                                                                          MAR 181987
MAR 181987
      Docket No. 50-289
Docket No. 50-289
      GPU Nuclear Corporation
GPU Nuclear Corporation
      ATTN: Mr. H. D. Hukill
ATTN: Mr. H. D. Hukill
              Vice President and Director, TMI-1
Vice President and Director, TMI-1
      P. O. Box 480
P. O. Box 480
      Middletown, Pennsylvania 17057
Middletown, Pennsylvania 17057
      Gentlemen:
Gentlemen:
      Subject:   Inspection Report No. 50-289/87-06
Subject:
      During the period from February 17 to March 3, 1987, a Region I team of ten
Inspection Report No. 50-289/87-06
      inspectors conducted a startup readiness assessment at the Three Mile Island
During the period from February 17 to March 3, 1987, a Region I team of ten
      Unit 1 Nuclear Power Station. The purpose of this inspection was to assess
inspectors conducted a startup readiness assessment at the Three Mile Island
      licensee control measures to assure the overall readiness of the facility and
Unit 1 Nuclear Power Station.
      personnel for the planned Cycle 6 startup in light of the five month refueling
The purpose of this inspection was to assess
      outage. At the conclusion of the inspection, Mr. R. Conte of my staff summar-
licensee control measures to assure the overall readiness of the facility and
      ized the inspection findings with you and other members of your~ staff.
personnel for the planned Cycle 6 startup in light of the five month refueling
      Since the inspection was conductsd with a number of weeks remaining in the out-
outage. At the conclusion of the inspection, Mr. R. Conte of my staff summar-
      age, the plant was not expected to be, nor was it found to be, fully ready for
ized the inspection findings with you and other members of your~ staff.
      startup.   However, the team concluded that overall your control measures were
Since the inspection was conductsd with a number of weeks remaining in the out-
      adequate to assure that a reasonably complete list of prerequisites for startup
age, the plant was not expected to be, nor was it found to be, fully ready for
      was _ identified and documented.     We noted that a significant amount of we-k
startup.
      remains in the procedure revision and design analysis areas. Careful manage-
However, the team concluded that overall your control measures were
      ment involvement and close attention to detail on the part of personnel and
adequate to assure that a reasonably complete list of prerequisites for startup
      their supervisors is warranted to assure a safe restart of the unit.
was _ identified and documented.
      As a result of our inspections, we identified two apparent violations of NRC
We noted that a significant amount of we-k
      requirements.     In your response, you should follow the instructions               in
remains in the procedure revision and design analysis areas. Careful manage-
      -Appendix A.
ment involvement and close attention to detail on the part of personnel and
      Also, this letter acknowledges receipt of your letter, dated February 19, 1987,
their supervisors is warranted to assure a safe restart of the unit.
      concerning your test objectives for the integrated functional test of the
As a result of our inspections, we identified two apparent violations of NRC
      remote shutdown panel installed in accordance with 10 CFR 50 Appendix R. We
requirements.
      are in fundamental agreement with these objectives and we will be conducting a
In your response, you should follow the instructions
      more detailed review, including test witnessing, in a future inspection.
in
      Thank you for your cooperation in these matters.
-Appendix A.
                                                  Sincerely,
Also, this letter acknowledges receipt of your letter, dated February 19, 1987,
          8703260213 EI70318
concerning your test objectives for the integrated functional test of the
          PDR    ADOCK 05000289
remote shutdown panel installed in accordance with 10 CFR 50 Appendix R.
                                                                                        t/s
We
          G
are in fundamental agreement with these objectives and we will be conducting a
                                                                                        f( E
more detailed review, including test witnessing, in a future inspection.
                              PDR
Thank you for your cooperation in these matters.
                                                  Orir.inc1 Sim e ? '<* t           fg/
Sincerely,
                                                  William F. Kane, Director
8703260213 EI70318
                                                  Division of Reactor Projects
t/s
                                  0FFICIAL RECORD COPY         IR TMIl 87-06 - 0001.0.0
PDR
                                                              03/17/87
ADOCK 05000289
f( E
G
PDR
Orir.inc1 Sim e ? '<* t
fg/
William F. Kane, Director
Division of Reactor Projects
0FFICIAL RECORD COPY
IR TMIl 87-06 - 0001.0.0
03/17/87


                      - _ _ - _ _ _ _ _ _ - _ _ - _
- _ _ - _ _ _ _ _ _ - _ _ - _
l-
g
i,
!
,GPU Nuclear Corporation
2
!
f-
j
Enclosures:
>
1.
Appendix A, Notice of Violation
l
l
-
2.
      g  i,
NRC Region I. Inspection Report 50-289/87-06
cc w/encis:
R. J. Toole, Operations and Maintenance Director, TMI-1
C. W. Smyth, TMI-1 Licensing Manager
R. J. McGoey, Manager, PWR Licensing
E. L. Blake, Jr.
TMI-1 OTSG Hearing Service List
i
Public Document Room (PDR)
I
Local Public Document Room.(LPDR)
r
!
!
            ,GPU Nuclear Corporation                                    2
Nuclear Safety Information Center (NSIC)
!
!
f-
NRC Resident Inspector
j            Enclosures:
Commonwealth of Pennsylvania
>            1.    Appendix A, Notice of Violation
I
l            2.    NRC Region I. Inspection Report 50-289/87-06
bec w/encls:
              cc w/encis:
[
              R. J. Toole, Operations and Maintenance Director, TMI-1
Region i Docket Room (with concurrences)
              C. W. Smyth, TMI-1 Licensing Manager
-
              R. J. McGoey, Manager, PWR Licensing
J. Goldberg, OELD:HQ
              E. L. Blake, Jr.
Management Assistant, DRMA (w/o encls)
              TMI-1 OTSG Hearing Service List                                                              i
Eperations Branch, DRS Files
              Public Document Room (PDR)                                                                    I
    r
              Local Public Document Room.(LPDR)                                                            !
              Nuclear Safety Information Center (NSIC)                                                      !
              NRC Resident Inspector
              Commonwealth of Pennsylvania
I             bec w/encls:
[             Region i Docket Room (with concurrences)
  -
              J. Goldberg, OELD:HQ
              Management Assistant, DRMA (w/o encls)
!
!
              Eperations Branch, DRS Files
C. Collins, Deputy Director
              C. Collins, Deputy Director
R. Blough, DRP Section Chief
              R. Blough, DRP Section Chief
W. Travers, NRR
              W. Travers, NRR
J. Thoma, PM, NRR
              J. Thoma, PM, NRR
T. Ross, PM, NRR
              T. Ross, PM, NRR
K. Abraham, RI
              K. Abraham, RI
R. Conte, RI
              R. Conte, RI
W. Baunack, RI
              W. Baunack, RI
P. Bissett, RI
              P. Bissett, RI
-L. Briggs, RI
    ,        -L. Briggs, RI
,
              D. Johnson, RI
D. Johnson, RI
              J. Kaucher, RI
J. Kaucher, RI
              T. Kenny, RI
T. Kenny, RI
              S. Peleschak, RI
S. Peleschak, RI
              D.' Trimble, RI
D.' Trimble, RI
              F. Young, RI
F. Young, RI
                                                      k
k
        .    RI:DRP                                 RI:DRP               RI:DRP
RI:DRP
              RConte/geb/mjd                         ABlough               WKane
RI:DRP
              3/ /87                                 3/4/87               3/ /87
RI:DRP
                                                  4         0FFICIAL RECORD COPY   IR TMIl 87-06 - 0002.0.0
.
                                                    N     tv                       03/18/87
RConte/geb/mjd
                                                      nc , ,
ABlough
                                                          eg '
WKane
                                                            %
3/ /87
                                                                ,
3/4/87
                                                                  %s  9
3/ /87
4
0FFICIAL RECORD COPY
IR TMIl 87-06 - 0002.0.0
N
tv
03/18/87
nc , ,
eg '
%
%s
,
9


                    -__
-__
    h,   t,
h,
            GPU Nuclear Corporation                   2
t,
                                                                                        h'AR 18 Lc87
GPU Nuclear Corporation
            Enclosures:
2
            1.   Appendix A, Notice of Violation
h'AR 18 Lc87
            2.   NRC Region I Inspection Report 50-289/87-06
Enclosures:
            cc w/encls:
1.
            R. J. Toole, Operations and Maintenance Director, TMI-1
Appendix A, Notice of Violation
            C. W. Smyth, TMI-1 Licensing Manager
2.
            R. J. McGoey, Manager, PWR Licensing
NRC Region I Inspection Report 50-289/87-06
            E. L. Blake, Jr.
cc w/encls:
            TMI-1 GTSG Hearing Service List
R. J. Toole, Operations and Maintenance Director, TMI-1
            Public Document Room (POR)
C. W. Smyth, TMI-1 Licensing Manager
            local Public Document Room (LPOR)
R. J. McGoey, Manager, PWR Licensing
            Nuclear Safety Information Center (NSIC)
E. L. Blake, Jr.
            NRC Resident Inspector
TMI-1 GTSG Hearing Service List
            Commonwealth of Pennsylvania
Public Document Room (POR)
            bec w/encis:
local Public Document Room (LPOR)
            Region 1 Docket Room (with concurrences)
Nuclear Safety Information Center (NSIC)
            J. Goldberg, OELD:HQ
NRC Resident Inspector
            Management Assistant, DRMA (w/o encis)
Commonwealth of Pennsylvania
            Operations Branch, DRS Files
bec w/encis:
            S. Collins, DRP Bnneh4Mef Q'Areth
Region 1 Docket Room (with concurrences)
            R. Blough, DRP Section Chief
J. Goldberg, OELD:HQ
            W. Travers, NRR
Management Assistant, DRMA (w/o encis)
            J. Thoma, PM, NRR
Operations Branch, DRS Files
            T. Ross, PM, NRR
h
            K. Abraham,'RI
S. Collins, DRP Bnneh4Mef Q'Aret
            R. Conte, RI
R. Blough, DRP Section Chief
            W. Baunack, RI
W. Travers, NRR
            P. Bissett, RI
J. Thoma, PM, NRR
            L. Briggs, RI
T. Ross, PM, NRR
            D. Johnson, RI
K. Abraham,'RI
            J. Kaucher, RI
R. Conte, RI
            T. Kenny, RI
W. Baunack, RI
            S. Peleschak, RI
P. Bissett, RI
            D..Trimble, RI
L. Briggs, RI
            F. Young, RI
D. Johnson, RI
        # RI:DRP
J. Kaucher, RI
                                $RI:DRP                                                   8( [P
T. Kenny, RI
        N RConte/gcb/mjd           ABlough
S. Peleschak, RI
                                                          RI\DRP/
D..Trimble, RI
                                                          SCo'llins
F. Young, RI
                                                                                          f.ne
$
            3/G/87               3//)/87               3/   87                         3/17/87
RI\\DRP/
                                        0FFICIAL RECORD COPY           IR TMIl 87-06 - 0002.0.0
8( [P
                                                                        03/17/87
# RI:DRP
                                                                                                        i
RI:DRP
                                                                                                        l
N RConte/gcb/mjd
ABlough
SCo'llins
f.ne
3/G/87
3//)/87
3/
87
3/17/87
0FFICIAL RECORD COPY
IR TMIl 87-06 - 0002.0.0
03/17/87
i
l
t
t
1 --               _                                 _     -
1 --
                                                                    _-__     _ , - _ .     ,   ,. ._
_
_
-
_-__
_ , - _ .
,
,.
._
}}
}}

Latest revision as of 20:09, 7 December 2024

Forwards Insp Rept 50-289/87-06 on 870217-0303 & Notice of Violation.Insp Conducted to Assess Licensee Control Measures to Assure Overall Readiness of Facility & Personnel for Cycle 6 Startup in Light of 5 Month Refueling Outage
ML20204F536
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/18/1987
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20204F540 List:
References
NUDOCS 8703260213
Download: ML20204F536 (3)


See also: IR 05000289/1987006

Text

-

"

,

MAR 181987

Docket No. 50-289

GPU Nuclear Corporation

ATTN: Mr. H. D. Hukill

Vice President and Director, TMI-1

P. O. Box 480

Middletown, Pennsylvania 17057

Gentlemen:

Subject:

Inspection Report No. 50-289/87-06

During the period from February 17 to March 3, 1987, a Region I team of ten

inspectors conducted a startup readiness assessment at the Three Mile Island

Unit 1 Nuclear Power Station.

The purpose of this inspection was to assess

licensee control measures to assure the overall readiness of the facility and

personnel for the planned Cycle 6 startup in light of the five month refueling

outage. At the conclusion of the inspection, Mr. R. Conte of my staff summar-

ized the inspection findings with you and other members of your~ staff.

Since the inspection was conductsd with a number of weeks remaining in the out-

age, the plant was not expected to be, nor was it found to be, fully ready for

startup.

However, the team concluded that overall your control measures were

adequate to assure that a reasonably complete list of prerequisites for startup

was _ identified and documented.

We noted that a significant amount of we-k

remains in the procedure revision and design analysis areas. Careful manage-

ment involvement and close attention to detail on the part of personnel and

their supervisors is warranted to assure a safe restart of the unit.

As a result of our inspections, we identified two apparent violations of NRC

requirements.

In your response, you should follow the instructions

in

-Appendix A.

Also, this letter acknowledges receipt of your letter, dated February 19, 1987,

concerning your test objectives for the integrated functional test of the

remote shutdown panel installed in accordance with 10 CFR 50 Appendix R.

We

are in fundamental agreement with these objectives and we will be conducting a

more detailed review, including test witnessing, in a future inspection.

Thank you for your cooperation in these matters.

Sincerely,

8703260213 EI70318

t/s

PDR

ADOCK 05000289

f( E

G

PDR

Orir.inc1 Sim e ? '<* t

fg/

William F. Kane, Director

Division of Reactor Projects

0FFICIAL RECORD COPY

IR TMIl 87-06 - 0001.0.0

03/17/87

- _ _ - _ _ _ _ _ _ - _ _ - _

l-

g

i,

!

,GPU Nuclear Corporation

2

!

f-

j

Enclosures:

>

1.

Appendix A, Notice of Violation

l

2.

NRC Region I. Inspection Report 50-289/87-06

cc w/encis:

R. J. Toole, Operations and Maintenance Director, TMI-1

C. W. Smyth, TMI-1 Licensing Manager

R. J. McGoey, Manager, PWR Licensing

E. L. Blake, Jr.

TMI-1 OTSG Hearing Service List

i

Public Document Room (PDR)

I

Local Public Document Room.(LPDR)

r

!

Nuclear Safety Information Center (NSIC)

!

NRC Resident Inspector

Commonwealth of Pennsylvania

I

bec w/encls:

[

Region i Docket Room (with concurrences)

-

J. Goldberg, OELD:HQ

Management Assistant, DRMA (w/o encls)

Eperations Branch, DRS Files

!

C. Collins, Deputy Director

R. Blough, DRP Section Chief

W. Travers, NRR

J. Thoma, PM, NRR

T. Ross, PM, NRR

K. Abraham, RI

R. Conte, RI

W. Baunack, RI

P. Bissett, RI

-L. Briggs, RI

,

D. Johnson, RI

J. Kaucher, RI

T. Kenny, RI

S. Peleschak, RI

D.' Trimble, RI

F. Young, RI

k

RI:DRP

RI:DRP

RI:DRP

.

RConte/geb/mjd

ABlough

WKane

3/ /87

3/4/87

3/ /87

4

0FFICIAL RECORD COPY

IR TMIl 87-06 - 0002.0.0

N

tv

03/18/87

nc , ,

eg '

%

%s

,

9

-__

h,

t,

GPU Nuclear Corporation

2

h'AR 18 Lc87

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC Region I Inspection Report 50-289/87-06

cc w/encls:

R. J. Toole, Operations and Maintenance Director, TMI-1

C. W. Smyth, TMI-1 Licensing Manager

R. J. McGoey, Manager, PWR Licensing

E. L. Blake, Jr.

TMI-1 GTSG Hearing Service List

Public Document Room (POR)

local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/encis:

Region 1 Docket Room (with concurrences)

J. Goldberg, OELD:HQ

Management Assistant, DRMA (w/o encis)

Operations Branch, DRS Files

h

S. Collins, DRP Bnneh4Mef Q'Aret

R. Blough, DRP Section Chief

W. Travers, NRR

J. Thoma, PM, NRR

T. Ross, PM, NRR

K. Abraham,'RI

R. Conte, RI

W. Baunack, RI

P. Bissett, RI

L. Briggs, RI

D. Johnson, RI

J. Kaucher, RI

T. Kenny, RI

S. Peleschak, RI

D..Trimble, RI

F. Young, RI

$

RI\\DRP/

8( [P

  1. RI:DRP

RI:DRP

N RConte/gcb/mjd

ABlough

SCo'llins

f.ne

3/G/87

3//)/87

3/

87

3/17/87

0FFICIAL RECORD COPY

IR TMIl 87-06 - 0002.0.0

03/17/87