ML13128A062: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:FLORIDA POWER CORPORATION DOCKET NUMBER 50 - 302 / LICENSE NUMBER DPR- 72 ATTACHMENT B OFF-SITE DOSE CALCULATION MANUAL, REVISION 33
{{#Wiki_filter:}}
 
2~ ~'
CRYSTAL RIVER UNIT #3 OFF-SITE DOSE CALCULATION MANUAL PNSC & PGM approval documented in  PNSC Meeting  2012-08    on  05/02/2012 APPROVED BY:  Lee Hughes      (signature on file)
Superintendent Environmental & Chemistry DATE:        05/21/2012 REVISION:        33 APPROVED BY:  Interpretation Contact Rudy Pinner      (signature on file)
Sr. Nuclear Plant Chemistry Specialist
 
PART I  -  SPECIFICATIONS  (CON'T)
Section                                                                          Page 3.0  SPECIFICATION BASES    (Con't) 3.10 Total    Dose Basis                                                      52 3.11 Radiological    Environmental    Monitoring Program Basis                53 3.12 Radiological    Environmental    Monitoring Program Land Use Census Basis                                                                  53 3.13 Radiological Environmental      Monitoring Interlaboratory Comparison Program Basis                                              53 3.14 Explosive Gas Mixture                                                    54 3.15 Waste Gas Decay Tanks                                                    54 3.16 Waste Gas Decay Tank -      Explosive Gas Monitoring                    54 3.17 Meteorological    Instrumentation                                      54 PART II  -  METHODOLOGIES Section                                                                          Page 1.0        RADIOACTIVE  EFFLUENTS MONITOR SETPOINT SPECIFICATIONS                  56 1.1    Effluent Monitor Setpoint Specifications                        58 1.2    Nuclide Analyses                                                61 1.3    Pre-Release Calculations                                        66 1.4    Setpoint Calculations                                            72 2.0        RADIOACTIVE EFFLUENTS DOSE REDUCTION SPECIFICATIONS                    85 2.1    Waste Reduction    Specifications                          8-7-86 2.2    Dose  Projection Methodology                                -88 2.3    Total  Dose Specification                                  91 90 3.0        RADIOACTIVE EFFLUENTS SAMPLING SPECIFICATIONS                      &---93 3.1-1  Liquid Releases    (Batch)                                  f-9 5 3.1-2  Liquid Releases    (Continuous)                            96-95 3.1-3  Gaseous Releases    (Waste Gas Decay Tanks)                a6--95 3.1.4  Gaseous Releases    (RB  & AB)                              96-995 Page iii
 
PART II - METHODOLOGIES (Con't) 3.1-5    Reactor Bldg. with  Personnel  and  Equipment Hatches Open 3.1-6  Reactor Bldg. During Integrated    Leak Rate Test              -96 4.0      RADIOACTIVE EFFLUENTS DOSE CALCULATION SPECIFICATIONS                    9-8---97 4.1    Dose Specifications                                            +/--00--99 4.2    Nuclide Analyses                                            +CY---102 4.3    Dose Calculations                                            108      107 4.4    Dose Factors                                                          112 4.5    Carbon-14 Methodology                                                138 5.0      ENVIRONMENTAL MONITORING                                            +/-3-9-144 6.0      ADMINISTRATIVE CONTROLS                                            +/-4-G-152 6.1    Origin and Purpose of the ODCM                              +/-4-9 153 6.2    Changes                                                      4-i  153 6.3    Review                                                      +/-4-& 153 6.4    Unplanned  Releases  (moved  to section 1)                  +/-4-8 153 6.5    Radioactive  Effluent Release Report                        +/-    153 6.6    Annual  Radiological  Environmental    Operating  Report    +/--51&    155 6.7    Voluntary Reporting  as a Result of Groundwater Cont.        5      156 6.8    Pathway Exemptions from Appendix I      Calculations        +/-5-R 163 6.9    Power Rx Eff.  & Direct Rad. Limits in  Unrestricted Areas+-6&165 Page iv
 
PART II LIST OF TABLES Tabl e                                                            Page I  RADIOACTIVE EFFLUENTS MONITOR    SETPOINTS                    57 II  RADWASTE REDUCTION SYSTEM-DOSE PROJECTIONS                    86 III    GASEOUS AND LIQUID EFFLUENT REPRESENTATIVE SAMPLING      91--94 IV  CUMULATIVE DOSE CALCULATIONS                            99--98 4.4-1    Dose Factors for Exposure  to a Semi-Infinite Cloud of Noble Gases 4.4-2    Inhalation Dose Factors - Infant 1-3-4--113 4.4-3    Inhalation Dose Factors - Child 114 -113 4.4-4    Inhalation Dose  Factors  - Teen                    1+5 114 4.4-5    Inhalation Dose  Factors  - Adult                    if,--1.15 4.4-6    Ingestion Dose Factors,  Grass-Cow-Milk-Infant      H19-118 4.4-7    Ingestion Dose  Factors,  Grass-Cow-Milk-Child      i-2o--119 4.4-8    Ingestion Dose  Factors,  Grass-Cow-Milk-Teen      i2--120 4.4-9    Ingestion Dose  Factors,  Grass-Cow-Meat-Adult      **-2"-- 12 1 4.4-10    Ingestion Dose  Factors,  Grass-Cow-Meat-Child      H-5--124 4.4-11    Ingestion Dose  Factors,  Grass-Cow-Meat-Teen      2---125  5 4.4-12    Ingestion Dose  Factors,  Grass-Cow-Meat-Adult      12-7-126 4.4-13    Ingestion Dose  Factors,  Vegetation-Child          i-36--129 4.4-14    Ingestion Dose  Factors,  Vegetation-Teen          +/-3-1-1300 4.4-15    Ingestion Dose  Factors,  Vegetation-Adult          13-2--131 Page vi
 
LIST OF TABLES (Continued)
Table                                                                        Page 4.4-16        Dose Factors Ground  Plane                              1-3 133 4.4-17        Liquid Effluent Adult Ingestion    Dose Factors          1-3-6 135 5.1-1          Environmental  Monitoring Station Location                +/-4& 145 5.1-2          Environmental Monitoring Station's    Locations, Groundwater Monitoring Wells                                          14 146 5.1-3          Ring TLDs (Inner  Ring)                                  14-a 147 5.1-4          Ring TLDs (5  Mile Ring)                                  +/-4--l 148 Page vii
 
TABLE 2-3 (Continued)
TABLE NOTATION ACTION 25 RM-A2 (Continued)
With the affected channel inoperable, effluent  releases may continue for 1 hour with no auxiliary sampling,  provided that AB airborne levels are steady state or declining. If indicators of AB atmospheric activity, such as RM-A3, RM-A4,  and RM-A8 show an increase in activity then restore the affected  sampler, or implement auxiliary sampling, or shut down the  release.
With the affected sampler inoperable, effluent releases may continue for more than 1 hour provided that samples (reference Table 2-6) are continuously taken (except for filter changes) with auxiliary sampling equipment.
Auxiliary sampling equipment includes 1) RM-A4 and RM-A8 used together 2) general area AB air samples, or 3) RMA-15. Other sampling regimes are acceptable provided results are representative of plant effluents.
ACTION 26  With the number of OPERABLE channels less than required, effluent releases via this pathway may continue, provided flow rate is estimated at least once per 4 hours.
ACTION 27  With the noble gas monitor (operating range) inoperable, operation of the RB purge may continue for 1 hour, provided that RB airborne levels are steady state or declining. If indicators of RB atmospheric activity such as RM-A6, RCS leakage, or general area air samples show an increase in RB activity while the monitor is inoperable, then immediately restore the noble gas monitor or shut down the purge.
Note:    Coordination of sampling during core alterations or fuel movement is required in order to comply with Technical Specifications.
ACTION 28  If the auxiliary building ventilation system is secured, such that there is no effluent release path, then there are no compensatory sampling requirements.
With the number of OPERABLE channels less than required, releases via this pathway may continue, provided RM-A4 and RM-A8 are operable and auxiliary building airborne levels are steady state or declining as indicated by trend data from these monitors. If using RM-A4 and RM-A8 as compensatory monitors for RM-A2, then evaluate the trend data of these monitors every 12 hours and notate the evaluation in the plant log until RM-A2 is returned to service or the release is secured. Review of monitor trends using the plant computer system (such as OSI-PI or equivalent) is an approved method to satisfy this requirement.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 13
 
TABLE 2-3 (Continued)
TABLE NOTATION Note:  An increasing trend for RM-A4 and/or RM-A8 is defined as RM-A4 or RM-A8 count rate increases by a factor of 2 above baseline counts or if either monitor's warning alarm setpoint actuates, exclusive of momentary spikes or spurious alarms.
If an increasing trend is noted on RM-A4 or RM-A8, then collect grab samples at the appropriate monitors (or plant areas) to evaluate the condition.
IF RM-A4 and RM-A8 are not operable, then collect gas grab samples at least once per 12 hours and analyze within 24 hours from RM-A2, if its pump is running with acceptable flow rates.
If RM-A4 or RM-A8 is not available, then other local grab sampling regimes at a frequency of once per 12 hours can be utilized as long as it is representative of plant effluents.
Additionally either the requirements of ACTION 24 Part 2 are met or RM-All is OPERABLE prior to releasing the contents of the Waste Gas Decay Tanks.
ACTION 29  With the number of OPERABLE channels less than required by the Minimum Channels OPERABLE requirements,
: 1)  Either restore the inoperable Channel(s) to OPERABLE status within 7 days of the event, or
: 2)  Prepare and submit a Special Report to the Commission pursuant to Specification 2.14 within the next 30 days outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.
NOTE:    Action Statement 2.2a not applicable.
ACTION 30  With no channels OPERABLE, plant operation may continue provided grab samples are collected and analyzed for noble gases at least once per 24 hours.
NOTE:    The absence of a conversion factor to relate cpm to gpd primary to secondary leakage does not make RM-A12 inoperable; RM-A12 can still be used as an indicator of changes in noble gas concentrations in the condenser off gas. CP-152, Primary to Secondary Leakage Operating Guideline, specifies the actions to take when a leak rate conversion factor is not available for use with RM-A12.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 14
 
historical average atmospheric conditions. The release rate specifications for 1-131, 1-133, Tritium, and radioactive particulates with half-life greater than eight days are dependent on the existing radionuclide pathways to man, in areas at and beyond the SITE BOUNDARY. The pathways which were examined in the development of these calculations were:    1) Individual inhalation of airborne radionuclides, 2) deposition of radionuclides onto green leaf vegetation with subsequent consumption by man,
: 3) deposition onto grassy areas where milk animals and meat producing animals graze with consumption of the milk and meat by man, and 4) deposition on the ground with subsequent exposure of man.
3.10      TOTAL DOSE BASIS This specification is provided to meet the dose limitations of 40 CFR Part 190 that have now been incorporated into 10 CFR Part 20 by 46 FR 18525. The specification requires the preparation and submittal of a Special Report whenever the calculated doses from plant radioactive effluents exceed twice the design objective doses of Appendix I. For sites containing up to 4 reactors, it is highly unlikely that the resultant dose to a MEMBER OF THE PUBLIC will exceed the dose limits of 40 CFR Part 190 if the individual reactors remain within the reporting requirement level. The Special Report will describe a course of action that should result in the limitation of the annual dose to a MEMBER OF THE PUBLIC to within the 40 CFR Part 190 limits. For the purposes of the Special Report, it may be assumed that the dose commitment to the MEMBER OF THE PUBLIC from other uranium fuel cycle sources is negligible, with the exception that dose contributions from other nuclear fuel cycle facilities at the same site or within a radius of 8 km must be considered. If the dose to any MEMBER OF THE PUBLIC is estimated to exceed the requirements of 40 CFR Part 190, the Special Report with a request for a variance (provided the release conditions resulting in violation of 40 CFR Part 190 have not already been corrected), in accordance with the provisions of 40 CFR part 190.11 and 10 CFR Part 20.405c, is considered to be a timely request and fulfills  the requirements of 40 CFR Part 190 until NRC staff action is completed. The variance only relates to the limits of 40 CFR Part 190 and does not apply in any way to the other requirements for dose limitation of 10 CFR Part 20, as addressed in Specifications 2.5 thru 2.9. An individual is not considered a MEMBER OF THE PUBLIC during any period in which he/she is engaged in carrying out any operation that is part of the nuclear fuel cycle.
OFF-SITE DOSE CALCULATION  MANUAL                                              Page 52
 
PRE-RELEASE CALCULATION 1.3-3 GASEOUS EFFLUENT IODINE MONITORS I.      INTRODUCTION In order to determine the setpoints              for these monitors,        the following assumptions are used.
A. The release rate through the Auxiliary Building and Fuel Handling Area exhaust duct is 7.4 x 10' cc/sec. (156,000 cfm).
B. The release        rate through the Reactor Building Purge Exhaust Duct is 2.4        x 107 cc/sec (50,000 cfm).
C. A limitless        supply of uniformly      concentrated    1-131 is  available to supply the Exhaust Ducts.
D. The iodine filter        has been installed      for 8 hours and operating at a constant flow rate of 472 cc/sec (1 cfm).                  Therefore, total    flow through the filter      has been 1.36 x 107 cc.
II.      CALCULATIONS The limiting concentration of Iodine in the vent which would                      result in a concentration equal to the 10 CFR 20 limit                  at the site boundary is calculated as follows:
Cv=C]/[(X/Q)FK]            (1.7) where:
Cv      =    The Concentration of Radioiodine in            the vent    in pCi/cc.
C!        =    The 10 CFR 20 effluent      concentration      limit    for Iodine 131, 2 x 10-1' pCi/cc.
F        =    The duct flow rate:      2.4 x 10' cc/sec for the Reactor Building Purge Exhaust Duct and 7.4 x 10' cc/sec for the Auxiliary Building and Fuel Handling Area Exhaust Duct.
K        =    Unit conversion    constant,  1 x 10-1 m3/cc XIQ      =    The highest calculated      annual    average concentration        for any area at or beyond the unrestricted          area boundary,      2.5 x 10' sec/m3 .
Solving eqn.        1.7 for the Reactor Building Purge exhaust vent yields:
CV(RB)    = 3.33    x 10' pCi/cc Solving eqn. 1.7 for the Auxiliary            Building & Fuel        Handling Area Exhaust vent yields:
CV(AB)    = 1.1 X 10.'    pCi/cc OFF-SITE DOSE CALCULATION MANUAL                                                                    Page 70
 
EFFLUENT FLOW DIAGRAM  - LIQUID 2.3-2 L&S Sump        NSSW    System RWP 3A RWP 2
LSST-A    LSST-B          2A 2
                                      =RCB RWP WMWST*                                    39 R M-L2 Ponds To Unit 3 Discharge Canal OFF-SITE DOSE CALCULATION MANUAL                                            Page 92
 
CALCULATION OF LIQUID EFFLUENT ADULT INGESTION DOSE FACTORS Air= 1.14E5 (21BFi 5BIi)DFi Aiz      =  Composite dose parameter for the total          body or critical organ of an adult for nuclide i,        for all  appropriate pathways, mrem/hr per iCi/ml I.14E5    =  units conversion      factor,  106pci/pci  x 10' ml/kg ÷ 8760 hr/yr BFi      =  Bioaccumulation factor for nuclide i,          in fish, pCi/kg per pCi/L, from Table A-1 of Regulatory Guide 1.109 (Rev. 1) or Table A-8 of Regulatory Guide 1.109 (original draft).
BIi      =  Bioaccumulation factor for nuclide i,          in invertebrates, pCi/kg per pCi/L, from Table A-1 of Regulatory Guide 1.109 (Rev. 1) or Table A-8 of Regulatory Guide 1.109 (original draft).
DFi      =  Dose conversion factor for nuclide i, for adults in pre-selected organ -r, in mrem/pCi,        from Table E-11 or Regulatory Guide 1.109 (Rev. 1) or Table A-3 of Regulatory Guide 1.109 (original draft).
 
==Reference:==
The equation for Saltwater sites from NUREG 0133, Section 4.3.1, where Uw/Dw = 0 since no drinking water pathway exists.
OFF-SITE DOSE CALCULATION MANUAL                                                        Page 134
 
Table 4.4-17 Liquid Effluent - Adult Ingestion Dose Factors (A 17)
Nuclide    Bone        Liver      T. Body        Thyroid    Kidney      Lung          GI-LLI H-3        2. 82E-1    2. 82E-1    2. 82E-1        2. 82E-1    2. 82E-1    2. 82E-1    2. 82E-1 Na-24      4. 57E-1    4. 57E-1    4. 57E-1        4. 57E-1    4. 57E-1    4. 57E-1    4. 57E-1 Cr-51      ND          ND          5. 58E0        3. 34E0    1. 23E0      7. 40E0      1.40E3 Mn-54      ND          7.06E3      1. 35E3        ND          2.10E3      ND            2.16E4 Mn-56      ND          1. 78E2    3. 15E1        ND          2. 26E2      ND            5.67E3 Fe-55      5. 11E4      3. 53E4    8. 23E3        ND          ND          1. 97E4      2 . 03E4 Fe-59      8.06E4      1.90E5      7. 27E4        ND          ND          5. 30E4      6. 32E5 Co-58      ND          6. 03E2    1. 35E3        ND          ND          ND            1.22E4 Co-60      ND          1.73E3      3. 82E3        ND          ND          ND            3 .25E4 Ni -63    4. 96E4      3.44E3      1. 67E3        ND          ND          ND            7.18E2 Ni-65      2. 02 E2    2. 62E1    1. 20E1        ND          ND          ND            6.65E21 Cu-64      ND          2 . 14E2    1.01E2          ND          5. 40E2      ND            1.83E4 Zn-65      1.61E5      5.13E5      2. 32E5        ND          3.43E5      ND            3. 23E5 Zn-69      3.43E2      6.56E2      4. 56E1        ND          4. 26E2      ND            9. 85E1 Br-83      ND          ND          7. 25E-2        ND          ND          ND          1.04E-1 Br-84      ND          ND          9. 39E-2        ND          ND          ND          7. 37E-7 Br-85      ND          ND          3. 86E-3        ND          ND          ND            LE-18 Rb-86      ND          6. 24E2    2. 91E2        ND          ND          ND            1.23E2 Rb-88      ND          1. 79E0    9. 49E-1        ND          ND          ND        2.47E-11 Rb-89      ND          1. 19E0    8. 34E-1        ND          ND          ND        6.89E-14 Sr-89      4.99E3      ND          1. 43E2        ND          ND          ND            8.00E2 Sr-90      1. 23E5      ND          3. 01E4        ND          ND          ND            3.55E3 Sr-91      9. 18E1      ND          3. 71E0        ND          ND          ND            4.37E2 Sr-92      3.48E1      ND          1. 51EO        ND          ND          ND            6. 90E2 Y-90      6.06E0      ND          1. 63E-1        ND          ND          ND            6.42E4 Y-91m      5. 73E-2    ND          2. 22E-3        ND          ND          ND          1.68E-1 Y-91      8. 88E1      ND          2. 37E0        ND          ND          ND            4. 89E4 Y-92      5.32E-1      ND          1. 56E-2        ND          ND          ND            9.32E3 Y-93      1. 69E0      ND          4. 66E-2        ND          ND          ND            5.35E4 Zr-95      1. 59E1      5. 11EO    3. 46E0        ND          8.02E0      ND            1.62E4 Zr-97      8.81E-1      1.78E-1    8. 13E-2        ND          2. 68E-1    ND            5.51E4 OFF-SITE  DOSE CALCULATION MANUAL                                            Page 135
 
Table 4.4-17 Liquid Effluent - Adult Ingestion Dose Factors (Ai 1 )
Nuclide    Bone      Liver      T. Body        Thyroid    Kidney        Lung        GI-LLI Nb-95      4.47E2    2.49E2      1.34E2          ND          2.46E2        ND          1.51E6 Mo-99      ND        1.28E2      2.47E2          ND          2.89E2        ND          2.96E21 Tc-99m    1.30E-2    3.66E-2    4.66E-1        ND          5.56E-1      1.79E-2    2.17E1 Tc-101    1.33E-2    1.92E-2    1.88E-1        ND          3.46E-1      9.81E-3    5.77E-14
'Ru-103    1.07E2    ND          4.60E1          ND          4.07E2        ND          1.25E4 Ru-105    8.89EO    ND          3.51E0          ND          1.15E2        ND          5.44E3 Ru-106    1.59E3    ND          2.01E2          ND          3.06E3        ND          1.03E5 Ag-110m    1.57E3    1.45E3      1.33E1          ND          2.85E3        ND          5.91E5 Sb-124    2.77E2    5.23E0      1.09E2          6.71E-1      ND          2.15E2      7.83E3 Sb-125    1.77E2    1.97E0      4.20E1          1.80E-1      ND          1.36E2      1.94E3 Sb-126    1.13E2    2.31E0      4.09E1          6.96E-1      ND          6.95E1      9.27E3 Te-125m    2.17E2    7.86E1      2.91E1          6.52E1      8.82E2        ND          8.66E2 Te-127m    5.48E2    1.96E2      6.68E1          1.40E2      2.23E3        ND          1.84E3 Te-127    8.90EO    3.20EO      1.93E0          6.60E0      3.63E1        ND          7.03E2 Te-129m    9.31E2    3.47E2      1.47E2          3.20E2      3.89E3        ND          4.69E3 Te-129    2.54EO    9.55E-1    6.19E-1        1.95E0      1.07E1        ND          1.92E0 Te-131m    1.40E2    6.85E1      5.71E1          1.08E2      6.94E2        ND          6.8OE3 Te-131    1.59EO    6.66E-1    5.03E-1        1.31E0      6.99E0        ND        2.26E-1 Te-132    2.04E2    1.32E2      1.24E2          1.46E2      1.27E3        ND          6.24E3 1-130      3.96E1    1.17E2      4.61E1          9.91E3      1.82E2        ND          1.01E2 1-131      2.18E2    3.12E2      1.79E2          1.02E5      5.35E2        ND          8.23E1 1-132      1.06E1    2.85E1      9.96E0          9.96E2      4.54E1        ND          5.35E0 1-133      7.54E1    1.30E2      3.95E1          1.90E4      2.26E2        ND          1.16E2 1-134      5.56E0    1.51E1      5.40E0          2.62E2      2.40E1        ND        1.32E-2 1-135      2.32E1    6.08E1      2.24EI          4.01E3      9.75E1        ND          6.87E1 Cs-134    6.84E3    1.63E4      1.33E4          ND          5.27E3        1.75E3      2.85E2 Cs-136    7.16E2    2.83E3      2.04E3          ND          1.57E3        2.16E2      3.21E2 Cs-137    8.78E3    1.20E4      7.85E3          ND          4.07E3        1.35E3      2.32E2 Cs-138    6.07EO    1.20EI      5.94E0          ND          8.81E0        8.70E-1    5.12E-5 Ba-139    7.85E0    5.59E-3    2.30E-1        ND          5.23E-3      3.17E-3    1.39E1 Ba-140    1.64E3    2.06E0      1.08E2          ND          7.02E-1      1.18E0      3.38E3 Ba-141    3.81E0    2.88E-3    1.29E-1        ND          2.68E-3      1.63E-3    1.80E-91 Ba-142    1.72E0    1.77E-3    1.08E-1        ND          1.50E-3      1.OOE-3    2.43E-18 La-140    1.57E0    7.94E-1    2.10E-1        ND          ND            ND          5.83E4 La-142    8.06E-2    3.67E-2    9.13E-3        ND          ND            ND          2.68E2 OFF-SITE DOSE CALCULATION MANUAL                                            Page 136
 
Table 4.4-17 Liquid Effluent - Adult Ingestion Dose Factors (AiT)
Nuclide    Bone      Liver      T. Body      Thyroid      Kidney      Lung_    GI-LLI Ce-141    3.43E0    2.32E0      2.63E-1        ND          1.08E0      ND        8.86E3 Ce-143    6.04E-1    4.46E2      4.94E-2        ND          1.97E-1    ND        1.67E4 Ce-144    1.79E2    7.47E1      9.59EO        ND          4.43E1      ND        6.04E4 Pr-143    5.79E0    2.32E0      2.87E-1        ND          1.34E0      ND        2.54E41 Pr-144    1.90E-2    7.87E-3    9.64E-4        ND          4.44E-3    ND      2.73E-9 Nd-147    3.96E0    4.58E0      2.74E-1        ND          2.68E0      ND        2.20E4 W-187      9.16E0    7.66E0      2.68E0        ND          ND          ND        2.51E3 Np-239    3.53E-2    3.47E-3    1.91E-3        ND          1.08E-2    Nd        7.11E2 OFF-SITE DOSE CALCULATION MANUAL                                        Page 137
 
4.5      METHODOLOGY FOR CARBON-14 DOSE Carbon-14 may become a principal radionuclide for the gaseous effluent pathway. It is produced by several nuclear reactions. In a nuclear reactor the most dominate mechanism is the reaction of 0-17 in the fuel or water with a neutron to produce C-14 and an alpha particle.
C-14 releases in PWRs occur primarily as a mix of organic carbon and carbon dioxide released from the waste gas system. Because the dose contribution of C-14 from liquid radioactive waste is much less than that contributed by gaseous radioactive waste, evaluation of C-14 in liquid waste is not required. The dose rate and subsequent dose to an individual from C-14 intake depends upon the specific activity of the food from each source and the amount of the ingested C-14 which is retained over the period under consideration.
The quantity of C-14 discharged can be estimated by sample measurements, or by use of a normalized C-14 source term and scaling factors based upon power generation, or by use of the GALE code per NUREG-001 7. Use of the GALE code per NUREG-001 7 Rev 1 "Calculation of Releases of Radioactive Materials in Gaseous and Liquid Effluents from Pressurized Reactors" provides a C-14 source term based on sample measurements made at 10 operating power plants. The C-14 source term recommended by NUREG-0017 Rev 1 is 7.3 curies/year for an 80% capacity factory or 292 Effective Full Power Days. Additionally, if estimating C-14 in gaseous effluent releases is based on scaling factors and fission rates, a precise and detailed evaluation is not necessary. Also, it is not necessary to calculate uncertainties for C-14 orto include C-14 uncertainty in any calculation of overall uncertainty.
In the determination of the limiting sector, all age groups and all of the exposure pathways are evaluated using the highest X/Q, D/Q values at the site boundary as referenced in the CR3 FSAR table 2-20 and in the ODCM dose equations. These could include milk, meat and vegetable ingestion, and inhalation pathways. Atmospheric Carbon Dioxide (C02) is incorporated in cellular material by the photosynthetic actions of green plants. Plants and grasses, from which most food-stuff is derived, equilibrate with the C-14 CO 2 of the air. Due to the Primary Water System reducing environment, only 30% of the C-14 is released in the organic form.
CR3 ODCM Surveillance Requirement 2.12.1 requires that a land-use census survey be conducted on an annual basis. During this survey, the nearest milk animal, the nearest residence, and the nearest garden of greater than 500 square feet that produces fresh leafy vegetables is determined. Thus, depending on the results of the survey, a new limiting location could result. Normally CR-3 uses the site boundary as the nearest receptor, which is more restrictive than the nearest residence.
Regulatory Guide 1.109 provides the detailed implementation guidance to show compliance with Appendix I of 10 CFR 50 limits.
OFF-SITE DOSE CALCULATION          MANUAL                                                        Page 138
 
4.5    METHODOLOGY FOR CARBON 14 DOSE (continued) 4.5.1  Annual Dose from Inhalation of Carbon-14 in Air The annual average airborne concentration of C-14 at the location with respect to the release point may be determined as:
X,=-3.17X i0 4 Q        (!)                                                        (Equation 4.5-1) 3 Xc        =      the annual average ground-level concentration of C-14 in air, in pCi/m Qc        =      the release rate of C-14 to the atmosphere, in Ci/yr, this can be determined by:
(1) using actual sample data obtained during the reporting period (2) estimation by correcting the NUREG 0017 Rev 1 annual C-14 curies released for actual capacity factor using the number of effective full power days (EFPD) for the reporting period Q,= 7.3 x EFPD                                        (Equation 4.5-2) 292 X/Q              The highest calculated annual average dispersion concentration for any area at or beyond the unrestricted area boundary: 2.5 x 10-6 sec/m3 4
3.17 X 10            the number of pCi/Ci divided by the number of sec/yr The annual dose associated with inhalation for C-14, to organ U)to an age group (a), is then:
D  =  (U)  ( DFAJa(Xc)                                                            (Equation 4.5-3)
D        =ý      the annual dose from inhalation to an organ (j) of an age group (a) from C-14 in mrem/yr X        =      the annual average ground-level concentration of C-14 in air, in pCi/m3 U        =      Inhalaton rate for age group (a), Table 4.5-3, in m3/yr DFAja =          Dose factor for an organ from carbon-14 for the inhalation pathway to an organ j) of an age group (a), Table 4.5-4 in mrem/pCi, OFF-SITE DOSE CALCULATION MANUAL                                                                                  Page 139
 
4.5    METHODOLOGY FOR CARBON 14 DOSE (continued) 4.5.2 Concentration of Airborne Carbon-14 in vegetation The concentration of Carbon-14 in vegetation at location with respect to the release point may be determined as:
                  =VX (3.17    X            )(Q 1 4 )(Q).(0"1)101)(p                              (Equation 4.5-4)
V cvl  =        The concentration of C-14 in vegetation in pCi/kg p    =        the fractional equilibrium fraction, dimensionless
            =        1.0 for continuous releases Q14  =        annual release rate of C-14 from a PWR, assume 30% of annual C-14 release rate in lieu of site specific data, in Ci/yr 0.30 x Qc X/Q  =        The highest calculated annual average dispersion concentration 3
for any area at or beyond the unrestricted area boundary: 2.5 x 10-6 sec/m 3.17 E7 =        (1012 pCi/Ci)(10 3 g/kg) / (3.15E7 sec/yr) 0.11  =        fraction of total plant mass that is natural carbon, dimensionless 0.16  =        concentration of natural carbon in the atmosphere, in g/m 3 4.5.3 Concentration of Airborne Carbon-14 in Milk The concentration of Carbon-14 in milk is dependent on the amount of contamination level of the feed consumed by the animal.
                  = (F,,)        (C                                                              (Equation 4.5-5)
C 14  =        The concentration of C-14 in milk, pCi/L Fm              average fraction of the animal's daily intake of C-14 that appears in each liter of milk, in days/liter
            =        0.012 C1 4  =        The concentration of C-1 4 in animal's feed, in pCi/kg Qf    =        amount of feed consumed by the animal per day, in kg/day
            =        Cow or cattle = 50 kg, goat = 6 kg OFF-SITE DOSE CALCULATION MANUAL                                                                                    Page 140
 
4.5    METHODOLOGY FOR CARBON 14 DOSE (continued) 4.5.4  Concentration of Airborne Carbon-14 in Meat C14  = (FF) (Ci4) (Q)'                                                              (Equation 4.5-5)
C1 4            The concentration of C-14 in meat, pCi/kg FF    =        average fraction of the animal's daily intake of C-14 that appears in each kilogram of flesh, in days/kg
              =        0.031 V
C1 4  =        The concentration of C-14 in animal's feed, in pCi/kg Qf              amount of feed consumed by the animal per day, in kg/day Cow or cattle = 50 kg, goat = 6 kg 4.5.5  Annual Dose from Atmospherically Released Carbon-14 in Foods DD = DFIa [      UJg C"      + UM        + U1R0B +          I4]                  (Equation 4.5-6)
                )a        Ja.aý1                      4          14 +      14J, D4)            the annual dose to organ (j) of an individual in age group (a) from the dietary intake of atmospherically released Carbon-14, in mrem/yr DFlj,          the dose conversion factor for the ingestion of Carbon-14, organ (j), and age group (a), in mrem/pCi Table 4.5-5 Ua    =        ingestion rate of produce (non-leafy vegetables, fruit, grains), in kg/yr, Table 4.5-3
        *l  =        ingestion rate of milk, in I/yr, Table 4.5-3 Ua    =        ingestion rate of meat and poultry in kg/yr, Table 4.5-3 IUL  =        ingestion rate of leafy vegetables, in kg/yr, Table 4.5-3 f      =        fraction of produce ingested grow in the garden of interest
              =        0.76, in lieu of site specific data f=        fraction of leafy vegetables in the garden of interest
              =        1.0 , in lieu of site specific data v
C1 4  =        The concentration of C-14 in vegetation, in pCi/kg
                =o C1 4  =        The concentration of C-14 in milk, pCi/kg B
C14    =        The concentration of 0-14 in meat, pCi/kg OFF-SITE DOSE CALCULATION            MANUAL                                                                      Page 141
 
4.5        METHODOLOGY FOR CARBON 14 DOSE (continued)
Table 4.5-3 Recommended Values for Uap to be used for the Maximum Exposed Individual in Lieu of Site Specific Data (Table E-5 Regulatory Guide 1.109 Rev 1)
Pathway                  Infant      Child    Teen        Adult Fruits, vegetables & grain                      520      630          520 (kg/yr) 1 Leafy Vegetables (kg/yr)            -            26        42          64 Milk (L/yr)              330          330      400          310 Meat & poultry (kglyr)            -            41        65          110 Inhalation (m3/yr)          1400          3700    8000        8000 Note 1 - Consists of the following (on a mass basis): 22% fruit, 54% vegetables (including leafy vegetables), and 24% grain Table 4.5-4 Inhalation Dose Factors from Carbon-14 for organ to an individual from Tables E-7 to E-10 Regulatory Guide 1.109 Rev 1 (mremlpCi inhaled)
Individual          Bone              Liver        T.Body        Thyroid      Kidney          Lung      GI-LLI Infant        1.89E-05          3.79E-06        3.79E-06        3.79E-06    3.79E-06        3.79E-06  3.79E-06 Child        9.70E-06          1.82E-06        1.82E-06        1.82E-06    1.82E-06        1.82E-06    1.82E-06 Teen          3.25E-06          6.09E-07        6.09E-07      6.09E-07    6.09E-07        6.09E-07  6.09E-07 Adult        2.27E-06          4.26E-07        4.26E-07        4.26E-07    4.26E-07        4.26E-07  4.26E-07 Table 4.5-5 Ingestion Dose Factors from Carbon-14 for organ to an individual from Tables E-11 to E-14 Regulatory Guide 1.109 Rev 1 (mrem/pCi ingested)
Individual        Bone              Liver        T.Body        Thyroid      Kidney          Lung      GI-LLI Infant        2.37E-05          5.06E-06        5.06E-06        5.06E-06    5.06E-06        5.06E-06  5.06E-06 Child        1.21 E-05        2.42E-06        2.42E-06      2.42E-06    2.42E-06        2.42E-06  2.42E-06 Teen          4.06E-06          8.12E-07        8.12E-07        8.12E-07    8.12E-07        8.12E-07  8.12E-07 Adult        2.84E-06          5.68E-07        5.68E-07        5.68E-07    5.68E-07        5.68E-07  5.68E-07 OFF-SITE DOSE CALCULATION MANUAL                                                                                    Page 142
 
4.5      METHODOLOGY FOR CARBON 14 DOSE (continued)
Table 4.5-6 Carbon -14 Source Term from NUREG-0017, Rev 1 (GALE Code)
Section 2.2.25.2, Page 2-90, Tables 2-38 & 2-39, Section 1.5.1.1 Capacity Factor = 80% (292 effective full power days/yr)
Release Points                                    % of Total Ci                      Ci Released Containment Building                                21.92%                              1.6 Aux. Bldg. & Fuel Handling                          61.64%                              4.5 Waste Decay Tanks                                    16.44%                              1.2 Total                                                100.00%                              7.3 Qi.co2 (EPRI estimation of C02 is 30%, EPRI Technical Report 1021106, 2010, pages 3-26 & 4-28)
OFF-SITE    DOSE CALCULATION MANUAL                                                              Page 143
 
Table 5.1-1 Environmental Radiological Monitoring Station's      Locations DIRECTION      APPROX. DISTANCE STATION        LOCATION                                        FROM PLANT      FROM PLANT Cmi)
C04          State Park Old Dam on River                            ENE              10.6 near road intersection C07          Crystal  River Public Water          Plant            ESE                7.4 C09          Fort Island Gulf Beach                                  S                3.2 C10          Indian Waters Public Water          Supply            ESE                6.0 C13          Mouth of Intake Canal                                  WSW                4.6 C14H          Head of Discharge Canal                                  N                0.1 C14M          Midpoint of Discharge Canal                              W                1.2 C14G          Discharge Canal      at Gulf of Mexico                  W                2.5 C18          Yankeetown City Well                                    N                5.3 C19          NW Corner State Roads 488 & 495                        ENE                9.6 C29          Discharge Area                                          W                2.0 C30          Intake Area                                            WSW                3.4 C40          Near E. Site Boundary & well          pump              E                3.6 station  CR-South #5 C41          Onsite meteorological        tower                    SW                0.4 C46          North Pump Station                                      N                0.4 C47          Office of Radiation Control,          Orlando        ESE                  78 C48A'        Near C46 North    Pump Station                          N                0.4 C48B'        Onsite NNE of CR 4 & 5                                NNE                0.9 NOTE:  Distances are approximate.        More than one type of sample media,(e.g. air      and water) are obtained at some stations.            For multi-media stations  there may be minor difference in distance for each type of sample.
'If vegetation is not available, then select another suitable nearby location.              The ENE sector is also an acceptable sector based on D/Q values.
OFF-SITE DOSE CALCULATION MANUAL                                                        Page 145
 
The licensee shall document any agreement with State/Local officials that differs from this Industry guidance as part of their record. For example, some states or local authorities have indicated that they do not wish leaks/spills to be included in the voluntary communication protocol or that the voluntary communication should be completed in a shorter timeframe.
: b. Communication with the designated State/Local officials shall be made before the end of the next business day for a water sample result i    Of off-site ground water or surface water that exceeds any of the REMP reporting criteria for water as described in the ODCM/ODAM, or ii Of on-site surface water, that is hydrologically connected to ground water, or ground water that is or could be used as a source of drinking water, that exceeds any of the REMP reporting criteria for water as described in the ODCM/ODAM The licensee shall document the basis for concluding that the on-site ground water is not or would not be considered a source of drinking water. Examples of a defensible basis are documents from the regulatory agency with jurisdiction over ground water use.
: c. When communicating to the State/Local officials, be clear and precise in quantifying the actual release information as it applies to the appropriate regulatory criteria (i.e. put it in perspective). The following information should be provided as part of the informal communication:
i    A statement that the communication is being made as part of the NEI Ground Water Protection Initiative, ii The date and time of the spill, leak, or sample result(s),
iii Whether or not the spill has been contained or the leak has been stopped, iv If known, the location of the leak or spill or water sample(s),
v      The source of the leak or spill, if known, vi A list of the contaminant(s) and the verified concentration(s),
vii Description of the action(s) already taken and a general description of future actions, viii An estimate of the potential or bounding annual dose to a member of the public if available at this time, and ix An estimated time/date to provide additional information or follow-up.
: d. Voluntary communication to State and/or Local officials may also require NRC notification under 10 CFR 50.72(b)(2)(xi). Licensees should perform these notifications consistent with their existing program.
: e. Contact NEI by email to GW Notice(,nei.org as part of a voluntary communication event as described in Objective 2.2.
: f. Contact American Nuclear Insurers (ANI) as part of a voluntary communication event as described in OBJECTIVE 2.2 above.
OFF-SITE DOSE CALCULATION                MANUAL                                                              Page 161
 
Summary of Changes Revision 33
: 1. Table 2-3, page 13, 14, action 28, guidance added regarding actions if the auxiliary building ventilation system is secured. Also compensatory actions for sample requirements if RM-A2 is out of service updated to allow trending radiation monitors RM-A4 and RM-A8 instead of collecting grab samples.
: 2. Section 3.9, page 52, changed less than to greater than. (typo)
: 3. Pre-release calculation section 1.3-3, page 70 added equation identifier number 1.7.
: 4. Page 92 flow diagram, removed evaporators and replaced with MWST to reflect current configuration for waste processing.
: 5. Page 134, inserted C for pCi/ml for Air term in equation. (typo)
: 6. Pages 135, 136, & 137 corrected various dose factors. (typos)
: 7. Pages 138 to 143, added discussion for Carbon-14 source term and dose calculations.
: 8. Page 145, updated the descriptor for sample location C48A for vegetation sampling.
: 9. Page 161, added substep fto provide guidance to also contact ANI if there is an occurrence of a radiological leak or spill that potentially could reach the groundwater.
OFF-SITE DOSE CALCULATION            MANUAL                                                          Page 167
 
CRYSTAL RIVER UNIT #3 OFF-SITE DOSE CALCULATION MANUAL PNSC & PGM approval documented in PNSC Meeting  2012-08    on _05/02/2012_
APPROVED BY:  Lee Hughes    (signature on file)
Superintendent  Environmental & Chemistry DATE:      05/21/2012 REVISION:      33 APPROVED BY:  Interpretation Contact Rudy Pinner    (signature on file)
Sr. Nuclear Plant Chemistry Specialist
 
INTRODUCTION The Off-site Dose Calculation Manual (ODCM)  is provided to support implementation of the Crystal River Unit 3 radiological effluent controls.
The ODCM is divided into two parts. Part I contains the specifications for liquid and gaseous radiological effluents and the radiological environmental monitoring program which were relocated from the Technical Specifications in accordance with the provisions of Generic Letter 89-01 issued by the NRC in January, 1989. Part II of the ODCM contains the calculational methods to be used in determining the dose to members of the public resulting from routine radioactive effluents released from Crystal River Unit 3. Part II also contains the methodology used to determine effluent monitor alarm/trip
.setpoints which assure that releases of radioactive materials remain within specified concentrations.
The ODCM shall become effective after acceptance by the Plant Nuclear Safety Committee and approval by the Plant General Manager in accordance with Technical Specification Section 5.6.2.3. Changes to the ODCM shall be documented and records of reviews performed shall be retained. This documentation shall contain sufficient information to support the change (including analyses or evaluations), and a determination that the change will maintain the level of radioactive effluent control required by the regulations listed in Technical Specification and not adversely impact the accuracy or reliability of effluent, dose, or setpoint calculations.
Changes shall be submitted to the NRC in the form of a complete and legible copy of the entire ODCM as part of, or concurrent with, the Radioactive Effluent Release Report for the period of the report in which any change to the ODCM was made. Each change shall be identified by markings in the margin of the affected pages, clearly indicating the area of the page that was changed, and shall indicate the date (e.g. month/year) the change was implemented.
 
TABLE OF CONTENTS PART I - SPECIFICATIONS Section                                                          Page 1.0  DEFINITIONS                                                    1 1.1  Channel Calibration                                        1 1.2  Channel Check                                              1 1.3  Channel  Functional Test                                  1 1.4  Degassing                                                  1 1.5  Frequency                                                2 1.6  Liquid Radwaste Treatment. System                        2 1.7  Member of the Public                                      2 1.8  Mode                                                      2 1.9  Offsite Dose Calculation Manual                            3 1.10 Operable - Operability                                    3 1.11 Site Boundary                                              3 1.12 Source Check                                              3 1.13 Unplanned Release                                          3 1.14 Unrestricted Area                                          3 1.15 Ventilation Exhaust Treatment System                      4 1.16 Waste Gas System                                          4 1.17 Purge - Purging                                            4 2.0  SPECIFICATIONS                                                  5 2.1  Radioactive Effluent Monitoring Instrumentation            5 2.2  Radioactive Gaseous Effluent Monitoring Instrumentation  10 2.3  Liquid Radwaste Treatment System                          17 2.4  Waste Gas System                                          18 2.5  Liquid Effluents Concentration                            19 2.6  Liquid Effluents - Dose                                  23 Page i
 
PART I - SPECIFICATIONS (CON'T)
Section                                                                    PAge 2.0  SPECIFICATIONS (Con't) 2.7  Gaseous Effluents Dose Rate                                        24 2.8  Dose Noble Gases                                                    28 2.9  Dose 1-131, 1-133,  Tritium,  and Radioactive Particulates        29 2.10 Total Dose                                                          30 2.11 Radiological  Environmental  Monitoring                            31 2.12 Land Use Census                                                    38 2.13 Interlaboratory Comparison Program                                  39 2.14 Special Reports                                                    40 2.15 Meteorological  Instrumentation                                    41 2.16 Waste Gas Decay Tank -    Explosive Gas Monitoring                  44 Instrumentati on 2.17 Waste Gas Decay Tanks                                              46 2.18 Waste Gas Decay Tank -    Explosive Gas Mixture                    47 3.0  SPECIFICATION BASES 3.1  Radioactive Effluent Monitoring Instrumentation Basis              48 3.2  Radioactive Gaseous Effluent Monitoring Instrumentation Basis      48 3.3  Liquid Radwaste Treatment System Basis                              48 3.4  Waste Gas System Basis                                              49 3.5  Liquid Effluents Concentration Basis                                49 3.6  Liquid Effluents Dose Basis                                        50 3.7  Gaseous Effluents Dose Rate Basis                                  50 3.8  Gaseous Effluents Dose Noble Gases Basis                            51 3.9  Gaseous Effluents Dose 1-131, 1-133,    Tritium, and Radioactive Particulates Basis                                                  51 Page ii
 
PART I - SPECIFICATIONS (CON'T)
Section                                                                  Page 3.0  SPECIFICATION BASES (Con't) 3.10 Total Dose Basis                                                52 3.11 Radiological Environmental Monitoring Program Basis              53 3.12 Radiological Environmental Monitoring Program Land Use Census Basis                                                          53 3.13 Radiological Environmental Monitoring Interlaboratory Comparison Program Basis.                                      53 3.14 Explosive Gas Mixture                                          54 3.15 Waste Gas Decay Tanks                                          54 3.16 Waste Gas Decay Tank - Explosive Gas Monitoring                54 3.17 Meteorological Instrumentation                                  54 PART II  - METHODOLOGIES Section                                                                  Page 1.0      RADIOACTIVE EFFLUENTS MONITOR SETPOINT SPECIFICATIONS            56 1.1    Effluent Monitor Setpoint Specifications                58 1.2    Nuclide Analyses                                        61 1.3    Pre-Release Calculations                                66 1.4    Setpoint Calculations                                    72 2.0      RADIOACTIVE EFFLUENTS DOSE REDUCTION SPECIFICATIONS              85 2.1    Waste Reduction Specifications                            86 2.2    Dose Projection Methodology                              88 2.3    Total Dose Specification                                  90 3.0      RADIOACTIVE EFFLUENTS SAMPLING SPECIFICATIONS                    93 3.1-1  Liquid Releases (Batch)                                  95 3.1-2  Liquid Releases (Continuous)                              95 3.1-3  Gaseous Releases (Waste Gas Decay Tanks)                  95 3.1.4  Gaseous Releases (RB & AB)                                95 Page iii
 
PART II - METHODOLOGIES (Con't) 3.1-5    Reactor Bldg. with Personnel and Equipment Hatches Open          96 3.1-6  Reactor Bldg. During Integrated Leak Rate Test            96 4.0      RADIOACTIVE EFFLUENTS DOSE CALCULATION SPECIFICATIONS            97 4.1    Dose Specifications                                      99 4.2    Nuclide Analyses                                        102 4.3    Dose Calculations                                        107 4.4    Dose Factors                                            110 4.5    Carbon-14 Methodology                                    138 5.0      ENVIRONMENTAL MONITORING                                        144 6.0      ADMINISTRATIVE CONTROLS                                        153 6.1    Origin and Purpose of the ODCM                          154 6.2    Changes                                                  154 6.3    Review                                                  154 6.4    Unplanned Releases (moved to section 1)                  154 6.5    Radioactive Effluent Release Report                      154 6.6    Annual Radiological Environmental Operating Report      156 6.7    Voluntary Reporting as a Result of Groundwater Cont. 157 6.8    Pathway Exemptions from Appendix I Calculations          164 6.9    Power Rx Eff. & Direct Rad. Limits in Unrestricted Areas 166 Page iv
 
PART I LIST OF TABLES Table                                                          Paae 2-1  Radioactive Liquid Effluent Monitoring Instrumentation        6 2-2  Radioactive Liquid Effluent Monitoring Instrumentation Surveillance Requirements                                    8 2-3  Radioactive Gaseous Effluent Monitoring Instrumentation    11 2-4  Radioactive Gaseous Effluent Monitoring Instrumentation Surveillance Requirements                                  15 2-.5  Radioactive Liquid Waste Sampling and Analysis Program      20 2-6  Radioactive Gaseous Waste Sampling and Analysis Program    25 2-7  Operational Radiological Environmental Monitoring Program  32 2-8  Reporting Levels for Radioactivity Concentrations in Environmental Samples                                      34 2-9  Maximum Values for the Lower Limits of Detection            35 2-10  Meteorological Monitoring Instrumentation                  42 2-11  Meteorological Monitoring Instrumentation Surveillance Requi rements                                              43 2-12  Waste Gas System Explosive Gas Monitoring Instrumentation  45 Page v
 
PART II LIST OF TABLES Table                                                    Paae I RADIOACTIVE EFFLUENTS. MONITOR SETPOINTS              57 II  RADWASTE REDUCTION SYSTEM-DOSE PROJECTIONS            85 III  GASEOUS AND LIQUID EFFLUENT REPRESENTATIVE SAMPLING  94 IV  CUMULATIVE DOSE CALCULATIONS                          98 4.4-1  Dose Factors for Exposure to a Semi-Infinite Cloud of Noble Gases                                110 1 4.4-2  Inhalation Dose Factors - Infant                    112 4.4-3  Inhalation Dose Factors - Child                      113 4.4-4  Inhalation Dose Factors - Teen                      114 4.4-5  Inhalation Dose Factors - Adult                      115 4.4-6  Ingestion Dose Factors,  Grass-Cow-Milk-Infant      118 4.4-7  Ingestion Dose Factors,  Grass-Cow-Milk-Child        119 4.4-8  Ingestion Dose Factors,  Grass-Cow-Milk-Teen        120 4.4-9  Ingestion Dose Factors,  Grass-Cow-Meat-Adult        121 4.4-10  Ingestion Dose Factors,  Grass-Cow-Meat-Child        124 4.4-11  Ingestion Dose Factors,  Grass-Cow-Meat-Teen        125 4.4-12  Ingestion Dose Factors,  Grass-Cow-Meat-Adult        126 4.4-13  Ingestion Dose Factors,  Vegetation-Child            129 4.4-14  Ingestion Dose Factors,  Vegetati on-Teen            130 4.4-15  Ingestion Dose Factors,  Vegetation-Adult            131 Page vi
 
LIST OF TABLES (Continued)
Table                                                                    Page 4.4-16        Dose Factors Ground Plane                                  133 4.4-17        Liquid Effluent Adult Ingestion Dose Factors              135 I 5.1-1          Environmental Monitoring Station Location                  145 I 5.1-2          Environmental Monitoring Station's Locations, Groundwater Monitoring Wells                                          146 I 5.1-3          Ring TLDs (Inner Ring)                                    147 I 5.1-4          Ring TLDs (5 Mile Ring)                                    148 I Page vii
 
PART I SPECIFICATIONS
 
1.0      DEFINITIONS 1.1      CHANNEL CALIBRATION Refer to Technical Specifications.
1.2      CHANNEL CHECK Refer to Technical Specifications.
1.3      CHANNEL FUNCTIONAL TEST Refer to Technical Specifications.
1.4      DEGASSING DEGASSING, for purposes of hydrogen and oxygen control, means venting of the make-up or reactor coolant systems to the WASTE GAS SYSTEM.
DEGASSING, for purposes of controlling the inventory of radioactive material, means venting of the pressurizer to the WASTE GAS SYSTEM.
DEGASSING does not include sampling.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 1
 
1.5      FREQUENCY NOTATION              FREQUENCY S          At least once per 12 hours.
D          At least once per 24 hours.
W            At least once  per 7 days.
M            At least once  per 31 days.
Q            At least once  per 92 days.
SA          At least once  per 6 months.
R          At least once per 18 months.
S/U        Prior to each reactor startup.
P          Completed prior to each release.
N.A.        Not applicable.
NOTE:    Surveillance frequencies are met if the surveillance is performed within 1.25 times the interval specified, as measured from the previous performance or as measured from the time a specified condition of the frequency is met.
This is consistent with the convention of ITS 3.0.2.
1.6      LIQUID RADWASTE TREATMENT SYSTEM
*The                LIQUID RADWASTE TREATMENT SYSTEM shall be any available equipment (e.g., filters, evaporators) capable of reducing the quantity of radioactive: material, in liquid effluents, prior to discharge.
1.7      MEMBER OF THE PUBLIC MEMBER OF THE PUBLIC means an individual in a controlled or unrestricted area. However, an individual is not a member of the public during any period in which the individual receives an occupational dose.
1.8      MODE Refer to Technical Specifications.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 2
 
1.9      OFFSITE DOSE CALCULATION MANUAL (ODCM)
The OFFSITE DOSE CALCULATION MANUAL contains the methodology and parameters used in the calculation of offsite doses resulting from radioactive gaseous and liquid effluents, in the calculation of gaseous and liquid effluent monitoring Alarm Trip Setpoints, and in the conduct of the Environmental Radiological Monitoring Program.
The ODCM also contains the Radioactive Effluent Controls and Radiological Environmental Monitoring Program and descriptions of the information that should be included in the Annual Radiological Environmental Operating and Radioactive Effluent Release Reports.
1.10      OPERABLE - OPERABILITy Refer to Technical Specifications.
1.11      SITE BOUNDARY The SITE BOUNDARY shall be that line beyond which the land is  not owned, leased, or otherwise controlled by the licensee.
1.12      SOURCE CHECK.
A SOURCE CHECK shall be the qualitative assessment of channel response when the channel sensor is exposed to a radioactive source.
1.13      UNPLANNED RELEASE An UNPLANNED RELEASE is an unintended discharge of liquid or airborne radioactivity to the environment. The Auxiliary Building ventilation system is designed to handle leakage from various plant components. Leakage of this sort is not considered unplanned unless the magnitude of the leak is significant (i.e., reportable).
Minor equipment failures which cause an increase in plant releases are not unplanned as it is expected that minor failures will occur from time-to-time. Human error which results in a release of radioactivity to the environment is considered unplanned.
Examples:
Releasing the wrong waste tank.
Plant leakage which exceeds reporting limits such as those of 10 CFR 50.72 and 10 CFR 50.73.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 3
 
1.14      UNRESTRICTED AREA An UNRESTRICTED AREA shall be any area at or beyond the site boundary, access to which is not controlled by the licensee for purposes of protection of individuals from exposure to radiation and radioactive materials, or any area within the site boundary used for residential quarters or industrial, commercial, institutional, and/or recreational purposes.
1.15      VENTILATION EXHAUST TREATMENT SYSTEM A VENTILATION EXHAUST TREATMENT SYSTEM is  any system designed and installed to reduce gaseous radioiodine or radioactive material in particulate form in effluents by passing ventilation or vent exhaust gases through charcoal adsorbers and/or HEPA filters  for the purpose of removing iodines or particulates from the gaseous exhaust stream prior to release to the environment (such a system is not considered to have any effect on noble gas effluents).
Engineered Safety Feature (ESF) atmospheric cleanup systems are not considered to be VENTILATION EXHAUST TREATMENT SYSTEM components.
1.16      WASTE GAS SYSTEM A WASTE GAS SYSTEM is any equipment (e.g., tanks, vessels, piping) capable of collecting primary coolant system offgases from the primary system and providing for delay or holdup for the purpose of reducing the total radioactivity prior to release to the environment.
1.17      PURGE - PURGING PURGE or PURGING is the controlled process of discharging air or gas from a confinement to maintain temperature, pressure, humidity, concentration or other operating condition, in such a manner that replacement air or gas is required to purify the confinement.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 4
 
2.0      SPECIFICATIONS RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION 2.1      The radioactive liquid effluent monitoring instrumentation channels shown in Table 2-1 shall be OPERABLE with their alarm/trip setpoi.nts set to ensure that the limits of specification 2.5 are not exceeded.
APPLICABILITY:  As shown on Table 2-1 ACTION:
: a. With a radioactive liquid effluent monitoring instrumentation channel alarm/trip setpoint less conservative than required above, without delay suspend the release of radioactive liquid effluents monitored by the affected channel, or change the setpoint so that it is acceptably conservative, or declare the channel inoperable.
: b. With one or more radioactive liquid effluent monitoring instrumentation channels inoperable, take the ACTION shown in Table 2-1. For the instrumentation covered by items 1 and 2 of the table, exert best efforts to return the inoperable instrument(s) to OPERABLE status within 30 days. If the affected instrument(s) cannot be returned to OPERABLE status within 30 days, provide information on the reasons for inoperability and lack of timely corrective action in the next Radioactive Effluent. Release Report.
SURVEILLANCE REQUIREMENTS 2.1.1    Each radioactive liquid effluent monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK, SOURCE CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations at the frequencies shown in Table 2-2..
OFF-SITE DOSE CALCULATION MANUAL                                                Page 5
 
TABLE 2-1 RADIOACTIVE LIQUID EFFLUENT AND PROCESS MONITORING INSTRUMENTATION MINIMUM CHANNELS      APPLICABLE INSTRUMENT                          OPERABLE        MODES      ACTIONS
: 1. GROSS RADIOACTIVITY MONITORS PROVIDING ALARM AND AUTOMATIC TERMINATION OF RELEASE
: a. Auxiliary Building Liquid Radwaste Effluent Line (RM-L2)                                  1          ALL MODES        21
: b. Secondary Drain Tank Liquid Effluent Line (RM.-L7)                                1          ALL MODES        22
: 2. FLOW RATE MEASUREMENT DEVICES
: a. Auxiliary Building Liquid Radwaste Effluent Line                                          1          ALL MODES        23
: b. Secondary Drain Tank Liquid Effluent Line                                          1          ALL MODES        23
: 3. PROCESS MONITORS
: a. Nuclear Services Closed Cooling                        1                          24 Water Monitor (RM-L3)
: b. Decay Heat Closed Cooling Water Monitors (RM-L5 and RM-L6)                      1                          24
* During system operation OFF-SITE DOSE CALCULATION MANUAL                                                Page 6
 
TABLE 2-1 (Continued)
TABLE NOTATION ACTION 21 With less than the required number of OPERABLE channels, effluent releases via this pathway may continue, provided that prior to initiating a release:
: a. At least two independent samples are analyzed in accordance with Specification 2.5.1, and
: b. Two qualified persons independently verify the release rate calculations, and
: c. Two qualified persons independently verify the discharge valve lineup.
Otherwise, suspend releases of radioactive materials via this pathway.
ACTION 22  With less than the required number of OPERABLE channels, effluent releases via this pathway may continue, provided that grab samples are collected and analyzed for gross radioactivity, at least once per 12 hours.
ACTION 23  With less than the required number of OPERABLE channels, effluent releases via this pathway may continue, provided that the flow rate is estimated at least once per 4 hours during actual releases.
ACTION 24  With no channels OPERABLE, plant operation may continue provided grab samples are collected and analyzed at least once per 24 hours.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 7
 
TABLE 2-2 RADIOACTIVE LIQUID EFFLUENT AND PROCESS MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL          MODES IN CHANNEL    SOURCE    CHANNEL    FUNCTIONAL  WHICH SURVEILLANCE INSTRUMENT                        CHECK      CHECK  CALIBRATION      TEST          REQUIRED
: 1. GROSS RADIOACTIVITY MONITORS PROVIDING ALARM AND AUTOMATIC TERMINATION OF RELEASE
: a. Auxiliary Building Liquid Radwaste Effluent Line (RM-L2)                                      D*          P        R (1)          Q              N.A.
: b. Secondary Drain Tank Liquid Effluent Line (RM-L7)                              D*          P        R (1)          Q              N.A.
: 2. FLOW RATE MEASUREMENT DEVICES
: a. Auxiliary Building Liquid Radwaste Effluent Line                                    D (2)      N.A.        R          N.A.            N.A.
: b. Secondary Drain Tank Liquid                      D (2)      N.A.        R          N.A.            N.A.
Effluent Line
: 3. PROCESS MONITORS
: a. Nuclear Services Closed Cooling                    D        N.A.        R            Q          ALL MODES Water Monitor (RM-L3)
: b. Decay Heat Closed Cooling Water Monitors (RM-L5 and RM-L6)                  D        N.A.        R            Q          ALL MODES OFF-SITE DOSE CALCULATION MANUAL                                                                            Page 8
 
TABLE 2-2 (Continued)
TABLE NOTATION During periods of release.
(1)    CHANNEL CALIBRATION shall be performed using:
: a. One or more standards traceable to the National Bureau of Standards, or
: b. Standards obtained from suppliers that participate in measurement assurance activities with the National Bureau of Standards, or
: c. Standards related to previous calibrations performed using (a) or (b) above.
(2)    CHANNEL CHECK shall consist of verifying indication of flow during periods of release. A CHANNEL CHECK shall be performed at least once per day on any day that continuous, periodic or batch releases are made.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 9
 
RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION 2.2      The radioactive gaseous effluent monitoring instrumentation channels shown in Table 2-3 shall be OPERABLE with the effluent release isolation alarm/trip setpoints set to ensure that the limits of Specification 2.7 are not exceeded.
APPLICABILITY:  As shown in Table 2.-3 ACTION:
: a. With a radioactive gaseous effluent monitoring instrumentation channel alarm/trip setpoint less conservative than required above, without delay suspend the release of radioactive gaseous effluents monitored by the affected channel where applicable,
              *or *change the setpoint so that it is acceptably conservative, or declare the channel inoperable.
: b. With one or more radioactive gaseous effluent monitoring instrumentation channels inoperable, take the ACTION shown in Table 2-3. For the instruments covered by items 1, 2, and 3 of the. table, exert best efforts to return the inoperable instrument(s) to OPERABLE statUs within 30 days. If the affected instruments cannot be returned to OPERABLE status within 30 days, provide information on reasons for inoperability and lack of timely corrective action in the next Radioactive Effluent Release Report.
SURVEILLANCE REOUIREMENTS 2..2.1    Each radioactive gaseous effluent monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK, SOURCE CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations during the MODES and frequencies shown in Table 2-4.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 10
 
TABLE 2-3 RADIOACTIVE GASEOUS EFFLUENT AND PROCESS MONITORING INSTRUMENTATION MINIMUM CHANNELS    APPLICABLE OPERABLE        MODES          ACTION
: 1. Waste Gas Decay Tank Monitor (RM-A11)
: a. Noble Gas Activity Monitor*                                1      ALL MODES          24
: b. Effluent System Flow Rate Monitor                          1      ALL MODES          26
: 2. Reactor Building Purge Exhaust Duct Monitor (RM-A1)
: a. Noble Gas Activity Monitor
: i. Operating Range*                                    1            **            27 ii. Mid Range#                                        1                          29 iii. High Range#                                          1                          29
: b. Iodine Sampler                                            1                          25
: c. Particulate Sampler                                      1            **            25
: d. Effluent System Flow Rate Monitor                        1            **            26
: e. Sampler Flow Rate Monitor                                1                          26
: 3. Auxiliary Building and Fuel Handling Area Exhaust Duct Monitor (RM-A2)
: a. Noble Gas Activity Monitor
: i. Operating Range
* 1      ALL MODES          28 ii. Mid Range #                                        1      1, 2, 3 & 4          29 iii. High Range #                                        1      1, 2, 3 & 4          29
: b. Iodine Sampler                                              1      ALL MODES          25
: c. Particulate Sampler                                        1      ALL MODES          25
: d. Effluent System Flow Rate Monitor                          1      ALL MODES          26
: e. Sampler Flow Rate Monitor                                  1      ALL MODES          26
: 4. Condenser Vacuum Pump Exhaust - Gaseous                        1      1, 2, 3, 4          30 Activity Monitor (RM-A12)
Provides control room alarm and automatic termination of release.
P
** During periods of reactor building purge, except during fuel movement. During fuel movement surveillance requirements for RM-A1 (operating range) are specified by ITS 3.3.15. Automatic isolation function is not required if moving fuel that has not been recently irradiated. (See ITS B 3.3.15 and B 3.9.3 for discussion), Fuel movement includes preparation for and demobilization from AI-504, Shutdown Condition 3. Automatic isolation function is also not required in 'no mode' plant status.    # There is no isolation setpoint or release termination function for this monitor. Alarm setpoints are determined by the appropriate system procedures.
OFF-SITE DOSE CALCULATION MANUAL                                                      Page 11
 
TABLE 2-3 (Continued)
TABLE NOTATION ACTION 24 With less than the required number of OPERABLE channels, the contents of the Waste Gas Decay Tank may be released to the environment, provided that prior to initiating a release:
: 1. The Auxiliary Building & Fuel Handling Area Exhaust Duct Monitor (RM-A2) is OPERABLE with its setpoints set to ensure that the limits of Specification 2.7 are not exceeded. The setpoint shall be determined in accordance with the OFFSITE DOSE CALCULATION MANUAL, or
: 2. a. At least two independent samples of the tank's contents are analyzed in accordance with Table 2-6 and
: b. Two qualified persons independently verify the release rate calculations, and
: c. Two qualified persons independently verify the discharge valve lineup.
Otherwise, suspend releases of radioactive effluents via this pathway.
ACTION 25  RM-A1 With the affected sampler inoperable, operation of the RB purge may continue for 1 hour with no auxiliary sampling, provided that RB airborne levels are steady state or declining. If indicators of RB atmospheric activity, such as RM-A6, RCS leakage, or general area air samples, show an increase in RB activity while the sampler is inoperable, then immediately restore the affected sampler, or implement auxiliary sampling, or shut down the purge.
With the affected sampler inoperable, operation of the RB purge may continue for more than 1 hour provided that samples (reference Tables 2-6) are continuously taken (except for filter changes) with auxiliary sampling equipment.
Auxiliary sampling equipment includes general area RB air samples or RMA-15. Other sampling regimes are acceptable provided results are representative of plant effluents.
Note:    Coordination of sampling during core alterations or fuel movement is required in order to comply with Technical Specifications.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 12
 
TABLE 2-3 (Continued)
TABLE NOTATION ACTION 25 RM-A2 (Continued)
With the affected channel inoperable, effluent    releases may continue for 1 hour with no auxiliary sampling,    provided that AB airborne levels are steady state or declining. If i.ndicators of AB atmospheric activity, such as RM-A3, RM-A4,    and RM-A8 show an increase in activity then restore the affected    sampler, or implement auxiliary sampling, or shut down the    release.
With the affected sampler inoperable, effluent releases may continue for more than I hour provided that samples (reference Table 2-6) are continuously taken (except for filter changes) with auxiliary sampling equipment.
Auxiliary sampling equipment includes 1) RM-A4 and RM-A8 used together 2) general area AB air samples, or 3) RMA-15.      Other sampling regimes are acceptable provided results are representative of plant effluents.
ACTION 26    With the number of OPERABLE channels less than required, effluent releases via this pathway may continue, provided flow rate is estimated at least once per 4 hours.
ACTION 27    With the noble gas monitor (operating range) inoperable, operation of the RB purge may continue for 1 hour, provided that RB airborne levels are steady state or declining. If indicators of RB atmospheric activity such as RM-A6, RCS leakage, or general area air samples show an increase in RB activity while the monitor is inoperable, then immediately restore the noble gas monitor or shut down the purge.
Note:  Coordination of sampling during core alterations or fuel movement is required in order to comply with Technical Speci fi cations.
ACTION 28    If the auxiliary building ventilation system is secured, such that there is no effluent release path, then there are no compensatory sampling requirements.
With the number of OPERABLE channels less than required, releases via this pathway may continue, provided RM-A4 and RM-A8 are operable and auxiliary building airborne levels are steady state or declining as indicated by trend data from these monitors.      If using RM-A4 and RM-A8 as compensatory monitors for RM-A2, then.
evaluate the trend data of these monitors every 12 hours and notate the evaluation in the plant log until RM-A2 is returned to service or the release is secured. Review of monitor trends using the plant computer system (such as OSI-PI or equivalent) is an approved method to satisfy this requirement.
OFF-SITE DOSE CALCULATION MANUAL                                                  Page 13
 
TABLE 2-3 (Continued)
TABLE NOTATION Note:  An increasing trend for RM-A4 and/or RM-A8 is defined as RM-A4 or RM-AB count rate increases by a factor of 2 above baseline counts or if either monitor's warning alarm setpoint actuates, exclusive of momentary spikes or spurious alarms.
If an increasing trend is noted on RM-A4 or RM-A8, then collect grab samples at the appropriate monitors (or plant areas) to evaluate the condition.
IF RM-A4 and RM-A8 are not operable, then collect gas grab samples at least once per 12 hours and analyze within 24 hours from RM-A2, if its pump i-s running with acceptable flow rates.
If RM-A4 or RM-A8 is not available, then other local grab sampling regimes at a frequency of once per 12 hours can be utilized as long as it is representative of plant effluents.
Additionally either the requirements of ACTION 24 Part 2 are met or RM-All is OPERABLE prior to releasing the contents of the Waste Gas Decay Tanks.
ACTION 29  With the number of OPERABLE channels less than required by the Minimum Channels OPERABLE requirements,
: 1)  Either restore the inoperable Channel(s) to OPERABLE status within 7 days of the event, or
: 2)  Prepare and submit a Special Report to the Commission pursuant to Specification 2.14 within the next 30 days outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.
NOTE:    Action Statement 2.2a not applicable.
ACTION 30  With no channels OPERABLE, plant operation may continue provided grab samples are collected and analyzed for noble gases at least once per 24 hours.
NOTE:    The absence of a conversion factor to relate cpm to gpd primary to secondary leakage does not make RM-A12 inoperable; RM-A12 can still be used as an indicator of changes in noble gas concentrations in the condenser off gas. CP-152, Primary to Secondary Leakage Operating Guideline, specifies the actions to take when a leak rate conversion factor is not available for use with RM-A12.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 14
 
TABLE 2-4 RADIOACTIVE GASEOUS EFFLUENT AND PROCESS MONITORING INSTRUMENTATION SURVEILL _ANCE REQUIREMENTS ANCE REQUIREMENT CHANNEL    MODES IN WHICH CHANNEL    SOURCE      CHANNEL      FUNCTIONAL    SURVEILLANCE INSTRUMENT                      CHECK      CHECK    CALIBRATION        TEST        REQUIRED
: 1. WASTE GAS DECAY TANK MONITOR (RM-A11)
: a. Noble Gas Activity Monitor                        P            P        R(1)            Q        ALL MODES
: b. Effluent System Flow Rate Monitor                  P          N.A.          R            Q        ALL MODES
: 2. REACTOR BUILDING PURGE EXHAUST DUCT MONITOR (RM-A1)
: a. Noble Gas Activity Monitor I. Operating Range                              D            P        R(1)            Q ii. Mid Range                                    W          M          R(1)            Q iii. High Range                                    W          M          R(1)            Q
: b. Iodine Sampler                                    W          N.A.        N.A.          N.A.
: c. Particulate Sampler                                W          N.A.        N.A.          N.A.
: d. Effluent System Flow Rate Monitor                  D          N.A.          R            Q
: e. Sampler Flow Rate Monitor                          D          N.A.          R            Q
: 3. AUXILIARY BUILDING & FUEL HANDLING AREA EXHAUST DUCT MONITOR (RM-A2)
: a. Noble Gas Activity Monitor I. Operating Range                              D          N.A.        R (1)            Q        ALL MODES ii. Mid Range.                                    W          M          R (1)            Q        1, 2, 3, 4 iii. High. Range                                  W          M          R(1)            Q        1, 2, 3, 4
: b. Iodine Sampler                                    W          N.A.        N.A.          N.A.      ALL MODES
: c. Particulate Sampler                                W          N.A.        N.A.          N.A.      ALL MODES
: d. Effluent System Flow Rate Monitor                  D          N.A.          R            Q        ALL MODES
: e. Sampler Flow Rate Monitor                          D          N.A.          R            Q        ALL MODES
: 4. Condenser Vacuum Pump Exhaust-    Gaseous              D          N.A.          R            Q        1,  2, 3,  4 Activity Monitor (RM-A12)
OFF-SITE DOSE CALCULATION MANUAL                                                                                Page 15
 
TABLE 2-4 (Continued)
# During periods of Reactor Building Purge, except during fuel movement.
During fuel movement surveillance requirements for RM-A1 (operating range)
*are specified by ITS 3.3.15. Automatic isolation function is not required if moving fuel that has not been recently irradiated. (See ITS B 3.3.15 and B 3.9.3 for discussion). Fuel movement includes preparation for and demobilization from AI-504, Shutdown Condition 3.
(1)  CHANNEL CALIBRATION shall be performed using:
: a. One or more standards traceable to the National  Bureau of Standards, or
: b. Standards obtained from suppliers that participate in measurement assurance activities with the National Bureau of Standards, or
: c. Standards related to previous calibrations using (a)  or (b) above.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 16
 
LIQUID RADWASTE TREATMENT SYSTEM 2.3      The LIQUID RADWASTE TREATMENT SYSTEM shall be used, as required, to reduce radioactive materials in liquid wastes prior to their discharge, when projected monthly doses due to liquid effluents discharged to UNRESTRICTED AREAS would exceed the following values:
: a. 0.06 mrem whole body; b.. 0.2 mrem to any organ APPLICABILITY:    At all times.
ACTION-  a. When radioactive liquid waste, in excess of the above limits, is discharged without prior treatment, prepare and submit to the Commission within 30 days, a Special Report pursuant to Specification 2.14, which includes the following information:
: 1. Identification of inoperable equipment and the reasons for inoperability.
: 2. Actions taken to restore the inoperable equipment to OPERABLE status.
: 3. Actions taken to prevent recurrence.
SURVEILLANCE REQUTREMENTS 2.3.1    Doses due to liquid releases shall be projected at least once per 31 days.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 17
 
WASTE GAS SYSTEM 2.4      The WASTE GAS SYSTEM shall  be used, as required, to reduce the radioactivity of materials  in gaseous waste prior to discharge, when projected monthly air  doses due to releases of gaseous effluents from the site to  areas at or beyond the SITE BOUNDARY would exceed:
: 1)  0.2 mrad gamma;
: 2)  0.4 mrad beta; and The VENTILATION EXHAUST TREATMENT SYSTEM shall be used, as required, to reduce the quantity of radioactive materials in gaseous waste prior to discharge, when projected monthly air doses due to release of gaseous effluents from the site to areas at or beyond the SITE BOUNDARY would exceed:
: 1)  0.3 mrem to any organ APPLICABILITY:    At all times.
ACTION:
: a. When the WASTE GAS SYSTEM and/or VENTILATION EXHAUST TREATMENT SYSTEM are not used and gaseous waste in excess of the above limits is discharged without prior treatment, prepare and submit to the Commission, within 30 days a Special Report, pursuant to Specification 2.14, which includes:
: 1)  Identification of the inoperable equipment and the reason(s) for inoperability.
: 2)  Actions taken to restore the inoperable equipment to OPERABLE status.
: 3)  Actions taken to prevent recurrence.
SURVEILLANCE REQUIREMENTS 2.4.1    Doses due to gaseous releases from the site shall be projected at least once per 31 days.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 18
 
LIQUID EFFLUENTS CONCENTRATION 2.5      The concentration of radioactive material released to UNRESTRICTED AREAS shall be less than or equal to 10 times the concentrations specified in 10 CFR Part 20, Appendix B, Table II, Column 2 for radionuclides other than dissolved or entrained noble gases. For Xe-133, the concentration shall be < 1 x 10-3 microcuries/cc. For all other dissolved or entrained noble gases, the concentration shall be less than or equal to 2x10- 4 microcuries/cc total activity.
APPLICABILITY:  At all times.
ACTION:
: a. With the concentration of radioactive materials released to UNRESTRICTED AREAS exceeding the above limits, without delay restore the concentration of radioactive materials being released to UNRESTRICTED AREAS to within the above limits. If the concentration of radioactive materials being released in excess of the above limit is related to a plant-operating characteristic, appropriate corrective measures (e.g., power reduction, plant shutdown) shall be taken to restore the concentration of radioactive materials being released to UNRESTRICTED AREAS to within the above limits.
SURVEILLANCE REQUIREMENTS 2.5.1    Radioactive liquid wastes shall be sampled and analyzed in accordance with the sampling and analysis program of Table 2-5.
2.5.2    The results of the radioactivity analyses shall be used to assure the concentrations of radioactive material released from the site are maintained within the limits of Specification 2.5.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 19
 
TABLE 2-5 RAflTt'AACT'TVF  I TflIITfl WAqTF  *AMPl TNir ANfl ANIAIYV*T'  PROGRlAM RADIOACTIVE LIQUIDWASTE SAMPLING AND                ANA' V-,Tc, PPnrQAM Minimum                              Lower Limit of Liquid Release          Sampling                Analysis        Type of Activity      Detection Type                Frequency                Frequency              Analysis            (LLD)
(pCi/ml)a A. Batch Waste                P                      P Release              Each Batch              Each Batch        Principal Gamma          5x10-7 Tanksd                                                          Emittersf
: 1. Evaporator                                                      1-131                    jx10-6 Condensate Storage Tanks (2)
: 2. Laundry &                  P                      M            Dissolved and            1x10-5 Shower Sump        One Batch/M                                Entrained Gases Tanks (2)                                                      (Gamma Emitters
: 3.                                                                                                    5 Secondary                  P                      M            H-3                      lxlO-Drain Tank          Each Batch              Compositeb Gross Alpha              lx10-7 P                      Q            Sr-89, Sr-90            5x10-8 Each Batch              Compositeb Fe-55                    1x10-6 B. Continuous                                        W            Principal Gamma Releasese          Continuousc              Compositec        Emittersf                5x10-7
: 1. Condensate System                                                          1-131                    jx10-6 M                      M            Dissolved and            1x1O-5 Grab Sample                                Entrained Gases (Gamma Emitters)
M            H-3                      lx10-5 Continuousc              Compositec Gross Alpha              lx10-7 Q            Sr-89, SR-90            5x10-8 Continuousc              Compositec Fe-55                    1x10-6 OFF-SITE DOSE CALCULATION MANUAL                                                              Page 20
 
TABLE 2-5 (Continued)
TABLE NOTATION
: a. The LLD* is the smallest concentration of radioactive material in a sample that will be detected with 95% probability with 5% probability of falsely concluding that a blank observation represents a "real" signal.
For a particular measurement system (which may include radiochemical separation):
LLD = 4.66s/C2.22x1OeEVYe-"t)
Where:
LLD is the lower limit of detection as defined above (as microcurie per unit mass or volume),
sb is the standard deviation of the background counting rate or of the counting rate of a blank sample as appropriate (as counts per minute),
E is the counting efficiency (as counts per disintegration),
V is the sample size (in units of mass or volume),
2.22x10 6 is the number of disintegrations per minute per microcurie, Y is the fractional radiochemical yield (when applicable),
X is the radioactive decay constant for the particular radionuclide,  and At is  the elapsed time between midpoint of sample collection and time of counting (for plant effluents, not environmental samples).
Typical values of E, V, Y, and At shall be used in the calculation.
* The LLD is defined as an a priori (before the fact) limit representing the capability of a measurement system and not as an a posteriori (after the fact) limit for a particular measurement.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 21
 
TABLE 2-5 (Continued)
TABLE NOTATION
: b. A composite sample is one in which the quantity of liquid sampled is proportional to the quantity of liquid waste discharged and in which the method of sampling employed results in a specimen which is representative of the liquids released.
: c. To be representative of the quantities and concentrations of radioactive materials in liquid effluents, samples shall be collected continuously in proportion to the rate of flow of the effluent stream. Prior to analyses, all samples taken for the composite shall be thoroughly mixed in order for the composite sample to be representative of the effluent release.
: d. A batch release is the discharge of liquid wastes of a discrete volume.
Prior to sampling for analyses, each batch shall be isolated, and then thoroughly mixed to assure representative sampling.
: e. A continuous release is the discharge of liquid wastes of a nondiscrete volume; e.g., from a volume or system that has an input flow during the continuous release.
: f. The principal gamma emitters for which the LLD specification applies exclusively are the following radionuclides:  Mn-54, Fe-59, Co-58, Co-60, Zn-65, Mo-99, Cs-134, Cs-137, Ce-141, and Ce-144. This list does not mean that only these nuclides are to be detected and reported. Other peaks, which are measurable and identifiable, together with the above nuclides, shall also be identified and reported. Nuclides which are below the LLD for the analyses shall be reported as "less than" the nuclide's LLD, and shall not be reported as being present at the LLD level for that nuclide. The "less than" values shall not be used in the required dose calculations.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 22
 
LIQUID EFFLUENTS - DOSE 2.6      The dose or dose commitment to a MEMBER OF THE PUBLIC from radioactive materials in liquid effluents released to UNRESTRICTED AREAS shall be limited as follows:
: a. During any calendar quarter to less than or equal to 1.5 mrem to the total body and less than or equal to 5 mrem to any organ.
: b. During any calendar year to less than or equal to 3 mrem to the total body and to less than or equal to 10 mrem to any organ.
APPLICABILITY!    At all times.
ACTION:
: a. With the calculated dose: from the release of radioactive materials in liquid effluents exceeding any of the above limits, prepare and submit to the Commission, within 30 days, a Special Report pursuant to Specification 2.14, which includes:
: 1. Identification of the cause for exceeding the limit(s);
: 2. Corrective action taken to reduce the release of radioactive materials in liquid effluents during the remainder of the current calendar quarter an during the remainder of the current calendar year so that the dose or dose commitment to a MEMBER OF THE PUBLIC from this source is less than or equal to 3 mrem total body and less than or equal to 10 mrem to any organ during the calendar year.
SURVEILLANCE REOUIREMENTS 2.6.1    DOSE CALCULATIONS. Cumulative dose contributions from liquid effluents shall be determined at least once per 31 days.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 23
 
GASEOUS EFFLUENTS - DOSE RATE 2.7      The dose rate at or beyond the SITE BOUNDARY, due to radioactive materials released in gaseous effluents, shall be limited as follows:
: a. Noble gases:    less than or equal to 500 mrem/year total body and less than or equal to 3000 mrem/year to the skin.
: b. 1-131, 1-133, Tritium, and radioactive particulates with half-lives of greater than 8 days:    less than or equal to 1500 mrem/year to :any organ.
APPLICABILITY:    At all times ACTION:
: a. With dose rate (s) exceeding the above limits, without delay decrease the dose rate to within the above limit(s). If the dose rate at or beyond the SITE BOUNDARY due to radioactive materials in gaseous effluents in excess of the above limits is related to a plant-operating characteristic, appropriate corrective measures (e.g., power reduction, plant shutdown) shall be taken to decrease the dose rate to within the above limits.
SURVEILLANCE REQUIREMENTS 2.7.1    The dose rate due to noble gases in gaseous effluents shall be determined to be within the above limits.
2.7.2    The dose rate due to radioactive materials specified above, other than noble gases, in gaseous effluents shall be determined to be within the above limits by obtaining representative samples and performing analyses in accordance with Table 2-6.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 24
 
TABLE 2-6 RADIOACTIVE GASEOUS WASTE SAMPLING AND ANALYSIS PROGRAM Lower Limit of Gaseous Release. Type      Sampling          Minimum Analysis                                      Detection (LLD)
Frequency        Frequency          Type of Activity Analysis  (pCi/ml)a A. Waste Gas Decay Tank            P                P Each Tank Grab      Each Tank        Principal Gamma Emittersf      lx10-4 Sample B. Reactor Building              P                P          Principal Gamma Emittersb,f    lx10-4 Purge Exhaust Duct      Each Purgec      Each Purge Monitor                      Grab (RM-A1)                    Sample H-3                            1x10-6 C. Auxiliary Building            Mc                M          Principal Gamma Emittersb,f    lx10-4 and Fuel Handling            Grab Area Exhaust Duct          Sample Monitor (RM-A2)
H-3                            jx10-6 D. All Release Types as    Continuouse            Wd          1-131 Listed in A, B, C                          Charcoal                                              12 1X10-above                                        Sample Continuouse            Wd          Principal Gamma Emittersf Particulate      (1-131, Others)                        11 1x10-Sample Continuouse            M          Gross Alpha Composite                                      1x10- 1 1 Parti cul ate Sample Continuouse            Q          Sr-89, Sr-90 Composi te                                      1x10- 1 1 Particulate Sample Continuouse        Noble Gas        Noble Gases Monitor        Gross Beta & Gamma              lx10-6 OFF-SITE DOSE CALCULATION MANUAL                                                                        Page 25
 
TABLE 2-6 (Continued)
TABLE NOTATION
: a. The LLD* is the smallest concentration of radioactive material in a sample that will be detected with 95% probability with 5% probability of falsely concluding that a blank observation represents a "real" signal.
For a particular measurement system (which may include radiochemical separation):
LLD = 4.66s b/(2.22x1O6EVYe-At)
Where:
LLD is the lower limit of detection as defined above (as microcurie per unit mass or volume),
sb is the standard deviation of the background counting rate or of the counting rate of a blank sample as appropriate (as counts per minute),
E is the counting efficiency (as counts per disintegration),
V is the sample size (in units of mass or volume),
2.22x10' is the number of disintegrations per minute per microcurie, Y is the fractional  radiochemical yield (when applicable),
X is the radioactive decay constant for the particular radionuclide,  and At is the elapsed time between midpoint of sample collection and time of counting (for plant effluents, not environmental samples).
Typical values of E, V, Y, and At shall be used in the calculation.
* The LLD is defined as an a priori (before the fact) limit representing the capability of a measurement system and not as an a posteriori (after the fact) limit for a particular measurement.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 26
 
TABLE 2-6 (Continued)
TABLE NOTATION
: b. Analyses shall be performed when there is a sustained increase in the noble gas monitor count rate. As sustained increase is one in which the count rate stays above the monitor warning sepoint for at least one hour.
Sampling shall be done within 2 hours of warning alarm actuation.
If the associated noble gas monitor (RM-Al or RM-A2) is out of service during a release, then analyses shall be performed between 2 and 6 hours following shutdown, startup, or a change in power level exceeding 15%
rated thermal power within one hour.
: c. Tritium grab samples shall be taken between 12 and 24 hours after flooding the refueling canal and at least once per 7 days thereafter while the refueling canal is flooded.
: d. Samples shall be changed at least once per 7 days and analyses shall be completed within 48 hours after changing (or after removal from sampler).
Sampling and analyses shall be performed at least once per 24 hours for at least 7 days following each shutdown, startup or change in power level exceeding 15% of RATED THERMAL POWER within one hour, unless the Iodine Monitoring Channels in Radiation Monitors RM-Al and RM-A2 show that the Radionuclide concentration in the Auxiliary Building and Fuel Handling Area or the Reactor Building Purge Exhaust Ducts will lead to a release which is less than the 10 CFR 20, Appendix B, Table II, Column I limits, at or beyond the SITE BOUNDARY.
: e. The ratio of the sample flow rate to the sampled stream flow rate shall be known for the time period covered by each dose or dose rate calculation made in accordance with the Specifications 2.7, 2.8, and 2.9.
: f. The principal gamma emitters for which the LLD specification applies exclusively are the following radionucllides: Kr-87, Kr-88, Xe-133, Xe-133m, Xe-135, and Xe-138 for gaseous emissions and Mn-54, Fe-59, Co-58, Co-60, Zn-65, Mo-99, Cs-134, Cs-137, Ce-141 and Ce-144 for particulate emissions. This list does not mean that only these nuclides are to be detected and reported. Other peaks, which are measurable and identifiable, together with. the above nuclides, shall also be identified and reported. Nuclides which are below the LLD for the analyses shall be reported as "less than" the nuclide's LLD and shall not be reported as being present at the LLD level for that nuclide. The "less than" values shall not be used in the required dose calculations.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 27
 
DOSE-NOBLE GASES 2.8      The air dose at or beyond the SITE BOUNDARY, due to radioactive noble gases released in gaseous effluents shall be limited to:
: a. During any calendar quarter:    less than or equal to 5 mrad gamma and less than or equal to 10 mrad beta radiation, and
: b. During any calendar year: less than or equal to 10 mrad gamma and less than or equal to 20 mrad beta radiation.
APPLICABILITY:    At all times.
ACTION:
: a. With the calculated air dose from radioactive noble gases in gaseous effluents exceeding any of the above limits, prepare and submit to the Commission, within 30 days, a Special Report, pursuant to Specification 2.14, which includes:
: 1)  Identification of the cause for exceeding the limit(s).
: 2)  Corrective action taken to reduce the release of radioactive noble gases in gases effluents during the remainder of the current calendar quarter and during the remainder of the current calendar year so that the average dose during the calendar year is less than or equal to 10 mrad gamma and 20 mrad beta radiation.
SURVEILLANCE REQUIREMENTS 2.8.1    DOSE CALCULATIONS:    Cumulative dose contributions for the current calendar quarter and current calendar year shall be determined at least once per 31 days.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 28
 
DOSE 131. 1-133. TRITIUM. AND RADIOACTIVE PARTICULATES 2.9      The dose to a MEMBER OF THE PUBLIC from 1-131, 1-133, Tritium, and radioactive particulates with half-lives greater than 8 days in gaseous effluents released from the site to areas at or beyond the SITE BOUNDARY shall be limited as follows:
: a. During any calendar quarter:    less than or equal to 7.5 mrem to any organ, and
: b. During any calendar year:    less than or equal to 15 mrem to any organ.
APPLICABILITY:    At all times.
ACTION:
: a. With the calculated dose from the release of 1-131, 1-133, Tritium, and radioactive particulates with greater than 8 day half-lives, in gaseous effluents, exceeding any of the above limits, prepare and submit to the Commission, within 30 days, a Special Report, pursuant to Specification 2.14, which includes:
: 1)  Identification of the cause for exceeding the limits(s);
: 2)  Corrective action to reduce those releases during the remainder of the current calendar quarter and the remainder of the current calendar year so that the average dose to any organ is less than or equal to 15 mrem.
SURVEILLANCE REQUIREMENTS 2.9.1    DOSE CALCULATIONS:    Cumulative dose calculations for the current calendar quarter and current calendar year shall be determined at least once per 31 days.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 29
 
TOTAL DOSE 2.10      The calendar year dose or dose commitment to any MEMBER OF THE PUBLIC, due to releases of radioactivity and radiation, from uranium fuel cycle sources shall be limited to less than or equal to 25 mrems to the total body or any organ (except the thyroid, which shall be limited to less than or equal to 75 mrems).
APPLICABILITY. At all times.
ACTION:
: a. With the calculated doses from the release of radioactive materials in liquid or gaseous effluents exceeding twice the limits of Specification 2.6a, 2.6b, 2.8a, 2.8b, 2.9a, or 2.9b, calculations should be made, which include direct radiation contributions from the reactor, to determine whether the above limits of Specification 2.10 have been exceeded. If such is the case, prepare and submit to the Commission within 30 days, pursuant to Specification 2.14, a Special Report that defines the corrective action to be taken to reduce subsequent releases to prevent recurrence of exceeding the above limits and includes the schedule for achieving conformance with the above limits. This Special Report, as defined in 10 CFR Part 20.2203, shall include an analysis that estimates the radiation exposure (dose) to a MEMBER OF THE PUBLIC from uranium fuel cycle sources, including all effluent pathways and direct radiation, for the calendar year that includes the release(s) covered by this report. It shall also describe levels of radiation and concentrations of radioactive material involved, and the cause of the exposure levels or concentrations. If the estimated dose(s) exceeds the above limits, and if the release condition resulting in violation of 40 CFR Part 190 has not already been corrected, the Special Report shall include a request for a variance in accordance with the provisions of 40 CFR Part 190. Submittal of the report is considered a timely request, and a variance is granted until staff action on the request is complete.
SURVEILLANCE REOUIREMENTS 2.10.1    DOSE CALCULATIONS - Cumulative dose contributions from liquid and gaseous effluents shall be. determined in accordance with Specifications 2.6.1, 2.8.1, and 2.9.1.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 30
 
RADIOLOGICAL ENVIRONMENTAL MONITORING 2.11      The radiological environmental monitoring program shall be conducted as specified in Table 2-7.
APPLICABILITY:    At all times.
ACTION:
: a. With the radiological environmental monitoring program not being conducted as specified in Table 2-7, prepare and submit to the Commission, in the Annual Radiological Environmental Operating Report, a description of the reasons for not conducting the program as required and the plans for preventing a recurrence.
: b. With the level of radioactivity, resulting from plant effluents, in an environmental sampling medium exceeding the reporting levels of Table 2-8 when averaged over any calendar quarter, prepare and submit to the Commission, within 30 days of obtaining analytical results from the affected sampling period, a Special Report pursuant to Specification 2.14, which.
identifies the cause(s) for exceeding the limit(s) and defines corrective actions to be taken to reduce radioactive effluents so that the potential annual dose to a MEMBER OF THE PUBLIC is less than the calendar year limits of Specifications 2.7, 2.8, and 2.9. When more than one of the radionuclides in Table 2-8 are detected in the radionuclides in Table 2-8 are detected in the sampling medium, this report shall be submitted if:
concentration (1)  concentration (2) limit level (1)  + limit level  (2)  + ...  > 1.0 When radionuclides other than those in Table 2-8 are detected and are the result of plant effluents, this report shall be submitted if the potential annual dose to a MEMBER OF THE PUBLIC is greater than or equal to the calendar year limits of Specifications 2.7, 2.8, and 269. This report is not required if the measured level of radioactivity was not the result of plant effluents; however, in such an event, the condition shall be reported and described in the Annual Radiological Environmental Operating Report.
: c. With milk or fresh leafy vegetation samples unavailable from one or more of the sample locations required by Table 2-7, identify the cause of the unavailability of samples and identify locations for obtaining replacement samples in the next Annual Radiological Environmental Operating Report. The locations from which samples were unavailable may then be deleted from those required by Table 2-7, provided the locations from which the replacement samples were obtained are added to the environmental monitoring program as replacement locations.
SURVEILLANCE REQUIREMENTS 2.11.1    The radiological environmental monitoring samples shall be collected pursuant to Table 2-7 from the locations given in the table and Figures 5.1., 5.2, and 5.3 and shall be analyzed pursuant to the requirements of Tables 2-7 and 2-9.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 31
 
TABLE 2-7 OPERATIONAL RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM Exposure Pathway        Number of Samples            Sampling/        Type/Frequency of and/or Sample            and Locations        Collection Frequency        Analysis 1.AIRBORNE              One sample each:          Continuous sampler/  Radioiodine canister:
Radioiodine and      C07, C18, C40, C41,      Weekly collection parti culates        C46 and Control                                a) 1-131 analysis Location C47                                      weekly Particulate sampler:
a) Gross 10at > 24 hours/foll owing weekly filter change.
b) Composite gamma special analysis (by location)/
quarterly. (Gamma Spectral Analysis shall also be performed on individual samples if gross beta activity of any sample is greater than 1.0 pCi/m 3 and which is also greater than ten times the control sample activity.
2.DIRECT RADIATION      1)    Site Boundary:      Continuous            Gamma exposure C60, C61,  C62,    placement/Quarterly  rate/quarterly C63, C64,  C65,    collection C66, C67,  C68, C69, C41,  C70, C27, C71,  C72, C73
: 2)    Five Miles:
C18, C03, C04, C74, C75, C76, COB, C77, C09, C78, C14G, COI, C79
: 3)    Control Location:  C47 OFF-SITE DOSE CALCULATION MANUAL                                                  Page 32
 
TABLE 2-7 (Continued)
OPERATIONAL RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM Exposure Pathway        Number of Samples            Sampling/        Type/Frequency of and/or Sample            and Locations        Collection Frequency          Analysis
: 3. WATERBORNE          One sample each:        Grab sample/Monthly  Gamma spectral Seawater            C14H, C14G Control                            anal ysi s/monthly Location C13 Tritium analysis on each sample or on a quarterly composite of monthly samples Ground water        One sample;            Grab                  Gamma spectral and C40 (Control            sample/semiannual    Tritium analysis/each Location)                                    sample Site Ground        One sample each:        Grab                  Gamma spectral and Water                CR3-2, CR3-4, CR3-5,    sample/quarterly      Tritium analysis/each CR3-6S, CR3-6D, CR3-7                        sample CR3-8, CR3-9, CR3-10 One sample each:
Drinking water    C07, CIO, C18 (All      Grab                  Gamma spectral and Control Locations)      sample/quarterly      Tri ti um anal ysi s/each sample One sample each:
Shoreline          C14H, C14M, C14G        Semiannual sample    Gamma spectral Sediment            Control Location C09                          analysis/each sample
: 4. INGESTION Fish &    One sample each:        Quarterly:            Gamma spectral Invertebrates        C29, Control            Oysters and          analysis on edible Location C30            carnivorous fish      portions/each sample Food Products      One sample each:        Monthly (when        Gamma spectral and C48a*, C48b*,          available): Sample    1-131 analysis/each Control Location C47    compressed of three  sample (3) types of broad leaf vegetation from each location One sample:    C19 Annual during        Gamma spectral harvest: Citrus      anal ysi s/each sample One sample:    C04 Annual during        Gamma spectral harvest: Watermelon  analysis/each sample
* Stations C48a and C48b are located near the site boundary for gaseous effluents in the two sectors which yield the highest historical annual average D/Q values.
OFF-SITE DOSE CALCULATION MANUAL                                                  Page 33
 
TABLE 2-8 REPORTING LEVELS FOR RADIOACTIVITY CONCENTRATIONS IN ENVIRONMENTAL SAMPLES Water    Airborne Particulate          Fish      Milk    Food Products Analysis        (pCi/l)    or Gases (pCi/m 3)    (pCi/Kg, wet) (pCi/l)    (pCi/Kg, wet)
H-3        20,000c)
Mn-54          1,000                                30,000 Fe-59          400                                10,000 Co-58          1,000                                30,000 Co-60            300                                10,000 Zn-65            300                                20,000 Zr-Nb-95l          400 1-131            2C&deg;*            0.9                              3          100 Cs-134          30              10                1,000        60          1,000 Cs-137          50              20                2,000        70          2,000 Ba-La-140cb)        200                                              300 (a)For drinking water samples. This is 40 CFR Part 141 value.      If no drinking water pathway exists, a value of 30,000 pCi/l may be used.
(b)An equilibrium mixture of the parent and daughter isotope which contains the reporting value of the parent isotope.
(c)    For drinking water samples only.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 34
 
TABLE 2-9 MAXIMUM VALUES FOR THE LOWER lIMITS OF DETECTION (LLD3) a.d
                                          ... TH ..    ....
LOWER.      ..
LIMITS- OF  DE  EC .. I .. NmLL    ) -
MAXIMUM. VA.... UE Airborne Particulate Water      or Gases                        Fish            Milk        Food Products      Sediment Analysis        (pCi/l)        (pCi/m')            (pCi/Kg, wet)        (pCi/i)        (pCi/Kg, wet)  (pCi/Kg, dry) gross beta                          0.01 3H          2000b 54Mn            15                                        130 59 Fe          30                                        260 58 Co          15                                        130 60 Co          15                                        130 65 Zn          30                                        260 95 Zr-Nb        15c 1311            if            0.079                                        1                  60 1 34 Cs        15              0 .0 5 e                  130              15                  60          150 137Cs          18              0 .0 6 e                  150              18                  80          180 1 40 Ba-La        15c                                                        15c OFF-SITE DOSE CALCULATION MANUAL                                                                        Page 35
 
TABLE 2-9 (Continued)
TABLE NOTATION
: a. The LLD* is the smallest concentration of radioactive material in a sample that will be detected with 95% probability with 5% probability of falsely concluding that a blank observation represents a "real" signal.
For a particular measurement system (which may include radiochemical separation):
LLD = 4.66s b/(2.22EVYe-XAt)
Where:
LLD is the lower limit of detection as defined above (as picocurie per unit mass or volume),
sbis the standard deviation of the background counting rate or of the counting rate of a blank sample as appropriate (as counts per minute),
E is the counting efficiency (as counts per disintegration),
V is the sample size (in units of mass or volume),
2.22 is the number of disintegrations per minute per picocurie, Y is the fractional radiochemical yield (when applicable),
X is the radioactive decay constant for the particular radionuclide, and At is the elapsed time between environmental collection, or end of the sample collection period, and time of counting.
Typical values of E, V, Y, and At shall be used in the calculation.
* The LLD is defined as an a priori (before the fact) limit representing the capability of the measurement system and not as an a posteriori (after the fact) limit for a particular measurement.      Analyses shall be performed in such a manner that the stated LLD's will be achieved under routine conditions. Occasionally, background fluctuations, unavoidable small sample sizes, the presence of interfering nuclides, or other uncontrollable circumstances may render these LLD's unachievable.      In such cases, the contributing factors shall be identified and described in the Annual Radiological Environmental Operating Report.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 36
 
TABLE 2-9 (Continued)
TABLE NOTATION
: b. LLD for drinking water. If no drinking water pathway exists, a value of 3000 pCi/1 may be used.
: c. The specified LLD is for an equilibrium mixture of parent and daughter nuclides which contain 15 pCi/l of the parent nuclide.
: d. Other peaks which are measurable and identifiable, together with the radionuclides in Table 2.9, shall be identified and reported.
: e. Cs-134, and Cs-137 LLD's apply only to the quarterly composite gamma spectral analysis, not to analyses of single particulate filters.
: f. LLD for drinking water. If no drinking water pathway exists, the LLD of gamma isotopic analysis may be used.
: g. LLD for 1-131 applies to a single weekly filter.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 37
 
LAND USE CENSUS 2.12      A land use census shall be conducted and shall identify the location of the nearest milk animal, the nearest residence and the nearest garden* of greater than 500 square feet producing fresh leafy vegetables in.each of the land based meteorological sectors within a distance of five miles.
APPLICABILITY,    At all times.
ACTION:
: a. With a land use census identifying a location(s) that yields a calculated dose or dose commitment greater than the values currently being calculated by Specification 2.9.1, identify the new location in the next Annual Radiological Environmental Operating Report.
: b. With a land use census identifying a location(s) which yields a calculated dose or dose commitment (via the same exposure pathway) which is at least 20% greater than at a location from which samples are currently being obtained in accordance with Specification 2.11, this location shall be added to the radiological environmental monitoring program within 30 days.
The new sampling location shall replace the present sampling location, which has the lower calculated dose or dose commitment (via the same exposure pathway), after June 30 following this land use census. Identification of the new location and revisions of the appropriate figures shall be submitted with the next Radioactive Effluent Release Report.
* Broad leaf vegetation sampling may be performed at the site boundary in the direction sector with the highest D/Q in lieu of the garden census.
SURVEILLANCE REOUIREMENTS 2.12.1    The land use census shall be conducted at least once per 12 months during the growing season by a door-to-door survey, aerial survey, or by consulting local agriculture authorities, using that information which will provide adequate results.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 38
 
INTERLABORATORY COMPARISON PROGRAM 2.13      Analyses shall be performed on radioactive materials supplied as part of an Interlaboratory Comparison Program which has been approved by the Commission. A summary of the results obtained from this program shall be included in the Annual Radiological Environmental Operating Report.
APPLICABILITY:    At all times.
ACTION:
: a. With analyses not being performed as required above,  report the corrective actions taken to prevent a recurrence to the Commission in the Annual Radiological  Environmental Operating Report.
SURVEILLANCE REOUIREMENTS 2.13.1    No surveillance requirements other than those required by the Interlaboratory Comparison Program.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 39
 
ADMINISTRATIVE CONTROLS 2.14      SPECIAL REPORTS Special reports shall be submitted to the Nuclear Regulatory Commission within the time period specified for each report. These reports shall be submitted covering the activities identified below. A separate Licensee Event Report, when required by 10 CFR 50.73 (a), need not be submitted if the Special Report meets the requirements of 10 CFR 50.73 (b) in addition to the requirements of the applicable referenced Specification.
A. Dose due to radioactive materials in liquid effluents in excess of specified limits, Specification 2.6.
: 8. Dose due to noble gas in gaseous effluents in excess of specified limits, Specification 2.8.
C. Total calculated dose due to release of radioactive effluents exceeding twice the limits of Specifications 2.6a, 2.6b, 2.8a, 2.8b, 2.9a, or 2.9b (required by Specification 2.10).
D. Dose due to 1-131, 1-133, Tritium, and radioactive particulates with greater than eight day half-lives, in gaseous effluents in excess of specified limits, Specification 2.9.
E. Failure to process liquid radwaste,  in excess of limits, prior to release, Specification 2.3.
F. Failure to process gaseous radwaste,  in excess of limits, prior to release, Specification 2.4.
G. Measured levels of radioactivity in environmental sampling medium in excess of the reporting levels of Table 2-8, when averaged over any quarterly sampling period, Specification 2.11.
H. Inoperable Mid or High Range Noble Gas Effluent Monitoring Instrumentation, Specification 2.2.
I. Meteorological monitoring channel inoperable for more than 7 days, Specification 2.15.
J. WGDT explosive gas monitoring instrumentation inoperable for more than 30 days, Specification 2.16.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 40
 
METEOROLOGICAL INSTRUMENTATION 2.15      The meteorological monitoring instrumentation channels shown in Table 2-10 shall be OPERABLE.
APPLICABILITY:  At all times.
ACTION:
: a. With one or more required meteorological monitoring channels inoperable for more than 7 days, prepare and submit a Special Report to the Commission pursuant to Specification 2.14 within the next 10 days outlining the cause of the malfunction and the plans for restoring the channel(s) to OPERABLE status.
SURVEILLANCE REOUIREMENTS 2.15.1    Each of the above meteorological monitoring instrumentation channels shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK and CHANNEL CALIBRATION operations at the frequencies shown in Table 2-11.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 41
 
TABLE 2-10 MPTFARflInC'.TCAI T .................................................
MONITORING INSTRUMENTATION MINIMUM INSTRUMENT                            LOCATION.                                        OPERABLE
: 1. WIND SPEED Nominal Elev.                          33'                                      1
: 2. WIND DIRECTION Nominal Elev.                          33'                                      1
: 3. STABILITY CLASS (DELTA-T OR SIGMA-THETA)
Nominal Elev.
* 1
* 33'  for sigma-theta.                    175'-33'                    for delta-T.
NOTE:    Back up meteorological tower instruments may be used to meet the minimum operability requirement of ODCM specification 2.15.
OFF-SITE DOSE CALCULATION MANUAL                                                                  Page 42
 
TABLE 2-11 METEOROLOGICAL MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL                  CHANNEL INSTRUMENT                          CHECK              CALIBRATION
: 1. WIND SPEED Nominal Elev. 33'          D                          SA
: 2. WIND DIRECTION Nominal Elev. 33'          D                          SA
: 3. STABILITY CLASS (DELTA-T  OR SIGMA-THETA)
Nominal Elev.                D                          SA
* 33'  for sigma-theta. 175' - 33'  for delta - T OFF-SITE DOSE CALCULATION MANUAL                                          Page 43
 
WASTE GAS DECAY TANK - EXPLOSIVE GAS MONITORING INSTRUMENTATION 2.16      The Waste Gas Decay Tanks shall  have one hydrogen and one oxygen monitoring channel OPERABLE.
APPLICABILITY:    During WASTE GAS SYSTEM operation.
ACTION:
: a. With the number of OPERABLE channels less than required above, operation of this system may continue, provided grab samples are collected and analyzed:
(1) at least once per 4 hours during DEGASSING operations (2)  at least once per 24 hours during other operations
: b. If the affected channel(s) cannot be returned to OPERABLE status within 30 days, submit a special report to the Commission pursuant to Specification 2.14 within 30 days describing the reasons for inoperability and a schedule for corrective action.
SURVEILLANCE REOUIREMENTS 2.16.1    The Waste Gas Decay Tank explosive gas monitoring instrumentation shall be demonstrated operable by performing the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST, and CHANNEL CALIBRATION at the frequencies shown in Table 2-12.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 44
 
TABLE 2-12 WASTE GAS SYSTEM EXPLOSIVE GAS MONITORING INSTRUMENTATION CIIDJPTI I AMCr DoPIITDIMPMTr CHANNEL CHANNEL              CHANNEL    FUNCTIONAL INSTRUMENT                        CHECK              CALIBRATION      TEST
: 1. Hydrogen Monitors              D                                  M
: 2. Oxygen Monitors                D                                  M
*The CHANNEL CALIBRATION shall include the use of standard gas samples contai ni ng a nominal :
Hvdrogen Monitors
: a. 1 volume percent hydrogen,    balance nitrogen.
: b. 4 volume percent hydrogen,    balance nitrogen.
Oxygen Monitors
: c. 1 volume percent oxygen,    balance nitrogen.
: d. 4 volume percent oxygen,    balance nitrogen.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 45
 
WASTE GAS DECAY TANKS 2.17      The quantity of radioactivity contained in each Waste Gas Decay Tank shall be limited to less than or equal to 39000 curies (considered as Xe 133).
APPLICABILITY:    At all times.
ACTION:
: a. With the quantity of radioactivity in any Waste Gas Decay Tank exceeding the above limit, immediately suspend all additions of radioactive material to that tank, and within 48 hours reduce the. tank contents to within its limit.
SURVEILLANCE REOUIREMENTS 2.17.1    The quantity of radioactive material contained in each Waste Gas Decay Tank shall be determined* to be within the limit at least once per 7 days whenever radioactive materials are being added to the tank, and at least once per 24 hours during primary coolant system DEGASSING operations.
* Determining that each waste gas decay is in compliance with the limit may be done by a method other than direct sampling of the tank provided it is in accordance with an approved procedure.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 46
 
WASTE GAS DECAY TANK -  EXPLOSIVE GAS MIXTURE 2.18      The concentration of oxygen in any Waste Gas Decay Tank shall be limited to less than or equal to 2% by volume whenever the concentration of hydrogen in that Waste Gas Decay Tank is greater than or equal to 4% by volume.
NOTE: Whenever the concentration of hydrogen in the bulk of the waste gas header, including the cover gas of the reactor coolant bleed tanks, is greater than 4%, or the oxygen concentration is greater than 2%, then consideration should be given to purging the waste gas header with nitrogen.
APPLICABILITY!  At all times.
ACTION:
Whenever the concentration of hydrogen in  any Waste Gas Decay Tank is greater than or equal to 4% by volume,  and:
: a. The concentration of oxygen in that Waste Gas Decay Tank is greater than 2% by volume, but less than 4% by volume, without delay begin to reduce the oxygen concentration to within its limit.
: b. The concentration of oxygen in that Waste Gas Decay Tank is greater than or equal to 4% by volume, immediately suspend additions of waste gas to that Waste Gas Decay Tank and without delay begin to reduce the oxygen concentration to within its limit.
SURVEILLANCE REQUIREMENTS 2.18.1    The concentrations of hydrogen and oxygen in the in-service Waste Gas Decay Tank shall be continuously monitored with the hydrogen and oxygen monitors required OPERABLE by Specification 2.16 or by sampling in accordance with Specification 2.16 action a.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 47
 
3.0      SPECIFICATION BASES 3.1      RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION BASIS The radioactive liquid effluent instrumentation is provided to monitor and control, as applicable, the releases of radioactive materials in liquid effluents during actual or potential releases of liquid effluents. The alarm/trip setpoints for these instruments shall be calculated in accordance with the procedures in the OFFSITE DOSE CALCULATION MANUAL (ODCM) to ensure that the alarm/trip will occur prior to exceeding the 10 times limits of 10 CFR Part 20. The OPERABILITY and use of this instrumentation is consistent with the requirements of General Design Criteria 60, 63 and 64 of Appendix A to 10 CFR Part 50.
3.2      RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION BASIS The radioactive gaseous effluent instrumentation is provided to monitor and control, as applicable, the releases of radioactive materials in gaseous effluents during actual or potential releases of gaseous effluents. The alarm/trip setpoints for these instruments are calculated in accordance with the procedures in the OFFSITE DOSE CALCULATION MANUAL (ODCM) to ensure that the alarm/trip will occur prior to exceeding a Site Boundary dose rate of 500 mrem/year to the total body. The OPERABILITY and use of this instrumentation is consistent with the requirements of General Design Criteria 60, 63, and 64 of Appendix A to 10 CFR Part 50.
3.3      LIQUID RADWASTE TREATMENT SYSTEM BASIS The requirement that these systems be used when specified provides assurance that the releases of radioactive materials in liquid effluents will be kept "as low as reasonably achievable" (ALARA).
This specification implements the requirements of 10 CFR Part 50.36a, General Design Criterion 60 of Appendix A to 10 CFR Part 50 and the design objective given in Section II..D of Appendix I to 10 CFR Part 50. The specified limits governing the use of appropriate portions of the liquid radwaste treatment system were specified as a suitable fraction of the dose design objectives set forth in Section II.A of Appendix I, 10 CFR Part 50, for liquid effluents.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 48
 
3.4      WASTE GAS SYSTEM BASIS The requirement that these systems be used when specified provides reasonable assurance that the releases of radioactive materials in gaseous effluents will be kept "as low as is reasonable achievable" (ALARA). This specification implements the requirements of 10 CFR Part 50.36a, General Design Criterion 60 of Appendix A to 10 CFR Part 50, and the design objectives given in Section II.D of Appendix I to 10 CFR Part 50. The specified limits governing the use of appropriate portions of the systems were specified as a suitable fraction of the dose design objectives set forth in Sections II.B and II.C of Appendix I, 10 CFR Part 50, for gaseous effluents.
3.5      LIQUID EFFLUENTS CONCENTRATION BASIS This specification is provided to ensure that the concentration of radioactive materials released in liquid waste effluents to UNRESTRICTED AREAS will be less than 10 times the effluent concentration limits (ECLs) specified in 10 CFR Part 20. This limitation provides additional. assurance that the levels of radioactive materials in bodies of water in UNRESTRICTED AREAS will result in exposures within the Section II.A design objectives of Appendix I, 10 CFR 50, to a MEMBER OF THE PUBIC. The concentration limit for Xe-133 was determined by calculating that amount of the isotope, which if present in water, would give a dose rate of 500 mrem/yr at the surface. Typically, over 90% of the noble gas released in liquid effluents at CR-3 is Xe-133. The concentration limit for all other dissolved or entrained noble gases is based upon the assumption that Xe-135 is the controlling radioisotope and its MPC in air (submersion) was converted to an equivalent concentration in water using the methods described in International Commission on Radiological Protection (ICRP) Publication 2.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 49
 
3.6      LIQUID EFFLUENTS DOSE BASIS This specification is provided to implement the requirements of Sections II.A. Ill-A and IV.A of Appendix I, 10 CFR Part 50. The Limiting Condition for Operation implements the guides set forth in Section II.A of Appendix I. The ACTION statement provides the required operating flexibility and at that same time implements the guides set forth in Section IV.A of Appendix I to assure that the releases of radioactive material in liquid effluents will be kept "as low as is reasonably achievable" (ALARA). The dose calculations in the OFFSITE DOSE CALCULATION MANUAL (ODCM) implement the requirements in Section III.A of Appendix I that conformance with the guides of Appendix I be shown by calculational procedures based on models and data, such that the actual exposure of a MEMBER OF THE PUBLIC through appropriate pathways is unlikely to be substantially underestimated. The equations specified in the OFFSITE DOSE CALCULATIONAL. MANUAL (QDCM) for calculating the doses due to the actual release rates of radioactive materials in liquid effluents are consistent with the methodology provided in Regulatory Guide 1.109, "Calculation of Annual Doses to Man from Routine Releases of Reactor Effluents for the Purpose of Evaluating Compliance with 10 CFR Part 50, Appendix I," Revision 1, October 1977 and Regulatory Guide. 1.113, "Estimating Aquatic Dispersion of Effluents from Accidental and Routine Reactor Releases for the Purpose of Implementing Appendix I," April 1977.
3.7      GASEOUS EFFLUENTS DOSE RATE BASIS This specification is provided to ensure that the dose at any time at and beyond the SITE BOUNDARY from gaseous effluents will be within the annual dose limits of 10 CFR Part 20, &sect;&sect; 20.1 - 20.602.
The annual dose limits are the doses associated with the concentrations of 10 CFR Part 20, &sect;&sect; 20.1 - 20.602, Appendix B:,
Table II, Column 1. These limits provide reasonable assurance that radioactive material discharged in gaseous effluents will not result in the exposure of a MEMBER OF THE PUBLIC, either within or outside the SITE BOUNDARY to annual average concentrations exceeding the limits specified in Appendix B, Table II of 10 CFR Part 20 (10 CFR Part 20.106(b)(1)). For a MEMBER OF THE PUBLIC who may at time be within the SITE BOUNDARY, the occupancy of the MEMBER OF THE PUBLIC will be sufficiently low to compensate for any increase in the atmospheric diffusion factor above that for the SITE BOUNDARY. The specified release rate limits restrict, at all times, the corresponding gamma and beta dose rates above to a MEMBER OF THE PUBLIC at or beyond the SITE BOUNDARY to less than or equal to 500 mrem/year to the total body or to less than or equal to 3000 mrem/year to the skin. These release rate limits also restrict, at all times, the corresponding thyroid dose rate above background to a child via the inhalation pathway to less than or equal to 1500 mrem/year.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 50
 
3.8      GASEOUS EFFLUENTS DOSE NOBLE GASES BASIS This Specification is provided to implement the requirements of Sections II.B, III.A and IV.A of Appendix I, 10 CFR Part 50. The.
Limiting Condition for Operation implements the guides set. forth in Section II.B of Appendix I. The ACTION statements provide the required operating flexibility and at the same time implement the guides set forth in Section IV.A of Appendix I to assure that the releases of radioactive material in gaseous effluents will be kept "as low as reasonably achievable" (ALARA). The Surveillance Requirements implement the requirements in Section III.A of Appendix I that conformance with the guides of Appendix I be shown by calculational procedures based on models and data such that the actual exposure of a MEMBER OF THE PUBLIC through appropriate pathways is unlikely to be. substantially underestimated. The dose calculations established for calculating the doses due to the actual release rates of radioactive noble gases in gaseous effluents are consistent with the methodology provided in Regulatory Guide 1.109, "Calculational of Annual Doses to Man from Routine Releases of Reactor Effluents for the Purpose of Evaluating Compliance with 10 CFR Part 50, Appendix I," Revision 1, October 1977 and Regulatory Guide 1.111, "Methods for Estimating Atmospheric Transport and Dispersion of Gaseous Effluents in Routine Releases from Light-Water Cooled Reactors," Revision 1, July 1977. The equations provided for determining the air doses at and beyond the SITE BOUNDARY are based upon the historical average atmospheric conditions.
3.9      GASEOUS EFFLUENTS DOSE 1-131, 1-133, TRITIUM, AND RADIOACTIVE PARTICULATE BASIS This specification is provided to implement the requirements of Sections II.C, III.A, and IV.A of Appendix I, 10 CFR Part 50. The Limiting Conditions for Operation are the guides set forth in Section II.C of Appendix I. The ACTION statements provide the required operating flexibility and at the same time implement the guides set forth in Section IV.A of Appendix I to assure that the releases of radioactive materials in gaseous effluent will be kept "as low as is reasonably achievable" (ALARA). The calculational methods specified in the Surveillance Requirements implement the requirements in Section III.A of Appendix I that conformance with the guides of Appendix I be shown by calculational procedures based on models and data, such that the actual exposure of a MEMBER. OF THE PUBLIC through appropriate pathways is unlikely to be substantially underestimated. The methods for calculating the dose due to the actual release rates of the subject materials are consistent with the methodology provided in Regulatory Guide 1.109, "Calculation of Annual Doses to Man from Routine Releases' of Reactor Effluents for the Purpose of Evaluating Compliance with 10 CFR Part 50, Appendix I," Revision 1, October 1977 and Regulatory Guide 1.111, "Methods for Estimating Atmospheric Transport and Dispersion of Gaseous Effluents in Routine Releases from Light-Water-Cooled Reactors," Revision 1, July 1977. These equations also provide for determining the actual doses based upon the OFF-SITE DOSE CALCULATION MANUAL                                              Page 51
 
historical average atmospheric conditions. The release rate specifications for 1-131, 1-133, Tritium, and radioactive particulates with half-life greater than eight days are dependent on the existing radionuclide pathways to man, in areas at and beyond the SITE BOUNDARY. The pathways which were examined in the development of these calculations were:    1) Individual inhalation of airborne radionuclides, 2) deposition of radionuclides onto green leaf vegetation with subsequent consumption by man,
: 3) deposition onto grassy areas where milk animals and meat producing animals graze with consumption of the milk and meat by man, and 4) deposition on the ground with subsequent exposure of man.
3.10      TOTAL DOSE BASIS This specification is provided to meet the dose limitations of 40 CFR Part 190 that have now been incorporated into 10 CFR Part 20 by 46 FR 18525. The specification requires the preparation and submittal of a Special Report whenever the calculated doses from plant radioactive effluents exceed twice the design objective doses of Appendix I. For sites containing up to 4 reactors, it is highly unlikely that the resultant dose to a MEMBER OF THE PUBLIC will exceed the dose limits of 40 CFR Part 190 if the individual reactors remain within the reporting requirement level. The Special Report will describe a course of action that should result in the limitation of the annual dose to a MEMBER OF THE PUBLIC to within the 40 CFR Part 190 limits. For the purposes of the Special Report, it may be assumed that the dose commitment to the MEMBER OF THE PUBLIC from other uranium fuel cycle sources is negligible, with the exception that dose contributions from other nuclear fuel cycle facilities at the same site or within a radius of 8 km must be considered. If the dose to any MEMBER OF THE PUBLIC is estimated to exceed the requirements of 40 CFR Part 190, the Special Report with a request for a variance (provided the release conditions resulting in violation of 40 CFR Part 190 have not already been corrected), in accordance with the provisions of 40 CFR part 190.11 and 10 CFR Part 20.405c, is considered to be a timely request and fulfills  the requirements of 40 CFR Part 190 until NRC staff action is completed. The variance only relates to the limits of 40 CFR Part 190 and does not apply in any way to the other requirements for dose limitation of 10 CFR Part 20, as addressed in Specifications 2.5 thru 2.9. An individual is not considered a MEMBER OF THE PUBLIC during any period in which he/she is engaged in carrying out any operation that is part of the nuclear fuel cycle.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 52
 
3.11i    RADIOLOGICAL  ENVIRONMENTAL MONITORING PROGRAM BASIS The radiological monitoring program required by this specification provides measurements of radiation and of radioactive materials in those exposure pathways and for those radionuclides which lead to the highest potential radiation exposures of MEMBER OF THE PUBLIC resulting from the station operation. This monitoring program thereby supplements the radiological effluent monitoring program by verifying that the measurable concentrations of radioactive materials and levels of radiation are not higher than expected on the basis of the effluent measurements and modeling of the environmental exposure pathways. Program changes may be initiated based on operational experience.
The LLD's required by Table 2-9 are considered optimum for routine environmental measurements in industrial laboratories. The LLD's for drinking water meet. the requirements of 40 CFR 141.
3.12      RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM LAND USE CENSUS BASIS This specification is provided to ensure that changes in the use of areas at or beyond the SITE BOUNDARY are identified and that modifications to the monitoring program are made if required by the results of this census. Adequate information gained from door-to-door or aerial surveys or through consultation with local agricultural authorities shall. be used. This census satisfies the requirements of Section IV.B.3 of Appendix I to 10 CFR Part 50.
Restricting the census to gardens of greater than 500 square feet provides assurance that significant exposure pathways via leafy vegetables will be identified and monitored since a garden of this size is the minimum required to produce the quantity (26 kg/year) of leafy vegetables assumed in Regulatory Guide 1.109 for consumption by a child. To determine this minimum garden size, the following assumption were used: 1) that 20% of the garden was used for growing broad leaf vegetation (i.e., similar to lettuce and cabbage), and 2) a vegetation yield of 2 kg/square meter.
3.13      RADIOLOGICAL ENVIRONMENTAL MONITORING INTERLABORATORY COMPARISON PROGRAM BASIS The requirement for participation in an Interlaboratory Comparison Program is provided to ensure that independent checks on the precision and accuracy of the measurements of radioactive material in environmental sample matrices are performed as part of the quality assurance program for environmental monitoring in order to demonstrate that the results are reasonably valid.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 53
 
BASES 3.14      EXPLOSIVE GAS MIXTURE This specification is provided to ensure that the concentration of potentially explosive gas mixtures contained in the Waste Gas Decay Tanks is maintained below the flammability limits of hydrogen and.
oxygen. Maintaining the concentration of hydrogen and oxygen below their flammability limits provides assurance that the releases of radioactive materials will be controlled in conformance with the requirements of General Design Criterion 60 of Appendix A to 10 CFR Part 50.
3.15      WASTE GAS DECAY TANKS Restricting the quantity of radioactivity contained in each waste gas decay tank provides assurance that in the event of a simultaneous uncontrolled release of all the tanks' contents, the resulting total body exposure to an individual at the nearest exclusion area boundary will not exceed 0.5 rem. This is consistent with Branch Technical Position ETSB 11-5.
3.16      WASTE GAS DECAY TANK - EXPLOSIVE GAS MONITORING INSTRUMENTATION The OPERABILITY of the Waste Gas Decay Tank explosive gas monitoring instrumentation or the sampling and analysis program required by this specification provides for the monitoring (and controlling) of potentially explosive gas mixtures in the Waste Gas Decay Tanks.
3.17      METEOROLOGICAL INSTRUMENTATION The OPERABILITY of the meteorological instrumentation ensures the sufficient meteorological data is available for estimating potential radiation doses to the public as a result of routine or accidental release of radioactive materials to the atmosphere.
This capability is required to evaluate the needs for initiating protective measures to protect the health and safety of the public.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 54
 
PART II METHODOLOGIES OFF-SITE DOSE CALCULATION MANUAL              Page 55
 
SECTION 1.0 RADIOACTIVE EFFLUENT MONITOR SETPOINTS SPECIFICATIONS OFF-SITE DOSE CALCULATION MANUAL                        Page 56
 
TABLE I - RADIOACTIVE EFFLUENT MONITOR SETPOINTS RELEASE    TYPE      SETPOINT            NUCLIDE ANAL.      SETPOINT      SETPOINT SPECIFICATION                          CALCULATION  ADJUSTMENT MON1TT(*R      RATCH      CeNJT                      TVPP
* g:PR MON!TQP        BATCH      rONT                      TYPE
* pppn RM-A1            x                  1.1-1            1.2-1          P      1.3-1        1.4-1 (Noble Gas)
RM-A1                      x                        1.2-1          w      1.3-1        1.4-2 (Noble Gas)
RM-A2            x        x                        1.2-2        W/P      1.3-1        1.4-3 (Noble Gas)
RM-All            x                                  1.2-3          P      1.3-1        1.4-4 (Noble Gas)
RM-L2            x                  1.1-2            1.2-4          P      1.3-2        1.4-5 (Gamma)
RM-L7            x        x        1.1-2            1.2-5          w      1.3-2      1.4-6 & 1.4-7 (Gamma)
RM-A1 &
RM-A2          N/A        N/A      1.1-3            NA          NA      1.3-3          NA (Iodine Channels)
*For composited samples the results from the most recently completed analysis are used.
OFF-SITE DOSE CALCULATION MANUAL                                            Page 57
 
GASEOUS EFFLUENT MONITORS SETPOINT SPECIFICATION 1.1-1 (Monitors RM-A1, RM-A2 and RM-A11)
The dose rate at or beyond the SITE BOUNDARY, due to radioactive materials released in gaseous effluents, is limited as follows:
Noble Gases -                        500 mrem/year (total body) 3000 mrem/year (skin) 1-131, 1-133, Tritium and Radioactive                      1500 mrem/year (any organ via particulates with                    the inhalation pathway.)
greater than 8 day half-lives The radioactive gaseous effluent monitors (RM-A1, RM-A2 and RM-A11) shall have their alarm/trip setpoints set to ensure that the above total body, noble gas dose rate limit is not exceeded.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 58
 
LIQUID EFFLUENT MONITORS SETPOINT SPECIFICATION 1.1-2 (Monitors RM-L2, RM-L7)
The concentration of radioactive. materials in liquid effluents, released to UNRESTRICTED AREAS, is limited to 10 times the effluent concentrations specified by 10 CFR 20, for radionuclides other than noble gases. For all dissolved or entrained noble gases, except Xe-133, the concentration limit is 2E-4 pCi/ml. For Xe-133 the concentration limit is 1E-3 pCi/ml.
The radioactive liquid effluent monitors (RM-L2 and RM-L7) shall have their alarm/trip setpoints set to ensure that the above gamma emitting concentration limits are not exceeded.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 59
 
GASEOUS EFFLUENT MONITORS SETPOINT SPECIFICATION 1.1-3 (Iodine Channels in RM-Al and RM-A2)
Sampling and analyses of the Reactor Building Purge Exhaust, and the Auxiliary Building and Fuel Handling Area Exhaust for radioiodine and other gamma emitters, shall be performed at least once per 24 hours for at least 7 days when the Radioiodine concentration in the Auxiliary Building and Fuel Handling Area or the Reactor Building Purge Exhaust Ducts will lead to a release which is greater than or equal to the 10 CFR 20, Appendix B, Table II, Column I limits, at or beyond the SITE BOUNDARY.
The iodine monitoring channels in radiation monitors RM-A1 and RM-A2 shall have their alarm setpoints set to alarm when the above radioiodine concentration limits are exceeded.
OFF-SITE DOSE CALCULATION MANUAL                                            Page 60
 
NUCLIDE ANALYSIS 1.2-1 REACTOR BUILDING PURGE EXHAUST NUCLIDE                          SAMPLE SOURCE                  LLD(b) (uCi/cc)
A. Principal Gamma Emitters (a)
Mn-54 Fe-59 Co-58              Pre-release grab sample for Batch Co-60              Type release. Weekly Particulate Zn-65              Filter Analysis for continuous(c)          lxlO-4 /lx1O- 1 1 Mo-99              type release.
Cs-.134 Cs-137 Ce-141 Ce-144 Kr-87              Pre-release grab sample for Batch Kr-88              type release. Noble Gas monitor Xe-133            during batch and continuous releases        lXIO-4 Xe-133m            Grab sample within 2-6 hr. following Xe-135            startup, shutdown or > 15% RTP Xe-138            change in 1 hr.
12 B. Iodine 131          Pre-release grab sample for Batch          NA/1x10_
type release. Weekly charcoal filter and once per 24 hr for 7 days following startup shutdown or > 15% RTP change in 1 hr if 1-131 concentration at site boundary > 10 CFR 20 limit.
6 C. Tritium            Pre-release Grab Sample and within        1X10-12-24 hr following flooding of refueling canal and once per 7 days while canal is flooded.
D. Gross Alpha        Monthly Particulate Filter Composite        11-11 11 E. Sr-89              Quarterly Particulate Filter Composite    1X10 11 F. Sr-90              Quarterly Particulate Filter Composite    1X10-(a)      Other identified Gamma Emitters not listed in this table shall be included in dose and setpoint calculations.
(b)      The first value refers to the LLD for pre-release grab sample; the second value refers to the LLD for weekly Particulate Filter Analysis.
(c)      Reactor Building Purge is considered continuous after a minimum of one Reactor Building volume has been released on a continuous basis (i.e.,
first volume is a batch type).
OFF-SITE DOSE CALCULATION MANUAL                                                Page 61
 
NUCLIDE ANALYSIS 1.2-2 AUXILIARY BUILDING AND FUEL HANDLING AREA EXHAUST NUCLIDE                        SAMPLE SOURCE                  LLD(b) (uCi/ml)
A. Principal Gamma Emitters (a)
Mn-54 Fe-59 Co-58 Co-60 Zn-65            Weekly Particulate Filter Analysis        1xI1- 4 /1x10-1 1 Mo-99 Cs-134 Cs-137 Ce-141 Ce- 144 Kr-87            Monthly Grab Sample and Kr-88            Continuous Noble Gas monitor.
Xe-133            Grab sample within 2-6 hr following        1X10-4 Xe-133m          startup, shutdown or .&#x17d; 15% RTP Xe-135            change in 1 hr.
Xe-138 12 B. Iodine 131        Weekly Charcoal Filter analysis and once    1X10 per 24 hr for 7 days following startup shutdown or 2 15% RTP change in 1 hr if 1-131 concentration at site boundary > 10 CFR 20 limit.
6 C. Tritium            Monthly Grab Sample and within              1X10-12-24 hr following flooding of refueling canal and once per 7 days while canal is flooded.
11 D. Gross Alpha        Monthly Particulate Filter Composite        1x10 11 E. Sr-89              Quarterly Particulate Filter Composite      1X10 11 F. Sr-90              Quarterly Particulate Filter Composite      1X10 (a)  Other identified Gamma Emitters not listed in this table shall  be included in dose and setpoint calculations.
(b)  The first value refers to the LLD for pre-release grab sample;  the second value refers to the LLD for weekly Particulate Filter Analysis.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 62
 
NUCLIDE ANALYSIS 1.2-3 WASTE GAS DECAY TANKS NUCLIDE                        SAMPLE SOURCE                  LLD(b) (uCi /ml )
A. Principal Gamma Emitters (a)
Mn-54 Fe-59 Co- 58 Co-60 Zn-65              Pre-release Grab sample and Weekly        1X10-4 /1X10-1 1 Mo-99              Particulate Filter Sample from RM-A2 Cs-134 Cs-137 Ce-141 Ce-144 Kr-87 Kr-88 Xe-133              Pre-release Grab sample.                  1X10-4 Xe-133m Xe-135 Xe-138 12 B. Iodine 131        Weekly Charcoal Filter from RM-A2.        1X10 (a)  Other identified Gamma Emitters not listed in this table shall be included in dose and setpoint calculations.
(b)  The first value refers to the LLD for pre-release grab sample; the second value refers to the LLD for weekly Particulate Filter Analysis.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 63
 
NUCLIDE ANALYSIS 1.2-4 EVAPORATOR CONDENSATE STORAGE TANKS, LAUNDRY AND SHOWER SUMP TANKS, SECONDARY DRAIN TANK NUCLIDE                      SAMPLE SOURCE                    LLD(uCi/ml)
(a)
A. Principal Gamma Emitters Mn-54 Fe-S9 Co-58 Co-60 Zn-65              Pre-re lease Grab Sample                    SX10-7 Mo-99 Cs-134 Cs-137 Ce-141 Ce-144 6
B. Iodine 131          Pre-R*elease Grab Sample                    1X10-C. Dissolved and Entrained Noble 5
Gases              Month ly Grab Sample                        1X10-5 D. Tritium            Month ly Composite                          1X10-7 E. Gross Alpha        Month ly Composite                          1X10-F. Sr-89              Quart*erly Composite                        5xO 8 8
G. Sr-90              Quart*erly Composite                        5X10-H. Fe-55              QuartEerly Composite                        lX10o 6 (a)  Other identified Gamma Emitters not listed in this table shall  be included in dose and setpoint calculations.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 64
 
NUCLIDE ANALYSIS 1.2-5 SECONDARY DRAIN TANK AND/OR PLANT CONDENSATE NUCLIDE                  SAMPLE SOURCE                        LLD(uCi/ml)
A. Principal Gamma Emitters (a)
Mn-54 Fe-59 Co-58 Co-60 Zn-65              Weekly Co mposi te                        5x10-7 Mo-99 Cs-134 Cs-137 Ce-141 Ce-144 6
B. Iodine 131        Weekly Co mposite                          1X10 Dissolved and C.
Entrained Noble 5
Gases              Monthly Grab Sample                        1X10 5
D. Tri ti um          Monthly Composite                          1X10-7 E. Gross Alpha        Monthly Composite                          1X10 F. Sr-89              Quarterly Composite                        5x,10_ 8 G. Sr-90              Quarterly Composite                        5x10 8 H. Fe-S5              Quarterly Composite                        lx 1O 6 (a)  Other identified Gamma Emitters not listed in this table shall be included in dose and setpoint calculations.
OFF-SITE DOSE CALCULATION MANUAL                                            Page 65
 
PRE-RELEASE CALCULATION 1.3-1 GASEOUS RADWASTE RELEASE I. INTRODUCTION Prior to initiating a release of gaseous radwaste,      it must be determined that the concentration of radionuclides      to be released, and the flow rates at which they are released will      not cause the dose rate limitations of Specification 1.1-1 to be      exceeded.
II.      INFORMATION REQUIRED Results of appropriate Nuclide Analysis from Section 1.2 III.      CALCULATIONS Noble Gas Gamma Emissions Dose Rate (Total    Body) = I (X/Q)KiQi      mrem/yr.        (1.1)
Noble Gas Beta Emissions Dose Rate (Skin)    = I (X/Q)Qi:(Li + 1.1Mi)  mrem/yr.        (1.2)
Iodine 131,  Iodine 133,    Tritium, Radioactive Particulates Dose Rate (I,T,P) = I (X/Q)PiQi                mrem/yr.        (1.3) where:
Ki  = The total body dose factor due to gamma emissions for each identified noble gas radionuclide, in mrem/yr per 3
pCi/m    .  (See Table 4.4-1).
Li    = The skin dose factor due to beta emissions for each 3
identified noble gas radionuclide,in mrem/yr per pCi/m        .
(See Table 4.4-1).
Mi    = The air dose factor due to gamma emissions for each 3
identified noble gas radionuclide, i.n mrad/yr per pCi/m (unit conversion constant of 1.1 mrem/mrad converts air dose to skin dose).      (See Table 4.4-I).
Pi      The dose parameter for radionuclides other than noble 3
gases for the inhalation pathway, in mrem/yr per pCi/m        .
(See Table 4.4-3).
Qi      The release rate of radionuclides, i, in gaseous effluent from individual release sources, in pCi/sec (per unit, unless otherwise specified).      Qi = Effluent stream nuclide concentration x flow rate.
OFF-SITE DOSE CALCULATION MANUAL                                                      Page 66
 
Flow Rates (Variable - based on setpoint needs,    nominal or maximum values listed below.)
: 1)  Reactor Building Purge Exhaust Duct = 50,000 cfm  =
2.4 x 10' cc/sec
: 2)    Auxiliary Building and Fuel Handling Area Exhaust Duct=
156,000 cfm = 7.4 x 10' cc/sec
: 3)    Waste Gas Decay Tank Release Line = 50 cfm max  =
2.4 x 101 cc/sec (X/Q)  =    2.5 x 10' sec/m3 . For all vent releases. The highest calculated annual average relative concentration for any area at or beyond the unrestricted area boundary.
In order for a gaseous release to be within the limits of specification 1.1-1, the Projected Dose Rate Ratio (PDRR) must not exceed 1.        The PDRR for each limit is calculated as follows:
PDRRT    = PDRTB  / 500                (1.4)
PDRR,    = PDR    / 3000              (1.5)
PDRR,,  = PDRORC  / 1500              (1.6)
PDRTB  =  Projected Dose Rate to the TOTAL BODY due to noble gas emissions.
PDRSK  =  Projected Dose Rate to the SKIN due to noble gas emissions.
PDRORG  =  Projected Dose Rate to any organ due to inhalation of iodine, tritium and particulates with half-lives greater than 8 days.
500 =  The allowable total body dose rate due to noble gas gamma emissions in mrem/yr.
3000 =  The allowable skin dose rate due to noble gas beta emissions in mrem/yr.
1500 =  The allowable organ dose rate in mrem/yr.
Equations 1.1, 1.2, and 1.3 are solved for each release type and release point currently releasing or awaiting release.        If relationships 1.4, 1.5, and 1.6 are satisfied, the release can be made under the assumed flow rates.        If one or more of the relationships 1.4, 1.5 and 1.6 are not satisfied, action must be taken to reduce the the radionuclide release rate prior to initiating a release (or to reduce the radionuclide release rate already in progress).
OFF-SITE DOSE CALCULATION MANUAL                                                    Page 67
 
The following actions are available to reduce the release rates at the three release points.
: 1)  Waste Gas Decay Tanks a) Release Valve may be throttled b) Tank contents may be diluted c) Release may be delayed for longer decay time.
: 2)  Reactor Building Purge Exhaust Duct a) Dilution flow may be opened to reduce purge rate while maintaining the same flow rate.
: 3)  Auxiliary Building and Fuel    Handling Area Exhaust a) Reduce inlet air supply to areas in Auxiliary Building to reduce radioactivity source rate to vent.
b) Identify and isolate the sources of radioactive releases into the Auxiliary Building.
Effluent Monitor LLD Determination The relationship given below may be used to calculate a monitor LLD.
LLD = (4.661-B)/Slope B      =  Average monitor background count rate in cpm.
Slope =    Slope of monitor calibration curve in cpm/pCi/ml.
OFF-SITE DOSE CALCULATION MANUAL                                            Page 68
 
PRE-RELEASE CALCULATION 1.3-2 LIQUID RADWASTE RELEASE I.      INTRODUCTION Prior to initiating a release of liquid radwaste, it must be determined that the concentration of radionuclides to be released and the flow rates at which they will be released will not lead to a release concentration greater than the limits of specification 1.1-2 at the point of discharge.
II.        INFORMATION REQUIRED Results of appropriate Nuclide Analysis from Section 1.2 III.        CALCULATIONS Discharge Concentration Cocetrton=
:0.1  1: C*  +CG +C"X
                    ~i~ECLi +2E -5
                                            + Ca
                                          -1.3 IE-4 CT  TC.
C+
ECLa ECLT ECL  +
                                                                  &#xfd; 1.+*-c*&#xf7;-*-
ECLFej-
                                                                      ]
FD+El E]
where:
                  =C  The concentration of isotope i, in the gamma spectrum excluding dissolved or entrained noble gases.
CG              Total dissolved or entrained noble gas concentration, excluding Xe-133.
CxE-133    =    XE-133 concentration.
CT        =    Tritium Concentration from most recent analysis.
Ca        =    Gross alpha concentration from most recent analysis.
Cs              Sr-89,  90 concentration  from most recent analysis.
CR        =    Fe-55 concentration from most recent analysis.
E=              Effluent Stream Flow Rate D              Dilution Stream Flow Rate (Nuclear Services and Decay Heat seawater flow only)
ECL      =      10CFR20 Appendix B, effluent concentration limit.
If Discharge Concentration is less than or equal to 1, the discharge may be initiated. If Discharge Concentration is greater than 1, then release parameters must be changed to assure that Discharge Concentration is not greater than 1.
Changes include reducing tank concentration by decay or dilution, reducing the waste stream release rate, or increasing dilution water flow rate.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 69
 
PRE-RELEASE CALCULATION 1.3-3 GASEOUS EFFLUENT IODINE MONITORS I.      INTRODUCTION In order to determine the setpoints for these monitors,            the following assumptions are used.
A. The release rate through the Auxiliary Building and Fuel Handling Area exhaust duct is 7.4 x 10' cc/sec. (156,000 cfm).
B. The release rate through the Reactor Building Purge Exhaust Duct is 2.4 x 10' cc/sec (50,000 cfm).
C. A limitless supply of uniformly concentrated 1-131 is          available to supply the Exhaust Ducts.
D. The iodine filter    has been installed for 8 hours and operating at a constant flow rate of 472 cc/sec (1 cfm).          Therefore, total flow through the filter has been 1.36 x 10' cc.
II.      CALCULATIONS The limiting concentration of Iodine in the vent which would result in a concentration equal to the 10 CFR 20 limit at the site boundary is calculated as follows:
Cv = C1/[(X/Q)FK]          (1.7) where:
Cv          The Concentration of Radioiodine in the vent in pCi/cc.
Ci        =  The 10 CFR 20 effluent concentration limit for Iodine 131, 2 x 10-" pCi/cc.
F        =  The duct flow rate:      2.4 x 10 cc/sec for the Reactor Building Purge Exhaust Duct and 7.4 x 10' cc/sec for the Auxiliary Building and Fuel Handling Area Exhaust Duct.
K        =  Unit conversion constant,        I x 10-6 mI/cc X/Q      =  The highest calculated annual average concentration for any area at or beyond the unrestricted area boundary,          2.5 x 10-1 sec/m3'.
Solving eqn. 1.7 for the Reactor Building Purge exhaust vent yields:
CV(RB)  = 3.33 x 10-' pCi/cc Solving eqn. 1.7 for the Auxiliary Building & Fuel Handling Area Exhaust vent yields:
CV(AB)  = 1.1 X 10.' pCi/cc OFF-SITE DOSE CALCULATION MANUAL                                                          Page 70
 
In order to determine the total quantity of Iodine 131 collected on the filter, the values of C above are multiplied by the volume assumed to have passed through the" filter QI = fkC,    (1.8) where:
QI  =  The total quantity of Iodine 131 collected on the filter, in pCi.
CV  =  The concentration of Iodine 131 in the vent in pCi/cc.
f  =  The assumed total volume of vent atmosphere that has passed through the filter, 1.36 x 10' cc (1 CFM for 8 hours).
k    =  The Iodine removal efficiency of the filters:  90%
Solving eqn. 1.8 for the Reactor Building vent yields:
QI(RB) = 40.8 pCi Solving eqn. 1.8 for the Auxiliary Building and Fuel Handling Area vent yields:
Q (AB) = 13.5 pCi These values are converted to counts per minute for the Iodine monitoring channels through use of the appropriate calibration curve.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 71
 
Setpoint Calculation 1.4-1 Reactor Building Purge Exhaust Duct Monitor (RM-AI)
(Batch Type Releases)
INTRODUCTION Following completion of the analyses required by Section 1.2-1 and determination of release rates and concentration limits in accordance with Section 1.3-1, the monitor setpoint requires adjustment to ensure that alarm and pathway isolation occur if nuclide concentration limits are exceeded.
METHODOLOGY Reactor Building atmosphere is circulated through radiation monitor RM-A6 (containment atmosphere noble gas monitor) and the count rate is observed.
The observed count rate is correlated to a corresponding count rate for RM-Al (Reactor Building purge exhaust duct monitor), and factors are applied to account for background radiation, and the pressure difference between the detector chambers and exhaust vent. The obtained value establishes the maximum allowable setpoint. The alarm/trip setpoint is adjusted to this or a more conservative value prior to initiating the release.            If the concentration of radionuclides to be released is less than the effluent monitor LLD "Net CPM" is obtained from the calibration curve by determining the CPM which corresponds to 2.5E-2 pCi/cc, and PDRR is set equal to 1.
CALCULATION RM-AI Sctpoint (CPM) = [Net CPMxVF 29.9-VI, PDRR    29.9-V6  /tICi/cc-cPM)AI 1
(,UCi/cc/CPM)A6] Bkg where:
Net.CPM                  The observed RM-A6 count rate, in cpm, less background, or obtained from the calibration curve.
VF                        The vent fraction; that portion of the total plant gaseous release associated with this vent and discharge type. Value can be set to a number between 0 and 1.
The summation of the vent fractions of RM-A1 and RM-A2 cannot exceed 1.
PDRR                    The noble gas gamma emission Projected Dose Rate Ratio calculated in accordance with Section 1.3. This ratio is the actual projected dose rate divided by the allowable dose rate referenced in Section 1.3-1, relationship 1.4.
V6=                      The actual gauge vacuum reading at RM-A6 at the time of sampling.
Vl                  =    The actual or average gauge vacuum reading at RM-A1 during normal operation.
OFF-SITE DOSE CALCULATION MANUAL                                                  Page 72
 
(pCi /CC /CPM).A6      =Ci/cc per cpm for RM-A6. This is based on an actual sample or derived from the calibration curve.
(j1C i/ce!CPM.)A I    pCi/cc per cpm for RM-A1. This is  based on an actual sample or derived from the calibration curve.
Bkg                    RM-A1 background count rate in cpm.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 73
 
Setpoint Calculation 1.4-1A Reactor Building Purge Exhaust Duct Monitor (RM-A1)
(Special Release For Functional Testing of the Reactor Building Purge System)
INTRODUCTION Following completion of the analyses required by Section 1.2-1 and determination of release rates and concentration limits in accordance with Section 1.3-1, the monitor setpoint requires adjustment to ensure that alarm and pathway isolation occur if nuclide concentration limits are exceeded.
METHODOLOGY Auxiliary Building and Fuel Handling Area atmosphere is continuously passed through radiation monitor RM-A2 and the count rate is observed.              The observed count rate is correlated to a corresponding count rate for RM-Al, and factors are applied to account for background radiation and the pressure difference between the detector chambers and exhaust vent. The obtained value establishes the maximum allowable setpoint. The alarm/trip setpoint is adjusted to this or a more conservative value prior to initiating the release. If the concentration of radionuclides to be released is less than the effluent monitor LLD "Net CPM" is obtained from the calibration curve by determining the CPM which corresponds to 2.5E-2 pCi/cc, and PDRR is set equal to 1.
CALCULATION Setpoint (CPM) = [Net CPM x VF 29.9-VI  (,iCi!cc/CPM)IA  + Bkg PDRR    29.9- V2 (,Lcii /C        J where:
Net CPM              =    The observed RM-A2 count rate, in cpm, less background, or obtained from the calibration curve.
VF                    =    The vent fraction; that portion of the total plant gaseous release associated with this vent and discharge type. VF can be set to a value from 0 and 1. The sum of RM-Al and RM-A2 vent fractions cannot exceed 1.
PDRR                  =    The noble gas gamma emission Projected Dose Rate Ratio calculated in accordance with Section 1.3. This ratio is the actual projected dose rate divided by the allowable dose rate referenced in Section 1.3-1, relationship 1.4.
V2                          The actual gauge vacuum reading at RM-A2 at the time of sampling.
Vl                          The actual or average gauge vacuum reading at RM-Al during normal operation.
(/10i/cC/CPM)A-            pCi/cc per cpm for RM-A2.      This is    based on an actual sample or derived from the calibration curve.
(JlCi/cc/CPM)AI            pCi/cc per cpm for RM-Al.      This is based on an actual sample or derived from the calibration curve.
Bkg                  =    RM-A1 background count rate in cpm.
OFF-SITE DOSE CALCULATION MANUAL                                                          Page 74
 
Setpoint Calculation 1.4-1B Reactor Building Purge Exhaust Duct Monitor (RM-A1)
(Special Release Following ILRT of Reactor Building)
INTRODUCTION Following completion of the analyses required by Section 1.2-1 and determination of release rates and concentration limits in accordance with Section 1.3-1, the monitor setpoint requires adjustment to ensure that alarm and pathway isolation occur if nuclide concentration limits are exceeded.
METHODOLOGY Net CPM is obtained from the calibration curve by determining the CPM which corresponds to 2.5E-2 pCi/cc. This value is combined with the monitor background, vent fraction and projected dose rate ratio (PDRR) to arrive at the monitor setpoint. The obtained value establishes the maximum allowable setpoint. The alarm/trip setpoint is adjusted to this or a more conservative value prior to initiating the release.
Shortly, after beginning the purge, new RM-A1 alarm/trip setpoints are determined using the methodology of Setpoint Calculation 1.4-2.
CALCULATION RM-AI Setpoint (CPM) =Net CPMDRR V+ Bkg NetCPM                  A value derived from RM-A1 calibration curve.
VF=                    The vent fraction; that portion of the total plant gaseous release associated with this vent and discharge type. VF can be set to a value from 0 and .. The sum of RM-Al and RM-A2 vent fractions can not exceed 1.
PDRR              =  1 Bkg                =  RM-Al background count rate in cpm.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 75
 
Setpoint Calculation 1.4-2 Reactor Building Purge Exhaust Duct Monitor (RM-A1)
(Continuous Type Releases)
INTRODUCTION Following completion of the analyses. required by Section 1.2-1 and determination of release rates and concentration limits in accordance with Section 1.3-1, the monitor setpoint requires adjustment to ensure that alarm and pathway isolation occur if nuclide concentration limits are exceeded.
METHODOLOGY Reactor Building atmosphere is passing through radiation monitor RM-A1 during a continuous type release. Factors are applied to the observed count rate to account for background radiation and vent fraction. The obtained value establishes the maximum allowable setpoint. The alarm/trip setpoint is adjusted to this or a more conservative value weekly during continuous releases. If the concentration of radionuclides to be released is less than the effluent monitor LLD "Net CPM" is obtained from the calibration curve by determining the CPM which corresponds to 2.5E-2 pCi/cc, and PDRR is set equal to 1.
CALCULATION RM -AI Sepo(CPM)    Net CPM=x VF* Dkg where:
NetCPM                The observed RM-Al count rate, in cpm, less background, or obtained from the calibration curve.
VW                    The vent fraction; that portion of the total plant gaseous release associated with this vent and discharge type. Value can be set to a number between 0 and 1.
The summation of the vent fractions of RM-A1 and RM-A2 cannot exceed 1.
PDRR                  The noble gas gamma emission Projected Dose Rate Ratio calculated in accordance with Section 1.3. This ratio is the actual projected dose rate divided by the allowable dose rate referenced in Section 1.3-1, relationship 1.4.
Bkg                =  RM-Al background count rate in cpm.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 76
 
Setpoint Calculation 1.4-3 Auxiliary Building & Fuel Handling Area Exhaust Monitor (RM-A2)
(Continuous Type Releases)
INTRODUCTION Following completion of the analyses. required by Section 1.2-2 and determination of release rates and concentration limits in accordance with Section 1.3-1, the monitor :setpoint requires adjustment to ensure that alarm and pathway isolation occur if nuclide concentration limits are exceeded.
METHODOLOGY Auxiliary Building and Fuel Handling Area atmosphere is continuously passing through radiation monitor RM-A2.      Factors are applied to the observed count rate to account for background radiation and vent fraction. The obtained value establishes the maximum allowable setpoint.        The alarm/trip setpoint is adjusted to this or a more conservative value weekly during continuous releases. If the concentration of radionuclides to be released is less than the effluent monitor LLD "Net CPM" is obtained from the calibration curve by determining the CPM which corresponds to 8E-3 pCi/cc, and PDRR is set equal to 1.
CALCULATION RM-A2 Setpoint (CPM) = Net CPMpX VF]+ Bkg where:
NetCPM                The observed RM-A2 count rate, in cpm, less background, or obtained from the calibration curve.
VW                    The vent fraction; that portion of the total plant gaseous release associated with this vent and discharge type. Value can be set to a number between 0 and 1.
The summation of the vent fractions of RM-Al and RM-A2 cannot exceed 1.
PDRR                  The noble gas gamma emission Projected Dose Rate Ratio calculated in accordance with Section 1.3. This ratio is the actual projected dose rate divided by the allowable dose rate referenced in Section 1.3-1, relationship 1.4.
Bkg                    RM-A2 background count rate in cpm.
OFF-SITE DOSE CALCULATION MANUAL                                                    Page 77
 
Setpoint Calculation 1.4-4 Waste Gas Decay Tank Monitor (RM-AII)
(Batch Type Releases)
INTRODUCTION Following completion of the analyses required by Section 1.2-3 and determination of release rates and concentration limits in accordance with Section 1.3-1, the monitor setpoint requires adjustment to ensure that alarm and pathway isolation occur if nuclide concentration limits are exceeded.
METHODOLOGY Prior to initiating a Waste Gas Decay Tank release, its contents are drawn through radiation monitor RM-All and returned to the waste gas header.
Factors are applied to the observed count rate to account for background radiation and vent fraction. The obtained value establishes the maximum allowable setpoint. The alarm/trip setpoint is adjusted to this or a more conservative value weekly during continuous releases.        If the concentration of radionuclides to be released is less than the effluent monitor LLD "Net CPM" is obtained from the calibration curve by determining the CPM which corresponds to 20 pCi/cc, and PDRR is set equal to 1.
CALCULATION
                                      -[Net CPM x VF x 24.7 1 RM-AI] Setpoint(CPM)k    P    xg
                                                    ".DRR+
where:
Net CPM                The observed RM-All count rate, in cpm, less background, or obtained from the calibration curve.
VYP                    The vent fraction; that portion of the total plant gaseous release associated with this vent and discharge type. Value is equal to 0.5.
PDRR                  The noble gas gamma emission Projected Dose Rate Ratio calculated in accordance with Section 1.3. This ratio is the actual projected dose rate divided by the allowable dose rate referenced in Section 1.3-1, relationship 1.4.
24.7                  The maximum pressure (psia) which RM-Al1 detector chamber should be subjected to.        This corresponds to a flow of 15 CFM from the release line to the vent.
P                  =  Pressure (psia) in RM-Al1    at time of obtaining net CPM.
Bkg                =  RM-All background count rate in cpm.
OFF-SITE DOSE CALCULATION MANUAL                                                    Page 78
 
Setpoint Calculation 1.4-5 Plant Discharge Line Monitor (RM-L2)
(Batch Type Releases)
INTRODUCTION Following completion of the analyses required by Section 1.2-4 and determination of release rates and concentration limits in accordance with Section 1.3-2, the monitor setpoint requires adjustment to ensure that alarm and pathway isolation occur if nuclide concentration limits are exceeded.
METHODOLOGY Evaporator Condensate Storage Tank or Laundry and Shower Sump Tank contents are circulated through radiation monitor RM-L2 and returned to the auxiliary building sump to obtain the actual count rate at RM-L2 for the concentration contained in the tank for release. The observed count rate is adjusted for release flow, background and statistical counting variations, particular to this release flow path.        The resulting value is used as the alarm/trip setpoint and RM-L2 is adjusted to this or a more conservative value prior to initiating the release. If the concentration of radionuclides to be released is less than the effluent monitor LLD use setpoint calculation 1.4-8.
CALCULATION F-Net CPM x AF~x (E + D)- .
RMM-L2Setpoint (CPM)  [... Ci/(10xECL)xE ) +Bkg + 3.3JBkg where:
NetCPM                The observed RM-L2 count rate, in cpm,        less back-ground, or obtained from the calibration curve.
AF                    Administration        Factor to account for error in setpoint determination.        AF = 0.8.
Ci/(10ixECLi)        The ratio of the actual gamma emitting concentrations (excluding dissolved and entrained gases) of the tank contents to be released to 10 times as listed in 10 CFR 20 the Effluent Concentration Limits (ECL).
E              =      The release flow rate of waste to be discharged in gallons per minute.      A maximum flow rate of 100 gpm will be used for the Evaporator Condensate Storage Tanks and 40 gpm for the Laundry and Shower Sump Tanks.
D              =      The dilution flow from the Nuclear Services and Decay Heat Sea Water system in gallons per minute.
Bkg            =      RM-L2 background count rate in cpm.
3.3.Bki                A statistical spread on the background count rate which represents a 99.95% confidence level on monitor counting.
This factor is included to prevent inadvertent high/trip alarms due to random counts on the monitor.
OFF-SITE DOSE CALCULATION MANUAL                                                      Page 79
 
Setpoint Calculation 1.4-6 Turbine Building Basement Discharge Line Monitor (RM-L7)
(Continuous Type Releases)
INTRODUCTION The activity released through the Turbine Building Basement Discharge Line Monitor RM-L7 is analyzed in accordance with Section 1.2-5. The setpoint is a fixed concentration based on worst case nuclide released at the worst case rate as described in the Methodology Section below. The monitor setpoint is adjusted to ensure isolation of the release pathway if nuclide concentration limits are exceeded.
METHODOLOGY The alarm/trip setpoint determination is based on the worst case assumption that 1-131 is the only nuclide being discharged. This assumption equates all counts on RM-L7 to 1-131 with an. ECL of 1E-6 uci/ml.            1-131 has the most conservative ECL of the nuclides available to this release path and "visible" to RM-L7. The setpoint is based on assuring 10 ECLs or less of 1-131 in the discharge canal and is determined by deriving the cpm from the RM-L7 calibration curve which corresponds to a concentration of 1E-5 uci/ml and applying the flow dilution factor, background counts, and statistical counting variations. The resulting value is used as the alarm/trip setpoint and RM-L7 is adjusted to this or a more conservative value to maintain control on release conditions.
CALCULATION RM - L7 Setpoint (CPM) = CPN4x(E +D] + Bkg + 33,rBjk where:
CPM        =  The counts per minute corresponding to 1E-5 uci/ml (10 ECLs 1-131) from the current RM-L7 calibration curve.
E          =  The maximum release flow rate of water able to be discharged in gallons per minute..
D          =  The dilution flow from the Nuclear Services and Decay Heat Sea Water system in gallons per minute.
Bkg            The background count rate at RM-L7 in cpm.
3.3 FB        A statistical      spread on the background count rate which represents a 99.95% confidence level on monitor counting.
This factor is included to prevent inadvertent high/trip alarms due to random counts on the monitor.
OFF-SITE DOSE CALCULATION MANUAL                                                    Page 80
 
Setpoint Calculation 1.4-7 Turbine Building Basement Discharge Line Monitor (RM-L7)
(Batch Type Releases)
INTRODUCTION Following completion of the analyses required by Section 1.2-4 and determination of release rates and concentration limits in accordance with Section 1.3-2, the monitor setpoint requires adjustment to ensure that alarm and pathway isolation occur if nuclide concentration limits are exceeded.
METHODOLOGY Station Drain Tank (SDT-1) contents: are circulated through radiation monitor RM-L7 and returned to the sump to obtain the actual count rate at RM-L7 for the concentration contained in the tank for release. The observed count rate is adjusted for release flow, background and statistical counting variations, particular to this release flow path. The resulting value is used as the alarm/trip setpoint and RM-L7 is adjusted to this or a more conservative value prior to initiating the release.            If the concentration of radionuclides to be released is less than the effluent monitor LLD use setpoint calculation 1.4-8.
CALCULATION 1 Bkg + 3.31B SNet CPMx AF x(E +D) ]Bg+
RM-L7 Setpoint (C~pM)_=NtPxAxED                        .ji L(C
(      0(IO  1 xE j x ECL ))
where:
NetCPM                The observed RM-L7 count rate, in cpm,          less background.
AF                    Administration Factor to account for error in setpoint determination.          AF = 0.8.
YCi!(10xECL)          The ratio of the actual gamma emitting concentrations (excluding dissolved and entrained gases) of the tank contents to be released to 10 times the Effluent Concentration Limits (ECL) as listed in 10 CFR 20.
E                      The release flow rate of waste to be discharged in gallons per minute. A maximum flow rate of 600 gpm will be used.
D                      The dilution flow from the Nuclear Services and Decay Heat Sea Water system in gallons per minute.
Bkg                    RM-L7 background count rate in cpm.
3.3-,FB k              A statistical spread on the background count rate which represents a 99.95% confidence level on monitor counting. This factor is included to prevent inadvertent high/trip alarms due to random counts on the monitor.
OFF-SITE DOSE CALCULATION MANUAL                                                        Page 81
 
Setpoint Calculation 1.4-8 Alternate Setpoints Methodology for RM-L2 and RM-L7 The following method may be employed to establish an upper bound fixed setpoint for RM-L7. Once established, the setpoint need not be changed unless the monitor response or background changes significantly, or there is a significant change in secondary plant activity levels.
This method may also be used to establish setpoints for laundry tanks being released through RM-L2, and for low activity (< monitor LLD) ECSTs.
Setpoint = [(cpm/pCi/ml)  x (IE-5 uCi/ml)  x DF x RF] + Bkg where:
cpm/wCi/ml    =  The monitor response (slope) 1E-5 pCi/ml  =  Worst case effluent concentration limit, for major gamma emitting isotopes in waste stream, multiplied by 10.
DF            =  The minimum dilution factor based on maximum tank discharge rate and minimum RW dilution; 100 for ECSTs, 240 for LSSTs, 30 for SDT-1 or CD releases through RM-L7.
RF                Release fraction. RF is that fraction of site liquid releases allocated to a particular liquid effluent monitor. The sum of the RFs for each liquid effluent monitor must be < = 1 during periods of simultaneous releases from liquid effluent discharge points. During periods when simultaneous discharges are not made, RF may be set to 1 for each monitor.
Bkg          =  Monitor background.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 82
 
CALCULATION OF INHALATION PATHWAY DOSE FACTOR (Pi) 3 Pi = K' (BR)DFAi rnreni/ year per uCi / nU where:
K'          A constant unit of conversion - 106 pCi/uCi BR    =    The Breathing Rate of the child age group = 3700 m3 /year DFtu  =    The maximum organ inhalation dose factor for the child age group for the ith radionuclide, in mrem/pCi.              The total body is considered as an organ in the selection of DFA.
NOTE: For the inhalation pathway Pi = Ri,            so values of Pi may be taken from Table 4.4-3.
 
==References:==
: 1)  NUREG-0133, Section 5.2.1.1
: 2)  Regulatory Guide 1.109, Table E-S, and Table E-9 OFF-SITE DOSE CALCULATION MANUAL                                                        Page 83
 
SECTION 2.0 RADIOACTIVE EFFLUENTS DOSE REDUCTION SPECIFICATIONS OFF-SITE DOSE CALCULATION MANUAL                      Page 84
 
TABLE II RADWASTE REDUCTION SYSTEMS - DOSE PROJECTION DOSE PROJECTION SYSTEM              SPECIFICATION            CALCULATION      PROJECTION FREQUENCY FLOW DIAGRAM Waste                            2.1-1                    2.2-1                                  2.3-1 Gas Treatment Ventilation                      2.1-1                    2.2-1                                  2.3-1 Exhaust Treatment Liquid                          2.1-2                    2.2-1                                  2.3-2 Radwaste Treatment
* When a Radwaste Reduction System is  not available for use.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 85
 
WASTE REDUCTION SPECIFICATION NO. 2.1-1 The WASTE GAS SYSTEM shall be used, as required, to reduce the radioactivity of materials in gaseous waste prior to discharge, when projected monthly air doses due to releases of gaseous effluents from the site to areas at or beyond the SITE BOUNDARY would exceed:
: 1)  0.2 mrad gamma/month
: 2)  0.4 mrad beta/month AND The VENTILATION EXHAUST TREATMENT SYSTEM shall be used,  as required, to reduce the quantity of radioactive materials in gaseous waste prior to discharge, when projected monthly air doses due to release of gaseous effluents from the site to areas at or beyond the SITE BOUNDARY would exceed:
: 1)  0.3 mrem to any organ/month
* Doses due to gaseous releases from the site shall be projected at least once per 31 days.
The limits of the .10CFR5O, Appendix I, paragraph B1 criteria were reduced to 1/4 of the monthly portion of the annual limit as explained in correspondence among AIF, Utilities and the NRC dated December 24, 1981.
 
==References:==
: 1)  Plant Procedures
: 2)  Correspondence C.A. Willis (NRC) to S. Pandy (Franklin Research Center) dated 11/20/81 and AIF letter to AIF subcommittee on RETS dated 12/24/81.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 86
 
WASTE REDUCTION SPECIFICATION NO. 2.1-2 The LIQUID RADWASTE TREATMENT SYSTEM shall be used, as required, to reduce radioactive materials in liquid wastes prior to their discharge, when projected monthly doses due to liquid effluents discharged to UNRESTRICTED AREAS would exceed the following values:
: a. 0.06 mrem whole body/month *
: b. 0.2 mrem to any organ/month
* Doses due to liquid releases shall be projected at least once per 31 days.
The limits of the 10CFR50, Appendix I, paragraph A criteria were reduced to 1/4 of the monthly portion of the annual limit as explained in correspondence among AIF, Utilities and the NRC dated 12/24/81.
 
==References:==
: 1)  Plant Procedures
: 2)  Correspondence C.A. Willis (NRC) to S. Pandy (Franklin Research Center) dated 11/20/81 and AIF letter to AIF subcommittee on RETS dated 12/24/81.
OFF-SITE DOSE CALCULATION MANUAL                                            Page 87
 
DOSE PROJECTION METHODOLOGY 2.2-1 GASEOUS RADWASTE I.        INTRODUCTION Crystal River Unit 3 operating practices require use of the WASTE GAS SYSTEM (Waste Gas Decay Tanks). The normal release paths for gaseous effluents are via the VENTILATION EXHAUST TREATMENT SYSTEM (HEPA and Charcoal Filters). The operability of the VENTILATION EXHAUST TREATMENT SYSTEM is controlled by Section 2.4 of Part I of the ODCM.
As long as these practices and specifications are maintained, the radwaste reduction requirements of Part I, Section 2 are met, and there is no need to project doses prior to the release of gaseous radwaste.
II.        CALCULATIONS Dose projection calculations will be necessary if either system is not available for use.
D = 31Dc/NDQ where:
Dp    =  Projected Dose (monthly).
D      =  Current quarter cumulative dose,  including projection C        for release under evaluation.
NDQ  =  Number of days into quarter, where the quarterly periods are:
January 1 through March 31, April 1 through June 30, July 1 through September 31, October 1 through December 31.
 
==References:==
: 1)    FSAR 5.5.1, 5.5.2 OFF-SITE DOSE CALCULATION MANUAL                                                    Page 88
 
DOSE PROJECTION METHODOLOGY 2.2-2 LIQUID RADWASTE I. INTRODUCTION Crystal River Unit 3 operating practices require liquid radwastes (except for Laundry and Shower Sump waste and Secondary Drain Tank waste) to be processed prior to releasing them to the environment.
As long as these practices are maintained the radwaste reduction requirements of Section 2.3 of Part I of the ODCM are met, and there is no need to project doses prior to the release of liquid radwaste.
II.      CALCULATIONS Dose projection calculations will be necessary if there is    a malfunction of LIQUID RADWASTE TREATEMENT SYSTEM equipment    and liquid radwaste must be released without prior treatment.
DP = 31D C/NDQ c
whe re:
D    =  Projected Dose (monthly).
P D    =  Current release quarter  cumulative dose, including projection for under evaluation.
NDQ      Number of days into quarter, where the quarterly periods are:
January 1 through March 31, April 1 through June 30, July 1 through September 31, October 1 through December 31.
 
==References:==
: 1)    ODCM Part I,  Section 2.3 and 3.3.
OFF-SITE DOSE CALCULATION MANUAL                                                  Page 89
 
TOTAL DOSE SPECIFICATION 2.3 (LIQUID AND GASEOUS RELEASES)
The calendar year dose or dose commitment to any member of the public, due to releases of radioactivity and radiation from uranium fuel cycle sources shall be limited to less than or equal to 25 mrems to the whole body or any organ, (except the thyroid which shall be limited to less than or equal to 75 mrems).
This specification is satisfied by meeting specifications 4.1-1, 4.1-2, and 4.1-3.
If doses exceed twice the limits of specifications 4.1-1, 4.1-2, and 4.1-3 then an analysis shall be performed to confirm continued compliance with 40CFR190(b).
 
==References:==
: 1)  ODCM Part I, Section 2.10
: 2)  Plant Procedures
: 3)  40 CFR 190 OFF-SITE DOSE CALCULATION MANUAL                                              Page 90
 
EFFLUENT FLOW DIAGRAM - GASEOUS 2.3-1 Control Complex Nuc Sx Rm Hoods Prim. Lab Hoods 4
LRRM-A OFF-SITE DOSE CALCULATION MANUAL                        Page 91
 
EFFLUENT FLOW DIAGRAM - LIQUID 2.3-2 o CB--
OFF-SITE DOSE CALCULATION MANUAL                        Page 92
 
SECTION 3.0 RADIOACTIVE EFFLUENTS SAMPLING SPECIFICATIONS OFF-SITE DOSE CALCULATION MANUAL                  Page 93
 
TABLE III GASEOUS AND LIQUID EFFLUENT REPRESENTATIVE SAMPLING RELEASE TYPE REPRESENTATIVE SAMPLING SOURCE OF EFFLUENT                                  METHOD BATCH      CONT.
Evaporator                X                          3.1-1 Condensate Storage Tanks Laundry and                X                          3.1-1 Shower Sump Tanks Secondary                  X          X            3.1-1,  3.1-2 Drain Tanks Plant Condensate                      X                3.1-2 Waste Gas                  X                          3.1-3 Decay Tanks Reactor Bldg.              X          X                3.1-4 Purge Exhaust Auxiliary Bldg.                      X                3.1-4
& Fuel Handling Area Purge Exhaust Reactor Bldg.                        X                3.1-5 with Both Personnel and Equipment Hatches Open OFF-SITE DOSE CALCULATION MANUAL                                      Page 94
 
Representative Sampling Method No. 3.1-1 (Evaporator Condensate Storage Tanks, Laundry & Shower Sump Tanks, Secondary Drain Tank)
To obtain representative samples from these tanks, the contents of the tank to be sampled will be recirculated through two contained volumes and a grab sample will be collected upon completion.                                                              No additions of liquid waste will be made to this tank until completion of the release.
Representative Sampling Method No. 3.1-.2 (Secondary Drain Tank and/or Plant Condensate)
A representative sample may be obtained via grab sample of the Turbine Building Sump or the Secondary Drain Tank, Plant Condensate, or from the release compositor.
Representative Sampling Method .No. 3.1-3 (Waste Gas Decay Tank)
Representative gas, iodine, and particulate samples are drawn from the waste gas decay tank sample lines.
No additions of waste gas i.s allowed into a tank following sampling until the release has been completed.
.............................................................................
Representative Sampling Method No. 3.1-4 (Reactor Building & Auxiliary Building & Fuel Handling Area Exhaust)
Representative gas, iodine, particulate: and tritium samples are taken from these ducts at the location of the radiation monitors. The sample for the Reactor Building Purge Duct is taken form radiation monitor RM-A6 prior to a purge and is drawn from radiation monitor RM-A1 during a purge. The sample for the Auxiliary Building and Fuel Handling Area Exhaust Duct is drawn from RM-A2 during venting since this is a continuous release pathway.
If samples cannot be obtained from the ducts of the Reactor or Auxiliary Building, samples can be obtained from areas of these buildings that are considered to be representative of the radionuclide concentrations present throughout the respective buildings.                                                              Sampling times and volumes should be established to assure the LLD Limits of Sections 1.2 and 4.2 for the radionuclides can be met.
OFF-SITE DOSE CALCULATION MANUAL                                                                                                        Page 95
 
Representative Sampling Method No. 3.1-5 (Reactor Building With Personnel And Equipment Hatch Opened)
The following guidelines do not apply when the Personnel Hatch or Equipment Hatch is closed, or when a structure, such as a wooden door, is used in lieu of either Hatch. By having one of these hatches closed, sustained drafts through the RB are prevented.
Guidelines:
The Reactor Building purge exhaust fans should be operational and the supply fans shut down. If the purge exhaust must be shut down then either the personnel hatch or equipment hatch openings should be closed if operational conditions allow.
Monitor the Reactor Building recirculation system by using RM-A6 or by taking general area air samples.
Other Considerations:
Run the main purge long enough to assure cleanup of the RB atmosphere.
Degas and depressurize the Reactor Coolant System.
.Note:  Refuel 16 outage will require an additional opening in the Reactor Building wall to facilitate steam generator replacement.      The above guidelines/considerations still    apply with the steam generator replacement opening treated as a second equipment hatch.
Representative Sampling Method No. 3.1-6 (Reactor Building During Integrated Leak Rate Test)
Due to building overpressure, prepurge samples cannot be taken from RM-A6.
Representative gas, iodine, particulate and tritium samples may be obtained from the Intermediate Building containment sampling apparatus or the Post-Accident Sampling System.
Representative gas, iodine, particulate, and tritium samples may also be obtained from RM-A6 prior to pressurizing the RB or RM-A1 samples collected from the prior RB purge permit may be used to generate the ILRT batch release permit if no changes to source term are observed.
 
==Reference:==
Telecon-FPC (Dan Green, Dan Wilder) to NRC (Charles Willis) dated 03/15/85 at 0930;
 
==Subject:==
Personnel and Equipment Hatch Openings.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 96
 
SECTION 4.0 RADIOACTIVE EFFLUENTS DOSE CALCULATIONAL SPECIFICATIONS OFF-SITE DOSE CALCULATION MANUAL                        Page 97
 
TABLE IV                  CUMULATIVE DOSE CALCULATION DOSE                                            NUCLIDE                                  CALCULATION                              DOSE PATHWAY                                          SPECIFICATION                                            ANALYSIS                                  METHODOLOGY                            FACTORS
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
* _ _. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Noble Gases                                              4.1-1                                        4.2-1, 4.2-2                                        4.3-1                                  4.4-1 4.2-3 Radioiodines, Radioactive Parti cul ates,                                          4.1-2                                        4.2-1, 4.2-2                                        4.3-2                        4.4-2 to 4.4-16 Radionuclides                                                                                                  4.2-3 other than Noble Gases Liquid Effluents                                          4.1-3                                        4.2-4,        4.2-5                                4.3-3                                  4.4-17 OFF-SITE DOSE CALCULATION MANUAL                                                                                                                            Page 98
 
DOSE SPECIFICATION 4.1-1 (NOBLE GASES)
The air dose at or beyond the SITE BOUNDARY due to radioactive noble gases released in gaseous effluents shall be limited as follows:
: 1) During any calendar quarter, < 5 mrad gamma, and < 10 mrad beta radiation.
: 2)  During any calendar year, < 10 mrad gamma, and < 20 mrad beta radiation.
Cumulative dose contributions for the current calendar quarter and current calendar year shall be determined at least once per 31 days.
 
==References:==
: 1)  ODCM Part I, Section 2.8 OFF-SITE DOSE CALCULATION MANUAL                                          Page 99
 
DOSE SPECIFICATION 4.1-2 (RADIOIODINE & PARTICULATES)
The dose to a MEMBER OF THE PUBLIC from 1-131, 1-133, Tritium and radioactive particulates with half lives of greater than 8 days in gaseous effluents released from the site to areas at or beyond the SITE BOUNDARY shall be limited as follows:
: 1)  During any calendar quarter, < 7.5 mrem to any organ.
: 2)  During any calendar year,  < 15 mrem to any organ.
Cumulative dose calculations for the current calendar quarter and current calendar year shall be determined at least once per 31 days.
 
==References:==
: 1)  ODCM Part I, Section 2.9 OFF-SITE DOSE CALCULATION MANUAL                                            Page IO00
 
DOSE SPECIFICATION 4.1-3 (LIQUID EFFLUENTS)
The dose or dose commitment to a MEMBER OF THE PUBLIC from radioactive materials in liquid effluents released to UNRESTRICTED AREAS shall be limited as follows:
: 1)  During any calendar quarter, < 1.5 mrem total body.
: 2)  During any calendar quarter, < 5 mrem any organ.
: 3)  During any calendar year, < 3 mrem total body.
: 4)  During any calendar year, < 10 mrem any organ.
Cumulative dose contributions from liquid effluents shall be determined at least once per 31 days.
 
==References:==
: 1)  ODCM Part I,  Section 2.6 OFF-SITE DOSE CALCULATION MANUAL                                            Page 101
 
NUCLIDE ANALYSIS 4.2-1 REACTOR BUILDING PURGE EXHAUST NUCLIDE                        SAMPLE SOURCE                      LLD(b) CuCi/ml)
A. Principal Gamma Emitters (a)
Mn-54 Fe-59 Co-58              Batch release particulate filter Co-60              for Batch Releases. Weekly Zn-65              Particulate Filter Analysis for            1X10-4 /1xI10 11 Mo-99              continuous(c) type release.
Cs-134 Cs-137 Ce-141 Ce-144 Kr-87              Pre-release grab sample for Batch Kr-88              type release. Weekly grab sample          1xlO-4 Xe-133              for continuous type release.
Xe-133m Xe-135 Xe-138 12 B. Iodine 131          Batch release charcoal filter for          NA/1 x 10-Batch Releases. Weekly charcoal filter for continuous releases.
6 C. Tri ti um          Pre-release Grab Sample.                  lxlO D. Gross Alpha        Monthly Particulate Filter Composite      lx 1o- 11 11 E. Sr-89              Quarterly Particulate Filter Composite    1x10_
1 F. Sr-90              Quarterly Particulate Filter Composite    lxlO' (a)  Other identified Gamma Emitters not listed in this table shall be included in dose calculations.
(b)  The first value refers to the LLD for pre-release grab sample; the second value refers to the LLD for weekly Particulate Filter Analysis.
(c)  Reactor Building Purge is considered continuous after minimum of one Reactor Building volumes have been released on a continuous basis (i.e., first one volume is a batch type).
OFF-SITE DOSE CALCULATION MANUAL                                              Page 102
 
NUCLIDE ANALYSIS 4.2-2 AUXILIARY BUILDING AND FUEL HANDLING AREA EXHAUST NUCLIDE                        SAMPLE SOURCE                        LLD(b) (uCi/ml)
Principal Gamma Emitters (a)
Mn-54 Fe-59 Co-58 Co-60 Zn-65              Weekly Par ticulate Filter Analysis          ixlO-4/iXlO-11 Mo-99 Cs-134 Cs-137 Ce-141 Ce-144 Kr-87 Kr-88 Xe-133              Monthly Grab Sample                        1x10-4 Xe-133m Xe-135 Xe-138 12 Iodine 131          Weekly Cha rcoal Filter Analysis.        lx10-6 Tritium            Monthly Gr ab Sample.                      lx10-Gross Alpha        Monthly Pa rticulate Filter Composite    lxO- 11 Sr-89              Quarterly Particulate Filter Composite    lx10- 11 11 Sr-90              Quarterly Particulate Filter Composite    lx 10 (a)  Other identified Gamma Emitters not listed in this table shall be included in dose calculations.
(b)  The first value refers to the LLD for pre-release grab sample; the second value refers to the LLD for weekly Particulate Filter Analysis.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 103
 
NUCLIDE ANALYSIS 4.2-3 WASTE GAS DECAY TANKS NUCLIDE                        SAMPLE SOURCE                        LLD(b) (lCi/ml)
A. Principal Gamma Emitters (a)
Mn-54 Fe-59 Co- 58 Co-60 Zn-65    -  Weekly Particulate Filter sample (from RM-A2)      jxjO-4 /jxlO- 1 1 Mo-99 Cs-134 Cs-137 Ce-141 Ce-144 Kr-87 Kr-88 Xe-133    -  Pre-release Grab sample                          1x10-4 Xe-133m Xe-135 Xe-138 B. Iodine 131          Weekly Charcoal  Filter (from RM-A2)        lx10- 12 (a)  Other identified Gamma Emitters not listed in this table shall be included in dose and setpoint calculations.
(b)  The first value refers to the LLD for pre-release grab sample; the second value refers to the LLD for weekly Particulate Filter Analysis.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 104
 
NUCLIDE ANALYSIS 4.2-4 EVAPORATOR CONDENSATE STORAGE TANKS, LAUNDRY AND SHOWER SUMP TANKS, SECONDARY DRAIN TANK NUCLIDE                          SAMPLE SOURCE.                      LLD(uCi/ml)
A. Principal Gamma Emitters (a)
Mn-54 Fe-59 Co-58 Co-60 Zn-65                Pre-rele ase Grab Sample                  5x10- 7 Mo-99 Cs-134 Cs-137 Ce-141 Ce-144 B. Iodine 131          Pre-Rele ase Grab Sample C. Dissolved and Entrained Noble Gases                Monthly Grab Sample Ix10-5 D. Tritium              Monthly Composite E. Gross Alpha        Monthly Composite                          5x 1O_
F. Sr-89              Quarterly Composite 5x10-8 G. Sr-90              Quarterly Composite ixlO -6 H. Fe-55              Quarterly Composite (a)  Other identified Gamma Emitters not listed in this table shall  be included in dose calculations.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 10S
 
NUCLIDE ANALYSIS 4.2-5 SECONDARY DRAIN TANK AND/OR PLANT CONDENSATE NUCLIDE                        SAMPLE SOURCE                    LLD(uCi/ml)
A. Principal Gamma Emitters (a)
Mn-54 Fe-59 Co-58 Co-60 Zn-65              Weekly Coniposite                        5xlO-7 Mo-99 Cs-134 Cs-137 Ce-141 Ce-144 B. Iodine 131        Weekly Coniposite C. Dissolved and Entrained Noble Gases              Monthly Gr ab Sample 1x10-S D. Tri ti um          Monthly Composite 1x10-7 E. Gross Alpha        Monthly Composite 8
F. Sr-89              Quarterly Composite                      5x1O-G. Sr-90              Quarterly Composite                      5x10- 8 H. Fe-55              Quarterly Composite                        X10- 6 (a)  Other identified Gamma Emitters not listed in this table shall be included in dose calculations.
OFF-SITE DOSE CALCULATION MANUAL                                            Page 106
 
DOSE CALCULATION 4.3-1 (NOBLE GAS)
The air dose at or beyond the SITE BOUNDARY due to noble gases released in gaseous effluents is calculated as follows:
Dy = 3.17 x 10-F, M,(X/Q)Q,            mrad Dp = 3.17 x 10-'Y_ N,(X/Q)Q,            mrad where:
                  =  The air dose at or beyond the SITE BOUNDARY due to gamma emissions from noble gases in gaseous effluents in mrad/time period.
D0      -      The air dose at or beyond the SITE BOUNDARY due to beta emissions from noble gases in gaseous effluents in mrad/time period.
3.17 x 10-8      =  The number of years in one second, yr/sec.
M,          =  The air dose factor due to gamma emissions for each identified noble gas radionuclide, in mrad/year per uCi/ml.
N,        -    The air dose factor due to beta emissions for each identified noble gas radionuclide, in mrad/year per uCi/m3 .
X/Q          =  The highest calculated annual average relative concentration for areas at or beyond the UNRESTRICTED AREA Boundary, 2.5 x lO-6 sec/m3 .
Q,          =  Total pCi of isotope i released during the calendar quarter or calendar year, as appropriate.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 107
 
DOSE CALCULATION 4.3-2 (RADIOIODINES & PARTICULATES)
The dose to an individual at or beyond the SITE BOUNDARY due to 1-131, 1-133, Tritium and radioactive particulates with half lives of greater than 8 days is calculated as follows:
D = 3.17 x 10-8 1 WRQ 1                mrem where:
D            The radiation dose to an individual at or beyond the UNRESTRICTED AREA BOUNDARY, in mrem.
The dose factor for each identified radionuclide, i,    in m2(mrem/year) per uCi/sec or mrem/year per uCi/m 3 .
W        -  X/Q for inhalation pathway, 2.5 x 10' sec/m3 the site boundary and 7.5 x 10.' sec/mr  at the critical receptor.
W          = D/Q for food and ground plane pathway, 1.9 x 10-'m-2 the site boundary and .5.7 x 10-1 m-2 at the critical receptor.
Q,          Total ciCof isotope i released during the calendar quarter or calendar year, as appropriate.
3.17 x i0"-    =  The number of years in one second,    yr/sec.
 
==Reference:==
 
NUREG 0133, Section 5.3.1 FSAR, Table 2-20 OFF-SITE DOSE CALCULATION MANUAL                                              Page 108
 
DOSE CALCULATION 4.3-3 (LIQUID EFFLUENTS)
The dose or dose commitment to a MEMBER OF THE PUBLIC from radioactive materials in liquid effluents released to UNRESTRICTED AREAS is calculated as follows:
1)= i Ai  tkCikFk]
where:
D    =    The cumulative dose commitment to the total body or any organ, T, from the liquid effluents for the total time period Itk in mrem.
tk          The length of the kth time period over which Cik is averaged for all liquid releases,    in hours.
              -I    The average concentration of radionuclide, i, in undiluted liquid effluent during time period tk from any liquid release,  in pCi/ml.
An    =    The site related ingestion dose commitment factor to the total body or any organ for each identified principal gamma and beta emitter as shown in Table 4.4-17 of this manual, in mrem-ml per hour-pCi.
Fk    =    Waste flow rate /    (Waste flow rate + Dilution flow rate)*
Dilution flow rate is the sum of available circulating water and Nuclear Services and Decay Heat Seawater flow.
Units 1 and 2 circulating water flow may be included.
 
==References:==
: 1)  NUREG 0133, Section 4.3.
: 2)  *Telecon/Meeting Summary with C. Willis (USNRC)    dated 01/16/85 regarding Fk OFF-SITE DOSE CALCULATION MANUAL                                                Page 109
 
TABLE 4.4-1 rnnczF l:ArTnpcZ Pnp  FYPAnllDP TA A *FMT-TMNPTTTF  ri niirn Al: pimll:r .A4ZP'Z Ni                  Li                  Mi                    Ki Nuclide          P-Ai r  *  (DFi P)  3-Skin ** (DFSi)  y-Air * (DFic)        Y-Body ** (DFBi)
Kr-83m              2. 88E+2                                1.93E+1              7.56E-2 KR-85m              1. 97E+3            1.46E+3            1.23E+3              1.17E+3 Kr-85              1.95E+3              1. 34E+3            1. 72E+1              1.61E+1 Kr-87              1.03E+4              9.73E+3            6.17E+3              5 .92E+3 Kr-88              2.93E+3              2. 37E+3            1. 52E+4              1.47E+4 Kr-89              1.06E+4              1.01E+4            1. 73E+4              1.66E+4 KR-90              7.83E+3              7.29E+3            1.63E+4              1.56E+4 Xe-131m              1. 11E+3            4.76E+2            1. 56E+2              9.15E+1 Xe-133m              1. 48E+3            9.94E+2            3.27E+2              2 .51E+2 Xe-133              1.05E+3              3.06E+2            3.53E+2              2.94E+2 Xe-135m              7. 39E+2            7.11E+2            3.36E+3              3.12E+3 Xe-135              2. 46E+3            1.86E+3            1. 92E+3              1.81E+3 Xe-137              1. 2 7E+4            1.2 2E+4            1. 51E+3              1.42E+3 Xe-138              4. 75E+3            4.13E+3            9.21E+3              8.83E+3 Ar-41              3.28E+3              2.69E+3            9. 30E+3              8.84E+3
* mrad-m 3 pci -yr 3
**  mrem-m pCi -yr
 
==References:==
: 1)  NUREG 0133
: 2)  USNRC Regulatory Guide 1.109,        Table B-1 OFF-SITE DOSE CALCULATION MANUAL                                                            Page 110
 
CALCULATION OF INHALATION PATHWAY DOSE FACTOR (Ri) 3 Ri= K' (BR)DFAi  mrem/year per uCi / m where:
K'    =    A constant unit of conversion - 106 pCi/uCi BR    =    The Breathing Rate of the represented age group:
1400 m3 /yr - infant 3700 m3 /yr  - child 8000 m3 /yr  - teen 3
8000 m /yr    - adult DFAi  =    The maximum organ inhalation dose factor for the represented age group for the ith radionuclide, in mrem/pCi.
 
==References:==
: 1)  NUREG-0133, Section 5.3.1.1
: 2)  Regulatory Guide 1.109, Table E-5,    and Tables E-7 through E-10 OFF-SITE DOSE CALCULATION MANUAL                                            Page 111
 
TABLE 4.4-2 Inhalation Dose Factors (Ri) - Infant Nuclide    Bone      Liver        T, Body        Thyroid      Kidney Lung      GI-LLI H-3        6.47E2    6.47E2      6.47E2        6.47E2      6.47E2 6.47E2    6.47E2 Cr-51      ND        ND          8.9SE1        1.32E1      1.32E1 1.28E4    3.57E2 Mn-54      ND        2.53E4      4.98E3        4.98E3      4.98E3 9.95E5    7.06E3 Fe-55      1.97E4    1.17E4      3.33E3        ND          ND    8.69E4    1.09E3 Fe-59      1.36E4    2.35E4      9.48E3        ND          ND    1.02E6    2.48E4 Co-58      ND        1.22E3      1.82E3        ND          ND    7.77E5    1.11E4 Co-60      ND        8.02E3      1.18E4        ND          ND    4.51E6    3.19E4 Ni-63      3.39E5    2.04E4      1.16E4        ND          ND    2.09E5    2.42E3 Zn-65      1.93E4    6.26E4      3.11E4        ND          3.25E4 6.47E5    5.14E4 Rb-86      ND        1.90E5      8.82E4        ND          ND    ND        3.04E3 Sr-89      3.98E5    ND          1.14E4        ND          ND    2.03E6    6.40E4 Sr-90      4.09E7    ND          2.59E6        ND          ND    1.12E7    1.31E5 Y-91      5.88E5    ND          1.57E4        ND          ND    2.45E6    7.07E4 Zr-95      1.15E5    2.79E4      2.03E4        ND          3.11E4 1.75E6    2.17E4 Nb-95      1.57E4    6.43E3      3.78E3        ND          4.72E3 4.79E5    1.27E4 Ru-103    2.02E3    ND          6.79E2        ND          4.24E3 5.52E5    1.61E4 Ru-106    8.68E4    ND          1.09E4        ND          1.07E5 1.16E7    1.64E5 Ag-110m    9.98E3    7.22E3      5.00E3        ND          1.09E4 3.67E6    3.30E4 Te-125m    4.76E3    1.99E3      6.58E2        1.62E3      ND    4.47E5    1.29E4 Te-127m    1.67E4    6.90E3      2.07E3        4.87E3      3.75E4 1.31E6    2.73E4 Te-129m    1.41E4    6.09E3      2.23E3        5.47E3      3.18E4 1.68E6    6.90E4 1-131      3.79E4    4.44E4      1.96E4        1.48E7      5.18E4 ND        1.06E3 Cs-134    3.96E5    7.03E5      7.45E4        ND          1.90E5 7.97E4    1.33E3 Cs-136    4.83E4    1.35E5      5.29E4        ND          5.64E4 1.18E4    1.43E3 Cs-137    5.49E5    6.12E5      4.55E4        ND          1.72E5 7.13E4    1.33E3 Ba-140    5.60E4    5.60E1      2.90E3        ND          1.34E1 1.60E6    3.84E4 Ce-141    2.77E4    1.67E4      1.99E3        ND          5.25E3 5.17E5    2.16E4 Ce-144    3.19E6    1.21E6      1.76E5        ND          5.38E5 9.84E6    1.48E5 Pr-143    1.40E4    5.24E3      6.99E2        ND          1.97E3 4.33E5    3.72E4 Nd-147    7.94E3    8.13E3      5.00E2        ND          3.15E3 3.22E5    3.12E4 OFF-SITE DOSE CALCULATION MANUAL                                    Page 112
 
TABLE 4.4-3 Inhalation Dose Factors (Ri) - Child Nuclide    Bone      Liver      T. Body        Thyroid      Kidney Lung      GI-LLI H-3        1.12E3    1.12E3      1.12E3        1.12E3      1.12E3 1.12E3    1.12E3 Cr-51      ND        ND          1.54E2        8.55E1      2.43E1 1.70E4    1.08E3 Mn-54      ND        4.29E4      9.51E3        ND          1.00E4 1.58E6    2.29E4 Fe-55      4.74E4    2.52E4      7.77E3        ND          ND    1.11E5    2.87E3 Fe-59      2.07E4    3.34E4      1.67E4        ND          ND    1.27E6    7.07E4 Co-58      ND        1.77E3      3.16E3        ND          ND    1.11E6    3.44E4 Co-60      ND        1.31E4      2.26E4        ND          ND    7.07E6    9.62E4 Ni-63      8.21E5    4.63E4      2.80E4        ND          ND    2.75E5    6.33E3 Zn-65      4.26E4    1.13ES      7.03E4        ND          7.14E4 9.95E5    1.63E4 Rb-86      ND        1.98E5      1.14E5        ND          ND    ND        7.99E3 Sr-89      5.99E5    ND          1.72E4        ND          ND    2.16E6    1.67E5 Sr-90      1.01E8    ND          6.44E6        ND          ND    1.48E7    3.43E5 Y-91      9.14E5    ND          2.44E4        ND          ND    2.63E6    1.84E5 Zr-95      1.90E5    4.18E4      3.70E4        ND          5.96E4 2.23E6    6.11E4 Nb-95      2.35E4    9.18E3      6.55E3        ND          8.62E3 6.14E5    3.70E4 Ru-103    2.79E3    ND          1.07E3        ND          7.03E3 6.62E5    4.48E4 Ru-106    1.36E5    ND          1.69E4        ND          1.84E5 1.43E7    4.29E5 Ag-lOrm    1.69E4    1.14E4      9.14E3        ND          2.12E4 5.48E6    1.OOE5 Te-125m    6.73E3    2.33E3      9.14E2        1.92E3      ND    4.77E5    3.38E4 Te-127m    2.49E4    8.55E3      3.02E3        6.07E3      6.36E4 1.48E6    7.14E4 Te-129m    1.92E4    6.85E3      3.04E3        6.33E3      5.03E4 1.76E6    1.82E5 1-131      4.81E4    4.81E4      2.73E4        1.62E7      7.88E4 ND        2.84E3 Cs-134    6.51E5    1.O1E6      2.25E5        ND          3.30E5 1.21E5    3.85E3 Cs-136    6.51E4    1.71E5      1.16E5        ND          9.55E4 1.45E4    4.18E3 Cs-137    9.07E5    8.25E5      1.28E5        ND          2.82E5 1.04E5    3.62E3 Ba-140    7.40E4    6.48E1      4.33E3        ND          2.11E1 1.74E6    1.02E5 Ce-141    3.92E4    1.95E4      2.90E3        ND          8.55E3 5.44E5    5.66E4 Ce-144    6.77E6    2.12E6      3.61E5        ND          1.17E6 1.20E7    3.89E5 Pr-143    1.85E4    5.55E3      9.14E2        ND          3.00E3 4.33E5    9.73E4 Nd-147    1.08E4    8.73E3      6.81E2        ND          4.81E3 3.28E5    8.21E4 OFF-SITE DOSE CALCULATION MANUAL                                    Page 113
 
TABLE 4.4-4 Inhalation Dose Factors (Ri) - Teen Nuclide    Bone      Liver      T. Body        Thyroid      Kidney Lung      GI-LLI H-3        1.27E3    1.27E3      1.27E3        1.27E3      1.27E3 1.27E3    1.27E3 Cr-51      ND        ND          1.35E2        7.49E1      3.07E1 2.09E4    3.00E3 Mn-54      ND        1.70E0      8.40E3        ND          1.27E4 1.98E6    6.68E4 Fe-55      3.34E4    2.38E4      5.54E3        ND          ND    1.24E5    6.39E3 Fe-59      1.59E4    3.70E4      1.43E4        ND          ND    1.53E6    1.78E5 Co-58      ND        2.07E3      2.78E3        ND          ND    1.34E6    9.52E4 Co-60      ND        1.51E4      1.98E4        ND          ND    8.72E6    2.59ES Ni-63      5.80E5    4.34E4      1.98E4        ND          ND    3.07E5    1.42E4 Zn-65      3.86E4    1.34E5      6.24E4        ND          8.64E4 1.24E6    4.66E4 Rb-86      ND        1.90E5      8.40E4        ND          ND    ND        1.77E4 Sr-89      4.34E5    ND          1.25E4        ND          ND    2.42E6    3.71E5 Sr-90      1.08E8    ND          6.68E6        ND          ND    1.65E7    7.65E5 Y-91      6.61E5    ND          1.77E4        ND          ND    2.94E6    4.09E5 Zr-95      1.48E5    4.58E4      3.15E4        ND          6.74E4 2.69E6    1.49E5 Nb-95      1.86E4    1.03E4      5.66E3        ND          1.00E4 7.51E5    9.68E4 Ru-103    2.10E3    ND          8.96E3        ND          7.43E3 7.83E5    1.09E5 Ru-106    9.84E4    ND          1.24E4        ND          1.90E5 1.61E7    9.60E5 Ag-110m    1.38E4    1.31E4      7.99E3        ND          2.50E4 6.75E6    2.73E5 Te-125m    4.88E3    2.24E3      6.67E2        1.40E3      ND    5.36E5    7.5OE4 Te-127m    1.80E4    8.16E3      2.18E3        4.38E3      6.54E4 1.66E6    1.59E5 Te-129m    1.39E4    6.58E3      2.25E3        4.58E3      5.19E4 1.98E6    4.05E5 1-131      3.54E4    4.91E4      2.64E4        1.46E7      8.40E4 ND        6.49E3 Cs-134    5.02E5    1.13E6      5.49E5        ND          3.75E5 1.46E5    9.76E3 Cs-136    5.15E4    1.94E5      1.37E5        ND          1.10E5 1.78E4    1.09E4 Cs-137    6.70E5    8.48E5      3.11E5        ND          3.04E5 1.21E5    8.48E3 Ba-140    5.47E4    6.70E1      3.52E3        ND          2.28E1 2.03E6    2.29E5 Ce-141    2.84E4    1.90E4      2.17E3        ND          8.88E3 6.14E5    1.26E5 Ce-144    4.89E6    2.02E6      2.62E5        ND          1.21E6 1.34E7    8.64E5 Pr-143    1.34E4    5.31E3      6.62E2        ND          3.09E3 4.83E5    2.14E5 Nd-147    7.86E3    8.56E3      5.13E2        ND          5.02E3 3.72E5    1.82E5 OFF-SITE DOSE CALCULATION MANUAL                                    Page 114
 
TABLE 4.4-5 Inhalation Dose Factors (Ri) - Adult Nuclide    Bone      Liver      T, Body        Thyroid      Kidney  uLng      GgLL.
H-3        1.26E3    1.26E3      1.26E3        1.26E3      1.26E3 1.26E3    1.26E3 Cr-51      ND        ND          1.00E2        5.95EI      2.28EI 1.44E4    3.32E3 Mn-54      ND        3.96E4      6.30E3        ND          9.84E3 1.40E6    7.74E4 Fe-55      2.46E4    1.70E4      3.94E3        ND          ND    7.21E4    6.03E3 Fe-59      1.18E4    2.78E4      1.06E4        ND          ND    1.02E6    1.88E5 Co-58      ND        1.58E3      2.07E3        ND          ND    9.28E5    1.06E5 Co-60      ND        1.15E4      1.48E4        ND          ND    5.97E6    2.85ES Ni-63      4.32E5    3.14E4      1.45E4        ND          ND    1.78E5    1.34E4 Zn-65      3.24E4    1.03E5      4.66E4        ND          6.90E4 8.64E5    5.34E4 Rb-86      ND        1.35E5      5.90E4        ND          ND    ND        1.66E4 Sr-89      3.04E5    ND          8.72E3        ND          ND    1.4E6      3.5E5 Sr-90      9.92E7    ND          6.10E6        ND          ND    9.60E6    7.22E5 Y-91      4.62E5    ND          1.24E4        ND          ND    1.70E6    3.85E5 Zr-95      1.07E5    3.44E4      2.33E4        ND          5.36E4 1.77E6    1.50E5 Nb-95      1.41E4    7.76E3      4.21E3        ND          7.74E3 5.05E5    1.04E5 Ru-103    1.53E3    ND          6.58E2        ND          5.83E3 5.05E5    1.10E5 Ru-106    6.91E4    ND          8.72E3        ND          1.34E5 9.36E6    9.12E5 Ag-110m    1.08E4    1.00E4      5.94E3        ND          1.97E4 4.63E6    3.02E5 Te-125m    3.42E3    1.58E3      4.67E2        1.05E3      1.24E4 3.14E5    7.06E4 Te-127m    1.26E4    5.77E3      1.57E3        3.29E3      4.58E4 9.60E5    1.50E6 Te-129m    9.76E3    4.67E3      1.58E3        3.44E3      3.66E4 1.16E6    3.83E5 1-131      2.52E4    3.58E4      2.05E4        1.19E7      6.13E4 ND        6.28E3 Cs-134    3.73E5    8.48E5      7.28E5        ND          2.87E5 9.76E4    1.04E4 Cs-136    3.90E4    1.46E5      1.10E5        ND          8.56E4 1.20E4    1.17E4 Cs-137    4.78E5    6.21E5      4.28E5        ND          2.22E5 7.52E4    8.40E3 Ba-140    3.90E4    4.90E1      2.57E3        ND          1.67E1 1.27E6    2.18E5 Ce-141    1.99E4    1.35E4      1.53E3        ND          6.26E3 3.62E5    1.20E5 Ce-144    3.43E6    1.43E6      1.84E5        ND          8.48E5 7.78E6    8.16E5 Pr-143    9.36E3    3.75E3      4.64E2        ND          2.16E3 2.81E5    2.00E5 Nd-147    5.27E3    6.10E3      3.65E2        ND          3.56E3 2.21E5    1.73E5 OFF-SITE DOSE CALCULATION MANUAL                                    Page 115
 
Calculation of Ingestion Dose Factor Grass-Cow-Milk Pathway KQF(U,p)] Fm(r)VDFL)i &#xfd;E+(
R., [DQ]                                ,-&    ,ht where:  Unit = m2 .mrem/yr per pCi/sec                Reference Table R.G. 1.109 K'    =  A constant of unit conversion,      10' pCi/Ci.
QF    =  The cow's consumption rate,      50 kg/day (wet weight)              E-3 Up  = The receptor's milk consumption rate for age (a),                    E-5 in liters, yr Infant & Child - 330    Teen - 400    Adult - 310 y    =  The agricultural    productivity by unit area of pasture            E-15 feed grass                          0.7 kg/m 2 Ys    =  The agricultural productivity of unit area of                        E-1S stored feed                        2.0 kg/m 2 Fm    =  The stable element transfer coefficients,        in days/kg.        E-1 r    =  Fraction of deposited activity retained on cow's                    E-15 feed grass      1.0 radioiodine 0.2 particulates tf    =  Transport time from pasture to receptor, in sec.                    E-1S 1.73x10s sec (2 days) th    =  Transport time from crop field to receptor, in sec.                  E-15 7.78x10 6 sec. (90 days)
(DFLi)a=  The maximum organ ingestion dose factor for the ith                  E-11 to radionuclide for the receptor in age group (a),                      E-14 in mrem/pCi At    =  The decay constant for the ith radionuclide, in sec A.    =  The decay constant for removal of activity on leaf and              E-15 plant surfaces by weathering 5.73 x 10-7 sec-1 (corresponding to a 14 day half-life).
fp    =  Fraction of the year that the cow is        on pasture (dimensionless) = 1".
G-    =  Fraction of the cow feed that is pasture grass while the cow is on pasture (dimensionless) = 1*.
*Milk cattle are considered to be fed from two potential          sources, pasture grass and stored feeds.
OFF-SITE DOSE CALCULATION MANUAL                                                      Page 116
 
Note:  The above equation does not apply to the concentration of tritium in meat. A separate equation is provided in NUREG 0133, section 5.3.1.4 to determine Tritium value.
 
==Reference:==
The equation for R', (D/Q) was taken from NUREG-0133 Section 5.3.1.3 OFF-SITE DOSE CALCULATION MANUAL                                              Page 117
 
TABLE 4.4-6 Ingestion Dose Factors (K*)
Grass-Cow-Milk Pathway (Infant)
Nuclide    Bone      Liver        T. Body        Thyroid      Kidney  Lung      GI-LLI H-3        2.38E3    2..38E3      2.38E3        2.38E3        2.38E3  2.38E3    2.38E3 Cr-51      ND        ND          1.61E5        1.05E5        2.30E4  2.05E5    4.71E6 Mn-54      ND        3.89E7      8.83E6        ND            8.63E6  ND        1.43E7 Fe-55      1.35E8    8.72E7      2.33E7        ND            ND      4.26E7    1.11E7 Fe-59      2.26E8    3.94E8      1.55E8        ND            ND      1.17E8    1.88E8 Co-58      ND        2.43E7      6.06E7        ND            ND      ND        6.05E7 Co-60      ND        8.81E7      2.08E8        ND            ND      ND        2.10E8 Ni-63      3.49EI0    2.16E9      1.21E9        ND            ND      ND        1.07E8 Zn-65      5.55E9    1.90E10      8.78E9        ND            9.24E9  ND        1.61E10 Rb-86      ND        2.23E10      1.10E10        ND            ND      ND        5.70E8 Sr-89      ND        1.45E6      9.98E5        ND            ND      ND        4.93E5 Sr-90      1.22E11    ND          3.1OE1O        ND            ND      ND        1.52E9 Y-91      7.33E4    ND          1.95E3        ND            ND      ND        S.26E6 Zr-95      6.84E3    1.67E3      1.18E3        ND            1.80E3  ND        8.30E5 Nb-95      5.93E5    2.44E5      1.41E5        ND            1.75E5  ND        2.06E8 Ru-103    8.68E3    ND          2.90E3        ND            1.81E4  ND        1.06E5 Ru-106    1.90E5    ND          2.38E4        ND            2.25E5  ND        1.44E6 Ag-110m    3.86E8    2.82E8      1.87E8        ND            4.03E8  ND        1.46E10 Te-125m    1.51E8    5.04E7      2.04E7        5.07E7        ND      ND        7.18E7 Te-127m    4.21E8    1.40E8      5.10E7        1.22E8        1.04E9  ND        1.70E8 Te-129m    5.60E8    1.92E8      8.62E7        2.15E8        1.40E9  ND        3.34E8 1-131      2.72E9    3.21E9      1.41E9        1.05E12      3.75E9  ND        1.15E8 Cs-134    3.65E10    6.80E10      6.87E9        ND            1.75E10 7.18E9    1.85E8 Cs-136    2.03E9    5.96E9      2.22E9        ND            2.37E9  4.85E8    9.05E7 Cs-137    5.15E10    6.02E10      4.27E9        ND            1.62EI0 6.55E9    1.88E8 Ba-140    2.41E8    2.41E5      1.24E7        ND            5.73E4  1.48E5    5.92E7 Ce-141    4.34E4    2.64E4      3.11E3        ND            8.16E3  ND        1.37E7 Ce-144    2.33E6    9.52E5      1.30E5        ND            3.85E5  ND        1.33E8 Pr-143    1.49E3    5.56E2      7.37E1        ND            2.07E2  ND        7.85E5 Nd-147    8.86E2    9.10E2      5.57E1        ND            3.51E2  ND        5.77E5 OFF-SITE DOSE CALCULATION MANUAL                                      Page 118
 
TABLE 4.4-7 Ingestion Dose Factors (K)
Grass-Cow-Milk Pathway (Child)
Nuclide    Bone      Liver        T. Body        Thyroid      Kidney  Lung_      GI-LLI H-3        1.57E3    1..57E3      1.57E3        1.57E3      1.57E3  1.57E3    1.57E3 Cr-51      ND        ND          1,02E5        5.66E4      1.55E4  1.03E5    5.41E6 Mn-54      ND        2.09E7      5.58E6        ND          5.87E6  ND        1.76E7 Fe-55      1.12E8    5.93E7      1.84E7        ND          ND      3.35E7    1.10E7 Fe-59      1.21E8    1.96E8      9.75E7        ND          ND      5.67E7    2.04E8 Co-58      ND        1.21E7      3.72E7        ND          ND      ND        7.08E7 Co-60      ND        4.32E7      1.27E8        ND          ND      ND        2.39E8 Ni-63      2.96EI0    1.59E9      1.01E9        ND          ND      ND        1.07E8 Zn-65      4.13E9    1.10E10      6.85E9        ND          6.94E9  ND        1.93E9 Rb-86      ND        8.77E9      5.39E9        ND          ND      ND        5.64E8 Sr-89      6.69E9    ND          1.91E8        ND          ND      ND        2.59E8 Sr-90      1.12E11    ND          2.83E10        ND          ND      ND        1.50E9 Y-91      3.91E4    ND          1.04E3        ND          ND      ND        5.21E6 Zr-95      3.85E3    8.46E2      7.53E2        ND          1.21E3  ND        8.83E5 Nb-95      3.18E5    1.24E5      8.84E4        ND          1.16E5  ND        2.29E8 Ru-103    4.29E3    ND          1.65E3        ND          1.08E4  ND        1.11E5 Ru-106    9.24E4    ND          1.15E4        ND          1.25E5  ND        1.44E6 Pg-ilbm    2.09E8    1.41E8      1.13E8        ND          2.63E8  ND        1.68E10 Te-125m    7.38E7    2.00E7      9.84E6        2.07E7      ND      ND        7.12E7 Te-127m    2.08E8    5.60E7      2.47E7        4.97E7      5.93E8  ND        1.68E8 Te-129m    3.17E8    8.85E7      4.92E7        1.02E8      9.31E8  ND        3.87E8 1-131      1.30E9    1.31E9      7.46E8        4.34E11      2.15E9  ND        1.17E8 Cs-134    2.26E10    3.71E10      7.84E9        ND          1.15E10 4.13E9    2.00E8 Cs-136    1.04E9    2.85E9      1.84E9        ND          1.52E9  2.26E8    1.00E8 Cs-137    3.22E10    3.09E10      4.55E9        ND          1.01EIO 3.62E9    1.93E8 Ba-140    1.17E8    1.03E5      6.84E6        ND          3.34E4  6.12E4    5.94E7 Ce-141    2.19E4    1.09E4      1.62E3        ND          4.78E3  ND        1.36E7 Ce-144    1.62E6    5.09E5      8.66E4        ND          2.82E5  ND        1.33E8 Pr-143    7.19E2    2.16E2      3.57E1        ND          1.17E2  ND        7.76E5 Nd-147    4.47E2    3.62E2      2.80E1        ND          1.99E2  ND        5.73E5 OFF-SITE DOSE CALCULATION MANUAL                                      Page 119
 
TABLE 4.4-8 Ingestion Dose Factors  (R&#xfd;)
Grass-Cow-Milk Pathway (Teen)
Nuclide    Bone      Liver      T. Body        Thyroid      Kidney Lung      GI-LLI H-3        9.94E2    9.94E2      9.94E2        9.94E2      9.94E2 9.94E2    9.94E2 Cr-51      ND        ND          5.00E4        2.78E4      1.09E4 7.13E4    8.40E6 Mn-54      ND        1.40E7      2.78E6        ND          4.18E6 ND        2.87E7 Fe-55      4.45E7    3.16E7      7.36E6        ND          ND    2.00E7    1.37E7 Fe-59      5.21E7    1.22E8      4.70E7        ND          ND    3.87E7    2.88E8 Co-58      ND        7.95E6      1.83E7        ND          ND    ND        1.10E8 Co-60      ND        1.64E6      3.70E6        ND          ND    ND        3.14E7 Ni-63      1.82E10    8.35E8      4.O1E8        ND          ND    ND        1.33E8 Zn-65      2.11E9    7.32E9      3.41E9        ND          4.68E9 ND        3.10E9 Rb-86      ND        4.73E9      2.22E9        ND          ND    ND        6.99E8 Sr-89      2.70E9    ND          7.73E7        ND          ND    ND        3.22E8 Sr-90      6.61E10    ND          1.63E10        ND          ND    ND        1.86E9 Y-91      1.S8E4    ND          4.24E2        ND          ND    ND        6.48E6 Zr-95      1.66E3    5.22E2      3.59E2        ND          7.68E2 ND        1.21E6 Nb-95      1.41E5    7.80E4      4.29E4        ND          7.56E4 ND        3.34E8 Ru-103    1.81E3    ND          7.74E2        ND          6.39E3 ND        1.51E5 Ru-106    3.75E4    ND          4.73E3        ND          7.24E4 ND        1.80E6 Ag-110m    9.64E7    9.12E7      5.55E7        ND          1.74E8 ND        2.56E10 Te-125m    3.00E7    1.08E7      4.02E6        8.39E6      ND    ND        8.86E7 Te-127m    8.44E7    2.99E7      1.OOE7        2.01E7      3.42E8 ND        2.10E8 Te-129m    1.11E8    4.11E7      1.75E7        3.57E7      4.63E8 ND        4.16E8 1-131      5.38E8    7.53E8      4.05E8        2.20El1      1.30E9 ND        1.49E8 Cs-134    9.81E9    2.31E10    1.07E10        ND          7.34E9 2.80E9    2.87E8 Cs-136    4.59E8    1.80E9      1.21E9        ND          9.82E8 1.55E8    1.45E8 Cs-137    1.34E10    1.78E10    6.20E9        ND          6.06E9 2.35E9    2.53E8 Ba-140    4.87E7    5.96E4      3.14E6        ND          2.02E4 4.01E4    7.51E7 Ce-141    8.89E3    5.93E3      6.81E2        ND          2.79E3 ND        1.70E7 Ce-144    6.58E5    2.72E5      3.54E4        ND          1.63E5 ND        1.65E8 Pr-143    2.89E2    1.15E2      1.44E1        ND          6.73E1 ND        9.53E5 Nd-147    1.82E2    1.98E2      1.19E1        ND          1.16E2 ND        7.15E5 OFF-SITE DOSE CALCULATION MANUAL                                    Page 120
 
TABLE 4.4-9 Ingestion Dose Factors (RK)
Grass-Cow-Milk Pathway (Adult)
Nuclide    Bone      Liver        T. Body        Thyroid      Kidney  Lung      GI-LLI H-3        2.63E2    7.63E2      7.63E2        7.63E2      .7.63E2 7.63E2    7.63E2 Cr-51      ND        ND          2.86E4        1.71E4      6.27E3  3.80E4    7.20E6 Mn-54      ND        8.40E6      i.60E6        ND          2.50E6  ND        2.57E7 Fe-55      2.51E7    1.73E7      4.04E6        ND          ND      9.67E6    9.95E6 Fe-59      2.99E7    7.02E7      2.69E7        ND          ND      1.96E7    2.34E8 Co-58      ND        4.72E6      1.06E7        ND          ND      ND        9.51E7 Co-60      ND        1.64E7      3.62E7        ND          ND      ND        3.08E8 Ni-63      6.73E9    4.66E8      2.27E8        ND          ND      ND        9.73E7 Zn-65      1.37E9    4.37E9      1.97E9        ND          2.92E9  ND        2.75E9 Rb-86      ND        2.59E9      1.21E9        ND          ND      ND        5.11E8 Sr-89      1.47E9    ND          4.21E7        ND          ND      ND        2.35E8 Sr-90      4.69E10    ND          1.15E10        ND          ND      ND        1.35E9 Y-91      8.60E3    ND          2.29E2        ND          ND      ND        4.73E6 Zr-95      1.06E3    3.04E2      2.06E2        ND          4.77E2  ND        9.63E5 Nb-95      5.65E5    2.44E5      9.59E3        ND          2.43E5  ND        1.95E9 Ru-103    1.02E3    ND          4.39E2        ND          3.89E3  ND        1.19E5 Ru-106    2.04E4    ND          2.58E3        ND          3.94E4  ND        1.32E6 Ag-110m    5.83E7    5.39E7      3.20E7        ND          1.06E8  ND        2.20E10 Te-125m    1.63E7    5.90E6      2.18E6        4.90E6      6.63E7  ND        6.50E7 Te-127m    4.58E7    1.64E7      5.58E6        1.17E7      1.86E8  ND        1.54E8 Te-129m    6.05E7    2.26E7      9.58E6        2.08E7      2.53E8  ND        3.05E8 1-131      2.97E8    4.24E8      2.43E8        1.39E11      7.27E8  ND        1.12E8 Cs-134    5.65E9    1.34E10      1.10E10        ND          4.33E9  1.44E9    2.35E8 Cs-136    2.69E8    1.06E9      7.65E8        ND          5.92E8  8.11E7    1.21E8 Cs-137    7.38E9    1.01E1O      6.61E9        ND          3.43E9  1.14E9    1.95E8 Ba-140    2.70E7    3.39E4      1.77E6        ND          1.15E4  1.94E4    5.55E7 Ce-141    4.85E3    3.28E3      3.72E2        ND          1.52E3  ND        1.25E7 Ce-144    3.58E5    1.50E5      1.92E4        ND          8.87E4  ND        1.21E8 Pr-143    1.94E2    7.79E1      9.62E0        ND          4.49E1  ND        8.50E5 Nd-147    9.49E1    1.10E2      6.56E0        ND          6.41E1  ND        5.26E5 OFF-SITE DOSE CALCULATION MANUAL                                      Page 121
 
Calculation of Ingestion Dose Factor Grass-Cow-Meat Pathway R - [D!Q] = K'Q[n]      FfHrDFU fP&[!    [(1 - fpfie_"
I QF[U.p] I2v      &#xfd;.Yp -fi]
                                                        +
J          Y .,
where:  Unit = m2.mrem/yr per iCi/sec                Reference Table        R. G. 1.109 K'    =  A constant of unit conversion 106 pCi/uCi.
QF    =  The cow's consumption rate,        50 kg/day (wet weight)              E-3 Up    =  The receptor's meat consumption rate for age (a),                      E-5 in kg/yr Infant  -  0      Teen - 65 Child -    41      Adult -110 yp    =  The agricultural    productivity by unit area of pasture              E-15 2
feed grass                            0.7 kg/m Ys    =  The agricultural    productivity of unit area of                      E-15 stored feed                          2.0 kg/m 2
        =  The stable element transfer coefficients,              in days/kg. E-1 r    =  Fraction of deposited activity retained on cow's                        E-15 feed grass                          1.0 radioiodine 0.2 particulates if      =  Transport time from pasture to receptor, in sec.                        E-15 1.73xlO6 sec (20 days) tm      =  Transport time from crop field to receptor, in sec.                    E-15 7.78x10 6 sec. (90 days)
(DFLi)a = The maximum organ ingestion dose factor for the ith                      E-11 to radionuclide for the receptor in age group (a),                        E-14 in mrem/pCi 14,    = The decay constant for the ith radionuclide, in sec AW      =  The decay constant for removal of activity on                          E-15 leaf and plant surfaces by weathering, 5.73 x 10-7 sec -' (corresponding to a 14 day half-life).
        =  Fraction of the year that the cow is on pasture (dimensionless) = 1*.
        =  Fraction of the cow feed that is pasture grass while the cow is on pasture (dimensionless) = 1.
OFF-SITE DOSE CALCULATION MANUAL                                                          Page 122
 
*Milk cattle are considered to be fed from two potential sources, pasture grass and stored feeds. Following the development in Regulatory Guide 1.109, the values of fp and fs will be considered unity, in lieu of site specific information provided in the annual land census report by the licensee.
Note:  The above equation does not apply to the concentration of tritium in meat. A separate equation is provided in NUREG 0133, section 5.3.1.4 to determine Tritium value.
 
==Reference:==
The equation deriving R0 (D/Q)  was taken from NUREG 0133, Section 5.3.1.4.
tf in NUREG 0133 is equivalent to ts in R.G. 1.109 Table E-15.
OFF-SITE DOSE CALCULATION MANUAL                                            Page 123
 
TABLE 4.4-10 Ingestion Dose Factors (K")
Grass-Cow-Meat  Pathway (Child)
Nuclide    Bone      Liver        T. Body        Thyroid        Kidney Lung        GI-LLI H-3        2.34E2    2.. 34E2    2.34E2        2.34E2        2.34E2 2.34E2      2.34E2 Cr-51      ND        ND          8.82E3        4.89E3        1.34E3 8.93E3      4.68E5 Mn-54      ND        7.99E6      2.13E6        ND            2.24E6 ND          6.70E6 Fe-55      4.57E8    2.42E8      7. 50E7        ND            ND    1. 37E8    4.49E7 Fe-59      3.81E8    6.16E8      3.07E8        ND            ND    1. 79E8    6.42E8 Co-58      ND        1.65E7      5.04E7        ND            ND    ND          9.60E7 Co-60      ND        6.93E7      2 .04E8        ND            ND    ND          3.84E8 Ni-63      2.91E10    1. 56E9      9.91E8        ND            ND    ND          1.05E8 Zn-65      3.76E8    1.00E9      6.22E8        ND            6.30E8 ND          1.76E8 Rb-86      ND        5. 77E8      3.55E8        ND            ND    ND          3.71E7 Sr-89      4.92E8    ND          1.40E7        ND            ND    ND          1.90E7 Sr-90      1.04E10    ND          2.64E9        ND            ND    ND          1.40E8 Y-91      1.81E6    ND          4.83E4        ND            ND    ND          2.41E8 Zr-95      2.69E6    5.91E5      5.26E5        ND            8.46E5 ND          6.16E8 Nb-95      3.09E6    1.20E6      8.61E5        ND            1.13E6 ND          2.23E9 Ru-103    1.55E8    ND          5 .97E7        ND            3.91E8 ND          4.02E9 Ru-106    4.44E9    ND          5.54E8        ND            5.99E9 ND        6.90E10 Ag-libm    8.41E6    5.68E6      4.54E6        ND            1.06E7 ND          6.76E8 Te-125m    5.69E8    1. 54E8      7.59E7        1.60E8        ND    ND          5.49E8 Te-127m    1.77E9    4. 78E8      2.11E8        4.24E8        5.06E9 ND          1.44E9 Te-129m    4.78E9    5.05E8      2 .81E8        5.83E8        5.31E9 ND          2.21E9 1-131      1.66E7    1.67E7      9 .49E6        5.52E9        2.74E7 ND          1.49E6 Cs-134    9.22E8    1.51E9      3.19E8        ND            4.69E8 1.68E8      8.16E6 Cs-136    1.73E7    4. 74E7      3 .07E7        ND            2.53E7 3.77E6      1.67E6 Cs-137    1.33E9    1.28E9      1.88E8        ND            4.16E8 1. 50E8    7.99E6 Ba-140    4.39E7    3.85E4      2 .56E6        ND            1.25E4 2.29E4      2.22E7 Ce-141    2.22E4    1.11E4      1.64E3        ND            4.86E3 ND          1.38E7 Ce-144    2.32E6    7.26ES      1.24E5        ND            4.02E5 ND          1.89E8 Pr-143    3.35E4    1.01E4      1.66E3        ND            5.45E3 ND          3.61E7 Nd-147    1.18E4    9.60E3      7 .43E2        ND            5.27E3 ND          1.52E7 OFF-SITE DOSE CALCULATION MANUAL                                        Page 124
 
TABLE 4.4-11 Ingestion Dose Factors (K.)
Grass-Cow-Meat    Pathway (Teen)
Nuclide    Bone      Liver      T. Body      Thyroid        Kidney  Lu ng      GI-LLI H-3        1.94E2    1. 94E2    1.94E2          1.94E2        1.94E2  1.94E2      1.94E2 Cr-51      ND        ND          5.65E3          3.14E3        1.24E3  8.07E3      9.49E5 Mn-54      ND        6.98E6      1.39E6          ND            2.08E6  ND          1.43E7 Fe-55      2.38E8    1.69E8      3.93E7          ND            ND      1.07E8      7.30E7 Fe-59      2.15E8    5.01E8      1.94E8          ND            ND      1. 58E8      1.19E9 Co-58      ND        1.41E7      3.25E7          ND            ND      ND          1.94E8 Co-60      ND        5.83E7      1.31E8          ND            ND      ND          7.6OE8 Ni-63      1.52E10    1.07E9      5 .15E8        ND            ND      ND          1.71E8 Zn-65      2. SOE8    8.69E8      4.06E8          ND            5.56E8  ND          3.68E8 Rb-86      ND        4.06E8      1.91E8          ND            ND      ND          6.01E7 Sr-89      2.60E8    ND          7.44E6          ND            ND      ND          3.09E7 Sr-90      8.05E9    ND          1.99E9          ND            ND      ND          2.2 6E8 Y-91        9.S6ES    ND          2.56E4          ND            ND      ND          3.92E8 Zr-95      1. 51E6    4. 78E5    3.28E5          ND            7.02ES  ND          1.10E9 Nb-95      1. 79E6    9.93ES      5.47E5          ND            9.63E5  ND          4.2 5E9 Ru-103      8.58E7    ND          3.67E7          ND            3.03E8  ND          7.17E9 Ru- 106    2. 36E9    ND          2.97E8          ND            4.55E9  ND        1. 13 Ell Ag- 110m    5.07E6    4.80E6      2.92E6          ND            9. 15E6 ND          1.35E9 Te-125m    3.03E8    1.09E8      4.05 E7        8.47E7        ND      ND          8.94E8 Te-127m    9.42E8    3. 34E8    1. 12 E8        2 .24E8        3.82E9  ND          2.35E9 Te-129m    9.61E8    3.57E8      1. 52E8        3.10E8        4.02E9  ND          3.61E9 1-131      8.97E6    1. 26E7    6. 75E6        3.66E9        2.16E7  ND          2 .48E6 Cs-134      5.23E8    1. 23 E9    5.71E8          ND            3.91E8  1.49E8      1.53E7 Cs-136      9.96E6    3. 92 E7    2.63E7          ND            2.13E7  3.36E6      3.15E6 Cs-137      7.24E8    9. 63 E8    3.36E8          ND            3.28E8  1.27E8      1.37E7 Ba- 140    2. 39E7    2.93E4      1.54E6          ND            9.94E3  1.97E4      3.69E7 Ce-141      1.18E4    7.88E3      9.05E2          ND            3.71E3  ND          2.25E7 Ce- 144    1.23E6    5.08E5      6.60E4          ND            3.04E5  ND          3.09E8 Pr-143      1.76E4    7.03E3      8.76E2          ND            4.09E3  ND          5.79E7 Nd-147      6.32E3    6.87E3      4.12E2          ND            4.04E3  ND          2.48E7 OFF-SITE DOSE CALCULATION MANUAL                                        Page 125
 
TABLE 4.4-12 Ingestion Dose Factors (R")
Grass-Cow-Meat Pathway (Adult)
Nuclide    Bone      Liver      T. Body      Thyroid        Kidney Lung      GI-LLI H-3        3.25E2    3..25E2    3.25E2        3.25E2        3.25E2 3.25E2    3.25E2 Cr-51      ND        ND          7.06E3        4.22E3        1.56E3 9.37E3    1.78E6 Mn-54      ND        9.16E6      1.75E6        ND            2.72E6 ND        2.8OE7 Fe-55      2.93E8    2.02E8      4.72E7        ND            ND    1.13E8    1.16E8 Fe-S9      2.69E8    6.32E8      2.42E8        ND            ND    1.76E8    2.11E9 Co-58      ND        1.83E7      4.10E7        ND            ND    ND        3.70E8 Co-60      ND        7.52E7      1.66E8        ND            ND    ND        1.41E9 Ni-63      1.89E10    1.31E9      6.33E8        ND            ND    ND        2.73E8 Zn-65      3.56E8    1.13E9      5.12E8        ND            7.58E8 ND        7.13E8 Rb-86      ND        4.86E8      2.27E8        ND            ND    ND        9.59E7 Sr-89      3.08E8    ND          8.83E6        ND            ND    ND        4.93E7 Sr-90      1.24E10    ND          3.05E9        ND            ND    ND        3.59E8 Y-91      1.13E6    ND          3.03E4        ND            ND    ND        6.24E8 Zr-95      1.89E6    6.06E5      4.10E5        ND            9.51E5 ND        1.92E9 Nb-95      2.29E6    1.28E6      6.86E5        ND            1.26E6 ND        7.74E9 Ru-103    1.05E8    ND          4.54E7        ND            4.02E8 ND        1.23E10 Ru-106    2.80E9    ND          3.S4E8        ND            5.40E9 ND        1.81El1 Ag-ib0m    6.70E6    6.19E6      3.69E6        ND            1.22E7 ND        2.53E9 Te-125m    3.59E8    1.30E8      4.81E7        1.08E8        1.46E9 ND        1.43E9 Te-127m    1.12E9    3.99E8      1.36E8        2.85E8        4.53E9 ND        3.74E9 Te-129m    1.15E9    4.28E8      1.82E8        3.94E8        4.79E9 ND        5.78E9 1-131      1.08E7    1.54E7      8.85E6        5.06E9        2.65E7 ND        4.07E6 Cs-134    6.57E8    156E9      1.29E9        ND            5.06E8 1.68E8    2.74E7 Cs-136    1.28E7    5.04E7      3.63E7        ND            2.80E7 3.84E6    5.73E6 Cs-137    8.72E8    1.19E9      7.81E8        ND            4.05E8 1.35E8    2.31E7 Ba-140    2.90E7    3.64E4      1.90E6        ND            1.24E4 2.08E4    5.96E7 Ce-141    1.41E4    9.51E3      1.08E3        ND            4.41E3 ND        3.63E7 Ce-144    1.46E6    6.09E5      7.82E4        ND            3.61E5 ND        4.93E8 Pr-143    2.09E4    8.39E3      1.04E3        ND            4.85E3 ND        9.17E7 Nd-147    7.17E3    8.29E3      4.96E2        ND            4.85E3 ND        3.99E7 OFF-SITE DOSE CALCULATION MANUAL                                    Page 126
 
Calculation of Ingestion Dose Factor Vegetation Pathway Rv[DIQJ= K{1[      1IiaVJrtie.f At+tj, fgeZ1-tj where: Units = m2.mrem/yr per uCi/sec.                  Reference Table,      R.G. 1.109 K'      =  A constant of unit conversion,    10' pCi/uCi.
UL      =  The consumption rate of fresh leafy vegetation by the              E-5 receptor in age group (a), in kg/yr.
Infant    0 Child      26 Teen      42 Adult      64
        =  The consumption rate of stored vegetation by the                    E-5 receptor in age group (a),  in kg/yr Infant    0 Child      520 Teen      630 Adult      520 (DFLa)a  =  The maximum organ ingesting dose factor for the ith            E-11 to E-14 radionuclide for the receptor in age group (a),
in mrem/pCi.
fL      =  The fraction of the annual intake of fresh leafy                    E-15 vegetation grown locally. (default 1.0)
        =  The fraction of the annual intake of stored vegetation              E-15 grown locally.  (default 0.76)
IL      =  The average time between harvest of leafy vegetation                E-15 and its consumption, 8.6 x 104 seconds (1 day) th      =  The average time between harvest of stored vegetation              E-15 and its consumption, 5.18 x 10 6 seconds (60 days)
Yv      =  The vegetation areal density,    2.0 kg/m 2                        E-15 r        =  Fraction of deposited activity retained on the                      E-15 vegetation 1.0 radioiodine 0.2 particulates i      =  The decay constant for the ith radionuclide,      in sec"1 AW      =  The decay constant for removal of activity on leaf and              E-15 plant surfaces by weathering, 5.73 x 10' sec-1 (corresponding  to a 14 day half-life).
OFF-SITE DOSE CALCULATION MANUAL                                                      Page 127
 
Note:  The above equation does not apply to the concentrations of tritium in vegetation. A separate equation is provided in NUREG 0133, section 5.3.1.5 to determine tritium values.
 
==Reference:==
The equation deriving  R' (D/Q) was taken from NUREG 0133, Section 5.3.1.5.
OFF-SITE DOSE CALCULATION MANUAL                                          Page 128
 
TABLE 4.4-13 Ingestion Dose Factors (R )
Vegetation Pathway (Child)
Nuclide    Bone      Liver        T. Body        Thyroid    Kidney Lung      GI-LLI H-3        4.01E3    4.01E3      4.01E3        4.01E3      4.01E3 4.01E3    4.01E3 Cr-51      ND        ND          1.18E5        6.54E4      1.79E4 1.19E5    6.25E6 Mn-54      ND        6.61E8      1.76E8        ND          1.85E8 ND        5.55E8 Fe-55      8.00E8    4.24E8      1.31E8        ND          ND    2.40E8    7.86E7 Fe-59      4.07E8    6.58E8      3.28E8        ND          ND    1.91E8    6.85E8 Co-58      ND        6.47E7      1.98E8        ND          ND    ND        3.77E8 Co-60      ND        3.78E8      1.12E9        ND          ND    ND        2.10E9 Ni-63      3.95E10    2.11E9      1.34E9        ND          ND    ND        1.42E8 Zn-65      8.13E8    2.17E9      1.35E9        ND          1.36E9 ND        3.80E8 Rb-86      ND        4.52E8      2.78E8        ND          ND    ND        2.91E7 Sr-89      3.74E10    ND          1.07E9        ND          ND    ND        1.45E9 Sr-90      1.24E12    ND          3.15E11        ND          ND    ND        1.67E10 Y-91      1.87E7    ND          5.01E5        ND          ND    ND        2.49E9 Zr-95      3.92E6    8.63E5      7.68E5        ND          1.23E6 ND        9.00E8 Nb-95      4.10E5    1.60E5      1.14E5        ND          1.50E5 ND        2.95E8 Ru-103    1.54E7    ND          5.92E6        ND          3.88E7 ND        3.98E8 Ru-106    7.45E8    ND          9.30E7        ND          1.01E9 ND        1.16E10 Ag-110m    3.23E7    2.18E7      1.74E7        ND          4.06E7 ND        2.59E9 Te-125m    3.51E8    9.50E7      4.67E7        9.84E7      ND    ND        3.38E8 Te-127m    1.32E9    3.56E8      1.57E8        3.16E8      1.94E9 ND        1.07E9 Te-129m    8.58E8    2.40E8      1.33E8        2.77E8      2.52E9 ND        1.05E9 1-131      1.43E8    1.44E8      8.18E7        4.76E10    2.36E8 ND        1.28E7 Cs-134    1.60E10    2.63E10      5.55E9        ND          8.15E9 2.92E9    1.42E8 Cs-136    4.44E8    1.22E9      7.90E8        ND          6.50E8 9.69E7    4.29E7 Cs-137    2.39E10    2.29E10      3.38E9        ND          7.46E9 2.68E9    1.43E8 Ba-140    2.77E8    2.43E5      1.62E7        ND          7.91E4 1.45E5    1.40E8 Ce-141    6.56E5    3.27E5      4.86E4        ND          1.43E5 ND        4.08E8 Ce-144    1.27E8    3.98E7      6.78E6        ND          2.21E7 ND        1.04E10 Pr-143    1.46E5    4.39E4      7.26E3        ND          2.38E4 ND        1.58E8 Nd-147    7.23E4    5.86E4      4.54E3        ND          5.47E1 ND        9.28E7 OFF-SITE DOSE CALCULATION MANUAL                                    Page 129
 
TABLE 4.4-14 Ingestion Dose Factors (R )
Vegetation Pathway (Teen)
Nuclide      Bone      Liver        T. Body        Thyroid  Kidney  Lung*      GI-LLI H-3          4.10E3    4. 10E3      4.1OE3          4.10E3    4.1OE3  4.10E3      4.10E3 P-32        1.60E9    9.91E7      6.20E7          ND        ND      ND          1. 34E8 Cr-51        ND        ND          6.19E4          3.44E4    1.36E4  8.84E4      1.04E7 Mn-54        ND        4. 52 E8    8.97E7          ND        1.35E8  ND          9.27E8 Fe-55        3.25E8    2. 31E8      5.38E7          ND        ND      1.46E8      9.98E7 Fe-59        1.83E8    4.28E8      1.6SE8          ND        ND      1. 35E8    1.01E9 Co-58        ND        4.38E7      1.01E8          ND        ND      ND          6.04E8 Co-60        ND        2.49E8      5.60E8          ND        ND      ND          3.24E9 Ni-63        1.61E10    1. 13 E9    5.44E8          ND        ND      ND          1.81E8 Zn-65        4.24E8    1.47E9      6.87E8          ND        9.43E8  ND          6.24E8 Rb-86        ND        2.73E8      1.28E8          ND        ND      ND          4.04E7 Sr-89        1. 57E10  ND          4.50E8          ND        ND      ND          1.87E9 Sr-90        7.S1Ell    ND          1.85Ell          ND        ND      ND        2.11E1O Y-91        7.87E6    ND          2.11E5          ND        ND      ND          3.23E9 Zr-95        1. 75E6    5.52E5      3.80E5          ND        8.12 E5 ND          1.27E9 Nb-95        1.92E5    1.06ES      5.85E4          ND        1.03E5  ND          4.54E8 Ru-103      6.85E6    ND          2.93E6          ND        2.41E7  ND          5. 72 E8 Ru-106      3.09E8    ND          3.90E7          ND        5.97E8  ND        1.48 E10 Ag-hOrm      1. 52E7    1.44E7      8.76E6          ND        2.75E7  ND          4.04E9 Te- 12 5m    1.48E8    5. 34E7      1.98E7          4.14E7    ND      ND          4.3 7E8 Te-127m      5. 52E8    1.96E8      6.56E7          1.31E8    2.24E9  ND          1. 37E9 Te-129m      3.69E8    1. 37E8      5.84E7          1.19E8    1.54E9  ND          1. 39E9 1-131        7.70E7    1.08E8      5.79E7          3.15E1O  1.86E8  ND          2.13E7 Cs-134      7.10E9    1.67E10      7.75E9          ND        S.31E9  2.03E9      2.08E8 Cs-136      4.65E7    1.83E8      1.23E8          ND        9.96E7  1. 57E7    1.47E7 Cs-137      1.O1E1O    1. 35E10    4.69E9          ND        4.59E9  1. 78E9    1.92E8 Ba-140      1.39E8    1. 71E5      8.97E6          ND        5.78E4  1.15E5      2.15E8 Ce-141      2.83E5    1. 89E5      2.17E4          ND        8.90E4  ND          S.41E8 Ce-144      5.27E7    2.18E7      2 .82E6          ND        1.30E7  ND        1. 33 E10 Pr-143      6.99E4    2.79E4      3.48E3          ND        1.62 E4 ND          2.30E8 Nd- 147      3.66E4    3.98E4      2 .39E3          ND        2.34E4  ND          1.44E8 OFF-SITE DOSE CALCULATION MANUAL                                      Page 130
 
TABLE 4.4-15 Ingestion Dose Factors (R")
Vegetation Pathway (Adult)
Nuclide    Bone      Liver      T. Body      Thyroid    Kidney Lung      GI-LLI H-3        5.11E3    5.11E3      5.11E3        5.11E3      5.11E3 5.11E3    5.11E3 Cr-51      ND        ND          4.66E4        2.79E4      1.03E4 6.18E4    1.17E7 Mn-54      ND        3.11E8      5.94E7        ND          9.27E7 ND        9.54E8 Fe-55      2.09E8    1.45E8      3.37E7        ND          ND    8.06E7    8.29E7 Fe-59      1.29E8    3.02E8      1.16E8        ND          ND    8.45E7    1.01E9 Co-58      ND        3.09E7      6.92E7        ND          ND    ND        6.26E8 Co-60      ND        1.67E8      3.69E8        ND          ND    ND        3.14E9 Ni-63      1.04E10    7.21E8      3.49E8        ND          ND    ND        1.50E8 Zn-65      3.18E8    1.01E9      4.57E8        ND          6.76E8 ND        6.37E8 Rb-86      ND        2.19E8      1.02E8        ND          ND    ND        4.32E7 Sr-89      1.03E10    ND          2.96E8        ND          ND    ND        1.65E9 Sr-90      6.05E11    ND          1.48E11        ND          ND    ND        1.75E10 Y-91      5.13E6    ND          1.37E5        ND          ND    ND        2.82E9 Zr-95      1.19E6    3.83E5      2.59E5        ND          6.00E5 ND        1.21E9 Nb-95      1.42E5    7.90E4      4.24E4        ND          7.81E4 ND        4.79E8 Ru-103    4.79E6    ND          2.06E6        ND          1.83E7 ND        5.59E8 Ru-106    1.93E8    ND          2.44E7        ND          3.72E8 ND        1.25E10 Ag-ib0m    1.06E7    9.78E6      5.81E6        ND          1.92E7 ND        3.99E9 Te-125m    9.66E7    3.50E7      1.29E7        2.90E7      3.93E8 ND        3.86E8 Te-127m    3.49E8    1.25E8      4.26E7        8.93E7      1.42E9 ND        1.17E9 Te-129m    2.56E8    9.55E7      4.05E7        8.79E7      1.07E9 ND        1.29E9 1-131      8.09E7    1.16E8      6.63E7        3.79EI0    1.98E8 ND        3.05E7 Cs-134    4.66E9    1.11E10    9.07E9        ND          3.59E9 1.19E9    1.94E8 Cs-136    4.47E7    1.77E8      1.27E8        ND          9.82E7 1.35E7    2.01E7 Cs-137    6.36E9    8.70E9      5.70E9        ND          2.95E9 9.81E8    1.68E8 Ba-140    1.29E8    1.62E5      8.47E6        ND          5.52E4 9.29E4    2.66E8 Ce-141    1.97E5    1.33E5      1.51E4        ND          6.20E4 ND        5.10E8 Ce-144    3.29E7    1.37E7      1.77E6        ND          8.15E6 ND        1.11E10 Pr-143    6.25E4    2.51E4      3.10E3        ND          1.45E4 ND        2.74E8 Nd-147    3.36E4    3.89E4      2.33E3        ND          2.27E4 ND        1.87E8 OFF-SITE DOSE CALCULATION MANUAL                                  Page 131
 
Calculation of Dose Factors in  the Ground. Plane Pathway (R2 [D/Q])
R~ ['D / Q] = K'K-(SF)(DFGI)[( I - e-Ait ) 1 L units = m2 mrem/yr per uCi/sec where:                                                                      Reference Table.R.G.1.109 K'  =    A constant unit of conversion,          10Q pCi/WCi.
K"  =    A constant unit of conversion,          8760 hr/yr SF  =    The shielding factor, O.7(dimensionless)                                E-15 1    =    The decay constant for the ith radionuclide,                  sec-1 t    =    The exposure period,      4.73 x 108 sec (15 years)
DFG-      The ground plane dose conversion factor for the ith radionuclide (mrem/hr per pCi/m 2 )                                  E-6
 
==Reference:==
The equation deriving      R' [D/Q] was taken from NUREG 0133,            Section 5.3.1.2.
OFF-SITE DOSE CALCULATION MANUAL                                                              Page 132
 
Table 4.4-16 Dose Factors Ground Plane Pathway (R' [D/Q])
Nucl i de                T. Body                    Skin Cr-51                    4.65E6                    5.5E6 Mn-54                    1. 39E9                  1.63E9 Fe-5S                    0                        0 Fe-59                    2.73E8                    3.21E8 Co-58                    3.79E8                    4.44E8 Co-60                    2.15E10                  2.53E10 Ni-63                    0                        0 Zn-65                    7.47E8                    8.57E8 Rb-86                    8.98E6                    1.02E7 Sr-89                    2.17E4                    2.52E4 Y-91                      1. 07E6                  1.21E6 Zr-95                    2.45E8                    2.84E8 Nb-95                    1.41E7                    1.66E7 Ru-106                    4.22E8                    S.07E8 Ag- 110m                  3.44E9                    4.02E9 Te-125m                  1. 5SE6                  2.13E6 Te-127m                  9.17E4                    1.08E5 Te-129m                  1.98E7                    2.31E7 1-131                    1.72E7                    2.08E7 Cs-134                    6.85E9                    8.0E9 Cs-136                    1.51E8                    1. 72E8 Cs-137                    1.03E10                  1.20E10 Ba-140                    2.06E7                    2.35E7 Ce-141                    1.37E7                    1. 54E7 Ce-144                    6.95E7                    8.05E7 Pr-143                    0                        0 Nd-147                    8.40E6                    1. 01E7 Units are m2.mrem/yr per pCi/sec OFF-SITE DOSE CALCULATION MANUAL                                  Page 133
 
CALCULATION OF LIQUID EFFLUENT ADULT INGESTION DOSE FACTORS Air - 1.14E5 (21BFi +5B~i)DFi ir          Composite dose parameter for the total body or critical organ of an adult for nuclide i, for all appropriate pathways, mrem/hr per pCi/ml 1.14E5    = units conversion factor, 10 6pci/pci x 10 mi/kg + 8760 hr/yr BFi.      =  Bioaccumulation factor for nuclide i, in fish, pCi/kg per pCi/L, from Table A-1 of Regulatory Guide 1.109 (Rev. 1) or Table A-8 of Regulatory Guide 1.109 (original draft).
B        =  Bioaccumulation factor for nuclide i, in invertebrates, pCi/kg per pCi/L, from Table A-1 of Regulatory Guide 1.109 (Rev.. 1) or Table A-8 of Regulatory Guide 1.109 (original draft).
DFi      =  Dose conversion factor for nuclide i, for adults in pre-selected organ r, in mrem/pCi, from Table E-11 or Regulatory Guide 1.109 (Rev. 1) or Table A-3 of Regulatory Guide 1.109 (original draft).
 
==Reference:==
The equation for Saltwater sites from NUREG 0133, Section 4.3.1, where Uw/Dw = 0 since no drinking water pathway exists.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 134
 
Table 4.4-17 Liquid Effluent - Adult Ingestion Dose Factors (AIT)
Nuclide    Bone      Liver      T. Body        Thyroid    Kidney      Lung        GI- LLI H-3        2. 82E-1  2.82E-1    2 .82E-1        2 .82E-1    2.82E-1    2.82E-1    2.82E-1 Na-24      4.57E-1    4.57E-1    4.57E-1        4.57E-1    4. 57E-1    4. 57E-1    4. 57E-1 Cr-51      ND        ND          S.58E0          3. 34E0    1. 23EQ    7.40E0      1.40E3 Mn-54      ND        7. 06E3    1.35E3          ND          2.10E3      ND          2.16E4 Mn-56      ND        1. 78E2    3.15E1          ND          2.26E2      ND          5.67E3 Fe-55      5.11E4    3. 53E4    8.23E3          ND          ND          1.97E4      2.03E4 Fe-59      8.06E4    1.90E5      7.27E4          ND          ND          5.30E4      6.32E5 Co-58      ND        6.03E2      1.35E3          ND          ND          ND          1.22E4 Co-60      ND        1. 73E3    3.82E3          ND          ND          ND          3.25E4 Ni-63      4.96E4    3.44E3      1.67E3          ND          ND          ND          7.18E2 Ni-65      2.02E2    2.62E1      1.20E1          ND          ND          ND          6.65E21 Cu-64      ND        2.14E2      1.01E2          ND          5.40E2      ND          1.83E4 Zn-65      1.61E5    5. 13ES    2 .32E5        ND          3.43ES      ND          3.23E5 Zn-69      3.43E2    6.56E2      4.56E1          ND          4.26E2      ND          9.85E1 Br-83      ND        ND          7.25E-2        ND          ND          ND          1.04E-1 Br-84      ND        ND          9.39E-2        ND          ND          ND          7. 37E-7 Br-85      ND        ND          3.86E-3        ND          ND          ND          LE-18 Rb-86      ND        6.24E2      2 .91E2        ND          ND          ND          1.23E2 Rb-88      ND        1.79E0      9.49E-1        ND          ND          ND        2.47E-11 Rb-89      ND        1.19E0      8.34E-1        ND          ND          ND        6.89E-14 Sr-89      4.99E3    ND          1.43E2          ND          ND          ND          8.00E2 Sr-90      1.23E5    ND          3.01E4          ND          ND          ND          3.55E3 Sr-91      9.18E1    ND          3.71E0          ND          ND          ND          4.37E2 Sr-92      3.48E1    ND          1.51E0          ND          ND          ND          6.90E2 Y-90      6.06E0    ND          1.63E-1        ND          ND          ND          6.42E4 Y-91m      5.73E-2    ND          2 .22E-3        ND          ND          ND          1.68E-1 Y-91      8.88E1    ND          2.37E0          ND          ND          ND          4.89E4 Y-92      5. 32E-1  ND          1.56E-2        ND          ND          ND          9.32E3 Y-93      1.69E0    ND          4.66E-2        ND          ND          ND          5.35E4 Zr-95      1.59E1    5.11EO      3.46E0          ND          8.02 EO    ND          1.62 E4 Zr-97      8.81E-1    1.78E-1    8.13E-2        ND          2.68E-1    ND          5.51E4 OFF-SITE DOSE CALCULATION MANUAL                                          Page 135
 
Table 4.4-17 Liquid Effluent - Adult Ingestion Dose Factors (AiT)
Nuclide    Bone      Liver      T. Body        Thyroid      Kidney      Lung        GI-LLI Nb-95      4.47E2    2.49E2      1.34E2        ND          2.46E2      ND          1.51E6 Mo-99      ND        1.28E2      2.47E2        ND          2.89E2      ND          2.96E21 Tc-99m    1.30E-2    3.66E-2    4.66E-1        ND          5.56E-1    1.79E-2    2.17E1 Tc-101    1.33E-2    1.92E-2    1.88E-1        ND          3.46E-1    9.81E-3    5.77E-14 Ru-103    1.07E2    ND          4.60E1        ND          4.07E2      ND          1.25E4 Ru-105    8.89E0    ND          3.51E0        ND          1.15E2      ND          5.44E3 Ru-106    1.59E3    ND          2.01E2        ND          3.06E3      ND          1.03E5 Ag-110m    1.57E3    1.45E3      1.33E1        ND          2.85E3      ND          5.91E5 Sb-124    2.77E2    5.23E0      1.09E2        6.71E-1      ND        2.15E2      7.83E3 Sb-125    1.77E2    1.97E0      4.20E1        1.80E-1      ND        1.36E2      1.94E3 Sb-126    1.13E2    2.31E0      4.09E1        6.96E-1      ND        6.95E1      9.27E3 Te-125m    2.17E2    7.86E1      2.91E1        6.52EI      8.82E2      ND          8.66E2 Te-127m    5.48E2    1.96E2      6.68E1        1.40E2      2.23E3      ND          1.84E3 Te-127    8.90E0    3.20E0      1.93E0        6.60E0      3.63EI      ND          7.03E2 Te-129m    9.31E2    3.47E2      1.47E2        3.20E2      3.89E3      ND          4.69E3 Te-129    2.54E0    9.55E-1    6.19E-1        1.95E0      1.07E1      ND          1.92E0 Te-131m    1.40E2    6.85E1      5.71E1        1.08E2      6.94E2      ND          6.80E3 Te-131    1.59E0    6.66E-1    5.03E-1        1.31E0      6.99E0      ND        2.26E-1 Te-132    2.04E2    1.32E2      1.24E2        1.46E2      1.27E3      ND          6.24E3 1-130      3.96E1    1.17E2      4.61E1        9.91E3      1.82E2      ND          1.O1E2 1-131      2.18E2    3.12E2      1.79E2        1.02E5      5.35E2      ND          8.23E1 1-132      1.06E1    2.85EI      9.96EO        9.96E2      4.54E1      ND          5.35E0 1-133      7.54E1    1.30E2      3.95E1        1.90E4      2.26E2      ND          1.16E2 1-134      5.56E0    1.51E1      5.40EO        2.62E2      2.40E1      ND        1.32E-2 1-135      2.32E1    6.08E1      2.24E1        4.01E3      9.75E1      ND          6.87E1 Cs-134    6.84E3    1.63E4      1.33E4        ND          5.27E3      1.75E3      2.85E2 Cs-136    7.16E2    2.83E3      2.04E3        ND          1.57E3      2.16E2      3.21E2 Cs-137    8.78E3    1.20E4      7.85E3        ND          4.07E3      1.35E3      2.32E2 Cs-138    6.07EO    1.20E1      5.94E0        ND          8.81E0      8.70E-1    5.12E-5 Ba-139    7.85E0    559E-3      2.30E-1        ND          5.23E-3    3.17E-3    1.39E1 Ba-140    1.64E3    2.06EO      1.08E2        ND          7.02E-1    1.18E0      3.38E3 Ba-141    3.81EO    2.88E-3    1.29E-1        ND          2.68E-3    1.63E-3    1.80E-91 Ba-142    1.72E0    1.77E-3    1.08E-1        ND          1.50E-3    1.OOE-3    2.43E-18 La-140    1.57E0    7.94E-1    2.10E-1        ND          ND          ND          5.83E4 La-142    8.06E-2    3.67E-2    9.13E-3        ND          ND          ND          2.68E2 OFF-SITE DOSE CALCULATION MANUAL                                          Page 136
 
Table 4.4-17 Liquid Effluent - Adult Ingestion Dose Factors (AiT)
Nuclide    Bone      Liver      T. Body        Thyroid      Kidney      Lung    GI-LLI Ce-141    3.43E0    2.32E0      2.63E-1        ND          1.08EO      ND      8.86E3 Ce-143    6.04E-1    4.46E2      4.94E-2        ND          1.97E-1    ND      1.67E4 Ce-i44    1.79E2    7.47E1      9.59E0        ND          4.43EI      ND      6.04E4 Pr-143    5.79E0    2.32E0      2.87E-1        ND          1.34E0      ND      2.54E41 Pr-144    1.90E-2    7.87E-3    9.64E-4        ND          4.44E-3    ND      2.73E-9 Nd-147    3.96E0    4.58E0      2.74E-1        ND          2.68E0      ND      2.20E4 W-187      9.16E0    7.66E0      2.68E0        ND          ND          ND      2.51E3 Np-239    3.53E-2    3.47E-3    1.91E-3        ND          1.08E-2    Nd      7.11E2 OFF-SITE DOSE CALCULATION MANUAL                                      Page 137
 
4.5      METHODOLOGY FOR CARBON-14 DOSE Carbon-14 may become a principal radionuclide for the gaseous effluent pathway. It is produced by several nuclear reactions. In a nuclear reactor the most dominate mechanism is the reaction of 0-17 in the fuel or water with a neutron to produce C-14 and an alpha particle.
C-14 releases in PWRs occur primarily .as a mix of organic carbon and carbon dioxide released from the waste gas system. Because the dose contribution of C-14 from liquid radioactive waste is much less than that contributed by gaseous radioactive waste, evaluation of C-14 in liquid waste is not required. The dose rate and subsequent dose to an individual from C-14 intake depends upon the specific activity of the food from each source and the amount of the ingested C-14 which is retained over the: period under consideration.
The quantity of C-14 discharged can be estimated by sample measurements, or by use of a normalized C-14 source term and scaling factors based upon power generation, or by use of the GALE code per NUREG-0017. Use of the GALE code per NUREG-0017 Rev 1 "Calculation of Releases of Radioactive Materials in Gaseous and Liquid Effluents from Pressurized Reactors" provides a C-14 source term based on sample measurements made at 10 operating power plants. The C-14 source term recommended by NUREG-0017 Rev 1 is 7.3 curies/year for an 80% capacity factory or 292 Effective Full Power Days. Additionally, if estimating C-14 in gaseous effluent releases is based on scaling factors and fission rates, a precise and detailed evaluation is not necessary. Also, it is not necessary to calculate uncertainties for C-14 or to include C-14 uncertainty in any calculation of overall uncertainty.
In the determination of the limiting sector, all age groups and all of the exposure pathways are evaluated using the highest X/Q, D/Q values at the site boundary as referenced in the CR3 FSAR table 2-20 and in the ODCM dose equations. These could include milk, meat and vegetable ingestion, and inhalation pathways. Atmospheric Carbon Dioxide (C02) is incorporated in cellular material by the photosynthetic actions of green plants. Plants and grasses, from which most food-stuff is derived, equilibrate with the C-14 C02 of the air. Due to the Primary Water System reducing environment, only 30% of the C-14 is released in the organic form.
CR3 0DCM Surveillance Requirement 2.12.1 requires that a land-use census survey be conducted on an annual basis. During this survey, the nearest milk animal, the nearest residence, and the nearest garden of greater than 500 square feet that produces fresh leafy vegetables is determined. Thus, depending on the results of the survey, a new limiting location could result. Normally CR-3 uses the site boundary as the nearest receptor, which is more restrictive than the nearest residence.
Regulatory Guide 1.109 provides the detailed implementation guidance to show compliance with Appendix I of 10 CFR 50 limits..
OFF-SITE DOSE CALCULATION MANUAL                                                                Page 138
 
4.5    METHODOLOGY FOR CARBON 14 DOSE (continued) 4.5.1  Annual Dose from Inhalation of Carbon-14 in Air The annual average airborne concentration of C-14 at the location with respect to the release point may be determined as:
                      .        4                                                                  (Equation 4.5-1) 3 Xc              the annual average ground-level concentration of C-14 in air, in pCi/mr QC        =      the release rate of C-14 to the atmosphere, in Ci/yr, this can be determined by:
(1) using actual sample data obtained during the reporting period (2) estimation by correcting the NUREG 0017 Rev 1 annual C-14 curies released for actual capacity factor using the number of effective full power days (EFPD) for the reporting period Q,= 7.3 x EFPD                                          (Equation 4.5-2) 292 X'/Q    =      The highest calculated annual average dispersion concentration  3  for any area at or beyond the unrestricted area boundary: 2.5 x 10- sec/rn 3.17 X10'    =      the number of pCi/Ci divided by the number of seclyr The annual dose associated with. inhalation for C-14. to organ (j) to an age group (a), is then:
Dja = (U')  (DFAja)(Xc)                                                          (Equation 4.5-3)
                        =j&#xfd;    the annual dose from inhalation to an organ (j) of an age group (a) from C-14 in mrem/yr 3
Xc      =      the annual average ground-level concentration of C-14 in air, in pCi/mr
                ]      =      Inhalation rate for age group (a), Table 4.5-m3, in m3/yr DFAi, =          Dose factor for an organ from carbon-14 for the inhalation pathway to an organ (i) of an age group (a), Table 4.5-4 in mrem/pCi, OFF-SITE DOSE CALCULATION MANUAL                                                                                Page 139
 
4-5    METHODOLOGY FOR CARBON 14 DOSE (continued) 4.5.2 Concentration of Airborne Carbon-14 In vegetation The concentration of Carbon-14 in vegetation at location with respect to the release point may be determined as:
                  = (3.17 x i07 ) (p                                                            ,()(Equation 4.5-4)
V CIA4          The concentration of C-14 in vegetation in pCi/kg p    =        the fractional equilibrium fraction, dimensionless
            =        1.0 for continuous releases Q1 4  =        annual release rate of C-14 from a PWR, assume 30% of annual C-14 release rate in lieu of site specific data, in Ci/yr
            =        0.30 x Qc X/Q  =        The highest calculated annual average dispersion concentration for any area at or beyond the unrestricted area boundary: 2.5 x 10 sec/m3 3
3.17 E7 =        (1012 pCi/Ci)(10      g/kg) / (3.15E7 sec/yr) 0.11  =        fraction of total plant mass that is natural carbon, dimensionless 3
0.16  =        concentration of natural carbon in the atmosphere, in g/m 4.5.3 Concentration of Airborne Carbon-14 In Milk The concentration of Carbon-14 in milk is dependent on the amount of contamination level of the feed consumed by the animal.
C14    (Fo) 1,C4) (Qf)                                                            (Equation 4.5-5)
C14            The concentration of C-14 in milk, pCifL Fm            average fraction of the animal's daily intake of C-1 4 that appears in each liter of milk, in days/liter 0.012 V
C14  =        The concentration of C-14 in animal's feed, in pCi/kg Q    =        amount of feed consumed by the animal per day, in kg/day
            =        Cow or cattle = 50 kg, goat = 6 kg OFF-SITE DOSE CALCULATION MANUAL                                                                                    Page 140
 
4.5  METHODOLOGY FOR CARBON 14 DOSE (continued) 4.5.4    Concentration of Airborne Carbon-14 In Meat
                  = (Fr) (cV4) (Q      )                                                          (Equation 4.5-5)
CB14          The concentration of C-14 in meat, pCi/kg FF      =      average fraction of the animal's daily intake of C-14 that appears in each kilogram of flesh, in days/kg
              =      0.031 CV1 4.        The concentration of C-14 in animal's feed, in pCi/kg Qf      =      amount of feed consumed by the animal per day, in kg/day
              -      Cow or cattle = 50 kg, goat = 6 kg 4.5.5  Annual Dose from Atmospherically Released Carbon-14 in Foods DP  DF1j [ Uvgv            +    M      + U'BCB +UfC D[UfC4          a      14+ +    aC.                + U      1 4C                  (Equation 4.5-6) a          the annual dose to organ (j) of an individual in age group (a) from the dietary intake of atmospherically released Carbon-14, in mremiyr DF/ja          the dose conversion factor for the ingestion of Carbon-14, organ (j), and age group (a), in mrem/pCi Table 4.5-5 UV Ua    =      ingestion rate of produce (non-leafy vegetables, fruit, grains), in kg/yr, Table 4.5-3 a    =      ingestion rate of milk, in Ilyr, Table 4.5-3 UB      =      ingestion rate of meat and poultry in kg/yr, Table 4.5-3 U.      =      ingestion rate of leafy vegetables, in kg/yr, Table 4.5-3 fg              fraction of produce ingested grow in the garden of interest
              -      0.76, in lieu of site specific data
              =      fraction of leafy vegetables in the garden of interest
              =      1.0, in lieu of site specific data CV 14          The concentration of C-14 in vegetation, in pCi/kg CM      =      The concentration of C-14 in milk, pCi/kg C1B4    =      The concentration of C-14 in meat, pCi/kg OFF-SITE DOSE CALCULATION MANUAL                                                                                  Page 141
 
4.5        METHODOLOGY FOR CARBON 14 DOSE (continued)
Table 4.5-3 Recommended Values for Uap to be used for the Maximum Exposed Individual in Lieu of Site Specific Data (Table E-5 Regulatory Guide 1.109 Rev 1)
Pathway                  Infant      Child      Teen        Adult Fruits, vegetables.& grain.                    520        630          520 (kglyr) 1 Leafy Vegetables (kglyr)            -          26        42            64 Milk (L/yr)              330        330        400          310 Meat & poultry (kg/yr)            -          41        65          110 Inhalation (m 3/yr)          1400        3700      8000        8000 Note 1 - Consists of the following (on a mass basis): 22% fruit, 54% vegetables (including leafy vegetables), and 24% grain Table 4.5-4 Inhalation Dose Factors from Carbon-14 for organ to an individual from Tables E-7 to E-10 Regulatory Guide 1.109 Rev 1 (mremJpCi inhaled)
Individual        Bone              Liver        T.Body        Thyroid      Kidney            Lung      GI-LLI Infant        1.89E-05          3.79E-06      3.79E-06      3.79E-06    3.79E-06        3.79E-06    3.79E-06 Child        9.70E-06          1.82E-06      1.82E-06      1.82E-06    1.82E-06        1.82E-06    1.82E-06 Teen        3.25E-06          6.09E-07      6.09E-07      6.09E-07    6.09E-07        6.09E-07    6.09E-07 Adult        2.27E-06          4.26E-07      4.26E-07      4.26E-07    4.26E-07        4.26E-07    4.26E-07 Table 4.5-5 Ingestion Dose Factors from Carbon-14 for organ to an individual from Tables E-1 1 to E-14 Regulatory Guide 1.109 Rev 1 (mrem/pCi ingested)
Individual        Bone              Liver        T.Body        Thyroid      Kidney          Lung      GI-LLI Infant      2.37E-05          5.06E-06      5.06E-06      5.06E-06    5.06E-06        5.06E-06    5.06E-06 Child        1.21 E-05        2.42E-06      2.42E-06      2.42E-06    2.42E-06        2.42E-06    2.42E-06 Teen        4.06E-06          8.12E-07      8.12E-07      8.12E-07    8.12E-07        8.12E-07    8.12E-07 Adult        2.84E-06          5.68E-07      5.68E-07      5.68E-07    5.68E-07        5.68E-07    5.68E-07 OFF-SITE DOSE CALCULATION MANUAL                                                                                    Page 142
 
4.5      METHODOLOGY FOR CARBON 14 DOSE (continued)
Table 4.5-6 Carbon -14 Source Term from NUREG-0017, Rev 1 (GALE Code)
Section 2.2.25.2, Page 2-90, Tables 2-38 & 2-39, Section 1.5.1.1 Capacitv Factor = 80% (292 effective full iower davs/vr)
Release Points                                      % of Total Ci                      Ci Released Containment Building                                  21.92%                              1.6 Aux. Bldg. & Fuel Handling                            61.64%                              4.5 Waste Decay Tanks                                      16.44%                              1.2 Total                                                100.00%                              7.3 Q.c 0 2 (EPRI estimation of CO 2 is 30%, EPRI Technical Report 1021106, 2010, pages 3-26 & 4-28)
OFF-SITE DOSE CALCULATION MANUAL                                                                    Page 143
 
SECTION 5.0 ENVIRONMENTAL MONITORING OFF-SITE DOSE CALCULATION MANUAL                    Page 144
 
Table 5.1-1 Environmental Radiological Monitoring Station's Locations DIRECTION    APPROX. DISTANCE STATION        LOCATION                                FROM PLANT      FROM PLANT (mi C04            State Park Old Dam on River                  ENE              10.6 near road intersection C07            Crystal River Public Water Plant              ESE              7.4 C09            Fort Island Gulf Beach                        S                3.2 C1O            Indian Waters Public Water Supply            ESE              6.0 C13          Mouth of Intake Canal                        WSW                4.6 C14H          Head of Discharge Canal                        N                0.1 C14M          Midpoint of Discharge Canal                    W                1.2 C14G          Discharge Canal at Gulf of Mexico              W                2.5 C18          Yankeetown City Well                            N                5.3 C19            NW Corner State Roads 488 & 495              ENE              9.6 C29          Discharge Area                                  W                2.0 C30            Intake Area                                  WSW                3.4 C40          Near E. Site Boundary & well pump              E                3.6 station CR-South #5 C41          Onsite meteorological tower                    SW                0.4 C46          North Pump Station                              N                0.4 C47          Office of Radiation Control,  Orlando        ESE                78 C48A'        Near C46 North Pump Station                    N              0.4 C48B1        Onsite NNE of CR 4 & 5                        NNE              0.9 NOTE: Distances are approximate.      More than one type of sample media,(e.g. air and water) are obtained at some stations. For multi-media stations there may be minor difference in distance for each type of sample.
'If vegetation is not available, then select another suitable nearby location. The ENE sector is also an acceptable sector based on D/Q values.
OFF-SITE DOSE CALCULATION MANUAL                                                Page 145
 
Table 5.1-2 Envi.ronmental Radiological Monitoring Station's Locations-Groundwater Monitoring Wells DIRECTION    APPROX. DISTANCE STATION            LOCATION                    FROM PLANT      FROM PLANTCmi)
CR3-2      CR-3 Site Perimeter, Just Outside          E              0.1 of Protected Area Fence CR3-4      CR-3 Site Perimeter,  Just Outside        SSE            0.086 of Protected Area Fence CR3-5      CR-3 Site Perimeter,  Just Outside        SSW            0.051 of Protected Area Fence CR3-6S    CR-3 Site Perimeter, Just Outside          W              0.038 of Protected Area Fence CR3-6D    CR-3 Site Perimeter, Just Outside          W              0.038 of Protected Area Fence CR3-7      CR-3 Site Perimeter, Just Outside          WNW            0.060 of Protected Area Fence CR3-8      CR-3 Site Perimeter, Just Outside          WNW            0.073 of Protected Area Fence CR3-9      CR-3 Site Perimeter, Just Outside          NW              0.1 of Protected Area Fence CR3-10    CR-3 Site Perimeter, Just Outside          NNE            0.1 of Protected Area Fence The above listed wells have been included in the REMP as a result of information provided in the groundwater flow study completed January 22, 2007 by EnHydro, LLC.
OFF-SITE DOSE CALCULATION MANUAL                                            Page 146
 
TABLE 5.1-3 RING TLDs (INNER RING)
LOCATION                DIRECTION      APPROX. DISTANCE (Mi.)
C27                          W                0.4 C60                          N                0.9 C61                        NNE                0.9 C62                          NE                1.2 C63                        ENE                0.9 C64                          E                0.8 C65                        ESE                0.3 C66                          SE                0.4 C67                        SSE                0.3 C68                          S                0.3 C69                        SSW                0.3 C41                          SW                0.4 C70                        WSW                0.7 C71                        WNW                0.6 C72                          NW                0.3 C73                        NNW                0.7 OFF-SITE DOSE CALCULATION MANUAL                                      Page 147
 
TABLE 5.1-4 RING TLDs (5 MILE RING)
LOCATION                DIRECTION    APPROX. DISTANCE (Mi.)
C18                        N                  5.3 C03                      NNE                  4.9 C04                      NE                  6.0 C74                      ENE                  5.1 C75                        E                  4.0 C76                      ESE                  5.6 C08                      SE                  5.7 C77                      SSE                  3.4 C09                        S                  3.2 C78                      WSW                  4.6 C14G                      W                  2.5 COl                      NW                  4.8 C79                      NNW                  5.0 OFF-SITE DOSE CALCULATION MANUAL                                      Page 148
 
FIGURE 5.1 Envi ronmental Monitoring Sample Station Locations OFF-SITE DOSE CALCULATION MANUAL Page 149
 
FIGURE 5.2 Environmental Monitoring TLD Locations C60      C61
                                                  %ers  C62 073    TOWSl~
C63
                                                ~              c64 OFF-SITE DOSE CALCULATION MANUAL                                    Page 150
 
FIGURE 5.3 Environmental Monitoring TLD Locations (5 mile)
OFF-SITE DOSE CALCULATION MANUAL                      Page 151
 
HELD IN HARDCOPY - ODCM, REV 33 FIGURE 5.4 CR3 Groundwater Monitoring Well Locations Deep Wells Are Also Installed at #'s 1, 3, 6 Wells # 1 & 3 are not routinely sampled by the REMP OFF-SITE DOSE CALCULATION MANUAL                                Page 152 I
 
SECTION 6.0 ADMINISTRATIVE CONTROLS OFF-SITE DOSE CALCULATION MANUAL                  Page 153
 
6.1      ORIGIN AND PURPOSE OF THE OFFSITE DOSE CALCULATIONAL MANUAL The Offsite Dose Calculation manual was developed to support the implementation of the Radiological Effluent Technical Specifications required by 10 CFR 50, Appendix I., and 10 CFR 50.36.
The purpose of the manual is to provide the NRC with sufficient information relative to effluent monitor setpoint calculations, effluent related dose calculations, and environmental monitoring to demonstrate compliance with radiological effluent controls.
6.2      CHANGES The ODCM shall be changed in accordance with Technical Specifications (ref. ITS 5.6.2.3). In addition, interdepartmental reviews shall be performed as appropriate.
6.3      REVIEW The ODCM and its implementation shall be reviewed every 24 months (ref. FSAR 1.7.1.18)
Unplanned Releases:  This section moved to section 1.
6.5      RADIOACTIVE EFFLUENT RELEASE REPORT This report is submitted as required by Technical Specification 5.7.1.1.c to Crystal River Facility Operating License No. DPR-72.
The following information is included:
* A summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the plant as outlined in Regulatory Guide 1.21 (Rev. 1, 1974) with data summarized on a quarterly basis following the format of Appendix B thereof.
          "  An annual summary of hourly meteorological data collected over the previous years.  (In lieu of submittal, this data is maintained on-site and is available to the NRC upon request.)
* A list and description of unplanned releases to unrestricted areas.
          "    Change to the Process Control Program (PCP)
          "    Changes to the Off-Site Dose Calculation Manual (ODCM)
* Significant changes to Radioactive Waste Treatment Systems
* A list of new Environmental Radiological Monitoring Program dose calculation location changes identified by the land-use census.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 154
* Information relating to effluent monitors being inoperable for 30 or more days.
* A summary of dose estimates to demonstrate compliance with the dose specifications of the ODCM.
NOTE: The results of the effluent report may reflect different quantities, concentrations, and dose estimates than those of the year end summary from the effluent management system. This is based on a year-end data review and correction of release data (e.g., removing miss-identified isotopes) and accounting for actual site dilution for liquid releases which are difficult to account for in real time.
OFF-SITE DOSE CALCULATION MANUAL                                            Page 155
 
6.6      ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT This report is submitted as required by Technical Specification 5.7.1.1.b to Crystal River Facility Operating License No. DPR-72.
The following information is included:
* Summaries
* Interpretations
* Unachievable LLDs
* An analysis of trends of the results of the radiological environmental studies and previous annual reports.
          "    An assessment of any observed impact of plant operation on. the environment.
NOTE: If harmful effects or evidence of irreversible damage are detected by the monitoring, the Report shall provide an analysis of the problem and a planned course of action to alleviate the problem.
          "    Summarized and tabulated results, in the format of Regulatory Guide 4.8 (December 1975), of all radiological environmental samples taken during the report period.
NOTE: If some results are not available for inclusion, the report shall note and explain the reason for the missing results. The missing results shall be submitted as soon as possible in a supplementary report.
          "    A summary description of the REMP.
* A map of all sampling locations keyed to a table giving distances and directions from the reactor.
Unavailability of milk or fresh leafy vegetable samples required by Table 2-7 of Technical Specifications.
* The results of land-use censuses.
          "    Results of Interlaboratory Comparison Program.
          "    Results of any unplanned release or spill of radioactive material that could have the potential to contaminate the groundwater as reported to maintain compliance with the groundwater protection initiative.
OFF-SITE DOSE CALCULATION MANUAL                                              Page 156
 
6.7    Voluntary Reporting as a Result of Groundwater Radioactive Contamination OBJECTIVE 2.2 from NEI 07-07 NOTE The following communication protocol only applies to licensed radioactive materials that are generated as a result of plant operations.
NOTE Baseline radioactivity levels resulting from normal plant effluent releases should be evaluated and considered prior to initiating the following communication protocol (e.g.,
tritium in rain water or clean systems that are made up from water sources that receive licensed effluent releases).
NOTE Communication time requirements for water samples that exceed reporting criteria start following notification of sample results from an applicable vendor or corporate laboratory to the CR-3 Environmental & Chemistry Section.
A.        Unplanned or uncontrolled release of radioactive material from the protected area
: 1.      INVESTIGATE and document the event.
: 2.      INITIATE a Nuclear Condition Report for documentation purposes.
B.      Industry groundwater protection voluntary communication protocol for spills or leaks that reach or could potentially reach the groundwater
: 1.      DOCUMENT any event meeting the criteria in this section in the plant 10 CFR 50.75 (g) file.
OFF-SITE DOSE CALCULATION MANUAL                                                                        Page 157
 
ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT Cont'd OBJECTIVE 2.4 from NEI 07-07 Document all on-site ground water sample results and a description of any significant on-site leaks/spills into ground water for each calendar year in the Annual Radiological Environmental Operating Report (AREOR) for REMP or the Annual Radioactive Effluent Release Report (ARERR) for the RETS as contained in the appropriate reporting procedure, beginning with the report for calendar year 2006.
Acceptance Criteria:
: a. The appropriate changes to the ODCM/ODAM or to the appropriate procedures were expected to be completed in a timeframe to support the 2007 report of 2006 performance for plants that were operating or decommissioningwhen the. GPI was adopted. For new plants, appropriate procedures that require inclusion of significant on-site leaks/spills into ground water and all on-site ground water results shall be developed and implemented prior to initial receipt of nuclear fuel.
: b. Reporting of on-site ground water sample results shall be as follows:
i    Ground water sample results that are taken in support of the GPI but are not part of the REMP program (e.g. samples obtained during the investigatory phase of the Action Plan circa year 2006) are reported in the ARERR required by 10 CFR 50.36a (a)(2).
ii    Once the long-term monitoring sample points have been established per Objective 1.3, acceptance criterion d, the results are reported in the AREOR for those sample points that are included in the REMP as described in the ODCM/ODAM. The sample results for those long-term monitoring sample points that are not included in REMP are reported in the ARERR.
: c. In addition to 2.4.b, voluntary communications shall be included in an annual report as follows:
i    A description of all spills or leaks that were communicated per Objective 2.2 acceptance criterion a shall be included in the ARERR.
ii    All on-site or off-site ground water sample results that exceeded the REMP reporting thresholds as described in the ODCM/ODAM that were communicated per section 6.7 acceptance criterion b shall be included in either the ARERR and/or in the AREOR.
OFF-SITE DOSE CALCULATION MANUAL                                                                              Page 158
 
NOTIFICATION REQUIREMENTS (Cont'd)
NOTE The contact position for the State Official is:
Department of Health Bureau of Radiation Control Environmental Administrator The contact position for the Local Officials are:
Citrus County Emergency Management Director AND Levy County Emergency Management Director NOTE The groundwater beneath CR-3 is too saline and brackish to be a source of potable water and will never be used as a source of drinking water.
Make informal* communication as soon as practicable to appropriate StatelLocal officials, with follow-up notification to the NRC, as appropriate, regarding significant* on-site leaks/spills into ground water and on-site or off-site water sample results exceeding the criteria in the REMP as described in the ODCMIODAM.
Acceptance Criteria:
This guidance provides a threshold for voluntary communication. Some States may require different communication thresholds; the licensee shall document any agreements with State/Local officials that differs from Industry guidance.
: a. Communication to the designated State/Local officials shall be made before the end of the next business day if an inadvertent leak or spill to the environment has or can potentially get into the ground water and exceeds any of the following criteria:
: i. Ifa spill or leak exceeding 100 gallons from a source containing licensed material, ii. Ifthe volume of a spill or leak cannot be quantified but is likely to exceed 100 gallons from a source containing licensed material, or iii. Any leak or spill, regardless of volume or activity, deemed by the licensee to warrant voluntary communication.
To determine whether a leak or spill Would trigger voluntary communication, consider the clarification in the following three text boxes in addition to 2.2.a i to iii above:
LEAK OR SPILL: The "leak or spill" represents an inadvertent event or perturbation in a system or component's performance. This event threshold is intended to ensure that State/Local officials are made aware that there has been an event of interest at the site and to keep them apprised of the licensee's action to contain and, as needed, remediate the event. "Leak or spill" events that meet the criteria shall be communicated regardless of whether or not the on-site ground water is, or could be used as, a source of drinking water.
The quantity of liquid resulting from leaks or spills of solid materials or waste or steam leaks should be evaluated with respect to 2.2.a. i to iii, inclusive.
* see glossary at end of section OFF-SITE DOSE CALCULATION MANUAL                                                                          Page 159
 
SOURCE CONTAINING LICENSED MATERIAL: A liquid, including steam, for which a statistically valid positive result is obtained when the sample is analyzed to the following a priori lower limits of detection (analytical sensitivity).
The analytical sensitivity for identifying a source containing licensed material is, at a minimum, the licensee's lower limits of detection that are required for radioactive liquid effluents for all isotopes.
POTENTIAL TO REACH GROUND WATER Spills or leaks with the potential to reach ground water:
Spill or leak directly onto native soil or fill, Spill or leak onto an artificial surface (i.e. concrete or asphalt) if the surface is cracked or the material is porous or unsealed, Spill or leak that is directed into unlined or non impervious ponds or retention basins (i.e. water hydrologically connected to ground water).
A spill or leak inside a .buildingor containment unit is generally unlikely to reach ground water, particularly if the building or containment unit has a drain and sump system. However, the sump and drain system should be evaluated as part of the SSC risk assessment.
A spill or leak to a semi-impermeable or impermeable surface that is recaptured or remediated per Objective 1.4 before the close of the next business day does not trigger the voluntary communication protocol.
OFF-SITE DOSE CALCULATION MANUAL                                                                                Page 160
 
The licensee shall document any agreement with State/Local officials that differs from this Industry guidance as part of their record. For example, some states or local authorities have indicated that they do not wish leaks/spills to be included in the voluntary communication protocol or that the voluntary communication should be completed in a shorter timeframe.
: b. Communication with the designated State/Local officials shall be made before the end of the next business day for a water sample result i Of off-site ground water or surface water that exceeds any of the REMP reporting criteria for water as described in the ODCM/ODAM, or ii Of on-site surface water, that is hydrologically connected to ground water, or ground water that is or could be used as a source of drinking water, that exceeds any of the REMP reporting criteria for water as described in the ODCM/ODAM The licensee shall, document the basis for concluding that the on-site ground water is not or would not be considered a source of drinking water. Examples of a defensible basis are documents from the regulatory agency with jurisdiction over ground water use.
: c. When communicating to the State/Local officials, be clear and precise in quantifying the actual release information as it applies to the appropriate regulatory criteria (i.e. put it in perspective). The following information should be provided as part of the informal communication:
i A statement that the communication is being made as part of the NEI Ground Water Protection Initiative, ii The date and time of the spill, leak, or sample result(s),
iii Whether or not the spill has been contained or the leak has been stopped, iv If known, the location of the leak or spill or water sample(s),
v The source of the leak or spill, if known, vi A list of the contaminant(s) and the verified concentration(s),
vii Description of the action(s) already taken and a general description of future actions, viii An estimate of the potential or bounding annual dose to a member of the public if available at this time, and ix An estimated timeldate to provide additional information or follow-up.
: d. Voluntary communication to State and/or Local officials may also require NRC notification under 10 CFR 50.72(b)(2)(xi). Licensees should perform these notifications consistent with their existing program.
: e. Contact NEI by email to GW Noticec,,nei.orq as part of a voluntary communication event as described in Objective 2.2.
: f. Contact American Nuclear Insurers (ANI) as part of a voluntary communication event as described in OBJECTIVE 2.2 above.
OFF-SITE DOSE CALCULATION MANUAL                                                                            Page 161
 
THIRTY-DAY REPORTS OBJECTIVE 2.3 from NEI 07-07 Submit a written 30-day report to the NRC for any water sample result for on-site ground water that is or may be used as a source of drinking water that exceeds any of the criteria in the licensee's existing REMP as described in the ODCMIODAM for 30-day reporting of off-site water sample results. Copies of the written 30-day reports for both on-site and off-site water samples shall also be provided to the appropriate State/Local officials.
Acceptance Criteria:
: a. All ground water samples taken for the. Industry Initiative shall be analyzed.and compared to the standards and limits contained in the station's REMP as described in the ODCM/ODAM. Pre-2006 ODCM/ODAM requirements specify a written 30-day report to the NRC for REMP sample results.that exceed any of the REMP reporting criteria. Under the Initiative, a written 30-day NRC report is also required for all on-site sample results that exceed any of the REMP reporting criteria and could potentially reach the ground water that is or could be used in the future as a source of drinking water. If the ground water is not currently used for drinking water but is potable, each station should consider the ground water as a potential source of drinking water (see objective 2.2 acceptance criterion b for documentation needed to establish a defensible basis for determining the beneficial use(s) of ground water).
The initial discovery of ground water contamination greater than the REMP reporting criterion is the event documented in a written 30-day report. It is not expected that a written 30-day report will be generated each time a subsequent sample(s) suspected to be from the same "plume" identifies concentrations greater than any of the REMP criteria as described in the ODCM/ODAM.
The licensee should evaluate the need for additional reports or communications based on unexpected changes in conditions.
: b. The  30-day special report should include:
i      A statement that the report is being submitted in support of the GPI, ii    A list of the contaminant(s) and the verified concentration(s),
iii    Description of the action(s) taken, iv    An estimate of the potential or bounding annual dose to a member of the public, and v      Corrective action(s), if necessary, that will be taken to reduce the projected annual dose to a member of the public to less than the limits in 10 CFR 50 Appendix I.
: c. All written 30-day NRC reports generated under item 2.3.a are to be concurrently forwarded to the designated State/Local officials.
GLOSSARY (sections 6.6 and 6.7)
AREOR means the Annual Radiological Environmental Operating Report - summarizes the results of the REMP to the NRC.
ARERR means the Annual Radioactive Effluent Release Report as required by 10 CFR 50.36a (a)(2) -
summarizes the releases of liquid, airborne, and solid wastes from the facility and providesthe calculated doses attributable to those releases.
Ground water as used in the GPI, means any subsurface water, whether in the unsaturated or vadose zone, or in the saturated zone of the earth.
Informal (communication) means a communication, typically by telephone, between licensee personnel and the State/Local officials. Subsequent notification of the NRC under 10 CFR 50.72 should be performed consistent with station policy.
OFF-SITE DOSE CALCULATION MANUAL                                                                            Page 162
 
Licensed material(from 10 CFR 20.1003) means source material, special nuclear material, or byproduct material received, possessed, used, transferred or disposed of under a general or specific license issued by the Commission.
ODCM/ODAM means the Offsite Dose Calculation Manual or Offsite Dose Assessment Manual or equivalent document The licensee's manual required by Technical Specification that contains the dose assessment methodology and radiological effluent technical specifications.
REMP means the Radiological Environmental Monitoring Program specified by the ODCM/ODAM that provides measurements of radiation and of radioactive materials in those exposure pathways and for those radionuclides, which lead to the highest potential radiation exposures of individuals resulting from the station operation.
RETS means the Radiological Effluent Technical Specifications required to control the release of radioactive liquids and airborne materials from the site. Standard radiological effluent technical specifications are found in NUREG CR-1 301.
Significant (leak or spill) means an item or incident that is of interest to the public or stakeholders. It does not imply or refer to regulatory terminology nor is.it intended to indicate that the leak or spill has public health and safety or environmental protection consequences.
Voluntary as used in the GPI, means not required by statute or regulation.
Verbs "may', "shalt', "should", "wilt', and "would" have the meanings commonly used in the nuclear power industry (see ANSI N42.14-1999). "Shall" denotes a requirement; "should" denotes a recommendation; "may" denotes permission.
OFF-SITE DOSE CALCULATION MANUAL                                                                              Page 163
 
6.8 Pathway Exemptions from Appendix I Calculations Crystal River Unit 3's (CR-3) effluents limitations are primarily based on 10 CFR 50, Appendix I, which is the standard for assessing whether a power reactor effluents program is ALARA. 10 CFR 50 Appendix I is implemented by CR-3's Improved Technical Specifications and the Offsite Dose Calculation Manual (ODCM). Appendix I limits are significantly lower than the health and safety standards of 10CFR20, and lower than the EPA fuel cycle standard of 40 CFR 190.
To aid licensees in establishing methods to demonstrate compliance with effluent technical specification or ODCM specifications which are based on Appendix I, the NRC issued guidance documents in the form of NUREGs and regulatory guides (e.g. NUREG-0133 and R.G 1.109 being the primary documents). In establishing an effluents program, licensees were required to determine the primary release pathways and receptors and to include these in the routine effluents program. Calculations which are performed to demonstrate compliance with Appendix I derived limits, usually use conservative assumptions which more than compensate for leaving out insignificant pathways.
Regulatory Position C of Regulatory Guide 1.109, provides guidance for determining whethera questionable pathway is significant enough to include in the effluents program (i.e. whether to apply all of the ODCM and Technical specification limitations and sampling and analysis requirements) for purposes of demonstrating compliancewith Appendix I derived limits. Position C states that if the dose.contribution is 10
    % or greater than the combination of all other pathways then it should be added to the program. This means that pathways which are <10% of ODCM pathways need not be included in Appendix I dose calculations. When a pathway is suspected or will be created an evaluation should be done. Ifthe results show a significant contribution to off-site exposure (10% or greater) then this pathway should be accounted for in Appendix I calculations. If the pathway is significant and will exist:for a prolonged period it should also be identified in the ODCM. This does not mean that pathways which do not meet this criteria should be ignored or not otherwise evaluated.
Ifa pathway is not included in Appendix I calculations it may still be subject to the 10 CFR 20.. Part 20 and RG 1.109 do not provide explicit descriptions or methods for performing non-ODCM pathway analysis. But part 20 requires that surveys (evaluations) be done. Surveys or evaluations need not be done for every release; a. one-time bounding evaluation can. be done to provide reasonable assurancethat the process will not result in more than a negligible dose.
Releases to the Settling Ponds Releases of tritium contaminated Waste Water to the on-site settling ponds fits the scenario of a pathway that is not significant enough to warrant including in Appendix I dose calculations. CR-3 releases about 400 curies of tritium per year, .of which < 1% is routed to the settling ponds. The dose due to the - 400 Curies tritium released through normal pathways is generally a small fraction (on. the order of 1.0%) of the total dose from all radionuclides. This further diminishes the importance of the dose contribution from tritium released to the ponds to a small fraction of 1% of total dose, a lot less than the 10% criteria of Position C. Releases to the settling ponds have been authorized by the NRC OFF-SITE DOSE CALCULATION MANUAL                                                                                Page 164
 
Settling Ponds - History 1979 - As a result of a violation FPC committed to making no releases to the ponds.
Reference Inspection Report 79-35.
1981 - Installed oily water separator to meet NPDES requirements.
1983 - Letter to. NRC outlining need to make pond releases due to having to take oily water separator offline. Outlined controls including sampling and analysis 1984 - Letter to NRC outlining need to make pond releases due to having to take oily water separator offline. Outlined controls including sampling and analysis. Plan was specific about taking 2 liter samples. Not clear why 2 although it may have been common practice at the time to take 2 liters, with one liter being a backup sample.
1986 - Letter to NRC scope expands scope of pond releases to include any time release could violate any NPDES permit parameter. Use same controls as outlined in 1984 letter. NRC OKs this plan.
1988 - Dose assessment of pond releases shows that a group of releases result in dose on the order of le-5 mrem, a very small fraction of the limit.
OFF-SITE DOSE CALCULATION MANUAL                                                                          Page 165
 
Power Rx Effluent & Direct Radiation Limits in Unrestricted and Controlled Areas Unrestricted Area (Beyond Site Boundary):
From Appendix I Air Dose: 10 mrad/y gamma 20 mrad/y beta From Nureg-0472 Dose Rate: 500 mrem/y from Noble Gases 1500 mrem/y from 1-131, H-3, and Particulates w/ tl/2 > 8 days From 10 CFR 20 2 mrem EDE in anyl hr from external sources only Unrestricted Area (Real Receptor):
Doses apply to a real receptor location From Appendix I Liquids: 3 mrem/y Gases: 15 mrem/y 1-131, H-3, and particulates wl tl12 > 8 days From 40 CFR 190 (EPA Fuel Cycle Standard) 25 mrem to the TB or any organ except thyroid 75 mrem to thyroid These doses include direct radiation from outside storage tanks, radwaste storage, etc.
From 10 CFR 20 100 mrem/y, TEDE Controlled Area:
Dose applies at real receptor location From 10 CFR 20 100 mrem/y, TEDE (From Effluents & Outside storage/activities)
OFF-SITE DOSE CALCULATION MANUAL                                                            Page 166
 
Summary of Changes Revision 33
: 1. Table 2-3, page 13, 14, action 28, guidance added regarding actions if the auxiliary building ventilation system is secured. Also compensatory actions for sample requirements if RM-A2 is out of service updated to allow trending radiation monitors RM-A4 and RM-A8 instead of collecting grab samples.
: 2. Section 3.9, page 52, changed less than to greater than. (typo)
: 3. Pre-release calculation section 1.3-3, page 70 added equation identifier number 1.7.
: 4. Page 92 flow diagram, removed evaporators and replaced with MWST to reflect current configuration for waste processing.
: 5. Page 134, inserted C for pCi/ml for Air term in equation. (typo)
: 6. Pages 135, 136, & 137 corrected various dose factors. (typos)
: 7. Pages 138 to 143, added discussion for Carbon-14 source term and dose calculations.
: 8. Page 145, updated the descriptor for sample location C48A for vegetation sampling.
: 9. Page 161, added substep f to. provide guidance to also contact ANI if there is an occurrence of a radiological leak or spill that potentially could reach the groundwater.
OFF-SITE DOSE CALCULATION MANUAL                                                                      Page 167}}

Latest revision as of 08:57, 11 January 2025

Attachment B, Off-Site Dose Calculation Manual, Revision 33
ML13128A062
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/02/2012
From:
Duke Energy Florida, Florida Power Corp
To:
Office of Nuclear Reactor Regulation
References
3F0413-03
Download: ML13128A062 (202)