ML20211A302: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:f()~ | {{#Wiki_filter:f()~ | ||
-September 9, 1997-L Federal Energy-Regulatory Commission. | |||
' Atlanta : Regional: Office; | |||
: Attn: > Hr. Jerrold W. Gotzmer. P.E. | : Attn: > Hr. Jerrold W. Gotzmer. P.E. | ||
-Parkridge 85 North Building-- | |||
3125 Presidential Parkwa Atlanta, Georgia: 30340.y - Suite 300-SUBJECTi | 3125 Presidential Parkwa Atlanta, Georgia: 30340.y - Suite 300-SUBJECTi V,C, Summer Nuclear Power Station Service Water Pond Dams | ||
==Dear Mr. Gotzmer:== | ==Dear Mr. Gotzmer:== | ||
0' n office has received the draft o!eration inspection report for the V.C.- | |||
August-19J1997, The draft report states -that there is no evidence of an immediate threat to the safety of the dams. Several suggestions were made to improve the maintenance and instrumentation checks for the structures. | u Summer Nuclear Power Station Servic Water Pond dams. | ||
NRC staff have reviewed tne draft document, and is in agreement with-your findings - Please note that-the correct name for the station is V.C. Summer, not "V.C. Sumner", as stated:in your draft report. Please make the appropriate corrections to the final report document. | The report was dated August-19J1997, The draft report states -that there is no evidence of an immediate threat to the safety of the dams. Several suggestions were made to improve the maintenance and instrumentation checks for the structures. | ||
NRC staff have reviewed tne draft document, and is in agreement with-your findings - Please note that-the correct name for the station is V.C. Summer, not "V.C. Sumner", as stated:in your draft report. | |||
Please make the appropriate corrections to the final report document. | |||
Sincerely.. | -Prior to issuance of ~the Final Report, we request that-if there are significant changes Mr, Wayne B. King P.E., of your office, discuss your-findings with us. JWe would appreciate receiving the final report within 30 days of the date af this letter. | ||
Joseph J. Holonich, Chief Uranium Recovery Branch | If you have any questions regarding this | ||
Division of-Waste Management _ | -correspondence, please call Mr. Daniel Rom at (301) 415-6704. | ||
Office of Nuclear Material _ Safety and Safeguards 1 0-DISTRIBUTI0h: | Sincerely.. | ||
DWM r/f .MFederline CAbrams | j (Originalsigned_by) is Joseph J. Holonich, Chief Uranium Recovery Branch Division of-Waste Management _ | ||
0FC | Office of Nuclear Material _ Safety and Safeguards 1 0-DISTRIBUTI0h: | ||
sTicket DWM-198 M | |||
"II.ErCENTER PUBLIC NMSS r/f URB r/f ACNW | |||
-JGreeves DWM r/f.MFederline CAbrams MLayton dC,h-DOCUMENT NAME: S:\\DWM\\ URB \\DSR\\SUMMERD.REV : | |||
0FC URB 1 URB f, i, d | |||
NAME DRom,fr52-JdiIch DATE | |||
-9/)/97-9/h/97~ | |||
nFF TI AL RECORD COPY 9709240204 970909 NRC FIE CENTER 80PY NE'; | |||
^ | |||
w ggggggy}} | |||
Latest revision as of 00:38, 6 December 2024
| ML20211A302 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 09/09/1997 |
| From: | Joseph Holonich NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Gotzmer J FEDERAL ENERGY REGULATORY COMMISSION |
| References | |
| NUDOCS 9709240204 | |
| Download: ML20211A302 (1) | |
Text
f()~
-September 9, 1997-L Federal Energy-Regulatory Commission.
' Atlanta : Regional: Office;
- Attn: > Hr. Jerrold W. Gotzmer. P.E.
-Parkridge 85 North Building--
3125 Presidential Parkwa Atlanta, Georgia: 30340.y - Suite 300-SUBJECTi V,C, Summer Nuclear Power Station Service Water Pond Dams
Dear Mr. Gotzmer:
0' n office has received the draft o!eration inspection report for the V.C.-
u Summer Nuclear Power Station Servic Water Pond dams.
The report was dated August-19J1997, The draft report states -that there is no evidence of an immediate threat to the safety of the dams. Several suggestions were made to improve the maintenance and instrumentation checks for the structures.
NRC staff have reviewed tne draft document, and is in agreement with-your findings - Please note that-the correct name for the station is V.C. Summer, not "V.C. Sumner", as stated:in your draft report.
Please make the appropriate corrections to the final report document.
-Prior to issuance of ~the Final Report, we request that-if there are significant changes Mr, Wayne B. King P.E., of your office, discuss your-findings with us. JWe would appreciate receiving the final report within 30 days of the date af this letter.
If you have any questions regarding this
-correspondence, please call Mr. Daniel Rom at (301) 415-6704.
Sincerely..
j (Originalsigned_by) is Joseph J. Holonich, Chief Uranium Recovery Branch Division of-Waste Management _
Office of Nuclear Material _ Safety and Safeguards 1 0-DISTRIBUTI0h:
sTicket DWM-198 M
"II.ErCENTER PUBLIC NMSS r/f URB r/f ACNW
-JGreeves DWM r/f.MFederline CAbrams MLayton dC,h-DOCUMENT NAME: S:\\DWM\\ URB \\DSR\\SUMMERD.REV :
0FC URB 1 URB f, i, d
NAME DRom,fr52-JdiIch DATE
-9/)/97-9/h/97~
nFF TI AL RECORD COPY 9709240204 970909 NRC FIE CENTER 80PY NE';
^
w ggggggy