ML20097F334: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:__ ___               __ _ _ _ _ _ _ _______-________-___                                                                                                                                          -._
{{#Wiki_filter:__ ___
4 Attachment 1 I
4 I
e i
e i
Completed Version of Proposed Changes North Anna Units 1 and 2 Virginia Electric and Power Company 9206150253 9U M :
Completed Version of Proposed Changes North Anna Units 1 and 2 Virginia Electric and Power Company 9206150253 9U M :
PDR                         ADOCK 0500G138
PDR ADOCK 0500G138
                ~P                                         FDR
~P FDR


          ' SPECIALTEST EXCEETO43
' SPECIALTEST EXCEETO43
                - PHYSICSTESTS UMITING CONDITION FOR OPERATION -
- PHYSICSTESTS UMITING CONDITION FOR OPERATION -
3.10.3               The limitations of Specifications 3.1.1.4, 3.1.3.1, 3.1.3.5_ and 3.1.3.6 may be suspended during the performance of PHYSICS TESTS provided:
3.10.3 The limitations of Specifications 3.1.1.4, 3.1.3.1, 3.1.3.5_ and 3.1.3.6 may be suspended during the performance of PHYSICS TESTS provided:
: a.             The THERMAL POWER does not exceed 5% of RATED THERMAL POWER,                 l
a.
: b.             The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less than or equal to 35% of RATED THERMAL POWER, and -
The THERMAL POWER does not exceed 5% of RATED THERMAL POWER, l
: c.             The reactor trip setpoints on the OPERABLE Power Range Channels are set at less than or equal to 25% of RATED THERMAL. POWER.
b.
The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less than or equal to 35% of RATED THERMAL POWER, and -
c.
The reactor trip setpoints on the OPERABLE Power Range Channels are set at less than or equal to 25% of RATED THERMAL. POWER.
AEPLICABILITY: MODE 2.
AEPLICABILITY: MODE 2.
ACTD t With the THERMAL POWER > 5% of RATED THERMAL POWER,immediately open the                                   '
ACTD t With the THERMAL POWER > 5% of RATED THERMAL POWER,immediately open the reactor trip breakers.
reactor trip breakers.
SURVEll' ANCEREQUIREMENTS 4.10.3.1 The THERMAL POWER shall be determined to be s.5% of RATED THERMAL POWER at least once per hour during PHYSICS TESTS.
SURVEll' ANCEREQUIREMENTS 4.10.3.1 The THERMAL POWER shall be determined to be s.5% of RATED THERMAL POWER at least once per hour during PHYSICS TESTS.
5 4.10.3.2 Each intermediate and Power Isange Channel shall be subjected to a CHANNEL FUNCTIONAL TEST within 12 hours prior to initiating PHYSICS TESTS.
5 4.10.3.2 Each intermediate and Power Isange Channel shall be subjected to a CHANNEL FUNCTIONAL TEST within 12 hours prior to initiating PHYSICS TESTS.
NORTH ANNA - UNIT 1.                                     3/4 10 3
NORTH ANNA - UNIT 1.
                                                                                                                          -l
3/4 10 3
-l


L SPECIALTEST EXCEPTIONS REACTORCOOUNrLOOPS UMITING CONDITION FOR OPERATION 3.10.4       The limitations of Specification 3.4.1.1 may be suspended during the performance of startup and PHYSICS TESTS provided:
L SPECIALTEST EXCEPTIONS REACTORCOOUNrLOOPS UMITING CONDITION FOR OPERATION 3.10.4 The limitations of Specification 3.4.1.1 may be suspended during the performance of startup and PHYSICS TESTS provided:
: a. The THERMAL POWER does not exceed the P 7 Interlock Setpoint,             l
a.
,                      b. ~ The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less thsn or equal to 35% of RATED THERMAL POWER, and
The THERMAL POWER does not exceed the P 7 Interlock Setpoint, l
: c. The reactor trip setpoints on the OPERABLE Power Range Channels are set at less than or equal to 25% of RATED THERMAL POWER.                                       P
: b. ~ The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less thsn or equal to 35% of RATED THERMAL POWER, and c.
                                                                                                                    ] d APPLICABILITY: During operation below the P 7 Interlock Setpoint.
The reactor trip setpoints on the OPERABLE Power Range Channels are set at less than or equal to 25% of RATED THERMAL POWER.
P
]
d APPLICABILITY: During operation below the P 7 Interlock Setpoint.
ACTION.
ACTION.
              - With the THERMAL POWER greater than the P 7 Interlock Setpoint, immediatel; open the reactor trip breakers.
- With the THERMAL POWER greater than the P 7 Interlock Setpoint, immediatel; open the reactor trip breakers.
SURVEILUWCE REQUIREMENTS 4.10.4.1 The THERMAL POWER shall be determined to be less than P 7 Interlock Setpoint at least once per hour during startup and PHYSICS TESTS.'
SURVEILUWCE REQUIREMENTS 4.10.4.1 The THERMAL POWER shall be determined to be less than P 7 Interlock Setpoint at least once per hour during startup and PHYSICS TESTS.'
4.10.4.2 Each Intermediate, Power Range Channel and P 7 Interlock shall be subjected to a CHANNEL FUNCTIONAL TEST within 12 hours prior to initiating startup or PHYSICS TESTS.
4.10.4.2 Each Intermediate, Power Range Channel and P 7 Interlock shall be subjected to a CHANNEL FUNCTIONAL TEST within 12 hours prior to initiating startup or PHYSICS TESTS.
NORTH ANNA - UNIT 1                           3/4 10 4 k
NORTH ANNA - UNIT 1 3/4 10 4 k


SPECIALTEST EXCEPTIONS PHYSICSTESTS UMITING CONDITION FOR OPERATION i
SPECIALTEST EXCEPTIONS PHYSICSTESTS UMITING CONDITION FOR OPERATION i
3.10.3       The limitations of Specifications 3.1.1.4, 3.1.1.5, 3.1.3.1, 3.1.3.5 and 3.1.3.6 may be suspended during the perfonnance of PHYSICS TESTS provided:
3.10.3 The limitations of Specifications 3.1.1.4, 3.1.1.5, 3.1.3.1, 3.1.3.5 and 3.1.3.6 may be suspended during the perfonnance of PHYSICS TESTS provided:
: a. . TheTHERMALPOWERdoesnot exceed 5%of RATEDTHERMALPOWER,                                                     l
: a.. TheTHERMALPOWERdoesnot exceed 5%of RATEDTHERMALPOWER, l
: b. The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less than or equal to 35% of RATED THERMAL POWER, and -
b.
: c. The reactor trip setpoints on the OPERABLE Power Range Channels are set at less than or equa! to 25% of RATED THERMAL POWER, and
The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less than or equal to 35% of RATED THERMAL POWER, and -
: d. The Reactor Coolant System lowest operating loop temperature (Tavg) is;                                 l
c.
                            ' greater than or equal to $310F,
The reactor trip setpoints on the OPERABLE Power Range Channels are set at less than or equa! to 25% of RATED THERMAL POWER, and d.
              - APPLICABILITY: MODE 2.
The Reactor Coolant System lowest operating loop temperature (Tavg) is; l
' greater than or equal to $310F,
- APPLICABILITY: MODE 2.
ACTION.
ACTION.
: a.     With tha THERMAL POWER greater than 5% of RATED THERMAL POWER, immediately open the reactor trio breakers,
a.
: b.     With_ a Reactor Coolant System operating loop temperature (Tavg) less than 531_OF, restore Tavg to_ within its limit within 15 minutes or be'in at least HOT STANDBY within the next 15 minutos.
With tha THERMAL POWER greater than 5% of RATED THERMAL POWER, immediately open the reactor trio breakers, b.
              - SURVEILLANCE REQUIREMENTS
With_ a Reactor Coolant System operating loop temperature (Tavg) less than 531_OF, restore Tavg to_ within its limit within 15 minutes or be'in at least HOT STANDBY within the next 15 minutos.
              '4.10.3.1 The THERMAL POWER shall be determined to be less than or equal to 5% of-
- SURVEILLANCE REQUIREMENTS
                ' RATED THERMAL POWER at least once per hour during PHYSICS TESTS."
'4.10.3.1 The THERMAL POWER shall be determined to be less than or equal to 5% of-
' RATED THERMAL POWER at least once per hour during PHYSICS TESTS."
4.10.3.2 Each Intermediate and Power Range Channel shall be subjected to a CHANNEL FUNCTIONAL TEST. within 12 hours prior to initiating PHYSICS TESTS.
4.10.3.2 Each Intermediate and Power Range Channel shall be subjected to a CHANNEL FUNCTIONAL TEST. within 12 hours prior to initiating PHYSICS TESTS.
4.10.3.3 : The Reactor Coolant System temperature (Tavg) shall bo determined to be i greater than or equal to 5310F at least once per.30 minutes during PHYSICS TESTG.
4.10.3.3 : The Reactor Coolant System temperature (Tavg) shall bo determined to be i greater than or equal to 5310F at least once per.30 minutes during PHYSICS TESTG.
NORTH ANNA- UNIT 2 -                                   3/41103 -
NORTH ANNA-UNIT 2 -
1 L_i-_=                           -                    _ _ _. _ __ _ - - _ -    . _ _ - _ _ . __
3/41103 -
1 L_i-_=


e . ..
e 4
4 SPECIALTEST EXCEPTIONS .
SPECIALTEST EXCEPTIONS.
REACTORCOQUWTLOOPS UMITiNG CONDITK)N FOR OPERATION 3.10.4     The limitations of Specification 3.4.1.1 may be suspended during the
REACTORCOQUWTLOOPS UMITiNG CONDITK)N FOR OPERATION 3.10.4 The limitations of Specification 3.4.1.1 may be suspended during the
                          . performance of startup and PHYSICS TESTS provided:
. performance of startup and PHYSICS TESTS provided:
: a. The THERMAL POWER does not exceed the P4 Interlock Setpoint,                     l
a.
: b. ~ The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less than or equal to 35% of RATED THERMAL POWER, and
The THERMAL POWER does not exceed the P4 Interlock Setpoint, l
: c. The reactor trip setpoints on the OPERABLE Power Range Channels are set at 1                           iess than or equal to 25% of RATED THERMAL POWER.
: b. ~ The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less than or equal to 35% of RATED THERMAL POWER, and c.
The reactor trip setpoints on the OPERABLE Power Range Channels are set at 1
iess than or equal to 25% of RATED THERMAL POWER.
T APPLICABILITY: During operation below the P.7 Interlock Setpoint.
T APPLICABILITY: During operation below the P.7 Interlock Setpoint.
ACTIOtt
ACTIOtt
              - With the THERMAL. POWER greater than the P-7 Interlock Setpoint, immediately open -
- With the THERMAL. POWER greater than the P-7 Interlock Setpoint, immediately open -
the reactor trip breakers.                                                         '
the reactor trip breakers.
SURVElLLANCE REQUIREMENTS .
SURVElLLANCE REQUIREMENTS.
4.10.4.1 The THERMAL POWER shall be determined to be less than P 7 luterlock' Setpoint at least once per hour during startup and PHYSICS TESTS.-
4.10.4.1 The THERMAL POWER shall be determined to be less than P 7 luterlock' Setpoint at least once per hour during startup and PHYSICS TESTS.-
4.10.4.2 Each Intermediate, Power Range Channel and P 7 Interlock shall be subjected to a CHANNEL FUNCTIONAL TEST within 12 hours prior to initiating startup or PHYSICS TESTS.
4.10.4.2 Each Intermediate, Power Range Channel and P 7 Interlock shall be subjected to a CHANNEL FUNCTIONAL TEST within 12 hours prior to initiating startup or PHYSICS TESTS.
1 G-l NORTH ANNA- UNIT 2                             3/4 10 4-                                               ,
1 G-l NORTH ANNA-UNIT 2 3/4 10 4-
                                - _              - _- -__                _ -      _ - - - - - - -    -- -  -}}
-}}

Latest revision as of 07:28, 13 December 2024

Proposed TS 3.10.3 & 3.10.4 Re Reactor Trip Setpoints for intermediate-range Channels & power-range Channels
ML20097F334
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 06/08/1992
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20097F331 List:
References
NUDOCS 9206150253
Download: ML20097F334 (5)


Text

__ ___

4 I

e i

Completed Version of Proposed Changes North Anna Units 1 and 2 Virginia Electric and Power Company 9206150253 9U M :

PDR ADOCK 0500G138

~P FDR

' SPECIALTEST EXCEETO43

- PHYSICSTESTS UMITING CONDITION FOR OPERATION -

3.10.3 The limitations of Specifications 3.1.1.4, 3.1.3.1, 3.1.3.5_ and 3.1.3.6 may be suspended during the performance of PHYSICS TESTS provided:

a.

The THERMAL POWER does not exceed 5% of RATED THERMAL POWER, l

b.

The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less than or equal to 35% of RATED THERMAL POWER, and -

c.

The reactor trip setpoints on the OPERABLE Power Range Channels are set at less than or equal to 25% of RATED THERMAL. POWER.

AEPLICABILITY: MODE 2.

ACTD t With the THERMAL POWER > 5% of RATED THERMAL POWER,immediately open the reactor trip breakers.

SURVEll' ANCEREQUIREMENTS 4.10.3.1 The THERMAL POWER shall be determined to be s.5% of RATED THERMAL POWER at least once per hour during PHYSICS TESTS.

5 4.10.3.2 Each intermediate and Power Isange Channel shall be subjected to a CHANNEL FUNCTIONAL TEST within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to initiating PHYSICS TESTS.

NORTH ANNA - UNIT 1.

3/4 10 3

-l

L SPECIALTEST EXCEPTIONS REACTORCOOUNrLOOPS UMITING CONDITION FOR OPERATION 3.10.4 The limitations of Specification 3.4.1.1 may be suspended during the performance of startup and PHYSICS TESTS provided:

a.

The THERMAL POWER does not exceed the P 7 Interlock Setpoint, l

b. ~ The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less thsn or equal to 35% of RATED THERMAL POWER, and c.

The reactor trip setpoints on the OPERABLE Power Range Channels are set at less than or equal to 25% of RATED THERMAL POWER.

P

]

d APPLICABILITY: During operation below the P 7 Interlock Setpoint.

ACTION.

- With the THERMAL POWER greater than the P 7 Interlock Setpoint, immediatel; open the reactor trip breakers.

SURVEILUWCE REQUIREMENTS 4.10.4.1 The THERMAL POWER shall be determined to be less than P 7 Interlock Setpoint at least once per hour during startup and PHYSICS TESTS.'

4.10.4.2 Each Intermediate, Power Range Channel and P 7 Interlock shall be subjected to a CHANNEL FUNCTIONAL TEST within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to initiating startup or PHYSICS TESTS.

NORTH ANNA - UNIT 1 3/4 10 4 k

SPECIALTEST EXCEPTIONS PHYSICSTESTS UMITING CONDITION FOR OPERATION i

3.10.3 The limitations of Specifications 3.1.1.4, 3.1.1.5, 3.1.3.1, 3.1.3.5 and 3.1.3.6 may be suspended during the perfonnance of PHYSICS TESTS provided:

a.. TheTHERMALPOWERdoesnot exceed 5%of RATEDTHERMALPOWER, l

b.

The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less than or equal to 35% of RATED THERMAL POWER, and -

c.

The reactor trip setpoints on the OPERABLE Power Range Channels are set at less than or equa! to 25% of RATED THERMAL POWER, and d.

The Reactor Coolant System lowest operating loop temperature (Tavg) is; l

' greater than or equal to $310F,

- APPLICABILITY: MODE 2.

ACTION.

a.

With tha THERMAL POWER greater than 5% of RATED THERMAL POWER, immediately open the reactor trio breakers, b.

With_ a Reactor Coolant System operating loop temperature (Tavg) less than 531_OF, restore Tavg to_ within its limit within 15 minutes or be'in at least HOT STANDBY within the next 15 minutos.

- SURVEILLANCE REQUIREMENTS

'4.10.3.1 The THERMAL POWER shall be determined to be less than or equal to 5% of-

' RATED THERMAL POWER at least once per hour during PHYSICS TESTS."

4.10.3.2 Each Intermediate and Power Range Channel shall be subjected to a CHANNEL FUNCTIONAL TEST. within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to initiating PHYSICS TESTS.

4.10.3.3 : The Reactor Coolant System temperature (Tavg) shall bo determined to be i greater than or equal to 5310F at least once per.30 minutes during PHYSICS TESTG.

NORTH ANNA-UNIT 2 -

3/41103 -

1 L_i-_=

e 4

SPECIALTEST EXCEPTIONS.

REACTORCOQUWTLOOPS UMITiNG CONDITK)N FOR OPERATION 3.10.4 The limitations of Specification 3.4.1.1 may be suspended during the

. performance of startup and PHYSICS TESTS provided:

a.

The THERMAL POWER does not exceed the P4 Interlock Setpoint, l

b. ~ The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less than or equal to 35% of RATED THERMAL POWER, and c.

The reactor trip setpoints on the OPERABLE Power Range Channels are set at 1

iess than or equal to 25% of RATED THERMAL POWER.

T APPLICABILITY: During operation below the P.7 Interlock Setpoint.

ACTIOtt

- With the THERMAL. POWER greater than the P-7 Interlock Setpoint, immediately open -

the reactor trip breakers.

SURVElLLANCE REQUIREMENTS.

4.10.4.1 The THERMAL POWER shall be determined to be less than P 7 luterlock' Setpoint at least once per hour during startup and PHYSICS TESTS.-

4.10.4.2 Each Intermediate, Power Range Channel and P 7 Interlock shall be subjected to a CHANNEL FUNCTIONAL TEST within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to initiating startup or PHYSICS TESTS.

1 G-l NORTH ANNA-UNIT 2 3/4 10 4-

-