ML20134K742: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:,    ie e
{{#Wiki_filter:ie e
COOPER NUCLEAR STATON P.O. BOX Of., BROWNYlLLE NEBRASKA 68321 g
COOPER NUCLEAR STATON P.O. BOX Of., BROWNYlLLE NEBRASKA 68321 Nebraska Public Power District
Nebraska Public Power District
=*La20''"
                                                                                            =*La20''"
AA g
AA NLS960216 November 15, 1996 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.           20555
NLS960216 November 15, 1996 U.
S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555


==Subject:==
==Subject:==
Monthly Operating Status Report for October 1996, Docket No. 50-298.
Monthly Operating Status Report for October 1996, Docket No. 50-298.
Gentlemen:
Gentlemen:
Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for October 1996.         The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown Data and a Narrative Summary of Operating Experience for the month of October.
Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for October 1996.
The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown Data and a Narrative Summary of Operating Experience for the month of October.
Should you have any comments, or require additional information regarding this report, please contact me.
Should you have any comments, or require additional information regarding this report, please contact me.
Sine     ly, M. F. eckham Plant Manager MFP:lb Enclosures cc: ANI Library R. W. Beck and Associates T. H. Black T. L. Bundy L. J. Callan J. M. Cline A. L. Dostal R. L. Gumm G. R. Horn INPO Records Center E. A. Lanning J. L. Long W. R. Mayben J. R. McPhail
Sine ly, M.
                                                                                                                            ,l P. D. Graham NRC Senior Resident Inspector                                                             /                 l R. J. Singer F. E. Yost 9611200014 961031 PDR     ADOCK 05000298 R                           PDR
F.
eckham Plant Manager MFP:lb Enclosures cc: ANI Library R.
W.
Beck and Associates T.
H.
Black T.
L.
Bundy L.
J.
Callan J.
M.
Cline A.
L.
Dostal R.
L.
Gumm G.
R.
Horn INPO Records Center E.
A.
Lanning J.
L.
Long W.
R. Mayben J.
R. McPhail
,l P.
D. Graham NRC Senior Resident Inspector
/
l R.
J.
Singer F.
E.
Yost 9611200014 961031 PDR ADOCK 05000298 R
PDR
~
~
                                                                  ^
NTNNM.M[NfEIN3N[N
=. u =_-- #= _ . ___                     --
^
NTNNM.M[NfEIN3N[N em= ~=       = = = = = -              ==--                      -=
=. u =_-- #= _. ___
em= ~=
= = = = = -


4                                                                                                                                                                  l 1
==--
e OPERATING DATA REPO;1T DOCKET NO, 050-0298 UNIT CNS DATE 11/15/96 OPERATING STATl'S                                                                                          FELEPilONE (402)825-5295
-=
: 1. Unit Name:                                  Cooper Nuclear Station                                    Notes
: 2. Reporting Period:                              October 1996
: 3. Licensed Thermal Power (MWt):                                                  2381 4    Nameplate Rating (Gross MWe):                                                    836
: 5. Design Electrical Rating (Net MWe):                                            778
: 6. Maximum Dependable Capacity (Gross MWe):                                      787
: 7. Maximum Dependable Capacity (Net MWs):                                        764
: 3. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
i
: 9. Power L.evel "      'h Restricted,If Any (Net MWe):
: 10. Reasons For k Tv        n, if Any:
This Month                  Yr.-to-Date                  Cumulative
      ! I,  llours in Reporting Period                                                    745.0                    7,320.0                          195,817.0
: 12. Number ofilours Reactor Was Critical                                            745.0                    7.139.3                          146,180.7
: 13. Reactor Reserve Shutdown llours                                                    0.0                          0.0                                0.0
: 14. Ifours Generator On-Line                                                        745.0                    7,076.2                          144,020 1
: 15. Unit Reserve Shutdown llours                                                      0.0                          0.0                                0.0
: 16. Gross Thermal Energy Generated (MWil)                                      1,770,216.0                16,318,327.0                      300,644,755.0
: 17. Gross Electric Energy Generated (MWil)                                      580,820.0                5.363,018.0                        97.743,328.0
: 10. Net Electric EUrgy Generated (MWil)                                          569,616.0                5,225.650.0                        94.451,779.0
: 19. Unit Service Factor                                                              100.0                        96.7                              73.5
: 20. Unit Availability Factor                                                        100.0                        96.7                              73 5
: 21. Unit Capacity Factor (Using MIX' Net)                                            100.1                        93.4                              63.1
: 22. Unit Capacity Factor (Using DER Net)                                              98.3                        91.8                              62.0
: 23. Unit Forced Outage Rate                                                            0.0                          0.0                                8.1
: 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):              Refueling Outage, March 28.1997,40 days.                        ,
: 25. If Shut Down At End of Report Period, Estimated Date of Startup:                      N/A
: 26. Units in Test Statas (Prior to Commercial Operation):                                  Forecast                      Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION


                                                                                . ~ _ .        .._
4 l
        ..                                                                                                              l I
e OPERATING DATA REPO;1T DOCKET NO, 050-0298 UNIT CNS DATE 11/15/96 OPERATING STATl'S FELEPilONE (402)825-5295 1.
i AVERAGE DAILY UNIT POWER LEVEL I
Unit Name:
l
Cooper Nuclear Station Notes 2.
'                                                                                        DOCKET NO.      050-0298       I i
Reporting Period:
UNIT             CNS           I l
October 1996 3.
DATE             11/15/96 l
Licensed Thermal Power (MWt):
TELEPHONE        (402) 825-5295 MONTil                October 1996
2381 4
,              DAY'      AVERAGE DAILY POWER LEVEL                              DAY    AVERAGE DAILY POWER LEVEL (MWe-Net)                                                   (MWe-Net) 1                       766                                        17               763                !
Nameplate Rating (Gross MWe):
2                        764                                        18              763 3                        765                                        19               765 4                        765                                        20               766 5                       765                                        21               765 6                        765                                        22               765 7-                      764                                        23               764 8                       764                                        24               765 9                        764                                        25               764                i I
836 5.
10                        764                                        26               765                l 11                        764                                        27              766 12                        765                                        28              766 13                        765                                        29              766 14                      764                                        30              765 15                      764                                        31              765 16                      763 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Design Electrical Rating (Net MWe):
778 6.
Maximum Dependable Capacity (Gross MWe):
787 7.
Maximum Dependable Capacity (Net MWs):
764 3.
If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
i 9.
Power L.evel "
'h Restricted,If Any (Net MWe):
: 10. Reasons For k Tv n, if Any:
This Month Yr.-to-Date Cumulative
! I, llours in Reporting Period 745.0 7,320.0 195,817.0
: 12. Number ofilours Reactor Was Critical 745.0 7.139.3 146,180.7
: 13. Reactor Reserve Shutdown llours 0.0 0.0 0.0
: 14. Ifours Generator On-Line 745.0 7,076.2 144,020 1
: 15. Unit Reserve Shutdown llours 0.0 0.0 0.0
: 16. Gross Thermal Energy Generated (MWil) 1,770,216.0 16,318,327.0 300,644,755.0
: 17. Gross Electric Energy Generated (MWil) 580,820.0 5.363,018.0 97.743,328.0
: 10. Net Electric EUrgy Generated (MWil) 569,616.0 5,225.650.0 94.451,779.0
: 19. Unit Service Factor 100.0 96.7 73.5
: 20. Unit Availability Factor 100.0 96.7 73 5
: 21. Unit Capacity Factor (Using MIX' Net) 100.1 93.4 63.1
: 22. Unit Capacity Factor (Using DER Net) 98.3 91.8 62.0
: 23. Unit Forced Outage Rate 0.0 0.0 8.1
: 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling Outage, March 28.1997,40 days.
: 25. If Shut Down At End of Report Period, Estimated Date of Startup:
N/A
: 26. Units in Test Statas (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION


UNIT SIIUTDOWNS AND POWER REDUCTIONS                                                                                                                                  ,
. ~ _.
DOCKET NO.                                                   050-0298 UNIT NAME                                                    Cooper Nuclear Station DATE                                                         11/15/96 COMPLETED BY                                                  P.1. Ballinger REPORT MONTII                October 1996                                    TELEPHONE                                                   (402)825-5295 No.        Date  T 3pe i      ",'"      Reason 2  Shuttin D e  Licensee Esent Report                                    Component Code 5                                                                          p                              I
I i
                                    ,,                                                                  4 Reacter 3 None i
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
i F: Forced          2 Reason:                                        3 Method                                                                                                          4 Exhibit G -Instructions for S: Scheduled        A - Equipment Failure (Explain)                 1 - Manual                                                                                                                Preparation of Datz Entry B - Maintenance or Test                          2 - Manual Scram                                                                                                        Sheets for Licenwe Esest C- Refueling                                    3 - Aatomatic Scram                                                                                                      Report (LER) File (NUREG-016I)
050-0298 i
D - Regulatory Restriction                      4 - Continued E - Operator Training & Ucense Examination      5 - Redeced lead                                                                                              5 Exhibit I-Same Source F- Administrative                                6 - Other G - Operational Error (Explain)
UNIT CNS l
II- Other (Enplain)
DATE 11/15/96 TELEPHONE (402) 825-5295 MONTil October 1996 DAY' AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 766 17 763 2
764 18 763 3
765 19 765 4
765 20 766 5
765 21 765 6
765 22 765 7-764 23 764 8
764 24 765 9
764 25 764 i
10 764 26 765 11 764 27 766 12 765 28 766 13 765 29 766 14 764 30 765 15 764 31 765 16 763 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.


q l                                           OPERATIONS NARRATIVE i                                                                                                                     ,
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
COOPER NUCLEAR STATION                                                     I October 1996 i
050-0298 UNIT NAME Cooper Nuclear Station DATE 11/15/96 COMPLETED BY P.1. Ballinger REPORT MONTII October 1996 TELEPHONE (402)825-5295 T pe i 3
The plant operated at full power for the month. Periodic surveillance testing was performed as required. l A capacity factor of 98.3 % was achieved for the month.                                                     l l
Reason 2 Shuttin D e Licensee Esent Report Component Code 5 I
No.
Date 4
p Reacter 3 None i
i F: Forced 2 Reason:
3 Method 4 Exhibit G -Instructions for S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparation of Datz Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licenwe Esest C-Refueling 3 - Aatomatic Scram Report (LER) File (NUREG-016I)
D - Regulatory Restriction 4 - Continued E - Operator Training & Ucense Examination 5 - Redeced lead 5 Exhibit I-Same Source F-Administrative 6 - Other G - Operational Error (Explain)
II-Other (Enplain)
 
q l
OPERATIONS NARRATIVE i
COOPER NUCLEAR STATION October 1996 i
The plant operated at full power for the month. Periodic surveillance testing was performed as required.
A capacity factor of 98.3 % was achieved for the month.
i 1
i 1
.                                                                                                                      1 i
i a
a 1
1 4
4 9
9 i
i~
~
J i-t in f.
J i-t in f.
4 3
4 3


l     ATTACHMENT 3     LIST OF NRC COMMITMENTS l
l ATTACHMENT 3 LIST OF NRC COMMITMENTS l
Correspondence No: NLS960216 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
Correspondence No: NLS960216 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District.
COMMITTED DATE COMMITMENT                                 OR OUTAGE None l
They are described to the NRC for the NRC's information and are not regulatory commitments.
l l
Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
l l          PROCEDURE NUMBER 0.42       l   REVISION NUMBER 1.2   l   PAGE 8 OF 10       l}}
COMMITTED DATE COMMITMENT OR OUTAGE None l
PROCEDURE NUMBER 0.42 l
REVISION NUMBER 1.2 l
PAGE 8 OF 10 l}}

Latest revision as of 03:58, 12 December 2024

Monthly Operating Rept for Oct 1996 for Cooper Nuclear Station
ML20134K742
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/31/1996
From: Ballinger P, Peckham M
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLS960216, NUDOCS 9611200014
Download: ML20134K742 (6)


Text

ie e

COOPER NUCLEAR STATON P.O. BOX Of., BROWNYlLLE NEBRASKA 68321 Nebraska Public Power District

=*La20"

AA g

NLS960216 November 15, 1996 U.

S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.

20555

Subject:

Monthly Operating Status Report for October 1996, Docket No. 50-298.

Gentlemen:

Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for October 1996.

The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown Data and a Narrative Summary of Operating Experience for the month of October.

Should you have any comments, or require additional information regarding this report, please contact me.

Sine ly, M.

F.

eckham Plant Manager MFP:lb Enclosures cc: ANI Library R.

W.

Beck and Associates T.

H.

Black T.

L.

Bundy L.

J.

Callan J.

M.

Cline A.

L.

Dostal R.

L.

Gumm G.

R.

Horn INPO Records Center E.

A.

Lanning J.

L.

Long W.

R. Mayben J.

R. McPhail

,l P.

D. Graham NRC Senior Resident Inspector

/

l R.

J.

Singer F.

E.

Yost 9611200014 961031 PDR ADOCK 05000298 R

PDR

~

NTNNM.M[NfEIN3N[N

^

=. u =_-- #= _. ___

em= ~=

= = = = = -

==--

-=

4 l

e OPERATING DATA REPO;1T DOCKET NO, 050-0298 UNIT CNS DATE 11/15/96 OPERATING STATl'S FELEPilONE (402)825-5295 1.

Unit Name:

Cooper Nuclear Station Notes 2.

Reporting Period:

October 1996 3.

Licensed Thermal Power (MWt):

2381 4

Nameplate Rating (Gross MWe):

836 5.

Design Electrical Rating (Net MWe):

778 6.

Maximum Dependable Capacity (Gross MWe):

787 7.

Maximum Dependable Capacity (Net MWs):

764 3.

If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:

i 9.

Power L.evel "

'h Restricted,If Any (Net MWe):

10. Reasons For k Tv n, if Any:

This Month Yr.-to-Date Cumulative

! I, llours in Reporting Period 745.0 7,320.0 195,817.0

12. Number ofilours Reactor Was Critical 745.0 7.139.3 146,180.7
13. Reactor Reserve Shutdown llours 0.0 0.0 0.0
14. Ifours Generator On-Line 745.0 7,076.2 144,020 1
15. Unit Reserve Shutdown llours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWil) 1,770,216.0 16,318,327.0 300,644,755.0
17. Gross Electric Energy Generated (MWil) 580,820.0 5.363,018.0 97.743,328.0
10. Net Electric EUrgy Generated (MWil) 569,616.0 5,225.650.0 94.451,779.0
19. Unit Service Factor 100.0 96.7 73.5
20. Unit Availability Factor 100.0 96.7 73 5
21. Unit Capacity Factor (Using MIX' Net) 100.1 93.4 63.1
22. Unit Capacity Factor (Using DER Net) 98.3 91.8 62.0
23. Unit Forced Outage Rate 0.0 0.0 8.1
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage, March 28.1997,40 days.

25. If Shut Down At End of Report Period, Estimated Date of Startup:

N/A

26. Units in Test Statas (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

. ~ _.

I i

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

050-0298 i

UNIT CNS l

DATE 11/15/96 TELEPHONE (402) 825-5295 MONTil October 1996 DAY' AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 766 17 763 2

764 18 763 3

765 19 765 4

765 20 766 5

765 21 765 6

765 22 765 7-764 23 764 8

764 24 765 9

764 25 764 i

10 764 26 765 11 764 27 766 12 765 28 766 13 765 29 766 14 764 30 765 15 764 31 765 16 763 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.

050-0298 UNIT NAME Cooper Nuclear Station DATE 11/15/96 COMPLETED BY P.1. Ballinger REPORT MONTII October 1996 TELEPHONE (402)825-5295 T pe i 3

Reason 2 Shuttin D e Licensee Esent Report Component Code 5 I

No.

Date 4

p Reacter 3 None i

i F: Forced 2 Reason:

3 Method 4 Exhibit G -Instructions for S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparation of Datz Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licenwe Esest C-Refueling 3 - Aatomatic Scram Report (LER) File (NUREG-016I)

D - Regulatory Restriction 4 - Continued E - Operator Training & Ucense Examination 5 - Redeced lead 5 Exhibit I-Same Source F-Administrative 6 - Other G - Operational Error (Explain)

II-Other (Enplain)

q l

OPERATIONS NARRATIVE i

COOPER NUCLEAR STATION October 1996 i

The plant operated at full power for the month. Periodic surveillance testing was performed as required.

A capacity factor of 98.3 % was achieved for the month.

i 1

i a

1 4

9 i

~

J i-t in f.

4 3

l ATTACHMENT 3 LIST OF NRC COMMITMENTS l

Correspondence No: NLS960216 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District.

They are described to the NRC for the NRC's information and are not regulatory commitments.

Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None l

PROCEDURE NUMBER 0.42 l

REVISION NUMBER 1.2 l

PAGE 8 OF 10 l