Line 2: Line 2:
| number = ML17309A503
| number = ML17309A503
| issue date = 11/30/1992
| issue date = 11/30/1992
| title = Monthly Operating Rept for Nov 1992 for Re Ginna Nuclear Power Plant.W/921210 Ltr
| title = Monthly Operating Rept for Nov 1992 for Re Ginna Nuclear Power Plant
| author name = Dodge R, Mecredy R
| author name = Dodge R, Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:'Ci
{{#Wiki_filter:'Ci
          ~l stsilllll"'ite)~tz" ROCHESTER GAS AND ELECTRIC CORPORATION             o 89 EAST AVENUE, ROCHESTER N.Y. 14649.0001 ROBERTC MECREDY                                                                     TELEPHONE Vice President                                                               AREA CODE 71B 546 2700 Cinna Nuclear Producrion GZNNA STATION December 10, 1992 US     Nuclear Regulatory Commission Document                 Control Desk Washington,                 DC 20555
~l stsilllll"'ite)~tz" ROCHESTER GAS AND ELECTRIC CORPORATION o
89 EAST AVENUE, ROCHESTER N.Y. 14649.0001 ROBERTC MECREDY Vice President Cinna Nuclear Producrion TELEPHONE AREACODE 71B 546 2700 GZNNA STATION December 10, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555


==Subject:==
==Subject:==
Monthly Report for November, 1992 Operating Status Xnformation R. E. Ginna Nuclear Power Plant Docket No. 50-244
Monthly Report for November, 1992 Operating Status Xnformation R.
E. Ginna Nuclear Power Plant Docket No. 50-244


==Dear         Sir:==
==Dear Sir:==
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of November, 1992.
Very truly yours, Robert C. Mecred RCM/
Attachments cc:, Mr. Thomas T. Martin NRC (1)


Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of November, 1992.
ap
Very  truly yours, Robert C. Mecred RCM/
Attachments cc:,        Mr. Thomas T. Martin        NRC  (1)


ap OPERATING DATA REPORT DOCKET NO.       50-244 DATE     Dec     r 10   1992 COHPLETED BY Robert E. Dodge TELEPHONE       315   524.4446 ext. 396 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO.
: 1.     Unit Name: R.E. GINNA NUCLEAR POWER PLANT                               Notes: The unit operated at approx.
50-244 DATE Dec r 10 1992 COHPLETED BY Robert E. Dodge OPERATING STATUS TELEPHONE 315 524.4446 ext. 396 1.
: 2.      Reporting Period:         November 1992                                             97/. reactor power level for
2.
: 3.      Licensed Thermal Power (MWt):                 1520                                  the report period except for 4~      Nameplate Rating (Gross HWe):                 490                                  events outlined on page 4.
3.
: 5.      Design Electrical Rating (Net HWe):           470
4 ~
: 6.      Haximm Dependable Capacity (Gross HWe):       490
5.
: 7.      Maxinun Dependable Capacity (Net MWe):         470
6.
: 8.      If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
7.
: 9.       Power Level to Which Restricted, If Any (Net MWe):
8.
: 10. Reasons For Restrictions, If Any:
Unit Name:
This Hcnth         Yr.-to-Date             Cmulat 1 ve
R.E.
: 11.     Hours In Report Period                                   720                  8 040                  202 146.45
GINNA NUCLEAR POWER PLANT Reporting Period:
: 12.      Nunber of Hours Reactor Was Critical                     720                  6 889.71                160 220.67 13 ~    Reactor Reserve Shutdown Hours                                                                         1  687.55 14 ~    Hours Generator On-Line                                 720                  6 793.75                157 499.13
November 1992 Licensed Thermal Power (MWt):
: 15. Unit Reserve Shutdown Hours                                                                                   8.5
Nameplate Rating (Gross HWe):
* 16 ~    Gross Thermal Energy Generated (HWN)               1 045 291            9 723 083              222 937 596
Design Electrical Rating (Net HWe):
: 17.      Gross Electrical Energy Generated (HWN)             356 190            3 291 724                73 621 331
Haximm Dependable Capacity (Gross HWe):
: 18.      Net Electrical Energy Generated (HWN)               338 563            3 125 312                69 877 859
Maxinun Dependable Capacity (Net MWe):
: 19. Unit Service Factor                                     100%                    84.50%                    78.07/.
If Changes Occur in Capacity Ratings (Items Notes:
: 20. Unit Availability Factor                                 100/,                  84.50%                    78.07%
The unit operated at approx.
21  ~  Unit Capacity Factor (Using   HDC Net)                   100.05/,               82.71%                     74.89%
97/. reactor power level for the report period except for events outlined on page 4.
: 22. Unit  Capacity Factor (Using  DER Net)                  100.05%                 82.71%                     74.89%
1520 490 470 490 470 Number 3 Through 7) Since Last Report, Give Reasons:
23.,    Unit  Forced Outage Rate                                    0/                    2.25%                     5.89%
9.
: 24. Shutdowns Scheduled Over Next 6 Honths (Type, Date and Duraticn   of Each):
Power Level to Which Restricted, If Any (Net MWe):
    'f Refueli   and Haintenance - Harch 19 1993 45 da 25         Shut Down At End Of Report Period, Estimated Date of Startup:
10.
26 'nits In     Test Status (Prior to Comnerciai Operation):                       Forecast                 Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Reasons For Restrictions, If Any:
  <<CUMULATIVE TOTAL COMMENCING JANUARY   1, 1975
This Hcnth Yr.-to-Date Cmulat 1 ve 11.
<<*CUMULATIVE TOTAL COMMENCING NOVEMBER     8, 1969
12.
13 ~
14 ~
15.
16 ~
17.
18.
19.
20.
21 ~
22.
23.,
Hours In Report Period Nunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (HWN)
Gross Electrical Energy Generated (HWN)
Net Electrical Energy Generated (HWN)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using HDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate 720 720 720 1 045 291 356 190 338 563 100%
100/,
100.05/,
100.05%
0/
8 040 6 889.71 6 793.75 9 723 083 3 291 724 3 125 312 84.50%
84.50%
82.71%
82.71%
2.25%
202 146.45 160 220.67 1 687.55 157 499.13 8.5 222 937 596 73 621 331 69 877 859 78.07/.
78.07%
74.89%
74.89%
5.89%
24.
Shutdowns Scheduled Over Next 6 Honths (Type, Date and Duraticn of Each):
Refueli and Haintenance
- Harch 19 1993 45 da 25'fShut Down At End Of Report Period, Estimated Date of Startup:
26'nits In Test Status (Prior to Comnerciai Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
<<CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975
<<*CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969


t AVERAGE DAILY UNIT POWER LEVEL t
t t
DOCKET NO.     50-244 UNIT R.E. Ginna Nuclear Power       Plant DATE December       0   1992 COMPLETED BY o ert E. Dodge TELEPHONE 1 315       524-4446   ext. 396 MONTH           November   1992 DAY AVERAGE DAILY POWER LEVEL             DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                               (MWe-Net)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
: 17.              480 2 ~             480                      18.              481 3 ~             481                      19.               481 4               481                      20.               481
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE December 0
    '80
1992 COMPLETED BY o ert E.
  ~
Dodge TELEPHONE 1
5  ~              481                      21.               481 6 ~              481                      22.               481 7  ~              421                      23               481 482
315 524-4446 ext.
                                                '4.
396 MONTH November 1992 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
8  ~                                                          481 9  ~              481                      25.               481
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 2 ~
: 10.              481                      26 ~             481 481                      27               481
3 ~
: 12.              481
4 ~
                                              '8.
5 ~
481 13                481                      29.               258
6 ~
    '4 481                      30.               431
7 ~
    '5.
8 ~
481                       31.
9 ~
16                481 INSTRUCTIONS On       this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
10.
12.
13
'4
'5.
16
'80 480 481 481 481 481 421 482 481 481 481 481 481 481 481 481 17.
18.
19.
20.
21.
22.
23
'4.
25.
26
~
27
'8.
29.
30.
31.
480 481 481 481 481 481 481 481 481 481 481 481 258 431 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.


00(:KET NO.         SO 244 liNlTNAMl'.R.E- 6INNA NUCLEAtc POWER PLAN'K UNIT SHUTDOWN AND POWER REDUCTIONS
00(:KET NO.
(:OMPLI'.TED BY Robert E l)odge 9>>             PfiON'f,   Bi>-524-4446 ext. 396 Ginna   Station Pl CY      cn>>0 0                        4      4 0  Licensee        Em        O IC) 4 0                Cause  L Corrective Ho.           Date           4 0 0
SO 244 liNlTNAMl'.R.E-6INNA NUCLEAtc POWER PLAN'K UNIT SHUTDOWN AND POWER REDUCTIONS
4 0>>> cc4O  Event          o 0 VI 4 0 4 0  0 Action to
(:OMPLI'.TED BY Robert E
                                >T
l)odge 9>>
                                ~
PfiON'f, Bi>-524-4446 ext.
0 v) c   Report 0       lA 0       E                   Prevent Recurrence 0
396 Ginna Station Ho.
O Cl 92-08     11-29-92         7. 67                       A                                           Gasket   failure   on 2B   MSR   2nd pass drain LCV-3334B     to feedwater heater 5B,replaced gasket.
Date 0
1                                                                             3 F: Forced           Reason:                                                    Method:                            Exhibic G - Instructions S: Scheduled       A-Equipment Failure (Explain)                             14lanual                            for Preparation of Data B-Maintenance. or Test                                     2-Manual Scram.                    Entry Sheets for Licensee C-Refueling                                               3-Aucomacic Scram.                  Event Report (LER) File (NUREG-D-Regulatory Restriction'peracor 4-Other (Explain)                  O161)
4
Training 8c License Examinacion F-Administrative
~
                      &Operational Error (Explain)
0
RKV. 445 4949          Hither (Explain)                                                                               Exhibit I - Same Source
>T CY 40 40 Pl cn>>0 4 04 0>>
O
> cc 0 v) c 0
Cl Licensee Event Report 0
Em o
0 VI 40 lA O IC) 4 0
00 4
E 0
O Cause L Corrective Action to Prevent Recurrence 92-08 11-29-92
: 7. 67 A
Gasket failure on 2B MSR 2nd pass drain LCV-3334B to feedwater heater 5B,replaced gasket.
1 F: Forced S:
Scheduled RKV. 445 4949 Reason:
A-Equipment Failure (Explain)
B-Maintenance. or Test C-Refueling D-Regulatory Restriction'peracor Training 8c License Examinacion F-Administrative
&Operational Error (Explain)
Hither (Explain) 3 Method:
14lanual 2-Manual Scram.
3-Aucomacic Scram.
4-Other (Explain)
Exhibic G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-O161)
Exhibit I - Same Source


    ~w H
~ w H
'I
'I


Line 91: Line 177:


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Decem   r 10 1992 COMPLETED BY Robert E. Dodge TELEPHONE 1 315   524-4446 ext. 396 MONTH   November 1992 The reactor power level averaged 974 for the majority of the report, with the following exception:
OF OPERATING EXPERIENCE DOCKET NO.
On November 29, 1992 power level was reduced to 32% to repair a gasket on MSR 2B steam drain line to feedwater heater 5B.}}
50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE Decem r 10 1992 COMPLETED BY Robert E.
Dodge TELEPHONE 1
315 524-4446 ext.
396 MONTH November 1992 The reactor power level averaged 974 for the majority of the report, with the following exception:
On November 29, 1992 power level was reduced to 32% to repair a gasket on MSR 2B steam drain line to feedwater heater 5B.}}

Latest revision as of 01:09, 8 January 2025

Monthly Operating Rept for Nov 1992 for Re Ginna Nuclear Power Plant
ML17309A503
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/30/1992
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9212150032
Download: ML17309A503 (7)


Text

'Ci

~l stsilllll"'ite)~tz" ROCHESTER GAS AND ELECTRIC CORPORATION o

89 EAST AVENUE, ROCHESTER N.Y. 14649.0001 ROBERTC MECREDY Vice President Cinna Nuclear Producrion TELEPHONE AREACODE 71B 546 2700 GZNNA STATION December 10, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for November, 1992 Operating Status Xnformation R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of November, 1992.

Very truly yours, Robert C. Mecred RCM/

Attachments cc:, Mr. Thomas T. Martin NRC (1)

ap

OPERATING DATA REPORT DOCKET NO.

50-244 DATE Dec r 10 1992 COHPLETED BY Robert E. Dodge OPERATING STATUS TELEPHONE 315 524.4446 ext. 396 1.

2.

3.

4 ~

5.

6.

7.

8.

Unit Name:

R.E.

GINNA NUCLEAR POWER PLANT Reporting Period:

November 1992 Licensed Thermal Power (MWt):

Nameplate Rating (Gross HWe):

Design Electrical Rating (Net HWe):

Haximm Dependable Capacity (Gross HWe):

Maxinun Dependable Capacity (Net MWe):

If Changes Occur in Capacity Ratings (Items Notes:

The unit operated at approx.

97/. reactor power level for the report period except for events outlined on page 4.

1520 490 470 490 470 Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level to Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

This Hcnth Yr.-to-Date Cmulat 1 ve 11.

12.

13 ~

14 ~

15.

16 ~

17.

18.

19.

20.

21 ~

22.

23.,

Hours In Report Period Nunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (HWN)

Gross Electrical Energy Generated (HWN)

Net Electrical Energy Generated (HWN)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using HDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate 720 720 720 1 045 291 356 190 338 563 100%

100/,

100.05/,

100.05%

0/

8 040 6 889.71 6 793.75 9 723 083 3 291 724 3 125 312 84.50%

84.50%

82.71%

82.71%

2.25%

202 146.45 160 220.67 1 687.55 157 499.13 8.5 222 937 596 73 621 331 69 877 859 78.07/.

78.07%

74.89%

74.89%

5.89%

24.

Shutdowns Scheduled Over Next 6 Honths (Type, Date and Duraticn of Each):

Refueli and Haintenance

- Harch 19 1993 45 da 25'fShut Down At End Of Report Period, Estimated Date of Startup:

26'nits In Test Status (Prior to Comnerciai Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

<<CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975

<<*CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969

t t

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT R.E. Ginna Nuclear Power Plant DATE December 0

1992 COMPLETED BY o ert E.

Dodge TELEPHONE 1

315 524-4446 ext.

396 MONTH November 1992 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 2 ~

3 ~

4 ~

5 ~

6 ~

7 ~

8 ~

9 ~

10.

12.

13

'4

'5.

16

'80 480 481 481 481 481 421 482 481 481 481 481 481 481 481 481 17.

18.

19.

20.

21.

22.

23

'4.

25.

26

~

27

'8.

29.

30.

31.

480 481 481 481 481 481 481 481 481 481 481 481 258 431 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

00(:KET NO.

SO 244 liNlTNAMl'.R.E-6INNA NUCLEAtc POWER PLAN'K UNIT SHUTDOWN AND POWER REDUCTIONS

(:OMPLI'.TED BY Robert E

l)odge 9>>

PfiON'f, Bi>-524-4446 ext.

396 Ginna Station Ho.

Date 0

4

~

0

>T CY 40 40 Pl cn>>0 4 04 0>>

O

> cc 0 v) c 0

Cl Licensee Event Report 0

Em o

0 VI 40 lA O IC) 4 0

00 4

E 0

O Cause L Corrective Action to Prevent Recurrence 92-08 11-29-92

7. 67 A

Gasket failure on 2B MSR 2nd pass drain LCV-3334B to feedwater heater 5B,replaced gasket.

1 F: Forced S:

Scheduled RKV. 445 4949 Reason:

A-Equipment Failure (Explain)

B-Maintenance. or Test C-Refueling D-Regulatory Restriction'peracor Training 8c License Examinacion F-Administrative

&Operational Error (Explain)

Hither (Explain) 3 Method:

14lanual 2-Manual Scram.

3-Aucomacic Scram.

4-Other (Explain)

Exhibic G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-O161)

Exhibit I - Same Source

~ w H

'I

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE Decem r 10 1992 COMPLETED BY Robert E.

Dodge TELEPHONE 1

315 524-4446 ext.

396 MONTH November 1992 The reactor power level averaged 974 for the majority of the report, with the following exception:

On November 29, 1992 power level was reduced to 32% to repair a gasket on MSR 2B steam drain line to feedwater heater 5B.