COOPER NUCLEAR STATON P.O. BOX Of., BROWNYlLLE NEBRASKA 68321 Nebraska Public Power District
=*La20"
AA g
NLS960216 November 15, 1996 U.
S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555
Subject:
Monthly Operating Status Report for October 1996, Docket No. 50-298.
Gentlemen:
Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for October 1996.
The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown Data and a Narrative Summary of Operating Experience for the month of October.
Should you have any comments, or require additional information regarding this report, please contact me.
Sine ly, M.
F.
eckham Plant Manager MFP:lb Enclosures cc: ANI Library R.
W.
Beck and Associates T.
H.
Black T.
L.
Bundy L.
J.
Callan J.
M.
Cline A.
L.
Dostal R.
L.
Gumm G.
R.
Horn INPO Records Center E.
A.
Lanning J.
L.
Long W.
R. Mayben J.
R. McPhail
,l P.
D. Graham NRC Senior Resident Inspector
/
l R.
J.
Singer F.
E.
Yost 9611200014 961031 PDR ADOCK 05000298 R
~
NTNNM.M[NfEIN3N[N
^
=. u =_-- #= _. ___
em= ~=
= = = = = -
==--
-=
4 l
e OPERATING DATA REPO;1T DOCKET NO, 050-0298 UNIT CNS DATE 11/15/96 OPERATING STATl'S FELEPilONE (402)825-5295 1.
Unit Name:
Cooper Nuclear Station Notes 2.
Reporting Period:
October 1996 3.
Licensed Thermal Power (MWt):
2381 4
Nameplate Rating (Gross MWe):
836 5.
Design Electrical Rating (Net MWe):
778 6.
Maximum Dependable Capacity (Gross MWe):
787 7.
Maximum Dependable Capacity (Net MWs):
764 3.
If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
i 9.
Power L.evel "
'h Restricted,If Any (Net MWe):
- 10. Reasons For k Tv n, if Any:
This Month Yr.-to-Date Cumulative
! I, llours in Reporting Period 745.0 7,320.0 195,817.0
- 12. Number ofilours Reactor Was Critical 745.0 7.139.3 146,180.7
- 13. Reactor Reserve Shutdown llours 0.0 0.0 0.0
- 14. Ifours Generator On-Line 745.0 7,076.2 144,020 1
- 15. Unit Reserve Shutdown llours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWil) 1,770,216.0 16,318,327.0 300,644,755.0
- 17. Gross Electric Energy Generated (MWil) 580,820.0 5.363,018.0 97.743,328.0
- 10. Net Electric EUrgy Generated (MWil) 569,616.0 5,225.650.0 94.451,779.0
- 19. Unit Service Factor 100.0 96.7 73.5
- 20. Unit Availability Factor 100.0 96.7 73 5
- 21. Unit Capacity Factor (Using MIX' Net) 100.1 93.4 63.1
- 22. Unit Capacity Factor (Using DER Net) 98.3 91.8 62.0
- 23. Unit Forced Outage Rate 0.0 0.0 8.1
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling Outage, March 28.1997,40 days.
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
N/A
- 26. Units in Test Statas (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
. ~ _.
I i
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
050-0298 i
UNIT CNS l
DATE 11/15/96 TELEPHONE (402) 825-5295 MONTil October 1996 DAY' AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 766 17 763 2
764 18 763 3
765 19 765 4
765 20 766 5
765 21 765 6
765 22 765 7-764 23 764 8
764 24 765 9
764 25 764 i
10 764 26 765 11 764 27 766 12 765 28 766 13 765 29 766 14 764 30 765 15 764 31 765 16 763 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
050-0298 UNIT NAME Cooper Nuclear Station DATE 11/15/96 COMPLETED BY P.1. Ballinger REPORT MONTII October 1996 TELEPHONE (402)825-5295 T pe i 3
Reason 2 Shuttin D e Licensee Esent Report Component Code 5 I
No.
Date 4
p Reacter 3 None i
i F: Forced 2 Reason:
3 Method 4 Exhibit G -Instructions for S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparation of Datz Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licenwe Esest C-Refueling 3 - Aatomatic Scram Report (LER) File (NUREG-016I)
D - Regulatory Restriction 4 - Continued E - Operator Training & Ucense Examination 5 - Redeced lead 5 Exhibit I-Same Source F-Administrative 6 - Other G - Operational Error (Explain)
II-Other (Enplain)
q l
OPERATIONS NARRATIVE i
COOPER NUCLEAR STATION October 1996 i
The plant operated at full power for the month. Periodic surveillance testing was performed as required.
A capacity factor of 98.3 % was achieved for the month.
i 1
i a
1 4
9 i
~
J i-t in f.
4 3
l ATTACHMENT 3 LIST OF NRC COMMITMENTS l
Correspondence No: NLS960216 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District.
They are described to the NRC for the NRC's information and are not regulatory commitments.
Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMENT OR OUTAGE None l
PROCEDURE NUMBER 0.42 l
REVISION NUMBER 1.2 l
PAGE 8 OF 10 l