ML20198D110: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:I 4 coq
{{#Wiki_filter:I
                                                                                                ~
~
x                                                                                              $)$.5
coq 4
    ,                    TEO cog 8ES%g y
$)$.5 h.%
occKET 11UCBEM
TEO cog 8ES%g x
_..-r.n.           h.%.  ......                c l
occKET 11UCBEM c
PACIFIC GAS AND ELECTRIC C O M PAN Y                                                                       l 77 BEALE STREET. SAN FR ANCISCO. C ALIFORNI A 94106     YE LEPHO. E f 415) 781-4211 July 18,1985         ES   .
_..-r.n.
                                                                                  %, >U A!O q PGandE Letter Nbe: DCL-85-245 w
y l
w;iBR,,j,gyOgj Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Comission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Re: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-81 Diablo Canyon Units 1 and 2 Emergency Plan Implementing Procedure Updates
PACIFIC GAS AND ELECTRIC C O M PAN Y l
77 BEALE STREET. SAN FR ANCISCO. C ALIFORNI A 94106 YE LEPHO. E f 415) 781-4211 July 18,1985 ES
%, >U A!O q PGandE Letter Nbe: DCL-85-245 w;i,,j,gyOgj w
BR Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Comission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Re: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-81 Diablo Canyon Units 1 and 2 Emergency Plan Implementing Procedure Updates


==Dear Mr. Martin:==
==Dear Mr. Martin:==
 
In accordance with Section V, " Implementing Procedures," of 10 CFR 50, Appendix E, PGandE is submitting one copy of the updates to the detailed Implementing Procedures (Enclosure 3) for the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan. These updates are listed in Enclosure 1.
In accordance with Section V, " Implementing Procedures," of 10 CFR 50,                                 .
Concurren tly,
Appendix E, PGandE is submitting one copy of the updates to the detailed Implementing Procedures (Enclosure 3) for the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan. These updates are listed in Enclosure 1. Concurren tly ,
two copies of each update are being submitted to the Document Control Desk.
two copies of each update are being submitted to the Document Control Desk.
Some of the updates contain privacy / proprietary information. This privacy /
Some of the updates contain privacy / proprietary information. This privacy /
proprietary information has been bracketed in accordance with NRC Generic Letter 81-27 and is identified in Enclosure 2.
proprietary information has been bracketed in accordance with NRC Generic Letter 81-27 and is identified in Enclosure 2.
Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.
Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.
Sincerely, ORIGINAL SIGNED BY J. D. Shiffer Enclosures cc:   R. T. Dodds R. Fish Document Control Desk (2)
Sincerely, ORIGINAL SIGNED BY J. D. Shiffer Enclosures cc:
Service List cc w/o Enc 3:     G. W. Knighton 8511120266 850718 PDR   ADOCK 05000275 l           p                   PDR l
R. T. Dodds R. Fish Document Control Desk (2)
Service List cc w/o Enc 3:
G. W. Knighton 8511120266 850718 PDR ADOCK 05000275 l
p PDR l
u
u


F .
F PGandE Letter Ns.: DCL-85-245 ENCLOSURE 1 Updates Included In This Submittal DIABLO CANYON EMERGENCY PLAN NPLB4ENTING PROCEDURES Volume 3A Updated Table of Contents EP M-4, Revision 9 Volume 38 Updated Table of Contents EP OR-1, Revision 5 0502d/0005K
  .                                        PGandE Letter Ns.: DCL-85-245 ENCLOSURE 1 Updates Included In This Submittal DIABLO CANYON EMERGENCY PLAN NPLB4ENTING PROCEDURES Volume 3A Updated Table of Contents EP M-4, Revision 9 Volume 38 Updated Table of Contents EP OR-1, Revision 5 0502d/0005K


PGandE Letter Ns.: DCL-85-245 ENCLOSURE 2 Location of Proprietary Information Procedure:
PGandE Letter Ns.: DCL-85-245 ENCLOSURE 2 Location of Proprietary Information Procedure:
EP M-4 -- pp. 3, 6, and 11 of 50; Data Sheet
EP M-4 -- pp. 3, 6, and 11 of 50; Data Sheet
                                          " Post Earthquake Evaluation Sumary",
" Post Earthquake Evaluation Sumary",
p.1 of 1.
p.1 of 1.
EP OR-1 -- Table 1, "Of fsite Emergency Support Organization Phone List," pp.1-9 of 9 a
EP OR-1 -- Table 1, "Of fsite Emergency Support Organization Phone List," pp.1-9 of 9 a
Line 54: Line 58:


f.
f.
* PGandE Letter No.: DCL-85-245 ENCLOSURE 3 Updates to Diablo Canyon Emergency Plan Implementing Procedures a
PGandE Letter No.: DCL-85-245 ENCLOSURE 3 Updates to Diablo Canyon Emergency Plan Implementing Procedures a
0502d/0005K}}
0502d/0005K}}

Latest revision as of 11:41, 10 December 2024

Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 9 to EP M-4, Earthquake & Rev 5 to EP OR-1, Offsite Support & Assistance. Related Correspondence
ML20198D110
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/18/1985
From: Shiffer J
PACIFIC GAS & ELECTRIC CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20198D114 List:
References
CON-#485-004, CON-#485-4 DCL-85-245, OL, NUDOCS 8511120266
Download: ML20198D110 (4)


Text

I

~

coq 4

$)$.5 h.%

TEO cog 8ES%g x

occKET 11UCBEM c

_..-r.n.

y l

PACIFIC GAS AND ELECTRIC C O M PAN Y l

77 BEALE STREET. SAN FR ANCISCO. C ALIFORNI A 94106 YE LEPHO. E f 415) 781-4211 July 18,1985 ES

%, >U A!O q PGandE Letter Nbe: DCL-85-245 w;i,,j,gyOgj w

BR Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Comission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Re: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-81 Diablo Canyon Units 1 and 2 Emergency Plan Implementing Procedure Updates

Dear Mr. Martin:

In accordance with Section V, " Implementing Procedures," of 10 CFR 50, Appendix E, PGandE is submitting one copy of the updates to the detailed Implementing Procedures (Enclosure 3) for the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan. These updates are listed in Enclosure 1.

Concurren tly,

two copies of each update are being submitted to the Document Control Desk.

Some of the updates contain privacy / proprietary information. This privacy /

proprietary information has been bracketed in accordance with NRC Generic Letter 81-27 and is identified in Enclosure 2.

Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.

Sincerely, ORIGINAL SIGNED BY J. D. Shiffer Enclosures cc:

R. T. Dodds R. Fish Document Control Desk (2)

Service List cc w/o Enc 3:

G. W. Knighton 8511120266 850718 PDR ADOCK 05000275 l

p PDR l

u

F PGandE Letter Ns.: DCL-85-245 ENCLOSURE 1 Updates Included In This Submittal DIABLO CANYON EMERGENCY PLAN NPLB4ENTING PROCEDURES Volume 3A Updated Table of Contents EP M-4, Revision 9 Volume 38 Updated Table of Contents EP OR-1, Revision 5 0502d/0005K

PGandE Letter Ns.: DCL-85-245 ENCLOSURE 2 Location of Proprietary Information Procedure:

EP M-4 -- pp. 3, 6, and 11 of 50; Data Sheet

" Post Earthquake Evaluation Sumary",

p.1 of 1.

EP OR-1 -- Table 1, "Of fsite Emergency Support Organization Phone List," pp.1-9 of 9 a

f

}

Y 4

l 0502d/0005K

f.

PGandE Letter No.: DCL-85-245 ENCLOSURE 3 Updates to Diablo Canyon Emergency Plan Implementing Procedures a

0502d/0005K