ML20065C918: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:~,,
{{#Wiki_filter:~,,
  ,e     ..
,e MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 164 0, J A C K S O N, MIS SIS SIP PI 3 9 2 05 September 15,19$M
MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O . B O X 164 0, J A C K S O N, MIS SIS SIP PI 3 9 2 05 September 15,19$M         _g JAMES P. McGAUGHY, JR A5SinfANT v1CE Ps4ES# DENT                                                             (/)       v.
_g JAMES P. McGAUGHY, JR A5SinfANT v1CE Ps4ES# DENT
m     p Of fice of Inspection & Enforcement U. S. Nuclear Regulatory Commission                                                       -
(/)
M
v.
                                                                                                            }g Region II                                                                                       got 101 Marietta Street, N.W.                                                                 -    - 9 Suite 3100                                                                               ..        :y Atlanta, Georgia 30303                                                                     3       ,-
m p
Attention:             Mr. J. P. O'Reilly, Regional Administrator Dea r Mr. O'Reilly:
Of fice of Inspection & Enforcement M
U. S. Nuclear Regulatory Commission
}g Region II got
- 9 101 Marietta Street, N.W.
Suite 3100
:y Atlanta, Georgia 30303 3
Attention:
Mr. J. P. O'Reilly, Regional Administrator Dea r Mr. O'Reilly:
i
i


==SUBJECT:==
==SUBJECT:==
Grand Gulf Nuclear Station Unit 2 Docket No. 50-417 License No. NPF-13 File 0260/15525/15526 PRD-82/28, Final Report Unit 2, Hille r Actuators AECM-82/2-001 Ref e rence: AECM-82/274, 6/11/82 On May 12, 1982, Mississippi Power & Light Company notified Mr. F. S.
Grand Gulf Nuclear Station Unit 2 Docket No. 50-417 License No. NPF-13 File 0260/15525/15526 PRD-82/28, Final Report Unit 2, Hille r Actuators AECM-82/2-001 Ref e rence: AECM-82/274, 6/11/82 On May 12, 1982, Mississippi Power & Light Company notified Mr. F. S.
Cantrell, of your office, of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (GGNS) construction site. The deficiency concerns the failure of drywell, containment, and secondary containment isolation valves to close on a loss of air. This deficiency is reportable under the provisions of 10CFR21 and 10CFR50.55(e) for Unit I and 10CFR50.55(e) for Unit 2.
Cantrell, of your office, of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (GGNS) construction site.
All applicable information was given in our previous report. It also stated that corrective actions for Unit I would be completed by August 1, 1982. These have not been completed at this time but will be prior to exceeding 5% power.
The deficiency concerns the failure of drywell, containment, and secondary containment isolation valves to close on a loss of air.
Our Architect / Engineer has issued Non-Conformance Report (NCR) 6418 to track l           corrective actions for Unit 2.               All corrective actions should be complete prior
This deficiency is reportable under the provisions of 10CFR21 and 10CFR50.55(e) for Unit I and 10CFR50.55(e) for Unit 2.
!          to Unit 2 fuel load.
All applicable information was given in our previous report.
l l                                                                 Yours truly,
It also stated that corrective actions for Unit I would be completed by August 1, 1982. These have not been completed at this time but will be prior to exceeding 5% power.
                                                                  /'     -
Our Architect / Engineer has issued Non-Conformance Report (NCR) 6418 to track l
i   /
corrective actions for Unit 2.
(A-l<       .~ sfy KDS:dr cc:     See page 2 l
All corrective actions should be complete prior to Unit 2 fuel load.
l 8209240341 820915                                                                       , I POk".N. )
l l
PDR ADOCK 05000417                                                                      -
Yours truly,
                                                                                                                ~~
/'
S                                 pon Member Middle South Utilities System             l--6' J2_
i
/
(A-l<
sf
.~
y KDS:dr cc:
See page 2 l
l 8209240341 820915 PDR ADOCK 05000417
, I POk".N. )
~~
S pon Member Middle South Utilities System l--6' J2_


.s . o.
.s.
Mr. J. P. O'Reilly                         AECM-82/2-001 NRC                                         Page 2 cc: Mr. N. L. Stampley Mr. R. B. McGehee Mr. T. B. Conner Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. G. B. Taylor South Mias. Electric Power Association P. O. Box 1589 llattiesburg, MS 39401}}
o.
Mr. J. P. O'Reilly AECM-82/2-001 NRC Page 2 cc:
Mr. N. L. Stampley Mr. R. B. McGehee Mr. T. B. Conner Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. G. B. Taylor South Mias. Electric Power Association P. O. Box 1589 llattiesburg, MS 39401}}

Latest revision as of 19:58, 16 December 2024

Final Deficiency Rept Re Failure of Drywell,Containment & Secondary Containment Isolation Valves to Close on Loss of Air.Initially Reported on 820512.Corrective Actions for Unit 1 Not Completed.Nonconformance Rept 6418 Issued for Unit 2
ML20065C918
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/15/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, AECM-82-2-001, AECM-82-2-1, NUDOCS 8209240341
Download: ML20065C918 (2)


Text

~,,

,e MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 164 0, J A C K S O N, MIS SIS SIP PI 3 9 2 05 September 15,19$M

_g JAMES P. McGAUGHY, JR A5SinfANT v1CE Ps4ES# DENT

(/)

v.

m p

Of fice of Inspection & Enforcement M

U. S. Nuclear Regulatory Commission

}g Region II got

- 9 101 Marietta Street, N.W.

Suite 3100

y Atlanta, Georgia 30303 3

Attention:

Mr. J. P. O'Reilly, Regional Administrator Dea r Mr. O'Reilly:

i

SUBJECT:

Grand Gulf Nuclear Station Unit 2 Docket No. 50-417 License No. NPF-13 File 0260/15525/15526 PRD-82/28, Final Report Unit 2, Hille r Actuators AECM-82/2-001 Ref e rence: AECM-82/274, 6/11/82 On May 12, 1982, Mississippi Power & Light Company notified Mr. F. S.

Cantrell, of your office, of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (GGNS) construction site.

The deficiency concerns the failure of drywell, containment, and secondary containment isolation valves to close on a loss of air.

This deficiency is reportable under the provisions of 10CFR21 and 10CFR50.55(e) for Unit I and 10CFR50.55(e) for Unit 2.

All applicable information was given in our previous report.

It also stated that corrective actions for Unit I would be completed by August 1, 1982. These have not been completed at this time but will be prior to exceeding 5% power.

Our Architect / Engineer has issued Non-Conformance Report (NCR) 6418 to track l

corrective actions for Unit 2.

All corrective actions should be complete prior to Unit 2 fuel load.

l l

Yours truly,

/'

i

/

(A-l<

sf

.~

y KDS:dr cc:

See page 2 l

l 8209240341 820915 PDR ADOCK 05000417

, I POk".N. )

~~

S pon Member Middle South Utilities System l--6' J2_

.s.

o.

Mr. J. P. O'Reilly AECM-82/2-001 NRC Page 2 cc:

Mr. N. L. Stampley Mr. R. B. McGehee Mr. T. B. Conner Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. G. B. Taylor South Mias. Electric Power Association P. O. Box 1589 llattiesburg, MS 39401