Forwards Insp Rept 50-289/87-06 on 870217-0303 & Notice of Violation.Insp Conducted to Assess Licensee Control Measures to Assure Overall Readiness of Facility & Personnel for Cycle 6 Startup in Light of 5 Month Refueling Outage
ML20204F536
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/18/1987
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20204F540 List:
References
NUDOCS 8703260213
Download: ML20204F536 (3)


See also: IR 05000289/1987006

Text

-

"

,

MAR 181987

Docket No. 50-289

GPU Nuclear Corporation

ATTN: Mr. H. D. Hukill

Vice President and Director, TMI-1

P. O. Box 480

Middletown, Pennsylvania 17057

Gentlemen:

Subject:

Inspection Report No. 50-289/87-06

During the period from February 17 to March 3, 1987, a Region I team of ten

inspectors conducted a startup readiness assessment at the Three Mile Island

Unit 1 Nuclear Power Station.

The purpose of this inspection was to assess

licensee control measures to assure the overall readiness of the facility and

personnel for the planned Cycle 6 startup in light of the five month refueling

outage. At the conclusion of the inspection, Mr. R. Conte of my staff summar-

ized the inspection findings with you and other members of your~ staff.

Since the inspection was conductsd with a number of weeks remaining in the out-

age, the plant was not expected to be, nor was it found to be, fully ready for

startup.

However, the team concluded that overall your control measures were

adequate to assure that a reasonably complete list of prerequisites for startup

was _ identified and documented.

We noted that a significant amount of we-k

remains in the procedure revision and design analysis areas. Careful manage-

ment involvement and close attention to detail on the part of personnel and

their supervisors is warranted to assure a safe restart of the unit.

As a result of our inspections, we identified two apparent violations of NRC

requirements.

In your response, you should follow the instructions

in

-Appendix A.

Also, this letter acknowledges receipt of your letter, dated February 19, 1987,

concerning your test objectives for the integrated functional test of the

remote shutdown panel installed in accordance with 10 CFR 50 Appendix R.

We

are in fundamental agreement with these objectives and we will be conducting a

more detailed review, including test witnessing, in a future inspection.

Thank you for your cooperation in these matters.

Sincerely,

8703260213 EI70318

t/s

PDR

ADOCK 05000289

f( E

G

PDR

Orir.inc1 Sim e ? '<* t

fg/

William F. Kane, Director

Division of Reactor Projects

0FFICIAL RECORD COPY

IR TMIl 87-06 - 0001.0.0

03/17/87

- _ _ - _ _ _ _ _ _ - _ _ - _

l-

g

i,

!

,GPU Nuclear Corporation

2

!

f-

j

Enclosures:

>

1.

Appendix A, Notice of Violation

l

2.

NRC Region I. Inspection Report 50-289/87-06

cc w/encis:

R. J. Toole, Operations and Maintenance Director, TMI-1

C. W. Smyth, TMI-1 Licensing Manager

R. J. McGoey, Manager, PWR Licensing

E. L. Blake, Jr.

TMI-1 OTSG Hearing Service List

i

Public Document Room (PDR)

I

Local Public Document Room.(LPDR)

r

!

Nuclear Safety Information Center (NSIC)

!

NRC Resident Inspector

Commonwealth of Pennsylvania

I

bec w/encls:

[

Region i Docket Room (with concurrences)

-

J. Goldberg, OELD:HQ

Management Assistant, DRMA (w/o encls)

Eperations Branch, DRS Files

!

C. Collins, Deputy Director

R. Blough, DRP Section Chief

W. Travers, NRR

J. Thoma, PM, NRR

T. Ross, PM, NRR

K. Abraham, RI

R. Conte, RI

W. Baunack, RI

P. Bissett, RI

-L. Briggs, RI

,

D. Johnson, RI

J. Kaucher, RI

T. Kenny, RI

S. Peleschak, RI

D.' Trimble, RI

F. Young, RI

k

RI:DRP

RI:DRP

RI:DRP

.

RConte/geb/mjd

ABlough

WKane

3/ /87

3/4/87

3/ /87

4

0FFICIAL RECORD COPY

IR TMIl 87-06 - 0002.0.0

N

tv

03/18/87

nc , ,

eg '

%

%s

,

9

-__

h,

t,

GPU Nuclear Corporation

2

h'AR 18 Lc87

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC Region I Inspection Report 50-289/87-06

cc w/encls:

R. J. Toole, Operations and Maintenance Director, TMI-1

C. W. Smyth, TMI-1 Licensing Manager

R. J. McGoey, Manager, PWR Licensing

E. L. Blake, Jr.

TMI-1 GTSG Hearing Service List

Public Document Room (POR)

local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/encis:

Region 1 Docket Room (with concurrences)

J. Goldberg, OELD:HQ

Management Assistant, DRMA (w/o encis)

Operations Branch, DRS Files

h

S. Collins, DRP Bnneh4Mef Q'Aret

R. Blough, DRP Section Chief

W. Travers, NRR

J. Thoma, PM, NRR

T. Ross, PM, NRR

K. Abraham,'RI

R. Conte, RI

W. Baunack, RI

P. Bissett, RI

L. Briggs, RI

D. Johnson, RI

J. Kaucher, RI

T. Kenny, RI

S. Peleschak, RI

D..Trimble, RI

F. Young, RI

$

RI\\DRP/

8( [P

  1. RI:DRP

RI:DRP

N RConte/gcb/mjd

ABlough

SCo'llins

f.ne

3/G/87

3//)/87

3/

87

3/17/87

0FFICIAL RECORD COPY

IR TMIl 87-06 - 0002.0.0

03/17/87

i

l

t

1 --

_

_

-

_-__

_ , - _ .

,

,.

._