ML17207A306: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML17207A306
| number = ML17207A306
| issue date = 07/19/1979
| issue date = 07/19/1979
| title = Responds to NRC 790625 Ltr Re Violations Noted in IE Insp Rept 50-335/79-15.Corrective Actions:Amended Renewal Applications for OLs Were Submitted Detailing Deficiencies in Individual Requalification Program Attendance
| title = Responds to NRC Re Violations Noted in IE Insp Rept 50-335/79-15.Corrective Actions:Amended Renewal Applications for OLs Were Submitted Detailing Deficiencies in Individual Requalification Program Attendance
| author name = Uhrig R
| author name = Uhrig R
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = L-79197, NUDOCS 7908240104
| document report number = L-79197, NUDOCS 7908240104
| title reference date = 06-25-1979
| package number = ML17207A305
| package number = ML17207A305
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 5
| page count = 5
| project =
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:P. O,Bog 0)3100, .":IA'     FL ~y/0l 0
{{#Wiki_filter:P. O,Bog 0)3100,.":IA' FL ~y/0l 0
FLORIO< POVi'EF' LIGHT ~   CQ':F-''.i July 19,   1979 L-79-197 Nr. James P. O'Reilly, Director,     Region II Office of Inspection       and Enforcement U. S. Nuclear Regulatory Commission
FLORIO< POVi'EF' LIGHT ~ CQ':F-''.i July 19, 1979 L-79-197 Nr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U.
'01 Via ri etta Street, Sui te 3100 Atl anta, Georgi a 30303
S. Nuclear Regulatory Commission
'01 Viarietta Street, Sui te 3100
: Atlanta, Georgi a 30303


==Dear Nr. O'Reilly:==
==Dear Nr. O'Reilly:==
Re:
RI I:WAR 50-335/79-15 Florida Power 8 Light Company has reviewed the subject inspection report and a response is attached.
There is no proprietary information in the report.
Very truly yours, Robert E. Uhrig Vice President Advanced Systems
& Technology REU/MAS/cph Attachment cc:
8arold F. Reis, Esquire 79082g0 ~~
PEOPLE
..SERVING PEOPLE


Re:   RI I:WAR 50-335/79-15 Florida Power    8  Light  Company has  reviewed the subject inspection report and a response      is attached.
ATTACHflEtlT Re:
There  is  no proprietary information in the report.
RI1:tjAK 50-335/79-15 Findinq As reouired by Technical Specification 6.8.1, procedur s shall be established and implemented.
Very  truly yours, Robert E. Uhrig Vice President Advanced Systems      & Technology REU/MAS/cph Attachment cc:  8arold  F. Reis, Esquire 79082g0 ~~
Contlaiy to the above, procedures AP 000720 and 01-2-PR/PSL2 were nol.
PEOPLE  ..SERVING PEOPLE
imple;;:anted in that:
 
AP 0005720, Revision 6, dated f!arch 25, 1977, requires (Section 8.2.7) that personnel who make less than GO percent on any portion o
ATTACHflEtlT Re:    RI1:tjAK 50-335/79-15 Findinq As reouired by Technical Specification 6.8.1, procedur           s shall be established and implemented.
tt.e annual exa.iination-shall attend lectures in those ar=as and 5 of 17 persons scoring less than 80 percent in one or more areas of the 1977 annual examination did not attend the lectures on those are"s in 1978.
Contlaiy to the above, procedures         AP 000720 and 01-2-PR/PSL2 were nol.
(';1-2-PR/PSL2, Pevision 5, dated triarch 1977, requires (Section 4.3) that Departm nt Heads establish departmental person.iel training standards
imple;;:anted     in that:
: and, as of t!ay 30,
AP   0005720, Revision 6, dated f!arch 25, 1977, requires     (Section 8.2.7) that personnel     who make less than GO percent on any portion o tt.e annual exa.iination- shall attend lectures in those ar=as and 5 of 17 persons scoring less than 80 percent in one or more areas of the 1977 annual examination did not attend the lectures on those are"s in 1978.
: 1979, such standards had not been prepared for the t'.echani'cal t:;aintenance, Electrical t'aintenance, arid tnstrument and Control Dkpartmerts.
(';1-2-PR/PSL2, Pevision 5, dated triarch 1977, requires (Section 4.3) that Departm nt Heads establish departmental person.iel training standards and, as of t!ay 30, 1979, such standards had not been prepared for the t'.echani'cal t:;aintenance, Electrical t'aintenance, arid   tnstrument and Control Dkpartmerts.


===Response===
===Response===
Th     personnel who did not have a graCe of GO;: or better in the annu:.'l examination and who did not attend the required lectuies were retesteC and re;eivi d exa".. gi ades of GO or greiter.
Th personnel who did not have a
Jn   tl;: fulure, fuiluri'o ante>>C lc'i Jr: s c.s ri lill1 ed will li" r.oie, c.i.
graCe of GO;: or better in the annu:.'l examination and who did not attend the required lectuies were retesteC and re;eivi d exa".. gi ades of GO or greiter.
a   deficie>>cg against an individual is record, and make-up trai>>i>>g will be   requi red.
Jn tl;: fulure, fuiluri'o ante>>C lc'i Jr: s c.s ri lill1ed will li" r.oie, c.i.
B. t"   chanical, Electrical, and lI C haintenance Department personnel 1
a deficie>>cg against an individual is record, and make-up trai>>i>>g will be requi red.
trainirio standards comply with AHS1 STD N18.1. Each of. these depaltments have now documented this standard in thei r proora is.
B.
t" chanical, Electrical, and 1
lI C haintenance Department personnel trainirio standards comply with AHS1 STD N18.1.
Each of. these depaltments have now documented this standard in thei r proora is.


~Findin In the second paraqraph on page 2 of a letter from tsr. P. Collins of tie Operator Licensing Branch of the l/BC to t)r. t:. Harris of the St. Lucie Plant dated December 9, 1977, the licensee was instructed to assu.e th;t applications for the renewal of operator licenses contain statements indicating any area(s) where the applicant failed to participate in the accepted requalification program and indicate the actions taken or plar">ed to compensate for such nonparticipation.
~Findin In the second paraqraph on page 2 of a letter from tsr.
P. Collins of tie Operator Licensing Branch of the l/BC to t)r.
t:. Harris of the St. Lucie Plant dated December 9, 1977, the licensee was instructed to assu.e th;t applications for the renewal of operator licenses contain statements indicating any area(s) where the applicant failed to participate in the accepted requalification program and indicate the actions taken or plar">ed to compensate for such nonparticipation.
Contrary to the above, applications for the renewal of two licenses were sub'itted on February 23, 1979, for operators who had missed one or mo;e required lectures, and no statement of the inadequacy nor of the corrective actions wie re included.
Contrary to the above, applications for the renewal of two licenses were sub'itted on February 23, 1979, for operators who had missed one or mo;e required lectures, and no statement of the inadequacy nor of the corrective actions wie re included.
~Res onse Amended renewal   applications for operator licenses were submitted detailing the deficiencies in the individual requalification program attendance for the personnel involved.
~Res onse Amended renewal applications for operator licenses were submitted detailing the deficiencies in the individual requalification program attendance for the personnel involved.
The Training Supervisor is aware of this deviation and will assure tha'u ure applications for operator license renewal will include inadequacies and deficiercies of the operator as defined in fir. Collins letter of 9/12/77.
The Training Supervisor is aware of this deviation and will assure tha'u ure applications for operator license renewal will include inadequacies and deficiercies of the operator as defined in fir. Collins letter of 9/12/77.


~,}}
~,}}

Latest revision as of 16:28, 8 January 2025

Responds to NRC Re Violations Noted in IE Insp Rept 50-335/79-15.Corrective Actions:Amended Renewal Applications for OLs Were Submitted Detailing Deficiencies in Individual Requalification Program Attendance
ML17207A306
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/19/1979
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17207A305 List:
References
L-79197, NUDOCS 7908240104
Download: ML17207A306 (5)


Text

P. O,Bog 0)3100,.":IA' FL ~y/0l 0

FLORIO< POVi'EF' LIGHT ~ CQ':F-.i July 19, 1979 L-79-197 Nr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U.

S. Nuclear Regulatory Commission

'01 Viarietta Street, Sui te 3100

Atlanta, Georgi a 30303

Dear Nr. O'Reilly:

Re:

RI I:WAR 50-335/79-15 Florida Power 8 Light Company has reviewed the subject inspection report and a response is attached.

There is no proprietary information in the report.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems

& Technology REU/MAS/cph Attachment cc:

8arold F. Reis, Esquire 79082g0 ~~

PEOPLE

..SERVING PEOPLE

ATTACHflEtlT Re:

RI1:tjAK 50-335/79-15 Findinq As reouired by Technical Specification 6.8.1, procedur s shall be established and implemented.

Contlaiy to the above, procedures AP 000720 and 01-2-PR/PSL2 were nol.

imple;;:anted in that:

AP 0005720, Revision 6, dated f!arch 25, 1977, requires (Section 8.2.7) that personnel who make less than GO percent on any portion o

tt.e annual exa.iination-shall attend lectures in those ar=as and 5 of 17 persons scoring less than 80 percent in one or more areas of the 1977 annual examination did not attend the lectures on those are"s in 1978.

(';1-2-PR/PSL2, Pevision 5, dated triarch 1977, requires (Section 4.3) that Departm nt Heads establish departmental person.iel training standards

and, as of t!ay 30,
1979, such standards had not been prepared for the t'.echani'cal t:;aintenance, Electrical t'aintenance, arid tnstrument and Control Dkpartmerts.

Response

Th personnel who did not have a

graCe of GO;: or better in the annu:.'l examination and who did not attend the required lectuies were retesteC and re;eivi d exa".. gi ades of GO or greiter.

Jn tl;: fulure, fuiluri'o ante>>C lc'i Jr: s c.s ri lill1ed will li" r.oie, c.i.

a deficie>>cg against an individual is record, and make-up trai>>i>>g will be requi red.

B.

t" chanical, Electrical, and 1

lI C haintenance Department personnel trainirio standards comply with AHS1 STD N18.1.

Each of. these depaltments have now documented this standard in thei r proora is.

~Findin In the second paraqraph on page 2 of a letter from tsr.

P. Collins of tie Operator Licensing Branch of the l/BC to t)r.

t:. Harris of the St. Lucie Plant dated December 9, 1977, the licensee was instructed to assu.e th;t applications for the renewal of operator licenses contain statements indicating any area(s) where the applicant failed to participate in the accepted requalification program and indicate the actions taken or plar">ed to compensate for such nonparticipation.

Contrary to the above, applications for the renewal of two licenses were sub'itted on February 23, 1979, for operators who had missed one or mo;e required lectures, and no statement of the inadequacy nor of the corrective actions wie re included.

~Res onse Amended renewal applications for operator licenses were submitted detailing the deficiencies in the individual requalification program attendance for the personnel involved.

The Training Supervisor is aware of this deviation and will assure tha'u ure applications for operator license renewal will include inadequacies and deficiercies of the operator as defined in fir. Collins letter of 9/12/77.

~,