010                                                        Responder: Clark                                192. Y        Closed                        Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL
( (      (        (
204  7.5.1. 7.5.2                              7/26/2010                                                        Responder: Costley/Norman                      193. Y        Closed                        Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL 205                                                7/26/2010                                                        Responder: Clark                                194. Y        Closed                        Closed              EICB RAI              TVA Letter dated Question B related to prior NRC M M M  M ( M M 206  7.5.1. 7.5.2                              7/27/2010                                                        Responder: Clark                                195. Y        Closed                        Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL 207                                                July 27, 2010                                                    Date:                                          196. Y        Closed                        Closed C C      C         C 208  7.5.2. 7.5.1                              7/27/2010                                                        Responder: Clark                                197. Y        Closed                        Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL a a a  a G a a 209  7.5.2. 7.5.1                              7/27/2010                                                        Responder: Clark                                198. Y        Closed                        Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL 210  7.5.2. 7.5.1                              7/27/2010                                                        Responder: Clark                                199. Y        Closed                        Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL 211  7.5.1.                                        7/27/2010                                                        Responder: Clark                                200. Y        Closed                        Closed              EICB RAI              TVA Letter dated Relates to SE Sections:
214                                                7/27/2010                                                        Responder: WEC                                  201. Y        Closed                        Closed              EICB RAI              TVA Letter dated
(    (        (
215                                                7/29/2010                                                        Responder: WEC                                  202. Y        Closed                        Closed 216  7.5.1. 7.5.2                              7/29/2010                                                        Responder: Clark                                203. Y        Closed                        Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL 217                                                7/6/2010                                                        Responder: Clark                                204. Y        Close                        Closed              EICB RAI              TVA Letter dated
(  (                    (
218                                                7/6/2010                                                        Responder: Clark                                205. Y        Closed                        Closed              EICB RAI              TVA Letter dated 219                                                8/4/2010                                                        Responder: TVA Licensing                        206. Y        Closed                        Closed              EICB RAI
(  ( M ( ( M ( ( ( ( M 220                                                8/4/2010                                                        Responder: Ayala                                207. Y        Closed                        Closed              EICB RAI              TVA Letter dated 221  7.7.1. 7.7.1.3                              8/4/2010                                                        Responder: Trelease                            208. Y        Closed                        Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL C  C                    P 222                                                8/4/2010                                                        Responder: Clark                                209. Y        Close                        Closed              EICB RAI              TVA Letter dated 223                                                8/4/2010                                                        Responder: Clark                                210. Y        Closed                        Closed              EICB RAI G  G a G G a G G G G a 224  7.5.1. 7.5.2                              8/4/2010                                                        Responder: Norman (TVA CEG)                    211. Y        Closed                        Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL 225                                                8/4/2010                                                        Responder: Scansen                              212. Y        Close                        Closed              EICB RAI              TVA Letter dated 226                                                8/4/2010                                                        Responder: TVA Licensing                        213. Y        Closed                        Closed              N/A - Information      TVA Letter dated See also Open Item Nos. 41 & 270.
227                                                8/4/2010                                                        Responder: Clark                                214. Y        Close                        Closed              EICB RAI              TVA Letter dated 228                                                8/4/2010                                                         Responder: Clark                               215. Y       Closed                       Closed               EICB RAI               TVA Letter dated


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                 radE4C39.docx                                                                               Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR        NRC No.                                                                    Issue                        TVA Response(s)            Acceptable       Status/ Current Actions     Resolution Path     RAI No. & Date     RAI Resp. Date                 Comments Sec.     Sec.       POC                                                                                                    Y/N 229                        ( (                              8/4/2010           Responder: Clark                               216. Y       Closed                       Closed               EICB RAI             TVA Letter dated
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 229
(
C 8/4/2010 Responder: Clark 216. Y Closed Closed EICB RAI TVA Letter dated 230
(
C 8/4/2010 Responder: Webb 217. Y Closed Closed EICB RAI TVA Letter dated 231
(
G 8/4/2010 Responder: Clark 218. Y Closed Closed EICB RAI TVA Letter dated 232
(
(
230                        C C                              8/4/2010            Responder: Webb                                217. Y        Closed                        Closed              EICB RAI            TVA Letter dated G
S i
231                                                        8/4/2010            Responder: Clark                                218. Y        Closed                        Closed              EICB RAI            TVA Letter dated
8/4/2010 Responder: Clark 219. Y Closed Closed RAI No. 5 TVA Letter dated 233
( ( (    ( ( (
232                                                        8/4/2010           Responder: Clark                               219. Y       Closed                       Closed               RAI No. 5           TVA Letter dated 233                                                         8/4/2010            Responder: Clark                                220. Y        Closed                        Closed              EICB RAI            TVA Letter dated
(      ( (
234                                                        8/4/2010            Responder:                                      221. Y        Closed                        Closed              N/A - Duplicate      N/A C C C    C C S 235                                                        8/4/2010            Responder: TVA Licensing                        222. Y        Closed                        Closed              N/A                  N/A 236                                                        8/4/2010            Responder: Clark                                223. Y        Close                        Closed              EICB RAI            TVA Letter dated G      G G 237                                                        8/4/2010            Responder: Clark                                224. Y        Closed                        Closed              EICB RAI            TVA Letter dated i
238                                                        8/4/2010            Responder: Webb/Hilmes                          225. Y        Closed                        Closed              N/A - Duplicate      N/A 239                                                        8/4/2010            Responder: Hilmes                              226. Y        Closed                        Closed              N/A - Meeting        N/A 240                                                        8/4/2010            Responder: Clark                                227. Y        Close                        Closed              Ml102910008          TVA Letter dated
( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( (  (
241                                                        8/4/2010            Responder: Davies                              228. Y        Closed                        Closed              RAI No. 10          TVA Letter dated 242                                                        8/4/2010            Responder: Hilmes                              229. Y        Close                        Closed              EICB RAI            TVA Letter dated 243                                                        8/3/2010            Responder: WEC                                  230. Y        Closed                        Closed              N/A - Closed to      N/A 247                                                        8/8/2010            Responder: WEC                                  231. Y        Closed                        Closed              EICB RAI            Response is        LIC-101 Rev. 3 Appendix B Section 4,
(
(
248                                                        8/8/2010            Responder: WEC                                  232. Y        Closed                        Closed                                    Response is        LIC-101 Rev. 3 Appendix B Section 4, 249                                                        8/8/2010            Responder: WEC                                  233. Y        Closed                        Closed                                                      LIC-101 Rev. 3 Appendix B Section 4, 253                                                        8/8/2010            Responder: Clark                                234. Y        Closed                        Closed                                    TVA Letter dated Related to Open Item no. 83.
C 8/4/2010 Responder: Clark 220. Y Closed Closed EICB RAI TVA Letter dated 234
254                                                        8/10/2010          Responder: WEC                                  235. Y        Closed                        Closed              N/A - Request to    TVA Letter dated C C C C C C C C C C C C C C C C C C C C  S 255                                                        8/10/2010          Responder: WEC                                  236. Y        Closed                        Closed              N/A - Request to    TVA Letter dated 256                                                        8/10/2010          Responder: WEC                                  237. Y        Closed                        Closed              N/A - Request to    TVA Letter dated 257                                                        8/10/2010          Responder: WEC                                  238. Y        Closed                        Closed              N/A - Request to    N/A G
258                                                        8/10/2010          Responder: WEC                                  239. Y        Closed                        Closed              N/A - Request to    N/A 259                                                        8/10/2010          Responder: WEC                                  240. Y        Closed                        Closed              N/A - Request to    TVA Letter dated 260                                                        8/10/2010          Responder: WEC                                  241. Y        Closed                        Closed              N/A - Request to    N/A 261                                                        8/10/2010          Responder: WEC                                  242. Y        Closed                        Closed              N/A - Closed to      TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:
i 262                                                        8/10/2010          Responder: WEC                                  243. Y        Closed                        Closed              N/A - Request to    N/A 263                                                        8/11/2010          Responder: WEC                                  244. Y        Closed                        Closed              ML101650255, Item 264                                                        8/11/2010          Responder: WEC                                  245. Y        Closed                        Closed              ML101650255, Item 265                                                        8/11/2010          Responder: WEC                                  246. Y        Closed                        Closed              ML101650255, Item 266                                                        8/11/2010          Responder: Webb/Webber                          247. Y        Closed                        Closed                                    TVA Letter dated 267                                                        8/11/2010          Responder: WEC                                  248. Y        Closed                        Closed 268                                                        8/19/2010          Responder: WEC                                  249. N        Closed                        Closed
( ( (
269                                                        8/20/2010          Responder: NRC                                  250. Y        Closed                        Closed              N/A                  N/A
( ( (
270                                                        8/23/2010           Responder: Clark                               251. Y        Closed                        Closed                                                      See also Open Item Nod. 41 & 245.
M M M 271                                                        8/23/2010          Responder: WEC                                  252. Y       Closed                       Closed               N/A - Closed to      NA C C P 272    7.5.2. 7.5.1                                      8/26/2010          Responder: Clark                                253. Y        Closed                        Closed              EICB RAI             TVA Letter dated EICB RAI ML102861885 sent to DORL a a a 273    7.5.2. 7.5.1                                      8/26/2010          Responder: Clark                                254. Y        Closed                        Closed              EICB RAI            TVA Letter dated EICB RAI ML102861885 sent to DORL 274. 7.5.2. 7.5.1                                      8/26/2010          Responder: Clark                                255. Y        Closed                        Closed              EICB RAI            TVA Letter dated EICB RAI ML102861885 sent to DORL
(
(
274.                                                       8/26/2010           Responder: Stockton                             256. Y       Closed                       Closed               RAI No. 6           TVA Letter dated S
C 8/4/2010 Responder:
i 275                      ( (                                8/27/2010           Responder: Clark                               257. Y       Closed                       Closed               Not Required         N/A G S i                                                                                                    258. Y 276     7.6     7.6                                       8/27/2010           Responder: Webb                                               Closed                       Closed               EICB RAI             TVA Letter dated
221. Y Closed Closed N/A - Duplicate N/A 235
(
G 8/4/2010 Responder: TVA Licensing 222. Y Closed Closed N/A N/A 236
(
G 8/4/2010 Responder: Clark 223. Y Close Closed EICB RAI TVA Letter dated 237
(
C 8/4/2010 Responder: Clark 224. Y Closed Closed EICB RAI TVA Letter dated 238
(
C 8/4/2010 Responder: Webb/Hilmes 225. Y Closed Closed N/A - Duplicate N/A 239
(
C 8/4/2010 Responder: Hilmes 226. Y Closed Closed N/A - Meeting N/A 240
(
G 8/4/2010 Responder: Clark 227. Y Close Closed Ml102910008 TVA Letter dated 241
(
S i
8/4/2010 Responder: Davies 228. Y Closed Closed RAI No. 10 TVA Letter dated 242
(
G 8/4/2010 Responder: Hilmes 229. Y Close Closed EICB RAI TVA Letter dated 243
(
C 8/3/2010 Responder: WEC 230. Y Closed Closed N/A - Closed to N/A 247
(
C 8/8/2010 Responder: WEC 231. Y Closed Closed EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4, 248
(
C 8/8/2010 Responder: WEC 232. Y Closed Closed Response is LIC-101 Rev. 3 Appendix B Section 4, 249
(
C 8/8/2010 Responder: WEC 233. Y Closed Closed LIC-101 Rev. 3 Appendix B Section 4, 253
(
C 8/8/2010 Responder: Clark 234. Y Closed Closed TVA Letter dated Related to Open Item no. 83.
254
(
C 8/10/2010 Responder: WEC 235. Y Closed Closed N/A - Request to TVA Letter dated 255
(
C 8/10/2010 Responder: WEC 236. Y Closed Closed N/A - Request to TVA Letter dated 256
(
C 8/10/2010 Responder: WEC 237. Y Closed Closed N/A - Request to TVA Letter dated 257
(
C 8/10/2010 Responder: WEC 238. Y Closed Closed N/A - Request to N/A 258
(
C 8/10/2010 Responder: WEC 239. Y Closed Closed N/A - Request to N/A 259
(
C 8/10/2010 Responder: WEC 240. Y Closed Closed N/A - Request to TVA Letter dated 260
(
C 8/10/2010 Responder: WEC 241. Y Closed Closed N/A - Request to N/A 261
(
C 8/10/2010 Responder: WEC 242. Y Closed Closed N/A - Closed to TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:
262
(
C 8/10/2010 Responder: WEC 243. Y Closed Closed N/A - Request to N/A 263
(
C 8/11/2010 Responder: WEC 244. Y Closed Closed ML101650255, Item 264
(
C 8/11/2010 Responder: WEC 245. Y Closed Closed ML101650255, Item 265
(
C 8/11/2010 Responder: WEC 246. Y Closed Closed ML101650255, Item 266
(
C 8/11/2010 Responder: Webb/Webber 247. Y Closed Closed TVA Letter dated 267
(
C 8/11/2010 Responder: WEC 248. Y Closed Closed 268
(
C 8/19/2010 Responder: WEC 249. N Closed Closed 269
(
P 8/20/2010 Responder: NRC 250. Y Closed Closed N/A N/A 270
(
C 8/23/2010 Responder: Clark 251. Y Closed Closed See also Open Item Nod. 41 & 245.
271
(
C 8/23/2010 Responder: WEC 252. Y Closed Closed N/A - Closed to NA 272 7.5.2.
7.5.1
(
M a
8/26/2010 Responder: Clark 253. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 273 7.5.2.
7.5.1
(
M a
8/26/2010 Responder: Clark 254. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 274.
7.5.2.
7.5.1
(
M a
8/26/2010 Responder: Clark 255. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 274.
(
S i
8/26/2010 Responder: Stockton 256. Y Closed Closed RAI No. 6 TVA Letter dated 275
(
S i
8/27/2010 Responder: Clark 257. Y Closed Closed Not Required N/A 276 7.6 7.6
(
G 8/27/2010 Responder: Webb 258. Y Closed Closed EICB RAI TVA Letter dated  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                         radE4C39.docx                                                                                 Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR            NRC No.                                                                            Issue                                                    TVA Response(s)                    Acceptable       Status/ Current Actions     Resolution Path     RAI No. & Date     RAI Resp. Date                   Comments Sec.      Sec.          POC                                                                                                                                            Y/N
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 277 7.6 7.6.3
( ( ( ( (
(
277   7.6     7.6.3                           8/27/2010                                                         Responder: Clark                                         259. Y       Close                         Closed               EICB RAI           TVA Letter dated 278   7.6     7.6.6                           8/27/2010                                                         Responder: Trelease                                     260. Y       Close                         Closed               EICB RAI           TVA Letter dated 279   7.6     7.6.6                           8/27/2010                                                         Responder: Mather                                       261. Y       Close                         Closed               EICB RAI           TVA Letter dated 280   7.6     7.6.6                           8/27/2010                                                         Responder: Trelease                                     262. Y       Closed                       Closed               EICB RAI           TVA Letter dated D D D D D 281   7.6     7.6.8                           8/27/2010                                                         Responder: Webb                                         263.         Closed                       Closed               EICB RAI           TVA Letter dated
G 8/27/2010 Responder: Clark 259. Y Close Closed EICB RAI TVA Letter dated 278 7.6 7.6.6
(          ( ( ( ( ( (
(
282   7.6     7.6.9                           8/27/2010                                                        Responder: Trelease                                      264. Y      Close                        Closed              EICB RAI            TVA Letter dated 283  7.7.5      XX                              8/27/2010                                                        Responder: Clark                                        265. Y      Closed                        Closed              EICB RAI No.13      TVA Letter dated This item is a follow-up question to item a a a a a 284  7.7.3    7.4.1                            8/27/2010                                                        Responder: Webber                                        266. Y      Closed                        Closed              EICB RAI No.14      TVA Letter dated This item is a follow-up question to item 285  7.3.3      7.3                            8/27/2010                                                        Responder: McNeil                                        267. Y      Closed                        Closed              EICB RAI No.15      TVA Letter dated This item is a follow-up question to item G          G G G G G G 286  7.7.3    9.3.4.2.4                        8/27/2010                                                        Responder: Webber                                        268. Y      Closed                        Closed              EICB RAI No.16      TVA Letter dated 287    7.3      7.3-1                            8/27/2010                                                        Responder: Elton                                        269. Y      Closed                        Closed              ML102390538, Item Response 288    7.3                                      9/2/2010                                                          Responder: McNeil                                        270. Y      Closed                        Closed              EICB RAI
G 8/27/2010 Responder: Trelease 260. Y Close Closed EICB RAI TVA Letter dated 279 7.6 7.6.6
( ( ( ( (
(
289                                              9/2/2010                                                          Responder: Faulkner                                      271. Y      Closed                        Closed              RAI No. 24          TVA Letter dated 290              7.7                            9/7/2010                                                          Responder: Clark                                        272. Y      Closed                        Closed              N/A                N/A                This item is a duplicate of item 291.
G 8/27/2010 Responder: Mather 261. Y Close Closed EICB RAI TVA Letter dated 280 7.6 7.6.6
(
G 8/27/2010 Responder: Trelease 262. Y Closed Closed EICB RAI TVA Letter dated 281 7.6 7.6.8
(
G 8/27/2010 Responder: Webb 263.
Closed Closed EICB RAI TVA Letter dated 282 7.6 7.6.9
(
(
291              7.7                            9/7/2010                                                          Responder: Clark                                        273. Y      Closed                        Closed                                  TVA Letter dated
G 8/27/2010 Responder: Trelease 264. Y Close Closed EICB RAI TVA Letter dated 283 7.7.5 XX
( D D D D D    ( ( (
292  7.2.5      7.2                            9/7/2010                                                         Responder: Craig                                        274. Y       Closed                       Closed              EICB RAI           TVA Letter dated M (
293  7.7.4    7.2.2.3.5                         9/8/2010                                                          Responder: Craig                                        275. Y      Closed                        Closed              EICB RAI            TVA Letter dated EICB RAI ML102861885 sent to DORL 294    7.3    7.3.1.1.1                        9/9/2010                                                          Responder: Elton                                        276. Y      Closed                        Closed              ML102390538, Item Response C a a a a a    C C S 295    7.3    7.3.1.1.2                        9/9/2010                                                          Responder: Elton                                        277. Y      Closed                        Closed              ML102390538, Item Response a G 296    7.3    7.3.1.2.1                        9/9/2010                                                          Responder: Elton                                        278. Y      Closed                        Closed              ML102390538, Item Response i
297    7.3    7.3.1.2.2                        9/9/2010                                                          Responder: Elton                                        279. Y      Closed                        Closed              ML102390538, Item Response 298    7.3      XX                             9/9/2010                                                          Responder: Clark                                        280. Y      Closed                        Closed              ML102390538, Item Response 299                                              Provide Common Q Software Requirements Specification Post        Attachment 41 of the 10/5 letter contains the Common Q  281. Y      Closed                        Closed                                  TVA Letter dated
(
(
300                                              Need Radiation Monitoring System Description/Design Criteria      Responder: Temples/Mather                                282. Y      Closed                        Closed              RAI No. 25          TVA Letter S
D a
i
8/27/2010 Responder: Clark 265. Y Closed Closed EICB RAI No.13 TVA Letter dated This item is a follow-up question to item 284 7.7.3 7.4.1
( (
301                                              1.TVA is requested to address the consequences of software        Responder: WEC/Davies/Clark                              283. Y      Closed                        Closed              RAI No. 11          TVA Letter dated Note 1:
302  7.5.2. 7.5.1                            09/17/2010                                                        Responder: Tindell                                      284. Y      Closed                        Closed              EICB RAI            TVA Letter dated EICB RAI ML102861885 sent to DORL
( ( ( (
303  7.5.2. 7.5.1                            09/17/2010                                                        Responder: Tindell                                      285. Y      Closed                        Closed              EICB RAI            TVA Letter dated EICB RAI ML102861885 sent to DORL 304  7.5.2. 7.5.1                            09/17/2010                                                        Responder: Tindell                                      286. Y      Closed                        Closed              EICB RAI            TVA Letter dated EICB RAI ML102861885 sent to DORL D D                      (
305  7.5.2. 7.5.1                            09/17/2010                                                       Responder: Tindell                                      287. Y       Closed                       Closed               EICB RAI           TVA Letter dated EICB RAI ML102861885 sent to DORL 306    7.1      7.1                            FSAR amendment 100, page 7.1-12 provides the definition of        Responder: Hilmes                                        288. Y      Closed                        Closed              EICB RAI            TVA Letter dated
(    ( ( ( ( ( ( ( M M M M 307    7.1      7.1                            (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of  Responder: Hilmes                                        289. Y      Closed                        Closed              EICB RAI            TVA Letter dated 308    7.1      7.1                            (1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of  Responder: Hilmes                                        290. Y      Closed                        Closed              EICB RAI            TVA Letter dated a a                      S 309    7.1    7.1.2.1.9                        (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint        Responder: Hilmes                                        291. Y      Closed                        Closed              EICB RAI            TVA Letter dated 292. Y G    G G G G G G G a a a a 310    7.1    7.1.2.1.9                        (1) FSAR amendment 100, Page 7.1-14, TVA setpoint                Responder: Hilmes                                                    Closed                        Closed              EICB RAI            TVA Letter dated 311    7.1      7.1                            Both Westinghouse and TVA setpoint methodology do not have        Responder: Hilmes                                        293. Y      Closed                        Closed              EICB RAI            TVA Letter dated i
312              7.0                            By letter dated September 10,2010, TVA provided the summary      Responder: Stockton                                      294. Y      Close                        Closed              EICB RAI            TVA Letter dated 313  7.7.8    7.7.1.12                          EDCR 52408 (installation of AMSAC in Unit 2) states that Design  Responder: Ayala                                        295. Y      Closed                        Closed              EICB RAI No.18      TVA Letter dated 314    7.3      7.3                            The following 50.59 changes were listed in the March 12 RAI      Responder: Stockton                                      296. Y      Closed                        Closed              EICB RAI No. 19    TVA Letter dated Related to OI 10 315  7.5.3    7.5.3                            IE Bulletin 79-27 required that emergency operating procedures to Responder: S. Smith (TVA Operations)                    297. Y      Close                        Closed              EICB RAI            TVA Letter dated
(
(
316  7.5.2. 7.5                            TVA has provided various documents in support of RM-1000 high Responder: Temples/Mather                                    298. Y       Closed                       Closed               RAI No. 26 S
D a
i
8/27/2010 Responder: Webber 266. Y Closed Closed EICB RAI No.14 TVA Letter dated This item is a follow-up question to item 285 7.3.3 7.3
(
(
317  7.5.2. 7.5                            TVA has provided a proprietary and a non-proprietary version of  Responder: Temples                                      299. Y       Closed                       Closed               RAI No. 27          TVA Letter dated S
D a
i
8/27/2010 Responder: McNeil 267. Y Closed Closed EICB RAI No.15 TVA Letter dated This item is a follow-up question to item 286 7.7.3 9.3.4.2.4
(
(
319   7.5.2. 7.5                             TVA provided System Verification Test Results 04507007-1TR       Responder: Temples                                       300. Y       Closed                       Closed               RAI No. 29         TVA Letter dated S
D a
i E
8/27/2010 Responder: Webber 268. Y Closed Closed EICB RAI No.16 TVA Letter dated 287 7.3 7.3-1
320                            I               Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY             Responder: Clark                                         301. Y       Closed                       Closed               N/A                 N/A               Duplicate of item 156
(
D a
8/27/2010 Responder: Elton 269. Y Closed Closed ML102390538, Item Response 288 7.3
(
G 9/2/2010 Responder: McNeil 270. Y Closed Closed EICB RAI 289
(
S i
9/2/2010 Responder: Faulkner 271. Y Closed Closed RAI No. 24 TVA Letter dated 290 7.7
(
C 9/7/2010 Responder: Clark 272. Y Closed Closed N/A N/A This item is a duplicate of item 291.
291 7.7
(
C 9/7/2010 Responder: Clark 273. Y Closed Closed TVA Letter dated 292 7.2.5 7.2
(
G 9/7/2010 Responder: Craig 274. Y Closed Closed EICB RAI TVA Letter dated 293 7.7.4 7.2.2.3.5
(
M a
9/8/2010 Responder: Craig 275. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 294 7.3 7.3.1.1.1
(
D a
9/9/2010 Responder: Elton 276. Y Closed Closed ML102390538, Item Response 295 7.3 7.3.1.1.2
(
D a
9/9/2010 Responder: Elton 277. Y Closed Closed ML102390538, Item Response 296 7.3 7.3.1.2.1
(
D a
9/9/2010 Responder: Elton 278. Y Closed Closed ML102390538, Item Response 297 7.3 7.3.1.2.2
(
D a
9/9/2010 Responder: Elton 279. Y Closed Closed ML102390538, Item Response 298 7.3 XX
(
D a
9/9/2010 Responder: Clark 280. Y Closed Closed ML102390538, Item Response 299
(
C Provide Common Q Software Requirements Specification Post 1 of the 10/5 letter contains the Common Q 281. Y Closed Closed TVA Letter dated 300
(
S i
Need Radiation Monitoring System Description/Design Criteria Responder: Temples/Mather 282. Y Closed Closed RAI No. 25 TVA Letter 301
(
S i
1.TVA is requested to address the consequences of software Responder: WEC/Davies/Clark 283. Y Closed Closed RAI No. 11 TVA Letter dated Note 1:
302 7.5.2.
7.5.1
(
M a
09/17/2010 Responder: Tindell 284. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 303 7.5.2.
7.5.1
(
M a
09/17/2010 Responder: Tindell 285. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 304 7.5.2.
7.5.1
(
M a
09/17/2010 Responder: Tindell 286. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 305 7.5.2.
7.5.1
(
M a
09/17/2010 Responder: Tindell 287. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 306 7.1 7.1
(
G FSAR amendment 100, page 7.1-12 provides the definition of Responder: Hilmes 288. Y Closed Closed EICB RAI TVA Letter dated 307 7.1 7.1
(
G (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of Responder: Hilmes 289. Y Closed Closed EICB RAI TVA Letter dated 308 7.1 7.1
(
G (1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of Responder: Hilmes 290. Y Closed Closed EICB RAI TVA Letter dated 309 7.1 7.1.2.1.9
(
G (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint Responder: Hilmes 291. Y Closed Closed EICB RAI TVA Letter dated 310 7.1 7.1.2.1.9
(
G (1) FSAR amendment 100, Page 7.1-14, TVA setpoint Responder: Hilmes 292. Y Closed Closed EICB RAI TVA Letter dated 311 7.1 7.1
(
G Both Westinghouse and TVA setpoint methodology do not have Responder: Hilmes 293. Y Closed Closed EICB RAI TVA Letter dated 312 7.0
(
G By {{letter dated|date=September 10, 2010|text=letter dated September 10,2010}}, TVA provided the summary Responder: Stockton 294. Y Close Closed EICB RAI TVA Letter dated 313 7.7.8 7.7.1.12
(
D a
EDCR 52408 (installation of AMSAC in Unit 2) states that Design Responder: Ayala 295. Y Closed Closed EICB RAI No.18 TVA Letter dated 314 7.3 7.3
(
D a
The following 50.59 changes were listed in the March 12 RAI Responder: Stockton 296. Y Closed Closed EICB RAI No. 19 TVA Letter dated Related to OI 10 315 7.5.3 7.5.3
(
G IE Bulletin 79-27 required that emergency operating procedures to Responder: S. Smith (TVA Operations) 297. Y Close Closed EICB RAI TVA Letter dated 316 7.5.2.
7.5
(
S i
TVA has provided various documents in support of RM-1000 high Responder: Temples/Mather 298. Y Closed Closed RAI No. 26 317 7.5.2.
7.5
(
S i
TVA has provided a proprietary and a non-proprietary version of Responder: Temples 299. Y Closed Closed RAI No. 27 TVA Letter dated 319 7.5.2.
7.5
(
S i
TVA provided System Verification Test Results 04507007-1TR Responder: Temples 300. Y Closed Closed RAI No. 29 TVA Letter dated 320 E
I Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY Responder: Clark 301. Y Closed Closed N/A N/A Duplicate of item 156  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                     radE4C39.docx                                                                                             Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR      NRC No.                                                                      Issue                                                    TVA Response(s)                          Acceptable       Status/ Current Actions         Resolution Path         RAI No. & Date       RAI Resp. Date                   Comments Sec.      Sec.      POC                                                                                                                                                  Y/N B B 321                                       For the purposes of measuring reactor coolant flow for Reactor     Responder: Clark                                               302. Y       Closed                         Closed                   N/A                   N/A                 Duplicate of OI# 157 322           7.7.1.11     (             Section 7.7.1.11 will be added to FSAR Amendment 101 to provide Responder: Clark                                                 303. Y       Closed                         Closed
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 321 E
( (  ( E M
I For the purposes of measuring reactor coolant flow for Reactor Responder: Clark 302. Y Closed Closed N/A N/A Duplicate of OI# 157 322 7.7.1.11
324                                      Per the NRC reviewer, the BISI calculation is not required to be                                                                 304. Y       Closed                         Closed 325                     G G  C I        The Unit 2 loops in service for Unit 1 that are scheduled to be   Responder: TVA Startup Olson                                   305. Y       Closed                         Closed                                                               Closed to open item ?
(
a 326                                       TVA uses double-sided methodology for as-found and as-left         Responder: Webb                                               306. Y       Closed                         Closed                                         TVA Letter dated
C Section 7.7.1.11 will be added to FSAR Amendment 101 to provide Responder: Clark 303. Y Closed Closed 324
(
M a
Per the NRC reviewer, the BISI calculation is not required to be 304. Y Closed Closed 325 B
(
G The Unit 2 loops in service for Unit 1 that are scheduled to be Responder: TVA Startup Olson 305. Y Closed Closed Closed to open item ?
326 B
(
G TVA uses double-sided methodology for as-found and as-left Responder: Webb 306. Y Closed Closed TVA Letter dated 328 7.5.2.
7.5
(
S i
Provide the model number for the four containment high range Responder: Temples 307. Y Closed Closed RAI No. 30 TVA Letter dated 329 7.6.1 7.6.7
(
S i
Section 7.6.7 of the FSAR (Amendment 100) states that, The Responder: Clark 308. Y Closed Closed RAI No. 1 TVA Letter dated 330 7.3 7.3
(
D a
Related to Item 298 Responder: Hilmes/Faulkner 309. Y Closed Closed EICB RAI No.20 Item 7, TVA letter 331 7.6.1 7.6.7
(
S i
As a follow up of OI 190, Staff has reviewed the proprietary version Responder: WEC/Harless/Clark 310. Y Closed Closed RAI No. 8 TVA Letter dated Follow-up of OI-190.
332 7.5.2.
7.5.1
(
M a
10/26/2010 311. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL 333 7.5.2.
7.5.1
(
(
328  7.5.2. 7.5                      Provide the model number for the four containment high range      Responder: Temples                                            307. Y        Closed                          Closed                    RAI No. 30            TVA Letter dated S
M a
i
10/27/2010 312. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL 334 7
(                                                                                                                                                  308. Y 329  7.6.1    7.6.7  D (              Section 7.6.7 of the FSAR (Amendment 100) states that, The        Responder: Clark                                                            Closed                          Closed                    RAI No. 1            TVA Letter dated a S i                                                                                                                                                309. Y 330    7.3      7.3                      Related to Item 298                                                Responder: Hilmes/Faulkner                                                  Closed                          Closed                    EICB RAI No.20        Item 7, TVA letter 331  7.6.1    7.6.7  (                As a follow up of OI 190, Staff has reviewed the proprietary version Responder: WEC/Harless/Clark                                310. Y        Closed                          Closed                    RAI No. 8            TVA Letter dated Follow-up of OI-190.
7
( (
332  7.5.2. 7.5.1  D    (          10/26/2010                                                                                                                        311. Y        Closed                          Closed                    ML103000105 Item TBD                      EICB RAI ML103000105 sent to DORL M M 333  7.5.2. 7.5.1  a    S          10/27/2010                                                                                                                       312. Y       Closed                         Closed                   ML103000105 Item TBD                       EICB RAI ML103000105 sent to DORL a a i
334     7         7                       FSAR Figure 7A-3 Mechanical Flow and Control Diagram              Responder: Stockton                                            313. Y        Closed                          Closed                    RAI not required. N/A                  RAI not required because the figure is
(
(
335   7.6.1     7.6.7                     LPMS: Reference to OI-331, sub item 2.                            Responder: WEC                                                314. Y        Closed                          Closed                    RAI# 1, EICB letter TVA letter, dated      We need to confirm when MEEB when S
D a
i
FSAR Figure 7A-3 Mechanical Flow and Control Diagram Responder: Stockton 313. Y Closed Closed RAI not required.
N/A RAI not required because the figure is 335 7.6.1 7.6.7
(
(
336   7.5.2. 7.5                     Re: RM-1000 Report 04508905-QR                                    Responder: GA                                                  315. Y        Closed                          Closed S
S i
i
LPMS: Reference to OI-331, sub item 2.
Responder: WEC 314. Y Closed Closed RAI# 1, EICB letter TVA letter, dated We need to confirm when MEEB when 336 7.5.2.
7.5
(
(
337  7.5.2. 7.5                      Re: RM-1000 Report 04508905-QR                                     Responder: GA                                                 316. Y       Closed                         Closed S
S i
i
Re: RM-1000 Report 04508905-QR Responder: GA 315. Y Closed Closed 337 7.5.2.
7.5
(
(
338  7.5.2. 7.5                      In page 3-15 and appendix B of Qualification Test Report           04508905-QR, Qualification Test Report for RM-1000            317. Y       Closed                         Closed                   RAI #4 letter dated FSAR amend 103 Note: Item to be added to Section 3.10 S
S i
i
Re: RM-1000 Report 04508905-QR Responder: GA 316. Y Closed Closed 338 7.5.2.
7.5
(
(
339   7.5.2. 7.5                     In the Qualification Test Report 04508905-QR, the licensee         As agreed to with the reviewer, Attachment 1 contains the     318. Y       Closed                         Closed                   RAI #5 letter dated FSAR amend 103 Note: Item to be added to Section 3.10 S
S i
i
In page 3-15 and appendix B of Qualification Test Report 04508905-QR, Qualification Test Report for RM-1000 317. Y Closed Closed RAI #4 letter dated FSAR amend 103 Note: Item to be added to Section 3.10 339 7.5.2.
7.5
(
S i
In the Qualification Test Report 04508905-QR, the licensee As agreed to with the reviewer, Attachment 1 contains the 318. Y Closed Closed RAI #5 letter dated FSAR amend 103 Note: Item to be added to Section 3.10 341 7.5.2.
7.5
(
S i
FSAR Tables 3.10 list seismically qualified equipment. However, A review of WBN Unit 2 FSAR amendment 102 chapters 319. Y Closed Closed RAI #1 letter dated FSAR amend 103 342 7.5.2.
7.5
(
(
341  7.5.2. 7.5                     FSAR Tables 3.10 list seismically qualified equipment. However, A review of WBN Unit 2 FSAR amendment 102 chapters                319. Y        Closed                          Closed                    RAI #1 letter dated FSAR amend 103 S
S i
i
Please confirm that RM-1000 monitors and the associated The RM-1000 containment high range radiation monitors are 320. Y Closed Closed 343 7.5.2.
7.5
(
(
342  7.5.2. 7.5                      Please confirm that RM-1000 monitors and the associated            The RM-1000 containment high range radiation monitors are 320.      Y        Closed                          Closed S
S i
i g
Seismic RRS in the 04508905-QR report Figures 3-2 and 3-3 (1) The cause of the difference between the RRS and TRS 321. Y Closed Closed 344 7.6.6  
343  7.5.2. 7.5    ( (              Seismic RRS in the 04508905-QR report Figures 3-2 and 3-3         (1) The cause of the difference between the RRS and TRS 321.       Y       Closed                         Closed G S i                                                                                                                                                322. Y 344   7.6.6       ?                       Unit 1 SE discussed in Section 7.6.5, Valve Power Lockout.      (a) In accordance with0PDP-6, Locked Valve/Breaker                          Close                          Closed                                                              Close based on TVA letter dated
?
g
(
(
345   7.5.2. 7.5                     Provide the normal temperatures and expected periods of high/low RM-1000 in a NIM Bin was Tested at 39&deg;F for 72 Hrs and          323. Y        Closed                          Closed                                          Response S
G Unit 1 SE discussed in Section 7.6.5, Valve Power Lockout.
i
(a) In accordance with0PDP-6, Locked Valve/Breaker 322. Y Close Closed Close based on TVA letter dated 345 7.5.2.
7.5
(
(
347   7.5.2. 7.5                     Qualification report 04508905-1SP does not address EMI/RFI        Qualification report 04038903-7SP, Qualification Basis for    324. Y        Closed                          Closed S
S i
i
Provide the normal temperatures and expected periods of high/low RM-1000 in a NIM Bin was Tested at 39&deg;F for 72 Hrs and 323. Y Closed Closed
 
===Response===
347 7.5.2.
7.5
(
(
348  7.5.2. 7.5                      Qualification report 04508905-2SP does not address EMI/RFI         Qualification report 04038903-7SP, Qualification Basis for     325. Y       Closed                         Closed S
S i
i
Qualification report 04508905-1SP does not address EMI/RFI Qualification report 04038903-7SP, Qualification Basis for 324. Y Closed Closed 348 7.5.2.
7.5
(
(
350   7.5.2. 7.5                     The seismic required response spectra (RRS) is shown in Figures The RM-1000 was seismically tested in a NIM Bin and the          326. Y        Closed                          Closed                    RAI # 9, letter      FSAR amend 103 Note: Item to be added to Section 3.10 S
S i
i
Qualification report 04508905-2SP does not address EMI/RFI Qualification report 04038903-7SP, Qualification Basis for 325. Y Closed Closed 350 7.5.2.
7.5
(
(
351   7.5.2. 7.5                     The replacement schedule for the components that have a            The replacement schedules stated in 04508905-1SP,              327. Y        Closed                          Closed S
S i
i
The seismic required response spectra (RRS) is shown in Figures The RM-1000 was seismically tested in a NIM Bin and the 326. Y Closed Closed RAI # 9, letter FSAR amend 103 Note: Item to be added to Section 3.10 351 7.5.2.
7.5
(
(
352   7.5.2. 7.5                     Please clarify how many RM-1000 radiation monitors are being      The total number of RM-1000 units procured under MR            328. Y        Closed                          Closed S
S i
i
The replacement schedule for the components that have a The replacement schedules stated in 04508905-1SP, 327. Y Closed Closed 352 7.5.2.
7.5
(
(
354   7.5.2. 7.5                     RG 1.180 endorsed the guidance of IEEE-1050-1996 with              (1) The WBN Unit 2 grounding system design is in              329. Y        Closed                          Closed                                                              The grounding specification used by S
S i
i
Please clarify how many RM-1000 radiation monitors are being The total number of RM-1000 units procured under MR 328. Y Closed Closed 354 7.5.2.
7.5
(
(
356   7.5.2. 7.5                     The attachment number refers to your February 25, 2011 letter. The loss of the RM-3 output (current to frequency (I/F)       330. Y       Closed                         Closed                                         Closed by TVA S
S i
i 041   7.5.2     7.5.1                     2/19/2010                                                          Responder: WEC                                                1. N        Open                            Open-NRC Review          NRC Meeting          TVA Letter dated See also Open Item Nos. 226 & 270.
RG 1.180 endorsed the guidance of IEEE-1050-1996 with (1) The WBN Unit 2 grounding system design is in 329. Y Closed Closed The grounding specification used by 356 7.5.2.
EICB (Carte)
7.5
Summary NRC          6/18/10 Please provide the following Westinghouse documents:               Items (1) and (2) were docketed by TVA letter dated April 8,                Pending Submittal of the Test  Due 3/29/11              Meeting Summary (1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements             2010.                                                                        Summary Report due 3/29/11                                ML093560019, Item    TVA Letter dated Specification"                                                                                                                                                                 NNC 1/27/11: Issues      No. 11                10/5/10 (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design                   Item (3) will be addressed by Revision 2 of the Licensing                    Final Response included in      with the STP were Specification"                                                     Technical Report. Due 12/3/10                                                letter dated 12/3/10            discussed in the weekly (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g"                                                                                                                         public meetings.
(
Please provide the following Westinghouse documents or pointers   Item (4) will be addressed by Westinghouse developing a                      Partial Response is included in Westinghouse to:
S i
to where the material was reviewed and approved in the CQ TR or   WBN2 Specific Test Plan to compensate for the fact that the                  letter dated 10/5/10.          (1) perfrom STP self SPM:                                                               NRC disapproved WNA-PT-00058-GEN during the original                        The SysRS and SRS              assessment., and (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q         Common Q review. Due 12/7/10                                                incorporate requirements from (2) Augment Test Safety systems"                                                                                                                                 many other documents by        Summary report to (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test               Item (5) Procedures that are listed in the SPM compliance                   reference.                      provide missing test Procedure"                                                        table in the Licensing Technical Report revision 1 supersede                                                 plan information that test procedure WNA-TP-00357-GEN.Due 10/22/10                           NNC 8/25/10: (3) An earlier version of this report was     NNC 2/3/11: At next For Item 3, Attachment 19 contains the Westinghouse                          docketed for the Common Q      audit compare &
The attachment number refers to your {{letter dated|date=February 25, 2011|text=February 25, 2011 letter}}.
The loss of the RM-3 output (current to frequency (I/F) 330. Y Closed Closed Closed by TVA 041 7.5.2 7.5.1 EICB (Carte) 2/19/2010 Please provide the following Westinghouse documents:
(1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements Specification" (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design Specification" (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" Please provide the following Westinghouse documents or pointers to where the material was reviewed and approved in the CQ TR or SPM:
(4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test Procedure" Responder: WEC Items (1) and (2) were docketed by TVA {{letter dated|date=April 8, 2010|text=letter dated April 8, 2010}}.
Item (3) will be addressed by Revision 2 of the Licensing Technical Report. Due 12/3/10 Item (4) will be addressed by Westinghouse developing a WBN2 Specific Test Plan to compensate for the fact that the NRC disapproved WNA-PT-00058-GEN during the original Common Q review. Due 12/7/10 Item (5) Procedures that are listed in the SPM compliance table in the Licensing Technical Report revision 1 supersede that test procedure WNA-TP-00357-GEN.Due 10/22/10 For Item 3, Attachment 19 contains the Westinghouse
: 1.
N Open Pending Submittal of the Test Summary Report due 3/29/11 Final Response included in letter dated 12/3/10 Partial Response is included in letter dated 10/5/10.
The SysRS and SRS incorporate requirements from many other documents by reference.
NNC 8/25/10: (3) An earlier version of this report was docketed for the Common Q Open-NRC Review Due 3/29/11 NNC 1/27/11: Issues with the STP were discussed in the weekly public meetings.
Westinghouse to:
(1) perfrom STP self assessment., and (2) Augment Test Summary report to provide missing test plan information NNC 2/3/11: At next audit compare &
NRC Meeting Summary NRC Meeting Summary ML093560019, Item No. 11 TVA Letter dated 6/18/10 TVA Letter dated 10/5/10 See also Open Item Nos. 226 & 270.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                     radE4C39.docx                                                                                           Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                                  Issue                                                        TVA Response(s)                            Acceptable       Status/ Current Actions           Resolution Path       RAI No. & Date   RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                                        Y/N document Post-Accident Monitoring System (PAMS)                             topical report; therefore, there  discuss:
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments document Post-Accident Monitoring System (PAMS)
Licensing Technical Report, WNA-LI-00058-WBT, Revision                       should be no problem to docket    (1) WNA-PT-00058-2, dated December 2010. Attachment 20 contains the                           this version. (4) Per              GEN Rev. 0 Westinghouse Application for Withholding for the Post-                      ML091560352, the testing          (2) WNA-PT-00138-Accident Monitoring System (PAMS) Licensing Technical                         process document does not          WBT Rev. 0 Report, WNA-LI-00058-WBT, Revision 2, dated December                         address the test plan              (3) AP1000 STP 2010.                                                                        requirements of the SPM.
Licensing Technical Report, WNA-LI-00058-WBT, Revision 2, dated December 2010. Attachment 20 contains the Westinghouse Application for Withholding for the Post-Accident Monitoring System (PAMS) Licensing Technical Report, WNA-LI-00058-WBT, Revision 2, dated December 2010.
Please provide a test plan that For Item 4, Attachment 9 contains the Westinghouse                           implements the requirements of document Nuclear Automation Watts Bar 2 NSSS                                 the SPM.
For Item 4, Attachment 9 contains the Westinghouse document Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.
Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
(1) WEC presented the results of the self assessment to the NRC on February 2, 2011.
(1) WEC presented the results of the self assessment to the NRC on February 2, 2011.
(2) By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with the STP. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.
(2) By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with the STP. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.
043   7.5.2   7.5.1                 2/19/2010                                                              Responder: WEC                                                  2. N        Open                              Open-NRC Review        EICB RAI          TVA Letter dated NNC 8/25/10: A CQ PAMS ISG6 EICB (Carte)
topical report; therefore, there should be no problem to docket this version. (4) Per ML091560352, the testing process document does not address the test plan requirements of the SPM.
Date: 5/25/10                                                                                                              ML102910002      2/5/10          compliance matrix was docketed on: (1)
Please provide a test plan that implements the requirements of the SPM.
The PAMS ISG6 compliance matrix supplied as Enclosure 1 to                                                                                           Pending Submittal of Revision 3 Due 3/29/11                Item No. 2                        February, 5 12010, (2) March 12, 2010, TVA letter dated February 5, 2010 is a first draft of the information The PAMS ISG6 compliance matrix supplied as Enclosure 1                        of the Licensing Technical                                                  TVA Letter dated & (3) June 18, 2010. The staff has needed. The shortcomings of the first three lines in the matrix are: to TVA letter dated February 5, 2010 is a first draft of the                    Report due 3/29/11.              NNC 2/2/11: Issues                          5/12/10          expressed issued with all of these information needed.                                                                                              with Common Q TR &                                          compliance evaluations. The staff is still Line 1: Section 11 of the Common Q topical report did include a                                                                                       Revised response included in SPM compliance were                            TVA Letter dated waiting for a good compliance commercial grade dedication program, but this program was not         By letter dated April 8, 2010 TVA provided the PAMS                            letter dated 12/22/10.          discussed in the weekly                    6/18/10          evaluation.
discuss:
approved in the associated SE. Westinghouse stated that this was Licensing Technical Report provided additional information.                                                          public meetings.
(1) WNA-PT-00058-GEN Rev. 0 (2) WNA-PT-00138-WBT Rev. 0 (3) AP1000 STP 043 7.5.2 7.5.1 EICB (Carte) 2/19/2010 The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA {{letter dated|date=February 5, 2010|text=letter dated February 5, 2010}} is a first draft of the information needed. The shortcomings of the first three lines in the matrix are:
the program and it could now be reviewed. The NRC stated that                                                                                         Response is included in letter Westinghouse to                              TVA Letter dated NNC 11/23/10: WNA-LI-00058-WT-P TVA should identified what they believe was previously reviewed Attachment 3 contains the revised Common Q PAMS ISG-6                                dated 10/5/10.                  perform Common Q TR                        10/5/10          Rev. 1 Section 7 does not include the and approved.                                                         Compliance Matrix, dated June 11, 2010, that addresses                                                          & SPM compliance self                                        RSED documents, and it should. Table these items (Reference 13).                                                    Revised compliance matrix is    assessment; his will be                                      6-1 Item No. 15 should also include the Line 2: TVA stated the D3 analysis was not applicable to PAMS,                                                                                       unacceptable.                    discussed in detail on                                      RSED RTMs.
Line 1: Section 11 of the Common Q topical report did include a commercial grade dedication program, but this program was not approved in the associated SE. Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that TVA should identified what they believe was previously reviewed and approved.
but provided no justification. The NRC asked for justification since By letter Dated June 18, 2010 (see Attachment 3) TVA                                                              the next audit.
Line 2: TVA stated the D3 analysis was not applicable to PAMS, but provided no justification. The NRC asked for justification since SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as being SRP acceptance criteria for PAMS.
SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as           provided a table, "Watts Bar 2 - Common Q PAMS ISG-6                            NNC 8/12/10: It is not quite being SRP acceptance criteria for PAMS.                               Compliance Matrix."                                                            enough to provide all of the documents requested. There Line 3: TVA identified that the Design report for computer integrity   It is TVAs understanding that this comment is focused on                    are two possible routes to was completed as part of the common Q topical report. The NRC           the fact that there are documents that NRC has requested                      review that the NRC can noted that this report is applicable for a system in a plant, and the   that are currently listed as being available for audit at the                undertake: (1) follow ISG6, and CQ topical report did no specifically address this PAMS system at       Westinghouse offices. For those Common Q PAMS                                 (2) follow the CQ SPM. The Watts Bar Unit 2.                                                       documents that are TVA deliverable documents from                             TVA response that was Westinghouse, TVA has agreed to provide those to NRC.                         originally pursued was to follow NRC then concluded that TVA should go through and provide a            Westinghouse documents that are not deliverable to TVA will                   ISG6, but some of the
Line 3: TVA identified that the Design report for computer integrity was completed as part of the common Q topical report. The NRC noted that this report is applicable for a system in a plant, and the CQ topical report did no specifically address this PAMS system at Watts Bar Unit 2.
NRC then concluded that TVA should go through and provide a Responder: WEC Date: 5/25/10 The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA {{letter dated|date=February 5, 2010|text=letter dated February 5, 2010}} is a first draft of the information needed.
By {{letter dated|date=April 8, 2010|text=letter dated April 8, 2010}} TVA provided the PAMS Licensing Technical Report provided additional information.
contains the revised Common Q PAMS ISG-6 Compliance Matrix, dated June 11, 2010, that addresses these items (Reference 13).
By letter Dated June 18, 2010 (see Attachment 3) TVA provided a table, "Watts Bar 2 - Common Q PAMS ISG-6 Compliance Matrix."
It is TVAs understanding that this comment is focused on the fact that there are documents that NRC has requested that are currently listed as being available for audit at the Westinghouse offices. For those Common Q PAMS documents that are TVA deliverable documents from Westinghouse, TVA has agreed to provide those to NRC.
Westinghouse documents that are not deliverable to TVA will
: 2.
N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
Revised response included in letter dated 12/22/10.
Response is included in letter dated 10/5/10.
Revised compliance matrix is unacceptable.
NNC 8/12/10: It is not quite enough to provide all of the documents requested. There are two possible routes to review that the NRC can undertake: (1) follow ISG6, and (2) follow the CQ SPM. The TVA response that was originally pursued was to follow ISG6, but some of the Open-NRC Review Due 3/29/11 NNC 2/2/11: Issues with Common Q TR &
SPM compliance were discussed in the weekly public meetings.
Westinghouse to perform Common Q TR
& SPM compliance self assessment; his will be discussed in detail on the next audit.
EICB RAI ML102910002 Item No. 2 TVA Letter dated 2/5/10 TVA Letter dated 5/12/10 TVA Letter dated 6/18/10 TVA Letter dated 10/5/10 NNC 8/25/10: A CQ PAMS ISG6 compliance matrix was docketed on: (1)
February, 5 12010, (2) March 12, 2010,
& (3) June 18, 2010. The staff has expressed issued with all of these compliance evaluations. The staff is still waiting for a good compliance evaluation.
NNC 11/23/10: WNA-LI-00058-WT-P Rev. 1 Section 7 does not include the RSED documents, and it should. Table 6-1 Item No. 15 should also include the RSED RTMs.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                             radE4C39.docx                                                                                         Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                              Issue                                                    TVA Response(s)                            Acceptable       Status/ Current Actions             Resolution Path   RAI No. & Date   RAI Resp. Date     Comments Sec. Sec. POC                                                                                                                                                Y/N more complete and thorough compliance matrix.                   be available for audit as stated above. Requirements                         compliance items for ISG6 were Traceability Matrix issues will be tracked under NRC RAI                     addressed by referencing the Matrix Items 142 (Software Requirements Specification) and                   SPM. The NRC approved the 145 (System Design Specification). Commercial Item                           CQ TR and associated SPM; it Dedication issues will be tracked under NRC RAI Matrix                       may be more appropriate to Item 138. This item is considered closed.                                     review the WBN2 PAMS application to for adherence to TVA Response to Follow-up NRC Request:                                       the SPM that to ISG6. In either path chosen, the applicant WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring                     should provide documents and a System (PAMS) Licensing Technical Report submitted in                       justification for the acceptability TVA Letter to NRC dated December 3, 2010, (Reference 1)                       of any deviation from the path contains the following changes to address the NRC                             chosen. For example, it requests:                                                                     appears that the Westinghouse's CDIs are (1) While RSEDs are not specifically mentioned, Section 7                     commercial grade dedication has been revised to be applicable to both hardware and                   plans, but Westinghouse software which includes the RSEDs.                                       maintains that they are (2) Table 6-1 item 15 reference added for WNA-VR-00280-                       commercial grade dedication WBT (RESD)                                                               reports; this apparent deviation should be justified or explained.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments more complete and thorough compliance matrix.
be available for audit as stated above. Requirements Traceability Matrix issues will be tracked under NRC RAI Matrix Items 142 (Software Requirements Specification) and 145 (System Design Specification). Commercial Item Dedication issues will be tracked under NRC RAI Matrix Item 138. This item is considered closed.
TVA Response to Follow-up NRC Request:
WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:
(1) While RSEDs are not specifically mentioned, Section 7 has been revised to be applicable to both hardware and software which includes the RSEDs.
(2) Table 6-1 item 15 reference added for WNA-VR-00280-WBT (RESD)
TVA Response to Second Follow-up NRC Request:
TVA Response to Second Follow-up NRC Request:
The NRC audited the Westinghouse commercial item dedication process for both hardware and software during the week of February 28 to March 4, 2011. The audif found the processes acceptable. Westinghouse and TVA previously agreed to provide additional information to address this item in Revision 3 of the Licensing Technical Report.
The NRC audited the Westinghouse commercial item dedication process for both hardware and software during the week of February 28 to March 4, 2011. The audif found the processes acceptable. Westinghouse and TVA previously agreed to provide additional information to address this item in Revision 3 of the Licensing Technical Report.
Attachment 2 contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary).
contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary). contains WNA-LI-00058-WBT-NP, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3 dated March 2011 (non-proprietary). contains CWA-11-311, Application for Withholding Proprietary Information from Public Disclosure, WNA-LI-00058-WBT-P, Revision 3 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post-Accident Monitoring System (PAMS) Licensing Technical Report, dated March 14, 2011.
Attachment 3 contains WNA-LI-00058-WBT-NP, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3 dated March 2011 (non-proprietary).
compliance items for ISG6 were addressed by referencing the SPM. The NRC approved the CQ TR and associated SPM; it may be more appropriate to review the WBN2 PAMS application to for adherence to the SPM that to ISG6. In either path chosen, the applicant should provide documents and a justification for the acceptability of any deviation from the path chosen. For example, it appears that the Westinghouse's CDIs are commercial grade dedication plans, but Westinghouse maintains that they are commercial grade dedication reports; this apparent deviation should be justified or explained.
Attachment 4 contains CWA-11-311, Application for Withholding Proprietary Information from Public Disclosure, WNA-LI-00058-WBT-P, Revision 3 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post-Accident Monitoring System (PAMS) Licensing Technical Report, dated March 14, 2011.
067 7.5.2 7.5.1 EICB (Carte)
067   7.5.2   7.5.1                 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                    Date: 5/25/10            3. N        Open                                  Open-NRC Review  N/A - No question TVA Letter dated EICB (Carte) date for the "Commercial Grade Dedication Instructions for AI687,                                                                                                                   Due: 3/29/11    was asked. Item 6/18/10 AI688, Upgraded PC node box and flat panels." was September         The following status is from the revised WB2 Common Q                     Pending Submittal of Revision 3                        was opened to track 28, 2010.                                                          PAMS ISG-6 Compliance Matrix submitted in response to                     of the Licensing Technical                            comm8ittment Item 43:                                                                   Report due 3/29/11.              NNC 2/2/11: Section 7 made by applicant.
By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the "Commercial Grade Dedication Instructions for AI687, AI688, Upgraded PC node box and flat panels." was September 28, 2010.
of the WBN2 PAMS
Responder: WEC Date: 5/25/10 The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:
: a. AI687, AI688 - Scheduled for September 28, 2010                           Response included in letter      LTR should be updated dated 12/22/10.                  to include:
: a. AI687, AI688 - Scheduled for September 28, 2010
: b. Upgraded PC node box and flat panel displays - Per                                                         (1) non-proprietary Westinghouse letter WBT-D-2024 (Reference 7), these items                     This item is addressed in Rev. 2 description of are available for audit at the Westinghouse Rockville office.                 of the Licensing Technical      commercial grade Report                          dedication, and
: b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), these items are available for audit at the Westinghouse Rockville office.
: c. Power supplies - Per Westinghouse letter WBT-D-2035                                                         (2) Software example (Reference 12), these items are available for audit at the Westinghouse Rockville office.                                                                                     Commercial grade
: c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
: 3.
N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
Response included in letter dated 12/22/10.
This item is addressed in Rev. 2 of the Licensing Technical Report Open-NRC Review Due: 3/29/11 NNC 2/2/11: Section 7 of the WBN2 PAMS LTR should be updated to include:
(1) non-proprietary description of commercial grade dedication, and (2) Software example Commercial grade N/A - No question was asked. Item was opened to track comm8ittment made by applicant.
TVA Letter dated 6/18/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                               radE4C39.docx                                                                                         Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                              Issue                                                    TVA Response(s)                            Acceptable       Status/ Current Actions         Resolution Path         RAI No. & Date   RAI Resp. Date     Comments Sec. Sec. POC                                                                                                                                                Y/N dedication will also be To be addressed during 9/20-9/21 audit                                                                       addressed at the next audit.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments To be addressed during 9/20-9/21 audit TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:
WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:
Section 7, Commercial Grade Dedication Process, has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.
Section 7, Commercial Grade Dedication Process, has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.
Line 377: Line 1,189:
The non-proprietary commercial grade dedication discussion is included in Attachment 3, WNA-LI-00058-WBT-NP, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3 dated March 2011 (non-proprietary)
The non-proprietary commercial grade dedication discussion is included in Attachment 3, WNA-LI-00058-WBT-NP, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3 dated March 2011 (non-proprietary)
Section 7. The software example is included in Attachment 2, WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary) Section 7.
Section 7. The software example is included in Attachment 2, WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary) Section 7.
068   7.5.2   7.5.1                 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                    Date: 5/25/10            4. N        Open                            Open-NRC Review          N/A - No question TVA Letter dated EICB (Carte) date for the "Summary Report on acceptance of AI687, AI688,                                                                                                                                             was asked. Item 6/18/10 Upgraded PC node box, flat panels, and power supplies." was         The following status is from the revised WB2 Common Q                     Response included in letter      NNC 2/2/11:              was opened to track September 28, 2010.                                                PAMS ISG-6 Compliance Matrix submitted in response to                     dated 12/22/10.                  Commercial grade        comm8ittment Item 43:                                                                                                   dedication will be      made by applicant.
dedication will also be addressed at the next audit.
addressed at the next
068 7.5.2 7.5.1 EICB (Carte)
: a. AI687, AI688 - Scheduled for September 28, 2010                           This item is addressed in Rev. 2 audit. Summary of the Licensing Technical      reports for AI687 &
By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the "Summary Report on acceptance of AI687, AI688, Upgraded PC node box, flat panels, and power supplies." was September 28, 2010.
: b. Upgraded PC node box - Per Westinghouse letter WBT-                       Report                          AI688 were docketed D-2024 (Reference 7), this item is available for audit at the                                                 one month late.
Responder: WEC Date: 5/25/10 The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:
Westinghouse Rockville office.
: a. AI687, AI688 - Scheduled for September 28, 2010
: b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
: d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
Line 387: Line 1,200:
For the commercial grade dedication process, please see the response to Request for Additional Information (RAI) item 3 in this letter, NRC Matrix Item 067.
For the commercial grade dedication process, please see the response to Request for Additional Information (RAI) item 3 in this letter, NRC Matrix Item 067.
The component level EQ/Seismic summary reports for the hardware listed above are available for NRC review/audit as described below:
The component level EQ/Seismic summary reports for the hardware listed above are available for NRC review/audit as described below:
: 4.
N Open Response included in letter dated 12/22/10.
This item is addressed in Rev. 2 of the Licensing Technical Report Open-NRC Review NNC 2/2/11:
Commercial grade dedication will be addressed at the next audit. Summary reports for AI687 &
AI688 were docketed one month late.
N/A - No question was asked. Item was opened to track comm8ittment made by applicant.
TVA Letter dated 6/18/10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                 radE4C39.docx                                                               Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                            TVA Response(s)                      Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                Y/N (1) AI687 and AI688, the following documents were submitted in TVA Letter to NRC dated October 26, 2010, Watts Bar Nuclear Plant (WBN) Unit 2 -
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (1) AI687 and AI688, the following documents were submitted in TVA Letter to NRC dated October 26, 2010, Watts Bar Nuclear Plant (WBN) Unit 2 -
Instrumentation and Controls Staff Information Requests, (Reference 5):
Instrumentation and Controls Staff Information Requests, (Reference 5):
: a. EQ-EV-62-WBT, Revision 0, Common Q PAMS Comparison of Tested Conditions for the AI687 and AI688 Common Q Modules and Supporting Components to the Watts Bar Unit 2 (WBT)
: a.
EQ-EV-62-WBT, Revision 0, Common Q PAMS Comparison of Tested Conditions for the AI687 and AI688 Common Q Modules and Supporting Components to the Watts Bar Unit 2 (WBT)
Requirements, dated September 10, 2010
Requirements, dated September 10, 2010
: b. EQLR-171, Revision 0, Environmental and Seismic Test Report, Analog Input (AI)687 &
: b.
EQLR-171, Revision 0, Environmental and Seismic Test Report, Analog Input (AI)687 &
AI688 Modules for use in Common Q PAMS, dated September 10, 2010
AI688 Modules for use in Common Q PAMS, dated September 10, 2010
: c. CN-EQT-10-44, Revision 0, Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS), dated September 28, 2010 (2) Upgraded PC Node Box - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:
: c.
: a. CDI-3722, Revision 7, Next Generation PC Node Box Commercial Dedication Instruction
CN-EQT-10-44, Revision 0, Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS), dated September 28, 2010 (2) Upgraded PC Node Box - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:
: b. LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (3) Flat Panel Displays - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:
: a.
: a. CDI-3803, Revision 8, Next Generation Flat Panel Display (FPD) Commercial Dedication Instruction
CDI-3722, Revision 7, Next Generation PC Node Box Commercial Dedication Instruction
: b. LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (4) Power supplies - As stated in Westinghouse letter WBT-D-2035 dated June 11, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office (Reference 7), the following documents are available for NRC audit at the Westinghouse Rockville office:
: b.
: a. CDI- 4057, Revision 4, Commercial Dedication Instruction
LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (3) Flat Panel Displays - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:
: b. EQ-TP-1 05-GEN, Revision 0, Electromagnetic Compatibility Test Plan and Procedure for Quint Power Supplies and Safety System Line Filter
: a.
: c. Breakers, EQ-TP-114-GEN, Revision 0, Seismic Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, Line Filter Assemblies, and South Texas Units 3 & 4 Circuit
CDI-3803, Revision 8, Next Generation Flat Panel Display (FPD) Commercial Dedication Instruction
: d. EQ-TP-117-GEN, Revision 0, Environmental Qualification Test Procedure For Common Q Powe Supplies, Quint Power Supplies, and Line Filter
: b.
LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (4) Power supplies - As stated in Westinghouse letter WBT-D-2035 dated June 11, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office (Reference 7), the following documents are available for NRC audit at the Westinghouse Rockville office:
: a.
CDI-4057, Revision 4, Commercial Dedication Instruction
: b.
EQ-TP-1 05-GEN, Revision 0, Electromagnetic Compatibility Test Plan and Procedure for Quint Power Supplies and Safety System Line Filter
: c.
Breakers, EQ-TP-114-GEN, Revision 0, Seismic Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, Line Filter Assemblies, and South Texas Units 3 & 4 Circuit
: d.
EQ-TP-117-GEN, Revision 0, Environmental Qualification Test Procedure For Common Q Powe Supplies, Quint Power Supplies, and Line Filter  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                   radE4C39.docx                                                                                           Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                                Issue                                                        TVA Response(s)                          Acceptable       Status/ Current Actions           Resolution Path         RAI No. & Date   RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                                    Y/N Assemblies 069   7.5.2   7.5.1                 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC              Date: 5/25/10                      5. N        Open                              Open-NRC Review          N/A - No question N/A EICB (Carte) date for the "Watts Bar 2 PAMS Specific FAT Report" was October                                                                                                                     Due 3/29/11              was asked. Item 2010.                                                              Attachment 1 contains non-proprietary WNA-TR-02451-                           Pending Submittal of the Test                              was opened to track WBT, Revision 0, Test Summary Report for the Post                             Summary Report due 3/29/11       NNC 2/3/11: The           comm8ittment As agreed, the Watts Bar 2 PAMS Specific FAT Report will not be Accident Monitoring System, dated March 2011.                                                                      current due dated         made by applicant.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Assemblies 069 7.5.2 7.5.1 EICB (Carte)
submitted. Instead a non-proprietary PAMS Test Summary Report                                                                                      Awaiting for document to be      above is 4 months will be submitted.                                                                                                                                docketed by TVA.                  later than planned.
By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the "Watts Bar 2 PAMS Specific FAT Report" was October 2010.
074   7.5.2   7.5.1                 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                Date: 5/25/10                  6.      N        Open                              Open-NRC Review    N/A - No question N/A                      Rev. 4 will be available for the NRC EICB (Carte) date for the Post FAT IV&V Phase Summary Report was                                                                                                                                                     was asked. Item                            audit on 2/28/11. This document will not November 30, 2010.                                                 Attachment 1 contains WNA-VR-00283-WBT-P, IV&V                               Response in letter dated March Due TBD                was opened to track                        be submitted. Rev. 5 will be submitted Summary Report for the Post Accident Monitoring System,                       16, 2011                                              commitment made                            after resolution of the datastorm display Revision 4, dated March 2011 (proprietary). Attachment 2                                                     NNC 2/3/11: At least 3 by applicant.                              issue.
As agreed, the Watts Bar 2 PAMS Specific FAT Report will not be submitted. Instead a non-proprietary PAMS Test Summary Report will be submitted.
contains WNA-VR-00283-WBT-NP, IV&V Summary Report                                                           months later than for the Post Accident Monitoring System, Revision 4, dated                                                   planned.
Responder: WEC Date: 5/25/10 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.
March 2011 (non-proprietary). Attachment 3 contains CWA-11-3121, Application for Withholding Proprietary Information from Public Disclosure, WNA-VR-00283-WBT-P, Revision 4 Nuclear Automation IV&V Summary Report for the Post Accident Monitoring System" (Proprietary), dated March 3, 2011.
: 5.
081  7.5.2  7.5.1                  5/6/2010                                                                Responder: Merten/WEC                                        7. N       Open                             Open-NRC Review           EICB RAI          TVA Letter dated NNC 1/5/11: See Also Open Item No.
N Open Pending Submittal of the Test Summary Report due 3/29/11 Awaiting for document to be docketed by TVA.
EICB (Carte)
Open-NRC Review Due 3/29/11 NNC 2/3/11: The current due dated above is 4 months later than planned.
ML102910002        6/18/10          86 and 202.
N/A - No question was asked. Item was opened to track comm8ittment made by applicant.
The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.             The codes and standards documents listed in Section 7 of                  ML101600092 Item No.1: There Due 2/25/11                    Item No. 9 0, Dated April 2010), in Section 7, lists codes and standards           the Common Q PAMS Licensing Technical Report are the                      are three sets of regulatory                                                                    NNC 4/125/2011: See Open Item No.
N/A 074 7.5.2 7.5.1 EICB (Carte)
applicable to the Common Q PAMS. This list contains references         documents that the Common Q platform was licensed to                      criteria that relate to a Common TVA to provide                                                  364.
By {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} TVA stated that the target submittal date for the Post FAT IV&V Phase Summary Report was November 30, 2010.
to old revisions of several regulatory documents, for example:         when the NRC approved the original topical report and                      Q application (e.g. WBN2          requested information.
Responder: WEC Date: 5/25/10 contains WNA-VR-00283-WBT-P, IV&V Summary Report for the Post Accident Monitoring System, Revision 4, dated March 2011 (proprietary). Attachment 2 contains WNA-VR-00283-WBT-NP, IV&V Summary Report for the Post Accident Monitoring System, Revision 4, dated March 2011 (non-proprietary). Attachment 3 contains CWA-11-3121, Application for Withholding Proprietary Information from Public Disclosure, WNA-VR-00283-WBT-P, Revision 4 Nuclear Automation IV&V Summary Report for the Post Accident Monitoring System" (Proprietary), dated March 3, 2011.
(1) RG 1.29 - September 1978 vs. March 2007                             issued the approved SER. The WBN Unit 2 Common Q                          PAMS):
: 6.
(2) RG 1.53 - June 1973 vs. November 2003                               PAMS is designed in accordance with the approved                          (a) Common Q platform              NNC 2/3/11: The (a) IEEE 379-1994 vs. -2000                                             Common Q topical report and approved SER and the codes                    components - Common Q TR above due date has (3) RG 1.75 - September 1975 vs. February 2005                         and standards on which the SER was based. Since the                        (b) Application Development        been missed by at (a) IEEE 384-1992 vs. -1992                                             current versions referenced are not applicable to WBN Unit                Processes - Common Q SPM least 2 months.
N Open Response in {{letter dated|date=March 16, 2011|text=letter dated March 16, 2011}} Open-NRC Review Due TBD NNC 2/3/11: At least 3 months later than planned.
(4) RG 1.100 - June 1988 vs. September 2009                             2, there is no basis for a comparison review.                              (c) Application Specific - current Please provide new (a) IEEE 344-1987 vs. -2004                                                                                                                       regulatory criteria                due date.
N/A - No question was asked. Item was opened to track commitment made by applicant.
(5) RG 1.152 - January 1996 vs. January 2006                           Bechtel to develop a matrix and work with Westinghouse to                  The Common Q Topical Report (a) IEEE 7-4.33.2-1993 vs. -2003                                       provide justification.                                                    and associated appendices (6) RG 1.168 - September 1997 vs. February 2004                                                                                                   primarily addressed (a) and (b).
N/A Rev. 4 will be available for the NRC audit on 2/28/11. This document will not be submitted. Rev. 5 will be submitted after resolution of the datastorm display issue.
(a) IEEE 1012-1986 vs. -1998                                           TVA Response to Follow-up NRC Request:                                    The Common Q SER states:
081 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.
(b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991                                         Attachment 4 contains the results of the TVA analysis of                  Appendix 1, Post Accident (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 endorses         standards and regulatory guides applicable to the Common                  Monitoring Systems, provides 323-1974)                                                               Q PAMS. Based on the results of the analysis, the Common                  the functional requirements and However, LIC-110, "Watts Bar Unit 2 License Application Review,"       Q PAMS design meets the applicable requirements and is                    conceptual design approach for states: "Design features and administrative programs that are           acceptable.                                                                upgrading an existing PAMS unique to Unit 2 should then be reviewed in accordance with the                                                                                   based on Common Q current staff positions." Please identify all differences between the                                                                             components (page 58, Section versions referenced and the current staff positions. Please provide                                                                               4.4.1.1, Description)On the a justification for the acceptability PAMS with respect to these                                                                                  basis of the above review, the differences.                                                                                                                                      staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)
0, Dated April 2010), in Section 7, lists codes and standards applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:
The NRC did not approve the
(1) RG 1.29 - September 1978 vs. March 2007 (2) RG 1.53 - June 1973 vs. November 2003 (a) IEEE 379-1994 vs. -2000 (3) RG 1.75 - September 1975 vs. February 2005 (a) IEEE 384-1992 vs. -1992 (4) RG 1.100 - June 1988 vs. September 2009 (a) IEEE 344-1987 vs. -2004 (5) RG 1.152 - January 1996 vs. January 2006 (a) IEEE 7-4.33.2-1993 vs. -2003 (6) RG 1.168 - September 1997 vs. February 2004 (a) IEEE 1012-1986 vs. -1998 (b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 endorses 323-1974)
However, LIC-110, "Watts Bar Unit 2 License Application Review,"
states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions." Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences.
Responder: Merten/WEC The codes and standards documents listed in Section 7 of the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the codes and standards on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.
Bechtel to develop a matrix and work with Westinghouse to provide justification.
TVA Response to Follow-up NRC Request:
contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common Q PAMS design meets the applicable requirements and is acceptable.
: 7.
N Open ML101600092 Item No.1: There are three sets of regulatory criteria that relate to a Common Q application (e.g. WBN2 PAMS):
(a) Common Q platform components - Common Q TR (b) Application Development Processes - Common Q SPM (c) Application Specific - current regulatory criteria The Common Q Topical Report and associated appendices primarily addressed (a) and (b).
The Common Q SER states:
Appendix 1, Post Accident Monitoring Systems, provides the functional requirements and conceptual design approach for upgrading an existing PAMS based on Common Q components (page 58, Section 4.4.1.1, Description)On the basis of the above review, the staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)
The NRC did not approve the Open-NRC Review Due 2/25/11 TVA to provide requested information.
NNC 2/3/11: The above due date has been missed by at least 2 months.
Please provide new due date.
EICB RAI ML102910002 Item No. 9 TVA Letter dated 6/18/10 NNC 1/5/11: See Also Open Item No.
86 and 202.
NNC 4/125/2011: See Open Item No.
364.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                     radE4C39.docx                                                                                       Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                                  Issue                                                        TVA Response(s)                            Acceptable       Status/ Current Actions         Resolution Path   RAI No. & Date   RAI Resp. Date               Comments Sec. Sec. POC                                                                                                                                                        Y/N proposed PAMS design.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments proposed PAMS design.
Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.
Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.
Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design. For example IEEE Std.
Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design. For example IEEE Std.
603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other Systems, contain application specific requirements that must be addressed by a PAMS system.
603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other Systems, contain application specific requirements that must be addressed by a PAMS system.
Awaiting TVA Response.
Awaiting TVA Response.
086   7.5.2   7.5.1                 5/6/2010                                                                Responder: WEC                    Date: 5/24/10              8. N        Open                              Open-NRC Review      EICB RAI          TVA Letter dated NNC 1/6/11: See Also Open Item No.81 EICB (Carte)
086 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.
ML102910002      6/18/10          & 202 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.               The regulatory documents listed in the Common Q PAMS                        TVA to address with item OI      Due 2/25/11          Item No. 14 0, Dated April 2010), in Section 6, lists references applicable to the   Licensing Technical Report are the documents that the                        81.
0, Dated April 2010), in Section 6, lists references applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:
Common Q PAMS. This list contains references to old revisions of         Common Q platform was licensed to when the NRC                                                                NNC 2/3/11: The several regulatory documents, for example:                               approved the original topical report and issued the approved                                                  above due date has (1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1                         SER. The WBN Unit 2 Common Q PAMS is designed in                                                              been missed by at (ML083310185)                                                           accordance with the approved Common Q topical report and                                                      least 2 months.
(1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 (ML083310185)
However, LIC-110, "Watts Bar Unit 2 License Application Review,"         approved SER and the regulatory documents on which the                                                        Please provide new states: "Design features and administrative programs that are           SER was based. Since the current versions referenced are                                                      due date.
However, LIC-110, "Watts Bar Unit 2 License Application Review,"
unique to Unit 2 should then be reviewed in accordance with the         not applicable to WBN Unit 2, there is no basis for a current staff positions." Please identify all differences between the   comparison review.
states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions." Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences.
versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these         Rev 0 of the Licensing Technical Report references Rev. 1 of differences.                                                            ISG4 TVA Response to Follow-up NRC Request:
Responder: WEC Date: 5/24/10 The regulatory documents listed in the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the regulatory documents on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.
Rev 0 of the Licensing Technical Report references Rev. 1 of ISG4 TVA Response to Follow-up NRC Request:
The analysis for compliance with DI&C-ISG04, Revision 0 to Revision 1 was previously submitted as part of the Common Q PAMS Licensing Technical Report Revision 2 on December 22, 2010. Attachment 4 contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common Q PAMS design is acceptable.
The analysis for compliance with DI&C-ISG04, Revision 0 to Revision 1 was previously submitted as part of the Common Q PAMS Licensing Technical Report Revision 2 on December 22, 2010. Attachment 4 contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common Q PAMS design is acceptable.
: 8.
N Open TVA to address with item OI
: 81.
Open-NRC Review Due 2/25/11 NNC 2/3/11: The above due date has been missed by at least 2 months.
Please provide new due date.
EICB RAI ML102910002 Item No. 14 TVA Letter dated 6/18/10 NNC 1/6/11: See Also Open Item No.81
& 202


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                   radE4C39.docx                                                                                         Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                                Issue                                                      TVA Response(s)                          Acceptable       Status/ Current Actions           Resolution Path       RAI No. & Date   RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                                    Y/N 101                                 4/12/2010                                                           Responder: Slifer                                              9. Y      Open                              Open-NRC Review        N/A                                  TVA is working with the vendor to meet DORL (Poole) the 6/30 date, however there is the The non-proprietary versions of the following RM-1000,         The documents, and affidavits for withholding for the listed                      Documents provided in letter      Due 10/14/10                                                potential this will slip to 7/14.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 101 DORL (Poole) 4/12/2010 The non-proprietary versions of the following RM-1000, Containment High Range Post Accident Radiation Monitor documents will be provided by June 30, 2010.
Containment High Range Post Accident Radiation Monitor         documents were submitted to the NRC on TVA letter to the                          dated 07/15/10 documents will be provided by June 30, 2010.                  NRC dated July 15, 2010.                                                                                              Confirm receipt.
: 1. V&V Report 04508006A
: 1. V&V Report 04508006A
: 2. System Description 04508100-1TM
: 2. System Description 04508100-1TM
: 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
: 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
: 4. Functional Testing Report 04507007-1TR 138                                  By letter dated February 3, 2010, Westinghouse informed TVA that Responder: WEC                                                    10. N      Open                               Open-NRC Review         ML101650255, Item                    See also No. 82.
: 4. Functional Testing Report 04507007-1TR Responder: Slifer The documents, and affidavits for withholding for the listed documents were submitted to the NRC on TVA letter to the NRC dated July 15, 2010.
EICB (Carte) certain PAMS documentation has been completed.                                                                                                                                                               No. 2 This item is used to track all Commercial Grade                              Pending Submittal of Revision 3 NNC 2/2/11:
: 9.
(a) The draft ISG6 states that a commercial grade dedication plan Dedication issues.                                                              of the Licensing Technical      Commercial grade should be provided with an application for a Tier 2 review.                                                                                       Report due 3/29/11.              dedication will be
Y Open Documents provided in letter dated 07/15/10 Open-NRC Review Due 10/14/10 Confirm receipt.
: a. WNA-LI-00058-WT-P, Revision 2, Post-Accident                                                              addressed at the next By letter dated February 5, 2010, TVA stated that the commercial       Monitoring System (PAMS) Licensing Technical Report                      Revised response included in audit.
N/A TVA is working with the vendor to meet the 6/30 date, however there is the potential this will slip to 7/14.
grade dedication plan was included in the Common Q Topical             submitted in TVA Letter to NRC dated December 3,                          letter dated 12/22/10 Report Section 11, Commercial Grade Dedication Program.               2010, (Reference 1) contains the following changes to                                                      NNC 2/17/11: The Section 11 includes a description of the Common Q Commercial           address the NRC request:                                                  TVA agreed to include a          description of the Grade Dedication Program, and states: A detailed review plan is                                                                                 description of the generic      commercial grade developed for each Common Q hardware or software component             Section 7, Commercial Grade Dedication Process has                     Westinghouse hardware            dedication process in that requires commercial grade dedication.                            been revised to describe the general commercial grade                     commercial grade dedication      the CQ PAMS LTR dedication process for both hardware and software and                     process in the PAMS licensing Rev. 2 should be Please provide the commercial grade dedication plans for each          uses a description of the AI687 dedication process as                     technical report. (see          updated to include a Common Q hardware or software component that has not been              an example of how the process is applied.                                 ML102920031 Item No 1)          non-proprietary previously reviewed and approved by the NRC.                                                                                                                                      description and to As listed in Table 6-3. Westinghouse Watts Bar 2                         TVA agreed to include (in the    include a software (b) The draft ISG6 states that a commercial grade dedication report    Common Q PAMS Documents at Westinghouse                                   PAMS licensing technical report) example.
138 EICB (Carte)
should be provided within 12 months of requested approval for a        Rockville Office, the following commercial grade                         an evaluation of WBN2 critical Tier 2 review.                                                          dedication documents are available for NRC audit at the                   characteristics for commercial Westinghouse Rockville office: (list included in letter)                 Westinghouse hardware (i) Please provide 00000-ICE-37722 Rev. 0, Commercial Grade                                                                                      components against the generic Dedication Report for the QNX Operating System for Common Q b. It is TVAs understanding that the submittal of the                               critical characteristics. (see Applications.                                                          documents listed in (b.i) and (b.ii) is no longer required.               ML102920031 Item No 2)
By {{letter dated|date=February 3, 2010|text=letter dated February 3, 2010}}, Westinghouse informed TVA that certain PAMS documentation has been completed.
Rather, it was agreed, that the inclusion of a description (ii) Please provide WNA-CD-00018-GEN Rev. 3, Commercial                of the commercial grade dedication process in revision                   TVA agreed to include a Dedication Report for QNX 4.25G for Common Q Applications.            2 of the Post-Accident Monitoring System (PAMS)                           description of the generic Licensing Technical Report, WNA-LI-00058-WT-P,                           Westinghouse software would be sufficient to address this request.                             commercial grade dedication process in the PAMS licensing TVA Response to Follow-up NRC Request:                                       technical report. (see ML102920031 Item No 3)
(a) The draft ISG6 states that a commercial grade dedication plan should be provided with an application for a Tier 2 review.
The non-proprietary commercial grade dedication discussion is included in Attachment 3, WNA-LI-00058-WBT-NP, Post-                     TVA agreed to include (in the Accident Monitoring System (PAMS) Licensing Technical                       PAMS licensing technical report)
By {{letter dated|date=February 5, 2010|text=letter dated February 5, 2010}}, TVA stated that the commercial grade dedication plan was included in the Common Q Topical Report Section 11, Commercial Grade Dedication Program.
Report, Revision 3 dated March 2011 (non-proprietary)                       an evaluation of WBN2 critical Section 7. The software example is included in Attachment                   characteristics for commercial 2, WNA-LI-00058-WBT-P, Post-Accident Monitoring System                     software components against (PAMS) Licensing Technical Report, Revision 3, dated                       the generic critical March 2011 (proprietary) Section 7.                                         characteristics. (see ML102920031 Item No 4) 142                                  The applicable regulatory guidance for reviewing the WBN2 PAMS Responder: WEC                                                11.         N      Open                              Open-NRC Review         ML101650255, Item                   WBN2 PAMS System Requirements EICB          SysRS would be IEEE 830 as endorsed by Regulatory Guide 1.172                                                                                                                                               No. 6                                Specification (Carte)        and BTP 7-14 Section B.3.3.1, Requirements Activities - Software This item is used to track all traceability issues with the                                                        Due 2/25/11 (document Requirements Specifications. IEEE 830-1994 Section 4.3.8,       Software Requirements Specification (SRS).                                       Revised response included in       submittals)                                                 TVA docketed WNA-DS-01617-WBT
Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: A detailed review plan is developed for each Common Q hardware or software component that requires commercial grade dedication.
Please provide the commercial grade dedication plans for each Common Q hardware or software component that has not been previously reviewed and approved by the NRC.
(b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval for a Tier 2 review.
(i) Please provide 00000-ICE-37722 Rev. 0, Commercial Grade Dedication Report for the QNX Operating System for Common Q Applications.
(ii) Please provide WNA-CD-00018-GEN Rev. 3, Commercial Dedication Report for QNX 4.25G for Common Q Applications.
Responder: WEC This item is used to track all Commercial Grade Dedication issues.
: a.
WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC request:
Section 7, Commercial Grade Dedication Process has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.
As listed in Table 6-3. Westinghouse Watts Bar 2 Common Q PAMS Documents at Westinghouse Rockville Office, the following commercial grade dedication documents are available for NRC audit at the Westinghouse Rockville office: (list included in letter)
: b.
It is TVAs understanding that the submittal of the documents listed in (b.i) and (b.ii) is no longer required.
Rather, it was agreed, that the inclusion of a description of the commercial grade dedication process in revision 2 of the Post-Accident Monitoring System (PAMS)
Licensing Technical Report, WNA-LI-00058-WT-P, would be sufficient to address this request.
TVA Response to Follow-up NRC Request:
The non-proprietary commercial grade dedication discussion is included in Attachment 3, WNA-LI-00058-WBT-NP, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3 dated March 2011 (non-proprietary)
Section 7. The software example is included in Attachment 2, WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary) Section 7.
: 10. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
Revised response included in letter dated 12/22/10 TVA agreed to include a description of the generic Westinghouse hardware commercial grade dedication process in the PAMS licensing technical report. (see ML102920031 Item No 1)
TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial Westinghouse hardware components against the generic critical characteristics. (see ML102920031 Item No 2)
TVA agreed to include a description of the generic Westinghouse software commercial grade dedication process in the PAMS licensing technical report. (see ML102920031 Item No 3)
TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4)
Open-NRC Review NNC 2/2/11:
Commercial grade dedication will be addressed at the next audit.
NNC 2/17/11: The description of the commercial grade dedication process in the CQ PAMS LTR Rev. 2 should be updated to include a non-proprietary description and to include a software example.
ML101650255, Item No. 2 See also No. 82.
142 EICB (Carte)
The applicable regulatory guidance for reviewing the WBN2 PAMS SysRS would be IEEE 830 as endorsed by Regulatory Guide 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities - Software Requirements Specifications. IEEE 830-1994 Section 4.3.8, Responder: WEC This item is used to track all traceability issues with the Software Requirements Specification (SRS).
: 11. N Open Revised response included in Open-NRC Review Due 2/25/11 (document submittals)
ML101650255, Item No. 6 WBN2 PAMS System Requirements Specification TVA docketed WNA-DS-01617-WBT  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                         radE4C39.docx                                                                               Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                                    Issue                                                        TVA Response(s)                        Acceptable       Status/ Current Actions       Resolution Path   RAI No. & Date RAI Resp. Date               Comments Sec. Sec. POC                                                                                                                                          Y/N Traceable, states: A [requirements specification] is traceable of                                                                           letter dated 02/25/11                                                                  Rev. 1, RRAS Watts Bar 2 NSSS the origin of each of its requirements is clear                                                                                                                               NNC 2/2/11: Updated                                  Completion Program I&C Projects Post Response included in letter      Specifications and                                    Accident Monitoring System- System
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Traceable, states: A [requirements specification] is traceable of the origin of each of its requirements is clear
: 1. How did TVA ensure the traceability of each requirement in     TVA Response to 1:                                                       dated 12/22/10                  RTMs to be provided by                               Requirements Specification, dated the WBN2 PAMS SysRS.                                           Traceability of requirements for the WBN Unit 2 Common Q                                                   TVA                                                  December 2009.
: 1.
PAMS is ensured by:                                                       TVA/Westinghouse agreed to
How did TVA ensure the traceability of each requirement in the WBN2 PAMS SysRS.
: a. Preparation of the TVA Contract Compliance Matrix                     include the V&V evaluation of Tracability to be contained in WNA-LI-00058-WBT-P, Revision 2, Post-               their reusable software element addressed during the Accident Monitoring System (PAMS) Licensing                       development process in the      next audit.
: 2.
Technical Report submitted in TVA Letter to NRC                   V&V design phase summary dated December 3, 2010 (Reference 1).                             report. This evaluation would
Explain the source(s) of the requirements present in the Post Accident Monitoring Systems Software Requirements Specification. To clarify, many documents have requirements that are incorporated by reference into the SRS, but what served to direct the author to include those various documents in the SRS or, if the requirement is based on the System Requirements Specification, what directed the author to include the requirement there?
: b. Engineering review/comment/status of each revision                   include an evaluation against of:                                                               the development process
: 3.
: i. WNA-DS-01617-WBT, Post Accident                         requirements. This evaluation Monitoring System - System Requirements                   would also include an evaluation Specification                                           of how the WBN2 specific ii. WNA-DS-01667-WBT, Post Accident                         requirements were addressed Monitoring System - System Design                         by the reusable software Specification (hardware)                                 elements. (see ML102920031 iii. WNA-SD-00239-WBT, Software Requirements                 Item No 5)
Clarify whether the unnumbered paragraphs in the Post Accident Monitoring Systems Software Requirements Specification, such as in the section headings, or are all such sections simply considered to be informative?
Specification for the Post Accident Monitoring System (software)
Does the same apply to documents referenced by the SRS?
Such as WCAP-16096-NP-A, Rev. 1A, Software Program Manual for Common Q Systems, which is incorporated by reference in requirement R2.3-2 in the SRS.
R2.3-2 [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, Software Program Manual for Common Q Systems (reference 5).]
If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity, and describe how they were verified.
: 4.
Are there any sources of requirements in parallel with the Post Accident Monitoring Systems Software Requirements TVA Response to 1:
Traceability of requirements for the WBN Unit 2 Common Q PAMS is ensured by:
: a.
Preparation of the TVA Contract Compliance Matrix contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
: b. Engineering review/comment/status of each revision of:
: i.
WNA-DS-01617-WBT, Post Accident Monitoring System - System Requirements Specification ii.
WNA-DS-01667-WBT, Post Accident Monitoring System - System Design Specification (hardware) iii.
WNA-SD-00239-WBT, Software Requirements Specification for the Post Accident Monitoring System (software)
TVA Response to 2:
TVA Response to 2:
: 2. Explain the source(s) of the requirements present in the Post    As documented in the RTM, some software requirements Accident Monitoring Systems Software Requirements              are taken from generic documents. The decision to include Specification. To clarify, many documents have requirements      generic software requirements was to reduce the overall that are incorporated by reference into the SRS, but what        scope for Common Q features that are unchanged across served to direct the author to include those various            projects. Westinghouse reviewed the generic PAMS documents in the SRS or, if the requirement is based on the      requirements and included those requirements that were System Requirements Specification, what directed the author      applicable to WBN Unit 2 PAMS.
As documented in the RTM, some software requirements are taken from generic documents. The decision to include generic software requirements was to reduce the overall scope for Common Q features that are unchanged across projects. Westinghouse reviewed the generic PAMS requirements and included those requirements that were applicable to WBN Unit 2 PAMS.
to include the requirement there?
Source: E-mail from Westinghouse (Matthew A.
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 3. Clarify whether the unnumbered paragraphs in the Post            TVA Response to 3:
TVA Response to 3:
Accident Monitoring Systems Software Requirements              Unnumbered paragraphs in the Post Accident Monitoring Specification, such as in the section headings, or are all such  Systems Software Requirements Specification, such as in sections simply considered to be informative?                    the section headings, are informative and are not to be interpreted as requirements. All requirements are explicitly Does the same apply to documents referenced by the SRS?          numbered.
Unnumbered paragraphs in the Post Accident Monitoring Systems Software Requirements Specification, such as in the section headings, are informative and are not to be interpreted as requirements. All requirements are explicitly numbered.
Such as WCAP-16096-NP-A, Rev. 1A, Software Program Manual for Common Q Systems, which is incorporated by          It depends on the document type. The statement would be reference in requirement R2.3-2 in the SRS.                      true for requirements documents (such as the SysRS or SDS) if they were incorporated by reference. However, for R2.3-2 [The PAMS software shall comply with the                  the specific item cited, WCAP-16096-NP-A, Rev. 1A, it does requirements and guidelines defined in WCAP-16096-NP-A,          not contain numbered requirements. The requirements Software Program Manual for Common Q Systems                    contained in this document are contained within the text of (reference 5).]                                                  the various sections.
It depends on the document type. The statement would be true for requirements documents (such as the SysRS or SDS) if they were incorporated by reference. However, for the specific item cited, WCAP-16096-NP-A, Rev. 1A, it does not contain numbered requirements. The requirements contained in this document are contained within the text of the various sections.
If any requirements are expressed in such unnumbered              Source: E-mail from Westinghouse (Matthew A. Shakun) to paragraph form instead of individually identified requirements, Bechtel (Mark S. Clark), RE: December 22 letter review, please list them, describe why they satisfy the fundamental      dated December 17, 2010 (Reference 13) requirement of unambiguity, and describe how they were verified.
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 4. Are there any sources of requirements in parallel with the      TVA Response to 4:
TVA Response to 4:
Post Accident Monitoring Systems Software Requirements          The Westinghouse SRS, WNA-SD-00239-WBT, Revision 3
The Westinghouse SRS, WNA-SD-00239-WBT, Revision 3 letter dated 02/25/11 Response included in letter dated 12/22/10 TVA/Westinghouse agreed to include the V&V evaluation of their reusable software element development process in the V&V design phase summary report. This evaluation would include an evaluation against the development process requirements. This evaluation would also include an evaluation of how the WBN2 specific requirements were addressed by the reusable software elements. (see ML102920031 Item No 5)
NNC 2/2/11: Updated Specifications and RTMs to be provided by TVA Tracability to be addressed during the next audit.
Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Requirements Specification, dated December 2009.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                     radE4C39.docx                                                                 Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                                    Issue                                                    TVA Response(s)                        Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                                                      Y/N Specification? Meaning does the SRS contain, explicitly or   contains references to other Westinghouse software by reference, all the requirements that were used in the     requirements documents. Specifically, design phase for the application specific software, or do software design phase activities use requirements found in   00000-ICE-3238, Revision 5, Software Requirements any other source or document? If so, what are these           Specification Post Accident Monitoring System sources or documents?
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Specification? Meaning does the SRS contain, explicitly or by reference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in any other source or document? If so, what are these sources or documents?
00000-ICE-3239, Revision 13, Software Requirements Specification for the Common Q Generic Flat Panel Display Software Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 5.
: 5. References 12, 27, 29, and 31-44 in the Post Accident        TVA Response to 5:
References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification are various types of Reusable Software Element.
Monitoring Systems Software Requirements Specification      Requirements for the reusable software elements (RSEDs) are various types of Reusable Software Element.          are evaluated in WNA-VR-00283-WBT-P, Revision 3, IV&V Summary Report for the Post Accident Monitoring System, These references are used in the body of the SRS, for        dated December 2010 (Attachment 10).
These references are used in the body of the SRS, for example:
example:
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal
RSED traceability is contained in WNA-VR-00280-WBT, R5.3.14-2 [The Addressable Constants CRC error signal shall  Revision 2, Watts Bar 2 NSSS Completion Program I&C be TRUE when any CAL CRC's respective ERROR terminal          Projects Requirements Traceability Matrix for the Reactor
= TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
                              = TRUE (WNA-DS-00315-GEN, "Reusable Software Element          Vessel Level Indication System (RVLIS) Custom PC Document CRC for Calibration Data" [Reference 12]).]          Elements. This document can be made available for audit at the Westinghouse Rockville office.
They are also included via tables such as found in requirement R7.1.2-1
They are also included via tables such as found in requirement R7.1.2-1                                        At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
[The Watts Bar 2 PAMS shall use the application-specific    traceability concerns with the Software Requirements type circuits and custom PC elements listed in Table 7.1-1.] Specification.
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?
: 1. Westinghouse will perform a review of the Do the referenced reusable software element documents include            Requirements Traceability Matrix(RTM), using the requirements not explicitly stated in the SRS? If so what is their        issues identified at the 9/15 public meeting as a guide origin?                                                                  (documented below) and update the RTM as required.
contains references to other Westinghouse software requirements documents. Specifically, 00000-ICE-3238, Revision 5, Software Requirements Specification Post Accident Monitoring System 00000-ICE-3239, Revision 13, Software Requirements Specification for the Common Q Generic Flat Panel Display Software Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
TVA Response to 5:
Requirements for the reusable software elements (RSEDs) are evaluated in WNA-VR-00283-WBT-P, Revision 3, IV&V Summary Report for the Post Accident Monitoring System, dated December 2010 (Attachment 10).
RSED traceability is contained in WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements. This document can be made available for audit at the Westinghouse Rockville office.
At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the traceability concerns with the Software Requirements Specification.
: 1.
Westinghouse will perform a review of the Requirements Traceability Matrix(RTM), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
TVA Response:
TVA Response:
See response to letter Item 13 (NRC Matrix Item 145).
See response to letter Item 13 (NRC Matrix Item 145).
: 2. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 2.
The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
TVA Response:
TVA Response:
See response to letter Item 13 (NRC Matrix Item 145).
See response to letter Item 13 (NRC Matrix Item 145).
: 3. Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.
: 3.
Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.
TVA Response:
TVA Response:
A comments column has been added to WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System.
A comments column has been added to WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System.
Source: E-mail from Westinghouse (Matthew A.
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22
Shakun) to Bechtel (Mark S. Clark), RE: December 22  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                               radE4C39.docx                                                                 Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                            TVA Response(s)                      Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                Y/N letter review, dated December 17, 2010 (Reference 13)
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments letter review, dated December 17, 2010 (Reference 13)
: 4. IEEE 830 says you shouldnt have planning information in the SRS. Westinghouse has agreed to remove this information.
: 4.
IEEE 830 says you shouldnt have planning information in the SRS. Westinghouse has agreed to remove this information.
TVA Response:
TVA Response:
Westinghouse has confirmed that process requirements have been removed from the SRS.
Westinghouse has confirmed that process requirements have been removed from the SRS.
Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
: 5. IEEE 830 says you shouldnt have process requirements in the SRS. Westinghouse has agreed to remove these requirements.
: 5.
IEEE 830 says you shouldnt have process requirements in the SRS. Westinghouse has agreed to remove these requirements.
TVA Response:
TVA Response:
Westinghouse confirmed that process requirements have been removed from the SRS.
Westinghouse confirmed that process requirements have been removed from the SRS.
Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
: 6. Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Reg.
: 6.
Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Reg.
Guide 1.172 and justify any deviations.
Guide 1.172 and justify any deviations.
TVA Response:
TVA Response:
WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1):
WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1):
Section 9, Compliance Evaluation Of The Watts Bar 2 PAMS Software Requirements Specification To IEEE Standard 830-1998 And Regulatory Guide 1.172 has been added.
Section 9, Compliance Evaluation Of The Watts Bar 2 PAMS Software Requirements Specification To IEEE Standard 830-1998 And Regulatory Guide 1.172 has been added.
: 7. 25 issues identified by V&V where some requirements have not been included in the System Design Specification (SDS) (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed?
: 7.
25 issues identified by V&V where some requirements have not been included in the System Design Specification (SDS) (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed?
TVA Response:
TVA Response:
The twenty-five (25) issues are captured in Exception Reports (ERs): V&V-769 and V&V-770. These ERs have all been addressed and the ERs have been closed satisfactorily by Westinghouse IV&V.
The twenty-five (25) issues are captured in Exception Reports (ERs): V&V-769 and V&V-770. These ERs have all been addressed and the ERs have been closed satisfactorily by Westinghouse IV&V.
Source: E-mail from Westinghouse (Matthew A.
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 8. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). These will be removed from the SRS and
: 8.
Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). These will be removed from the SRS and  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                 radE4C39.docx                                                               Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                            TVA Response(s)                        Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                  Y/N incorporated into the next revision of the SDS.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments incorporated into the next revision of the SDS.
TVA Response:
TVA Response:
The hardware requirements in the Software Requirements Specification have been deleted and moved to System Design Specification.
The hardware requirements in the Software Requirements Specification have been deleted and moved to System Design Specification.
Source: E-mail from Westinghouse (Matthew A.
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 16, 2010 (Reference 15)
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 16, 2010 (Reference 15)
: 9. RTM item R4.2-2 protection class software set to 0.
: 9.
RTM item R4.2-2 protection class software set to 0.
Needs to be fixed internally. Write CAPs to revise the application restrictions document on AC160.
Needs to be fixed internally. Write CAPs to revise the application restrictions document on AC160.
TVA Response:
TVA Response:
Line 555: Line 1,492:
TVA Response:
TVA Response:
Westinghouse has elected to standardize on the terms FE keyswitch and ENABLE. A review of recent documents for compliance with this comment and commitment was performed with the following results:
Westinghouse has elected to standardize on the terms FE keyswitch and ENABLE. A review of recent documents for compliance with this comment and commitment was performed with the following results:
: a. Revision 3 of the SysRS, and SDS have been revised to use the terms FE keyswitch. Revision 3 of the SDS is consistent in use of the term ENABLE.
: a.
: b. SysRS Revision 3 is not consistent in use of the term ENABLE as noted below:
Revision 3 of the SysRS, and SDS have been revised to use the terms FE keyswitch. Revision 3 of the SDS is consistent in use of the term ENABLE.
: b.
SysRS Revision 3 is not consistent in use of the term ENABLE as noted below:
: i. R2.5.2.1-2 uses the term ENABLED instead of ENABLE ii. R2.5.2.1.3-3, R2.6.3.3-1, R2.6.3.3-2, R2.6.3.3-3, and R2.6.3.3-7, use the term Enable instead of ENABLE
: i. R2.5.2.1-2 uses the term ENABLED instead of ENABLE ii. R2.5.2.1.3-3, R2.6.3.3-1, R2.6.3.3-2, R2.6.3.3-3, and R2.6.3.3-7, use the term Enable instead of ENABLE
: c. Revision 3 of the SRS is not consistent in use of the terms FE keyswitch and ENABLE as noted below:
: c.
: i. Tables 7.2-1 Train A PAMS Data Transmitted to
Revision 3 of the SRS is not consistent in use of the terms FE keyswitch and ENABLE as noted below:
: i. Tables 7.2-1 Train A PAMS Data Transmitted to  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                     radE4C39.docx                                                               Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                                TVA Response(s)                      Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                    Y/N the Plant Computer and 7.2-2 Train B PAMS Data Transmitted to the Plant Computer items 101 and 102 in the SRS refer to the FE switch.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments the Plant Computer and 7.2-2 Train B PAMS Data Transmitted to the Plant Computer items 101 and 102 in the SRS refer to the FE switch.
All other items in the SRS refer to the FE keyswitch.
All other items in the SRS refer to the FE keyswitch.
ii. Section 2.1, page 2-4, uses the term Enable instead of ENABLE iii. Requirements R7.2.14-6 and R7.2.16-7 use the term active instead of ENABLE iv. Requirements R7.2.23-2, R7.2.25-2, R7.2.26-2, R7.2.31-4, 7.2.56 FPDS Availability, and R7.2.57-4 use the term enabled instead of ENABLE
ii. Section 2.1, page 2-4, uses the term Enable instead of ENABLE iii. Requirements R7.2.14-6 and R7.2.16-7 use the term active instead of ENABLE iv. Requirements R7.2.23-2, R7.2.25-2, R7.2.26-2, R7.2.31-4, 7.2.56 FPDS Availability, and R7.2.57-4 use the term enabled instead of ENABLE
: d. WNA-AR-00180-WBT-P, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System, dated October 2010, submitted in TVA letter to NRC dated (Reference
: d.
WNA-AR-00180-WBT-P, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System, dated October 2010, submitted in TVA letter to NRC dated (Reference
: 12) is not consistent in use of the term FE keyswitch as noted below:
: 12) is not consistent in use of the term FE keyswitch as noted below:
: i. Section 2.2 System Description and Table 3-1 WB2 PAMS FMEA refer to the FE switch.
: i. Section 2.2 System Description and Table 3-1 WB2 PAMS FMEA refer to the FE switch.
ii. Table 3-1 describes the switch as the Functional Enable (FE) switch and the FE key-switch
ii. Table 3-1 describes the switch as the Functional Enable (FE) switch and the FE key-switch
: e. Revision 2 of the Licensing Technical Report is not consistent in use of the term FE keyswitch as noted below:
: e.
Revision 2 of the Licensing Technical Report is not consistent in use of the term FE keyswitch as noted below:
: i. Sections 2.2, 5.3 use the term (FE) keylock switch on pages 2-3 (2 places), page 5-3, page 5-6 (4 places)
: i. Sections 2.2, 5.3 use the term (FE) keylock switch on pages 2-3 (2 places), page 5-3, page 5-6 (4 places)
The identified discrepancies in the use of the terms FE keyswitch and ENABLE in the SysRS, SRS, FMEA and Licensing Technical Report, will be corrected in the next revision of the documents.
The identified discrepancies in the use of the terms FE keyswitch and ENABLE in the SysRS, SRS, FMEA and Licensing Technical Report, will be corrected in the next revision of the documents.
Line 580: Line 1,525:
: 13. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no later than 9/30/10 TVA Response:
: 13. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no later than 9/30/10 TVA Response:
The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010 (Reference 5).
The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010 (Reference 5).
: 14. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
: 14. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                 radE4C39.docx                                                               Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                            TVA Response(s)                      Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                Y/N TVA Response:
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response:
The Procurement Requisition Resolution Matrix has been updated and is included in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS)
The Procurement Requisition Resolution Matrix has been updated and is included in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS)
Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1), as Section 11, TVA Contract Compliance Matrix.
Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1), as Section 11, TVA Contract Compliance Matrix.
Line 599: Line 1,547:
: 17. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.
: 17. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.
TVA Response:
TVA Response:
See response in letter dated December 22, 2010, item 2 (NRC Matrix Item 050).
See response in {{letter dated|date=December 22, 2010|text=letter dated December 22, 2010}}, item 2 (NRC Matrix Item 050).
: 18. Westinghouse to resolve the following questions concerning Software Design Descriptions (SDDs)
: 18. Westinghouse to resolve the following questions concerning Software Design Descriptions (SDDs)
: a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
: a.
: b. What are the SDDs?
Is the SDD a standalone document or will it incorporate the generic SDD by reference?
: c. PAMS is a delta document so how do we capture all the generic requirements for traceability.
: b.
What are the SDDs?
: c.
PAMS is a delta document so how do we capture all the generic requirements for traceability.
TVA Response:
TVA Response:
: a. There are three SDDs prepared specifically for the Watts Bar 2 PAMS project. These are listed below in Item b. These documents and superior requirements documents refer to other generic SDDs also listed in Item b.
: a.
There are three SDDs prepared specifically for the Watts Bar 2 PAMS project. These are listed below in Item b. These documents and superior requirements documents refer to other generic SDDs also listed in Item b.  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                 radE4C39.docx                                                                 Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                            TVA Response(s)                        Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                  Y/N
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
: b. The SDDs developed for this project are:
: b.
: i. WNA-SD-00248-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display ii. WNA-SD-00250-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System AC160 Software iii. WNA-SD-00277-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display System Screen Design Details iv. Other generic SDDs referenced by the PAMS project are:
The SDDs developed for this project are:
: i.
WNA-SD-00248-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display ii.
WNA-SD-00250-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System AC160 Software iii.
WNA-SD-00277-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display System Screen Design Details iv.
Other generic SDDs referenced by the PAMS project are:
(a) 00000-ICE-20157, Revision 18, Software Design Description for the Common Q Generic Flat-Panel Software (b) 00000-ICE-30152, Revision 5, Software Design Description Post Accident Monitoring System AC160 (c) 00000-ICE-30140, Revision 4, Software Design Description for the Common Q Core Protection Calculator System Database and Utility Functions
(a) 00000-ICE-20157, Revision 18, Software Design Description for the Common Q Generic Flat-Panel Software (b) 00000-ICE-30152, Revision 5, Software Design Description Post Accident Monitoring System AC160 (c) 00000-ICE-30140, Revision 4, Software Design Description for the Common Q Core Protection Calculator System Database and Utility Functions
: c. Refer to WNA-VR-00279-WBT, Revision 3.
: c.
Refer to WNA-VR-00279-WBT, Revision 3.
Source: E-mail from Westinghouse (Matthew A.
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Line 621: Line 1,582:
Section 3.2.4.1 of WCAP-15927 describes the RSED design process for custom PC elements and type circuits. The Glossary of Terms in the SPM defines custom PC elements and type circuits as modules.
Section 3.2.4.1 of WCAP-15927 describes the RSED design process for custom PC elements and type circuits. The Glossary of Terms in the SPM defines custom PC elements and type circuits as modules.
Therefore, the relationship between WCAP-15927 describing the RSED process as circuits, is defined in the SPM requirements for software module development.
Therefore, the relationship between WCAP-15927 describing the RSED process as circuits, is defined in the SPM requirements for software module development.
WCAP-15927 is on the AP1000 docket.
WCAP-15927 is on the AP1000 docket.  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                       radE4C39.docx                                                                                     Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                      Issue                                                      TVA Response(s)                            Acceptable       Status/ Current Actions     Resolution Path       RAI No. & Date   RAI Resp. Date             Comments Sec. Sec. POC                                                                                                                                        Y/N Source: E-mail from Westinghouse (Matthew A.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
WNA-VR-00279-WBT, Revision 4, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System is scheduled to be available for audit at the Westinghouse Rockville office February 21, 2011. The document will be available at the Westinghouse Cranberry offices to support the NRC Common Q PAMS audit.
WNA-VR-00279-WBT, Revision 4, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System is scheduled to be available for audit at the Westinghouse Rockville office February 21, 2011. The document will be available at the Westinghouse Cranberry offices to support the NRC Common Q PAMS audit.
Attachment 9 contains the proprietary version of WNA-DS-01617-WBT-P, Revision 4, Post Accident Monitoring System - System Requirements Specification, dated February 2011. Attachment 10 contains the non-proprietary version WNA-DS-01617-WBT-NP, Revision 4, Post Accident Monitoring System - System Requirements Specification, dated February, 2011. Attachment 11 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01617-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - System Requirements Specification (Proprietary),
contains the proprietary version of WNA-DS-01617-WBT-P, Revision 4, Post Accident Monitoring System - System Requirements Specification, dated February 2011. Attachment 10 contains the non-proprietary version WNA-DS-01617-WBT-NP, Revision 4, Post Accident Monitoring System - System Requirements Specification, dated February, 2011. Attachment 11 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01617-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - System Requirements Specification (Proprietary),
dated February 10, 2011.
dated February 10, 2011.
Attachment 12 contains the proprietary version of WNA-DS-01667-WBT-P, Revision 4, Post Accident Monitoring System - System Design Specification, dated February 2011. Attachment 13 contains the non-proprietary version WNA-DS-01667-WBT-NP, Revision 4, Post Accident Monitoring System - System Design Specification, dated February 2011. Attachment 14 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01667-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (Proprietary), dated February 11, 2011.
2 contains the proprietary version of WNA-DS-01667-WBT-P, Revision 4, Post Accident Monitoring System - System Design Specification, dated February 2011. Attachment 13 contains the non-proprietary version WNA-DS-01667-WBT-NP, Revision 4, Post Accident Monitoring System - System Design Specification, dated February 2011. Attachment 14 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01667-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (Proprietary), dated February 11, 2011.
Attachment 15 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 4, Software Requirements Specification for the Post Accident Monitoring System, dated February 2011. Attachment 16 contains the non-proprietary version WNA-SD-00239-WBT-NP, Revision 4, Software Requirements Specification for the Post Accident Monitoring System, dated February 2011. Attachment 17 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-SD-00239-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System (Proprietary), dated February 10, 2011.
5 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 4, Software Requirements Specification for the Post Accident Monitoring System, dated February 2011. Attachment 16 contains the non-proprietary version WNA-SD-00239-WBT-NP, Revision 4, Software Requirements Specification for the Post Accident Monitoring System, dated February 2011. Attachment 17 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-SD-00239-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System (Proprietary), dated February 10, 2011.
143                   EICB The WBN2 PAMS Software Requirements Specification (WBN2          Responder: WEC                                                  12. N        Open                          Open-NRC Review        ML101650255, Item                    WBN2 PAMS System Requirements (Carte PAMS SRS - ML101050202) contains a table (see page iii) titled,                                                                                                                                       No. 7                                Specification
143 EICB (Carte
                          )
)
Document Traceability & Compliance, which states that the       Addressed in the 9/15 public meeting and 9/20 - 9/21 audit.                   Response included in letter   Due 2/25/11 (document
The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS - ML101050202) contains a table (see page iii) titled, Document Traceability & Compliance, which states that the Responder: WEC Addressed in the 9/15 public meeting and 9/20 - 9/21 audit.
: 12. N Open Response included in letter Open-NRC Review Due 2/25/11 (document ML101650255, Item No. 7 WBN2 PAMS System Requirements Specification


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                       radE4C39.docx                                                                             Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                                    Issue                                                        TVA Response(s)                      Acceptable     Status/ Current Actions     Resolution Path   RAI No. & Date RAI Resp. Date               Comments Sec. Sec. POC                                                                                                                                        Y/N WBN2 PAMS SRS was created to support the three documents           A detailed explanation will be provided.                                  dated 12/22/10              submittals)                                          TVA docketed WNA-DS-01617-WBT identified (one of which is the WBN2 PAMS SysRS). Section 1.1,                                                                                                                                                                   Rev. 1, RRAS Watts Bar 2 NSSS Overview, of the WBN2 PAMS SRS states: This document             TVA Response:                                                                                          To be addressed by                                    Completion Program I&C Projects Post describes requirements for the major software components                                                                                                                 Revision of the RTM,                                  Accident Monitoring System- System (a) and (b) The requested information is provided in the                                              SRS, SysRS, and                                      Requirements Specification, dated (a) Please list and describe each of the major software                   following documents:                                                                            SysDS.                                                December 2009.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments WBN2 PAMS SRS was created to support the three documents identified (one of which is the WBN2 PAMS SysRS). Section 1.1, Overview, of the WBN2 PAMS SRS states: This document describes requirements for the major software components (a) Please list and describe each of the major software components. Please include a description of any NRC review for each of these components.
components. Please include a description of any NRC review for           i.     WNA-LI-00058-WBT-P, Revision 2, Post-each of these components.                                                          Accident Monitoring System (PAMS) Licensing                                             NNC 2/2/11: Updated Technical Report, Table 6-1, Document                                                 Specifications and (b) Please list and describe each of the other software                            Requirements which lists the software                                                 RTMs to be provided by components. Please include a description of any NRC review for                    documentation requirements for the Common Q                                             TVA each of these components.                                                          PAMS and Section 11 TVA Contract Compliance Matrix submitted in TVA Letter to                                           NNC 2/3/11: The (c) What other documents contain the requirements for the other                    NRC, dated December 3, 2010 (Reference 1).                                             above due date has software components?                                                      ii.     WNA-DS-01617-WBT-P, Revision 3, Post                                                   been missed by at Accident Monitoring System- System                                                     least 2 months.
(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.
The WBN2 PAMS System Design Specification (WBN2 PAMS                              Requirements Specification, dated December                                             Please provide new SDS) contains a table (see page iii) titled, Document Traceability                2010 (Attachment 1)                                                                     due date.
(c) What other documents contain the requirements for the other software components?
                        & Compliance, which states that the WBN2 PAMS SysRS was                iii.      WNA-SD-00239-WBT-P, Revision 3, Software created to support the WBN2 PAMS SysRS. Section 1.1,                              Requirements Specification for the Post Accident Purpose, of the WBN2 PAMS SDS states: The purpose of this                      Monitoring System, dated December 2010 document is to define the hardware design requirements                          (Attachment 7) iv.       WNA-VR-00279-WBT, Revision 3, Watts Bar 2 (c) Do the WBN2 PAMS SRS and SDS, together, implement all of                      NSSS Completion Program I&C Projects the requirements in the WBN2 PAMS SysRS?                                          Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC (e) Please briefly describe all of the documents that implement                    audit at the Westinghouse Rockville office) the WBN2 PAMS SysRS.                                                          To the best of TVAs knowledge, no prior NRC review of the software components has been performed.
The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, Document Traceability
& Compliance, which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, Purpose, of the WBN2 PAMS SDS states: The purpose of this document is to define the hardware design requirements (c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?
(e) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS.
A detailed explanation will be provided.
TVA Response:
(a) and (b) The requested information is provided in the following documents:
: i.
WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Table 6-1, Document Requirements which lists the software documentation requirements for the Common Q PAMS and Section 11 TVA Contract Compliance Matrix submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).
ii.
WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System-System Requirements Specification, dated December 2010 (Attachment 1) iii.
WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010 (Attachment 7) iv.
WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office)
To the best of TVAs knowledge, no prior NRC review of the software components has been performed.
(c) WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)
(c) WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)
(d) No. Please see Item (e) below.
(d) No. Please see Item (e) below.
(e) The documents that describe the requirements that implement the WBN Unit 2 SysRS are:
(e) The documents that describe the requirements that implement the WBN Unit 2 SysRS are:
: i.     WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office) ii.     WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)
: i.
WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office) ii.
WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
See Response to item 3 (Item number 142)
See Response to item 3 (Item number 142) dated 12/22/10 submittals)
To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.
NNC 2/2/11: Updated Specifications and RTMs to be provided by TVA NNC 2/3/11: The above due date has been missed by at least 2 months.
Please provide new due date.
TVA docketed WNA-DS-01617-WBT Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Requirements Specification, dated December 2009.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                               radE4C39.docx                                                                                           Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                              Issue                                                      TVA Response(s)                          Acceptable       Status/ Current Actions         Resolution Path         RAI No. & Date   RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                                Y/N 144                                 The WBN2 PAMS Software Requirements Specification (WBN2             Responder: WEC                                                13. N        Open                            Open-NRC Review            ML101650255, Item TVA Letter dated WBN2 PAMS Software Requirements EICB (Carte)
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 144 EICB (Carte)
PAMS SRS) contains a table (see page iii) titled, Document                                                                                                                                               No. 8            10/5/10          Specification Traceability & Compliance, which states that the WBN2 PAMS     (a) The purpose of NABU-DP-00014-GEN document is to                          Pending Submittal of Revision 3 Due 3/29/11 SRS was created to support the three documents identified (two ofdefine the process for system level design, software design                  of the Licensing Technical                                                                      By letter dated April 8, 2010 these documents have been provided on the docket).               and implementation, and hardware design and                                  Report due 3/29/11.            Responses to items a                                           (ML10101050203), TVA docketed implementation for Common Q safety system development.                                                       and e provided.                                                 WNA-SD-00239-WBT, Revision 1, (a) Please describe the third document (i.e., NABU-DP-00014-GEN This document supplements the Common Q SPM, WCAP-                                                                                                                             "RRAS Watts Bar 2 NSSS Completion Revision 2, Design Process for Common Q Safety Systems).      16096-NP-A. The scope of NABU-DP-00014-GEN includes                           Revised response included in    NNC 11/18/10:                                                  Program I&C Projects, Software the design and implementation processes for the application                   letter dated 12/22/10          (1) Items b-d closed to                                        Requirements Specification for the Post (b) Please describe the flow of information between these three  development. For a fuller description of the design process                                                   other Open Item nos.                                            Accident Monitoring System, dated documents.                                                      described in NABU-DP-00014-GEN please refer to the                           Response provided in letter    (2) The point of these                                          February 2010 (ML101050202).
The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS) contains a table (see page iii) titled, Document Traceability & Compliance, which states that the WBN2 PAMS SRS was created to support the three documents identified (two of these documents have been provided on the docket).
Design Process for AP1000 Common Q Safety Systems,                           dated 10/5/10                  questions was to (c) Does the PAMS SRS implement the requirements in these        WCAP-15927 on the AP1000 docket. Since this is a                                                             understand how the three documents?                                                Westinghouse process document that is not specifically                       NRC Review and WEC to          origin of the referenced in the SRS, it will be removed in the next revision               complete response.              requirements in the (d) Please describe if and how these three documents are used in of the document.                                                                                             requirements the development of the PAMS Software Design Description.                                                                                      b-d to be addressed at public  specifications were (b) - Closed to items 142 and 145                                           meeting and audit. Will require documented. TVA (e) Do the WBN2 V&V activities include verification that the                                                                                  information to be docketed. stated that the origin of requirements of these three documents have been incorporated      (c) - Closed 142                                                                                             the requirements would into the WBN2 PAMS SRS.                                                                                                                                                        be demonstrated in (d) - Closed to Item 142                                                                                     Rev. 2 of the CQ PAMS LTR.
(a) Please describe the third document (i.e., NABU-DP-00014-GEN Revision 2, Design Process for Common Q Safety Systems).
(e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document                                                               NNC 2/3/11: CQ Traceability & Compliance table on page iii. This table has                                                 PAMS LTR Rev. 2 three entries; Design Process for Common Q Safety                                                           Section 11 & 12 do not Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar                                                         adequately 2 NSSS Completion Program I&C Projects Post Accident                                                       demonstrate the origin Monitoring System - System Requirements Specification                                                       of requirements in (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2                                                           SysRS. TVA to NSSS Completion Program I&C Projects Post Accident                                                         describe how to Monitoring System - System Design Specification (WNA-                                                       address concern.
(b) Please describe the flow of information between these three documents.
DS-01667-WBT, Rev. 1).
(c) Does the PAMS SRS implement the requirements in these three documents?
IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.
(d) Please describe if and how these three documents are used in the development of the PAMS Software Design Description.
(e) Do the WBN2 V&V activities include verification that the requirements of these three documents have been incorporated into the WBN2 PAMS SRS.
Responder: WEC (a) The purpose of NABU-DP-00014-GEN document is to define the process for system level design, software design and implementation, and hardware design and implementation for Common Q safety system development.
This document supplements the Common Q SPM, WCAP-16096-NP-A. The scope of NABU-DP-00014-GEN includes the design and implementation processes for the application development. For a fuller description of the design process described in NABU-DP-00014-GEN please refer to the Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket. Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision of the document.
(b) - Closed to items 142 and 145 (c) - Closed 142 (d) - Closed to Item 142 (e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).
IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V-770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.
IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.
IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
(1) Item (a) in the original list, NABU-DP-00014-GEN Revision 2, Design Process for Common Q Safety
(1) Item (a) in the original list, NABU-DP-00014-GEN Revision 2, Design Process for Common Q Safety
: 13. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
Revised response included in letter dated 12/22/10 Response provided in letter dated 10/5/10 NRC Review and WEC to complete response.
b-d to be addressed at public meeting and audit. Will require information to be docketed.
Open-NRC Review Due 3/29/11 Responses to items a and e provided.
NNC 11/18/10:
(1) Items b-d closed to other Open Item nos.
(2) The point of these questions was to understand how the origin of the requirements in the requirements specifications were documented. TVA stated that the origin of the requirements would be demonstrated in Rev. 2 of the CQ PAMS LTR.
NNC 2/3/11: CQ PAMS LTR Rev. 2 Section 11 & 12 do not adequately demonstrate the origin of requirements in SysRS. TVA to describe how to address concern.
ML101650255, Item No. 8 TVA Letter dated 10/5/10 WBN2 PAMS Software Requirements Specification By {{letter dated|date=April 8, 2010|text=letter dated April 8, 2010}} (ML10101050203), TVA docketed WNA-SD-00239-WBT, Revision 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, dated February 2010 (ML101050202).


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                 radE4C39.docx                                                                                       Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                                Issue                                                      TVA Response(s)                        Acceptable       Status/ Current Actions           Resolution Path       RAI No. & Date   RAI Resp. Date               Comments Sec. Sec. POC                                                                                                                                                Y/N Systems, is available for NRC audit at the Westinghouse Rockville office.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Systems, is available for NRC audit at the Westinghouse Rockville office.
(2) WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:
(2) WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:
Section 11, TVA Contract Compliance Matrix showing the origin of the requirements was added.
Section 11, TVA Contract Compliance Matrix showing the origin of the requirements was added.
TVA Response to Second Follow-up NRC Request:
TVA Response to Second Follow-up NRC Request:
Section 13, Origin Tracing of WBN2 PAMS System Requirements Specification was added to the Licensing Technical Report Revision 3 to address this concern.
Section 13, Origin Tracing of WBN2 PAMS System Requirements Specification was added to the Licensing Technical Report Revision 3 to address this concern. contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary).
Attachment 2 contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary).
145 EICB (Carte)
145                                 The WBN2 PAMS System Design Specification (WBN2 PAMS                 Responder: WEC                                              14. N        Open                                Open-NRC Review        ML101650255, Item                    WBN2 PAMS System Design EICB (Carte)
The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, Document Traceability  
SDS) contains a table (see page iii) titled, Document Traceability                                                                                                                                       No. 9                                Specification
& Compliance, which states that the WBN2 PAMS SDS was created to support the WBN2 PAMS SysRS.
                                    & Compliance, which states that the WBN2 PAMS SDS was               (1) The review and update of the RTM is complete. The                    Response included in letter        Due 2/25/11 created to support the WBN2 PAMS SysRS.                                   revised RTM can be made available for NRC audit at                  dated 12/22/10                                                                                  TVA docketed WNA-DS-01667-WBT the Westinghouse office in Rockville.                                                                    To be addressed by                                          Rev. 1, RRAS Watts Bar 2 NSSS (a) Does the WBN2 PAMS SDS implement all of the hardware                                                                                       During the September 20-21,        Revision of the RTM,                                        Completion Program I&C Projects Post requirements in the WBN2 PAMS SysRS?                                 (2) Please see letter Item 10 (NRC Matrix Item 142, sub                  2010 audit at Westinghouse, it      SRS, SysRS, and                                            Accident Monitoring System- System item 13).                                                            was acknowledged that              SysDS.                                                      Design Specification, dated December (b) Please briefly describe all of the documents that implement the                                                                           TVA/Westinghouse had                                                                            2009.
(a) Does the WBN2 PAMS SDS implement all of the hardware requirements in the WBN2 PAMS SysRS?
hardware requirements of the WBN2 PAMS SysRS.                         (3) Please see letter Item 10 (NRC Matrix Item 142, sub                  previously (in September 15, item 12).                                                            2010 public meeting) stated:
(b) Please briefly describe all of the documents that implement the hardware requirements of the WBN2 PAMS SysRS.
This item is used to track all traceability issues with the System Design Specification (SDS).                               (4) Section 11 TVA Contract Compliance Matrix was                          TVA would provide the RSED added to WNA-LI-00058-WBT-P, Revision 2, Post-                          RTM. (see ML102920031 Item At the September 15 public meeting in Rockville, the following       Accident Monitoring System (PAMS) Licensing                              No 6) actions were agreed to. These items partially address the             Technical Report submitted in TVA Letter to NRC traceability concerns with the System Design Specification.           dated December 3, 2010, (Reference 1).                                  TVA would revise and resubmit This item will be updated with the results of the September 20                                                                                 the PAMS RTM to address all and 21 Commercial Grade Dedication and SDS RTM audit.             (5) WNA-VR-00283-WBT, Revision 1, IV&V Summary                              types of issues identified in the Report for the Post Accident Monitoring System,                        public meeting. (see
This item is used to track all traceability issues with the System Design Specification (SDS).
: 1. Westinghouse will perform completed a review of the               submitted in TVA to NRC letter dated December 3,                        ML102920031 Item No 7)
At the September 15 public meeting in Rockville, the following actions were agreed to. These items partially address the traceability concerns with the System Design Specification.
Requirements Traceability Matrix(RT), using the issues           2010 (Reference 1) includes the Requirements and identified at the 9/15 public meeting as a guide (documented     Design phase reviews.                                                    TVA would revise and resubmit below) and update the RTM as required.                                                                                                   the Software Verification and (6) Per Westinghouse letter WBT-D-2268 NRC Access to                        Validation phase summary
This item will be updated with the results of the September 20 and 21 Commercial Grade Dedication and SDS RTM audit.
: 2. Some hardware requirements are contained in the SRS               Common Q Documents at the Westinghouse Rockville                        report for the requirements instead of the System Design Specification (SDS). These will     Office dated August 16, 2010 (Reference 9) System                      phase to document the be removed from the SRS and incorporated into the next           Requirements Specification for the Common Q Generic                      completion of the requirements revision of the SDS.                                             Flat Panel Display, 00000-ICE-30155, Revision 9 is                      phase review. (see available for audit at the Westinghouse Rockville office.                ML102920031 Item No 8)
: 1.
: 3. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and SRS (11) at the            The generic AC160 specifications are contained in the revisions reviewed by V&V. Have these been addressed?           documents listed below. The documents are available Yes. The next revisions of the SDS and SRS address these         for NRC audit at the Westinghouse Rockville office in issues.                                                         accordance with the letter number referenced. List is contained in letter.
Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
: 4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS          (7) A schedule was developed and is reviewed weekly by
: 2.
Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). These will be removed from the SRS and incorporated into the next revision of the SDS.
: 3.
25 issues identified by V&V where some requirements have not been included in the SDS (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed?
Yes. The next revisions of the SDS and SRS address these issues.
: 4.
TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS Responder: WEC (1) The review and update of the RTM is complete. The revised RTM can be made available for NRC audit at the Westinghouse office in Rockville.
(2) Please see letter Item 10 (NRC Matrix Item 142, sub item 13).
(3) Please see letter Item 10 (NRC Matrix Item 142, sub item 12).
(4) Section 11 TVA Contract Compliance Matrix was added to WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1).
(5) WNA-VR-00283-WBT, Revision 1, IV&V Summary Report for the Post Accident Monitoring System, submitted in TVA to NRC {{letter dated|date=December 3, 2010|text=letter dated December 3, 2010}} (Reference 1) includes the Requirements and Design phase reviews.
(6) Per Westinghouse letter WBT-D-2268 NRC Access to Common Q Documents at the Westinghouse Rockville Office dated August 16, 2010 (Reference 9) System Requirements Specification for the Common Q Generic Flat Panel Display, 00000-ICE-30155, Revision 9 is available for audit at the Westinghouse Rockville office.
The generic AC160 specifications are contained in the documents listed below. The documents are available for NRC audit at the Westinghouse Rockville office in accordance with the letter number referenced. List is contained in letter.
(7) A schedule was developed and is reviewed weekly by
: 14. N Open Response included in letter dated 12/22/10 During the September 20-21, 2010 audit at Westinghouse, it was acknowledged that TVA/Westinghouse had previously (in September 15, 2010 public meeting) stated:
TVA would provide the RSED RTM. (see ML102920031 Item No 6)
TVA would revise and resubmit the PAMS RTM to address all types of issues identified in the public meeting. (see ML102920031 Item No 7)
TVA would revise and resubmit the Software Verification and Validation phase summary report for the requirements phase to document the completion of the requirements phase review. (see ML102920031 Item No 8)
Open-NRC Review Due 2/25/11 To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.
ML101650255, Item No. 9 WBN2 PAMS System Design Specification TVA docketed WNA-DS-01667-WBT Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Design Specification, dated December 2009.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                   radE4C39.docx                                                                                     Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                                Issue                                                      TVA Response(s)                        Acceptable       Status/ Current Actions       Resolution Path         RAI No. & Date   RAI Resp. Date     Comments Sec. Sec. POC                                                                                                                                                  Y/N design meets the contract requirements.                              Westinghouse and TVA project management.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments design meets the contract requirements.
: 5. The next issue of the IV&V report will include the               (8) The revised document submittal schedule was Requirements phase review of the RTM and a partial review           included as item 3 NRC Request (Matrix Item Number for the Design phase.                                                142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010.
: 5.
: 6. Westinghouse to provide the generic AC160 and flat panel specifications.                                                  (9) The flow of documentation information was provided to the NRC inspector during the Common Q PAMS audit.
The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.        Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI on SysRS, dated
: 6.
: 8. The flow of information is from the SysRS to the SDS            December 8, 2010 (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a TVA Response to Follow-up NRC Request:
Westinghouse to provide the generic AC160 and flat panel specifications.
good write up of how the process works.
: 7.
See Response to item 3 (Item number 142) 183                                 7/15/2010                                                            Responder: WEC                                              15. Y        Open                            Open-NRC Review          EICB RAI        TVA Letter dated EICB (Carte)
Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
ML102980066 Item 10/21/10 An emphasis is placed on traceability in System Requirements         The generic Software Requirements Specification applies                  Pending Submittal of Revision 3 Due 3/29/11              No. 9            Enclosure 1 Item Specifications in the SRP, in the unmodified IEEE std 830-1993,       except as modified by the WBN Unit 2 System Requirements                  of the Licensing Technical                                                No. 4 and even more so given the modifications to the standard listed in   Specification.                                                            Report due 3/29/11.            NNC 11/18/10: The Regulatory Guide 1.172, which breaks with typical NRC use of the                                                                                                               point behind this open word should to say Each identifiable requirement in an SRS must    TVA Response to Follow-up NRC Request:                                                                    item was that TVA must be traceable backwards to the system requirements and the design                                                                               Revised response included in demonstrate that the bases or regulatory requirements that is satisfies                   Please see the response to RAI item 12 in letter dated                    letter dated 12/22/10.          origin of each 12/22/10, NRC Matrix Item 144.                                                                            requirement in the On page 1-2 of the Post Accident Monitoring Systems Software                                                                                                                   WEC requirements Requirements Specification in the background section, is the         TVA Response to Second Follow-up NRC Request:                            Response provided in letter    specification is known sentence Those sections of the above references that require                                                                                   dated 10/21/10                  and documented. TVA modification from the generic PAMS are defined in the document       This item was addressed by updating the Contract                                                          stated that this referring purely to the changes from WNA-DS-01617-WBT Post           Compliance Matrix and adding Section 13, Origin Tracing of                                                information would be in Accident Monitoring System-System Requirements Specification         WBN2 PAMS System Requirements Specification to the                                                        CQ PAMS LTR Rev. 2.
: 8.
or is it saying that there are additional changes beyond those and   Licensing Technical Report Revision 3 to address this that the SRS defines them?                                            concern. Attachment 2 contains WNA-LI-00058-WBT-P,                                                       NNC 2/3/11: CQ PMS Post-Accident Monitoring System (PAMS) Licensing                                                         LTR Rev. 2 Sections 11 If there are additional changes, what is their origin?                Technical Report, Revision 3, dated March 2011                                                           & 12 do not prove this (proprietary).                                                                                            information. TVA to proive a plan to address requested information.
The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.
185                                7/15/2010                                                            Responder: WEC                                              16. N        Open                            Open-NRC Review        EICB RAI EICB (Carte)
Westinghouse and TVA project management.
ML102980066 Item An emphasis is placed on the traceability of requirements in         Steve Clark to look at how to combine traceability items.                Response included in letter    NNC 11/18/10: (1)The No. 17 Software Requirements Specifications in the SRP, in the                                                                                         dated 12/22/10.                point behind this open unmodified IEEE std 830-1993, and even more so given the             Was addressed to during the 9/15 meeting and 9/20 - 9/21                                                  item was that TVA must modifications to the standard listed in Regulatory Guide 1.172,       audit.                                                                                                    demonstrate that the which breaks with typical NRC use of the word should to say                                                                                                                   origin of each Each identifiable requirement in an SRS must be traceable       TVA Response to Follow-up NRC Request:                                                                        requirement in the backwards to the system requirements and the design bases or       (1) See NRC Matrix Item 144                                                                                  WEC requirements regulatory requirements that is satisfies Also the NRC considers (2) There is no RTM for development of the individual                                                        specification is known that the SRS is the complete set of requirements used for the         reusable software elements. As listed in item 15 of                                                      and documented. TVA design of the software, whether it is contained within one document   Table 6-1 Document Requirements of WNA-LI-00058-                                                      stated that this or many. In order to evaluate an SRS against the guidance in the       WT-P, Revision 2, Post-Accident Monitoring System                                                       information would be in SRP the staff needs access to all the requirements.                    (PAMS) Licensing Technical Report submitted in TVA                                                     CQ PAMS LTR Rev. 2.
(8) The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010.
Letter to NRC, dated December 3, 2010, a RTM for                                                         (2) TVA also said it References 12, 27, 29, and 31-44 in the Post Accident Monitoring      implementation of the RSEDs (WNA-VR-00280-WBT)                                                           would provide a RTM Systems Software Requirements Specification are various types of      for the WBN Unit 2 Common Q PAMS has been                                                               for the RSED
(9) The flow of documentation information was provided to the NRC inspector during the Common Q PAMS audit.
Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI on SysRS, dated December 8, 2010 TVA Response to Follow-up NRC Request:
See Response to item 3 (Item number 142) 183 EICB (Carte) 7/15/2010 An emphasis is placed on traceability in System Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word should to say Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies On page 1-2 of the Post Accident Monitoring Systems Software Requirements Specification in the background section, is the sentence Those sections of the above references that require modification from the generic PAMS are defined in the document referring purely to the changes from WNA-DS-01617-WBT Post Accident Monitoring System-System Requirements Specification or is it saying that there are additional changes beyond those and that the SRS defines them?
If there are additional changes, what is their origin?
Responder: WEC The generic Software Requirements Specification applies except as modified by the WBN Unit 2 System Requirements Specification.
TVA Response to Follow-up NRC Request:
Please see the response to RAI item 12 in letter dated 12/22/10, NRC Matrix Item 144.
TVA Response to Second Follow-up NRC Request:
This item was addressed by updating the Contract Compliance Matrix and adding Section 13, Origin Tracing of WBN2 PAMS System Requirements Specification to the Licensing Technical Report Revision 3 to address this concern. Attachment 2 contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary).
: 15. Y Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
Revised response included in letter dated 12/22/10.
Response provided in letter dated 10/21/10 Open-NRC Review Due 3/29/11 NNC 11/18/10: The point behind this open item was that TVA must demonstrate that the origin of each requirement in the WEC requirements specification is known and documented. TVA stated that this information would be in CQ PAMS LTR Rev. 2.
NNC 2/3/11: CQ PMS LTR Rev. 2 Sections 11
& 12 do not prove this information. TVA to proive a plan to address requested information.
EICB RAI ML102980066 Item No. 9 TVA Letter dated 10/21/10 Item No. 4 185 EICB (Carte) 7/15/2010 An emphasis is placed on the traceability of requirements in Software Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word should to say Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies Also the NRC considers that the SRS is the complete set of requirements used for the design of the software, whether it is contained within one document or many. In order to evaluate an SRS against the guidance in the SRP the staff needs access to all the requirements.
References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification are various types of Responder: WEC Steve Clark to look at how to combine traceability items.
Was addressed to during the 9/15 meeting and 9/20 - 9/21 audit.
TVA Response to Follow-up NRC Request:
(1) See NRC Matrix Item 144 (2) There is no RTM for development of the individual reusable software elements. As listed in item 15 of Table 6-1 Document Requirements of WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC, dated December 3, 2010, a RTM for implementation of the RSEDs (WNA-VR-00280-WBT) for the WBN Unit 2 Common Q PAMS has been
: 16. N Open Response included in letter dated 12/22/10.
Open-NRC Review NNC 11/18/10: (1)The point behind this open item was that TVA must demonstrate that the origin of each requirement in the WEC requirements specification is known and documented. TVA stated that this information would be in CQ PAMS LTR Rev. 2.
(2) TVA also said it would provide a RTM for the RSED EICB RAI ML102980066 Item No. 17


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                     radE4C39.docx                                                                                       Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                                Issue                                                          TVA Response(s)                        Acceptable       Status/ Current Actions           Resolution Path       RAI No. & Date   RAI Resp. Date               Comments Sec. Sec. POC                                                                                                                                                    Y/N Reusable Software Element.                                             developed. This document is available for NRC audit at the Westinghouse Rockville office.                                                                        NNC 2/3/11: To be These references are used in the body of the SRS, for example:                                                                                                                       addressed during next audit.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Reusable Software Element.
These references are used in the body of the SRS, for example:
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
They are also included via tables such as found in requirement R7.1.2-1
They are also included via tables such as found in requirement R7.1.2-1
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?
202  7.5.2                         7/22/2010                                                              Responder: WEC                                                17. N        Open                              Open-NRC Review        EICB RAI        TVA Letter dated NNC 1/5/11: See Also Open Item No.
developed. This document is available for NRC audit at the Westinghouse Rockville office.
EICB (Carte)
NNC 2/3/11: To be addressed during next audit.
ML102980066 Item 10/5/10          81 and 86.
202 7.5.2 EICB (Carte) 7/22/2010 The letter (ML0003740165) which transmitted the Safety Evaluation for the Common Q topical report to Westinghouse stated: "Should our criteria or regulations change so that our conclusions as to the acceptability of the report are invalidated, CE Nuclear Power and/or the applicant referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation."
The letter (ML0003740165) which transmitted the Safety                 Revision 1 of the Licensing Technical Report will provide                  Pending Submittal of Revision 3 Due 2/25/11 &              No. 4 Evaluation for the Common Q topical report to Westinghouse             more detailed information on the changes to the platform.                  of the Licensing Technical          3/29/11 stated: "Should our criteria or regulations change so that our                                                                                     Report due 3/29/11.
Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report.
conclusions as to the acceptability of the report are invalidated, CE                                                                                                             to provide information Nuclear Power and/or the applicant referencing the topical report       Rev. 2 of the Licensing Technical Report will include the                  Response included in letter    requested.
Responder: WEC Revision 1 of the Licensing Technical Report will provide more detailed information on the changes to the platform.
will be expected to revise and resubmit their respective               applicability of guidance.                                                dated 12/22/10 documentation, or submit justification for continued applicability of                                                                                                             Due TBD the topical report without revision of the respective documentation."   TVA Response to Follow-up NRC Request:                                    Partial Response provided in Question No 81 identified many criteria changes; please revise the     WNA-LI-00058-WBT-P, Revision 2, Post-Accident                             letter dated 10/5/10 respective documentation or submit justification for continued          Monitoring System (PAMS) Licensing Technical Report applicability of the topical report.                                    (LTR) submitted in TVA Letter to NRC dated December 3,                     NNC 1/5/11: Summary provided 2010, contains the following change to address the NRC                     in Licensing Technical Report request:                                                                   R2 has been reviewed and found to be unacceptable.
Rev. 2 of the Licensing Technical Report will include the applicability of guidance.
Section 9, Compliance Evaluation of the Watts Bar 2 PAMS Software Requirements Specification to IEEE Standard 830-                 LTR Section 9 evaluates the 1998 and Regulatory Guide 1.172 to show the origin of the                 compliance of the SRS to IEEE requirements has been added.                                               830-1998. There are two issues with this evaluation:
TVA Response to Follow-up NRC Request:
The descriptions and commitments in the Topical Report                     (1) IEEE 830-1998 is not the (TR) still apply. The LTR provides compliance evidence to                 current SRP acceptance criteria.
WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report (LTR) submitted in TVA Letter to NRC dated December 3, 2010, contains the following change to address the NRC request:
the new ISG-04 criteria. The statement in the SE means that               IEEE 830-1998 has not been the TR can be evaluated against later NRC criteria when it                 formally endorsed by a appears.                                                                  regulatory guide.
Section 9, Compliance Evaluation of the Watts Bar 2 PAMS Software Requirements Specification to IEEE Standard 830-1998 and Regulatory Guide 1.172 to show the origin of the requirements has been added.
(2) Westinghouse committed to Source: E-mail from Westinghouse (Matthew A. Shakun) to                   evaluate the SRS against 830 Bechtel (Mark S. Clark), RE: December 22 letter review,                   when the NRC identified several dated December 17, 2010                                                   inconsistencies.
The descriptions and commitments in the Topical Report (TR) still apply. The LTR provides compliance evidence to the new ISG-04 criteria. The statement in the SE means that the TR can be evaluated against later NRC criteria when it appears.
Partial TVA Response to Follow-up NRC Request:                             Yes ISG-4 is one new criteria, and an evaluation against it has Attachment 4 contains the results of the TVA analysis of                   been provided.
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 Partial TVA Response to Follow-up NRC Request:
standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common                   In addition, LTR Rev. 2 Section Q PAMS design is acceptable.                                               13 states: The applicable NRC regulatory guides, IEEE and The final response is pending submittal of the Licensing                   EPRI industry standards fo the Technical Report Revision 3 scheduled for March 29, 2011.                 common Q PAMS are shown
contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common Q PAMS design is acceptable.
The final response is pending submittal of the Licensing Technical Report Revision 3 scheduled for March 29, 2011.
: 17. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
Response included in letter dated 12/22/10 Partial Response provided in letter dated 10/5/10 NNC 1/5/11: Summary provided in Licensing Technical Report R2 has been reviewed and found to be unacceptable.
LTR Section 9 evaluates the compliance of the SRS to IEEE 830-1998. There are two issues with this evaluation:
(1) IEEE 830-1998 is not the current SRP acceptance criteria.
IEEE 830-1998 has not been formally endorsed by a regulatory guide.
(2) Westinghouse committed to evaluate the SRS against 830 when the NRC identified several inconsistencies.
Yes ISG-4 is one new criteria, and an evaluation against it has been provided.
In addition, LTR Rev. 2 Section 13 states: The applicable NRC regulatory guides, IEEE and EPRI industry standards fo the common Q PAMS are shown Open-NRC Review Due 2/25/11 &
3/29/11 to provide information requested.
Due TBD EICB RAI ML102980066 Item No. 4 TVA Letter dated 10/5/10 NNC 1/5/11: See Also Open Item No.
81 and 86.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                               radE4C39.docx                                                                                           Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                                Issue                                                    TVA Response(s)                            Acceptable       Status/ Current Actions         Resolution Path         RAI No. & Date   RAI Resp. Date     Comments Sec. Sec. POC                                                                                                                                                  Y/N below. Compliance to these TVA Response to Follow-up NRC Request:                               codes and standards are stated in Section 4 of Reference 1.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response to Follow-up NRC Request:
(1) As discussed on page 9-1 of the Licensing Technical                     Reference 1 is the common Q Report (Attachment 2) a comparison of IEEE 830-1993                     topical report.
(1) As discussed on page 9-1 of the Licensing Technical Report (Attachment 2) a comparison of IEEE 830-1993 and IEEE 830-1998 was performed and it was determined that the 1998 version enveloped all the requirements of the 1993 version which is endorsed by Regulatory Guide 1.172. Therefore the use of IEEE 830-1998 is acceptable.
and IEEE 830-1998 was performed and it was determined that the 1998 version enveloped all the requirements of the 1993 version which is endorsed by Regulatory Guide 1.172. Therefore the use of IEEE 830-1998 is acceptable.
(2) Table 9.1 IEEE Std 830-1998 Compliance of the Licensing Technical Report (Attachment 2) evaluates the Software Requirements Specification against the requirements of IEEE 830-1998.
(2) Table 9.1 IEEE Std 830-1998 Compliance of the Licensing Technical Report (Attachment 2) evaluates the Software Requirements Specification against the requirements of IEEE 830-1998.
(3) See TVA to NRC letter Watts Bar Nuclear Plant (WBN)
(3) See TVA to NRC letter Watts Bar Nuclear Plant (WBN)
Unit 2 - Instrumentation And Controls Staff Information Requests, dated February 25, 2011 Attachment 4 Common Q PAMS Regulatory Guide and IEEE Standard Analysis.
Unit 2 - Instrumentation And Controls Staff Information Requests, dated February 25, 2011 Attachment 4 Common Q PAMS Regulatory Guide and IEEE Standard Analysis.
(4) This section of the Licensing Technical Report (Attachment 2) has been relocated to section 15. The comment has been addressed by adding Reference 40 to TVA to NRC letter dated February 25, 2011, Attachment 4 which is the Common Q PAMS Regulatory Guide and IEEE Standard Analysis.
(4) This section of the Licensing Technical Report (Attachment 2) has been relocated to section 15. The comment has been addressed by adding Reference 40 to TVA to NRC {{letter dated|date=February 25, 2011|text=letter dated February 25, 2011}}, which is the Common Q PAMS Regulatory Guide and IEEE Standard Analysis.
212   7.5.2                         7/27/2010                                                         Responder: WEC                                                  18. N        Open                            Open-NRC Review            EICB RAI EICB (Carte)
below. Compliance to these codes and standards are stated in Section 4 of Reference 1.
ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated             Application specific requirements for testing. This cannot be                Partial Response included in                                No. 10 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system       addressed in a topical report. Evaluation of how the                        letter dated 03/16/11 design specification and software requirements specification       hardware meets the regulatory requirements.
Reference 1 is the common Q topical report.
contain information to address the "Design Report on Computer                                                                                   Final response due 3/29/11 Integrity, Test and Calibration..." The staff has reviewed these   WEC to provide the information and determine where the documents, and it is not clear how this is the case.              information will be located.
212 7.5.2 EICB (Carte) 7/27/2010 By {{letter dated|date=June 18, 2010|text=letter dated June 18, 2010}} (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Design Report on Computer Integrity, Test and Calibration..." The staff has reviewed these documents, and it is not clear how this is the case.
(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.       IEEE-603 1991:
(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.
(2) Please describe how the information provided demonstrates           5.5 System Integrity. The safety systems shall be                                                        NNC 2/17/2011: IEEE conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.                   designed to accomplish their safety functions under the                                                 603 Clause 5.5 full range of applicable conditions enumerated in the                                                   basically states that design basis.                                                                                           conditions identified in IEEE 603 Clauses 4.7 TVA Response: The applicable conditions and                                                             & 4.8 must be Common Q PAMS system compliance are contained in                                                         addressed in the WNA-LI-00058-WBT-P, Rev. 2, Post-Accident                                                               design. Energy supply Monitoring System (PAMS) Licensing Technical                                                             conditions have not Report submitted in TVA Letter to NRC dated                                                             been identified, or December 3, 2010, Section 11, Contract Compliance                                                       explicitly addressed.
(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.
Matrix items:
Responder: WEC Application specific requirements for testing. This cannot be addressed in a topical report. Evaluation of how the hardware meets the regulatory requirements.
87 and 88 Seismic 89, 90, 91, 92 and 185 EMI/RFI 300, 301 and 302 Environmental Seismic qualification of the equipment to meet the design basis requirements NNC 2/18/11: Clause 5.7 is acceptably 5.7 Capability for Test and Calibration. Capability for
WEC to provide the information and determine where the information will be located.
IEEE-603 1991:
5.5 System Integrity. The safety systems shall be designed to accomplish their safety functions under the full range of applicable conditions enumerated in the design basis.
TVA Response: The applicable conditions and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, Section 11, Contract Compliance Matrix items:
87 and 88 Seismic 89, 90, 91, 92 and 185 EMI/RFI 300, 301 and 302 Environmental Seismic qualification of the equipment to meet the design basis requirements 5.7 Capability for Test and Calibration. Capability for
: 18. N Open Partial Response included in letter dated 03/16/11 Final response due 3/29/11 Open-NRC Review NNC 2/17/2011: IEEE 603 Clause 5.5 basically states that conditions identified in IEEE 603 Clauses 4.7
& 4.8 must be addressed in the design. Energy supply conditions have not been identified, or explicitly addressed.
NNC 2/18/11: Clause 5.7 is acceptably EICB RAI ML102980066 Item No. 10


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                               radE4C39.docx                                                                         Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                          TVA Response(s)                        Acceptable Status/ Current Actions     Resolution Path       RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                              Y/N testing and calibration of safety system equipment                                           addressed.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments testing and calibration of safety system equipment shall be provided while retaining the capability of the safety systems to accomplish their safety functions.
shall be provided while retaining the capability of the safety systems to accomplish their safety functions.
The capability for testing and calibration of safety system equipment shall be provided during power operation and shall duplicate, as closely as practicable, performance of the safety function. Testing of Class 1E systems shall be in accordance with the requirements of IEEE Std 338-1987. Exceptions to testing and calibration during power operation are allowed where this capability cannot be provided without adversely affecting the safety or operability of the generating station. In this case:
The capability for testing and calibration of safety system equipment shall be provided during power operation and shall duplicate, as closely as practicable, performance of the safety function. Testing of Class 1E systems shall be in accordance with the requirements of IEEE Std 338-1987. Exceptions to testing and calibration during power operation are allowed where this capability cannot be provided without adversely affecting the safety or operability of the generating station. In this case:
(1) appropriate justification shall be provided (for example, demonstration that no practical design exists),
(1) appropriate justification shall be provided (for example, demonstration that no practical design exists),
(2) acceptable reliability of equipment operation shall be otherwise demonstrated, and (3) the capability shall be provided while the generating station is shut down.
(2) acceptable reliability of equipment operation shall be otherwise demonstrated, and (3) the capability shall be provided while the generating station is shut down.
TVA Response: The requirements for test and calibration and Common Q PAMS system compliance, are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11, TVA Contract Compliance Matrix items:
TVA Response: The requirements for test and calibration and Common Q PAMS system compliance, are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11, TVA Contract Compliance Matrix items:
202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters,                                                               NNC 2/18/2011: WNA-400 and 401 3.7.2 Testing, Calibration, and                                               AR-00189-WBT Rev. 0 Verification                                                                         Table 5-2 shows a 402, 403 and 404, 3.7.3 Channel Bypass or                                                 MTTR of 7.2 hours. It Removal from Operation                                                               is not clear how this satisfies the 5.10 Repair. The safety systems shall be designed to                                         contractual item No.
202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and Verification 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.10 Repair. The safety systems shall be designed to facilitate timely recognition, location, replacement, repair, and adjustment of malfunctioning equipment.
facilitate timely recognition, location, replacement,                                       179.
TVA Response: The requirements for repair and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11, TVA Contract Compliance Matrix items:
repair, and adjustment of malfunctioning equipment.
179 Mean time to repair 202 self test 398 3.7 Maintenance 399 3.7.1 Troubleshooting 6.5 Capability for Testing and Calibration 6.5.1 Means shall be provided for checking, with a high degree of confidence, the operational availability of each sense and command feature input sensor required for a safety function during reactor operation.
The Contract TVA Response: The requirements for repair and                                               Compliance Matrix Item Common Q PAMS system compliance are contained in                                             179 in Revision 3 of the WNA-LI-00058-WBT-P, Rev. 2, Post-Accident                                                   LTR has been revised Monitoring System (PAMS) Licensing Technical                                                 to show this item as a Report Section 11, TVA Contract Compliance Matrix                                         deviaition and to reflect items:                                                                                       TVAs acceptance of 179 Mean time to repair                                                                   the 7.2 hour MTTR 202 self test                                                                             value. Attachment 2 contains WNA-LI-398 3.7 Maintenance 00058-WBT-P, Post-399 3.7.1 Troubleshooting Accident Monitoring System (PAMS) 6.5 Capability for Testing and Calibration Licensing Technical Report, Revision 3, 6.5.1 Means shall be provided for checking, with a high dated March 2011 degree of confidence, the operational availability of (proprietary).
each sense and command feature input sensor required for a safety function during reactor operation.
This may be accomplished in various ways; for example:
This may be accomplished in various ways; for example:
addressed.
NNC 2/18/2011: WNA-AR-00189-WBT Rev. 0 Table 5-2 shows a MTTR of 7.2 hours. It is not clear how this satisfies the contractual item No.
179.
The Contract Compliance Matrix Item 179 in Revision 3 of the LTR has been revised to show this item as a deviaition and to reflect TVAs acceptance of the 7.2 hour MTTR value. Attachment 2 contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS)
Licensing Technical Report, Revision 3, dated March 2011 (proprietary).


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                   radE4C39.docx                                                                 Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                              TVA Response(s)                          Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                      Y/N (1) by perturbing the monitored variable, (2) within the constraints of 6.6, by introducing and varying, as appropriate, a substitute input to the sensor of the same nature as the measured variable, or (3) by cross-checking between channels that bear a known relationship to each other and that have readouts available.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (1) by perturbing the monitored variable, (2) within the constraints of 6.6, by introducing and varying, as appropriate, a substitute input to the sensor of the same nature as the measured variable, or (3) by cross-checking between channels that bear a known relationship to each other and that have readouts available.
6.5.2 One of the following means shall be provided for assuring the operational availability of each sense and command feature required during the post-accident period:
6.5.2 One of the following means shall be provided for assuring the operational availability of each sense and command feature required during the post-accident period:
(1) Checking the operational availability of sensors by use of the methods described in 6.5.1.
(1) Checking the operational availability of sensors by use of the methods described in 6.5.1.
Line 767: Line 1,849:
10, display of sensor diagnostic information 202 self test 205 self diagnostics and watchdog timer 264 through 271, system self checks 311 system status displays, 341 alarms, 344 on-line diagnostics IEEE 7-4.3.2-2003 5.5 System integrity In addition to the system integrity criteria provided by IEEE Std 603-1998, the following are necessary to achieve system integrity in digital equipment for use in safety systems:
10, display of sensor diagnostic information 202 self test 205 self diagnostics and watchdog timer 264 through 271, system self checks 311 system status displays, 341 alarms, 344 on-line diagnostics IEEE 7-4.3.2-2003 5.5 System integrity In addition to the system integrity criteria provided by IEEE Std 603-1998, the following are necessary to achieve system integrity in digital equipment for use in safety systems:
Design for computer integrity Design for test and calibration Fault detection and self-diagnostics 5.5.1 Design for computer integrity The computer shall be designed to perform its safety function when subjected to conditions, external or internal, that have significant potential for defeating the safety function. For example, input and output processing failures, precision or round off problems, improper recovery actions, electrical input voltage and frequency fluctuations, and maximum credible number of coincident signal changes.
Design for computer integrity Design for test and calibration Fault detection and self-diagnostics 5.5.1 Design for computer integrity The computer shall be designed to perform its safety function when subjected to conditions, external or internal, that have significant potential for defeating the safety function. For example, input and output processing failures, precision or round off problems, improper recovery actions, electrical input voltage and frequency fluctuations, and maximum credible number of coincident signal changes.
If the system requirements identify a safety system preferred failure mode, failures of the computer shall not preclude the safety system from being placed in that mode. Performance of computer system restart operations shall not result in the safety system being inhibited from performing its function.
If the system requirements identify a safety system preferred failure mode, failures of the computer shall not preclude the safety system from being placed in that mode. Performance of computer system restart operations shall not result in the safety system being inhibited from performing its function.  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                               radE4C39.docx                                                                 Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                        TVA Response(s)                          Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                Y/N TVA Response: Common Q PAMS system reliability and failure modes are described in:
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response: Common Q PAMS system reliability and failure modes are described in:
WNA-AR-00180-WBT, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System WNA-AR-00189-WBT, Revision 0 Post Accident Monitoring System Reliability Analysis The requirements for mean time between failure and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Section 11 TVA Contract Compliance Matrix item 178.
WNA-AR-00180-WBT, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System WNA-AR-00189-WBT, Revision 0 Post Accident Monitoring System Reliability Analysis The requirements for mean time between failure and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Section 11 TVA Contract Compliance Matrix item 178.
5.5.2 Design for test and calibration Test and calibration functions shall not adversely affect the ability of the computer to perform its safety function. Appropriate bypass of one redundant channel is not considered an adverse effect in this context. It shall be verified that the test and calibration functions do not affect computer functions that are not included in a calibration change (e.g., setpoint change).
5.5.2 Design for test and calibration Test and calibration functions shall not adversely affect the ability of the computer to perform its safety function. Appropriate bypass of one redundant channel is not considered an adverse effect in this context. It shall be verified that the test and calibration functions do not affect computer functions that are not included in a calibration change (e.g., setpoint change).
Line 779: Line 1,864:
V&V, configuration management, and QA are not required when the test and calibration function is resident on a separate computer and does not provide the sole verification of test and calibration data for the computer that is part of the safety system.
V&V, configuration management, and QA are not required when the test and calibration function is resident on a separate computer and does not provide the sole verification of test and calibration data for the computer that is part of the safety system.
TVA Response: The requirements for test and calibration and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:
TVA Response: The requirements for test and calibration and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:
202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and Verification 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.5.3 Fault detection and self-diagnostics Computer systems can experience partial failures that can degrade the capabilities of the computer system,
202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and Verification 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.5.3 Fault detection and self-diagnostics Computer systems can experience partial failures that can degrade the capabilities of the computer system,  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                             radE4C39.docx                                                                 Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                          TVA Response(s)                        Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                Y/N but may not be immediately detectable by the system.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments but may not be immediately detectable by the system.
Self-diagnostics are one means that can be used to assist in detecting these failures. Fault detection and self-diagnostics requirements are addressed in this sub-clause.
Self-diagnostics are one means that can be used to assist in detecting these failures. Fault detection and self-diagnostics requirements are addressed in this sub-clause.
The reliability requirements of the safety system shall be used to establish the need for self-diagnostics. Self diagnostics are not required for systems in which failures can be detected by alternate means in a timely manner. If self-diagnostics are incorporated into the system requirements, these functions shall be subject to the same V&V processes as the safety system functions.
The reliability requirements of the safety system shall be used to establish the need for self-diagnostics. Self diagnostics are not required for systems in which failures can be detected by alternate means in a timely manner. If self-diagnostics are incorporated into the system requirements, these functions shall be subject to the same V&V processes as the safety system functions.
Line 798: Line 1,886:
Infrequent communication link failures that do not result in a system failure or a lack of system functionality do not require reporting.
Infrequent communication link failures that do not result in a system failure or a lack of system functionality do not require reporting.
When self-diagnostics are applied, the following self-diagnostic features shall be incorporated into the system design:
When self-diagnostics are applied, the following self-diagnostic features shall be incorporated into the system design:
a) Self-diagnostics during computer system startup b) Periodic self-diagnostics while the computer system is operating c) Self-diagnostic test failure reporting TVA Response: The requirements for fault detection and self diagnostics and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS)
a) Self-diagnostics during computer system startup b) Periodic self-diagnostics while the computer system is operating c)
Self-diagnostic test failure reporting TVA Response: The requirements for fault detection and self diagnostics and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS)
Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:
Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:
107 error free download 202 self test 205 self diagnostics and watchdog timer 263 primary and backup communication 264 through 271, continuous on-line self checks
107 error free download 202 self test 205 self diagnostics and watchdog timer 263 primary and backup communication 264 through 271, continuous on-line self checks  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                               radE4C39.docx                                                                                       Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                                Issue                                                    TVA Response(s)                          Acceptable       Status/ Current Actions       Resolution Path       RAI No. & Date   RAI Resp. Date     Comments Sec. Sec. POC                                                                                                                                                Y/N 311 system status displays, 341 alarms, 344 on-line diagnostics 5.7 Capability for test and calibration No requirements beyond IEEE Std 603-1998 are necessary.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 311 system status displays, 341 alarms, 344 on-line diagnostics 5.7 Capability for test and calibration No requirements beyond IEEE Std 603-1998 are necessary.
TVA Response: No response required.
TVA Response: No response required.
Concurrence: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI 212 Response - Errors in the Contract Compliance Matrix, dated December 17, 2010 (a) Energy Supply conditions are specified in WNA-DS-01617-WBT-P, System Requirements Specification Rev.
Concurrence: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI 212 Response - Errors in the Contract Compliance Matrix, dated December 17, 2010 (a) Energy Supply conditions are specified in WNA-DS-01617-WBT-P, System Requirements Specification Rev.
4, Requirement 4.1-1 which requires 120Vac +/-10% and 60+/-3Hz. Power to the Common Q PAMS is provided from the 120Vac vital power system. Per WBN Unit 2 FSAR section 8.3.1.1 the vital 120 volt ac system specifications are 120Vac +/-2% and 60+/-0.5Hz. Based on this, the power provided meets the system requirements.
4, Requirement 4.1-1 which requires 120Vac +/-10% and 60+/-3Hz. Power to the Common Q PAMS is provided from the 120Vac vital power system. Per WBN Unit 2 FSAR section 8.3.1.1 the vital 120 volt ac system specifications are 120Vac +/-2% and 60+/-0.5Hz. Based on this, the power provided meets the system requirements.
Electromagnetic compatibility, seismic and environmental qualification of the equipment to meet the design basis requirements is documented in EQ-QR                                                                                                             WBT-P, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS)" (Proprietary)
Electromagnetic compatibility, seismic and environmental qualification of the equipment to meet the design basis requirements is documented in EQ-QR WBT-P, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS)" (Proprietary)
(Attachment 4). Attachment 5 contains EQ-QR                                                                                                             WBT-NP, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS)" (non-proprietary). Attachment 6 contains CWA-11-3118, Application for Withholding Proprietary Information from Public Disclosure, EQ-QR-68-WBT-P, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS), (Proprietary), dated February 28, 2011.
(Attachment 4). Attachment 5 contains EQ-QR WBT-NP, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS)" (non-proprietary). Attachment 6 contains CWA-11-3118, Application for Withholding Proprietary Information from Public Disclosure, EQ-QR-68-WBT-P, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS), (Proprietary), dated February 28, 2011.
(b) The Contract Compliance Matrix Item 179 in Revision 3 of the Licensing Technical Report will be revised to show this item as a deviation and to reflect TVAs acceptance of the 7.2 hour MTTR value. WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, (proprietary) dated March 2011, will be submitted no later than March 29, 2011.
(b) The Contract Compliance Matrix Item 179 in Revision 3 of the Licensing Technical Report will be revised to show this item as a deviation and to reflect TVAs acceptance of the 7.2 hour MTTR value. WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, (proprietary) dated March 2011, will be submitted no later than March 29, 2011.
213   7.5.2                         7/27/2010                                                         Responder: WEC                                                19. N        Open                            Open-NRC Review          EICB RAI EICB (Carte)
213 7.5.2 EICB (Carte) 7/27/2010 By {{letter dated|date=June 18, 2010|text=letter dated June 18, 2010}} (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Theory of Operation Description." The staff has reviewed these documents, and it is not clear how this is the case. The docketed material does not appear to contain the design basis information that is required to evaluate compliance with the Clause of IEEE 603.
ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated               Conformance with IEEE 603 is documented in the revised                    Pending Submittal of Revision 3 Due 3/29/11              No. 18 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system         Common Q PAMS Licensing Technical Report and the                          of the Licensing Technical design specification and software requirements specification         Common Q PAMS System Design Specification.                                Report due 3/29/11.            NNC 2/3/11: The contain information to address the "Theory of Operation                                                                                                                       identified Description." The staff has reviewed these documents, and it is not Attachment 1 contains the proprietary version of                          Response is included in letter documentation does clear how this is the case. The docketed material does not appear Westinghouse document Tennessee Valley Authority                            dated 10/25/10                  not include the design to contain the design basis information that is required to evaluate (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring                                                 bases. Please provide compliance with the Clause of IEEE 603.                              System (PAMS), Licensing Technical Report, Revision 1,                   NNC to review and revise this schedule for providing (1) Please provide the design basis (as described in IEEE 604        WNA-LI-00058-WBT-P, Dated October 2010                                   question after LTR R2 is       the requested
(1) Please provide the design basis (as described in IEEE 604 Responder: WEC Conformance with IEEE 603 is documented in the revised Common Q PAMS Licensing Technical Report and the Common Q PAMS System Design Specification.
contains the proprietary version of Westinghouse document Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010
: 19. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
Response is included in letter dated 10/25/10 NNC to review and revise this question after LTR R2 is Open-NRC Review Due 3/29/11 NNC 2/3/11: The identified documentation does not include the design bases. Please provide schedule for providing the requested EICB RAI ML102980066 Item No. 18


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                 radE4C39.docx                                                                                           Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                                Issue                                                      TVA Response(s)                          Acceptable       Status/ Current Actions           Resolution Path       RAI No. & Date   RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                                    Y/N Clause 4) of the Common Q PAMS.                                                                                                                  received.                        information.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Clause 4) of the Common Q PAMS.
(2) Please provide a regulatory evaluation of how the PAMs           Attachment 8 contains the proprietary version of complies with the applicable regulatory requirements for the theory   Westinghouse document Nuclear Automation Watts Bar 2 of operation.                                                         NSSS Completion Program I&C Projects Post Accident For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the         Monitoring System - System Design Specification, WNA-manually controlled protective actions? (2) How do the documents     DS-01667-WBT, Rev. 2 dated September 2010.
(2) Please provide a regulatory evaluation of how the PAMs complies with the applicable regulatory requirements for the theory of operation.
identified demonstrate compliance with this clause?
For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the manually controlled protective actions? (2) How do the documents identified demonstrate compliance with this clause?
contains the proprietary version of Westinghouse document Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification, WNA-DS-01667-WBT, Rev. 2 dated September 2010.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
The Regulatory Guide 1.97 classification of the Common Q PAMS variables is documented in TVA Design Criteria WB-DC-30-7 Post Accident Monitoring Instrumentation which was submitted as Attachment 5 on TVA to NRC letter Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation And Controls Staff Information Requests dated June 18, 2010 (Reference 1)
The Regulatory Guide 1.97 classification of the Common Q PAMS variables is documented in TVA Design Criteria WB-DC-30-7 Post Accident Monitoring Instrumentation which was submitted as Attachment 5 on TVA to NRC letter Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation And Controls Staff Information Requests dated June 18, 2010 (Reference 1)
Line 826: Line 1,925:
The Common Q PAMS indications are used to support operator response to events described in chapter 15 of the WBN Unit 2 FSAR such as:
The Common Q PAMS indications are used to support operator response to events described in chapter 15 of the WBN Unit 2 FSAR such as:
RCCA/RCCA Bank dropped/misaligned Steam Generator Tube Rupture Inadvertent Loading of a Fuel Assembly Into an Improper Position Loss of Shutdown Power Major Reactor Coolant System Pipe Ruptures (Loss Of Coolant Accident)
RCCA/RCCA Bank dropped/misaligned Steam Generator Tube Rupture Inadvertent Loading of a Fuel Assembly Into an Improper Position Loss of Shutdown Power Major Reactor Coolant System Pipe Ruptures (Loss Of Coolant Accident)
Major Secondary System Pipe Rupture 244                                 8/3/2010                                                             Responder: WEC                                                20. N        Open                              Open-NRC Review    EICB RAI        Response is              LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
Major Secondary System Pipe Rupture received.
ML102980066 Item provided in letter      "Safety Evaluation" states: "the Section 8.2.2 of the Common Q SPM (ML050350234) states that           The process related requirements have been removed from                    Revised response is included in Due 2/25/11 Document No. 14          dated 10/25/10.          information relied upon in the SE must the Software Requirements Specification (SRS) shall be developed     revision 2 of the Software Requirements Specification (SRS).                letter dated 12/22/10          revisions                                                      be docketed correspondence."
information.
using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS         Attachment 3 of letter dated 10/25/10 contains the                          Response is provided in letter    NNC 2/2/11: Issues                                          LIC-101 Rev. 3 states: "The safety should address the software product, not the process of producing     proprietary version of Westinghouse document Nuclear                      dated 10/25/10.                  with Common Q TR &                                          analysis that supports the change the software. In addition Section 4.3.2.1 of the SPM states "Any     Automation, Watts Bar 2 NSSS Completion Program, I&C                                                          SPM compliance were                                          requested should include technical alternatives to the SPM processes or additional project specific     Projects, Software Requirements Specification for the Post                  NNC 11/18/10: SysRS Rev. 2        discussed in the weekly                                      information in sufficient detail to enable information for the ...SCMP...shall be specified in the PQP.         Accident Monitoring System, WNA-SD-00239-WBT,                              also contains process            public meetings.                                            the NRC staff to make an independent Revision 2, Dated September 2010.                                          requirements that are more        Westinghouse to                                              assessment regarding the acceptability Contrary to these two statements in the SPM, the WBN2 PAMS                                                                                       appropriately incorporated into  perform Common Q TR                                          of the proposal in terms of regulatory SRS (ML101050202) contains many process related requirements,                                                                                     process documentation.            & SPM compliance self                                        requirements and the protection of for example all seventeen requirements in Section 2.3.2,     TVA Response to Follow-up NRC Request:                                                                               assessment; this will be                                    public health and safety."
244 EICB (Carte) 8/3/2010 Section 8.2.2 of the Common Q SPM (ML050350234) states that the Software Requirements Specification (SRS) shall be developed using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS should address the software product, not the process of producing the software. In addition Section 4.3.2.1 of the SPM states "Any alternatives to the SPM processes or additional project specific information for the...SCMP...shall be specified in the PQP.
                                    "Configuration Control," address process requirements for    As shown is the listed documents, process related                                                                     discussed in detail on configuration control.                                        requirements have been deleted from the SRS and SysRS in                                                             the next audit.
Contrary to these two statements in the SPM, the WBN2 PAMS SRS (ML101050202) contains many process related requirements, for example all seventeen requirements in Section 2.3.2, "Configuration Control," address process requirements for configuration control.
Revision 3:
Please explain how the above meets the intent of the approved SPM.
Please explain how the above meets the intent of the approved SPM.                                                          Attachment 1 contains proprietary version of WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System-System Requirements Specification, dated December 2010.
Responder: WEC The process related requirements have been removed from revision 2 of the Software Requirements Specification (SRS).
Attachment 7 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, Software Requirements
of letter dated 10/25/10 contains the proprietary version of Westinghouse document Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, WNA-SD-00239-WBT, Revision 2, Dated September 2010.
TVA Response to Follow-up NRC Request:
As shown is the listed documents, process related requirements have been deleted from the SRS and SysRS in Revision 3:
contains proprietary version of WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System-System Requirements Specification, dated December 2010.
contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, Software Requirements
: 20. N Open Revised response is included in letter dated 12/22/10 Response is provided in letter dated 10/25/10.
NNC 11/18/10: SysRS Rev. 2 also contains process requirements that are more appropriately incorporated into process documentation.
Open-NRC Review Due 2/25/11 Document revisions NNC 2/2/11: Issues with Common Q TR &
SPM compliance were discussed in the weekly public meetings.
Westinghouse to perform Common Q TR
& SPM compliance self assessment; this will be discussed in detail on the next audit.
EICB RAI ML102980066 Item No. 14 Response is provided in letter dated 10/25/10.
LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                               radE4C39.docx                                                                                           Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                              Issue                                                    TVA Response(s)                          Acceptable       Status/ Current Actions         Resolution Path         RAI No. & Date     RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                                Y/N Specification for the Post Accident Monitoring System, dated December 2010.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Specification for the Post Accident Monitoring System, dated December 2010.
Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
The documents discussed in Item 3 have been revised to address compliance with the Topical Report (TR) and the Software Program Manual (SPM).
The documents discussed in Item 3 have been revised to address compliance with the Topical Report (TR) and the Software Program Manual (SPM).
245                                 8/3/2010                                                           Responder: WEC                                                21. N        Open                              Open-NRC Review          EICB RAI                              LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
245 EICB (Carte) 8/3/2010 Section 5.8 of the Common Q SPM (ML050350234) identifies the required test documentation for systems developed using the Common Q SPM. Please provide sufficient information for the NRC staff to independently assess whether the test plan for WBN2 PAMS, is as described in the SPM (e.g., Section 5.8.1).
ML102980066 Item                      "Safety Evaluation" states: "the Section 5.8 of the Common Q SPM (ML050350234) identifies the       Relates to the commitment to provide the test plan and the                Pending Submittal of the Test    Due 3/29/11              No. 119                              information relied upon in the SE must required test documentation for systems developed using the       SPM compliance matrix                                                      Summary Report due 3/29/11                                                                        be docketed correspondence."
Responder: WEC Relates to the commitment to provide the test plan and the SPM compliance matrix contains the Westinghouse document Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010.
Common Q SPM. Please provide sufficient information for the                                                                                                                     NNC 2/2/11: Issues NRC staff to independently assess whether the test plan for WBN2   Attachment 9 contains the Westinghouse document Post                      Response included in letter      with the Common Q TR                                            LIC-101 Rev. 3 states: "The safety PAMS, is as described in the SPM (e.g., Section 5.8.1).           Accident Monitoring System Test Plan, WNA-PT-00138-                       dated 12/3/10                    & SPM were discussed                                            analysis that supports the change WBT, Revision 0, dated November 2010. Attachment 10                                                         in the weekly public                                            requested should include technical contains the Westinghouse Application for Withholding for                 Common Q PAMS Test                meetings.                                                      information in sufficient detail to enable the Post Accident Monitoring System Test Plan, WNA-PT-                   Summary Report scheduled to      Westinghouse to                                                the NRC staff to make an independent 00138-WBT, Revision 0, dated November 2010.                               be submitted March 29, 2011.      perform Common Q TR                                            assessment regarding the acceptability
TVA Response to Follow-up NRC Request:
                                                                                                                                                                                                                    & SPM compliance self                                          of the proposal in terms of regulatory TVA Response to Follow-up NRC Request:                                                                       assessment                                                      requirements and the protection of public health and safety."
The results of the self assessment were reviewed by Westinghouse with the NRC on February 2, 2011 and were further reviewed by TVA during the NRC Common Q PAMS audit during the week of February 28 to March 4, 2011.
The results of the self assessment were reviewed by Westinghouse with the NRC on February 2, 2011 and were further reviewed by TVA during the NRC Common Q PAMS audit during the week of February 28 to March 4, 2011.
Corrections to WNA-TR-02451-WBT, Test Summary Report for the Post Accident Monitoring System and the self assessment were made as a result of the TVA review to ensure this comment was fully addressed.
Corrections to WNA-TR-02451-WBT, Test Summary Report for the Post Accident Monitoring System and the self assessment were made as a result of the TVA review to ensure this comment was fully addressed.
By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with TR and SPM compliance. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.
By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with TR and SPM compliance. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.
246                                8/3/2010                                                          Responder: WEC                                                22. N        Open                              Open-NRC Review           EICB RAI         Response is          LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
: 21. N Open Pending Submittal of the Test Summary Report due 3/29/11 Response included in letter dated 12/3/10 Common Q PAMS Test Summary Report scheduled to be submitted March 29, 2011.
ML102980066 Item provided in letter  "Safety Evaluation" states: "the Section 4.3.2.1, "Initiation Phase" of the Common Q SPM           As agreed ISG6 does not apply to the Common Q PAMS                        Pending Submittal of Revision 3  Due 3/29/11              No. 15          dated 10/25/10      information relied upon in the SE must (ML050350234) requires that a Project Quality Plan (PQP) be       platform. The information required to address this question                of the Licensing Technical                                                                        be docketed correspondence."
Open-NRC Review Due 3/29/11 NNC 2/2/11: Issues with the Common Q TR
developed. Many other section of the SPM identify that this PQP   concerning the PQP and SPM has been added to                              Report due 3/29/11. PQP          NNC 2/2/11: Issues should contain information required by ISG6. Please provide the   compliance matrix in revision 1 of the Licensing Technical                provided for audit the week of    with the Common Q TR                                            LIC-101 Rev. 3 states: "The safety PQP. If "PQP" is not the name of the documentation produced,       Report.                                                                    2/28/11.                          & SPM implementation                                            analysis that supports the change please describe the documentation produced and provide the                                                                                                                     were discussed in the                                          requested should include technical information that the SPM states should be in the PQP.             Attachment 1 of letter dated 10/25/10 contains the                         Response is provided in letter    weekly public meetings.                                        information in sufficient detail to enable proprietary version of Westinghouse document Tennessee                   dated 10/25/10                    Westinghouse to                                                the NRC staff to make an independent Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-                                                       perform Common Q TR                                            assessment regarding the acceptability Accident Monitoring System (PAMS), Licensing Technical                     NNC 11/18/10: PQP has not        & SPM compliance self                                          of the proposal in terms of regulatory Report, Revision 1, WNA-LI-00058-WBT-P, Dated October                     been provided and CQ PAMS         assessment                                                      requirements and the protection of 2010                                                                      LTR Rev. 1 does not contain                                                                       public health and safety."
& SPM were discussed in the weekly public meetings.
comparable information.
Westinghouse to perform Common Q TR
& SPM compliance self assessment EICB RAI ML102980066 Item No. 119 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
246 EICB (Carte) 8/3/2010 Section 4.3.2.1, "Initiation Phase" of the Common Q SPM (ML050350234) requires that a Project Quality Plan (PQP) be developed. Many other section of the SPM identify that this PQP should contain information required by ISG6. Please provide the PQP. If "PQP" is not the name of the documentation produced, please describe the documentation produced and provide the information that the SPM states should be in the PQP.
Responder: WEC As agreed ISG6 does not apply to the Common Q PAMS platform. The information required to address this question concerning the PQP and SPM has been added to compliance matrix in revision 1 of the Licensing Technical Report.
of letter dated 10/25/10 contains the proprietary version of Westinghouse document Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010
: 22. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11. PQP provided for audit the week of 2/28/11.
Response is provided in letter dated 10/25/10 NNC 11/18/10: PQP has not been provided and CQ PAMS LTR Rev. 1 does not contain comparable information.
Open-NRC Review Due 3/29/11 NNC 2/2/11: Issues with the Common Q TR
& SPM implementation were discussed in the weekly public meetings.
Westinghouse to perform Common Q TR
& SPM compliance self assessment EICB RAI ML102980066 Item No. 15 Response is provided in letter dated 10/25/10 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                               radE4C39.docx                                                                                       Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                              Issue                                                      TVA Response(s)                          Acceptable       Status/ Current Actions         Resolution Path     RAI No. & Date   RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                                  Y/N TVA Response to Follow-up NRC Request:
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response to Follow-up NRC Request:
The results of the Common Q TR and SPM self assessment were reviewed by Westinghouse with the NRC on February 2, 2011.
The results of the Common Q TR and SPM self assessment were reviewed by Westinghouse with the NRC on February 2, 2011.
The Westinghouse Watts Bar Unit 2 NSSS Completion I&C Projects Project Quality Plan, WNA-PQ-00220-WBT, Revision 1 is available for NRC audit at the Westinghouse Rockville Office and was available for review during the NRC Common Q PAMS audit during the week of February 28 to March 4, 2011. During the audit, the Westinghouse Quality Assurance in process audit of the Common Q PAMS project was reviewed by the NRC inspector with no issues identified.
The Westinghouse Watts Bar Unit 2 NSSS Completion I&C Projects Project Quality Plan, WNA-PQ-00220-WBT, Revision 1 is available for NRC audit at the Westinghouse Rockville Office and was available for review during the NRC Common Q PAMS audit during the week of February 28 to March 4, 2011. During the audit, the Westinghouse Quality Assurance in process audit of the Common Q PAMS project was reviewed by the NRC inspector with no issues identified.
250                                 8/8/2010                                                             Responder: WEC                                                23. N        Open                              Open-NRC Review                                          LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
250 EICB (Carte) 8/8/2010 The SPM describes the software and documents that will be created and placed under configuration control. The SCMP (e.g.,
                                                                                                                                                                                                                                                                                "Safety Evaluation" states: "the The SPM describes the software and documents that will be           Westinghouse develops Software Release Reports/Records                      Revised response included in      NNC 2/2/11: To be                                        information relied upon in the SE must created and placed under configuration control. The SCMP (e.g.,     and a Configuration Management Release Report. Describe                    letter dated 12/22/10            addressed during the                                    be docketed correspondence."
SPM Section 6, Software Configuration Management Plan) describes the implementation tasks that are to be carried out. The acceptance criterion for software CM implementation is that the tasks in the SCMP have been carried out in their entirety.
SPM Section 6, Software Configuration Management Plan)             the documents and when they will be produced. Summarize                                                      next audit.
Documentation should exist that shows that the configuration management tasks for that activity group have been successfully accomplished. Please provide information that shows that the CM tasks have been successfully accomplished for each life cycle activity group.
describes the implementation tasks that are to be carried out. The   guidance on how to produce these records, focus on project                  Response included in letter                                                                LIC-101 Rev. 3 states: "The safety acceptance criterion for software CM implementation is that the     specific requirements in SPM etc.                                          dated 10/25/10.                                                                            analysis that supports the change tasks in the SCMP have been carried out in their entirety.                                                                                                                                                                                 requested should include technical Documentation should exist that shows that the configuration         TVA Response to Follow-up NRC Request:                                                                                                                                information in sufficient detail to enable management tasks for that activity group have been successfully                                                                                                                                                                             the NRC staff to make an independent accomplished. Please provide information that shows that the CM     The following documentation shows that the configuration                                                                                                              assessment regarding the acceptability tasks have been successfully accomplished for each life cycle       management tasks for that activity group have been                                                                                                                     of the proposal in terms of regulatory activity group.                                                      successfully accomplished.                                                                                                                                             requirements and the protection of public health and safety."
Responder: WEC Westinghouse develops Software Release Reports/Records and a Configuration Management Release Report. Describe the documents and when they will be produced. Summarize guidance on how to produce these records, focus on project specific requirements in SPM etc.
: 2. WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:
TVA Response to Follow-up NRC Request:
: a. Section 2.2.1 Hardware/Software Change Process has been added to describe the process of how changes are evaluated.
The following documentation shows that the configuration management tasks for that activity group have been successfully accomplished.
: b. Section 2.2.2, Software has been expanded to include a table detailing evolutionary software changes that have occurred since the initial submittal and the change evaluation of the life cycle.
: 2.
: 3. WNA-PT-00138-WBT, Revision 0, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, (Proprietary), dated November 2010 submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).
WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:
251                                8/8/2010                                                            Responder: WEC                                                24. N       Open                             Open-NRC Review                                         LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
: a.
                                                                                                                                                                                                                                                                                "Safety Evaluation" states: "the The SPM describes the software testing and documents that will be   The software testing performed and documents created are                    Pending Submittal of the Test    Due 3/29/11                                              information relied upon in the SE must created. The SPM also describes the testing tasks that are to be     addressed by the SPM Compliance matrix contained in                        Summary Report due 3/29/11                                                                be docketed correspondence."
Section 2.2.1 Hardware/Software Change Process has been added to describe the process of how changes are evaluated.
carried out. The acceptance criterion for software test             Revision 1 of the Licensing Technical Report.                                                                NNC 2/2/11: Issues implementation is that the tasks in the SPM have been carried out                                                                               Revised response included in      with the Common Q TR                                    LIC-101 Rev. 3 states: "The safety in their entirety. Please provide information that shows that       Attachment 1 of the letter dated 10/25/10 contains the                     letter dated 12/22/10            & SPM were discussed                                    analysis that supports the change testing been successfully accomplished.                              Proprietary version of Westinghouses document titled:                                                       in the weekly public                                    requested should include technical Tennessee Valley Authority (TVA), Watts Bar Unit 2                         Partial response is provided in   meetings.                                               information in sufficient detail to enable
: b.
Section 2.2.2, Software has been expanded to include a table detailing evolutionary software changes that have occurred since the initial submittal and the change evaluation of the life cycle.
: 3.
WNA-PT-00138-WBT, Revision 0, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, (Proprietary), dated November 2010 submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).
: 23. N Open Revised response included in letter dated 12/22/10 Response included in letter dated 10/25/10.
Open-NRC Review NNC 2/2/11: To be addressed during the next audit.
LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
251 EICB (Carte) 8/8/2010 The SPM describes the software testing and documents that will be created. The SPM also describes the testing tasks that are to be carried out. The acceptance criterion for software test implementation is that the tasks in the SPM have been carried out in their entirety. Please provide information that shows that testing been successfully accomplished.
Responder: WEC The software testing performed and documents created are addressed by the SPM Compliance matrix contained in Revision 1 of the Licensing Technical Report.
of the letter dated 10/25/10 contains the Proprietary version of Westinghouses document titled:
Tennessee Valley Authority (TVA), Watts Bar Unit 2
: 24. N Open Pending Submittal of the Test Summary Report due 3/29/11 Revised response included in letter dated 12/22/10 Partial response is provided in Open-NRC Review Due 3/29/11 NNC 2/2/11: Issues with the Common Q TR
& SPM were discussed in the weekly public meetings.
LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                               radE4C39.docx                                                                                 Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR    NRC No.                                                              Issue                                                    TVA Response(s)                        Acceptable       Status/ Current Actions     Resolution Path     RAI No. & Date   RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                              Y/N (WBN2), Post-Accident Monitoring System (PAMS),                           letter dated 10/25/10        Westinghouse to                                          the NRC staff to make an independent Licensing Technical Report, Revision 1, WNA-LI-00058-                                                   perform Common Q TR                                      assessment regarding the acceptability WBT-P, Dated October 2010                                                                               & SPM compliance self                                    of the proposal in terms of regulatory assessment                                                requirements and the protection of TVA Response to Follow-up NRC Request:                                                                                                                             public health and safety."
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (WBN2), Post-Accident Monitoring System (PAMS),
Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010 TVA Response to Follow-up NRC Request:
Please see the response to RAI item 21 in letter dated 12/22/10, NRC Matrix Item 250.
Please see the response to RAI item 21 in letter dated 12/22/10, NRC Matrix Item 250.
TVA Response to second Follow-up NRC Request:
TVA Response to second Follow-up NRC Request:
The results of the Common Q TR and SPM self assessment were reviewed by Westinghouse with the NRC on February 2, 2011.
The results of the Common Q TR and SPM self assessment were reviewed by Westinghouse with the NRC on February 2, 2011.
By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with TR and SPM compliance. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.
By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with TR and SPM compliance. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.
252                                8/8/2010                                                          Responder: WEC                                                25. N        Open                          Open-NRC Review                                          LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
letter dated 10/25/10 Westinghouse to perform Common Q TR
                                                                                                                                                                                                                                                                        "Safety Evaluation" states: "the The SPM contain requirements for software requirements           Explain response to AP1000 audit report.                                  Response included in letter  Due 2/25/11 (document                                    information relied upon in the SE must traceability analysis and associated documentation (see Section   RTM docketed NRC awaiting V&V evaluation of RTM.                          dated 12/22/10                submittals)                                              be docketed correspondence."
& SPM compliance self assessment the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
5.4.5.3, Requirements Traceability Analysis). Please provide information that demonstrates that requirements traceability     The following responses are based on WBN Unit 2 Common                     Read ML091560352              NNC 2/2/11: Updated                                      LIC-101 Rev. 3 states: "The safety analysis has been successfully accomplished.                      Q PAMS traceability:                                                                                     RTMs and                                                  analysis that supports the change specifications to be                                      requested should include technical Software requirements traceability analysis is described in                                             provided.                                                information in sufficient detail to enable the following documents:                                                                                                                                           the NRC staff to make an independent Requirements                                              assessment regarding the acceptability
252 EICB (Carte) 8/8/2010 The SPM contain requirements for software requirements traceability analysis and associated documentation (see Section 5.4.5.3, Requirements Traceability Analysis). Please provide information that demonstrates that requirements traceability analysis has been successfully accomplished.
: 1. WNA-LI-00058-WBT-P, Revision 2, Post-Accident                                                     traceability to be                                        of the proposal in terms of regulatory Monitoring System (PAMS) Licensing Technical                                                       addressed during he                                      requirements and the protection of Report submitted in TVA Letter to NRC dated                                                       next audit.                                              public health and safety."
Responder: WEC Explain response to AP1000 audit report.
December 3, 2010, (Reference 1) Section 11, TVA Contract Compliance Matrix
RTM docketed NRC awaiting V&V evaluation of RTM.
: 2. WNA-VR-00279-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office)
The following responses are based on WBN Unit 2 Common Q PAMS traceability:
: 3. WNA-VR-00280-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office) This document addresses the RSEDs used in the WBN Unit 2 Common Q PAMS.
Software requirements traceability analysis is described in the following documents:
: 1.
WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) Section 11, TVA Contract Compliance Matrix
: 2.
WNA-VR-00279-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office)
: 3.
WNA-VR-00280-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office) This document addresses the RSEDs used in the WBN Unit 2 Common Q PAMS.
The V&V evaluation of the RTM is documented in section 2.2.2 of the following documents:
The V&V evaluation of the RTM is documented in section 2.2.2 of the following documents:
: 1. The Independent Verification & Validation (IV&V)
: 1.
The Independent Verification & Validation (IV&V)
: 25. N Open Response included in letter dated 12/22/10 Read ML091560352 Open-NRC Review Due 2/25/11 (document submittals)
NNC 2/2/11: Updated RTMs and specifications to be provided.
Requirements traceability to be addressed during he next audit.
LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                     radE4C39.docx                                                                                       Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                  Issue                                                        TVA Response(s)                          Acceptable       Status/ Current Actions         Resolution Path       RAI No. & Date   RAI Resp. Date     Comments Sec.      Sec. POC                                                                                                                                                      Y/N report covering the Concept and Definition phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 1, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments report covering the Concept and Definition phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 1, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
: 2. The Independent Verification &Validation (IV&V) report covering the Design and Implementation phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 2, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
: 2.
: 3. The integration phase is covered in Attachment 10, the proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-P, Revision 3, dated December 2010.
The Independent Verification &Validation (IV&V) report covering the Design and Implementation phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 2, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
Attachment 11 contains the non-proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-NP, Revision 3, dated December 2010. Attachment 12 contains the Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283-WBT-P, Revision 3, IV &V Summary Report for the Post Accident Monitoring System (Proprietary), dated December 2010.
: 3.
The integration phase is covered in Attachment 10, the proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-P, Revision 3, dated December 2010. 1 contains the non-proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-NP, Revision 3, dated December 2010. Attachment 12 contains the Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283-WBT-P, Revision 3, IV &V Summary Report for the Post Accident Monitoring System (Proprietary), dated December 2010.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
See Response to item 3 (Matrix Item Number 142) 318   7.5.2. 7.5                   TVA has provided the following documents for RM-1000                 Responder: Temples                                              26. Y        Open                            Open-NRC Review          RAI No. 28        TVA Letter dated 3                            equipment qualification:                                                                                                                                                                                     ML102980005      10/29/10, Encl 1 Revised response is included in Due 2/25/11              10/26/2010        Item 34, and TVA (i)     Qualification Test Report for RM-1000 Processor Module                                                                                     letter dated 12/22/10.                                                      letter 11/24/10, and Current-To-Frequency Converter 04508905-QR               (i)     Applicable to WBN Unit 2. 04508905-1QR is                                                             Response update                            Att. 2.
See Response to item 3 (Matrix Item Number 142) 318 7.5.2.
(January 2001)                                                        applicable only in regards to the RM-1000, with the                   Note check 04508905-1QR or required. It is clear that (ii)    Qualification Test Report Supplement, RM-1000 Upgrades                exception of re-qualification of certain RM-1000                     QR. Staff version is QR only. 04508903-2SP and -
3 7.5 EICB (Singh)
04508905-1SP (June 2006)                                              equipment differences covered in the -1SP report.                                                    3SP are not applicable.
TVA has provided the following documents for RM-1000 equipment qualification:
(iii)  Qualification Test Report Supplement, RM-1000 Upgrades                The Current-to-Frequency (I-F) converter module                       Response is included in letter The response for 04508905-2SP (June 2008)                                              qualifications in the base report and the -1SP report                 dated 10/29/10                  applicability of are not applicable to the RM-1000s, and will be used EICB (Singh)
(i)
(iv)    Qualification Test Report Supplement, RM-1000 Upgrades                                                                                                                      04508905-QR and -
Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter 04508905-QR (January 2001)
04508905-3SP (May 2008)                                              later as references in the WBN Unit 2 specific                                                       1SP to RM-1000 and IF qualification reports.                                                                                converter is not clear.
(ii)
Please clarify whether all of these are fully applicable to WBN2 or are they applicable with exceptions? If with exceptions, then        (ii)   Applicable to WBN Unit 2.                                                                             Check page numbers of please clarify what those are.                                                                                                                                                      Appendix F (iii)   Not applicable to WBN Unit 2 (missing/duplicate Supplement 3 was issued one month prior to supplement 2.              (iv)   Not applicable to WBN Unit 2                                                                         pages).
Qualification Test Report Supplement, RM-1000 Upgrades 04508905-1SP (June 2006)
Please explain the reason for the same.                                                                                                                                            Check applicability of The 04508905-3SP report was prepared for another TVA                                                         Appendix C to RM1000 plant, as a monitor system-level report, where the system                                                     instead of RM2300?
(iii)
included equipment mostly based on the base report                                                           See items 336 and 337.
Qualification Test Report Supplement, RM-1000 Upgrades 04508905-2SP (June 2008)
equipment items. These two -2SP and -3SP supplement All equipment
(iv)
Qualification Test Report Supplement, RM-1000 Upgrades 04508905-3SP (May 2008)
Please clarify whether all of these are fully applicable to WBN2 or are they applicable with exceptions? If with exceptions, then please clarify what those are.
Supplement 3 was issued one month prior to supplement 2.
Please explain the reason for the same.
Responder: Temples (i)
Applicable to WBN Unit 2. 04508905-1QR is applicable only in regards to the RM-1000, with the exception of re-qualification of certain RM-1000 equipment differences covered in the -1SP report.
The Current-to-Frequency (I-F) converter module qualifications in the base report and the -1SP report are not applicable to the RM-1000s, and will be used later as references in the WBN Unit 2 specific qualification reports.
(ii)
Applicable to WBN Unit 2.
(iii)
Not applicable to WBN Unit 2 (iv)
Not applicable to WBN Unit 2 The 04508905-3SP report was prepared for another TVA plant, as a monitor system-level report, where the system included equipment mostly based on the base report equipment items. These two -2SP and -3SP supplement
: 26. Y Open Revised response is included in letter dated 12/22/10.
Note check 04508905-1QR or QR. Staff version is QR only.
Response is included in letter dated 10/29/10 Open-NRC Review Due 2/25/11 Response update required. It is clear that 04508903-2SP and -
3SP are not applicable.
The response for applicability of 04508905-QR and -
1SP to RM-1000 and IF converter is not clear.
Check page numbers of Appendix F (missing/duplicate pages).
Check applicability of Appendix C to RM1000 instead of RM2300?
See items 336 and 337.
All equipment RAI No. 28 ML102980005 10/26/2010 TVA Letter dated 10/29/10, Encl 1 Item 34, and TVA letter 11/24/10, Att. 2.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                   radE4C39.docx                                                                           Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                              TVA Response(s)                          Acceptable Status/ Current Actions     Resolution Path     RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                      Y/N reports were essentially worked concurrently, but the -2SP                                         qualification reports document review/release process resulted in the release                                             including supplements time difference.                                                                                   2SP and 3SP have been reviewed as TVA Response to Follow-up NRC Request:                                                             vendor drawings for WBN-2. Please explain NOTE: The response for the current to frequency (I to F)                                           the reason for converter in item 1 below is a reversal of the                                             applicability of one response previously provided in TVA to NRC letter                                         report and not the dated October 29, 2010 (Reference 22). General                                             other.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments reports were essentially worked concurrently, but the -2SP document review/release process resulted in the release time difference.
Atomics Electronic Systems Inc. (GA-ESI) notified TVA of this change on December 8, 2010                                                     Further all TVA/Bechtel (Reference 20).                                                                           reviews seems to be dispositioned as Code (1) The applicability of the qualification reports from GA-                                       4, Review not required.
TVA Response to Follow-up NRC Request:
ESI e-mail dated December 10, 2010 (Reference 19) is                                         Work may proceed.
NOTE: The response for the current to frequency (I to F) converter in item 1 below is a reversal of the response previously provided in TVA to NRC {{letter dated|date=October 29, 2010|text=letter dated October 29, 2010}} (Reference 22). General Atomics Electronic Systems Inc. (GA-ESI) notified TVA of this change on December 8, 2010 (Reference 20).
as follows:                                                                                   The applicable reports should have been
(1) The applicability of the qualification reports from GA-ESI e-mail dated December 10, 2010 (Reference 19) is as follows:
: a. 04508905-QR Qualification Test Report for RM-reviewed prior to 1000 Processor Module and Current-to-dispositioning them.
: a.
Frequency Converter is applicable to the WBN Please explain the Unit 2 RM-1000 and I to F converter modules.
04508905-QR Qualification Test Report for RM-1000 Processor Module and Current-to-Frequency Converter is applicable to the WBN Unit 2 RM-1000 and I to F converter modules.
apparent lack of review
: b.
: b. 04508905-1SP Supplement to Qualification Test                                         of WBN-2 applicable Report for RM-1000 Processor Module and                                                 documents. Was Current-to-Frequency Converter is applicable to                                       appropriate review the WBN Unit 2 RM-1000 module.                                                         guidance used?
04508905-1SP Supplement to Qualification Test Report for RM-1000 Processor Module and Current-to-Frequency Converter is applicable to the WBN Unit 2 RM-1000 module.
: c. 04508905-1SP is not applicable to the WBN Unit                                         Further update required 2 I to F converter module.
: c.
Provide model
04508905-1SP is not applicable to the WBN Unit 2 I to F converter module.
: d. 04508905-2SP Qualification Test Report                                                 number/part number for Supplement, I-F Converter Upgrades is                                                 the RM-1000 and I/F applicable to the WBN Unit 2 I to F converter                                           converter used for module.                                                                                 WBN-2. This information is needed GA-ESI provided two other reports required to support                                         to verify that the model qualification of the containment high range radiation                                         or part number used is monitors. The report descriptions are from GA-ESI e-                                         the equipment that has mail on December 8, 2010 (Reference 20). The                                                 been qualified for WBN-reports are:                                                                                 2.
: d.
: e. GA-ESI report 04038903-QSR, Qualification                                             Provide qualification Summary Report for Watts Bar Nuclear Plant Unit                                         reports 04038903-QSR 2 Replacement Radiation Monitors: The report is                                       and 04038903-7SP by the principle report and the starting point for all                                     the dues date of the radiation monitors provided as part of the                                         1/22/11.
04508905-2SP Qualification Test Report Supplement, I-F Converter Upgrades is applicable to the WBN Unit 2 I to F converter module.
replacement contract. The report describes each monitor; referenced to the technical manual for                                         Submit a copy of any the physical and functional description and lists                                       other relevant reviewed the major components of the monitor system.                                             versions of the Report section 3 identifies the TVA Watts Bar Unit                                     qualification reports.
GA-ESI provided two other reports required to support qualification of the containment high range radiation monitors. The report descriptions are from GA-ESI e-mail on December 8, 2010 (Reference 20). The reports are:
2 Environmental, Seismic, Electromagnetic Compatibility (EMC), and software requirements                                         Submit copies of the for each monitor. In section 4 a brief description                                     reviewed reports for of GA-ESI generic qualification programs for all                                       04508905-QR, radiation monitoring equipment in each of the four                                     04508905-1SP, above areas is provided. The qualification basis                                       04508905-2SP.
: e.
for each monitor is provided in a separate supplement to the principle report and is identified                                   Clarification of
GA-ESI report 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors: The report is the principle report and the starting point for all the radiation monitors provided as part of the replacement contract. The report describes each monitor; referenced to the technical manual for the physical and functional description and lists the major components of the monitor system.
Report section 3 identifies the TVA Watts Bar Unit 2 Environmental, Seismic, Electromagnetic Compatibility (EMC), and software requirements for each monitor. In section 4 a brief description of GA-ESI generic qualification programs for all radiation monitoring equipment in each of the four above areas is provided. The qualification basis for each monitor is provided in a separate supplement to the principle report and is identified qualification reports including supplements 2SP and 3SP have been reviewed as vendor drawings for WBN-2. Please explain the reason for applicability of one report and not the other.
Further all TVA/Bechtel reviews seems to be dispositioned as Code 4, Review not required.
Work may proceed.
The applicable reports should have been reviewed prior to dispositioning them.
Please explain the apparent lack of review of WBN-2 applicable documents. Was appropriate review guidance used?
Further update required Provide model number/part number for the RM-1000 and I/F converter used for WBN-2. This information is needed to verify that the model or part number used is the equipment that has been qualified for WBN-
: 2.
Provide qualification reports 04038903-QSR and 04038903-7SP by the dues date of 1/22/11.
Submit a copy of any other relevant reviewed versions of the qualification reports.
Submit copies of the reviewed reports for 04508905-QR, 04508905-1SP, 04508905-2SP.
Clarification of  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                     radE4C39.docx                                                                         Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                              TVA Response(s)                          Acceptable Status/ Current Actions     Resolution Path       RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                      Y/N in section 5.                                                                          applicability of existing reports is acceptable.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments in section 5.
: f. GA-ESI report 04038903-7SP, Qualification Basis for 04034101-001 (2-RE-90-271, -272, -
: f.
GA-ESI report 04038903-7SP, Qualification Basis for 04034101-001 (2-RE-90-271, -272, -
273, & -274) [TVA Note: These are the containment post accident high range radiation monitors.]: GA-ESI report 04038903-7SP is divided into subsections to address the Environmental, Seismic, EMC, and Software qualification basis for the High Range Area Monitors. Within each subsection, the HRAM is compared to a tested or analyzed article to demonstrate similarity and/or evaluate differences, the tests that were performed, and evaluation to demonstrate qualification. In most cases, the qualification basis references other documents. In addition to qualification, a section is provided that lists the life of those replaceable components that have life expectancy less than 40 years.
273, & -274) [TVA Note: These are the containment post accident high range radiation monitors.]: GA-ESI report 04038903-7SP is divided into subsections to address the Environmental, Seismic, EMC, and Software qualification basis for the High Range Area Monitors. Within each subsection, the HRAM is compared to a tested or analyzed article to demonstrate similarity and/or evaluate differences, the tests that were performed, and evaluation to demonstrate qualification. In most cases, the qualification basis references other documents. In addition to qualification, a section is provided that lists the life of those replaceable components that have life expectancy less than 40 years.
(2) This is addressed by response to RAI Question 336 in TVA to NRC letter dated November 24, 2010 (Reference 8)
(2) This is addressed by response to RAI Question 336 in TVA to NRC {{letter dated|date=November 24, 2010|text=letter dated November 24, 2010}} (Reference 8)
(3) This is addressed by response to RAI Question 337 in TVA to NRC letter dated November 24, 2010 (Reference 8)
(3) This is addressed by response to RAI Question 337 in TVA to NRC {{letter dated|date=November 24, 2010|text=letter dated November 24, 2010}} (Reference 8)
(4) The 04508905-3SP Qualification Test Report Supplement, RM-1000 Upgrades is not applicable to WBN Unit 2 (Reference 19).
(4) The 04508905-3SP Qualification Test Report Supplement, RM-1000 Upgrades is not applicable to WBN Unit 2 (Reference 19).
Please see Item 1, above, for applicability of the other reports.
Please see Item 1, above, for applicability of the other reports.
(5) TVA provided the proprietary versions of the reports by letter dated March 12, 2010 (Reference 10). By letter dated July 15, 2010 (Reference 23), TVA provided the non-proprietary version of the reports and included a copy of the proprietary report which had been erroneously marked as having not been reviewed.
(5) TVA provided the proprietary versions of the reports by {{letter dated|date=March 12, 2010|text=letter dated March 12, 2010}} (Reference 10). By {{letter dated|date=July 15, 2010|text=letter dated July 15, 2010}} (Reference 23), TVA provided the non-proprietary version of the reports and included a copy of the proprietary report which had been erroneously marked as having not been reviewed.
04508905-QR report has been reviewed by TVA. The review of the remaining reports is ongoing.
04508905-QR report has been reviewed by TVA. The review of the remaining reports is ongoing.
(6) See item 5.
(6) See item 5.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
The following documents are the qualification documents associated with the RM-1000 radiation monitors:
The following documents are the qualification documents associated with the RM-1000 radiation monitors: contains the approved proprietary version of General Atomics Electronic Systems 04508905-1SP, Qualification Test Report Supplement, RM-1000 Upgrade.
Attachment 5 contains the approved proprietary version of General Atomics Electronic Systems 04508905-1SP, Qualification Test Report Supplement, RM-1000 Upgrade.
contains the approved proprietary version of General Atomics Electronic Systems 04508905-2SP, Qualification Test Report Supplement, applicability of existing reports is acceptable.
Attachment 6 contains the approved proprietary version of General Atomics Electronic Systems 04508905-2SP, Qualification Test Report Supplement,


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                 radE4C39.docx                                                                                   Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                Issue                                                    TVA Response(s)                          Acceptable       Status/ Current Actions     Resolution Path       RAI No. & Date   RAI Resp. Date     Comments Sec.      Sec. POC                                                                                                                                                Y/N I-F Converter Upgrades.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments I-F Converter Upgrades.
Attachment 7 contains the approved proprietary version of General Atomics Electronic Systems 04038903-7SP, Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274).
contains the approved proprietary version of General Atomics Electronic Systems 04038903-7SP, Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274).
Attachment 8 contains the proprietary version of General Atomics Electronic Systems 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors. In order to meet the NRC submittal schedule, the engineering review of this document was limited to the RM-1000. The document has been accepted for the RM-1000 monitors. Engineering approval will not occur until full review for all covered monitors is complete.
contains the proprietary version of General Atomics Electronic Systems 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors. In order to meet the NRC submittal schedule, the engineering review of this document was limited to the RM-1000. The document has been accepted for the RM-1000 monitors. Engineering approval will not occur until full review for all covered monitors is complete.
Attachment 23 contains the approved proprietary version of General Atomics Electronic Systems 04508905-QR, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter.
3 contains the approved proprietary version of General Atomics Electronic Systems 04508905-QR, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter.
327                                   Attachment 36 contains Foxboro proprietary drawings 08F802403- Responder: Webber                                                27. Y        Open                          Open-NRC Review SC-2001 sheets 1 through 6. An affidavit for withholding and non-DORL (Poole) proprietary versions of the drawings will be submitted by January In accordance with correspondence from Foxboro, there is                     Response Included in letter  Due 11/24/10 31, 2011.                                                        no proprietary information contained in the 08F802403-SC-                   dated 11/24/10 2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.
327 DORL (Poole) 6 contains Foxboro proprietary drawings 08F802403-SC-2001 sheets 1 through 6. An affidavit for withholding and non-proprietary versions of the drawings will be submitted by January 31, 2011.
346   7.5.2. 7.5                   TVA has previously stated in response to open item 319 that RM-     Document 04507007-1TR is the RM-1000 System                28. N        Open                          Open-NRC Review 3                            1000 System Verification Test Results report, 04507007-1TR is not   Verification Test Results. 04038903-QSR, Qualification                    Due 4/15/11 applicable to WBN-2. However, TVA has not provided a WBN-2         Summary Report for Watts Bar Nuclear Plant Unit 2                                                        Due: 2/25/11 specific test results report. Please identify and provide the       Replacement Radiation Monitors (Attachment 8) and and appropriate test results reports to complete the review.            04038903-7SP, Qualification Basis for 04034101 (2-RE                                               The proposed response 271, 272, 273 & 274) (Attachment 7) are the Watts Bar Unit                                               appears to be 2 equipment specific qualification reports.                                                             conflicting with the proposed response for TVA Response to Follow up NRC Request:                                                                   OI-351 regarding not submitting the Report 04507007-1TR RM-1000 System Verification Test                                                   04508905-QR report.
Responder: Webber In accordance with correspondence from Foxboro, there is no proprietary information contained in the 08F802403-SC-2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.
Results is applicable to the WBN Unit 2 monitors. The                                                   TVA to re-assess EICB (Singh) applicability is that 04507007-1TR includes all test cases                                               proposed response for called out in the 04507006 RM-1000 System Test                                                         both OIs.
: 27. Y Open Response Included in letter dated 11/24/10 Open-NRC Review Due 11/24/10 346 7.5.2.
Procedure Specification and contains evidence that the V&V tests were performed with version 1.0 software code. The                                                 TVA to re-evaluate verification report for version 1.1 software is document                                                 previous responses to 04508005 RM-1000 Software Version 1.1 Software                                                         OI-316 and OI-319 Verification Report. Document 04508006 RM-1000                                                         which have conflicting Version 1.2 Software Verification and Validation Report                                                 responses regarding shows that the required test was completed to validated                                                 the applicability of version 1.2 code for the RM-1000.                                                                        04507007-1TR.
3 7.5 EICB (Singh)
TVA has previously stated in response to open item 319 that RM-1000 System Verification Test Results report, 04507007-1TR is not applicable to WBN-2. However, TVA has not provided a WBN-2 specific test results report. Please identify and provide the appropriate test results reports to complete the review.
Document 04507007-1TR is the RM-1000 System Verification Test Results. 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors (Attachment 8) and and 04038903-7SP, Qualification Basis for 04034101 (2-RE 271, 272, 273 & 274) (Attachment 7) are the Watts Bar Unit 2 equipment specific qualification reports.
TVA Response to Follow up NRC Request:
Report 04507007-1TR RM-1000 System Verification Test Results is applicable to the WBN Unit 2 monitors. The applicability is that 04507007-1TR includes all test cases called out in the 04507006 RM-1000 System Test Procedure Specification and contains evidence that the V&V tests were performed with version 1.0 software code. The verification report for version 1.1 software is document 04508005 RM-1000 Software Version 1.1 Software Verification Report. Document 04508006 RM-1000 Version 1.2 Software Verification and Validation Report shows that the required test was completed to validated version 1.2 code for the RM-1000.
The Engineering reviewed and approved proprietary versions of 04507007-1TR, 04508005 and 04508006 will be submitted within two weeks of receipt from GA-ESI. The unreviewed proprietary versions, non-proprietary versions and affidavit for withholding were submitted on TVA to NRC
The Engineering reviewed and approved proprietary versions of 04507007-1TR, 04508005 and 04508006 will be submitted within two weeks of receipt from GA-ESI. The unreviewed proprietary versions, non-proprietary versions and affidavit for withholding were submitted on TVA to NRC
: 28. N Open Due 4/15/11 Open-NRC Review Due: 2/25/11 The proposed response appears to be conflicting with the proposed response for OI-351 regarding not submitting the 04508905-QR report.
TVA to re-assess proposed response for both OIs.
TVA to re-evaluate previous responses to OI-316 and OI-319 which have conflicting responses regarding the applicability of 04507007-1TR.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                 radE4C39.docx                                                                                   Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                  Issue                                                    TVA Response(s)                          Acceptable       Status/ Current Actions     Resolution Path       RAI No. & Date   RAI Resp. Date     Comments Sec.      Sec. POC                                                                                                                                                Y/N letter July 15, 2010 (Reference 3).
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments letter July 15, 2010 (Reference 3).
353   7.5.2. 7.5                   Please provide a summary of the [manufacturers] commercial       GA-ESI submitted their commercial grade dedication        29. N        Open                          Open-NRC Review 3                            dedication plan for radiation monitors with references to the     procedure (OP-7.3-240, Safety-Related Commercial Grade                    Due 4/15/11 guidance document that it follows. Also please include different   Item Parts Acceptance, Revision H) to engineering for                                                    TVA to note that staff facets (e.g. receiving, inspection, testing etc.) of the plan. review. Engineering review of the procedure found that the                                               has written a safety procedure, Section 5, did not require multiple dedication                                                 evaluation and methods for complex CGI or CGI used in digital safety                                                     accepted EPRI TR-systems. As a result, it was determined that the GA-ESI                                                   106439 (1996) as an program did not meet the requirements of NUREG-800,                                                       acceptable method of Section 7.0A, Revision 5.                                                                                 addressing commercial dedication. EPRI NP-A discussion with GA-ESI found that while not required by                                                 5652 must be used in procedure, GA-ESI does perform vendor surveys as required                                                 conjunction with the by Method 2 of NP-5652. The surveys are done based on                                                     additional guidance in prudent business practices. Based on this discussion, GA-                                                 EPRI TR-106439 for ESI agreed to review the CGI used in the WBN Unit 2 digital                                               commercial dedication safety-related monitors to determine if they had been                                                     processes e.g. EPRI dedicated by more than one method.                                                                       NP-6404, EPRI TR-102260, GL 89-02, and The review of the CGI used in the WBN Unit 2 digital safety-                                             GL-91-05 per Section related monitors determined that all CGI had been dedicated                                               3.3 of EPRI TR-using Method 1 of EPRI guideline NP-5652. However, in the                                                 106439.
353 7.5.2.
sample of items reviewed, there were CGI that were dedicated using a single method. Based on the results of the engineering procedure review and the results of the GA-ESI CGI review, Service Request 346896 was initiated to document the condition and to place the monitors in Conditional Release status.
3 7.5 EICB (Singh)
EICB (Singh)
Please provide a summary of the [manufacturers] commercial dedication plan for radiation monitors with references to the guidance document that it follows. Also please include different facets (e.g. receiving, inspection, testing etc.) of the plan.
GA-ESI submitted their commercial grade dedication procedure (OP-7.3-240, Safety-Related Commercial Grade Item Parts Acceptance, Revision H) to engineering for review. Engineering review of the procedure found that the procedure, Section 5, did not require multiple dedication methods for complex CGI or CGI used in digital safety systems. As a result, it was determined that the GA-ESI program did not meet the requirements of NUREG-800, Section 7.0A, Revision 5.
A discussion with GA-ESI found that while not required by procedure, GA-ESI does perform vendor surveys as required by Method 2 of NP-5652. The surveys are done based on prudent business practices. Based on this discussion, GA-ESI agreed to review the CGI used in the WBN Unit 2 digital safety-related monitors to determine if they had been dedicated by more than one method.
The review of the CGI used in the WBN Unit 2 digital safety-related monitors determined that all CGI had been dedicated using Method 1 of EPRI guideline NP-5652. However, in the sample of items reviewed, there were CGI that were dedicated using a single method. Based on the results of the engineering procedure review and the results of the GA-ESI CGI review, Service Request 346896 was initiated to document the condition and to place the monitors in Conditional Release status.
Based on the results of the previous reviews, GA-ESI agreed to the following plan of action to resolve the CGD issue:
Based on the results of the previous reviews, GA-ESI agreed to the following plan of action to resolve the CGD issue:
: 1. GA-ESI shall revise its commercial grade dedication procedure (OP-7.3-240) to require multiple dedication methods be utilized for complex commercial grade items and commercial grade items for digital safety class systems. The evidence that this has been completed will be provided to TVA by April 15, 2011.
: 1.
GA-ESI shall revise its commercial grade dedication procedure (OP-7.3-240) to require multiple dedication methods be utilized for complex commercial grade items and commercial grade items for digital safety class systems. The evidence that this has been completed will be provided to TVA by April 15, 2011.
Specifically, Method 1 and at least one additional method from the list below will be used to ensure that the CGD procedure complies with the current SRP.
Specifically, Method 1 and at least one additional method from the list below will be used to ensure that the CGD procedure complies with the current SRP.
Method 1 - Special Tests and Inspections Method 2 - Commercial Grade Survey of Supplier Method 3 - Source Verification Method 4 - Acceptable Supplier/Item Performance Record
Method 1 - Special Tests and Inspections Method 2 - Commercial Grade Survey of Supplier Method 3 - Source Verification Method 4 - Acceptable Supplier/Item Performance Record
: 2. GA-ESI shall take actions consistent with the revised operating procedure to address the CGls used in the WBN Unit 2 safety-related digital monitors. Evidence that those actions have been completed will be provided no later than September 1, 2011.
: 2.
GA-ESI shall take actions consistent with the revised operating procedure to address the CGls used in the WBN Unit 2 safety-related digital monitors. Evidence that those actions have been completed will be provided no later than September 1, 2011.
Based on the above action plan, TVA will resolve the issues with the GA-ESI CGD of CGI used in the WBN Unit 2 monitors and submit documentation of the resolution to the
Based on the above action plan, TVA will resolve the issues with the GA-ESI CGD of CGI used in the WBN Unit 2 monitors and submit documentation of the resolution to the
: 29. N Open Due 4/15/11 Open-NRC Review TVA to note that staff has written a safety evaluation and accepted EPRI TR-106439 (1996) as an acceptable method of addressing commercial dedication. EPRI NP-5652 must be used in conjunction with the additional guidance in EPRI TR-106439 for commercial dedication processes e.g. EPRI NP-6404, EPRI TR-102260, GL 89-02, and GL-91-05 per Section 3.3 of EPRI TR-106439.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                   radE4C39.docx                                                                                 Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                Issue                                                      TVA Response(s)                            Acceptable       Status/ Current Actions     Resolution Path   RAI No. & Date   RAI Resp. Date     Comments Sec.      Sec. POC                                                                                                                                                    Y/N NRC by:
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments NRC by:
GA-ESI procedure OP-7.3-240 revision: April 30, 2011 Resolution of CGD of CGI used in WBN Unit 2 RM-1000 monitors: September 15, 2011 357   7.5.2. 7.5                   In Attachment 5, Qualification Test Report Supplement, RM-1000       Attachment 8 contains GA-ESI qualification report          30. N                                      Open-NRC Review 3                            (04508905-1SP), Attachment 6, Qualification Test Report             04508903-1TR Seismic Qualification Test Results RM-1000 Supplement, I-F Converter Upgrade (04508905-2SP), and               and Current-to Frequency (I/F) Converter original release, EICB (Singh)
GA-ESI procedure OP-7.3-240 revision: April 30, 2011 Resolution of CGD of CGI used in WBN Unit 2 RM-1000 monitors: September 15, 2011 357 7.5.2.
Attachment 23, Qualification Test Report for RM-1000 Processor       dated April 1999.
3 7.5 EICB (Singh)
Module and Current-To-Frequency Converter (04508905-QR), the applicant made a statement that the results for these tests are provided in SE document 04508903-1TR. Please provide SE document 04508903-1TR for the staff to review. IF this report has been submitted earlier then please advise us the letter number and date by which it was submitted.
In Attachment 5, Qualification Test Report Supplement, RM-1000 (04508905-1SP), Attachment 6, Qualification Test Report Supplement, I-F Converter Upgrade (04508905-2SP), and 3, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter (04508905-QR), the applicant made a statement that the results for these tests are provided in SE document 04508903-1TR. Please provide SE document 04508903-1TR for the staff to review. IF this report has been submitted earlier then please advise us the letter number and date by which it was submitted. contains GA-ESI qualification report 04508903-1TR Seismic Qualification Test Results RM-1000 and Current-to Frequency (I/F) Converter original release, dated April 1999.
358   7.5.2. 7.5                   The attachment numbers refer to your February 25, 2011 letter. In An incomplete response was inadvertently submitted in TVA 1.          N        Open                          Open-NRC Review 3                            Attachment 2, Wyle Test Report 41991 Safety Shutdown             to NRC letter dated March 31, 2011 (Reference 1). The                          Due 4/15/11 Earthquake (SSE) Test Response Spectra (TRS) Plots all five (5) following response supersedes the previous response in its pages, in Attachment 5, General Atomics Electronic Systems       entirety.
: 30. N Open-NRC Review 358 7.5.2.
04508905-1SP, page 5-5, Figure 5-2, and in Attachment 23, Qualification Test Report for RM-1000 Processor Module and       1. Attachment 2, Wyle Test Report 41991 Safety Current-To-Frequency Converter (04508905-QR), page 4-25,             Shutdown Earthquake (SSE) Test Response Spectra Figure 4-5 X-Axis SSE Test Response Spectra (TRS) versus               (TRS) Plots all five (5) pages. These five Test Required Response Spectra (RRS), it shows that the TRS were           Response Spectra (TRS) Plots versus Required below the RRS at various frequency (5% Damping). Please provide       Response Spectra (RRS) show that the TRS were an explanation regarding why this is acceptable.                      below the RRS at various frequency (5% Damping).
3 7.5 EICB (Singh)
The attachment numbers refer to your {{letter dated|date=February 25, 2011|text=February 25, 2011 letter}}. In, Wyle Test Report 41991 Safety Shutdown Earthquake (SSE) Test Response Spectra (TRS) Plots all five (5) pages, in Attachment 5, General Atomics Electronic Systems 04508905-1SP, page 5-5, Figure 5-2, and in Attachment 23, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter (04508905-QR), page 4-25, Figure 4-5 X-Axis SSE Test Response Spectra (TRS) versus Required Response Spectra (RRS), it shows that the TRS were below the RRS at various frequency (5% Damping). Please provide an explanation regarding why this is acceptable.
An incomplete response was inadvertently submitted in TVA to NRC {{letter dated|date=March 31, 2011|text=letter dated March 31, 2011}} (Reference 1). The following response supersedes the previous response in its entirety.
: 1., Wyle Test Report 41991 Safety Shutdown Earthquake (SSE) Test Response Spectra (TRS) Plots all five (5) pages. These five Test Response Spectra (TRS) Plots versus Required Response Spectra (RRS) show that the TRS were below the RRS at various frequency (5% Damping).
Please provide an explanation regarding why this is acceptable.
Please provide an explanation regarding why this is acceptable.
Attachment 2 of this letter provides five pages from the first seismic test (Wyle Test report 41991) from GA-ESI report 04508903-1TR, submitted in response to OI-357 on TVA to NRC letter dated March 31, 2011 (Reference 1). The following discussion refers to these pages.
of this letter provides five pages from the first seismic test (Wyle Test report 41991) from GA-ESI report 04508903-1TR, submitted in response to OI-357 on TVA to NRC {{letter dated|date=March 31, 2011|text=letter dated March 31, 2011}} (Reference 1). The following discussion refers to these pages.
EICB (Singh)
Wyle test report 41991 provided the seismic test results for two RM-1000 monitors (one area monitor and one process monitor) and one I/F converter. During the test, the RM-1000 monitor configured as an area monitor was damaged due to the test table impacting its mechanical stop (see page 4 of Wyle Test Report 41991 attached).
Wyle test report 41991 provided the seismic test results for two RM-1000 monitors (one area monitor and one process monitor) and one I/F converter. During the test, the RM-1000 monitor configured as an area monitor was damaged due to the test table impacting its mechanical stop (see page 4 of Wyle Test Report 41991 attached).
This first test was completed for the RM-1000 monitor configured as a process monitor and the I/F converter.
This first test was completed for the RM-1000 monitor configured as a process monitor and the I/F converter.
A second seismic test for the RM-1000 monitor configured as an area monitor and two I/F converters (Wyle Test Report 41991-1) is also included in 04508903-1TR. The RM-1000 monitor used in this second test was the same RM-1000 process monitor used in the first seismic test reconfigured (switch in application type 1 mode) as an area monitor. One of the I/F converters tested was the same I/F converter tested in the first seismic test. This second test was performed to complete the testing which could not be performed during the first seismic test due to the damage to the RM-1000 area monitor and the loss of the high voltage power supply to the I/F converter that occurred during the first seismic test. None of the TRS plots in this
A second seismic test for the RM-1000 monitor configured as an area monitor and two I/F converters (Wyle Test Report 41991-1) is also included in 04508903-1TR. The RM-1000 monitor used in this second test was the same RM-1000 process monitor used in the first seismic test reconfigured (switch in application type 1 mode) as an area monitor. One of the I/F converters tested was the same I/F converter tested in the first seismic test. This second test was performed to complete the testing which could not be performed during the first seismic test due to the damage to the RM-1000 area monitor and the loss of the high voltage power supply to the I/F converter that occurred during the first seismic test. None of the TRS plots in this
: 1.
N Open Due 4/15/11 Open-NRC Review


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                 radE4C39.docx                                                                 Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                            TVA Response(s)                        Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                  Y/N second seismic test report 41991-1 were below the RRS.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments second seismic test report 41991-1 were below the RRS.
General Atomics Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter (04508905-QR) refers to both Wyle Reports 41991 and 41991-1 included in report 04508903-1TR. It is recognized that the five TRS Plots versus the RRS where the TRS were below the RRS is an exceedance that must be justified. From Wyle report 41991 it can be determined that these five TRS versus RRS plots are for the seismic response in the front to back panel direction.
General Atomics Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter (04508905-QR) refers to both Wyle Reports 41991 and 41991-1 included in report 04508903-1TR. It is recognized that the five TRS Plots versus the RRS where the TRS were below the RRS is an exceedance that must be justified. From Wyle report 41991 it can be determined that these five TRS versus RRS plots are for the seismic response in the front to back panel direction.
The RRS used in the Wyle test reports envelopes the TVA standard RRS shown in Fig 3.1 of TVA Standard Specification CEB-SS-5.10, For Seismic Qualification of Electrical, Mechanical and I&C Devices, submitted on TVA to NRC letter dated February 25, 2011, (Reference
The RRS used in the Wyle test reports envelopes the TVA standard RRS shown in Fig 3.1 of TVA Standard Specification CEB-SS-5.10, For Seismic Qualification of Electrical, Mechanical and I&C Devices, submitted on TVA to NRC {{letter dated|date=February 25, 2011|text=letter dated February 25, 2011}}, (Reference
: 2) below 33 Hz. This TVA standard RRS conservatively envelopes the in panel seismic demand for most TVA applications. For specific cases when required the actual in panel RRS can be developed. Calculation WCG-ACQ-0766, In-Cabinet Required Response Spectra for RM-1000 Radiation Monitors in MCR Panel 2-M-30, Revision 0, (Attachment 3) has been issued to generate the 5% RRS for these safety related RM-1000 monitors, I/F converters and NIM bins for the WBN2 panel (2-M-30) where they will be installed. As can be seen from the RRS plots in calculation WCG-ACQ-0766 the front to back 5% RRS broad band peak is 9.76 g which is lower than the front to back 5% TRS shown in the subject five (5) plots.
: 2) below 33 Hz. This TVA standard RRS conservatively envelopes the in panel seismic demand for most TVA applications. For specific cases when required the actual in panel RRS can be developed. Calculation WCG-ACQ-0766, In-Cabinet Required Response Spectra for RM-1000 Radiation Monitors in MCR Panel 2-M-30, Revision 0, (Attachment 3) has been issued to generate the 5% RRS for these safety related RM-1000 monitors, I/F converters and NIM bins for the WBN2 panel (2-M-30) where they will be installed. As can be seen from the RRS plots in calculation WCG-ACQ-0766 the front to back 5% RRS broad band peak is 9.76 g which is lower than the front to back 5% TRS shown in the subject five (5) plots.
: 2. Attachment 5, General Atomics Electronic Systems 04508905-1SP, page 5-5, Figure 5-2. The Figure 5-2 Test Response Spectra (TRS) Plots versus Required Response Spectra (RRS) shows the TRS to be below the RRS at various frequency (5% Damping). Please provide an explanation regarding why this is acceptable.
: 2., General Atomics Electronic Systems 04508905-1SP, page 5-5, Figure 5-2. The Figure 5-2 Test Response Spectra (TRS) Plots versus Required Response Spectra (RRS) shows the TRS to be below the RRS at various frequency (5% Damping). Please provide an explanation regarding why this is acceptable.
The display module for the RM-1000 monitors procured for WBN2 differs from that used in previous RM-1000 qualification tests. The seismic qualification basis for the WBN2 display module is established by similarity to the display module used in RM-2000 monitor qualification tests shown on page 5-4 and 5-5 of 04508905-1SP (pages attached). The basis for the similarity discussion is provided on pages 5-2 and 5-3 of 04508905-1SP. The TRS non-exceedance at approximately 6-7 Hz shown on page 5-5 is not applicable to WBN2 since the RRS shown on that figure is not used for WBN2 qualification. The correct comparison for WBN2 would be the TVA standard RRS shown in Fig 3.1 of CEB-SS-5.10 for 5% damping. The TRS shown on page 5-5 meets or exceeds all points of the TVA standard RRS. Therefore, the seismic qualification of the WBN2 display module is provided by pages 5-4 and 5-5 for which the TRS completely envelopes the TVA standard RRS shown in Fig 3.1 of CEB-SS-5.10. Additionally, as previously stated,
The display module for the RM-1000 monitors procured for WBN2 differs from that used in previous RM-1000 qualification tests. The seismic qualification basis for the WBN2 display module is established by similarity to the display module used in RM-2000 monitor qualification tests shown on page 5-4 and 5-5 of 04508905-1SP (pages attached). The basis for the similarity discussion is provided on pages 5-2 and 5-3 of 04508905-1SP. The TRS non-exceedance at approximately 6-7 Hz shown on page 5-5 is not applicable to WBN2 since the RRS shown on that figure is not used for WBN2 qualification. The correct comparison for WBN2 would be the TVA standard RRS shown in Fig 3.1 of CEB-SS-5.10 for 5% damping. The TRS shown on page 5-5 meets or exceeds all points of the TVA standard RRS. Therefore, the seismic qualification of the WBN2 display module is provided by pages 5-4 and 5-5 for which the TRS completely envelopes the TVA standard RRS shown in Fig 3.1 of CEB-SS-5.10. Additionally, as previously stated,  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                         radE4C39.docx                                                                               Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                      Issue                                                    TVA Response(s)                            Acceptable       Status/ Current Actions     Resolution Path   RAI No. & Date   RAI Resp. Date     Comments Sec.      Sec. POC                                                                                                                                                    Y/N Calculation WCG-ACQ-0766 was issued to generate the 5% RRS for the WBN2 panel (2-M-30) where the safety related RM-1000 monitors will be installed. The vertical 5% RRS plot in calculation WCG-ACQ-0766 broad band peak is 4.2 g which is lower than the 5% TRS shown in 04508905-1SP, page 5-5, Figure 5-2.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Calculation WCG-ACQ-0766 was issued to generate the 5% RRS for the WBN2 panel (2-M-30) where the safety related RM-1000 monitors will be installed. The vertical 5% RRS plot in calculation WCG-ACQ-0766 broad band peak is 4.2 g which is lower than the 5% TRS shown in 04508905-1SP, page 5-5, Figure 5-2.
: 3. Attachment 23, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter (04508905-QR), page 4-25, Figure 4-5 X-Axis SSE Test Response Spectra (TRS) versus Required Response Spectra (RRS) shows the TRS to be below the RRS at various frequency (5% Damping). Please provide an explanation regarding why this is acceptable.
: 3. 3, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter (04508905-QR), page 4-25, Figure 4-5 X-Axis SSE Test Response Spectra (TRS) versus Required Response Spectra (RRS) shows the TRS to be below the RRS at various frequency (5% Damping). Please provide an explanation regarding why this is acceptable.
This Figure 4-5 is one of the same figures identified in item 1. See item 1. for the appropriate discussion.
This Figure 4-5 is one of the same figures identified in item 1. See item 1. for the appropriate discussion.
359   7.7.1.                           Was the CERPI system developed under a 10 CFR 50 Appendix B CERPI is a non-safety related system. Therefore, 10 CFR                 31.          Open                          Open-NRC Review 1                EICB          compliant program?                                          50 Appendix B is not applicable.                                                     Due 4/15/11 (Carte) 360                                      In order for staff to review the acceptability of the Incore         (a) The Watts Bar Unit 2 In-core Instrumentation System 32.               Open                          Open-NRC Review Instrumentation System (IIS):                                            (IIS) replaces all of the functionality provided by the               Due 4/15/11 Movable Incore Detector System (MIDS) used at Watts (a)  Provide a brief system description of IIS and its regulatory        Bar Unit 1. The IIS to be used at Watts Bar Unit 2 is a compliance. In your discussion include the discussion of            Westinghouse IN-Core Information, Surveillance, and WINCISE and BEACON system which are part of the IIS.                Engineering (WINCISE) System that is functionally Also provide the differences between the system used at              described in Section 7.7.1.9 of the Watts Bar Unit 2 WBN Unit vs. at Unit 2, e.g. Movable vs. fixed IIS. For              Final Safety Analysis Report (FSAR). The WINCISE-WINCISE provide the basis for acceptance.                            style IIS used at Watts Bar Unit 2 is essentially the same as the in-core power distribution measurement systems (b)  If this system has been accepted by the staff previously at          used at most Combustion Engineering style of operating some other plant then provide the reference to that SE.              reactors that use a type of in-core neutron sensors Identify the document that describes the functionally of the IIS    commonly called "Fixed In-core Detectors (FID)." The that is identical to the IIS used in the Westinghouse AP1000        Watts Bar Unit 2 IIS is functionally identical to the IIS reactor design.                                                      used in the Westinghouse 1AP1000' reactor design.
359 7.7.1.
The Watts Bar Unit 2 IIS includes the FIDs, Core Exit EICB (Garg)
1 EICB (Carte)
(c)  If this has not been evaluated by the staff previously, then        Thermocouples (CET), FID and CET signal cables, the provide the effect of CCF of this system and its effect on          FID signal processing hardware, and the FID signal safety system or chapter 15 analysis.                                processing software. This hardware and software is required to provide the measured signals to the (d)  Does this have any interconnection with safety system?
Was the CERPI system developed under a 10 CFR 50 Appendix B compliant program?
associated BEACON System to periodically determine (e)  For BEACON provide the acceptability of this system. I              whether the reactor is operating within design core believe that this system was accepted at WBN Unit 1. If that        peaking factor limits. A detailed description of the Watts is the case then provide the reference to that review. Also          Bar Unit 2 IIS hardware is provided in the document provide any differences of this system to the one at WBN Unit        titled, Westinghouse Incore Information Surveillance &
CERPI is a non-safety related system. Therefore, 10 CFR 50 Appendix B is not applicable.
1 system.                                                            Engineering (WINCISE) System Technical Manual, NO-WBT-002, Revision 0 supplied by Westinghouse to TVA (f)  Please provide detailed information about the In-core                in September of 2010.
: 31.
Instrumentation System (IIS) to be installed in Watts Bar Unit
Open Due 4/15/11 Open-NRC Review 360 EICB (Garg)
: 2. This information should indicate how the system meets the        The qualification for the BEACON System to perform the requirements established in the Standard Review Plan,                core power distribution measurement function using the including system concept, system requirements, system                Watts   Bar Unit 2 WINCISE style IIS instrumentation is design, and system development, as well as the regulatory            documented in the generic NRC Safety Evaluation requirements identified for Watts Bar Unit 2.                        Reports (SER) provided with WCAP-12472-P-A, 1
In order for staff to review the acceptability of the Incore Instrumentation System (IIS):
AP-1000 is a registered trademark of the Westinghouse Electric Company LLC
(a) Provide a brief system description of IIS and its regulatory compliance. In your discussion include the discussion of WINCISE and BEACON system which are part of the IIS.
Also provide the differences between the system used at WBN Unit vs. at Unit 2, e.g. Movable vs. fixed IIS. For WINCISE provide the basis for acceptance.
(b) If this system has been accepted by the staff previously at some other plant then provide the reference to that SE.
Identify the document that describes the functionally of the IIS that is identical to the IIS used in the Westinghouse AP1000 reactor design.
(c) If this has not been evaluated by the staff previously, then provide the effect of CCF of this system and its effect on safety system or chapter 15 analysis.
(d) Does this have any interconnection with safety system?
(e) For BEACON provide the acceptability of this system. I believe that this system was accepted at WBN Unit 1. If that is the case then provide the reference to that review. Also provide any differences of this system to the one at WBN Unit 1 system.
(f) Please provide detailed information about the In-core Instrumentation System (IIS) to be installed in Watts Bar Unit
: 2. This information should indicate how the system meets the requirements established in the Standard Review Plan, including system concept, system requirements, system design, and system development, as well as the regulatory requirements identified for Watts Bar Unit 2.
(a) The Watts Bar Unit 2 In-core Instrumentation System (IIS) replaces all of the functionality provided by the Movable Incore Detector System (MIDS) used at Watts Bar Unit 1. The IIS to be used at Watts Bar Unit 2 is a Westinghouse IN-Core Information, Surveillance, and Engineering (WINCISE) System that is functionally described in Section 7.7.1.9 of the Watts Bar Unit 2 Final Safety Analysis Report (FSAR). The WINCISE-style IIS used at Watts Bar Unit 2 is essentially the same as the in-core power distribution measurement systems used at most Combustion Engineering style of operating reactors that use a type of in-core neutron sensors commonly called "Fixed In-core Detectors (FID)." The Watts Bar Unit 2 IIS is functionally identical to the IIS used in the Westinghouse 1AP1000' reactor design.
The Watts Bar Unit 2 IIS includes the FIDs, Core Exit Thermocouples (CET), FID and CET signal cables, the FID signal processing hardware, and the FID signal processing software. This hardware and software is required to provide the measured signals to the associated BEACON System to periodically determine whether the reactor is operating within design core peaking factor limits. A detailed description of the Watts Bar Unit 2 IIS hardware is provided in the document titled, Westinghouse Incore Information Surveillance &
Engineering (WINCISE) System Technical Manual, NO-WBT-002, Revision 0 supplied by Westinghouse to TVA in September of 2010.
The qualification for the BEACON System to perform the core power distribution measurement function using the Watts Bar Unit 2 WINCISE style IIS instrumentation is documented in the generic NRC Safety Evaluation Reports (SER) provided with WCAP-12472-P-A,
: 32.
Open Due 4/15/11 Open-NRC Review 1 AP-1000 is a registered trademark of the Westinghouse Electric Company LLC  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                     radE4C39.docx                                                                 Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                                  Issue                                                      TVA Response(s)                        Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                                                      Y/N BEACON Core Monitoring and Operations Support (g) Please provide a description on how the system will meet the     System, Addendum I-A and Addendum 2-A.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (g) Please provide a description on how the system will meet the regulatory requirements identified in Table 7.1-1 of the SRP, applicable to the IIS.
regulatory requirements identified in Table 7.1-1 of the SRP, applicable to the IIS.                                       (b) The WINCISE style IIS used at Watts Bar Unit 2 is essentially the same as the in-core power distribution (h) Provide detailed description about the connection and             measurement systems used at all Combustion communication for the signals to be transmitted from the Core     Engineering style of operating reactors that use a type Exit Thermocouples to the Common Q Post Accident                 of in-core neutron sensors commonly called "Fixed In-Monitoring System (PAMS). Also, describe how this                 core Detectors (FID)." The Watts Bar Unit 2 IIS is communication will meet the NRC communications regulatory         functionally identical to the IIS described in the requirements.                                                     Westinghouse AP1000 design documents and approved in the Westinghouse AP1000 SER section 7.5.7 as (i) Please provide the following Westinghouse document: NO-           documented in Westinghouse Letter WBT-D-____ ,
(h) Provide detailed description about the connection and communication for the signals to be transmitted from the Core Exit Thermocouples to the Common Q Post Accident Monitoring System (PAMS). Also, describe how this communication will meet the NRC communications regulatory requirements.
WBT-002, Westinghouse Incore Information Surveillance &         title, dated April 14, 2011 (Attachment 7)
(i) Please provide the following Westinghouse document: NO-WBT-002, Westinghouse Incore Information Surveillance &
Engineering (WINCISE') System Technical Manual.
Engineering (WINCISE') System Technical Manual.
(c) The digital in-core flux monitoring portion of the IIS is (j) Provide the failure modes and effects analyses for the IIS,      non-safety-related. As such, CCF analysis is not documented in calculation WBNOSG4220 WB Incore                  required by NUREG-800 section 7.0-A. The IIS has no Instrumentation System Failure Modes and Effects Analyses,      impact on any Safety Analysis documented in Chapter and demonstrate how these potential failures do not adversely    15 of the Watts Bar Unit 2 FSAR.
(j) Provide the failure modes and effects analyses for the IIS, documented in calculation WBNOSG4220 WB Incore Instrumentation System Failure Modes and Effects Analyses, and demonstrate how these potential failures do not adversely affect reactor safety.
affect reactor safety.
BEACON Core Monitoring and Operations Support System, Addendum I-A and Addendum 2-A.
(b) The WINCISE style IIS used at Watts Bar Unit 2 is essentially the same as the in-core power distribution measurement systems used at all Combustion Engineering style of operating reactors that use a type of in-core neutron sensors commonly called "Fixed In-core Detectors (FID)." The Watts Bar Unit 2 IIS is functionally identical to the IIS described in the Westinghouse AP1000 design documents and approved in the Westinghouse AP1000 SER section 7.5.7 as documented in Westinghouse Letter WBT-D-____,
title, dated April 14, 2011 (Attachment 7)
(c) The digital in-core flux monitoring portion of the IIS is non-safety-related. As such, CCF analysis is not required by NUREG-800 section 7.0-A. The IIS has no impact on any Safety Analysis documented in Chapter 15 of the Watts Bar Unit 2 FSAR.
(d) The IIS includes the 1E qualified CET and CET analog signal cables required to allow the CETs to be directly connected to the Common Q Post Accident Monitoring System (PAMS). There is no other interface to safety systems. The CET signals are electrically isolated from signals output from the non-1E FID signals and signal processing electronics.
(d) The IIS includes the 1E qualified CET and CET analog signal cables required to allow the CETs to be directly connected to the Common Q Post Accident Monitoring System (PAMS). There is no other interface to safety systems. The CET signals are electrically isolated from signals output from the non-1E FID signals and signal processing electronics.
(e) The qualification for the BEACON System to perform the core power distribution measurement function using the Watts Bar Unit 2 WINCISE style IIS instrumentation is documented in the generic NRC Safety Evaluation Reports (SER) provided with WCAP-12472-P-A. This WCAP generically approves the BEACON System for use at PWR reactors including those using Movable In-core Detector Systems (MIDS) like Watts Bar Unit 1 and, through Addendum I-A and 2-A, those like Watts Bar Unit 2 using a WINCISE type fixed in-core instrumentation system.
(e) The qualification for the BEACON System to perform the core power distribution measurement function using the Watts Bar Unit 2 WINCISE style IIS instrumentation is documented in the generic NRC Safety Evaluation Reports (SER) provided with WCAP-12472-P-A. This WCAP generically approves the BEACON System for use at PWR reactors including those using Movable In-core Detector Systems (MIDS) like Watts Bar Unit 1 and, through Addendum I-A and 2-A, those like Watts Bar Unit 2 using a WINCISE type fixed in-core instrumentation system.
The specific differences between the Unit 1 and Unit 2 core power distribution measurement systems are too numerous to simply list. A detailed description of the Watts Bar Unit 2 IIS hardware is provided in section 2 of the WINCISE System Technical Manual NO-WBT-002 (Attachment 5).
The specific differences between the Unit 1 and Unit 2 core power distribution measurement systems are too numerous to simply list. A detailed description of the Watts Bar Unit 2 IIS hardware is provided in section 2 of the WINCISE System Technical Manual NO-WBT-002 (Attachment 5).
(f) NUREG-800 section 7.0-A, Table 7.0-A-1. Review Topics for Various Systems, requires only a limited review for non-safety related system discussed in NUREG-800 section 7.7 Control. WINCISE is a non-safety-related, indication only system within the scope of NUREG-800 section 7.7. The limited review required is:
(f) NUREG-800 section 7.0-A, Table 7.0-A-1. Review Topics for Various Systems, requires only a limited review for non-safety related system discussed in NUREG-800 section 7.7 Control. WINCISE is a non-safety-related, indication only system within the scope of NUREG-800 section 7.7. The limited review required is:
Control systems receive a limited review as necessary to confirm that control system failures cannot have an adverse effect on safety system functions and will not pose frequent challenges to the safety systems. The
Control systems receive a limited review as necessary to confirm that control system failures cannot have an adverse effect on safety system functions and will not pose frequent challenges to the safety systems. The  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                       radE4C39.docx                                                                 Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                                  TVA Response(s)                        Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                        Y/N only WINCISE interface with a safety-related system is the CET in the IITA which is hardwired to the Common Q PAMS system. See item (g) below for a description of the qualification process that demonstrates that failures in the balance of the WINCISE system do not impact the performance of the safety-related CET function.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments only WINCISE interface with a safety-related system is the CET in the IITA which is hardwired to the Common Q PAMS system. See item (g) below for a description of the qualification process that demonstrates that failures in the balance of the WINCISE system do not impact the performance of the safety-related CET function.
(g) With the exception of the IITA hardware, WINCISE is a non-safety-related indication system. The IITA assemblies meet the following criteria:
(g) With the exception of the IITA hardware, WINCISE is a non-safety-related indication system. The IITA assemblies meet the following criteria:
: i.       R.G. 1.26 Rev. 3 Quality Group Classification and Standards for Water, Steam and Radioactive Waste Components of Nuclear Power Plants ii.       R.G. 1.38 Rev. 2 Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage and Handling of Items for Water-Cooled Nuclear Power Plants iii.       R.G. 1.71 Rev. 0 Welder Qualification for Areas of Limited Accessibility iv.       R.G. 8.8 Rev. 3 Information Relevant to Ensuring that Occupational Radiation Exposure at Nuclear Power Stations will be As Low As Reasonably Achievable
: i.
: v.       R.G. 8.19 Rev. 1 Occupational Radiation Dose Assessment in Light-Water Reactor Plants Design State Man-Rem Estimates vi.       R.G. 1.84 Rev. 27 Design and Fabrication Code Case Acceptability - ASME Section III, Division 1R.G. 1.85 Rev. 27 Material Code Case Acceptability - ASME Section III, Division 1 1.1.4     The design, materials, fabrication, inspection, and testing of the IITA shall be in accordance with the ASME Boiler and Pressure Vessel Code, Section III Class 3, and all applicable Code Cases as proposed by the supplier and approved by Westinghouse. Materials shall be in accordance with this specification.
R.G. 1.26 Rev. 3 Quality Group Classification and Standards for Water, Steam and Radioactive Waste Components of Nuclear Power Plants ii.
1.1.5     Component Classification - The IITA is classified as an instrument tube, so it is not under the jurisdiction of the ASME per NCA-1130(c). However, the design, primary pressure boundary materials, and NDE Requirements are per ASME Section III, Class 3 and the IITA is classified as Safety Class 2.
R.G. 1.38 Rev. 2 Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage and Handling of Items for Water-Cooled Nuclear Power Plants iii.
The non-safety-related WINCISE Signal Processing System Cabinets are located inside containment and are therefore required to not impact the function of any safety-related equipment. To meet this requirement the cabinets were
R.G. 1.71 Rev. 0 Welder Qualification for Areas of Limited Accessibility iv.
R.G. 8.8 Rev. 3 Information Relevant to Ensuring that Occupational Radiation Exposure at Nuclear Power Stations will be As Low As Reasonably Achievable
: v.
R.G. 8.19 Rev. 1 Occupational Radiation Dose Assessment in Light-Water Reactor Plants Design State Man-Rem Estimates vi.
R.G. 1.84 Rev. 27 Design and Fabrication Code Case Acceptability - ASME Section III, Division 1R.G. 1.85 Rev. 27 Material Code Case Acceptability - ASME Section III, Division 1 1.1.4 The design, materials, fabrication, inspection, and testing of the IITA shall be in accordance with the ASME Boiler and Pressure Vessel Code, Section III Class 3, and all applicable Code Cases as proposed by the supplier and approved by Westinghouse. Materials shall be in accordance with this specification.
1.1.5 Component Classification - The IITA is classified as an instrument tube, so it is not under the jurisdiction of the ASME per NCA-1130(c). However, the design, primary pressure boundary materials, and NDE Requirements are per ASME Section III, Class 3 and the IITA is classified as Safety Class 2.
The non-safety-related WINCISE Signal Processing System Cabinets are located inside containment and are therefore required to not impact the function of any safety-related equipment. To meet this requirement the cabinets were  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                     radE4C39.docx                                                                   Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                              TVA Response(s)                            Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                        Y/N tested and passed based on the following criteria:
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments tested and passed based on the following criteria:
: i. In accordance with WB-DC-40-31.2, Watts Bar Nuclear Plant Seismic Qualification of Category 1 Fluid System Components and Electrical or Mechanical Equipment, Revision 8, November 2000 and U.S. N.R.C. Regulatory Guide 1.100, Seismic Qualification of Electrical and Mechanical Equipment for Nuclear Power Plants, Revision 2, June 1988, the equipment must withstand five OBEs and one SSE without creating missiles. Testing was done in accordance with:
: i.
(1)     IEEE Std 344-1975, IEEE Recommended Practice for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations, Institute of Electrical and Electronics Engineers, Inc., 1975 (2)     IEEE Std 344-1987, IEEE Recommended Practice for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations, Institute of Electrical and Electronics Engineers, Inc., 1987 ii. In accordance with U.S NRC Regulatory Guide 1.180 Guidelines for Evaluating Electromagnetic and Radio-Frequency Interference in Safety-Related Instrumentation and Control Systems, Revision 1, October 2003 and IEEE 323-1983 IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generator Stations, Institute of Electrical and Electronics Engineers, Inc., 1983, the equipment must not generate spurious electromagnetic emissions or suffer some common mode failure due to its operating environment that could directly or indirectly impact the operation of safety-related equipment (1)     IEC 61000-6-2, Electromagnetic compatibility (EMC). Generic Standards. Immunity for Industrial Environments, 2005 (2)     MIL-STD-461E, Requirements for the control of Electromagnetic interference Characteristics of Subsystems and Equipment, August 1999 (3)     IEC 61000-4-4, Electromagnetic compatibility (EMC) - Part 4-4: Testing and Measurement Techniques - Electrical Fast Transient/Burst Immunity Test, 1995 (4)     IEC 61000-4-12, Electromagnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 12:
In accordance with WB-DC-40-31.2, Watts Bar Nuclear Plant Seismic Qualification of Category 1 Fluid System Components and Electrical or Mechanical Equipment, Revision 8, November 2000 and U.S. N.R.C. Regulatory Guide 1.100, Seismic Qualification of Electrical and Mechanical Equipment for Nuclear Power Plants, Revision 2, June 1988, the equipment must withstand five OBEs and one SSE without creating missiles. Testing was done in accordance with:
Oscillatory Waves Immunity Tests, 1996 iii. In order to demonstrate that a maximum expected surge of 600 volts on the power input to the cabinets
(1)
IEEE Std 344-1975, IEEE Recommended Practice for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations, Institute of Electrical and Electronics Engineers, Inc., 1975 (2)
IEEE Std 344-1987, IEEE Recommended Practice for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations, Institute of Electrical and Electronics Engineers, Inc., 1987 ii.
In accordance with U.S NRC Regulatory Guide 1.180 Guidelines for Evaluating Electromagnetic and Radio-Frequency Interference in Safety-Related Instrumentation and Control Systems, Revision 1, October 2003 and IEEE 323-1983 IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generator Stations, Institute of Electrical and Electronics Engineers, Inc., 1983, the equipment must not generate spurious electromagnetic emissions or suffer some common mode failure due to its operating environment that could directly or indirectly impact the operation of safety-related equipment (1)
IEC 61000-6-2, Electromagnetic compatibility (EMC). Generic Standards. Immunity for Industrial Environments, 2005 (2)
MIL-STD-461E, Requirements for the control of Electromagnetic interference Characteristics of Subsystems and Equipment, August 1999 (3)
IEC 61000-4-4, Electromagnetic compatibility (EMC) - Part 4-4: Testing and Measurement Techniques - Electrical Fast Transient/Burst Immunity Test, 1995 (4)
IEC 61000-4-12, Electromagnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 12:
Oscillatory Waves Immunity Tests, 1996 iii.
In order to demonstrate that a maximum expected surge of 600 volts on the power input to the cabinets  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                       radE4C39.docx                                                                                       Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                  Issue                                                        TVA Response(s)                            Acceptable       Status/ Current Actions       Resolution Path       RAI No. & Date   RAI Resp. Date     Comments Sec.      Sec. POC                                                                                                                                                        Y/N would not propagate and damage the CET cables in the IITA, the cabinets were surge tested in accordance with IEC 61000-4-5, Electromagnetic compatibility (EMC) - Part 4-5: Testing and Measurement Techniques - Surge Immunity Test, 1995.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments would not propagate and damage the CET cables in the IITA, the cabinets were surge tested in accordance with IEC 61000-4-5, Electromagnetic compatibility (EMC) - Part 4-5: Testing and Measurement Techniques - Surge Immunity Test, 1995.
(h) The cables for the CETs separate from the FID cables at the seal table. The CETs are connected directly to the Common Q PAMS cabinet. The FIDs are connected directly to the in-containment signal processing system cabinets.
(h) The cables for the CETs separate from the FID cables at the seal table. The CETs are connected directly to the Common Q PAMS cabinet. The FIDs are connected directly to the in-containment signal processing system cabinets.
(i)   Attachment 5 is the proprietary section 2 Equipment Description of NO-WBT-002, Westinghouse Incore Information Surveillance & Engineering (WINCISE')
(i) Attachment 5 is the proprietary section 2 Equipment Description of NO-WBT-002, Westinghouse Incore Information Surveillance & Engineering (WINCISE')
System Technical Manual. This is strictly a proprietary document and a non-proprietary version will not be submitted. An affidavit for withholding will be submitted within two weeks of receipt from Westinghouse.
System Technical Manual. This is strictly a proprietary document and a non-proprietary version will not be submitted. An affidavit for withholding will be submitted within two weeks of receipt from Westinghouse.
(j)   Attachment 6 is the proprietary WINCISE FMEA. A non-proprietary version and affidavit for withholding will be provided within two weeks of receipt from Westinghouse.
(j) Attachment 6 is the proprietary WINCISE FMEA. A non-proprietary version and affidavit for withholding will be provided within two weeks of receipt from Westinghouse.
Westinghouse is available to discuss any specific questions on the methodology and hardware used in the Watts Bar Unit 2 IIS that the NRC believes are not well defined in the documents listed above.
Westinghouse is available to discuss any specific questions on the methodology and hardware used in the Watts Bar Unit 2 IIS that the NRC believes are not well defined in the documents listed above.
361   7.7.1.                           Was the Foxboro IA system developed under a 10 CFR 50                 Foxboro I/A is a non-safety related system. Therefore, 10         33.          Open                          Open-NRC Review 1              EICB          Appendix B compliant program?                                        CFR 50 Appendix B is not applicable.                                           Due 4/15/11 (Carte) 355   7.5.2. 7.5                   Staff has not found the stated exclusion zone for EMI/RFI             Cautions and distance limitations for WBN Unit 1 legacy          34. Y        Open                          Open-NRC Reviewl 3                              interfering devices (e.g. hand-held radio devices) in the submitted   equipment are documented in TVA procedure TI-134,                              Due 4/15/11 documents. TVA to provide the distance for the exclusion zones if     Revision 0, Control of Portable Two-Way Radios,                                                            TVA to provide not provided already. If it is already a submitted information then   (Attachment 7) Appendix B. Where WBN Unit 2 uses the                                                         commitment that an please point the source of the information.                          same legacy equipment, the same cautions and distance                                                       EMI/RFI survey will be limitations apply.                                                                                           conducted after the installation of the New equipment is procured and tested to TVA Standard                                                         equipment to confirm Specification SS E18.14.01, Revision 3, Electromagnetic                                                     the non-susceptibility Interference (EMI) Testing Requirements for Electronic                                                       when using portable EICB (Singh)
361 7.7.1.
Devices (Attachment 6). The TVA specification is                                                           radio-frequency conservative with respect to Regulatory Guide 1.180,                                                         sources such as hand-Revision 1. The specification requires that equipment not be                                                 held radios or other susceptible to external interference or create external                                                     authorized devices that interference. New equipment is either tested by the                                                          may be used in the manufacturer or tested in the TVA EMI test facility to ensure                                               control room.
1 EICB (Carte)
it meets the specification. If issues are found, the equipment                                               Summary of the results is modified and installation documents are revised to                                                       to be submitted to NRC eliminate the issue(s). This is true for the RM-1000 radiation                                               to close this item.
Was the Foxboro IA system developed under a 10 CFR 50 Appendix B compliant program?
monitors which were tested prior to installation in Browns                                                 Survey results are to be Ferry at 10v/meter (Browns Ferry High Range Radiation                                                       available for audit by Monitor dated December 8, 2006). Based on this, no                                                           NRC.
Foxboro I/A is a non-safety related system. Therefore, 10 CFR 50 Appendix B is not applicable.
exclusion zone for radio use is required for the RM-1000 radiation monitors in WBN Unit 2.
: 33.
Open Due 4/15/11 Open-NRC Review 355 7.5.2.
3 7.5 EICB (Singh)
Staff has not found the stated exclusion zone for EMI/RFI interfering devices (e.g. hand-held radio devices) in the submitted documents. TVA to provide the distance for the exclusion zones if not provided already. If it is already a submitted information then please point the source of the information.
Cautions and distance limitations for WBN Unit 1 legacy equipment are documented in TVA procedure TI-134, Revision 0, Control of Portable Two-Way Radios, (Attachment 7) Appendix B. Where WBN Unit 2 uses the same legacy equipment, the same cautions and distance limitations apply.
New equipment is procured and tested to TVA Standard Specification SS E18.14.01, Revision 3, Electromagnetic Interference (EMI) Testing Requirements for Electronic Devices (Attachment 6). The TVA specification is conservative with respect to Regulatory Guide 1.180, Revision 1. The specification requires that equipment not be susceptible to external interference or create external interference. New equipment is either tested by the manufacturer or tested in the TVA EMI test facility to ensure it meets the specification. If issues are found, the equipment is modified and installation documents are revised to eliminate the issue(s). This is true for the RM-1000 radiation monitors which were tested prior to installation in Browns Ferry at 10v/meter (Browns Ferry High Range Radiation Monitor dated December 8, 2006). Based on this, no exclusion zone for radio use is required for the RM-1000 radiation monitors in WBN Unit 2.
: 34. Y Open Due 4/15/11 Open-NRC Reviewl TVA to provide commitment that an EMI/RFI survey will be conducted after the installation of the equipment to confirm the non-susceptibility when using portable radio-frequency sources such as hand-held radios or other authorized devices that may be used in the control room.
Summary of the results to be submitted to NRC to close this item.
Survey results are to be available for audit by NRC.  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                   radE4C39.docx                                                                                         Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                  Issue                                                      TVA Response(s)                            Acceptable       Status/ Current Actions         Resolution Path       RAI No. & Date   RAI Resp. Date     Comments Sec.      Sec. POC                                                                                                                                                    Y/N TVA Response to Follow-up NRC Request:
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response to Follow-up NRC Request:
TVA will perform an EMI survey of the containment high range radiation monitors after installation in WBN Unit 2 and submit the results to the NRC within two weeks of the survey being completed.
TVA will perform an EMI survey of the containment high range radiation monitors after installation in WBN Unit 2 and submit the results to the NRC within two weeks of the survey being completed.
323                                   WCAP-13869 revision 1 was previously reviewed under WBN Unit Responder: Hilmes/Unit 1                                                2. Y        Open                            Open-TVA/Bechtel                            TVA Letter dated 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An                                                                                                                                                                 10/29/10 analysis of the differences and their acceptability will be submitted Attachment 12 contains the WCAP 13869 Revision 1 to                          Due 3/29/11                    Due:                                        Enclosure 1 Item to the NRC by November 15, 2010                                       Revision 2 Change Analysis.                                                                                                                             No. 36 Revised Response is included in Need to provide TVA Response to Follow-up NRC Request                                         letter dated 10/29/10          additional info on why A FSAR change will be submitted in a future FSAR                                                             Rev. 1 is acceptable for amendment to change the revision level back to 1.                            The staff is confused with the  both units.
323 EICB(Garg)
response since both units have TVA Response to Second Follow-up NRC Request                                 reference leg not insulated Rev 3/10/11 2 should apply to Unit 1 also  Staff does not agree The differences between the Revision 1 and Revision 2                         and there should be no          with the statement that EICB(Garg)
WCAP-13869 revision 1 was previously reviewed under WBN Unit 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An analysis of the differences and their acceptability will be submitted to the NRC by November 15, 2010 Responder: Hilmes/Unit 1 2 contains the WCAP 13869 Revision 1 to Revision 2 Change Analysis.
WCAPs is documented in Attachment 12, WCAP 13869                             difference between Unit 1 and 2 there is no technical Revision 1 to Revision 2 Change Analysis, to TVA to NRC                                                     differences between letter dated October 29, 2010 (Reference 2). The design                                                       WCAP-13869 rev.1 and bases for the response to feedwater break inside                                                             rev2., but staff agree containment, as documented in Chapter 15 of the WBN Unit                                                     that rev1 and change 2 FSAR, is the same for WBN Unit 1. Since WBN Unit 2 is                                                       analysis could be basis required to match the WBN Unit 1 licensing basis to the                                                       for acceptance for both extent practical, the decision was made to revise the WBN                                                     Watts Bar units.
TVA Response to Follow-up NRC Request A FSAR change will be submitted in a future FSAR amendment to change the revision level back to 1.
Unit 2 FSAR to agree with the WBN Unit 1 FSAR which uses Revision 1.                                                                                                   4/6/11 TVA response is acceptable, however this item remains open until TVA makes changes to FSAR.
TVA Response to Second Follow-up NRC Request The differences between the Revision 1 and Revision 2 WCAPs is documented in Attachment 12, WCAP 13869 Revision 1 to Revision 2 Change Analysis, to TVA to NRC {{letter dated|date=October 29, 2010|text=letter dated October 29, 2010}} (Reference 2). The design bases for the response to feedwater break inside containment, as documented in Chapter 15 of the WBN Unit 2 FSAR, is the same for WBN Unit 1. Since WBN Unit 2 is required to match the WBN Unit 1 licensing basis to the extent practical, the decision was made to revise the WBN Unit 2 FSAR to agree with the WBN Unit 1 FSAR which uses Revision 1.
340   7.5.2. 7.5                   Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 Responder: GA                                                35. N        Open                            Open-TVA/Bechtel 3                            (page 3-8) of the Qualification Test Report 04508905-QR. In                                                                                       Due 4/30/11 addition, please provide the standards or the guidance documents The following responses are based on e-mail: GA-ESI to                                                            Provide the qual reports used as the source for ENV 50140, ENV 55011 Class A, and EN Bechtel, dated December 8, 2010 (Reference 20),                                       Response included in letter    by 1/28/11 per TVA 55022 Class B.                                                                                                                                    dated 12/22/10.                letter of 12/22/10.
: 2.
(1) The EMI/RFI tests described in Table 3-2 are based on GA-ESI report 04509050 and are summarized in GA-                                                       Due: 2/25/11 ESI report 04508905-QR. The independent laboratory                                                     Clarification Needed:
Y Open Due 3/29/11 Revised Response is included in letter dated 10/29/10 The staff is confused with the response since both units have reference leg not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 Open-TVA/Bechtel Due:
report, with curves, is part of GA-ESI report 04509050.                                               Per 2/25/11 response Subsequent to issuing GA-ESI report 04508905-QR                                                       TVA document SS-EICB (Singh) additional EMC testing was performed in accordance                                                     E18.14.01, Rev. 3 is with TVA specific requirements. The results of the                                                     the source document subsequent EMC testing are reported in GA-ESI report                                                   for all testing. Please 04038800. GA-ESI report 04038800 includes the test                                                     provide this document curves and the report is used as the basis for EMC                                                     for staff review. In qualification of the Upper and Lower Inside                                                           addition British Containment Post Accident Radiation Monitors (2-RE-                                                   Standards (e.g. ENV 90-271 through -274). The results of the testing and                                                   50140) have been cited the acceptability of the RM-1000 monitors for use at                                                   in testing which are not WBN Unit 2 are addressed in GA-ESI report                                                             per RG 1.180, R1. TVA 04038903-7SP. This report will be submitted no later                                                   to describe compliance than January 28, 2010.                                                                                 of SS-E18-14.01 to RG 1.180 with justification (2) ENV 50140, EN 55011, and EN 55022 are British                                                            for deviations. No test
Need to provide additional info on why Rev. 1 is acceptable for both units.
3/10/11 Staff does not agree with the statement that there is no technical differences between WCAP-13869 rev.1 and rev2., but staff agree that rev1 and change analysis could be basis for acceptance for both Watts Bar units.
4/6/11 TVA response is acceptable, however this item remains open until TVA makes changes to FSAR.
TVA Letter dated 10/29/10 Item No. 36 340 7.5.2.
3 7.5 EICB (Singh)
Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B.
Responder: GA The following responses are based on e-mail: GA-ESI to Bechtel, dated December 8, 2010 (Reference 20),
(1) The EMI/RFI tests described in Table 3-2 are based on GA-ESI report 04509050 and are summarized in GA-ESI report 04508905-QR. The independent laboratory report, with curves, is part of GA-ESI report 04509050.
Subsequent to issuing GA-ESI report 04508905-QR additional EMC testing was performed in accordance with TVA specific requirements. The results of the subsequent EMC testing are reported in GA-ESI report 04038800. GA-ESI report 04038800 includes the test curves and the report is used as the basis for EMC qualification of the Upper and Lower Inside Containment Post Accident Radiation Monitors (2-RE-90-271 through -274). The results of the testing and the acceptability of the RM-1000 monitors for use at WBN Unit 2 are addressed in GA-ESI report 04038903-7SP. This report will be submitted no later than January 28, 2010.
(2) ENV 50140, EN 55011, and EN 55022 are British
: 35. N Open Due 4/30/11 Response included in letter dated 12/22/10.
Open-TVA/Bechtel Provide the qual reports by 1/28/11 per TVA letter of 12/22/10.
Due: 2/25/11 Clarification Needed:
Per 2/25/11 response TVA document SS-E18.14.01, Rev. 3 is the source document for all testing. Please provide this document for staff review. In addition British Standards (e.g. ENV 50140) have been cited in testing which are not per RG 1.180, R1. TVA to describe compliance of SS-E18-14.01 to RG 1.180 with justification for deviations. No test  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                   radE4C39.docx                                                                         Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE    FSAR  NRC No.                                        Issue                              TVA Response(s)                      Acceptable Status/ Current Actions     Resolution Path     RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                  Y/N Standard Institution (BSI) publications concerning                                       curves have been equipment electromagnetic and radio frequency                                             provided in any of the performance. The standard titles are shown below:                                         reports. As a minimum
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Standard Institution (BSI) publications concerning equipment electromagnetic and radio frequency performance. The standard titles are shown below:
: a. ENV 50140 - Electromagnetic Compatibility -                                           TVA to provide a few Basic Immunity Standard - Radiated Radio-                                           sample test curves or Frequency Electromagnetic Field - Immunity Test                                     justify not supplying
: a.
: b. EN 55011 - Industrial, scientific and medical                                         them.
ENV 50140 - Electromagnetic Compatibility -
equipment - Radio-frequency disturbance characteristics - Limits and methods of                                             No EMI/RFI curves measurement                                                                         have been provided as
Basic Immunity Standard - Radiated Radio-Frequency Electromagnetic Field - Immunity Test
: c. EN 55022 - Information technology equipment -                                         yet. TVA to provide Radio disturbance characteristics - Limits and                                     representative curves.
: b.
methods of measurement NRC review proceeding TVA Response to Follow-up NRC Request:                                                           in parallel.
EN 55011 - Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurement
The total EMI/RFI testing of the RM-1000 and current-to-                                         NRC current review frequency converter is documented in the following reports:                                     guidance is based on compliance with RG Attachment 5 contains the proprietary version of                                           1.180 or equal with General Atomics Electronic Systems 04508905-1SP,                                           justification for Qualification Test Report Supplement, RM-1000                                             variations. TVA is Upgrade. See sections 5.1.1, 5.1.2 and 5.1.4 for                                         requested to provide EMI/RFI.                                                                                   the roadmap for Attachment 7 contains the proprietary version of                                           compliance to RG General Atomics Electronic Systems 04038903-7SP,                                           1.180 with justifications Qualification Basis for 04034101 (2-RE-90-271, 272,                                       for any deviations.
: c.
273 & 274). See section 5 for EMC qualification basis.                                   Simply following TVA Attachment 8 contains the proprietary version of                                           standard specification General Atomics Electronic Systems 04038903-QSR,                                           SS E18.14.01, Rev. 3 is Qualification Summary Report for Watts Bar Nuclear                                       not sufficient.
EN 55022 - Information technology equipment -
Plant Unit 2 Replacement Radiation Monitors. See section 3.4 for electromagnetic compatibility qualification requirements.
Radio disturbance characteristics - Limits and methods of measurement TVA Response to Follow-up NRC Request:
Attachment 23 contains the proprietary version of General Atomics Electronic Systems 04508905-QR, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter. See sections 3.2.1 through 3.2.5 and 6.2 for EMI/RFI.
The total EMI/RFI testing of the RM-1000 and current-to-frequency converter is documented in the following reports:
contains the proprietary version of General Atomics Electronic Systems 04508905-1SP, Qualification Test Report Supplement, RM-1000 Upgrade. See sections 5.1.1, 5.1.2 and 5.1.4 for EMI/RFI.
contains the proprietary version of General Atomics Electronic Systems 04038903-7SP, Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274). See section 5 for EMC qualification basis.
contains the proprietary version of General Atomics Electronic Systems 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors. See section 3.4 for electromagnetic compatibility qualification requirements.
3 contains the proprietary version of General Atomics Electronic Systems 04508905-QR, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter. See sections 3.2.1 through 3.2.5 and 6.2 for EMI/RFI.
Attachments 7 and 8 document the EMI/RFI testing specific to the WBN Unit 2 RM-1000 monitors and current-to-frequency converters.
Attachments 7 and 8 document the EMI/RFI testing specific to the WBN Unit 2 RM-1000 monitors and current-to-frequency converters.
TVA Response to Second Follow-up NRC Request:
TVA Response to Second Follow-up NRC Request:
GA-ESI qualification report 04038903-7SP, Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274)
GA-ESI qualification report 04038903-7SP, Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274)
Revision C dated February 22, 2011(Proprietary), submitted on TVA to NRC letter dated February 25, 2011 (Reference 2), section 5.1 states:
Revision C dated February 22, 2011(Proprietary), submitted on TVA to NRC {{letter dated|date=February 25, 2011|text=letter dated February 25, 2011}} (Reference 2), section 5.1 states:
GA-ESI has performed the tests on a 2 channel RM-1000 radiation monitoring system the configuration of which is shown in GA-ESI drawing 04509000 System Installation Configuration, RFI/EMI Test, RM-1000 the results of which are issued in GA-ESI report 04038800, RM-1000 EMC Test Report, TVA and 04509050, RM-1000 EMC Test Report.
GA-ESI has performed the tests on a 2 channel RM-1000 radiation monitoring system the configuration of which is shown in GA-ESI drawing 04509000 System Installation Configuration, RFI/EMI Test, RM-1000 the results of which are issued in GA-ESI report 04038800, RM-1000 EMC Test Report, TVA and 04509050, RM-1000 EMC Test Report.
curves have been provided in any of the reports. As a minimum TVA to provide a few sample test curves or justify not supplying them.
No EMI/RFI curves have been provided as yet. TVA to provide representative curves.
NRC review proceeding in parallel.
NRC current review guidance is based on compliance with RG 1.180 or equal with justification for variations. TVA is requested to provide the roadmap for compliance to RG 1.180 with justifications for any deviations.
Simply following TVA standard specification SS E18.14.01, Rev. 3 is not sufficient.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                               radE4C39.docx                                                                                 Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                            Issue                                                        TVA Response(s)                            Acceptable       Status/ Current Actions     Resolution Path   RAI No. & Date   RAI Resp. Date     Comments Sec.      Sec. POC                                                                                                                                                                Y/N The equipment tested used an RM-1000 microprocessor radiation monitor Display/Control NIM Bin Assembly, an I-F Converter, line filter, and an RD-23 detector. The monitor system being qualified is the same as the monitor system tested and includes ECO-17656 modifications to ensure EMC compliance.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments The equipment tested used an RM-1000 microprocessor radiation monitor Display/Control NIM Bin Assembly, an I-F Converter, line filter, and an RD-23 detector. The monitor system being qualified is the same as the monitor system tested and includes ECO-17656 modifications to ensure EMC compliance.
Attachment 1 contains the TVA Browns Ferry High Range Radiation Monitor which contains the requested EMI test curves. We have confirmed that the GA-ESI reports (04509050, RM-1000 EMC Test Report, dated 4/22/03 and 04038800, RM-1000 EMC Test Report, dated 11/11/99) included in the TVA report are applicable to the WBN Unit 2 RM-1000 monitors. The non-proprietary versions and affidavit for withholding of GA-ESI reports (04509050 and 04038800) will be submitted within two weeks of receipt from GA-ESI.
contains the TVA Browns Ferry High Range Radiation Monitor which contains the requested EMI test curves. We have confirmed that the GA-ESI reports (04509050, RM-1000 EMC Test Report, dated 4/22/03 and 04038800, RM-1000 EMC Test Report, dated 11/11/99) included in the TVA report are applicable to the WBN Unit 2 RM-1000 monitors. The non-proprietary versions and affidavit for withholding of GA-ESI reports (04509050 and 04038800) will be submitted within two weeks of receipt from GA-ESI.
GA-ESI qualification report 04038903-7SP, section 5, provides a detailed discussion of the test results in GA-ESi report 04509050.
GA-ESI qualification report 04038903-7SP, section 5, provides a detailed discussion of the test results in GA-ESi report 04509050.
362   7.6.1   7.6.7                             OI #331 requested TVA to provide information regarding how the TVA committed to provide a letter on the docket (targeted is 3.                    Open-TVA                      Open-TVA/Bechtel Loose Parts Monitoring System (LPMS) in-containment                   for 4/30/2011) stating why the the in-containment equipment components (e.g., Accelerometer ( including the integral insulated has been qualified for vibration per RG 1.133, Rev. 1.
362 7.6.1 7.6.7 EICB ( Kemper & Singh)
hardline cable), Softline cable, and Remote Charge Preamplifiers) were qualified for vibration as addressed in regulatory position C.1.g of RG 1.133, Rev. 1. TVA responded by stating that TVA has reviewed the information provided by Westinghouse describing how the Loose Part Monitoring System (LPMS) sensor is qualified for normal operating conditions provided in Westinghouse letter EICB ( Kemper & Singh)
OI #331 requested TVA to provide information regarding how the Loose Parts Monitoring System (LPMS) in-containment components (e.g., Accelerometer ( including the integral insulated hardline cable), Softline cable, and Remote Charge Preamplifiers) were qualified for vibration as addressed in regulatory position C.1.g of RG 1.133, Rev. 1. TVA responded by stating that TVA has reviewed the information provided by Westinghouse describing how the Loose Part Monitoring System (LPMS) sensor is qualified for normal operating conditions provided in Westinghouse letter WBT-D-2782, dated December 17, 2010 (Reference 11) as addressed in regulatory position C.1.g of Reg. Guide 1.133 and found it acceptable. Vibration qualification is not applicable to the softline cable. Due to the installation location (junction boxes mounted to the shield or fan room walls) and previous seismic qualification, vibration qualification of the charge converter/preamplifier is not required. This completes the response to this item.
WBT-D-2782, dated December 17, 2010 (Reference 11) as addressed in regulatory position C.1.g of Reg. Guide 1.133 and found it acceptable. Vibration qualification is not applicable to the softline cable. Due to the installation location (junction boxes mounted to the shield or fan room walls) and previous seismic qualification, vibration qualification of the charge converter/preamplifier is not required. This completes the response to this item.
However, the staff still desires further clarification on this response. Specifically, please provide a documented basis that demonstrates the LPMS in-containment equipment is qualified for normal operating conditions (e.g., test results compared to the equipment qualification specification), including vibration qualification. Also, provide justification for why vibration qualification if the Remote Charge Preamplifier is not required.
However, the staff still desires further clarification on this response. Specifically, please provide a documented basis that demonstrates the LPMS in-containment equipment is qualified for normal operating conditions (e.g., test results compared to the equipment qualification specification), including vibration qualification. Also, provide justification for why vibration qualification if the Remote Charge Preamplifier is not required.
363   7.5.1. 7.5.2                             OI#199 requested TVA to provide information concerning how TVA                                                                       4.            Due 4/30/11                  Open-TVA/Bechtel 1.3                                      plans to meet regulatory criteria for Quality (10 CFR 50.55a(a)(1))
TVA committed to provide a letter on the docket (targeted is for 4/30/2011) stating why the the in-containment equipment has been qualified for vibration per RG 1.133, Rev. 1.
EICB (Rahn and Mossman) and                                      associated with the Technical Support Center and Nuclear Data 7.9.1                                      Link. TVA responded in Letter Dated October 5, 2010, Item 63; however, TVAs response does not address the quality aspects of these system features. A similar question had been asked for Quality Criteria adherence for the SPDS and the BISI functions of the Integrated Computer System. In response to that request (same letter) TVA provided a description of TVA procedures, BISI software development procedures, and various management measures that will be taken to assure high quality in the design, operation, and maintenance of the SPDS and BISI functions of the
: 3.
Open-TVA Open-TVA/Bechtel 363 7.5.1.
1.3 and 7.9.1 7.5.2 EICB (Rahn and Mossman)
OI#199 requested TVA to provide information concerning how TVA plans to meet regulatory criteria for Quality (10 CFR 50.55a(a)(1))
associated with the Technical Support Center and Nuclear Data Link. TVA responded in Letter Dated October 5, 2010, Item 63; however, TVAs response does not address the quality aspects of these system features. A similar question had been asked for Quality Criteria adherence for the SPDS and the BISI functions of the Integrated Computer System. In response to that request (same letter) TVA provided a description of TVA procedures, BISI software development procedures, and various management measures that will be taken to assure high quality in the design, operation, and maintenance of the SPDS and BISI functions of the
: 4.
Due 4/30/11 Open-TVA/Bechtel


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                       radE4C39.docx                                                                                     Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                  Issue                                                        TVA Response(s)                          Acceptable       Status/ Current Actions     Resolution Path       RAI No. & Date   RAI Resp. Date               Comments Sec.      Sec. POC                                                                                                                                                      Y/N ICS. Since the TSC and Nuclear Data Link information originates in the SPDS function of the ICS, are there any aspects of the quality measures that apply to the TSC and NDL features developed as part of quality processes for the ICS that are applicable to the data communications features?
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments ICS. Since the TSC and Nuclear Data Link information originates in the SPDS function of the ICS, are there any aspects of the quality measures that apply to the TSC and NDL features developed as part of quality processes for the ICS that are applicable to the data communications features?
Specifically, what is the scope of TVA Procedure SPP-2.6 Computer Software Control? How does it apply to the ICS functions of a) SPDS, b) BISI, and c) TSC and NDL functions?
Specifically, what is the scope of TVA Procedure SPP-2.6 Computer Software Control? How does it apply to the ICS functions of a) SPDS, b) BISI, and c) TSC and NDL functions?
Wouldnt there be aspects of the quality procedures that apply to the development, maintenance, and operations of the software needed to support the data communications features. Also, what quality measures will be applied to develop, maintain, and operate the hardware that accomplishes the TSC and NDL functions to ensure that these features will be reliable and available when needed?
Wouldnt there be aspects of the quality procedures that apply to the development, maintenance, and operations of the software needed to support the data communications features. Also, what quality measures will be applied to develop, maintain, and operate the hardware that accomplishes the TSC and NDL functions to ensure that these features will be reliable and available when needed?
349   7.5.2. 7.5                   Radiation testing was not considered in any of the test reports as     The design criteria provides the criteria for determining what 1. Y        Open                          Open-TVA/Licensing 3                              all the equipment has been assumed to be located in nuclear           is a mild environment at WBN Unit 2. Calculation power plant areas with mild environments and radiation dosages         WBNAPS4004 Summary of Mild Environment Conditions for                                                    Due: 2/25/11 less than 1 x 103 rads for total integrated dose (TID). However,       Watts Bar Nuclear Plant provides the actual values for each the radiation monitors and the I/F converters are located in the      area of the plant. In accordance with Table 1, the Control                                                TVA to provide the main control room which is defined as mild environment. For           Room has a 40 year maximum TID of 3.5x102 RAD and a                                                        assessment document WBN-2 mild environment is defined as room or building zone             maximum integrated accident dose of 710.5 RAD for a                                                        or a summary of the where (1) the temperature, pressure, or relative humidity resulting   maximum TID of 1060.5 RAD.                                                                                document with the from the direct effects of a design basis event (DBE) (e.g.,                                                                                                                     reference to the temperature rise due to steam release) are no more severe than         The accident dose of 710.5 RAD is the dose for a 100 day                                                  appropriate those which would occur during an abnormal plant operational           LOCA at the surface of the HEPA filter in the Mechanical                                                  document/documents.
349 7.5.2.
condition, (2) the temperature will not exceed 130&#xba;F due to indirect   Equipment Room. This is documented in TVA calculation effects of a DBE, (3) the event radiation dose is less than or equal   WBNTSR-005, Dose Due to the Control Building                                                              February 25, 2011 EICB (Singh) to 1 x 104 rads, and (4) the total event plus the 40 year TID (total   Emergency Air Cleanup Filters Revision 3. However, on                                                    response is acceptable.
3 7.5 EICB (Singh)
integrated dose) is less than or equal to 5 x 104 rads (reference     page 25 of WBNTSR-005, the shine from this source into the                                                Item will be tracked as WB-DC-40-54). TVA to address lack of radiation qualification for       control room is negligible and is not considered in the dose                                               a confirmatory item in WBN-2.                                                                calculation for the control room.                                                                         the SE. TVA to provide calculation or summary Calculation WBNAPS3-126, EQ Dose in the U1/U2 Auxiliary                                                   of calculation when Instrument Rooms and the Computer Room in the Control                                                     complete.
Radiation testing was not considered in any of the test reports as all the equipment has been assumed to be located in nuclear power plant areas with mild environments and radiation dosages less than 1 x 103 rads for total integrated dose (TID). However, the radiation monitors and the I/F converters are located in the main control room which is defined as mild environment. For WBN-2 mild environment is defined as room or building zone where (1) the temperature, pressure, or relative humidity resulting from the direct effects of a design basis event (DBE) (e.g.,
Building Revision 0 documents the environmental qualification (EQ) radiation dose in the control building. A review of this document by the TVA radiation protection engineer determined that the TID including the normal and accident dose values for the control room is less than 1x103 RAD. Calculation WBNAPS3-126, will be revised to include the control room by July 1, 2011. Since the control room TID has been determined to be less than 1x103 RAD, radiation qualification of the RM-1000.
temperature rise due to steam release) are no more severe than those which would occur during an abnormal plant operational condition, (2) the temperature will not exceed 130&#xba;F due to indirect effects of a DBE, (3) the event radiation dose is less than or equal to 1 x 104 rads, and (4) the total event plus the 40 year TID (total integrated dose) is less than or equal to 5 x 104 rads (reference WB-DC-40-54). TVA to address lack of radiation qualification for WBN-2.
092                                    5/20/2010                                                              Responder: Hilmes                                              1. Y       Open                         Open-TVA/Oversight                                          Continuous review as items are added DORL                                                                                                                                                               Due SER Issue (Poole)         TVA to review Licensee Open Item list and determine which items This item will close when we are no longer using this                                                             Due: SER Issue are proprietary.                                                document as a communications tool.
The design criteria provides the criteria for determining what is a mild environment at WBN Unit 2. Calculation WBNAPS4004 Summary of Mild Environment Conditions for Watts Bar Nuclear Plant provides the actual values for each area of the plant. In accordance with Table 1, the Control Room has a 40 year maximum TID of 3.5x102 RAD and a maximum integrated accident dose of 710.5 RAD for a maximum TID of 1060.5 RAD.
364   7.5.2. 7.5                   On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an                                                                         1. N        Open                          Open-TVA/WEC                                                NNC 4/125/2011: See Open Item No.
The accident dose of 710.5 RAD is the dose for a 100 day LOCA at the surface of the HEPA filter in the Mechanical Equipment Room. This is documented in TVA calculation WBNTSR-005, Dose Due to the Control Building Emergency Air Cleanup Filters Revision 3. However, on page 25 of WBNTSR-005, the shine from this source into the control room is negligible and is not considered in the dose calculation for the control room.
2                              evaluation of the Common Q PAMS against the current staff                                                                                           Due 5/15/11                                                                              81.
Calculation WBNAPS3-126, EQ Dose in the U1/U2 Auxiliary Instrument Rooms and the Computer Room in the Control Building Revision 0 documents the environmental qualification (EQ) radiation dose in the control building. A review of this document by the TVA radiation protection engineer determined that the TID including the normal and accident dose values for the control room is less than 1x103 RAD. Calculation WBNAPS3-126, will be revised to include the control room by July 1, 2011. Since the control room TID has been determined to be less than 1x103 RAD, radiation qualification of the RM-1000.
EICB (Carte) position.
: 1.
Y Open Open-TVA/Licensing Due: 2/25/11 TVA to provide the assessment document or a summary of the document with the reference to the appropriate document/documents.
February 25, 2011 response is acceptable.
Item will be tracked as a confirmatory item in the SE. TVA to provide calculation or summary of calculation when complete.
092 DORL (Poole) 5/20/2010 TVA to review Licensee Open Item list and determine which items are proprietary.
Responder: Hilmes This item will close when we are no longer using this document as a communications tool.
: 1.
Y Open Due SER Issue Open-TVA/Oversight Due: SER Issue Continuous review as items are added 364 7.5.2.
2 7.5 EICB (Carte)
On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an evaluation of the Common Q PAMS against the current staff position.
By letter dated 2/25/11 (ML110620219), TVA docketed a response: TVA performed an analysis and concluded that the Common Q PAMS equipment does not need to meet either IEEE 279-1971 or IEEE 603-1991 and so no analysis was performed or
By letter dated 2/25/11 (ML110620219), TVA docketed a response: TVA performed an analysis and concluded that the Common Q PAMS equipment does not need to meet either IEEE 279-1971 or IEEE 603-1991 and so no analysis was performed or
: 1.
N Open Due 5/15/11 Open-TVA/WEC NNC 4/125/2011: See Open Item No.
: 81.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                         radE4C39.docx                                                                       Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                  Issue                                    TVA Response(s)            Acceptable       Status/ Current Actions     Resolution Path   RAI No. & Date   RAI Resp. Date               Comments Sec.      Sec. POC                                                                                                                  Y/N provided.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments provided.
However, SRP (NUREG-0800 Rev. 2 dated March 2007) Section 7.7, Information System Important to Safety, specifically identifies IEEE Std 603-1991 as being applicable to accident monitoring instrumentation. Based upon the review of this item, the staff finds the following open items:
However, SRP (NUREG-0800 Rev. 2 dated March 2007) Section 7.7, Information System Important to Safety, specifically identifies IEEE Std 603-1991 as being applicable to accident monitoring instrumentation. Based upon the review of this item, the staff finds the following open items:
1 TVA to demonstrate that the Common Q PAMS meets the applicable regulatory requirements in IEEE Std 603-1991.
1 TVA to demonstrate that the Common Q PAMS meets the applicable regulatory requirements in IEEE Std 603-1991.
2 TVA to updated FSAR (Amendment 103) Table 7.1-1 to reference IEEE Std 603-1991 for WBN2 Common Q PAMS and Sorento Containment High Radiation Monitors.
2 TVA to updated FSAR (Amendment 103) Table 7.1-1 to reference IEEE Std 603-1991 for WBN2 Common Q PAMS and Sorento Containment High Radiation Monitors.
365   7.5.2. 7.5                   On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an                                     2.            Open                          Open-TVA/WEC                                          NNC 4/125/2011: See Open Item No.
365 7.5.2.
2                            evaluation of the Common Q PAMS against the current staff                                                       Due 5/15/11                                                                        81.
2 7.5 EICB (Carte)
position.
On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an evaluation of the Common Q PAMS against the current staff position.
By letter dated 2/25/11 (ML110620219), TVA docketed a response: that WBN2 is not committed in complying with Reg.
By letter dated 2/25/11 (ML110620219), TVA docketed a response: that WBN2 is not committed in complying with Reg.
Guide 1.75Since WBN2 is not committed to RG 1.75 or IEEE-384, no comparison is required However, WBN2 is committed to RG 1.75 Rev. 2, Physical Independence of Electric Systems. RG 1.75 Rev. 3 and IEEE EICB (Carte)
Guide 1.75Since WBN2 is not committed to RG 1.75 or IEEE-384, no comparison is required However, WBN2 is committed to RG 1.75 Rev. 2, Physical Independence of Electric Systems. RG 1.75 Rev. 3 and IEEE Std. 384-1992 are used, in part, to address IEEE Std 603-1991 Clause 5.6.1. The current NRC staff position for RG 1.75 is documented in Rev. 3. Based upon the review of this item, the staff finds the following open item:
Std. 384-1992 are used, in part, to address IEEE Std 603-1991 Clause 5.6.1. The current NRC staff position for RG 1.75 is documented in Rev. 3. Based upon the review of this item, the staff finds the following open item:
1 TVA to updated FSAR (Amendment 103) Table 7.1-1 to include RG 1.75 Rev. 3 for WBN2 Common Q PAMS and the Sorento Containment High Radiation monitor.
1 TVA to updated FSAR (Amendment 103) Table 7.1-1 to include RG 1.75 Rev. 3 for WBN2 Common Q PAMS and the Sorento Containment High Radiation monitor.
The Common Q PAMS was designed to meet the requirements of RG 1.75 Rev. 2. WBN2 did not perform an analysis to RG 1.75 Rev. 3. Based upon the review of this item, the staff finds the following open item:
The Common Q PAMS was designed to meet the requirements of RG 1.75 Rev. 2. WBN2 did not perform an analysis to RG 1.75 Rev. 3. Based upon the review of this item, the staff finds the following open item:
2 TVA to evaluate Common Q PAMS and the Sorento Containment High Radiation monitor for conformance with RG 1.75 Rev. 3.
2 TVA to evaluate Common Q PAMS and the Sorento Containment High Radiation monitor for conformance with RG 1.75 Rev. 3.
366   7.5.2. 7.5                   On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an                                     3. N        Open                          Open-TVA/WEC                                          NNC 4/125/2011: See Open Item No.
: 2.
2                            evaluation of the Common Q PAMS against the current staff                                                       Due 5/15/11                                                                        81.
Open Due 5/15/11 Open-TVA/WEC NNC 4/125/2011: See Open Item No.
position.
: 81.
By letter dated 2/25/11 (ML110620219), TVA docketed a response: TVA stated that the Common Q PAMS equipment fully meets the RG 1.100 Rev. 0 and is compliant with Rev. 3, with exception of testing above 33 Hz, which is not applicable to Watts EICB (Carte)
366 7.5.2.
Bar.
2 7.5 EICB (Carte)
On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an evaluation of the Common Q PAMS against the current staff position.
By letter dated 2/25/11 (ML110620219), TVA docketed a response: TVA stated that the Common Q PAMS equipment fully meets the RG 1.100 Rev. 0 and is compliant with Rev. 3, with exception of testing above 33 Hz, which is not applicable to Watts Bar.
The WBN2 FSAR (Amendment 103) references Regulatory Guide 1.100 Rev. 1 Seismic Qualification of Electrical Equipment for Nuclear Power Plants. The Common Q PAMS was designed to meet the requirements of RG 1.100 Rev. 2. RG 1.100 Rev. 3 is the current revision of this guide and is endorsed by the NRC. RG 1.100 Rev. 3 endorses IEEE 344-2004.
The WBN2 FSAR (Amendment 103) references Regulatory Guide 1.100 Rev. 1 Seismic Qualification of Electrical Equipment for Nuclear Power Plants. The Common Q PAMS was designed to meet the requirements of RG 1.100 Rev. 2. RG 1.100 Rev. 3 is the current revision of this guide and is endorsed by the NRC. RG 1.100 Rev. 3 endorses IEEE 344-2004.
Based upon the review of this item, the staff finds the following open item:
Based upon the review of this item, the staff finds the following open item:
1 TVA to updated FSAR (Amendment 103) Table 7.1-1 to
1 TVA to updated FSAR (Amendment 103) Table 7.1-1 to
: 3.
N Open Due 5/15/11 Open-TVA/WEC NNC 4/125/2011: See Open Item No.
: 81.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                         radE4C39.docx                                                                       Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                  Issue                                    TVA Response(s)            Acceptable       Status/ Current Actions     Resolution Path   RAI No. & Date   RAI Resp. Date               Comments Sec.      Sec. POC                                                                                                                  Y/N include RG 1.100 Rev. 3 for WBN2 Common Q PAMS and the Sorento Containment High Radiation monitor.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments include RG 1.100 Rev. 3 for WBN2 Common Q PAMS and the Sorento Containment High Radiation monitor.
or 2   TVA to evaluate Common Q PAMS for conformance with RG 1.100 Rev. 1.
or 2
367   7.5.2. 7.5                   On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an                                     4. N        Open                          Open-TVA/WEC                                          NNC 4/125/2011: See Open Item No.
TVA to evaluate Common Q PAMS for conformance with RG 1.100 Rev. 1.
2                            evaluation of the Common Q PAMS against the current staff                                                       Due 5/15/11                                                                        81.
367 7.5.2.
position.
2 7.5 EICB (Carte)
On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an evaluation of the Common Q PAMS against the current staff position.
By letter dated 2/25/11 (ML110620219), TVA docketed a response.
By letter dated 2/25/11 (ML110620219), TVA docketed a response.
The WBN2 FSAR (Amendment 103) references RG 1.153 Rev. 0, Criteria for Safety Systems. The Common Q PAMS is designed to meet the requirements of RG 1.153 Rev. 1. By letter dated February 25, 2010 (ML110620219), TVA stated:
The WBN2 FSAR (Amendment 103) references RG 1.153 Rev. 0, Criteria for Safety Systems. The Common Q PAMS is designed to meet the requirements of RG 1.153 Rev. 1. By {{letter dated|date=February 25, 2010|text=letter dated February 25, 2010}} (ML110620219), TVA stated:
The subject Regulatory Guides [RG 1.153 Rev. 0 & 1]
The subject Regulatory Guides [RG 1.153 Rev. 0 & 1]
endorse and reference other standards. Common Q PAMS EICB (Carte) has been evaluated to comply with the requirements of these other endorsed standards ([Comparison report in this letter titled IEEE-279-1971 to IEEE-603-1991 Comparison]).
endorse and reference other standards. Common Q PAMS has been evaluated to comply with the requirements of these other endorsed standards ([Comparison report in this letter titled IEEE-279-1971 to IEEE-603-1991 Comparison]).
Therefore no additional analysis needs to be performed and no further action is necessary.
Therefore no additional analysis needs to be performed and no further action is necessary.
However, the Comparison report in this letter titled IEEE-279-1971 to IEEE-603-1991 Comparison, stated:
However, the Comparison report in this letter titled IEEE-279-1971 to IEEE-603-1991 Comparison, stated:
Line 1,164: Line 2,513:
Based on the reasoning quoted above, WBN2 did not evaluate the Common Q PAMS against the criteria of RG 1.153 Rev. 1; therefore, the staff finds the following open item (see also Open Items No. 1 & 2 above.):
Based on the reasoning quoted above, WBN2 did not evaluate the Common Q PAMS against the criteria of RG 1.153 Rev. 1; therefore, the staff finds the following open item (see also Open Items No. 1 & 2 above.):
1 TVA to evaluate Common Q PAMS for conformance with RG 1.153 Rev. 1.
1 TVA to evaluate Common Q PAMS for conformance with RG 1.153 Rev. 1.
368   7.5.2. 7.5                   On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an                                     5. N        Open                          Open-TVA/WEC                                          NNC 4/125/2011: See Open Item No.
: 4.
2                            evaluation of the Common Q PAMS against the current staff                                                       Due 5/15/11                                                                        81.
N Open Due 5/15/11 Open-TVA/WEC NNC 4/125/2011: See Open Item No.
position.
: 81.
368 7.5.2.
2 7.5 EICB (Carte)
On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an evaluation of the Common Q PAMS against the current staff position.
By letter dated 2/25/11 (ML110620219), TVA docketed a response.
By letter dated 2/25/11 (ML110620219), TVA docketed a response.
The WBN2 FSAR (Amendment 103) references RG 1.152 Rev. 0, EICB (Carte)
The WBN2 FSAR (Amendment 103) references RG 1.152 Rev. 0, Criteria for Digital Computers in Safety Systems of Nuclear Power Plants. The Common Q PAMS was designed to meet the requirements of RG 1.152 Rev. 1. RG 1.152 Rev. 2 is the current revision of this guide and is endorsed by the NRC. By {{letter dated|date=February 25, 2010|text=letter dated February 25, 2010}} (ML110620219), TVA stated:
Criteria for Digital Computers in Safety Systems of Nuclear Power Plants. The Common Q PAMS was designed to meet the requirements of RG 1.152 Rev. 1. RG 1.152 Rev. 2 is the current revision of this guide and is endorsed by the NRC. By letter dated February 25, 2010 (ML110620219), TVA stated:
RG 1.152 rev 2 endorses ANSI/IEEE-ANS-7-4.3.2-2003, but also provides extra regulatory guidance concerning computer based cyber security. Since this revision was not part of the design basis of WBN2 or Common Q PAMS, the project makes no commitment to the compliance of RG 1.152 rev 2.
RG 1.152 rev 2 endorses ANSI/IEEE-ANS-7-4.3.2-2003, but also provides extra regulatory guidance concerning computer based cyber security. Since this revision was not part of the design basis of WBN2 or Common Q PAMS, the project makes no commitment to the compliance of RG 1.152 rev 2.
Based upon the review of this item, the staff finds the following open item:
Based upon the review of this item, the staff finds the following open item:
: 5.
N Open Due 5/15/11 Open-TVA/WEC NNC 4/125/2011: See Open Item No.
: 81.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                     radE4C39.docx                                                                       Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                Issue                                  TVA Response(s)            Acceptable       Status/ Current Actions     Resolution Path   RAI No. & Date   RAI Resp. Date               Comments Sec.      Sec. POC                                                                                                              Y/N 1   TVA to evaluate Common Q PAMS for conformance with RG 1.152 Rev. 2.
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 1
369   7.5.2. 7.5                   On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an                                 6. N        Open                          Open-TVA/WEC                                          NNC 4/125/2011: See Open Item No.
TVA to evaluate Common Q PAMS for conformance with RG 1.152 Rev. 2.
2                            evaluation of the Common Q PAMS against the current staff                                                   Due 5/15/11                                                                        81.
369 7.5.2.
position.
2 7.5 EICB (Carte)
On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an evaluation of the Common Q PAMS against the current staff position.
By letter dated 2/25/11 (ML110620219), TVA docketed a response.
By letter dated 2/25/11 (ML110620219), TVA docketed a response.
The WBN2 FSAR (Amendment 103) references IEEE 7-4.3.2-EICB (Carte) 1982, "IEEE Standard Criteria for Digital Computers in Safety Systems of Nuclear Power Generating Stations" as endorsed by Regulatory Guide (RG) 1.152, "Criteria for Use of Computers in Safety Systems of Nuclear Power Plants," Revision 0 for the Eagle 21 system. The current regulatory position is documented in RG 1.152 Rev. 2 which endorses IEEE Std 7-4.3.2-2003 as an acceptable method for using digital computers to meet IEEE Std 603-1991. Based upon the review of this item, the staff finds the following open item:
The WBN2 FSAR (Amendment 103) references IEEE 7-4.3.2-1982, "IEEE Standard Criteria for Digital Computers in Safety Systems of Nuclear Power Generating Stations" as endorsed by Regulatory Guide (RG) 1.152, "Criteria for Use of Computers in Safety Systems of Nuclear Power Plants," Revision 0 for the Eagle 21 system. The current regulatory position is documented in RG 1.152 Rev. 2 which endorses IEEE Std 7-4.3.2-2003 as an acceptable method for using digital computers to meet IEEE Std 603-1991. Based upon the review of this item, the staff finds the following open item:
1 WBN2 to updated FSAR Table 7.1-1 to reference IEEE 7-4.3.2-2003 as being applicable to WBN2 Common Q PAMS and the Sorento Containment High Radiation monitor.
1 WBN2 to updated FSAR Table 7.1-1 to reference IEEE 7-4.3.2-2003 as being applicable to WBN2 Common Q PAMS and the Sorento Containment High Radiation monitor.
370   7.5.2. 7.5                   On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an                                 7. N        Open                          Open-TVA/WEC                                          NNC 4/125/2011: See Open Item No.
: 6.
2                            evaluation of the Common Q PAMS against the current staff                                                   Due 5/15/11                                                                        81.
N Open Due 5/15/11 Open-TVA/WEC NNC 4/125/2011: See Open Item No.
position.
: 81.
370 7.5.2.
2 7.5 EICB (Carte)
On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an evaluation of the Common Q PAMS against the current staff position.
By letter dated 2/25/11 (ML110620219), TVA docketed a response.
By letter dated 2/25/11 (ML110620219), TVA docketed a response.
EICB (Carte)
The WBN2 FSAR (Amendment 103) does not reference RG 1.168, IEEE 1012, or IEEE 1028. IEEE Std 7-4.3.2-2003 indentifies IEEE Std 1012-1998 as normative. RG 1.168 Rev. 1 endorses, with clarifications, IEEE 1012-1998. The current staff positions are documented in RG 1.168 Rev. 1, IEEE 1012-1998, and IEEE 1020-1997. Based upon the review of this item, the staff finds the following open item:
The WBN2 FSAR (Amendment 103) does not reference RG 1.168, IEEE 1012, or IEEE 1028. IEEE Std 7-4.3.2-2003 indentifies IEEE Std 1012-1998 as normative. RG 1.168 Rev. 1 endorses, with clarifications, IEEE 1012-1998. The current staff positions are documented in RG 1.168 Rev. 1, IEEE 1012-1998, and IEEE 1020-1997. Based upon the review of this item, the staff finds the following open item:
1 WBN2 to updated FSAR Table 7.1-1 to reference RG 1.168 Rev. 1, IEEE 1012-1998, and IEEE 1020-1997 as being applicable to WBN2 Common Q PAMS and the Sorento Containment High Radiation monitor.
1 WBN2 to updated FSAR Table 7.1-1 to reference RG 1.168 Rev. 1, IEEE 1012-1998, and IEEE 1020-1997 as being applicable to WBN2 Common Q PAMS and the Sorento Containment High Radiation monitor.
371   7.5.2. 7.5                   On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an                                 8. N        Open                          Open-TVA/WEC                                          NNC 4/125/2011: See Open Item No.
: 7.
2                            evaluation of the Common Q PAMS against the current staff                                                   Due 5/15/11                                                                        81.
N Open Due 5/15/11 Open-TVA/WEC NNC 4/125/2011: See Open Item No.
position.
: 81.
EICB (Carte)
371 7.5.2.
2 7.5 EICB (Carte)
On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an evaluation of the Common Q PAMS against the current staff position.
By letter dated 2/25/11 (ML110620219), TVA docketed a response.
By letter dated 2/25/11 (ML110620219), TVA docketed a response.
The WBN2 FSAR (Amendment 103) does not reference Regulatory Guide 1.209, Guidelines for Environmental Qualification of Safety-Related Computer-Based Instrumentation and Control Systems in Nuclear Power Plants. Based upon the
The WBN2 FSAR (Amendment 103) does not reference Regulatory Guide 1.209, Guidelines for Environmental Qualification of Safety-Related Computer-Based Instrumentation and Control Systems in Nuclear Power Plants. Based upon the
: 8.
N Open Due 5/15/11 Open-TVA/WEC NNC 4/125/2011: See Open Item No.
: 81.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                       radE4C39.docx                                                                       Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.
SE Sec.
FSAR Sec.
NRC POC Issue TVA Response(s)


===Response===
===Response===
SE      FSAR    NRC No.                                                                Issue                                  TVA Response(s)            Acceptable       Status/ Current Actions     Resolution Path   RAI No. & Date   RAI Resp. Date               Comments Sec.      Sec. POC                                                                                                                Y/N review of this item, the staff finds the following open item:
Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments review of this item, the staff finds the following open item:
1 WBN2 to updated FSAR Table 7.1-1 to reference RG 1.209 and IEEE Std. 323-2003 as being applicable to WBN2 Common Q PAMS and the Sorento Containment High Radiation monitor.
1 WBN2 to updated FSAR Table 7.1-1 to reference RG 1.209 and IEEE Std. 323-2003 as being applicable to WBN2 Common Q PAMS and the Sorento Containment High Radiation monitor.
TVA did not docket an evaluation against the criteria in RG 1.209.
TVA did not docket an evaluation against the criteria in RG 1.209.
Based upon the review of this item, the staff finds the following open item:
Based upon the review of this item, the staff finds the following open item:
2 WBN2 to evaluate Common Q PAMS for conformance with RG 1.209 and IEEE Std. 323-2003.
2 WBN2 to evaluate Common Q PAMS for conformance with RG 1.209 and IEEE Std. 323-2003.
372   7.5.2. 7.5                   On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an                                   9. N        Open                          Open-TVA/WEC                                          NNC 4/125/2011: See Open Item No.
372 7.5.2.
2                            evaluation of the Common Q PAMS against the current staff                                                     Due 5/15/11                                                                        81.
2 7.5 EICB (Carte)
position.
On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an evaluation of the Common Q PAMS against the current staff position.
By letter dated 2/25/11 (ML110620219), TVA docketed a response.
By letter dated 2/25/11 (ML110620219), TVA docketed a response.
The requirements in the SysRS and SRS are not traceable back to the design basis (e.g., IEEE Std 603-1991 Section 4) for the system. The SRS does not include any documented evidence that EICB (Carte) it was ever independently reviewed in accordance with the 10CFR50 Appendix B Criterion III, Design Control. (Note: It appears that the only Common Q or WBN2 PAMS document that was independently reviewed in accordance with 10 CFR 50 Appendix B requirements is the SysRS.)
The requirements in the SysRS and SRS are not traceable back to the design basis (e.g., IEEE Std 603-1991 Section 4) for the system. The SRS does not include any documented evidence that it was ever independently reviewed in accordance with the 10CFR50 Appendix B Criterion III, Design Control. (Note: It appears that the only Common Q or WBN2 PAMS document that was independently reviewed in accordance with 10 CFR 50 Appendix B requirements is the SysRS.)
Based upon the review of the SysRS and SRS, the staff finds that there is reasonable assurance that the systems fully conform to the applicable guidelines, except for the following open items:
Based upon the review of the SysRS and SRS, the staff finds that there is reasonable assurance that the systems fully conform to the applicable guidelines, except for the following open items:
1 TVA to produce an acceptable description of how the SysRS and SRS implement the design basis requirements of IEEE 603-1991 Clause 4.
1 TVA to produce an acceptable description of how the SysRS and SRS implement the design basis requirements of IEEE 603-1991 Clause 4.
2 TVA to produce a final SRS that is independently reviewed in accordance with 10CFR50Appendix B, Criterion III Design Control, requirements.
2 TVA to produce a final SRS that is independently reviewed in accordance with 10CFR50Appendix B, Criterion III Design Control, requirements.
373   7.5.2. 7.5                   The SDDs do not include any documented evidence that they were                                 10. N        Open                          Open-TVA/WEC 2                            independently reviewed in accordance with the 10CFR50                                                         Due 5/15/11 EICB (Carte)
: 9.
Appendix B Criterion III, Design Control.
N Open Due 5/15/11 Open-TVA/WEC NNC 4/125/2011: See Open Item No.
: 81.
373 7.5.2.
2 7.5 EICB (Carte)
The SDDs do not include any documented evidence that they were independently reviewed in accordance with the 10CFR50 Appendix B Criterion III, Design Control.
Based upon the review of the SDDs, the staff the following open item:
Based upon the review of the SDDs, the staff the following open item:
1 TVA to produce final SDDs that are independently reviewed in accordance with 10 CFR50 Appendix B Criterion III, Design Control, requirements.
1 TVA to produce final SDDs that are independently reviewed in accordance with 10 CFR50 Appendix B Criterion III, Design Control, requirements.
374   7.5.2. 7.5                   By letter dated October 29, 2010 (ML103120711), TVA docketed a                                 11. N        Open                          Open-TVA/WEC 2                            draft technical evaluation associated with an engineering design                                             Due 5/15/11 EICB (Carte) change (ML103120712) that states the Common Q PAMS will require changes in the technical specifications. The technical specifications (TS) have not be received yet for review. The TS will be reviewed once they are received.
: 10. N Open Due 5/15/11 Open-TVA/WEC 374 7.5.2.
1 Confirm/Verify Technical Specification changes associated with Common Q PAMS are acceptable.}}
2 7.5 EICB (Carte)
By {{letter dated|date=October 29, 2010|text=letter dated October 29, 2010}} (ML103120711), TVA docketed a draft technical evaluation associated with an engineering design change (ML103120712) that states the Common Q PAMS will require changes in the technical specifications. The technical specifications (TS) have not be received yet for review. The TS will be reviewed once they are received.
1 Confirm/Verify Technical Specification changes associated with Common Q PAMS are acceptable.
: 11. N Open Due 5/15/11 Open-TVA/WEC}}

Latest revision as of 06:12, 13 January 2025

OL - 20110415 Open Item List Master TVA Update 04-19-11.docx
ML11136A087
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 04/19/2011
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML11136A087 (60)


Text

1 WBN2Public Resource From:

Clark, Mark Steven [msclark0@tva.gov]

Sent:

Tuesday, April 19, 2011 11:58 AM To:

Crouch, William D; Hilmes, Steven A Cc:

Poole, Justin

Subject:

20110415 Open Item List Master TVA Update 04-19-11.docx Attachments:

20110415 Open Item List Master TVA Update 04-19-11.docx Bill:

Please forward the attached update to Justin. Not much of an update this week.

Regards, Steve Steve Clark Bechtel Power Corp.

Control Systems Watts Bar 2 Completion Project Phone: 423.365.3007 e-mail: msclark0@tva.gov

Hearing Identifier:

Watts_Bar_2_Operating_LA_Public Email Number:

352 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF1816A07E)

Subject:

20110415 Open Item List Master TVA Update 04-19-11.docx Sent Date:

4/19/2011 11:57:32 AM Received Date:

4/19/2011 11:57:43 AM From:

Clark, Mark Steven Created By:

msclark0@tva.gov Recipients:

"Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>

Tracking Status: None "Hilmes, Steven A" <sahilmes@tva.gov>

Tracking Status: None Post Office:

TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 321 4/19/2011 11:57:43 AM 20110415 Open Item List Master TVA Update 04-19-11.docx 500862 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 001 All All B

(

A The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (Agency 12/15/2009 Presentation Slides

1.

Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains 002 All All B

(

A Are there I&C components and systems that have changed to a 12/15/2009 Presentation Slides

2.

Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains 003 All All B

(

A Because a digital I&C platform can be configured and programmed 12/15/2009 Presentation Slides

3.

Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains 004 All All B

(

A Please identify the information that will be submitted for each Responder: Webb 1/13/10 Public Meeting

4.

Y Closed Closed EICB RAI January 13, 2010 NNC 11/19/09: LIC-110 Rev. 1 Section 005 7.1.3.

(

G By letter date February 28, 2008 (Agencywide Documents Access Responder: Craig/Webb

5.

Y Closed Closed EICB RAI TVA Letter dated 006

(

G Amendment 95 of the FSAR, Chapter 7.3, shows that change 7.3-1 By letter dated February 5, 2010: TVA provided the Unit 2

6.

Y Closed Closed EICB RAI TVA Letter dated NNC: WCAP-12096 Rev. 7 007 7.1.3.

(

G The setpoint methodology has been reviewed and approved by the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 7 7.

Y Closed Closed EICB RAI TVA Letter dated TVA to provide Rev. 8 of the Unit 1 008 7.3

(

G There are several staff positions that provide guidance on setpoint TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 8 8.

Y Closed Closed EICB RAI TVA Letter dated 009 7.3.2 5.6,

(

D a

Change 7.3-2, identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 9 9.

Y Closed Closed EICB RAI 3/12/10, 010 7.3 7.3

(

D a

The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 10 10. Y Closed Closed EICB RAI 3/12/10, 011 7.3.2 5.6,

(

D a

NUREG-0847 Supplement No. 2 Section 7.3.2 includes an TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 11 11. Y Closed Closed EICB RAI ML101680598, 012 7.4 7.4

(

D a

The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 12 12. Y Closed Closed EICB RAI TVA Letter dated 013 7.1.3.

(

G Chapter 7 and Chapter 16 of Amendment 95 to the FSAR do not TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 13 13. Y Closed Closed EICB RAI TVA Letter dated TS have been docketed.

014 All All B

(

A Provide the justification for any hardware and software changes Date: 4/27/10

14. Y Closed Closed NRC Meeting TVA Letter dated 015

(

G Verify that the refurbishment of the power range nuclear Date: 4/27/10

15. Y Closed Closed NRC Meeting TVA Letter dated 016

(

C Identify the precedents in license amendment requests (LARs), if Date: 4/27/10

16. Y Closed Closed NRC Meeting TVA Letter dated 017 7.3.1 7.3.1,

(

D a

Identify precedents in LARs, if any, for the solid state protection Date: 4/27/10

17. Y Closed Closed NRC Meeting TVA Letter dated 018

(

G Identify any changes made to any instrumentation and control Date: 4/27/10

18. Y Closed Closed NRC Meeting TVA Letter dated 019

(

G Verify that the containment purge isolation radiation monitor is the Date: 4/27/10

19. Y Closed Closed NRC Meeting TVA Letter dated 020

(

G Provide environmental qualification information pursuant to Section Date: 4/27/10

20. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

021 7.3

(

G For the Foxboro Spec 200 platform, identify any changes in Date: 5/25/10

21. Y Closed Closed NRC Meeting TVA Letter dated The resolution of this item will be 022 7.3.2 5.6,

(

D a

Verify the auxiliary feedwater control refurbishment results in a like-Date: 4/27/10

22. Y Closed Closed NRC Meeting TVA Letter dated 023

(

G Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10

23. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

024

(

C Provide a schedule by the January 13, 2010, meeting for providing During the January 13, 2010 meeting, TVA presented a

24. Y Closed Closed NRC Meeting N/A - Request for NNC 4/30/10: Carte to address 025 7.5.2 7.5.1

(

S i

For the containment radiation high radiation monitor, verify that the Date: 4/27/10

25. Y Closed Closed NRC Meeting ML101230248, 026

(

G Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10

26. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

027 7.7.1.

(

C For Foxboro I/A provide information regarding safety/non-safety-Date: 4/27/10

27. Y Closed Closed NRC Meeting TVA Letter dated 028

(

G For the turbine control AEH system, verify that the refurbishment Responder: Mark Scansen

28. Y Closed Closed NRC Meeting TVA Letter dated 029

(

C For the rod control system, verify that the refurbishment results in a Date: 4/27/10

29. Y Closed Closed NRC Meeting TVA Letter dated 030

(

G Regarding the refurbishment of I&C equipment, identify any Responder: Clark

30. Y Closed Closed NRC Meeting TVA Letter dated 031

(

C For the rod position indication system (CERPI), provide information Date: 4/27/10

31. Y Closed Closed NRC Meeting TVA Letter dated CERPI is non-safety related.

032

(

C For the process computer, need to consider cyber security issues Date: 4/27/10

32. Y Closed Closed NRC Meeting TVA Letter dated EICB will no longer consider cyber 033

(

C For the loose parts monitoring system, provide information Date: 4/27/10

33. Y Closed Closed NRC Meeting TVA Letter dated The loose parts monitoring system is 034

(

G 2/4/2010 Responder: TVA

34. Y Closed Closed N/A TVA Letter dated 034.

a r

g Chapter 7.1 - Introduction

35. Y Closed Closed N/A N/A 034.

(

G Chapter 7.2 - Reactor Trip System

36. Y Closed Closed N/A N/A 034.

7.3 7.3

(

D a

Chapter 7.3 - ESFAS

37. Y Closed Closed N/A N/A 034.

7.5.1.

7.5.2

(

M a

Chapter 7.5 - Instrumentation Systems Important to Safety

38. Y Closed Closed N/A N/A Closed 034.

7.5.1.

7.5.2 r

c u

Chapter 7.6 - All Other Systems Required for Safety

39. Y Closed Closed N/A N/A Closed 034.

n g

h

/

Chapter 7.7 Control Systems

40. Y Closed Closed N/A N/A 035

(

S i

2/18/2010 Responder: Clark

41. Y Closed Closed RAI No. 1 TVA Letter dated LIC-110 Section 6.2.2 states: Design 036 7.5.2 7.5.1

(

C February 18, 2010 Date: 5/25/10

42. Y Closed Closed NRC Meeting NNC: Unit 2 FSAR Section 7.5.1, Post 037 7.5.1.

7.5.2

(

M a

2/18/2010 Responder: Clark Date: 5/25/10

43. Y Closed Closed N/A TVA Letter dated FSAR Amendment 100 provides

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 038 7.5.1.

7.5.2

(

M a

2/18/2010 Responder: Clark Date: 5/25/10

44. Y Closed Closed EICB RAI TVA Letter dated The slides presented at the December 039

(

G January 13, 2010 Responder: Clark Date: 5/25/10

45. Y Closed Closed EICB RAI FSAR amendment The equation for the calculation of the 040

(

G January 13, 2010 Responder: Clark Date: 5/25/10

46. Y Closed Closed EICB RAI EICB RAI FSAR amendment The equation for the calculation of the 042 All All B

(

A February 25, 2010: Telecom Date: 5/25/10

47. Y Closed Closed EICB RAI TVA Letter dated The drawing provided did not have the 044 7.5.2 7.5.1

(

C February 25, 2010 Date: 5/25/10

48. Y Closed Closed EICB RAI TVA Letter dated 045

(

C February 25, 2010 Date: 5/25/10

49. Y Closed Closed EICB RAI TVA Letter dated 046

(

C February 25, 2010 Date: 5/25/10

50. Y Closed Closed N/A - Request for N/A 047 7.5.2 7.5.1

(

C 4/8/2010 Responder: WEC/Hilmes Date: 5/25/10

51. Y Closed Closed EICB RAI TVA Letter dated 048 7.5.2 7.5.1

(

C April 8, 2010 Date: 5/25/10

52. Y Closed Closed EICB RAI TVA Letter dated 049 7.5.2 7.5.1

(

C 4/8/2010 Responder: WEC Date: 5/25/10

53. Y Closed Closed EICB RAI TVA Letter dated 050 7.5.2 7.5.1

(

C 4/8/2010 Responder: WEC Date: 5/25/10

54. N Closed Closed EICB RAI TVA Letter dated NNC 11/18/10: SysRS Rev. 2 contains 051

(

G April 15, 2010 Date: 5/25/10

55. Y Closed Closed N/A N/A Review addressed by another Open 052 7.5.2 7.5.1

(

S i

April 19, 2010 Date: 5/25/10

56. Y Closed Closed RAI No. 12 053 7.5.2 7.5.1

(

S i

April 19, 2010 Date: 5/25/10

57. Y Closed Closed RAI No. 13 054 7.5.2 7.5.1

(

S i

4/19/2010 Responder: Slifer/Clark Date: 5/25/10

58. Y Closed Closed RAI No. 14 TVA Letter dated 055 7.5.2 7.5.1

(

S i

4/19/2010 Responder: Slifer/Clark Date: 5/25/10

59. Y Closed Closed RAI No. 15 TVA Letter dated 056

(

S i

April 19, 2010 Date: 5/25/10

60. Y Closed Closed RAI No. 16 TVA Letter dated Sorrento Radiation Monitoring 057 7.5.2 7.5.1

(

S i

4/19/2010 Responder: TVA I&C Staff Date: 5/25/10

61. Y Closed Closed RAI No. 17 TVA Letter dated 058 7.5.0 7.5

(

S i

April 19, 2010 Date: 5/25/10

62. Y Closed Closed RAI No. 18 TVA Letter dated 059 7.5.2 7.5.1

(

S i

April 19, 2010 Date:

63. Y Closed Closed RAI No. 19 TVA Letter dated 060 7.5.2 7.5.1

(

C April 19, 2010 Date: 5/25/10

64. Y Closed Closed N/A N/A Addressed by Open Item No. 47 061 7.5.2 7.5.1

(

C April 19, 2010 Date: 5/25/10

65. Y Closed Closed N/A N/A Addressed by Open Item No. 48 062 7.5.2 7.5.1

(

C April 19, 2010 Date: 5/25/10

66. Y Closed Closed N/A N/A Addressed by Open Item No. 49 063 7.5.2 7.5.1

(

C April 19, 2010 Date: 5/25/10

67. Y Closed Closed N/A N/A Addressed by Open Item No. 50 064 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: Webb Date: 4/8/2010

68. Y Closed Closed N/A - No question TVA Letter dated 065 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10

69. Y Closed Closed N/A - No question TVA Letter dated 066 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10

70. Y Closed Closed N/A - No question TVA Letter dated 070 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10

71. N Closed Closed N/A - No question TVA Letter dated NNC 11/23/10: The dues date in this 071 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10

72. N Closed Closed N/A - No question N/A NNC 11/23/10: The dues date in this 072 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10

73. Y Closed Closed N/A - No question N/A 073 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10

74. N Closed Closed N/A - No question N/A 075 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10

75. N Closed Closed N/A - No question N/A 076 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: Clark Date: 5/25/10

76. Y Closed Closed N/A - No question N/A 077 7.5.2 7.5.1

(

C By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10

77. Y Closed Closed N/A - No question TVA Letter dated 078

(

G 4/26/2010 Responder: Clark Date: 5/25/10

78. Y Closed Closed EICB RAI TVA Letter dated 079

(

G 4/26/2010 Responder: Clark Date: 5/25/10

79. Y Closed Closed EICB RAI TVA Letter dated Reviewed under Item 154 080

(

S i

4/26/2010 Responder: WEC

80. Y Closed Closed RAI No. 2 TVA Letter dated 082 7.5.2 7.5.1

(

C 5/6/2010 Responder: WEC Date: 6/18/10

81. N Closed Closed EICB RAI TVA Letter dated NNC 11/18/10: See also Open Item No.

083 7.5.2 7.5.1

(

C May 6, 2010 Date: 6/18/10

82. Y Closed Closed EICB RAI TVA Letter dated 084 7.5.2 7.5.1

(

C May 6, 2010 Date: 6/18/10

83. Y Closed Closed EICB RAI TVA Letter dated 085 7.5.2 7.5.1

(

C 5/6/2010 Responder: WEC

84. N Closed Closed EICB RAI 087 7.5.2 7.5.1

(

S i

May 6, 2010 Date: 5/24/10

85. Y Closed Closed RAI No. 20 TVA Letter dated 088 7.5.2 7.5.1

(

S i

May 6, 2010 Date: 5/24/10

86. Y Closed Closed RAI No. 21 TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 089

(

C 5/6/2010 Responder: Clark

87. Y Closed Closed EICB RAI TVA Letter dated NNC: Docketed response states that 090

(

C 5/6/2010 Responder: Clark Date: 5/25/10

88. Y Closed Closed EICB RAI TVA Letter dated 091 7.4 7.4

(

D a

May 20, 2010 Date: 5/25/10

89. Y Closed Closed EICB RAI No.1 TVA Letter dated 093

(

G May 20, 2010 Date: 5/25/10

90. Y Closed Closed N/A N/A Will be reviewed under item 154 094

(

G 5/20/2010 Responder: Clark Date: 5/25/10

91. Y Closed Closed N/A N/A Information was found in FSAR 095 7.8.1, XX

(

D a

May 20, 2010 Date:

92. Y Closed Closed EICB RAI No. 2 TVA Letter dated 096 7.7.5 XX

(

D a

5/20/2010 Responder:

93. Y Closed Closed EICB RAI No.3 TVA Letter dated 097 7.4.2 7.4

(

D a

May 20, 2010 Date:

94. Y Closed Closed EICB RAI No.4 TVA Letter dated 098 7.4.2 7.4

(

D a

May 25, 2010 Date:

95. Y Closed Closed EICB RAI No.5 TVA Letter dated 099

(

B a

April 12, 2010 Date:

96. Y Closed Closed Closed to Item 129 100

(

C 5/20/2010 Responder: WEC

97. Y Closed Closed N/A - No question N/A 102

(

C May 24, 2010 Date: 5/24/10

98. Y Closed Closed N/A TVA Letter dated Request for schedule not information.

103 7.4 7.4

(

D a

5/27/2010 Responder: Ayala Date: 5/27/10

99. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 104 7.4 7.4

(

D a

5/27/2010 Responder: Merten Date: 5/27/10 100. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 105

(

G April 29, 2010 Date:

101. Y Closed Closed N/A N/A Will be reviewed under item 154.

106

(

S i

May 6, 2010 Date: 5/25/10 102. Y Closed Closed RAI No. 9 TVA Letter dated 107

(

S i

May 6, 2010 Date: 5/28/10 103. Y Closed Closed RAI No. 22 TVA Letter dated 108

(

G May 6, 2010 Date: 5/25/10 104. Y Closed Closed N/A N/A Will be reviewed under OI#154 109.

(

C 5/6/2010 Responder: N/A 105. Y Closed Closed N/A N/A Duplicate of another open Item.

109.

7.8 XX

(

D a

5/6/2010 Responder: N/A 106. Y Closed Closed N/A N/A 110

(

G May 6, 2010 Date:

107. Y Closed Closed N/A N/A Information was found.

111

(

C May 6, 2010 Date: 5/28/10 108. Y Closed Closed N/A TVA Letter dated Request to help find, not a request for 112

(

G June 1, 2010 Date:

109. Y Closed Closed N/A N/A Information was received 113

(

G 6/1/2010 Responder: Clark 110. Y Closed Closed EICB RAI TVA Letter dated 114 7.2 7.2

(

G 6/1/2010 Responder: WEC 111. Y Close Closed EICB RAI TVA Letter dated 115

(

C 2/25/2010 Responder: Clark 112. Y Closed Closed EICB RAI TVA Letter dated 116

(

G 6/3/2010 Responder: WEC 113. Y Closed Closed EICB RAI TVA Letter dated Letter sent to Westinghouse requesting 117 7.1 7.1

(

G 6/3/2010 Responder: Hilmes 114. Y Closed Closed EICB RAI TVA Letter dated 118 7.4 7.4

(

D a

6/8/2010 Responder: Merten 115. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 119

(

S i

June 10, 2010 Date:

116. Y Closed Closed RAI No. 23 TVA Letter dated 120

(

C 5/6/2010 Responder: Hilmes/Merten/Costley 117. Y Closed Closed EICB RAI TVA Letter dated 121

(

C 5/6/2010 Responder: Webb/Webber 118. Y Closed Closed EICB RAI TVA Letter dated 122

(

C June 14, 2010 Date:

119. Y Closed Closed N/A - Request for N/A 123 7.7.3 7.4.1,

(

D a

6/14/2010 Responder:

120. Y Closed Closed ML101720589, TVA Letter dated 124 7.7.5 XX

(

D a

6/14/2010 Responder:

121. Y Closed Closed ML101720589, Item TVA Letter dated 125 7.7.8 7.7.1.12

(

D a

6/14/2010 Responder:

122. Y Closed Closed ML101720589, Item TVA Letter dated 126 7.8 7.8

(

D a

June 14, 2010 Date:

123. Y Closed Closed ML101720589, Item TVA Letter dated 127 7.2 7.2

(

G 6/16/2010 Responder: WEC/Clark 124. Y Closed Closed EICB RAI TVA Letter dated 128 7.2 7.2

(

G 6/18/2010 Responder: WEC Drake /TVA Craig 125. Y Closed Closed EICB RAI TVA Letter dated Track through SE open item 129

(

P 6/12/2010 Responder: WEC 126. Y Closed Closed N/A TVA Letter dated 130

(

P 6/28/2010 Responder: Clark 127. Y Closed Closed N/A TVA Letter dated 131

(

P 6/28/2010 Responder: Clark 128. Y Closed Closed N/A TVA Letter dated 132

(

P 6/28/2010 Responder: Clark 129. Y Closed Closed N/A TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 133

(

P 6/28/2010 Responder: Clark 130. Y Closed Closed TVA Letter dated 134

(

P 6/28/2010 Responder: Clark 131. Y Closed Closed TVA Letter dated 135 7.3.1 7.3.1

(

D a

6/30/2010 Responder: Clark 132. Y Closed Closed RAI not necessary TVA Letter dated 136 7.3.2, 7.4, 5.6,

(

D a

6/30/2010 Responder: Clark 133. Y Closed Closed RAI not necessary TVA Letter dated 137

(

C Several WBN2 PAMS documents contain a table titled, Document Responder: WEC 134. Y Closed Closed ML101650255, Item TVA Letter dated 139

(

C The WBN2 PAMS System Requirements Specification (WBN2 Responder: WEC 135. Y Closed Closed ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements 140

(

C The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1)

Responder: Clark 136. N Closed Closed ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements 141

(

C Deleted by DORL Date:

137. Y Closed Closed ML101650255, Item WBN2 PAMS System Requirements 146

(

C 6/17/2010 Responder:

138. Y Closed Closed ML101650255, Item PAMS System Requirements 147

(

C 6/17/2010 Responder:

139. Y Closed Closed ML101650255, Item PAMS System Requirements 148

(

C 6/17/2010 Responder:

140. Y Closed Closed ML101650255, Item PAMS System Requirements 149 7.2 7.2

(

G FSAR Section 7.1.1.2(2), Overtemperature delta T and Responder: Tindell 141. Y Close Closed ML101720589, Item TVA Letter dated 150 7.2 7.2

(

G Many of the changes were based on the Westinghouse document Responder: Clark 142. Y Close Closed ML101720589, Item TVA Letter dated 151 7.2 7.2

(

G Provide the EDCR 52378 and 54504 which discusses the basis for Responder: Clark 143. Y Close Closed ML101720589, Item TVA Letter dated 152 7.2 7.2

(

G Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR Responder: Merten/Clark 144. Y Close Closed ML101720589, Item TVA Letter dated 153 7.2 7.2

(

G FSAR section 7.2.1.1.7 added the reference to FSAR section Responder: Craig/Webb 145. Y Close Closed ML101720589, Item TVA Letter dated 154 7.2 7.2

(

G FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS Responder: Craig/Webb 146. Y Closed Closed ML101720589, Item TVA Letter dated EICB RAI ML102861885 sent to DORL 155 7.2 7.2

(

G Summary of FSAR change document section 7.2 states that Date:

147. Y Closed Closed ML101720589, Item 156 7.2 7.2

(

G FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1-Responder: WEC 148. Y Closed Closed ML101720589, Item TVA Letter dated Response on hold pending 157 7.2 7.2

(

G FSAR section 7.2.2.1.1, fifth paragraph was deleted except for the Responder: Tindell 149. Y Close Closed ML101720589, Item TVA Letter dated 158 7.2 7.2

(

G FSAR section 7.2.2.1.1, paragraph six was changed to state that Responder: Tindell 150. Y Closed Closed ML101720589, Item TVA Letter dated 159 7.2 7.2

(

G FSAR section 7.2.2.1.2 discusses reactor coolant flow Responder: Craig 151. Y Close Closed ML101720589, Item TVA Letter dated 160 7.2 7.2

(

G FSAR section 7.2.2.2(7) deleted text which has references 12 and Responder: Tindell 152. Y Close Closed ML101720589, Item TVA Letter dated 161 7.2 7.2

(

G FSAR section 7.2.2.3 states that changes to the control function Responder: Clark 153. Y Closed Closed ML101720589, Item TVA Letter dated 162 7.2 7.2

(

G FSAR section 7.2.2.2(14) states that bypass of a protection Responder: Tindell 154. Y Closed Closed ML101720589, Item TVA Letter dated 163 7.2 7.2

(

G Deleted by DORL Date:

155. Y Closed Closed ML101720589, Item 164 7.2 7.2 a

r g

l FSAR section 7.2.2.2(20) has been revised to include the plant Responder: Perkins 156. Y Closed Closed ML101720589, Item TVA Letter dated Item No. 8 sent to DORL 165 7.2 7.2

(

G FSAR section 7.2.2.3.2, last paragraph of this section has been Responder: Clark 157. Y Closed Closed ML101720589, Item TVA Letter dated 166 7.2 7.2

(

G Changes to FSAR section 7.2.2.2(20) are justified based on the Responder: Clark 158. Y Closed Closed ML101720589, Item TVA Letter dated 167 7.2 7.2

(

G FSAR section 7.2.2.4, provide an analysis or reference to chapter Responder: Clark 159. Y Close Closed ML101720589, Item TVA Letter dated 168 7.2 7.2

(

G FSAR table 7.2-4, item 9 deleted loss of offsite power to station Responder: Clark 160. Y Close Closed ML101720589, Item TVA Letter dated 169

(

G 6/18/2010 Responder: Clark 161. Y Closed Closed 170

(

G 6/17/2010 Responder: Clark 162. Y Closed Closed 171 7.2 7.2

(

G 6/17/2010 Responder: Craig 163. Y Closed Closed EICB RAI TVA Letter dated Closed to SE Open Item 172

(

G 6/17/2010 Responder: Craig 164. Y Closed Closed EICB RAI 173 7.1 7.1

(

G 6/17/2010 Responder: Craig/Webb/Powers 165. Y Closed Closed EICB RAI 174

(

G 6/28/2010 Responder: Hilmes/Craig 166. Y Closed Closed EICB RAI 175

(

G June 28, 2010 Responder:

167. Y Closed Closed EICB RAI 176 7.1 7.1

(

G 6/28/2010 Responder: Craig/Webb 168. Y Closed Closed EICB RAI 177 7.5.2.

7.5.1

(

M a

7/15/2010 Responder: Clark 169. Y Closed Closed N/A TVA Letter dated RAI not required 178 7.5.2.

7.5.1

(

M a

7/15/2010 Responder: Clark 170. Y Closed Closed N/A TVA Letter dated RAI not required 179

(

C An emphasis is placed on traceability in System Requirements Responder: WEC 171. Y Closed Closed N/A - Closed to NA 180

(

C The SRP, BTP 7-14, Section B.3.3.1 states that Regulatory Guide Responder: WEC 172. Y Closed Closed N/A - Closed to NA

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 181

(

C An emphasis is placed on traceability in System Requirements Responder: WEC 173. Y Closed Closed N/A - Closed to NA 182

(

C Characteristics that the SRP states that a Software Requirements Responder: WEC 174. Y Closed Closed N/A - Closed to NA 184

(

C 7/15/2010 Responder: WEC 175. Y Closed Closed N/A - Closed to N/A 186 7.7.8 7.7.1.12

(

D a

7/15/2010 Responder: Perkins/Clark 176. Y Closed Closed EICB RAI No.6 TVA Letter dated 187

(

C By letter dated June 18, 2010, TVA docketed responses to NRC Responder: Merten 177. N Closed Closed ML101970033, Item TVA Letter dated Are these connections already 188

(

C By letter dated June 30, 2010, TVA docketed, Tennessee Valley Responder: Clark 178. Y Closed Closed ML101970033, Item TVA Letter dated 189 7.6.7

(

S i

7/20/2010 Responder: Clark 179. Y Closed Closed RAI No. 3 TVA Letter dated 190 7.9

(

S i

FSAR Table 7.1-1 states: Regulatory Guide 1.133, May 1981 Responder: Clark 180. Y Closed Closed RAI No. 4 TVA Letter dated Closed to OI-331.

191 7.9

(

C NUREG-0800 Chapter 7, Section 7.9, "Data Communication Responder: Jimmie Perkins 181. Y Closed Closed ML10197016, Item TVA Letter dated 192 7.5.1.

7.5.2

(

M a

The NRC Staff is using SRP (NUREG-0800) Chapter 7 Section Responder: Clark 182. Y Closed Closed Item No. 1 sent to TVA Letter dated EICB RAI ML1028618855 sent to 193 7.5.1.

7.5.2

(

M a

The WBU2 FSAR, Section 7.5.2, Plant Computer System, Responder: Clark 183. Y Closed Closed Item No. 2 sent to TVA Letter dated EICB RAI ML1028618855 sent to 194 7.5.1.

7.5.2.1

(

M a

The WBU2 FSAR Section 7.5.2.1, Safety Parameter Display Responder: Costley/Norman 184. Y Closed Closed Item No. 3 sent to TVA Letter dated EICB RAI ML1028618855 sent to 195 7.5.1.

7.5.2.2

(

M a

Bypassed and Inoperable Status Indication (BISI)

Responder: Costley/Norman 185. Y Closed Closed Item No. 4 sent to TVA Letter dated EICB RAI ML1028618855 sent to 196 7.5.1.

7.5.2.2

(

M a

Bypassed and Inoperable Status Indication (BISI)

Responder: Costley/Norman 186. Y Closed Closed Item No. 5 sent to TVA Letter dated EICB RAI ML1028618855 sent to 197 X

Open Item 197 was never issued.

187. Y Closed Closed 198 7.5.1.

7.5.2.2

(

M a

SRP Section 7.5, Subsection III, Review Procedures states:

Responder: Costley/Norman 188. Y Closed Closed Item No. 6 sent to TVA Letter dated EICB RAI ML1028618855 sent to 199 7.5.1.

7.5.2.3

(

M a

The WBU2 FSAR Section 7.5.2.3, Technical Support Center and Responder: Costley/Norman 189. Y Closed Closed Item No. 7 sent to TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200 7.2 7/21/2010 Responder: Clark 190. Y Closed Closed EICB RAI TVA Letter dated 201 7.7.1.

7.7.11

(

C 7/21/2010 Responder: Webb 191. Y Closed Closed EICB RAI TVA Letter dated 203 7.5.1.

7.5.2

(

M a

7/26/2010 Responder: Clark 192. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 204 7.5.1.

7.5.2

(

M a

7/26/2010 Responder: Costley/Norman 193. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 205

(

G 7/26/2010 Responder: Clark 194. Y Closed Closed EICB RAI TVA Letter dated Question B related to prior NRC 206 7.5.1.

7.5.2

(

M a

7/27/2010 Responder: Clark 195. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 207

(

C July 27, 2010 Date:

196. Y Closed Closed 208 7.5.2.

7.5.1

(

M a

7/27/2010 Responder: Clark 197. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 209 7.5.2.

7.5.1

(

M a

7/27/2010 Responder: Clark 198. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 210 7.5.2.

7.5.1

(

M a

7/27/2010 Responder: Clark 199. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 211 7.5.1.

(

C 7/27/2010 Responder: Clark 200. Y Closed Closed EICB RAI TVA Letter dated Relates to SE Sections:

214

(

C 7/27/2010 Responder: WEC 201. Y Closed Closed EICB RAI TVA Letter dated 215

(

P 7/29/2010 Responder: WEC 202. Y Closed Closed 216 7.5.1.

7.5.2

(

M a

7/29/2010 Responder: Clark 203. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 217

(

G 7/6/2010 Responder: Clark 204. Y Close Closed EICB RAI TVA Letter dated 218

(

G 7/6/2010 Responder: Clark 205. Y Closed Closed EICB RAI TVA Letter dated 219

(

G 8/4/2010 Responder: TVA Licensing 206. Y Closed Closed EICB RAI 220

(

G 8/4/2010 Responder: Ayala 207. Y Closed Closed EICB RAI TVA Letter dated 221 7.7.1.

7.7.1.3

(

M a

8/4/2010 Responder: Trelease 208. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 222

(

G 8/4/2010 Responder: Clark 209. Y Close Closed EICB RAI TVA Letter dated 223

(

G 8/4/2010 Responder: Clark 210. Y Closed Closed EICB RAI 224 7.5.1.

7.5.2

(

M a

8/4/2010 Responder: Norman (TVA CEG) 211. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 225

(

G 8/4/2010 Responder: Scansen 212. Y Close Closed EICB RAI TVA Letter dated 226

(

C 8/4/2010 Responder: TVA Licensing 213. Y Closed Closed N/A - Information TVA Letter dated See also Open Item Nos. 41 & 270.

227

(

G 8/4/2010 Responder: Clark 214. Y Close Closed EICB RAI TVA Letter dated 228

(

C 8/4/2010 Responder: Clark 215. Y Closed Closed EICB RAI TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 229

(

C 8/4/2010 Responder: Clark 216. Y Closed Closed EICB RAI TVA Letter dated 230

(

C 8/4/2010 Responder: Webb 217. Y Closed Closed EICB RAI TVA Letter dated 231

(

G 8/4/2010 Responder: Clark 218. Y Closed Closed EICB RAI TVA Letter dated 232

(

S i

8/4/2010 Responder: Clark 219. Y Closed Closed RAI No. 5 TVA Letter dated 233

(

C 8/4/2010 Responder: Clark 220. Y Closed Closed EICB RAI TVA Letter dated 234

(

C 8/4/2010 Responder:

221. Y Closed Closed N/A - Duplicate N/A 235

(

G 8/4/2010 Responder: TVA Licensing 222. Y Closed Closed N/A N/A 236

(

G 8/4/2010 Responder: Clark 223. Y Close Closed EICB RAI TVA Letter dated 237

(

C 8/4/2010 Responder: Clark 224. Y Closed Closed EICB RAI TVA Letter dated 238

(

C 8/4/2010 Responder: Webb/Hilmes 225. Y Closed Closed N/A - Duplicate N/A 239

(

C 8/4/2010 Responder: Hilmes 226. Y Closed Closed N/A - Meeting N/A 240

(

G 8/4/2010 Responder: Clark 227. Y Close Closed Ml102910008 TVA Letter dated 241

(

S i

8/4/2010 Responder: Davies 228. Y Closed Closed RAI No. 10 TVA Letter dated 242

(

G 8/4/2010 Responder: Hilmes 229. Y Close Closed EICB RAI TVA Letter dated 243

(

C 8/3/2010 Responder: WEC 230. Y Closed Closed N/A - Closed to N/A 247

(

C 8/8/2010 Responder: WEC 231. Y Closed Closed EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4, 248

(

C 8/8/2010 Responder: WEC 232. Y Closed Closed Response is LIC-101 Rev. 3 Appendix B Section 4, 249

(

C 8/8/2010 Responder: WEC 233. Y Closed Closed LIC-101 Rev. 3 Appendix B Section 4, 253

(

C 8/8/2010 Responder: Clark 234. Y Closed Closed TVA Letter dated Related to Open Item no. 83.

254

(

C 8/10/2010 Responder: WEC 235. Y Closed Closed N/A - Request to TVA Letter dated 255

(

C 8/10/2010 Responder: WEC 236. Y Closed Closed N/A - Request to TVA Letter dated 256

(

C 8/10/2010 Responder: WEC 237. Y Closed Closed N/A - Request to TVA Letter dated 257

(

C 8/10/2010 Responder: WEC 238. Y Closed Closed N/A - Request to N/A 258

(

C 8/10/2010 Responder: WEC 239. Y Closed Closed N/A - Request to N/A 259

(

C 8/10/2010 Responder: WEC 240. Y Closed Closed N/A - Request to TVA Letter dated 260

(

C 8/10/2010 Responder: WEC 241. Y Closed Closed N/A - Request to N/A 261

(

C 8/10/2010 Responder: WEC 242. Y Closed Closed N/A - Closed to TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:

262

(

C 8/10/2010 Responder: WEC 243. Y Closed Closed N/A - Request to N/A 263

(

C 8/11/2010 Responder: WEC 244. Y Closed Closed ML101650255, Item 264

(

C 8/11/2010 Responder: WEC 245. Y Closed Closed ML101650255, Item 265

(

C 8/11/2010 Responder: WEC 246. Y Closed Closed ML101650255, Item 266

(

C 8/11/2010 Responder: Webb/Webber 247. Y Closed Closed TVA Letter dated 267

(

C 8/11/2010 Responder: WEC 248. Y Closed Closed 268

(

C 8/19/2010 Responder: WEC 249. N Closed Closed 269

(

P 8/20/2010 Responder: NRC 250. Y Closed Closed N/A N/A 270

(

C 8/23/2010 Responder: Clark 251. Y Closed Closed See also Open Item Nod. 41 & 245.

271

(

C 8/23/2010 Responder: WEC 252. Y Closed Closed N/A - Closed to NA 272 7.5.2.

7.5.1

(

M a

8/26/2010 Responder: Clark 253. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 273 7.5.2.

7.5.1

(

M a

8/26/2010 Responder: Clark 254. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 274.

7.5.2.

7.5.1

(

M a

8/26/2010 Responder: Clark 255. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 274.

(

S i

8/26/2010 Responder: Stockton 256. Y Closed Closed RAI No. 6 TVA Letter dated 275

(

S i

8/27/2010 Responder: Clark 257. Y Closed Closed Not Required N/A 276 7.6 7.6

(

G 8/27/2010 Responder: Webb 258. Y Closed Closed EICB RAI TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 277 7.6 7.6.3

(

G 8/27/2010 Responder: Clark 259. Y Close Closed EICB RAI TVA Letter dated 278 7.6 7.6.6

(

G 8/27/2010 Responder: Trelease 260. Y Close Closed EICB RAI TVA Letter dated 279 7.6 7.6.6

(

G 8/27/2010 Responder: Mather 261. Y Close Closed EICB RAI TVA Letter dated 280 7.6 7.6.6

(

G 8/27/2010 Responder: Trelease 262. Y Closed Closed EICB RAI TVA Letter dated 281 7.6 7.6.8

(

G 8/27/2010 Responder: Webb 263.

Closed Closed EICB RAI TVA Letter dated 282 7.6 7.6.9

(

G 8/27/2010 Responder: Trelease 264. Y Close Closed EICB RAI TVA Letter dated 283 7.7.5 XX

(

D a

8/27/2010 Responder: Clark 265. Y Closed Closed EICB RAI No.13 TVA Letter dated This item is a follow-up question to item 284 7.7.3 7.4.1

(

D a

8/27/2010 Responder: Webber 266. Y Closed Closed EICB RAI No.14 TVA Letter dated This item is a follow-up question to item 285 7.3.3 7.3

(

D a

8/27/2010 Responder: McNeil 267. Y Closed Closed EICB RAI No.15 TVA Letter dated This item is a follow-up question to item 286 7.7.3 9.3.4.2.4

(

D a

8/27/2010 Responder: Webber 268. Y Closed Closed EICB RAI No.16 TVA Letter dated 287 7.3 7.3-1

(

D a

8/27/2010 Responder: Elton 269. Y Closed Closed ML102390538, Item Response 288 7.3

(

G 9/2/2010 Responder: McNeil 270. Y Closed Closed EICB RAI 289

(

S i

9/2/2010 Responder: Faulkner 271. Y Closed Closed RAI No. 24 TVA Letter dated 290 7.7

(

C 9/7/2010 Responder: Clark 272. Y Closed Closed N/A N/A This item is a duplicate of item 291.

291 7.7

(

C 9/7/2010 Responder: Clark 273. Y Closed Closed TVA Letter dated 292 7.2.5 7.2

(

G 9/7/2010 Responder: Craig 274. Y Closed Closed EICB RAI TVA Letter dated 293 7.7.4 7.2.2.3.5

(

M a

9/8/2010 Responder: Craig 275. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 294 7.3 7.3.1.1.1

(

D a

9/9/2010 Responder: Elton 276. Y Closed Closed ML102390538, Item Response 295 7.3 7.3.1.1.2

(

D a

9/9/2010 Responder: Elton 277. Y Closed Closed ML102390538, Item Response 296 7.3 7.3.1.2.1

(

D a

9/9/2010 Responder: Elton 278. Y Closed Closed ML102390538, Item Response 297 7.3 7.3.1.2.2

(

D a

9/9/2010 Responder: Elton 279. Y Closed Closed ML102390538, Item Response 298 7.3 XX

(

D a

9/9/2010 Responder: Clark 280. Y Closed Closed ML102390538, Item Response 299

(

C Provide Common Q Software Requirements Specification Post 1 of the 10/5 letter contains the Common Q 281. Y Closed Closed TVA Letter dated 300

(

S i

Need Radiation Monitoring System Description/Design Criteria Responder: Temples/Mather 282. Y Closed Closed RAI No. 25 TVA Letter 301

(

S i

1.TVA is requested to address the consequences of software Responder: WEC/Davies/Clark 283. Y Closed Closed RAI No. 11 TVA Letter dated Note 1:

302 7.5.2.

7.5.1

(

M a

09/17/2010 Responder: Tindell 284. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 303 7.5.2.

7.5.1

(

M a

09/17/2010 Responder: Tindell 285. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 304 7.5.2.

7.5.1

(

M a

09/17/2010 Responder: Tindell 286. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 305 7.5.2.

7.5.1

(

M a

09/17/2010 Responder: Tindell 287. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 306 7.1 7.1

(

G FSAR amendment 100, page 7.1-12 provides the definition of Responder: Hilmes 288. Y Closed Closed EICB RAI TVA Letter dated 307 7.1 7.1

(

G (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of Responder: Hilmes 289. Y Closed Closed EICB RAI TVA Letter dated 308 7.1 7.1

(

G (1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of Responder: Hilmes 290. Y Closed Closed EICB RAI TVA Letter dated 309 7.1 7.1.2.1.9

(

G (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint Responder: Hilmes 291. Y Closed Closed EICB RAI TVA Letter dated 310 7.1 7.1.2.1.9

(

G (1) FSAR amendment 100, Page 7.1-14, TVA setpoint Responder: Hilmes 292. Y Closed Closed EICB RAI TVA Letter dated 311 7.1 7.1

(

G Both Westinghouse and TVA setpoint methodology do not have Responder: Hilmes 293. Y Closed Closed EICB RAI TVA Letter dated 312 7.0

(

G By letter dated September 10,2010, TVA provided the summary Responder: Stockton 294. Y Close Closed EICB RAI TVA Letter dated 313 7.7.8 7.7.1.12

(

D a

EDCR 52408 (installation of AMSAC in Unit 2) states that Design Responder: Ayala 295. Y Closed Closed EICB RAI No.18 TVA Letter dated 314 7.3 7.3

(

D a

The following 50.59 changes were listed in the March 12 RAI Responder: Stockton 296. Y Closed Closed EICB RAI No. 19 TVA Letter dated Related to OI 10 315 7.5.3 7.5.3

(

G IE Bulletin 79-27 required that emergency operating procedures to Responder: S. Smith (TVA Operations) 297. Y Close Closed EICB RAI TVA Letter dated 316 7.5.2.

7.5

(

S i

TVA has provided various documents in support of RM-1000 high Responder: Temples/Mather 298. Y Closed Closed RAI No. 26 317 7.5.2.

7.5

(

S i

TVA has provided a proprietary and a non-proprietary version of Responder: Temples 299. Y Closed Closed RAI No. 27 TVA Letter dated 319 7.5.2.

7.5

(

S i

TVA provided System Verification Test Results 04507007-1TR Responder: Temples 300. Y Closed Closed RAI No. 29 TVA Letter dated 320 E

I Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY Responder: Clark 301. Y Closed Closed N/A N/A Duplicate of item 156

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 321 E

I For the purposes of measuring reactor coolant flow for Reactor Responder: Clark 302. Y Closed Closed N/A N/A Duplicate of OI# 157 322 7.7.1.11

(

C Section 7.7.1.11 will be added to FSAR Amendment 101 to provide Responder: Clark 303. Y Closed Closed 324

(

M a

Per the NRC reviewer, the BISI calculation is not required to be 304. Y Closed Closed 325 B

(

G The Unit 2 loops in service for Unit 1 that are scheduled to be Responder: TVA Startup Olson 305. Y Closed Closed Closed to open item ?

326 B

(

G TVA uses double-sided methodology for as-found and as-left Responder: Webb 306. Y Closed Closed TVA Letter dated 328 7.5.2.

7.5

(

S i

Provide the model number for the four containment high range Responder: Temples 307. Y Closed Closed RAI No. 30 TVA Letter dated 329 7.6.1 7.6.7

(

S i

Section 7.6.7 of the FSAR (Amendment 100) states that, The Responder: Clark 308. Y Closed Closed RAI No. 1 TVA Letter dated 330 7.3 7.3

(

D a

Related to Item 298 Responder: Hilmes/Faulkner 309. Y Closed Closed EICB RAI No.20 Item 7, TVA letter 331 7.6.1 7.6.7

(

S i

As a follow up of OI 190, Staff has reviewed the proprietary version Responder: WEC/Harless/Clark 310. Y Closed Closed RAI No. 8 TVA Letter dated Follow-up of OI-190.

332 7.5.2.

7.5.1

(

M a

10/26/2010 311. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL 333 7.5.2.

7.5.1

(

M a

10/27/2010 312. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL 334 7

7

(

D a

FSAR Figure 7A-3 Mechanical Flow and Control Diagram Responder: Stockton 313. Y Closed Closed RAI not required.

N/A RAI not required because the figure is 335 7.6.1 7.6.7

(

S i

LPMS: Reference to OI-331, sub item 2.

Responder: WEC 314. Y Closed Closed RAI# 1, EICB letter TVA letter, dated We need to confirm when MEEB when 336 7.5.2.

7.5

(

S i

Re: RM-1000 Report 04508905-QR Responder: GA 315. Y Closed Closed 337 7.5.2.

7.5

(

S i

Re: RM-1000 Report 04508905-QR Responder: GA 316. Y Closed Closed 338 7.5.2.

7.5

(

S i

In page 3-15 and appendix B of Qualification Test Report 04508905-QR, Qualification Test Report for RM-1000 317. Y Closed Closed RAI #4 letter dated FSAR amend 103 Note: Item to be added to Section 3.10 339 7.5.2.

7.5

(

S i

In the Qualification Test Report 04508905-QR, the licensee As agreed to with the reviewer, Attachment 1 contains the 318. Y Closed Closed RAI #5 letter dated FSAR amend 103 Note: Item to be added to Section 3.10 341 7.5.2.

7.5

(

S i

FSAR Tables 3.10 list seismically qualified equipment. However, A review of WBN Unit 2 FSAR amendment 102 chapters 319. Y Closed Closed RAI #1 letter dated FSAR amend 103 342 7.5.2.

7.5

(

S i

Please confirm that RM-1000 monitors and the associated The RM-1000 containment high range radiation monitors are 320. Y Closed Closed 343 7.5.2.

7.5

(

S i

Seismic RRS in the 04508905-QR report Figures 3-2 and 3-3 (1) The cause of the difference between the RRS and TRS 321. Y Closed Closed 344 7.6.6

?

g

(

G Unit 1 SE discussed in Section 7.6.5, Valve Power Lockout.

(a) In accordance with0PDP-6, Locked Valve/Breaker 322. Y Close Closed Close based on TVA letter dated 345 7.5.2.

7.5

(

S i

Provide the normal temperatures and expected periods of high/low RM-1000 in a NIM Bin was Tested at 39°F for 72 Hrs and 323. Y Closed Closed

Response

347 7.5.2.

7.5

(

S i

Qualification report 04508905-1SP does not address EMI/RFI Qualification report 04038903-7SP, Qualification Basis for 324. Y Closed Closed 348 7.5.2.

7.5

(

S i

Qualification report 04508905-2SP does not address EMI/RFI Qualification report 04038903-7SP, Qualification Basis for 325. Y Closed Closed 350 7.5.2.

7.5

(

S i

The seismic required response spectra (RRS) is shown in Figures The RM-1000 was seismically tested in a NIM Bin and the 326. Y Closed Closed RAI # 9, letter FSAR amend 103 Note: Item to be added to Section 3.10 351 7.5.2.

7.5

(

S i

The replacement schedule for the components that have a The replacement schedules stated in 04508905-1SP, 327. Y Closed Closed 352 7.5.2.

7.5

(

S i

Please clarify how many RM-1000 radiation monitors are being The total number of RM-1000 units procured under MR 328. Y Closed Closed 354 7.5.2.

7.5

(

S i

RG 1.180 endorsed the guidance of IEEE-1050-1996 with (1) The WBN Unit 2 grounding system design is in 329. Y Closed Closed The grounding specification used by 356 7.5.2.

7.5

(

S i

The attachment number refers to your February 25, 2011 letter.

The loss of the RM-3 output (current to frequency (I/F) 330. Y Closed Closed Closed by TVA 041 7.5.2 7.5.1 EICB (Carte) 2/19/2010 Please provide the following Westinghouse documents:

(1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements Specification" (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design Specification" (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" Please provide the following Westinghouse documents or pointers to where the material was reviewed and approved in the CQ TR or SPM:

(4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test Procedure" Responder: WEC Items (1) and (2) were docketed by TVA letter dated April 8, 2010.

Item (3) will be addressed by Revision 2 of the Licensing Technical Report. Due 12/3/10 Item (4) will be addressed by Westinghouse developing a WBN2 Specific Test Plan to compensate for the fact that the NRC disapproved WNA-PT-00058-GEN during the original Common Q review. Due 12/7/10 Item (5) Procedures that are listed in the SPM compliance table in the Licensing Technical Report revision 1 supersede that test procedure WNA-TP-00357-GEN.Due 10/22/10 For Item 3, Attachment 19 contains the Westinghouse

1.

N Open Pending Submittal of the Test Summary Report due 3/29/11 Final Response included in letter dated 12/3/10 Partial Response is included in letter dated 10/5/10.

The SysRS and SRS incorporate requirements from many other documents by reference.

NNC 8/25/10: (3) An earlier version of this report was docketed for the Common Q Open-NRC Review Due 3/29/11 NNC 1/27/11: Issues with the STP were discussed in the weekly public meetings.

Westinghouse to:

(1) perfrom STP self assessment., and (2) Augment Test Summary report to provide missing test plan information NNC 2/3/11: At next audit compare &

NRC Meeting Summary NRC Meeting Summary ML093560019, Item No. 11 TVA Letter dated 6/18/10 TVA Letter dated 10/5/10 See also Open Item Nos. 226 & 270.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments document Post-Accident Monitoring System (PAMS)

Licensing Technical Report, WNA-LI-00058-WBT, Revision 2, dated December 2010. Attachment 20 contains the Westinghouse Application for Withholding for the Post-Accident Monitoring System (PAMS) Licensing Technical Report, WNA-LI-00058-WBT, Revision 2, dated December 2010.

For Item 4, Attachment 9 contains the Westinghouse document Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.

TVA Response to Follow-up NRC Request:

(1) WEC presented the results of the self assessment to the NRC on February 2, 2011.

(2) By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with the STP. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.

topical report; therefore, there should be no problem to docket this version. (4) Per ML091560352, the testing process document does not address the test plan requirements of the SPM.

Please provide a test plan that implements the requirements of the SPM.

discuss:

(1) WNA-PT-00058-GEN Rev. 0 (2) WNA-PT-00138-WBT Rev. 0 (3) AP1000 STP 043 7.5.2 7.5.1 EICB (Carte) 2/19/2010 The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information needed. The shortcomings of the first three lines in the matrix are:

Line 1: Section 11 of the Common Q topical report did include a commercial grade dedication program, but this program was not approved in the associated SE. Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that TVA should identified what they believe was previously reviewed and approved.

Line 2: TVA stated the D3 analysis was not applicable to PAMS, but provided no justification. The NRC asked for justification since SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as being SRP acceptance criteria for PAMS.

Line 3: TVA identified that the Design report for computer integrity was completed as part of the common Q topical report. The NRC noted that this report is applicable for a system in a plant, and the CQ topical report did no specifically address this PAMS system at Watts Bar Unit 2.

NRC then concluded that TVA should go through and provide a Responder: WEC Date: 5/25/10 The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information needed.

By letter dated April 8, 2010 TVA provided the PAMS Licensing Technical Report provided additional information.

contains the revised Common Q PAMS ISG-6 Compliance Matrix, dated June 11, 2010, that addresses these items (Reference 13).

By letter Dated June 18, 2010 (see Attachment 3) TVA provided a table, "Watts Bar 2 - Common Q PAMS ISG-6 Compliance Matrix."

It is TVAs understanding that this comment is focused on the fact that there are documents that NRC has requested that are currently listed as being available for audit at the Westinghouse offices. For those Common Q PAMS documents that are TVA deliverable documents from Westinghouse, TVA has agreed to provide those to NRC.

Westinghouse documents that are not deliverable to TVA will

2.

N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Revised response included in letter dated 12/22/10.

Response is included in letter dated 10/5/10.

Revised compliance matrix is unacceptable.

NNC 8/12/10: It is not quite enough to provide all of the documents requested. There are two possible routes to review that the NRC can undertake: (1) follow ISG6, and (2) follow the CQ SPM. The TVA response that was originally pursued was to follow ISG6, but some of the Open-NRC Review Due 3/29/11 NNC 2/2/11: Issues with Common Q TR &

SPM compliance were discussed in the weekly public meetings.

Westinghouse to perform Common Q TR

& SPM compliance self assessment; his will be discussed in detail on the next audit.

EICB RAI ML102910002 Item No. 2 TVA Letter dated 2/5/10 TVA Letter dated 5/12/10 TVA Letter dated 6/18/10 TVA Letter dated 10/5/10 NNC 8/25/10: A CQ PAMS ISG6 compliance matrix was docketed on: (1)

February, 5 12010, (2) March 12, 2010,

& (3) June 18, 2010. The staff has expressed issued with all of these compliance evaluations. The staff is still waiting for a good compliance evaluation.

NNC 11/23/10: WNA-LI-00058-WT-P Rev. 1 Section 7 does not include the RSED documents, and it should. Table 6-1 Item No. 15 should also include the RSED RTMs.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments more complete and thorough compliance matrix.

be available for audit as stated above. Requirements Traceability Matrix issues will be tracked under NRC RAI Matrix Items 142 (Software Requirements Specification) and 145 (System Design Specification). Commercial Item Dedication issues will be tracked under NRC RAI Matrix Item 138. This item is considered closed.

TVA Response to Follow-up NRC Request:

WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:

(1) While RSEDs are not specifically mentioned, Section 7 has been revised to be applicable to both hardware and software which includes the RSEDs.

(2) Table 6-1 item 15 reference added for WNA-VR-00280-WBT (RESD)

TVA Response to Second Follow-up NRC Request:

The NRC audited the Westinghouse commercial item dedication process for both hardware and software during the week of February 28 to March 4, 2011. The audif found the processes acceptable. Westinghouse and TVA previously agreed to provide additional information to address this item in Revision 3 of the Licensing Technical Report.

contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary). contains WNA-LI-00058-WBT-NP, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3 dated March 2011 (non-proprietary). contains CWA-11-311, Application for Withholding Proprietary Information from Public Disclosure, WNA-LI-00058-WBT-P, Revision 3 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post-Accident Monitoring System (PAMS) Licensing Technical Report, dated March 14, 2011.

compliance items for ISG6 were addressed by referencing the SPM. The NRC approved the CQ TR and associated SPM; it may be more appropriate to review the WBN2 PAMS application to for adherence to the SPM that to ISG6. In either path chosen, the applicant should provide documents and a justification for the acceptability of any deviation from the path chosen. For example, it appears that the Westinghouse's CDIs are commercial grade dedication plans, but Westinghouse maintains that they are commercial grade dedication reports; this apparent deviation should be justified or explained.

067 7.5.2 7.5.1 EICB (Carte)

By letter dated March 12, 2010 TVA stated that the target submittal date for the "Commercial Grade Dedication Instructions for AI687, AI688, Upgraded PC node box and flat panels." was September 28, 2010.

Responder: WEC Date: 5/25/10 The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:

a. AI687, AI688 - Scheduled for September 28, 2010
b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), these items are available for audit at the Westinghouse Rockville office.
c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
3.

N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Response included in letter dated 12/22/10.

This item is addressed in Rev. 2 of the Licensing Technical Report Open-NRC Review Due: 3/29/11 NNC 2/2/11: Section 7 of the WBN2 PAMS LTR should be updated to include:

(1) non-proprietary description of commercial grade dedication, and (2) Software example Commercial grade N/A - No question was asked. Item was opened to track comm8ittment made by applicant.

TVA Letter dated 6/18/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments To be addressed during 9/20-9/21 audit TVA Response to Follow-up NRC Request:

WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:

Section 7, Commercial Grade Dedication Process, has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.

TVA Response to Follow-up NRC Request dated 2/2/11:

The non-proprietary commercial grade dedication discussion is included in Attachment 3, WNA-LI-00058-WBT-NP, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3 dated March 2011 (non-proprietary)

Section 7. The software example is included in Attachment 2, WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary) Section 7.

dedication will also be addressed at the next audit.

068 7.5.2 7.5.1 EICB (Carte)

By letter dated March 12, 2010 TVA stated that the target submittal date for the "Summary Report on acceptance of AI687, AI688, Upgraded PC node box, flat panels, and power supplies." was September 28, 2010.

Responder: WEC Date: 5/25/10 The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:

a. AI687, AI688 - Scheduled for September 28, 2010
b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit TVA Response to Follow-up NRC Request:

For the commercial grade dedication process, please see the response to Request for Additional Information (RAI) item 3 in this letter, NRC Matrix Item 067.

The component level EQ/Seismic summary reports for the hardware listed above are available for NRC review/audit as described below:

4.

N Open Response included in letter dated 12/22/10.

This item is addressed in Rev. 2 of the Licensing Technical Report Open-NRC Review NNC 2/2/11:

Commercial grade dedication will be addressed at the next audit. Summary reports for AI687 &

AI688 were docketed one month late.

N/A - No question was asked. Item was opened to track comm8ittment made by applicant.

TVA Letter dated 6/18/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (1) AI687 and AI688, the following documents were submitted in TVA Letter to NRC dated October 26, 2010, Watts Bar Nuclear Plant (WBN) Unit 2 -

Instrumentation and Controls Staff Information Requests, (Reference 5):

a.

EQ-EV-62-WBT, Revision 0, Common Q PAMS Comparison of Tested Conditions for the AI687 and AI688 Common Q Modules and Supporting Components to the Watts Bar Unit 2 (WBT)

Requirements, dated September 10, 2010

b.

EQLR-171, Revision 0, Environmental and Seismic Test Report, Analog Input (AI)687 &

AI688 Modules for use in Common Q PAMS, dated September 10, 2010

c.

CN-EQT-10-44, Revision 0, Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS), dated September 28, 2010 (2) Upgraded PC Node Box - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:

a.

CDI-3722, Revision 7, Next Generation PC Node Box Commercial Dedication Instruction

b.

LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (3) Flat Panel Displays - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office, (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:

a.

CDI-3803, Revision 8, Next Generation Flat Panel Display (FPD) Commercial Dedication Instruction

b.

LTR-EQ-10-50 PC Node Box/Flat Panel Display System Components Qualification Summary (4) Power supplies - As stated in Westinghouse letter WBT-D-2035 dated June 11, 2010 NRC Access to Common Q Documents at the Westinghouse Rockville Office (Reference 7), the following documents are available for NRC audit at the Westinghouse Rockville office:

a.

CDI-4057, Revision 4, Commercial Dedication Instruction

b.

EQ-TP-1 05-GEN, Revision 0, Electromagnetic Compatibility Test Plan and Procedure for Quint Power Supplies and Safety System Line Filter

c.

Breakers, EQ-TP-114-GEN, Revision 0, Seismic Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, Line Filter Assemblies, and South Texas Units 3 & 4 Circuit

d.

EQ-TP-117-GEN, Revision 0, Environmental Qualification Test Procedure For Common Q Powe Supplies, Quint Power Supplies, and Line Filter

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Assemblies 069 7.5.2 7.5.1 EICB (Carte)

By letter dated March 12, 2010 TVA stated that the target submittal date for the "Watts Bar 2 PAMS Specific FAT Report" was October 2010.

As agreed, the Watts Bar 2 PAMS Specific FAT Report will not be submitted. Instead a non-proprietary PAMS Test Summary Report will be submitted.

Responder: WEC Date: 5/25/10 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.

5.

N Open Pending Submittal of the Test Summary Report due 3/29/11 Awaiting for document to be docketed by TVA.

Open-NRC Review Due 3/29/11 NNC 2/3/11: The current due dated above is 4 months later than planned.

N/A - No question was asked. Item was opened to track comm8ittment made by applicant.

N/A 074 7.5.2 7.5.1 EICB (Carte)

By letter dated March 12, 2010 TVA stated that the target submittal date for the Post FAT IV&V Phase Summary Report was November 30, 2010.

Responder: WEC Date: 5/25/10 contains WNA-VR-00283-WBT-P, IV&V Summary Report for the Post Accident Monitoring System, Revision 4, dated March 2011 (proprietary). Attachment 2 contains WNA-VR-00283-WBT-NP, IV&V Summary Report for the Post Accident Monitoring System, Revision 4, dated March 2011 (non-proprietary). Attachment 3 contains CWA-11-3121, Application for Withholding Proprietary Information from Public Disclosure, WNA-VR-00283-WBT-P, Revision 4 Nuclear Automation IV&V Summary Report for the Post Accident Monitoring System" (Proprietary), dated March 3, 2011.

6.

N Open Response in letter dated March 16, 2011 Open-NRC Review Due TBD NNC 2/3/11: At least 3 months later than planned.

N/A - No question was asked. Item was opened to track commitment made by applicant.

N/A Rev. 4 will be available for the NRC audit on 2/28/11. This document will not be submitted. Rev. 5 will be submitted after resolution of the datastorm display issue.

081 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.

0, Dated April 2010), in Section 7, lists codes and standards applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:

(1) RG 1.29 - September 1978 vs. March 2007 (2) RG 1.53 - June 1973 vs. November 2003 (a) IEEE 379-1994 vs. -2000 (3) RG 1.75 - September 1975 vs. February 2005 (a) IEEE 384-1992 vs. -1992 (4) RG 1.100 - June 1988 vs. September 2009 (a) IEEE 344-1987 vs. -2004 (5) RG 1.152 - January 1996 vs. January 2006 (a) IEEE 7-4.33.2-1993 vs. -2003 (6) RG 1.168 - September 1997 vs. February 2004 (a) IEEE 1012-1986 vs. -1998 (b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 endorses 323-1974)

However, LIC-110, "Watts Bar Unit 2 License Application Review,"

states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions." Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences.

Responder: Merten/WEC The codes and standards documents listed in Section 7 of the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the codes and standards on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.

Bechtel to develop a matrix and work with Westinghouse to provide justification.

TVA Response to Follow-up NRC Request:

contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common Q PAMS design meets the applicable requirements and is acceptable.

7.

N Open ML101600092 Item No.1: There are three sets of regulatory criteria that relate to a Common Q application (e.g. WBN2 PAMS):

(a) Common Q platform components - Common Q TR (b) Application Development Processes - Common Q SPM (c) Application Specific - current regulatory criteria The Common Q Topical Report and associated appendices primarily addressed (a) and (b).

The Common Q SER states:

Appendix 1, Post Accident Monitoring Systems, provides the functional requirements and conceptual design approach for upgrading an existing PAMS based on Common Q components (page 58, Section 4.4.1.1, Description)On the basis of the above review, the staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)

The NRC did not approve the Open-NRC Review Due 2/25/11 TVA to provide requested information.

NNC 2/3/11: The above due date has been missed by at least 2 months.

Please provide new due date.

EICB RAI ML102910002 Item No. 9 TVA Letter dated 6/18/10 NNC 1/5/11: See Also Open Item No.

86 and 202.

NNC 4/125/2011: See Open Item No.

364.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments proposed PAMS design.

Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.

Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design. For example IEEE Std.

603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other Systems, contain application specific requirements that must be addressed by a PAMS system.

Awaiting TVA Response.

086 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.

0, Dated April 2010), in Section 6, lists references applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:

(1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 (ML083310185)

However, LIC-110, "Watts Bar Unit 2 License Application Review,"

states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions." Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences.

Responder: WEC Date: 5/24/10 The regulatory documents listed in the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the regulatory documents on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.

Rev 0 of the Licensing Technical Report references Rev. 1 of ISG4 TVA Response to Follow-up NRC Request:

The analysis for compliance with DI&C-ISG04, Revision 0 to Revision 1 was previously submitted as part of the Common Q PAMS Licensing Technical Report Revision 2 on December 22, 2010. Attachment 4 contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common Q PAMS design is acceptable.

8.

N Open TVA to address with item OI

81.

Open-NRC Review Due 2/25/11 NNC 2/3/11: The above due date has been missed by at least 2 months.

Please provide new due date.

EICB RAI ML102910002 Item No. 14 TVA Letter dated 6/18/10 NNC 1/6/11: See Also Open Item No.81

& 202

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 101 DORL (Poole) 4/12/2010 The non-proprietary versions of the following RM-1000, Containment High Range Post Accident Radiation Monitor documents will be provided by June 30, 2010.

1. V&V Report 04508006A
2. System Description 04508100-1TM
3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
4. Functional Testing Report 04507007-1TR Responder: Slifer The documents, and affidavits for withholding for the listed documents were submitted to the NRC on TVA letter to the NRC dated July 15, 2010.
9.

Y Open Documents provided in letter dated 07/15/10 Open-NRC Review Due 10/14/10 Confirm receipt.

N/A TVA is working with the vendor to meet the 6/30 date, however there is the potential this will slip to 7/14.

138 EICB (Carte)

By letter dated February 3, 2010, Westinghouse informed TVA that certain PAMS documentation has been completed.

(a) The draft ISG6 states that a commercial grade dedication plan should be provided with an application for a Tier 2 review.

By letter dated February 5, 2010, TVA stated that the commercial grade dedication plan was included in the Common Q Topical Report Section 11, Commercial Grade Dedication Program.

Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: A detailed review plan is developed for each Common Q hardware or software component that requires commercial grade dedication.

Please provide the commercial grade dedication plans for each Common Q hardware or software component that has not been previously reviewed and approved by the NRC.

(b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval for a Tier 2 review.

(i) Please provide 00000-ICE-37722 Rev. 0, Commercial Grade Dedication Report for the QNX Operating System for Common Q Applications.

(ii) Please provide WNA-CD-00018-GEN Rev. 3, Commercial Dedication Report for QNX 4.25G for Common Q Applications.

Responder: WEC This item is used to track all Commercial Grade Dedication issues.

a.

WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC request:

Section 7, Commercial Grade Dedication Process has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.

As listed in Table 6-3. Westinghouse Watts Bar 2 Common Q PAMS Documents at Westinghouse Rockville Office, the following commercial grade dedication documents are available for NRC audit at the Westinghouse Rockville office: (list included in letter)

b.

It is TVAs understanding that the submittal of the documents listed in (b.i) and (b.ii) is no longer required.

Rather, it was agreed, that the inclusion of a description of the commercial grade dedication process in revision 2 of the Post-Accident Monitoring System (PAMS)

Licensing Technical Report, WNA-LI-00058-WT-P, would be sufficient to address this request.

TVA Response to Follow-up NRC Request:

The non-proprietary commercial grade dedication discussion is included in Attachment 3, WNA-LI-00058-WBT-NP, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3 dated March 2011 (non-proprietary)

Section 7. The software example is included in Attachment 2, WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary) Section 7.

10. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Revised response included in letter dated 12/22/10 TVA agreed to include a description of the generic Westinghouse hardware commercial grade dedication process in the PAMS licensing technical report. (see ML102920031 Item No 1)

TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial Westinghouse hardware components against the generic critical characteristics. (see ML102920031 Item No 2)

TVA agreed to include a description of the generic Westinghouse software commercial grade dedication process in the PAMS licensing technical report. (see ML102920031 Item No 3)

TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4)

Open-NRC Review NNC 2/2/11:

Commercial grade dedication will be addressed at the next audit.

NNC 2/17/11: The description of the commercial grade dedication process in the CQ PAMS LTR Rev. 2 should be updated to include a non-proprietary description and to include a software example.

ML101650255, Item No. 2 See also No. 82.

142 EICB (Carte)

The applicable regulatory guidance for reviewing the WBN2 PAMS SysRS would be IEEE 830 as endorsed by Regulatory Guide 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities - Software Requirements Specifications. IEEE 830-1994 Section 4.3.8, Responder: WEC This item is used to track all traceability issues with the Software Requirements Specification (SRS).

11. N Open Revised response included in Open-NRC Review Due 2/25/11 (document submittals)

ML101650255, Item No. 6 WBN2 PAMS System Requirements Specification TVA docketed WNA-DS-01617-WBT

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Traceable, states: A [requirements specification] is traceable of the origin of each of its requirements is clear

1.

How did TVA ensure the traceability of each requirement in the WBN2 PAMS SysRS.

2.

Explain the source(s) of the requirements present in the Post Accident Monitoring Systems Software Requirements Specification. To clarify, many documents have requirements that are incorporated by reference into the SRS, but what served to direct the author to include those various documents in the SRS or, if the requirement is based on the System Requirements Specification, what directed the author to include the requirement there?

3.

Clarify whether the unnumbered paragraphs in the Post Accident Monitoring Systems Software Requirements Specification, such as in the section headings, or are all such sections simply considered to be informative?

Does the same apply to documents referenced by the SRS?

Such as WCAP-16096-NP-A, Rev. 1A, Software Program Manual for Common Q Systems, which is incorporated by reference in requirement R2.3-2 in the SRS.

R2.3-2 [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, Software Program Manual for Common Q Systems (reference 5).]

If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity, and describe how they were verified.

4.

Are there any sources of requirements in parallel with the Post Accident Monitoring Systems Software Requirements TVA Response to 1:

Traceability of requirements for the WBN Unit 2 Common Q PAMS is ensured by:

a.

Preparation of the TVA Contract Compliance Matrix contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).

b. Engineering review/comment/status of each revision of:
i.

WNA-DS-01617-WBT, Post Accident Monitoring System - System Requirements Specification ii.

WNA-DS-01667-WBT, Post Accident Monitoring System - System Design Specification (hardware) iii.

WNA-SD-00239-WBT, Software Requirements Specification for the Post Accident Monitoring System (software)

TVA Response to 2:

As documented in the RTM, some software requirements are taken from generic documents. The decision to include generic software requirements was to reduce the overall scope for Common Q features that are unchanged across projects. Westinghouse reviewed the generic PAMS requirements and included those requirements that were applicable to WBN Unit 2 PAMS.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

TVA Response to 3:

Unnumbered paragraphs in the Post Accident Monitoring Systems Software Requirements Specification, such as in the section headings, are informative and are not to be interpreted as requirements. All requirements are explicitly numbered.

It depends on the document type. The statement would be true for requirements documents (such as the SysRS or SDS) if they were incorporated by reference. However, for the specific item cited, WCAP-16096-NP-A, Rev. 1A, it does not contain numbered requirements. The requirements contained in this document are contained within the text of the various sections.

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

TVA Response to 4:

The Westinghouse SRS, WNA-SD-00239-WBT, Revision 3 letter dated 02/25/11 Response included in letter dated 12/22/10 TVA/Westinghouse agreed to include the V&V evaluation of their reusable software element development process in the V&V design phase summary report. This evaluation would include an evaluation against the development process requirements. This evaluation would also include an evaluation of how the WBN2 specific requirements were addressed by the reusable software elements. (see ML102920031 Item No 5)

NNC 2/2/11: Updated Specifications and RTMs to be provided by TVA Tracability to be addressed during the next audit.

Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Requirements Specification, dated December 2009.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Specification? Meaning does the SRS contain, explicitly or by reference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in any other source or document? If so, what are these sources or documents?

5.

References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification are various types of Reusable Software Element.

These references are used in the body of the SRS, for example:

R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal

= TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]

They are also included via tables such as found in requirement R7.1.2-1

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]

Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?

contains references to other Westinghouse software requirements documents. Specifically, 00000-ICE-3238, Revision 5, Software Requirements Specification Post Accident Monitoring System 00000-ICE-3239, Revision 13, Software Requirements Specification for the Common Q Generic Flat Panel Display Software Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

TVA Response to 5:

Requirements for the reusable software elements (RSEDs) are evaluated in WNA-VR-00283-WBT-P, Revision 3, IV&V Summary Report for the Post Accident Monitoring System, dated December 2010 (Attachment 10).

RSED traceability is contained in WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements. This document can be made available for audit at the Westinghouse Rockville office.

At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the traceability concerns with the Software Requirements Specification.

1.

Westinghouse will perform a review of the Requirements Traceability Matrix(RTM), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.

TVA Response:

See response to letter Item 13 (NRC Matrix Item 145).

2.

The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.

TVA Response:

See response to letter Item 13 (NRC Matrix Item 145).

3.

Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.

TVA Response:

A comments column has been added to WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments letter review, dated December 17, 2010 (Reference 13)

4.

IEEE 830 says you shouldnt have planning information in the SRS. Westinghouse has agreed to remove this information.

TVA Response:

Westinghouse has confirmed that process requirements have been removed from the SRS.

Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)

5.

IEEE 830 says you shouldnt have process requirements in the SRS. Westinghouse has agreed to remove these requirements.

TVA Response:

Westinghouse confirmed that process requirements have been removed from the SRS.

Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)

6.

Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Reg.

Guide 1.172 and justify any deviations.

TVA Response:

WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1):

Section 9, Compliance Evaluation Of The Watts Bar 2 PAMS Software Requirements Specification To IEEE Standard 830-1998 And Regulatory Guide 1.172 has been added.

7.

25 issues identified by V&V where some requirements have not been included in the System Design Specification (SDS) (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed?

TVA Response:

The twenty-five (25) issues are captured in Exception Reports (ERs): V&V-769 and V&V-770. These ERs have all been addressed and the ERs have been closed satisfactorily by Westinghouse IV&V.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

8.

Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). These will be removed from the SRS and

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments incorporated into the next revision of the SDS.

TVA Response:

The hardware requirements in the Software Requirements Specification have been deleted and moved to System Design Specification.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 16, 2010 (Reference 15)

9.

RTM item R4.2-2 protection class software set to 0.

Needs to be fixed internally. Write CAPs to revise the application restrictions document on AC160.

TVA Response:

Westinghouse CAPs IR# 10-259-M034 has been issued. This item will be addressed in revision 4 of the RTM.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

10. Westinghouse to improve the traceability of the tests that are performed with the function enable (FE) switch in the ENABLE position.

TVA Response:

The tests that are performed with the FE keyswitch in the ENABLE position are defined in the SRS Sections:

6.2 Manually Initiated Testing, 7.2.23 Annunciator Test Display, 7.2.25 Saturation Margin Test Display, and 7.2.26 Analog Output Test Display.

11. Westinghouse to revise documents to be consistent with referring to the FE switch in the ENABLE position.

TVA Response:

Westinghouse has elected to standardize on the terms FE keyswitch and ENABLE. A review of recent documents for compliance with this comment and commitment was performed with the following results:

a.

Revision 3 of the SysRS, and SDS have been revised to use the terms FE keyswitch. Revision 3 of the SDS is consistent in use of the term ENABLE.

b.

SysRS Revision 3 is not consistent in use of the term ENABLE as noted below:

i. R2.5.2.1-2 uses the term ENABLED instead of ENABLE ii. R2.5.2.1.3-3, R2.6.3.3-1, R2.6.3.3-2, R2.6.3.3-3, and R2.6.3.3-7, use the term Enable instead of ENABLE
c.

Revision 3 of the SRS is not consistent in use of the terms FE keyswitch and ENABLE as noted below:

i. Tables 7.2-1 Train A PAMS Data Transmitted to

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments the Plant Computer and 7.2-2 Train B PAMS Data Transmitted to the Plant Computer items 101 and 102 in the SRS refer to the FE switch.

All other items in the SRS refer to the FE keyswitch.

ii. Section 2.1, page 2-4, uses the term Enable instead of ENABLE iii. Requirements R7.2.14-6 and R7.2.16-7 use the term active instead of ENABLE iv. Requirements R7.2.23-2, R7.2.25-2, R7.2.26-2, R7.2.31-4, 7.2.56 FPDS Availability, and R7.2.57-4 use the term enabled instead of ENABLE

d.

WNA-AR-00180-WBT-P, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System, dated October 2010, submitted in TVA letter to NRC dated (Reference

12) is not consistent in use of the term FE keyswitch as noted below:
i. Section 2.2 System Description and Table 3-1 WB2 PAMS FMEA refer to the FE switch.

ii. Table 3-1 describes the switch as the Functional Enable (FE) switch and the FE key-switch

e.

Revision 2 of the Licensing Technical Report is not consistent in use of the term FE keyswitch as noted below:

i. Sections 2.2, 5.3 use the term (FE) keylock switch on pages 2-3 (2 places), page 5-3, page 5-6 (4 places)

The identified discrepancies in the use of the terms FE keyswitch and ENABLE in the SysRS, SRS, FMEA and Licensing Technical Report, will be corrected in the next revision of the documents.

12. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS.

Need a good write up of how the process works.

TVA Response:

See response to letter item 13 (NRC Matrix Item 145).

13. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no later than 9/30/10 TVA Response:

The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010 (Reference 5).

14. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response:

The Procurement Requisition Resolution Matrix has been updated and is included in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS)

Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1), as Section 11, TVA Contract Compliance Matrix.

15. Westinghouse to add the Software Design Descriptions to the RTM TVA Response:

The Software Design Description documents were added to the RTM in WNA-VR-00279-WBT, Rev 2.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.

TVA Response:

When a Common Q PAMS requirements document references a section of another document, all requirements in that section are applicable.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

17. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.

TVA Response:

See response in letter dated December 22, 2010, item 2 (NRC Matrix Item 050).

18. Westinghouse to resolve the following questions concerning Software Design Descriptions (SDDs)
a.

Is the SDD a standalone document or will it incorporate the generic SDD by reference?

b.

What are the SDDs?

c.

PAMS is a delta document so how do we capture all the generic requirements for traceability.

TVA Response:

a.

There are three SDDs prepared specifically for the Watts Bar 2 PAMS project. These are listed below in Item b. These documents and superior requirements documents refer to other generic SDDs also listed in Item b.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments

b.

The SDDs developed for this project are:

i.

WNA-SD-00248-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display ii.

WNA-SD-00250-WBT, Revision 1, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System AC160 Software iii.

WNA-SD-00277-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display System Screen Design Details iv.

Other generic SDDs referenced by the PAMS project are:

(a) 00000-ICE-20157, Revision 18, Software Design Description for the Common Q Generic Flat-Panel Software (b) 00000-ICE-30152, Revision 5, Software Design Description Post Accident Monitoring System AC160 (c) 00000-ICE-30140, Revision 4, Software Design Description for the Common Q Core Protection Calculator System Database and Utility Functions

c.

Refer to WNA-VR-00279-WBT, Revision 3.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

19. For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified using the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP. Westinghouse to determine if the WCAP was docketed under the AP1000. RSED concept is not in the SPM. WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable. RSEDs are listed in the SDD References.

TVA Response:

Section 3.2.4.1 of WCAP-15927 describes the RSED design process for custom PC elements and type circuits. The Glossary of Terms in the SPM defines custom PC elements and type circuits as modules.

Therefore, the relationship between WCAP-15927 describing the RSED process as circuits, is defined in the SPM requirements for software module development.

WCAP-15927 is on the AP1000 docket.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

TVA Response to Follow-up NRC Request:

WNA-VR-00279-WBT, Revision 4, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System is scheduled to be available for audit at the Westinghouse Rockville office February 21, 2011. The document will be available at the Westinghouse Cranberry offices to support the NRC Common Q PAMS audit.

contains the proprietary version of WNA-DS-01617-WBT-P, Revision 4, Post Accident Monitoring System - System Requirements Specification, dated February 2011. Attachment 10 contains the non-proprietary version WNA-DS-01617-WBT-NP, Revision 4, Post Accident Monitoring System - System Requirements Specification, dated February, 2011. Attachment 11 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01617-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - System Requirements Specification (Proprietary),

dated February 10, 2011.

2 contains the proprietary version of WNA-DS-01667-WBT-P, Revision 4, Post Accident Monitoring System - System Design Specification, dated February 2011. Attachment 13 contains the non-proprietary version WNA-DS-01667-WBT-NP, Revision 4, Post Accident Monitoring System - System Design Specification, dated February 2011. Attachment 14 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01667-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (Proprietary), dated February 11, 2011.

5 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 4, Software Requirements Specification for the Post Accident Monitoring System, dated February 2011. Attachment 16 contains the non-proprietary version WNA-SD-00239-WBT-NP, Revision 4, Software Requirements Specification for the Post Accident Monitoring System, dated February 2011. Attachment 17 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-SD-00239-WBT-P, Revision 4, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System (Proprietary), dated February 10, 2011.

143 EICB (Carte

)

The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS - ML101050202) contains a table (see page iii) titled, Document Traceability & Compliance, which states that the Responder: WEC Addressed in the 9/15 public meeting and 9/20 - 9/21 audit.

12. N Open Response included in letter Open-NRC Review Due 2/25/11 (document ML101650255, Item No. 7 WBN2 PAMS System Requirements Specification

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments WBN2 PAMS SRS was created to support the three documents identified (one of which is the WBN2 PAMS SysRS). Section 1.1, Overview, of the WBN2 PAMS SRS states: This document describes requirements for the major software components (a) Please list and describe each of the major software components. Please include a description of any NRC review for each of these components.

(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.

(c) What other documents contain the requirements for the other software components?

The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, Document Traceability

& Compliance, which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, Purpose, of the WBN2 PAMS SDS states: The purpose of this document is to define the hardware design requirements (c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?

(e) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS.

A detailed explanation will be provided.

TVA Response:

(a) and (b) The requested information is provided in the following documents:

i.

WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Table 6-1, Document Requirements which lists the software documentation requirements for the Common Q PAMS and Section 11 TVA Contract Compliance Matrix submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).

ii.

WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System-System Requirements Specification, dated December 2010 (Attachment 1) iii.

WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010 (Attachment 7) iv.

WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office)

To the best of TVAs knowledge, no prior NRC review of the software components has been performed.

(c) WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)

(d) No. Please see Item (e) below.

(e) The documents that describe the requirements that implement the WBN Unit 2 SysRS are:

i.

WNA-VR-00279-WBT, Revision 3, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office) ii.

WNA-VR-00280-WBT, Revision 2, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office)

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

TVA Response to Follow-up NRC Request:

See Response to item 3 (Item number 142) dated 12/22/10 submittals)

To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.

NNC 2/2/11: Updated Specifications and RTMs to be provided by TVA NNC 2/3/11: The above due date has been missed by at least 2 months.

Please provide new due date.

TVA docketed WNA-DS-01617-WBT Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Requirements Specification, dated December 2009.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 144 EICB (Carte)

The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS) contains a table (see page iii) titled, Document Traceability & Compliance, which states that the WBN2 PAMS SRS was created to support the three documents identified (two of these documents have been provided on the docket).

(a) Please describe the third document (i.e., NABU-DP-00014-GEN Revision 2, Design Process for Common Q Safety Systems).

(b) Please describe the flow of information between these three documents.

(c) Does the PAMS SRS implement the requirements in these three documents?

(d) Please describe if and how these three documents are used in the development of the PAMS Software Design Description.

(e) Do the WBN2 V&V activities include verification that the requirements of these three documents have been incorporated into the WBN2 PAMS SRS.

Responder: WEC (a) The purpose of NABU-DP-00014-GEN document is to define the process for system level design, software design and implementation, and hardware design and implementation for Common Q safety system development.

This document supplements the Common Q SPM, WCAP-16096-NP-A. The scope of NABU-DP-00014-GEN includes the design and implementation processes for the application development. For a fuller description of the design process described in NABU-DP-00014-GEN please refer to the Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket. Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision of the document.

(b) - Closed to items 142 and 145 (c) - Closed 142 (d) - Closed to Item 142 (e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).

IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V-770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.

IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.

TVA Response to Follow-up NRC Request:

(1) Item (a) in the original list, NABU-DP-00014-GEN Revision 2, Design Process for Common Q Safety

13. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Revised response included in letter dated 12/22/10 Response provided in letter dated 10/5/10 NRC Review and WEC to complete response.

b-d to be addressed at public meeting and audit. Will require information to be docketed.

Open-NRC Review Due 3/29/11 Responses to items a and e provided.

NNC 11/18/10:

(1) Items b-d closed to other Open Item nos.

(2) The point of these questions was to understand how the origin of the requirements in the requirements specifications were documented. TVA stated that the origin of the requirements would be demonstrated in Rev. 2 of the CQ PAMS LTR.

NNC 2/3/11: CQ PAMS LTR Rev. 2 Section 11 & 12 do not adequately demonstrate the origin of requirements in SysRS. TVA to describe how to address concern.

ML101650255, Item No. 8 TVA Letter dated 10/5/10 WBN2 PAMS Software Requirements Specification By letter dated April 8, 2010 (ML10101050203), TVA docketed WNA-SD-00239-WBT, Revision 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, dated February 2010 (ML101050202).

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Systems, is available for NRC audit at the Westinghouse Rockville office.

(2) WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:

Section 11, TVA Contract Compliance Matrix showing the origin of the requirements was added.

TVA Response to Second Follow-up NRC Request:

Section 13, Origin Tracing of WBN2 PAMS System Requirements Specification was added to the Licensing Technical Report Revision 3 to address this concern. contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary).

145 EICB (Carte)

The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, Document Traceability

& Compliance, which states that the WBN2 PAMS SDS was created to support the WBN2 PAMS SysRS.

(a) Does the WBN2 PAMS SDS implement all of the hardware requirements in the WBN2 PAMS SysRS?

(b) Please briefly describe all of the documents that implement the hardware requirements of the WBN2 PAMS SysRS.

This item is used to track all traceability issues with the System Design Specification (SDS).

At the September 15 public meeting in Rockville, the following actions were agreed to. These items partially address the traceability concerns with the System Design Specification.

This item will be updated with the results of the September 20 and 21 Commercial Grade Dedication and SDS RTM audit.

1.

Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.

2.

Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). These will be removed from the SRS and incorporated into the next revision of the SDS.

3.

25 issues identified by V&V where some requirements have not been included in the SDS (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed?

Yes. The next revisions of the SDS and SRS address these issues.

4.

TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS Responder: WEC (1) The review and update of the RTM is complete. The revised RTM can be made available for NRC audit at the Westinghouse office in Rockville.

(2) Please see letter Item 10 (NRC Matrix Item 142, sub item 13).

(3) Please see letter Item 10 (NRC Matrix Item 142, sub item 12).

(4) Section 11 TVA Contract Compliance Matrix was added to WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1).

(5) WNA-VR-00283-WBT, Revision 1, IV&V Summary Report for the Post Accident Monitoring System, submitted in TVA to NRC letter dated December 3, 2010 (Reference 1) includes the Requirements and Design phase reviews.

(6) Per Westinghouse letter WBT-D-2268 NRC Access to Common Q Documents at the Westinghouse Rockville Office dated August 16, 2010 (Reference 9) System Requirements Specification for the Common Q Generic Flat Panel Display, 00000-ICE-30155, Revision 9 is available for audit at the Westinghouse Rockville office.

The generic AC160 specifications are contained in the documents listed below. The documents are available for NRC audit at the Westinghouse Rockville office in accordance with the letter number referenced. List is contained in letter.

(7) A schedule was developed and is reviewed weekly by

14. N Open Response included in letter dated 12/22/10 During the September 20-21, 2010 audit at Westinghouse, it was acknowledged that TVA/Westinghouse had previously (in September 15, 2010 public meeting) stated:

TVA would provide the RSED RTM. (see ML102920031 Item No 6)

TVA would revise and resubmit the PAMS RTM to address all types of issues identified in the public meeting. (see ML102920031 Item No 7)

TVA would revise and resubmit the Software Verification and Validation phase summary report for the requirements phase to document the completion of the requirements phase review. (see ML102920031 Item No 8)

Open-NRC Review Due 2/25/11 To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.

ML101650255, Item No. 9 WBN2 PAMS System Design Specification TVA docketed WNA-DS-01667-WBT Rev. 1, RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System-System Design Specification, dated December 2009.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments design meets the contract requirements.

5.

The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.

6.

Westinghouse to provide the generic AC160 and flat panel specifications.

7.

Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.

8.

The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.

Westinghouse and TVA project management.

(8) The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010.

(9) The flow of documentation information was provided to the NRC inspector during the Common Q PAMS audit.

Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI on SysRS, dated December 8, 2010 TVA Response to Follow-up NRC Request:

See Response to item 3 (Item number 142) 183 EICB (Carte) 7/15/2010 An emphasis is placed on traceability in System Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word should to say Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies On page 1-2 of the Post Accident Monitoring Systems Software Requirements Specification in the background section, is the sentence Those sections of the above references that require modification from the generic PAMS are defined in the document referring purely to the changes from WNA-DS-01617-WBT Post Accident Monitoring System-System Requirements Specification or is it saying that there are additional changes beyond those and that the SRS defines them?

If there are additional changes, what is their origin?

Responder: WEC The generic Software Requirements Specification applies except as modified by the WBN Unit 2 System Requirements Specification.

TVA Response to Follow-up NRC Request:

Please see the response to RAI item 12 in letter dated 12/22/10, NRC Matrix Item 144.

TVA Response to Second Follow-up NRC Request:

This item was addressed by updating the Contract Compliance Matrix and adding Section 13, Origin Tracing of WBN2 PAMS System Requirements Specification to the Licensing Technical Report Revision 3 to address this concern. Attachment 2 contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, dated March 2011 (proprietary).

15. Y Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Revised response included in letter dated 12/22/10.

Response provided in letter dated 10/21/10 Open-NRC Review Due 3/29/11 NNC 11/18/10: The point behind this open item was that TVA must demonstrate that the origin of each requirement in the WEC requirements specification is known and documented. TVA stated that this information would be in CQ PAMS LTR Rev. 2.

NNC 2/3/11: CQ PMS LTR Rev. 2 Sections 11

& 12 do not prove this information. TVA to proive a plan to address requested information.

EICB RAI ML102980066 Item No. 9 TVA Letter dated 10/21/10 Item No. 4 185 EICB (Carte) 7/15/2010 An emphasis is placed on the traceability of requirements in Software Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word should to say Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies Also the NRC considers that the SRS is the complete set of requirements used for the design of the software, whether it is contained within one document or many. In order to evaluate an SRS against the guidance in the SRP the staff needs access to all the requirements.

References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification are various types of Responder: WEC Steve Clark to look at how to combine traceability items.

Was addressed to during the 9/15 meeting and 9/20 - 9/21 audit.

TVA Response to Follow-up NRC Request:

(1) See NRC Matrix Item 144 (2) There is no RTM for development of the individual reusable software elements. As listed in item 15 of Table 6-1 Document Requirements of WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC, dated December 3, 2010, a RTM for implementation of the RSEDs (WNA-VR-00280-WBT) for the WBN Unit 2 Common Q PAMS has been

16. N Open Response included in letter dated 12/22/10.

Open-NRC Review NNC 11/18/10: (1)The point behind this open item was that TVA must demonstrate that the origin of each requirement in the WEC requirements specification is known and documented. TVA stated that this information would be in CQ PAMS LTR Rev. 2.

(2) TVA also said it would provide a RTM for the RSED EICB RAI ML102980066 Item No. 17

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Reusable Software Element.

These references are used in the body of the SRS, for example:

R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]

They are also included via tables such as found in requirement R7.1.2-1

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]

Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?

developed. This document is available for NRC audit at the Westinghouse Rockville office.

NNC 2/3/11: To be addressed during next audit.

202 7.5.2 EICB (Carte) 7/22/2010 The letter (ML0003740165) which transmitted the Safety Evaluation for the Common Q topical report to Westinghouse stated: "Should our criteria or regulations change so that our conclusions as to the acceptability of the report are invalidated, CE Nuclear Power and/or the applicant referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation."

Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report.

Responder: WEC Revision 1 of the Licensing Technical Report will provide more detailed information on the changes to the platform.

Rev. 2 of the Licensing Technical Report will include the applicability of guidance.

TVA Response to Follow-up NRC Request:

WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report (LTR) submitted in TVA Letter to NRC dated December 3, 2010, contains the following change to address the NRC request:

Section 9, Compliance Evaluation of the Watts Bar 2 PAMS Software Requirements Specification to IEEE Standard 830-1998 and Regulatory Guide 1.172 to show the origin of the requirements has been added.

The descriptions and commitments in the Topical Report (TR) still apply. The LTR provides compliance evidence to the new ISG-04 criteria. The statement in the SE means that the TR can be evaluated against later NRC criteria when it appears.

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 Partial TVA Response to Follow-up NRC Request:

contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common Q PAMS design is acceptable.

The final response is pending submittal of the Licensing Technical Report Revision 3 scheduled for March 29, 2011.

17. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Response included in letter dated 12/22/10 Partial Response provided in letter dated 10/5/10 NNC 1/5/11: Summary provided in Licensing Technical Report R2 has been reviewed and found to be unacceptable.

LTR Section 9 evaluates the compliance of the SRS to IEEE 830-1998. There are two issues with this evaluation:

(1) IEEE 830-1998 is not the current SRP acceptance criteria.

IEEE 830-1998 has not been formally endorsed by a regulatory guide.

(2) Westinghouse committed to evaluate the SRS against 830 when the NRC identified several inconsistencies.

Yes ISG-4 is one new criteria, and an evaluation against it has been provided.

In addition, LTR Rev. 2 Section 13 states: The applicable NRC regulatory guides, IEEE and EPRI industry standards fo the common Q PAMS are shown Open-NRC Review Due 2/25/11 &

3/29/11 to provide information requested.

Due TBD EICB RAI ML102980066 Item No. 4 TVA Letter dated 10/5/10 NNC 1/5/11: See Also Open Item No.

81 and 86.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response to Follow-up NRC Request:

(1) As discussed on page 9-1 of the Licensing Technical Report (Attachment 2) a comparison of IEEE 830-1993 and IEEE 830-1998 was performed and it was determined that the 1998 version enveloped all the requirements of the 1993 version which is endorsed by Regulatory Guide 1.172. Therefore the use of IEEE 830-1998 is acceptable.

(2) Table 9.1 IEEE Std 830-1998 Compliance of the Licensing Technical Report (Attachment 2) evaluates the Software Requirements Specification against the requirements of IEEE 830-1998.

(3) See TVA to NRC letter Watts Bar Nuclear Plant (WBN)

Unit 2 - Instrumentation And Controls Staff Information Requests, dated February 25, 2011 Attachment 4 Common Q PAMS Regulatory Guide and IEEE Standard Analysis.

(4) This section of the Licensing Technical Report (Attachment 2) has been relocated to section 15. The comment has been addressed by adding Reference 40 to TVA to NRC letter dated February 25, 2011, which is the Common Q PAMS Regulatory Guide and IEEE Standard Analysis.

below. Compliance to these codes and standards are stated in Section 4 of Reference 1.

Reference 1 is the common Q topical report.

212 7.5.2 EICB (Carte) 7/27/2010 By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Design Report on Computer Integrity, Test and Calibration..." The staff has reviewed these documents, and it is not clear how this is the case.

(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.

(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.

Responder: WEC Application specific requirements for testing. This cannot be addressed in a topical report. Evaluation of how the hardware meets the regulatory requirements.

WEC to provide the information and determine where the information will be located.

IEEE-603 1991:

5.5 System Integrity. The safety systems shall be designed to accomplish their safety functions under the full range of applicable conditions enumerated in the design basis.

TVA Response: The applicable conditions and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, Section 11, Contract Compliance Matrix items:

87 and 88 Seismic 89, 90, 91, 92 and 185 EMI/RFI 300, 301 and 302 Environmental Seismic qualification of the equipment to meet the design basis requirements 5.7 Capability for Test and Calibration. Capability for

18. N Open Partial Response included in letter dated 03/16/11 Final response due 3/29/11 Open-NRC Review NNC 2/17/2011: IEEE 603 Clause 5.5 basically states that conditions identified in IEEE 603 Clauses 4.7

& 4.8 must be addressed in the design. Energy supply conditions have not been identified, or explicitly addressed.

NNC 2/18/11: Clause 5.7 is acceptably EICB RAI ML102980066 Item No. 10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments testing and calibration of safety system equipment shall be provided while retaining the capability of the safety systems to accomplish their safety functions.

The capability for testing and calibration of safety system equipment shall be provided during power operation and shall duplicate, as closely as practicable, performance of the safety function. Testing of Class 1E systems shall be in accordance with the requirements of IEEE Std 338-1987. Exceptions to testing and calibration during power operation are allowed where this capability cannot be provided without adversely affecting the safety or operability of the generating station. In this case:

(1) appropriate justification shall be provided (for example, demonstration that no practical design exists),

(2) acceptable reliability of equipment operation shall be otherwise demonstrated, and (3) the capability shall be provided while the generating station is shut down.

TVA Response: The requirements for test and calibration and Common Q PAMS system compliance, are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11, TVA Contract Compliance Matrix items:

202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and Verification 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.10 Repair. The safety systems shall be designed to facilitate timely recognition, location, replacement, repair, and adjustment of malfunctioning equipment.

TVA Response: The requirements for repair and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11, TVA Contract Compliance Matrix items:

179 Mean time to repair 202 self test 398 3.7 Maintenance 399 3.7.1 Troubleshooting 6.5 Capability for Testing and Calibration 6.5.1 Means shall be provided for checking, with a high degree of confidence, the operational availability of each sense and command feature input sensor required for a safety function during reactor operation.

This may be accomplished in various ways; for example:

addressed.

NNC 2/18/2011: WNA-AR-00189-WBT Rev. 0 Table 5-2 shows a MTTR of 7.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. It is not clear how this satisfies the contractual item No.

179.

The Contract Compliance Matrix Item 179 in Revision 3 of the LTR has been revised to show this item as a deviaition and to reflect TVAs acceptance of the 7.2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> MTTR value. Attachment 2 contains WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS)

Licensing Technical Report, Revision 3, dated March 2011 (proprietary).

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (1) by perturbing the monitored variable, (2) within the constraints of 6.6, by introducing and varying, as appropriate, a substitute input to the sensor of the same nature as the measured variable, or (3) by cross-checking between channels that bear a known relationship to each other and that have readouts available.

6.5.2 One of the following means shall be provided for assuring the operational availability of each sense and command feature required during the post-accident period:

(1) Checking the operational availability of sensors by use of the methods described in 6.5.1.

(2) Specifying equipment that is stable and retains its calibration during the post-accident time period.

TVA Response: The requirements for sense and command feature testing and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:

10, display of sensor diagnostic information 202 self test 205 self diagnostics and watchdog timer 264 through 271, system self checks 311 system status displays, 341 alarms, 344 on-line diagnostics IEEE 7-4.3.2-2003 5.5 System integrity In addition to the system integrity criteria provided by IEEE Std 603-1998, the following are necessary to achieve system integrity in digital equipment for use in safety systems:

Design for computer integrity Design for test and calibration Fault detection and self-diagnostics 5.5.1 Design for computer integrity The computer shall be designed to perform its safety function when subjected to conditions, external or internal, that have significant potential for defeating the safety function. For example, input and output processing failures, precision or round off problems, improper recovery actions, electrical input voltage and frequency fluctuations, and maximum credible number of coincident signal changes.

If the system requirements identify a safety system preferred failure mode, failures of the computer shall not preclude the safety system from being placed in that mode. Performance of computer system restart operations shall not result in the safety system being inhibited from performing its function.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response: Common Q PAMS system reliability and failure modes are described in:

WNA-AR-00180-WBT, Revision 0, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System WNA-AR-00189-WBT, Revision 0 Post Accident Monitoring System Reliability Analysis The requirements for mean time between failure and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Section 11 TVA Contract Compliance Matrix item 178.

5.5.2 Design for test and calibration Test and calibration functions shall not adversely affect the ability of the computer to perform its safety function. Appropriate bypass of one redundant channel is not considered an adverse effect in this context. It shall be verified that the test and calibration functions do not affect computer functions that are not included in a calibration change (e.g., setpoint change).

V&V, configuration management, and QA shall be required for test and calibration functions on separate computers (e.g., test and calibration computer) that provide the sole verification of test and calibration data.

V&V, configuration management, and QA shall be required when the test and calibration function is inherent to the computer that is part of the safety system.

V&V, configuration management, and QA are not required when the test and calibration function is resident on a separate computer and does not provide the sole verification of test and calibration data for the computer that is part of the safety system.

TVA Response: The requirements for test and calibration and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:

202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and Verification 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.5.3 Fault detection and self-diagnostics Computer systems can experience partial failures that can degrade the capabilities of the computer system,

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments but may not be immediately detectable by the system.

Self-diagnostics are one means that can be used to assist in detecting these failures. Fault detection and self-diagnostics requirements are addressed in this sub-clause.

The reliability requirements of the safety system shall be used to establish the need for self-diagnostics. Self diagnostics are not required for systems in which failures can be detected by alternate means in a timely manner. If self-diagnostics are incorporated into the system requirements, these functions shall be subject to the same V&V processes as the safety system functions.

If reliability requirements warrant self-diagnostics, then computer programs shall incorporate functions to detect and report computer system faults and failures in a timely manner. Conversely, self-diagnostic functions shall not adversely affect the ability of the computer system to perform its safety function, or cause spurious actuations of the safety function. A typical set of self-diagnostic functions includes the following:

Memory functionality and integrity tests (e.g.,

PROM checksum and RAM tests)

Computer system instruction set (e.g., calculation tests)

Computer peripheral hardware tests (e.g.,

watchdog timers and keyboards)

Computer architecture support hardware (e.g.,

address lines and shared memory interfaces)

Communication link diagnostics (e.g., CRC checks)

Infrequent communication link failures that do not result in a system failure or a lack of system functionality do not require reporting.

When self-diagnostics are applied, the following self-diagnostic features shall be incorporated into the system design:

a) Self-diagnostics during computer system startup b) Periodic self-diagnostics while the computer system is operating c)

Self-diagnostic test failure reporting TVA Response: The requirements for fault detection and self diagnostics and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, Post-Accident Monitoring System (PAMS)

Licensing Technical Report Section 11 TVA Contract Compliance Matrix items:

107 error free download 202 self test 205 self diagnostics and watchdog timer 263 primary and backup communication 264 through 271, continuous on-line self checks

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 311 system status displays, 341 alarms, 344 on-line diagnostics 5.7 Capability for test and calibration No requirements beyond IEEE Std 603-1998 are necessary.

TVA Response: No response required.

Concurrence: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI 212 Response - Errors in the Contract Compliance Matrix, dated December 17, 2010 (a) Energy Supply conditions are specified in WNA-DS-01617-WBT-P, System Requirements Specification Rev.

4, Requirement 4.1-1 which requires 120Vac +/-10% and 60+/-3Hz. Power to the Common Q PAMS is provided from the 120Vac vital power system. Per WBN Unit 2 FSAR section 8.3.1.1 the vital 120 volt ac system specifications are 120Vac +/-2% and 60+/-0.5Hz. Based on this, the power provided meets the system requirements.

Electromagnetic compatibility, seismic and environmental qualification of the equipment to meet the design basis requirements is documented in EQ-QR WBT-P, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS)" (Proprietary)

(Attachment 4). Attachment 5 contains EQ-QR WBT-NP, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS)" (non-proprietary). Attachment 6 contains CWA-11-3118, Application for Withholding Proprietary Information from Public Disclosure, EQ-QR-68-WBT-P, Revision 0 Qualification Summary Report for Post-Accident Monitoring System (PAMS), (Proprietary), dated February 28, 2011.

(b) The Contract Compliance Matrix Item 179 in Revision 3 of the Licensing Technical Report will be revised to show this item as a deviation and to reflect TVAs acceptance of the 7.2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> MTTR value. WNA-LI-00058-WBT-P, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Revision 3, (proprietary) dated March 2011, will be submitted no later than March 29, 2011.

213 7.5.2 EICB (Carte) 7/27/2010 By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Theory of Operation Description." The staff has reviewed these documents, and it is not clear how this is the case. The docketed material does not appear to contain the design basis information that is required to evaluate compliance with the Clause of IEEE 603.

(1) Please provide the design basis (as described in IEEE 604 Responder: WEC Conformance with IEEE 603 is documented in the revised Common Q PAMS Licensing Technical Report and the Common Q PAMS System Design Specification.

contains the proprietary version of Westinghouse document Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010

19. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Response is included in letter dated 10/25/10 NNC to review and revise this question after LTR R2 is Open-NRC Review Due 3/29/11 NNC 2/3/11: The identified documentation does not include the design bases. Please provide schedule for providing the requested EICB RAI ML102980066 Item No. 18

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Clause 4) of the Common Q PAMS.

(2) Please provide a regulatory evaluation of how the PAMs complies with the applicable regulatory requirements for the theory of operation.

For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the manually controlled protective actions? (2) How do the documents identified demonstrate compliance with this clause?

contains the proprietary version of Westinghouse document Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification, WNA-DS-01667-WBT, Rev. 2 dated September 2010.

TVA Response to Follow-up NRC Request:

The Regulatory Guide 1.97 classification of the Common Q PAMS variables is documented in TVA Design Criteria WB-DC-30-7 Post Accident Monitoring Instrumentation which was submitted as Attachment 5 on TVA to NRC letter Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation And Controls Staff Information Requests dated June 18, 2010 (Reference 1)

The hardware design bases for the Common Q PAMS is described in the WBN Unit 2 FSAR section 7.5.1.8 Post Accident Monitoring System (PAMS).

The Common Q PAMS indications are used to support operator response to events described in chapter 15 of the WBN Unit 2 FSAR such as:

RCCA/RCCA Bank dropped/misaligned Steam Generator Tube Rupture Inadvertent Loading of a Fuel Assembly Into an Improper Position Loss of Shutdown Power Major Reactor Coolant System Pipe Ruptures (Loss Of Coolant Accident)

Major Secondary System Pipe Rupture received.

information.

244 EICB (Carte) 8/3/2010 Section 8.2.2 of the Common Q SPM (ML050350234) states that the Software Requirements Specification (SRS) shall be developed using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS should address the software product, not the process of producing the software. In addition Section 4.3.2.1 of the SPM states "Any alternatives to the SPM processes or additional project specific information for the...SCMP...shall be specified in the PQP.

Contrary to these two statements in the SPM, the WBN2 PAMS SRS (ML101050202) contains many process related requirements, for example all seventeen requirements in Section 2.3.2, "Configuration Control," address process requirements for configuration control.

Please explain how the above meets the intent of the approved SPM.

Responder: WEC The process related requirements have been removed from revision 2 of the Software Requirements Specification (SRS).

of letter dated 10/25/10 contains the proprietary version of Westinghouse document Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System, WNA-SD-00239-WBT, Revision 2, Dated September 2010.

TVA Response to Follow-up NRC Request:

As shown is the listed documents, process related requirements have been deleted from the SRS and SysRS in Revision 3:

contains proprietary version of WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System-System Requirements Specification, dated December 2010.

contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, Software Requirements

20. N Open Revised response is included in letter dated 12/22/10 Response is provided in letter dated 10/25/10.

NNC 11/18/10: SysRS Rev. 2 also contains process requirements that are more appropriately incorporated into process documentation.

Open-NRC Review Due 2/25/11 Document revisions NNC 2/2/11: Issues with Common Q TR &

SPM compliance were discussed in the weekly public meetings.

Westinghouse to perform Common Q TR

& SPM compliance self assessment; this will be discussed in detail on the next audit.

EICB RAI ML102980066 Item No. 14 Response is provided in letter dated 10/25/10.

LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Specification for the Post Accident Monitoring System, dated December 2010.

Source: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)

TVA Response to Follow-up NRC Request:

The documents discussed in Item 3 have been revised to address compliance with the Topical Report (TR) and the Software Program Manual (SPM).

245 EICB (Carte) 8/3/2010 Section 5.8 of the Common Q SPM (ML050350234) identifies the required test documentation for systems developed using the Common Q SPM. Please provide sufficient information for the NRC staff to independently assess whether the test plan for WBN2 PAMS, is as described in the SPM (e.g., Section 5.8.1).

Responder: WEC Relates to the commitment to provide the test plan and the SPM compliance matrix contains the Westinghouse document Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010.

TVA Response to Follow-up NRC Request:

The results of the self assessment were reviewed by Westinghouse with the NRC on February 2, 2011 and were further reviewed by TVA during the NRC Common Q PAMS audit during the week of February 28 to March 4, 2011.

Corrections to WNA-TR-02451-WBT, Test Summary Report for the Post Accident Monitoring System and the self assessment were made as a result of the TVA review to ensure this comment was fully addressed.

By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with TR and SPM compliance. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.

21. N Open Pending Submittal of the Test Summary Report due 3/29/11 Response included in letter dated 12/3/10 Common Q PAMS Test Summary Report scheduled to be submitted March 29, 2011.

Open-NRC Review Due 3/29/11 NNC 2/2/11: Issues with the Common Q TR

& SPM were discussed in the weekly public meetings.

Westinghouse to perform Common Q TR

& SPM compliance self assessment EICB RAI ML102980066 Item No. 119 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

246 EICB (Carte) 8/3/2010 Section 4.3.2.1, "Initiation Phase" of the Common Q SPM (ML050350234) requires that a Project Quality Plan (PQP) be developed. Many other section of the SPM identify that this PQP should contain information required by ISG6. Please provide the PQP. If "PQP" is not the name of the documentation produced, please describe the documentation produced and provide the information that the SPM states should be in the PQP.

Responder: WEC As agreed ISG6 does not apply to the Common Q PAMS platform. The information required to address this question concerning the PQP and SPM has been added to compliance matrix in revision 1 of the Licensing Technical Report.

of letter dated 10/25/10 contains the proprietary version of Westinghouse document Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010

22. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11. PQP provided for audit the week of 2/28/11.

Response is provided in letter dated 10/25/10 NNC 11/18/10: PQP has not been provided and CQ PAMS LTR Rev. 1 does not contain comparable information.

Open-NRC Review Due 3/29/11 NNC 2/2/11: Issues with the Common Q TR

& SPM implementation were discussed in the weekly public meetings.

Westinghouse to perform Common Q TR

& SPM compliance self assessment EICB RAI ML102980066 Item No. 15 Response is provided in letter dated 10/25/10 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response to Follow-up NRC Request:

The results of the Common Q TR and SPM self assessment were reviewed by Westinghouse with the NRC on February 2, 2011.

The Westinghouse Watts Bar Unit 2 NSSS Completion I&C Projects Project Quality Plan, WNA-PQ-00220-WBT, Revision 1 is available for NRC audit at the Westinghouse Rockville Office and was available for review during the NRC Common Q PAMS audit during the week of February 28 to March 4, 2011. During the audit, the Westinghouse Quality Assurance in process audit of the Common Q PAMS project was reviewed by the NRC inspector with no issues identified.

250 EICB (Carte) 8/8/2010 The SPM describes the software and documents that will be created and placed under configuration control. The SCMP (e.g.,

SPM Section 6, Software Configuration Management Plan) describes the implementation tasks that are to be carried out. The acceptance criterion for software CM implementation is that the tasks in the SCMP have been carried out in their entirety.

Documentation should exist that shows that the configuration management tasks for that activity group have been successfully accomplished. Please provide information that shows that the CM tasks have been successfully accomplished for each life cycle activity group.

Responder: WEC Westinghouse develops Software Release Reports/Records and a Configuration Management Release Report. Describe the documents and when they will be produced. Summarize guidance on how to produce these records, focus on project specific requirements in SPM etc.

TVA Response to Follow-up NRC Request:

The following documentation shows that the configuration management tasks for that activity group have been successfully accomplished.

2.

WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:

a.

Section 2.2.1 Hardware/Software Change Process has been added to describe the process of how changes are evaluated.

b.

Section 2.2.2, Software has been expanded to include a table detailing evolutionary software changes that have occurred since the initial submittal and the change evaluation of the life cycle.

3.

WNA-PT-00138-WBT, Revision 0, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, (Proprietary), dated November 2010 submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).

23. N Open Revised response included in letter dated 12/22/10 Response included in letter dated 10/25/10.

Open-NRC Review NNC 2/2/11: To be addressed during the next audit.

LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

251 EICB (Carte) 8/8/2010 The SPM describes the software testing and documents that will be created. The SPM also describes the testing tasks that are to be carried out. The acceptance criterion for software test implementation is that the tasks in the SPM have been carried out in their entirety. Please provide information that shows that testing been successfully accomplished.

Responder: WEC The software testing performed and documents created are addressed by the SPM Compliance matrix contained in Revision 1 of the Licensing Technical Report.

of the letter dated 10/25/10 contains the Proprietary version of Westinghouses document titled:

Tennessee Valley Authority (TVA), Watts Bar Unit 2

24. N Open Pending Submittal of the Test Summary Report due 3/29/11 Revised response included in letter dated 12/22/10 Partial response is provided in Open-NRC Review Due 3/29/11 NNC 2/2/11: Issues with the Common Q TR

& SPM were discussed in the weekly public meetings.

LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (WBN2), Post-Accident Monitoring System (PAMS),

Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010 TVA Response to Follow-up NRC Request:

Please see the response to RAI item 21 in letter dated 12/22/10, NRC Matrix Item 250.

TVA Response to second Follow-up NRC Request:

The results of the Common Q TR and SPM self assessment were reviewed by Westinghouse with the NRC on February 2, 2011.

By agreement between TVA, WEC and the NRC, the Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0 will not be revised. Instead a non-proprietary Common Q PAMS Test Summary Report will be developed and submitted to address the issues with TR and SPM compliance. Attachment 1 contains non-proprietary WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System, dated March 2011.

letter dated 10/25/10 Westinghouse to perform Common Q TR

& SPM compliance self assessment the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

252 EICB (Carte) 8/8/2010 The SPM contain requirements for software requirements traceability analysis and associated documentation (see Section 5.4.5.3, Requirements Traceability Analysis). Please provide information that demonstrates that requirements traceability analysis has been successfully accomplished.

Responder: WEC Explain response to AP1000 audit report.

RTM docketed NRC awaiting V&V evaluation of RTM.

The following responses are based on WBN Unit 2 Common Q PAMS traceability:

Software requirements traceability analysis is described in the following documents:

1.

WNA-LI-00058-WBT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) Section 11, TVA Contract Compliance Matrix

2.

WNA-VR-00279-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System (available for NRC audit at the Westinghouse Rockville office)

3.

WNA-VR-00280-WBT, Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements (available for NRC audit at the Westinghouse Rockville office) This document addresses the RSEDs used in the WBN Unit 2 Common Q PAMS.

The V&V evaluation of the RTM is documented in section 2.2.2 of the following documents:

1.

The Independent Verification & Validation (IV&V)

25. N Open Response included in letter dated 12/22/10 Read ML091560352 Open-NRC Review Due 2/25/11 (document submittals)

NNC 2/2/11: Updated RTMs and specifications to be provided.

Requirements traceability to be addressed during he next audit.

LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments report covering the Concept and Definition phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 1, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).

2.

The Independent Verification &Validation (IV&V) report covering the Design and Implementation phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 2, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).

3.

The integration phase is covered in Attachment 10, the proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-P, Revision 3, dated December 2010. 1 contains the non-proprietary version of IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT-NP, Revision 3, dated December 2010. Attachment 12 contains the Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283-WBT-P, Revision 3, IV &V Summary Report for the Post Accident Monitoring System (Proprietary), dated December 2010.

TVA Response to Follow-up NRC Request:

See Response to item 3 (Matrix Item Number 142) 318 7.5.2.

3 7.5 EICB (Singh)

TVA has provided the following documents for RM-1000 equipment qualification:

(i)

Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter 04508905-QR (January 2001)

(ii)

Qualification Test Report Supplement, RM-1000 Upgrades 04508905-1SP (June 2006)

(iii)

Qualification Test Report Supplement, RM-1000 Upgrades 04508905-2SP (June 2008)

(iv)

Qualification Test Report Supplement, RM-1000 Upgrades 04508905-3SP (May 2008)

Please clarify whether all of these are fully applicable to WBN2 or are they applicable with exceptions? If with exceptions, then please clarify what those are.

Supplement 3 was issued one month prior to supplement 2.

Please explain the reason for the same.

Responder: Temples (i)

Applicable to WBN Unit 2. 04508905-1QR is applicable only in regards to the RM-1000, with the exception of re-qualification of certain RM-1000 equipment differences covered in the -1SP report.

The Current-to-Frequency (I-F) converter module qualifications in the base report and the -1SP report are not applicable to the RM-1000s, and will be used later as references in the WBN Unit 2 specific qualification reports.

(ii)

Applicable to WBN Unit 2.

(iii)

Not applicable to WBN Unit 2 (iv)

Not applicable to WBN Unit 2 The 04508905-3SP report was prepared for another TVA plant, as a monitor system-level report, where the system included equipment mostly based on the base report equipment items. These two -2SP and -3SP supplement

26. Y Open Revised response is included in letter dated 12/22/10.

Note check 04508905-1QR or QR. Staff version is QR only.

Response is included in letter dated 10/29/10 Open-NRC Review Due 2/25/11 Response update required. It is clear that 04508903-2SP and -

3SP are not applicable.

The response for applicability of 04508905-QR and -

1SP to RM-1000 and IF converter is not clear.

Check page numbers of Appendix F (missing/duplicate pages).

Check applicability of Appendix C to RM1000 instead of RM2300?

See items 336 and 337.

All equipment RAI No. 28 ML102980005 10/26/2010 TVA Letter dated 10/29/10, Encl 1 Item 34, and TVA letter 11/24/10, Att. 2.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments reports were essentially worked concurrently, but the -2SP document review/release process resulted in the release time difference.

TVA Response to Follow-up NRC Request:

NOTE: The response for the current to frequency (I to F) converter in item 1 below is a reversal of the response previously provided in TVA to NRC letter dated October 29, 2010 (Reference 22). General Atomics Electronic Systems Inc. (GA-ESI) notified TVA of this change on December 8, 2010 (Reference 20).

(1) The applicability of the qualification reports from GA-ESI e-mail dated December 10, 2010 (Reference 19) is as follows:

a.

04508905-QR Qualification Test Report for RM-1000 Processor Module and Current-to-Frequency Converter is applicable to the WBN Unit 2 RM-1000 and I to F converter modules.

b.

04508905-1SP Supplement to Qualification Test Report for RM-1000 Processor Module and Current-to-Frequency Converter is applicable to the WBN Unit 2 RM-1000 module.

c.

04508905-1SP is not applicable to the WBN Unit 2 I to F converter module.

d.

04508905-2SP Qualification Test Report Supplement, I-F Converter Upgrades is applicable to the WBN Unit 2 I to F converter module.

GA-ESI provided two other reports required to support qualification of the containment high range radiation monitors. The report descriptions are from GA-ESI e-mail on December 8, 2010 (Reference 20). The reports are:

e.

GA-ESI report 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors: The report is the principle report and the starting point for all the radiation monitors provided as part of the replacement contract. The report describes each monitor; referenced to the technical manual for the physical and functional description and lists the major components of the monitor system.

Report section 3 identifies the TVA Watts Bar Unit 2 Environmental, Seismic, Electromagnetic Compatibility (EMC), and software requirements for each monitor. In section 4 a brief description of GA-ESI generic qualification programs for all radiation monitoring equipment in each of the four above areas is provided. The qualification basis for each monitor is provided in a separate supplement to the principle report and is identified qualification reports including supplements 2SP and 3SP have been reviewed as vendor drawings for WBN-2. Please explain the reason for applicability of one report and not the other.

Further all TVA/Bechtel reviews seems to be dispositioned as Code 4, Review not required.

Work may proceed.

The applicable reports should have been reviewed prior to dispositioning them.

Please explain the apparent lack of review of WBN-2 applicable documents. Was appropriate review guidance used?

Further update required Provide model number/part number for the RM-1000 and I/F converter used for WBN-2. This information is needed to verify that the model or part number used is the equipment that has been qualified for WBN-

2.

Provide qualification reports 04038903-QSR and 04038903-7SP by the dues date of 1/22/11.

Submit a copy of any other relevant reviewed versions of the qualification reports.

Submit copies of the reviewed reports for 04508905-QR, 04508905-1SP, 04508905-2SP.

Clarification of

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments in section 5.

f.

GA-ESI report 04038903-7SP, Qualification Basis for 04034101-001 (2-RE-90-271, -272, -

273, & -274) [TVA Note: These are the containment post accident high range radiation monitors.]: GA-ESI report 04038903-7SP is divided into subsections to address the Environmental, Seismic, EMC, and Software qualification basis for the High Range Area Monitors. Within each subsection, the HRAM is compared to a tested or analyzed article to demonstrate similarity and/or evaluate differences, the tests that were performed, and evaluation to demonstrate qualification. In most cases, the qualification basis references other documents. In addition to qualification, a section is provided that lists the life of those replaceable components that have life expectancy less than 40 years.

(2) This is addressed by response to RAI Question 336 in TVA to NRC letter dated November 24, 2010 (Reference 8)

(3) This is addressed by response to RAI Question 337 in TVA to NRC letter dated November 24, 2010 (Reference 8)

(4) The 04508905-3SP Qualification Test Report Supplement, RM-1000 Upgrades is not applicable to WBN Unit 2 (Reference 19).

Please see Item 1, above, for applicability of the other reports.

(5) TVA provided the proprietary versions of the reports by letter dated March 12, 2010 (Reference 10). By letter dated July 15, 2010 (Reference 23), TVA provided the non-proprietary version of the reports and included a copy of the proprietary report which had been erroneously marked as having not been reviewed.

04508905-QR report has been reviewed by TVA. The review of the remaining reports is ongoing.

(6) See item 5.

TVA Response to Follow-up NRC Request:

The following documents are the qualification documents associated with the RM-1000 radiation monitors: contains the approved proprietary version of General Atomics Electronic Systems 04508905-1SP, Qualification Test Report Supplement, RM-1000 Upgrade.

contains the approved proprietary version of General Atomics Electronic Systems 04508905-2SP, Qualification Test Report Supplement, applicability of existing reports is acceptable.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments I-F Converter Upgrades.

contains the approved proprietary version of General Atomics Electronic Systems 04038903-7SP, Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274).

contains the proprietary version of General Atomics Electronic Systems 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors. In order to meet the NRC submittal schedule, the engineering review of this document was limited to the RM-1000. The document has been accepted for the RM-1000 monitors. Engineering approval will not occur until full review for all covered monitors is complete.

3 contains the approved proprietary version of General Atomics Electronic Systems 04508905-QR, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter.

327 DORL (Poole) 6 contains Foxboro proprietary drawings 08F802403-SC-2001 sheets 1 through 6. An affidavit for withholding and non-proprietary versions of the drawings will be submitted by January 31, 2011.

Responder: Webber In accordance with correspondence from Foxboro, there is no proprietary information contained in the 08F802403-SC-2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.

27. Y Open Response Included in letter dated 11/24/10 Open-NRC Review Due 11/24/10 346 7.5.2.

3 7.5 EICB (Singh)

TVA has previously stated in response to open item 319 that RM-1000 System Verification Test Results report, 04507007-1TR is not applicable to WBN-2. However, TVA has not provided a WBN-2 specific test results report. Please identify and provide the appropriate test results reports to complete the review.

Document 04507007-1TR is the RM-1000 System Verification Test Results. 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors (Attachment 8) and and 04038903-7SP, Qualification Basis for 04034101 (2-RE 271, 272, 273 & 274) (Attachment 7) are the Watts Bar Unit 2 equipment specific qualification reports.

TVA Response to Follow up NRC Request:

Report 04507007-1TR RM-1000 System Verification Test Results is applicable to the WBN Unit 2 monitors. The applicability is that 04507007-1TR includes all test cases called out in the 04507006 RM-1000 System Test Procedure Specification and contains evidence that the V&V tests were performed with version 1.0 software code. The verification report for version 1.1 software is document 04508005 RM-1000 Software Version 1.1 Software Verification Report. Document 04508006 RM-1000 Version 1.2 Software Verification and Validation Report shows that the required test was completed to validated version 1.2 code for the RM-1000.

The Engineering reviewed and approved proprietary versions of 04507007-1TR, 04508005 and 04508006 will be submitted within two weeks of receipt from GA-ESI. The unreviewed proprietary versions, non-proprietary versions and affidavit for withholding were submitted on TVA to NRC

28. N Open Due 4/15/11 Open-NRC Review Due: 2/25/11 The proposed response appears to be conflicting with the proposed response for OI-351 regarding not submitting the 04508905-QR report.

TVA to re-assess proposed response for both OIs.

TVA to re-evaluate previous responses to OI-316 and OI-319 which have conflicting responses regarding the applicability of 04507007-1TR.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments letter July 15, 2010 (Reference 3).

353 7.5.2.

3 7.5 EICB (Singh)

Please provide a summary of the [manufacturers] commercial dedication plan for radiation monitors with references to the guidance document that it follows. Also please include different facets (e.g. receiving, inspection, testing etc.) of the plan.

GA-ESI submitted their commercial grade dedication procedure (OP-7.3-240, Safety-Related Commercial Grade Item Parts Acceptance, Revision H) to engineering for review. Engineering review of the procedure found that the procedure, Section 5, did not require multiple dedication methods for complex CGI or CGI used in digital safety systems. As a result, it was determined that the GA-ESI program did not meet the requirements of NUREG-800, Section 7.0A, Revision 5.

A discussion with GA-ESI found that while not required by procedure, GA-ESI does perform vendor surveys as required by Method 2 of NP-5652. The surveys are done based on prudent business practices. Based on this discussion, GA-ESI agreed to review the CGI used in the WBN Unit 2 digital safety-related monitors to determine if they had been dedicated by more than one method.

The review of the CGI used in the WBN Unit 2 digital safety-related monitors determined that all CGI had been dedicated using Method 1 of EPRI guideline NP-5652. However, in the sample of items reviewed, there were CGI that were dedicated using a single method. Based on the results of the engineering procedure review and the results of the GA-ESI CGI review, Service Request 346896 was initiated to document the condition and to place the monitors in Conditional Release status.

Based on the results of the previous reviews, GA-ESI agreed to the following plan of action to resolve the CGD issue:

1.

GA-ESI shall revise its commercial grade dedication procedure (OP-7.3-240) to require multiple dedication methods be utilized for complex commercial grade items and commercial grade items for digital safety class systems. The evidence that this has been completed will be provided to TVA by April 15, 2011.

Specifically, Method 1 and at least one additional method from the list below will be used to ensure that the CGD procedure complies with the current SRP.

Method 1 - Special Tests and Inspections Method 2 - Commercial Grade Survey of Supplier Method 3 - Source Verification Method 4 - Acceptable Supplier/Item Performance Record

2.

GA-ESI shall take actions consistent with the revised operating procedure to address the CGls used in the WBN Unit 2 safety-related digital monitors. Evidence that those actions have been completed will be provided no later than September 1, 2011.

Based on the above action plan, TVA will resolve the issues with the GA-ESI CGD of CGI used in the WBN Unit 2 monitors and submit documentation of the resolution to the

29. N Open Due 4/15/11 Open-NRC Review TVA to note that staff has written a safety evaluation and accepted EPRI TR-106439 (1996) as an acceptable method of addressing commercial dedication. EPRI NP-5652 must be used in conjunction with the additional guidance in EPRI TR-106439 for commercial dedication processes e.g. EPRI NP-6404, EPRI TR-102260, GL 89-02, and GL-91-05 per Section 3.3 of EPRI TR-106439.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments NRC by:

GA-ESI procedure OP-7.3-240 revision: April 30, 2011 Resolution of CGD of CGI used in WBN Unit 2 RM-1000 monitors: September 15, 2011 357 7.5.2.

3 7.5 EICB (Singh)

In Attachment 5, Qualification Test Report Supplement, RM-1000 (04508905-1SP), Attachment 6, Qualification Test Report Supplement, I-F Converter Upgrade (04508905-2SP), and 3, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter (04508905-QR), the applicant made a statement that the results for these tests are provided in SE document 04508903-1TR. Please provide SE document 04508903-1TR for the staff to review. IF this report has been submitted earlier then please advise us the letter number and date by which it was submitted. contains GA-ESI qualification report 04508903-1TR Seismic Qualification Test Results RM-1000 and Current-to Frequency (I/F) Converter original release, dated April 1999.

30. N Open-NRC Review 358 7.5.2.

3 7.5 EICB (Singh)

The attachment numbers refer to your February 25, 2011 letter. In, Wyle Test Report 41991 Safety Shutdown Earthquake (SSE) Test Response Spectra (TRS) Plots all five (5) pages, in Attachment 5, General Atomics Electronic Systems 04508905-1SP, page 5-5, Figure 5-2, and in Attachment 23, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter (04508905-QR), page 4-25, Figure 4-5 X-Axis SSE Test Response Spectra (TRS) versus Required Response Spectra (RRS), it shows that the TRS were below the RRS at various frequency (5% Damping). Please provide an explanation regarding why this is acceptable.

An incomplete response was inadvertently submitted in TVA to NRC letter dated March 31, 2011 (Reference 1). The following response supersedes the previous response in its entirety.

1., Wyle Test Report 41991 Safety Shutdown Earthquake (SSE) Test Response Spectra (TRS) Plots all five (5) pages. These five Test Response Spectra (TRS) Plots versus Required Response Spectra (RRS) show that the TRS were below the RRS at various frequency (5% Damping).

Please provide an explanation regarding why this is acceptable.

of this letter provides five pages from the first seismic test (Wyle Test report 41991) from GA-ESI report 04508903-1TR, submitted in response to OI-357 on TVA to NRC letter dated March 31, 2011 (Reference 1). The following discussion refers to these pages.

Wyle test report 41991 provided the seismic test results for two RM-1000 monitors (one area monitor and one process monitor) and one I/F converter. During the test, the RM-1000 monitor configured as an area monitor was damaged due to the test table impacting its mechanical stop (see page 4 of Wyle Test Report 41991 attached).

This first test was completed for the RM-1000 monitor configured as a process monitor and the I/F converter.

A second seismic test for the RM-1000 monitor configured as an area monitor and two I/F converters (Wyle Test Report 41991-1) is also included in 04508903-1TR. The RM-1000 monitor used in this second test was the same RM-1000 process monitor used in the first seismic test reconfigured (switch in application type 1 mode) as an area monitor. One of the I/F converters tested was the same I/F converter tested in the first seismic test. This second test was performed to complete the testing which could not be performed during the first seismic test due to the damage to the RM-1000 area monitor and the loss of the high voltage power supply to the I/F converter that occurred during the first seismic test. None of the TRS plots in this

1.

N Open Due 4/15/11 Open-NRC Review

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments second seismic test report 41991-1 were below the RRS.

General Atomics Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter (04508905-QR) refers to both Wyle Reports 41991 and 41991-1 included in report 04508903-1TR. It is recognized that the five TRS Plots versus the RRS where the TRS were below the RRS is an exceedance that must be justified. From Wyle report 41991 it can be determined that these five TRS versus RRS plots are for the seismic response in the front to back panel direction.

The RRS used in the Wyle test reports envelopes the TVA standard RRS shown in Fig 3.1 of TVA Standard Specification CEB-SS-5.10, For Seismic Qualification of Electrical, Mechanical and I&C Devices, submitted on TVA to NRC letter dated February 25, 2011, (Reference

2) below 33 Hz. This TVA standard RRS conservatively envelopes the in panel seismic demand for most TVA applications. For specific cases when required the actual in panel RRS can be developed. Calculation WCG-ACQ-0766, In-Cabinet Required Response Spectra for RM-1000 Radiation Monitors in MCR Panel 2-M-30, Revision 0, (Attachment 3) has been issued to generate the 5% RRS for these safety related RM-1000 monitors, I/F converters and NIM bins for the WBN2 panel (2-M-30) where they will be installed. As can be seen from the RRS plots in calculation WCG-ACQ-0766 the front to back 5% RRS broad band peak is 9.76 g which is lower than the front to back 5% TRS shown in the subject five (5) plots.
2., General Atomics Electronic Systems 04508905-1SP, page 5-5, Figure 5-2. The Figure 5-2 Test Response Spectra (TRS) Plots versus Required Response Spectra (RRS) shows the TRS to be below the RRS at various frequency (5% Damping). Please provide an explanation regarding why this is acceptable.

The display module for the RM-1000 monitors procured for WBN2 differs from that used in previous RM-1000 qualification tests. The seismic qualification basis for the WBN2 display module is established by similarity to the display module used in RM-2000 monitor qualification tests shown on page 5-4 and 5-5 of 04508905-1SP (pages attached). The basis for the similarity discussion is provided on pages 5-2 and 5-3 of 04508905-1SP. The TRS non-exceedance at approximately 6-7 Hz shown on page 5-5 is not applicable to WBN2 since the RRS shown on that figure is not used for WBN2 qualification. The correct comparison for WBN2 would be the TVA standard RRS shown in Fig 3.1 of CEB-SS-5.10 for 5% damping. The TRS shown on page 5-5 meets or exceeds all points of the TVA standard RRS. Therefore, the seismic qualification of the WBN2 display module is provided by pages 5-4 and 5-5 for which the TRS completely envelopes the TVA standard RRS shown in Fig 3.1 of CEB-SS-5.10. Additionally, as previously stated,

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Calculation WCG-ACQ-0766 was issued to generate the 5% RRS for the WBN2 panel (2-M-30) where the safety related RM-1000 monitors will be installed. The vertical 5% RRS plot in calculation WCG-ACQ-0766 broad band peak is 4.2 g which is lower than the 5% TRS shown in 04508905-1SP, page 5-5, Figure 5-2.

3. 3, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter (04508905-QR), page 4-25, Figure 4-5 X-Axis SSE Test Response Spectra (TRS) versus Required Response Spectra (RRS) shows the TRS to be below the RRS at various frequency (5% Damping). Please provide an explanation regarding why this is acceptable.

This Figure 4-5 is one of the same figures identified in item 1. See item 1. for the appropriate discussion.

359 7.7.1.

1 EICB (Carte)

Was the CERPI system developed under a 10 CFR 50 Appendix B compliant program?

CERPI is a non-safety related system. Therefore, 10 CFR 50 Appendix B is not applicable.

31.

Open Due 4/15/11 Open-NRC Review 360 EICB (Garg)

In order for staff to review the acceptability of the Incore Instrumentation System (IIS):

(a) Provide a brief system description of IIS and its regulatory compliance. In your discussion include the discussion of WINCISE and BEACON system which are part of the IIS.

Also provide the differences between the system used at WBN Unit vs. at Unit 2, e.g. Movable vs. fixed IIS. For WINCISE provide the basis for acceptance.

(b) If this system has been accepted by the staff previously at some other plant then provide the reference to that SE.

Identify the document that describes the functionally of the IIS that is identical to the IIS used in the Westinghouse AP1000 reactor design.

(c) If this has not been evaluated by the staff previously, then provide the effect of CCF of this system and its effect on safety system or chapter 15 analysis.

(d) Does this have any interconnection with safety system?

(e) For BEACON provide the acceptability of this system. I believe that this system was accepted at WBN Unit 1. If that is the case then provide the reference to that review. Also provide any differences of this system to the one at WBN Unit 1 system.

(f) Please provide detailed information about the In-core Instrumentation System (IIS) to be installed in Watts Bar Unit

2. This information should indicate how the system meets the requirements established in the Standard Review Plan, including system concept, system requirements, system design, and system development, as well as the regulatory requirements identified for Watts Bar Unit 2.

(a) The Watts Bar Unit 2 In-core Instrumentation System (IIS) replaces all of the functionality provided by the Movable Incore Detector System (MIDS) used at Watts Bar Unit 1. The IIS to be used at Watts Bar Unit 2 is a Westinghouse IN-Core Information, Surveillance, and Engineering (WINCISE) System that is functionally described in Section 7.7.1.9 of the Watts Bar Unit 2 Final Safety Analysis Report (FSAR). The WINCISE-style IIS used at Watts Bar Unit 2 is essentially the same as the in-core power distribution measurement systems used at most Combustion Engineering style of operating reactors that use a type of in-core neutron sensors commonly called "Fixed In-core Detectors (FID)." The Watts Bar Unit 2 IIS is functionally identical to the IIS used in the Westinghouse 1AP1000' reactor design.

The Watts Bar Unit 2 IIS includes the FIDs, Core Exit Thermocouples (CET), FID and CET signal cables, the FID signal processing hardware, and the FID signal processing software. This hardware and software is required to provide the measured signals to the associated BEACON System to periodically determine whether the reactor is operating within design core peaking factor limits. A detailed description of the Watts Bar Unit 2 IIS hardware is provided in the document titled, Westinghouse Incore Information Surveillance &

Engineering (WINCISE) System Technical Manual, NO-WBT-002, Revision 0 supplied by Westinghouse to TVA in September of 2010.

The qualification for the BEACON System to perform the core power distribution measurement function using the Watts Bar Unit 2 WINCISE style IIS instrumentation is documented in the generic NRC Safety Evaluation Reports (SER) provided with WCAP-12472-P-A,

32.

Open Due 4/15/11 Open-NRC Review 1 AP-1000 is a registered trademark of the Westinghouse Electric Company LLC

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (g) Please provide a description on how the system will meet the regulatory requirements identified in Table 7.1-1 of the SRP, applicable to the IIS.

(h) Provide detailed description about the connection and communication for the signals to be transmitted from the Core Exit Thermocouples to the Common Q Post Accident Monitoring System (PAMS). Also, describe how this communication will meet the NRC communications regulatory requirements.

(i) Please provide the following Westinghouse document: NO-WBT-002, Westinghouse Incore Information Surveillance &

Engineering (WINCISE') System Technical Manual.

(j) Provide the failure modes and effects analyses for the IIS, documented in calculation WBNOSG4220 WB Incore Instrumentation System Failure Modes and Effects Analyses, and demonstrate how these potential failures do not adversely affect reactor safety.

BEACON Core Monitoring and Operations Support System, Addendum I-A and Addendum 2-A.

(b) The WINCISE style IIS used at Watts Bar Unit 2 is essentially the same as the in-core power distribution measurement systems used at all Combustion Engineering style of operating reactors that use a type of in-core neutron sensors commonly called "Fixed In-core Detectors (FID)." The Watts Bar Unit 2 IIS is functionally identical to the IIS described in the Westinghouse AP1000 design documents and approved in the Westinghouse AP1000 SER section 7.5.7 as documented in Westinghouse Letter WBT-D-____,

title, dated April 14, 2011 (Attachment 7)

(c) The digital in-core flux monitoring portion of the IIS is non-safety-related. As such, CCF analysis is not required by NUREG-800 section 7.0-A. The IIS has no impact on any Safety Analysis documented in Chapter 15 of the Watts Bar Unit 2 FSAR.

(d) The IIS includes the 1E qualified CET and CET analog signal cables required to allow the CETs to be directly connected to the Common Q Post Accident Monitoring System (PAMS). There is no other interface to safety systems. The CET signals are electrically isolated from signals output from the non-1E FID signals and signal processing electronics.

(e) The qualification for the BEACON System to perform the core power distribution measurement function using the Watts Bar Unit 2 WINCISE style IIS instrumentation is documented in the generic NRC Safety Evaluation Reports (SER) provided with WCAP-12472-P-A. This WCAP generically approves the BEACON System for use at PWR reactors including those using Movable In-core Detector Systems (MIDS) like Watts Bar Unit 1 and, through Addendum I-A and 2-A, those like Watts Bar Unit 2 using a WINCISE type fixed in-core instrumentation system.

The specific differences between the Unit 1 and Unit 2 core power distribution measurement systems are too numerous to simply list. A detailed description of the Watts Bar Unit 2 IIS hardware is provided in section 2 of the WINCISE System Technical Manual NO-WBT-002 (Attachment 5).

(f) NUREG-800 section 7.0-A, Table 7.0-A-1. Review Topics for Various Systems, requires only a limited review for non-safety related system discussed in NUREG-800 section 7.7 Control. WINCISE is a non-safety-related, indication only system within the scope of NUREG-800 section 7.7. The limited review required is:

Control systems receive a limited review as necessary to confirm that control system failures cannot have an adverse effect on safety system functions and will not pose frequent challenges to the safety systems. The

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments only WINCISE interface with a safety-related system is the CET in the IITA which is hardwired to the Common Q PAMS system. See item (g) below for a description of the qualification process that demonstrates that failures in the balance of the WINCISE system do not impact the performance of the safety-related CET function.

(g) With the exception of the IITA hardware, WINCISE is a non-safety-related indication system. The IITA assemblies meet the following criteria:

i.

R.G. 1.26 Rev. 3 Quality Group Classification and Standards for Water, Steam and Radioactive Waste Components of Nuclear Power Plants ii.

R.G. 1.38 Rev. 2 Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage and Handling of Items for Water-Cooled Nuclear Power Plants iii.

R.G. 1.71 Rev. 0 Welder Qualification for Areas of Limited Accessibility iv.

R.G. 8.8 Rev. 3 Information Relevant to Ensuring that Occupational Radiation Exposure at Nuclear Power Stations will be As Low As Reasonably Achievable

v.

R.G. 8.19 Rev. 1 Occupational Radiation Dose Assessment in Light-Water Reactor Plants Design State Man-Rem Estimates vi.

R.G. 1.84 Rev. 27 Design and Fabrication Code Case Acceptability - ASME Section III, Division 1R.G. 1.85 Rev. 27 Material Code Case Acceptability - ASME Section III, Division 1 1.1.4 The design, materials, fabrication, inspection, and testing of the IITA shall be in accordance with the ASME Boiler and Pressure Vessel Code,Section III Class 3, and all applicable Code Cases as proposed by the supplier and approved by Westinghouse. Materials shall be in accordance with this specification.

1.1.5 Component Classification - The IITA is classified as an instrument tube, so it is not under the jurisdiction of the ASME per NCA-1130(c). However, the design, primary pressure boundary materials, and NDE Requirements are per ASME Section III, Class 3 and the IITA is classified as Safety Class 2.

The non-safety-related WINCISE Signal Processing System Cabinets are located inside containment and are therefore required to not impact the function of any safety-related equipment. To meet this requirement the cabinets were

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments tested and passed based on the following criteria:

i.

In accordance with WB-DC-40-31.2, Watts Bar Nuclear Plant Seismic Qualification of Category 1 Fluid System Components and Electrical or Mechanical Equipment, Revision 8, November 2000 and U.S. N.R.C. Regulatory Guide 1.100, Seismic Qualification of Electrical and Mechanical Equipment for Nuclear Power Plants, Revision 2, June 1988, the equipment must withstand five OBEs and one SSE without creating missiles. Testing was done in accordance with:

(1)

IEEE Std 344-1975, IEEE Recommended Practice for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations, Institute of Electrical and Electronics Engineers, Inc., 1975 (2)

IEEE Std 344-1987, IEEE Recommended Practice for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations, Institute of Electrical and Electronics Engineers, Inc., 1987 ii.

In accordance with U.S NRC Regulatory Guide 1.180 Guidelines for Evaluating Electromagnetic and Radio-Frequency Interference in Safety-Related Instrumentation and Control Systems, Revision 1, October 2003 and IEEE 323-1983 IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generator Stations, Institute of Electrical and Electronics Engineers, Inc., 1983, the equipment must not generate spurious electromagnetic emissions or suffer some common mode failure due to its operating environment that could directly or indirectly impact the operation of safety-related equipment (1)

IEC 61000-6-2, Electromagnetic compatibility (EMC). Generic Standards. Immunity for Industrial Environments, 2005 (2)

MIL-STD-461E, Requirements for the control of Electromagnetic interference Characteristics of Subsystems and Equipment, August 1999 (3)

IEC 61000-4-4, Electromagnetic compatibility (EMC) - Part 4-4: Testing and Measurement Techniques - Electrical Fast Transient/Burst Immunity Test, 1995 (4)

IEC 61000-4-12, Electromagnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 12:

Oscillatory Waves Immunity Tests, 1996 iii.

In order to demonstrate that a maximum expected surge of 600 volts on the power input to the cabinets

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments would not propagate and damage the CET cables in the IITA, the cabinets were surge tested in accordance with IEC 61000-4-5, Electromagnetic compatibility (EMC) - Part 4-5: Testing and Measurement Techniques - Surge Immunity Test, 1995.

(h) The cables for the CETs separate from the FID cables at the seal table. The CETs are connected directly to the Common Q PAMS cabinet. The FIDs are connected directly to the in-containment signal processing system cabinets.

(i) Attachment 5 is the proprietary section 2 Equipment Description of NO-WBT-002, Westinghouse Incore Information Surveillance & Engineering (WINCISE')

System Technical Manual. This is strictly a proprietary document and a non-proprietary version will not be submitted. An affidavit for withholding will be submitted within two weeks of receipt from Westinghouse.

(j) Attachment 6 is the proprietary WINCISE FMEA. A non-proprietary version and affidavit for withholding will be provided within two weeks of receipt from Westinghouse.

Westinghouse is available to discuss any specific questions on the methodology and hardware used in the Watts Bar Unit 2 IIS that the NRC believes are not well defined in the documents listed above.

361 7.7.1.

1 EICB (Carte)

Was the Foxboro IA system developed under a 10 CFR 50 Appendix B compliant program?

Foxboro I/A is a non-safety related system. Therefore, 10 CFR 50 Appendix B is not applicable.

33.

Open Due 4/15/11 Open-NRC Review 355 7.5.2.

3 7.5 EICB (Singh)

Staff has not found the stated exclusion zone for EMI/RFI interfering devices (e.g. hand-held radio devices) in the submitted documents. TVA to provide the distance for the exclusion zones if not provided already. If it is already a submitted information then please point the source of the information.

Cautions and distance limitations for WBN Unit 1 legacy equipment are documented in TVA procedure TI-134, Revision 0, Control of Portable Two-Way Radios, (Attachment 7) Appendix B. Where WBN Unit 2 uses the same legacy equipment, the same cautions and distance limitations apply.

New equipment is procured and tested to TVA Standard Specification SS E18.14.01, Revision 3, Electromagnetic Interference (EMI) Testing Requirements for Electronic Devices (Attachment 6). The TVA specification is conservative with respect to Regulatory Guide 1.180, Revision 1. The specification requires that equipment not be susceptible to external interference or create external interference. New equipment is either tested by the manufacturer or tested in the TVA EMI test facility to ensure it meets the specification. If issues are found, the equipment is modified and installation documents are revised to eliminate the issue(s). This is true for the RM-1000 radiation monitors which were tested prior to installation in Browns Ferry at 10v/meter (Browns Ferry High Range Radiation Monitor dated December 8, 2006). Based on this, no exclusion zone for radio use is required for the RM-1000 radiation monitors in WBN Unit 2.

34. Y Open Due 4/15/11 Open-NRC Reviewl TVA to provide commitment that an EMI/RFI survey will be conducted after the installation of the equipment to confirm the non-susceptibility when using portable radio-frequency sources such as hand-held radios or other authorized devices that may be used in the control room.

Summary of the results to be submitted to NRC to close this item.

Survey results are to be available for audit by NRC.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response to Follow-up NRC Request:

TVA will perform an EMI survey of the containment high range radiation monitors after installation in WBN Unit 2 and submit the results to the NRC within two weeks of the survey being completed.

323 EICB(Garg)

WCAP-13869 revision 1 was previously reviewed under WBN Unit 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An analysis of the differences and their acceptability will be submitted to the NRC by November 15, 2010 Responder: Hilmes/Unit 1 2 contains the WCAP 13869 Revision 1 to Revision 2 Change Analysis.

TVA Response to Follow-up NRC Request A FSAR change will be submitted in a future FSAR amendment to change the revision level back to 1.

TVA Response to Second Follow-up NRC Request The differences between the Revision 1 and Revision 2 WCAPs is documented in Attachment 12, WCAP 13869 Revision 1 to Revision 2 Change Analysis, to TVA to NRC letter dated October 29, 2010 (Reference 2). The design bases for the response to feedwater break inside containment, as documented in Chapter 15 of the WBN Unit 2 FSAR, is the same for WBN Unit 1. Since WBN Unit 2 is required to match the WBN Unit 1 licensing basis to the extent practical, the decision was made to revise the WBN Unit 2 FSAR to agree with the WBN Unit 1 FSAR which uses Revision 1.

2.

Y Open Due 3/29/11 Revised Response is included in letter dated 10/29/10 The staff is confused with the response since both units have reference leg not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 Open-TVA/Bechtel Due:

Need to provide additional info on why Rev. 1 is acceptable for both units.

3/10/11 Staff does not agree with the statement that there is no technical differences between WCAP-13869 rev.1 and rev2., but staff agree that rev1 and change analysis could be basis for acceptance for both Watts Bar units.

4/6/11 TVA response is acceptable, however this item remains open until TVA makes changes to FSAR.

TVA Letter dated 10/29/10 Item No. 36 340 7.5.2.

3 7.5 EICB (Singh)

Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B.

Responder: GA The following responses are based on e-mail: GA-ESI to Bechtel, dated December 8, 2010 (Reference 20),

(1) The EMI/RFI tests described in Table 3-2 are based on GA-ESI report 04509050 and are summarized in GA-ESI report 04508905-QR. The independent laboratory report, with curves, is part of GA-ESI report 04509050.

Subsequent to issuing GA-ESI report 04508905-QR additional EMC testing was performed in accordance with TVA specific requirements. The results of the subsequent EMC testing are reported in GA-ESI report 04038800. GA-ESI report 04038800 includes the test curves and the report is used as the basis for EMC qualification of the Upper and Lower Inside Containment Post Accident Radiation Monitors (2-RE-90-271 through -274). The results of the testing and the acceptability of the RM-1000 monitors for use at WBN Unit 2 are addressed in GA-ESI report 04038903-7SP. This report will be submitted no later than January 28, 2010.

(2) ENV 50140, EN 55011, and EN 55022 are British

35. N Open Due 4/30/11 Response included in letter dated 12/22/10.

Open-TVA/Bechtel Provide the qual reports by 1/28/11 per TVA letter of 12/22/10.

Due: 2/25/11 Clarification Needed:

Per 2/25/11 response TVA document SS-E18.14.01, Rev. 3 is the source document for all testing. Please provide this document for staff review. In addition British Standards (e.g. ENV 50140) have been cited in testing which are not per RG 1.180, R1. TVA to describe compliance of SS-E18-14.01 to RG 1.180 with justification for deviations. No test

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Standard Institution (BSI) publications concerning equipment electromagnetic and radio frequency performance. The standard titles are shown below:

a.

ENV 50140 - Electromagnetic Compatibility -

Basic Immunity Standard - Radiated Radio-Frequency Electromagnetic Field - Immunity Test

b.

EN 55011 - Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurement

c.

EN 55022 - Information technology equipment -

Radio disturbance characteristics - Limits and methods of measurement TVA Response to Follow-up NRC Request:

The total EMI/RFI testing of the RM-1000 and current-to-frequency converter is documented in the following reports:

contains the proprietary version of General Atomics Electronic Systems 04508905-1SP, Qualification Test Report Supplement, RM-1000 Upgrade. See sections 5.1.1, 5.1.2 and 5.1.4 for EMI/RFI.

contains the proprietary version of General Atomics Electronic Systems 04038903-7SP, Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274). See section 5 for EMC qualification basis.

contains the proprietary version of General Atomics Electronic Systems 04038903-QSR, Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors. See section 3.4 for electromagnetic compatibility qualification requirements.

3 contains the proprietary version of General Atomics Electronic Systems 04508905-QR, Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter. See sections 3.2.1 through 3.2.5 and 6.2 for EMI/RFI.

Attachments 7 and 8 document the EMI/RFI testing specific to the WBN Unit 2 RM-1000 monitors and current-to-frequency converters.

TVA Response to Second Follow-up NRC Request:

GA-ESI qualification report 04038903-7SP, Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274)

Revision C dated February 22, 2011(Proprietary), submitted on TVA to NRC letter dated February 25, 2011 (Reference 2), section 5.1 states:

GA-ESI has performed the tests on a 2 channel RM-1000 radiation monitoring system the configuration of which is shown in GA-ESI drawing 04509000 System Installation Configuration, RFI/EMI Test, RM-1000 the results of which are issued in GA-ESI report 04038800, RM-1000 EMC Test Report, TVA and 04509050, RM-1000 EMC Test Report.

curves have been provided in any of the reports. As a minimum TVA to provide a few sample test curves or justify not supplying them.

No EMI/RFI curves have been provided as yet. TVA to provide representative curves.

NRC review proceeding in parallel.

NRC current review guidance is based on compliance with RG 1.180 or equal with justification for variations. TVA is requested to provide the roadmap for compliance to RG 1.180 with justifications for any deviations.

Simply following TVA standard specification SS E18.14.01, Rev. 3 is not sufficient.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments The equipment tested used an RM-1000 microprocessor radiation monitor Display/Control NIM Bin Assembly, an I-F Converter, line filter, and an RD-23 detector. The monitor system being qualified is the same as the monitor system tested and includes ECO-17656 modifications to ensure EMC compliance.

contains the TVA Browns Ferry High Range Radiation Monitor which contains the requested EMI test curves. We have confirmed that the GA-ESI reports (04509050, RM-1000 EMC Test Report, dated 4/22/03 and 04038800, RM-1000 EMC Test Report, dated 11/11/99) included in the TVA report are applicable to the WBN Unit 2 RM-1000 monitors. The non-proprietary versions and affidavit for withholding of GA-ESI reports (04509050 and 04038800) will be submitted within two weeks of receipt from GA-ESI.

GA-ESI qualification report 04038903-7SP, section 5, provides a detailed discussion of the test results in GA-ESi report 04509050.

362 7.6.1 7.6.7 EICB ( Kemper & Singh)

OI #331 requested TVA to provide information regarding how the Loose Parts Monitoring System (LPMS) in-containment components (e.g., Accelerometer ( including the integral insulated hardline cable), Softline cable, and Remote Charge Preamplifiers) were qualified for vibration as addressed in regulatory position C.1.g of RG 1.133, Rev. 1. TVA responded by stating that TVA has reviewed the information provided by Westinghouse describing how the Loose Part Monitoring System (LPMS) sensor is qualified for normal operating conditions provided in Westinghouse letter WBT-D-2782, dated December 17, 2010 (Reference 11) as addressed in regulatory position C.1.g of Reg. Guide 1.133 and found it acceptable. Vibration qualification is not applicable to the softline cable. Due to the installation location (junction boxes mounted to the shield or fan room walls) and previous seismic qualification, vibration qualification of the charge converter/preamplifier is not required. This completes the response to this item.

However, the staff still desires further clarification on this response. Specifically, please provide a documented basis that demonstrates the LPMS in-containment equipment is qualified for normal operating conditions (e.g., test results compared to the equipment qualification specification), including vibration qualification. Also, provide justification for why vibration qualification if the Remote Charge Preamplifier is not required.

TVA committed to provide a letter on the docket (targeted is for 4/30/2011) stating why the the in-containment equipment has been qualified for vibration per RG 1.133, Rev. 1.

3.

Open-TVA Open-TVA/Bechtel 363 7.5.1.

1.3 and 7.9.1 7.5.2 EICB (Rahn and Mossman)

OI#199 requested TVA to provide information concerning how TVA plans to meet regulatory criteria for Quality (10 CFR 50.55a(a)(1))

associated with the Technical Support Center and Nuclear Data Link. TVA responded in Letter Dated October 5, 2010, Item 63; however, TVAs response does not address the quality aspects of these system features. A similar question had been asked for Quality Criteria adherence for the SPDS and the BISI functions of the Integrated Computer System. In response to that request (same letter) TVA provided a description of TVA procedures, BISI software development procedures, and various management measures that will be taken to assure high quality in the design, operation, and maintenance of the SPDS and BISI functions of the

4.

Due 4/30/11 Open-TVA/Bechtel

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments ICS. Since the TSC and Nuclear Data Link information originates in the SPDS function of the ICS, are there any aspects of the quality measures that apply to the TSC and NDL features developed as part of quality processes for the ICS that are applicable to the data communications features?

Specifically, what is the scope of TVA Procedure SPP-2.6 Computer Software Control? How does it apply to the ICS functions of a) SPDS, b) BISI, and c) TSC and NDL functions?

Wouldnt there be aspects of the quality procedures that apply to the development, maintenance, and operations of the software needed to support the data communications features. Also, what quality measures will be applied to develop, maintain, and operate the hardware that accomplishes the TSC and NDL functions to ensure that these features will be reliable and available when needed?

349 7.5.2.

3 7.5 EICB (Singh)

Radiation testing was not considered in any of the test reports as all the equipment has been assumed to be located in nuclear power plant areas with mild environments and radiation dosages less than 1 x 103 rads for total integrated dose (TID). However, the radiation monitors and the I/F converters are located in the main control room which is defined as mild environment. For WBN-2 mild environment is defined as room or building zone where (1) the temperature, pressure, or relative humidity resulting from the direct effects of a design basis event (DBE) (e.g.,

temperature rise due to steam release) are no more severe than those which would occur during an abnormal plant operational condition, (2) the temperature will not exceed 130ºF due to indirect effects of a DBE, (3) the event radiation dose is less than or equal to 1 x 104 rads, and (4) the total event plus the 40 year TID (total integrated dose) is less than or equal to 5 x 104 rads (reference WB-DC-40-54). TVA to address lack of radiation qualification for WBN-2.

The design criteria provides the criteria for determining what is a mild environment at WBN Unit 2. Calculation WBNAPS4004 Summary of Mild Environment Conditions for Watts Bar Nuclear Plant provides the actual values for each area of the plant. In accordance with Table 1, the Control Room has a 40 year maximum TID of 3.5x102 RAD and a maximum integrated accident dose of 710.5 RAD for a maximum TID of 1060.5 RAD.

The accident dose of 710.5 RAD is the dose for a 100 day LOCA at the surface of the HEPA filter in the Mechanical Equipment Room. This is documented in TVA calculation WBNTSR-005, Dose Due to the Control Building Emergency Air Cleanup Filters Revision 3. However, on page 25 of WBNTSR-005, the shine from this source into the control room is negligible and is not considered in the dose calculation for the control room.

Calculation WBNAPS3-126, EQ Dose in the U1/U2 Auxiliary Instrument Rooms and the Computer Room in the Control Building Revision 0 documents the environmental qualification (EQ) radiation dose in the control building. A review of this document by the TVA radiation protection engineer determined that the TID including the normal and accident dose values for the control room is less than 1x103 RAD. Calculation WBNAPS3-126, will be revised to include the control room by July 1, 2011. Since the control room TID has been determined to be less than 1x103 RAD, radiation qualification of the RM-1000.

1.

Y Open Open-TVA/Licensing Due: 2/25/11 TVA to provide the assessment document or a summary of the document with the reference to the appropriate document/documents.

February 25, 2011 response is acceptable.

Item will be tracked as a confirmatory item in the SE. TVA to provide calculation or summary of calculation when complete.

092 DORL (Poole) 5/20/2010 TVA to review Licensee Open Item list and determine which items are proprietary.

Responder: Hilmes This item will close when we are no longer using this document as a communications tool.

1.

Y Open Due SER Issue Open-TVA/Oversight Due: SER Issue Continuous review as items are added 364 7.5.2.

2 7.5 EICB (Carte)

On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an evaluation of the Common Q PAMS against the current staff position.

By letter dated 2/25/11 (ML110620219), TVA docketed a response: TVA performed an analysis and concluded that the Common Q PAMS equipment does not need to meet either IEEE 279-1971 or IEEE 603-1991 and so no analysis was performed or

1.

N Open Due 5/15/11 Open-TVA/WEC NNC 4/125/2011: See Open Item No.

81.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments provided.

However, SRP (NUREG-0800 Rev. 2 dated March 2007) Section 7.7, Information System Important to Safety, specifically identifies IEEE Std 603-1991 as being applicable to accident monitoring instrumentation. Based upon the review of this item, the staff finds the following open items:

1 TVA to demonstrate that the Common Q PAMS meets the applicable regulatory requirements in IEEE Std 603-1991.

2 TVA to updated FSAR (Amendment 103) Table 7.1-1 to reference IEEE Std 603-1991 for WBN2 Common Q PAMS and Sorento Containment High Radiation Monitors.

365 7.5.2.

2 7.5 EICB (Carte)

On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an evaluation of the Common Q PAMS against the current staff position.

By letter dated 2/25/11 (ML110620219), TVA docketed a response: that WBN2 is not committed in complying with Reg.

Guide 1.75Since WBN2 is not committed to RG 1.75 or IEEE-384, no comparison is required However, WBN2 is committed to RG 1.75 Rev. 2, Physical Independence of Electric Systems. RG 1.75 Rev. 3 and IEEE Std. 384-1992 are used, in part, to address IEEE Std 603-1991 Clause 5.6.1. The current NRC staff position for RG 1.75 is documented in Rev. 3. Based upon the review of this item, the staff finds the following open item:

1 TVA to updated FSAR (Amendment 103) Table 7.1-1 to include RG 1.75 Rev. 3 for WBN2 Common Q PAMS and the Sorento Containment High Radiation monitor.

The Common Q PAMS was designed to meet the requirements of RG 1.75 Rev. 2. WBN2 did not perform an analysis to RG 1.75 Rev. 3. Based upon the review of this item, the staff finds the following open item:

2 TVA to evaluate Common Q PAMS and the Sorento Containment High Radiation monitor for conformance with RG 1.75 Rev. 3.

2.

Open Due 5/15/11 Open-TVA/WEC NNC 4/125/2011: See Open Item No.

81.

366 7.5.2.

2 7.5 EICB (Carte)

On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an evaluation of the Common Q PAMS against the current staff position.

By letter dated 2/25/11 (ML110620219), TVA docketed a response: TVA stated that the Common Q PAMS equipment fully meets the RG 1.100 Rev. 0 and is compliant with Rev. 3, with exception of testing above 33 Hz, which is not applicable to Watts Bar.

The WBN2 FSAR (Amendment 103) references Regulatory Guide 1.100 Rev. 1 Seismic Qualification of Electrical Equipment for Nuclear Power Plants. The Common Q PAMS was designed to meet the requirements of RG 1.100 Rev. 2. RG 1.100 Rev. 3 is the current revision of this guide and is endorsed by the NRC. RG 1.100 Rev. 3 endorses IEEE 344-2004.

Based upon the review of this item, the staff finds the following open item:

1 TVA to updated FSAR (Amendment 103) Table 7.1-1 to

3.

N Open Due 5/15/11 Open-TVA/WEC NNC 4/125/2011: See Open Item No.

81.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments include RG 1.100 Rev. 3 for WBN2 Common Q PAMS and the Sorento Containment High Radiation monitor.

or 2

TVA to evaluate Common Q PAMS for conformance with RG 1.100 Rev. 1.

367 7.5.2.

2 7.5 EICB (Carte)

On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an evaluation of the Common Q PAMS against the current staff position.

By letter dated 2/25/11 (ML110620219), TVA docketed a response.

The WBN2 FSAR (Amendment 103) references RG 1.153 Rev. 0, Criteria for Safety Systems. The Common Q PAMS is designed to meet the requirements of RG 1.153 Rev. 1. By letter dated February 25, 2010 (ML110620219), TVA stated:

The subject Regulatory Guides [RG 1.153 Rev. 0 & 1]

endorse and reference other standards. Common Q PAMS has been evaluated to comply with the requirements of these other endorsed standards ([Comparison report in this letter titled IEEE-279-1971 to IEEE-603-1991 Comparison]).

Therefore no additional analysis needs to be performed and no further action is necessary.

However, the Comparison report in this letter titled IEEE-279-1971 to IEEE-603-1991 Comparison, stated:

The first of the two standards, IEEE-279, is part of the design basis of WBN2 but is not relevant to Common Q PAMS. The second standard, IEEE-603-1991 is not part of the design basis for the Common Q PAMS forWBN2.

Based on the reasoning quoted above, WBN2 did not evaluate the Common Q PAMS against the criteria of RG 1.153 Rev. 1; therefore, the staff finds the following open item (see also Open Items No. 1 & 2 above.):

1 TVA to evaluate Common Q PAMS for conformance with RG 1.153 Rev. 1.

4.

N Open Due 5/15/11 Open-TVA/WEC NNC 4/125/2011: See Open Item No.

81.

368 7.5.2.

2 7.5 EICB (Carte)

On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an evaluation of the Common Q PAMS against the current staff position.

By letter dated 2/25/11 (ML110620219), TVA docketed a response.

The WBN2 FSAR (Amendment 103) references RG 1.152 Rev. 0, Criteria for Digital Computers in Safety Systems of Nuclear Power Plants. The Common Q PAMS was designed to meet the requirements of RG 1.152 Rev. 1. RG 1.152 Rev. 2 is the current revision of this guide and is endorsed by the NRC. By letter dated February 25, 2010 (ML110620219), TVA stated:

RG 1.152 rev 2 endorses ANSI/IEEE-ANS-7-4.3.2-2003, but also provides extra regulatory guidance concerning computer based cyber security. Since this revision was not part of the design basis of WBN2 or Common Q PAMS, the project makes no commitment to the compliance of RG 1.152 rev 2.

Based upon the review of this item, the staff finds the following open item:

5.

N Open Due 5/15/11 Open-TVA/WEC NNC 4/125/2011: See Open Item No.

81.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 1

TVA to evaluate Common Q PAMS for conformance with RG 1.152 Rev. 2.

369 7.5.2.

2 7.5 EICB (Carte)

On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an evaluation of the Common Q PAMS against the current staff position.

By letter dated 2/25/11 (ML110620219), TVA docketed a response.

The WBN2 FSAR (Amendment 103) references IEEE 7-4.3.2-1982, "IEEE Standard Criteria for Digital Computers in Safety Systems of Nuclear Power Generating Stations" as endorsed by Regulatory Guide (RG) 1.152, "Criteria for Use of Computers in Safety Systems of Nuclear Power Plants," Revision 0 for the Eagle 21 system. The current regulatory position is documented in RG 1.152 Rev. 2 which endorses IEEE Std 7-4.3.2-2003 as an acceptable method for using digital computers to meet IEEE Std 603-1991. Based upon the review of this item, the staff finds the following open item:

1 WBN2 to updated FSAR Table 7.1-1 to reference IEEE 7-4.3.2-2003 as being applicable to WBN2 Common Q PAMS and the Sorento Containment High Radiation monitor.

6.

N Open Due 5/15/11 Open-TVA/WEC NNC 4/125/2011: See Open Item No.

81.

370 7.5.2.

2 7.5 EICB (Carte)

On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an evaluation of the Common Q PAMS against the current staff position.

By letter dated 2/25/11 (ML110620219), TVA docketed a response.

The WBN2 FSAR (Amendment 103) does not reference RG 1.168, IEEE 1012, or IEEE 1028. IEEE Std 7-4.3.2-2003 indentifies IEEE Std 1012-1998 as normative. RG 1.168 Rev. 1 endorses, with clarifications, IEEE 1012-1998. The current staff positions are documented in RG 1.168 Rev. 1, IEEE 1012-1998, and IEEE 1020-1997. Based upon the review of this item, the staff finds the following open item:

1 WBN2 to updated FSAR Table 7.1-1 to reference RG 1.168 Rev. 1, IEEE 1012-1998, and IEEE 1020-1997 as being applicable to WBN2 Common Q PAMS and the Sorento Containment High Radiation monitor.

7.

N Open Due 5/15/11 Open-TVA/WEC NNC 4/125/2011: See Open Item No.

81.

371 7.5.2.

2 7.5 EICB (Carte)

On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an evaluation of the Common Q PAMS against the current staff position.

By letter dated 2/25/11 (ML110620219), TVA docketed a response.

The WBN2 FSAR (Amendment 103) does not reference Regulatory Guide 1.209, Guidelines for Environmental Qualification of Safety-Related Computer-Based Instrumentation and Control Systems in Nuclear Power Plants. Based upon the

8.

N Open Due 5/15/11 Open-TVA/WEC NNC 4/125/2011: See Open Item No.

81.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radE4C39.docx Open Items to be Resolved for SER Approval No.

SE Sec.

FSAR Sec.

NRC POC Issue TVA Response(s)

Response

Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments review of this item, the staff finds the following open item:

1 WBN2 to updated FSAR Table 7.1-1 to reference RG 1.209 and IEEE Std. 323-2003 as being applicable to WBN2 Common Q PAMS and the Sorento Containment High Radiation monitor.

TVA did not docket an evaluation against the criteria in RG 1.209.

Based upon the review of this item, the staff finds the following open item:

2 WBN2 to evaluate Common Q PAMS for conformance with RG 1.209 and IEEE Std. 323-2003.

372 7.5.2.

2 7.5 EICB (Carte)

On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an evaluation of the Common Q PAMS against the current staff position.

By letter dated 2/25/11 (ML110620219), TVA docketed a response.

The requirements in the SysRS and SRS are not traceable back to the design basis (e.g., IEEE Std 603-1991 Section 4) for the system. The SRS does not include any documented evidence that it was ever independently reviewed in accordance with the 10CFR50 Appendix B Criterion III, Design Control. (Note: It appears that the only Common Q or WBN2 PAMS document that was independently reviewed in accordance with 10 CFR 50 Appendix B requirements is the SysRS.)

Based upon the review of the SysRS and SRS, the staff finds that there is reasonable assurance that the systems fully conform to the applicable guidelines, except for the following open items:

1 TVA to produce an acceptable description of how the SysRS and SRS implement the design basis requirements of IEEE 603-1991 Clause 4.

2 TVA to produce a final SRS that is independently reviewed in accordance with 10CFR50Appendix B, Criterion III Design Control, requirements.

9.

N Open Due 5/15/11 Open-TVA/WEC NNC 4/125/2011: See Open Item No.

81.

373 7.5.2.

2 7.5 EICB (Carte)

The SDDs do not include any documented evidence that they were independently reviewed in accordance with the 10CFR50 Appendix B Criterion III, Design Control.

Based upon the review of the SDDs, the staff the following open item:

1 TVA to produce final SDDs that are independently reviewed in accordance with 10 CFR50 Appendix B Criterion III, Design Control, requirements.

10. N Open Due 5/15/11 Open-TVA/WEC 374 7.5.2.

2 7.5 EICB (Carte)

By letter dated October 29, 2010 (ML103120711), TVA docketed a draft technical evaluation associated with an engineering design change (ML103120712) that states the Common Q PAMS will require changes in the technical specifications. The technical specifications (TS) have not be received yet for review. The TS will be reviewed once they are received.

1 Confirm/Verify Technical Specification changes associated with Common Q PAMS are acceptable.

11. N Open Due 5/15/11 Open-TVA/WEC