August 10, 1982 ANPP-21590-JAR U. S. Nuclear Regulatory Commission
August 10, 1982 ANPP-21590-JAR U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94595-5368 Attention:
;                    Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94595-5368 Attention:       Mr. T.             W.~ Bishop, Chief Reactor Construction Projects Branch
Mr. T.
W.~ Bishop, Chief Reactor Construction Projects Branch


==Subject:==
==Subject:==
NRC Resident Inspector Report of April 5-30, 1982 File:             82-019-026 D.4.33.2
NRC Resident Inspector Report of April 5-30, 1982 File:
82-019-026 D.4.33.2


==Dear Sir:==
==Dear Sir:==
 
This letter refers to the Inspection conducted by Mr. L. E. Vorderbrueggen during April 5-30, 1982, as documented in your letter of July 9, 1982, of activities authorized by the Nuclear Regulatory Commission (NRC)
This letter refers to the Inspection conducted by Mr. L. E. Vorderbrueggen
;                    during April 5-30, 1982, as documented in your letter of July 9, 1982, of activities authorized by the Nuclear Regulatory Commission (NRC)
Construction Permit Nos. CPPR-141, 142 and 143.
Construction Permit Nos. CPPR-141, 142 and 143.
During this Inspection, one (1) item of noncompliance was identified.
During this Inspection, one (1) item of noncompliance was identified.
Our response to this item of noncompliance (Severity Level V-Supplement II) is presented in the enclosed Attachment A.
Our response to this item of noncompliance (Severity Level V-Supplement II) is presented in the enclosed Attachment A.
Very truly yours,
Very truly yours, L
                                                                                                        -            L    % (g({Q E. E. Van Brunt, Jr.
% (g({Q E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects ANPP Project Director 1
APS Vice President Nuclear Projects ANPP Project Director 1
EEVBJr/BSK:ske Attachment cc:   T. G. Woods, Jr.
EEVBJr/BSK:ske Attachment cc:
G. C. Andognini D. B. Fasnacht A. C. Rogers
T. G. Woods, Jr.
,                        J. A. Roedel W. E. Ide
G. C. Andognini D. B. Fasnacht A. C. Rogers J. A. Roedel W. E. Ide A. C. Gehr W. H. Wilson R. L. Patterson l
;                        A. C. Gehr W. H. Wilson R. L. Patterson l                         R. M. Grant i                         D. R. Hawkinson 8208270325 820820
R. M. Grant i
                                                ~
D. R. Hawkinson i
i l       PDR ADOCK 05000528 i     G                   PDR
8208270325 820820
~
l PDR ADOCK 05000528 i
G PDR


A
A s.
: s.    .
STATE OF ARIZONA
STATE OF ARIZONA   )
)
                                  ) ss.
) ss.
COUNTY OF MARICOPA )     t I,     A. C. Rogers.             , represent that I am Manager of Nuclear Engineering of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority so to do, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.
COUNTY OF MARICOPA )
09()V3 A.C.Rokors Sworn to before me this   lk     day of       nos           ,
t I,
0 19 91
A. C. Rogers.
                                                    &            O.         c~,~
, represent that I am Manager of Nuclear Engineering of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority so to do, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.
09()V3 A.C.Rokors Sworn to before me this lk day of nos 0
19 91 O.
c~,~
Notary Public My Commission Expires:
Notary Public My Commission Expires:
baV       b ,19 N
baV b,19 N


ATTACHMENT A NOTICE OF VIOLATION Docket No. 50-529 Construction Permit No. CPPR-142 During an Inspection on April 20, 1982, and in accordance with the NRC Enforcement Policy 10CFR Part 2, Appendix C, 47FR9987 (March 9, 1982), the following Violation was identified:
ATTACHMENT A NOTICE OF VIOLATION Docket No. 50-529 Construction Permit No. CPPR-142 During an Inspection on April 20, 1982, and in accordance with the NRC Enforcement Policy 10CFR Part 2, Appendix C, 47FR9987 (March 9, 1982), the following Violation was identified:
Appendix B of 10CFR50, Criterion V, states, in part:
Appendix B of 10CFR50, Criterion V, states, in part:
                          " Activities affecting quality shall be prescribed by documented instructions, procedures or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings..."
" Activities affecting quality shall be prescribed by documented instructions, procedures or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings..."
Paragraph 9.5.6 of Bechtel Specification No. 13-PM-204, Field Fabrication and Installation of Nuclear Piping Systems, requires that if work is interrupted after a pipe spool end closure had been removed, "a temporary closure shall be provided by covering the end with plastic and taping or otherwise scaling."
Paragraph 9.5.6 of Bechtel Specification No. 13-PM-204, Field Fabrication and Installation of Nuclear Piping Systems, requires that if work is interrupted after a pipe spool end closure had been removed, "a temporary closure shall be provided by covering the end with plastic and taping or otherwise scaling."
Contrary to this requirement, on April 20, 1982, after work had been suspended at the end of day shift, five (5) safety-related pipe end ss s            openings were observed to be open in the Unit 2 Auxiliary Building.
Contrary to this requirement, on April 20, 1982, after work had been suspended at the end of day shift, five (5) safety-related pipe end openings were observed to be open in the Unit 2 Auxiliary Building.
This is a Severity Level V Violation (Supplement II).
s s s This is a Severity Level V Violation (Supplement II).
I


===RESPONSE===
===RESPONSE===
: 1. Corrective Steps Taken and Results Achieved Upon notification of the Infraction, the Unit 2 General Superintendent immediately informed the responsible General Foreman and Foreman of the Violation and their responsibil-ities for capping pipe ends during installation. Immediate l                     action was taken to inspect the uncapped pipe for cleanliness and properly cap them.
I 1.
i                 2. Corrective Steps That Have Been Taken to Avoid Further Items of Noncompliance Construction Specification 13-PM-204 and Work Plan Procedures 13.0, 200.0 and 202.0, have been reviewed and found to be adequate. Capping of pipe openings has been given increased emphasis and will be an item of special interest by surveillance in Units 1, 2 and 3.
Corrective Steps Taken and Results Achieved Upon notification of the Infraction, the Unit 2 General Superintendent immediately informed the responsible General Foreman and Foreman of the Violation and their responsibil-ities for capping pipe ends during installation.
Immediate l
action was taken to inspect the uncapped pipe for cleanliness and properly cap them.
i 2.
Corrective Steps That Have Been Taken to Avoid Further Items of Noncompliance Construction Specification 13-PM-204 and Work Plan Procedures 13.0, 200.0 and 202.0, have been reviewed and found to be adequate. Capping of pipe openings has been given increased emphasis and will be an item of special interest by surveillance in Units 1, 2 and 3.
l
l


a-   ,'.
a-Attachment A Notice of Violation Page 2 A memo was issued by the Unit 2 General Superintendent to all Craft Supervisors, Piping Area Field Engineers, Pipe Fitters, General Foremen and Foremen. The memo outlines the require-ments for maintaining pipe cleanliness during installation, and directed training be conducted on this subject.
Attachment A                   -
In addi-tion, training is being conducted in Units 1 and 3 on this subject to avoid further violations.
Notice of Violation Page 2 A memo was issued by the Unit 2 General Superintendent to all Craft Supervisors, Piping Area Field Engineers, Pipe Fitters, General Foremen and Foremen. The memo outlines the require-ments for maintaining pipe cleanliness during installation, and directed training be conducted on this subject. In addi-tion, training is being conducted in Units 1 and 3 on this subject to avoid further violations.
3.
: 3. Date When Full Compliance Will Be Achieved August 13, 1982 1
Date When Full Compliance Will Be Achieved August 13, 1982 1
1 L                                                                         _ . .}}
1 L
_..}}

Latest revision as of 22:06, 16 December 2024

Responds to NRC 820709 Notice of Violation.Corrective Actions:Immediate Action Taken to Inspect Uncapped Pipe for Cleanliness & Proper Capping
ML20063C669
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/10/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20063C656 List:
References
ANPP-21590-JAR, NUDOCS 8208270325
Download: ML20063C669 (4)


Text

, __

(%

9 8

/J ;,

M 1%

~

'y PHOENIX, ARIZON A 85036 P. O. BOX 21666 q

August 10, 1982 ANPP-21590-JAR U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94595-5368 Attention:

Mr. T.

W.~ Bishop, Chief Reactor Construction Projects Branch

Subject:

NRC Resident Inspector Report of April 5-30, 1982 File:

82-019-026 D.4.33.2

Dear Sir:

This letter refers to the Inspection conducted by Mr. L. E. Vorderbrueggen during April 5-30, 1982, as documented in your letter of July 9, 1982, of activities authorized by the Nuclear Regulatory Commission (NRC)

Construction Permit Nos. CPPR-141, 142 and 143.

During this Inspection, one (1) item of noncompliance was identified.

Our response to this item of noncompliance (Severity Level V-Supplement II) is presented in the enclosed Attachment A.

Very truly yours, L

% (g({Q E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director 1

EEVBJr/BSK:ske Attachment cc:

T. G. Woods, Jr.

G. C. Andognini D. B. Fasnacht A. C. Rogers J. A. Roedel W. E. Ide A. C. Gehr W. H. Wilson R. L. Patterson l

R. M. Grant i

D. R. Hawkinson i

8208270325 820820

~

l PDR ADOCK 05000528 i

G PDR

A s.

STATE OF ARIZONA

)

) ss.

COUNTY OF MARICOPA )

t I,

A. C. Rogers.

, represent that I am Manager of Nuclear Engineering of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority so to do, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.

09()V3 A.C.Rokors Sworn to before me this lk day of nos 0

19 91 O.

c~,~

Notary Public My Commission Expires:

baV b,19 N

ATTACHMENT A NOTICE OF VIOLATION Docket No. 50-529 Construction Permit No. CPPR-142 During an Inspection on April 20, 1982, and in accordance with the NRC Enforcement Policy 10CFR Part 2, Appendix C, 47FR9987 (March 9, 1982), the following Violation was identified:

Appendix B of 10CFR50, Criterion V, states, in part:

" Activities affecting quality shall be prescribed by documented instructions, procedures or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings..."

Paragraph 9.5.6 of Bechtel Specification No. 13-PM-204, Field Fabrication and Installation of Nuclear Piping Systems, requires that if work is interrupted after a pipe spool end closure had been removed, "a temporary closure shall be provided by covering the end with plastic and taping or otherwise scaling."

Contrary to this requirement, on April 20, 1982, after work had been suspended at the end of day shift, five (5) safety-related pipe end openings were observed to be open in the Unit 2 Auxiliary Building.

s s s This is a Severity Level V Violation (Supplement II).

RESPONSE

I 1.

Corrective Steps Taken and Results Achieved Upon notification of the Infraction, the Unit 2 General Superintendent immediately informed the responsible General Foreman and Foreman of the Violation and their responsibil-ities for capping pipe ends during installation.

Immediate l

action was taken to inspect the uncapped pipe for cleanliness and properly cap them.

i 2.

Corrective Steps That Have Been Taken to Avoid Further Items of Noncompliance Construction Specification 13-PM-204 and Work Plan Procedures 13.0, 200.0 and 202.0, have been reviewed and found to be adequate. Capping of pipe openings has been given increased emphasis and will be an item of special interest by surveillance in Units 1, 2 and 3.

l

a-Attachment A Notice of Violation Page 2 A memo was issued by the Unit 2 General Superintendent to all Craft Supervisors, Piping Area Field Engineers, Pipe Fitters, General Foremen and Foremen. The memo outlines the require-ments for maintaining pipe cleanliness during installation, and directed training be conducted on this subject.

In addi-tion, training is being conducted in Units 1 and 3 on this subject to avoid further violations.

3.

Date When Full Compliance Will Be Achieved August 13, 1982 1