ML20198D110
| ML20198D110 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 07/18/1985 |
| From: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML20198D114 | List: |
| References | |
| CON-#485-004, CON-#485-4 DCL-85-245, OL, NUDOCS 8511120266 | |
| Download: ML20198D110 (4) | |
Text
I
~
coq 4
$)$.5 h.%
TEO cog 8ES%g x
occKET 11UCBEM c
_..-r.n.
y l
PACIFIC GAS AND ELECTRIC C O M PAN Y l
77 BEALE STREET. SAN FR ANCISCO. C ALIFORNI A 94106 YE LEPHO. E f 415) 781-4211 July 18,1985 ES
%, >U A!O q PGandE Letter Nbe: DCL-85-245 w;i,,j,gyOgj w
BR Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Comission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Re: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-81 Diablo Canyon Units 1 and 2 Emergency Plan Implementing Procedure Updates
Dear Mr. Martin:
In accordance with Section V, " Implementing Procedures," of 10 CFR 50, Appendix E, PGandE is submitting one copy of the updates to the detailed Implementing Procedures (Enclosure 3) for the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan. These updates are listed in Enclosure 1.
Concurren tly,
two copies of each update are being submitted to the Document Control Desk.
Some of the updates contain privacy / proprietary information. This privacy /
proprietary information has been bracketed in accordance with NRC Generic Letter 81-27 and is identified in Enclosure 2.
Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.
Sincerely, ORIGINAL SIGNED BY J. D. Shiffer Enclosures cc:
R. T. Dodds R. Fish Document Control Desk (2)
Service List cc w/o Enc 3:
G. W. Knighton 8511120266 850718 PDR ADOCK 05000275 l
p PDR l
u
F PGandE Letter Ns.: DCL-85-245 ENCLOSURE 1 Updates Included In This Submittal DIABLO CANYON EMERGENCY PLAN NPLB4ENTING PROCEDURES Volume 3A Updated Table of Contents EP M-4, Revision 9 Volume 38 Updated Table of Contents EP OR-1, Revision 5 0502d/0005K
PGandE Letter Ns.: DCL-85-245 ENCLOSURE 2 Location of Proprietary Information Procedure:
EP M-4 -- pp. 3, 6, and 11 of 50; Data Sheet
" Post Earthquake Evaluation Sumary",
p.1 of 1.
EP OR-1 -- Table 1, "Of fsite Emergency Support Organization Phone List," pp.1-9 of 9 a
f
}
Y 4
l 0502d/0005K
f.
PGandE Letter No.: DCL-85-245 ENCLOSURE 3 Updates to Diablo Canyon Emergency Plan Implementing Procedures a
0502d/0005K