DEC 2 31985
j
In Reply Refer To:
. Docket:
50-285/85-25
,
f
'
Omaha Public Power District
^
ATTN:
R. L. Andrews, Division Manager-
Nuclear Production
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
This refers to the inspection conducted by Messrs. R. E. Baer and
D. B. Spitzberg of this office during the period November 4-8, 1985, of
'
activities authorized by NRC Operating License DPR-40 for Fort Calhoun Station,
and to the. discussion of our findings with Mr. W. G. Gates and other members of
your staff at the conclusion of the inspection.
Areas examined during the inspection included the radiation protection program
j
during the refueling outage. Within these areas, the. inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspectors. These findings are documented
in the enclosed inspection report.
!
Within the scope of the inspection, no violations or deviations were identified.
Two unresolved items are identified in paragraph 3 of the enclosed inspection
report.
.
Should you have any questions concerning this inspection, we will be pleased to
~
4
discuss them with you.
Sincerely,
I
lLh.e a 44 bgt
f> $-
Iv"
O
i
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosure:
-
'
Appendix - NRC Inspection Report
50-285/85-25
cc w/ enclosure:
(See next page)
!
RPSBh
^
RIV:FRPS h FRPS
C:FRPS
D:
S
C:RPB
DSpitzberg:de RBaer
BMurray
Rd
drt DHunn cutt
JGagliardo
lE/13/85
l7/p'/85
f//85
p / /85 lfMl61/85
Q/6/85
/
'
P
B601070554 851223
DR
ADOCK O
g5
g
6 ,1 i,
g
_ .-- --
.
-
. -
-
- - - - - -
. - .
- - . - -
. -
.
.
Omaha Public Power District
-2-
cc w/ enclosure:
W. G. Gates, Manager
Fort Calhoun Station
P. O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Es'q.
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
20036
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bec to DMB (IE06)
bcc distrib. by RIV:
- RPB
- Resident Inspector
R. D. Martin, RA
- R&SPB
- Section Chief (RPB/B)
- MIS System
- RIV File
E. H. Johnson, DRSP
- RSTS Operator
- RSB
- B. Spitzberg, FRPS
- B. Murray, FRPS