ML20127D528: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _ _   -_ -
{{#Wiki_filter:_ _ _ _ _ _
          (.I
-_ -
l                                                   JUN 181985
(.I
              Docket / License: 50-334/DPR-66
l
l             Duquesne Light Company
JUN 181985
l             ATTN: Mr. J. J. Carey
Docket / License: 50-334/DPR-66
:                      Vice President
l
l                     Nuclear Group
Duquesne Light Company
l             P. O. Box 4
l
              Shippingport, Pennsylvania     15077
ATTN: Mr. J. J. Carey
l             Gentlemen:
Vice President
              Subject:   Inspection 50-334/85-11
:
              This refers to our letter of April 29, 1985, forwarding to you the results of
l
              resident safety inspection 50-334/85-11, at the Beaver Valley Power Station, Unit
Nuclear Group
              1 Shippingport, Pennsylvania. In that inspection, an apparent violation of NRC
l
              fire protection requirements, as contained in 10 CFR 50 Appendix R, was identified.
P. O. Box 4
              At that time, it was indicated that the technical significance of this problem was
Shippingport, Pennsylvania
              undergoing evaluation. The Region I staff has since completed that evaluation.
15077
              In performing this evaluation, we have noted that the plant specific configuration
l
              resulted in the two adjoining fire areas containing redundant emergency diesel-
Gentlemen:
,              generator power cables which could have been lost due to a fire in these adjoining
Subject:
Inspection 50-334/85-11
This refers to our letter of April 29, 1985, forwarding to you the results of
resident safety inspection 50-334/85-11, at the Beaver Valley Power Station, Unit
1 Shippingport, Pennsylvania.
In that inspection, an apparent violation of NRC
fire protection requirements, as contained in 10 CFR 50 Appendix R, was identified.
At that time, it was indicated that the technical significance of this problem was
undergoing evaluation.
The Region I staff has since completed that evaluation.
In performing this evaluation, we have noted that the plant specific configuration
resulted in the two adjoining fire areas containing redundant emergency diesel-
generator power cables which could have been lost due to a fire in these adjoining
,
'
'
              fire areas (CS-1 and CS-4) in that there were no fire dampers in the connecting
fire areas (CS-1 and CS-4) in that there were no fire dampers in the connecting
              ductwork. Thus, safe shutdown capability could have been lost. Therefore, this
ductwork.
              failure to meet regulatory requirements had more than minor safety significance.
Thus, safe shutdown capability could have been lost.
              This violation was identified by Duquesne Light Company during a Quality Assurance
Therefore, this
              Audit in December 1984, but appropriate corrective actions were not taken until
failure to meet regulatory requirements had more than minor safety significance.
              licensee personnel knowledgeable of specific fire protection requirements became
This violation was identified by Duquesne Light Company during a Quality Assurance
[             aware of the finding and initiated such actions on February 20, 1985. That repre-
Audit in December 1984, but appropriate corrective actions were not taken until
              sents slow initiation of corrective actions dictating that an NRC citation be is-
licensee personnel knowledgeable of specific fire protection requirements became
!             sued for the violation. You are required to reply to this violation in accordance
[
l             with the instruction in the enclosed Notice of Violation (Appendix A).
aware of the finding and initiated such actions on February 20, 1985.
              The responses directed by this letter and the accompanied Notice are not sbbject
That repre-
              to the clearance procedures of the Office of Management and Budget as required by
sents slow initiation of corrective actions dictating that an NRC citation be is-
;              the Paperwork Reduction Act of 1980, PL 96-511.
!
sued for the violation.
You are required to reply to this violation in accordance
l
with the instruction in the enclosed Notice of Violation (Appendix A).
The responses directed by this letter and the accompanied Notice are not sbbject
to the clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980, PL 96-511.
;
l
l
              Your cooperation with us in this matter is appreciated.
Your cooperation with us in this matter is appreciated.
                                                          Sincerely,
Sincerely,
                                                                      Ut 2 Atuol Gigned Bys
Ut 2 Atuol Gigned Bys
                                                                        G             ' ~
G
                                                          Edward C. Wenzinger, Chief
' ~
                                                          Projects Branch No. 3
Edward C. Wenzinger, Chief
                                                          DivisionofReactorProjects
Projects Branch No. 3
              Enclosure:   Appendix A. Notice of Violation
DivisionofReactorProjects
Enclosure:
Appendix A. Notice of Violation
8506240259 850618
gDR
ADOCM 05000334
e
i
I
I
                              8506240259 850618
PM
                              gDR  ADOCM 05000334                                          e  i
/
l}l
g
I
I
                                                PM                                          /    g
!
!
t
t
                                                                                              l}l


        _
_
,   t
t
  .
,
      Duquesne Light Company                     2           JUN 181985
.
      cc w/ enc 1:
JUN 181985
      C. E. Ewing, QA Manager
Duquesne Light Company
      W. S. Lacey, Station Superintendent
2
      R. Druga, Chief Engineer
cc w/ enc 1:
      R. Martin, Nuclear Engineer
C. E. Ewing, QA Manager
      J. Sieber, Manager, Nuclear Safety and Licensing
W. S. Lacey, Station Superintendent
      T. D. Jones, Manager, Nuclear Operations
R. Druga, Chief Engineer
      H. M. Siegel, Manager, Nuclear Engineering Department
R. Martin, Nuclear Engineer
      Public Document Room (PDR)
J. Sieber, Manager, Nuclear Safety and Licensing
      Local Public Document Room (LPDR)
T. D. Jones, Manager, Nuclear Operations
      Nuclear Safety Information Center (NSIC)
H. M. Siegel, Manager, Nuclear Engineering Department
      NRC Resident Inspector
Public Document Room (PDR)
      Commonwealth of Pennsylvania
Local Public Document Room (LPDR)
      bec w/ enc 1:
Nuclear Safety Information Center (NSIC)
      Region I Docket Room (with concurrences)
NRC Resident Inspector
      Senior Operations Officer (w/o enc 1)
Commonwealth of Pennsylvania
      DRP Section Chief
bec w/ enc 1:
      RI:DRP               RI:DRP         RI:DRS                 !
Region I Docket Room (with concurrences)
                                                        gRI:DRP
Senior Operations Officer (w/o enc 1)
      Troskoski/meo*       Tripp*         Anderson * f$nting
DRP Section Chief
      5/16/85                                               f   y
!
                                    0FFICIAL RECORD COPY
RI:DRP
      *SEE PREVIOUS CONCURRENCES
RI:DRP
RI:DRS
gRI:DRP
Troskoski/meo*
Tripp*
Anderson *
f$nting
5/16/85
f
y
0FFICIAL RECORD COPY
*SEE PREVIOUS CONCURRENCES


        .,                                     I.
I.
>         .
.,
                                                                                  Duquesne Light Company                   2               ' 1 8 1985
>
.
Duquesne Light Company
2
' 1 8 1985
l
l
l
l
                                                                                  Your cooperation with us in this matter is appreciated.
Your cooperation with us in this matter is appreciated.
                                                                                                                            Sincerely,
Sincerely,
i
i
i                                                                                                                           Edward C. Wenzinger, Chief
i
                                                                                                                            Projects Branch No. 3
Edward C. Wenzinger, Chief
                                                                                                                            Division of Reactor Projects
Projects Branch No. 3
                                                                                  Enclosure:   Appendix A, Notice of Violation
Division of Reactor Projects
Enclosure:
Appendix A, Notice of Violation
;
;
                                                                                  cc w/ enc 1:
cc w/ enc 1:
l                                                                                 C. E. Ewing, QA Manager
l
                                                                                  W. S. Lacey, Station Superintendent
C. E. Ewing, QA Manager
.                                                                                 R. Druga, Chief Engineer
W. S. Lacey, Station Superintendent
l                                                                                 R. Martin, Nuclear Engineer
.
i                                                                                 J. Sieber, Manager, Nuclear Safety and Licensing
R. Druga, Chief Engineer
l                                                                                 T. D. Jones, Manager, Nuclear Operations
l
l                                                                                 H. M. Siegel, Manager, Nuclear Engineering Department
R. Martin, Nuclear Engineer
i
J. Sieber, Manager, Nuclear Safety and Licensing
l
T. D. Jones, Manager, Nuclear Operations
l
H. M. Siegel, Manager, Nuclear Engineering Department
l
l
                                                                                  Public Document Room (PDR)
Public Document Room (PDR)
                                                                                  local Public Document Room (LPDR)
local Public Document Room (LPDR)
                                                                                  Nuclear Safety Information Center (NSIC)
Nuclear Safety Information Center (NSIC)
                                                                                  MC Resident Inspector
MC Resident Inspector
l                                                                                  Commonwealth of Pennsylvania
l                                                                                  bec w/ enc 1:
1                                                                                  Region I Docket Room (with concurrences)
!                                                                                  Senior Operations Officer (w/o enc 1)
l                                                                                  DRP Section Chief
l
l
Commonwealth of Pennsylvania
l
l
                                                                                                              RI:DR9
bec w/ enc 1:
                                                                                  RI:
1
                                                                                                        ig   h*kfr
Region I Docket Room (with concurrences)
                                                                                                                ''l
!
                                                                                                                            o'
Senior Operations Officer (w/o enc 1)
                                                                                                                        RI:DRP
l
                                                                                        {I             /RT:DRP
DRP Section Chief
                                                                      ,
l
                                                                          Mrdtkoski/meo                 T ipp         Wenzinger
l
                                                                                  5/16/85            3          A
RI:DR9
                                                                          i                              $
ig h*kfr o'
                                                                                                                OFFICIAL RECORD COPY
/RT:DRP ''l
RI:DRP
{I
RI:
Mrdtkoski/meo
T ipp
Wenzinger
,
,
5/16/85
3
A
i
$
OFFICIAL RECORD COPY
,
.
.
-
-
- -
-
-
-
- -
.
.
  . _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - - _ _ _ - _ _ _ _ _ _ - _ _ _ _ - _ - -                                                                      . - - - - _ _ - _ - - - - -
- - - -
-
- - - - -
}}
}}

Latest revision as of 17:07, 12 December 2024

Discusses Safety Insp Rept 50-334/85-11 on 850321-0405 & Forwards Notice of Violation.Fire Protection Requirements Not Appropriately Acted Upon,Per 10CFR50,App R
ML20127D528
Person / Time
Site: Beaver Valley
Issue date: 06/18/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Carey J
DUQUESNE LIGHT CO.
Shared Package
ML20127D533 List:
References
NUDOCS 8506240259
Download: ML20127D528 (3)


See also: IR 05000321/2004005

Text

_ _ _ _ _ _

-_ -

(.I

l

JUN 181985

Docket / License: 50-334/DPR-66

l

Duquesne Light Company

l

ATTN: Mr. J. J. Carey

Vice President

l

Nuclear Group

l

P. O. Box 4

Shippingport, Pennsylvania

15077

l

Gentlemen:

Subject:

Inspection 50-334/85-11

This refers to our letter of April 29, 1985, forwarding to you the results of

resident safety inspection 50-334/85-11, at the Beaver Valley Power Station, Unit

1 Shippingport, Pennsylvania.

In that inspection, an apparent violation of NRC

fire protection requirements, as contained in 10 CFR 50 Appendix R, was identified.

At that time, it was indicated that the technical significance of this problem was

undergoing evaluation.

The Region I staff has since completed that evaluation.

In performing this evaluation, we have noted that the plant specific configuration

resulted in the two adjoining fire areas containing redundant emergency diesel-

generator power cables which could have been lost due to a fire in these adjoining

,

'

fire areas (CS-1 and CS-4) in that there were no fire dampers in the connecting

ductwork.

Thus, safe shutdown capability could have been lost.

Therefore, this

failure to meet regulatory requirements had more than minor safety significance.

This violation was identified by Duquesne Light Company during a Quality Assurance

Audit in December 1984, but appropriate corrective actions were not taken until

licensee personnel knowledgeable of specific fire protection requirements became

[

aware of the finding and initiated such actions on February 20, 1985.

That repre-

sents slow initiation of corrective actions dictating that an NRC citation be is-

!

sued for the violation.

You are required to reply to this violation in accordance

l

with the instruction in the enclosed Notice of Violation (Appendix A).

The responses directed by this letter and the accompanied Notice are not sbbject

to the clearance procedures of the Office of Management and Budget as required by

the Paperwork Reduction Act of 1980, PL 96-511.

l

Your cooperation with us in this matter is appreciated.

Sincerely,

Ut 2 Atuol Gigned Bys

G

' ~

Edward C. Wenzinger, Chief

Projects Branch No. 3

DivisionofReactorProjects

Enclosure:

Appendix A. Notice of Violation

8506240259 850618

gDR

ADOCM 05000334

e

i

I

PM

/

l}l

g

I

!

t

_

t

,

.

JUN 181985

Duquesne Light Company

2

cc w/ enc 1:

C. E. Ewing, QA Manager

W. S. Lacey, Station Superintendent

R. Druga, Chief Engineer

R. Martin, Nuclear Engineer

J. Sieber, Manager, Nuclear Safety and Licensing

T. D. Jones, Manager, Nuclear Operations

H. M. Siegel, Manager, Nuclear Engineering Department

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ enc 1:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o enc 1)

DRP Section Chief

!

RI:DRP

RI:DRP

RI:DRS

gRI:DRP

Troskoski/meo*

Tripp*

Anderson *

f$nting

5/16/85

f

y

0FFICIAL RECORD COPY

  • SEE PREVIOUS CONCURRENCES

I.

.,

>

.

Duquesne Light Company

2

' 1 8 1985

l

l

Your cooperation with us in this matter is appreciated.

Sincerely,

i

i

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosure:

Appendix A, Notice of Violation

cc w/ enc 1:

l

C. E. Ewing, QA Manager

W. S. Lacey, Station Superintendent

.

R. Druga, Chief Engineer

l

R. Martin, Nuclear Engineer

i

J. Sieber, Manager, Nuclear Safety and Licensing

l

T. D. Jones, Manager, Nuclear Operations

l

H. M. Siegel, Manager, Nuclear Engineering Department

l

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

MC Resident Inspector

l

Commonwealth of Pennsylvania

l

bec w/ enc 1:

1

Region I Docket Room (with concurrences)

!

Senior Operations Officer (w/o enc 1)

l

DRP Section Chief

l

l

RI:DR9

ig h*kfr o'

/RT:DRP l

RI:DRP

{I

RI:

Mrdtkoski/meo

T ipp

Wenzinger

,

5/16/85

3

A

i

$

OFFICIAL RECORD COPY

,

.

.

-

-

- -

-

-

-

- -

.

- - - -

-

- - - - -