ML20042A853: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_ . . . .-         --          .          -          -                        . . . . .
{{#Wiki_filter:_....-
I 4
I 4
m j                                                   VERMONT YANKEE NUCLEAR POWER STATION
m j
}                                                     MONTHLY STATISTICAL REPORT 81-02 l
VERMONT YANKEE NUCLEAR POWER STATION
;                                                      FOR THE MONTH OF FEBRUARY, 1981 4
}
MONTHLY STATISTICAL REPORT 81-02 l
FOR THE MONTH OF FEBRUARY, 1981 4
4 1
4 1
4 I
4 I
                  '8203240208 810309 PDR ADOCK 05000271 R                 PDR
'8203240208 810309 PDR ADOCK 05000271 R
  , .                ___      . . ~     ___.._ _
PDR
.. ~


l             .
l OPERATING DATA REPORT DOCKET NO. 50-271 DATE R101oo COMPLETED BY D.
OPERATING DATA REPORT DOCKET NO. 50-271 DATE R101oo COMPLETED BY D. Bernard-TELEPHONE 617-872-8100 Ext. 2390 OPERATING STATUS Notes
Bernard-TELEPHONE 617-872-8100 Ext. 2390 OPERATING STATUS Notes
  . Unit Name:           Vermont Yankee
. Unit Name:
  . Rzporting Period: February 1981
Vermont Yankee Rzporting Period: February 1981 Licensed Thermal Power (bMt):
  . Licensed Thermal Power (bMt):         1593
1593 Namsplate Rating (Gross >Me):
  . Namsplate Rating (Gross >Me):           540
540 Design Electrical Ratlng(Net SNe):
  . Design Electrical Ratlng(Net SNe):   514 (onen) 504 (closed)
514 (onen) 504 (closed)
  . Maximum Dependable Capacity (Gross FMe): 535
Maximum Dependable Capacity (Gross FMe): 535 Maximum Dependable Capacity (Net FMe):
  . Maximum Dependable Capacity (Net FMe):     504
504 If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:
  . If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:
Power Level to Which Restricted,If Any(Net >Me):
  . Power Level to Which Restricted,If Any(Net >Me):
: i. Reasons For Restrictions, If Any:
: i. Reasons For Restrictions, If Any:
This Month       Yr -to-Date         Cumulative
This Month Yr -to-Date Cumulative Hours In Reporting Period 672.00 1416.00 Number Of Hours Reactor Was Critical 672.00 1416.00 58.951.78 Reactor Reserve Shutdown Hours 0.00 0.00 0.00 Hours Generator On-Line 672.00 1366.60 56,968.18 l
  . Hours In Reporting Period                             672.00           1416.00
Unit Reserve Shutdown Hours 0.00 0.00 0.00 Gross Ther=al Energy Generated (FMH) 1.063.277.50 2,054,859.00 80.658.376.00 l
  . Number Of Hours Reactor Was Critical                 672.00           1416.00           58.951.78
Gross Electrical Energy Generated (MWH) 363.092.00 694.838.00 26.807.685.00 Net Electrical Energy Generated (>MH) 348,721.00 666.753.00 25.414.332.00
  . Reactor Reserve Shutdown Hours                           0.00             0.00                 0.00
). Unit Service Factor 100.00 96.51 76.94 Unit Availability Factor 100.00 96.51 76.99
  . Hours Generator On-Line                               672.00           1366.60           56,968.18 l
,. Unit Capacity Factor (Using MDC Net) 102.96 93.43 68.15 f.UnitCapacityFactor(UsingDERNet) 100.96 91.61 66.82 f.UnitForcedOutageRate 0.00 1.49 7 ??
..      Unit Reserve Shutdown Hours                             0.00             0.00                 0.00
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
  . Gross Ther=al Energy Generated (FMH)           1.063.277.50     2,054,859.00         80.658.376.00 l
    . Gross Electrical Energy Generated (MWH)           363.092.00       694.838.00         26.807.685.00
    . Net Electrical Energy Generated (>MH)             348,721.00       666.753.00         25.414.332.00
). Unit Service Factor                                       100.00             96.51   .
76.94
    . Unit Availability Factor                             100.00             96.51                 76.99
,. Unit Capacity Factor (Using MDC Net)                       102.96             93.43                 68.15 f.UnitCapacityFactor(UsingDERNet)                             100.96             91.61                 66.82 f.UnitForcedOutageRate                                           0.00             1.49                 7 ??
    . Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
I l
I l
h.IfShut Down At End Of Report Period, Estimated Date of Startup:
h.IfShut Down At End Of Report Period, Estimated Date of Startup:
f.UnitsInTestStatus(PriortoCo==ercialOperation):                           Forecast           Achieved i                       INITIAL CRITICALITY
f.UnitsInTestStatus(PriortoCo==ercialOperation):
                        ' INITIAL ELECTRICITY l                       COMMERCIAL OPERATION                                           _                    _
Forecast Achieved i
INITIAL CRITICALITY
' INITIAL ELECTRICITY l
COMMERCIAL OPERATION


Y
Y
                                                                                              /
/
AVERAGE DAILY UNIT ?OWER LEVEL                                     2
AVERAGE DAILY UNIT ?OWER LEVEL 2
                              *                                                    .4 DOCKET NO. 50-271 UNIT     Vermbnt Yankee DATE     810309             -
.4 DOCKET NO.
1 COMPLETED BY '" .F.J. Burger TELEPHONE' '802-257-7711 Ext. 137 i '.
50-271 UNIT Vermbnt Yankee DATE 810309 1
MONTH   February                                                       .-
COMPLETED BY '"
DAY   AVERAGE DAILY POWER LEVEL             DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                                 (MWe-Net)'         ,
.F.J.
: 1.             513                         17,           522
Burger TELEPHONE' '802-257-7711 Ext. 137 i
: 2.             522                         18.           522     -
MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
: 3.             521                         19.           521
(MWe-Net)'
: 4.             522                         20.           522
1.
: 5.             521                         21.           521
513 17, 522 2.
: 6.             521                         22,           495
522 18.
: 7.             491                         23.           521
522 3.
: 8.             521                         24.           522
521 19.
: 9.             522                         25.           522
521 4.
: 10.             521                         26.           522
522 20.
: 11.             522                         27.           523
522 5.
;          12.             522                         28.           522
521 21.
: 13.               521                         29.
521 6.
: 14.               521                         30.
521 22, 495 7.
: 15.               509                         31.                                           --
491 23.
                                                                                              ~
521 8.
522-                                                                      /
521 24.
522 9.
522 25.
522 10.
521 26.
522 11.
522 27.
523 12.
522 28.
522 13.
521 29.
14.
521 30.
15.
509 31.
~
16.
16.
522-
/
INSTRUCTIONS:
INSTRUCTIONS:
On this for=at, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
On this for=at, list the average daily unit power level in MWe-Net for each day in the reporting month.
: t. .
Compute to the nearest whole megawatt.
: t..


s UNIT SilUTDOWNS AND POWER FEDUCTIONS.                         .      DOCKET NO         50-271 UNIT NAME         Vermont Yankee DATE       810309 REPORT MONTil February COMPLETED BY         F.J. Burger TELEPllONE         802-257-7711 Ext. 137 S 12       m        o  $                                $"                        Cause & Corrective No.       ,
s UNIT SilUTDOWNS AND POWER FEDUCTIONS.
Date   y   ;j g         g     y 7j g   Licen:-e    g4                   .                          Action to                         '
DOCKET NO 50-271 UNIT NAME Vermont Yankee DATE 810309 REPORT MONTil February COMPLETED BY F.J. Burger TELEPllONE 802-257-7711 Ext. 137 S 12 Cause & Corrective m
Rep t0                     *                          '''"      " " ' " " * '
o Licen:-e No.
x    g                                 u e
Date y
81-04   810207     S     O           B     4         N/A       IIA           TURBINE     Power reduction for turbine generator                   ;
;j g g
(Power                 RB           CONROD     and control rod surveillance.                           -
y 7j g g4 Action to Rep t0 x
reduc-tion) 81-05   810222     F       0         A     4         N/A       MB           CKTBRK     Power reduction due to a loss of control (Power                                           power to the Augmented Off-Cas System reduc-                                           caused by a blown fuse. Fuse replaced tion)                                             and the circuit tested satisfactorily.
g u
e 81-04 810207 S
O B
4 N/A IIA TURBINE Power reduction for turbine generator (Power RB CONROD and control rod surveillance.
reduc-tion) 81-05 810222 F
0 A
4 N/A MB CKTBRK Power reduction due to a loss of control (Power power to the Augmented Off-Cas System reduc-caused by a blown fuse. Fuse replaced tion) and the circuit tested satisfactorily.
l l
l l
                                                                                                                              /
/
l 1
l 1 F: Forced Reason:
F: Forced           Reason:                                           Method:                                 Exhibit G- Instructions               !
Method:
S: Scheduled       A-Equipment Failure (Explain)                               1- Manual                     for Preparation of Data B-Maintenance or Test                                       2- Manual Scram               Entry Sheets for Licensee C-Refueling                                                 3- Automatic Scram             Event Report (LER) File               !
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
D-Regulatory Restriction                                   4- Other (Explain)             (NUREG 0161)           -
(NUREG 0161)
E-Operator Training & Lic(nse Ixamination F-Administrative                                                                       5 Exhibit I - Same Source G-Operational Error (Explatn)
E-Operator Training & Lic(nse Ixamination 5
F-Administrative Exhibit I - Same Source G-Operational Error (Explatn)
II-Other (Explain) 7/80
II-Other (Explain) 7/80


DOCKET NO. 50-271
DOCKET NO.
* UNIT     Vermont Tcnkee         _
50-271 UNIT Vermont Tcnkee
                                                                                                                                  -e
-e
                    ~
~
DATE     810309                   -
DATE 810309 COMT ETED BY F.J. Burger TELEPHONE 802-257-7711 Ext / 137 SAFETY RELATED MAINTENANCE.
        -                                                                        COMT ETED BY     F.J. Burger TELEPHONE     802-257-7711 Ext / 137 SAFETY RELATED MAINTENANCE.
NATURE OF MALFUNCTI0tt LER OR OUTAGE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION "B" SBGT Train lienter Corrective N/A Worn Parts IIcater Control-Replaced Controller MR 80-712 ler Required Frequent Reset-ting.
NATURE OF                                     MALFUNCTI0tt LER OR OUTAGE EQUIPMENT         MAINTENANCE           NUMBER           CAUSE               RESULT         CORRECTIVE ACTION "B" SBGT Train lienter   Corrective             N/A           Worn Parts         IIcater Control-   Replaced Controller MR 80-712                                                 ler Required Frequent Reset-ting.
TIP Machine #3 Contain-Corrective N/A Normal Wear Leakage Replaced "O" Rings ment Penetration MR 80-1051 "A" Reactor Protection Corrective N/A Failed Parts Power Supply Replaced Power Supply System Analog Cabinet MR 81-202 Failure "B" SBGT Train Fan Corrective N/A Worn Parts' Fan Drive Belt Replaced Belt MR 81-222 Broken "A" SBGT Train Demister Corrective N/A
TIP Machine #3 Contain-   Corrective             N/A           Normal Wear         Leakage           Replaced "O" Rings ment Penetration         MR 80-1051 "A" Reactor Protection   Corrective             N/A           Failed Parts       Power Supply       Replaced Power Supply System Analog Cabinet     MR 81-202                                                 Failure "B" SBGT Train Fan       Corrective             N/A           Worn Parts'         Fan Drive Belt     Replaced Belt MR 81-222                       -
' Normal Operation Demister Exhib-Replaced Filter MR 81-227 ited High Diff-crential Press-ure.
Broken "A" SBGT Train Demister   Corrective             N/A         ' Normal Operation   Demister Exhib-   Replaced Filter MR 81-227                                                 ited High Diff-crential Press-ure.
ECIC EGR Corrective LER Broken Connector RCIC Inoperative Replaced Connector MR 81-230 81/08/3L Service Water Pump Corrective N/A Normal Wear Packing Leakage Repacked Pump P-71A MR 81-2,49
ECIC EGR                   Corrective             LER           Broken Connector   RCIC Inoperative   Replaced Connector MR 81-230               81/08/3L Service Water Pump         Corrective             N/A           Normal Wear         Packing Leakage   Repacked Pump P-71A                     MR 81-2,49
* o DOCKET NO.
 
50-271 UNIT Vermont Yankee DATE 810309.
  *o DOCKET NO. 50-271 UNIT Vermont Yankee DATE 810309.
COMPLETED BY F.J. Burger TELEPHONE 802-257-7711. Ext. 137 REPORT MONTH February
COMPLETED BY F.J. Burger TELEPHONE 802-257-7711. Ext. 137   ,
REPORT MONTH           February


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 99.3%         of rated thermal power for the month.
OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 99.3%
of rated thermal power for the month.
Gross electrical generation was 363,092 MWH, or 100% of design electrical capacity.
Gross electrical generation was 363,092 MWH, or 100% of design electrical capacity.
Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
2/1/81     At the beginning of the reporting period the plant ada operating at 90% of rated thermal power. Turbine generator surveillance was in progress.
2/1/81 At the beginning of the reporting period the plant ada operating at 90% of rated thermal power.
2/7/81     At 0700 hrs, a power reduction was initiated for turbine generator and control rod surveillance. At 1200 hrs. a return to full power was initiated.
Turbine generator surveillance was in progress.
2/22/81   At 0020 hrs. a power reduction was initiated due to the loss of of the A0G System control power. Turbine generator surveillance was also completed.
2/7/81 At 0700 hrs, a power reduction was initiated for turbine generator and control rod surveillance. At 1200 hrs. a return to full power was initiated.
2/22/81 At 0020 hrs. a power reduction was initiated due to the loss of of the A0G System control power.
Turbine generator surveillance was also completed.
At 0100 hrs. repairs were completed and a return to full power initiated.
At 0100 hrs. repairs were completed and a return to full power initiated.
2/28/81   At the end of the reporting period the plant was operating at 99.8% of rated thermal power.
2/28/81 At the end of the reporting period the plant was operating at 99.8% of rated thermal power.
9 5
9 5
_,                      -- v -}}
v
-}}

Latest revision as of 18:43, 19 December 2024

Monthly Operating Rept for Feb 1981
ML20042A853
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 03/09/1981
From: Bernard D
VERMONT YANKEE NUCLEAR POWER CORP.
To:
Shared Package
ML20042A851 List:
References
NUDOCS 8203240208
Download: ML20042A853 (6)


Text

_....-

I 4

m j

VERMONT YANKEE NUCLEAR POWER STATION

}

MONTHLY STATISTICAL REPORT 81-02 l

FOR THE MONTH OF FEBRUARY, 1981 4

4 1

4 I

'8203240208 810309 PDR ADOCK 05000271 R

PDR

.. ~

l OPERATING DATA REPORT DOCKET NO. 50-271 DATE R101oo COMPLETED BY D.

Bernard-TELEPHONE 617-872-8100 Ext. 2390 OPERATING STATUS Notes

. Unit Name:

Vermont Yankee Rzporting Period: February 1981 Licensed Thermal Power (bMt):

1593 Namsplate Rating (Gross >Me):

540 Design Electrical Ratlng(Net SNe):

514 (onen) 504 (closed)

Maximum Dependable Capacity (Gross FMe): 535 Maximum Dependable Capacity (Net FMe):

504 If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:

Power Level to Which Restricted,If Any(Net >Me):

i. Reasons For Restrictions, If Any:

This Month Yr -to-Date Cumulative Hours In Reporting Period 672.00 1416.00 Number Of Hours Reactor Was Critical 672.00 1416.00 58.951.78 Reactor Reserve Shutdown Hours 0.00 0.00 0.00 Hours Generator On-Line 672.00 1366.60 56,968.18 l

Unit Reserve Shutdown Hours 0.00 0.00 0.00 Gross Ther=al Energy Generated (FMH) 1.063.277.50 2,054,859.00 80.658.376.00 l

Gross Electrical Energy Generated (MWH) 363.092.00 694.838.00 26.807.685.00 Net Electrical Energy Generated (>MH) 348,721.00 666.753.00 25.414.332.00

). Unit Service Factor 100.00 96.51 76.94 Unit Availability Factor 100.00 96.51 76.99

,. Unit Capacity Factor (Using MDC Net) 102.96 93.43 68.15 f.UnitCapacityFactor(UsingDERNet) 100.96 91.61 66.82 f.UnitForcedOutageRate 0.00 1.49 7 ??

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

I l

h.IfShut Down At End Of Report Period, Estimated Date of Startup:

f.UnitsInTestStatus(PriortoCo==ercialOperation):

Forecast Achieved i

INITIAL CRITICALITY

' INITIAL ELECTRICITY l

COMMERCIAL OPERATION

Y

/

AVERAGE DAILY UNIT ?OWER LEVEL 2

.4 DOCKET NO.

50-271 UNIT Vermbnt Yankee DATE 810309 1

COMPLETED BY '"

.F.J.

Burger TELEPHONE' '802-257-7711 Ext. 137 i

MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)'

1.

513 17, 522 2.

522 18.

522 3.

521 19.

521 4.

522 20.

522 5.

521 21.

521 6.

521 22, 495 7.

491 23.

521 8.

521 24.

522 9.

522 25.

522 10.

521 26.

522 11.

522 27.

523 12.

522 28.

522 13.

521 29.

14.

521 30.

15.

509 31.

~

16.

522-

/

INSTRUCTIONS:

On this for=at, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

t..

s UNIT SilUTDOWNS AND POWER FEDUCTIONS.

DOCKET NO 50-271 UNIT NAME Vermont Yankee DATE 810309 REPORT MONTil February COMPLETED BY F.J. Burger TELEPllONE 802-257-7711 Ext. 137 S 12 Cause & Corrective m

o Licen:-e No.

Date y

j g g

y 7j g g4 Action to Rep t0 x

g u

e 81-04 810207 S

O B

4 N/A IIA TURBINE Power reduction for turbine generator (Power RB CONROD and control rod surveillance.

reduc-tion) 81-05 810222 F

0 A

4 N/A MB CKTBRK Power reduction due to a loss of control (Power power to the Augmented Off-Cas System reduc-caused by a blown fuse. Fuse replaced tion) and the circuit tested satisfactorily.

l l

/

l 1 F: Forced Reason:

Method:

Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)

(NUREG 0161)

E-Operator Training & Lic(nse Ixamination 5

F-Administrative Exhibit I - Same Source G-Operational Error (Explatn)

II-Other (Explain) 7/80

DOCKET NO.

50-271 UNIT Vermont Tcnkee

-e

~

DATE 810309 COMT ETED BY F.J. Burger TELEPHONE 802-257-7711 Ext / 137 SAFETY RELATED MAINTENANCE.

NATURE OF MALFUNCTI0tt LER OR OUTAGE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION "B" SBGT Train lienter Corrective N/A Worn Parts IIcater Control-Replaced Controller MR 80-712 ler Required Frequent Reset-ting.

TIP Machine #3 Contain-Corrective N/A Normal Wear Leakage Replaced "O" Rings ment Penetration MR 80-1051 "A" Reactor Protection Corrective N/A Failed Parts Power Supply Replaced Power Supply System Analog Cabinet MR 81-202 Failure "B" SBGT Train Fan Corrective N/A Worn Parts' Fan Drive Belt Replaced Belt MR 81-222 Broken "A" SBGT Train Demister Corrective N/A

' Normal Operation Demister Exhib-Replaced Filter MR 81-227 ited High Diff-crential Press-ure.

ECIC EGR Corrective LER Broken Connector RCIC Inoperative Replaced Connector MR 81-230 81/08/3L Service Water Pump Corrective N/A Normal Wear Packing Leakage Repacked Pump P-71A MR 81-2,49

  • o DOCKET NO.

50-271 UNIT Vermont Yankee DATE 810309.

COMPLETED BY F.J. Burger TELEPHONE 802-257-7711. Ext. 137 REPORT MONTH February

SUMMARY

OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 99.3%

of rated thermal power for the month.

Gross electrical generation was 363,092 MWH, or 100% of design electrical capacity.

Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:

2/1/81 At the beginning of the reporting period the plant ada operating at 90% of rated thermal power.

Turbine generator surveillance was in progress.

2/7/81 At 0700 hrs, a power reduction was initiated for turbine generator and control rod surveillance. At 1200 hrs. a return to full power was initiated.

2/22/81 At 0020 hrs. a power reduction was initiated due to the loss of of the A0G System control power.

Turbine generator surveillance was also completed.

At 0100 hrs. repairs were completed and a return to full power initiated.

2/28/81 At the end of the reporting period the plant was operating at 99.8% of rated thermal power.

9 5

v

-