__ ___
4 I
e i
Completed Version of Proposed Changes North Anna Units 1 and 2 Virginia Electric and Power Company 9206150253 9U M :
PDR ADOCK 0500G138
~P FDR
' SPECIALTEST EXCEETO43
- PHYSICSTESTS UMITING CONDITION FOR OPERATION -
3.10.3 The limitations of Specifications 3.1.1.4, 3.1.3.1, 3.1.3.5_ and 3.1.3.6 may be suspended during the performance of PHYSICS TESTS provided:
a.
The THERMAL POWER does not exceed 5% of RATED THERMAL POWER, l
b.
The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less than or equal to 35% of RATED THERMAL POWER, and -
c.
The reactor trip setpoints on the OPERABLE Power Range Channels are set at less than or equal to 25% of RATED THERMAL. POWER.
AEPLICABILITY: MODE 2.
ACTD t With the THERMAL POWER > 5% of RATED THERMAL POWER,immediately open the reactor trip breakers.
SURVEll' ANCEREQUIREMENTS 4.10.3.1 The THERMAL POWER shall be determined to be s.5% of RATED THERMAL POWER at least once per hour during PHYSICS TESTS.
5 4.10.3.2 Each intermediate and Power Isange Channel shall be subjected to a CHANNEL FUNCTIONAL TEST within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to initiating PHYSICS TESTS.
NORTH ANNA - UNIT 1.
3/4 10 3
-l
L SPECIALTEST EXCEPTIONS REACTORCOOUNrLOOPS UMITING CONDITION FOR OPERATION 3.10.4 The limitations of Specification 3.4.1.1 may be suspended during the performance of startup and PHYSICS TESTS provided:
a.
The THERMAL POWER does not exceed the P 7 Interlock Setpoint, l
- b. ~ The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less thsn or equal to 35% of RATED THERMAL POWER, and c.
The reactor trip setpoints on the OPERABLE Power Range Channels are set at less than or equal to 25% of RATED THERMAL POWER.
P
]
d APPLICABILITY: During operation below the P 7 Interlock Setpoint.
ACTION.
- With the THERMAL POWER greater than the P 7 Interlock Setpoint, immediatel; open the reactor trip breakers.
SURVEILUWCE REQUIREMENTS 4.10.4.1 The THERMAL POWER shall be determined to be less than P 7 Interlock Setpoint at least once per hour during startup and PHYSICS TESTS.'
4.10.4.2 Each Intermediate, Power Range Channel and P 7 Interlock shall be subjected to a CHANNEL FUNCTIONAL TEST within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to initiating startup or PHYSICS TESTS.
NORTH ANNA - UNIT 1 3/4 10 4 k
SPECIALTEST EXCEPTIONS PHYSICSTESTS UMITING CONDITION FOR OPERATION i
3.10.3 The limitations of Specifications 3.1.1.4, 3.1.1.5, 3.1.3.1, 3.1.3.5 and 3.1.3.6 may be suspended during the perfonnance of PHYSICS TESTS provided:
- a.. TheTHERMALPOWERdoesnot exceed 5%of RATEDTHERMALPOWER, l
b.
The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less than or equal to 35% of RATED THERMAL POWER, and -
c.
The reactor trip setpoints on the OPERABLE Power Range Channels are set at less than or equa! to 25% of RATED THERMAL POWER, and d.
The Reactor Coolant System lowest operating loop temperature (Tavg) is; l
' greater than or equal to $310F,
- APPLICABILITY: MODE 2.
ACTION.
a.
With tha THERMAL POWER greater than 5% of RATED THERMAL POWER, immediately open the reactor trio breakers, b.
With_ a Reactor Coolant System operating loop temperature (Tavg) less than 531_OF, restore Tavg to_ within its limit within 15 minutes or be'in at least HOT STANDBY within the next 15 minutos.
- SURVEILLANCE REQUIREMENTS
'4.10.3.1 The THERMAL POWER shall be determined to be less than or equal to 5% of-
' RATED THERMAL POWER at least once per hour during PHYSICS TESTS."
4.10.3.2 Each Intermediate and Power Range Channel shall be subjected to a CHANNEL FUNCTIONAL TEST. within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to initiating PHYSICS TESTS.
4.10.3.3 : The Reactor Coolant System temperature (Tavg) shall bo determined to be i greater than or equal to 5310F at least once per.30 minutes during PHYSICS TESTG.
NORTH ANNA-UNIT 2 -
3/41103 -
1 L_i-_=
e 4
SPECIALTEST EXCEPTIONS.
REACTORCOQUWTLOOPS UMITiNG CONDITK)N FOR OPERATION 3.10.4 The limitations of Specification 3.4.1.1 may be suspended during the
. performance of startup and PHYSICS TESTS provided:
a.
The THERMAL POWER does not exceed the P4 Interlock Setpoint, l
- b. ~ The reactor trip setpoints on the OPERABLE Intermediate Range Channels are set at less than or equal to 35% of RATED THERMAL POWER, and c.
The reactor trip setpoints on the OPERABLE Power Range Channels are set at 1
iess than or equal to 25% of RATED THERMAL POWER.
T APPLICABILITY: During operation below the P.7 Interlock Setpoint.
ACTIOtt
- With the THERMAL. POWER greater than the P-7 Interlock Setpoint, immediately open -
the reactor trip breakers.
SURVElLLANCE REQUIREMENTS.
4.10.4.1 The THERMAL POWER shall be determined to be less than P 7 luterlock' Setpoint at least once per hour during startup and PHYSICS TESTS.-
4.10.4.2 Each Intermediate, Power Range Channel and P 7 Interlock shall be subjected to a CHANNEL FUNCTIONAL TEST within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to initiating startup or PHYSICS TESTS.
1 G-l NORTH ANNA-UNIT 2 3/4 10 4-
-