                                                                September 25,1998
September 25,1998
.
.
Mr. T. C. Feigenbaum
,
,
              Mr. T. C. Feigenbaum
Executive Vice President and Chief Nuclear Officer
                Executive Vice President and Chief Nuclear Officer
' Seabrook Station
              ' Seabrook Station
North Atlantic Energy Service Corporation
                North Atlantic Energy Service Corporation
c/o Mr. Terry L. Harpster
              c/o Mr. Terry L. Harpster
P. O. Box 300:
              P. O. Box 300:
Seabrook, NH 03874
              Seabrook, NH 03874
SUBJECT:
              SUBJECT:       NRC INTEGRATED INSPECTION REPORT NO. 50-443/98-05
NRC INTEGRATED INSPECTION REPORT NO. 50-443/98-05
              ~ Dear Mr. Feigenbaum:
~ Dear Mr. Feigenbaum:
              On August 22,1998, the NRC completed an inspection at Seabrook Station.' The enclosed
On August 22,1998, the NRC completed an inspection at Seabrook Station.' The enclosed
              report presents the results of _that inspection.
report presents the results of _that inspection.
The plant was operated safely during the period. Operators performed routine activities
4
4
              The plant was operated safely during the period. Operators performed routine activities
;
;              includireg the plant start-up and power ascension well. Maintenance technicians performed
includireg the plant start-up and power ascension well. Maintenance technicians performed
. several activities well, and engineering provided good support of the spent fuel pool rack
s
s
              . several activities well, and engineering provided good support of the spent fuel pool rack
modification. The security program was inspected during this period. The NRC determined
,              modification. The security program was inspected during this period. The NRC determined
,
              that'you are implementing a security program that protects against acts of radiological
that'you are implementing a security program that protects against acts of radiological
sabotage. Also, a radiation protection program inspection took place. Overall, the NRC
<
<
              sabotage. Also, a radiation protection program inspection took place. Overall, the NRC                                !
i
i              found the radiation' protection program was effectively implemented.                                                 q
found the radiation' protection program was effectively implemented.
i             in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
q
,.
i
              and its enclosures will be placed in the NRC Public Document Room.                                                   j
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
                                                                                                                                      ;
, .
q                                                                   Sincerely,
and its enclosures will be placed in the NRC Public Document Room.
                                                                    Original Signed By:
j
                                                                                                                            lI
;
                                                                                                                                  l
q
                                                                    Curtis J. Cowgill, Chief
Sincerely,
                                                                    Projects Branch 5
Original Signed By:
?'                                                                   Division of Reactor Projects
lI
              Docket No. 50-443
l
p             License No: NPF-86
Curtis J. Cowgill, Chief
Projects Branch 5
?'
Division of Reactor Projects
Docket No. 50-443
p
License No: NPF-86
.
.
              Enclosure:     1. NRC Inspection Report No. 50-443/98-05
Enclosure:
i-
1. NRC Inspection Report No. 50-443/98-05
f-
i-
:
f-
:
~
~
l                 9810050020 980925
f ,0l
                  PDR    ADOCK 05000443
l
                                                              "
9810050020 980925
                                                                                                  .i
.i
                                                                                                    f ,0l
"
                                                                                                      *
*
                  G                               pm                                             i
PDR
ADOCK 05000443
G
pm
i
1
1
a
a
                                          ,-                     e.
,-
e.
.w-=


    . . . _ _ _ _ _ _ . _ . . . . . _ . _ . . . . _ _       . .   . _ _ _ . _ . . = . . . . . _ . _ _ _ .     - _.. , _ ._ .. _ , _.. .. ._ ._ . _ . . . . _ _ . . .
. . . _ _ _ _ _ _ . _ . . . . . _ . _ . . . . _ _
        .
. .
        ..
. _ _ _ . _ . . = . . . . . _ . _ _ _ .
g                           Mr. Ted C. Feigenbaum                                                       2                                                             -
-
                                                                                                                                                                          i
_.. , _ ._ .. _ , _.. .. ._ ._ . _ . . . . _ _ . . .
                          - cc w/ encl:
.
                          -
..
                                                      .                          _
g
                                                                                                                                                                          l
Mr. Ted C. Feigenbaum
                            B. D. Kenyon, President - Nuclear Group
2
                            J. S. Streeter, Recovery Officer - Nuclear Oversight
-  
                            W. A. DiProfio, Station Director - Seabrook Station
i
                            R. E. Hickok, Nuclear Training Manager - Seabrook Station
- cc w/ encl:
                            D. E. Carriere, Director,' Production Se; vices
.
                            - L. M. Cuoco, Senior Nuclear Counsel
_
                            - W. Fogg, Director, New Hampshire Office of Emergency Management
-
                            D. C. McElhinney, RAC Chairman, FEMA Rl, Boston, Mass.                                                                                       .
B. D. Kenyon, President - Nuclear Group
                            . R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire                                                                                 i
J. S. Streeter, Recovery Officer - Nuclear Oversight
                            D. Brown-Couture, Director, Nuclear Safety, Massachusetts Emergency
W. A. DiProfio, Station Director - Seabrook Station
                              Management Agency
R. E. Hickok, Nuclear Training Manager - Seabrook Station
                            F. W. Getman, Jr., Vice President and General Counsel - Great Bay Power
D. E. Carriere, Director,' Production Se; vices
                            Corporation
- L. M. Cuoco, Senior Nuclear Counsel
                            R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts
- W. Fogg, Director, New Hampshire Office of Emergency Management
                            Seacoast Anti-Pollution League                                                                                                               i
D. C. McElhinney, RAC Chairman, FEMA Rl, Boston, Mass.
                            D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire
.
                            S. Comley, Executive Director, We the People of the United States
. R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire
                            W. Meinert, Nuclear Engineer
D. Brown-Couture, Director, Nuclear Safety, Massachusetts Emergency
Management Agency
F. W. Getman, Jr., Vice President and General Counsel - Great Bay Power
Corporation
R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts
Seacoast Anti-Pollution League
D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire
S. Comley, Executive Director, We the People of the United States
W. Meinert, Nuclear Engineer
4
.
.
                                                                                                                                                                          4
1
1
,
,
Line 115: Line 147:
J-
J-
!
!
i
i
$
$
l.
l
k
.
k
4
4
          w                     -           w-       - , e m     . - - + -         a   yw--~ry-     w                                         -
w
                                                                                                                                                                    ryy
-
w-
- ,
e
m
. - - + -
a
yw--~ry-
w
-
ryy


                                                              - _    _ ~ .                         .-         .     -               . .
-
  '4
_ ~ .
    .
.-
      Mr. Ted C. Feigenbaum                                               3
.
      Distribution w/encI       _l -
-
      Region i Docket Room (with concurrences)
. .
      PUBLIC '
_
      Nuclear Safety Information Center (NSIC)
'4
      NRC Resident inspector
.
      H. Miller, RA/W. Axelson, DRA
Mr. Ted C. Feigenbaum
      C. Cowgill, DRP
3
      R. Summers, DRP
Distribution w/encI -
      C. O'Daniell, DRP
_l
      Distribution w/encls (VIA E-MAIL):
Region i Docket Room (with concurrences)
      B. McCabe, OEDO
PUBLIC '
      C. Thomas, PD l-3, NRR (COT)
Nuclear Safety Information Center (NSIC)
      J. Harrison, PD l-3, NRR
NRC Resident inspector
      R. Correia, NRR (RPC)
H. Miller, RA/W. Axelson, DRA
      F. Talbot, NRR
C. Cowgill, DRP
      D. Screnci, . PAO, ORA
R. Summers, DRP
      Inspection Program Branch, NRR (IPAS)
C. O'Daniell, DRP
      DOCDESK
Distribution w/encls (VIA E-MAIL):
      DOCUMENT NAME: G:\ BRANCH 5\98-05. SEA
B. McCabe, OEDO
      To receive a copy of this document, indicate in the box: "C" - Copy without attachment / enclosure "E" = Copy with ettachment/ enclosure
C. Thomas, PD l-3, NRR (COT)
      "N' = No copy                           ,,,
J. Harrison, PD l-3, NRR
        OFFICE         Rl/DRP         (j Q               Rl/DRP [/V                                                                     l
R. Correia, NRR (RPC)
        NAME           RLorson ' *[ f                     CCowgill
F. Talbot, NRR
;       DATE         Jj /6/98                           d pJ/98
D. Screnci, . PAO, ORA
Inspection Program Branch, NRR (IPAS)
DOCDESK
DOCUMENT NAME: G:\\ BRANCH 5\\98-05. SEA
To receive a copy of this document, indicate in the box: "C" - Copy without attachment / enclosure
"E" = Copy with ettachment/ enclosure
"N' = No copy
,,,
OFFICE
Rl/DRP
(j Q
Rl/DRP [/V
l
NAME
RLorson ' [ f
CCowgill
;
DATE
Jj /6/98
d pJ/98
*
..
..
                                                          OFFICIAL RECORD COPY
OFFICIAL RECORD COPY
}}
}}

Latest revision as of 01:46, 11 December 2024

Forwards Insp Rept 50-443/98-05 on 980705-0822.Security Program That Protects Against Acts of Radiological Sabotage Being Implemented.No Violations Were Identified
ML20154A835
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/25/1998
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Feigenbaum T, Harpster T
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
Shared Package
ML20154A841 List:
References
50-443-98-05, 50-443-98-5, NUDOCS 9810050020
Download: ML20154A835 (3)


See also: IR 05000443/1998005

Text

.

_ _.

.

. _ . .

. . _

.

. _ . _ .

_ _ _ _ _ _ _ _ . _ _ _

. _ . ~ . . . . _ . . _

i'

L-

J

=:

.

L'

+

September 25,1998

.

Mr. T. C. Feigenbaum

,

Executive Vice President and Chief Nuclear Officer

' Seabrook Station

North Atlantic Energy Service Corporation

c/o Mr. Terry L. Harpster

P. O. Box 300:

Seabrook, NH 03874

SUBJECT:

NRC INTEGRATED INSPECTION REPORT NO. 50-443/98-05

~ Dear Mr. Feigenbaum:

On August 22,1998, the NRC completed an inspection at Seabrook Station.' The enclosed

report presents the results of _that inspection.

The plant was operated safely during the period. Operators performed routine activities

4

includireg the plant start-up and power ascension well. Maintenance technicians performed

. several activities well, and engineering provided good support of the spent fuel pool rack

s

modification. The security program was inspected during this period. The NRC determined

,

that'you are implementing a security program that protects against acts of radiological

sabotage. Also, a radiation protection program inspection took place. Overall, the NRC

<

i

found the radiation' protection program was effectively implemented.

q

i

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

, .

and its enclosures will be placed in the NRC Public Document Room.

j

q

Sincerely,

Original Signed By:

lI

l

Curtis J. Cowgill, Chief

Projects Branch 5

?'

Division of Reactor Projects

Docket No. 50-443

p

License No: NPF-86

.

Enclosure:

1. NRC Inspection Report No. 50-443/98-05

i-

f-

~

f ,0l

l

9810050020 980925

.i

"

PDR

ADOCK 05000443

G

pm

i

1

a

,-

e.

.w-=

. . . _ _ _ _ _ _ . _ . . . . . _ . _ . . . . _ _

. .

. _ _ _ . _ . . = . . . . . _ . _ _ _ .

-

_.. , _ ._ .. _ , _.. .. ._ ._ . _ . . . . _ _ . . .

.

..

g

Mr. Ted C. Feigenbaum

2

-

i

- cc w/ encl:

.

_

-

B. D. Kenyon, President - Nuclear Group

J. S. Streeter, Recovery Officer - Nuclear Oversight

W. A. DiProfio, Station Director - Seabrook Station

R. E. Hickok, Nuclear Training Manager - Seabrook Station

D. E. Carriere, Director,' Production Se; vices

- L. M. Cuoco, Senior Nuclear Counsel

- W. Fogg, Director, New Hampshire Office of Emergency Management

D. C. McElhinney, RAC Chairman, FEMA Rl, Boston, Mass.

.

. R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire

D. Brown-Couture, Director, Nuclear Safety, Massachusetts Emergency

Management Agency

F. W. Getman, Jr., Vice President and General Counsel - Great Bay Power

Corporation

R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts

Seacoast Anti-Pollution League

D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire

S. Comley, Executive Director, We the People of the United States

W. Meinert, Nuclear Engineer

4

.

1

,

4

J-

!

i

$

l

.

k

4

w

-

w-

- ,

e

m

. - - + -

a

yw--~ry-

w

-

ryy

-

_ ~ .

.-

.

-

. .

_

'4

.

Mr. Ted C. Feigenbaum

3

Distribution w/encI -

_l

Region i Docket Room (with concurrences)

PUBLIC '

Nuclear Safety Information Center (NSIC)

NRC Resident inspector

H. Miller, RA/W. Axelson, DRA

C. Cowgill, DRP

R. Summers, DRP

C. O'Daniell, DRP

Distribution w/encls (VIA E-MAIL):

B. McCabe, OEDO

C. Thomas, PD l-3, NRR (COT)

J. Harrison, PD l-3, NRR

R. Correia, NRR (RPC)

F. Talbot, NRR

D. Screnci, . PAO, ORA

Inspection Program Branch, NRR (IPAS)

DOCDESK

DOCUMENT NAME: G:\\ BRANCH 5\\98-05. SEA

To receive a copy of this document, indicate in the box: "C" - Copy without attachment / enclosure

"E" = Copy with ettachment/ enclosure

"N' = No copy

,,,

OFFICE

Rl/DRP

(j Q

Rl/DRP [/V

l

NAME

RLorson ' [ f

CCowgill

DATE

Jj /6/98

d pJ/98

..

OFFICIAL RECORD COPY