Text

'Ci

~l stsilllll"'ite)~tz" ROCHESTER GAS AND ELECTRIC CORPORATION o

89 EAST AVENUE, ROCHESTER N.Y. 14649.0001 ROBERTC MECREDY Vice President Cinna Nuclear Producrion TELEPHONE AREACODE 71B 546 2700 GZNNA STATION December 10, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for November, 1992 Operating Status Xnformation R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of November, 1992.

Very truly yours, Robert C. Mecred RCM/

Attachments cc:, Mr. Thomas T. Martin NRC (1)

ap

OPERATING DATA REPORT DOCKET NO.

50-244 DATE Dec r 10 1992 COHPLETED BY Robert E. Dodge OPERATING STATUS TELEPHONE 315 524.4446 ext. 396 1.

2.

3.

4 ~

5.

6.

7.

8.

Unit Name:

R.E.

GINNA NUCLEAR POWER PLANT Reporting Period:

November 1992 Licensed Thermal Power (MWt):

Nameplate Rating (Gross HWe):

Design Electrical Rating (Net HWe):

Haximm Dependable Capacity (Gross HWe):

Maxinun Dependable Capacity (Net MWe):

If Changes Occur in Capacity Ratings (Items Notes:

The unit operated at approx.

97/. reactor power level for the report period except for events outlined on page 4.

1520 490 470 490 470 Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level to Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

This Hcnth Yr.-to-Date Cmulat 1 ve 11.

12.

13 ~

14 ~

15.

16 ~

17.

18.

19.

20.

21 ~

22.

23.,

Hours In Report Period Nunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (HWN)

Gross Electrical Energy Generated (HWN)

Net Electrical Energy Generated (HWN)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using HDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate 720 720 720 1 045 291 356 190 338 563 100%

100/,

100.05/,

100.05%

0/

8 040 6 889.71 6 793.75 9 723 083 3 291 724 3 125 312 84.50%

84.50%

82.71%

82.71%

2.25%

202 146.45 160 220.67 1 687.55 157 499.13 8.5 222 937 596 73 621 331 69 877 859 78.07/.

78.07%

74.89%

74.89%

5.89%

24.

Shutdowns Scheduled Over Next 6 Honths (Type, Date and Duraticn of Each):

Refueli and Haintenance

- Harch 19 1993 45 da 25'fShut Down At End Of Report Period, Estimated Date of Startup:

26'nits In Test Status (Prior to Comnerciai Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

<<CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975

<<*CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969

t t

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT R.E. Ginna Nuclear Power Plant DATE December 0

1992 COMPLETED BY o ert E.

Dodge TELEPHONE 1

315 524-4446 ext.

396 MONTH November 1992 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 2 ~

3 ~

4 ~

5 ~

6 ~

7 ~

8 ~

9 ~

10.

12.

13

'4

'5.

16

'80 480 481 481 481 481 421 482 481 481 481 481 481 481 481 481 17.

18.

19.

20.

21.

22.

23

'4.

25.

26

~

27

'8.

29.

30.

31.

480 481 481 481 481 481 481 481 481 481 481 481 258 431 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

00(:KET NO.

SO 244 liNlTNAMl'.R.E-6INNA NUCLEAtc POWER PLAN'K UNIT SHUTDOWN AND POWER REDUCTIONS

(:OMPLI'.TED BY Robert E

l)odge 9>>

PfiON'f, Bi>-524-4446 ext.

396 Ginna Station Ho.

Date 0

4

~

0

>T CY 40 40 Pl cn>>0 4 04 0>>

O

> cc 0 v) c 0

Cl Licensee Event Report 0

Em o

0 VI 40 lA O IC) 4 0

00 4

E 0

O Cause L Corrective Action to Prevent Recurrence 92-08 11-29-92

7. 67 A

Gasket failure on 2B MSR 2nd pass drain LCV-3334B to feedwater heater 5B,replaced gasket.

1 F: Forced S:

Scheduled RKV. 445 4949 Reason:

A-Equipment Failure (Explain)

B-Maintenance. or Test C-Refueling D-Regulatory Restriction'peracor Training 8c License Examinacion F-Administrative

&Operational Error (Explain)

Hither (Explain) 3 Method:

14lanual 2-Manual Scram.

3-Aucomacic Scram.

4-Other (Explain)

Exhibic G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-O161)

Exhibit I - Same Source

~ w H

'I

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE Decem r 10 1992 COMPLETED BY Robert E.

Dodge TELEPHONE 1

315 524-4446 ext.

396 MONTH November 1992 The reactor power level averaged 974 for the majority of the report, with the following exception:

On November 29, 1992 power level was reduced to 32% to repair a gasket on MSR 2B steam drain line to feedwater heater 5B.