ML20052C265: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:. . 1 .
{{#Wiki_filter:1.
:    c r,-' t -
c r,-' t -
CONTAINMENT SYSTEMS                                  h7,w[
h7,w[.r.,,,,i. ',,i' u.: U' i CONTAINMENT SYSTEMS gg, CONTAINMENT.AND ORYWELL HYDROGEN IGNITION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.7.2 Two independent containment and drywell hydrogen ignition system subsystems,shall be OPERABLE.
gg,    .r.,,, ,i. ', ,i' u .: U' i CONTAINMENT.AND ORYWELL HYDROGEN IGNITION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.7.2 Two independent containment and drywell hydrogen ignition system subsystems,shall be OPERABLE.
APPLICABILITY:
APPLICABILITY:   OPERATIONAL CONDITIONS 1 and 2.
OPERATIONAL CONDITIONS 1 and 2.
ACTION:
ACTION:
With one containment and drywell-hydrogen ignition subsystem inoperable,. restore the inoperable subsystem to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours.                           -
With one containment and drywell-hydrogen ignition subsystem inoperable,. restore the inoperable subsystem to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours.
SURVEILLANCE REQUIREMENTS 4.6.7.2 Each containment and drywell hydrogen ignition subsystem.shall be demonstrated OPERABLE:
SURVEILLANCE REQUIREMENTS 4.6.7.2 Each containment and drywell hydrogen ignition subsystem.shall be demonstrated OPERABLE:
: a. At least. Once per 92 days by energizing the supply breakers and verifying that at least 41     glow plugs are energized.
At least. Once per 92 days by energizing the supply breakers and a.
: b. At least once per 18 months by-               ,                                , ,
verifying that at least 41 glow plugs are energized.
: 1. Verifying the cleanliness of each glow plug by a visual                             '
b.
inspection.
At least once per 18 months by-1.
: 2. Energizing each glow plug and verifying a surface temperature.
Verifying the cleanliness of each glow plug by a visual inspection.
of at least 1700   F.
2.
4
Energizing each glow plug and verifying a surface temperature.
* t      )
of at least 1700 F.
b l                                                                                                                     9 8205040552 820430 PDR ADOCK 05000416 A                   PDR EEB         1 1982       '
4 t
GRAND GULF-UNIT 1                   3/4 6-58
)
                                                            .        .}}
b l
9 8205040552 820430 PDR ADOCK 05000416 A
PDR EEB 1 1982 GRAND GULF-UNIT 1 3/4 6-58
.}}

Latest revision as of 07:46, 18 December 2024

Tech Spec 3/4.6.7.2 Re Containment & Drywell Hydrogen Ignition Sys
ML20052C265
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 02/01/1982
From:
MISSISSIPPI POWER & LIGHT CO.
To:
Shared Package
ML20052C255 List:
References
NUDOCS 8205040552
Download: ML20052C265 (1)


Text

1.

c r,-' t -

h7,w[.r.,,,,i. ',,i' u.: U' i CONTAINMENT SYSTEMS gg, CONTAINMENT.AND ORYWELL HYDROGEN IGNITION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.7.2 Two independent containment and drywell hydrogen ignition system subsystems,shall be OPERABLE.

APPLICABILITY:

OPERATIONAL CONDITIONS 1 and 2.

ACTION:

With one containment and drywell-hydrogen ignition subsystem inoperable,. restore the inoperable subsystem to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.7.2 Each containment and drywell hydrogen ignition subsystem.shall be demonstrated OPERABLE:

At least. Once per 92 days by energizing the supply breakers and a.

verifying that at least 41 glow plugs are energized.

b.

At least once per 18 months by-1.

Verifying the cleanliness of each glow plug by a visual inspection.

2.

Energizing each glow plug and verifying a surface temperature.

of at least 1700 F.

4 t

)

b l

9 8205040552 820430 PDR ADOCK 05000416 A

PDR EEB 1 1982 GRAND GULF-UNIT 1 3/4 6-58

.