MONTHLY OPERATING REPORT DOCKET NO.       50-483 UNIT NAME CALLAWAY UNIT 1 DATE     JirNe 10. 19Rs COMPLsTsp BY n n connevow TELEPHONE (114T 676-R460                                                                 .
MONTHLY OPERATING REPORT DOCKET NO.
PART A   OPERATIONS  
50-483 UNIT NAME CALLAWAY UNIT 1 DATE JirNe 10. 19Rs COMPLsTsp BY n n connevow TELEPHONE (114T 676-R460 PART A OPERATIONS  


==SUMMARY==
==SUMMARY==
 
MAY 1985 Callaway operated at 100% power for the month of May except as noted on Part E and a load reduction on May 25.
MAY 1985 Callaway operated at 100% power for the month of May except as noted on Part E and a load reduction on May 25. On May 25 the load was reduced to 60% due to 1
On May 25 the load was reduced to 60% due to problems with ' A' Main Feed Pump and a loss of primary speed signal.
problems with ' A' Main Feed Pump and a loss of primary speed signal.
1 0
0
PART B PORV AND SAFETY VALVE  
    -            PART B   PORV AND SAFETY VALVE  


==SUMMARY==
==SUMMARY==
 
~
    ~
MnNF I
MnNF I
1
1
(   .
(
l l
l l
i CA-#804 05/09/84 8508090262 850531                                                      QDP-ZZ-04204 d PDR   ADOCK 05000483               Page 1 of 4                               g/ g 7 \
i CA-#804 05/09/84 QDP-ZZ-04204 d 8508090262 850531 g/ g 7 \\
R                  PDR 1
PDR ADOCK 05000483 Page 1 of 4 R
t
PDR 1t


Part D OPERATING DATA REPORT DOCKET NO.
Part D OPERATING DATA REPORT 50-483 DOCKET NO.
50-483 UNIT     Callaway DATE   JUNF 10.1985 COMPLETED 8Y R. R. GOODENOW TELEPHONE    (314) 676-8460 OPER ATING STATUS MAY 1985             gross MOURS #N REPORTING PERIOD:           744
UNIT Callaway DATE JUNF 10.1985 R. R. GOODENOW COMPLETED 8Y (314) 676-8460 TELEPHONE OPER ATING STATUS MAY 1985 gross MOURS #N REPORTING PERIOD:
744
: 1. REPORTING PERIOD:
: 1. REPORTING PERIOD:
: 2. CURRENTLY AL,THORIZED POWER LEVEL (MWil:    341l     MAX. DEPEND. CAPACITY (MWo.Nett:   1120 j
341l MAX. DEPEND. CAPACITY (MWo.Nett:
DESIGN ELECTRICAL RATING IMWo Net): 1171*           *At stretch reactor power level which is a                    not currently authorized under the o erating license
1120 j
: 2. CURRENTLY AL,THORIZED POWER LEVEL (MWil:
DESIGN ELECTRICAL RATING IMWo Net):
1171*
*At stretch reactor power level which is not currently authorized under the o erating license a
: 3. POWER LEVEL TO WHICM RESTRICTED tlP ANY)(MWo.Neti:
: 3. POWER LEVEL TO WHICM RESTRICTED tlP ANY)(MWo.Neti:
: 4. REASONS FOR RESTRICTION (IP ANYl:
: 4. REASONS FOR RESTRICTION (IP ANYl:
THIS MONTM YR TO DATE CUMULATivt 728.8       3241.1         3543.6
THIS MONTM YR TO DATE CUMULATivt 728.8 3241.1 3543.6
: 5. NUMSER OF HOURS REACTOR WAS CRITICAL 0             0             0
: 5. NUMSER OF HOURS REACTOR WAS CRITICAL 0
: 6. RE ACTOR RESERVE SMUTDOWN MOURS 721.0       3168.7         3471.2 7                 7 MOURS GENER ATOR ON LINE 0             0             0 7
0 0
                ,  8. UNaf RESERVE SMUTDOWN *OURS
: 6. RE ACTOR RESERVE SMUTDOWN MOURS 721.0 3168.7 3471.2 7
: 9. GROSS THERMAL ENERGY GENER ATED (MWHI 2.351.261     9.744.671 10.746.196 to GROSS ELECTRICAL ENERGY GENER ATED (MWM) .
7 MOURS GENER ATOR ON LINE 0
800.389 3.301.714           1.640.894 761.511   1.110 qqs         1 Asq 358
0 0
: 11. NET ELECTRICAL ENERGY GENERATED IMWM)     .
: 8. UNaf RESERVE SMUTDOWN *OURS 7
98.0%       89.5%         90.3%
2.351.261 9.744.671 10.746.196
: 9. GROSS THERMAL ENERGY GENER ATED (MWHI 800.389 3.301.714 1.640.894 to GROSS ELECTRICAL ENERGY GENER ATED (MWM).
761.511 1.110 qqs 1 Asq 358
: 11. NET ELECTRICAL ENERGY GENERATED IMWM) 98.0%
89.5%
90.3%
: 12. RE ACTOR SERvlCE F ACTOR j
: 12. RE ACTOR SERvlCE F ACTOR j
98.0%       89.5%         90.3%
98.0%
: 13. REACTOR AV All.ASILITY F ACTOR l
89.5%
96.9%       87.5%         88.4%
90.3%
l                 14 UNIT SERVICE FACTOR             ,.
l
96.9%       87.5%         88.4%
: 13. REACTOR AV All.ASILITY F ACTOR 96.9%
: 15. UNIT AVAILAslLITY P ACTOR 91.4%       77.1%         78.57 ts. UNIT CAPACITY F ACTOR (Umas MDCI 87.4%*     73.8%*         75.1?*
87.5%
17 UNif CAPACITY F ACTOR (Umag Demon MWel .
88.4%
3.1%       4.7%           4.47
l 14 UNIT SERVICE FACTOR 96.9%
      .          18. UNIT FORCED OUTAGE RATE                         ,    .    .
87.5%
: 19. SHUTDOWNS SCHEDULED OVER NEXT S MONTHS (TYPE OATE. ANO OURAflON OF EACMI:         None NA
88.4%
: 15. UNIT AVAILAslLITY P ACTOR 91.4%
77.1%
78.57 ts. UNIT CAPACITY F ACTOR (Umas MDCI 87.4%*
73.8%*
75.1?*
17 UNif CAPACITY F ACTOR (Umag Demon MWel.
3.1%
4.7%
4.47
: 18. UNIT FORCED OUTAGE RATE
: 19. SHUTDOWNS SCHEDULED OVER NEXT S MONTHS (TYPE OATE. ANO OURAflON OF EACMI:
None
: 20. IF SMUT DOWN AT END OF REPORT PER100. ESTIMATED OATE OF STARTUF:
: 20. IF SMUT DOWN AT END OF REPORT PER100. ESTIMATED OATE OF STARTUF:
CA d804 05/09/84 Page 3 of 4                                         QDP-ZZ-04204
NA CA d804 05/09/84 Page 3 of 4 QDP-ZZ-04204


                        .                      . . . .          o                                             .
o r
r                     .
Part E DOCKET NO.
Part E                             DOCKET NO. 50-483 UNil SHUTDOWNS AND POWER REDUCTIONS               UNIT NAME     Callaway QATE JUNE 10. 1985 R. R. GOODENOW COMPLETED BY REPORT MONTil     MAY 1985               TELEPHONE (314) 676-8460 METHOD OF TYPE                             SHUTTING DOWN F: FORCED DURAflON                 THE REACTOR OR NO. DATE S: SCHEDULED (HOURS)     REASON     REDUCING POWER           CCRRECTIVE ACTIONSN5NTS
50-483 UNil SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway QATE JUNE 10. 1985 R. R. GOODENOW COMPLETED BY REPORT MONTil MAY 1985 TELEPHONE (314) 676-8460 METHOD OF TYPE SHUTTING DOWN F: FORCED DURAflON THE REACTOR OR NO.
                                                                                            ~
DATE S: SCHEDULED (HOURS)
8   850503 Scheduled     0           B               1         Load reduced to 60% due to maintenance on 'B' Main Feed Pump.
REASON REDUCING POWER CCRRECTIVE ACTIONSN5NTS
9   850506 Forced       23.0         A               3         Reactor Trip from 100% Power due to loss of ' fain Feedwater Pump 'B.'
~
8 850503 Scheduled 0
B 1
Load reduced to 60% due to maintenance on
'B' Main Feed Pump.
9 850506 Forced 23.0 A
3 Reactor Trip from 100% Power due to loss of ' fain Feedwater Pump
'B.'
LER's 85-024-00 and 85-025-00.
LER's 85-024-00 and 85-025-00.


==SUMMARY==
==SUMMARY==
CA-#804
CA-#804
                                                                                                  ' 05/09/84 Page 4 of 4                                   QDP-ZZ-04204
' 05/09/84 Page 4 of 4 QDP-ZZ-04204


I Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.     50-483      -
I Part C AVERAGE DAILY UNIT POWER LEVEL 50-483 DOCKET NO.
UNIT   Callaway DATE   JUNE 10.1985 COMPLETED BY     R. R. GOODENOW TELEPHONE       (314) 676-8460 I
UNIT Callaway DATE JUNE 10.1985 COMPLETED BY R. R.
MONTH   MAY 1985 l
GOODENOW TELEPHONE (314) 676-8460 I
a              DAY AVERAGE DAILY POWER LEVEL                 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                                       (MWe-Net) l 1           1105                           37               1113 1110                           jg               1115 2
l MONTH MAY 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL a
1108                           3, 1111 3
(MWe-Net)
4              776                         20 1108
(MWe-Net) l 1
'                                  881                                           1108 5                                           21 878                                           1112 6                                           3 0                                           1112 7
1105 37 1113 1115 1110 jg 2
562                                           1108 3                                           24 1024                                           1071 9
1108 1111 3
1109                                           1077 10                                           26 1102                                           1107 33 1107                           g               1112 12 1110                                           1106 33                                           3 14            1109                           3               1075 1111                                           1086 15                                           31 1112 f                 16 l
3, 1108 776 20 4
l 0[ 64 Page 2 of 4                                 QDP-ZZ-04204
881 1108 5
21 878 1112 6
3 0
1112 7
562 1108 3
24 1024 1071 9
1109 1077 10 26 1102 1107 33 1112 1107 g
12 1110 1106 33 3
1075 1109 3
14 1111 1086 15 31 1112 f
16 l
l 0[
64 Page 2 of 4 QDP-ZZ-04204


9 l                             UNION EtscTaic COMPANY CALLAWAY PLANT MAILING ADDRESS:
9 l
UNION EtscTaic COMPANY CALLAWAY PLANT MAILING ADDRESS:
P. O. sox S20 FULTON. MO. 6 52 SI June 12, 1985 i
P. O. sox S20 FULTON. MO. 6 52 SI June 12, 1985 i
Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1110
Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1110


==Dear Sir:==
==Dear Sir:==
 
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT MAY 1985 The enclosed Monthly Operating Report for May 1985 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
!                                    DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1
l fOC e
,                              FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT MAY 1985 The enclosed Monthly Operating Report for May 1985 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
S. E. Miltenberger Manager, Callaway Plant A/C-d%P ET/WRC/RRG/drs Enclosure cc: Distribution attached rE14
l                                                           f OC            e S. E. Miltenberger Manager, Callaway Plant A/C-d%P ET/WRC/RRG/drs Enclosure cc: Distribution attached
'l.
  ;                                                                                      rE14
                                                                                                  'l . _


cc distribution for ULNRC-1110 with enclosures Mr. James G. Keppler Regional Administrator Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector I
cc distribution for ULNRC-1110 with enclosures Mr. James G. Keppler Regional Administrator Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector I
i l
i l
i s
i s
_, ._}}
_,._}}

Latest revision as of 08:09, 12 December 2024

Monthly Operating Rept for May 1985
ML20133H257
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/31/1985
From: Goodenow R, Miltenberger S
UNION ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ULNRC-1110, NUDOCS 8508090262
Download: ML20133H257 (6)


Text

MONTHLY OPERATING REPORT DOCKET NO.

50-483 UNIT NAME CALLAWAY UNIT 1 DATE JirNe 10. 19Rs COMPLsTsp BY n n connevow TELEPHONE (114T 676-R460 PART A OPERATIONS

SUMMARY

MAY 1985 Callaway operated at 100% power for the month of May except as noted on Part E and a load reduction on May 25.

On May 25 the load was reduced to 60% due to problems with ' A' Main Feed Pump and a loss of primary speed signal.

1 0

PART B PORV AND SAFETY VALVE

SUMMARY

~

MnNF I

1

(

l l

i CA-#804 05/09/84 QDP-ZZ-04204 d 8508090262 850531 g/ g 7 \\

PDR ADOCK 05000483 Page 1 of 4 R

PDR 1t

Part D OPERATING DATA REPORT 50-483 DOCKET NO.

UNIT Callaway DATE JUNF 10.1985 R. R. GOODENOW COMPLETED 8Y (314) 676-8460 TELEPHONE OPER ATING STATUS MAY 1985 gross MOURS #N REPORTING PERIOD:

744

1. REPORTING PERIOD:

341l MAX. DEPEND. CAPACITY (MWo.Nett:

1120 j

2. CURRENTLY AL,THORIZED POWER LEVEL (MWil:

DESIGN ELECTRICAL RATING IMWo Net):

1171*

  • At stretch reactor power level which is not currently authorized under the o erating license a
3. POWER LEVEL TO WHICM RESTRICTED tlP ANY)(MWo.Neti:
4. REASONS FOR RESTRICTION (IP ANYl:

THIS MONTM YR TO DATE CUMULATivt 728.8 3241.1 3543.6

5. NUMSER OF HOURS REACTOR WAS CRITICAL 0

0 0

6. RE ACTOR RESERVE SMUTDOWN MOURS 721.0 3168.7 3471.2 7

7 MOURS GENER ATOR ON LINE 0

0 0

8. UNaf RESERVE SMUTDOWN *OURS 7

2.351.261 9.744.671 10.746.196

9. GROSS THERMAL ENERGY GENER ATED (MWHI 800.389 3.301.714 1.640.894 to GROSS ELECTRICAL ENERGY GENER ATED (MWM).

761.511 1.110 qqs 1 Asq 358

11. NET ELECTRICAL ENERGY GENERATED IMWM) 98.0%

89.5%

90.3%

12. RE ACTOR SERvlCE F ACTOR j

98.0%

89.5%

90.3%

l

13. REACTOR AV All.ASILITY F ACTOR 96.9%

87.5%

88.4%

l 14 UNIT SERVICE FACTOR 96.9%

87.5%

88.4%

15. UNIT AVAILAslLITY P ACTOR 91.4%

77.1%

78.57 ts. UNIT CAPACITY F ACTOR (Umas MDCI 87.4%*

73.8%*

75.1?*

17 UNif CAPACITY F ACTOR (Umag Demon MWel.

3.1%

4.7%

4.47

18. UNIT FORCED OUTAGE RATE
19. SHUTDOWNS SCHEDULED OVER NEXT S MONTHS (TYPE OATE. ANO OURAflON OF EACMI:

None

20. IF SMUT DOWN AT END OF REPORT PER100. ESTIMATED OATE OF STARTUF:

NA CA d804 05/09/84 Page 3 of 4 QDP-ZZ-04204

o r

Part E DOCKET NO.

50-483 UNil SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway QATE JUNE 10. 1985 R. R. GOODENOW COMPLETED BY REPORT MONTil MAY 1985 TELEPHONE (314) 676-8460 METHOD OF TYPE SHUTTING DOWN F: FORCED DURAflON THE REACTOR OR NO.

DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER CCRRECTIVE ACTIONSN5NTS

~

8 850503 Scheduled 0

B 1

Load reduced to 60% due to maintenance on

'B' Main Feed Pump.

9 850506 Forced 23.0 A

3 Reactor Trip from 100% Power due to loss of ' fain Feedwater Pump

'B.'

LER's 85-024-00 and 85-025-00.

SUMMARY

CA-#804

' 05/09/84 Page 4 of 4 QDP-ZZ-04204

I Part C AVERAGE DAILY UNIT POWER LEVEL 50-483 DOCKET NO.

UNIT Callaway DATE JUNE 10.1985 COMPLETED BY R. R.

GOODENOW TELEPHONE (314) 676-8460 I

l MONTH MAY 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL a

(MWe-Net)

(MWe-Net) l 1

1105 37 1113 1115 1110 jg 2

1108 1111 3

3, 1108 776 20 4

881 1108 5

21 878 1112 6

3 0

1112 7

562 1108 3

24 1024 1071 9

1109 1077 10 26 1102 1107 33 1112 1107 g

12 1110 1106 33 3

1075 1109 3

14 1111 1086 15 31 1112 f

16 l

l 0[

64 Page 2 of 4 QDP-ZZ-04204

9 l

UNION EtscTaic COMPANY CALLAWAY PLANT MAILING ADDRESS:

P. O. sox S20 FULTON. MO. 6 52 SI June 12, 1985 i

Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1110

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT MAY 1985 The enclosed Monthly Operating Report for May 1985 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

l fOC e

S. E. Miltenberger Manager, Callaway Plant A/C-d%P ET/WRC/RRG/drs Enclosure cc: Distribution attached rE14

'l.

cc distribution for ULNRC-1110 with enclosures Mr. James G. Keppler Regional Administrator Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector I

i l

i s

_,._