i-DuxE power GOMPANY P.O. I,Ox 33189 CHAMLOrrrE, N.C. 28242 RALB. TUCKER | i-DuxE power GOMPANY P.O. I,Ox 33189 CHAMLOrrrE, N.C. 28242 RALB. TUCKER ren,zy.some | ||
= ~ m-0] ECIl p3. y vua *===s===e 8 | |||
(704) 373-4ssa ll December 10, 1985 VIIr. | |||
J.. Nelson Grace, Regional Administrator p. | |||
-U.LS. Nuclear Regulatory Commission Region II 101'Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 | |||
==Subject:== | ==Subject:== | ||
| Line 28: | Line 28: | ||
==Dear Dr. Grace:== | ==Dear Dr. Grace:== | ||
On November 7,1985, with the unit in cold. shutdown, a pressurizer l'ORV opened to relieve system pressure. The special report (as require. by Technical Specifications 3.4.9.3 and 6.9.2) will be delayed until December 19, 1985. | On November 7,1985, with the unit in cold. shutdown, a pressurizer l'ORV opened to relieve system pressure. The special report (as require. by Technical Specifications 3.4.9.3 and 6.9.2) will be delayed until December 19, 1985. | ||
'The event had no impact on the health and safety of the public. | |||
Very truly yours, 74 / 8 6 | Very truly yours, 74 / 8 6 n | ||
Hal B. Tucker JBD/hrp cc: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 | |||
::r. Darl Hood, Project Manager Office of Nuclear Reactor Regulation. | ::r. Darl Hood, Project Manager Office of Nuclear Reactor Regulation. | ||
.U. S. Nuclear Regulatory Commission | |||
. Washington, D. C. 20555 Mr. W. T. Orders NRC Resident Inspector McGuire Nucient Station INPO Records Center 1100 Circle 75 Parkway, Suite 1500 Atlanta -Georgia 30339 PJa=Ina Pdfjg' B | |||
McGuire Nucient Station INPO Records Center 1100 Circle 75 Parkway, Suite 1500 Atlanta -Georgia 30339 PJa=Ina Pdfjg' B | io ze13}} | ||
io | |||
Latest revision as of 18:07, 11 December 2024
| ML20138Q413 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 12/10/1985 |
| From: | Tucker H DUKE POWER CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8512270196 | |
| Download: ML20138Q413 (1) | |
Text
_ _ _ _ _
1.
i-DuxE power GOMPANY P.O. I,Ox 33189 CHAMLOrrrE, N.C. 28242 RALB. TUCKER ren,zy.some
= ~ m-0] ECIl p3. y vua *===s===e 8
(704) 373-4ssa ll December 10, 1985 VIIr.
J.. Nelson Grace, Regional Administrator p.
-U.LS. Nuclear Regulatory Commission Region II 101'Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
Subject:
' 'McGuire Nuclear Station, Unit 1 Docket Number 50-369 Opening of Pressurizer vRV
Dear Dr. Grace:
On November 7,1985, with the unit in cold. shutdown, a pressurizer l'ORV opened to relieve system pressure. The special report (as require. by Technical Specifications 3.4.9.3 and 6.9.2) will be delayed until December 19, 1985.
'The event had no impact on the health and safety of the public.
Very truly yours, 74 / 8 6 n
Hal B. Tucker JBD/hrp cc: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555
- r. Darl Hood, Project Manager Office of Nuclear Reactor Regulation.
.U. S. Nuclear Regulatory Commission
. Washington, D. C. 20555 Mr. W. T. Orders NRC Resident Inspector McGuire Nucient Station INPO Records Center 1100 Circle 75 Parkway, Suite 1500 Atlanta -Georgia 30339 PJa=Ina Pdfjg' B
io ze13