                                          July 28, 1997
July 28, 1997
      Tennessee Valley Authority
Tennessee Valley Authority
      ATIN: Mr. Oliver D. Kingsley, Jr.
ATIN: Mr. Oliver D. Kingsley, Jr.
                President, TVA Nuclear and
President, TVA Nuclear and
                  Chief Nuclear Officer
Chief Nuclear Officer
      6A Lookout Place
6A Lookout Place
      1101 Market Street
1101 Market Street
      Chattanooga, TN 37402 2801
Chattanooga, TN 37402 2801
      SUBJECT:     NRC INTEGRATED INSPECTION REPORT 50 327/97 06 AND 50-328/97 06
SUBJECT:
                    AND NOTICE OF VIOLATION
NRC INTEGRATED INSPECTION REPORT 50 327/97 06 AND 50-328/97 06
      Dear Mr. Kingsley:
AND NOTICE OF VIOLATION
      This refers to the inspection conducted on May 25 through July 5, 1997 at the
Dear Mr. Kingsley:
      Sequoyah facility. The enclosed report presents the results of this
This refers to the inspection conducted on May 25 through July 5, 1997 at the
      inspection.
Sequoyah facility. The enclosed report presents the results of this
      During the inspection period, your conduct of activities at the Sequoyah
inspection.
      facility were generally characterized by adequate operations, with good
During the inspection period, your conduct of activities at the Sequoyah
      control of power changes and problem identification and negative observations     ,
facility were generally characterized by adequate operations, with good
      in procedure compliance and o>erator training; adequate maintenance, with
control of power changes and problem identification and negative observations
      positive observations in trou)leshooting and pre job briefings and negative
,
      observations in procedure compliance and numerous equipment failures: adequate
in procedure compliance and o>erator training; adequate maintenance, with
      engineering, including good quality of modifications and negative observations
positive observations in trou)leshooting and pre job briefings and negative
      in the Generic Letter (GL) 89-10 program, ASME Section XI program, and
observations in procedure compliance and numerous equipment failures: adequate
      corrective actions for deficient relief valve settings; and good plant
engineering, including good quality of modifications and negative observations
      support, with positive observations in radioactive shipping, waste storage,
in the Generic Letter (GL) 89-10 program, ASME Section XI program, and
      dose control, and water chemistry and a negative finding for failure to
corrective actions for deficient relief valve settings; and good plant
      maintain proper air pressure in the auxiliary building. Nuclear Assurance
support, with positive observations in radioactive shipping, waste storage,
      audits were strong, intrusively focused and continued to identify significant
dose control, and water chemistry and a negative finding for failure to
      areas needing improvement. A significant finding by Nuclear Assurance
maintain proper air pressure in the auxiliary building.
      involved an observation that control room personnel generally reacted to
Nuclear Assurance
      abnormal conditions in a routine manner. This is consistent with ongoing NRC
audits were strong, intrusively focused and continued to identify significant
      concerns that material condition deficiencies are numerous and often challenge
areas needing improvement. A significant finding by Nuclear Assurance
      operators. The NRC is concerned with the findings identified during the
involved an observation that control room personnel generally reacted to
      Corrective Action Program inspection. While it was noted tnat management
abnormal conditions in a routine manner.
      involvement in the Corrective Action Program has improved, weaknesses
This is consistent with ongoing NRC
      identified during the ins)ection indicated that the improvements in             /
concerns that material condition deficiencies are numerous and often challenge
      implementing the process lave leveled off and continued attention is           I
operators. The NRC is concerned with the findings identified during the
      warranted.
Corrective Action Program inspection. While it was noted tnat management
      Based on the results of this inspection, the NRC has determined that
involvement in the Corrective Action Program has improved, weaknesses
      violations of NRC requirements occurred. The violations are cited in the
identified during the ins)ection indicated that the improvements in
      enclosed Notice of Violation (Notice) and the circumstances surrounding them
/
l     are described in detail in the subject inspection report. A violation was
implementing the process lave leveled off and continued attention is
!     identified for inadequate corrective actions associated with improper safety
I
      injection system relief valve settings. Following initial NRC concerns with
warranted.
      the interpretation of ASME code requirements and subsecuent corporate review
Based on the results of this inspection, the NRC has determined that
      of the relief valve setpoint issue, the licensee failec to properly
violations of NRC requirements occurred. The violations are cited in the
  9708040123 970728                        ffffffff.ffffll]f fffllffflllfflllg.,
enclosed Notice of Violation (Notice) and the circumstances surrounding them
  PDR   ADOCK 05000327                       -
l
                                                    .   ,,,
are described in detail in the subject inspection report. A violation was
  G                   PDR
!
                                                                                      Ndl J
identified for inadequate corrective actions associated with improper safety
injection system relief valve settings.
Following initial NRC concerns with
the interpretation of ASME code requirements and subsecuent corporate review
of the relief valve setpoint issue, the licensee failec to properly
ffffffff.ffffll]f fffllffflllfflllg.,
9708040123 970728
PDR
ADOCK 05000327
-
.
,,,
G
PDR
Ndl J


  -       --         ..         .   . .. .---         . _ . - . . .   . -. - . - . . .     , . _ . _ _ - . . .
-
      .;4 - :
--
    '
..
                                                                                                                    ,
.
                                                                                                                    1
. .. .---
              TVA                                        2                                                         l
. _ . - . . .
.
-. - . - . . .
, . _ .
_ _ - . .
.
.;4 - :
'
,
TVA
2
2
2
'            interpret and implement ASME/ ANSI code requirements. A second violation was
interpret and implement ASME/ ANSI code requirements. A second violation was
              identified for failing to promptly identify that a negative pressure was not                         i
'
,            being maintained in the auxiliary building as required by the UFSAR.                                 ;
identified for failing to promptly identify that a negative pressure was not
.             You are required to respond to this letter and should follow the instructions                         1
being maintained in the auxiliary building as required by the UFSAR.
l             specified in the enclosed Notice when preparing your response. The NRC will
;
              use your response, in part, to determine whether further enforcement action is                       ,
,
              necessary to ensure compliance with regulatory requirements.                                         i
.
You are required to respond to this letter and should follow the instructions
1
l
specified in the enclosed Notice when preparing your response. The NRC will
use your response, in part, to determine whether further enforcement action is
,
necessary to ensure compliance with regulatory requirements.
+
+
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
'
'
              In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter, its enclosures, and your responsibility will be placed in the NRC
              this letter, its enclosures, and your responsibility will be placed in the NRC                       l
Public Document Room (PDR).
;            Public Document Room (PDR).
;
Sincerely,
l
,
,
                                                                  Sincerely,                                      l
l
l
                                                                    (Original signed by M. S. Lesser)
(Original signed by M. S. Lesser)
1
1
!                                                                 Mark S. Lesser Chief                             l
!
                                                                  Reactor Projects Branch 6
Mark S. Lesser Chief
                                                                  Division of Reactor Projects
Reactor Projects Branch 6
              Docket Nos.: 50 327, and 50 328
Division of Reactor Projects
              License Nos: DPR 77 and DRP-79
Docket Nos.:
              Enclosures:     1. Notice of Violation
50 327, and 50 328
                              2. Integrated Inspection Report
License Nos: DPR 77 and DRP-79
                              3. NRR Response to TIA 97-01
Enclosures:
              cc w/encls:     (See page 3)
1. Notice of Violation
                                                                                                                    :
2. Integrated Inspection Report
                                      -          _
3. NRR Response to TIA 97-01
                                                                                                .
cc w/encls:
(See page 3)
-
_
.


  ..       -     -     .
..
                              . _ - .   - .-     . - _ . - - . .             -     ..             --
-
      ,4 - r -                                                                                           l
-
      -
.
                                                                                                          1
. _ -
.
- .-
. - _ . - - . .
-
..
--
,4 - r -
-
;
;
,
,
                TVA                                     3
TVA
                cc w/encls:                                                                               I
3
<              Mr. O. J. Zeringue                               Mr. J. T. Herron
cc w/encls:
                Senior Vice President                             Plant Manager
Mr. O. J. Zeringue
;               Nuclear Operations                               Sequoyah Nuclear Plant
Mr. J. T. Herron
<
Senior Vice President
Plant Manager
;
Nuclear Operations
Sequoyah Nuclear Plant
Tennessee Valley Authority
Tennessee Valley Authority
-
-
                Tennessee Valley Authority                      Tennessee Valley Authority
6A Lookout Place
P. O. Box 2000
l
,
1101 Market Street
Soddy Daisy, TN 37379
Chattanooga, TN 37402 2801
'
Mr. Michael H. Mobley, Director
Mr. J. A. Bailey
Division of Radiological Health
.
Vice President
3rd Floor. L and C Annex
Engineering and Technical Services
401 Church Street
,
6A Lookout Place
Nashville, TN 37243-1532
1101 Market Street
i
Chattanooga, TN 37402-2801
County Executive
Hamilton County Courthouse
Mr. R. J. Adney
Chattanooga, TN 37402 2801
i
Site Vice President
'
Sequoyah Nuclear Plant
Distribution w/encls:
(See page 4)
4
Tennessee Valley Authority
P. O. Box 2000
,
,
                6A Lookout Place                                  P. O. Box 2000                          l
Soddy Daisy, TN 37379
'
;
                1101 Market Street                                Soddy Daisy, TN 37379
General Counsel
                Chattanooga, TN 37402 2801
Tennessee Valley Authority
                                                                  Mr. Michael H. Mobley, Director
ET 10H
.              Mr. J. A. Bailey                                  Division of Radiological Health        l
I
                Vice President                                    3rd Floor. L and C Annex
400 West Summit Hill Drive
                Engineering and Technical Services                401 Church Street                      ,
Knoxville, TN 37902
                6A Lookout Place                                  Nashville, TN 37243-1532                l
Mr. R. R. Baron
                1101 Market Street                                                                        i
)
                Chattanooga, TN 37402-2801                        County Executive                        !
General Manager Nuclear
                                                                  Hamilton County Courthouse
Assurance & Licensing
                Mr. R. J. Adney                                  Chattanooga, TN 37402 2801              i'
4J Blue Ridge
                Site Vice President
1101 Market Street
                Sequoyah Nuclear Plant                            Distribution w/encls:  (See page 4)    4
Chattanooga, TN 37402-2801
                Tennessee Valley Authority
Mr. P. Salas, Manager
                P. O. Box 2000                                                                            ,
Licensing and Industry Affairs
                Soddy Daisy, TN 37379                                                                    ;
Tennessee Valley Authority
                                                                                                          ;
4J Blue Ridge
                General Counsel
1101 Market Street
                Tennessee Valley Authority                                                                 l
Chattanooga, TN 37402 2801
                ET 10H                                                                                   I
Mr. R. H. Shell, Manager
                400 West Summit Hill Drive
Licensing and Industry Affairs
                Knoxville, TN 37902
Sequoyah Nuclear Plant
                Mr. R. R. Baron
Tennessee Valley Authority
                General Manager Nuclear
P. O. Box 2000
                                                                                                          )
Soddy Daisy, TN 37379
                    Assurance & Licensing
                4J Blue Ridge
                1101 Market Street
                Chattanooga, TN 37402-2801
                Mr. P. Salas, Manager
                Licensing and Industry Affairs
                Tennessee Valley Authority
                4J Blue Ridge
                1101 Market Street
                Chattanooga, TN 37402 2801
                Mr. R. H. Shell, Manager                                                                   !
                Licensing and Industry Affairs
                Sequoyah Nuclear Plant
                Tennessee Valley Authority
                P. O. Box 2000
                Soddy Daisy, TN 37379


            -             -    ..      . .    - .~          . --            -    - -              . - - - .                . . - -    --._ - - -
-
  ,
-
    ,.r                                                                                                                                              !
..
..
        TVA                                                               4
. .
        pistribution w/encls:
- .~
        J. R. Johnson, RII
. --
        H. S. Lesser, RII
-
        S. E. Sparks, RII                                                                                                                             !
- -
        P. A. Taylor, RII
. - - - .
                                                                                                                                                      '
. . - -
        F. J. Hebdon, NRR
--._ - -
        R. W. Hernan, NRR
-
        W. C. Bearden, RII                                                                                                                           q
,.r
        C. F. Smith, RII
,
        D. H. Thompson, RII
..
        J. H. Moorman. RII                                                                                                                           l
TVA
        E. D. Testa, RII
4
        T. G. Scarbough, NRR                                                                                                                         i
pistribution w/encls:
        D. Terao, NRR
J. R. Johnson, RII
        S. G. Tingen, NRR
H. S. Lesser, RII
        E. M. Kelly, RI
S. E. Sparks, RII
        W. J. Kropp, RIII
P. A. Taylor, RII
        C. A. Vandenburgh, RIV
'
        PUBLIC
F. J. Hebdon, NRR
        NRC Resident Inspector
R. W. Hernan, NRR
        U. S. Nuclear Regulatory Commission
W. C. Bearden, RII
        2600 Igou Ferry.
q
        Soddy Daisy, TN 37379
C. F. Smith, RII
        NRC Resident Inspector
D. H. Thompson, RII
        U. S. Nuclear Regulatory Commission
J. H. Moorman. RII
        1260 Nuclear Plant Road
E. D. Testa, RII
        Spring City TN 37381
T. G. Scarbough, NRR
                0FFICE     Dop/pff           DDottif             000/pff             nop/pff                 nos/pff       opstpff
i
              SIGNATURE                                                                                        pyf           {
D. Terao, NRR
                  NAME            : [g     MShannon             RStarkey             DSeymour               WBearden     ETesta
S. G. Tingen, NRR
                  DATE       07 / 2 7 / 97     07 /     / 97       07 /     / 97       07 /     / 97         07 / d / 97   07 / N / 97
E. M. Kelly, RI
                                                                .: =     :. == =:- =         ==--_
W. J. Kropp, RIII
                Drr1rE     OpsipiI           Op<inIf
C. A. Vandenburgh, RIV
                                                                M88_* fM88
PUBLIC
              SIGhATURE                      [M                             h
NRC Resident Inspector
                  NAME     CSmith \         EGirard             A '/ Ergo
U. S. Nuclear Regulatory Commission
                  DATE       07 /       / 97   07 /* 2 / 97         07 // 1 / 97         07 /     / 97         07 /   / 97 07 /   / 97
2600 Igou Ferry.
        _
Soddy Daisy, TN 37379
                  CDPV?     [fES)         NO   @         NO         YES       NO       YES       NO           YES     NO   YES     NO
NRC Resident Inspector
                  OffIllAL T d)KU LOP (         DOCUMthi NAMt.:       G; Wis6.50ut09/-06
U. S. Nuclear Regulatory Commission
1260 Nuclear Plant Road
Spring City TN 37381
0FFICE
Dop/pff
DDottif
000/pff
nop/pff
nos/pff
opstpff
pyf
{
SIGNATURE
[g
MShannon
RStarkey
DSeymour
WBearden
ETesta
NAME
:
DATE
07 / 2 7 / 97
07 /
/ 97
07 /
/ 97
07 /
/ 97
07 / d / 97
07 / N / 97
.: =
:. == =:-
=
= = - - _
M88_* fM88
Drr1rE
OpsipiI
Op<inIf
SIGhATURE
[M
h
NAME
CSmith \\
EGirard
A '/ Ergo
DATE
07 /
/ 97
07 /* 2 / 97
07 // 1 / 97
07 /
/ 97
07 /
/ 97
07 /
/ 97
CDPV?
[fES)
NO
@
NO
YES
NO
YES
NO
YES
NO
YES
NO
_
OffIllAL T d)KU LOP (
DOCUMthi NAMt.:
G; Wis6.50ut09/-06
_ . .


,      07-E-1957 02:39PM         FROM SElldYMH RESIDENT OFFICE                 TO           idO256kANh6       P$0I
07-E-1957 02:39PM
    .,                                                                                                                  ,
FROM SElldYMH RESIDENT OFFICE
TO
idO256kANh6
P$0I
,
,
.,
i
i
: .'                                                                                                                     1
.'
                                                                                                                          :
:
                                                                                                                          )
)
!                                                                                                                         l
!
:           TVA
:
                                                                  4
TVA
                                                                                                                      .
4
            tintritxttion w/encls:
.
            ;. R. Johnson RII
tintritxttion w/encls:
;          M. S. Lesser RII
;. R. Johnson
            S. E.    srks, RII
M. S. Lesser
            P. A,      or, RII
RII
:          F. J.        , NRR
RII
:          R. W. Hornen. MtR
j          W. C. Bearden, RII
.          C. F. Smith, RII
;
;
            D. H. Thompson, RII
S. E.
srks, RII
P. A,
or, RII
:
F. J.
, NRR
:
R. W. Hornen. MtR
j
W. C. Bearden, RII
C. F. Smith, RII
.
;
D. H. Thompson, RII
i
i
            J. H. Moormen. RII
J. H. Moormen. RII
i           E. D. Testa, RII
i
;           T. G. Scarbough, NRR
E. D. Testa, RII
i           D. Tereo, NRR
;
T. G. Scarbough, NRR
i
D. Tereo, NRR
!
!
            5. G. Tin (en, MtR
5. G. Tin (en, MtR
            E. M. Kel y, RI
E. M. Kel y, RI
            W. J. Kropp, RIII
W. J. Kropp, RIII
            C. A. Vandenburgh. RIV
C. A. Vandenburgh. RIV
            PUBLIC
PUBLIC
            NRC Resident Inspector
NRC Resident Inspector
            U. S. Nuclear Regulatory Comission
U. S. Nuclear Regulatory Comission
            2600 I
2600 I
            Soddy.gou
Soddy.gou Ferry
                  Daisy.Ferry
Daisy. TN 37379
                          TN 37379                                                                                     '
'
            NRC Resident Inspector
NRC Resident Inspector
            U. S. Nuclear Regulatory Comission
U. S. Nuclear Regulatory Comission
            1260 Nuclear Plant Road
1260 Nuclear Plant Road
            Spring City. TN 37381
Spring City. TN 37381
                                                                                                                          L
i
                                                                                                                          i
.
                                                                                                          .
k
                                k               n                                       N
n
                        UN
N
                                                                                                                          {
{
            __
UN
                **
[h
                    m w ,.
N
                                        [h
(
                                        .-
'vd
                                                        NA
nA.,[
                                                                        (
**
                                                                          =
f,
                                                                                        'vd
A
                                                                                        ...         nA.,[
__
                                                                                                      f,
m
                    WE    :7 /Z4 / pf     or /     / 97   c7 I     / 97   c7 i 2M/ p   of /d / 37   07]Orn
w ,.
                        umEmummm*mmemEmummu$mmumE===EmuMlMM
.-
                  -     - . , ,         . . , ,         moue
=
                SIWM                         #                     h
...
                    as We             anrue           A ho                                                             4
WE
                    wt   of /2 t/ W     of /8 * I y     gy ef2 f g7     g7 /   / or cf /   f ,7 pj   i 97
:7 /Z4 / pf
                    tm?   m       e     @         e     m         2       Ws     e     m     a   m     e
or /
                  UFPIL1%. WW W1           A rltAT f W L.   5 :\bRb.W0tW:r/=Lb
/ 97
                                                                                                        TOTAL P.02
c7 I
/ 97
c7 i 2M/ p
of /d / 37
07]Orn
umEmummm*mmemEmummu$mmumE===EmuMlMM
moue
-
- . , ,
. . , ,
SIWM
#
h
as We
anrue
A ho
4
wt
of /2 t/ W
of /8 * I y
gy ef2 f g7
g7 /
/ or
cf /
f ,7
pj
i 97
tm?
m
e
@
e
m
2
Ws
e
m
a
m
e
UFPIL1%. WW W1
A rltAT f W L.
5 :\\bRb.W0tW:r/=Lb
TOTAL P.02
}}
}}

Latest revision as of 14:46, 11 December 2024

Forwards Insp Repts 50-327/97-06 & 50-328/97-06 on 970525-0705 & Nov.Violation Identified for Inadequate Corrective Actions Associated W/Improper Safety Injection Sys Relief Valve Settings
ML20141H949
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/28/1997
From: Lesser M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kingsley O
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20141H951 List:
References
50-327-97-06, 50-327-97-6, 50-328-97-06, 50-328-97-6, GL-89-10, NUDOCS 9708040123
Download: ML20141H949 (5)


See also: IR 05000327/1997006

Text

g,-

,

July 28, 1997

Tennessee Valley Authority

ATIN: Mr. Oliver D. Kingsley, Jr.

President, TVA Nuclear and

Chief Nuclear Officer

6A Lookout Place

1101 Market Street

Chattanooga, TN 37402 2801

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50 327/97 06 AND 50-328/97 06

AND NOTICE OF VIOLATION

Dear Mr. Kingsley:

This refers to the inspection conducted on May 25 through July 5, 1997 at the

Sequoyah facility. The enclosed report presents the results of this

inspection.

During the inspection period, your conduct of activities at the Sequoyah

facility were generally characterized by adequate operations, with good

control of power changes and problem identification and negative observations

,

in procedure compliance and o>erator training; adequate maintenance, with

positive observations in trou)leshooting and pre job briefings and negative

observations in procedure compliance and numerous equipment failures: adequate

engineering, including good quality of modifications and negative observations

in the Generic Letter (GL) 89-10 program, ASME Section XI program, and

corrective actions for deficient relief valve settings; and good plant

support, with positive observations in radioactive shipping, waste storage,

dose control, and water chemistry and a negative finding for failure to

maintain proper air pressure in the auxiliary building.

Nuclear Assurance

audits were strong, intrusively focused and continued to identify significant

areas needing improvement. A significant finding by Nuclear Assurance

involved an observation that control room personnel generally reacted to

abnormal conditions in a routine manner.

This is consistent with ongoing NRC

concerns that material condition deficiencies are numerous and often challenge

operators. The NRC is concerned with the findings identified during the

Corrective Action Program inspection. While it was noted tnat management

involvement in the Corrective Action Program has improved, weaknesses

identified during the ins)ection indicated that the improvements in

/

implementing the process lave leveled off and continued attention is

I

warranted.

Based on the results of this inspection, the NRC has determined that

violations of NRC requirements occurred. The violations are cited in the

enclosed Notice of Violation (Notice) and the circumstances surrounding them

l

are described in detail in the subject inspection report. A violation was

!

identified for inadequate corrective actions associated with improper safety

injection system relief valve settings.

Following initial NRC concerns with

the interpretation of ASME code requirements and subsecuent corporate review

of the relief valve setpoint issue, the licensee failec to properly

ffffffff.ffffll]f fffllffflllfflllg.,

9708040123 970728

PDR

ADOCK 05000327

-

.

,,,

G

PDR

Ndl J

-

--

..

.

. .. .---

. _ . - . . .

.

-. - . - . . .

, . _ .

_ _ - . .

.

.;4 - :

'

,

TVA

2

2

interpret and implement ASME/ ANSI code requirements. A second violation was

'

identified for failing to promptly identify that a negative pressure was not

being maintained in the auxiliary building as required by the UFSAR.

,

.

You are required to respond to this letter and should follow the instructions

1

l

specified in the enclosed Notice when preparing your response. The NRC will

use your response, in part, to determine whether further enforcement action is

,

necessary to ensure compliance with regulatory requirements.

+

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

'

this letter, its enclosures, and your responsibility will be placed in the NRC

Public Document Room (PDR).

Sincerely,

l

,

l

(Original signed by M. S. Lesser)

1

!

Mark S. Lesser Chief

Reactor Projects Branch 6

Division of Reactor Projects

Docket Nos.:

50 327, and 50 328

License Nos: DPR 77 and DRP-79

Enclosures:

1. Notice of Violation

2. Integrated Inspection Report

3. NRR Response to TIA 97-01

cc w/encls:

(See page 3)

-

_

.

..

-

-

.

. _ -

.

- .-

. - _ . - - . .

-

..

--

,4 - r -

-

,

TVA

3

cc w/encls:

Mr. O. J. Zeringue

Mr. J. T. Herron

<

Senior Vice President

Plant Manager

Nuclear Operations

Sequoyah Nuclear Plant

Tennessee Valley Authority

Tennessee Valley Authority

-

6A Lookout Place

P. O. Box 2000

l

,

1101 Market Street

Soddy Daisy, TN 37379

Chattanooga, TN 37402 2801

'

Mr. Michael H. Mobley, Director

Mr. J. A. Bailey

Division of Radiological Health

.

Vice President

3rd Floor. L and C Annex

Engineering and Technical Services

401 Church Street

,

6A Lookout Place

Nashville, TN 37243-1532

1101 Market Street

i

Chattanooga, TN 37402-2801

County Executive

Hamilton County Courthouse

Mr. R. J. Adney

Chattanooga, TN 37402 2801

i

Site Vice President

'

Sequoyah Nuclear Plant

Distribution w/encls:

(See page 4)

4

Tennessee Valley Authority

P. O. Box 2000

,

Soddy Daisy, TN 37379

General Counsel

Tennessee Valley Authority

ET 10H

I

400 West Summit Hill Drive

Knoxville, TN 37902

Mr. R. R. Baron

)

General Manager Nuclear

Assurance & Licensing

4J Blue Ridge

1101 Market Street

Chattanooga, TN 37402-2801

Mr. P. Salas, Manager

Licensing and Industry Affairs

Tennessee Valley Authority

4J Blue Ridge

1101 Market Street

Chattanooga, TN 37402 2801

Mr. R. H. Shell, Manager

Licensing and Industry Affairs

Sequoyah Nuclear Plant

Tennessee Valley Authority

P. O. Box 2000

Soddy Daisy, TN 37379

-

-

..

. .

- .~

. --

-

- -

. - - - .

. . - -

--._ - -

-

,.r

,

..

TVA

4

pistribution w/encls:

J. R. Johnson, RII

H. S. Lesser, RII

S. E. Sparks, RII

P. A. Taylor, RII

'

F. J. Hebdon, NRR

R. W. Hernan, NRR

W. C. Bearden, RII

q

C. F. Smith, RII

D. H. Thompson, RII

J. H. Moorman. RII

E. D. Testa, RII

T. G. Scarbough, NRR

i

D. Terao, NRR

S. G. Tingen, NRR

E. M. Kelly, RI

W. J. Kropp, RIII

C. A. Vandenburgh, RIV

PUBLIC

NRC Resident Inspector

U. S. Nuclear Regulatory Commission

2600 Igou Ferry.

Soddy Daisy, TN 37379

NRC Resident Inspector

U. S. Nuclear Regulatory Commission

1260 Nuclear Plant Road

Spring City TN 37381

0FFICE

Dop/pff

DDottif

000/pff

nop/pff

nos/pff

opstpff

pyf

{

SIGNATURE

[g

MShannon

RStarkey

DSeymour

WBearden

ETesta

NAME

DATE

07 / 2 7 / 97

07 /

/ 97

07 /

/ 97

07 /

/ 97

07 / d / 97

07 / N / 97

.: =

. == =:-

=

= = - - _

M88_* fM88

Drr1rE

OpsipiI

Op<inIf

SIGhATURE

[M

h

NAME

CSmith \\

EGirard

A '/ Ergo

DATE

07 /

/ 97

07 /* 2 / 97

07 // 1 / 97

07 /

/ 97

07 /

/ 97

07 /

/ 97

CDPV?

[fES)

NO

@

NO

YES

NO

YES

NO

YES

NO

YES

NO

_

OffIllAL T d)KU LOP (

DOCUMthi NAMt.:

G; Wis6.50ut09/-06

_ . .

07-E-1957 02:39PM

FROM SElldYMH RESIDENT OFFICE

TO

idO256kANh6

P$0I

,

,

.,

i

.'

)

!

TVA

4

.

tintritxttion w/encls:

. R. Johnson

M. S. Lesser

RII

RII

S. E.

srks, RII

P. A,

or, RII

F. J.

, NRR

R. W. Hornen. MtR

j

W. C. Bearden, RII

C. F. Smith, RII

.

D. H. Thompson, RII

i

J. H. Moormen. RII

i

E. D. Testa, RII

T. G. Scarbough, NRR

i

D. Tereo, NRR

!

5. G. Tin (en, MtR

E. M. Kel y, RI

W. J. Kropp, RIII

C. A. Vandenburgh. RIV

PUBLIC

NRC Resident Inspector

U. S. Nuclear Regulatory Comission

2600 I

Soddy.gou Ferry

Daisy. TN 37379

'

NRC Resident Inspector

U. S. Nuclear Regulatory Comission

1260 Nuclear Plant Road

Spring City. TN 37381

i

.

k

n

N

{

UN

[h

N

(

'vd

nA.,[

f,

A

__

m

w ,.

.-

=

...

WE

7 /Z4 / pf

or /

/ 97

c7 I

/ 97

c7 i 2M/ p

of /d / 37

07]Orn

umEmummm*mmemEmummu$mmumE===EmuMlMM

moue

-

- . , ,

. . , ,

SIWM

h

as We

anrue

A ho

4

wt

of /2 t/ W

of /8 * I y

gy ef2 f g7

g7 /

/ or

cf /

f ,7

pj

i 97

tm?

m

e

@

e

m

2

Ws

e

m

a

m

e

UFPIL1%. WW W1

A rltAT f W L.

5 :\\bRb.W0tW:r/=Lb

TOTAL P.02