ML20069F116: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:i OPER ATING DAT 4 REPORT DOCKET NO. | ||
50-317 DATE -3/17/83 COstPLETED BY _ __ Elaine Lotito TELEPilONE (301) 78t-5363 OPE RATING STA1 US Calvert Cliffs #1 Notes Revision | |||
: 1. U i: Narre: | : 1. U i: Narre: | ||
October 1982 | |||
: 2. Rerortmg Period. | : 2. Rerortmg Period. | ||
: 3. Li:ensed Thermal Pow er (MWti. | : 3. Li:ensed Thermal Pow er (MWti. | ||
: i. Nameplate Rating iGr.,ss %IWei: | : i. Nameplate Rating iGr.,ss %IWei: | ||
: 5. Desi | : 5. Desi a Elcarical Rotin;t (Net MWel: | ||
: 6. Masimum Dependabie Capacity ICross SIWel: | : 6. Masimum Dependabie Capacity ICross SIWel: | ||
: 7. 4tasimum thpendable Capacity (Net SlWel: | : 7. 4tasimum thpendable Capacity (Net SlWel: | ||
I | |||
: 8. If Charges Occur in Cap., city Ratings tite,ns Nunter 3 Thrnyh 7) Since Last Report.Goe Reasons. | : 8. If Charges Occur in Cap., city Ratings tite,ns Nunter 3 Thrnyh 7) Since Last Report.Goe Reasons. | ||
: 9. Power Lesel 10 bhich He tri:ted. If Any (Net 4 thel: | : 9. Power Lesel 10 bhich He tri:ted. If Any (Net 4 thel: | ||
: 10. Itessora Fc Restrictic . ll Any: | : 10. Itessora Fc Restrictic. ll Any: | ||
This Month | This Month | ||
% to D.te Ct. nalatise | |||
: 11. Ilours in Reporting PerioJ | : 11. Ilours in Reporting PerioJ | ||
: 12. Number Of Hours Reactor Was Critical | : 12. Number Of Hours Reactor Was Critical | ||
: 13. Reactor Res.:ne Shutdown Haurs | : 13. Reactor Res.:ne Shutdown Haurs | ||
: 14. Hours Generator On Line | : 14. Hours Generator On Line | ||
: 15. Unit itesene Shutdown linurs | : 15. Unit itesene Shutdown linurs | ||
: 16. Grots Thertual Ener Ay Gererated (MWHI | : 16. Grots Thertual Ener Ay Gererated (MWHI | ||
: 17. Gross Electrical Energy Generated 1%IWill | : 17. Gross Electrical Energy Generated 1%IWill 671,198 4,333,464 | ||
4,333,464 | __ _ _ _ 40,327,461 _ | ||
: 18. Net Electrie:al Er.crgy Generated (MWHi | : 18. Net Electrie:al Er.crgy Generated (MWHi | ||
: 19. Lnit Senice Factor | : 19. Lnit Senice Factor | ||
: 20. Unit Assilability Facics | : 20. Unit Assilability Facics | ||
: 21. Unit Capacity Facter IUsi,g \1DC Net t | : 21. Unit Capacity Facter IUsi,g \\1DC Net t | ||
: 22. Unit C:pacity Factor IUung DER *ierl | : 22. Unit C:pacity Factor IUung DER *ierl | ||
: 23. Ur'it f orced Outage Rate | : 23. Ur'it f orced Outage Rate | ||
: 24. Shutdowns Scheduled 0.cr Sest 6 Stonths(Type. Date.an.1 Duration of Each: | : 24. Shutdowns Scheduled 0.cr Sest 6 Stonths(Type. Date.an.1 Duration of Each: | ||
: 25. If Shut tuwn At End Of Report Perso.l. Estimated Date of Startup: | : 25. If Shut tuwn At End Of Report Perso.l. Estimated Date of Startup: | ||
: 24. Units in Test Status (Prior to Commercial Operstion): | : 24. Units in Test Status (Prior to Commercial Operstion): | ||
INITl4L EL FC TRICITY | Forecast Achiesed INITIA L CRITICALITY INITl4L EL FC TRICITY COST %!ERCI A L OPER ATION 8303220322 830317 (457) | ||
COST %!ERCI A L OPER ATION 8303220322 830317 | PDR ADOCK 05000317 R | ||
PDR ADOCK 05000317 | PDR}} | ||
Latest revision as of 10:55, 16 December 2024
| ML20069F116 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 03/17/1983 |
| From: | Lotito E BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20069F108 | List: |
| References | |
| NUDOCS 8303220322 | |
| Download: ML20069F116 (1) | |
Text
i OPER ATING DAT 4 REPORT DOCKET NO.
50-317 DATE -3/17/83 COstPLETED BY _ __ Elaine Lotito TELEPilONE (301) 78t-5363 OPE RATING STA1 US Calvert Cliffs #1 Notes Revision
- 1. U i: Narre:
October 1982
- 2. Rerortmg Period.
- 3. Li:ensed Thermal Pow er (MWti.
- i. Nameplate Rating iGr.,ss %IWei:
- 5. Desi a Elcarical Rotin;t (Net MWel:
- 6. Masimum Dependabie Capacity ICross SIWel:
- 7. 4tasimum thpendable Capacity (Net SlWel:
I
- 8. If Charges Occur in Cap., city Ratings tite,ns Nunter 3 Thrnyh 7) Since Last Report.Goe Reasons.
- 9. Power Lesel 10 bhich He tri:ted. If Any (Net 4 thel:
- 10. Itessora Fc Restrictic. ll Any:
This Month
% to D.te Ct. nalatise
- 11. Ilours in Reporting PerioJ
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Res.:ne Shutdown Haurs
- 14. Hours Generator On Line
- 15. Unit itesene Shutdown linurs
- 16. Grots Thertual Ener Ay Gererated (MWHI
- 17. Gross Electrical Energy Generated 1%IWill 671,198 4,333,464
__ _ _ _ 40,327,461 _
- 18. Net Electrie:al Er.crgy Generated (MWHi
- 19. Lnit Senice Factor
- 20. Unit Assilability Facics
- 21. Unit Capacity Facter IUsi,g \\1DC Net t
- 22. Unit C:pacity Factor IUung DER *ierl
- 23. Ur'it f orced Outage Rate
- 24. Shutdowns Scheduled 0.cr Sest 6 Stonths(Type. Date.an.1 Duration of Each:
- 25. If Shut tuwn At End Of Report Perso.l. Estimated Date of Startup:
- 24. Units in Test Status (Prior to Commercial Operstion):
Forecast Achiesed INITIA L CRITICALITY INITl4L EL FC TRICITY COST %!ERCI A L OPER ATION 8303220322 830317 (457)
PDR ADOCK 05000317 R