{{#Wiki_filter:-_                           -       _   -                               .                         .   . _-._                 . --   -
{{#Wiki_filter:-_
              . *
-
_
-
.
.
. _-._
. --
-
*
.
'
'
                                                                        DEC 2 31985
DEC 2 31985
j                   In Reply Refer To:
j
,                . Docket:     50-285/85-25
In Reply Refer To:
. Docket:
50-285/85-25
,
f
f
'
'
                  Omaha Public Power District                                                                                               ^
Omaha Public Power District
                  ATTN:   R. L. Andrews, Division Manager-
^
                            Nuclear Production
ATTN:
                    1623 Harney Street
R. L. Andrews, Division Manager-
                  Omaha, Nebraska 68102
Nuclear Production
                  Gentlemen:
1623 Harney Street
                  This refers to the inspection conducted by Messrs. R. E. Baer and
Omaha, Nebraska 68102
Gentlemen:
This refers to the inspection conducted by Messrs. R. E. Baer and
D. B. Spitzberg of this office during the period November 4-8, 1985, of
;
;
'
'
                  D. B. Spitzberg of this office during the period November 4-8, 1985, of
activities authorized by NRC Operating License DPR-40 for Fort Calhoun Station,
                  activities authorized by NRC Operating License DPR-40 for Fort Calhoun Station,
and to the. discussion of our findings with Mr. W. G. Gates and other members of
                  and to the. discussion of our findings with Mr. W. G. Gates and other members of
your staff at the conclusion of the inspection.
                  your staff at the conclusion of the inspection.
Areas examined during the inspection included the radiation protection program
                  Areas examined during the inspection included the radiation protection program
j
j                 during the refueling outage. Within these areas, the. inspection consisted of
during the refueling outage. Within these areas, the. inspection consisted of
;                   selective examination of procedures and representative records, interviews with
;
                  personnel, and observations by the inspectors. These findings are documented
selective examination of procedures and representative records, interviews with
                    in the enclosed inspection report.
personnel, and observations by the inspectors. These findings are documented
in the enclosed inspection report.
!
!
                  Within the scope of the inspection, no violations or deviations were identified.
Within the scope of the inspection, no violations or deviations were identified.
                  Two unresolved items are identified in paragraph 3 of the enclosed inspection
Two unresolved items are identified in paragraph 3 of the enclosed inspection
;                   report.
;
report.
.
.
                                                    ~
Should you have any questions concerning this inspection, we will be pleased to
~
4
4
                  Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
                  discuss them with you.
Sincerely,
                                                                              Sincerely,
I
I
                                                                              lLh.e a 44 bgt
lLh.e a 44 bgt
                                                                                f> $-   Iv"     O
f> $-
i                                                                             J. E. Gagliardo, Chief
Iv"
                                                                              Reactor Projects Branch
O
i
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosure:
-
-
'
'
                  Enclosure:
Appendix - NRC Inspection Report
                  Appendix - NRC Inspection Report
50-285/85-25
                      50-285/85-25
cc w/ enclosure:
                  cc w/ enclosure:     (See next page)
(See next page)
!
!
                                                                                            ^
RPSBh
                  RIV:FRPS h FRPS                           C:FRPS                 D:     S
^
                                                                                                  RPSBh          C:RPB
RIV:FRPS h FRPS
                  DSpitzberg:de RBaer                       BMurray                 Rd     drt DHunn cutt     JGagliardo
C:FRPS
                  lE/13/85         l7/p'/85               f//85   '
D:
                                                                                      p / //85 lfMl61/85         Q/6/85
S
                                                                                                                                            P
C:RPB
                    B601070554 851223
DSpitzberg:de RBaer
                      DR   ADOCK O         g5                                                                                         g
BMurray
                                                                                                                                  6 ,1 i,
Rd
                                                                                                                                        g
drt DHunn cutt
      _ .-- --               .       -       . - _ _ - _ - - - - - - _ . - .                                     - - . - - _ . -
JGagliardo
lE/13/85
l7/p'/85
f//85
p / /85 lfMl61/85
Q/6/85
/
'
P
B601070554 851223
DR
ADOCK O
g5
g
6 ,1 i,
g
_ .-- --
.
-
. -
-
- - - - - -
. - .
- - . - -
. -


    .
.
  .
.
      Omaha Public Power District                                 -2-
Omaha Public Power District
      cc w/ enclosure:
-2-
      W. G. Gates, Manager
cc w/ enclosure:
      Fort Calhoun Station
W. G. Gates, Manager
      P. O. Box 399
Fort Calhoun Station
      Fort Calhoun, Nebraska 68023
P. O. Box 399
      Harry H. Voigt, Es'q.
Fort Calhoun, Nebraska 68023
      LeBoeuf, Lamb, Leiby & MacRae
Harry H. Voigt, Es'q.
      1333 New Hampshire Avenue, NW
LeBoeuf, Lamb, Leiby & MacRae
      Washington, DC         20036
1333 New Hampshire Avenue, NW
      Kansas Radiation Control Program Director
Washington, DC
      Nebraska Radiation Control Program Director
20036
      bec to DMB (IE06)
Kansas Radiation Control Program Director
      bcc distrib. by RIV:
Nebraska Radiation Control Program Director
      *RPB                               *   Resident Inspector                         R. D. Martin, RA
bec to DMB (IE06)
      *R&SPB                             *Section Chief (RPB/B)                         * MIS System
bcc distrib. by RIV:
      *RIV File                             E. H. Johnson, DRSP                         *RSTS Operator
*RPB
      *RSB                               *B. Spitzberg, FRPS                             *B. Murray, FRPS
* Resident Inspector
                                        *R. Baer, FRPS.
R. D. Martin, RA
      *w/766
*R&SPB
*Section Chief (RPB/B)
* MIS System
*RIV File
E. H. Johnson, DRSP
*RSTS Operator
*RSB
*B. Spitzberg, FRPS
*B. Murray, FRPS
*R. Baer, FRPS.
*w/766
i
i
          .
.
i
i
    .
.
            .         .-- . _ - . _ - - . . - .       - - _ - , .     . - . - , . . . ,           . . - - -. . . - _ ~ .
.
.-- . _ - . _ - - . . - .
- - _ - , .
. - . - , . . . ,
. . - -
-.
. . - _ ~ .
- . _ _ - -
}}
}}

Latest revision as of 15:31, 11 December 2024

Forwards Insp Rept 50-285/85-25 on 851104-08.No Violation or Deviation Noted.Two Unresolved Items Identified
ML20141E103
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/23/1985
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20141E109 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8601070554
Download: ML20141E103 (2)


See also: IR 05000285/1985025

Text

-_

-

_

-

.

.

. _-._

. --

-

.

'

DEC 2 31985

j

In Reply Refer To:

. Docket:

50-285/85-25

,

f

'

Omaha Public Power District

^

ATTN:

R. L. Andrews, Division Manager-

Nuclear Production

1623 Harney Street

Omaha, Nebraska 68102

Gentlemen:

This refers to the inspection conducted by Messrs. R. E. Baer and

D. B. Spitzberg of this office during the period November 4-8, 1985, of

'

activities authorized by NRC Operating License DPR-40 for Fort Calhoun Station,

and to the. discussion of our findings with Mr. W. G. Gates and other members of

your staff at the conclusion of the inspection.

Areas examined during the inspection included the radiation protection program

j

during the refueling outage. Within these areas, the. inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the inspectors. These findings are documented

in the enclosed inspection report.

!

Within the scope of the inspection, no violations or deviations were identified.

Two unresolved items are identified in paragraph 3 of the enclosed inspection

report.

.

Should you have any questions concerning this inspection, we will be pleased to

~

4

discuss them with you.

Sincerely,

I

lLh.e a 44 bgt

f> $-

Iv"

O

i

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure:

-

'

Appendix - NRC Inspection Report

50-285/85-25

cc w/ enclosure:

(See next page)

!

RPSBh

^

RIV:FRPS h FRPS

C:FRPS

D:

S

C:RPB

DSpitzberg:de RBaer

BMurray

Rd

drt DHunn cutt

JGagliardo

lE/13/85

l7/p'/85

f//85

p / /85 lfMl61/85

Q/6/85

/

'

P

B601070554 851223

DR

ADOCK O

g5

g

6 ,1 i,

g

_ .-- --

.

-

. -

-

- - - - - -

. - .

- - . - -

. -

.

.

Omaha Public Power District

-2-

cc w/ enclosure:

W. G. Gates, Manager

Fort Calhoun Station

P. O. Box 399

Fort Calhoun, Nebraska 68023

Harry H. Voigt, Es'q.

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, DC

20036

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bec to DMB (IE06)

bcc distrib. by RIV:

  • RPB
  • Resident Inspector

R. D. Martin, RA

  • R&SPB
  • Section Chief (RPB/B)
  • MIS System
  • RIV File

E. H. Johnson, DRSP

  • RSTS Operator
  • RSB
  • B. Spitzberg, FRPS
  • B. Murray, FRPS
  • R. Baer, FRPS.
  • w/766

i

.

i

.

.

.-- . _ - . _ - - . . - .

- - _ - , .

. - . - , . . . ,

. . - -

-.

. . - _ ~ .

- . _ _ - -