{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                                NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                                REGION II
REGION II  
                            245 PEACHTREE CENTER AVENUE NE, SUITE 1200
245 PEACHTREE CENTER AVENUE NE, SUITE 1200  
                                      ATLANTA, GEORGIA 30303-1257
ATLANTA, GEORGIA 30303-1257  
                                          December 30, 2014
Mr. David A. Heacock, President & CNO
December 30, 2014  
Virginia Electric & Power Company
500 Dominion Blvd.
Glen Allen, VA 23060-6711
SUBJECT: SURRY NUCLEAR PLANT (UNIT 1 AND UNIT 2) - NOTIFICATION OF A
Mr. David A. Heacock, President & CNO  
              TRIENNIAL FIRE PROTECTION BASELINE INSPECTION, U.S. NUCLEAR
Virginia Electric & Power Company  
              REGULATORY COMMISSION INSPECTION REPORT NOS. 05000280/2015008
500 Dominion Blvd.  
              AND 05000281/2015008
Glen Allen, VA 23060-6711  
Dear Mr. Heacock:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
SUBJECT: SURRY NUCLEAR PLANT (UNIT 1 AND UNIT 2) - NOTIFICATION OF A  
staff will conduct a triennial fire protection baseline inspection at Surry Nuclear Plant, Units 1
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION, U.S. NUCLEAR  
and 2. The inspection team will be led by David Jones, Senior Reactor Inspector, from the
REGULATORY COMMISSION INSPECTION REPORT NOS. 05000280/2015008  
NRC Region II office. The team will be composed of personnel from the NRC Region II office.
AND 05000281/2015008  
The inspection will be conducted in accordance with IP 71111.05T, the NRC's baseline fire
protection inspection procedure, dated January 31, 2013.
Dear Mr. Heacock:  
On December 23, 2014, during a telephone conversation between Ms. Jennifer Pollard,
Licensing, and Mr. David Jones, our respective staff confirmed arrangements for an information
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
gathering onsite visit and a two-week onsite inspection. The schedule for the inspection is as
staff will conduct a triennial fire protection baseline inspection at Surry Nuclear Plant, Units 1  
follows:
and 2. The inspection team will be led by David Jones, Senior Reactor Inspector, from the
        *   Information gathering visit:       February 03 - 05, 2015
NRC Region II office. The team will be composed of personnel from the NRC Region II office.
        *   Week 1 of onsite inspection:       March 02 - 06, 2015
The inspection will be conducted in accordance with IP 71111.05T, the NRC's baseline fire  
        *   Week 2 of onsite inspection:       March 16 - 20, 2015
protection inspection procedure, dated January 31, 2013.  
The purposes of the information gathering visit are to obtain information and documentation
needed to support the inspection, to become familiar with the Surry Nuclear Plant fire protection
On December 23, 2014, during a telephone conversation between Ms. Jennifer Pollard,  
program, fire protection features, post-fire safe shutdown capabilities, plant layout, mitigating
Licensing, and Mr. David Jones, our respective staff confirmed arrangements for an information  
strategies to address Title 10 of the Code of Federal Regulations (10 CFR) Section
gathering onsite visit and a two-week onsite inspection. The schedule for the inspection is as  
50.54(hh)(2), and, as necessary, obtain plant specific site access training and badging for
follows:
unescorted site access.
An initial list of the documents the team will review during the conduct of the inspection is listed
*  
in Enclosures 1 and 2. The team leader will contact you with any additional specific document
Information gathering visit:  
requests prior to the information gathering visit.
February 03 - 05, 2015
During the information gathering visit, the team will also discuss the following inspection support
*  
administrative details: office space and location; specific documents requested to be made
Week 1 of onsite inspection:  
March 02 - 06, 2015
*  
Week 2 of onsite inspection:  
March 16 - 20, 2015  
The purposes of the information gathering visit are to obtain information and documentation  
needed to support the inspection, to become familiar with the Surry Nuclear Plant fire protection  
program, fire protection features, post-fire safe shutdown capabilities, plant layout, mitigating  
strategies to address Title 10 of the Code of Federal Regulations (10 CFR) Section
50.54(hh)(2), and, as necessary, obtain plant specific site access training and badging for  
unescorted site access.
An initial list of the documents the team will review during the conduct of the inspection is listed  
in Enclosures 1 and 2. The team leader will contact you with any additional specific document  
requests prior to the information gathering visit.
During the information gathering visit, the team will also discuss the following inspection support  
administrative details: office space and location; specific documents requested to be made  


D. Heacock                                         2
D. Heacock  
available to the team in their office spaces; arrangements for reactor site access (including
2  
radiation protection training, security, safety, and fitness for duty requirements); and the
available to the team in their office spaces; arrangements for reactor site access (including  
availability of knowledgeable plant staff and licensing organization personnel to serve as points
radiation protection training, security, safety, and fitness for duty requirements); and the  
of contact during the inspection.
availability of knowledgeable plant staff and licensing organization personnel to serve as points  
We request that during the on-site inspection weeks you ensure that copies of analyses,
of contact during the inspection.
evaluations, or documentation regarding the implementation and maintenance of the station fire
protection program, including post-fire safe shutdown capability, be readily accessible to the
We request that during the on-site inspection weeks you ensure that copies of analyses,  
team for their review. Of specific interest for the fire protection portion of the inspection, are
evaluations, or documentation regarding the implementation and maintenance of the station fire  
those documents which establish that your fire protection program satisfies NRC regulatory
protection program, including post-fire safe shutdown capability, be readily accessible to the  
requirements and conforms to applicable NRC and industry fire protection guidance (i.e., fire
team for their review. Of specific interest for the fire protection portion of the inspection, are  
protection compliance assessment documents). For the 10 CFR 50.54(hh)(2) portion of the
those documents which establish that your fire protection program satisfies NRC regulatory  
inspection, those documents implementing your mitigating strategies and demonstrating the
requirements and conforms to applicable NRC and industry fire protection guidance (i.e., fire  
management of your commitments for the strategies are of specific interest. Also, personnel
protection compliance assessment documents). For the 10 CFR 50.54(hh)(2) portion of the  
should be available at the site during the inspection who are knowledgeable regarding those
inspection, those documents implementing your mitigating strategies and demonstrating the  
plant systems required to achieve and maintain safe shutdown conditions from inside and
management of your commitments for the strategies are of specific interest. Also, personnel  
outside the control room, including the electrical aspects of the relevant post-fire safe shutdown
should be available at the site during the inspection who are knowledgeable regarding those  
analyses, reactor plant fire protection systems and features, and the station fire protection
plant systems required to achieve and maintain safe shutdown conditions from inside and  
program and its implementation.
outside the control room, including the electrical aspects of the relevant post-fire safe shutdown  
This letter does not contain new or amended information collection requirements subject to the
analyses, reactor plant fire protection systems and features, and the station fire protection  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
program and its implementation.
requirements were approved by the Office of Management and Budget, under control number
This letter does not contain new or amended information collection requirements subject to the  
3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
request for information or an information collection requirement unless the requesting document
requirements were approved by the Office of Management and Budget, under control number  
displays a currently valid Office of Management and Budget control number.
3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a  
In accordance with 10 CFR 2.390 of the NRC Rules and Practices, a copy of this letter and its
request for information or an information collection requirement unless the requesting document  
enclosures will be available electronically for public inspection in the NRC Public Document
displays a currently valid Office of Management and Budget control number.
Room or from the Publicly Available Records System (PARS) component of NRCs document
In accordance with 10 CFR 2.390 of the NRC Rules and Practices, a copy of this letter and its  
enclosures will be available electronically for public inspection in the NRC Public Document  
Room or from the Publicly Available Records System (PARS) component of NRCs document  
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.hmtl (the Public Electronic Reading Room).
rm/adams.hmtl (the Public Electronic Reading Room).  


D. Heacock                                       3
D. Heacock  
Your cooperation and support during this inspection will be appreciated. If you have questions
3  
concerning this inspection, or the inspection team's information or logistical needs, please
Your cooperation and support during this inspection will be appreciated. If you have questions  
concerning this inspection, or the inspection team's information or logistical needs, please  
contact David Jones, the team leader in the Region II office at 404-997-4631 or me at 404-997-
contact David Jones, the team leader in the Region II office at 404-997-4631 or me at 404-997-
4511.
4511.  
                                              Sincerely,
                                              /RA: David A. Jones for/
Sincerely,  
                                              Scott M. Shaeffer, Chief
                                              Engineering Branch 2
                                              Division of Reactor Safety
Docket Nos.: 50-280; 50-281
License No.: DPR-32 and DPR-37
Enclosures:
1. Triennial Fire Protection Inspection Supporting
  Documentation
/RA: David A. Jones for/  
2. Mitigating Strategies Supporting Documentation
cc: Distribution via Listserv
Scott M. Shaeffer, Chief  
Engineering Branch 2  
Division of Reactor Safety  
Docket Nos.: 50-280; 50-281  
License No.: DPR-32 and DPR-37  
Enclosures:  
1. Triennial Fire Protection Inspection Supporting
    Documentation
2. Mitigating Strategies Supporting Documentation
cc: Distribution via Listserv  




__ML14364A403___________                 SUNSI REVIEW COMPLETE   FORM 665 ATTACHED
__ML14364A403___________  
OFFICE             RII:DRS       RII:DRS
SIGNATURE
SUNSI REVIEW COMPLETE  
NAME               DJONES       SSHAEFFER
FORM 665 ATTACHED  
DATE                 12/30/2014   12/30/2014   12/ /2014     12/ /2014     12/ /2014   12/ /2014     12/ /2014
OFFICE  
E-MAIL COPY?         YES     NO  YES     NO  YES   NO     YES     NO    YES    NO   YES     NO   YES     NO
RII:DRS  
       
RII:DRS  
      TRIENNIAL FIRE PROTECTION INSPECTION SUPPORTING DOCUMENTATION
The documents and information requested below should generally be made available to the
inspection team during the on-site information gathering visit for the team's use both on-site and
off-site during the inspection. Electronic format is the preferred media, except where specifically
noted, if readily available the preferred file format is searchable PDF files. If electronic media is
made available via an internet based remote document management system, then the remote
SIGNATURE  
document access must allow inspectors to download, save, and print the documents in the
NRC's regional office. Electronic media on compact disc or paper records (hard copy) are
acceptable. At the end of the inspection, the documents in the team's possession will not be
retained.
Approximately three weeks before the on-site information gathering visit, the following
documents should be made available to the team leader for review in the regional office:
    *   Post-fire Safe Shutdown or Alternative Shutdown Analysis (request A.1)
    *  Fire Hazards Analysis (request A.2)
NAME  
    *  Individual Plant Examination for External Events (Fire Chapter ONLY) (request A.3)
DJONES  
Based on review of the above three documents, the team leader will identify a preliminary list of
SSHAEFFER  
fire areas being considered for inspection prior to the on-site information gathering visit. During
the information gathering visit, or shortly thereafter, the fire areas selected for inspection will be
determined.
This document request is based on typical documents that a generic plant might have. As such,
this generic document request is not meant to imply that any specific plant is required to have all
of the listed documents. It is recognized that some documents listed below may not be
DATE  
available for your plant. In addition, the document titles listed below are based on typical
12/30/2014  
industry document names; your plant specific document titles may vary.
12/30/2014  
A.    DESIGN AND LICENSING BASIS DOCUMENTS
12/   /2014  
       A.1  Post-fire Safe Shutdown or Alternative Shutdown Analysis.
12/   /2014  
      A.2  Fire Hazards Analysis.
12/   /2014  
      A.3   Individual Plant Examination for External Events (IPEEE) (Fire Chapter ONLY),
12/   /2014  
            including:
12/   /2014  
            * Results of any post-IPEEE reviews; and
E-MAIL COPY?  
            * LIST of actions taken or plant modifications performed in response to the IPEEE
     YES  
              results.
NO    
      A.4  Fire Protection Program and/or Fire Protection Plan.
   YES  
                                                                                          Enclosure 1
NO       YES  
NO     
   YES  
NO     
   YES
NO       YES
NO   
   YES
NO   


                                                  2
  A.5 LIST of post-fire safe shutdown or alternative shutdown systems (i.e., safe shutdown
Enclosure 1
        equipment list).
TRIENNIAL FIRE PROTECTION INSPECTION SUPPORTING DOCUMENTATION
  A.6 Fire Protection System Design Basis Document.
   
  A.7  Post-fire Safe Shutdown or Alternative Shutdown Design Basis Document.
The documents and information requested below should generally be made available to the
  A.8  LIST of applicable NFPA codes and standards and issuance dates (i.e., codes of
inspection team during the on-site information gathering visit for the team's use both on-site and
        record).
off-site during the inspection. Electronic format is the preferred media, except where specifically
  A.9 LIST of deviations from NFPA codes of record.
noted, if readily available the preferred file format is searchable PDF files. If electronic media is
  A.10 NFPA Compliance Review Report.
made available via an internet based remote document management system, then the remote
  A.11 Report or evaluation that compares the fire protection program to the NRC Branch
document access must allow inspectors to download, save, and print the documents in the
        Technical Position (BTP) 9.5-1 Appendix A.
NRC's regional office.  Electronic media on compact disc or paper records (hard copy) are
  A.12 Electronic copy of licensee submittals and NRC safety evaluation reports that are
acceptableAt the end of the inspection, the documents in the team's possession will not be
        specifically listed in the facility operating license for the approved fire protection
retained.  
        program.
Approximately three weeks before the on-site information gathering visit, the following
  A.13 NRC Safety Evaluation Reports for fire protection program and post-fire safe
documents should be made available to the team leader for review in the regional office:
        shutdown or alternative shutdown features.
*
  A.14 NRC approved exemptions for plant fire protection and post-fire safe shutdown or
Post-fire Safe Shutdown or Alternative Shutdown Analysis (request A.1)
        alternative shutdown features.
*
  A.15 Exemption requests submitted but not yet approved for plant fire protection and post-
Fire Hazards Analysis (request A.2)
        fire safe shutdown or alternative shutdown features.
*
  A.16 Facility Operating License (electronic format only).
Individual Plant Examination for External Events (Fire Chapter ONLY) (request A.3)  
  A.17 Technical Specifications (electronic format only).
   
  A.18 Technical Requirements Manual (electronic format only).
Based on review of the above three documents, the team leader will identify a preliminary list of  
  A.19 Updated Final Safety Analysis Report (electronic format only).
fire areas being considered for inspection prior to the on-site information gathering visit. During
B. GENERAL PLANT DESIGN DOCUMENTS
the information gathering visit, or shortly thereafter, the fire areas selected for inspection will be
  B.1  Piping and instrumentation diagrams (P&IDs) and legend list for post-fire safe
determined.  
        shutdown or alternative shutdown systems (C-size paper drawings and electronic
This document request is based on typical documents that a generic plant might have. As such,
        copy).
this generic document request is not meant to imply that any specific plant is required to have all
  B.2 P&IDs and legend list for fire protection systems, including fire water supply, water
of the listed documents. It is recognized that some documents listed below may not be
        suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper
available for your plant.  In addition, the document titles listed below are based on typical
        drawings and electronic copy).
industry document names; your plant specific document titles may vary.  
A.  
DESIGN AND LICENSING BASIS DOCUMENTS
A.1
Post-fire Safe Shutdown or Alternative Shutdown Analysis.  
A.2
Fire Hazards Analysis.  
A.3
Individual Plant Examination for External Events (IPEEE) (Fire Chapter ONLY),
including:
* Results of any post-IPEEE reviews; and
* LIST of actions taken or plant modifications performed in response to the IPEEE
results.  
   
A.4
Fire Protection Program and/or Fire Protection Plan.


                                                3
2
  B.3 AC and DC electrical system single line diagrams, from off-site power down to the
   
        highest safety-related bus level (typically 4kV, EDG bus) (C-size paper drawings and
        electronic copy ).
A.5
  B.4  Single line diagrams for motor control centers (MCCs) that supply post-fire safe
LIST of post-fire safe shutdown or alternative shutdown systems (i.e., safe shutdown  
        shutdown or alternative shutdown loads (only for selected fire areas) (C-size paper
equipment list).  
        drawings and electronic copy ).
A.6  
  B.5  Equipment location drawings which identify the physical plant locations of post-fire
Fire Protection System Design Basis Document.
        safe shutdown or alternative shutdown equipment (C-size paper drawings and
A.7
        electronic copy).
Post-fire Safe Shutdown or Alternative Shutdown Design Basis Document.
  B.6 Plant layout drawings which identify: (C-size paper drawings and electronic copy)
A.8
        *    Plant fire area boundaries;
LIST of applicable NFPA codes and standards and issuance dates (i.e., codes of
        *    Combustible control zone drawings;
record).
        *    Areas protected by automatic fire suppression and detection; and
A.9
        *    Locations of fire protection equipment.
LIST of deviations from NFPA codes of record.  
C. CLASSICAL FIRE PROTECTION
A.10 NFPA Compliance Review Report.  
  C.1  Fire protection program implementing procedures (e.g., administrative controls,
A.11 Report or evaluation that compares the fire protection program to the NRC Branch
        surveillance testing, fire brigade).
Technical Position (BTP) 9.5-1 Appendix A.  
  C.2  LIST of calculations and engineering analyses, studies, or evaluations for the fire
A.12 Electronic copy of licensee submittals and NRC safety evaluation reports that are
        protection system, including the fire water system.
specifically listed in the facility operating license for the approved fire protection
  C.3  Hydraulic calculation or analysis for fire protection water system in the selected fire
program.
        areas.
A.13 NRC Safety Evaluation Reports for fire protection program and post-fire safe
  C.4  Last two completed surveillance's records of fire protection features in the selected
shutdown or alternative shutdown features.  
        fire areas (detection, suppression, damper inspections, damper tests, penetration
A.14 NRC approved exemptions for plant fire protection and post-fire safe shutdown or
        inspections, barrier inspections, etc.).
alternative shutdown features.  
  C.5  LIST of routine tests, surveillances, and preventive maintenance on fire pumps,
A.15 Exemption requests submitted but not yet approved for plant fire protection and post-
        including pump controllers and batteries.
fire safe shutdown or alternative shutdown features.
  C.6 Last two completed annual fire pump pressure and flow tests.
A.16 Facility Operating License (electronic format only).  
  C.7  Last two completed monthly and/or quarterly fire pump tests.
A.17 Technical Specifications (electronic format only).  
  C.8 Last two completed fire loop flow tests and loop flushes.
A.18 Technical Requirements Manual (electronic format only).  
  C.9  CO2 and Halon initial discharge testing or calculation that determined appropriate
A.19 Updated Final Safety Analysis Report (electronic format only).  
        concentrations and soak or hold times can be achieved (only for selected fire areas).
   
  C.10 Last five hot work permits (at power).
B.  
  C.11 Last five transient combustible permits (at power).
GENERAL PLANT DESIGN DOCUMENTS
B.1
Piping and instrumentation diagrams (P&IDs) and legend list for post-fire safe
shutdown or alternative shutdown systems (C-size paper drawings and electronic
copy).  
B.2
P&IDs and legend list for fire protection systems, including fire water supply, water
suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper
drawings and electronic copy).  


                                                4
C.12 For Fire Brigade Drills, provide the following:
3
    *  Last drill critique for a drill with off-site fire department support;
    *  Summary of any unsatisfactory drill performance items for last three years; and
    *  Last unannounced drill critique by a qualified individual independent of the
        licensee's staff.
B.3
C.13 For fire brigade equipment provide the following:
AC and DC electrical system single line diagrams, from off-site power down to the  
    *   Procedure for inventory and inspection; and
highest safety-related bus level (typically 4kV, EDG bus) (C-size paper drawings and
    *   Most recent inspection and inventory results.
electronic copy ).
C.14 Fire Brigade Medical Evaluations and Qualifications, including self-contained
B.4
    breathing apparatus (SCBA) and training lesson plans.
Single line diagrams for motor control centers (MCCs) that supply post-fire safe
C.15 Electronic copy of the mutual aid agreement for the first-due local fire department
shutdown or alternative shutdown loads (only for selected fire areas) (C-size paper
    that is currently in effect.
drawings and electronic copy ). 
C.16 Flooding analysis for selected fire areas which demonstrates:
B.5
    * a fire water pipe break in the selected fire areas, wont affect safe shutdown (SSD)
Equipment location drawings which identify the physical plant locations of post-fire
      capability for equipment in the selected fire areas;
safe shutdown or alternative shutdown equipment (C-size paper drawings and
    * a fire water pipe break in an adjacent fire area, wont affect SSD capability for
electronic copy).
      equipment in the selected fire areas;
B.6
    * hydrostatic rating of any floor penetration seals installed within the fire areas that
Plant layout drawings which identify:  (C-size paper drawings and electronic copy)
      are credited with keeping water from leaking into fire areas below.
*
C.17 Pre-fire plans for the selected fire areas and their adjacent fire areas.
Plant fire area boundaries;
C.18 For Emergency Lighting Units (ELU), provide the following:
*
    *  LIST of Preventive Maintenance tasks, frequencies, and bases;
Combustible control zone drawings;
    *  Most recently performed monthly or quarterly functional test;
*  
    *  Most recently performed battery discharge performance test; if applicable
Areas protected by automatic fire suppression and detection; and  
    *  ELU battery loading analysis;
*  
    *  vendor manual(s);
Locations of fire protection equipment.
    *  results of black-out testing (if performed);
    *  Maintenance Rule program information related to the ELU, if applicable; and
C. CLASSICAL FIRE PROTECTION
    *  Compensatory measures taken when ELU are out of service.
C.1 Fire protection program implementing procedures (e.g., administrative controls,  
C.19 Impairment Log (for period of 3 months before the start of inspection), for fire
surveillance testing, fire brigade).  
    protection features that are out of service.
C.2 LIST of calculations and engineering analyses, studies, or evaluations for the fire  
C.20 LIST of Fire Protection screening reviews since the last inspection for recent design
protection system, including the fire water system.  
    changes, modifications, or temporary modifications (e.g., a Generic Letter 86-10
C.3 Hydraulic calculation or analysis for fire protection water system in the selected fire  
    review that screened out).
areas.
C.21 LIST of fire protection system design changes completed in the last three years
C.4 Last two completed surveillance's records of fire protection features in the selected  
    (including their associated 10 CFR 50.59 and Generic Letter 86-10 evaluations).
fire areas (detection, suppression, damper inspections, damper tests, penetration
inspections, barrier inspections, etc.).
C.5 LIST of routine tests, surveillances, and preventive maintenance on fire pumps,
including pump controllers and batteries.  
C.6 Last two completed annual fire pump pressure and flow tests.  
C.7 Last two completed monthly and/or quarterly fire pump tests.  
C.8 Last two completed fire loop flow tests and loop flushes.  
C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate
concentrations and soak or hold times can be achieved (only for selected fire areas).  
C.10 Last five hot work permits (at power).  
C.11 Last five transient combustible permits (at power).  


                                                5
  C.22 LIST of penetration seal work, re-work, or installation activities, in the last three years.
4
  C.23 LIST of fire wrap work, re-work, or installation activities, in the last three years.
  C.24 Fire protection system health reports for the two most recent years.
  C.25 Fire protection program health report for the two most recent years.
  C.26 Emergency lighting system health reports for the two most recent years.
C.12 For Fire Brigade Drills, provide the following:
  C.27 Licensee evaluation of industry operating experience, related to the Fire Protection
*
        Program for the three most recent years.
Last drill critique for a drill with off-site fire department support;
D. ELECTRICAL
*
  D.1  Identify whether the cables in the selected fire areas are predominantly Thermoset or
Summary of any unsatisfactory drill performance items for last three years; and
        Thermoplastic. Specifically identify any Thermoplastic cable in the selected fire
*  Last unannounced drill critique by a qualified individual independent of the
        areas.
licensee's staff.  
  D.2  Breaker and fuse coordination calculation for post-fire safe shutdown or alternative
        shutdown equipment (only for selected fire areas).
C.13 For fire brigade equipment provide the following:
  D.3  Administrative or configuration control procedures that govern fuse replacement (e.g.,
*
        fuse control procedures).
Procedure for inventory and inspection; and
  D.4  Maintenance procedures that verify breaker over-current trip settings to ensure
*
        coordination remains functional, for post-fire safe shutdown or alternative shutdown
Most recent inspection and inventory results.  
        equipment.
  D.5 Electrical system health reports for the two most recent years.
C.14 Fire Brigade Medical Evaluations and Qualifications, including self-contained
  D.6  Last completed preventive maintenance of those components as tested from the safe
breathing apparatus (SCBA) and training lesson plans.  
        shutdown or alternative shutdown panel.
C.15 Electronic copy of the mutual aid agreement for the first-due local fire department
  D.7 Schematic or elementary diagrams for circuits to be reviewed, as requested by
that is currently in effect.  
        inspector (C-size paper drawings and electronic copy).
C.16 Flooding analysis for selected fire areas which demonstrates:
  D.8  Cable routing for components and equipment credited for post-fire safe shutdown or
* a fire water pipe break in the selected fire areas, wont affect safe shutdown (SSD)
        alternative shutdown (only for selected fire areas).
capability for equipment in the selected fire areas;
  D.LIST of post-fire safe shutdown or alternative shutdown design changes completed,
* a fire water pipe break in an adjacent fire area, wont affect SSD capability for
        since the last inspection.
equipment in the selected fire areas
E. SPURIOUS FIRE INDUCED CIRCUIT FAULTS
* hydrostatic rating of any floor penetration seals installed within the fire areas that
  E.LIST of identified fire induced circuit failure configurations (only for selected fire
are credited with keeping water from leaking into fire areas below.
        areas).
  E.2  Multiple Spurious Operation (MSO) Expert Panel Report.
C.17 Pre-fire plans for the selected fire areas and their adjacent fire areas.  
C.18 For Emergency Lighting Units (ELU), provide the following:
*
LIST of Preventive Maintenance tasks, frequencies, and bases;
*
Most recently performed monthly or quarterly functional test;
*
Most recently performed battery discharge performance test; if applicable
*
ELU battery loading analysis;
*
vendor manual(s);  
*
results of black-out testing (if performed);
*
Maintenance Rule program information related to the ELU, if applicable; and
*
Compensatory measures taken when ELU are out of service.  
   
C.19 Impairment Log (for period of 3 months before the start of inspection), for fire  
protection features that are out of service.  
C.20 LIST of Fire Protection screening reviews since the last inspection for recent design
changes, modifications, or temporary modifications (e.g., a Generic Letter 86-10
review that screened out).  
C.21 LIST of fire protection system design changes completed in the last three years
(including their associated 10 CFR 50.59 and Generic Letter 86-10 evaluations).  


                                                6
  E.3  Corrective actions for fire-induced circuit failures, both single and multiple spurious
5
        actuations for the selected fire areas.
F. OPERATIONS
  F.1  LIST of calculations and engineering analyses, studies, or evaluations for the safe
        shutdown or alternative shutdown methodology.
C.22 LIST of penetration seal work, re-work, or installation activities, in the last three years.
  F.2 LIST of licensed operator Job Performance Measures (JPMs) for operator manual
C.23 LIST of fire wrap work, re-work, or installation activities, in the last three years.
        actions required by post-fire safe shutdown or alternative shutdown.
C.24 Fire protection system health reports for the two most recent years.
  F.3 LIST of non-licensed operator training associated with post-fire safe shutdown or
C.25 Fire protection program health report for the two most recent years.  
        alternative shutdown manual actions which would be performed by a non-licensed
C.26 Emergency lighting system health reports for the two most recent years.  
        operator (including JPMs, in-field training walkdowns, simulations, or initial
C.27 Licensee evaluation of industry operating experience, related to the Fire Protection
        qualification).
Program for the three most recent years.
  F.4 LIST of lesson plans for post-fire safe shutdown or alternative shutdown training for
        licensed and non-licensed operators.
D. ELECTRICAL
  F.5 For operator manual actions (OMAs) provide the following:
D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or  
        *  Manual Action Feasibility Study;
Thermoplastic.  Specifically identify any Thermoplastic cable in the selected fire
        *  Operator Time Critical Action Program;
areas.  
        *  Time lines for time-critical OMAs; and
D.2 Breaker and fuse coordination calculation for post-fire safe shutdown or alternative  
        *  Time line validations.
shutdown equipment (only for selected fire areas).  
        *  Environmental and habitability evaluations for post-fire operator manual actions
D.3 Administrative or configuration control procedures that govern fuse replacement (e.g.,  
            (temperature, smoke, humidity, SCBAs, etc.).
fuse control procedures).  
  F.6  Thermal hydraulic calculation or analysis that determines the time requirements for
D.4 Maintenance procedures that verify breaker over-current trip settings to ensure
        time-critical manual operator actions.
coordination remains functional, for post-fire safe shutdown or alternative shutdown  
  F.7  Operating procedures for post-fire safe shutdown from the control room with a
equipment.  
        postulated fire in the selected fire areas.
D.5 Electrical system health reports for the two most recent years.
  F.8  Operating procedures for post-fire safe shutdown or alternative shutdown from
D.6 Last completed preventive maintenance of those components as tested from the safe
        outside the control room.
shutdown or alternative shutdown panel.
  F.9  For safe shutdown equipment and tools, provide the following:
D.7 Schematic or elementary diagrams for circuits to be reviewed, as requested by
        *  Procedure for inventory and inspection; and
inspector (C-size paper drawings and electronic copy).
        *  Most recent inspection and inventory results.
D.8 Cable routing for components and equipment credited for post-fire safe shutdown or
  F.10 LIST of procedures that implement Cold Shutdown Repairs.
alternative shutdown (only for selected fire areas).  
  F.11 For Cold Shutdown Repairs, provide the following:
D.9 LIST of post-fire safe shutdown or alternative shutdown design changes completed,
        *  Procedure for inventory and inspection (i.e., needed tools, material, etc.); and
since the last inspection.  
        *  Most recent inspection and inventory results.
E.  
SPURIOUS FIRE INDUCED CIRCUIT FAULTS
E.1
LIST of identified fire induced circuit failure configurations (only for selected fire
areas).  
E.2
Multiple Spurious Operation (MSO) Expert Panel Report.  


                                                7
  F.12 Calculation or analysis that demonstrates pressurizer level will remain within the
6
        indicating range for a PWR, or reactor water level will remain above the top of active
        fuel for a BWR, at the safe shutdown or alternative shutdown panel, in accordance
        with the requirements of 10 CFR 50 Appendix R III.L performance goals.
  F.13 For Radio communications, provide the following:
E.3    Corrective actions for fire-induced circuit failures, both single and multiple spurious
        *    Communications Plan for fire fighting and post-fire safe shutdown manual actions;
actuations for the selected fire areas.
        *   Repeater locations;
        *   Cable routing for repeater power supply cables;
F.
        *   Radio coverage test results; and
OPERATIONS
        *   Radio Dead Spot locations in the plant.
F.1
  F.14 NRC approved exemption requests for operator manual actions for
LIST of calculations and engineering analyses, studies, or evaluations for the safe
        10 CFR 50 Appendix R III.G.2 fire areas.
shutdown or alternative shutdown methodology.
  F.15 Exemption requests submitted but not yet approved, for operator manual actions for
F.2
        10 CFR 50 Appendix R III.G.2 fire areas.
LIST of licensed operator Job Performance Measures (JPMs) for operator manual
G. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS
actions required by post-fire safe shutdown or alternative shutdown.
  G.1  Corrective actions for fire-induced circuit failures (including but not limited to NRC
F.3
        IN 92-18), both single and multiple spurious actuations (only for selected fire areas).
LIST of non-licensed operator training associated with post-fire safe shutdown or  
  G.2  Corrective actions associated with post-fire safe shutdown or alternative shutdown
alternative shutdown manual actions which would be performed by a non-licensed
        operator manual actions.
operator (including JPMs, in-field training walkdowns, simulations, or initial
  G.3  Internal and external self assessments, peer assessments, and audits of fire
qualification).  
        protection activities for the last three years.
F.4
  G.4  Internal and external self assessments, peer assessments, and audits of post-fire
LIST of lesson plans for post-fire safe shutdown or alternative shutdown training for
        safe shutdown or alternative shutdown capabilities for the last three years.
licensed and non-licensed operators.
  G.5  LIST of condition reports for the fire protection system for the last three years.
F.5
  G.6  LIST of condition reports for emergency lighting units for the last three years.
For operator manual actions (OMAs) provide the following:
  G.7  LIST of condition reports for post-fire safe shutdown (SSD) or alternative shutdown
*  
        (ASD) issues for the last three years. This includes issues affecting the SSD or ASD
Manual Action Feasibility Study;  
        analysis, fire hazards analysis, SSD or ASD operating procedures and/or training,
*  
        timeline evaluations for operator actions, and supporting engineering evaluations,
Operator Time Critical Action Program;  
        analysis, or calculations.
*  
  G.LIST of all Generic Letter 86 - 10 evaluations.
Time lines for time-critical OMAs; and  
  G.9  Copy of all Generic Letter 86 - 10 evaluations performed in the last three years.
*  
  G.10 All fire loading calculations and evaluations performed (only for selected fire areas
Time line validations.  
        and their adjacent fire areas).
*
Environmental and habitability evaluations for post-fire operator manual actions  
(temperature, smoke, humidity, SCBAs, etc.).  
F.6
Thermal hydraulic calculation or analysis that determines the time requirements for  
time-critical manual operator actions.  
F.7
Operating procedures for post-fire safe shutdown from the control room with a
postulated fire in the selected fire areas.  
F.8
Operating procedures for post-fire safe shutdown or alternative shutdown from
outside the control room.
F.9
For safe shutdown equipment and tools, provide the following:
*
Procedure for inventory and inspection; and  
*
Most recent inspection and inventory results.  
F.10 LIST of procedures that implement Cold Shutdown Repairs.  
F.11 For Cold Shutdown Repairs, provide the following:
*
Procedure for inventory and inspection (i.e., needed tools, material, etc.); and  
*
Most recent inspection and inventory results.  


              MITIGATING STRATEGIES SUPPORTING DOCUMENTATION
H. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS
7
  H.1  LIST of all changes to regulatory commitments made to meet the requirements of
        Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).
  H.2  LIST of procedures and guidelines that were revised or generated to implement the
        mitigating strategies. These could be extensive damage mitigation guidelines
F.12 Calculation or analysis that demonstrates pressurizer level will remain within the
        (EDMGs), severe accident management guidelines (SAMGs), emergency operating
indicating range for a PWR, or reactor water level will remain above the top of active
        procedures (EOPs), abnormal operating procedures (AOPs), etc.
fuel for a BWR, at the safe shutdown or alternative shutdown panel, in accordance
  H.3 A matrix that shows the correlation between the mitigation strategies identified in
with the requirements of 10 CFR 50 Appendix R III.L performance goals.  
        Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline,"
F.13 For Radio communications, provide the following:
        issued December 2006, and the site-specific procedures or guidelines that are used
*
        to implement each strategy.
Communications Plan for fire fighting and post-fire safe shutdown manual actions;
  H.4 LIST of engineering evaluations or calculations that were used to verify the
*
        engineering bases for the mitigating strategies.
Repeater locations;
  H.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow
*
        diagrams for systems relied upon in the mitigating strategies. These could be the
Cable routing for repeater power supply cables;
        type used for training. (C-size paper drawings and electronic copy)
*
  H.6 LIST of modification packages or summary descriptions of modifications with
Radio coverage test results; and
        simplified drawings, for necessary facility changes to implement the mitigating
*
        strategies.
Radio Dead Spot locations in the plant.
  H.7 LIST of routine tests, surveillances, and preventive maintenance for equipment and
        tools needed to implement 10 CFR 50.54(hh)(2) strategies.
F.14  NRC approved exemption requests for operator manual actions for
  H.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,
10 CFR 50 Appendix R III.G.2 fire areas.
        provide the following:
F.15 Exemption requests submitted but not yet approved, for operator manual actions for
        *    Procedures for inventory, testing, and inspection; and
10 CFR 50 Appendix R III.G.2 fire areas.
        *    Most recent inspection, inventory, and testing results.
   
        *    Copies of the last two completed performance tests, surveillances, and
G. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS
            preventative maintenance performed on the pumps, including the pump
G.1 Corrective actions for fire-induced circuit failures (including but not limited to NRC
            controllers and batteries.
IN 92-18), both single and multiple spurious actuations (only for selected fire areas).  
  H.LIST of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that
G.2 Corrective actions associated with post-fire safe shutdown or alternative shutdown
        differ from that documented in the submittals or the safety evaluation report.
operator manual actions.  
                                                                                    Enclosure 2
   
G.3 Internal and external self assessments, peer assessments, and audits of fire
protection activities for the last three years.  
G.4 Internal and external self assessments, peer assessments, and audits of post-fire
safe shutdown or alternative shutdown capabilities for the last three years.  
G.5 LIST of condition reports for the fire protection system for the last three years.  
G.6 LIST of condition reports for emergency lighting units for the last three years.  
G.7 LIST of condition reports for post-fire safe shutdown (SSD) or alternative shutdown
(ASD) issues for the last three yearsThis includes issues affecting the SSD or ASD
analysis, fire hazards analysis, SSD or ASD operating procedures and/or training,
timeline evaluations for operator actions, and supporting engineering evaluations,  
analysis, or calculations.  
G.8 LIST of all Generic Letter 86 - 10 evaluations.  
G.9 Copy of all Generic Letter 86 - 10 evaluations performed in the last three years.
G.10 All fire loading calculations and evaluations performed (only for selected fire areas
and their adjacent fire areas).


                                          2
H.10 Site general arrangement drawings that show the majority of buildings and areas
    referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings and electronic
    copy).
H.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).
Enclosure 2  
H.12 Copies of memoranda of understanding (MOU) (e.g., with local fire departments)
MITIGATING STRATEGIES SUPPORTING DOCUMENTATION
    required to implement any mitigating strategies.
H.13 Docketed correspondence for 10 CFR 50.54(hh) to include license amendment
H. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS
    requests (LARS); Safety Evaluation Reports (SER); Request for Information (RFI)
H.1 LIST of all changes to regulatory commitments made to meet the requirements of
    and associated responses; and other pertinent documents.
Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).
H.2 LIST of procedures and guidelines that were revised or generated to implement the
mitigating strategies.  These could be extensive damage mitigation guidelines
(EDMGs), severe accident management guidelines (SAMGs), emergency operating
procedures (EOPs), abnormal operating procedures (AOPs), etc.
H.3 A matrix that shows the correlation between the mitigation strategies identified in
Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline,"
issued December 2006, and the site-specific procedures or guidelines that are used
to implement each strategy.
H.4 LIST of engineering evaluations or calculations that were used to verify the
engineering bases for the mitigating strategies.
H.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow
diagrams for systems relied upon in the mitigating strategies.  These could be the
type used for training. (C-size paper drawings and electronic copy)
H.6 LIST of modification packages or summary descriptions of modifications with
simplified drawings, for necessary facility changes to implement the mitigating
strategies.
H.7 LIST of routine tests, surveillances, and preventive maintenance for equipment and
tools needed to implement 10 CFR 50.54(hh)(2) strategies.
H.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,
provide the following:
*
Procedures for inventory, testing, and inspection; and
*
Most recent inspection, inventory, and testing results.
*
Copies of the last two completed performance tests, surveillances, and
preventative maintenance performed on the pumps, including the pump
controllers and batteries.
H.9 LIST of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that
differ from that documented in the submittals or the safety evaluation report.
 
2
H.10 Site general arrangement drawings that show the majority of buildings and areas  
referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings and electronic  
copy).  
H.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).  
  H.12 Copies of memoranda of understanding (MOU) (e.g., with local fire departments)  
required to implement any mitigating strategies.  
H.13 Docketed correspondence for 10 CFR 50.54(hh) to include license amendment  
requests (LARS); Safety Evaluation Reports (SER); Request for Information (RFI)  
and associated responses; and other pertinent documents.
}}
}}

Latest revision as of 15:11, 10 January 2025

Unit 2, Notification of a Triennial Fire Protection Baseline Inspection, U.S. Nuclear Regulatory Commission Inspection Report Nos. 0000280/2015008 and 05000281/2015008
ML14364A403
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/30/2014
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Heacock D
Virginia Electric & Power Co (VEPCO)
References
IR-2015008
Download: ML14364A403 (13)


See also: IR 05000281/2015008

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

December 30, 2014

Mr. David A. Heacock, President & CNO

Virginia Electric & Power Company

500 Dominion Blvd.

Glen Allen, VA 23060-6711

SUBJECT: SURRY NUCLEAR PLANT (UNIT 1 AND UNIT 2) - NOTIFICATION OF A

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION, U.S. NUCLEAR

REGULATORY COMMISSION INSPECTION REPORT NOS. 05000280/2015008

AND 05000281/2015008

Dear Mr. Heacock:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

staff will conduct a triennial fire protection baseline inspection at Surry Nuclear Plant, Units 1

and 2. The inspection team will be led by David Jones, Senior Reactor Inspector, from the

NRC Region II office. The team will be composed of personnel from the NRC Region II office.

The inspection will be conducted in accordance with IP 71111.05T, the NRC's baseline fire

protection inspection procedure, dated January 31, 2013.

On December 23, 2014, during a telephone conversation between Ms. Jennifer Pollard,

Licensing, and Mr. David Jones, our respective staff confirmed arrangements for an information

gathering onsite visit and a two-week onsite inspection. The schedule for the inspection is as

follows:

Information gathering visit:

February 03 - 05, 2015

Week 1 of onsite inspection:

March 02 - 06, 2015

Week 2 of onsite inspection:

March 16 - 20, 2015

The purposes of the information gathering visit are to obtain information and documentation

needed to support the inspection, to become familiar with the Surry Nuclear Plant fire protection

program, fire protection features, post-fire safe shutdown capabilities, plant layout, mitigating

strategies to address Title 10 of the Code of Federal Regulations (10 CFR) Section

50.54(hh)(2), and, as necessary, obtain plant specific site access training and badging for

unescorted site access.

An initial list of the documents the team will review during the conduct of the inspection is listed

in Enclosures 1 and 2. The team leader will contact you with any additional specific document

requests prior to the information gathering visit.

During the information gathering visit, the team will also discuss the following inspection support

administrative details: office space and location; specific documents requested to be made

D. Heacock

2

available to the team in their office spaces; arrangements for reactor site access (including

radiation protection training, security, safety, and fitness for duty requirements); and the

availability of knowledgeable plant staff and licensing organization personnel to serve as points

of contact during the inspection.

We request that during the on-site inspection weeks you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the station fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest for the fire protection portion of the inspection, are

those documents which establish that your fire protection program satisfies NRC regulatory

requirements and conforms to applicable NRC and industry fire protection guidance (i.e., fire

protection compliance assessment documents). For the 10 CFR 50.54(hh)(2) portion of the

inspection, those documents implementing your mitigating strategies and demonstrating the

management of your commitments for the strategies are of specific interest. Also, personnel

should be available at the site during the inspection who are knowledgeable regarding those

plant systems required to achieve and maintain safe shutdown conditions from inside and

outside the control room, including the electrical aspects of the relevant post-fire safe shutdown

analyses, reactor plant fire protection systems and features, and the station fire protection

program and its implementation.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, under control number

3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC Rules and Practices, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records System (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.hmtl (the Public Electronic Reading Room).

D. Heacock

3

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact David Jones, the team leader in the Region II office at 404-997-4631 or me at 404-997-

4511.

Sincerely,

/RA: David A. Jones for/

Scott M. Shaeffer, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos.: 50-280; 50-281

License No.: DPR-32 and DPR-37

Enclosures:

1. Triennial Fire Protection Inspection Supporting

Documentation

2. Mitigating Strategies Supporting Documentation

cc: Distribution via Listserv

__ML14364A403___________

SUNSI REVIEW COMPLETE

FORM 665 ATTACHED

OFFICE

RII:DRS

RII:DRS

SIGNATURE

NAME

DJONES

SSHAEFFER

DATE

12/30/2014

12/30/2014

12/ /2014

12/ /2014

12/ /2014

12/ /2014

12/ /2014

E-MAIL COPY?

YES

NO

YES

NO YES

NO

YES

NO

YES

NO YES

NO

YES

NO

Enclosure 1

TRIENNIAL FIRE PROTECTION INSPECTION SUPPORTING DOCUMENTATION

The documents and information requested below should generally be made available to the

inspection team during the on-site information gathering visit for the team's use both on-site and

off-site during the inspection. Electronic format is the preferred media, except where specifically

noted, if readily available the preferred file format is searchable PDF files. If electronic media is

made available via an internet based remote document management system, then the remote

document access must allow inspectors to download, save, and print the documents in the

NRC's regional office. Electronic media on compact disc or paper records (hard copy) are

acceptable. At the end of the inspection, the documents in the team's possession will not be

retained.

Approximately three weeks before the on-site information gathering visit, the following

documents should be made available to the team leader for review in the regional office:

Post-fire Safe Shutdown or Alternative Shutdown Analysis (request A.1)

Fire Hazards Analysis (request A.2)

Individual Plant Examination for External Events (Fire Chapter ONLY) (request A.3)

Based on review of the above three documents, the team leader will identify a preliminary list of

fire areas being considered for inspection prior to the on-site information gathering visit. During

the information gathering visit, or shortly thereafter, the fire areas selected for inspection will be

determined.

This document request is based on typical documents that a generic plant might have. As such,

this generic document request is not meant to imply that any specific plant is required to have all

of the listed documents. It is recognized that some documents listed below may not be

available for your plant. In addition, the document titles listed below are based on typical

industry document names; your plant specific document titles may vary.

A.

DESIGN AND LICENSING BASIS DOCUMENTS

A.1

Post-fire Safe Shutdown or Alternative Shutdown Analysis.

A.2

Fire Hazards Analysis.

A.3

Individual Plant Examination for External Events (IPEEE) (Fire Chapter ONLY),

including:

  • Results of any post-IPEEE reviews; and
  • LIST of actions taken or plant modifications performed in response to the IPEEE

results.

A.4

Fire Protection Program and/or Fire Protection Plan.

2

A.5

LIST of post-fire safe shutdown or alternative shutdown systems (i.e., safe shutdown

equipment list).

A.6

Fire Protection System Design Basis Document.

A.7

Post-fire Safe Shutdown or Alternative Shutdown Design Basis Document.

A.8

LIST of applicable NFPA codes and standards and issuance dates (i.e., codes of

record).

A.9

LIST of deviations from NFPA codes of record.

A.10 NFPA Compliance Review Report.

A.11 Report or evaluation that compares the fire protection program to the NRC Branch

Technical Position (BTP) 9.5-1 Appendix A.

A.12 Electronic copy of licensee submittals and NRC safety evaluation reports that are

specifically listed in the facility operating license for the approved fire protection

program.

A.13 NRC Safety Evaluation Reports for fire protection program and post-fire safe

shutdown or alternative shutdown features.

A.14 NRC approved exemptions for plant fire protection and post-fire safe shutdown or

alternative shutdown features.

A.15 Exemption requests submitted but not yet approved for plant fire protection and post-

fire safe shutdown or alternative shutdown features.

A.16 Facility Operating License (electronic format only).

A.17 Technical Specifications (electronic format only).

A.18 Technical Requirements Manual (electronic format only).

A.19 Updated Final Safety Analysis Report (electronic format only).

B.

GENERAL PLANT DESIGN DOCUMENTS

B.1

Piping and instrumentation diagrams (P&IDs) and legend list for post-fire safe

shutdown or alternative shutdown systems (C-size paper drawings and electronic

copy).

B.2

P&IDs and legend list for fire protection systems, including fire water supply, water

suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper

drawings and electronic copy).

3

B.3

AC and DC electrical system single line diagrams, from off-site power down to the

highest safety-related bus level (typically 4kV, EDG bus) (C-size paper drawings and

electronic copy ).

B.4

Single line diagrams for motor control centers (MCCs) that supply post-fire safe

shutdown or alternative shutdown loads (only for selected fire areas) (C-size paper

drawings and electronic copy ).

B.5

Equipment location drawings which identify the physical plant locations of post-fire

safe shutdown or alternative shutdown equipment (C-size paper drawings and

electronic copy).

B.6

Plant layout drawings which identify: (C-size paper drawings and electronic copy)

Plant fire area boundaries;

Combustible control zone drawings;

Areas protected by automatic fire suppression and detection; and

Locations of fire protection equipment.

C. CLASSICAL FIRE PROTECTION

C.1 Fire protection program implementing procedures (e.g., administrative controls,

surveillance testing, fire brigade).

C.2 LIST of calculations and engineering analyses, studies, or evaluations for the fire

protection system, including the fire water system.

C.3 Hydraulic calculation or analysis for fire protection water system in the selected fire

areas.

C.4 Last two completed surveillance's records of fire protection features in the selected

fire areas (detection, suppression, damper inspections, damper tests, penetration

inspections, barrier inspections, etc.).

C.5 LIST of routine tests, surveillances, and preventive maintenance on fire pumps,

including pump controllers and batteries.

C.6 Last two completed annual fire pump pressure and flow tests.

C.7 Last two completed monthly and/or quarterly fire pump tests.

C.8 Last two completed fire loop flow tests and loop flushes.

C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate

concentrations and soak or hold times can be achieved (only for selected fire areas).

C.10 Last five hot work permits (at power).

C.11 Last five transient combustible permits (at power).

4

C.12 For Fire Brigade Drills, provide the following:

Last drill critique for a drill with off-site fire department support;

Summary of any unsatisfactory drill performance items for last three years; and

  • Last unannounced drill critique by a qualified individual independent of the

licensee's staff.

C.13 For fire brigade equipment provide the following:

Procedure for inventory and inspection; and

Most recent inspection and inventory results.

C.14 Fire Brigade Medical Evaluations and Qualifications, including self-contained

breathing apparatus (SCBA) and training lesson plans.

C.15 Electronic copy of the mutual aid agreement for the first-due local fire department

that is currently in effect.

C.16 Flooding analysis for selected fire areas which demonstrates:

  • a fire water pipe break in the selected fire areas, wont affect safe shutdown (SSD)

capability for equipment in the selected fire areas;

  • a fire water pipe break in an adjacent fire area, wont affect SSD capability for

equipment in the selected fire areas;

are credited with keeping water from leaking into fire areas below.

C.17 Pre-fire plans for the selected fire areas and their adjacent fire areas.

C.18 For Emergency Lighting Units (ELU), provide the following:

LIST of Preventive Maintenance tasks, frequencies, and bases;

Most recently performed monthly or quarterly functional test;

Most recently performed battery discharge performance test; if applicable

ELU battery loading analysis;

vendor manual(s);

results of black-out testing (if performed);

Maintenance Rule program information related to the ELU, if applicable; and

Compensatory measures taken when ELU are out of service.

C.19 Impairment Log (for period of 3 months before the start of inspection), for fire

protection features that are out of service.

C.20 LIST of Fire Protection screening reviews since the last inspection for recent design

changes, modifications, or temporary modifications (e.g., a Generic Letter 86-10

review that screened out).

C.21 LIST of fire protection system design changes completed in the last three years

(including their associated 10 CFR 50.59 and Generic Letter 86-10 evaluations).

5

C.22 LIST of penetration seal work, re-work, or installation activities, in the last three years.

C.23 LIST of fire wrap work, re-work, or installation activities, in the last three years.

C.24 Fire protection system health reports for the two most recent years.

C.25 Fire protection program health report for the two most recent years.

C.26 Emergency lighting system health reports for the two most recent years.

C.27 Licensee evaluation of industry operating experience, related to the Fire Protection

Program for the three most recent years.

D. ELECTRICAL

D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or

Thermoplastic. Specifically identify any Thermoplastic cable in the selected fire

areas.

D.2 Breaker and fuse coordination calculation for post-fire safe shutdown or alternative

shutdown equipment (only for selected fire areas).

D.3 Administrative or configuration control procedures that govern fuse replacement (e.g.,

fuse control procedures).

D.4 Maintenance procedures that verify breaker over-current trip settings to ensure

coordination remains functional, for post-fire safe shutdown or alternative shutdown

equipment.

D.5 Electrical system health reports for the two most recent years.

D.6 Last completed preventive maintenance of those components as tested from the safe

shutdown or alternative shutdown panel.

D.7 Schematic or elementary diagrams for circuits to be reviewed, as requested by

inspector (C-size paper drawings and electronic copy).

D.8 Cable routing for components and equipment credited for post-fire safe shutdown or

alternative shutdown (only for selected fire areas).

D.9 LIST of post-fire safe shutdown or alternative shutdown design changes completed,

since the last inspection.

E.

SPURIOUS FIRE INDUCED CIRCUIT FAULTS

E.1

LIST of identified fire induced circuit failure configurations (only for selected fire

areas).

E.2

Multiple Spurious Operation (MSO) Expert Panel Report.

6

E.3 Corrective actions for fire-induced circuit failures, both single and multiple spurious

actuations for the selected fire areas.

F.

OPERATIONS

F.1

LIST of calculations and engineering analyses, studies, or evaluations for the safe

shutdown or alternative shutdown methodology.

F.2

LIST of licensed operator Job Performance Measures (JPMs) for operator manual

actions required by post-fire safe shutdown or alternative shutdown.

F.3

LIST of non-licensed operator training associated with post-fire safe shutdown or

alternative shutdown manual actions which would be performed by a non-licensed

operator (including JPMs, in-field training walkdowns, simulations, or initial

qualification).

F.4

LIST of lesson plans for post-fire safe shutdown or alternative shutdown training for

licensed and non-licensed operators.

F.5

For operator manual actions (OMAs) provide the following:

Manual Action Feasibility Study;

Operator Time Critical Action Program;

Time lines for time-critical OMAs; and

Time line validations.

Environmental and habitability evaluations for post-fire operator manual actions

(temperature, smoke, humidity, SCBAs, etc.).

F.6

Thermal hydraulic calculation or analysis that determines the time requirements for

time-critical manual operator actions.

F.7

Operating procedures for post-fire safe shutdown from the control room with a

postulated fire in the selected fire areas.

F.8

Operating procedures for post-fire safe shutdown or alternative shutdown from

outside the control room.

F.9

For safe shutdown equipment and tools, provide the following:

Procedure for inventory and inspection; and

Most recent inspection and inventory results.

F.10 LIST of procedures that implement Cold Shutdown Repairs.

F.11 For Cold Shutdown Repairs, provide the following:

Procedure for inventory and inspection (i.e., needed tools, material, etc.); and

Most recent inspection and inventory results.

7

F.12 Calculation or analysis that demonstrates pressurizer level will remain within the

indicating range for a PWR, or reactor water level will remain above the top of active

fuel for a BWR, at the safe shutdown or alternative shutdown panel, in accordance

with the requirements of 10 CFR 50 Appendix R III.L performance goals.

F.13 For Radio communications, provide the following:

Communications Plan for fire fighting and post-fire safe shutdown manual actions;

Repeater locations;

Cable routing for repeater power supply cables;

Radio coverage test results; and

Radio Dead Spot locations in the plant.

F.14 NRC approved exemption requests for operator manual actions for

10 CFR 50 Appendix R III.G.2 fire areas.

F.15 Exemption requests submitted but not yet approved, for operator manual actions for

10 CFR 50 Appendix R III.G.2 fire areas.

G. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS

G.1 Corrective actions for fire-induced circuit failures (including but not limited to NRC

IN 92-18), both single and multiple spurious actuations (only for selected fire areas).

G.2 Corrective actions associated with post-fire safe shutdown or alternative shutdown

operator manual actions.

G.3 Internal and external self assessments, peer assessments, and audits of fire

protection activities for the last three years.

G.4 Internal and external self assessments, peer assessments, and audits of post-fire

safe shutdown or alternative shutdown capabilities for the last three years.

G.5 LIST of condition reports for the fire protection system for the last three years.

G.6 LIST of condition reports for emergency lighting units for the last three years.

G.7 LIST of condition reports for post-fire safe shutdown (SSD) or alternative shutdown

(ASD) issues for the last three years. This includes issues affecting the SSD or ASD

analysis, fire hazards analysis, SSD or ASD operating procedures and/or training,

timeline evaluations for operator actions, and supporting engineering evaluations,

analysis, or calculations.

G.8 LIST of all Generic Letter 86 - 10 evaluations.

G.9 Copy of all Generic Letter 86 - 10 evaluations performed in the last three years.

G.10 All fire loading calculations and evaluations performed (only for selected fire areas

and their adjacent fire areas).

Enclosure 2

MITIGATING STRATEGIES SUPPORTING DOCUMENTATION

H. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS

H.1 LIST of all changes to regulatory commitments made to meet the requirements of

Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).

H.2 LIST of procedures and guidelines that were revised or generated to implement the

mitigating strategies. These could be extensive damage mitigation guidelines

(EDMGs), severe accident management guidelines (SAMGs), emergency operating

procedures (EOPs), abnormal operating procedures (AOPs), etc.

H.3 A matrix that shows the correlation between the mitigation strategies identified in

Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline,"

issued December 2006, and the site-specific procedures or guidelines that are used

to implement each strategy.

H.4 LIST of engineering evaluations or calculations that were used to verify the

engineering bases for the mitigating strategies.

H.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow

diagrams for systems relied upon in the mitigating strategies. These could be the

type used for training. (C-size paper drawings and electronic copy)

H.6 LIST of modification packages or summary descriptions of modifications with

simplified drawings, for necessary facility changes to implement the mitigating

strategies.

H.7 LIST of routine tests, surveillances, and preventive maintenance for equipment and

tools needed to implement 10 CFR 50.54(hh)(2) strategies.

H.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,

provide the following:

Procedures for inventory, testing, and inspection; and

Most recent inspection, inventory, and testing results.

Copies of the last two completed performance tests, surveillances, and

preventative maintenance performed on the pumps, including the pump

controllers and batteries.

H.9 LIST of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that

differ from that documented in the submittals or the safety evaluation report.

2

H.10 Site general arrangement drawings that show the majority of buildings and areas

referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings and electronic

copy).

H.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).

H.12 Copies of memoranda of understanding (MOU) (e.g., with local fire departments)

required to implement any mitigating strategies.

H.13 Docketed correspondence for 10 CFR 50.54(hh) to include license amendment

requests (LARS); Safety Evaluation Reports (SER); Request for Information (RFI)

and associated responses; and other pertinent documents.