SEP 2 1 1988
'
'
          .
.
                                          SEP 2 1 1988
,
  ,
In Reply Refer To:
  In Reply Refer To:
Docket:
  Docket:     50-267/88-17
50-267/88-17
  Public Service Company of Colorado
Public Service Company of Colorado
  ATTN:     Robert O. Williams, Jr.
ATTN:
            Vice President, Nuclear Operations
Robert O. Williams, Jr.
  2420 W. 26th Avenue, Suite 15c
Vice President, Nuclear Operations
  Denver, Colorado 80211
2420 W. 26th Avenue, Suite 15c
  Gentlemen:
Denver, Colorado 80211
  This refers to the inspection conducted by Mr. H. D. Chaney of this office
Gentlemen:
  during the period July 24 through August 2,1988, of activities authorized by
This refers to the inspection conducted by Mr. H. D. Chaney of this office
  NRC Operating License DPR-34 for the Fort St. Vrain Nuclear Generating Station,
during the period July 24 through August 2,1988, of activities authorized by
  and to the discussion of our findings with you and other members of your staff
NRC Operating License DPR-34 for the Fort St. Vrain Nuclear Generating Station,
  at the conclusion of the inspection.
and to the discussion of our findings with you and other members of your staff
  Areas examined during the inspection included the radiation protection program.
at the conclusion of the inspection.
  Within these areas, the inspection consisted of selective examination of
Areas examined during the inspection included the radiation protection program.
  procedures and representative records, interviews with personnel, and
Within these areas, the inspection consisted of selective examination of
  observations by the NRC inspector. The inspection findings are documented in
procedures and representative records, interviews with personnel, and
  the enclosed inspection report.
observations by the NRC inspector.
  During this inspection, it was found that certain of your activities were in
The inspection findings are documented in
  violation of NRC requirements. Consequently, you are required to respond to
the enclosed inspection report.
  there violations, in writing, in accordance with the provisions of
During this inspection, it was found that certain of your activities were in
  Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of
violation of NRC requirements. Consequently, you are required to respond to
  Federal Regulations.     Your response should be based on the specifics contained
there violations, in writing, in accordance with the provisions of
  in the Notice of Violation enclosed with this letter.
Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of
  In addition, we are concerned regarding the deterioration of your
Federal Regulations.
  respiratory protection program. Accordingly, you are requested to respond, in
Your response should be based on the specifics contained
  writing, within 30 days of the date of this letter, regarding steps you have
in the Notice of Violation enclosed with this letter.
  taken to improve your respiratory protection program. We suggest that you use
In addition, we are concerned regarding the deterioration of your
  the recommendations and guidance in NRC Regulatory Guide 8.15 and NUREG-0041
respiratory protection program. Accordingly, you are requested to respond, in
  when evaluating your respiratory protection program.
writing, within 30 days of the date of this letter, regarding steps you have
  We have also examined actions you have taken with regard to previously
taken to improve your respiratory protection program. We suggest that you use
  identified inspection findings.     The status of these items is identified in
the recommendations and guidance in NRC Regulatory Guide 8.15 and NUREG-0041
  paragraph 2 of the enclosed report.
when evaluating your respiratory protection program.
  RIV:FRPS:RPB           C:FRPS:RP     C:RPB           C:D                 Pg
We have also examined actions you have taken with regard to previously
  HDChaney/tw           REBaer         AMurray         TFWe   rman         llan
identified inspection findings.
        /88                             Q/ /88           /gl/88       g /g /88
The status of these items is identified in
                        Q//88                                       ,
paragraph 2 of the enclosed report.
                        27
RIV:FRPS:RPB
    ! BOOM $ o
C:FRPS:RP
C:RPB
C:D
Pg
HDChaney/tw
REBaer
AMurray
TFWe
rman
llan
Q//88
Q/ /88
/gl/88
g /g /88
/88
,
! BOOM $ o
27


  .
.
'. .
'.
              ,
.
        .
,
    Public Service Company of Colorado       -2-
.
    Should you have any questions concerning this inspection, we will be pleased to
Public Service Company of Colorado
    discuss them with you.
-2-
                                                Sincerely,
Should you have any questions concerning this inspection, we will be pleased to
                                                  Original Signed By,
discuss them with you.
                                                      A. B. Beach
Sincerely,
                                                L. J. Callan, Director
Original Signed By,
                                                Division of Reactor Projects
A. B. Beach
    Enclosures:
L. J. Callan, Director
    1.   Appendix A - Notice of Violation
Division of Reactor Projects
    2.   Appendix B - NRC Inspection Report
Enclosures:
            50-267/88-17
1.
    cc w/ enclosures:
Appendix A - Notice of Violation
    Fort St. Vrain Nuclear Station
2.
    Manager, Nuclear Production Division
Appendix B - NRC Inspection Report
    16805 WCR 19h
50-267/88-17
    Platteville, Colorado 80651
cc w/ enclosures:
    Fort St. Vrain Nuclear Station
Fort St. Vrain Nuclear Station
    P. Tomlinson, Manager, Quality
Manager, Nuclear Production Division
        Assurance Division
16805 WCR 19h
    (same address)
Platteville, Colorado 80651
    Colorado Radiation Control Program Director
Fort St. Vrain Nuclear Station
    Colorado Public Utilities Commission
P. Tomlinson, Manager, Quality
    bec to DM8 (IE06)
Assurance Division
    bec distrib, by RIV:
(same address)
    *RRI                                 *R. D. Martin, RA
Colorado Radiation Control Program Director
    *Section Chief (DRP/B)               * Project Engineer, DRP/B
Colorado Public Utilities Commission
    "RPB-DRSS                             Lisa Shea, RM/ALF
bec to DM8 (IE06)
    * MIS System                         *RSTS Operator
bec distrib, by RIV:
    *K. Heitner, NRR Project Manager     *RIV File
*RRI
    *DRS                                 *DRP
*R. D. Martin, RA
    *H. D. Chaney                         *R. E. Baer
*Section Chief (DRP/B)
    *B. Murray                           *R. E. Hall
* Project Engineer, DRP/B
      R. L. Bangart
"RPB-DRSS
    *w/766
Lisa Shea, RM/ALF
* MIS System
*RSTS Operator
*K. Heitner, NRR Project Manager
*RIV File
*DRS
*DRP
*H. D. Chaney
*R. E. Baer
*B. Murray
*R. E. Hall
R. L. Bangart
*w/766
}}
}}

Latest revision as of 23:50, 10 December 2024

Forwards Insp Rept 50-267/88-17 on 880724-0802 & Notice of Violation.Steps Taken to Improve Respiratory Protection Program Requested within 30 Days
ML20154M954
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 09/21/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20154M959 List:
References
NUDOCS 8809290146
Download: ML20154M954 (2)


See also: IR 05000267/1988017

Text

__

SEP 2 1 1988

'

.

,

In Reply Refer To:

Docket:

50-267/88-17

Public Service Company of Colorado

ATTN:

Robert O. Williams, Jr.

Vice President, Nuclear Operations

2420 W. 26th Avenue, Suite 15c

Denver, Colorado 80211

Gentlemen:

This refers to the inspection conducted by Mr. H. D. Chaney of this office

during the period July 24 through August 2,1988, of activities authorized by

NRC Operating License DPR-34 for the Fort St. Vrain Nuclear Generating Station,

and to the discussion of our findings with you and other members of your staff

at the conclusion of the inspection.

Areas examined during the inspection included the radiation protection program.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations by the NRC inspector.

The inspection findings are documented in

the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

there violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

In addition, we are concerned regarding the deterioration of your

respiratory protection program. Accordingly, you are requested to respond, in

writing, within 30 days of the date of this letter, regarding steps you have

taken to improve your respiratory protection program. We suggest that you use

the recommendations and guidance in NRC Regulatory Guide 8.15 and NUREG-0041

when evaluating your respiratory protection program.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

RIV:FRPS:RPB

C:FRPS:RP

C:RPB

C:D

Pg

HDChaney/tw

REBaer

AMurray

TFWe

rman

llan

Q//88

Q/ /88

/gl/88

g /g /88

/88

,

! BOOM $ o

27

.

'.

.

,

.

Public Service Company of Colorado

-2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed By,

A. B. Beach

L. J. Callan, Director

Division of Reactor Projects

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-267/88-17

cc w/ enclosures:

Fort St. Vrain Nuclear Station

Manager, Nuclear Production Division

16805 WCR 19h

Platteville, Colorado 80651

Fort St. Vrain Nuclear Station

P. Tomlinson, Manager, Quality

Assurance Division

(same address)

Colorado Radiation Control Program Director

Colorado Public Utilities Commission

bec to DM8 (IE06)

bec distrib, by RIV:

  • RRI
  • R. D. Martin, RA
  • Section Chief (DRP/B)
  • Project Engineer, DRP/B

"RPB-DRSS

Lisa Shea, RM/ALF

  • MIS System
  • RSTS Operator
  • K. Heitner, NRR Project Manager
  • RIV File
  • DRS
  • DRP
  • H. D. Chaney
  • R. E. Baer
  • B. Murray
  • R. E. Hall

R. L. Bangart

  • w/766