| issue date = 03/01/1984
| issue date = 03/01/1984
| title = Requests Mod of 830316 Order Requiring Installation of Noble Gas Steam Effluent Monitor by 840301.Mod Reflects Commitment to Install Acceptable Replacement for Existing Sys Prior to 841231,in Lieu of Schedule Proposed in Util 840203 Ltr
| title = Requests Mod of 830316 Order Requiring Installation of Noble Gas Steam Effluent Monitor by 840301.Mod Reflects Commitment to Install Acceptable Replacement for Existing Sys Prior to 841231,in Lieu of Schedule Proposed in Util
| author name = Lundvall A
| author name = Lundvall A
| author affiliation = BALTIMORE GAS & ELECTRIC CO.
| author affiliation = BALTIMORE GAS & ELECTRIC CO.
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULATOR     NFORMATION- DISTRIBUTION Sh       EM   .(RIDS)
{{#Wiki_filter:REGULATOR NFORMATION-DISTRIBUTION Sh EM.(RIDS)
ACCESSION NBR$ 8403060400,                     DUG~DATE:   84/03/01:   NOTARIZED'O           DOCKET' FACIL!50 347 Calvert Cl) ffs Nuclear Power P'lant'nit 1< Bal timore- 05000317 50 318 Calve('t Cliffs'uclear Power Plantr Unit 2i Bal,timor e 050003i8 AUTH~NAME                   'UTHOR       AFFILIATION LUNDVALL>A>E,                   Baltimore   'Gas L Electric Co ~
ACCESSION NBR$ 8403060400, DUG~DATE: 84/03/01:
    'RECIP,NAME                     RECIPIENT AFFILIATION MILLER'   ~ Re                     Oper atlng Reactor s Br anch 3
NOTARIZED'O DOCKET' FACIL!50 347 Calvert Cl)ffs Nuclear Power P'lant'nit 1< Bal timore-05000317 50 318 Calve('t Cliffs'uclear Power Plantr Unit 2i Bal,timor e 050003i8 AUTH~NAME
'UTHOR AFFILIATION LUNDVALL>A>E, Baltimore 'Gas L Electric Co ~
'RECIP,NAME RECIPIENT AFFILIATION MILLER'
~ Re Oper atlng Reactor s Br anch 3


==SUBJECT:==
==SUBJECT:==
Requests                 mod of 830316 or der requiring installation ofnoble gas steam,           effluent monitor. by 840301 Mod reflects commitment
Requests mod of 830316 or der requiring installation ofnoble gas steam, effluent monitor. by 840301
                                                                      ~
~ Mod reflects commitment to instill acceptable replacement for existing sys-prior.to 841231iin lieu of schedule pr oposed in util" 840203.
to instill acceptable replacement for existing sys- prior .to 841231iin lieu of schedule pr oposed in util" 840203. tr,                   1 DISTRIBUTION CODE! A001S                   COPIES RECEIVEDgLTR,J       ENCL, 4     SIZE~
1 tr, DISTRIBUTION CODE!
  -TITLE:   OR   Submit,ttal': General             Distr ibution
A001S COPIES RECEIVEDgLTR,J ENCL, 4 SIZE~
  ,NOTES!
-TITLE:
RECIPIENT                   <<COPIES            REC IP IENT"        ;COPIES "ID                            l.TTR -ENCL      ID CODE/NAME          LTTR ENCL CODE/NAME,'RR ORB3 BC               01   "7 INTERNAL; ELD/HDS4                               1           NRR/DK/MTEB               1 NRR/DL DIR                                        NRR/DL/ORAB               1 EXTERNALS NRR                    /MKTB          1            NRR/DSI/RAB               1 04      1-          RGN1                      1
OR Submit,ttal':
            'CRS                         09                    LPDR            03 NRC, PDR                   02.'                 NSIC           05 NTiS TOTAL NUMBER OF                 COPIES'EQUIRED'TTR           ?5   ENCL
General Distr ibution
,NOTES!
RECIPIENT "ID CODE/NAME,'RR ORB3 BC 01 INTERNAL; ELD/HDS4 NRR/DL DIR NRR
/MKTB 04
<<COPIES l.TTR -ENCL "7
1 1
1-REC IP IENT" ID CODE/NAME NRR/DK/MTEB NRR/DL/ORAB NRR/DSI/RAB RGN1
;COPIES LTTR ENCL 1
1 1
1 EXTERNALS
'CRS NRC, PDR NTiS 09 02.'
LPDR NSIC 03 05 TOTAL NUMBER OF COPIES'EQUIRED'TTR
?5 ENCL


Ik)yg   I)";]I ))II'(7f         )I ll4g,f)'-".         i q
Ik)yg I)";]I ))II'(7f
                                                                                                                                                  '              ''I I,         $ "47)
)I ll4g,f)'-".
            )(H   7)') "(lJ                                         li)( f   7)')I     g   l gd',)P )))(79             if,.                      e.~t'ai                          "y'il,          )())~ 4g>)I                l',Sf 5  I( 5  ))
i q '
              ') .'
''I I,
I,  '  i                        f[~p'fg)'"I                 ~Q))3)     f )('IF)                         s  f  p.,i).<                          f  II r l)( W,I)                                    fi'I II> '.) g w,'! l   4"))   qg))(yf'))           1'3               qr7>       f;)     >,~                                                   i
$ "47)
                                                                                                                                                                                                    <<)) (,            ll
)(H 7)') "(lJ 5
                                                                                                                          ) If  )
I( 5
                                                                                                                                  ')
)) ')
                                                                                                                                      )I   II g   7   gr')                     ( IIII)                                               f <<)I A ).i)   ~ (,I l           i I) i )
I, '
i k,,g          ",I   fi,                               . f.)'() t,]'
i r l)( W,I) li)( f 7)')I g
                                                                  )'(<
l gd',)P )))(79 f[~p'fg)'"I ~Q))3) f )('IF) fi'I II> '.)
I,'l.f)I l '.d I ll                                i     li          l,                                                                            I
g w,'! l 4"))
                                                                                                                                                                                                                                                  ~      g )
qg))(yf'))
((I f <<>73
1'3 I ll if,.
                                                                                                                                                            'I 00K      f                                        I                                II                d                                                                                              (Ii 1
s f p.,i).<
                                                                                      ~ Jj) ') (7                                                                                                                             I'~ 7)
e.~t'ai f
III 1 l rg  )
II qr7> f;) >,~
sg          0i,''r.'         "1)') if               )<)) l)fw g
)I f ) ') )I II g 7 gr')
                                                                                                                                        'lli,'I                                           I     l) < " '7))f
i
                                                                                                                              ''f ll ll I    'll f)H                                                                '~1   yfi''>II>'7,~
$ k,,g i
r,d77dia     odd     Weeedd7W d                                                 ',(f,l)~)''(,q f           )
li l '.d l,
                                                                                                                      ~   $                     ))',7,g"                       )
((I f <<>73 "y'il, )())~ 4g>)I l',Sf i <<)) (,
                                                                                                                                                                                                )                   ",,~II)           $   (I",g$         l)l         i,f "7
ll
                                                                                                    )l)(7il''R,<<! f dll )Iii f'                   f,"l)yi)gli                         ~
( IIII) f <<)I A ).i) ~ (,I l i
                                                                                                                                                                                          $            )i         f ikey f),'If'll, 7                                             ))'I     r                                                           <I (Ff i i                                                                                                              rr
I)
                                                                                                                                                                                                                ,ill       "I jj    (              Jl f                      ll l'7,.'k 'I)k<<(                   I   )I     ~     )I)(         I             (lj 7
",I fi,
I i
. f.)'() t,]'
f, l4
I,'l.f)I I ~
                                                                                                                      'f f'         ".~, g,is<i().               'I,   i   ~,'f.'t)J>                             3)()       )   'I.>> ")>)               I).">Y             (T
g )
i )
III 1 00K 1
l rg
)
sg f)'(<
I
~ Jj) ')
(7 0i,''r.'
"1)') if II
)<)) l)fw g ll ll I
'll f)H
'lli,'I
'I d
(Ii I'~ 7)
I l) < " '7))f
'~1 yfi''>II>'7,~
r,d77dia odd Weeedd7W d
',(f,l)~)''(,q f
)
~
$ ''f ))',7,g"
)
)
",,~II) $ (I",g$
l)l i,f "7
)l)(7il''R,<<!f dll )Iii f' f,"l)yi)gli
~
)i f f),'If'll, (Ff i 7
i
))'I r
rr jj
(
Jl f
<I
,ill "I ll l'7,.'k 'I)k<<(
I
)I
~
)I)(
I ikey (lj I
7 i
f,
'f f'
".~, g,is<i().
'I, i ~,'f.'t)J>
3)()
) 'I.>> ")>)
I).">Y (T l4


BALTIMORE GAS AND ELECTRIC CHARLES CENTER ~ P. O. BOX 1475 ~ BALTIMORE,MARYLAND2I203 ARTHUR E. LUNDVALL.JR.                                                                 March 1, 1980 VICC PRCSIDCNT SUPPLY Director of Nuclear Reactor Regulation Attention: Mr. J. R. Miller, Chief Operating Reactors Branch 83 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
BALTIMORE GAS AND ELECTRIC CHARLES CENTER ~ P. O. BOX 1475
~ BALTIMORE,MARYLAND2I203 ARTHUR E. LUNDVALL.JR.
VICC PRCSIDCNT SUPPLY March 1, 1980 Director of Nuclear Reactor Regulation Attention: Mr. J. R. Miller, Chief Operating Reactors Branch 83 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555


==Subject:==
==Subject:==
Calvert Cliffs Nuclear Power Plant Units Nos. 1 R 2; Dockets Nos. 50-317 and 50-318 Re uest for Modification of March 16 1983 Order Gentlemen:
Calvert Cliffs Nuclear Power Plant Units Nos.
By our letter dated February 3, 1980 we requested relief from the schedular requirements imposed by Commission Order dated March 16, 1983 inasmuch as it requires installation of a noble gas steam effluent monitor by March 1, 1980. As the result of discussion with Messrs. 3. Zwolinski (ORAB) and D. 3affe (ORB 3) on February 29, 1980 we understand that our proposed new completion dates of June 30, 1985 (Unit 1) and December 31, 1985 (Unit 2) cannot be accepted by your staff.
1 R 2; Dockets Nos. 50-317 and 50-318 Re uest for Modification of March 16 1983 Order Gentlemen:
The purpose of this letter is to request that, in lieu of the schedule suggested by our February 3, 1980 letter, the subject Order be modified to reflect the following commitment on our part:
By our {{letter dated|date=February 3, 1980|text=letter dated February 3, 1980}} we requested relief from the schedular requirements imposed by Commission Order dated March 16, 1983 inasmuch as it requires installation of a noble gas steam effluent monitor by March 1, 1980.
The Baltimore Gas and Electric Company will procure and install an acceptable replacement to the existing noble gas steam effluent monitor ratemeter module and place the system in service prior to December 31, 1980. In the event that the as-installed portions of the system (triaxial cabling and shielded detector assembly) are not compatible with the replacement system, then those as-installed portions of the system will be replaced with compatible equipment and the system made operational during the first outage of sufficient duration following December 31, 1980.
As the result of discussion with Messrs.
We have initiated procurement of a replacement system and expect to take delivery of all components by September 1980. On this basis, the proposed December 31, 1980, deadline is supportable in that it allows adequate time for installation'and testing assuming that the existing shielded detector assembly and triaxial cabling are electronically compatible with the replacement system. In the event that the detector and associated cabling are not compatible, then they will be replaced with acceptable equipment. However, because this equipment is located in the main steam penetration room in close proximity to the main steam line, replacement during power operations is 8403060400='840301'*PDR ADDCK     050003i7' PDR
: 3. Zwolinski (ORAB) and D. 3affe (ORB 3) on February 29, 1980 we understand that our proposed new completion dates of June 30, 1985 (Unit 1) and December 31, 1985 (Unit 2) cannot be accepted by your staff.
                                                  ''                                                                 gaol
The purpose of this letter is to request that, in lieu of the schedule suggested by our {{letter dated|date=February 3, 1980|text=February 3, 1980 letter}}, the subject Order be modified to reflect the following commitment on our part:
The Baltimore Gas and Electric Company will procure and install an acceptable replacement to the existing noble gas steam effluent monitor ratemeter module and place the system in service prior to December 31, 1980.
In the event that the as-installed portions of the system (triaxial cabling and shielded detector assembly) are not compatible with the replacement
: system, then those as-installed portions of the system will be replaced with compatible equipment and the system made operational during the first outage of sufficient duration following December 31, 1980.
We have initiated procurement of a replacement system and expect to take delivery of all components by September 1980.
On this basis, the proposed December 31, 1980, deadline is supportable in that it allows adequate time for installation'and testing assuming that the existing shielded detector assembly and triaxial cabling are electronically compatible with the replacement system.
In the event that the detector and associated cabling are not compatible, then they will be replaced with acceptable equipment.
However, because this equipment is located in the main steam penetration room in close proximity to the main steam line, replacement during power operations is 8403060400='840301'*PDR ADDCK 050003i7' PDR ''
gaol


V 'I Jf II II I "', I'f 78 ~
Jf II II V 'I I "',I'f 78
~


C Qr. 3. R. Miller                                                         March 1, 1980 not practical. This is because of (1) the high ambient temperatures in this room during power operations (130 - 100 F), (2) the possible need to modify the heavy lead shield assembly encapsulating the detector with the associated risk of a handling incident damaging main steam line peripherals, and (3) the potential for experiencing difficulty in achieving adequate cable-to-detector terminations given the high humidity conditions prevalent in this room during power operations.
Qr. 3. R. Miller C
March 1, 1980 not practical.
This is because of (1) the high ambient temperatures in this room during power operations (130
- 100 F),
(2) the possible need to modify the heavy lead shield assembly encapsulating the detector with the associated risk of a handling incident damaging main steam line peripherals, and (3) the potential for experiencing difficultyin achieving adequate cable-to-detector terminations given the high humidity conditions prevalent in this room during power operations.
Consequently, we believe that the proposed requirement to make the system operational during the first outage of sufficient duration following December 31, 1980, is appropriate for the case where replacement of the detector or associated cabling is required.
Consequently, we believe that the proposed requirement to make the system operational during the first outage of sufficient duration following December 31, 1980, is appropriate for the case where replacement of the detector or associated cabling is required.
If you should have any questions, please do not hesitate to contact us.
Ifyou should have any questions, please do not hesitate to contact us.
Sin rely, AEL/BSM/vf cc- 3. A. Biddison, 3r., Esq.
Sin
: rely, AEL/BSM/vf cc-
: 3. A. Biddison, 3r., Esq.
G. F. Trowbridge, Esq.
G. F. Trowbridge, Esq.
Mr. D. H. 3affe, NRC Mr. R. E. Architzel, NRC
Mr. D. H. 3affe, NRC Mr. R. E. Architzel, NRC


l ~ll J t'                                                   N t P S
l
H
~ll
        ~ g y                                          1 I C                            ni ~
~ g y J t' H
* ll ~
I C
C'         p*,
t P
* l g,a<,
1 N
Ir
S ni ~
'it \                                           1              IP 1
ll
~ q I         t                   1 R
~
C' p*,
l g,a<,
I r
'it \\
~ q I
1 t
IP 1
1 R
P
P
      ~   -~ ~ + ~
~
                    - ~p                   C P
-~ ~
0 0
+
P
~
                                                                                    ~   ~}}
~p C
P 0
0 P
~
~}}

Latest revision as of 16:21, 7 January 2025

Requests Mod of 830316 Order Requiring Installation of Noble Gas Steam Effluent Monitor by 840301.Mod Reflects Commitment to Install Acceptable Replacement for Existing Sys Prior to 841231,in Lieu of Schedule Proposed in Util
ML17320B174
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/01/1984
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To: John Miller
Office of Nuclear Reactor Regulation
References
NUDOCS 8403060400
Download: ML17320B174 (6)


Text

REGULATOR NFORMATION-DISTRIBUTION Sh EM.(RIDS)

ACCESSION NBR$ 8403060400, DUG~DATE: 84/03/01:

NOTARIZED'O DOCKET' FACIL!50 347 Calvert Cl)ffs Nuclear Power P'lant'nit 1< Bal timore-05000317 50 318 Calve('t Cliffs'uclear Power Plantr Unit 2i Bal,timor e 050003i8 AUTH~NAME

'UTHOR AFFILIATION LUNDVALL>A>E, Baltimore 'Gas L Electric Co ~

'RECIP,NAME RECIPIENT AFFILIATION MILLER'

~ Re Oper atlng Reactor s Br anch 3

SUBJECT:

Requests mod of 830316 or der requiring installation ofnoble gas steam, effluent monitor. by 840301

~ Mod reflects commitment to instill acceptable replacement for existing sys-prior.to 841231iin lieu of schedule pr oposed in util" 840203.

1 tr, DISTRIBUTION CODE!

A001S COPIES RECEIVEDgLTR,J ENCL, 4 SIZE~

-TITLE:

OR Submit,ttal':

General Distr ibution

,NOTES!

RECIPIENT "ID CODE/NAME,'RR ORB3 BC 01 INTERNAL; ELD/HDS4 NRR/DL DIR NRR

/MKTB 04

<<COPIES l.TTR -ENCL "7

1 1

1-REC IP IENT" ID CODE/NAME NRR/DK/MTEB NRR/DL/ORAB NRR/DSI/RAB RGN1

COPIES LTTR ENCL 1

1 1

1 EXTERNALS

'CRS NRC, PDR NTiS 09 02.'

LPDR NSIC 03 05 TOTAL NUMBER OF COPIES'EQUIRED'TTR

?5 ENCL

Ik)yg I)";]I ))II'(7f

)I ll4g,f)'-".

i q '

I I,

$ "47)

)(H 7)') "(lJ 5

I( 5

)) ')

I, '

i r l)( W,I) li)( f 7)')I g

l gd',)P )))(79 f[~p'fg)'"I ~Q))3) f )('IF) fi'I II> '.)

g w,'! l 4"))

qg))(yf'))

1'3 I ll if,.

s f p.,i).<

e.~t'ai f

II qr7> f;) >,~

)I f ) ') )I II g 7 gr')

i

$ k,,g i

li l '.d l,

((I f <<>73 "y'il, )())~ 4g>)I l',Sf i <<)) (,

ll

( IIII) f <<)I A ).i) ~ (,I l i

I)

",I fi,

. f.)'() t,]'

I,'l.f)I I ~

g )

i )

III 1 00K 1

l rg

)

sg f)'(<

I

~ Jj) ')

(7 0i,r.'

"1)') if II

)<)) l)fw g ll ll I

'll f)H

'lli,'I

'I d

(Ii I'~ 7)

I l) < " '7))f

'~1 yfi>II>'7,~

r,d77dia odd Weeedd7W d

',(f,l)~)(,q f

)

~

$ f ))',7,g"

)

)

",,~II) $ (I",g$

l)l i,f "7

)l)(7ilR,<<!f dll )Iii f' f,"l)yi)gli

~

)i f f),'If'll, (Ff i 7

i

))'I r

rr jj

(

Jl f

<I

,ill "I ll l'7,.'k 'I)k<<(

I

)I

~

)I)(

I ikey (lj I

7 i

f,

'f f'

".~, g,is<i().

'I, i ~,'f.'t)J>

3)()

) 'I.>> ")>)

I).">Y (T l4

BALTIMORE GAS AND ELECTRIC CHARLES CENTER ~ P. O. BOX 1475

~ BALTIMORE,MARYLAND2I203 ARTHUR E. LUNDVALL.JR.

VICC PRCSIDCNT SUPPLY March 1, 1980 Director of Nuclear Reactor Regulation Attention: Mr. J. R. Miller, Chief Operating Reactors Branch 83 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Calvert Cliffs Nuclear Power Plant Units Nos.

1 R 2; Dockets Nos. 50-317 and 50-318 Re uest for Modification of March 16 1983 Order Gentlemen:

By our letter dated February 3, 1980 we requested relief from the schedular requirements imposed by Commission Order dated March 16, 1983 inasmuch as it requires installation of a noble gas steam effluent monitor by March 1, 1980.

As the result of discussion with Messrs.

3. Zwolinski (ORAB) and D. 3affe (ORB 3) on February 29, 1980 we understand that our proposed new completion dates of June 30, 1985 (Unit 1) and December 31, 1985 (Unit 2) cannot be accepted by your staff.

The purpose of this letter is to request that, in lieu of the schedule suggested by our February 3, 1980 letter, the subject Order be modified to reflect the following commitment on our part:

The Baltimore Gas and Electric Company will procure and install an acceptable replacement to the existing noble gas steam effluent monitor ratemeter module and place the system in service prior to December 31, 1980.

In the event that the as-installed portions of the system (triaxial cabling and shielded detector assembly) are not compatible with the replacement

system, then those as-installed portions of the system will be replaced with compatible equipment and the system made operational during the first outage of sufficient duration following December 31, 1980.

We have initiated procurement of a replacement system and expect to take delivery of all components by September 1980.

On this basis, the proposed December 31, 1980, deadline is supportable in that it allows adequate time for installation'and testing assuming that the existing shielded detector assembly and triaxial cabling are electronically compatible with the replacement system.

In the event that the detector and associated cabling are not compatible, then they will be replaced with acceptable equipment.

However, because this equipment is located in the main steam penetration room in close proximity to the main steam line, replacement during power operations is 8403060400='840301'*PDR ADDCK 050003i7' PDR

gaol

Jf II II V 'I I "',I'f 78

~

Qr. 3. R. Miller C

March 1, 1980 not practical.

This is because of (1) the high ambient temperatures in this room during power operations (130

- 100 F),

(2) the possible need to modify the heavy lead shield assembly encapsulating the detector with the associated risk of a handling incident damaging main steam line peripherals, and (3) the potential for experiencing difficultyin achieving adequate cable-to-detector terminations given the high humidity conditions prevalent in this room during power operations.

Consequently, we believe that the proposed requirement to make the system operational during the first outage of sufficient duration following December 31, 1980, is appropriate for the case where replacement of the detector or associated cabling is required.

Ifyou should have any questions, please do not hesitate to contact us.

Sin

rely, AEL/BSM/vf cc-
3. A. Biddison, 3r., Esq.

G. F. Trowbridge, Esq.

Mr. D. H. 3affe, NRC Mr. R. E. Architzel, NRC

l

~ll

~ g y J t' H

I C

t P

1 N

S ni ~

ll

~

C' p*,

l g,a<,

I r

'it \\

~ q I

1 t

IP 1

1 R

P

~

-~ ~

+

~

~p C

P 0

0 P

~

~