ML17263B076: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML17263B076
| number = ML17263B076
| issue date = 05/31/1995
| issue date = 05/31/1995
| title = Monthly Operating Rept for May 1995 for Ginna NPP.W/950606 Ltr
| title = Monthly Operating Rept for May 1995 for Ginna NPP
| author name = Walden J, Widay J
| author name = Walden J, Widay J
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:RIQRITY PACCELERATED    RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
{{#Wiki_filter:P RIQRITY ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET  N FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                           G 05000244 AUTH. NAME             AUTHOR AFFILIATION WALDEN,J.V.           Rochester Gas 6 Electric Corp.
FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
WIDAY,J.A.             Rochester Gas 6 Electric Corp.                                                   P RECIP.NAME             RECIPIENT AFFILIATION
AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.
Rochester Gas 6 Electric Corp.
WIDAY,J.A.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION DOCKET N
05000244 P


==SUBJECT:==
==SUBJECT:==
Monthly operating rept               for May 1995     for Ginna   NP .   /950606 ltr ~
Monthly operating rept for May 1995 for Ginna NP
DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR                           ENCL       SIZE:
. /950606 ltr~
TITLE: Monthly Operating Report (per Tech Specks NOTES:License Exp date in- accordance with 10CFR2,2.109(9/19/72).                             05000244 p RECIPIENT                 COPIES            RECIPIENT              COPIES ID  CODE/NAME              LTTR ENCL        ID CODE/NAME         LTTR ENCL PD1-1 PD                         1      1      JOHNSON,A                  1      1 INTERNAL: AEOD/SPD/RRAB                     1      1                KTE  . 01      1      1 NRR/DISP/PIPB                   1      1      NRR/DOPS70ECB              1      1 RGN1                             1      1 EXTERNAL: LITCO BRYCE,J H                   1     1     NOAC                       1     1 NRC PDR                          1     1 D
DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specks NOTES:License Exp date in-accordance with 10CFR2,2.109(9/19/72).
05000244 p
RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB RGN1 EXTERNAL: LITCO BRYCE,J H
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME JOHNSON,A KTE
. 01 NRR/DOPS70ECB NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
C U
C U
N NOTE TO ALL RIDS" RECIPIENTS:
N NOTE TO ALL RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE! CONTACTTIIE DOCUWIENT CONTROL DESK, ROOK/ PI.37 (EXT. 504.2083 ) TO ELIAIINATEYOUR 4'AVE~ FRONI DISTRI!3UTION LISTS FOR DOCL'MEN'I'S YOU DON "I'L'ED!
PLEASE HELP US TO REDUCE iVASTE!CONTACTTIIE DOCUWIENTCONTROL DESK, ROOK/ PI.37 (EXT. 504.2083 ) TO ELIAIINATEYOUR 4'AVE~ FRONI DISTRI!3UTIONLISTS FOR DOCL'MEN'I'S YOU DON"I'L'ED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                   10   ENCL       10
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10


7
~ V 7
~ V l/ized~ y zzz                                                             l 1I ~ Ow ~ 1 ~
l/ized~ y zzz l1I ~ Ow ~ 1 ~
ZZ::."
ZZ::."
ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TKI.KPHONK ARKA COOK 7IO 546.2700 GINNA STATION June 6, 1995 US   Nuclear Regulatory Commission Document     Control Desk Washington,     DC 20555
ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TKI.KPHONK ARKA COOK 7IO 546.2700 GINNA STATION June 6,
1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555


==Subject:==
==Subject:==
Monthly Report for May, 1995 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No.'0-244
Monthly Report for May, 1995 Operating Status Information R.
 
E. Ginna Nuclear Power Plant Docket No.'0-244
==Dear    Sir:==


==Dear Sir:==
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of May, 1995.
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of May, 1995.
Very truly   yours, s h A. Wid ant Manager JAW:tjn Attachments c:   Mr. Thomas T. Martin   NRC (1)
Very truly yours, s
h A. Wid ant Manager JAW:tjn Attachments c:
Mr. Thomas T. Martin NRC (1)
I
I
        '7506200025 9'50531 PDR     'ADOCK 05000244 R                     PDR                                         ZpPf I
'7506200025 9'50531 PDR
'ADOCK 05000244 R
PDR ZpPf I


OPERATING DATA REPORT 50-244 Jun  6 1995 COMPLETED BY John V. Walden TELEPHONE (315)5244446 Ext.588
OPERATING DATAREPORT COMPLETED BY Jun 6 1995 50-244 John V. Walden TELEPHONE (315)5244446 Ext.588
: 1. Unit Name:             R.E. GINNA NUCLEAR POWER PLANT
: 1. Unit Name:
: 2. Reporting Period:             Ma   1995
R.E. GINNANUCLEAR POWER PLANT
: 3. Licensed Thermal Power (MWt):                         1520
: 2. Reporting Period:
: 4. Nameplate Rating (Gross MWe):                         490
Ma 1995 3.
: 5. Design Electric Rating (Net MWe):                     470
Licensed Thermal Power (MWt):
: 6. Maximum Dependable Capacity (Gross MWe):               490
1520 4.
: 7. Maximum Dependable Capacity (Net MWe):                 470 8., if Changes  Occur in Capacity Rating (items Number 3 Through 7) Since Last Report, Give Reason:
Nameplate Rating (Gross MWe):
: 9. Power Level to Which Restricted, If Any (Net MWe:
490 5.
: 10. Reason For Restrictions, If An:
Design Electric Rating (Net MWe):
This Month           Yr.-to-Date             Cumulative
470 6.
: 11. Hours in Reported Period                               744.0                  3623.0                223631.0
Maximum Dependable Capacity (Gross MWe):
: 12. Number of hours Reactor Was Critical                   690.2                  2746.5                178562.2
490 7.
: 13. Reactor Reserve Shutdown Hours                             0.0                    0.0 .                1687.6
Maximum Dependable Capacity (Net MWe):
: 14. Hours Generator On-line                                 658.3                  2685.3                175657.6
470 8., ifChanges Occur in Capacity Rating (items Number 3 Through 7) Since Last Report, Give Reason:
: 15. Unit Reserve Shutdown Hours                               0.0                    0.0                      8.5
9.
: 16. Gross Thermal Energy Generated (MWH)                 934804.0              3942688.0              249457925.0
Power Level to Which Restricted, IfAny (Net MWe:
: 17. Gross Electrical Energy Generated (MWH)             316061.0              1333378.0                82567430.0
: 10. Reason For Restrictions, IfAn:
: 18. Net Electrical Energy Generated (MWH)               300318.0              1267669.0                78376899.0
This Month Yr.-to-Date Cumulative
: 19. Unit Service Factor (%)                                 88.5                    74.1                      78.5
: 11. Hours in Reported Period
: 20. Unit Availability Factor (%)                             88.5                    74.1                      78.6
: 12. Number of hours Reactor Was Critical
: 21. Unit Capacity Factor (using MDC Net) (%)                 85.9                    74.4                      75.7
: 13. Reactor Reserve Shutdown Hours
: 22. Unit Capacity Factor (using DER Net) (%)                 85.9                    74.4                      75.7
: 14. Hours Generator On-line
: 23. Unit Forced Outage Rate (%)                               0.0                     0.0                     5.6
: 15. Unit Reserve Shutdown Hours
: 16. Gross Thermal Energy Generated (MWH)
: 17. Gross Electrical Energy Generated (MWH)
: 18. Net Electrical Energy Generated (MWH)
: 19. Unit Service Factor (%)
: 20. Unit AvailabilityFactor (%)
: 21. Unit Capacity Factor (using MDC Net) (%)
: 22. Unit Capacity Factor (using DER Net) (%)
: 23. Unit Forced Outage Rate (%)
744.0 690.2 0.0 658.3 0.0 934804.0 316061.0 300318.0 88.5 88.5 85.9 85.9 0.0 3623.0 2746.5 0.0 2685.3 0.0 3942688.0 1333378.0 1267669.0 74.1 74.1 74.4 74.4 0.0 223631.0 178562.2 1687.6 175657.6 8.5 249457925.0 82567430.0 78376899.0 78.5 78.6 75.7 75.7 5.6
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Refuelin and Maintenance Started 3/26/95 Finished 5/4/95 Duration 39 da
Refuelin and Maintenance Started 3/26/95 Finished 5/4/95 Duration 39 da
: 25. If Shutdown At End of Report Period. Estimate Date of Startup:
: 25. IfShutdown At End of Report Period. Estimate Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                 Forcast                 Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
: 26. Units In Test Status (Prior to Commercial Operation):
* CUMULATIVETOTAL COMMENCING JANUARY 1. 1975 CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969
Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
* CUMULATIVETOTALCOMMENCINGJANUARY 1. 1975 CUMULATIVETOTALCOMMENCINGNOVEMBER8, 1969


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: June 6 1995 COMPLETED BY:
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.
John Walden TELEPHONE: 315 524-4446   Ext. 588 MONTH   Ma   1995 DAY AVERAGE DAILY POWER LEVEL         DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                           (MWe-Net)
Ginna Nuclear Power Plant DATE: June 6
: 17.         474 2 ~                                   18.         474
1995 COMPLETED BY:
: 3.                                     19.         474
John Walden TELEPHONE:
: 4.           36                       20.         475
315 524-4446 Ext.
: 5.           211                       21.         475 6.
588 MONTH Ma 1995 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
7.
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17.
8.
474 2 ~
404 448 474 22.
18.
23 24.
474 3.
                                          '75      474 475
19.
: 9.           474                       25.         475
474 4.
: 10.         475                       26.         475 475                       27.         475 12;         475                       28.         476
36 20.
: 13.         475                       29.         476
475 5.
: 14.         475                       30.         475
211 21.
: 15.         474                       31.         475
475 6.
: 16.         474 INSTRUCTIONS On this format,   list the average daily unit power level in MWe-Net for each day in reporting month. 'ompute to the nearest whole megawatt.
404 22.
474 7.
448 23'75 8.
474 24.
475 9.
474 25.
475 10.
475 26.
475 475 27.
475 12; 475 28.
476 13.
475 29.
476 14.
475 30.
475 15.
474 31.
475 16.
474 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. 'ompute to the nearest whole megawatt.


DOCKET NO.         ~0-244 UNlTNAhlE   R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS COh)PLETl:D BY           V g hn V. Walden TELEPlIONf( 3l5 ) 524-4446 Ext. 588 I
DOCKET NO.
rI4         0 0I >>                             c c                c v   Licensee                  0 IA            Cause & Corrective 0          c                            Em        c No.            Date    0 I0 0 0
~0-244 UNlTNAhlE R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS COh)PLETl:D BY V
0 0>>    0    Event         0 0      0 0 0 0                    Action to 0         0                               0                        Prevent Recurrence I          ~
g hn V. Walden TELEPlIONf(3l5 ) 524-4446 Ext.
X.'        0 In  C  Report II      cA (J O
588 No.
0 O
Date 0
5-03         3/26/95 S     937.7                                                       Continuation of Annual Refueling Shutdown 1
I c0 0I 0
F: Forced           Reason:                                      hletbod:                          Fxhibit G - Instructions S:   Scheduled     A-Equipment Failure (Explain)               1 hhfanual                        for Preparation of Data B-Maintenance or Test                       2-hlanual Scram.                  Entry Sheets for Licensee C-Rcfucling                                 3-Automatic Scram.                Event Rcport (LER) File (NUREG-D-Regulatory Restriction                     4-Other (Explain)                0161)
0 X.'~
E-Operator Training & License Examination F-Administrative G.Operational Error (Explain)
rI4 c0 00 I
REV. 4/SS 4949        El-Other (Explain)                                                             Exhibit 1 - Same Source
0I >>0 c v 0>>
0 0 In C
0O Licensee Event Report II Em 0
0 0
cA (J c0 IA 0c 0
00 O
Cause & Corrective Action to Prevent Recurrence 5-03 3/26/95 S
937.7 Continuation of Annual Refueling Shutdown 1
F: Forced S:
Scheduled REV. 4/SS 4949 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Rcfucling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G.Operational Error (Explain)
El-Other (Explain) hletbod:
1 hhfanual 2-hlanual Scram.
3-Automatic Scram.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER) File (NUREG-0161)
Exhibit 1 - Same Source


NARRATXVE SVMIEMY OP OPERATING EXPERIENCE DOCKET NO:   50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: J ne 6 1995 COMPLETED BY:
NARRATXVE SVMIEMY OP OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.
John Walden TELEPHONE:   315 524-4446 Ext. 588 MONTH Ma   1995 On March 26,   the unit was taken off line as scheduled for its annual maintenance and refueling outage. The unit. was placed on line on May 4. Total outage duration was 39.1 days. Average power for the month following power ascension was 974.
Ginna Nuclear Power Plant DATE: J ne 6
1995 COMPLETED BY:
John Walden TELEPHONE:
315 524-4446 Ext.
588 MONTH Ma 1995 On March 26, the unit was taken off line as scheduled for its annual maintenance and refueling outage.
The unit. was placed on line on May 4.
Total outage duration was 39.1 days.
Average power for the month following power ascension was 974.


        "E J
"E J
              '2 0 ~
'2 0
1 e ~   ~
~
1 e ~
~
4}}
4}}

Latest revision as of 10:02, 8 January 2025

Monthly Operating Rept for May 1995 for Ginna NPP
ML17263B076
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/31/1995
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9506200025
Download: ML17263B076 (7)


Text

P RIQRITY ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.

Rochester Gas 6 Electric Corp.

WIDAY,J.A.

Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION DOCKET N

05000244 P

SUBJECT:

Monthly operating rept for May 1995 for Ginna NP

. /950606 ltr~

DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specks NOTES:License Exp date in-accordance with 10CFR2,2.109(9/19/72).

05000244 p

RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB RGN1 EXTERNAL: LITCO BRYCE,J H

NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME JOHNSON,A KTE

. 01 NRR/DOPS70ECB NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 D

C U

N NOTE TO ALL RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACTTIIE DOCUWIENTCONTROL DESK, ROOK/ PI.37 (EXT. 504.2083 ) TO ELIAIINATEYOUR 4'AVE~ FRONI DISTRI!3UTIONLISTS FOR DOCL'MEN'I'S YOU DON"I'L'ED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

~ V 7

l/ized~ y zzz l1I ~ Ow ~ 1 ~

ZZ::."

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TKI.KPHONK ARKA COOK 7IO 546.2700 GINNA STATION June 6,

1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for May, 1995 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No.'0-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of May, 1995.

Very truly yours, s

h A. Wid ant Manager JAW:tjn Attachments c:

Mr. Thomas T. Martin NRC (1)

I

'7506200025 9'50531 PDR

'ADOCK 05000244 R

PDR ZpPf I

OPERATING DATAREPORT COMPLETED BY Jun 6 1995 50-244 John V. Walden TELEPHONE (315)5244446 Ext.588

1. Unit Name:

R.E. GINNANUCLEAR POWER PLANT

2. Reporting Period:

Ma 1995 3.

Licensed Thermal Power (MWt):

1520 4.

Nameplate Rating (Gross MWe):

490 5.

Design Electric Rating (Net MWe):

470 6.

Maximum Dependable Capacity (Gross MWe):

490 7.

Maximum Dependable Capacity (Net MWe):

470 8., ifChanges Occur in Capacity Rating (items Number 3 Through 7) Since Last Report, Give Reason:

9.

Power Level to Which Restricted, IfAny (Net MWe:

10. Reason For Restrictions, IfAn:

This Month Yr.-to-Date Cumulative

11. Hours in Reported Period
12. Number of hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor (%)
20. Unit AvailabilityFactor (%)
21. Unit Capacity Factor (using MDC Net) (%)
22. Unit Capacity Factor (using DER Net) (%)
23. Unit Forced Outage Rate (%)

744.0 690.2 0.0 658.3 0.0 934804.0 316061.0 300318.0 88.5 88.5 85.9 85.9 0.0 3623.0 2746.5 0.0 2685.3 0.0 3942688.0 1333378.0 1267669.0 74.1 74.1 74.4 74.4 0.0 223631.0 178562.2 1687.6 175657.6 8.5 249457925.0 82567430.0 78376899.0 78.5 78.6 75.7 75.7 5.6

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuelin and Maintenance Started 3/26/95 Finished 5/4/95 Duration 39 da

25. IfShutdown At End of Report Period. Estimate Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

  • CUMULATIVETOTALCOMMENCINGJANUARY 1. 1975 CUMULATIVETOTALCOMMENCINGNOVEMBER8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.

Ginna Nuclear Power Plant DATE: June 6

1995 COMPLETED BY:

John Walden TELEPHONE:

315 524-4446 Ext.

588 MONTH Ma 1995 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17.

474 2 ~

18.

474 3.

19.

474 4.

36 20.

475 5.

211 21.

475 6.

404 22.

474 7.

448 23'75 8.

474 24.

475 9.

474 25.

475 10.

475 26.

475 475 27.

475 12; 475 28.

476 13.

475 29.

476 14.

475 30.

475 15.

474 31.

475 16.

474 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. 'ompute to the nearest whole megawatt.

DOCKET NO.

~0-244 UNlTNAhlE R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS COh)PLETl:D BY V

g hn V. Walden TELEPlIONf(3l5 ) 524-4446 Ext.

588 No.

Date 0

I c0 0I 0

0 X.'~

rI4 c0 00 I

0I >>0 c v 0>>

0 0 In C

0O Licensee Event Report II Em 0

0 0

cA (J c0 IA 0c 0

00 O

Cause & Corrective Action to Prevent Recurrence 5-03 3/26/95 S

937.7 Continuation of Annual Refueling Shutdown 1

F: Forced S:

Scheduled REV. 4/SS 4949 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Rcfucling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G.Operational Error (Explain)

El-Other (Explain) hletbod:

1 hhfanual 2-hlanual Scram.

3-Automatic Scram.

4-Other (Explain)

Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER) File (NUREG-0161)

Exhibit 1 - Same Source

NARRATXVE SVMIEMY OP OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.

Ginna Nuclear Power Plant DATE: J ne 6

1995 COMPLETED BY:

John Walden TELEPHONE:

315 524-4446 Ext.

588 MONTH Ma 1995 On March 26, the unit was taken off line as scheduled for its annual maintenance and refueling outage.

The unit. was placed on line on May 4.

Total outage duration was 39.1 days.

Average power for the month following power ascension was 974.

"E J

'2 0

~

1 e ~

~

4