ML19309F404: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:p 700*f29avv/
{{#Wiki_filter:.
BOSTON EoisON COMPANY DENERAL Orrects 800 Sovtsrow STREET S o s TO N. MASSACNUSETTs 0 219 9 G. CAmL ANOOGNINI S U P E RI N T E N D E N T NUCLEAR OPEmATIONS DEPARTMENT i
700*f29avv/
i April 22,1980 BECo. Ltr. #80- 76 Mr. Thomas A. Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.           20555 l                                                                                     License No. DPR-35 Docket No. 50-293
p BOSTON EoisON COMPANY DENERAL Orrects 800 Sovtsrow STREET S o s TO N. MASSACNUSETTs 0 219 9 G. CAmL ANOOGNINI S U P E RI N T E N D E N T NUCLEAR OPEmATIONS DEPARTMENT i
                                          " Revised" Safeguards Contingency Plan Ref: NRC Iatter (T. A. Ippolito) to BECo.
i April 22,1980 BECo. Ltr. #80- 76 Mr. Thomas A. Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.
20555 l
License No. DPR-35 Docket No. 50-293
" Revised" Safeguards Contingency Plan Ref: NRC Iatter (T. A. Ippolito) to BECo.
(G. C. Andognini) dated February 25, 1980
(G. C. Andognini) dated February 25, 1980


==Dear Sir:==
==Dear Sir:==
Please find additional information as requested in above referenced letter.
Please find additional information as requested in above referenced letter.
Additional typographical and Security Plan conformance changes have been in-cluded in the attached five (5) sets of changes which should be replaced in previously-submitted Contingency Plans. An additional hi-lighted set is included for expedient reference purposes.
Additional typographical and Security Plan conformance changes have been in-cluded in the attached five (5) sets of changes which should be replaced in previously-submitted Contingency Plans. An additional hi-lighted set is included for expedient reference purposes.
Pursuant to Section 2.790(d) of 10 CFR Part 2, we with are withholding the information provided in Enclosures, from public inspection. Withholding from public inspection does not affect the right, if any, of persons properly and directly concerned with the project to inspect the information.
Pursuant to Section 2.790(d) of 10 CFR Part 2, we with are withholding the information provided in Enclosures, from public inspection. Withholding from public inspection does not affect the right, if any, of persons properly and directly concerned with the project to inspect the information.
Very truly yourg, f 00 0 5
Very truly yourg, f 00 0 5
cc:         NRC Region 1 Regional Office                                                 /!I i}}
cc:
NRC Region 1 Regional Office
/!I i}}

Latest revision as of 02:47, 2 January 2025

Forwards Revised Safeguards Contingency Plan.Plan Withheld (Ref 10CFR2.790)
ML19309F404
Person / Time
Site: Pilgrim
Issue date: 04/22/1980
From: Andognini G
BOSTON EDISON CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
80-76, NUDOCS 8004290424
Download: ML19309F404 (1)


Text

.

700*f29avv/

p BOSTON EoisON COMPANY DENERAL Orrects 800 Sovtsrow STREET S o s TO N. MASSACNUSETTs 0 219 9 G. CAmL ANOOGNINI S U P E RI N T E N D E N T NUCLEAR OPEmATIONS DEPARTMENT i

i April 22,1980 BECo. Ltr. #80- 76 Mr. Thomas A. Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.

20555 l

License No. DPR-35 Docket No. 50-293

" Revised" Safeguards Contingency Plan Ref: NRC Iatter (T. A. Ippolito) to BECo.

(G. C. Andognini) dated February 25, 1980

Dear Sir:

Please find additional information as requested in above referenced letter.

Additional typographical and Security Plan conformance changes have been in-cluded in the attached five (5) sets of changes which should be replaced in previously-submitted Contingency Plans. An additional hi-lighted set is included for expedient reference purposes.

Pursuant to Section 2.790(d) of 10 CFR Part 2, we with are withholding the information provided in Enclosures, from public inspection. Withholding from public inspection does not affect the right, if any, of persons properly and directly concerned with the project to inspect the information.

Very truly yourg, f 00 0 5

cc:

NRC Region 1 Regional Office

/!I i