ML20199G402: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:p                                     ,
{{#Wiki_filter:p
                                                                    ' f -h4-hb f       GO'EM!leST ACCOUNTADILIT/ PROJECT o      M55 Connedricur Avenue, N.W., Suite 202               U hhington, D.C. 20036 e
' f -h4-hb f
(202)2324550 e
GO'EM!leST ACCOUNTADILIT/ PROJECT M55 Connedricur Avenue, N.W., Suite 202 U
t February 25, 1985 g                   Ms. Jane Axelrgd, Director
o hhington, D.C. 20036 (202)2324550 e
'                                                                                                    ~
e t
Office of Enforcement U.S. Nuclear Regulatory Commission Washington,     D.C. 20555                                                   -
February 25, 1985 g
4-
Ms. Jane Axelrgd, Director
~
Office of Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 4-


==Dear Ms. Axelrod:==
==Dear Ms. Axelrod:==
 
On February 15, 1985 Region IV issued two Severity Level IV violations to Tet:as Ut-ilities Electric Company (TUEC).
On February 15, 1985 Region IV issued two Severity Level IV
(A copy of the inspection report is enclosed.)
:                  violations to Tet:as Ut-ilities Electric Company (TUEC). (A copy of the inspection report is enclosed.)
Our review of this document leaves us astounded that such rerious violations of the 10 C.F.R. Appendix 3 could be dismissed as lightly as they have been by Region IV.
Our review of this document leaves us astounded that such rerious violations of the 10 C.F.R. Appendix 3 could be dismissed as lightly as they have been by Region IV.
Frankly, GAP has lcng held the view that the Nuclear Regulatory Commission's failure to c.nforce comp ~liance with re:-u-lations has been one of the chief causes of planti such as Comanche dicion.        Peak being completed in essentially indeterminate con-This inspection report represents a prime example of the type of " hand patting regulation" which has led to your agency's       lack of respect by the utility industry and the public alike.
Frankly, GAP has lcng held the view that the Nuclear Regulatory Commission's failure to c.nforce comp ~liance with re:-u-lations has been one of the chief causes of planti such as Comanche Peak being completed in essentially indeterminate con-dicion.
This inspection report represents a prime example of the type of " hand patting regulation" which has led to your agency's lack of respect by the utility industry and the public alike.
Just as significantly this report points out a problem which the agenc. has c.pparently ignored:
Just as significantly this report points out a problem which the agenc. has c.pparently ignored:
Comanche hak anyway?                         Who is running the ship at In this letter, Region IV has pre-empted the Technical                 a Review Team (TRT)         Sy issuing level IV violations on issues
Comanche hak anyway?
  ~             which have admittedly been part of the TRT's efforts.
Who is running the ship at In this letter, Region IV has pre-empted the Technical Review Team (TRT) a Sy issuing level IV violations on issues
I                      The findings,    " whipsaw" approach of hitting TUEC with both Regicn IV               .
~
violations, and required responses, at the same time 3
which have admittedly been part of the TRT's efforts.
j                similar issues are under investigation and review by the TRT, is j               both   counter-productive tion program      for Comanche  and   confusing to any reasonable regula-Peak.
The " whipsaw" approach of hitting TUEC with both Regicn IV I
.i 7 / unanswered for over five months now,Since                   my last letter to you regarding I respectfully request that you phone me in the near future with an immediate response to hg         whether or not you have the ability or authority to review an already issued Notice of Violation (such as the enclosed) for
findings, violations, and required responses, at the same time similar issues are under investigation and review by the TRT, 3
/T6         escalated enforcement.
is j
n,; 06 8606250216 PDR mtA45-bd 860611                             [       EDO           000377 FOIA                                   b g
both counter-productive and confusing to any reasonable regula-tion program for Comanche Peak.
GARDE 85-59           PDR               ~
j
r _ -__. _              1      .                  _
/ unanswered for over five months now,Since my last letter to you regarding 7
I respectfully request that
.i you phone me in the near future with an immediate response to
*hg whether or not you have the ability or authority to review an already issued Notice of Violation (such as the enclosed) for
/T6 escalated enforcement.
n,; 06 mtA45-bd 8606250216 860611
[
EDO 000377 PDR FOIA b
g GARDE 85-59 PDR
~
1 r


r
r
[                         Ms. Jane A: 41 red
[
                          , February 2., 1955 a
Ms. Jane A: 41 red a
j          4                page Two e       .
j
, February 2.,
1955 page Two 4
e
[
[
t<
t<
We are particularly concerned on whether there is any involvement by your staff in an escalated enforcement program i
We are particularly concerned on whether there is any involvement by your staff in an escalated enforcement program i
  '                            to deal with the findings of the TRT, or whether this pattern of Region I'/'s dribbling out minor violations for a decade of
to deal with the findings of the TRT, or whether this pattern of Region I'/'s dribbling out minor violations for a decade of
  )                           serious violations can be expected to continue.
)
serious violations can be expected to continue.
Thank you for your prompt respons.e to my inquiry.
Thank you for your prompt respons.e to my inquiry.
j                                                                     Sincerely, l                                          -
j Sincerely,
                                                                                    -O W Billie Pirne(r Garde %.~
-O l
    '                                                                .              \
\\ W Billie Pirne(r Garde
%.~
4 j
4 j
Enclosures as stated 4
Enclosures as stated 4
4 l                     cc:           Robert Martin i
4 l
cc:
Robert Martin i
I l
I l
  .i i                                                                           .
.i i
  +
+
1 I
1 I
1 I
1 I
1 j                                                                                         .
1 j
i I
i I
b                                                                                       .
b 1
1                                                                               -
. - -. ~
    .--.~         _ _ _ _ _ _ .      .v2                     _
.v2


m'
m'
                                            ~{ :r Rf In Reply Refer To:
~{
  -                  Dockets:     50-445/84-32                 FEB 15 H6 50-446/84-11 Texas Utilities Electric Company
Rf
                    < ATTN: M. D. Spence, President, TUGC0 j                   Skyway Tower
:r In Reply Refer To:
      ;              400 North Olive Street l               Lock Box 81 l               Dallas, Texas 75201 J
Dockets:
  ',                Gentlemen:
50-445/84-32 FEB 15 H6 50-446/84-11 Texas Utilities Electric Company
a
< ATTN:
    !                This refers to the inspection conducted under the Resident inspection Program by Mr. H. S. Phillips of this office and NRC contract personnel during the period August 20, 1984, through September 20, 1984, of activities authorized by
M. D. Spence, President, TUGC0 j
    ;                NRC Construction Permits CPPR-126 and CPPR-127 for the Comanche Peak facility, Units 1 and 2, and to the discussion of our findings with Mr. D. Chapman and other members of your staff at the conclusion of the inspection.
Skyway Tower 400 North Olive Street l
Areas examined during the inspection included a review and etaluation of how
Lock Box 81 l
    ;                effectively Texas uti.11 ties Electric Company management has implemented the corporate quality assurance (QA) program for design, procurement, and i                construction activities. Special emphasis was placed on evaluating the management of the audit program; management's action to regularly review tha
Dallas, Texas 75201 J
    '                status and adequacy of the QA program; and followup on findings pertinent to i                 program management identified by previous NRC and consultant inspection teams.
Gentlemen:
l Within these areas, the inspection consisted of selective examination of
a This refers to the inspection conducted under the Resident inspection Program by Mr. H. S. Phillips of this office and NRC contract personnel during the period August 20, 1984, through September 20, 1984, of activities authorized by NRC Construction Permits CPPR-126 and CPPR-127 for the Comanche Peak facility, Units 1 and 2, and to the discussion of our findings with Mr. D. Chapman and other members of your staff at the conclusion of the inspection.
  ,!                procedures and representative records, interviews with personnel, and 2                  observations by thi inspectors. These findings are documented in the enclosed
Areas examined during the inspection included a review and etaluation of how effectively Texas uti.11 ties Electric Company management has implemented the corporate quality assurance (QA) program for design, procurement, and construction activities.
  .                    inspection report.
Special emphasis was placed on evaluating the i
i                                                               .
management of the audit program; management's action to regularly review tha status and adequacy of the QA program; and followup on findings pertinent to i
Ouring this inspection, it was found that certain of your activities were in i
program management identified by previous NRC and consultant inspection teams.
violation of NRC requirements.       Consequently, you are required to respond to this violation, in writing, in accordance with the provisions of Section 2.201 of the NRC's " Rules of Pract. ice," Part 2, Title 10, Code of Federal
l Within these areas, the inspection consisted of selective examination of procedures and representative records, interviews with personnel, and observations by thi inspectors. These findings are documented in the enclosed 2
:l                     Regulations. Your response should be based on the specifics contained in the
inspection report.
;;                    Notice of Violation enclosed with this letter.
i Ouring this inspection, it was found that certain of your activities were in i
'f                     These violations may be related to findings identified by the NRC Technical Review Team (TRT). If the issues are considered to be similar, you may respond to the items separately or as part of the Comanche Peak Response Team Action Plan.
violation of NRC requirements.
Consequently, you are required to respond to this violation, in writing, in accordance with the provisions of Section 2.201 of the NRC's " Rules of Pract. ice," Part 2, Title 10, Code of Federal
:l Regulations. Your response should be based on the specifics contained in the Notice of Violation enclosed with this letter.
'f These violations may be related to findings identified by the NRC Technical Review Team (TRT).
If the issues are considered to be similar, you may respond to the items separately or as part of the Comanche Peak Response Team Action Plan.
:(
:(
RRI h fi/       TL/TF@         hS&S C/R 8           0/0     P NRR 48
RRI h fi/
      .                SPhilljps/lt     0Hunnicutt. R$hngart 0 Hunter   R0enise   Noonan L,/> /8f         p/p/8f           ' / \ 84 p /j~/8g
TL/TF@
                                                                        ,    & /84 I: /LU/84
hS&S C/R 8 0/0 P
                    -, u r ftD w,7 y,
NRR 48 SPhilljps/lt 0Hunnicutt.
                                                                                                  ~
R$hngart 0 Hunter R0enise Noonan L,/> /8f p/p/8f
' / \\ 84 p /j~/8g & /84 I: /LU/84 ftD
-, u r y,
w,7
~


I
I 5.
: 5.               Texas Utilities Electric Company           i                                                                                 s i
Texas Utilities Electric Company i s
L                Should you have any questions concerning this inspection, we will be pleased to i               discuss them with you.
i L
Sincerely, I                                                                       *Qrigin'al signed bVf D. M. HUNNtOUTT*
Should you have any questions concerning this inspection, we will be pleased to i
discuss them with you.
Sincerely, I
*Qrigin'al signed bVf D. M. HUNNtOUTT*
1 i
1 i
!                                                            D. R. Hunter, Chief I                                                           Reactor Project Branch 2
D. R. Hunter, Chief I
)                
Reactor Project Branch 2
)


==Enclosure:==
==Enclosure:==
1.
Appendix A - Notice of Violation l
2.
Appendix B - NRC Inspection Report 50-445/84-32 50-446/84-11 cc w/ enclosure:
Texas Utilities Electric Company Texas Utilities Electric Company ATTN:
B. R. Clements, Vice ATTN:
J. W. Beck, Manager President, Nuclear Nuclear Services Skyway Tower Skyway Tower
~
l 400 North Olive Street 400 North Olive Street Lock Box 81 Lock Box 81 Dallas, Texas 75201 Dallas, Texas 75201 bec to DMB,(IE01) l bec distrib. by RIV:
RPB1 RRI-OPS TX State Dept. Health j
RPB2 RRI-CONST.
Juanita Ellis EP&RPB R. Bangart Renea Hicks R. Martin, RA J. Gagliardo Billie Pirner Garde C. Wisner, PA0 D. Hunnicutt S. Phillips f
R. Denise, DRSP pTRT (CPSES) (2)
}
RIV File S. Treby, ELD j
MIS System D. Eisenhut, NRR I
r 9


:               1. Appendix A - Notice of Violation l                2. Appendix B - NRC Inspection Report 50-445/84-32 50-446/84-11                                             .
s P
cc w/ enclosure:                                               ,
p
  '              Texas Utilities Electric Company            Texas Utilities Electric Company ATTN:  B. R. Clements, Vice                ATTN:  J. W. Beck, Manager President, Nuclear                        Nuclear Services
(
                                                                                  ~
APPENDIX A NOTICE OF VIOLATION r
Skyway Tower                                Skyway Tower 400 North Olive Street                      400 North Olive Street l                Lock Box 81                                  Lock Box 81
Texas Utilities Electric Company Dockets:
:                Dallas, Texas 75201                          Dallas, Texas 75201
50-445/84-32 Comanche Peak Steam Electric Station, Units 1 and 2 50-446/84-11 k
!                bec to DMB ,(IE01) l                 bec distrib. by RIV:
l Construction Permits:
!                RPB1                        RRI-OPS                            TX State Dept. Health j                RPB2                        RRI-CONST.                        Juanita Ellis EP&RPB                      R. Bangart                          Renea Hicks R. Martin, RA              J. Gagliardo                        Billie Pirner Garde C. Wisner, PA0              D. Hunnicutt                        S. Phillips R. Denise, DRSP            pTRT (CPSES) (2) f                RIV File                    S. Treby, ELD
CPPR-126 j
CPPR-127 J
Based on the results of an NRC inspection conducted during the period of I(
August 20, 1984, through September 20, 1984, and in accordance with the NRC l
Enforcement Policy (10 CFR Part 2, Appendix C), 49 FR 8583, dated March 8,
}
}
MIS System                 D. Eisenhut, NRR j                                        .
1984, the following violations were identified:
I r
1.
9
Failure to Regularly Review the Status and Adequacy of the QA Program 4
I i
Criterion II of Appendix B to 10 CFR 50', as implemented by the Preliminary Safety Analysis Report (PSAR) and the Final Safety Analysis Report (FSAR),
i Section 17.1, " Quality Assurance Program," and ANSI N45.2-1971, requires that the quality assurance program shall provide for the regular review by the management participating in the program, of the status and adequacy of the part of the quality assurance program for which they have designated responsibi'lity.
Contrary to the above, the applicant did not establish quality assurance procedures to regularly review the status and adequacy of the construction i
quality assurance program; nor did the applicant appear to have reviewed the status and adequacy of the construction quality assurance program.
j This is a Severity Level IV Violation.
(Supplement II) (445/8432-02; t
446/8411-02) i 4
i 2.
Failure to Establish and Implement a Comprehensive System of Planned and Periodic Audits i
Criterion XVIII of Appendix B to 10 CFR 50, states, in part, "A j
comprehensive system of planned and periodic audits shall be carried out i
to verify compliance with all aspects of the quality assurance program and j
to determine the effectiveness of the program." The requirements are addressed in the PSAR and FSAR, Section 17.1, " Quality Assurance Program,"
l which references Regulatory Guide 1.28 (ANSI N45.2) and ANSI N45.2.12 (Draft 3, Revision 4). Those commitments require that a comprehensive 4
h system of planned audits be performed on an annual frequency.
Contrary to the above, the following examples w're identified which e
demonstrate the failure to establish and implement a comprehensive system
-of planned and periodic audits of safety-rplated activities as required, as noted below:
7 waw.e.u--es-rw e enw e m.
__w~
w
__-A.-


_. s P
2 i
p                                                                                                                            .
Notice of Violation yf a.
(                                                                          APPENDIX A NOTICE OF VIOLATION r
Annual audits were not adequately addressed by the audit implementation procedures.
Texas Utilities Electric Company                              Dockets:        50-445/84-32 Comanche Peak Steam Electric Station, Units 1 and 2                            50-446/84-11 k
1 i
l                                                                                Construction Permits:        CPPR-126 j                                                                                                            CPPR-127 J
TUGC0 Procedure DQP-CS-4, Revision 0, dated August 9, 1978, only required two audits of vendors fabricating reactor coolant
Based on the results of an NRC inspection conducted during the period of I(                              August 20, 1984, through September 20, 1984, and in accordance with the NRC l                              Enforcement Policy (10 CFR Part 2, Appendix C), 49 FR 8583, dated March 8, 1984, the following violations were identified:                                        -
}
}
4                              1. Failure to Regularly Review the Status and Adequacy of the QA Program I
pressure boundary components, parts, and equipment; one audit of j
i                                    Criterion II of Appendix B to 10 CFR 50', as implemented by the Preliminary i
vendors fabricating engineered safeguards components, parts, and equipment; and audits of balance of piant (safety-related) as a
Safety Analysis Report (PSAR) and the Final Safety Analysis Report (FSAR),
}
Section 17.1, " Quality Assurance Program," and ANSI N45.2-1971, requires that the quality assurance program shall provide for the regular review by the management participating in the program, of the status and adequacy of the part of the quality assurance program for which they have designated responsibi'lity.
required by the quality as'surance manager.
Contrary to the above, the applicant did not establish quality assurance
TUGC0 Procedure DQP-CS-4, Revision 2, dated April 16, 1981, required only that organizations will be audited on a regularly 8
  '                                    procedures to regularly review the status and adequacy of the construction i                                    quality assurance program; nor did the applicant appear to have reviewed the status and adequacy of the construction quality assurance program.
j                                      This is a Severity Level IV Violation.      (Supplement II) (445/8432-02; i
t                                    446/8411-02) 4 i                                2. Failure to Establish and Implement a Comprehensive System of Planned and
    .                                    Periodic Audits i                                      Criterion XVIII of Appendix B to 10 CFR 50, states, in part, "A j                                      comprehensive system of planned and periodic audits shall be carried out i                                      to verify compliance with all aspects of the quality assurance program and j                                      to determine the effectiveness of the program." The requirements are addressed in the PSAR and FSAR, Section 17.1, " Quality Assurance Program,"
l                  .                  which references Regulatory Guide 1.28 (ANSI N45.2) and ANSI N45.2.12 (Draft 3, Revision 4). Those commitments require that a comprehensive 4                                      system of planned audits be performed on an annual frequency.
h Contrary to the above, the following examples w're  e      identified which demonstrate the failure to establish and implement a comprehensive system
                . ,                    -of planned and periodic audits of safety-rplated activities as required, as noted below:          ,
7 waw.e.u--es-rw e enw e m.          ._
___  __w~ w          __-A.-              -
 
2 i    ,
y            Notice of Violation                                f
: a. Annual audits were not adequately addressed by the audit
.                      implementation procedures.
1 i                        -        TUGC0 Procedure DQP-CS-4, Revision 0, dated August 9, 1978, only
!                                required two audits of vendors fabricating reactor coolant
}                                pressure boundary components, parts, and equipment; one audit of j                                 vendors fabricating engineered safeguards components, parts, and a                                equipment; and audits of balance of piant (safety-related) as
}                                 required by the quality as'surance manager.
!                      -        TUGC0 Procedure DQP-CS-4, Revision 2, dated April 16, 1981,
!                                required only that organizations will be audited on a regularly 8
scheduled basis.
scheduled basis.
                        -        TUGC0 Procedure DQP-CS-4, Revisions 2 and 10, did not specify j                                 auditing frequencies for design, procurement, construction, and
TUGC0 Procedure DQP-CS-4, Revisions 2 and 10, did not specify j
;                                operations activities.
auditing frequencies for design, procurement, construction, and operations activities.
l                       -      TUGC0 Procedure DQP-CS-4, Revision 10, based audit requirements on Regulatory Guide 1.33, Revision 2, February 1978. This
l TUGC0 Procedure DQP-CS-4, Revision 10, based audit requirements on Regulatory Guide 1.33, Revision 2, February 1978.
'                                commitment did not fully address the require'ments of the construction quality assurance program.
This commitment did not fully address the require'ments of the construction quality assurance program.
The above procedure and subsequent revisions failed to describe and                 .
The above procedure and subsequent revisions failed to describe and require annual audits in accordance with commitments and requirements.
require annual audits in accordance with commitments and requirements. Earlier audit procedures were not available to
Earlier audit procedures were not available to determine if they met requirements.
,                        determine if they met requirements.
b.
: b. Planning and staffing to perform 1983 audits was inadequate to assure that a comprehensive system of audits was established and implemented to verify compliance with all aspects of the quality assurance program, in that, of 656 safety-related procedures (which control safety-related activities) the NRC review revealed that the applicant
Planning and staffing to perform 1983 audits was inadequate to assure that a comprehensive system of audits was established and implemented to verify compliance with all aspects of the quality assurance program, in that, of 656 safety-related procedures (which control safety-related activities) the NRC review revealed that the applicant sampled only 165, or 25 percent, during the 1983 au'dit program.
-i                        sampled only 165, or 25 percent, during the 1983 au'dit program.
-i Consequently, significant aspects of the safety-related activities were not adequately audited.
!                        Consequently, significant aspects of the safety-related activities were not adequately audited.
c.
-                c. The Westinghouse site organization, established in 1977 to perform Nuclear Steam System Supply (NSSS) engineering services, was not
The Westinghouse site organization, established in 1977 to perform Nuclear Steam System Supply (NSSS) engineering services, was not audited by TUGC0 during the years of 1977, 1978, 1979, 1980, and j
.,                        audited by TUGC0 during the years of 1977, 1978, 1979, 1980, and j                         1981.
1981.
s
s
?                 d. Audits of vendors that manufacture or fabricate parts, components, k                       and. equipment for reactor coolant pressure boundary and engineered safeguards systems have not been conducted annually dating back to f                         August 9, 1978.
?
t i                 This is a Severity Level IV Violation.             (Supplement II) (445/8432-03;
d.
Audits of vendors that manufacture or fabricate parts, components, k
and. equipment for reactor coolant pressure boundary and engineered safeguards systems have not been conducted annually dating back to f
August 9, 1978.
t i
This is a Severity Level IV Violation.
(Supplement II) (445/8432-03;
[*
[*
?
446/8411-03)
446/8411-03) e
?
                            "'Y"-                           w--
e
                                                    % w y -             e,             ,    , , , _ , _
"'Y"-
% w y -
w--
e,


L:             .
L:
                                                                                    .            __-. 2
2
          ?
?
l-I4       .
l-I4 V.
V.
Notice of Violation q 3.
q Notice of Violation                           !
Failure to Properly Certify a Vendor Compliance Inspector t, 5 Criterion V of 10 CFR 50, Appendix B, states, in part, " Activities t
: 3.       Failure to Properly Certify a Vendor Compliance Inspector t, 5                         Criterion V of 10 CFR 50, Appendix B, states, in part, " Activities t                         affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and j
affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures,
          ~
~
shall be accomplished in accordance with these instructions, procedures, j
j j
or drawings."                                                           -
or drawings."
i TUGCbProcedureDQP-VC-4, Revision 6,datedJanuary5,1984,requiresthat l
l TUGCbProcedureDQP-VC-4, Revision 6,datedJanuary5,1984,requiresthat i
    ;                          Level II inspectors (Corporate QA) shall attend and satisfactorily complete nondestructive testing courses including eddy current testing.
Level II inspectors (Corporate QA) shall attend and satisfactorily
    }~
}~
    !                        Contrary to the above, one of six inspector's files had no documen1!ation
complete nondestructive testing courses including eddy current testing.
    !                          to show that the inspector had attended and completed an eddy current testing course. Subsequent, discussions revealed that he had been
Contrary to the above, one of six inspector's files had no documen1!ation to show that the inspector had attended and completed an eddy current testing course.
  !-                          certified without meeting this requirement. The vendor compliance i                           supervisor stated that this inspection skill is not needed since there is no present vendor work activity which would require this skill; therefore, this procedure was revised and the requirement omitted during this j                         inspection.
Subsequent, discussions revealed that he had been certified without meeting this requirement.
    't
The vendor compliance i
    ! '                        This is a Severity Level V Violation.   (Supplement II) (445/8432-05; l                         446/8411-05)
supervisor stated that this inspection skill is not needed since there is no present vendor work activity which would require this skill; therefore, this procedure was revised and the requirement omitted during this j
Pursuant to the provisions of 10 CFR 2.201, Texas Utilities Electric Company is f                      hereby required to submit to this office, within 30 days of the date of this Notice, a written statement or explanation in reply, including: (1) the f
inspection.
ll                    corrective steps which have been taken and-the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when i                       full compliance will be achieved. Consideration may be given to extending your response time for good cause shown.
't This is a Severity Level V Violation.
l Dated:
(Supplement II) (445/8432-05; l
446/8411-05) f Pursuant to the provisions of 10 CFR 2.201, Texas Utilities Electric Company is hereby required to submit to this office, within 30 days of the date of this ll Notice, a written statement or explanation in reply, including:
(1) the corrective steps which have been taken and-the results achieved; (2) corrective f
steps which will be taken to avoid further violations; and (3) the date when i
full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown.
l
[
[
Dated:
c I
c I
r o
r o
F k
F k
i i
i i
r                                                   -
r 1
1 i                                 .
i k
k 2.
2.
1 i
1i


1
[--
[--
APPENDIX B U. S. NUCLEAR REGULATORY COMMISSION REGION IV e
1 APPENDIX B U. S. NUCLEAR REGULATORY COMMISSION REGION IV e
i NRC Inspection Report:               50-445/84-32           Construction Permit:       CPPR-126 50-446/84-11                                       CPPR-127 1          Dockets:     50-445                                         Category:         A2             ,
i NRC Inspection Report:
I.                        50-446 q
50-445/84-32 Construction Permit:
!            Licensee:         Texas Utilities Electric Company l                             Skyway Tower 400 North Olive Street Lock Box 81 Dallas, Texas 75201 Facility Name:         Comanche Peak Steam Electric Station (CPSES), Units 1 and 2 Inspection At:         Dallas Corporate Office, Dallas, Texas I
CPPR-126 50-446/84-11 CPPR-127 I.
Inspection Conducted:              August 20, 1984 through September 20, 1984
Dockets:
50-445 Category:
A2 1
50-446 q
Licensee:
Texas Utilities Electric Company l
Skyway Tower 400 North Olive Street Lock Box 81 Dallas, Texas 75201 Facility Name:
Comanche Peak Steam Electric Station (CPSES), Units 1 and 2 Inspection At:
Dallas Corporate Office, Dallas, Texas I
{
{
Inspector:                 -          -
Inspection Conducted:
Date
August 20, 1984 through September 20, 1984
                                                                                                    ////[f8 H. S. Phi lips, Senior Resident Reactor
////[f8 Inspector:
!                                  Inspector Construction NRC Contract Personnel:
H. S. Phi lips, Senior Resident Reactor Date Inspector Construction NRC Contract Personnel:
B. Freed, Senior Project Engineer, EG&G Idaho, Inc.
B. Freed, Senior Project Engineer, EG&G Idaho, Inc.
G. Thomas, Quality Engineer, EG&G Idaho, Inc.
G. Thomas, Quality Engineer, EG&G Idaho, Inc.
f i
f i
Approved:               fd' ) 4 m b u. @                                           8 .2.3!?9
Approved:
: 0. M. Hurinicutt, Team Leader                                   D&te   /
fd' ) 4 m b u. @
8.2.3!?9
: 0. M. Hurinicutt, Team Leader D&te
/
Region IV Task Force Inspection Summary Inspection Conducted August 20 throuah Septembe'r 20, 1984 (Report 50-445/84-32; 50-446/84-11) h k
Region IV Task Force Inspection Summary Inspection Conducted August 20 throuah Septembe'r 20, 1984 (Report 50-445/84-32; 50-446/84-11) h k
j-                                                                                                                -
j-


I I
I I
i       .            ,
i Areas Inspected:
'                        Areas Inspected:     Routine, announced inspection to determine how effectively corporate management has implemented the QA program for controlling design, t                       procurement, and construction activities; and to determine how site management
Routine, announced inspection to determine how effectively corporate management has implemented the QA program for controlling design, t
!                        interfaces with corporate management. The inspection involved 74 inspector-hours by one NRC inspector and 176 inspector-hours by two NRC 1                       contract personnel at the corporate office and the site.
procurement, and construction activities; and to determine how site management interfaces with corporate management.
The inspection involved 74 inspector-hours by one NRC inspector and 176 inspector-hours by two NRC 1
contract personnel at the corporate office and the site.
Results: Within the two areas inspected, three violations were identified (failure to regularly review the status and adequacy of the QA program -
Results: Within the two areas inspected, three violations were identified (failure to regularly review the status and adequacy of the QA program -
paragraph 2b.; failure to establish / implement a comprehensive system of planned
paragraph 2b.; failure to establish / implement a comprehensive system of planned and periodic audits paragraphs 2c.(1) and 2d.(3)(a); and failure to properly certify a Level II vendor compliance inspector, paragraph 2d.(3)(f).
:                        and periodic audits paragraphs 2c.(1) and 2d.(3)(a); and failure to properly t                        certify a Level II vendor compliance inspector,         paragraph 2d.(3)(f).
t t
t l                     .
l
  \
\\
t
t
)
)
i 1                                                                                               .
i 1
i I
I i
m     _ ___.
m


                                                                              . - .                              E f
E f
,                                                                    t
t
[       -
[
DETAILS
DETAILS
{
{
: 1. Persons Contacted
{
{
W. Clements, Vice President Nuclear Operations, Texas Utilities Generating Company (TUGCO) l
1.
                              *0. M. Chapman, Manager, Quality Assurance (QA), TUGC0
Persons Contacted W. Clements, Vice President Nuclear Operations, Texas Utilities Generating Company (TUGCO)
                              *R. G. Spangler, Supervisor, QA Services, TUGC0
*0. M. Chapman, Manager, Quality Assurance (QA), TUGC0 l
                              *D. L. Anderson, Supervisor, QA Audits, TUGC0 A. H. Boren, Supervisor, Vendor Compliance, TUGC0 J
*R. G. Spangler, Supervisor, QA Services, TUGC0
                              $5. L. Spencer, QA Auditor, TUGC0 D. Z. Hathcock, QA Auditor, TUGC0 l,
*D. L. Anderson, Supervisor, QA Audits, TUGC0 A. H. Boren, Supervisor, Vendor Compliance, TUGC0 J
H. R. Napper, QA Auditor, TUGC0 l                             A. Vega, Site QA Manager, TUGC0 L. M. Bielfeldt, Supervisor, Quality Engineering, TtJGC0 l
$5. L. Spencer, QA Auditor, TUGC0 l
C. Welch, Supervisor, QA, TUGC0 J. H. Roberts, Supervisor, Construction /Startup, TUGC0 l-                              J. T. Merritt, Assistant Manager, Engineering and Construction, TUGC0 i                           R. Gentry, Manager, Project Support Services, TUGC0 .
D. Z. Hathcock, QA Auditor, TUGC0 H. R. Napper, QA Auditor, TUGC0 l
F. Peyton, Supervisor, Purchasing, TUGC0 M. Strange, Supervisor, Engineering Support, TUGC0
A. Vega, Site QA Manager, TUGC0 L. M. Bielfeldt, Supervisor, Quality Engineering, TtJGC0 l
  ,                            R. Baker, Staff Engineer, TUGC0
C. Welch, Supervisor, QA, TUGC0 l
  ;                            H. Harrison, Supervisor, Technical Services, TUGC0 G. Krishnan, Supervisor Stress Analysis Group, TUGC0 l                            R. Williams, Drafting Supervisor, TUGC0 i
J. H. Roberts, Supervisor, Construction /Startup, TUGC0 J. T. Merritt, Assistant Manager, Engineering and Construction, TUGC0 i
G. Purdy, Site QA Manager, Brown & Root Inc. (B&R) j R. L. Moller, Site Manager, Westinghouse   ,
R. Gentry, Manager, Project Support Services, TUGC0.
F. Peyton, Supervisor, Purchasing, TUGC0 M. Strange, Supervisor, Engineering Support, TUGC0 R. Baker, Staff Engineer, TUGC0 H. Harrison, Supervisor, Technical Services, TUGC0 l
G. Krishnan, Supervisor Stress Analysis Group, TUGC0 R. Williams, Drafting Supervisor, TUGC0 i
G. Purdy, Site QA Manager, Brown & Root Inc. (B&R)
R. L. Moller, Site Manager, Westinghouse j
* Denotes those attending one or more exit interviews.
* Denotes those attending one or more exit interviews.
I                         2. Texas Utilities Manacement of QA Activities
I 2.
: a. Introduction The objective of this inspection was to determine the status of the
Texas Utilities Manacement of QA Activities a.
(                                  construction QA program and the effectiveness of implementation of the corporate QA program for ongoing design, procurement, and construction activities.
Introduction
f i
(
The NRC inspectors reviewed the QA commitments described in Section 17.1, " Quality Assurance During Design and Construction."
The objective of this inspection was to determine the status of the construction QA program and the effectiveness of implementation of the corporate QA program for ongoing design, procurement, and f
/                                   Texas Utilities Electric Company (TUEC), as the applicant, has delegated to Texas Utilities Generating Company (TUGCO) the responsibility and authority for engineering, design, procurement, construction, operation, and QA activities at Comanche Peak Steam l                                     Electrical Station (CPSES). Gibbs & Hill Inc. (G&H), is the i                                     Architect-Engineer (AE) and provides TUGC0 with design, engineering, I                                     and procurement services as requested. Westinghouse (W) is the   _
construction activities.
Nuclear Steam Supply System (NSSS) supplier and provides TUGC0 with
i The NRC inspectors reviewed the QA commitments described in Section 17.1, " Quality Assurance During Design and Construction."
      -                                the design, engineering, procurement and fabrication services for the NSSS and the initial supply of nuclear fuel. Brown and Root, Inc.
/
Texas Utilities Electric Company (TUEC), as the applicant, has delegated to Texas Utilities Generating Company (TUGCO) the responsibility and authority for engineering, design, procurement, construction, operation, and QA activities at Comanche Peak Steam l
Electrical Station (CPSES).
Gibbs & Hill Inc. (G&H), is the i
Architect-Engineer (AE) and provides TUGC0 with design, engineering, I
and procurement services as requested. Westinghouse (W) is the Nuclear Steam Supply System (NSSS) supplier and provides TUGC0 with the design, engineering, procurement and fabrication services for the NSSS and the initial supply of nuclear fuel.
Brown and Root, Inc.
9
9
_ u., u     t       -w                 mm .                 -                  ,e .
_ u., u t
                                                              -      ,#  _                . _. . _ ~__   e - - -
-w mm.
,e.
_.. _ ~__
e -


[                                                                                                       *l
[
  ;                                                                                                        l (B&R) is the Construction Manager / Constructor and provides                 '
*l (B&R) is the Construction Manager / Constructor and provides
('                          construction s.ervices at the site, including the QA program for ASME Division 1 Code work.
(
: b. Organization i
construction s.ervices at the site, including the QA program for ASME Division 1 Code work.
The TUGC0 corporate management structure and responsibilities were
b.
!                            described in the Final Safety Analysis Report (FSAR); and the various
Organization i
[                             TUGC0 QA manuals and procedures described how FSAR requirements were implemented to control design, procurement, and construction activities. Recent organizational changes pertaining to the QA program were described in FSAR figures 17.1-1, 17.1-2, 17.1-3, 17.1-4, and 17.1-5 which were included in Amendment 50 dated July 13, l
The TUGC0 corporate management structure and responsibilities were described in the Final Safety Analysis Report (FSAR); and the various
1984.                                                                 -
[
i i                             Recently, there have been three irportant QA personnel changes. A
TUGC0 QA manuals and procedures described how FSAR requirements were implemented to control design, procurement, and construction activities.
!                            new site QA manager reported in March 1984, a new site quality I                           engineering supervisor reported in August 1984, and a new vendor compliance supervisor was recently selected. These organizational I                             changes were made to replace individuals who were reassigned or I                             promoted to other positions, and these changes were reported to the l                             NRC. The independence and effectiveness of the QA effort do not I                             appear to be adversely affected by these changes.
Recent organizational changes pertaining to the QA program were described in FSAR figures 17.1-1, 17.1-2, 17.1-3, 17.1-4, and 17.1-5 which were included in Amendment 50 dated July 13, l
!                            The assistant project general (APG) manager reports to both the VP of i                           engineering and construction and to the TUGC0 Executive VP of operations. Discussions with the APG manager confirmed this and that I                             he was supervised by both. This management practice is questionable.
1984.
The CPSES QA Plan Section 1.2, paragraph 1.2.1, does not describe the i                             APG manager's interface with or the responsibility to the VP nuclear
i i
!                            operations. Subsequent discussions with TUGC0 QA personnel revealed f
Recently, there have been three irportant QA personnel changes.
that this position was discussed in the startup QA manual. This item     .
A new site QA manager reported in March 1984, a new site quality I
        -                    is considered unresolved pending clarification of the QA plan and further review during a subsequent inspection. (445/8432-01; 446/8411-01)
engineering supervisor reported in August 1984, and a new vendor compliance supervisor was recently selected.
[r l                         c. QA Program
These organizational I
[                             TUGC0 QA Program Plan and subtier procedures for design, j                             construction, engineering, and procurement described the control of all related project and quality activities.       A sample of these
changes were made to replace individuals who were reassigned or I
                            . procedures were reviewed and documented in NRC Inspection Report No.
promoted to other positions, and these changes were reported to the l
NRC. The independence and effectiveness of the QA effort do not I
appear to be adversely affected by these changes.
The assistant project general (APG) manager reports to both the VP of i
engineering and construction and to the TUGC0 Executive VP of operations.
Discussions with the APG manager confirmed this and that I
he was supervised by both. This management practice is questionable.
The CPSES QA Plan Section 1.2, paragraph 1.2.1, does not describe the i
APG manager's interface with or the responsibility to the VP nuclear operations.
Subsequent discussions with TUGC0 QA personnel revealed f
that this position was discussed in the startup QA manual. This item is considered unresolved pending clarification of the QA plan and further review during a subsequent inspection.
(445/8432-01; 446/8411-01)
[r l
c.
QA Program
[
TUGC0 QA Program Plan and subtier procedures for design, j
construction, engineering, and procurement described the control of all related project and quality activities.
A sample of these
. procedures were reviewed and documented in NRC Inspection Report No.
50-445/84-22; 50-446/84-07.
50-445/84-22; 50-446/84-07.
The Quality Assurance Program (described in the FSAR) provided the delegation of design, engineering, construction, and procurement
The Quality Assurance Program (described in the FSAR) provided the delegation of design, engineering, construction, and procurement functions to prime contractors, subcootractors, and vendors. *It stated that the TUGC0 audit program assured that these organizations had adequate QA programs and verified implementation of the overall h
-                              functions to prime contractors, subcootractors, and vendors. *It stated that the TUGC0 audit program assured that these organizations had adequate QA programs and verified implementation of the overall h                             QA program within TUGCO.
QA program within TUGCO.
t                                                                                           .
t p
p                                                                                             .
d; e,. ~,-
d;                                                 .
e ,. ~,-              .    .. _      , , . . _ , _    --


___                  i i(       -      .
i i(
h                                                                   '
h '
t l'
t l'
f                                   The inspectors reviewed the QA program procedures and any objective evidence to determine if the applicant regularly reviewed the status
f The inspectors reviewed the QA program procedures and any objective evidence to determine if the applicant regularly reviewed the status and adequacy of the QA program as required by Criterion II of Appendix 8 to 10 CFR 50, the PSAR and FSAR, and ANSI N45.2-1971.
'                                  and adequacy of the QA program as required by Criterion II of Appendix 8 to 10 CFR 50, the PSAR and FSAR, and ANSI N45.2-1971.
Reviews and discussions revealed no documented requirements or evidence that the QA program status and adequacy had been reviewed by the applicant.
Reviews and discussions revealed no documented requirements or evidence that the QA program status and adequacy had been reviewed by the applicant. In order to determine if the QA program had been assessed, the inspectors reviewed additional information. In late 1981 and 1982 audits were performed by a consultant (Fred Lobbin), by Sargent and Lundy (using INPO criteria), and by TUGC0 (using INPO criteria). Each of these audits' evaluated limited aspects of the QA program. In 1983 Cygna evaluated the design program.
In order to determine if the QA program had been assessed, the inspectors reviewed additional information.
The Lobbin Report (February 4, 1982) R-82-01, contained four major findings:                                                         ,
In late 1981 and 1982 audits were performed by a consultant (Fred Lobbin), by Sargent and Lundy (using INPO criteria), and by TUGC0 (using INPO criteria).
  !                                -      level of experience within the TUGC0 QA organization is low; i.e., commercial nuclear plant, design and construction QA
Each of these audits' evaluated limited aspects of the QA program.
    ;                                      experience;
In 1983 Cygna evaluated the design program.
                                    -      staffing for the audit and surveillance functions is inadequate;
The Lobbin Report (February 4, 1982) R-82-01, contained four major findings:
                                    +      the number and scope of design and construction audits conducted by TUGC0 QA to date has been limited; and
level of experience within the TUGC0 QA organization is low; i.e., commercial nuclear plant, design and construction QA experience; staffing for the audit and surveillance functions is inadequate; the number and scope of design and construction audits conducted
                                    +      QA management has not defined clearly the objectives for the
+
    >                                        surveillance program resulting in a program which, in the author's (Lobbin) opinion "is presently ineffective."
by TUGC0 QA to date has been limited; and QA management has not defined clearly the objectives for the
t The TUGC0 QA manager responded to these findings in an office memorandum (Q8C-18), dated February 23, 1982. This response basically concurred with these findings.
+
The response committed to recruit nuclear experienced individuals, to increase the number and scope of site audits, and to more effectively use the surveillance program. Two program reports (Q8C-25 and 29) regarding these matters were issued from the QA manager to the VP nuclear operations on May 21 and August 31, 1982, respectively.
surveillance program resulting in a program which, in the author's (Lobbin) opinion "is presently ineffective."
Following the Lobbin Report, the NRC performed a CAT inspection (IR 445/83-18; 446/83-12 dated April 11, 1983) and included a review I                                     of the TUGC0 audit program at the corporate offices. The inspection
The TUGC0 QA manager responded to these findings in an office t
memorandum (Q8C-18), dated February 23, 1982.
This response basically concurred with these findings.
The response committed to recruit nuclear experienced individuals, to increase the number and scope of site audits, and to more effectively use the surveillance program.
Two program reports (Q8C-25 and 29) regarding these matters were issued from the QA manager to the VP nuclear operations on May 21 and August 31, 1982, respectively.
Following the Lobbin Report, the NRC performed a CAT inspection (IR 445/83-18; 446/83-12 dated April 11, 1983) and included a review I
of the TUGC0 audit program at the corporate offices. The inspection
(
(
included a review of 18 audits (conducted between 1978 and early j                                     1983), auditor qualifications, audit planning and scheduling, audit
included a review of 18 audits (conducted between 1978 and early j
                      -              reporting and followup, and audit prograst effectiveness. The report concluded that weaknesses existed in the established QA audit program and included the scheduling and frequency of audits, the lack of
1983), auditor qualifications, audit planning and scheduling, audit reporting and followup, and audit prograst effectiveness.
  <                                  effective monitoring of the construction program, and the lack of effective resolution of certain audit findings. The inspection also
The report concluded that weaknesses existed in the established QA audit program and included the scheduling and frequency of audits, the lack of effective monitoring of the construction program, and the lack of effective resolution of certain audit findings.
      -                                indicated that the QA program should have been more effective.
The inspection also indicated that the QA program should have been more effective.
F
F
    -      *          . _ . .y
.y
                                            ,7fe-
,7fe-
                                                                                                      .- - _ = = - __
= = -


                ~ ~
l
    . _ _                                                                                                  l f
~ ~
            =
f
f                                                                                     :
=
s i                                                                                     .t i                         Based on the findings in the Lobbin report, and the findings in the i                         NRC CAT report, the QA program continues to exhibit weaknesses. The continuing weaknesses in the QA program over a significant period of time reinforce the need for the applicant to routinely" assess the f{                        status and adequacy of the QA program routinely to ensure that the areas are identified and adequate and timely corrective action is taken to correct the QA program weaknesses.
f s i
The failure to regularly review the status and adequacy of the QA program as required is a violation of Criterion II of Appendix B to 10 CFR 50.     (445/8432-02; 446/8411-02)
.t i
  ;                    d. Management of the TUGC0 Audit Program j
Based on the findings in the Lobbin report, and the findings in the i
j                       (1) Program Requirements FSAR Subsections 17.1.2, "QA Program," and 17.1.18, " Audits," require internal audits of (TUGC0 corporate and site activities) and external audits (prime contractors, subcontractors and vendors) to evaluate
NRC CAT report, the QA program continues to exhibit weaknesses.
  ;                      the effectiveness of the QA program by verifying conformance with design requirements; compliance with established requirements, 6                         methods and procedures; and implementation of corrective action.
The continuing weaknesses in the QA program over a significant period of f{
These commitments require the establishment and implementation of a comprehensive system of planned and periodic audits of.all aspects of the QA program.                                              .
time reinforce the need for the applicant to routinely" assess the status and adequacy of the QA program routinely to ensure that the areas are identified and adequate and timely corrective action is taken to correct the QA program weaknesses.
r The TUGC0 audit program consisted of internal and external audits of 4
The failure to regularly review the status and adequacy of the QA program as required is a violation of Criterion II of Appendix B to 10 CFR 50.
design, construction, engineering, and procurement activities. TUGC0 also retained responsibility for the external audits that were usually delegated to the AE and NSSS organizations; i.e., audit of vendors. In addition to construction and vendor audits, the TUGC0 audit group was also responsible for performing preoperational/startup and plant operation audits.
(445/8432-02; 446/8411-02) d.
Management of the TUGC0 Audit Program j
j (1) Program Requirements FSAR Subsections 17.1.2, "QA Program," and 17.1.18, " Audits," require internal audits of (TUGC0 corporate and site activities) and external audits (prime contractors, subcontractors and vendors) to evaluate the effectiveness of the QA program by verifying conformance with design requirements; compliance with established requirements, 6
methods and procedures; and implementation of corrective action.
These commitments require the establishment and implementation of a comprehensive system of planned and periodic audits of.all aspects of the QA program.
r The TUGC0 audit program consisted of internal and external audits of design, construction, engineering, and procurement activities.
TUGC0 4
also retained responsibility for the external audits that were usually delegated to the AE and NSSS organizations; i.e., audit of vendors.
In addition to construction and vendor audits, the TUGC0 audit group was also responsible for performing preoperational/startup and plant operation audits.
TUGC0 committed to the audit requirements of ANSI N45.2.12-1973, Draft 3, Revision 0, Section 3, " Audit System," and these program management objectives are:
TUGC0 committed to the audit requirements of ANSI N45.2.12-1973, Draft 3, Revision 0, Section 3, " Audit System," and these program management objectives are:
o
o to determine that a QA program has been developed and documented
                          +    to determine that a QA program has been developed and documented in accordance with applicable requirements;
+
                          +    to verify that the program has been implemented, ki                        -    to assess program effectiveness;
in accordance with applicable requirements; to verify that the program has been implemented,
                          -    to identify program nonconformance; and
+
                          -    to verify program correction where appropriate.
k to assess program effectiveness; i
m-                 :--._ _                                .- . m e
to identify program nonconformance; and to verify program correction where appropriate.
                                                                                              .      -+--
m-
.-. m e
-+--


7           _                                            _
7
_[
_[
lI This section also stated that to achieve these ANSI standard
. lI This section also stated that to achieve these ANSI standard objectives full management backing, manpower, funding, and facilities
;                objectives full management backing, manpower, funding, and facilities
[
[
shall be available to implement the system of audits.
shall be available to implement the system of audits.
f.
f.
(2) NRC Evaluation of Planning / Implementation of Program r
(2) NRC Evaluation of Planning / Implementation of Program r
(                 The NRC inspector reviewed and evaluated the applicant's plans, l
(
procedures, and number of audits performed (see paragraph 2e below) and determined that planning was inadequate. This audit effort was l
The NRC inspector reviewed and evaluated the applicant's plans, l
j                too large for the four available TUGC0 auditors in 1981, even though y
procedures, and number of audits performed (see paragraph 2e below) l and determined that planning was inadequate.
additional specialists were utilized to assist with the audit i
This audit effort was j
too large for the four available TUGC0 auditors in 1981, even though additional specialists were utilized to assist with the audit y
activities.
activities.
4 (a) The inspector reviewed and evaluated planning documents (formal l
i 4
;                      and informal) used by the TUGC0 QA manager, supervisor QA i                       services, and supervisor QA audits. The review and discussions i                       with these individuals revealed that annual audit plans were l                       based on the audit of organizations rather than activities.
l (a) The inspector reviewed and evaluated planning documents (formal and informal) used by the TUGC0 QA manager, supervisor QA i
TUGC0 Audit Procedure DQP-CS-4, Revision 0, dated August 9, 1978 j                       required:
services, and supervisor QA audits.
!                      -    semiannual internal audits, i
The review and discussions i
                        -    semiannual construction audits, i                      -    annual AE audits,
with these individuals revealed that annual audit plans were l
                        -    annu'al NSSS audits, and 4
based on the audit of organizations rather than activities.
j                        -    annual plant operation audits.
TUGC0 Audit Procedure DQP-CS-4, Revision 0, dated August 9, 1978 j
1, However, for vendor audits the procedure required:
required:
)                         -    first audit at 15 percent; and second audit at 60 percent j                             " item completion" by reactor coolant pressure boundary vendors;
semiannual internal audits, i
                          -    one audit of engineered safeguards vendors at 25 percent 9                             item completion; and
semiannual construction audits, annual AE audits, i
                          -    audit of balance of plant (other safety-related) vendors as determined by the manager QA.
annu'al NSSS audits, and 4
This does not meet the requirements of paragraphs 3.4.1 and 3.4.2 " Scheduling," of ANSI N45.2.12 which requires, " Auditing be. initiated as early in the life of the activity as practicable . . . applicable elements of the QA prr., gram shall be audited at least annually or at least once within the life of the activity whichever is shorter."
annual plant operation audits.
o b_                   -
j 1,
However, for vendor audits the procedure required:
)
first audit at 15 percent; and second audit at 60 percent j
" item completion" by reactor coolant pressure boundary vendors; one audit of engineered safeguards vendors at 25 percent 9
item completion; and audit of balance of plant (other safety-related) vendors as determined by the manager QA.
This does not meet the requirements of paragraphs 3.4.1 and 3.4.2 " Scheduling," of ANSI N45.2.12 which requires, " Auditing be. initiated as early in the life of the activity as practicable... applicable elements of the QA prr., gram shall be audited at least annually or at least once within the life of the activity whichever is shorter."
o b_


L                                                                     _                              -
L
h                                                                                                                     '
. h Furthermore, Audit Procedure DQP-CS-4, Revision 2, April 16,
}    ;
}
Furthermore, Audit Procedure DQP-CS-4, Revision 2, April 16, 1981, and Revision 10, June 4,1984, have further redt.ced the (scheduling) frequency of audits. Revision 10 now states, in j                                   part, "3.2.1, The following organizations will be audited on a
1981, and Revision 10, June 4,1984, have further redt.ced the (scheduling) frequency of audits.
;                                    regularly scheduled basis but in accordance with Regulatory                         '
Revision 10 now states, in j
Guide (RG) 1.33, Revision 2, January 1978, Regulatory Position 4: a. AE; b. NSSS; c. constructor; d. TUGC0 Internal;
part, "3.2.1, The following organizations will be audited on a regularly scheduled basis but in accordance with Regulatory Guide (RG) 1.33, Revision 2, January 1978, Regulatory Position 4:
: e. Preoperational/Startup; f. Plant Operations;                                 ,
: a. AE; b. NSSS; c. constructor; d. TUGC0 Internal;
: g. Subcontractor. . .       3.2.1 In lieu of regularly scheduled j                                   audits of vendors TUGC0 QA will perform the following:
: e. Preoperational/Startup; f. Plant Operations;
4                                a. Monitor the individual vendor ratings which are based on l                                 vendor performance . . . b. for those vendors who cannot be evaluated based on vendor ratings . . . regularly scheduled audits will be performed based on level of activity." The NRC
: g. Subcontractor...
  ;                                  inspector discussed with TUGC0 management the fact that RG 1.33 1
3.2.1 In lieu of regularly scheduled j
audits of vendors TUGC0 QA will perform the following:
: a. Monitor the individual vendor ratings which are based on 4
l vendor performance... b. for those vendors who cannot be evaluated based on vendor ratings... regularly scheduled audits will be performed based on level of activity." The NRC inspector discussed with TUGC0 management the fact that RG 1.33 1
is for operations and does not fully address the requirements of the construction QA program.
is for operations and does not fully address the requirements of the construction QA program.
This failure to develop audit program procedures which adequately address and describe QA program requirements and commitments is a violation of Appendix B, 10 CFR Part 50, Criterion XVIII (445/8432-03a; 446/8411-03a).
This failure to develop audit program procedures which adequately address and describe QA program requirements and commitments is a violation of Appendix B, 10 CFR Part 50, Criterion XVIII (445/8432-03a; 446/8411-03a).
1                               (b) In addition to evaluating to determine if annual audits were i                                 planned, the NRC inspector requested objective evidence which would demonstrate that planning for audits for calendar years 1983 and 1984 included a method to verify compliance with all aspects of the QA program and to determine the effectiveness of the QA program. The review of the objective evidence revealed
1 (b) In addition to evaluating to determine if annual audits were i
                                    .that the planning was not adequate, particularly regarding the audit basis, status, and tracking. The only objective evidence available consisted of a listing of planned audits of internal organizations and contractors each year and a summary of 1983 audit results and criteria audited; however, this data in many cases did not list the criteria audited and while reviewing older audits it was noted th'at an "after the fact" review resulted in identifying the applicable criteria covered for various organizations.
planned, the NRC inspector requested objective evidence which would demonstrate that planning for audits for calendar years 1983 and 1984 included a method to verify compliance with all aspects of the QA program and to determine the effectiveness of the QA program. The review of the objective evidence revealed
The inspector requested a listing of selected site procedures which were in effect in 1983 that were representative of site l                                    safety-related activiti'es and subject to audit by TUGC0 corporate QA. The review of the listings provided and the 1983 audits revealed the following information:
.that the planning was not adequate, particularly regarding the audit basis, status, and tracking.
i       4 e
The only objective evidence available consisted of a listing of planned audits of internal organizations and contractors each year and a summary of 1983 audit results and criteria audited; however, this data in many cases did not list the criteria audited and while reviewing older audits it was noted th'at an "after the fact" review resulted in identifying the applicable criteria covered for various organizations.
I e
The inspector requested a listing of selected site procedures l
                                                                  ,^     .;n         ..  . _  . ~~ m e ~n ---s--     .. n
which were in effect in 1983 that were representative of site safety-related activiti'es and subject to audit by TUGC0 corporate QA. The review of the listings provided and the 1983 audits revealed the following information:
i 4
e I
e
,^
.;n
. ~~ m e ~n
---s--
.. n


      .        i-
i-
                .Y
.Y
                                                                  .g.
.g.
F             ,.
F Audits of Total Procedures
Audits of         Total                   Procedures                   % Audited Procedures       Procedures           Audited / Referenced                 in 1983
% Audited Procedures Procedures Audited / Referenced in 1983 TVCC0 Quality Documents Index j
              -                  TVCC0 Quality Documents Index j                               (December 20, 1983) 295                             71                         24 3                                 TUSI Engineering Instruction Index                   .
(December 20, 1983) 295 71 24 3
l                              (December 2, 1983)           65                   16                         25 i
TUSI Engineering Instruction Index l
1                               TUSI Nuclear Engineering
(December 2, 1983) 65 16 25 i
* 1                                Procedures / Instructions Index (September 26, 1983) 26                             18                       69                   ,
1 TUSI Nuclear Engineering 1
TUSI Engineering Procedures Index                                                                               .
Procedures / Instructions Index (September 26, 1983) 26 18 69 TUSI Engineering Procedures Index (November 4, 1983) 30 12 40 8&R Quality Document Index i
(November 4, 1983)           30                     12                       40 8&R Quality Document
(November 22,1983) 51 20 39
  ',                            Index                                 .
)
i (November 22,1983) 51                               20                       39
B&R Construction Procedures Index 4
)                                 B&R Construction Procedures 4
(June 20, 1983) 189
Index
_2,8
  ;                              (June 20, 1983)             189                   _2,8                       _ 15 I                                   Total                 656                   165                         25 Only 25 percent of the procedures (specific safety-related activities) were audited in 1983. Although audits on a sampling
_ 15 I
?                                 basis are acceptable, there was no evidence that a_1,1, i                               safety-rela:ed areas were audited. The audits did not encompass l
Total 656 165 25 Only 25 percent of the procedures (specific safety-related activities) were audited in 1983.
all aspects of the QA program in order to determine j                                 effectiveness.
Although audits on a sampling
l                                 The failure to properly plan or produce evidence of adequate i                               planning for a comprehensive audit program to verify compliance
?
  }
basis are acceptable, there was no evidence that a_1,1, i
safety-rela:ed areas were audited.
The audits did not encompass l
all aspects of the QA program in order to determine j
effectiveness.
l The failure to properly plan or produce evidence of adequate i
planning for a comprehensive audit program to verify compliance
}
with all aspects of the QA program resulted in the failure to audit significant parts of the QA program is a violation of Criterion XVIII of Appendix B to 10 CFR 50 (445/8432-03b; 446/8411-03b).
with all aspects of the QA program resulted in the failure to audit significant parts of the QA program is a violation of Criterion XVIII of Appendix B to 10 CFR 50 (445/8432-03b; 446/8411-03b).
J The NRC inspector contacted the Westinghous M site manager to review the procedure listing for safety-related activities which Jf 7
J The NRC inspector contacted the Westinghous M site manager to Jf review the procedure listing for safety-related activities which TUGC0 had audited. As indicated below, no audits of NSSS site 7
TUGC0 had audited. As indicated below, no audits of NSSS site
activities were performed in 1983.
    ,                            activities were performed in 1983. Discussions with the LW),
Discussions with the LW),
site manager revealed that no audits had been performed by TUGC0 QA in 1977, 1978, 1979, 1980, or 1981. This was discussed with
site manager revealed that no audits had been performed by TUGC0 QA in 1977, 1978, 1979, 1980, or 1981.
            -                    the TUGC0 audit staff and QA manager who did not disagree with the stated audit frequency.
This was discussed with the TUGC0 audit staff and QA manager who did not disagree with h
h                                                                                                                      ,
the stated audit frequency.
t n.-                 -- = _ . _       _ _ _ _        - ,.--.-        . . ~ . . . _         - . . - . . - .              ..
t n.-
-- = _. _
.. ~... _


                                        = -
= -
_. _    __ m 3:
__ m 3:
          .            .                                                E
E
                                                                          ~
~
10-3 QW Site Organization 1                                                 External                 .
10-3 QW Site Organization 1
Total                   Procedures       % Audited Procedures                Procedures            Audited / Referenced    in 1983
External Total Procedures
% Audited
]
]
  ''                                              Westinghouse (W) Site Appitcable Procedure, QA Manual, May 1983                   18                                     ;i                                               PPD Procedures                       14                                     1                                                 Installation Procedures 29                                                     t
Procedures Procedures Audited / Referenced in 1983 Westinghouse (W) Site Appitcable Procedure, QA Manual, May 1983 18 ;i PPD Procedures 14 1 Installation Procedures 29 t
)                                                 The failure to audit DQ procedures (safety-related activities)
)
  !                                              annually as required by ANSI N45.2.12, Oraft 3 Revision 0, of the QA program is a violation of Criterion XVIII of Appendix B I
The failure to audit DQ procedures (safety-related activities) annually as required by ANSI N45.2.12, Oraft 3 Revision 0, of the QA program is a violation of Criterion XVIII of Appendix B I
to 10 CFR Part 50,,(445/8432-03c; 446/8411-03c).
to 10 CFR Part 50,,(445/8432-03c; 446/8411-03c).
(c) The NRC inspector discussed The staffing of the Audh Program j                                                 with TUGC0 QA management the findings of the Lobbin Report and
(c) The NRC inspector discussed The staffing of the Audh Program j
  ;                                              the NRC CAT Team Report regarding the staffing of the audit i                                               functions. The discussions revealed that the TUGC0 audit staff I
with TUGC0 QA management the findings of the Lobbin Report and the NRC CAT Team Report regarding the staffing of the audit i
functions.
The discussions revealed that the TUGC0 audit staff I
had been increased from 4 to the present number of 12 between l
had been increased from 4 to the present number of 12 between l
1982 and 1984, and TUGC0 management has been looking for 3 or j                                               4 additional nuclear experienced auditors to further increase the j                                               audit staff. However, it was also revealed that management had not determined the total audits required nor the manpower needed l                                               to accomplish the audits.
1982 and 1984, and TUGC0 management has been looking for 3 or j
i j                                               This matter is an unresolved item pending the determination of I                                               the number of audits and auditors that will be needed to effectively implement the audit program (445/8432-04;
4 additional nuclear experienced auditors to further increase the j
]                                                446/8411-04).
audit staff. However, it was also revealed that management had not determined the total audits required nor the manpower needed l
(d) The NRC inspector determined through review ef charts and procedures that current organization provided organizational freedom from cost and schedule.
to accomplish the audits.
]t
i j
  !                      -                (e) The NRC inspector evaluated audit personnel qualifications by reviewing 14 personnel files of lead auditors and auditors.
This matter is an unresolved item pending the determination of I
This included presently employed and formerly employed auditors.
the number of audits and auditors that will be needed to
/l                                                These personnel were qualified as required by TUGC0                               -
]
Procedure DQI-QA-2.1, Revision 7, and ANSI N45.2.23-1978,
effectively implement the audit program (445/8432-04; 446/8411-04).
                                                  " Qualification of Quality Program Audit Personnel for Nuclear Power Plants."
(d) The NRC inspector determined through review ef charts and procedures that current organization provided organizational
(f) The NRC inspectors reviewed TUGC0 Audit Procedures OQP-CS-4, Revision 10(June 4,1984),andpQI-CS-4.6, Revision 7 (April 13, 1984). As previously discussed in paragraph 2.C(1),
]
DQP-CS-4 does not include adequate commitments to perform annual audits and failed to address both de' sign and construction and plant operations audit requirements.'
freedom from cost and schedule.
t (e) The NRC inspector evaluated audit personnel qualifications by reviewing 14 personnel files of lead auditors and auditors.
/l This included presently employed and formerly employed auditors.
These personnel were qualified as required by TUGC0 Procedure DQI-QA-2.1, Revision 7, and ANSI N45.2.23-1978,
" Qualification of Quality Program Audit Personnel for Nuclear Power Plants."
(f) The NRC inspectors reviewed TUGC0 Audit Procedures OQP-CS-4, Revision 10(June 4,1984),andpQI-CS-4.6, Revision 7 (April 13, 1984).
As previously discussed in paragraph 2.C(1),
DQP-CS-4 does not include adequate commitments to perform annual audits and failed to address both de' sign and construction and
* plant operations audit requirements.'
e ent _M.Wf
e ent _M.Wf
* sag PWw** t   . * {++ MaC-   *
* sag PWw** t
                                                      ******=mW     *t'*   *'******1eampp+***v_
. * {++ MaC-
                                                                                                    -+***M   tr9     1d
******=mW
* t              _s
. *t'*
*'******1eampp+***v_
-+***M tr9 1d t
s


                        ^
^
                                                                                                                          . _s
. _s
(             .
(
: e.       Implementation of the TUGC0 Audit Program The NRC inspectors selected three areas of the audit program to review and evaluate implementation. Results of this evaluation are discussed in the following paragraphs.
* 11-e.
Implementation of the TUGC0 Audit Program The NRC inspectors selected three areas of the audit program to review and evaluate implementation.
Results of this evaluation are discussed in the following paragraphs.
(1) Internal Audits of Site Activities - T_he NRC inspector reviewed the index which showed all site audits and found that Audits TCP-1 through TCP-112 had been performed between March 1978 and August 1984. The number per year are:
(1) Internal Audits of Site Activities - T_he NRC inspector reviewed the index which showed all site audits and found that Audits TCP-1 through TCP-112 had been performed between March 1978 and August 1984. The number per year are:
(1) 4 in 1978; (2) 3 in 1979; (3) 10 in 1980; (4) 11 in 1981; (5) 30 in 1982; (6) 29 in 1983; and (7) 22 during the first 8 months of 1984. After the audit program was found inadequate in the consultant's report (Lobbin), the number of audits increased from less than 1.0 per month in 1982 to 2.5 per month
(1) 4 in 1978; (2) 3 in 1979; (3) 10 in 1980; (4) 11 in 1981; (5) 30 in 1982; (6) 29 in 1983; and (7) 22 during the first 8 months of 1984.
,-                                    in 1982. After the NRC CAT inspection report in 1983 this number increased to 2.7 per month for the first 8 months of 1984. This indicates that positive action concerning these reported weaknesses was taken; however, as previously discussed                           .
After the audit program was found inadequate in the consultant's report (Lobbin), the number of audits increased from less than 1.0 per month in 1982 to 2.5 per month in 1982.
objective evidence was not available that the required number of audits and auditors has been identified. This item was previously identified above as unresolved.
After the NRC CAT inspection report in 1983 this number increased to 2.7 per month for the first 8 months of 1984.
This indicates that positive action concerning these reported weaknesses was taken; however, as previously discussed objective evidence was not available that the required number of audits and auditors has been identified.
This item was previously identified above as unresolved.
The 1983 and 1984 audit schedule included each audit scheduled, cancelled, and any additional audits planned or performed.
The 1983 and 1984 audit schedule included each audit scheduled, cancelled, and any additional audits planned or performed.
Where audits were cancelled, they were rescheduled and other audits were added and performed. This effort was well documented.
Where audits were cancelled, they were rescheduled and other audits were added and performed. This effort was well documented.
In 1983 the TUGC0 audit group performed 158 audits.     Sixty-five 1                                     internal audits of site activities are as follows:
In 1983 the TUGC0 audit group performed 158 audits.
l j
Sixty-five 1
                                      -  . construction /QC/ engineering - 33 audits; l                                      -      startup - 5 audits; and 1
internal audits of site activities are as follows:
                                      -      operations - 27 audits.
l construction /QC/ engineering - 33 audits; j
I                                     The NRC inspector selected and reviewed 31 TCP 1983 audits of i                                      site activities. The audit files included notification to the organization audited, an audit plan, checklists, an audit report, audit response, and evaluation / closeout of findings.
startup - 5 audits; and l
operations - 27 audits.
1 I
The NRC inspector selected and reviewed 31 TCP 1983 audits of site activities. The audit files included notification to the i
organization audited, an audit plan, checklists, an audit report, audit response, and evaluation / closeout of findings.
Audit reports reflected good preparation and execution.
Audit reports reflected good preparation and execution.
Substantial findings generally resulted and were resolved.
Substantial findings generally resulted and were resolved.
Several lead auditors were interviewed concerning the management of the TUGC0 audit program. They stated that the audit program had weaknesses or deficiencies in 1978 but they had witnessed dramatic improvements and were confident that the audit program' b                                     was currently working well.                .
Several lead auditors were interviewed concerning the management of the TUGC0 audit program.
[MW     r-       a _ 1_   _  a -                                       % 9% -       M*     M**f*'W** 4 '?       *
They stated that the audit program had weaknesses or deficiencies in 1978 but they had witnessed dramatic improvements and were confident that the audit program' b
                                                                                                                " - . 12 ' E 2 * %9
was currently working well.
[MW r-a _
1_
a -
% 9% -
M*
M**f*'W**
4 '?
" -. 12
' E 2 * %9


a_                                       -          .                            i l
i a_
h' b                                                                                                     <
h' b <
(2) Assurance of Design Control - TUGC0' management verified that
(2) Assurance of Design Control - TUGC0' management verified that design was controlled in accordance with the QA program requirements and procedures through administering an effective audit program. The design control functions were delegated to the AE and M ; however, TUGC0 was designated the engineering organization responsibility for plant design.
.                              design was controlled in accordance with the QA program
l The NRC inspector reviewed and evaluated the results documented in 15'TUGC0 internal and external audit reports which j
!                            requirements and procedures through administering an effective
speciffcally relate to Criterion III of 10 CFR Part 50, Appendix 8, design and applicable procedures. These represent l
;                            audit program. The design control functions were delegated to the AE and M ; however, TUGC0 was designated the engineering organization responsibility for plant design.
al.1 audits design and consisted of 8 audits of TUGCO, 3 of M,
The NRC inspector reviewed and evaluated the results documented l
and 4 of G&H, engineering organizations.
,                              in 15'TUGC0 internal and external audit reports which speciffcally relate to Criterion III of 10 CFR Part 50, j
All audit findings, l
:                              Appendix 8, design and applicable procedures. These represent l                             al.1 audits design and consisted of 8 audits of TUGCO, 3 of M ,
concerns, and deficiencies were closed through correspondence and were later verified through subsequent audits. Management involvement was evident as the VP nuclear operations was on concurrence and was furnished status reports by the QA manager.
and 4 of G&H, engineering organizations. All audit findings, l                             concerns, and deficiencies were closed through correspondence
In October 1982, TUGC0 initiated a special audit effort to review design using the Institute of Nuclear Power Operations (INPO) performance objectives and criteria.
-                              and were later verified through subsequent audits. Management             ,
Sargent & Lundy l
involvement was evident as the VP nuclear operations was on
personnel were used to perform this audit.
                  -            concurrence and was furnished status reports by the QA manager.
This audit j
In October 1982, TUGC0 initiated a special audit effort to
identified 13 findings and TUGC0 audit No. TNO-2, dated June 1983, verified corrective action.
,                              review design using the Institute of Nuclear Power Operations (INPO) performance objectives and criteria. Sargent & Lundy l
l (3) Assurance Control of Procurement Activities - TUGC0 management j
personnel were used to perform this audit. This audit                     ;
elected to retain procurement responsibilities except for l
j                              identified 13 findings and TUGC0 audit No. TNO-2, dated
certain functions delegated to the AE and NSSS.
,                              June 1983, verified corrective action.
The NRC inspector selected several functions retained by TUGC0 to j
l
determine if their audit program effectively monitored or i
!                      (3) Assurance Control of Procurement Activities - TUGC0 management j                             elected to retain procurement responsibilities except for l
.i verified that procurement activities were accomplished in accordance with the QA program and applicable procurement I
certain functions delegated to the AE and NSSS. The NRC inspector selected several functions retained by TUGC0 to                 ,
procedures. Management involvement with procurement documents, j
j determine if their audit program effectively monitored or                 i
bid / source evaluation, and specific QA inputs were reviewed by l
.i verified that procurement activities were accomplished in accordance with the QA program and applicable procurement I                               procedures. Management involvement with procurement documents, j                               bid / source evaluation, and specific QA inputs were reviewed by l
the inspector. The vendor audits and evaluation of vendors were j
the inspector. The vendor audits and evaluation of vendors were j                               a large work effort. The following are the results of this
a large work effort.
;                                review and evaluation.
The following are the results of this review and evaluation.
!'                              The NRC Comanche Peak Special Review Team Report dated July 13, 1984, at the site identified a potential violation, i.e. ,
The NRC Comanche Peak Special Review Team Report dated July 13, 1984, at the site identified a potential violation, i.e.,
failure to perform annual audits of vendors. The report documented an inspection of the procurement effort at site and part of this inspection included determining the frequency of vendor audits. As a result of the special inspection, the TUGC0 AA manager approved an FSAR change request, dated August 3, 1984, which asked that TUGC0 be allowed to adopt NRC RG 1.144 audit requirements in lieu of ANSI N45.2.12, Oraft 3, l                               Revision 0, for construction and' ANSI N45.2.12, Oraft 4,
failure to perform annual audits of vendors.
  !                              Revision 2 for operations. This requested change would not change the requirement to perform internal audits annually but 1
The report documented an inspection of the procurement effort at site and part of this inspection included determining the frequency of vendor audits.
                              - h -e.h,w-     w,                                                 ~
As a result of the special inspection, the TUGC0 AA manager approved an FSAR change request, dated August 3, 1984, which asked that TUGC0 be allowed to adopt NRC RG 1.144 audit requirements in lieu of ANSI N45.2.12, Oraft 3, l
Revision 0, for construction and' ANSI N45.2.12, Oraft 4, Revision 2 for operations.
This requested change would not change the requirement to perform internal audits annually but 1
- h -e.h,w-w,
~


s.
~
                                        ~
~~
                                                                            =
j s.
                                                                                        ~~
=
j l
l l j
l j                 would reduce the requirement to perform annual' audits of f                 suppliers. Considering this requested QA program change which l                 had not been approved by the NRC, the following are the
would reduce the requirement to perform annual' audits of f
!                inspection results:
suppliers. Considering this requested QA program change which l
had not been approved by the NRC, the following are the inspection results:
(a) The NRC inspector reviewed the TUGC0 vendor audit program for 1983 to determine compliance with commitments (FSAR Section 17, paragraph 17.1.18), ANSI N45.2.12 and TUGC0 procedures DQP-CS-4 and DQI-CS-4.5.
(a) The NRC inspector reviewed the TUGC0 vendor audit program for 1983 to determine compliance with commitments (FSAR Section 17, paragraph 17.1.18), ANSI N45.2.12 and TUGC0 procedures DQP-CS-4 and DQI-CS-4.5.
The annual audit schedule revealed that 60 vendor audits were scheduled during 1983.       Audit TCLC-2 was cancelled (lack of activity with Purchase Order CPC-307) and audit TBS-3 was rescheduled (delayed by 1 wee'k) as a result of NRC CAT Team inspection findings.       The NRC inspector selected 3 vendor audit files, TVO-1, TM-3, and TBF-2, for review to determine the extent of the audits as applicable to the audit plan checklist, noted deficiencies, concerns, and comments. Also included in this review were the corrective actions and/or preventive action documented in writing by the vendor in response to the applicable audit findings. Documents in file closed the audit findings and indicated that followup on corrective action would be verified during the next audit.          .
The annual audit schedule revealed that 60 vendor audits were scheduled during 1983.
The NRC inspector reviewed the vendor audit frequency to determine if TUGC0 established a schedule to annually audit vendors. The licensee commitment to ANSI N45.2.12, Draft 3, Revision 0, requires annual audits or at least once within the life of the activity.       Neither procedural requirements were established, nor were vendors audited annually.                                                 ,
Audit TCLC-2 was cancelled (lack of activity with Purchase Order CPC-307) and audit TBS-3 was rescheduled (delayed by 1 wee'k) as a result of NRC CAT Team inspection findings.
The NRC inspector selected 3 vendor audit files, TVO-1, TM-3, and TBF-2, for review to determine the extent of the audits as applicable to the audit plan checklist, noted deficiencies, concerns, and comments.
Also included in this review were the corrective actions and/or preventive action documented in writing by the vendor in response to the applicable audit findings.
Documents in file closed the audit findings and indicated that followup on corrective action would be verified during the next audit.
The NRC inspector reviewed the vendor audit frequency to determine if TUGC0 established a schedule to annually audit vendors.
The licensee commitment to ANSI N45.2.12, Draft 3, Revision 0, requires annual audits or at least once within the life of the activity.
Neither procedural requirements were established, nor were vendors audited annually.
The failure to establish procedural requirements and to perform annual vendor audits is a violation of Criterion XVIII of 10 CFR Part 50, Appendix B and ANSI N45.2.12, Draft 3, Revision 0 (445/8432-03d; 446/8411-03d).
The failure to establish procedural requirements and to perform annual vendor audits is a violation of Criterion XVIII of 10 CFR Part 50, Appendix B and ANSI N45.2.12, Draft 3, Revision 0 (445/8432-03d; 446/8411-03d).
                .  (b) The NRC inspector reviewed the approved vendors list (AVL) program for 1983 to verify that methods. used by TUGC0 to qualify vendors to supply safety-related materials, parts, and services were consistent with the QA plan, procedural requirements, and commitments described in ANSI N45.2.13-1976. A review of supplemental memos and preaward survey files and revisions 9 through 12 of the AVL verified that the AVL was cMrrent. This review showed 33 additions, 40 status changes, and 1 deletion to the AVL for the period January 24, 1983, through December 20, 1983.
(b) The NRC inspector reviewed the approved vendors list (AVL) program for 1983 to verify that methods. used by TUGC0 to qualify vendors to supply safety-related materials, parts, and services were consistent with the QA plan, procedural requirements, and commitments described in ANSI N45.2.13-1976.
A review of supplemental memos and preaward survey files and revisions 9 through 12 of the AVL verified that the AVL was cMrrent.
This review showed 33 additions, 40 status changes, and 1 deletion to the AVL for the period January 24, 1983, through December 20, 1983.
The preaward survey files reviewed were consistent with l
The preaward survey files reviewed were consistent with l
l L                               _      _                    -
l L


T
.m.
                                        .      .m.                 _
T k-f bI Procedures DQP-CS-4, Revision 10, and DQI-CS-4.2,
k-f b
{
I                        Procedures DQP-CS-4, Revision 10, and DQI-CS-4.2,
Revision 3, December 1, 1982.
{                         Revision 3, December 1, 1982. During the review of
During the review of
]                         preaward survey files, the inspector confirmed that formal identification letters, the survey date, and the scope of
]
  'l                        the survey (checklist) were consistent with the vendor QA program. Also, the corrective action responses by the supplier concerning noted deficiencies, concerns, and comments were reviewed, and followup action verified in a subsequent audit.                          .
preaward survey files, the inspector confirmed that formal
(c) The NRC inspector reviewed the vendor performance evaluation (VPE) system to determine compliance with j                           commitment and procedural requirements. TUGC0 Procedure il                         DQP-CS-4.3, paragraph 1.1 stated that the purpose of the
'l identification letters, the survey date, and the scope of the survey (checklist) were consistent with the vendor QA program. Also, the corrective action responses by the supplier concerning noted deficiencies, concerns, and comments were reviewed, and followup action verified in a subsequent audit.
    !                      evaluation was to astablish a comprehensive method of 1                       identifying system weaknesses in vendor QA programs through 3                           acceptable / unacceptable hardware information generated as a j                           result of vendor release inspections. The VPE files d                           included release inspection trip report cover sheets, j                           vendor rating sheets, releases, and the inspection y                            checklists as required by TUGC0 Procedure DQI-CS-4.3, j                            Revision 4, paragraph 3.1.
(c) The NRC inspector reviewed the vendor performance evaluation (VPE) system to determine compliance with j
d                           The NRC inspector reviewed 3 VPE packages to determine that j                           the quality assurance services (QAS) group's review was consistent with procedural recuirements. One vendor file l
commitment and procedural requirements.
l1                  .      (Paul Monroe Hydraulic) was still active pending 1
TUGC0 Procedure il DQP-CS-4.3, paragraph 1.1 stated that the purpose of the evaluation was to astablish a comprehensive method of 1
engineering review and evaluation on the 0-ring discrepancy identified during release inspection at Remo Hydraulics (Purchase Order CPF-11436-5 issued to Paul Monroe
identifying system weaknesses in vendor QA programs through 3
    .                        Hydraulics) for 20 hydraulic snubber assemblies. As d                           required by DQP-VC-3, one vendor package (Meddco Metals)
acceptable / unacceptable hardware information generated as a j
;l                           was being held on a yellow flag sheet to alert TUGC0 l
result of vendor release inspections. The VPE files d
included release inspection trip report cover sheets, j
vendor rating sheets, releases, and the inspection checklists as required by TUGC0 Procedure DQI-CS-4.3, y
Revision 4, paragraph 3.1.
j d
The NRC inspector reviewed 3 VPE packages to determine that j
the quality assurance services (QAS) group's review was consistent with procedural recuirements. One vendor file l1 l
(Paul Monroe Hydraulic) was still active pending 1
engineering review and evaluation on the 0-ring discrepancy identified during release inspection at Remo Hydraulics (Purchase Order CPF-11436-5 issued to Paul Monroe Hydraulics) for 20 hydraulic snubber assemblies.
As d
required by DQP-VC-3, one vendor package (Meddco Metals)
;l was being held on a yellow flag sheet to alert TUGC0 l
auditors of next request for release so that TUGC0 auditors
auditors of next request for release so that TUGC0 auditors
/                           could accompany the TUGC0 vendor compliance insp'ector to resurvey the vendor. One other vendor (Volumetrics) performance evaluation record was reviewed and it showed a vendor rating of greater than 90. The NRC inspector interviewed the QA audit supervisor to determine what objective evidence (as required by referenced TUGC0
/
]                            Procedure DQI-CS-4.3, paragraph 3.2) was used to perform the vendor evaluation and support vendor ratings. Preaward surveys, previous audits, and receiving inspection reports were used as objective evidence to give the rating.
could accompany the TUGC0 vendor compliance insp'ector to resurvey the vendor. One other vendor (Volumetrics) performance evaluation record was reviewed and it showed a vendor rating of greater than 90.
i The NRC inspector reviewed the receiving inspection activity for previous releape inspection shipments relative to the aforementioned vendors. Receipt inspection consisted of' shipping damage inspection, receipt of g
The NRC inspector interviewed the QA audit supervisor to determine what
documentation, identification, and quality assurance release.
]
l                                                                               .
objective evidence (as required by referenced TUGC0 Procedure DQI-CS-4.3, paragraph 3.2) was used to perform the vendor evaluation and support vendor ratings.
L                                                 -
Preaward surveys, previous audits, and receiving inspection reports were used as objective evidence to give the rating.
The NRC inspector reviewed the receiving inspection i
activity for previous releape inspection shipments relative to the aforementioned vendors.
Receipt inspection consisted of' shipping damage inspection, receipt of documentation, identification, and quality assurance g
release.
l L


q.
7 q.
7 (d) The NRC inspector reviewed the method by which the licensee performed source selection to determine that procedural i                               requirements were met. QA plan Section 4.0, Revision 4,
. (d) The NRC inspector reviewed the method by which the licensee performed source selection to determine that procedural i
/                               July 31, 1984, required that a purchase order for
requirements were met.
!                              safety-related items not be issued to a vendor unless TUGC0 QA had reviewed and accepted the purchase order; i.e., QA
QA plan Section 4.0, Revision 4,
!                              determines whether QA provisions are adequate and determines that a preaward evaluation recommends selection of the vendor.
/
            .                  When procurement solicited bids outside the AVL, TUGC0 QA requested that an uncontrolled copy of the vendors quality assurance manual be sent with' the bid response. In the event of a positive bid response from the unapproved supplier, the TUGC0 procurement group forwards the QAM and a request for QA program evaluation, Form QA-VE, to tite TUGC0 QA audit group supervisor to initiate a preaward survey per QA Procedure DQT-CS-4.4, paragraph 3.1.
July 31, 1984, required that a purchase order for safety-related items not be issued to a vendor unless TUGC0 QA had reviewed and accepted the purchase order; i.e., QA determines whether QA provisions are adequate and determines that a preaward evaluation recommends selection of the vendor.
* However, until the preaward survey is completed and a supplemental memo has been issued by the audit group supervisor, no further procurement action was taken.
When procurement solicited bids outside the AVL, TUGC0 QA requested that an uncontrolled copy of the vendors quality assurance manual be sent with' the bid response.
The NRC inspector reviewed the actions taken when an acceptable bidder takes exceptians to the purchase order or subcontract. Upon receipt of the exception, procurement filled out an expediting request, assigns a procurement log number, and forwarded thir request to the field requisition originator for engineering review and evaluation. Should the engineering group allow the exception, the necessary actions; i.e., design charges, were initiated. The expediting request was returned to procurement accompanied by a field requisition documenting the change with the approval signatures of engineering and QA.
In the event of a positive bid response from the unapproved supplier, the TUGC0 procurement group forwards the QAM and a request for QA program evaluation, Form QA-VE, to tite TUGC0 QA audit group supervisor to initiate a preaward survey per QA Procedure DQT-CS-4.4, paragraph 3.1.
(e) The NRC inspector reviewed the method by which TUGC0 performed vendor item acceptance of safety-related materials, parts, and components. TUGC0 Procedure DQP-VC-1, Revision 8, June 4, 1984, paragraph 1.1, specified that the purpose was to establish guidelines for performing final inspection and release of TUGC0 purchased equipment and applies to both safety-related and nonsafety-related equipment. This procedure allowed for a waiver, in which case the inspection checklist applicable to the procurement specification became the responsibility of CPSES receiving
However, until the preaward survey is completed and a supplemental memo has been issued by the audit group supervisor, no further procurement action was taken.
[                                 inspection as described in B&R CPSES Procedure CP-QAP-8.1, Revision 8, June 11, 1984, paragraph 3.4.1 (f) The NRC inspector reviewed six vendor compliance inspector's files to determine if training / certification H
The NRC inspector reviewed the actions taken when an acceptable bidder takes exceptians to the purchase order or subcontract.
Upon receipt of the exception, procurement filled out an expediting request, assigns a procurement log number, and forwarded thir request to the field requisition originator for engineering review and evaluation.
Should the engineering group allow the exception, the necessary actions; i.e., design charges, were initiated.
The expediting request was returned to procurement accompanied by a field requisition documenting the change with the approval signatures of engineering and QA.
(e) The NRC inspector reviewed the method by which TUGC0 performed vendor item acceptance of safety-related materials, parts, and components.
TUGC0 Procedure DQP-VC-1, Revision 8, June 4, 1984, paragraph 1.1, specified that the purpose was to establish guidelines for performing final inspection and release of TUGC0 purchased equipment and applies to both safety-related and nonsafety-related equipment.
This procedure allowed for a waiver, in which case the inspection checklist applicable to the procurement specification became the responsibility of CPSES receiving
[
inspection as described in B&R CPSES Procedure CP-QAP-8.1, Revision 8, June 11, 1984, paragraph 3.4.1 (f) The NRC inspector reviewed six vendor compliance inspector's files to determine if training / certification H


s                 ~., .i
.i s
    .      .-                                                                                                l
~.,
        .                                                  t
t records met the requirements of ANSI N45.2.6-1978 and TUGC0 Procedure DQP-VC-4, " Guidelines for Certifying Vendor l
!                                      records met the requirements of ANSI N45.2.6-1978 and TUGC0 Procedure DQP-VC-4, " Guidelines for Certifying Vendor l                                     Compliance Personnel." Section 3.2.2 states that a Level II inspector shall attend and satisfactorily complete j                                     the nondestructive examination (NDE) courses. One
Compliance Personnel." Section 3.2.2 states that a Level II inspector shall attend and satisfactorily complete j
;                                      inspector had not completed all of the NDE courses but had i                                     been certified. This finding was discussed with the vendor i                                    compliance supervisor who stated that there is no real need for certification in eddy current testing since inspectors
the nondestructive examination (NDE) courses.
:                                    do not utilize this NDE technique and the requirements would therefore be deleted from the procedure.       The NRC
One inspector had not completed all of the NDE courses but had i
!                                      inspector verified the deletion of this requirement and
been certified.
  ;                                    procedural revision during this inspection.
This finding was discussed with the vendor compliance supervisor who stated that there is no real need i
for certification in eddy current testing since inspectors do not utilize this NDE technique and the requirements would therefore be deleted from the procedure.
The NRC inspector verified the deletion of this requirement and procedural revision during this inspection.
The failure to certify the inspector in accordance with the procedure is a violation of Criterion V of Appendix B to 10 CFR 50 (445/8432-05; 446/8411-05).
The failure to certify the inspector in accordance with the procedure is a violation of Criterion V of Appendix B to 10 CFR 50 (445/8432-05; 446/8411-05).
No other' violations or deviations were identified.
No other' violations or deviations were identified.
: 3. TUGC0 Corporate QA - Site t)A Activities Interface Appendix B to 10 CFR Part'50 requires TUGC0 to u tablish proper organizational and management interfaces, and pro.cedures must describe how various organizations coordinate and communicate design, procurement, engineering, construction, and QA/ control activi, ties and information. The following paragraphs describe inspection of this requirement,
3.
: a. Site Organizatiois TUGC0 Procedure CP-QP-3.0, Revision 15, July 30, 1984, described the
TUGC0 Corporate QA - Site t)A Activities Interface Appendix B to 10 CFR Part'50 requires TUGC0 to u tablish proper organizational and management interfaces, and pro.cedures must describe how various organizations coordinate and communicate design, procurement, engineering, construction, and QA/ control activi, ties and information. The following paragraphs describe inspection of this requirement, a.
Site Organizatiois TUGC0 Procedure CP-QP-3.0, Revision 15, July 30, 1984, described the
~,
~,
site QA organization for design and construction. This organization consisted of~a site QA manager, QA supervisor, and a QC supervisor.
site QA organization for design and construction.
'                        The site group performe~d no audit function, however, they did perform QA surveillances. The site group consisted of 13 QA/QC managers and more than 150 lead /QC inspectors and quality engineers. These
This organization consisted of~a site QA manager, QA supervisor, and a QC supervisor.
;                        personnel inspected non-ASME work.
The site group performe~d no audit function, however, they did perform QA surveillances.
B&R QA manual and implementing Procedure CP-QAP-03.01, Revision 6, described their responsibilities for QA/QC and construction activities pertaining to ASME work. This organization consisted of a
The site group consisted of 13 QA/QC managers and more than 150 lead /QC inspectors and quality engineers.
;                        QA manager, QE supervisor, and a QC supervisor.         The total QA/QC work j                        force involved with design / construction activities was approximately
These personnel inspected non-ASME work.
:                        100.
B&R QA manual and implementing Procedure CP-QAP-03.01, Revision 6, described their responsibilities for QA/QC and construction activities pertaining to ASME work.
4-j       ,
This organization consisted of a QA manager, QE supervisor, and a QC supervisor.
Several other site subcontractors such as Bahnson, Brand Industrial 1
The total QA/QC work force involved with design / construction activities was approximately j
Services, Inc., and Chicago Bridge and Iron, have small QA groups on i                         site and, as is the case with B&R, these organizations were audited j                         by their respective corporate offices.
100.
4-j Several other site subcontractors such as Bahnson, Brand Industrial 1
Services, Inc., and Chicago Bridge and Iron, have small QA groups on i
site and, as is the case with B&R, these organizations were audited j
by their respective corporate offices.
4, I
4, I


                                            ~~'   '                                                                . . .
~~'
i.
i.
2_
2_
V                           -
V
?
?
)                 . a h
)
:                                                                                                                        1 t                                                                                                                         1 f                                                                                                                         '
a h
The NRC inspector interviewed the TUGC0 site QA manager to determine I                                         how the site QA group interfaced with the corporate QA office. He stated that daily conversations occur between ranagers of these organizations, however, he did not make written summary reports.
1 t 1
f The NRC inspector interviewed the TUGC0 site QA manager to determine I
how the site QA group interfaced with the corporate QA office.
He stated that daily conversations occur between ranagers of these organizations, however, he did not make written summary reports.
Quarterly trending reports which analyte reported nonconformances and deficiencies are sent to the corporate QA manager, l
Quarterly trending reports which analyte reported nonconformances and deficiencies are sent to the corporate QA manager, l
: b. Site Surveillances
b.
  ;'                                      The NRC inspector noted that surveillances were briefly mentioned in
Site Surveillances The NRC inspector noted that surveillances were briefly mentioned in TUGC0 Procedure DQP-CS-4, Revision 10; however, there was no mention I
  '                                      TUGC0 Procedure DQP-CS-4, Revision 10; however, there was no mention I                                       of how or if the surveillances would be used to complement the audit l                                       program. During discussions with the QA manager and other personnel, I                                      it was revealed that procedures were not tracked to assure that all l                                       were audited. The present audit staff could not audit all site procedures annually. The NRC inspector pointed out that the surveillance function may complement and be used to (1) check that all procedures are implemented; (2) identify nonconforming trends; and (3) to feed potentially deficient or weak areas to the audit
of how or if the surveillances would be used to complement the audit l
;                                          group which could, in turn, factor this information into the audit
program.
  ;                                        program. Audit priorities could then be established and the audit personnel could be more effectively used.                              .
During discussions with the QA manager and other personnel, it was revealed that procedures were not tracked to assure that all I
i                                         TUGC0 Surveillance Procedures CP-QP-11.2, 19.3, 19.4, 19.5, 19.6,
l were audited.
';                                        19.7, 20.0, and 27.0 described the surveillances of specific
The present audit staff could not audit all site procedures annually. The NRC inspector pointed out that the surveillance function may complement and be used to (1) check that all procedures are implemented; (2) identify nonconforming trends; and (3) to feed potentially deficient or weak areas to the audit group which could, in turn, factor this information into the audit program.
!                                          activities; however, no general procedure which describes the overall surveillance program was provided.         The present program did not i                                         appear to have sufficient purpose, direction, coordination, and
Audit priorities could then be established and the audit personnel could be more effectively used.
]                                         feedback in relationship with the overall QA program. Furthermore, j                                         the inspection revealed that the surveillance staff had been reduced j                                         from a supervisor and eight technical personnel to four technical j                                         personnel. Considering the Lobbin Report this reduction of j
i TUGC0 Surveillance Procedures CP-QP-11.2, 19.3, 19.4, 19.5, 19.6, 19.7, 20.0, and 27.0 described the surveillances of specific activities; however, no general procedure which describes the overall surveillance program was provided.
surveillance effort may not be a prudent action.
The present program did not i
f j                                h         As noted in the findings in the Lobbin Report; i.e., QA management had not clearly defined the objectives and scope of the surveillance
appear to have sufficient purpose, direction, coordination, and
                                ~~
]
i J                                          program, it appeared that TUGC0 needed to strengthen the surveillance B                                         program. The TUGC0 management decision to commit to a surveillance program was a strength, but this lack of purpose and direction and support was a program weakness.
feedback in relationship with the overall QA program.
Additionally, the surveillance group was no longer observing work in Unit 1 but will now place most of their effort on Unit 2 construction activities.
Furthermore, j
J H
the inspection revealed that the surveillance staff had been reduced j
[                                         This matter is considered unresolved pending clarification of the p-                                         audit and surveillance program efforte and further review during a 6                                           subsequent inspection (445/8432-06; 446/8411-06).
from a supervisor and eight technical personnel to four technical j
personnel.
Considering the Lobbin Report this reduction of j
f surveillance effort may not be a prudent action.
h As noted in the findings in the Lobbin Report; i.e., QA management j
~~
i had not clearly defined the objectives and scope of the surveillance J
program, it appeared that TUGC0 needed to strengthen the surveillance B
program.
The TUGC0 management decision to commit to a surveillance program was a strength, but this lack of purpose and direction and support was a program weakness.
Additionally, the surveillance group was no longer observing work in Unit 1 but will now place most of their effort on Unit 2 construction J
activities.
H
[
This matter is considered unresolved pending clarification of the p-audit and surveillance program efforte and further review during a 6
subsequent inspection (445/8432-06; 446/8411-06).
it n.
it n.
g                                                                                   .
g
{:
{:
8
8
                                                ^
^
                                                                      ,_ :. _ ,            ,    ,~ ,  - ,      ,
,~,


                        =                   -    - .
=
                                                                ==                   y-           _        a
 
        , a .
==
f                                                                   P I                               The NRC inspector randomly selected and reviewed 28 surveillances             l performed in 1982, 1983, and 1984. Findings and resolutions of these           i
y-a a
.                              findings were reviewed and in each case, written responses and f                               corrective action were adequate.
f P I
A
The NRC inspector randomly selected and reviewed 28 surveillances performed in 1982, 1983, and 1984.
: c. Site Desian Activities                 .
Findings and resolutions of these i
The NRC inspect (r reviewed and e' valuated selected site activities pertaining to design verifications, design changes, design inputs, and control of vendor drawings as follows:
findings were reviewed and in each case, written responses and f
(1) Design Verification - The NRC inspector interviewed the TUGC0 supervisor of engineering, support, and other engineering i                                     personnel to determine how design verifications were performed, and examined the related procedures, logs, and design verification packages. Authorized design verifiers were l                                     maintained on lists and an automated tracking system was in
corrective action were adequate.
!                                    place to assure that all design changes, i.e., design change 2                                     authorizations / component modification cards (DCA/ CMC) were verified. Three design verification reports ware reviewed to assure that the design verifier was on the authorized list.
A c.
l
Site Desian Activities The NRC inspect (r reviewed and e' valuated selected site activities pertaining to design verifications, design changes, design inputs, and control of vendor drawings as follows:
!                                    Design verifiers were not to be involved in the original design review to assure an independence. It was noted that each l
(1) Design Verification - The NRC inspector interviewed the TUGC0 supervisor of engineering, support, and other engineering i
DCA/ CMC was being reviewed for verification. If there was no authorized signoff, then the design was verified.
personnel to determine how design verifications were performed, and examined the related procedures, logs, and design verification packages. Authorized design verifiers were l
l                                     Audit TGH-23, conducted during August 1984, concentrated on l
maintained on lists and an automated tracking system was in place to assure that all design changes, i.e., design change 2
authorizations / component modification cards (DCA/ CMC) were verified.
Three design verification reports ware reviewed to l
assure that the design verifier was on the authorized list.
Design verifiers were not to be involved in the original design review to assure an independence.
It was noted that each l
DCA/ CMC was being reviewed for verification.
If there was no authorized signoff, then the design was verified.
l Audit TGH-23, conducted during August 1984, concentrated on l
Unit 1 quality related activities for which onsite G&H design l
Unit 1 quality related activities for which onsite G&H design l
review team had responsibility. The audit involved evaluation of the program established and implemented for site review and -
review team had responsibility. The audit involved evaluation of the program established and implemented for site review and -
processing of changes (CMA and DCC) associated calculations and 287 design review packages were reviewed. No major technical problems were identified during this audit.
processing of changes (CMA and DCC) associated calculations and 287 design review packages were reviewed.
(2) Design Changes - The NRC inspector interviewed engineers and draftsmen in TUGC0 engineering to determine how design changes were processed and examined the related procedures, files, reports, and tracking systems. A master list was maintained identifying those individuals who were authorized to approve design changes and G&H updates this list by memo. The NRC review of three design review files verified that the reviewers     .
No major technical problems were identified during this audit.
were on the authorized list.
(2) Design Changes - The NRC inspector interviewed engineers and draftsmen in TUGC0 engineering to determine how design changes were processed and examined the related procedures, files, reports, and tracking systems.
The NRC inspector also reviewed the method used to incorporate l                                      field changes (DCA/ CMC) into related drawings and the subsequent i
A master list was maintained identifying those individuals who were authorized to approve design changes and G&H updates this list by memo.
j                                      review, approval, and incorporation of changes into as-built           '
The NRC review of three design review files verified that the reviewers were on the authorized list.
;                                      drawings. ' One observation required additional discussions. The l
l The NRC inspector also reviewed the method used to incorporate i
field changes (DCA/ CMC) into related drawings and the subsequent j
review, approval, and incorporation of changes into as-built drawings. ' One observation required additional discussions.
The l
drafting supervisor.'s (piping support) authority to incorporate ~~
drafting supervisor.'s (piping support) authority to incorporate ~~
a change into a drawing was transmitted and signed by a clerk.
a change into a drawing was transmitted and signed by a clerk.
This was clarified as being acceptable by management because it i
This was clarified as being acceptable by management because it i
h
h I-
              . . . . .        _I-            ..      . - . -          .--  . .-..:    . . - . .  -


e:             -
e:
{
{
                                                                  +
+
I
- I was in accordance with established procedure (CP-EI 4.6-8, paragraph 3.3) and also, as a final control, the as-built drawing was reviewed and approved by an authorized project engineer prior to release.
.                        was in accordance with established procedure (CP-EI 4.6-8, paragraph 3.3) and also, as a final control, the as-built drawing was reviewed and approved by an authorized project
The NRC inspector examined how the TUGC0 administrative services group handled NRC IE Bulletins, Circulars, and Information Notices. These documents were coordinated by the operations support department and were distributed to the appropriate TUGC0 engineering group for action.
,                        engineer prior to release.
Design changes resulting from i
The NRC inspector examined how the TUGC0 administrative services group handled NRC IE Bulletins, Circulars, and Information Notices. These documents were coordinated by the operations support department and were distributed to the appropriate TUGC0 i
j these inputs were processed in accordance with established j
engineering group for action. Design changes resulting from j                       these inputs were processed in accordance with established j                       design control procedures. Responses from personnel receiving i                      these reports were reviewed to verify that the reports were adequately addressed.               Summary reports and log sheets are used to keep management current as to the status of the responses.
design control procedures.
Responses from personnel receiving these reports were reviewed to verify that the reports were i
adequately addressed.
Summary reports and log sheets are used to keep management current as to the status of the responses.
An INPO audit of the operating experience review program in 1982 noted the following good practice, "The procedures for handling industry experience are excellent and are expected to provide a firm base for developing an effective industry experience program. "
An INPO audit of the operating experience review program in 1982 noted the following good practice, "The procedures for handling industry experience are excellent and are expected to provide a firm base for developing an effective industry experience program. "
TUGC0 QA audit Report TUG-41 was conducted in December 1983 to review implementation of the operations support program for evaluating and responding to NRC IE Bulletins, IE Notices, IE Circulars, and generic letters.               The auditors found the program in compliance with procedural requirements and the overall effectiveness of the program appeared to be adequate.
TUGC0 QA audit Report TUG-41 was conducted in December 1983 to review implementation of the operations support program for evaluating and responding to NRC IE Bulletins, IE Notices, IE Circulars, and generic letters.
The auditors found the program in compliance with procedural requirements and the overall effectiveness of the program appeared to be adequate.
(3) Design Document Control - Two packages were reviewed and these contained evidence of vendor data checklists, indexes, approval letters, and the vendor stamp on drawings was observed.
(3) Design Document Control - Two packages were reviewed and these contained evidence of vendor data checklists, indexes, approval letters, and the vendor stamp on drawings was observed.
: d.     Site Procurement Activities The NRC inspector determined that the TUGC0 procurement function was delegated to the TUGC0 site organization. The major procure.ments occurred several years ago; however, present procurement activities
d.
  ;                associated with items procured offsite for installation were performed by TUGC0 or were contracted to G&H, iWl, or B&R who were evaluated i
Site Procurement Activities The NRC inspector determined that the TUGC0 procurement function was delegated to the TUGC0 site organization.
and qualified by TUGC0 QA. Procurement documents were reviewed,
The major procure.ments occurred several years ago; however, present procurement activities associated with items procured offsite for installation were performed by TUGC0 or were contracted to G&H, iWl, or B&R who were evaluated i
!                  approved, and controlled; and receipt inspection of safety-related
and qualified by TUGC0 QA.
;                  items on site was performed in accordance with written procedures and checklists.
Procurement documents were reviewed, approved, and controlled; and receipt inspection of safety-related items on site was performed in accordance with written procedures and checklists.
l The NRC inapector selected two procurement actions for review:
l The NRC inapector selected two procurement actions for review:
i
i P.O. CPF-1233-S issued to. Combustion-Engineering for the procurement of a heated junction thermocouple system.
                    -    P.O. CPF-1233-S issued to. Combustion-Engineering for the
CPF-10469-5 issued to Paul Monroe Hydraulics to refurbish four Rockwell International actuators.
* procurement of a heated junction thermocouple system.
t 0- --
                    -    CPF-10469-5 issued to Paul Monroe Hydraulics to refurbish four
<e..
* Rockwell International actuators.
m n a-m - e e es e- -
t 0- --         <e..             .        m n a-m - e e es e- -     me- n.         ar v e o~e . e     - sw w' --* msp w     - enueen--
me-n.
ar v e o~e. e
- sw w' --* msp w
- enueen--


l> .              -
l l
l
l
                    -                                                                                              ~
~
l                                                                                                          .
. ~
            . ~       .
i A
i A                                   Both the procurement actions were reviewed to determine that technical requirements were commensurate with the scope of the procurement and was authenticated by engineering review in accordance with TUGC0 engineering division Procedure CP-EP-3.0, Section 2.0(d).
Both the procurement actions were reviewed to determine that technical requirements were commensurate with the scope of the procurement and was authenticated by engineering review in accordance with TUGC0 engineering division Procedure CP-EP-3.0, Section 2.0(d).
Both procurement actions reflected the necessary QA review signatures, as required by TUGC0 engineering division                   ..
Both procurement actions reflected the necessary QA review signatures, as required by TUGC0 engineering division
                                                                                                                  ~
~
Procedure CP-EP-5.0, paragraph 3.1.2; QA Procedure DQP-CS-2, paragraph 3.1.8; and instruction QI-QP 5.0.1. All field requisitions initiated to generate a supplement to the aforementioned purchase
Procedure CP-EP-5.0, paragraph 3.1.2; QA Procedure DQP-CS-2, paragraph 3.1.8; and instruction QI-QP 5.0.1.
:                                    orders were reviewed and documented as required by l                                     Procedure CP-EP-5.0. Reporting requirements set forth by 10 CFR Part-21 were included in the purchase order. The NRC inspector reviewed and verified that both purchase orders specified 3                                      that the supplier shall establish provisions for imposing similar QA
All field requisitions initiated to generate a supplement to the aforementioned purchase orders were reviewed and documented as required by l
    ;                                    requirements on applicable subtier vendors.
Procedure CP-EP-5.0.
1 No violations or deviations were identiffed.
Reporting requirements set forth by 10 CFR Part-21 were included in the purchase order. The NRC inspector reviewed and verified that both purchase orders specified that the supplier shall establish provisions for imposing similar QA 3
j
requirements on applicable subtier vendors.
  ) g
1 j
: 4. Unresolved Items Unresolved items are matters about which more information is required in order to determine whether they are acceptable items, items of noncompliance, or deviations. Unresolved items are identified in this -
No violations or deviations were identiffed.
)
4.
Unresolved Items g
Unresolved items are matters about which more information is required in order to determine whether they are acceptable items, items of noncompliance, or deviations. Unresolved items are identified in this -
report in paragraphs 2.a, 2.c.(2) and 3.b.
report in paragraphs 2.a, 2.c.(2) and 3.b.
)                           5. Exit Interview The NRC inspector met with members of the TUGC0 staff (denoted in paragraph 1) at various times during the course of the inspection. The j                               scope and findings of the inspection were discussed.               ,
)
l 1                                             .
5.
Exit Interview The NRC inspector met with members of the TUGC0 staff (denoted in paragraph 1) at various times during the course of the inspection. The j
scope and findings of the inspection were discussed.
l 1
;i i
;i i
*1 L
*1 L
I n
I n
i e
i e
        ~~
l
l c
~~
1,'
c 1,'
          ~
~
Q7
Q7


                                                                                                                                                                                                                                              .(
.(
    .m
?"
                                        ?"           1 *                                         ,                      _,,                                            ,
1
g
* g
                                                                                                                                                                                                                                                )
.m
i U.S.NUCLEAA F.EGUL.ATORY COMMIS loM                             mNoen msesCTeamm. tar. nr r. m,m,an,,w s                                                     '
)
        ,suic ign pommies 8 "c #"
i U.S.NUCLEAA F.EGUL.ATORY COMMIS loM mNoen msesCTeamm. tar. nr r. m,m,an,,w s
* I-Y N * $
,suic pommies Y
* had l ' ' P ,5 INSPECTOR'S REPORT                                                                       REVIEWER Office of Inspection and Enforcement                                         .
N * $
D M- blu a>rds c o 7 7 S*PNlQlh)                                                                                                                             .
* had l ' ' P,5 ign..
h h5           N                                                                               REPORT                   NEXT INSPEC. OAff I M OOA                                          y                          00CEET     eeO. rs eptaio,R   L8CEN5g NO. it. P900uCTH   3 eigens                           go,             3,, g.         ,o.           y,,
8 "c #"
                                                                                        ' "'******                              [ g 4 4' $                                    g4 3
I-INSPECTOR'S REPORT REVIEWER Office of Inspection and Enforcement D M-blu a>rds c o 7 7 S*PNlQlh) h h5 N
^
REPORT NEXT INSPEC. OAff 00CEET eeO. rs eptaio,R L8CEN5g I M OOA y
O$b UTt G i Y S ( $                                                                         O f       Q\
NO. it. P900uCTH 3 eigens go, 3,, g.
u ec.rn . c com ,w y                                             _
,o.
                                                                                        .-                      o x y                c4 , a                                  g ,, ,          ,      ,
y,,
o - oatsTE                                                                                                     C 4 - mePLACE                                                           l                             l 0
^
l NM                        '
O$b UTt G i Y S ( $
NNt*-D.N C~b N-9 E'.'E:                                   T8   5         ' ~ 18 i             PERT 0C 08 ipsb Fb71GAftON/h5PEC* ION                                             WSPECTION PER70AMED Sy                                                   ORGANi2ATCN CCCE OF REGCN/MO CONOUCT.
O f Q\\ [ g 4 4' $
ING ACTNITY (See ifMC 05J0 '
g 4 3 o x y c4, a g,,
;I                  smou                        To              , - nGGIONAL OFFICE STAFF                                                                                ,,, ,% u,,,,,,,am Meroower                         Assort-q ,eaa,;
u ec.rn. c com,w y o - oatsTE C
                                                                                                                ]C*MER q                    ox,     m                 oA,     ...
4 - mePLACE l
x :-..          NT       CTo.                                                                                 m.oM                 avscN                   e *Nc-1       o ei2Jo el4 o19 2!o                           814       3 - 'a'oa=ca ^P'a*'s^' Ti^=                                                                                   4                        7L                      3 d       ar y. w.e,;m a asacy-rs3-ize                         sugCpMy*,"g* Da,$1pgiqFynh'fpidg!NG S.na o -                                                               , ' . 3: ;         l           se           i     . as
l l
]                             neo,oNg ACTION
0 NM
                              'C***"***"*"*'
' NNt*-D.N C~b N-9 E'.'E: T8 5
k     at - sAprTY Ty pe ce ACruiry CONDUCTED ICha e .a Dos crew os - uGuf.v, sit                     ,o - P'. ANT sec.                             ,4 - wouiav q                                                                                                             _                                    _                                            _
' ~ 18 i
1 - NaC ponw eet                                       as - woooeNT                                     o7 - sPECAL                         ,1 - INVENT.Vte.                               ,5 - INVESTIGATION 1
PERT 0C 08 ipsb Fb71GAftON/h5PEC* ION WSPECTION PER70AMED Sy ORGANi2ATCN CCCE OF REGCN/MO CONOUCT.
2 - RGGa00aAL OPPICE LETTIA                           06 - EfePOAC4 MENT                               08-vsNDOA                           12 - $>HPMENT/ EXPORT a                                                                   5 - MGMT. AutXT                                 5 - MAT. ACCT.                       ,3-4MPORT
]C*MER
        ' mca%6 ~:pme wtitsigs                                 W:;:,k,tyg.ni;I;pg.TTg@.Wp:dyAni.- ,y;.ppyssyvs -                                                                -
,,,,% u,,,,,,,am Meroower Assort-ING ACTNITY (See ifMC 05J0 '
                    *** 7@a*ItN,@/*GmW                                   TOrALevuggp                 gNpo. CEMENT CONPERENCE                 PEPoRT COtTAiN 2.30 arcaMAT;ON MTTtm OF m,PO4T TR ANSMITTAL DATE crvouficNs ANo                           neto 4
;I smou To
Al8 Cl   D                                                 D VIAfiONS                                                                                             NRC FCR** 391                   REPORT SENT J.                         i-CuAn                                                                                                                                                     on aEG.                       To na sen j M                           - vouTioN uTmissuEo                              ACTcN 5
, - nGGIONAL OFFICE STAFF q,eaa,;
3 - DEVIATION                            A       B       C      o      A' S    Cl0                          A  B  C   0                         wo     $4.7       &           MO.       DAY       vR.
ox, m
  )
oA,
                            * - viouTom a oeviA'cN                g , '3 o,3                  ,              I i - Yt$                             , - vgg
... x NT CTo.
                                                                                                                                                                                %G *f y                           l         l       l wmmwwww=:mawmumwwaena m e
m.oM avscN e *Nc-q 4
                                                                                                                                                                                                              -              + -
7L 3
3 j                                                   ooma , .o. AfsoN                                                                                         ooxa ,N,0.mT:os 2        =          _m _                .. .                                        _ m.m. _ ,                   m               m _ . ....
1 o ei2Jo el4 o19 2!o 814 3 - 'a'oa=ca ^P'a*'s^' Ti^=
d ar y. w.e,;m a asacy-rs3-ize sugCpMy*,"g* Da,$1pgiqFynh'fpidg!NG S.na o -
, '. 3: ;
l se i
. as
]
Ty pe ce ACruiry CONDUCTED ICha e.a Dos crew neo,oNg ACTION
'C***"***"*"*'
k at - sAprTY os - uGuf.v, sit
,o - P'. ANT sec.
,4 - wouiav q
1 1 - NaC ponw eet as - woooeNT o7 - sPECAL
,1 - INVENT.Vte.
,5 - INVESTIGATION 2 - RGGa00aAL OPPICE LETTIA 06 - EfePOAC4 MENT 08-vsNDOA 12 - $>HPMENT/ EXPORT a
5 - MGMT. AutXT 5 - MAT. ACCT.
,3-4MPORT
' mca%6 ~:pme wtitsigs W:;:,k,tyg.ni;I;pg.TTg@.Wp:dyAni.-,y;.ppyssyvs -
*** 7@a*ItN,@/*GmW TOrALevuggp gNpo. CEMENT CONPERENCE PEPoRT COtTAiN 2.30 MTTtm OF m,PO4T TR ANSMITTAL DATE crvouficNs ANo neto arcaMAT;ON Al8 Cl D D VIAfiONS NRC FCR** 391 REPORT SENT 4
J.
i-CuAn on aEG.
To na sen j M uTmissuEo ACTcN
- vouTioN 5
A B
C 0
wo
$4.7 &
MO.
DAY vR.
3 - DEVIATION A
B C
o A'
S Cl0 e
I i - Yt$
, - vgg
%G *f y l
l l
* - viouTom a oeviA'cN g, '3 o,3
)
3 wmmwwww=:mawmumwwaena m
+ -
j ooma,.o.
AfsoN ooxa,N,0.mT:os
_ m.m. _,
m m _.....
y#,
y#,
                                                                                                                                                                                                          -e ..m ,_.
2 =
            .          vs 1                  ,
_m _
                                                      $,d,5e 3   iS       .    .,      as
-e..m,_.
                                                                                                    ~
$,d,5 1555 3S E
1              -            -s
3 iS
                                                                                                                                            ~
~
1                        -l 3S 1555          2:         .      .                s E
~
8 1   1 1 1!              il          ! i l l!!Il -i =l il                    l   li il               !!! !             Il li iillii!i                                   ill               i !!       !             !!          !
-l 2:
        .i13iol7,oi31 G iii o                                                                   IiiI                             iIiiI^                                                                                 IiiI
-s 1
(                                                '
as 1
                                                          ,1, o
vs 1
                                                                      ,i i
e s
                                                                                            ,    I,il
8
                                                                                                                  . r
- =l li l li il
                                                                                                                                                          =
! ! ! ! Il li iillii!i ill i 1 1 1 1! il
ii ii i i i ,
! i l l!!Il i
(.i13iol7,oi31 G iii o IiiI iIiiI^
IiiI ii i i i
,i i
r
,1, o I,il I,il
=
ii i,
liil Ii,I c
c ii i i i
i liil ii i
Ii,I H
o
=
i
i
                                                                                                                                                                                                                  ,      I,il c        ,,          , ,                  i    liil                                                    c ii            i i                        i      Ii,I H
. 1 3,sloi2iol e r ii. o /ioi o l,iI
                                                =
,I,,I*
                                                          ,,          , ,                  i    liil                                                    o ii            , ,                        i      Ii,I
Ii,I ii
        .    . 1 3,sloi2iol                   e     r ii. o /ioi o                     ,    l,iI             .  ,            ,I,,I*                             ii             , i                         i     Ii,I
, i i
?
?
                                                -        a.,o t,o, o                     ,    1,,1                                                    -            ,,            , ,                        ,      i,,i c        i,        , ,                  ,    1,,I                                                     c
1,,1 i,,i a.,o t,o, o i,,i 1,,I c
                                                                                                                                                                      ..            , ,                          ,      i,,i j
c j
a        ,_,.        , ,                  ,    1,,1                                                     o            ,,            , ,                          ,      I.,1 i   2   3sloiGiol @ 4 6io                         / ,0, 0                   i    IiiI               i            iliiI^                             ii             i i                         i     Ii,I rioi o      /,dio                    i   liiI                                                     '
i, 1,,1 I.,1 o
ii             i i                         i Iiii c
a l
                                                          ,i         , ,                  i    li,I                                   '
i 2 3sloiGiol @ 4 6io /,0, 0 IiiI iliiI^
c           ,,            , ,                          i     ii,I
ii i i i Ii,I i
                                                          ,,        , ,                  i   liil                                                     =            ,,             , i                         ,      I,,I s             i23i.5foiGiol G                         /,,ri o     /,oi o                 i   !,,I            . i           iIiiI^                              ii             i ,         l                i Ii,i
i liiI ii i i i Iiii rioi o /,dio i
li,I ii,I c
c i
,i i
liil I,,I
=
, i i
!,,I iIiiI^
l s
i23i.5foiGiol G
/,,ri o
/,oi o i
i ii i,
i Ii,i l
Ii,l
[
[
6'd io /,oi O                       ,    liiI                                                      *          ,i             i ,         l               ,      Ii,l c
liiI 6'd o
ii        , ,                  ,    Ii,I                                                     c i       . ,        l                .      Ii            I O cACLE SEQUENCE IF VIOLATON OR DfWTCN                 O g l       l [                   [       [ [
/,oi O
0 9 ,           y ,                         ,      l,f l u         , w. a mw..;;. 4,3,,5,                                 w.             .  ,,
,i i,
wwc                     4ny,xe ow,,                                     ,, , ,,        ,, . ,, ;,,            ,,  ,,                          s
i l
Ii I
Ii,I c
c i
ii O cACLE SEQUENCE IF 0
l,f l O
VIOLATON OR DfWTCN g l l [
[
[ [
9,
y,
u
, w. a mw..;;.
4,3,,5, w.
,, wwc 4ny,xe ow,,
s


ll                                                                                                                                           neacar           ucoutamuused                   r -,ygg 888 * *
ll neacar ucoutamuused r -,ygg 2.151 6 016:0i ?WD9f?
888 * *
* ooemerno.<ee sionucenas
* ooemerno.<ee sionucenas
                                                                                          ''* * *" 'uCD " 8 *'*"'                           wo.         sea. 2.151 6 016:0i            ?WD9f?
''* * *" 'uCD " 8 *'*"'
EEmi' -                                                                                                                       9@$          r. a  vouma sonin oneyyca               ,,sy,,
wo.
INSPECTOR'S REPORT                             o 5 o       e' ol4' 4-51                     '
sea.
n (8          '                                              S 4e o 5 o o o 4 4 ci                                         'l   I               ,  , 's   a   ,    o (Continuation)
EEmi' -
Office of Inspection and Enforcement c
vouma sonin oneyyca,,sy,,
o g        j      {      g  a c' g                                                                                                                                                                              =
9 @ $
,, a                                                                                             _^ mas.., _ . . 4 ww es necessary so g,     ,,c w. cima unos so so,;     :ers esca.3 VIOLATcm on DotAT10ps Weest we so 2400 enerossere Apr asen mesi. af one sort .
r.
:        1.
a INSPECTOR'S REPORT o 5 o e' ol4' 4-51 (Continuation) o 5 o o o 4 4 ci (8 'l I
Y$slli ,YO W W                         \     A                 Yf         f t Oh                   d L                  Ob      $ f fa reo ,'eu)
' s a
Io eF e ' Pa ed s a % k aco\,*ea 4 9,t , le > %
o S 4e n
:      L
{
    !
g a c' g
* de S 4 a f e1 e h4 I J , .., . ) , . o8 d                                                                     OA t
Office of Inspection and Enforcement g
                                                                                                                                                          < o < r a. m .
c j
3            ,                                                          -6                     >
o
n   t 7.
=
,, a
_^ mas.., _.. 4 ww es necessary so g,
,,c w. cima unos so so,;
:ers esca.3 VIOLATcm on DotAT10ps Weest we so 2400 enerossere Apr asen mesi. af one sort.
1.
L Ob
$ f fa Y$slli,YO W W
\\
A Yf f t Oh d
Io eF e ' Pa ed s a
%k aco\\,*ea 4 9,t, le >
reo,'eu)
L de S 4 a f e1 e h4 I J,..,. ),.
o8 d
OA t < o < r a. m.
- 6 3
n t
7.
L
L
.e           s.
.e s.
'?
'?
-}           tt
-}
    '        11, 4
tt 11, 4
tt.
tt.
-}           Y Ik is l
-}
              ,7.                                                                                                                                                                                            .
Y Ik l
4i ft 11 BL     1 21.
is 4
    <        22.
,7.
i ft 11 BL 1
21.
22.
3 l'
3 l'
is 3
is 3
N L                     .
N L
3               77 1
3 77 1
2E
2E m.
'.j             m.                                                                                                    -
'.j 27.
27.
?
                                                                                                                    -          ?
?
                                                                                                                                ?
2
2
  )
)
3.
3.
,-                        s                                                                                               -      - -          __ - ae se seasset. e s e e gsg g gg A 93 ggq,p , ,q q y gq q
s
__ - ae se seasset. e s e e gsg g gg A 93 ggq,p,,q q y gq q


                                                                                                                    .                                                                                                            t
t P
* P f.EPORT           MODULE NUWeEA                                             y; NRC70mM7M A                                                                     OOCKET NO. 48 eigitsi Cm uCENSE y'y .                                                                              No. teY PROQVCT)(13 eigits)                     NO.           SEO. 113ISlot%101                                   N"''SD9 INSPECTOR'S REPORT                                     o S o o d+4l f                       I               84       3 2         ^         *" 5 " ' a'"                                  .,$ eO O 6 0 C dt4 (                       I               B#         I 1       e   ," *,            , ,
y; f.EPORT MODULE NUWeEA N"''SD9 NRC70mM7M A OOCKET NO. 48 eigitsi Cm uCENSE No. teY PROQVCT)(13 eigits)
                                                                                                                                                                                    ," **T **                    3 .c (Continuation)                                                                                                                              3 Office of Inspection and Enforcement C
NO.
o
SEO. 113ISlot%101 y'y.
                                                                                                                                                                          )(     ,
3
p   .I 8 o i
," **T **
veOLATsON On OEviAT10N sinter no ra 2400 cneracters for secn stern. st une test onceece taas nuonber. or een De necessary to caraonrese. Lonset unes to 30 characters eacn.}
.,$ eO
I Ce nb.v u 40 % v o m; ., e m m+3                                                                             of Cyrteries x v.i n                                       af i    t        to C F ft 9ad 50_-Hb. a ull< ul                                                                           -Cn7Ie4 +o e 3 4 a. b l$ s k b    c        2= A ',w a\en e d a r e ,,A 'a r e k w .s n a r                                                                           s u sk en eS J
*" 5 " ' a'"
4         s        of m a r a ' And aer;a,Ue_ M u if < ,                                                   ''        -
INSPECTOR'S REPORT o S o o d+4l f I
-f       a 1                                               I                       .
84 3 2
^
(Continuation)
O 6 0 C dt4 (
I B #
I 1
e 3.c Office of Inspection and Enforcement
)(
p C
.I o
8 i
o veOLATsON On OEviAT10N sinter no ra 2400 cneracters for secn stern. st une test onceece taas nuonber. or een De necessary to caraonrese. Lonset unes to 30 characters eacn.}
I Ce nb.v u 40 % v o m;., e m m+3 of Cyrteries x v.i n af e 3 4 a. b l$ s k to C F ft 9ad 50_-Hb. a ull< ul
-Cn7Ie4
+o i
t b
2= A
',w a\\en e d a e,,A 'a r e k w.s n a r s u sk en eS c
r J
4 of m a r a ' And aer;a,Ue_
M u if <,
s
- f 1
I a
a G
a G
l !
l a
a
it 11.
    ,    it
: 11.                                   >
it
it
'I 14.
'I 14.
tt 11
tt 11
'l       17.
'l 17.
I j     it 19.
I j
it 19.
20.
20.
21.
21.
b
b n
!!        n
-4 24.
-4         24.
I
I
]         n
]
'f M-
n
:          n j         m i       n M
'f M-n j
m i
n M
31.
31.
: 32.                                                                                                               I
32.
        . ,. I nI 6                                 .
I
at                         .                . - . _ .
.,. I nI 6
                                                                                                                                                                                                                            $1 U.S. NUCLEAR REGULATORY COMMISSION
at
                                                                                                                                                    -r                 __._ _      _ - _ _ _ _ - _ _ - - .                  -_
$1 U.S. NUCLEAR REGULATORY COMMISSION
-r


                                                                                                                  --a._                                                     _ _ _ _ _ _                                I e           e aapont            wooutsmuussa                    -e        7 goam**                                                                                occxer,,o.....,o m "0 t* N "3"                                       mo.         sao. 113lft ol(,ID I                 k         kh"pg@
--a._
8141 3          7     *     '' cur *" 5'""'" oa ce'!p'o* e,53 o
I e
. a=coes IN           ,, 8PECTOR'S REPORT                                  d 4 d' d o 4 4 5
e "0 t* N "3" mo.
(-                                                      y .c d < o o d 4 4 (,                                       #4                     a i             ,  ,  3  .            , ,
sao. 113lft ol(,ID I k
(Continuation)
kh"pg aapont wooutsmuussa
Offico of Inspection and Enforcement c
-e 7
o K- ,
occxer,,o.....,o m goam**
{ Jeo[         ,
. a=coes,, 8PECTOR'S REPORT
'' cur *" 5'""'" oa ce'!p'o* e,53 o IN d 4 d' d o 4 4 5 8141 3 7 3
y.c (Continuation) d < o o d 4 4 (,
#4 i (-
a Offico of Inspection and Enforcement K-
{ Jeo[
c o
victArion ose ceviAficM (fAfor us so J430 cheresacre Mr ear # sfeat. # Irte forf escasse inse nuns 0er. A use to seesseery to -
turret skies to 30 cris,a; seen.)
turret skies to 30 cris,a; seen.)
victArion ose ceviAficM (fAfor us so J430 cheresacre Mr ear # sfeat. # Irte forf escasse inse nuns 0er. A use to seesseery to -
o[
1            b Abuu bb                                         c # 4 u 's e w h                         s         o[ b e de vi rta Y C              '
b e de vi rta Y C
in                 to er a ' pad so                                           %G a c ol:eu 4 Sa: Isa 4.e y VenA II Co e n i i a mer ,n s pe,b e l'                Ct t/ 4 *' f u one                    o 8 5'                                                                                                        ' 4 d''                 es        v ! ~ ,1 . ;o d                   hu Tusto un                                     e,L L ,_ %c04-vt-l'1s R n.at d ?                     L     h d-                         >
b Abuu bb c # 4 u 's e w h s
s,       le w4
1 in to er a ' pad so
' ' r.
%G a c ol:eu 4 Sa: Isa 4.e l'
i g, 9.
Ct t/ 4 *' f u one o 8 5' y VenA II Co e n i i a mer
e n    1C.
,n s pe,b e e,L L,_ %c04-vt-4 d''
v ! ~,1. ;o d hu Tusto un es l'1 R n.at d ?
L h d-s, le w4 s' ' r.
i g,
9.
e 1C.
n
{} ii.
{} ii.
1,1 l ti i it j a
1,1 l ti i it j u
u
a
.i it. l 18.
.i it. l 18.
!! rr.                                                                                                 -
!! rr.
1 ..
1..
M.
M.
11.
11.
Line 867: Line 1,283:
I Pf 3
I Pf 3
N 10.
N 10.
  ],
]
f       31                                                                                                                   T nl
f 31 T
          ,I ni 6i
nl
          =                                                                                                                                                                                                         ,,
,I ni 6i
=
U.S. NUCLEAR REGULATORY COMMISSION
U.S. NUCLEAR REGULATORY COMMISSION


1)
(
(      f YE Y                         Q                   Q                               UIiO Y   l
f 1)
                                                                                                                =
YE Y Q
Q UIiO Y
=
TEXAS UTILITIES GENERATING COMPANY
TEXAS UTILITIES GENERATING COMPANY
                                - v w., v. .w x . .... .s. . .r . . i v e -1 x rr. ... . . o i. . 1c.s - , u.. .
- v w., v..w x......s...r
9     . f.! "S'".'O!.*. ,
.. i v e -1 x rr...... o i.. 1c.s -, u...
February 28, 1985 f                                                                                                   TXX-4429 4
9 f.! "S'".'O!.*.
1 j         Dorwin R. Hunter, Chief j         Reactor Project Branch 2
February 28, 1985 f
  ;        U.S. Nuclear Regulatory Commission i         Office of Inspection & Enforcement 1         611 Ryan Plaza Drive. Suite 1000                                                       Docket Nos.:   50-445 i       Arlington, TX 76011                                                                                     50-446 a
TXX-4429 4
1 j
Dorwin R. Hunter, Chief j
Reactor Project Branch 2 U.S. Nuclear Regulatory Commission i
Office of Inspection & Enforcement 1
611 Ryan Plaza Drive. Suite 1000 Docket Nos.:
50-445 i
Arlington, TX 76011 50-446 a
COMANCHE PEAK STEAM ELECTRIC STATION RESPONSE TO NRC NOTICES OF VIOLATION INSPECTION REPORT 84-26
COMANCHE PEAK STEAM ELECTRIC STATION RESPONSE TO NRC NOTICES OF VIOLATION INSPECTION REPORT 84-26
.i                                                       FILE N0.: 10130 l
.i FILE N0.:
10130 l


==Dear Mr. Hunter:==
==Dear Mr. Hunter:==
 
We have reviewed your {{letter dated|date=January 18, 1985|text=letter dated January 18, 1985}} on the special inspection of the Safeguards and Auxiliary Building conducted by C.R. Oberg, M.E. Skow, and i
We have reviewed your {{letter dated|date=January 18, 1985|text=letter dated January 18, 1985}} on the special inspection of i
W.R. Bennett of activities authorized by NRC Construction Permit CPPR-125 for Comanche Pea < Unit 1.
the Safeguards and Auxiliary Building conducted by C.R. Oberg, M.E. Skow, and W.R. Bennett of activities authorized by NRC Construction Permit CPPR-125 for Comanche Pea < Unit 1.
j In a conversation between David Chapman and Doyle Hunnicutt, an extension of the response time was granted to March 1, 1985.
j         In a conversation between David Chapman and Doyle Hunnicutt, an extension of the response time was granted to March 1, 1985.
We are providing a partial response to the findings listed in Appendix A of that letter. To aid in the understanding of our response, we have repeated the Notices of Violation followed by a summary of our corrective actions.
We are providing a partial response to the findings listed in Appendix A of that letter. To aid in the understanding of our response, we have repeated the Notices of Violation followed by a summary of our corrective actions. The specific corrective action for each item identified is available at CPSES for
The specific corrective action for each item identified is available at CPSES for
.I         your Inspector's review. -The ac a , < m                      '
.I your Inspector's review. -The ac a, <
i                                                                                  s of thcsc item; are-beine "vab;ted h t:.c Nam-estetr+-rsned-td:deve
s of thcsc item; are-beine m
                @=pJiin:       S= 7 W - -- 4 ~"
i
rife'c}InVciFWevii#riE(TRTh
@=pJiin:
                                                                                  ' ~       ''            ' " ~~
S= 7 W - -- 4 ~"
rife'c}InVciFWevii#riE(TRTh "vab;ted h t:.c Nam-estetr+-rsned-td:deve
' ~
' " ~~
If you have any questions, please advise.
If you have any questions, please advise.
i Very truly yours, t
i Very truly yours, am/A t
am/A Billy R. Clements 4
Billy R. Clements 4
p.
:1'L F01A-85-5E p.
:1'L                                                                                   F01A-85-5E             /
/
l               ,      ,  aa222h     , A 368VD.%i.9N .br TEXA5 CTRLSTREM ELECTRIC COMP 4N Y V f at b
l V f at aa222h
, A 368VD.%i.9N.br TEXA5 CTRLSTREM ELECTRIC COMP 4N Y b


                                                                                                    -          ^ '
c :.. y
c :. . y         ...
^ '
: i.                 cc:.NRC Region IV (0 + 1 copy)
i.
cc:.NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
Director, Inspection & Enforcement (15 copies)
U.S. Nuclear Regulatory Comission i:
U.S. Nuclear Regulatory Comission i:
Washington, DC 20555 n
Washington, DC 20555 n
Mr. V.S. Noonan 1                                                                                 _
Mr. V.S. Noonan 1
i
i
  }           .                                                                                .
}
j'                                                                                     .
j' p
p                                                                                                 .
L a
L a
}
}
}
}
lJ t                                           .
lJ t
I h
I hj n
                                                              .          .                          j n
l, I
l, .
1-L;.
I 1-L; .
t
t
                                                                                              ~
~
I'       .
I' L:
L:
v
v
          .r e
.r e
t
t
_.b   h s. s   .                        .* _. m A   m ..n_. a   ..    -
_.b h s.
s m
A m
..n_.
a


[ ..
[..
l APPENDIX A                                     .
l APPENDIX A NOTICE OF VIOLATION Texas Utilities Electric Company Docket:
NOTICE OF VIOLATION Texas Utilities Electric Company                   Docket: 50-445/84-26 Comanche Peak Steam Electric Station               Construction Permit: CPPR-126 Based on the results of an NRC inspection conducted during the period of July 4                    16 through September 28, 1984, and in accordance with the NRC Enforcement j                    Policy (10 CFR Part 2, Appendix C), 49 FR 8583, dated March 8, 1984, the following violations were identified:
50-445/84-26 Comanche Peak Steam Electric Station Construction Permit: CPPR-126 Based on the results of an NRC inspection conducted during the period of July 16 through September 28, 1984, and in accordance with the NRC Enforcement 4j Policy (10 CFR Part 2, Appendix C), 49 FR 8583, dated March 8, 1984, the following violations were identified:
A.     Failure to Provide QC Inspection Criteria" and Minimum Separation 1
A.
j                            10 CFR Part 50, Appendix B, Criterion V states, in part, ". . .
Failure to Provide QC Inspection Criteria" and Minimum Separation 1j 10 CFR Part 50, Appendix B, Criterion V states, in part, "...
j                           Instructions, procedures, or drawings shall incl.ude appropriate quantitative or qualitative acceptance criteria for determining that i                          important activities have been satisfactorily accomplished."
j Instructions, procedures, or drawings shall incl.ude appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished."
1                             IEEE-384 provides separation criteria of Class IE equipment and circuits.
i 1
;                            The Comanche Peak Steam Electric Station Electrical Erection Specification j                             2323-ES-100 provides for the implementation of the criteria of IEEE-384 j                             (1974).
IEEE-384 provides separation criteria of Class IE equipment and circuits.
1                             Section 4.4.6 of 2323-ES-100 states in part, "In no case shall any part
The Comanche Peak Steam Electric Station Electrical Erection Specification j
..                          of the conduit or the conduit support system come in direct contact with
2323-ES-100 provides for the implementation of the criteria of IEEE-384 j
  !                          uninsulated equipment in the piping system or with pipe restraints or anchors."
(1974).
j                         QI-QP-11.3-29.1, Revision 16, paragraph 3.1.7, states in part, "In no j                           case shall any part of the raceway or raceway support system come in direct contact with uninsulated equipment in the piping system or with pipe restraints or anchors unless otherwise approved by the owner."
1 Section 4.4.6 of 2323-ES-100 states in part, "In no case shall any part of the conduit or the conduit support system come in direct contact with uninsulated equipment in the piping system or with pipe restraints or anchors."
.                          QI-QP-11.1-28, Revision 25, paragraph 3.3.4.2, states in part, "There
j QI-QP-11.3-29.1, Revision 16, paragraph 3.1.7, states in part, "In no j
}                             shall be an air gap (i.e., no contact) between electrical conduit / conduit supports and piping component supports."
case shall any part of the raceway or raceway support system come in direct contact with uninsulated equipment in the piping system or with pipe restraints or anchors unless otherwise approved by the owner."
Section 4.11.3.2 of 2323-ES-l.00 sp'ecifies separation between conduits of e                            different trains which, for 'het ex*amples listed, is a minimum of one
QI-QP-11.1-28, Revision 25, paragraph 3.3.4.2, states in part, "There
: 3.                           inch.
}
a j                           QI-QP-11.3-23, Section 3.9, specifies conduit separation per drawing 2323EI-1702-02, including several detailed sketches.
shall be an air gap (i.e., no contact) between electrical conduit / conduit supports and piping component supports."
Contrary to the above, a                           1. Specifications and QC inspection procedures do not contain specific f                                   acceptance criteria for separation of redundant trains of flexible conduits.
Section 4.11.3.2 of 2323-ES-l.00 sp'ecifies separation between conduits of different trains which, for 'he ex*amples listed, is a minimum of one e
<                            2. The separation requirements between conduits as contained in the erection specifications ES-100 and implementing procedures had not been met.
t 3.
D
inch.
_          4
a j
QI-QP-11.3-23, Section 3.9, specifies conduit separation per drawing 2323EI-1702-02, including several detailed sketches.
Contrary to the above, a
1.
Specifications and QC inspection procedures do not contain specific f
acceptance criteria for separation of redundant trains of flexible conduits.
2.
The separation requirements between conduits as contained in the erection specifications ES-100 and implementing procedures had not been met.
D 4


c.
c.
  ?,   .
?,
* l'     .,.-
l' I
I j               The following conditions were identified:
j The following conditions were identified:
l               1. Flexible condaits in the Safeguards and Auxiliary Buildings do not         -
l 1.
maintain the required one inch minimum separation between trains.
Flexible condaits in the Safeguards and Auxiliary Buildings do not maintain the required one inch minimum separation between trains.
"                      For example, flexible conduit C13G20208 contacts C13011132, and the 1" airspace is not maintained between C13007415 and C13G07413.
For example, flexible conduit C13G20208 contacts C13011132, and the 1" airspace is not maintained between C13007415 and C13G07413.
i
i 2.
: 2. Flexible conduits in the Safeguards and Auxiliary Buildings come in
Flexible conduits in the Safeguards and Auxiliary Buildings come in
[                     direct contact with uninsulated equipment.in the piping system or ff                     with pipe restraints or anchors. Examples include:
[
I I
direct contact with uninsulated equipment.in the piping system or ff with pipe restraints or anchors. Examples include:
        .                    Flexible Conduit Number             Item Description h                   .      C13G07743             Flex rests on pipe bracket next to valve 1-HV-5365.
I Flexible Conduit I
                      .      C13G07744             Flex rests on pipe next to valve 1-HV-5365.
Number Item Description h
                      .      C14021161             Flex rests on pipe support for 1-MS-030 and 1-MS-268.
C13G07743 Flex rests on pipe bracket next to valve 1-HV-5365.
                      .      C13G12499             Flex rests on support for J515 455G.
C13G07744 Flex rests on pipe next to valve 1-HV-5365.
                      .      C13G03781             Flex touches corner of support for valve 1-HV-4179.
C14021161 Flex rests on pipe support for 1-MS-030 and 1-MS-268.
  !                  .      C12005387             Flex touches pipe at elbow passing near i                                                 valve 1-HV-8106.
C13G12499 Flex rests on support for J515 455G.
                      .      C13015915             Flex resting on top of actuator for
C13G03781 Flex touches corner of support for valve 1-HV-4179.
}                                                   valve 1-HV-21SS.
C12005387 Flex touches pipe at elbow passing near i
1
valve 1-HV-8106.
  !                  .      C13G21323             Flex touching flange of support next to 0                                                   valve 1-FV-2196.
C13015915 Flex resting on top of actuator for
I
}
;                    .      C13G06734             Flex rests against unistrut below valve i                                                   1-FV-4537.
valve 1-HV-21SS.
                      .      C12G04690           .' Flex conduit rests on fire pipe.
1 C13G21323 Flex touching flange of support next to 0
                      .      C13G06834             Flex wraps around adjacent support.
valve 1-FV-2196.
                      .      C14G20503             Flex rests on valve body.
I C13G06734 Flex rests against unistrut below valve i
C12002856             Flex contacts 1-HV-2480.
1-FV-4537.
C12G04690
.' Flex conduit rests on fire pipe.
C13G06834 Flex wraps around adjacent support.
C14G20503 Flex rests on valve body.
C12002856 Flex contacts 1-HV-2480.
t l!
t l!
This is a Severity Level IV Violation (Supplement 11.0) (445/8426-01) 0 f
This is a Severity Level IV Violation (Supplement 11.0) (445/8426-01) 0 f
  *l c                                               .
*l c
6.,c .
6.,c.


                                                                                                -        .. _I y
_I y
f  r
fr Corrective Action Summary I
        ,          Corrective Action Summary                                                                 -
p DCA 20,721, Revision 1, dated September 18, 1984 has been issued against drawing U
I p                 DCA 20,721, Revision 1, dated September 18, 1984 has been issued against drawing U
El-1702-02. This DCA contains an approved method for maintaining minimum separation i
El-1702-02. This DCA contains an approved method for maintaining minimum separation i                 distance between flex conduits of different trains / channels. This action was completed prior to the walkdowns described below.
distance between flex conduits of different trains / channels. This action was completed prior to the walkdowns described below.
Generic NCR's for the items identified by the NRC have been issued and dispositioned.
Generic NCR's for the items identified by the NRC have been issued and dispositioned.
One NCR was issued for each of the following buildings: Safeguards, Reactor
One NCR was issued for each of the following buildings: Safeguards, Reactor Containment, Service Water Intake, Control, Auxiliary and Fuel. The disposition included a walkdown by Engineering, QC and craft personnel to identify any specific Cases where flexible conduits could inadvertantly be moved and cause the minimum separation criteria to be less than allowable. QC will document these instances on an electrical Separation Deficiency Report in accordance with QI-QP-11.3-29.
* Containment, Service Water Intake, Control, Auxiliary and Fuel. The disposition included a walkdown by Engineering, QC and craft personnel to identify any specific
s
                . Cases where flexible conduits could inadvertantly be moved and cause the minimum separation criteria to be less than allowable. QC will document these instances s
{
on an electrical Separation Deficiency Report in accordance with QI-QP-11.3-29.
Engineering will provide a disposition for each deficiency report. Upon completion y
{             Engineering will provide a disposition for each deficiency report. Upon completion y
of the walkdown, the dispositioned Separation Deficiency Reports for each building l
l of the walkdown, the dispositioned Separation Deficiency Reports for each building I
will be attached to the appropriate building NCR.
will be attached to the appropriate building NCR.             -
Il B. Failure to Properly Inspect i
l                B. Failure to Properly Inspect i                           10 CFR Part 50, Appendix B, Criterion X requires that the inspection program of activities affecting quality shall be establi'shed and conoucted in a manner to verify conformance with the documented instructions, procedures, and drawings.
10 CFR Part 50, Appendix B, Criterion X requires that the inspection program of activities affecting quality shall be establi'shed and conoucted in a manner to verify conformance with the documented instructions, procedures, and drawings.
N                             Procedure QI-QP-11.10-2, Revision 28, " Cable Tray Hanger Inspection,"
N Procedure QI-QP-11.10-2, Revision 28, " Cable Tray Hanger Inspection,"
i                         specifies the inspection attributes for inspection assembly, configu-ration, location, welding, etc., for conformance with design drawings and documents.
i specifies the inspection attributes for inspection assembly, configu-ration, location, welding, etc., for conformance with design drawings and documents.
h*                            Procedure QI-QAP-11.1-28, Revision 25, " Fabrication and Installation Inspection of Safety Class Component Supports," specifies the inspection
h Procedure QI-QAP-11.1-28, Revision 25, " Fabrication and Installation Inspection of Safety Class Component Supports," specifies the inspection
/                             attributes for inspecting fabrication, installation, material, dimensional k                           control, welding, etc., for conformance with design drawings and documents.
/
                            , Contrary to the above:
attributes for inspecting fabrication, installation, material, dimensional k
l jl.       The NRC inspector identified one cable tray hanger, CTH 639, that e        was missing the diagonhl brice called for on drawings 2323-El-0601-01-S and 2323-5-901.
control, welding, etc., for conformance with design drawings and documents.
: 2.   'The NRC inspector identified one cable tray hanger, CTH 12416, that had the horizontal legs aligned north-south vice east-west as specified on drawing 2323-El-0601-01S and FSE-00159 sheet 12416.
, Contrary to the above:
: 3. The NRC inspector identified one pipe support that was missing two welds as specified on drawing CT-1-014-015-542K.
ljl.
;j                                                                             e e
The NRC inspector identified one cable tray hanger, CTH 639, that was missing the diagonhl brice called for on drawings 2323-El-0601-e 01-S and 2323-5-901.
g-   p               . W   NN*"***M"
2.
'The NRC inspector identified one cable tray hanger, CTH 12416, that had the horizontal legs aligned north-south vice east-west as specified on drawing 2323-El-0601-01S and FSE-00159 sheet 12416.
3.
The NRC inspector identified one pipe support that was missing two welds as specified on drawing CT-1-014-015-542K.
;j e
e g-p
. W NN*"***M"


6   :
6 The following is a compilation of additional deficiencies by general
g                          The following is a compilation of additional deficiencies by general                   ~-
~-
1   .                    category and the drawing or ccmponent where it was found.
g 1
Category         Comoonent or Drawing             Number of Items l
category and the drawing or ccmponent where it was found.
Welding         MS-1-026-010-575K                     1 AF-1-026-005-533R                     1 Inst. Rack CP1-EIPRLI-31             2 h                                 Dimensions
Category Comoonent or Drawing Number of Items l
'                                                  AF-1-026-003-533R                     1 MS-1-026-010-575K '                   1 j                                               MS-1-025-009-R75K                     1 CC-1-043-013-A43K                     1 1
Welding MS-1-026-010-575K 1
8 CC-1-234-700-C53R                     1 CC-1-238-004-C53R                     1 l                                               CC-1-236-700-C53R                     1 i                                               C3-1-AB-20SA-001                     2
AF-1-026-005-533R 1
    !                                              CS-1-564-706-A33R                     1
Inst. Rack CP1-EIPRLI-31 2
    }                                               AF-1-035-037-Y33R                     1 j                                                 AF-1-035-034-Y33R                     1 3                                                 MS-1-028-047-543K                     1 CC-1-011-034-A63K                     1
h Dimensions AF-1-026-003-533R 1
  ?}
MS-1-026-010-575K '
j                               General         AF-1-103-036-553K                     1 i                             Workmanship     Inst. Rack cpl-EIPRLI-31             1 1
1 j
1-FT-2453                             1 Cl4010056-2                           1 l-
MS-1-025-009-R75K 1
  .i                             TOTAL ITEMS                                           22 3
CC-1-043-013-A43K 1
The above are examoles identified by the NRC inspectors where items were installed by the craft to conditions other than those specified I
1 CC-1-234-700-C53R 1
by the identified design documents, QC inspections had been ccmpleted, and the QC inspectors failed to identify these conditions. The
8 CC-1-238-004-C53R 1
  )                         inspection report details these findings.
l CC-1-236-700-C53R 1
.j                                                                                               <
i C3-1-AB-20SA-001 2
1                        This is a Severity Level IV Violation.       (Supplement II.0) (445/8426-
CS-1-564-706-A33R 1
.j                         02) j Corrective Action Sumary In summary, the corrective actions that have been taken are listed below.
}
(Note:   Each item below refers to the corresponding item as numbered in the Notice of Violation).
AF-1-035-037-Y33R 1
: 1. NCR M84-100470 was issued and subsequently closed on October 1, 1984. Disposition included the addition of the diagonal brace.
j AF-1-035-034-Y33R 1
: 2. NCR M84-100476 was issued and subsequently closed on October 2, 1984. Disposition included the issuance of CMC 48850, Revision               -
3 MS-1-028-047-543K 1
((                              2 which shows correct orientation.
?}
: 3. NCR M-14722 was issued and subsequently closed on August 22, 1984. Disposition included installation of the two welds.
CC-1-011-034-A63K 1
L     I       )       '~~"~__                  -
j General AF-1-103-036-553K 1
* Q ,V1"       ~
i Workmanship Inst. Rack cpl-EIPRLI-31 1
                                                                              ?~ M'                 "
1 1-FT-2453 1
                                                                                                                  -~l. J
Cl4010056-2 1
l-
.i TOTAL ITEMS 22 3
The above are examoles identified by the NRC inspectors where items were installed by the craft to conditions other than those specified by the identified design documents, QC inspections had been ccmpleted, I
and the QC inspectors failed to identify these conditions. The
)
inspection report details these findings.
.j 1
This is a Severity Level IV Violation.
(Supplement II.0) (445/8426-
.j 02) j Corrective Action Sumary In summary, the corrective actions that have been taken are listed below.
(Note:
Each item below refers to the corresponding item as numbered in the Notice of Violation).
1.
NCR M84-100470 was issued and subsequently closed on October 1, 1984. Disposition included the addition of the diagonal brace.
2.
NCR M84-100476 was issued and subsequently closed on October 2,
((
1984. Disposition included the issuance of CMC 48850, Revision 2 which shows correct orientation.
3.
NCR M-14722 was issued and subsequently closed on August 22, 1984. Disposition included installation of the two welds.
L I
)
' ~ ~ " ~ _
Q,V1"
~
?~
M'
-~l.
J


                                                                      =g
=g
~
F The remaining twenty-two items have been addressed by revision or Vendor Certified Drawings (VCD's), issuance and disposition of n reports (NCR), correction througn normal insp'ection process performance an engineering evaluations or performance of an additional review that indicated no corrective action was required.
of each itme is as follows:
Speci.fically the resolution Component or Drawing Resolution MS-1-026-010-S75K Review indicates no corrective action reouired AF-1-026-005-533R Review indicates no corrective action required Inst. Rack CPI-EIPRLI-31 AF-1-026-003-533R NCR issued Engineering evaluation indicates no MS-1-026-010-575K corrective action required MS-1-025-009-R75K NCR issued i
l CC-1-043-013-A43K Drafting error, NCR issued Review indicates support was acceptable, CC-1-238-004-C53R however NCR issued and VCD revised NCR issued ^
CC-1-236-700-C53R CC-1-234-700-C53R Orafting error NCR issued I
CS-1-A8-208A-001 3 rafting error,, NCR issued Review indicates support'was acceptable, i
however NCR. issued and VCD revised CS-1-564-706-A33R AF-1-035-037-Y33R NCR issued and VCD revised AF-1-035-034-Y33R NCR issued and VCD revised l
MS-1-028-047-543K NCR issued and VCD revised CC-1-011-034-A63K NCR issued and VCD revised Review indicates support was acceptable, i
i however NCR issued and VCD revised AF-1-103-036-S53K Support identification should be Inst. Rack CPI-EIPRLI-31 AF-1-103-026-S53K, NCR issued
{
1-FT-2458 NCR issued Corrected during normal inspection g
~
~
F The remaining twenty-two items have been addressed by revision or Vendor Certified Drawings (VCD's), issuance and disposition of n                          .
)
reports (NCR), correction througn normal insp'ection process performance an    engineering indicated                evaluations no corrective  action wasorrequired.
C14010056-2 process, see IR I-1-0054504 NCR issued t
performance of an additional review that of each itme is as follows:                                Speci.fically the resolution Component or Drawing Resolution MS-1-026-010-S75K Review reouired indicates no corrective action AF-1-026-005-533R Review required  indicates no corrective action Inst. Rack CPI-EIPRLI-31          NCR issued AF-1-026-003-533R Engineering evaluation indicates no MS-1-026-010-575K                  corrective action required MS-1-025-009-R75K                  NCR issued i
CC-1-043-013-A43K                  Drafting error, NCR issued l
!                                                          Review indicates support was acceptable, CC-1-238-004-C53R                  however NCR  issued NCR
                                                                        ^    issued and VCD revised CC-1-236-700-C53R CC-1-234-700-C53R                  Orafting error NCR issued I                    CS-1-A8-208A-001                  3 rafting error,, NCR issued i                                                        Review indicates support'was acceptable,
!                      CS-1-564-706-A33R                  however NCR. issued and VCD revised
  '                    AF-1-035-037-Y33R                  NCR issued and VCD revised
  !                    AF-1-035-034-Y33R                  NCR issued and VCD revised MS-1-028-047-543K                  NCR issued and VCD revised l
i                    CC-1-011-034-A63K                  NCR issued and VCD revised i                                                        Review indicates support was acceptable,
  !                    AF-1-103-036-S53K                  however NCR issued and VCD revised Support identification should be Inst. Rack CPI-EIPRLI-31          AF-1-103-026-S53K, NCR issued
{                    1-FT-2458                          NCR issued g
Corrected during normal inspection    ~
)                                                        process, see IR I-1-0054504 C14010056-2
!                                                        NCR issued t                                                         .
i i
i i
1 I
1 I
f t
f ti
i
(
(
L i
L i
> ___    _                            "~ ~             .
"~ ~
_}}
_}}

Latest revision as of 07:34, 10 December 2024

Expresses Concern Re Whipsaw Approach of Submitting Util W/Region IV Findings,Violations,Required Responses & Investigation Issues,At Same Time.Approach Counter Productive & Confusing.Response Re Catawba Ltr Requested
ML20199G402
Person / Time
Site: Catawba, Comanche Peak, 05000000
Issue date: 02/25/1985
From: Garde B
GOVERNMENT ACCOUNTABILITY PROJECT
To: Axelrad J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20197J178 List: ... further results
References
FOIA-85-59 850225, NUDOCS 8606250216
Download: ML20199G402 (2)


Text

p

' f -h4-hb f

GO'EM!leST ACCOUNTADILIT/ PROJECT M55 Connedricur Avenue, N.W., Suite 202 U

o hhington, D.C. 20036 (202)2324550 e

e t

February 25, 1985 g

Ms. Jane Axelrgd, Director

~

Office of Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 4-

Dear Ms. Axelrod:

On February 15, 1985 Region IV issued two Severity Level IV violations to Tet:as Ut-ilities Electric Company (TUEC).

(A copy of the inspection report is enclosed.)

Our review of this document leaves us astounded that such rerious violations of the 10 C.F.R. Appendix 3 could be dismissed as lightly as they have been by Region IV.

Frankly, GAP has lcng held the view that the Nuclear Regulatory Commission's failure to c.nforce comp ~liance with re:-u-lations has been one of the chief causes of planti such as Comanche Peak being completed in essentially indeterminate con-dicion.

This inspection report represents a prime example of the type of " hand patting regulation" which has led to your agency's lack of respect by the utility industry and the public alike.

Just as significantly this report points out a problem which the agenc. has c.pparently ignored:

Comanche hak anyway?

Who is running the ship at In this letter, Region IV has pre-empted the Technical Review Team (TRT) a Sy issuing level IV violations on issues

~

which have admittedly been part of the TRT's efforts.

The " whipsaw" approach of hitting TUEC with both Regicn IV I

findings, violations, and required responses, at the same time similar issues are under investigation and review by the TRT, 3

is j

both counter-productive and confusing to any reasonable regula-tion program for Comanche Peak.

j

/ unanswered for over five months now,Since my last letter to you regarding 7

I respectfully request that

.i you phone me in the near future with an immediate response to

  • hg whether or not you have the ability or authority to review an already issued Notice of Violation (such as the enclosed) for

/T6 escalated enforcement.

n,; 06 mtA45-bd 8606250216 860611

[

EDO 000377 PDR FOIA b

g GARDE 85-59 PDR

~

1 r

r

[

Ms. Jane A: 41 red a

j

, February 2.,

1955 page Two 4

e

[

t<

We are particularly concerned on whether there is any involvement by your staff in an escalated enforcement program i

to deal with the findings of the TRT, or whether this pattern of Region I'/'s dribbling out minor violations for a decade of

)

serious violations can be expected to continue.

Thank you for your prompt respons.e to my inquiry.

j Sincerely,

-O l

\\ W Billie Pirne(r Garde

%.~

4 j

Enclosures as stated 4

4 l

cc:

Robert Martin i

I l

.i i

+

1 I

1 I

1 j

i I

b 1

. - -. ~

.v2

m'

~{

Rf

r In Reply Refer To:

Dockets:

50-445/84-32 FEB 15 H6 50-446/84-11 Texas Utilities Electric Company

< ATTN:

M. D. Spence, President, TUGC0 j

Skyway Tower 400 North Olive Street l

Lock Box 81 l

Dallas, Texas 75201 J

Gentlemen:

a This refers to the inspection conducted under the Resident inspection Program by Mr. H. S. Phillips of this office and NRC contract personnel during the period August 20, 1984, through September 20, 1984, of activities authorized by NRC Construction Permits CPPR-126 and CPPR-127 for the Comanche Peak facility, Units 1 and 2, and to the discussion of our findings with Mr. D. Chapman and other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included a review and etaluation of how effectively Texas uti.11 ties Electric Company management has implemented the corporate quality assurance (QA) program for design, procurement, and construction activities.

Special emphasis was placed on evaluating the i

management of the audit program; management's action to regularly review tha status and adequacy of the QA program; and followup on findings pertinent to i

program management identified by previous NRC and consultant inspection teams.

l Within these areas, the inspection consisted of selective examination of procedures and representative records, interviews with personnel, and observations by thi inspectors. These findings are documented in the enclosed 2

inspection report.

i Ouring this inspection, it was found that certain of your activities were in i

violation of NRC requirements.

Consequently, you are required to respond to this violation, in writing, in accordance with the provisions of Section 2.201 of the NRC's " Rules of Pract. ice," Part 2, Title 10, Code of Federal

l Regulations. Your response should be based on the specifics contained in the Notice of Violation enclosed with this letter.

'f These violations may be related to findings identified by the NRC Technical Review Team (TRT).

If the issues are considered to be similar, you may respond to the items separately or as part of the Comanche Peak Response Team Action Plan.

(

RRI h fi/

TL/TF@

hS&S C/R 8 0/0 P

NRR 48 SPhilljps/lt 0Hunnicutt.

R$hngart 0 Hunter R0enise Noonan L,/> /8f p/p/8f

' / \\ 84 p /j~/8g & /84 I: /LU/84 ftD

-, u r y,

w,7

~

I 5.

Texas Utilities Electric Company i s

i L

Should you have any questions concerning this inspection, we will be pleased to i

discuss them with you.

Sincerely, I

  • Qrigin'al signed bVf D. M. HUNNtOUTT*

1 i

D. R. Hunter, Chief I

Reactor Project Branch 2

)

Enclosure:

1.

Appendix A - Notice of Violation l

2.

Appendix B - NRC Inspection Report 50-445/84-32 50-446/84-11 cc w/ enclosure:

Texas Utilities Electric Company Texas Utilities Electric Company ATTN:

B. R. Clements, Vice ATTN:

J. W. Beck, Manager President, Nuclear Nuclear Services Skyway Tower Skyway Tower

~

l 400 North Olive Street 400 North Olive Street Lock Box 81 Lock Box 81 Dallas, Texas 75201 Dallas, Texas 75201 bec to DMB,(IE01) l bec distrib. by RIV:

RPB1 RRI-OPS TX State Dept. Health j

RPB2 RRI-CONST.

Juanita Ellis EP&RPB R. Bangart Renea Hicks R. Martin, RA J. Gagliardo Billie Pirner Garde C. Wisner, PA0 D. Hunnicutt S. Phillips f

R. Denise, DRSP pTRT (CPSES) (2)

}

RIV File S. Treby, ELD j

MIS System D. Eisenhut, NRR I

r 9

s P

p

(

APPENDIX A NOTICE OF VIOLATION r

Texas Utilities Electric Company Dockets:

50-445/84-32 Comanche Peak Steam Electric Station, Units 1 and 2 50-446/84-11 k

l Construction Permits:

CPPR-126 j

CPPR-127 J

Based on the results of an NRC inspection conducted during the period of I(

August 20, 1984, through September 20, 1984, and in accordance with the NRC l

Enforcement Policy (10 CFR Part 2, Appendix C), 49 FR 8583, dated March 8,

}

1984, the following violations were identified:

1.

Failure to Regularly Review the Status and Adequacy of the QA Program 4

I i

Criterion II of Appendix B to 10 CFR 50', as implemented by the Preliminary Safety Analysis Report (PSAR) and the Final Safety Analysis Report (FSAR),

i Section 17.1, " Quality Assurance Program," and ANSI N45.2-1971, requires that the quality assurance program shall provide for the regular review by the management participating in the program, of the status and adequacy of the part of the quality assurance program for which they have designated responsibi'lity.

Contrary to the above, the applicant did not establish quality assurance procedures to regularly review the status and adequacy of the construction i

quality assurance program; nor did the applicant appear to have reviewed the status and adequacy of the construction quality assurance program.

j This is a Severity Level IV Violation.

(Supplement II) (445/8432-02; t

446/8411-02) i 4

i 2.

Failure to Establish and Implement a Comprehensive System of Planned and Periodic Audits i

Criterion XVIII of Appendix B to 10 CFR 50, states, in part, "A j

comprehensive system of planned and periodic audits shall be carried out i

to verify compliance with all aspects of the quality assurance program and j

to determine the effectiveness of the program." The requirements are addressed in the PSAR and FSAR, Section 17.1, " Quality Assurance Program,"

l which references Regulatory Guide 1.28 (ANSI N45.2) and ANSI N45.2.12 (Draft 3, Revision 4). Those commitments require that a comprehensive 4

h system of planned audits be performed on an annual frequency.

Contrary to the above, the following examples w're identified which e

demonstrate the failure to establish and implement a comprehensive system

-of planned and periodic audits of safety-rplated activities as required, as noted below:

7 waw.e.u--es-rw e enw e m.

__w~

w

__-A.-

2 i

Notice of Violation yf a.

Annual audits were not adequately addressed by the audit implementation procedures.

1 i

TUGC0 Procedure DQP-CS-4, Revision 0, dated August 9, 1978, only required two audits of vendors fabricating reactor coolant

}

pressure boundary components, parts, and equipment; one audit of j

vendors fabricating engineered safeguards components, parts, and equipment; and audits of balance of piant (safety-related) as a

}

required by the quality as'surance manager.

TUGC0 Procedure DQP-CS-4, Revision 2, dated April 16, 1981, required only that organizations will be audited on a regularly 8

scheduled basis.

TUGC0 Procedure DQP-CS-4, Revisions 2 and 10, did not specify j

auditing frequencies for design, procurement, construction, and operations activities.

l TUGC0 Procedure DQP-CS-4, Revision 10, based audit requirements on Regulatory Guide 1.33, Revision 2, February 1978.

This commitment did not fully address the require'ments of the construction quality assurance program.

The above procedure and subsequent revisions failed to describe and require annual audits in accordance with commitments and requirements.

Earlier audit procedures were not available to determine if they met requirements.

b.

Planning and staffing to perform 1983 audits was inadequate to assure that a comprehensive system of audits was established and implemented to verify compliance with all aspects of the quality assurance program, in that, of 656 safety-related procedures (which control safety-related activities) the NRC review revealed that the applicant sampled only 165, or 25 percent, during the 1983 au'dit program.

-i Consequently, significant aspects of the safety-related activities were not adequately audited.

c.

The Westinghouse site organization, established in 1977 to perform Nuclear Steam System Supply (NSSS) engineering services, was not audited by TUGC0 during the years of 1977, 1978, 1979, 1980, and j

1981.

s

?

d.

Audits of vendors that manufacture or fabricate parts, components, k

and. equipment for reactor coolant pressure boundary and engineered safeguards systems have not been conducted annually dating back to f

August 9, 1978.

t i

This is a Severity Level IV Violation.

(Supplement II) (445/8432-03;

[*

446/8411-03)

?

e

"'Y"-

% w y -

w--

e,

L:

2

?

l-I4 V.

Notice of Violation q 3.

Failure to Properly Certify a Vendor Compliance Inspector t, 5 Criterion V of 10 CFR 50, Appendix B, states, in part, " Activities t

affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures,

~

j j

or drawings."

l TUGCbProcedureDQP-VC-4, Revision 6,datedJanuary5,1984,requiresthat i

Level II inspectors (Corporate QA) shall attend and satisfactorily

}~

complete nondestructive testing courses including eddy current testing.

Contrary to the above, one of six inspector's files had no documen1!ation to show that the inspector had attended and completed an eddy current testing course.

Subsequent, discussions revealed that he had been certified without meeting this requirement.

The vendor compliance i

supervisor stated that this inspection skill is not needed since there is no present vendor work activity which would require this skill; therefore, this procedure was revised and the requirement omitted during this j

inspection.

't This is a Severity Level V Violation.

(Supplement II) (445/8432-05; l

446/8411-05) f Pursuant to the provisions of 10 CFR 2.201, Texas Utilities Electric Company is hereby required to submit to this office, within 30 days of the date of this ll Notice, a written statement or explanation in reply, including:

(1) the corrective steps which have been taken and-the results achieved; (2) corrective f

steps which will be taken to avoid further violations; and (3) the date when i

full compliance will be achieved.

Consideration may be given to extending your response time for good cause shown.

l

[

Dated:

c I

r o

F k

i i

r 1

i k

2.

1i

[--

1 APPENDIX B U. S. NUCLEAR REGULATORY COMMISSION REGION IV e

i NRC Inspection Report:

50-445/84-32 Construction Permit:

CPPR-126 50-446/84-11 CPPR-127 I.

Dockets:

50-445 Category:

A2 1

50-446 q

Licensee:

Texas Utilities Electric Company l

Skyway Tower 400 North Olive Street Lock Box 81 Dallas, Texas 75201 Facility Name:

Comanche Peak Steam Electric Station (CPSES), Units 1 and 2 Inspection At:

Dallas Corporate Office, Dallas, Texas I

{

Inspection Conducted:

August 20, 1984 through September 20, 1984

////[f8 Inspector:

H. S. Phi lips, Senior Resident Reactor Date Inspector Construction NRC Contract Personnel:

B. Freed, Senior Project Engineer, EG&G Idaho, Inc.

G. Thomas, Quality Engineer, EG&G Idaho, Inc.

f i

Approved:

fd' ) 4 m b u. @

8.2.3!?9

0. M. Hurinicutt, Team Leader D&te

/

Region IV Task Force Inspection Summary Inspection Conducted August 20 throuah Septembe'r 20, 1984 (Report 50-445/84-32; 50-446/84-11) h k

j-

I I

i Areas Inspected:

Routine, announced inspection to determine how effectively corporate management has implemented the QA program for controlling design, t

procurement, and construction activities; and to determine how site management interfaces with corporate management.

The inspection involved 74 inspector-hours by one NRC inspector and 176 inspector-hours by two NRC 1

contract personnel at the corporate office and the site.

Results: Within the two areas inspected, three violations were identified (failure to regularly review the status and adequacy of the QA program -

paragraph 2b.; failure to establish / implement a comprehensive system of planned and periodic audits paragraphs 2c.(1) and 2d.(3)(a); and failure to properly certify a Level II vendor compliance inspector, paragraph 2d.(3)(f).

t t

l

\\

t

)

i 1

I i

m

E f

t

[

DETAILS

{

{

1.

Persons Contacted W. Clements, Vice President Nuclear Operations, Texas Utilities Generating Company (TUGCO)

  • 0. M. Chapman, Manager, Quality Assurance (QA), TUGC0 l
  • R. G. Spangler, Supervisor, QA Services, TUGC0
  • D. L. Anderson, Supervisor, QA Audits, TUGC0 A. H. Boren, Supervisor, Vendor Compliance, TUGC0 J

$5. L. Spencer, QA Auditor, TUGC0 l

D. Z. Hathcock, QA Auditor, TUGC0 H. R. Napper, QA Auditor, TUGC0 l

A. Vega, Site QA Manager, TUGC0 L. M. Bielfeldt, Supervisor, Quality Engineering, TtJGC0 l

C. Welch, Supervisor, QA, TUGC0 l

J. H. Roberts, Supervisor, Construction /Startup, TUGC0 J. T. Merritt, Assistant Manager, Engineering and Construction, TUGC0 i

R. Gentry, Manager, Project Support Services, TUGC0.

F. Peyton, Supervisor, Purchasing, TUGC0 M. Strange, Supervisor, Engineering Support, TUGC0 R. Baker, Staff Engineer, TUGC0 H. Harrison, Supervisor, Technical Services, TUGC0 l

G. Krishnan, Supervisor Stress Analysis Group, TUGC0 R. Williams, Drafting Supervisor, TUGC0 i

G. Purdy, Site QA Manager, Brown & Root Inc. (B&R)

R. L. Moller, Site Manager, Westinghouse j

  • Denotes those attending one or more exit interviews.

I 2.

Texas Utilities Manacement of QA Activities a.

Introduction

(

The objective of this inspection was to determine the status of the construction QA program and the effectiveness of implementation of the corporate QA program for ongoing design, procurement, and f

construction activities.

i The NRC inspectors reviewed the QA commitments described in Section 17.1, " Quality Assurance During Design and Construction."

/

Texas Utilities Electric Company (TUEC), as the applicant, has delegated to Texas Utilities Generating Company (TUGCO) the responsibility and authority for engineering, design, procurement, construction, operation, and QA activities at Comanche Peak Steam l

Electrical Station (CPSES).

Gibbs & Hill Inc. (G&H), is the i

Architect-Engineer (AE) and provides TUGC0 with design, engineering, I

and procurement services as requested. Westinghouse (W) is the Nuclear Steam Supply System (NSSS) supplier and provides TUGC0 with the design, engineering, procurement and fabrication services for the NSSS and the initial supply of nuclear fuel.

Brown and Root, Inc.

9

_ u., u t

-w mm.

,e.

_.. _ ~__

e -

[

  • l (B&R) is the Construction Manager / Constructor and provides

(

construction s.ervices at the site, including the QA program for ASME Division 1 Code work.

b.

Organization i

The TUGC0 corporate management structure and responsibilities were described in the Final Safety Analysis Report (FSAR); and the various

[

TUGC0 QA manuals and procedures described how FSAR requirements were implemented to control design, procurement, and construction activities.

Recent organizational changes pertaining to the QA program were described in FSAR figures 17.1-1, 17.1-2, 17.1-3, 17.1-4, and 17.1-5 which were included in Amendment 50 dated July 13, l

1984.

i i

Recently, there have been three irportant QA personnel changes.

A new site QA manager reported in March 1984, a new site quality I

engineering supervisor reported in August 1984, and a new vendor compliance supervisor was recently selected.

These organizational I

changes were made to replace individuals who were reassigned or I

promoted to other positions, and these changes were reported to the l

NRC. The independence and effectiveness of the QA effort do not I

appear to be adversely affected by these changes.

The assistant project general (APG) manager reports to both the VP of i

engineering and construction and to the TUGC0 Executive VP of operations.

Discussions with the APG manager confirmed this and that I

he was supervised by both. This management practice is questionable.

The CPSES QA Plan Section 1.2, paragraph 1.2.1, does not describe the i

APG manager's interface with or the responsibility to the VP nuclear operations.

Subsequent discussions with TUGC0 QA personnel revealed f

that this position was discussed in the startup QA manual. This item is considered unresolved pending clarification of the QA plan and further review during a subsequent inspection.

(445/8432-01; 446/8411-01)

[r l

c.

QA Program

[

TUGC0 QA Program Plan and subtier procedures for design, j

construction, engineering, and procurement described the control of all related project and quality activities.

A sample of these

. procedures were reviewed and documented in NRC Inspection Report No.

50-445/84-22; 50-446/84-07.

The Quality Assurance Program (described in the FSAR) provided the delegation of design, engineering, construction, and procurement functions to prime contractors, subcootractors, and vendors. *It stated that the TUGC0 audit program assured that these organizations had adequate QA programs and verified implementation of the overall h

QA program within TUGCO.

t p

d; e,. ~,-

i i(

h '

t l'

f The inspectors reviewed the QA program procedures and any objective evidence to determine if the applicant regularly reviewed the status and adequacy of the QA program as required by Criterion II of Appendix 8 to 10 CFR 50, the PSAR and FSAR, and ANSI N45.2-1971.

Reviews and discussions revealed no documented requirements or evidence that the QA program status and adequacy had been reviewed by the applicant.

In order to determine if the QA program had been assessed, the inspectors reviewed additional information.

In late 1981 and 1982 audits were performed by a consultant (Fred Lobbin), by Sargent and Lundy (using INPO criteria), and by TUGC0 (using INPO criteria).

Each of these audits' evaluated limited aspects of the QA program.

In 1983 Cygna evaluated the design program.

The Lobbin Report (February 4, 1982) R-82-01, contained four major findings:

level of experience within the TUGC0 QA organization is low; i.e., commercial nuclear plant, design and construction QA experience; staffing for the audit and surveillance functions is inadequate; the number and scope of design and construction audits conducted

+

by TUGC0 QA to date has been limited; and QA management has not defined clearly the objectives for the

+

surveillance program resulting in a program which, in the author's (Lobbin) opinion "is presently ineffective."

The TUGC0 QA manager responded to these findings in an office t

memorandum (Q8C-18), dated February 23, 1982.

This response basically concurred with these findings.

The response committed to recruit nuclear experienced individuals, to increase the number and scope of site audits, and to more effectively use the surveillance program.

Two program reports (Q8C-25 and 29) regarding these matters were issued from the QA manager to the VP nuclear operations on May 21 and August 31, 1982, respectively.

Following the Lobbin Report, the NRC performed a CAT inspection (IR 445/83-18; 446/83-12 dated April 11, 1983) and included a review I

of the TUGC0 audit program at the corporate offices. The inspection

(

included a review of 18 audits (conducted between 1978 and early j

1983), auditor qualifications, audit planning and scheduling, audit reporting and followup, and audit prograst effectiveness.

The report concluded that weaknesses existed in the established QA audit program and included the scheduling and frequency of audits, the lack of effective monitoring of the construction program, and the lack of effective resolution of certain audit findings.

The inspection also indicated that the QA program should have been more effective.

F

.y

,7fe-

= = -

l

~ ~

f

=

f s i

.t i

Based on the findings in the Lobbin report, and the findings in the i

NRC CAT report, the QA program continues to exhibit weaknesses.

The continuing weaknesses in the QA program over a significant period of f{

time reinforce the need for the applicant to routinely" assess the status and adequacy of the QA program routinely to ensure that the areas are identified and adequate and timely corrective action is taken to correct the QA program weaknesses.

The failure to regularly review the status and adequacy of the QA program as required is a violation of Criterion II of Appendix B to 10 CFR 50.

(445/8432-02; 446/8411-02) d.

Management of the TUGC0 Audit Program j

j (1) Program Requirements FSAR Subsections 17.1.2, "QA Program," and 17.1.18, " Audits," require internal audits of (TUGC0 corporate and site activities) and external audits (prime contractors, subcontractors and vendors) to evaluate the effectiveness of the QA program by verifying conformance with design requirements; compliance with established requirements, 6

methods and procedures; and implementation of corrective action.

These commitments require the establishment and implementation of a comprehensive system of planned and periodic audits of.all aspects of the QA program.

r The TUGC0 audit program consisted of internal and external audits of design, construction, engineering, and procurement activities.

TUGC0 4

also retained responsibility for the external audits that were usually delegated to the AE and NSSS organizations; i.e., audit of vendors.

In addition to construction and vendor audits, the TUGC0 audit group was also responsible for performing preoperational/startup and plant operation audits.

TUGC0 committed to the audit requirements of ANSI N45.2.12-1973, Draft 3, Revision 0, Section 3, " Audit System," and these program management objectives are:

o to determine that a QA program has been developed and documented

+

in accordance with applicable requirements; to verify that the program has been implemented,

+

k to assess program effectiveness; i

to identify program nonconformance; and to verify program correction where appropriate.

m-

.-. m e

-+--

7

_[

. lI This section also stated that to achieve these ANSI standard objectives full management backing, manpower, funding, and facilities

[

shall be available to implement the system of audits.

f.

(2) NRC Evaluation of Planning / Implementation of Program r

(

The NRC inspector reviewed and evaluated the applicant's plans, l

procedures, and number of audits performed (see paragraph 2e below) l and determined that planning was inadequate.

This audit effort was j

too large for the four available TUGC0 auditors in 1981, even though additional specialists were utilized to assist with the audit y

activities.

i 4

l (a) The inspector reviewed and evaluated planning documents (formal and informal) used by the TUGC0 QA manager, supervisor QA i

services, and supervisor QA audits.

The review and discussions i

with these individuals revealed that annual audit plans were l

based on the audit of organizations rather than activities.

TUGC0 Audit Procedure DQP-CS-4, Revision 0, dated August 9, 1978 j

required:

semiannual internal audits, i

semiannual construction audits, annual AE audits, i

annu'al NSSS audits, and 4

annual plant operation audits.

j 1,

However, for vendor audits the procedure required:

)

first audit at 15 percent; and second audit at 60 percent j

" item completion" by reactor coolant pressure boundary vendors; one audit of engineered safeguards vendors at 25 percent 9

item completion; and audit of balance of plant (other safety-related) vendors as determined by the manager QA.

This does not meet the requirements of paragraphs 3.4.1 and 3.4.2 " Scheduling," of ANSI N45.2.12 which requires, " Auditing be. initiated as early in the life of the activity as practicable... applicable elements of the QA prr., gram shall be audited at least annually or at least once within the life of the activity whichever is shorter."

o b_

L

. h Furthermore, Audit Procedure DQP-CS-4, Revision 2, April 16,

}

1981, and Revision 10, June 4,1984, have further redt.ced the (scheduling) frequency of audits.

Revision 10 now states, in j

part, "3.2.1, The following organizations will be audited on a regularly scheduled basis but in accordance with Regulatory Guide (RG) 1.33, Revision 2, January 1978, Regulatory Position 4:

a. AE; b. NSSS; c. constructor; d. TUGC0 Internal;
e. Preoperational/Startup; f. Plant Operations;
g. Subcontractor...

3.2.1 In lieu of regularly scheduled j

audits of vendors TUGC0 QA will perform the following:

a. Monitor the individual vendor ratings which are based on 4

l vendor performance... b. for those vendors who cannot be evaluated based on vendor ratings... regularly scheduled audits will be performed based on level of activity." The NRC inspector discussed with TUGC0 management the fact that RG 1.33 1

is for operations and does not fully address the requirements of the construction QA program.

This failure to develop audit program procedures which adequately address and describe QA program requirements and commitments is a violation of Appendix B, 10 CFR Part 50, Criterion XVIII (445/8432-03a; 446/8411-03a).

1 (b) In addition to evaluating to determine if annual audits were i

planned, the NRC inspector requested objective evidence which would demonstrate that planning for audits for calendar years 1983 and 1984 included a method to verify compliance with all aspects of the QA program and to determine the effectiveness of the QA program. The review of the objective evidence revealed

.that the planning was not adequate, particularly regarding the audit basis, status, and tracking.

The only objective evidence available consisted of a listing of planned audits of internal organizations and contractors each year and a summary of 1983 audit results and criteria audited; however, this data in many cases did not list the criteria audited and while reviewing older audits it was noted th'at an "after the fact" review resulted in identifying the applicable criteria covered for various organizations.

The inspector requested a listing of selected site procedures l

which were in effect in 1983 that were representative of site safety-related activiti'es and subject to audit by TUGC0 corporate QA. The review of the listings provided and the 1983 audits revealed the following information:

i 4

e I

e

,^

.;n

. ~~ m e ~n

---s--

.. n

i-

.Y

.g.

F Audits of Total Procedures

% Audited Procedures Procedures Audited / Referenced in 1983 TVCC0 Quality Documents Index j

(December 20, 1983) 295 71 24 3

TUSI Engineering Instruction Index l

(December 2, 1983) 65 16 25 i

1 TUSI Nuclear Engineering 1

Procedures / Instructions Index (September 26, 1983) 26 18 69 TUSI Engineering Procedures Index (November 4, 1983) 30 12 40 8&R Quality Document Index i

(November 22,1983) 51 20 39

)

B&R Construction Procedures Index 4

(June 20, 1983) 189

_2,8

_ 15 I

Total 656 165 25 Only 25 percent of the procedures (specific safety-related activities) were audited in 1983.

Although audits on a sampling

?

basis are acceptable, there was no evidence that a_1,1, i

safety-rela:ed areas were audited.

The audits did not encompass l

all aspects of the QA program in order to determine j

effectiveness.

l The failure to properly plan or produce evidence of adequate i

planning for a comprehensive audit program to verify compliance

}

with all aspects of the QA program resulted in the failure to audit significant parts of the QA program is a violation of Criterion XVIII of Appendix B to 10 CFR 50 (445/8432-03b; 446/8411-03b).

J The NRC inspector contacted the Westinghous M site manager to Jf review the procedure listing for safety-related activities which TUGC0 had audited. As indicated below, no audits of NSSS site 7

activities were performed in 1983.

Discussions with the LW),

site manager revealed that no audits had been performed by TUGC0 QA in 1977, 1978, 1979, 1980, or 1981.

This was discussed with the TUGC0 audit staff and QA manager who did not disagree with h

the stated audit frequency.

t n.-

-- = _. _

.. ~... _

= -

__ m 3:

E

~

10-3 QW Site Organization 1

External Total Procedures

% Audited

]

Procedures Procedures Audited / Referenced in 1983 Westinghouse (W) Site Appitcable Procedure, QA Manual, May 1983 18 ;i PPD Procedures 14 1 Installation Procedures 29 t

)

The failure to audit DQ procedures (safety-related activities) annually as required by ANSI N45.2.12, Oraft 3 Revision 0, of the QA program is a violation of Criterion XVIII of Appendix B I

to 10 CFR Part 50,,(445/8432-03c; 446/8411-03c).

(c) The NRC inspector discussed The staffing of the Audh Program j

with TUGC0 QA management the findings of the Lobbin Report and the NRC CAT Team Report regarding the staffing of the audit i

functions.

The discussions revealed that the TUGC0 audit staff I

had been increased from 4 to the present number of 12 between l

1982 and 1984, and TUGC0 management has been looking for 3 or j

4 additional nuclear experienced auditors to further increase the j

audit staff. However, it was also revealed that management had not determined the total audits required nor the manpower needed l

to accomplish the audits.

i j

This matter is an unresolved item pending the determination of I

the number of audits and auditors that will be needed to

]

effectively implement the audit program (445/8432-04; 446/8411-04).

(d) The NRC inspector determined through review ef charts and procedures that current organization provided organizational

]

freedom from cost and schedule.

t (e) The NRC inspector evaluated audit personnel qualifications by reviewing 14 personnel files of lead auditors and auditors.

/l This included presently employed and formerly employed auditors.

These personnel were qualified as required by TUGC0 Procedure DQI-QA-2.1, Revision 7, and ANSI N45.2.23-1978,

" Qualification of Quality Program Audit Personnel for Nuclear Power Plants."

(f) The NRC inspectors reviewed TUGC0 Audit Procedures OQP-CS-4, Revision 10(June 4,1984),andpQI-CS-4.6, Revision 7 (April 13, 1984).

As previously discussed in paragraph 2.C(1),

DQP-CS-4 does not include adequate commitments to perform annual audits and failed to address both de' sign and construction and

  • plant operations audit requirements.'

e ent _M.Wf

  • sag PWw** t

. * {++ MaC-

            • =mW

. *t'*

  • '******1eampp+***v_

-+***M tr9 1d t

s

^

. _s

(

  • 11-e.

Implementation of the TUGC0 Audit Program The NRC inspectors selected three areas of the audit program to review and evaluate implementation.

Results of this evaluation are discussed in the following paragraphs.

(1) Internal Audits of Site Activities - T_he NRC inspector reviewed the index which showed all site audits and found that Audits TCP-1 through TCP-112 had been performed between March 1978 and August 1984. The number per year are:

(1) 4 in 1978; (2) 3 in 1979; (3) 10 in 1980; (4) 11 in 1981; (5) 30 in 1982; (6) 29 in 1983; and (7) 22 during the first 8 months of 1984.

After the audit program was found inadequate in the consultant's report (Lobbin), the number of audits increased from less than 1.0 per month in 1982 to 2.5 per month in 1982.

After the NRC CAT inspection report in 1983 this number increased to 2.7 per month for the first 8 months of 1984.

This indicates that positive action concerning these reported weaknesses was taken; however, as previously discussed objective evidence was not available that the required number of audits and auditors has been identified.

This item was previously identified above as unresolved.

The 1983 and 1984 audit schedule included each audit scheduled, cancelled, and any additional audits planned or performed.

Where audits were cancelled, they were rescheduled and other audits were added and performed. This effort was well documented.

In 1983 the TUGC0 audit group performed 158 audits.

Sixty-five 1

internal audits of site activities are as follows:

l construction /QC/ engineering - 33 audits; j

startup - 5 audits; and l

operations - 27 audits.

1 I

The NRC inspector selected and reviewed 31 TCP 1983 audits of site activities. The audit files included notification to the i

organization audited, an audit plan, checklists, an audit report, audit response, and evaluation / closeout of findings.

Audit reports reflected good preparation and execution.

Substantial findings generally resulted and were resolved.

Several lead auditors were interviewed concerning the management of the TUGC0 audit program.

They stated that the audit program had weaknesses or deficiencies in 1978 but they had witnessed dramatic improvements and were confident that the audit program' b

was currently working well.

[MW r-a _

1_

a -

% 9% -

M*

M**f*'W**

4 '?

" -. 12

' E 2 * %9

i a_

h' b <

(2) Assurance of Design Control - TUGC0' management verified that design was controlled in accordance with the QA program requirements and procedures through administering an effective audit program. The design control functions were delegated to the AE and M ; however, TUGC0 was designated the engineering organization responsibility for plant design.

l The NRC inspector reviewed and evaluated the results documented in 15'TUGC0 internal and external audit reports which j

speciffcally relate to Criterion III of 10 CFR Part 50, Appendix 8, design and applicable procedures. These represent l

al.1 audits design and consisted of 8 audits of TUGCO, 3 of M,

and 4 of G&H, engineering organizations.

All audit findings, l

concerns, and deficiencies were closed through correspondence and were later verified through subsequent audits. Management involvement was evident as the VP nuclear operations was on concurrence and was furnished status reports by the QA manager.

In October 1982, TUGC0 initiated a special audit effort to review design using the Institute of Nuclear Power Operations (INPO) performance objectives and criteria.

Sargent & Lundy l

personnel were used to perform this audit.

This audit j

identified 13 findings and TUGC0 audit No. TNO-2, dated June 1983, verified corrective action.

l (3) Assurance Control of Procurement Activities - TUGC0 management j

elected to retain procurement responsibilities except for l

certain functions delegated to the AE and NSSS.

The NRC inspector selected several functions retained by TUGC0 to j

determine if their audit program effectively monitored or i

.i verified that procurement activities were accomplished in accordance with the QA program and applicable procurement I

procedures. Management involvement with procurement documents, j

bid / source evaluation, and specific QA inputs were reviewed by l

the inspector. The vendor audits and evaluation of vendors were j

a large work effort.

The following are the results of this review and evaluation.

The NRC Comanche Peak Special Review Team Report dated July 13, 1984, at the site identified a potential violation, i.e.,

failure to perform annual audits of vendors.

The report documented an inspection of the procurement effort at site and part of this inspection included determining the frequency of vendor audits.

As a result of the special inspection, the TUGC0 AA manager approved an FSAR change request, dated August 3, 1984, which asked that TUGC0 be allowed to adopt NRC RG 1.144 audit requirements in lieu of ANSI N45.2.12, Oraft 3, l

Revision 0, for construction and' ANSI N45.2.12, Oraft 4, Revision 2 for operations.

This requested change would not change the requirement to perform internal audits annually but 1

- h -e.h,w-w,

~

~

~~

j s.

=

l l j

would reduce the requirement to perform annual' audits of f

suppliers. Considering this requested QA program change which l

had not been approved by the NRC, the following are the inspection results:

(a) The NRC inspector reviewed the TUGC0 vendor audit program for 1983 to determine compliance with commitments (FSAR Section 17, paragraph 17.1.18), ANSI N45.2.12 and TUGC0 procedures DQP-CS-4 and DQI-CS-4.5.

The annual audit schedule revealed that 60 vendor audits were scheduled during 1983.

Audit TCLC-2 was cancelled (lack of activity with Purchase Order CPC-307) and audit TBS-3 was rescheduled (delayed by 1 wee'k) as a result of NRC CAT Team inspection findings.

The NRC inspector selected 3 vendor audit files, TVO-1, TM-3, and TBF-2, for review to determine the extent of the audits as applicable to the audit plan checklist, noted deficiencies, concerns, and comments.

Also included in this review were the corrective actions and/or preventive action documented in writing by the vendor in response to the applicable audit findings.

Documents in file closed the audit findings and indicated that followup on corrective action would be verified during the next audit.

The NRC inspector reviewed the vendor audit frequency to determine if TUGC0 established a schedule to annually audit vendors.

The licensee commitment to ANSI N45.2.12, Draft 3, Revision 0, requires annual audits or at least once within the life of the activity.

Neither procedural requirements were established, nor were vendors audited annually.

The failure to establish procedural requirements and to perform annual vendor audits is a violation of Criterion XVIII of 10 CFR Part 50, Appendix B and ANSI N45.2.12, Draft 3, Revision 0 (445/8432-03d; 446/8411-03d).

(b) The NRC inspector reviewed the approved vendors list (AVL) program for 1983 to verify that methods. used by TUGC0 to qualify vendors to supply safety-related materials, parts, and services were consistent with the QA plan, procedural requirements, and commitments described in ANSI N45.2.13-1976.

A review of supplemental memos and preaward survey files and revisions 9 through 12 of the AVL verified that the AVL was cMrrent.

This review showed 33 additions, 40 status changes, and 1 deletion to the AVL for the period January 24, 1983, through December 20, 1983.

The preaward survey files reviewed were consistent with l

l L

.m.

T k-f bI Procedures DQP-CS-4, Revision 10, and DQI-CS-4.2,

{

Revision 3, December 1, 1982.

During the review of

]

preaward survey files, the inspector confirmed that formal

'l identification letters, the survey date, and the scope of the survey (checklist) were consistent with the vendor QA program. Also, the corrective action responses by the supplier concerning noted deficiencies, concerns, and comments were reviewed, and followup action verified in a subsequent audit.

(c) The NRC inspector reviewed the vendor performance evaluation (VPE) system to determine compliance with j

commitment and procedural requirements.

TUGC0 Procedure il DQP-CS-4.3, paragraph 1.1 stated that the purpose of the evaluation was to astablish a comprehensive method of 1

identifying system weaknesses in vendor QA programs through 3

acceptable / unacceptable hardware information generated as a j

result of vendor release inspections. The VPE files d

included release inspection trip report cover sheets, j

vendor rating sheets, releases, and the inspection checklists as required by TUGC0 Procedure DQI-CS-4.3, y

Revision 4, paragraph 3.1.

j d

The NRC inspector reviewed 3 VPE packages to determine that j

the quality assurance services (QAS) group's review was consistent with procedural recuirements. One vendor file l1 l

(Paul Monroe Hydraulic) was still active pending 1

engineering review and evaluation on the 0-ring discrepancy identified during release inspection at Remo Hydraulics (Purchase Order CPF-11436-5 issued to Paul Monroe Hydraulics) for 20 hydraulic snubber assemblies.

As d

required by DQP-VC-3, one vendor package (Meddco Metals)

l was being held on a yellow flag sheet to alert TUGC0 l

auditors of next request for release so that TUGC0 auditors

/

could accompany the TUGC0 vendor compliance insp'ector to resurvey the vendor. One other vendor (Volumetrics) performance evaluation record was reviewed and it showed a vendor rating of greater than 90.

The NRC inspector interviewed the QA audit supervisor to determine what

]

objective evidence (as required by referenced TUGC0 Procedure DQI-CS-4.3, paragraph 3.2) was used to perform the vendor evaluation and support vendor ratings.

Preaward surveys, previous audits, and receiving inspection reports were used as objective evidence to give the rating.

The NRC inspector reviewed the receiving inspection i

activity for previous releape inspection shipments relative to the aforementioned vendors.

Receipt inspection consisted of' shipping damage inspection, receipt of documentation, identification, and quality assurance g

release.

l L

7 q.

. (d) The NRC inspector reviewed the method by which the licensee performed source selection to determine that procedural i

requirements were met.

QA plan Section 4.0, Revision 4,

/

July 31, 1984, required that a purchase order for safety-related items not be issued to a vendor unless TUGC0 QA had reviewed and accepted the purchase order; i.e., QA determines whether QA provisions are adequate and determines that a preaward evaluation recommends selection of the vendor.

When procurement solicited bids outside the AVL, TUGC0 QA requested that an uncontrolled copy of the vendors quality assurance manual be sent with' the bid response.

In the event of a positive bid response from the unapproved supplier, the TUGC0 procurement group forwards the QAM and a request for QA program evaluation, Form QA-VE, to tite TUGC0 QA audit group supervisor to initiate a preaward survey per QA Procedure DQT-CS-4.4, paragraph 3.1.

However, until the preaward survey is completed and a supplemental memo has been issued by the audit group supervisor, no further procurement action was taken.

The NRC inspector reviewed the actions taken when an acceptable bidder takes exceptians to the purchase order or subcontract.

Upon receipt of the exception, procurement filled out an expediting request, assigns a procurement log number, and forwarded thir request to the field requisition originator for engineering review and evaluation.

Should the engineering group allow the exception, the necessary actions; i.e., design charges, were initiated.

The expediting request was returned to procurement accompanied by a field requisition documenting the change with the approval signatures of engineering and QA.

(e) The NRC inspector reviewed the method by which TUGC0 performed vendor item acceptance of safety-related materials, parts, and components.

TUGC0 Procedure DQP-VC-1, Revision 8, June 4, 1984, paragraph 1.1, specified that the purpose was to establish guidelines for performing final inspection and release of TUGC0 purchased equipment and applies to both safety-related and nonsafety-related equipment.

This procedure allowed for a waiver, in which case the inspection checklist applicable to the procurement specification became the responsibility of CPSES receiving

[

inspection as described in B&R CPSES Procedure CP-QAP-8.1, Revision 8, June 11, 1984, paragraph 3.4.1 (f) The NRC inspector reviewed six vendor compliance inspector's files to determine if training / certification H

.i s

~.,

t records met the requirements of ANSI N45.2.6-1978 and TUGC0 Procedure DQP-VC-4, " Guidelines for Certifying Vendor l

Compliance Personnel." Section 3.2.2 states that a Level II inspector shall attend and satisfactorily complete j

the nondestructive examination (NDE) courses.

One inspector had not completed all of the NDE courses but had i

been certified.

This finding was discussed with the vendor compliance supervisor who stated that there is no real need i

for certification in eddy current testing since inspectors do not utilize this NDE technique and the requirements would therefore be deleted from the procedure.

The NRC inspector verified the deletion of this requirement and procedural revision during this inspection.

The failure to certify the inspector in accordance with the procedure is a violation of Criterion V of Appendix B to 10 CFR 50 (445/8432-05; 446/8411-05).

No other' violations or deviations were identified.

3.

TUGC0 Corporate QA - Site t)A Activities Interface Appendix B to 10 CFR Part'50 requires TUGC0 to u tablish proper organizational and management interfaces, and pro.cedures must describe how various organizations coordinate and communicate design, procurement, engineering, construction, and QA/ control activi, ties and information. The following paragraphs describe inspection of this requirement, a.

Site Organizatiois TUGC0 Procedure CP-QP-3.0, Revision 15, July 30, 1984, described the

~,

site QA organization for design and construction.

This organization consisted of~a site QA manager, QA supervisor, and a QC supervisor.

The site group performe~d no audit function, however, they did perform QA surveillances.

The site group consisted of 13 QA/QC managers and more than 150 lead /QC inspectors and quality engineers.

These personnel inspected non-ASME work.

B&R QA manual and implementing Procedure CP-QAP-03.01, Revision 6, described their responsibilities for QA/QC and construction activities pertaining to ASME work.

This organization consisted of a QA manager, QE supervisor, and a QC supervisor.

The total QA/QC work force involved with design / construction activities was approximately j

100.

4-j Several other site subcontractors such as Bahnson, Brand Industrial 1

Services, Inc., and Chicago Bridge and Iron, have small QA groups on i

site and, as is the case with B&R, these organizations were audited j

by their respective corporate offices.

4, I

~~'

i.

2_

V

?

)

a h

1 t 1

f The NRC inspector interviewed the TUGC0 site QA manager to determine I

how the site QA group interfaced with the corporate QA office.

He stated that daily conversations occur between ranagers of these organizations, however, he did not make written summary reports.

Quarterly trending reports which analyte reported nonconformances and deficiencies are sent to the corporate QA manager, l

b.

Site Surveillances The NRC inspector noted that surveillances were briefly mentioned in TUGC0 Procedure DQP-CS-4, Revision 10; however, there was no mention I

of how or if the surveillances would be used to complement the audit l

program.

During discussions with the QA manager and other personnel, it was revealed that procedures were not tracked to assure that all I

l were audited.

The present audit staff could not audit all site procedures annually. The NRC inspector pointed out that the surveillance function may complement and be used to (1) check that all procedures are implemented; (2) identify nonconforming trends; and (3) to feed potentially deficient or weak areas to the audit group which could, in turn, factor this information into the audit program.

Audit priorities could then be established and the audit personnel could be more effectively used.

i TUGC0 Surveillance Procedures CP-QP-11.2, 19.3, 19.4, 19.5, 19.6, 19.7, 20.0, and 27.0 described the surveillances of specific activities; however, no general procedure which describes the overall surveillance program was provided.

The present program did not i

appear to have sufficient purpose, direction, coordination, and

]

feedback in relationship with the overall QA program.

Furthermore, j

the inspection revealed that the surveillance staff had been reduced j

from a supervisor and eight technical personnel to four technical j

personnel.

Considering the Lobbin Report this reduction of j

f surveillance effort may not be a prudent action.

h As noted in the findings in the Lobbin Report; i.e., QA management j

~~

i had not clearly defined the objectives and scope of the surveillance J

program, it appeared that TUGC0 needed to strengthen the surveillance B

program.

The TUGC0 management decision to commit to a surveillance program was a strength, but this lack of purpose and direction and support was a program weakness.

Additionally, the surveillance group was no longer observing work in Unit 1 but will now place most of their effort on Unit 2 construction J

activities.

H

[

This matter is considered unresolved pending clarification of the p-audit and surveillance program efforte and further review during a 6

subsequent inspection (445/8432-06; 446/8411-06).

it n.

g

{:

8

^

,~,

=

==

y-a a

f P I

The NRC inspector randomly selected and reviewed 28 surveillances performed in 1982, 1983, and 1984.

Findings and resolutions of these i

findings were reviewed and in each case, written responses and f

corrective action were adequate.

A c.

Site Desian Activities The NRC inspect (r reviewed and e' valuated selected site activities pertaining to design verifications, design changes, design inputs, and control of vendor drawings as follows:

(1) Design Verification - The NRC inspector interviewed the TUGC0 supervisor of engineering, support, and other engineering i

personnel to determine how design verifications were performed, and examined the related procedures, logs, and design verification packages. Authorized design verifiers were l

maintained on lists and an automated tracking system was in place to assure that all design changes, i.e., design change 2

authorizations / component modification cards (DCA/ CMC) were verified.

Three design verification reports ware reviewed to l

assure that the design verifier was on the authorized list.

Design verifiers were not to be involved in the original design review to assure an independence.

It was noted that each l

DCA/ CMC was being reviewed for verification.

If there was no authorized signoff, then the design was verified.

l Audit TGH-23, conducted during August 1984, concentrated on l

Unit 1 quality related activities for which onsite G&H design l

review team had responsibility. The audit involved evaluation of the program established and implemented for site review and -

processing of changes (CMA and DCC) associated calculations and 287 design review packages were reviewed.

No major technical problems were identified during this audit.

(2) Design Changes - The NRC inspector interviewed engineers and draftsmen in TUGC0 engineering to determine how design changes were processed and examined the related procedures, files, reports, and tracking systems.

A master list was maintained identifying those individuals who were authorized to approve design changes and G&H updates this list by memo.

The NRC review of three design review files verified that the reviewers were on the authorized list.

l The NRC inspector also reviewed the method used to incorporate i

field changes (DCA/ CMC) into related drawings and the subsequent j

review, approval, and incorporation of changes into as-built drawings. ' One observation required additional discussions.

The l

drafting supervisor.'s (piping support) authority to incorporate ~~

a change into a drawing was transmitted and signed by a clerk.

This was clarified as being acceptable by management because it i

h I-

e:

{

+

- I was in accordance with established procedure (CP-EI 4.6-8, paragraph 3.3) and also, as a final control, the as-built drawing was reviewed and approved by an authorized project engineer prior to release.

The NRC inspector examined how the TUGC0 administrative services group handled NRC IE Bulletins, Circulars, and Information Notices. These documents were coordinated by the operations support department and were distributed to the appropriate TUGC0 engineering group for action.

Design changes resulting from i

j these inputs were processed in accordance with established j

design control procedures.

Responses from personnel receiving these reports were reviewed to verify that the reports were i

adequately addressed.

Summary reports and log sheets are used to keep management current as to the status of the responses.

An INPO audit of the operating experience review program in 1982 noted the following good practice, "The procedures for handling industry experience are excellent and are expected to provide a firm base for developing an effective industry experience program. "

TUGC0 QA audit Report TUG-41 was conducted in December 1983 to review implementation of the operations support program for evaluating and responding to NRC IE Bulletins, IE Notices, IE Circulars, and generic letters.

The auditors found the program in compliance with procedural requirements and the overall effectiveness of the program appeared to be adequate.

(3) Design Document Control - Two packages were reviewed and these contained evidence of vendor data checklists, indexes, approval letters, and the vendor stamp on drawings was observed.

d.

Site Procurement Activities The NRC inspector determined that the TUGC0 procurement function was delegated to the TUGC0 site organization.

The major procure.ments occurred several years ago; however, present procurement activities associated with items procured offsite for installation were performed by TUGC0 or were contracted to G&H, iWl, or B&R who were evaluated i

and qualified by TUGC0 QA.

Procurement documents were reviewed, approved, and controlled; and receipt inspection of safety-related items on site was performed in accordance with written procedures and checklists.

l The NRC inapector selected two procurement actions for review:

i P.O. CPF-1233-S issued to. Combustion-Engineering for the procurement of a heated junction thermocouple system.

CPF-10469-5 issued to Paul Monroe Hydraulics to refurbish four Rockwell International actuators.

t 0- --

<e..

m n a-m - e e es e- -

me-n.

ar v e o~e. e

- sw w' --* msp w

- enueen--

l l

l

~

. ~

i A

Both the procurement actions were reviewed to determine that technical requirements were commensurate with the scope of the procurement and was authenticated by engineering review in accordance with TUGC0 engineering division Procedure CP-EP-3.0, Section 2.0(d).

Both procurement actions reflected the necessary QA review signatures, as required by TUGC0 engineering division

~

Procedure CP-EP-5.0, paragraph 3.1.2; QA Procedure DQP-CS-2, paragraph 3.1.8; and instruction QI-QP 5.0.1.

All field requisitions initiated to generate a supplement to the aforementioned purchase orders were reviewed and documented as required by l

Procedure CP-EP-5.0.

Reporting requirements set forth by 10 CFR Part-21 were included in the purchase order. The NRC inspector reviewed and verified that both purchase orders specified that the supplier shall establish provisions for imposing similar QA 3

requirements on applicable subtier vendors.

1 j

No violations or deviations were identiffed.

)

4.

Unresolved Items g

Unresolved items are matters about which more information is required in order to determine whether they are acceptable items, items of noncompliance, or deviations. Unresolved items are identified in this -

report in paragraphs 2.a, 2.c.(2) and 3.b.

)

5.

Exit Interview The NRC inspector met with members of the TUGC0 staff (denoted in paragraph 1) at various times during the course of the inspection. The j

scope and findings of the inspection were discussed.

l 1

i i
  • 1 L

I n

i e

l

~~

c 1,'

~

Q7

.(

?"

1

  • g

.m

)

i U.S.NUCLEAA F.EGUL.ATORY COMMIS loM mNoen msesCTeamm. tar. nr r. m,m,an,,w s

,suic pommies Y

N * $

  • had l ' ' P,5 ign..

8 "c #"

I-INSPECTOR'S REPORT REVIEWER Office of Inspection and Enforcement D M-blu a>rds c o 7 7 S*PNlQlh) h h5 N

REPORT NEXT INSPEC. OAff 00CEET eeO. rs eptaio,R L8CEN5g I M OOA y

NO. it. P900uCTH 3 eigens go, 3,, g.

,o.

y,,

^

O$b UTt G i Y S ( $

O f Q\\ [ g 4 4' $

g 4 3 o x y c4, a g,,

u ec.rn. c com,w y o - oatsTE C

4 - mePLACE l

l l

0 NM

' NNt*-D.N C~b N-9 E'.'E: T8 5

' ~ 18 i

PERT 0C 08 ipsb Fb71GAftON/h5PEC* ION WSPECTION PER70AMED Sy ORGANi2ATCN CCCE OF REGCN/MO CONOUCT.

]C*MER

,,,,% u,,,,,,,am Meroower Assort-ING ACTNITY (See ifMC 05J0 '

I smou To

, - nGGIONAL OFFICE STAFF q,eaa,;

ox, m

oA,

... x NT CTo.

m.oM avscN e *Nc-q 4

7L 3

1 o ei2Jo el4 o19 2!o 814 3 - 'a'oa=ca ^P'a*'s^' Ti^=

d ar y. w.e,;m a asacy-rs3-ize sugCpMy*,"g* Da,$1pgiqFynh'fpidg!NG S.na o -

, '. 3: ;

l se i

. as

]

Ty pe ce ACruiry CONDUCTED ICha e.a Dos crew neo,oNg ACTION

'C***"***"*"*'

k at - sAprTY os - uGuf.v, sit

,o - P'. ANT sec.

,4 - wouiav q

1 1 - NaC ponw eet as - woooeNT o7 - sPECAL

,1 - INVENT.Vte.

,5 - INVESTIGATION 2 - RGGa00aAL OPPICE LETTIA 06 - EfePOAC4 MENT 08-vsNDOA 12 - $>HPMENT/ EXPORT a

5 - MGMT. AutXT 5 - MAT. ACCT.

,3-4MPORT

' mca%6 ~:pme wtitsigs W:;:,k,tyg.ni;I;pg.TTg@.Wp:dyAni.-,y;.ppyssyvs -

      • 7@a*ItN,@/*GmW TOrALevuggp gNpo. CEMENT CONPERENCE PEPoRT COtTAiN 2.30 MTTtm OF m,PO4T TR ANSMITTAL DATE crvouficNs ANo neto arcaMAT;ON Al8 Cl D D VIAfiONS NRC FCR** 391 REPORT SENT 4

J.

i-CuAn on aEG.

To na sen j M uTmissuEo ACTcN

- vouTioN 5

A B

C 0

wo

$4.7 &

MO.

DAY vR.

3 - DEVIATION A

B C

o A'

S Cl0 e

I i - Yt$

, - vgg

%G *f y l

l l

  • - viouTom a oeviA'cN g, '3 o,3

)

3 wmmwwww=:mawmumwwaena m

+ -

j ooma,.o.

AfsoN ooxa,N,0.mT:os

_ m.m. _,

m m _.....

y#,

2 =

_m _

-e..m,_.

$,d,5 1555 3S E

3 iS

~

~

-l 2:

-s 1

as 1

vs 1

e s

8

- =l li l li il

! ! ! ! Il li iillii!i ill i 1 1 1 1! il

! i l l!!Il i

(.i13iol7,oi31 G iii o IiiI iIiiI^

IiiI ii i i i

,i i

r

,1, o I,il I,il

=

ii i,

liil Ii,I c

c ii i i i

i liil ii i

Ii,I H

o

=

i

. 1 3,sloi2iol e r ii. o /ioi o l,iI

,I,,I*

Ii,I ii

, i i

?

1,,1 i,,i a.,o t,o, o i,,i 1,,I c

c j

i, 1,,1 I.,1 o

a l

i 2 3sloiGiol @ 4 6io /,0, 0 IiiI iliiI^

ii i i i Ii,I i

i liiI ii i i i Iiii rioi o /,dio i

li,I ii,I c

c i

,i i

liil I,,I

=

, i i

!,,I iIiiI^

l s

i23i.5foiGiol G

/,,ri o

/,oi o i

i ii i,

i Ii,i l

Ii,l

[

liiI 6'd o

/,oi O

,i i,

i l

Ii I

Ii,I c

c i

ii O cACLE SEQUENCE IF 0

l,f l O

VIOLATON OR DfWTCN g l l [

[

[ [

9,

y,

u

, w. a mw..;;.

4,3,,5, w.

,, wwc 4ny,xe ow,,

s

ll neacar ucoutamuused r -,ygg 2.151 6 016:0i ?WD9f?

888 * *

  • ooemerno.<ee sionucenas

* * *" 'uCD " 8 *'*"'

wo.

sea.

EEmi' -

vouma sonin oneyyca,,sy,,

9 @ $

r.

a INSPECTOR'S REPORT o 5 o e' ol4' 4-51 (Continuation) o 5 o o o 4 4 ci (8 'l I

' s a

o S 4e n

{

g a c' g

Office of Inspection and Enforcement g

c j

o

=

,, a

_^ mas.., _.. 4 ww es necessary so g,

,,c w. cima unos so so,;

ers esca.3 VIOLATcm on DotAT10ps Weest we so 2400 enerossere Apr asen mesi. af one sort.

1.

L Ob

$ f fa Y$slli,YO W W

\\

A Yf f t Oh d

Io eF e ' Pa ed s a

%k aco\\,*ea 4 9,t, le >

reo,'eu)

L de S 4 a f e1 e h4 I J,..,. ),.

o8 d

OA t < o < r a. m.

- 6 3

n t

7.

L

.e s.

'?

-}

tt 11, 4

tt.

-}

Y Ik l

is 4

,7.

i ft 11 BL 1

21.

22.

3 l'

is 3

N L

3 77 1

2E m.

'.j 27.

?

?

2

)

3.

s

__ - ae se seasset. e s e e gsg g gg A 93 ggq,p,,q q y gq q

t P

y; f.EPORT MODULE NUWeEA N"SD9 NRC70mM7M A OOCKET NO. 48 eigitsi Cm uCENSE No. teY PROQVCT)(13 eigits)

NO.

SEO. 113ISlot%101 y'y.

3

," **T **

.,$ eO

  • " 5 " ' a'"

INSPECTOR'S REPORT o S o o d+4l f I

84 3 2

^

(Continuation)

O 6 0 C dt4 (

I B #

I 1

e 3.c Office of Inspection and Enforcement

)(

p C

.I o

8 i

o veOLATsON On OEviAT10N sinter no ra 2400 cneracters for secn stern. st une test onceece taas nuonber. or een De necessary to caraonrese. Lonset unes to 30 characters eacn.}

I Ce nb.v u 40 % v o m;., e m m+3 of Cyrteries x v.i n af e 3 4 a. b l$ s k to C F ft 9ad 50_-Hb. a ull< ul

-Cn7Ie4

+o i

t b

2= A

',w a\\en e d a e,,A 'a r e k w.s n a r s u sk en eS c

r J

4 of m a r a ' And aer;a,Ue_

M u if <,

s

- f 1

I a

a G

l a

it 11.

it

'I 14.

tt 11

'l 17.

I j

it 19.

20.

21.

b n

-4 24.

I

]

n

'f M-n j

m i

n M

31.

32.

I

.,. I nI 6

at

$1 U.S. NUCLEAR REGULATORY COMMISSION

-r

--a._

I e

e "0 t* N "3" mo.

sao. 113lft ol(,ID I k

kh"pg aapont wooutsmuussa

-e 7

occxer,,o.....,o m goam**

. a=coes,, 8PECTOR'S REPORT

cur *" 5'""'" oa ce'!p'o* e,53 o IN d 4 d' d o 4 4 5 8141 3 7 3

y.c (Continuation) d < o o d 4 4 (,

  1. 4 i (-

a Offico of Inspection and Enforcement K-

{ Jeo[

c o

victArion ose ceviAficM (fAfor us so J430 cheresacre Mr ear # sfeat. # Irte forf escasse inse nuns 0er. A use to seesseery to -

turret skies to 30 cris,a; seen.)

o[

b e de vi rta Y C

b Abuu bb c # 4 u 's e w h s

1 in to er a ' pad so

%G a c ol:eu 4 Sa: Isa 4.e l'

Ct t/ 4 *' f u one o 8 5' y VenA II Co e n i i a mer

,n s pe,b e e,L L,_ %c04-vt-4 d

v ! ~,1. ;o d hu Tusto un es l'1 R n.at d ?

L h d-s, le w4 s' ' r.

i g,

9.

e 1C.

n

{} ii.

1,1 l ti i it j u

a

.i it. l 18.

!! rr.

1..

M.

11.

C.

21 24 29 3

I Pf 3

N 10.

]

f 31 T

nl

,I ni 6i

=

U.S. NUCLEAR REGULATORY COMMISSION

(

f 1)

YE Y Q

Q UIiO Y

=

TEXAS UTILITIES GENERATING COMPANY

- v w., v..w x......s...r

.. i v e -1 x rr...... o i.. 1c.s -, u...

9 f.! "S'".'O!.*.

February 28, 1985 f

TXX-4429 4

1 j

Dorwin R. Hunter, Chief j

Reactor Project Branch 2 U.S. Nuclear Regulatory Commission i

Office of Inspection & Enforcement 1

611 Ryan Plaza Drive. Suite 1000 Docket Nos.:

50-445 i

Arlington, TX 76011 50-446 a

COMANCHE PEAK STEAM ELECTRIC STATION RESPONSE TO NRC NOTICES OF VIOLATION INSPECTION REPORT 84-26

.i FILE N0.:

10130 l

Dear Mr. Hunter:

We have reviewed your letter dated January 18, 1985 on the special inspection of the Safeguards and Auxiliary Building conducted by C.R. Oberg, M.E. Skow, and i

W.R. Bennett of activities authorized by NRC Construction Permit CPPR-125 for Comanche Pea < Unit 1.

j In a conversation between David Chapman and Doyle Hunnicutt, an extension of the response time was granted to March 1, 1985.

We are providing a partial response to the findings listed in Appendix A of that letter. To aid in the understanding of our response, we have repeated the Notices of Violation followed by a summary of our corrective actions.

The specific corrective action for each item identified is available at CPSES for

.I your Inspector's review. -The ac a, <

s of thcsc item; are-beine m

i

@=pJiin:

S= 7 W - -- 4 ~"

rife'c}InVciFWevii#riE(TRTh "vab;ted h t:.c Nam-estetr+-rsned-td:deve

' ~

' " ~~

If you have any questions, please advise.

i Very truly yours, am/A t

Billy R. Clements 4

1'L F01A-85-5E p.

/

l V f at aa222h

, A 368VD.%i.9N.br TEXA5 CTRLSTREM ELECTRIC COMP 4N Y b

c :.. y

^ '

i.

cc:.NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U.S. Nuclear Regulatory Comission i:

Washington, DC 20555 n

Mr. V.S. Noonan 1

i

}

j' p

L a

}

}

lJ t

I hj n

l, I

1-L;.

t

~

I' L:

v

.r e

t

_.b h s.

s m

A m

..n_.

a

[..

l APPENDIX A NOTICE OF VIOLATION Texas Utilities Electric Company Docket:

50-445/84-26 Comanche Peak Steam Electric Station Construction Permit: CPPR-126 Based on the results of an NRC inspection conducted during the period of July 16 through September 28, 1984, and in accordance with the NRC Enforcement 4j Policy (10 CFR Part 2, Appendix C), 49 FR 8583, dated March 8, 1984, the following violations were identified:

A.

Failure to Provide QC Inspection Criteria" and Minimum Separation 1j 10 CFR Part 50, Appendix B, Criterion V states, in part, "...

j Instructions, procedures, or drawings shall incl.ude appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished."

i 1

IEEE-384 provides separation criteria of Class IE equipment and circuits.

The Comanche Peak Steam Electric Station Electrical Erection Specification j

2323-ES-100 provides for the implementation of the criteria of IEEE-384 j

(1974).

1 Section 4.4.6 of 2323-ES-100 states in part, "In no case shall any part of the conduit or the conduit support system come in direct contact with uninsulated equipment in the piping system or with pipe restraints or anchors."

j QI-QP-11.3-29.1, Revision 16, paragraph 3.1.7, states in part, "In no j

case shall any part of the raceway or raceway support system come in direct contact with uninsulated equipment in the piping system or with pipe restraints or anchors unless otherwise approved by the owner."

QI-QP-11.1-28, Revision 25, paragraph 3.3.4.2, states in part, "There

}

shall be an air gap (i.e., no contact) between electrical conduit / conduit supports and piping component supports."

Section 4.11.3.2 of 2323-ES-l.00 sp'ecifies separation between conduits of different trains which, for 'he ex*amples listed, is a minimum of one e

t 3.

inch.

a j

QI-QP-11.3-23, Section 3.9, specifies conduit separation per drawing 2323EI-1702-02, including several detailed sketches.

Contrary to the above, a

1.

Specifications and QC inspection procedures do not contain specific f

acceptance criteria for separation of redundant trains of flexible conduits.

2.

The separation requirements between conduits as contained in the erection specifications ES-100 and implementing procedures had not been met.

D 4

c.

?,

l' I

j The following conditions were identified:

l 1.

Flexible condaits in the Safeguards and Auxiliary Buildings do not maintain the required one inch minimum separation between trains.

For example, flexible conduit C13G20208 contacts C13011132, and the 1" airspace is not maintained between C13007415 and C13G07413.

i 2.

Flexible conduits in the Safeguards and Auxiliary Buildings come in

[

direct contact with uninsulated equipment.in the piping system or ff with pipe restraints or anchors. Examples include:

I Flexible Conduit I

Number Item Description h

C13G07743 Flex rests on pipe bracket next to valve 1-HV-5365.

C13G07744 Flex rests on pipe next to valve 1-HV-5365.

C14021161 Flex rests on pipe support for 1-MS-030 and 1-MS-268.

C13G12499 Flex rests on support for J515 455G.

C13G03781 Flex touches corner of support for valve 1-HV-4179.

C12005387 Flex touches pipe at elbow passing near i

valve 1-HV-8106.

C13015915 Flex resting on top of actuator for

}

valve 1-HV-21SS.

1 C13G21323 Flex touching flange of support next to 0

valve 1-FV-2196.

I C13G06734 Flex rests against unistrut below valve i

1-FV-4537.

C12G04690

.' Flex conduit rests on fire pipe.

C13G06834 Flex wraps around adjacent support.

C14G20503 Flex rests on valve body.

C12002856 Flex contacts 1-HV-2480.

t l!

This is a Severity Level IV Violation (Supplement 11.0) (445/8426-01) 0 f

  • l c

6.,c.

_I y

fr Corrective Action Summary I

p DCA 20,721, Revision 1, dated September 18, 1984 has been issued against drawing U

El-1702-02. This DCA contains an approved method for maintaining minimum separation i

distance between flex conduits of different trains / channels. This action was completed prior to the walkdowns described below.

Generic NCR's for the items identified by the NRC have been issued and dispositioned.

One NCR was issued for each of the following buildings: Safeguards, Reactor Containment, Service Water Intake, Control, Auxiliary and Fuel. The disposition included a walkdown by Engineering, QC and craft personnel to identify any specific Cases where flexible conduits could inadvertantly be moved and cause the minimum separation criteria to be less than allowable. QC will document these instances on an electrical Separation Deficiency Report in accordance with QI-QP-11.3-29.

s

{

Engineering will provide a disposition for each deficiency report. Upon completion y

of the walkdown, the dispositioned Separation Deficiency Reports for each building l

will be attached to the appropriate building NCR.

Il B. Failure to Properly Inspect i

10 CFR Part 50, Appendix B, Criterion X requires that the inspection program of activities affecting quality shall be establi'shed and conoucted in a manner to verify conformance with the documented instructions, procedures, and drawings.

N Procedure QI-QP-11.10-2, Revision 28, " Cable Tray Hanger Inspection,"

i specifies the inspection attributes for inspection assembly, configu-ration, location, welding, etc., for conformance with design drawings and documents.

h Procedure QI-QAP-11.1-28, Revision 25, " Fabrication and Installation Inspection of Safety Class Component Supports," specifies the inspection

/

attributes for inspecting fabrication, installation, material, dimensional k

control, welding, etc., for conformance with design drawings and documents.

, Contrary to the above:

ljl.

The NRC inspector identified one cable tray hanger, CTH 639, that was missing the diagonhl brice called for on drawings 2323-El-0601-e 01-S and 2323-5-901.

2.

'The NRC inspector identified one cable tray hanger, CTH 12416, that had the horizontal legs aligned north-south vice east-west as specified on drawing 2323-El-0601-01S and FSE-00159 sheet 12416.

3.

The NRC inspector identified one pipe support that was missing two welds as specified on drawing CT-1-014-015-542K.

j e

e g-p

. W NN*"***M"

6 The following is a compilation of additional deficiencies by general

~-

g 1

category and the drawing or ccmponent where it was found.

Category Comoonent or Drawing Number of Items l

Welding MS-1-026-010-575K 1

AF-1-026-005-533R 1

Inst. Rack CP1-EIPRLI-31 2

h Dimensions AF-1-026-003-533R 1

MS-1-026-010-575K '

1 j

MS-1-025-009-R75K 1

CC-1-043-013-A43K 1

1 CC-1-234-700-C53R 1

8 CC-1-238-004-C53R 1

l CC-1-236-700-C53R 1

i C3-1-AB-20SA-001 2

CS-1-564-706-A33R 1

}

AF-1-035-037-Y33R 1

j AF-1-035-034-Y33R 1

3 MS-1-028-047-543K 1

?}

CC-1-011-034-A63K 1

j General AF-1-103-036-553K 1

i Workmanship Inst. Rack cpl-EIPRLI-31 1

1 1-FT-2453 1

Cl4010056-2 1

l-

.i TOTAL ITEMS 22 3

The above are examoles identified by the NRC inspectors where items were installed by the craft to conditions other than those specified by the identified design documents, QC inspections had been ccmpleted, I

and the QC inspectors failed to identify these conditions. The

)

inspection report details these findings.

.j 1

This is a Severity Level IV Violation.

(Supplement II.0) (445/8426-

.j 02) j Corrective Action Sumary In summary, the corrective actions that have been taken are listed below.

(Note:

Each item below refers to the corresponding item as numbered in the Notice of Violation).

1.

NCR M84-100470 was issued and subsequently closed on October 1, 1984. Disposition included the addition of the diagonal brace.

2.

NCR M84-100476 was issued and subsequently closed on October 2,

((

1984. Disposition included the issuance of CMC 48850, Revision 2 which shows correct orientation.

3.

NCR M-14722 was issued and subsequently closed on August 22, 1984. Disposition included installation of the two welds.

L I

)

' ~ ~ " ~ _

Q,V1"

~

?~

M'

-~l.

J

=g

~

F The remaining twenty-two items have been addressed by revision or Vendor Certified Drawings (VCD's), issuance and disposition of n reports (NCR), correction througn normal insp'ection process performance an engineering evaluations or performance of an additional review that indicated no corrective action was required.

of each itme is as follows:

Speci.fically the resolution Component or Drawing Resolution MS-1-026-010-S75K Review indicates no corrective action reouired AF-1-026-005-533R Review indicates no corrective action required Inst. Rack CPI-EIPRLI-31 AF-1-026-003-533R NCR issued Engineering evaluation indicates no MS-1-026-010-575K corrective action required MS-1-025-009-R75K NCR issued i

l CC-1-043-013-A43K Drafting error, NCR issued Review indicates support was acceptable, CC-1-238-004-C53R however NCR issued and VCD revised NCR issued ^

CC-1-236-700-C53R CC-1-234-700-C53R Orafting error NCR issued I

CS-1-A8-208A-001 3 rafting error,, NCR issued Review indicates support'was acceptable, i

however NCR. issued and VCD revised CS-1-564-706-A33R AF-1-035-037-Y33R NCR issued and VCD revised AF-1-035-034-Y33R NCR issued and VCD revised l

MS-1-028-047-543K NCR issued and VCD revised CC-1-011-034-A63K NCR issued and VCD revised Review indicates support was acceptable, i

i however NCR issued and VCD revised AF-1-103-036-S53K Support identification should be Inst. Rack CPI-EIPRLI-31 AF-1-103-026-S53K, NCR issued

{

1-FT-2458 NCR issued Corrected during normal inspection g

~

)

C14010056-2 process, see IR I-1-0054504 NCR issued t

i i

1 I

f ti

(

L i

"~ ~

_