ML20138Q413

From kanterella
Jump to navigation Jump to search
Ro:On 851107,pressurizer PORV Opened to Relieve Sys Pressure.Special Rept Delayed Until 851219
ML20138Q413
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 12/10/1985
From: Tucker H
DUKE POWER CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8512270196
Download: ML20138Q413 (1)


Text

_ _ _ _ _

1.

i-DuxE power GOMPANY P.O. I,Ox 33189 CHAMLOrrrE, N.C. 28242 RALB. TUCKER ren,zy.some

= ~ m-0] ECIl p3. y vua *===s===e 8

(704) 373-4ssa ll December 10, 1985 VIIr.

J.. Nelson Grace, Regional Administrator p.

-U.LS. Nuclear Regulatory Commission Region II 101'Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

Subject:

' 'McGuire Nuclear Station, Unit 1 Docket Number 50-369 Opening of Pressurizer vRV

Dear Dr. Grace:

On November 7,1985, with the unit in cold. shutdown, a pressurizer l'ORV opened to relieve system pressure. The special report (as require. by Technical Specifications 3.4.9.3 and 6.9.2) will be delayed until December 19, 1985.

'The event had no impact on the health and safety of the public.

Very truly yours, 74 / 8 6 n

Hal B. Tucker JBD/hrp cc: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555

r. Darl Hood, Project Manager Office of Nuclear Reactor Regulation.

.U. S. Nuclear Regulatory Commission

. Washington, D. C. 20555 Mr. W. T. Orders NRC Resident Inspector McGuire Nucient Station INPO Records Center 1100 Circle 75 Parkway, Suite 1500 Atlanta -Georgia 30339 PJa=Ina Pdfjg' B

io ze13