ML20069F127
Jump to navigation
Jump to search
| ML20069F127 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 03/17/1983 |
| From: | Lotito E BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20069F108 | List: |
| References | |
| NUDOCS 8303220328 | |
| Download: ML20069F127 (1) | |
Text
[
i OPERATING DAT4 REPORT DOCKET NO. 50-317 DATE 3/17/83 COMPLETED By Elaine Lotito TELEPHONE T30TI 787-M63 OPE iLATING STA T US Calvert Cliffs #1 Notes Revision
- 1. Cr.i: Name:
- 2. Reporting Period.
- 3. Li:cnsed Thenn.il Pow er (Mbi1.
- 4. Nameplate Rating (Gr<ns MWei:
- 5. Desi;,a E! curies! Rat.ng (Net MWe.l:
- 6. Maximum Dependab;e Capacity IGross MWel:
- 7. Manimum iApendable Capacity (Net MWel:
- 8. If Charges Oect.r in Op. city Ratings itsems Nunter 3 Through 7) Since Last Report.Gre Reawns-.
- 9. Power Lesel To bhich He.tri:ted. If Any (Net Mhd
- 10. Reason. For Restrutic-. !! Any:
This Month Yr.to Date Ct.:naktise
- 11. flours in Reporting Perio.!
- 12. Number Or tie irs Reactor was Critic !
- 13. Reacter Resene Shuttown Hars
- 14. Hours Generatar On Line
- 15. Unit Resene Shutdown flours
- 16. Gross Thermal Energy Gererated IMWH)
- 17. Cross Electrical Ener,y G:nerated IMWill 629,462_
4,962,926
_40,956,923
- 18. Net Electrial Energy Centrated (MWHi
- 19. Omt Senice Fact >r
- 20. Unit Assilability Factr,r
- 21. Unit Capacity Facter IUsing MDC Nett
- 22. Unit Capacity factor IUung DER 'ict)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled C,er. Nest 6 Montns (Type. Date,sn.1 Duration of Eacht
- 25. If Shut Down At End Of Rep.rt ferm.t, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Oper3tioni:
Forecast Achie ted INITIA L CRITICALITY INITI4 L El EC TRICITY COMMERCIAL OPLM ATION 8303220328 830317 gg.,3 PDR ADOCK 05000317 r
R PDR l'
-