ML19309F404
| ML19309F404 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 04/22/1980 |
| From: | Andognini G BOSTON EDISON CO. |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| References | |
| 80-76, NUDOCS 8004290424 | |
| Download: ML19309F404 (1) | |
Text
.
700*f29avv/
p BOSTON EoisON COMPANY DENERAL Orrects 800 Sovtsrow STREET S o s TO N. MASSACNUSETTs 0 219 9 G. CAmL ANOOGNINI S U P E RI N T E N D E N T NUCLEAR OPEmATIONS DEPARTMENT i
i April 22,1980 BECo. Ltr. #80- 76 Mr. Thomas A. Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.
20555 l
License No. DPR-35 Docket No. 50-293
" Revised" Safeguards Contingency Plan Ref: NRC Iatter (T. A. Ippolito) to BECo.
(G. C. Andognini) dated February 25, 1980
Dear Sir:
Please find additional information as requested in above referenced letter.
Additional typographical and Security Plan conformance changes have been in-cluded in the attached five (5) sets of changes which should be replaced in previously-submitted Contingency Plans. An additional hi-lighted set is included for expedient reference purposes.
Pursuant to Section 2.790(d) of 10 CFR Part 2, we with are withholding the information provided in Enclosures, from public inspection. Withholding from public inspection does not affect the right, if any, of persons properly and directly concerned with the project to inspect the information.
Very truly yourg, f 00 0 5
cc:
NRC Region 1 Regional Office
/!I i