CNL-13-140, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 21: | Line 21: | ||
Central Emergency Control Center - Emergency Plan. | Central Emergency Control Center - Emergency Plan. | ||
Implementing Procedure Revision In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, this submittal provides the revised Central Emergency Control Center (CECC) Emergency Plan Implementing Procedure (EPIP) as listed below. | Implementing Procedure Revision In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, this submittal provides the revised Central Emergency Control Center (CECC) Emergency Plan Implementing Procedure (EPIP) as listed below. | ||
EPIP | EPIP Revision Title Effective Date CECC EPIP-12 29 Operational Readiness Check of the CECC and the Field Coordination Centers for SQN, BFN, & WBN and Joint Information Centers (JIC) 12/05/2013 Printed on recycled paper | ||
Printed on recycled paper | |||
U.S. Nuclear Regulatory Commission Page 2 December 13, 2013 | U.S. Nuclear Regulatory Commission Page 2 December 13, 2013 provides a summary of the changes and the analysis performed that concluded the changes do not affect the outcome, results, functions, processes, responsibilities, or requirements of the performance of the EPIP. Enclosure 2 provides a copy of the revised EPIP. | ||
There are no new regulatory commitments in this letter. If you have any questions regarding this submittal, please contact Edward D. Schrull at (423) 751-3850. | There are no new regulatory commitments in this letter. If you have any questions regarding this submittal, please contact Edward D. Schrull at (423) 751-3850. | ||
J. W. Shea Vice President, Nuclear Licensing | J. W. Shea Vice President, Nuclear Licensing | ||
| Line 31: | Line 30: | ||
: 1. Summary of Changes and Analysis | : 1. Summary of Changes and Analysis | ||
: 2. Central Emergency Control Center (CECC), Emergency Plan Implementing Procedure (EPIP) Revision cc (Enclosures): | : 2. Central Emergency Control Center (CECC), Emergency Plan Implementing Procedure (EPIP) Revision cc (Enclosures): | ||
NRC | NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Senior Resident Inspector - Watts Bar Nuclear Plant}} | ||
Latest revision as of 10:19, 10 January 2025
| ML15205A196 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry, Watts Bar, Sequoyah |
| Issue date: | 12/13/2013 |
| From: | James Shea Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| CNL-13-140 | |
| Download: ML15205A196 (2) | |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-13-140 December 13, 2013 10 CFR 50, Appendix E, Section V 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No. 50-390
Subject:
Central Emergency Control Center - Emergency Plan.
Implementing Procedure Revision In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, this submittal provides the revised Central Emergency Control Center (CECC) Emergency Plan Implementing Procedure (EPIP) as listed below.
EPIP Revision Title Effective Date CECC EPIP-12 29 Operational Readiness Check of the CECC and the Field Coordination Centers for SQN, BFN, & WBN and Joint Information Centers (JIC) 12/05/2013 Printed on recycled paper
U.S. Nuclear Regulatory Commission Page 2 December 13, 2013 provides a summary of the changes and the analysis performed that concluded the changes do not affect the outcome, results, functions, processes, responsibilities, or requirements of the performance of the EPIP. Enclosure 2 provides a copy of the revised EPIP.
There are no new regulatory commitments in this letter. If you have any questions regarding this submittal, please contact Edward D. Schrull at (423) 751-3850.
J. W. Shea Vice President, Nuclear Licensing
Enclosures:
- 1. Summary of Changes and Analysis
- 2. Central Emergency Control Center (CECC), Emergency Plan Implementing Procedure (EPIP) Revision cc (Enclosures):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Senior Resident Inspector - Watts Bar Nuclear Plant