ML20069F127

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Nov 1982
ML20069F127
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 03/17/1983
From: Lotito E
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20069F108 List:
References
NUDOCS 8303220328
Download: ML20069F127 (1)


Text

[

i OPERATING DAT4 REPORT DOCKET NO. 50-317 DATE 3/17/83 COMPLETED By Elaine Lotito TELEPHONE T30TI 787-M63 OPE iLATING STA T US Calvert Cliffs #1 Notes Revision

1. Cr.i: Name:
2. Reporting Period.
3. Li:cnsed Thenn.il Pow er (Mbi1.
4. Nameplate Rating (Gr<ns MWei:
5. Desi;,a E! curies! Rat.ng (Net MWe.l:
6. Maximum Dependab;e Capacity IGross MWel:
7. Manimum iApendable Capacity (Net MWel:
8. If Charges Oect.r in Op. city Ratings itsems Nunter 3 Through 7) Since Last Report.Gre Reawns-.
9. Power Lesel To bhich He.tri:ted. If Any (Net Mhd
10. Reason. For Restrutic-. !! Any:

This Month Yr.to Date Ct.:naktise

11. flours in Reporting Perio.!
12. Number Or tie irs Reactor was Critic !
13. Reacter Resene Shuttown Hars
14. Hours Generatar On Line
15. Unit Resene Shutdown flours
16. Gross Thermal Energy Gererated IMWH)
17. Cross Electrical Ener,y G:nerated IMWill 629,462_

4,962,926

_40,956,923

18. Net Electrial Energy Centrated (MWHi
19. Omt Senice Fact >r
20. Unit Assilability Factr,r
21. Unit Capacity Facter IUsing MDC Nett
22. Unit Capacity factor IUung DER 'ict)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled C,er. Nest 6 Montns (Type. Date,sn.1 Duration of Eacht
25. If Shut Down At End Of Rep.rt ferm.t, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Oper3tioni:

Forecast Achie ted INITIA L CRITICALITY INITI4 L El EC TRICITY COMMERCIAL OPLM ATION 8303220328 830317 gg.,3 PDR ADOCK 05000317 r

R PDR l'

-