Y j
a Draft)10/02/84 AQ-130, CP7 SSER ~
1.
Allegation Group: QA/QC No. 5A Repair, Rework, Maintenance 2.
Allegation Number: AQ-130 3.
Characterization:
It is alleged that valve disc numbers on repair travelers are different than those on the code data report.
The% Wd 31g M.icance--of41s 4.
Assessment of, Safety Significance:
3 al'eg on/ s that T4u tomat$ta-n$ aceabh1 y
ve di c m 31 hu' I
chdl/lre he-)r vfl beng\\
n rep r a
h cSud;ca e NakFPte ts requir b h _ -
o pe In assessing this allegation, the TRT reviewed procedures CP-CPM-9.18, Revision 0, and QI-QAP-11.1.39A, Revision 3, concerning valve disassembdly/
reassembly and verified that the program for control of valve repairs was-adequate. The TRT reviewed the repair travelegspciped,githptQ the 53 valves that had been repaired between July #and October 1983;A Th
-',(
repair travelers required the QC inspector to record either the disc serial number or heat number on the traveler. On one traveler the QC inspector recordedtheassemblynumberforthediscandstudassembly,insteadof the serial or heat number.
In this instance, the number recorded differed from the matertal heat number recorded on the valve code data report, giving rise to the error alleged. However, the repair traveler providing the detailed instructions for repair of the valves required the parts to e traveler be packaged and tagged after dis sseg no g s required the inspector to verifyA hat the parts removed from the valve were reinstalled after repairs were made.
In all five travelers reviewed, this reinstallation was verified and signed off as acceptable by construc-tion and QA/QC. These additional checks and balances in the Mechanical Equipment Valve (MEV) traveler system helps to maintain traceability, even if a recordin'g error occurs in the inprocess paperwork.
The TRT also h62 9 860611 GARDE 85-59 PDR emeA4
,',~,,
4 wed the drawing M._ verifiN h hat the traveler contained the assem-re bly number recorded on the drawing there y confirming the matetial trace A
Wh abil-}ty for the. valve disc in question.
numoer wat' recorded on the traveler, the assemb y num er %
1-B, l
b coule also be used to maintain traceability.
Based on the information reviewed, this nomenclature error (disc and stud assembly number vs.
seriklorheatnumber)appearstobeanisolatedcase.
J 5.
Conclusion and Staff Positions:
The allegat'lon that valve disc numbers di fered from thog on pata reports has b,een sub tantiated. b d W CW.
-w -re,v.
D:.
X4 M#
on t e er H
v,er, the.TRT staff' finds that this mismatch was on y a nomenc ature error and has confirmed that the material removed from the valves was identical to the material reinstalled.
Hence, the repair traveler system assures parts traceability. Therefore, this allegation has neither safety signifi g nor generic. application.
A(ctionsRecuired:% - 4 None.7 Y M, G M '[ ~
er 6.
h
~
. omm _
8.
Attachments:
None.
e..
(Traveler for valve S/N12048 >NCR M-6061 CMTR for 9.
Reference documents:
g f
c..
disc heat 1K25 CMTR for disc heat 1H86 f,ront page of code data report, g
3 3
and part of drawing which identifies tiie assembly as number 720S9, f,DCA15842[Borc-Warnerdrawing73754A.
Mechanical Equipment Valve (MEV) roceiving IcFfg?MN.WiW9WHWi*ijf2hl9hD3from July, August,
~
-o 7 i
September and most of October 1983. p M 7/28/84 deposition, gTravelers j
for valves S/N12049, 12050,'12051, and 12052.
U.ld. LOW +
10.
ThisstatementpreparedbygM.G. Bullock Name Date Reviewed by:
Date Group Leader Approved by:
Date Project Director
5 G7//7
,,-" i;,. -
SSER WRITEUp DOCUMENT CONTROL / ROUTE SHEET Allegation Numb 6rs
/79-/3I Subject of Aiiegatipn Twou.es wen m <>. r da ms gro/ s/nJnW oryer.
TRT Group 9va l,6 Mum fA.
~
Author:
/~r*.
/<vu ne/1 U
il This sheet wi'.1 be initialed by each reviewer.
It stays with all revisions to the SSER writeup and serves as a routing and review record.
It will be filed in the work package when the writeup is published.
Draft Number *.
Draft 1
2 3,
4 5
i Author M
Nk
/
//
M:
/
2 i
f7/7#/8-44f/;'
ir-i Group Leader
/
,o re Tech. Editor
/
44 W////f Wessman/Vietti
/
/
'Ctju] ip/1#e.
J. Gaaliardo
/
/
T. Ippolito
/
/
/
(
~
Revision Number Final 1
i d i'[s 3
4 5
NN d
I /[
Author Tech. Editor As j
,/ /
/
Group Leader
~#WV7 & >V,#RW-'/ G M '
J. Gaaliardo
// '/e/ (
/f / 7'/
hWn d
/"
/
T. Ippolito Administrative Writeup integrated into SSER
/[
Potential Violations to Region IV jo Workpackage File Complete Workpackage Returned to Group Leader
~
[
~
N$
A -y(c-1w 19
/
h.
~ _.
/
ouhd i.;yrc
./
/
b.+
' Document Nam;:
AQ-131 Requester's ID:
JMN Author's Name:
Doslusny Document Comments:
10R9784 REDRAFT 2lpgef -
e e
i a
4 9
4 O
ghe
.- =