EDGA                   REV 25 (MC)               AP-770 0
EDGA REV 25 (MC)
AP-770 0
EMERGENCY DIESEL GENERATOR ACTUATION l
EMERGENCY DIESEL GENERATOR ACTUATION l
1.0 ENTRY CONDITIONS l
1.0 ENTRY CONDITIONS IN FOR V ATION l
IN FOR V ATION LE an ES 4160V Bus UV occurs,
LE an ES 4160V Bus UV occurs, y
                                        ~~~~
THEN use this procedure.
y THEN use this procedure.
~~~~
1 l
1 l
2.0 IMMEDIATE ACTIONS NOII There are no imediate actions for this procedure.
2.0 IMMEDIATE ACTIONS NOII There are no imediate actions for this procedure.
O l
O l
l l
l l
l l
l b// k Approved by MNP N/[v.'[fo%Date 04/08/98 (SIGRATURE ON FILE)
l b//       k Approved by MNP                   N/[v.'[fo%Date 04/08/98 (SIGRATURE ON FILE)
AP-770 PAGE 1 of 87 EDGA 9804160302 990409 DR ADOCK 0500 2
AP-770                     PAGE 1 of 87                   EDGA 9804160302 990409 DR   ADOCK 0500     2


r lO                                                 O l
r lO O
BLANK PAGE O                                                .c-O 1
BLANK PAGE OO
I l
.c-I l
l
^
                                                    ^
Q.-
,                                                  Q.-
1 AP-770 REV 25 (MC)
1 AP-770 REV 25 (MC)       PAGE 2 of 87   EDGA
PAGE 2 of 87 EDGA


i 3.0 FOLLOW-UP ACTIONS
i 3.0 FOLLOW-UP ACTIONS
!]
!]
l ACTIONS                             DETAILS t
l ACTIONS DETAILS t
3.1       Notify personnel of plant * ,_ STA i
3.1 Notify personnel of plant
conditions.
*,_ STA conditions.
                                        * ._ Plant operators
i
* __ NSM (evaluate plant conditions for entry into the Emergency l                                             Plan)
*._ Plant operators
                                                                            )
* __ NSM (evaluate plant conditions for entry into the Emergency l
3.2       jf at least one ES 4160V bus is energized, IliEB GO TO Step 3.12 in this procedure.
Plan)
O I
)
l
3.2 jf at least one ES 4160V bus is energized, IliEB GO TO Step 3.12 in this procedure.
O
(
(
)
)
i         AP-770         REV 25 (MC)     PAGE 3 of 87               EDGA
i AP-770 REV 25 (MC)
PAGE 3 of 87 EDGA


o i
o i
Line 62: Line 64:
l I
l I
{
{
i.
i.-s j
                                                -s j AP-770 REV 25 (MC)       PAGE 4 of 87 EDGA     l i
AP-770 REV 25 (MC)
PAGE 4 of 87 EDGA i
t
t


{
{
i                                                                                     .
i 3.0 FOLLOW-UP ACTIONS (CONT'D)
3.0 FOLLOW-UP ACTIONS (CONT'D)                                                    )
,p l \\d ACTIONS DETAILS
,p l \d                 ACTIONS                                     DETAILS             {
{
i STATUS l
i STATUS l
Both ES buses are de-energized.
Both ES buses are de-energized.
l t
t 3.3 Verify lockouts are not 1 Notify PP0 to verify EDG lockouts tripped.
3.3       Verify lockouts are not       1 Notify PP0 to verify EDG lockouts     l tripped.                         are not tripped:
are not tripped:
                                                      "868 3209 A EDG LOCK 0UT RELAY" l (A ES 4160V SWGR Room)         j, "86B-3210 B EDG LOCK 0UT RELAY" (B ES 4160V SWGR Room) 2 Verify ES bus lockouts are not tripped:
"868 3209 A EDG LOCK 0UT RELAY" (A ES 4160V SWGR Room) j "86B-3210 B EDG LOCK 0UT RELAY" (B ES 4160V SWGR Room) 2 Verify ES bus lockouts are not tripped:
A ES Bus         B ES Bus 86B 3205         868-3206 868-3207         868-3208 86B-3211         868-3212 IN If lockouts are tripped on both ES 4160V buses, M PERFORM Enclosure 1, Recovery of a Faulted ES Bus, in this procedure.
A ES Bus B ES Bus 86B 3205 868-3206 868-3207 868-3208 86B-3211 868-3212 IN If lockouts are tripped on both ES 4160V buses, M PERFORM Enclosure 1, Recovery of a Faulted ES Bus, in this procedure.
IE lockouts are tripped on only 1 ES 4160V bus, M CONCURRENTLY PERFORM Enclosure 1, Recovery of a Faulted ES Bus, in this procedure.
IE lockouts are tripped on only 1 ES 4160V bus, M CONCURRENTLY PERFORM, Recovery of a Faulted ES Bus, in this procedure.
l         AP-770         REV 25 (MC)           PAGE 5 of 87                   EDGA l
l AP-770 REV 25 (MC)
PAGE 5 of 87 EDGA l


i                                                       l i
i i
l gl..
gl l
l 1;
i BLANK PAGE O
i BLANK PAGE O                                               ..
1
1 1
?
                                                ?
AP-770 REV 25 (MC)
AP-770 REV 25 (MC)       PAGE 6 of 87 EDGA
PAGE 6 of 87 EDGA


I l   3.0 FOLLOW-UP ACTIONS (CONT'D) i ACTIONS                                   DETAllS 3.4       Prevent auto start of MVP.
I l
* Ensure ES actuations are
3.0 FOLLOW-UP ACTIONS (CONT'D) i ACTIONS DETAllS 3.4 Prevent auto start of MVP.
                                            -- bypassed or reset.
Ensure ES actuations are
* Select MVPs to normal after     I stop.
-- bypassed or reset.
l 3.5       Ensure all ES 4160V feeder Bkrs are open.                   A ES Bus     B ES Bus 3207     __. 3212 3209     __. 3206 3205         3208 3211     __ 3210 O
Select MVPs to normal after stop.
O                                                                               ,
l 3.5 Ensure all ES 4160V feeder Bkrs are open.
3.6       Initiate efforts to       e       Notify Maintenance to initiate restore a source of power.         repair efforts to restore an offsite power source.
A ES Bus B ES Bus 3207
* J.E EDG is @l running, IBM notify PP0 to CONCURRENTLY PERFORM Enclosure 2, Failed EDG Recovery, in this procedure.
__. 3212 3209
* Consider 500KV backfeed as a     i source of offsite power.       '
__. 3206 3205 3208 3211
1 3.7      W M an offsite power J
__ 3210 O
source is available, 08 an EDG is running,
O 3.6 Initiate efforts to e
Notify Maintenance to initiate restore a source of power.
repair efforts to restore an offsite power source.
J.E EDG is @l running, IBM notify PP0 to CONCURRENTLY PERFORM Enclosure 2, Failed EDG Recovery, in this procedure.
Consider 500KV backfeed as a source of offsite power.
W M an offsite power J
3.7 source is available, 08 an EDG is running,
_It13 continue in this procedure.
_It13 continue in this procedure.
l
l I O
!vO l
!v l
AP-770         REV 25 (MC)       PAGE 7 of 87                 EDGA
AP-770 REV 25 (MC)
PAGE 7 of 87 EDGA


O                                             O l
O O
l l
l l
l BLANK PAGE                   l l
BLANK PAGE 1
l 1
O
l O                                             <
<m AP-770 REV 25 (MC)
m   l AP-770 REV 25 (MC)       PAGE 8 of 87 EDGA
PAGE 8 of 87 EDGA


(                                                                                   I i
(
,    3.0 FOLLOW-UP ACTIONS (CONT'D) l(~'
I i
;'                    ACTIONS                               DETAILS l
3.0 FOLLOW-UP ACTIONS (CONT'D) l(~'
3.8       E an EDG is running,
ACTIONS DETAILS l
* __ E associated EDG output voltage l               ItiEli ensure proper voltage       is < 4150V, and frequency.                     EEff raise EDG output voltage:
3.8 E an EDG is running,
* __ E associated EDG output voltage l
ItiEli ensure proper voltage is < 4150V, and frequency.
EEff raise EDG output voltage:
Select affected "EDG A(B)
Select affected "EDG A(B)
EXC VOLT ADJ SELECT" to
EXC VOLT ADJ SELECT" to
                                                        " CONT RM".
" CONT RM".
Ensure EDG voltage is
Ensure EDG voltage is
                                                        = 4160V using "EDG A(B) EXC VOLT ADJUST".
= 4160V using "EDG A(B) EXC VOLT ADJUST".
e     Ensure frequency is = 60 Hz by   I adjusting "EDG A(B) SPEED".
e Ensure frequency is = 60 Hz by I
l l
adjusting "EDG A(B) SPEED".
3.9                                                                           I J.E an ES 4160V bus is energized,                                                         .
l 3.9 J.E an ES 4160V bus is energized, EE!( GO TO Step 3.12 in i
EE!( GO TO Step 3.12 in                                           l O             this procedure,                                                   i V
O this procedure, V
1 i
i lO AP-770 REV 25 (MC)
l l
PAGE 9 of 87 EDGA
lO AP-770         REV 25 (MC)       PAGE 9 of 87               EDGA


O                                               O l
O O
BLANK PAGE ps
BLANK PAGE ps
  '                                                ,. \
\\
i
i
                                                      )
)
a                                             t -
a t
AP-770 REV 25 (MC)       PAGE 10 of 87 EDGA
AP-770 REV 25 (MC)
PAGE 10 of 87 EDGA


l 3.0 FOLLOW-UP ACTIONS (CONT'D)                                                 l ACTIONS                                 DETAILS 3.10     JF at any time, an           1   lE " ACTUATED" lamp on "4160V ES alternate supply is             BUS 3A(3B) ES/UV BLOCK LOCK OUT available to a                   ACTUATED" is lit, de-energized ES bus:             THEN notify PP0 to defeat lockout for affected bus:
3.0 FOLLOW-UP ACTIONS (CONT'D)
BEST Open "AY Knife Switch A ES Offsite Power                     4160V Bus UV Relay Power" Transformer                       (4160V ES BUS 3A-13)         i Aux Transformer                   Open "AY Knife Switch B ES 4160V Bus UV Relay Power"   {
ACTIONS DETAILS 3.10 JF at any time, an 1
            @ND the bus is NOT                     (4160V ES BUS 38-2)         l faulted,                                                           l THEN energize dead bus.               WHEN AY knife switch is     {
lE " ACTUATED" lamp on "4160V ES alternate supply is BUS 3A(3B) ES/UV BLOCK LOCK OUT available to a ACTUATED" is lit, de-energized ES bus:
open,                       I TEEN depress "4160V ESA(ESB)
THEN notify PP0 to defeat lockout for affected bus:
BEST Open "AY Knife Switch A ES Offsite Power 4160V Bus UV Relay Power" Transformer (4160V ES BUS 3A-13) i Aux Transformer Open "AY Knife Switch B ES 4160V Bus UV Relay Power"
{
@ND the bus is NOT (4160V ES BUS 38-2) l
: faulted, l
THEN energize dead bus.
WHEN AY knife switch is
{
: open, TEEN depress "4160V ESA(ESB)
UV RESET" push button for the affected ES 4160V bus.
UV RESET" push button for the affected ES 4160V bus.
WHEN " RESET" lamp on "4160V ES BUS 3A(38) ES/UV BLOCK O                                                   LOCK OUT ACTUATE 0" is lit, IEEN notify PPO to restore lockout for affected bus:
WHEN " RESET" lamp on "4160V ES BUS 3A(38) ES/UV BLOCK O
Close "AY Knife Switch A ES 4160V Bus UV Relay Power" Close "AY Knife Switch !
LOCK OUT ACTUATE 0" is lit, IEEN notify PPO to restore lockout for affected bus:
B ES 4160V Bus UV     l Relay Power"           l 2     Close feeder Bkr from the available power source by holding in "CLOSE" until "4KV ES BUS A(B) DEAD" annunciator alarm I clears (normally d 10 seconds). )1 3.11       WHEN any ES 4160V bus is                                           l energized, AND adequate SCM exists, JHEN continue in this procedure.
Close "AY Knife Switch A ES 4160V Bus UV Relay Power" Close "AY Knife Switch B ES 4160V Bus UV Relay Power" 2
AP-770         REV 25 (MC)       PAGE 11 of 87                 EDGA
Close feeder Bkr from the available power source by holding in "CLOSE" until "4KV ES BUS A(B) DEAD" annunciator alarm I
clears (normally d 10 seconds).
3.11 WHEN any ES 4160V bus is energized, AND adequate SCM exists, JHEN continue in this procedure.
AP-770 REV 25 (MC)
PAGE 11 of 87 EDGA


O                                             O BLANK PAGE O                                             :
O O
AP-770 REV 25 (MC)       PAGE 12 of 87 EDGA
BLANK PAGE O
AP-770 REV 25 (MC)
PAGE 12 of 87 EDGA


3.0 FOLLOW-UP ACTIONS (CONT'D)
3.0 FOLLOW-UP ACTIONS (CONT'D)
/ \
/ \\
\                     ACTIONS                                   DETAILS STATUS At least 1 ES 4160V bus is energized.
\\
3.12       Verify letdown flow exists.
ACTIONS DETAILS STATUS At least 1 ES 4160V bus is energized.
If letdown flow does NOT
3.12 Verify letdown flow exists.
* Close MUV-49               J exist,                                                           i THEN isolate letdown.
If letdown flow does NOT Close MUV-49 J
* If MUV-49 will NOI close, l M Close;                   I MUV-50 J
: exist, i
THEN isolate letdown.
If MUV-49 will NOI close, l
M Close; I
MUV-50 J
MVV-51
MVV-51
/"'                                                                               I
/"'
(_,T/ 3.13       LF at any time, letdown flow restoration is desired, THEN CONCURRENTLY PERFORM E0P-14, Enclosure 4, Letdown Recovery.
(_,T/
3.13 LF at any time, letdown flow restoration is
: desired, THEN CONCURRENTLY PERFORM E0P-14, Enclosure 4, Letdown Recovery.
/~'T V
/~'T V
AP-770         REV 25 (MC)           PAGE 13 of 87             EDGA
AP-770 REV 25 (MC)
PAGE 13 of 87 EDGA


Applicable carry-over steps:
Applicable carry-over steps:
em  3.13 lE letdown flow restoration is desired, THEN CONCURRENTLY...
3.13 lE letdown flow restoration is desired, THEN CONCURRENTLY...
                                                                              ?i o) i b,a-AP-770         REV 25 (MC)               PAGE 14 of 87       EDGA
em
?i o) i b,a-AP-770 REV 25 (MC)
PAGE 14 of 87 EDGA


I 3.0 FOLLOW-UP ACTIONS (CONT'D)
3.0 FOLLOW-UP ACTIONS (CONT'D)
ACTIONS                               DETAILS l
ACTIONS DETAILS 3.14 Verify at least 1 SW pump running.
3.14       Verify at least 1 SW pump                                       i running.                           SWP-1A SWP-1B SWP-lc E no SW pumps are         1   E SW flow has been lost to running,                         RCPs, THEN start an available SW     M close SW valves to RCPs:     I pump.
SWP-1A SWP-1B SWP-lc E no SW pumps are 1
                                                                            )
E SW flow has been lost to
RCP-1A         SWV-80 __,SWV-84 RCP-18         SWV-79     SWV-83 RCP-lC   __ SWV-82       SWV-86 i RCP-lD         SWV-81     SWV-85 ,
: running, RCPs, THEN start an available SW M close SW valves to RCPs:
2    E the bus is being supplied by the EDG,                       1 M ensure adequate EDG margin exists.                       l (Rule 5, EDG Control) 3     Start available SW pump.
pump.
O AP-770         REV 25 (MC)     PAGE 15 of 87             EDGA
RCP-1A SWV-80
__,SWV-84 RCP-18 SWV-79 SWV-83 RCP-lC
__ SWV-82 SWV-86 RCP-lD SWV-81 SWV-85 2
E the bus is being supplied by the EDG, M ensure adequate EDG margin exists.
(Rule 5, EDG Control) 3 Start available SW pump.
O AP-770 REV 25 (MC)
PAGE 15 of 87 EDGA


1 Applicable carry-over steps:
1 Applicable carry-over steps:
3.13 lE letdown flow restoration is desired, I!![N CONCURRENTLY...
3.13 lE letdown flow restoration is desired, I!![N CONCURRENTLY...
o l
o O
I O                                                                        .~.i I
.~.i O
l O                                                                        s. -
s.
AP-770         REV 25 (MC)             PAGE 16 of 87           EDGA
AP-770 REV 25 (MC)
PAGE 16 of 87 EDGA


! 3.0 FOLLOW-UP ACTIONS (CONT'D)                                             !
3.0 FOLLOW-UP ACTIONS (CONT'D) l ACTIONS DETAILS 1
l                                                                             I ACTIONS                               DETAILS 1
l 3.15 Verify at least 1 MVP running.
l 3.15       Verify at least 1 MVP running.                         MVP-1A l                                             MVP-1B l
MVP-1A l
MVP-1B l
MVP-lc l
MVP-lc l
1E no MVPs are running, AN.Q MVP restart is desired, M CONCURRENTLY PERFORM Enclocure 3, MVP Restart, in this procedure.
1E no MVPs are running, AN.Q MVP restart is
3.16       Verify at least 1 SW RW pump running.                     RWP-1 RWP-2A RWP-2B E no SW RW pumps are     1     E the bus is being supplied by   I running,                       the EDG,                         i M start an available SW         J.!!M ensure adequate EDG margin i RW pump,                       exists.                         )
: desired, M CONCURRENTLY PERFORM Enclocure 3, MVP Restart, in this procedure.
l                                        [ Rule 5, EDG Control]
3.16 Verify at least 1 SW RW pump running.
2     Start available SW RW pump.
RWP-1 RWP-2A RWP-2B E no SW RW pumps are 1
E the bus is being supplied by
: running, the EDG, M start an available SW J.!!M ensure adequate EDG margin RW pump, exists.
)
[ Rule 5, EDG Control]
l 2
Start available SW RW pump.
l 1
l 1
AP-770         REV 25 (MC)   PAGE 17 of 87               EDGA
AP-770 REV 25 (MC)
PAGE 17 of 87 EDGA


1 1
Applicable carry-over steps:
Applicable carry-over steps:                                                 I
: f. m 3.131[ letdown flow restoration is desind, THEN CONCURRENTLY...
: f. m     3.131[ letdown flow restoration is desind, THEN CONCURRENTLY...
N]
N]
1 l
l')
l l
(_/
l l')                                                                               .-  1
i s
(_/                                                                           :
s i
l l
l l
1 s
(U s
l (U                                                                              .
l AP-770 REV 25 (MC)
AP-770         REV 25 (MC)             PAGE 18 of 87       EDCA       l
PAGE 18 of 87 EDCA l


LO FOLLOW-UP ACTIONS (CONT'D)
LO FOLLOW-UP ACTIONS (CONT'D)
ACTIONS                             DETAILS 3.17     Verify ES MCC 3AB is energized.
ACTIONS DETAILS 3.17 Verify ES MCC 3AB is energized.
IE ES MCC 3AB is NOT       1     E the energized ES 480V bus is energized,                       powered from the EDG, 1 HEN align ES MCC 3AB to       IEEN ensure 42 KW of EDG margin an energized bus,               exists.
IE ES MCC 3AB is NOT 1
E the energized ES 480V bus is energized, powered from the EDG, 1 HEN align ES MCC 3AB to IEEN ensure 42 KW of EDG margin an energized bus, exists.
(Rule 5, EDG Control]
(Rule 5, EDG Control]
2     Depress transfer push button for ES MCC 3AB to the energized bus.
2 Depress transfer push button for ES MCC 3AB to the energized bus.
3.18     E DHR is required, IBfd CONCURRENTLY PERFORM AP-404, Loss of Decay Heat Removal, beginning with q             Step 3.1
3.18 E DHR is required, IBfd CONCURRENTLY PERFORM AP-404, Loss of Decay Heat Removal, beginning with q
  %)     (Rule 5, EDG Control)                                                 ,
Step 3.1
l I
%)
i l
(Rule 5, EDG Control) l i
l l
l l
Q                                   L AP-770         REV 25 (MC)     PAGE 19 of 87             EDGA
Q L
AP-770 REV 25 (MC)
PAGE 19 of 87 EDGA


f I
f I
Applicable carry-over steps:
Applicable carry-over steps:
(
3.131E letdown flow restoration is desired, THEN CONCURRENTLY...
3.131E letdown flow restoration is desired, THEN CONCURRENTLY...
(
O l
'                                                                            O l
l
l
    \                                                                       s a                                                                         r'~
\\
Ov                                                                        e C
a r'~
AP-770       REV 25 (MC)               PAGE 20 of 87       EDGA
s O
v e
C AP-770 REV 25 (MC)
PAGE 20 of 87 EDGA


F l
F l
l 3.0 FOLLOW-UP ACTIONS (CONT'D)
l 3.0 FOLLOW-UP ACTIONS (CONT'D)
I ACTIONS                                     DETAILS 3.19       Verify ES 480V UV lockouts l
I ACTIONS DETAILS 3.19 Verify ES 480V UV lockouts l
are not actuated.
are not actuated.
l J.E ES 480V UV lockouts are 1 _ _ E AB is accessible, actuated,                           IliW notify PP0 to perform the     i l               JJim reset lockouts,               following for affected EDG:       1 I
l J.E ES 480V UV lockouts are 1 _ _ E AB is accessible,
Select CAHE-3A "A BAST l                                                         HEATER" to "0FF" (119 ft AB by BASTS).
: actuated, IliW notify PP0 to perform the i
Select CAHE-3B "B BAST     I HEATER" to "0FF" (119 ft AB by BASTS).                 l 2 ___ E AB is NOT accessible,             ;
l JJim reset lockouts, following for affected EDG:
1113 derate affected EDG by       I 50 KW.                             !
1 I
Select CAHE-3A "A BAST l
HEATER" to "0FF" (119 ft AB by BASTS).
Select CAHE-3B "B BAST HEATER" to "0FF" (119 ft AB by BASTS).
2 ___ E AB is NOT accessible, 1113 derate affected EDG by 50 KW.
[ Rule 5, EDG Control]
[ Rule 5, EDG Control]
3       Select BWST HTR control switch l
3 Select BWST HTR control switch l
to " LOCAL".
to " LOCAL".
4       Bypass or reset ES actuation.
4 Bypass or reset ES actuation.
5 Reset affected ES 480V UV lockouts:
5 Reset affected ES 480V UV lockouts:
A ES Bus         B ES Bus l
A ES Bus B ES Bus l
1         8627/ESA         8627/ESB l 2         86X27/ESA
1 8627/ESA 8627/ESB l
                                                                          ,      J" l
J" 2
86X27/ESA l
l l
l l
l O
l O
AP-770         REV 25 (MC)       PAGE 21 of 87                     EDGA
AP-770 REV 25 (MC)
PAGE 21 of 87 EDGA


i l
i l
Applicable carry-over steps:
Applicable carry-over steps:
3.13 LF. letdown flow restoration is desired, I!!@ CONCURRENTLY.. .
3.13 LF. letdown flow restoration is desired, I!!@ CONCURRENTLY...
l t'')
t'')
C/
C/
                                                                                  .. I
( '..
( '. . l O
O v
v g     .
g AP-770 REV 25 (MC)
AP-770         REV 25 (MC)             PAGE 22 of 87           EDGA         l l
PAGE 22 of 87 EDGA l
l                                                                                       ,
l I
I


3.0 FOLLOW-UP ACTIONS (CONT'D)
3.0 FOLLOW-UP ACTIONS (CONT'D) l ACTIONS DETAILS i
ACTIONS                             DETAILS l
i
: 3. 20 __ Verify IA pressure is
: 3. 20 __ Verify IA pressure is
              > 90 psig.
> 90 psig.
1 jfE IA pressure is
1 jfE IA pressure is IE an outside air compressor is l
* IE an outside air compressor is l               s 90 psig,                   available, JEEN start available air       JEEN notify SP0 to start compressors,                   available compressor:
s 90 psig, available, JEEN start available air JEEN notify SP0 to start compressors, available compressor:
SAP-lc SAP-lD SAP-lE l
SAP-lc SAP-lD SAP-lE l
O l
' O l
1 II AP-770         REV 25 (MC)     PAGE 23 of 87             EDGA
1 II AP-770 REV 25 (MC)
PAGE 23 of 87 EDGA


l l
l l
Applicable carry-over steps:
Applicable carry-over steps:
iG       3.13 If letdown flow restoration is desired, THEN CONCURRENTLY...
iG 3.13 If letdown flow restoration is desired, THEN CONCURRENTLY...
L. j l
L. j l
n q ,1                                                                              -
n q,1 4
1 4
s l
s l
l
~
      ~
\\
      \
v I
v       -
AP 770 REV 25 (MC)
I            AP 770                                   PAGE 24 of 87 REV 25 (MC)                                   EDGA
PAGE 24 of 87 EDGA


I 3.0 FOLLOW-UP ACTIONS (CONT'D) i
3.0 FOLLOW-UP ACTIONS (CONT'D) i ACTIONS DETAILS 3.21 Ensure RB cooling.
    .,              ACTIONS                         DETAILS 3.21     Ensure RB cooling. 1   E RB cooling by SW is desired, M perform the following in       I order:
1 E RB cooling by SW is desired, M perform the following in order:
Close SWV-151 Close SWV-152               '
Close SWV-151 Close SWV-152 Close SWV-355 Open SWV-353 Open SWV-354 2
Close SWV-355 Open SWV-353 Open SWV-354 2   E RB cooling by CI is desired,   "
E RB cooling by CI is desired, M perform the following in order:
l M perform the following in order:
l Close SWV 353 l
l                                               Close SWV 353 l
l Close SWV-354 Open SWV-151 l
l                                               Close SWV-354 Open SWV-151 l                                               Open SWV-152 l
Open SWV-152 l
Open SWV-355 3 Proper RB cooling unit operation:
Open SWV-355 3 Proper RB cooling unit operation:
E ES has N_ql actuated, i
E ES has N_ql actuated, i
M ensure both ES selected RB     l cooling units running in slow   1 speed.                           i E ES has actuated,               1 M ensure only 1 ES selected     l RB cooling unit running in slow l speed.
M ensure both ES selected RB cooling units running in slow 1
speed.
E ES has actuated, M ensure only 1 ES selected RB cooling unit running in slow speed.
[ Rule 5,EDGControl]
[ Rule 5,EDGControl]
O V
OV AP-770 REV 25 (MC)
AP-770       REV 25 (MC) PAGE 25 of 87             EDGA
PAGE 25 of 87 EDGA


f Applicable carry-over steps:
f Applicable carry-over steps:
q   3.13 If letdown flow restoration is desired,18Q1 CONCURRENTLY. . .
q 3.13 If letdown flow restoration is desired,18Q1 CONCURRENTLY...
\
f.o
L/                                                                          f.o c 's                                                                            _
' L/
                                                                                      )
\\
U                                                                           :
U c 's
l
. )
  .)                                                                           ,
~_
                                                                                ~_
AP-770 REV 25 (MC)
AP-770         REV 25 (MC)             PAGE 26 of 87         EDGA
PAGE 26 of 87 EDGA


l 1
l 1
3.0 FOLLOW-UP ACTIONS (CONT'D)
3.0 FOLLOW-UP ACTIONS (CONT'D)
ACTIONS                             DETAILS t
ACTIONS DETAILS t
3.22     Verify at least 2 PZR Htr groups energized.
3.22 Verify at least 2 PZR Htr groups energized.
E at least 2 PZR Htrs
E at least 2 PZR Htrs E A ES 4160V BUS is the desired groups are NOT energized,
* E A ES 4160V BUS is the desired   ,
: source, i
groups are NOT energized,       source,                         i MQ PZR Htrs are desired,         THEN CONCURRENTLY PERFORM       l ItiW energize PZR Htrs           Enclosure 4, A ES 4160V BUS     l from the desired source.       Supply to Support Equipment, in this procedure.
MQ PZR Htrs are desired, THEN CONCURRENTLY PERFORM l
ItiW energize PZR Htrs, A ES 4160V BUS l
from the desired source.
Supply to Support Equipment, in this procedure.
l
l
[ Rule 5, EDG Control]               '
[ Rule 5, EDG Control]
* E B ES 4160V BUS is the desired ,
E B ES 4160V BUS is the desired
source,               .        l THEN CONCURRENTLY PERFORM Enclosure 5, B ES 4160V BUS     j Supply to Support Equipment, in   !
: source, l
this procedure.
THEN CONCURRENTLY PERFORM, B ES 4160V BUS j
[ Rule 5, EDG Control)               )
Supply to Support Equipment, in this procedure.
3.23     E both ES 4160V buses are                                       q energized,                                                       I I!!@ GO TO Step 3,30 in this procedure.
[ Rule 5, EDG Control)
i O                                                                             .
)
I AP-770         REV 25 (MC)     PAGE 27 of 87               EDGA     l l
3.23 E both ES 4160V buses are q
energized, I!!@ GO TO Step 3,30 in this procedure.
i O
AP-770 REV 25 (MC)
PAGE 27 of 87 EDGA


Applicable carry-over steps:
Applicable carry-over steps:
O   3.131E letdown flow restoration is desired, THEN CONCURRENTLY...
O 3.131E letdown flow restoration is desired, THEN CONCURRENTLY...
O                                                                             b, I
O b,
I 1
i o)
i o)
L                                                                         i 1
L i
i l
i l
l                                                                                   \
l
\\
0 v
0 v
i'    -
i AP-770 REV 25 (MC)
AP-770       REV 25 (MC)               PAGE 28 of 87       EOGA l                                                                                  l l
PAGE 28 of 87 EOGA l
l


I 3.0 FOLLOW-UP ACTIONS (CONT'D)
3.0 FOLLOW-UP ACTIONS (CONT'D)
ACTIONS                                   DETAILS l                                         STATUS l                             Only 1 ES 4160V bus is energized.
ACTIONS DETAILS l
STATUS l
Only 1 ES 4160V bus is energized.
l l
l l
3.24       Prevent auto start of MVP
3.24 Prevent auto start of MVP Ensure ES actuations are on dead bus, bypassed or reset.
* Ensure ES actuations are on dead bus,                         bypassed or reset.
e Place MVP on affected bus in normal after stop.
e     Place MVP on affected bus in normal after stop.
3.25 Ensure all ES 4160V feeder Bkrs are open on the dead A ES Bus B ES Bus bus.
3.25       Ensure all ES 4160V feeder Bkrs are open on the dead         A ES Bus   B ES Bus bus.
3207 3212 3209 3206 3205 3208 3211 3210 t
;                                                      3207       3212 3209       3206
  .                                                    3205       3208 3211       3210 t
I 9
I 9
AP-770         REV 25 (MC)         PAGE 29 of 87               EDGA t
AP-770 REV 25 (MC)
PAGE 29 of 87 EDGA t


Applicable carry-over steps:
Applicable carry-over steps:
3.13 .lf letdown flow restoration is desired, THEN CONCURRENTLY...
~~
    ~~
3.13.lf letdown flow restoration is desired, THEN CONCURRENTLY...
  ,P%
,P%
  %.                                                                                    l
* <e*
                                                                                      <e* l l
l l
l l
l l
l 1
1 f
f    a j
j a
    %./
%./
                                                                                    ~
~
AP-770         REV 25 (MC)             PAGE 30 of 87       EDGA l
AP-770 REV 25 (MC)
PAGE 30 of 87 EDGA l
l
l


I
I 3.0 FOLLOW-UP ACTIONS (CONT'D) l 7-l()
,    3.0 FOLLOW-UP ACTIONS (CONT'D) l 7-l()                   ACTIONS                             DETAILS 3.26       Jf EDG associated with
ACTIONS DETAILS 3.26 Jf EDG associated with
* __ JE associated EDG output voltage affected bus is running,       is < 4150V,
* __ JE associated EDG output voltage affected bus is running, is < 4150V,
                .T_HfN H    ensure proper           IHEN raise EDG output voltage:
.T_HfN ensure proper IHEN raise EDG output voltage:
alignment.
H alignment.
Select affected "EDG A(B)
Select affected "EDG A(B)
EXC V0LT ADJ SELECT" to
EXC V0LT ADJ SELECT" to
                                                    " CONT RM".
" CONT RM".
                                                .__ Ensure EDG voltage is
.__ Ensure EDG voltage is
                                                    = 4160V using "EDG A(B) EXC VOLT ADJUST".
= 4160V using "EDG A(B) EXC VOLT ADJUST".
* __ Ensure frequency is = 60 Hz by adjusting "EDG A(B) SPEED".
* __ Ensure frequency is = 60 Hz by adjusting "EDG A(B) SPEED".
e     If both ES 4160V buses are energized, THEN GO TO Step 3.30 in this procedure.
e If both ES 4160V buses are energized, THEN GO TO Step 3.30 in this procedure.
tO Q,)
tO Q,)
1 l
!O V
l l
AP-770 REV 25 (MC)
  !O V
PAGE 31 of 87 EDGA
AP-770         REV 25 (MC)   PAGE 31 of 87                 EDGA


i r      Applicable carry-over steps:
i Applicable carry-over steps:
i
r i'f g
'f\_/
o 3.13 IE letdown flow restoration is desired, THEN CONCURRENTLY...
o g
\\_/
3.13 IE letdown flow restoration is desired, THEN CONCURRENTLY. . .
1
1
  'O C)                                                                             <
'O C)
l I
I
  >  \
\\
  %)                                                                             .
%)
AP-770       REV 25 (MC)               PAGE 32 of 87         EDGA
AP-770 REV 25 (MC)
PAGE 32 of 87 EDGA


r 3.0 FOLLOW-UP ACTIONS (CONT'D)
r 3.0 FOLLOW-UP ACTIONS (CONT'D)
ACTIONS                             DETAILS 3.27         Verify lockouts are not 1 Notify PP0 to verify lockouts are I
ACTIONS DETAILS 3.27 Verify lockouts are not 1 Notify PP0 to verify lockouts are I
tripped,                 not tripped on the affected EDG:
: tripped, not tripped on the affected EDG:
                                                "868-3209 A EDG LOCK 0UT RELAY" (A ES 4160V SWGR Room)
"868-3209 A EDG LOCK 0UT RELAY" (A ES 4160V SWGR Room)
                                                "86B-3210 B EDG LOCK 0UT RELAY" (B ES 4160V SWGR Room) 2 Verify ES bus lockouts are not tripped:
"86B-3210 B EDG LOCK 0UT RELAY" (B ES 4160V SWGR Room) 2 Verify ES bus lockouts are not tripped:
A ES Bus         B ES Bus 86B-3205       86B-3206 86B-3207       868-3208 86B-3211       86B-3212 l \       lE any lockout is tripped, IllEE CONCURRENTLY PERFORM Enclosure 1, Recovery of a Faulted ES Bus, in this procedure.
A ES Bus B ES Bus 86B-3205 86B-3206 86B-3207 868-3208 86B-3211 86B-3212 l \\
l l
lE any lockout is tripped, IllEE CONCURRENTLY PERFORM, Recovery of a Faulted ES Bus, in this procedure.
l O
l O
AP-770           REV 25 (MC)   PAGE 33 of 87                 EDGA
AP-770 REV 25 (MC)
PAGE 33 of 87 EDGA


I l
I l
1 1
1 Applicable carry-over steps:
Applicable carry-over steps:
>l p 3.13 IE letdown flow restoration is desired, THEN CONCURRENTLY...
l p   3.13 IE letdown flow restoration is desired, THEN CONCURRENTLY...
k_
k_                                                                               ,  ,
1 l
1 1
l l
l l
l 1
, r *-
Ns) l l
l 1
l l
l l
l l
l V
i 1
s_.
l l
f AP-770 REV 25 (MC)
l l
PAGE 34 of 87 EDGA L
                                                                              , r *-
Ns)                                                                        !
l l
l l
1                                                                                      l l
l l
l V                                                                            s_.
f AP-770         REV 25 (MC)               PAGE 34 of 87       EDGA L


(
(
3.0 FOLLOW-UP ACTIONS (CONT'D1
(
(
O V                 ACTIONS                             DETAILS I
3.0 FOLLOW-UP ACTIONS (CONT'D1 O
3.28       If at any time, an     1     1E " ACTUATED" lamp on "4160V ES alternate supply is           BUS 3A(3B) ES/UV BLOCK LOCK OUT
V ACTIONS DETAILS I
!                available to a                 ACTUATED" is lit, l               de-energized ES bus:           THEN notify PP0 to defeat i                                               lockout for affected bus:
3.28 If at any time, an 1
l                     BEST l                                                   Open "AY Knife Switch A ES l                     Offsite Power                 4160V Bus UV Relay Power" l                     Transformer                   (4160V ES BUS 3A-13) l               .___ Aux Transformer               Open "AY Knife Switch B ES 4160V Bus UV Relay Power" A.N.Q N    the bus is NOT               (4160V ES BUS 3B-2)
1E " ACTUATED" lamp on "4160V ES alternate supply is BUS 3A(3B) ES/UV BLOCK LOCK OUT available to a ACTUATED" is lit, l
I                 faulted, l               TU @ energize affer.ted             WHEN AY knife switch is bus.                               open, 1116 depress "4160V ESA(ESB)
de-energized ES bus:
THEN notify PP0 to defeat i
lockout for affected bus:
l BEST l
Open "AY Knife Switch A ES l
Offsite Power 4160V Bus UV Relay Power" l
Transformer (4160V ES BUS 3A-13) l
.___ Aux Transformer Open "AY Knife Switch B ES 4160V Bus UV Relay Power" A.N.Q the bus is NOT (4160V ES BUS 3B-2)
N I
: faulted, l
TU @ energize affer.ted WHEN AY knife switch is bus.
: open, 1116 depress "4160V ESA(ESB)
UV RESET" push button for the affected ES 4160V bus.
UV RESET" push button for the affected ES 4160V bus.
l                                                   WHEN " RESET" lamp on "4160V ES BUS 3A(38) ES/UV BLOCK
l WHEN " RESET" lamp on "4160V ES BUS 3A(38) ES/UV BLOCK LOCK OUT ACTUATED" is lit,
,s                                                    LOCK OUT ACTUATED" is lit, I                                                     IE @ notify PPO to restore l                                                     lockout for affected bus:
,s I
l Close "AY Knife Switch l                                                           A ES 4160V Bus UV Relay Power" I                                                           Close "AY Knife Switch B ES 4160V Bus UV Relay Power" l
IE @ notify PPO to restore l
2    Close feeder Bkr from the available power source by holding in "CLOSE" until "4KV ES BUS A(B) DEAD" annunciator alarm clears (normally s 10 seconds).
lockout for affected bus:
AP-770         REV 25 (MC)   PAGE 3S of 87               EDGA     l l
l Close "AY Knife Switch l
A ES 4160V Bus UV Relay Power" I
Close "AY Knife Switch B ES 4160V Bus UV l
Relay Power" 2
Close feeder Bkr from the available power source by holding in "CLOSE" until "4KV ES BUS A(B) DEAD" annunciator alarm clears (normally s 10 seconds).
AP-770 REV 25 (MC)
PAGE 3S of 87 EDGA l


Applicable carry-over steps:
Applicable carry-over steps:
1 O 3.13 E letdown flow restoration is desired, THEN CONCURRENTLY...
O 3.13 E letdown flow restoration is desired, THEN CONCURRENTLY...
lQ) l   3.28 E alternate supply available to a de-energized ES bus...           #'-
1 lQ) l 3.28 E alternate supply available to a de-energized ES bus...
l 1
l 1
\
\\
A                                                                       a
A
                                                                              ~
~
I O                                                                       .
a I
l      AP-770       REV 25 (MC)             PAGE 36 of 87         EDGA l
O l
AP-770 REV 25 (MC)
PAGE 36 of 87 EDGA l
l
l


,    3.0 FOLLOW-UP ACTIONS (CONT'0) l                                                                                   '
3.0 FOLLOW-UP ACTIONS (CONT'0) l ACTIONS DETAILS 1
ACTIONS                                 DETAILS 1
1 3.29 IE at any time, a e Notify PP0 to CONCURRENTLY PERFORM de-energized bus is NOT, Failed EDG Recovery, in r
1 3.29       IE at any time, a         e Notify PP0 to CONCURRENTLY PERFORM de-energized bus is NOT       Enclosure 2, Failed EDG Recovery, in r faulted,                     this procedure.                     l AND EDG is NOT running, THEN attempt recovery of failed EDG.
: faulted, this procedure.
3.30       Verify CC ventilation is running.
l AND EDG is NOT running, THEN attempt recovery of failed EDG.
IE CC ventilation is       e CONCURRENTLY PERFORM E0P-14, NOT running,                 Enclosure 17, Control Complex It!W start CC ventilation. Emergency Ventilation.                 j
3.30 Verify CC ventilation is running.
IE CC ventilation is e CONCURRENTLY PERFORM E0P-14, NOT running, 7, Control Complex It!W start CC ventilation.
Emergency Ventilation.
j
{
{
l 1
l i
i
,OQ AP-770 REV 25 (MC)
  ,OQ AP-770         REV 25 (MC)     PAGE 37 of 87                 EDGA
PAGE 37 of 87 EDGA


[
[
l
l Applicable carry-over steps:
.      Applicable carry-over steps:                                                     !
I I
I I
i,^)
3.13 If, letdown flow restoration is desired, THEN CONCURRENTLY...
3.13 If, letdown flow restoration is desired, THEN CONCURRENTLY...
'('
'('
  ,^)
l 3.28 IE alternate supply available to a de-energized ES bus...
3.28 IE alternate supply available to a de-energized ES bus...                 '
i 3.291E a de energized bus is (LQI faulted, A!LQ EDG is NOT running...
l i
3.291E a de energized bus is (LQI faulted, A!LQ EDG is NOT running...
l l
l l
l l
l rh O
l l
[
l l
rh                                                                               ..
O                                                                              [
l i
l i
f   \                                                                           -
f
  \__/
\\
AP-770         REV 25 (MC)             PAGE 38 of 87         EOGA
\\__/
AP-770 REV 25 (MC)
PAGE 38 of 87 EOGA


3,0 FOLLOW-UP ACTIONS (CONT'D) r ACTIONS                                DETAILS (7
3,0 FOLLOW-UP ACTIONS (CONT'D) r (7
l 3.31       Verify a CC chiller is
ACTIONS DETAILS l
    /                 running.
3.31 Verify a CC chiller is
_ E a CC chiller is NOT       1     E bus is being powered from an running,                         EDG, THEN start a CC chiller.         THEN ensure adequate EDG margin exists.
/
running.
_ E a CC chiller is NOT 1
E bus is being powered from an
: running, EDG, THEN start a CC chiller.
THEN ensure adequate EDG margin exists.
[ Rule 5, EDG Control]
[ Rule 5, EDG Control]
2     Notify PP0 to CONCURRENTLY PERFORM E0P-14, Enclosure 18, Control Complex Chiller Startup.
2 Notify PP0 to CONCURRENTLY PERFORM E0P-14, Enclosure 18, Control Complex Chiller Startup.
3.32     E at any time, Non-lE     e       E DPBC-lG is desired, battery charging is             THEN CONCURRENTLY PERFORM desired,                         Enclosure 4, A ES 4160V BUS p                 JHEN align chargers from         Supply to Support Equipment, in y)                 available buses.                 this procedure.
3.32 E at any time, Non-lE e
e       E DPBC-lH is desired, THEN CONCURRENTLY PERFORM Enclosure 5, B ES 4160V BUS     l Supply to Support Equipment, in j this procedure.                 l e     E DPBC-II is desired to be powered from PZR HTR MCC 3A, THEN CONCURRENTLY PERFORM Enclosure 4, A ES 4160V BUS Supply to Support Equipment, in this procedure, o     E DPBC-II is desired to be powered from PZR HTR MCC 3B, l                                                         THEN CONCURRENTLY PERFORM Enclosure 5, B ES 4160V BUS Supply to Support Equipment, in l
E DPBC-lG is desired, battery charging is THEN CONCURRENTLY PERFORM desired,, A ES 4160V BUS p
JHEN align chargers from Supply to Support Equipment, in y) available buses.
this procedure.
e E DPBC-lH is desired, THEN CONCURRENTLY PERFORM, B ES 4160V BUS l
Supply to Support Equipment, in j
this procedure.
e E DPBC-II is desired to be powered from PZR HTR MCC 3A, THEN CONCURRENTLY PERFORM, A ES 4160V BUS Supply to Support Equipment, in this procedure, o
E DPBC-II is desired to be powered from PZR HTR MCC 3B, l
THEN CONCURRENTLY PERFORM, B ES 4160V BUS Supply to Support Equipment, in l
this procedure.
this procedure.
l g) w AP-770         REV 25 (MC)     PAGE 39 of 87                 EDGA
l g) w AP-770 REV 25 (MC)
PAGE 39 of 87 EDGA f


(
(
l l
l l
Applicable carry-over steps:
Applicable carry-over steps:
p   3.13 E letdown flow restoration is desired, THEN CONCURRENTLY...
p 3.13 E letdown flow restoration is desired, THEN CONCURRENTLY...
3.28 E alternate supply available to a de-energized ES bus...
3.28 E alternate supply available to a de-energized ES bus...
3.29 E a de-energized bus is [LOI faulted, AND EDG is NOT running...
3.29 E a de-energized bus is [LOI faulted, AND EDG is NOT running...
Line 505: Line 598:
l l
l l
l
l
    \
\\
U                                                                           t.
U t.
AP-770       REV 25 (MC)             PAGE 40 of 87         EDGA   l
AP-770 REV 25 (MC)
-                                                                                I
PAGE 40 of 87 EDGA l
I


I
I
                                                                                        )
)
l 3.0 FOLLOW-UP ACTIONS (CONT'D) 1     .
l 3.0 FOLLOW-UP ACTIONS (CONT'D) 1
  \                       ACTIONS                                 DETAILS 3.33       1E at any time, heat       1     1E the bus is powered from an l                   tracing is desired,               EDG,
' \\
,                    JJiG restore heat tracing.       lHlN ensure an additional 50 KW I                                                     of margin exists.
ACTIONS DETAILS 3.33 1E at any time, heat 1
1E the bus is powered from an l
tracing is desired,
: EDG, JJiG restore heat tracing.
lHlN ensure an additional 50 KW I
of margin exists.
[ Rule 5, EDG Control) 2 Notify PPO to depress " RESET" pushbutton on the following:
[ Rule 5, EDG Control) 2 Notify PPO to depress " RESET" pushbutton on the following:
HTCP-5 " DIESEL LOAD SHEDDING PANEL" (119 ft AB by ES MCC 3A2)
HTCP-5 " DIESEL LOAD SHEDDING PANEL" (119 ft AB by ES MCC 3A2)
HTCP-2 " DIESEL LOAD SHEDDING PANEL" (95 ft AB by elevator) 1 l
HTCP-2 " DIESEL LOAD SHEDDING PANEL" (95 ft AB by elevator) 3.34 IE any EDG is running, Ili@ notify NSM to order
3.34       IE any EDG is running,
'O EDG fuel as required.
!                    Ili@ notify NSM to order
,\\_/
'O
,\_/
EDG fuel as required.                                              !
l i
l i
l l
l O
l O  O AP-770         REV 25 (MC)       PAGE 41 of 87                 EDGA i
O AP-770 REV 25 (MC)
PAGE 41 of 87 EDGA i


i l
i l
                                                                                )
)
Applicable carry-over steps:
Applicable carry-over steps:
3.13 E letdown flow restoration is desired, IBfM CONCURRENTLY...             4 l   3.281E alternate supply available to a de-energized ES bus...           #"
3.13 E letdown flow restoration is desired, IBfM CONCURRENTLY...
\
4 l
3.281E alternate supply available to a de-energized ES bus...
\\
3.29 IE a de-energized bus is NOT faulted, AND EDG is NOT running...
3.29 IE a de-energized bus is NOT faulted, AND EDG is NOT running...
l l   3.32 1E additional Non-lE Battery charging is desired, TEHIH align...       )
l l
3.32 1E additional Non-lE Battery charging is desired, TEHIH align...
)
i
i
(
(
v l
l v
i I                                                                           ...
i I
J l
l J
I I
I l
l O
Ov (L
v (L
AP-770 REV 25 (MC)
AP-770       REV 25 (MC)             PAGE 42 of 87           EDGA
PAGE 42 of 87 EDGA


(
(
Line 548: Line 649:
I l
I l
3.0 FOLLOW-UP ACTIONS (CONT'D)
3.0 FOLLOW-UP ACTIONS (CONT'D)
ACTIONS                                 DETAILS 1
ACTIONS DETAILS 3.35 LE Non-1E battery charger 1 Notify SP0 to perform the following is unavailable, in order (95 ft TB by Hydrogen It!EE notify SP0 to vent Panel):
3.35       LE Non-1E battery charger 1 Notify SP0 to perform the following is unavailable,             in order (95 ft TB by Hydrogen It!EE notify SP0 to vent   Panel):
main generator H2 Close HYV-28 "H2 Supply to Generator".
main generator H2 Close HYV-28 "H2 Supply to Generator".
Close GGV-213 "H2 Supply to Controller".
Close GGV-213 "H2 Supply to Controller".
Line 555: Line 655:
Open GGV 232 " Generator Vent".
Open GGV 232 " Generator Vent".
Open GGV-274 " Vent Iso".
Open GGV-274 " Vent Iso".
                                                }ElfN main generator PRESS lowers to < 2 psig, THEN close the following:
}ElfN main generator PRESS lowers to < 2 psig, THEN close the following:
GGV-232 " Generator Vent"
GGV-232 " Generator Vent" GGV-274 " Vent Iso" 2
'                                                    GGV-274 " Vent Iso" 2     1E TBP-2 is NOT running, ItiEH notify SP0 to CONCURRENTLY PERFORM E0P-14, Enclosure 14, Station Blackout Main Generator j Purging.
1E TBP-2 is NOT running, ItiEH notify SP0 to CONCURRENTLY PERFORM E0P-14, Enclosure 14, Station Blackout Main Generator j
I i
Purging.
l l
l l
l l
l O
O AP-770         REV 25 (MC)     PAGE 43 of 87                 EDGA
AP-770 REV 25 (MC)
PAGE 43 of 87 EDGA


Applicable carry-over steps:
Applicable carry-over steps:
3.13 E letdown flow restoration is desired, THEN CONCURRENTLY...                 >
3.13 E letdown flow restoration is desired, THEN CONCURRENTLY...
3.28 E alternate supply available to a de-energized ES bus...                 .-
3.28 E alternate supply available to a de-energized ES bus...
3.29 E a de-energized bus is N_0.10 faulted, 6NQ EDG is NOT running...
3.29 E a de-energized bus is N_0.1 faulted, 6NQ EDG is NOT running...
1 l   3.32 E additional Non-lE Battery charging is desired, IMS align...
0 1
l                                                                                     i l
l 3.32 E additional Non-lE Battery charging is desired, IMS align...
O                                                                         r; i
l i
O r;
l l
l l
(
(
c AP-770         REV 25 (MC)             PAGE 44 of 87           EDGA
c AP-770 REV 25 (MC)
PAGE 44 of 87 EDGA


3.0 FOLLOW-UP ACTIONS (CONT'D) r ACTIONS                               DETAILS 3 . 3 6 __ Verify SF cooling is in operation.
3.0 FOLLOW-UP ACTIONS (CONT'D) r ACTIONS DETAILS 3. 3 6 __ Verify SF cooling is in operation.
E SF cooling is NOT in
E SF cooling is NOT in E SFP that was previously operation, running is available, IliEH establish SF cooling.
* E SFP that was previously operation,                       running is available, IliEH establish SF cooling.     IHfH start previously running pump.
IHfH start previously running pump.
(Rule 5, EDG Control)
(Rule 5, EDG Control)
* E SFP that was previously running is NOT available, IBER start available SFP.
E SFP that was previously running is NOT available, IBER start available SFP.
* E SFHE-1A is in service, It!EH notify PP0 to ensure SW alignment:
E SFHE-1A is in service, It!EH notify PP0 to ensure SW alignment:
SWV-21 "SFHE 1A Inlet Iso" open (119 ft AB by SFPs)
SWV-21 "SFHE 1A Inlet Iso" open (119 ft AB by SFPs)
SWV-22 "SFHE-1B Inlet Iso" closed (119 ft AB by SFPs)
SWV-22 "SFHE-1B Inlet Iso" closed (119 ft AB by SFPs)
(
(
* E SFHE-1B is in service, THEN notify PPO to ensure SW alignment:
E SFHE-1B is in service, THEN notify PPO to ensure SW alignment:
SWV-21 "SFHE-1A Inlet Iso" closed (119 ft AB by SFPs)
SWV-21 "SFHE-1A Inlet Iso" closed (119 ft AB by SFPs)
SWV-22 "SFHE-1B Inlet Iso" i                                                       open (119 ft AB by SFPs)
SWV-22 "SFHE-1B Inlet Iso" i
O AP-770         REV 25 (MC)       PAGE 45 of 87               EDGA
open (119 ft AB by SFPs)
O AP-770 REV 25 (MC)
PAGE 45 of 87 EDGA


l Applicable carry-over steps:
Applicable carry-over steps:
Q V
Q 3.13 E letdown flow restoration is desired, THEN CONCURRENTLY...
3.13 E letdown flow restoration is desired, THEN CONCURRENTLY...
V f*%
3.28 E alternate supply available to a de-energized ES bus...           f*%
3.28 E alternate supply available to a de-energized ES bus...
3.29 E a de-energized bus is NOT faulted, AND EDG is NOT running...
3.29 E a de-energized bus is NOT faulted, AND EDG is NOT running...
3.32 E additional Non-lE Battery charging is desired, THEN align...
3.32 E additional Non-lE Battery charging is desired, THEN align...
(e~..
(e~
1 l
1 t
t 4                                                                                 1 3
1 4
!                                                                                1 O                                                                         i Q. -
3 1
AP-770         REV 25 (MC)             PAGE 46 of 87       EDGA         '
O iQ. -
AP-770 REV 25 (MC)
PAGE 46 of 87 EDGA


4 l
4 l
3.0 FOLLOW-UP ACTIONS (CONT'D) n V                     ACTIONS                                 DETAILS i
3.0 FOLLOW-UP ACTIONS (CONT'D) n V
3.37       If offsite power is supplying all available ES 4160V buses, THEN EXIT this procedure.                                         l
ACTIONS DETAILS i
!                                                                                    l l
3.37 If offsite power is supplying all available ES 4160V buses, THEN EXIT this procedure.
i l
l i
l      3.38       Consider 500KV backfeed as a source of ot; site power.
l l
l 3 . 3 9 __ IE Non-1E battery charger   e Notify SP0 to CONCURRENTLY PERFORM
3.38 Consider 500KV backfeed as a source of ot; site power.
: l.                 is unavailable,               E0P-14, Enclosure 14, Station l                   eEQ EDG-1B load is             Blackout Main Generator Purging.
l 3. 3 9 __ IE Non-1E battery charger e Notify SP0 to CONCURRENTLY PERFORM l.
is unavailable, E0P-14, Enclosure 14, Station l
eEQ EDG-1B load is Blackout Main Generator Purging.
l
l
                    > 3175 KW for 20 hrs,                                           ,
> 3175 KW for 20 hrs, THEN purge the main l
THEN purge the main                                             l generator.
generator.
1
1 3.40 If at any time, EDG-1B l
!        3.40       If at any time, EDG-1B l                   load > 3175 KW for 24 hrs, IllW ensure TBP-2 stopped.
load > 3175 KW for 24 hrs, IllW ensure TBP-2 stopped.
3.4! . _ Notify the TSC for guidance on maintaining l                   EDGs within their 2000 hr i                   or continuous ratings.
3.4!. _ Notify the TSC for guidance on maintaining l
EDGs within their 2000 hr i
or continuous ratings.
l See Table 1 l
l See Table 1 l
3.42       W!!@ offsite power is available, 111@ continue in this procedure.
3.42 W!!@ offsite power is available, 111@ continue in this procedure.
  ,n N
,n N
AP-770         REV 25 (MC)       PAGE 47 of 87               EDGA   !
AP-770 REV 25 (MC)
l l
PAGE 47 of 87 EDGA l
l


r Applicable carry-over steps:
r Applicable carry-over steps:
3.13 E letdown flow restoration is desired,-THEN CONCURRENTLY...             <
3.13 E letdown flow restoration is desired,-THEN CONCURRENTLY...
3.40 E EDG-1B load > 3175 KW for 24 hrs, THEN ensure TBP-2 stopped.     ~/ '
3.40 E EDG-1B load > 3175 KW for 24 hrs, THEN ensure TBP-2 stopped.
l O                                                                         -
~/ '
I....
O I....
I O                                                                           .
I O
AP-770         REV 25 (MC)             PAGE 48 of 87         EDGA
AP-770 REV 25 (MC)
PAGE 48 of 87 EDGA


1
[.
[.
1 i
i i
i i
i    3.0 FOLLOW-UP ACTIONS (CONT'D) l                                                                                 .'
3.0 FOLLOW-UP ACTIONS (CONT'D) l ACTIONS DETAILS i '
i '
3.43 1E A ES 4160V BUS is 1
ACTIONS                                DETAILS 3.43       1E A ES 4160V BUS is       1     Ensure plant conditions are i
Ensure plant conditions are i
supplied from EDG-1A,           stable.
supplied from EDG-1A, stable.
l               THEN sync in offsite power
l THEN sync in offsite power supply.
!              supply.                   2     Ensure HPI is bypassed or reset.
2 Ensure HPI is bypassed or reset.
I 3     Depress "4160V ESA UV RESET" push button.
I 3
4     Notify PPO to obtain key 94 from Control Room.
Depress "4160V ESA UV RESET" push button.
5     While maintaining frequency, notify PP0 to select EDG 1A
4 Notify PPO to obtain key 94 from Control Room.
                                                " SPEED DR0OP" (119 ft AB A EDG Engine Room) to 60 in increments of 10
5 While maintaining frequency, notify PP0 to select EDG 1A
;                                          6    Select "EDG A EXC VOLT ADJ l
" SPEED DR0OP" (119 ft AB A EDG Engine Room) to 60 in increments of 10 6
Select "EDG A EXC VOLT ADJ l
SELECT" to " CONT RM".
SELECT" to " CONT RM".
l 7   Notify PP0 to select "A EDG Unit-Parallel Switch" to " PAR."
l 7
l/^)
Notify PP0 to select "A EDG l/^)
V                                             (119 ft AB A EDG Control Room).
Unit-Parallel Switch" to " PAR."
l                                           8   Adjust "EDG A EXC VOLT ADJUST" to maintain EDG A voltage 4150 to 4250 volts.
V (119 ft AB A EDG Control Room).
l 9     Select synchroscope for Bkr to be paralleled to "0N".
l 8
10   Adjust "EDG A EXC VOLT ADJUST" l                                                 to match incoming and running l
Adjust "EDG A EXC VOLT ADJUST" to maintain EDG A voltage 4150 to 4250 volts.
voltages.
l 9
11   Adjust "EDG A SPEED" to
Select synchroscope for Bkr to be paralleled to "0N".
;                                                establish synchroscope moving
10 Adjust "EDG A EXC VOLT ADJUST" l
!                                                slow in the " FAST" direction.
to match incoming and running voltages.
1 l                                           12   Close oncoming Bkr at l                                                 = 11 o' clock.                   j l                                                                                   i 13   Select syre.hroscope to "0FF".
l 11 Adjust "EDG A SPEED" to establish synchroscope moving slow in the " FAST" direction.
l O
1 l
V AP-770         REV 25 (MC)       PAGE 49 of 87               EDGA
12 Close oncoming Bkr at l
= 11 o' clock.
j l
i 13 Select syre.hroscope to "0FF".
OV AP-770 REV 25 (MC)
PAGE 49 of 87 EDGA


Applicable carry-over steps:
Applicable carry-over steps:
S 3.131E letdown flow restoration is desired, LHf3 CONCURRENTLY...            .
S 3.131E letdown flow restoration is desired, LHf3 CONCURRENTLY...
3.40 lE EDG-1B load > 3175 KW for 24 hrs, JM N ensure TBP-2 stopped.     '
3.40 lE EDG-1B load > 3175 KW for 24 hrs, JM N ensure TBP-2 stopped.
i f
i f
l l
l l
Line 665: Line 784:
e r
e r
l i
l i
1 1
1 O
O                                                                         .
(_,
(_,
AP-770       REV 25 (MC)             PAGE 50 of 87           EDGA
AP-770 REV 25 (MC)
PAGE 50 of 87 EDGA


r 3.0 FOLLOW-UP ACTIONS (CONT'D)
r 3.0 FOLLOW-UP ACTIONS (CONT'D)
ACTIONS                               DETAILS l   3.44       JI EDG-1A is running in   1     Maintain -1.5 to +1.5 MVAR by
ACTIONS DETAILS l
,              parallel with offsite             adjusting "EDG A EXC VOLT l             power,                           ADJUST" IliM unload and shutdown EDG-1A.                   2     1E EDG-1A load is > 1200 KW, I!iW adjust "EDG A SPEED" to reduce load to = 1200 KW.
3.44 JI EDG-1A is running in 1
I 3     )LHM load has been reduced to
Maintain -1.5 to +1.5 MVAR by parallel with offsite adjusting "EDG A EXC VOLT l
                                                  = 1200 KW for 3 to 5 minutes, Ilim adjust "EDG A SPEED" to reduce EDG-1A load to = 200 KW.
: power, ADJUST" IliM unload and shutdown EDG-1A.
l                                         4       Open Bkr 3209 5     Depress EDG-1A "STOP" push button,                           f f
2 1E EDG-1A load is > 1200 KW, I!iW adjust "EDG A SPEED" to reduce load to = 1200 KW.
  \ 3.45       jf A ES 4160V BUS is   . 1     Place EFP-1 in normal after energized from an offsite         stop, source, l               MD EFP-1 is NOT required,   2     Notify PP0 to obtain key 11 from THEN restore EFP-1 to             Control Room, standby condition.
3
3 Notify PPO to ensure EFIC trip i                                             modules reset:
)LHM load has been reduced to I
Cabinet A, Module A-4-10, "EF-100-ZY" (A EFIC Room) l                                                 Cabinet B, Module B-4-10,
= 1200 KW for 3 to 5 minutes, Ilim adjust "EDG A SPEED" to reduce EDG-1A load to = 200 KW.
!                                                  "EF-200-ZY" (B EFIC Room) l l
l 4
O AP-770         REV 25 (MC)       PAGE 51 of 87               EDGA l
Open Bkr 3209 5
Depress EDG-1A "STOP" push
: button, f
f
\\
3.45 jf A ES 4160V BUS is 1
Place EFP-1 in normal after energized from an offsite
: stop, source, l
MD EFP-1 is NOT required, 2
Notify PP0 to obtain key 11 from THEN restore EFP-1 to Control Room, standby condition.
3 Notify PPO to ensure EFIC trip i
modules reset:
Cabinet A, Module A-4-10, "EF-100-ZY" (A EFIC Room) l Cabinet B, Module B-4-10, "EF-200-ZY" (B EFIC Room) l l
O AP-770 REV 25 (MC)
PAGE 51 of 87 EDGA l


I I
I I
l Applicable carry-over steps:                                                       l
Applicable carry-over steps:
                                                                                    )
3.13 E letdown flow restoration is desi. ed, JffE CONCURRENTLY...
3.13 E letdown flow restoration is desi. ed, JffE CONCURRENTLY...                 '
O e'
O 3.40 E EDG-1B load > 3175 KW for 24 hrs, J3f3 ensure TBP-2 stopped. e'      -
3.40 E EDG-1B load > 3175 KW for 24 hrs, J3f3 ensure TBP-2 stopped.
O                                                                           _
O h
h O                                                                       ,.
O AP-770 REV 25 (MC)
AP-770       REV 25 (MC)             PAGE 52 of 87           EDGA
PAGE 52 of 87 EDGA


3.0 FOLLOW-UP ACTIONS (CONT'D) i ACTIONS                               DETAILS l
3.0 FOLLOW-UP ACTIONS (CONT'D) i ACTIONS DETAILS l
3.46       1E B ES 4160V BUS is       1   Ensure plant conditions are supplied from EDG-1B,           stable.
3.46 1E B ES 4160V BUS is 1
THEN sync in offsite power
Ensure plant conditions are supplied from EDG-1B, stable.
!              supply.                   2   Ensure HPI is bypassed or reset.
THEN sync in offsite power supply.
l                                         3   Depress "4160V ESB UV RESET" l
2 Ensure HPI is bypassed or reset.
l 3
Depress "4160V ESB UV RESET" l
push button.
push button.
4   Notify PPO to obtain key 94 from Control Room.
4 Notify PPO to obtain key 94 from Control Room.
l                                         5   While maintaining frequency, notify PP0 to select EDG-1B
l 5
                                              " SPEED DR0OP" (119 ft AB B EDG
While maintaining frequency, notify PP0 to select EDG-1B
,                                              Engine Room) to 60 in increments
" SPEED DR0OP" (119 ft AB B EDG Engine Room) to 60 in increments of 10 l
!                                              of 10 l                                         6   Select "EDG B EXC VOLT ADJ
6 Select "EDG B EXC VOLT ADJ SELECT" to " CONT RM".
!                                              SELECT" to " CONT RM".
7 Notify PP0 to select "B EDG lpQ (119 ft AB B EDG Control Room).
7   Notify PP0 to select "B EDG Unit-Parallel" switch to " PAR."
Unit-Parallel" switch to " PAR."
lpQ                                           (119 ft AB B EDG Control Room).
8 Adjust "EDG B EXC VOLT ADJUST" to maintain EDG B voltage 4150 to 4250 volts.
8   Adjust "EDG B EXC VOLT ADJUST" to maintain EDG B voltage 4150 to 4250 volts.
l 9
l                                         9   Select synchroscope for Bkr to   I be paralleled to "0N".           l l
Select synchroscope for Bkr to I
l                                         10   Adjust "EDG B EXC VOLT ADJUST" l
be paralleled to "0N".
l l
l 10 Adjust "EDG B EXC VOLT ADJUST" l
to match incoming and running voltages.
to match incoming and running voltages.
11   Adjust "EDG B SPEED" to establish synchroscope moving slow in the " FAST" direction.
11 Adjust "EDG B SPEED" to establish synchroscope moving slow in the " FAST" direction.
12   Close oncoming Bkr at
12 Close oncoming Bkr at
                                                = 11 o' clock.
= 11 o' clock.
13__ Select synchroscope to "0FF".
13__ Select synchroscope to "0FF".
O v
Ov AP-770 REV 25 (MC)
AP-770         REV 25 (MC)     PAGE 53 of 87               EDGA I
PAGE 53 of 87 EDGA I


I O
O i.
i.
l I
l I
l l
l l
l l
l l
f
f BLANK PAGE n-e e
!                        BLANK PAGE n-e   e
i l
                                                    %.      i l
i i
i i
i t
i t
[.
[.
I l
I l
e                                                 -
e k..
k..     )
)
1 AP-770 REV 25 (MC)       PAGE 54 of 87 EDGA         i l
1 AP-770 REV 25 (MC)
i
PAGE 54 of 87 EDGA i
l i


i l
i l
3.0 FOLLOW-UP ACTIONS (CONT'D)
3.0 FOLLOW-UP ACTIONS (CONT'D)
O-l V .
O-l V ACTIONS DETAILS l
ACTIONS                               DETAILS l     3.47     J1 EDG-1B is running in     1   Maintain -1.5 to +1.5 MVAR by~
3.47 J1 EDG-1B is running in 1
l                parallel with offsite           adjusting "EDG B EXC VOLT i               power,                           ADJUST".
Maintain -1.5 to +1.5 MVAR by l
I               IEN unload and shutdown
parallel with offsite adjusting "EDG B EXC VOLT
'                EDG-18.                     2   jf EDG-1B load is > 1200 KW, IM H adjust "EDG B SPEED" to i                                                 reduce load to = 1200 KW.
~
3   W EN load has been reduced to
i
: power, ADJUST".
I IEN unload and shutdown i
EDG-18.
2 jf EDG-1B load is > 1200 KW, IM H adjust "EDG B SPEED" to i
reduce load to = 1200 KW.
3 W EN load has been reduced to
_= 1200 KW for 3 to 5 minutes, IMH adjust "EDG B SPEED" to reduce EDG B load to = 200 KW.
_= 1200 KW for 3 to 5 minutes, IMH adjust "EDG B SPEED" to reduce EDG B load to = 200 KW.
l                                           4   Open Bkr 3210 1
l 4
5     Depress EDG B "STOP" push button.
Open Bkr 3210 1
5 Depress EDG B "STOP" push button.
l a
l a
3.48 - Notify PP0 to restore EDGs to ES standby in l
O-
O-              accordance with OP-707, Operation of the ES l                 Emergency Diesel Generators, Section 4.13, l                 OperatiQn of EDG, l                 and EXJt this proradure.
- Notify PP0 to restore EDGs 3.48 to ES standby in accordance with OP-707, l
Operation of the ES l
Emergency Diesel Generators, Section 4.13, l
OperatiQn of EDG, l
and EXJt this proradure.
l l
l l
O AP-770         REV 25 (MC)       PAGE 55 of 87             EDGA
O AP-770 REV 25 (MC)
PAGE 55 of 87 EDGA


t O
t O
l l
l t
t l
l i
i BLANK PAGE                         1 1
BLANK PAGE 1
I                                                  u-t 1
1 I
u-t 1
l l
l l
l i
l i
,                                                      1 I
1 I
l l
l l
l l
                                                'q.*
'q.*
AP-770 REV 25 (MC)       PAGE 56 of 87 EDGA
AP-770 REV 25 (MC)
PAGE 56 of 87 EDGA


7-5.0 ENCLOSURE 1 RECOVERY OF AffULTED ES BUS ACTIONS                               DETAILS 1.1       Notify Maintenance to repair fault.
7-5.0 ENCLOSURE 1 RECOVERY OF AffULTED ES BUS ACTIONS DETAILS 1.1 Notify Maintenance to repair fault.
i 1
i 1
1.2       W!iB fault is repaired,   o Reset lockouts for the affected bus:
1.2 W!iB fault is repaired, o Reset lockouts for the affected bus:
THEN prepare to
THEN prepare to
                    -energize the affected A ES Bus       B ES Bus 86B-3205         86B-3206 86B-3207         868-3208 l
-energize the affected A ES Bus B ES Bus 86B-3205 86B-3206 86B-3207 868-3208 l
l                                                 868-3211         86B-3212 i
l 868-3211 86B-3212 i
!    1.3       J1 affected EDG is NOT
1.3 J1 affected EDG is NOT
* Notify PP0 to reset the affected EDG l  .
* Notify PP0 to reset the affected EDG
running,                     lockout:
: running, lockout:
i                I!!@ reset affected EDG i               lockout.                     ,_
l I!!@ reset affected EDG i
                                                  "86B-3209 A EDG LOCK 0UT RELAY"   l (A ES 4160V SWGR Room)           l "868-3210 B EDG LOCK 0UT RELAY"   l (B ES 4160V SWGR Room) l l
i lockout.
"86B-3209 A EDG LOCK 0UT RELAY" l
(A ES 4160V SWGR Room)
"868-3210 B EDG LOCK 0UT RELAY" (B ES 4160V SWGR Room) l l
l l
l l
!          AP-770         REV 25 (MC)     PAGE 57 of 87                 EDGA l
AP-770 REV 25 (MC)
PAGE 57 of 87 EDGA l


1 l
1 Of Ds f\\
l Ds f\                                               Of  -
l 1
BLANK PAGE
BLANK PAGE
                                                        )
)
i I
i I
a
a
                                                        \
\\
l l
l i
i l
T AP-770 REV 25 (MC)
T AP-770 REV 25 (MC)       PAGE 58 of 87 EDGA       l
PAGE 58 of 87 EDGA


i 5.0 ENCLOSURE 1 RECOVERY OF A FAULTID ES BUS (CONT'D)
i 5.0 ENCLOSURE 1 RECOVERY OF A FAULTID ES BUS (CONT'D)
ACTIONS                                 DETAILS 1.4       IE affected ES bus is NOT   1     Dispatch PP0 to the affected EDG energized,                       4160V ES Bus SWGR Room.
ACTIONS DETAILS 1.4 IE affected ES bus is NOT 1
E EDG is running, ItiG reset the affected     2     Place and maintain the affected EDG lockout.                     EDG Output Bkr in the open position:
Dispatch PP0 to the affected EDG energized, 4160V ES Bus SWGR Room.
Bkr 3209 Bkr 3210 3     Notify PPO to reset the affected EDG lockout:
E EDG is running, A
                                                        "868-3209 A EDG LOCK 0UT RELAY" (A ES 4160V SWGR Room)
ItiG reset the affected 2
                                                        "868-3210 B EDG LOCK 0UT RELAY" (B ES 4160V SWGR l                                                      Room) 4   Close affected EDG Output Bkr:
Place and maintain the affected EDG lockout.
EDG Output Bkr in the open position:
Bkr 3209 Bkr 3210 3
Notify PPO to reset the affected EDG lockout:
"868-3209 A EDG LOCK 0UT RELAY" (A ES 4160V SWGR Room)
"868-3210 B EDG LOCK 0UT RELAY" (B ES 4160V SWGR Room) l 4
Close affected EDG Output Bkr:
. (Q 1
. (Q 1
_./
_./
Bkr 3209 Bkr 3210 l
Bkr 3209 Bkr 3210 l
l l
i l
i l
1 l
O AP-770 REV 25 (MC)
O AP-770       REV 25 (MC)         PAGE 59 of 87               EDGA
PAGE 59 of 87 EDGA


l' u
l' u
Line 807: Line 963:
l l
l l
l 1
l 1
I
I s.
!                                                      I s.
AP-770 REV 25 (MC)
AP-770 REV 25 (MC)       PAGE 60 of 87 EDGA l
PAGE 60 of 87 EDGA l
t
t


,    5.0 ENCLOSURE 2 FAILED EDG RECOVERY l
5.0 ENCLOSURE 2 FAILED EDG RECOVERY l OV ACTIONS DETAILS j
O V                  ACTIONS                                 DETAILS j   2.1         Prevent EDG from starting
2.1 Prevent EDG from starting
* Select EDG " CONTROL" switch to
* Select EDG " CONTROL" switch to during recovery efforts.
;-                during recovery efforts.     "At Engine" for failed EDG (119 ft AB A(B) EDG Engine Room).
"At Engine" for failed EDG (119 ft AB A(B) EDG Engine Room).
i l   2.2         Ensure condition causing
i l
!                failure of EDG is corrected.
2.2 Ensure condition causing failure of EDG is corrected.
1 1
1 1
2.3         Prepare for EDG restart. 1 Ensure 86 lockout is reset for affected EDG:
2.3 Prepare for EDG restart.
                                                    "868-3209 A EDG LOCK 0UT RELAY" (A ES 4160V SWGR Room)
1 Ensure 86 lockout is reset for affected EDG:
                                                    "86B-3210 B EDG LOCKOUT RELAY" (B ES 4160V SWGR Room) 2       Reset EDG "86 DG" Lockout         (
"868-3209 A EDG LOCK 0UT RELAY" (A ES 4160V SWGR Room)
"86B-3210 B EDG LOCKOUT RELAY" (B ES 4160V SWGR Room) 2 Reset EDG "86 DG" Lockout
(
(119 ft AB A(B) EDG Control Room).
(119 ft AB A(B) EDG Control Room).
3       Depress the " RESET" push button (119 ft AB A(B) EDG Engine Room).
3 Depress the " RESET" push button (119 ft AB A(B) EDG Engine Room).
4       Wait at least 2 minutes to allow the shutdown relays to reset.
4 Wait at least 2 minutes to allow the shutdown relays to reset.
2.4         Start the recovered EDG. 1       Notify Control Room EDG is being started.
2.4 Start the recovered EDG.
i 2       Select EDG " CONTROL" switch to J I
1 Notify Control Room EDG is being started.
                                                      " Normal" (119 ft AB A(B) EDG Engine Room).                   l l
i 2
Select EDG " CONTROL" switch to J
I
" Normal" (119 ft AB A(B) EDG l
Engine Room).
l l
l l
O                                                                                   l AP-770           REV 25 (MC)       PAGE 61 of 87                   EDGA
O AP-770 REV 25 (MC)
PAGE 61 of 87 EDGA


O                                             G BLANK PAGE O                                             (.
O G
BLANK PAGE O
(.
1 I
1 I
O                                             ,.
O
e.
,.e.
AP-770 REV 25 (MC)       PAGE 62 of 87 EDGA     i i
AP-770 REV 25 (MC)
i
PAGE 62 of 87 EDGA i
i i


5.0 ENCLOSURE 3 MVP RESTART
5.0 ENCLOSURE 3 MVP RESTART
    /~~
/~~()i ACTIONS DETAILS l
()i ACTIONS                               DETAILS l       3.1       Prepare MVP for restart. 1     IE the bus is being supplied by l
3.1 Prepare MVP for restart.
the EDG, l                                                JJiG ensure adequate EDG margin l                                                 exists for MVP and required i                                                 cooling water pumps.
1 IE the bus is being supplied by l
(Rule 5 EDG Control)
the EDG, JJiG ensure adequate EDG margin l
;                                          2 Ensure MU control valves are closed:
l exists for MVP and required i
cooling water pumps.
(Rule 5 EDG Control) 2 Ensure MU control valves are closed:
l MUV-16 l
l MUV-16 l
_ MVV-31 3       Establish MVP cooling water supply.
_ MVV-31 3
Establish MVP cooling water supply.
4 Ensure MVP recirc to MUT valves are open:
4 Ensure MVP recirc to MUT valves are open:
l MVV-53                         l MVV-257 5 Ensure MVP main lube oil pump is running:
l MVV-53 l
MVV-257 5 Ensure MVP main lube oil pump is running:
MVP-2A MVP-2B MVP-2C 6 Ensure MVP main gear oil pump is running:
MVP-2A MVP-2B MVP-2C 6 Ensure MVP main gear oil pump is running:
MVP-4A                         ,
MVP-4A i
i MVP-4B MVP-4C l
MVP-4B MVP-4C l
l                                                                                 i
l i
  '(
'(
AP-770       REV 25 (MC)       PAGE 63 of 87               EDGA
AP-770 REV 25 (MC)
PAGE 63 of 87 EDGA


O                                                     O BLANK PAGE O                                                     (~
O O
                                                      ~. .
BLANK PAGE O
i 1
(~
l l
~.
O                                                      .-
i l
c:
l O
AP-770 REV 25 (MC)       PAGE 64 of 87 EDGA
.-c:
AP-770 REV 25 (MC)
PAGE 64 of 87 EDGA


i l
i 5.0 ENCLOSURE 3 MVP RESTART (CONT'D)
l
O-ACTIONS DETAILS 3.2 Select all MVPs to normal j
!      5.0 ENCLOSURE 3 MVP RESTART (CONT'D)
after stop.
O-ACTIONS                               DETAILS 3.2       Select all MVPs to normal j               after stop.                     __ MVP-1A                             j i
__ MVP-1A j
i
_ MVP-1B MVP-1C i
_ MVP-1B MVP-1C i
l     3.3       E an A Train MVP will be   1     E MVP-lC is NOT ES selected, started,                         THEN notify PPO to select THEN ensure suction               " PUMP 3C" on 4160V ES BUS 3B-5 l                 alignment to MUT.                                                 -
l 3.3 E an A Train MVP will be 1
3     E MUT level is 2 55 in, THEN ensure MUV-73 is closed.
E MVP-lC is NOT ES selected,
l                                           4     E MUT level is < 55 in, THEN ensure MUV-73 is open.
: started, THEN notify PPO to select THEN ensure suction
" PUMP 3C" on 4160V ES BUS 3B-5 l
alignment to MUT.
3 E MUT level is 2 55 in, THEN ensure MUV-73 is closed.
l 4
E MUT level is < 55 in, THEN ensure MUV-73 is open.
5 Ensure the following are open:
5 Ensure the following are open:
\
\\
MUV-69 MUV-58 l
MUV-69 MUV-58 l
3.4       E a B Train MVP will be   1     E MVP-1A is EI ES selected,         l started,                         It@ notify PP0 to select             '
3.4 E a B Train MVP will be 1
Ilg ensure suction               " PUMP 3A" on 4160V ES BUS 3A-10 alignment to MUT.
E MVP-1A is EI ES selected,
2     Ensure MUV-69 is closed.
: started, It@ notify PP0 to select Ilg ensure suction
I                                                 E MUT level is 2 55 in, 3                                        I l                                                 lH_E.tf ensure MUV-58 is closed.
" PUMP 3A" on 4160V ES BUS 3A-10 alignment to MUT.
l 4     IE MUT 1evel is < 55 in, IllEti ensure MUV-58 is open.       ;
2 Ensure MUV-69 is closed.
l                                           5 Ensure the following are open:
I 3
_ MUV-62 MUV-73 AP-770         REV 25 (MC)     PAGE 65 of 87                 EDGA
E MUT level is 2 55 in, I
l lH_E.tf ensure MUV-58 is closed.
l 4
IE MUT 1evel is < 55 in, IllEti ensure MUV-58 is open.
l 5 Ensure the following are open:
_ MUV-62 MUV-73 AP-770 REV 25 (MC)
PAGE 65 of 87 EDGA


O                                               O O                     BLANK PAGE O                                               e AP-770_ REV 25 (MC)'       PAGE 66 of 87 EDGA
O O
O BLANK PAGE O
e AP-770_
REV 25 (MC)'
PAGE 66 of 87 EDGA


l l
l 5.0 ENCLOSURE 3 MUP RESTART (CONT'D)
5.0 ENCLOSURE 3 MUP RESTART (CONT'D)
ACTIONS DETAILS 3.5 Start ES selected MVP l
ACTIONS                                 DETAILS 1
aligned to MUT.
3.5       Start ES selected MVP l             aligned to MUT.
[ Rule 5,EDGControl) 3.6 Maintain PZR level using MUV-31 3.7 Maintain MUT level e Cycle appropriate BWST to MVP valve 55 to 100 in.
[ Rule 5,EDGControl) 3.6       Maintain PZR level using MUV-31 3.7       Maintain MUT level       e Cycle appropriate BWST to MVP valve 55 to 100 in.               to maintain MUT level 55 to 100 in: 1 l
to maintain MUT level 55 to 100 in:
MUV-73                         i l
MUV-73 i
MUV-58                         I o
l MUV-58 oV 3.8 Restore RCP seal 1
3.8       Restore RCP seal         1       Throttle open MUV-16 to obtain 1
Throttle open MUV-16 to obtain injection.
injection.                       3 gpm seal injection per RCP   1 over 2 minutes.
3 gpm seal injection per RCP 1
2       Note the time that RCP seal injection was established at 3 gpm:
over 2 minutes.
3     Hli@ 2 10 min after the time noted in detail 2, I113 throttle open MUV-16 to establish 6 gpm per RCP.
2 Note the time that RCP seal injection was established at 3 gpm:
4     Note the time that RCP seal injection was established at 6 gpm:
3 Hli@ 2 10 min after the time noted in detail 2, I113 throttle open MUV-16 to establish 6 gpm per RCP.
5     WHEN 2 10 min after the time noted in detail 4, THEN throttle open MUV-16 to establish 10 gpm per RCP.
4 Note the time that RCP seal injection was established at 6 gpm:
O AP-770         REV 25 (MC)     PAGE 67 of 87               EDGA
5 WHEN 2 10 min after the time noted in detail 4, THEN throttle open MUV-16 to establish 10 gpm per RCP.
O AP-770 REV 25 (MC)
PAGE 67 of 87 EDGA


I                                                           l
I l
;                                                    v.     )
v.
)
4 l
4 l
l l
l l
Line 908: Line 1,100:
l l
l l
l BLANK PAGE f-(
l BLANK PAGE f-(
l I
l i
l l
i l
i l
l i
l l
l l
l s       .
s g.
g.
~.
                                                      ~.
AP-770 REV 25 (MC)
AP-770 REV 25 (MC)       PAGE 68 of 87 EDGA l
PAGE 68 of 87 EDGA l
i
i


5.0 ENCLOSURE 4 A ES 4160V BUS SUPPLY TO SUPPORT EOUIPMENT O
5.0 ENCLOSURE 4 A ES 4160V BUS SUPPLY TO SUPPORT EOUIPMENT OV ACTIONS DETAILS l
V ACTIONS                                 DETAILS 4.1       IE 480V REACTOR AUX BUS 3A l                  is energized, j
4.1 IE 480V REACTOR AUX BUS 3A is energized, j
1                 JE!i GO TO Step 4.7 in l                 this enclosure.
1 JE!i GO TO Step 4.7 in l
this enclosure.
i l
i l
l l       4.2         Ensure 480V REACTOR AUX BUS 3A feeder Bkrs are open.                                 Bkr 3305
l l
4.2 Ensure 480V REACTOR AUX BUS 3A feeder Bkrs are open.
Bkr 3305
_ Bkr 3395 1
_ Bkr 3395 1
4.3         Place IAP-1A in i
4.3 Place IAP-1A in
                    " PULL TO LOCK".
" PULL TO LOCK".
4.4         Prepare associated
i 4.4 Prepare associated
* Notify SP0 to ensure all Bkrs on the electrical equipment.         following are open:
* Notify SP0 to ensure all Bkrs on the electrical equipment.
following are open:
_ 480V REACTOR AUX BUS 3A (Unit 480V SWGR Room)
_ 480V REACTOR AUX BUS 3A (Unit 480V SWGR Room)
                                                    ,__ 480V PZR HTR MCC 3A (119 ft IB by east door) 4.5         WE!i notified that all     e Close the following Bkrs:
,__ 480V PZR HTR MCC 3A (119 ft IB by east door) 4.5 WE!i notified that all e Close the following Bkrs:
Bkrs on 480V REACTOR AUX BUS 3A AND 480V PZR HTR           Bkr 3321 MCC 3A are open, THEN energize 480V REACTOR   _ Bkr 3395 AUX BUS 3A.
Bkrs on 480V REACTOR AUX BUS 3A AND 480V PZR HTR Bkr 3321 MCC 3A are open, THEN energize 480V REACTOR
4.6         Energize 480V PZR HTR MCC
_ Bkr 3395 AUX BUS 3A.
* Notify SP0 to close 480V REACTOR AUX j                    3A.                           BUS 3A-1C " Breaker 3355 Feed to PZR Htr MCC 3A" (Unit 480V SWGR Ro:,m).
4.6 Energize 480V PZR HTR MCC
O AP-770           REV 25 (MC)       PAGE 69 of 87                 EDGA f
* Notify SP0 to close 480V REACTOR AUX 3A.
BUS 3A-1C " Breaker 3355 Feed to PZR j
Htr MCC 3A" (Unit 480V SWGR Ro:,m).
O AP-770 REV 25 (MC)
PAGE 69 of 87 EDGA f


O                                             O 1
O O
BLANK PAGE t                                               .,
1 BLANK PAGE t
                                                    ^
(.
(.
O                                             G.
^
AP-770 REV 25 (MC)       PAGE 70 of 87 EDGA
O G.
AP-770 REV 25 (MC)
PAGE 70 of 87 EDGA


5.0 ENCLOSURE 4 A ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT (CONT'D)
5.0 ENCLOSURE 4 A ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT (CONT'D)
ACTIONS                                     DETAILS 4.7       IE PZR Htrs are required,     1       Ensure EDG-1A margin is THEN energize PZR control             available for 252 KW, power and 2 groups of Htrs.                           (Rule 5, EDG Control]
ACTIONS DETAILS 4.7 IE PZR Htrs are required, 1
Ensure EDG-1A margin is THEN energize PZR control available for 252 KW, power and 2 groups of Htrs.
(Rule 5, EDG Control]
2 Notify SP0 to close the following Bkrs (119 ft IB by east door):
2 Notify SP0 to close the following Bkrs (119 ft IB by east door):
480V PZR HTR MCC 3A-1A "PZR HEATER CONTROL TRANSFORMER A-1" 1                                                   480V PZR HTR MCC 3A-2A "PZR l                                                   HEATER CONTROL TRANSFORMER A-2"
480V PZR HTR MCC 3A-1A "PZR HEATER CONTROL TRANSFORMER A-1" 1
!                                            3 Notify SP0 to close 2 of the l                                               following Bkrs (119 ft IB by east door):
480V PZR HTR MCC 3A-2A "PZR l
480V PZR HTR MCC 3A-4A "PZR HEATER SCR GROUP 1"               j 480V PZR HTR MCC 3A-lc "PZR q                                                HEATER GROUP 7" 480V PZR HTR MCC 3A-2C "PZR HEATER GROUP 8" l
HEATER CONTROL TRANSFORMER A-2" 3 Notify SP0 to close 2 of the l
l                                                   480V PZR HTR MCC 3A 3C "PZR HEATER GROUP 9" l
following Bkrs (119 ft IB by east door):
4      JE additional PZR Htrs are
480V PZR HTR MCC 3A-4A "PZR HEATER SCR GROUP 1" j
!                                                    required, l                                                   .A_NQ additional EDG margin exists i                                                     for 126 KW per heater group to l                                                     be energized,
480V PZR HTR MCC 3A-lc "PZR HEATER GROUP 7" q
!                                                    JH1H notify SP0 to close an l                                                     additional Bkr on 480V PZR HTR l                                                     MCC 3A (119 ft IB by east door).
480V PZR HTR MCC 3A-2C "PZR HEATER GROUP 8" l
l 480V PZR HTR MCC 3A 3C "PZR l
HEATER GROUP 9" 4
JE additional PZR Htrs are
: required, l
.A_NQ additional EDG margin exists i
for 126 KW per heater group to l
be energized, JH1H notify SP0 to close an l
additional Bkr on 480V PZR HTR l
MCC 3A (119 ft IB by east door).
i a
i a
O AP-770       REV 25 (MC)           PAGE 71 of 87                 EDGA I
O AP-770 REV 25 (MC)
PAGE 71 of 87 EDGA I


O                                               O BLANK PAGE O                                                 .._
O O
                                                ' dp 1
BLANK PAGE O
l 1
' dp 1
i O                                               t.
i O
AP-770 REV 25 (MC)       PAGE 72 of 87 EDGA
t.
AP-770 REV 25 (MC)
PAGE 72 of 87 EDGA


l 5.0 ENCLOSURE 4 A ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT (CONT'D)
l 5.0 ENCLOSURE 4 A ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT (CONT'D)
ACTIONS                                 DETAILS l                                                                                   '
ACTIONS DETAILS l
JF Non-lE battery charge           Ensure EDG-1A margin is 4.8                                    1 I
4.8 JF Non-lE battery charge 1
is required,                       available for 80 KW.
Ensure EDG-1A margin is I
l eg DPBC-lG available,                                               I l             THEN place DP8C-1G in           [ Rule 5, EDG Control]               I service.
is required, available for 80 KW.
I 2     Notify SP0 to close 480V PZR HTR l                                                 MCC 3A-3A "DPBC-lG C BATTERY CHARGER" (119 ft IB Ly east     f door).
l eg DPBC-lG available, l
THEN place DP8C-1G in
[ Rule 5, EDG Control]
service.
2 Notify SP0 to close 480V PZR HTR I
l MCC 3A-3A "DPBC-lG C BATTERY CHARGER" (119 ft IB Ly east f
door).
3 Notify SP0 to align DPBC-lG (95 ft TB Battery Charger Room):
3 Notify SP0 to align DPBC-lG (95 ft TB Battery Charger Room):
i i                                                 Open DPDP 1C-13 "DPBC-Il P, PN Feed from I Battery Charger".
i i
Close DPDP 1C-4 "DPBC-lG P, PN i                                                   Feed from G Battery Charger".
Open DPDP 1C-13 "DPBC-Il P, PN Feed from I Battery Charger".
O                         -
Close DPDP 1C-4 "DPBC-lG P, PN i
l I
Feed from G Battery Charger".
I l
O l
O                                                                                 !
I I
AP-770         REV 25 (MC)         PAGE 73 of 87                 EDGA   j i
l O
AP-770 REV 25 (MC)
PAGE 73 of 87 EDGA j
i


O                                               O l
O O
BLANK PAGE Q                                               (~
l BLANK PAGE Q
l' l
(~
l 3,1
3,1
* AP-770 REV 25 (MC)       PAGE 74 of 87 EDGA
* AP-770 REV 25 (MC)
PAGE 74 of 87 EDGA


[
[
5.0 ENCLOSURE _1 A ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT (CONT'D)
5.0 ENCLOSURE _1 A ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT (CONT'D)
ACTIONS                                     DETAILS l
ACTIONS DETAILS 4.9
4.9       .I_f Non-lE battery charge     1     Ensure EDG-1A margin is I             is required,                         available for 80 KW.
.I_f Non-lE battery charge 1
l             AND either of the following is NOT                 (Rule 5, EDG Control) available:
Ensure EDG-1A margin is l
2     Notify SP0 to close 480V PZR HTR l                   DPBC-lG                         MCC 3A-38 "DPXS-lC FEED TO l                                                   DPBC-ll" (119 ft IB by east DPBC-lH                         door).
I is required, available for 80 KW.
IEEN place DPBC-II in           3     1E DPBC-)G is NOT available, service.                             THEN notify SP0 to align DPBC-II (95 ft TB Battery Charger Room):
l AND either of the following is NOT (Rule 5, EDG Control) available:
2 Notify SP0 to close 480V PZR HTR l
DPBC-lG MCC 3A-38 "DPXS-lC FEED TO l
DPBC-ll" (119 ft IB by east DPBC-lH door).
IEEN place DPBC-II in 3
1E DPBC-)G is NOT available, service.
THEN notify SP0 to align DPBC-II (95 ft TB Battery Charger Room):
Open DPDP 1C-4 "DPBC-lG P, PN Feed from G Battery Charger".
Open DPDP 1C-4 "DPBC-lG P, PN Feed from G Battery Charger".
l
l Open DPDP IC-14 "DPBC-II PN, N Feed from I Battery Charger".
!                                                        Open DPDP IC-14 "DPBC-II PN, N Feed from I Battery Charger".
Close DPDP 1C-13 "DPBC-II P, PN Feed from I Battery Charger".
Close DPDP 1C-13 "DPBC-II P, PN Feed from I Battery Charger".
Select DPXS-lC "DPBC-II     l Transfer Switch" to " POWER !
Select DPXS-lC "DPBC-II Transfer Switch" to " POWER l
l                                                        FROM PZR HTR MCC 3A".
FROM PZR HTR MCC 3A".
4     JF DPBC-lH is NOT available, THEN notify SP0 to align DPBC-11 (95 ft TB Battery Charger Room):
4 JF DPBC-lH is NOT available, THEN notify SP0 to align DPBC-11 (95 ft TB Battery Charger Room):
l                                                         Open DPDP 1C-13 "DPBC-II     l l                                                        P, PN Feed from I Battery   l Charger".                   j Open DPDP 1C-5 "DPBC-lH PN, N Feed from H Battery       '
l Open DPDP 1C-13 "DPBC-II l
Charger".
P, PN Feed from I Battery Charger".
j Open DPDP 1C-5 "DPBC-lH PN, N Feed from H Battery Charger".
Close DPDP 1C-14 "DPBC-II PN, N Feed from I Battery Charger".
Close DPDP 1C-14 "DPBC-II PN, N Feed from I Battery Charger".
Select DPXS-lC "DPBC-II Transfer Switch" to " POWER FROM PZR HTR MCC 3A".
Select DPXS-lC "DPBC-II Transfer Switch" to " POWER FROM PZR HTR MCC 3A".
O AP-770         REV 25 (MC)           PAGE 75 of 87                 EDGA
O AP-770 REV 25 (MC)
PAGE 75 of 87 EDGA


1 1
1
  ?
?
,k b
b
1 l
,k 1
I l
l I
i l
l i
l i
l l
i 1
l BLANK PAGE 1<
k
?
1 l
1 l
BLANK PAGE 1<                                                ,.
?
k  * ,%
* 1 l
i I
i I
l i
l i
Line 1,020: Line 1,252:
l t
l t
l l
l l
l O                                             .
l O
m AP-770 REV 25 (MC)       PAGE 76 of 87 EDGA 1
.m AP-770 REV 25 (MC)
PAGE 76 of 87 EDGA


l l
l l
1 5.0 ENCLOSURE 5 B ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT l
1 5.0 ENCLOSURE 5 B ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT l
ACTIONS                                 DETAILS l
ACTIONS DETAILS l
5.1         1E 480V REACTOR AUX BUS 3B is energized, l               THEN GO TO Step 5.8 in I               this enclosure.
5.1 1E 480V REACTOR AUX BUS 3B is energized, l
l                                                                     -
THEN GO TO Step 5.8 in I
l 5.2   ___  Ensure 480V feeder and Cross-Tie Bkrs are open.
this enclosure.
Bkr 3399 Bkr 3393 Bkr 3394 Bkr 3306 Bkr 3396 Bkr 3312 lQ 1
l l
lV                                              __,Bkr 3392                         j l
5.2 Ensure 480V feeder and Cross-Tie Bkrs are open.
Bkr 3399 Bkr 3393 Bkr 3394 Bkr 3306 Bkr 3396 Bkr 3312 lQ 1lV
__,Bkr 3392 j
l l
l l
5.3         Place IAP-1B in                                                   !
l 5.3 Place IAP-1B in
                  " PULL TO LOCK".
" PULL TO LOCK".
l l
l l
l l    5.4         Prepare associated         e Notify SP0 to ensure all Bkrs on the l                 electrical equipment.         following are open:
l 5.4 Prepare associated e Notify SP0 to ensure all Bkrs on the l
electrical equipment.
following are open:
i 480V PLANT AUX BUS (Unit 480V SWGR Room) 480V REACTOR AUX BUS 3B (Unit 480V SWGR Room) 480V PZR HTR MCC 3B (119 ft IB by East door)
i 480V PLANT AUX BUS (Unit 480V SWGR Room) 480V REACTOR AUX BUS 3B (Unit 480V SWGR Room) 480V PZR HTR MCC 3B (119 ft IB by East door)
AP-770         REV 25 (MC)       PAGE 77 of 87               EDGA i
AP-770 REV 25 (MC)
PAGE 77 of 87 EDGA i


I i
I i
I l
I l
l lv                                               i...
l lv i.
4 1
4 1
4 BLANK PAGE
4 BLANK PAGE
                                                      .1
.1
(                                             (.
(
(.
I i
I i
1 l
1 l
l l
i OV C'
i O
AP-770 REV 25 (MC)
V                                              C' AP-770 REV 25 (MC)       PAGE 78 of 87 EDGA I
PAGE 78 of 87 EDGA I
L
L


f 5.0 ENCLOSURE 5 8 ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT (CONT'D)
f 5.0 ENCLOSURE 5 8 ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT (CONT'D)
ACTIONS                                   DETAILS 5.5       WHEN notified that all       e Close the following Bkrs:             '
ACTIONS DETAILS 5.5 WHEN notified that all e Close the following Bkrs:
l Bkrs on the following are l             open:                               Bkr 3222 480V PLANT AUX BUS 3           Bkr 3312 480V REACTOR AUX BUS 38 480V PZR HTR MCC 3B l
Bkrs on the following are l
l It[EE energize 480V PLANT t
open:
AUX BUS.
Bkr 3222 480V PLANT AUX BUS 3 Bkr 3312 480V REACTOR AUX BUS 38 480V PZR HTR MCC 3B l
i                                                                                   i l
It[EE energize 480V PLANT AUX BUS.
l 5.6       Energize 480V REACTOR AUX   e Close the following Bkrs:             ;
t i
i               BUS 3B.                                                             l Bkr 3392                       l l
i l
Bkr 3396 I
5.6 Energize 480V REACTOR AUX e Close the following Bkrs:
O 1
i BUS 3B.
l 5.7       Energize 480V PZR HTR MCC   e Notify SP0 to close 480V REACTOR AUX l
Bkr 3392 l
: 38.                           BUS 3B-1C " Breaker 3356 Feed to PZR l l
Bkr 3396 O
Htr MCC 3B" (Unit 480V SWGR Room).
I l
5.7 Energize 480V PZR HTR MCC e Notify SP0 to close 480V REACTOR AUX 38.
BUS 3B-1C " Breaker 3356 Feed to PZR Htr MCC 3B" (Unit 480V SWGR Room).
l l
l l
l O
O AP-770 REV 25 (MC)
AP-770         REV 25 (MC)       PAGE 79 of 87               EDGA 1
PAGE 79 of 87 EDGA 1
l
l


                                                    )
)
O                                             O I
O O
BLANK PAGE f                                                 .-
BLANK PAGE f
L 1
L 1
l l
l l
l l
l l
l l
l l
I v                                             (..
I v
AP-770 REV 25 (MC)       PAGE 80 of 87 EDGA 1
(..
AP-770 REV 25 (MC)
PAGE 80 of 87 EDGA 1


5.0 ENCLOSURE 5 8 ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT (CONT'D)
5.0 ENCLOSURE 5 8 ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT (CONT'D)
ACTIONS                                     DETAILS 5.8       E PZR Htrs are required,     1       Ensure EDG-1B margin is I!!Q energize PZR control             available for 252 KW.
ACTIONS DETAILS 5.8 E PZR Htrs are required, 1
t              power and 2 groups of Htrs.                             [ Rule 5, EDG Control) 1 2 Notify SP0 to close the following l                                               Bkrs at 480V PZR HTR MCC 3B
Ensure EDG-1B margin is I!!Q energize PZR control available for 252 KW.
!                                                (119 ft IB by East door):
power and 2 groups of t
Htrs.
[ Rule 5, EDG Control) 1 2 Notify SP0 to close the following l
Bkrs at 480V PZR HTR MCC 3B (119 ft IB by East door):
480V PZR HTR MCC 38-1A "PZR HEATER CONTROL TRANSFORMER B-1" 480V PZR HTR MCC 3B-1B "PZR HEATER CONTROL TRANSFORMER B-2" l
480V PZR HTR MCC 38-1A "PZR HEATER CONTROL TRANSFORMER B-1" 480V PZR HTR MCC 3B-1B "PZR HEATER CONTROL TRANSFORMER B-2" l
3 Notify SP0 to close 2 of the l                                               following Bkrs at 480V PZR HTR MCC     1 3B (119 ft 13 by east door):           I l
3 Notify SP0 to close 2 of the l
480V PZR HTR MCC 38-2A "PZR       j HEATER SCR GROUP 2" 480V PZR HTR MCC 3B-3A "PZR HEATER SCR GROUP 5" 480V PZR HTR MCC 3B-4A "PZR HEATER SCR GROUP 6" 480V PZR HTR MCC 3B-10 "PZR l                                                     HEATER GROUP 10"                 i 480V PZR HTR MCC 38-2C "PZR HEATER GROUP 11" 480V PZR HTR MCC 3B-3C "PZR HEATER GROUP 12" 480V PZR HTR MCC 38-4C "PZR HEATER GROUP 13" 4       E additional PZR Htrs are required, AND additional EDG margin exists or 126 KW per heater group to be energized, THEN notify SP0 to close an additional Bkr on 480V PZR HTR MCC 3B (119 ft IB by east door).
following Bkrs at 480V PZR HTR MCC 1
O                                                                                     l AP-770         REV 25 (MC)         PAGE 81 of 87                 EDGA l
3B (119 ft 13 by east door):
480V PZR HTR MCC 38-2A "PZR j
HEATER SCR GROUP 2" 480V PZR HTR MCC 3B-3A "PZR HEATER SCR GROUP 5" 480V PZR HTR MCC 3B-4A "PZR HEATER SCR GROUP 6" 480V PZR HTR MCC 3B-10 "PZR l
HEATER GROUP 10" 480V PZR HTR MCC 38-2C "PZR HEATER GROUP 11" 480V PZR HTR MCC 3B-3C "PZR HEATER GROUP 12" 480V PZR HTR MCC 38-4C "PZR HEATER GROUP 13" 4
E additional PZR Htrs are
: required, AND additional EDG margin exists or 126 KW per heater group to be energized, THEN notify SP0 to close an additional Bkr on 480V PZR HTR MCC 3B (119 ft IB by east door).
O AP-770 REV 25 (MC)
PAGE 81 of 87 EDGA l


i l
i l
l 1
l
: G                                               p..g.
: G p..g l
l l
l BLANK PAGE J-r.
l BLANK PAGE J-                                               r.
1 l
1 l
l l
lO
l                                                        l lO                                               ,
~~
                                                  ~~
AP-770 REV 25 (MC)
l AP-770 REV 25 (MC)       PAGE 82 of 87 EDGA         l l
PAGE 82 of 87 EDGA l
l


i
i 5.0 ENCLOSURE 5 B ES 4160V BUS SUPPLY TO SUPPORT E0VIPMENT (CONT'D)
5.0 ENCLOSURE 5 B ES 4160V BUS SUPPLY TO SUPPORT E0VIPMENT (CONT'D)
I ACTIONS DETAILS 1
I ACTIONS                                     DETAILS 1
l 5.9 IE Non-lE battery recharge 1
l 5.9       IE Non-lE battery recharge   1     Ensure EDG-1B margin is l             is required,                       available for 80 KW.
Ensure EDG-1B margin is l
l             AND DPBC-1H is available, l             IEW place DPBC-lH in           [ Rule 5, EDG Control) service.
is required, available for 80 KW.
2     Notify SP0 to close 480V PZR HTR l MCC 38-3BL "DPBC-1H H BATTERY l                                                 CHARGER" (119 ft IB by east door).
l AND DPBC-1H is available, l
IEW place DPBC-lH in
[ Rule 5, EDG Control) service.
2 Notify SP0 to close 480V PZR HTR MCC 38-3BL "DPBC-1H H BATTERY l
CHARGER" (119 ft IB by east door).
3 Notify SP0 to align DPBC-lH (95 ft TB Battery Charger Room):
3 Notify SP0 to align DPBC-lH (95 ft TB Battery Charger Room):
Open DPDP 1C-14 "DPBC-Il PN, N Feed from I Battery Charger".
Open DPDP 1C-14 "DPBC-Il PN, N Feed from I Battery Charger".
Close DPDP 1C-5 "DPBC-lH PN, N ,
Close DPDP 1C-5 "DPBC-lH PN, N Feed from H Battery Charger".
Feed from H Battery Charger". l I
l lO AP-770 REV 25 (MC)
lO AP-770       REV 25 (MC)         PAGE 83 of 87               EDGA i
PAGE 83 of 87 EDGA i


O                                             O l
O O
I l
l I
l l
l l
l l
l BLANK PAGE f                                                     -
BLANK PAGE f
;                                                        c I                                                       i
c I
                                                        \
i
l I
\\
g..
l g..
Q .'
Q.'
AP-770 REV 25 (NC)       PAGE 84 of 87 EDGA
AP-770 REV 25 (NC)
PAGE 84 of 87 EDGA


i l
i 5.0 ENCLOSURE 5 B ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT (CONT'D) l ACTIONS DETAILS l
5.0 ENCLOSURE 5 B ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT (CONT'D)
5.10 JE Non-lE battery charge 1
ACTIONS                                   DETAILS l
Ensure EDG-1B margin is j
l 5.10       JE Non-lE battery charge     1     Ensure EDG-1B margin is           j l             is required,                       available for 80 KW.
l is required, available for 80 KW.
l             AND either of the T6Tlowing is NOT               (Rule 5, EDG Control)
l AND either of the T6Tlowing is NOT (Rule 5, EDG Control) available:
.              available:
I 2
I                                           2     Notify SP0 to close 480V PZR HTR l                   DPBC-1G                       MCC 3B-3BL "DPBC-lH H BATTERY CHARGER" (119 ft IB by east l
Notify SP0 to close 480V PZR HTR l
DPBC-lH                       door).                             j l
DPBC-1G MCC 3B-3BL "DPBC-lH H BATTERY CHARGER" (119 ft IB by east DPBC-lH door).
THEN place DPBC-11 in       3     If DPBC-1G is NOT available,       !'
j l
service.                           THE notify SP0 to align DPBC-ll l                                                       ft TB Battery Charger Room):
THEN place DPBC-11 in 3
If DPBC-1G is NOT available, service.
THE notify SP0 to align DPBC-ll l
ft TB Battery Charger Room):
Open DPDP IC-4 "DPBC-1G P, PN Feed from G Battery Charger".
Open DPDP IC-4 "DPBC-1G P, PN Feed from G Battery Charger".
Open DPDP 1C-14 "DPBC-II PN, N Feed from I Battery l                                                                                     l Charger".
Open DPDP 1C-14 "DPBC-II l
PN, N Feed from I Battery l
Charger".
Close DPDP 1C-13 "DPBC-11 P, PN Feed from i Battery Charger".
Close DPDP 1C-13 "DPBC-11 P, PN Feed from i Battery Charger".
l                                                        Select DPXS-lC "DPBC-ll Transfer Switch" to " POWER FROM PZR HTR MCC 3B".
Select DPXS-lC "DPBC-ll l
4       "F DPBC-lH is NOT available, t
Transfer Switch" to " POWER FROM PZR HTR MCC 3B".
4 "F DPBC-lH is NOT available, t
lei notify SP0 to align DPBC-ll L95 ft TB Battery Charger Room):
lei notify SP0 to align DPBC-ll L95 ft TB Battery Charger Room):
Open DPDP 1C-13 "DPBC-11 P, PN Feed from I Battery   4 Charger".
Open DPDP 1C-13 "DPBC-11 P, PN Feed from I Battery 4
Open DPDP 1C-5 "DPBC-lH PN,   ,
Charger".
N Feed from H Battery         '
Open DPDP 1C-5 "DPBC-lH PN, N Feed from H Battery Charger".
Close DPDP 1C-14 "DPBC-ll PN, N Feed from ! Battery l
Charger".
Charger".
Close DPDP 1C-14 "DPBC-ll PN, N Feed from ! Battery l                                                        Charger".
Select DPXS-lC "DPBC-ll Transfer Switch" to " POWER FROM PZR HTR MCC 3B".
Select DPXS-lC "DPBC-ll Transfer Switch" to " POWER FROM PZR HTR MCC 3B".
O l         AP-770         REV 25 (MC)         PAGE 85 of 87                   EDGA     ,
O l
l
AP-770 REV 25 (MC)
PAGE 85 of 87 EDGA l


1 0
1 0
i l
i l
l 8
l 8
BLANK PAGE fI                                                               ,-
BLANK PAGE fI
                                                                  -s l
,-s l
i i
i i
i l
i l
(. .
(..
t..,
t..,
w'   l AP-770   REV 25 (MC)                     PAGE 86 of 87 EDGA       l I
w' AP-770 REV 25 (MC)
PAGE 86 of 87 EDGA


l Load range in KW
l Load range in KW
  't               Maximum load   3474 l   Table 1:         30 min     3376 to 3474 EDG Ratings     200 hr     3176 to 3375 2000 hr     2826 to 3175 Continuous   0 to 2825 l
't Maximum load 3474 l
I l
Table 1:
t wJ I
30 min 3376 to 3474 EDG Ratings 200 hr 3176 to 3375 2000 hr 2826 to 3175 Continuous 0 to 2825 twJ l
l l
t-U AP 770 REV 25 (MC)
l t-U AP 770   REV 25 (MC)   PAGE 87 of 87 (LAST PAGE) EDGA}}
PAGE 87 of 87 (LAST PAGE)
EDGA}}

Latest revision as of 10:28, 3 December 2024

Rev 25 to AP-770, EDG Actuation
ML20216F032
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/08/1998
From: Wilson I
FLORIDA POWER CORP.
To:
Shared Package
ML20216F000 List:
References
AP-770, NUDOCS 9804160382
Download: ML20216F032 (87)


Text

,

EDGA REV 25 (MC)

AP-770 0

EMERGENCY DIESEL GENERATOR ACTUATION l

1.0 ENTRY CONDITIONS IN FOR V ATION l

LE an ES 4160V Bus UV occurs, y

THEN use this procedure.

~~~~

1 l

2.0 IMMEDIATE ACTIONS NOII There are no imediate actions for this procedure.

O l

l l

l b// k Approved by MNP N/[v.'[fo%Date 04/08/98 (SIGRATURE ON FILE)

AP-770 PAGE 1 of 87 EDGA 9804160302 990409 DR ADOCK 0500 2

r lO O

BLANK PAGE OO

.c-I l

^

Q.-

1 AP-770 REV 25 (MC)

PAGE 2 of 87 EDGA

i 3.0 FOLLOW-UP ACTIONS

!]

l ACTIONS DETAILS t

3.1 Notify personnel of plant

  • ,_ STA conditions.

i

  • ._ Plant operators
  • __ NSM (evaluate plant conditions for entry into the Emergency l

Plan)

)

3.2 jf at least one ES 4160V bus is energized, IliEB GO TO Step 3.12 in this procedure.

O

(

)

i AP-770 REV 25 (MC)

PAGE 3 of 87 EDGA

o i

l l

l I

1 i

BLANK PAGE I

l I

{

i.-s j

AP-770 REV 25 (MC)

PAGE 4 of 87 EDGA i

t

{

i 3.0 FOLLOW-UP ACTIONS (CONT'D)

,p l \\d ACTIONS DETAILS

{

i STATUS l

Both ES buses are de-energized.

t 3.3 Verify lockouts are not 1 Notify PP0 to verify EDG lockouts tripped.

are not tripped:

"868 3209 A EDG LOCK 0UT RELAY" (A ES 4160V SWGR Room) j "86B-3210 B EDG LOCK 0UT RELAY" (B ES 4160V SWGR Room) 2 Verify ES bus lockouts are not tripped:

A ES Bus B ES Bus 86B 3205 868-3206 868-3207 868-3208 86B-3211 868-3212 IN If lockouts are tripped on both ES 4160V buses, M PERFORM Enclosure 1, Recovery of a Faulted ES Bus, in this procedure.

IE lockouts are tripped on only 1 ES 4160V bus, M CONCURRENTLY PERFORM, Recovery of a Faulted ES Bus, in this procedure.

l AP-770 REV 25 (MC)

PAGE 5 of 87 EDGA l

i i

gl l

i BLANK PAGE O

1

?

AP-770 REV 25 (MC)

PAGE 6 of 87 EDGA

I l

3.0 FOLLOW-UP ACTIONS (CONT'D) i ACTIONS DETAllS 3.4 Prevent auto start of MVP.

Ensure ES actuations are

-- bypassed or reset.

Select MVPs to normal after stop.

l 3.5 Ensure all ES 4160V feeder Bkrs are open.

A ES Bus B ES Bus 3207

__. 3212 3209

__. 3206 3205 3208 3211

__ 3210 O

O 3.6 Initiate efforts to e

Notify Maintenance to initiate restore a source of power.

repair efforts to restore an offsite power source.

J.E EDG is @l running, IBM notify PP0 to CONCURRENTLY PERFORM Enclosure 2, Failed EDG Recovery, in this procedure.

Consider 500KV backfeed as a source of offsite power.

W M an offsite power J

3.7 source is available, 08 an EDG is running,

_It13 continue in this procedure.

l I O

!v l

AP-770 REV 25 (MC)

PAGE 7 of 87 EDGA

O O

l l

BLANK PAGE 1

O

<m AP-770 REV 25 (MC)

PAGE 8 of 87 EDGA

(

I i

3.0 FOLLOW-UP ACTIONS (CONT'D) l(~'

ACTIONS DETAILS l

3.8 E an EDG is running,

  • __ E associated EDG output voltage l

ItiEli ensure proper voltage is < 4150V, and frequency.

EEff raise EDG output voltage:

Select affected "EDG A(B)

EXC VOLT ADJ SELECT" to

" CONT RM".

Ensure EDG voltage is

= 4160V using "EDG A(B) EXC VOLT ADJUST".

e Ensure frequency is = 60 Hz by I

adjusting "EDG A(B) SPEED".

l 3.9 J.E an ES 4160V bus is energized, EE!( GO TO Step 3.12 in i

O this procedure, V

i lO AP-770 REV 25 (MC)

PAGE 9 of 87 EDGA

O O

BLANK PAGE ps

\\

i

)

a t

AP-770 REV 25 (MC)

PAGE 10 of 87 EDGA

3.0 FOLLOW-UP ACTIONS (CONT'D)

ACTIONS DETAILS 3.10 JF at any time, an 1

lE " ACTUATED" lamp on "4160V ES alternate supply is BUS 3A(3B) ES/UV BLOCK LOCK OUT available to a ACTUATED" is lit, de-energized ES bus:

THEN notify PP0 to defeat lockout for affected bus:

BEST Open "AY Knife Switch A ES Offsite Power 4160V Bus UV Relay Power" Transformer (4160V ES BUS 3A-13) i Aux Transformer Open "AY Knife Switch B ES 4160V Bus UV Relay Power"

{

@ND the bus is NOT (4160V ES BUS 38-2) l

faulted, l

THEN energize dead bus.

WHEN AY knife switch is

{

open, TEEN depress "4160V ESA(ESB)

UV RESET" push button for the affected ES 4160V bus.

WHEN " RESET" lamp on "4160V ES BUS 3A(38) ES/UV BLOCK O

LOCK OUT ACTUATE 0" is lit, IEEN notify PPO to restore lockout for affected bus:

Close "AY Knife Switch A ES 4160V Bus UV Relay Power" Close "AY Knife Switch B ES 4160V Bus UV Relay Power" 2

Close feeder Bkr from the available power source by holding in "CLOSE" until "4KV ES BUS A(B) DEAD" annunciator alarm I

clears (normally d 10 seconds).

3.11 WHEN any ES 4160V bus is energized, AND adequate SCM exists, JHEN continue in this procedure.

AP-770 REV 25 (MC)

PAGE 11 of 87 EDGA

O O

BLANK PAGE O

AP-770 REV 25 (MC)

PAGE 12 of 87 EDGA

3.0 FOLLOW-UP ACTIONS (CONT'D)

/ \\

\\

ACTIONS DETAILS STATUS At least 1 ES 4160V bus is energized.

3.12 Verify letdown flow exists.

If letdown flow does NOT Close MUV-49 J

exist, i

THEN isolate letdown.

If MUV-49 will NOI close, l

M Close; I

MUV-50 J

MVV-51

/"'

(_,T/

3.13 LF at any time, letdown flow restoration is

desired, THEN CONCURRENTLY PERFORM E0P-14, Enclosure 4, Letdown Recovery.

/~'T V

AP-770 REV 25 (MC)

PAGE 13 of 87 EDGA

Applicable carry-over steps:

3.13 lE letdown flow restoration is desired, THEN CONCURRENTLY...

em

?i o) i b,a-AP-770 REV 25 (MC)

PAGE 14 of 87 EDGA

3.0 FOLLOW-UP ACTIONS (CONT'D)

ACTIONS DETAILS 3.14 Verify at least 1 SW pump running.

SWP-1A SWP-1B SWP-lc E no SW pumps are 1

E SW flow has been lost to

running, RCPs, THEN start an available SW M close SW valves to RCPs:

pump.

RCP-1A SWV-80

__,SWV-84 RCP-18 SWV-79 SWV-83 RCP-lC

__ SWV-82 SWV-86 RCP-lD SWV-81 SWV-85 2

E the bus is being supplied by the EDG, M ensure adequate EDG margin exists.

(Rule 5, EDG Control) 3 Start available SW pump.

O AP-770 REV 25 (MC)

PAGE 15 of 87 EDGA

1 Applicable carry-over steps:

3.13 lE letdown flow restoration is desired, I!![N CONCURRENTLY...

o O

.~.i O

s.

AP-770 REV 25 (MC)

PAGE 16 of 87 EDGA

3.0 FOLLOW-UP ACTIONS (CONT'D) l ACTIONS DETAILS 1

l 3.15 Verify at least 1 MVP running.

MVP-1A l

MVP-1B l

MVP-lc l

1E no MVPs are running, AN.Q MVP restart is

desired, M CONCURRENTLY PERFORM Enclocure 3, MVP Restart, in this procedure.

3.16 Verify at least 1 SW RW pump running.

RWP-1 RWP-2A RWP-2B E no SW RW pumps are 1

E the bus is being supplied by

running, the EDG, M start an available SW J.!!M ensure adequate EDG margin RW pump, exists.

)

[ Rule 5, EDG Control]

l 2

Start available SW RW pump.

l 1

AP-770 REV 25 (MC)

PAGE 17 of 87 EDGA

Applicable carry-over steps:

f. m 3.131[ letdown flow restoration is desind, THEN CONCURRENTLY...

N]

l')

(_/

i s

l l

(U s

l AP-770 REV 25 (MC)

PAGE 18 of 87 EDCA l

LO FOLLOW-UP ACTIONS (CONT'D)

ACTIONS DETAILS 3.17 Verify ES MCC 3AB is energized.

IE ES MCC 3AB is NOT 1

E the energized ES 480V bus is energized, powered from the EDG, 1 HEN align ES MCC 3AB to IEEN ensure 42 KW of EDG margin an energized bus, exists.

(Rule 5, EDG Control]

2 Depress transfer push button for ES MCC 3AB to the energized bus.

3.18 E DHR is required, IBfd CONCURRENTLY PERFORM AP-404, Loss of Decay Heat Removal, beginning with q

Step 3.1

%)

(Rule 5, EDG Control) l i

l l

Q L

AP-770 REV 25 (MC)

PAGE 19 of 87 EDGA

f I

Applicable carry-over steps:

(

3.131E letdown flow restoration is desired, THEN CONCURRENTLY...

O l

l

\\

a r'~

s O

v e

C AP-770 REV 25 (MC)

PAGE 20 of 87 EDGA

F l

l 3.0 FOLLOW-UP ACTIONS (CONT'D)

I ACTIONS DETAILS 3.19 Verify ES 480V UV lockouts l

are not actuated.

l J.E ES 480V UV lockouts are 1 _ _ E AB is accessible,

actuated, IliW notify PP0 to perform the i

l JJim reset lockouts, following for affected EDG:

1 I

Select CAHE-3A "A BAST l

HEATER" to "0FF" (119 ft AB by BASTS).

Select CAHE-3B "B BAST HEATER" to "0FF" (119 ft AB by BASTS).

2 ___ E AB is NOT accessible, 1113 derate affected EDG by 50 KW.

[ Rule 5, EDG Control]

3 Select BWST HTR control switch l

to " LOCAL".

4 Bypass or reset ES actuation.

5 Reset affected ES 480V UV lockouts:

A ES Bus B ES Bus l

1 8627/ESA 8627/ESB l

J" 2

86X27/ESA l

l l

l O

AP-770 REV 25 (MC)

PAGE 21 of 87 EDGA

i l

Applicable carry-over steps:

3.13 LF. letdown flow restoration is desired, I!!@ CONCURRENTLY...

t)

C/

( '..

O v

g AP-770 REV 25 (MC)

PAGE 22 of 87 EDGA l

l I

3.0 FOLLOW-UP ACTIONS (CONT'D) l ACTIONS DETAILS i

3. 20 __ Verify IA pressure is

> 90 psig.

1 jfE IA pressure is IE an outside air compressor is l

s 90 psig, available, JEEN start available air JEEN notify SP0 to start compressors, available compressor:

SAP-lc SAP-lD SAP-lE l

' O l

1 II AP-770 REV 25 (MC)

PAGE 23 of 87 EDGA

l l

Applicable carry-over steps:

iG 3.13 If letdown flow restoration is desired, THEN CONCURRENTLY...

L. j l

n q,1 4

s l

~

\\

v I

AP 770 REV 25 (MC)

PAGE 24 of 87 EDGA

3.0 FOLLOW-UP ACTIONS (CONT'D) i ACTIONS DETAILS 3.21 Ensure RB cooling.

1 E RB cooling by SW is desired, M perform the following in order:

Close SWV-151 Close SWV-152 Close SWV-355 Open SWV-353 Open SWV-354 2

E RB cooling by CI is desired, M perform the following in order:

l Close SWV 353 l

l Close SWV-354 Open SWV-151 l

Open SWV-152 l

Open SWV-355 3 Proper RB cooling unit operation:

E ES has N_ql actuated, i

M ensure both ES selected RB cooling units running in slow 1

speed.

E ES has actuated, M ensure only 1 ES selected RB cooling unit running in slow speed.

[ Rule 5,EDGControl]

OV AP-770 REV 25 (MC)

PAGE 25 of 87 EDGA

f Applicable carry-over steps:

q 3.13 If letdown flow restoration is desired,18Q1 CONCURRENTLY...

f.o

' L/

\\

U c 's

. )

~_

AP-770 REV 25 (MC)

PAGE 26 of 87 EDGA

l 1

3.0 FOLLOW-UP ACTIONS (CONT'D)

ACTIONS DETAILS t

3.22 Verify at least 2 PZR Htr groups energized.

E at least 2 PZR Htrs E A ES 4160V BUS is the desired groups are NOT energized,

source, i

MQ PZR Htrs are desired, THEN CONCURRENTLY PERFORM l

ItiW energize PZR Htrs, A ES 4160V BUS l

from the desired source.

Supply to Support Equipment, in this procedure.

l

[ Rule 5, EDG Control]

E B ES 4160V BUS is the desired

source, l

THEN CONCURRENTLY PERFORM, B ES 4160V BUS j

Supply to Support Equipment, in this procedure.

[ Rule 5, EDG Control)

)

3.23 E both ES 4160V buses are q

energized, I!!@ GO TO Step 3,30 in this procedure.

i O

AP-770 REV 25 (MC)

PAGE 27 of 87 EDGA

Applicable carry-over steps:

O 3.131E letdown flow restoration is desired, THEN CONCURRENTLY...

O b,

i o)

L i

i l

l

\\

0 v

i AP-770 REV 25 (MC)

PAGE 28 of 87 EOGA l

3.0 FOLLOW-UP ACTIONS (CONT'D)

ACTIONS DETAILS l

STATUS l

Only 1 ES 4160V bus is energized.

l l

3.24 Prevent auto start of MVP Ensure ES actuations are on dead bus, bypassed or reset.

e Place MVP on affected bus in normal after stop.

3.25 Ensure all ES 4160V feeder Bkrs are open on the dead A ES Bus B ES Bus bus.

3207 3212 3209 3206 3205 3208 3211 3210 t

I 9

AP-770 REV 25 (MC)

PAGE 29 of 87 EDGA t

Applicable carry-over steps:

~~

3.13.lf letdown flow restoration is desired, THEN CONCURRENTLY...

,P%

  • <e*

l l

1 f

j a

%./

~

AP-770 REV 25 (MC)

PAGE 30 of 87 EDGA l

l

I 3.0 FOLLOW-UP ACTIONS (CONT'D) l 7-l()

ACTIONS DETAILS 3.26 Jf EDG associated with

  • __ JE associated EDG output voltage affected bus is running, is < 4150V,

.T_HfN ensure proper IHEN raise EDG output voltage:

H alignment.

Select affected "EDG A(B)

EXC V0LT ADJ SELECT" to

" CONT RM".

.__ Ensure EDG voltage is

= 4160V using "EDG A(B) EXC VOLT ADJUST".

  • __ Ensure frequency is = 60 Hz by adjusting "EDG A(B) SPEED".

e If both ES 4160V buses are energized, THEN GO TO Step 3.30 in this procedure.

tO Q,)

!O V

AP-770 REV 25 (MC)

PAGE 31 of 87 EDGA

i Applicable carry-over steps:

r i'f g

o 3.13 IE letdown flow restoration is desired, THEN CONCURRENTLY...

\\_/

1

'O C)

I

\\

%)

AP-770 REV 25 (MC)

PAGE 32 of 87 EDGA

r 3.0 FOLLOW-UP ACTIONS (CONT'D)

ACTIONS DETAILS 3.27 Verify lockouts are not 1 Notify PP0 to verify lockouts are I

tripped, not tripped on the affected EDG:

"868-3209 A EDG LOCK 0UT RELAY" (A ES 4160V SWGR Room)

"86B-3210 B EDG LOCK 0UT RELAY" (B ES 4160V SWGR Room) 2 Verify ES bus lockouts are not tripped:

A ES Bus B ES Bus 86B-3205 86B-3206 86B-3207 868-3208 86B-3211 86B-3212 l \\

lE any lockout is tripped, IllEE CONCURRENTLY PERFORM, Recovery of a Faulted ES Bus, in this procedure.

l O

AP-770 REV 25 (MC)

PAGE 33 of 87 EDGA

I l

1 Applicable carry-over steps:

>l p 3.13 IE letdown flow restoration is desired, THEN CONCURRENTLY...

k_

1 l

l l

l 1

, r *-

Ns) l l

l 1

l l

l V

s_.

f AP-770 REV 25 (MC)

PAGE 34 of 87 EDGA L

(

(

3.0 FOLLOW-UP ACTIONS (CONT'D1 O

V ACTIONS DETAILS I

3.28 If at any time, an 1

1E " ACTUATED" lamp on "4160V ES alternate supply is BUS 3A(3B) ES/UV BLOCK LOCK OUT available to a ACTUATED" is lit, l

de-energized ES bus:

THEN notify PP0 to defeat i

lockout for affected bus:

l BEST l

Open "AY Knife Switch A ES l

Offsite Power 4160V Bus UV Relay Power" l

Transformer (4160V ES BUS 3A-13) l

.___ Aux Transformer Open "AY Knife Switch B ES 4160V Bus UV Relay Power" A.N.Q the bus is NOT (4160V ES BUS 3B-2)

N I

faulted, l

TU @ energize affer.ted WHEN AY knife switch is bus.

open, 1116 depress "4160V ESA(ESB)

UV RESET" push button for the affected ES 4160V bus.

l WHEN " RESET" lamp on "4160V ES BUS 3A(38) ES/UV BLOCK LOCK OUT ACTUATED" is lit,

,s I

IE @ notify PPO to restore l

lockout for affected bus:

l Close "AY Knife Switch l

A ES 4160V Bus UV Relay Power" I

Close "AY Knife Switch B ES 4160V Bus UV l

Relay Power" 2

Close feeder Bkr from the available power source by holding in "CLOSE" until "4KV ES BUS A(B) DEAD" annunciator alarm clears (normally s 10 seconds).

AP-770 REV 25 (MC)

PAGE 3S of 87 EDGA l

Applicable carry-over steps:

O 3.13 E letdown flow restoration is desired, THEN CONCURRENTLY...

1 lQ) l 3.28 E alternate supply available to a de-energized ES bus...

l 1

\\

A

~

a I

O l

AP-770 REV 25 (MC)

PAGE 36 of 87 EDGA l

l

3.0 FOLLOW-UP ACTIONS (CONT'0) l ACTIONS DETAILS 1

1 3.29 IE at any time, a e Notify PP0 to CONCURRENTLY PERFORM de-energized bus is NOT, Failed EDG Recovery, in r

faulted, this procedure.

l AND EDG is NOT running, THEN attempt recovery of failed EDG.

3.30 Verify CC ventilation is running.

IE CC ventilation is e CONCURRENTLY PERFORM E0P-14, NOT running, 7, Control Complex It!W start CC ventilation.

Emergency Ventilation.

j

{

l i

,OQ AP-770 REV 25 (MC)

PAGE 37 of 87 EDGA

[

l Applicable carry-over steps:

I I

i,^)

3.13 If, letdown flow restoration is desired, THEN CONCURRENTLY...

'('

l 3.28 IE alternate supply available to a de-energized ES bus...

i 3.291E a de energized bus is (LQI faulted, A!LQ EDG is NOT running...

l l

l rh O

[

l i

f

\\

\\__/

AP-770 REV 25 (MC)

PAGE 38 of 87 EOGA

3,0 FOLLOW-UP ACTIONS (CONT'D) r (7

ACTIONS DETAILS l

3.31 Verify a CC chiller is

/

running.

_ E a CC chiller is NOT 1

E bus is being powered from an

running, EDG, THEN start a CC chiller.

THEN ensure adequate EDG margin exists.

[ Rule 5, EDG Control]

2 Notify PP0 to CONCURRENTLY PERFORM E0P-14, Enclosure 18, Control Complex Chiller Startup.

3.32 E at any time, Non-lE e

E DPBC-lG is desired, battery charging is THEN CONCURRENTLY PERFORM desired,, A ES 4160V BUS p

JHEN align chargers from Supply to Support Equipment, in y) available buses.

this procedure.

e E DPBC-lH is desired, THEN CONCURRENTLY PERFORM, B ES 4160V BUS l

Supply to Support Equipment, in j

this procedure.

e E DPBC-II is desired to be powered from PZR HTR MCC 3A, THEN CONCURRENTLY PERFORM, A ES 4160V BUS Supply to Support Equipment, in this procedure, o

E DPBC-II is desired to be powered from PZR HTR MCC 3B, l

THEN CONCURRENTLY PERFORM, B ES 4160V BUS Supply to Support Equipment, in l

this procedure.

l g) w AP-770 REV 25 (MC)

PAGE 39 of 87 EDGA f

(

l l

Applicable carry-over steps:

p 3.13 E letdown flow restoration is desired, THEN CONCURRENTLY...

3.28 E alternate supply available to a de-energized ES bus...

3.29 E a de-energized bus is [LOI faulted, AND EDG is NOT running...

3.32 E additional Non-lE Battery charging is desired, I!LG align...

(

l l

l

\\

U t.

AP-770 REV 25 (MC)

PAGE 40 of 87 EDGA l

I

I

)

l 3.0 FOLLOW-UP ACTIONS (CONT'D) 1

' \\

ACTIONS DETAILS 3.33 1E at any time, heat 1

1E the bus is powered from an l

tracing is desired,

EDG, JJiG restore heat tracing.

lHlN ensure an additional 50 KW I

of margin exists.

[ Rule 5, EDG Control) 2 Notify PPO to depress " RESET" pushbutton on the following:

HTCP-5 " DIESEL LOAD SHEDDING PANEL" (119 ft AB by ES MCC 3A2)

HTCP-2 " DIESEL LOAD SHEDDING PANEL" (95 ft AB by elevator) 3.34 IE any EDG is running, Ili@ notify NSM to order

'O EDG fuel as required.

,\\_/

l i

l O

O AP-770 REV 25 (MC)

PAGE 41 of 87 EDGA i

i l

)

Applicable carry-over steps:

3.13 E letdown flow restoration is desired, IBfM CONCURRENTLY...

4 l

3.281E alternate supply available to a de-energized ES bus...

\\

3.29 IE a de-energized bus is NOT faulted, AND EDG is NOT running...

l l

3.32 1E additional Non-lE Battery charging is desired, TEHIH align...

)

i

(

l v

i I

l J

I l

Ov (L

AP-770 REV 25 (MC)

PAGE 42 of 87 EDGA

(

l l

I l

3.0 FOLLOW-UP ACTIONS (CONT'D)

ACTIONS DETAILS 3.35 LE Non-1E battery charger 1 Notify SP0 to perform the following is unavailable, in order (95 ft TB by Hydrogen It!EE notify SP0 to vent Panel):

main generator H2 Close HYV-28 "H2 Supply to Generator".

Close GGV-213 "H2 Supply to Controller".

Close GGV-220 " Generator Gas Manifold Inlet Iso".

Open GGV 232 " Generator Vent".

Open GGV-274 " Vent Iso".

}ElfN main generator PRESS lowers to < 2 psig, THEN close the following:

GGV-232 " Generator Vent" GGV-274 " Vent Iso" 2

1E TBP-2 is NOT running, ItiEH notify SP0 to CONCURRENTLY PERFORM E0P-14, Enclosure 14, Station Blackout Main Generator j

Purging.

l l

l O

AP-770 REV 25 (MC)

PAGE 43 of 87 EDGA

Applicable carry-over steps:

3.13 E letdown flow restoration is desired, THEN CONCURRENTLY...

3.28 E alternate supply available to a de-energized ES bus...

3.29 E a de-energized bus is N_0.1 faulted, 6NQ EDG is NOT running...

0 1

l 3.32 E additional Non-lE Battery charging is desired, IMS align...

l i

O r;

l l

(

c AP-770 REV 25 (MC)

PAGE 44 of 87 EDGA

3.0 FOLLOW-UP ACTIONS (CONT'D) r ACTIONS DETAILS 3. 3 6 __ Verify SF cooling is in operation.

E SF cooling is NOT in E SFP that was previously operation, running is available, IliEH establish SF cooling.

IHfH start previously running pump.

(Rule 5, EDG Control)

E SFP that was previously running is NOT available, IBER start available SFP.

E SFHE-1A is in service, It!EH notify PP0 to ensure SW alignment:

SWV-21 "SFHE 1A Inlet Iso" open (119 ft AB by SFPs)

SWV-22 "SFHE-1B Inlet Iso" closed (119 ft AB by SFPs)

(

E SFHE-1B is in service, THEN notify PPO to ensure SW alignment:

SWV-21 "SFHE-1A Inlet Iso" closed (119 ft AB by SFPs)

SWV-22 "SFHE-1B Inlet Iso" i

open (119 ft AB by SFPs)

O AP-770 REV 25 (MC)

PAGE 45 of 87 EDGA

Applicable carry-over steps:

Q 3.13 E letdown flow restoration is desired, THEN CONCURRENTLY...

V f*%

3.28 E alternate supply available to a de-energized ES bus...

3.29 E a de-energized bus is NOT faulted, AND EDG is NOT running...

3.32 E additional Non-lE Battery charging is desired, THEN align...

(e~

1 t

1 4

3 1

O iQ. -

AP-770 REV 25 (MC)

PAGE 46 of 87 EDGA

4 l

3.0 FOLLOW-UP ACTIONS (CONT'D) n V

ACTIONS DETAILS i

3.37 If offsite power is supplying all available ES 4160V buses, THEN EXIT this procedure.

l i

l l

3.38 Consider 500KV backfeed as a source of ot; site power.

l 3. 3 9 __ IE Non-1E battery charger e Notify SP0 to CONCURRENTLY PERFORM l.

is unavailable, E0P-14, Enclosure 14, Station l

eEQ EDG-1B load is Blackout Main Generator Purging.

l

> 3175 KW for 20 hrs, THEN purge the main l

generator.

1 3.40 If at any time, EDG-1B l

load > 3175 KW for 24 hrs, IllW ensure TBP-2 stopped.

3.4!. _ Notify the TSC for guidance on maintaining l

EDGs within their 2000 hr i

or continuous ratings.

l See Table 1 l

3.42 W!!@ offsite power is available, 111@ continue in this procedure.

,n N

AP-770 REV 25 (MC)

PAGE 47 of 87 EDGA l

l

r Applicable carry-over steps:

3.13 E letdown flow restoration is desired,-THEN CONCURRENTLY...

3.40 E EDG-1B load > 3175 KW for 24 hrs, THEN ensure TBP-2 stopped.

~/ '

O I....

I O

AP-770 REV 25 (MC)

PAGE 48 of 87 EDGA

[.

1 i

i i

3.0 FOLLOW-UP ACTIONS (CONT'D) l ACTIONS DETAILS i '

3.43 1E A ES 4160V BUS is 1

Ensure plant conditions are i

supplied from EDG-1A, stable.

l THEN sync in offsite power supply.

2 Ensure HPI is bypassed or reset.

I 3

Depress "4160V ESA UV RESET" push button.

4 Notify PPO to obtain key 94 from Control Room.

5 While maintaining frequency, notify PP0 to select EDG 1A

" SPEED DR0OP" (119 ft AB A EDG Engine Room) to 60 in increments of 10 6

Select "EDG A EXC VOLT ADJ l

SELECT" to " CONT RM".

l 7

Notify PP0 to select "A EDG l/^)

Unit-Parallel Switch" to " PAR."

V (119 ft AB A EDG Control Room).

l 8

Adjust "EDG A EXC VOLT ADJUST" to maintain EDG A voltage 4150 to 4250 volts.

l 9

Select synchroscope for Bkr to be paralleled to "0N".

10 Adjust "EDG A EXC VOLT ADJUST" l

to match incoming and running voltages.

l 11 Adjust "EDG A SPEED" to establish synchroscope moving slow in the " FAST" direction.

1 l

12 Close oncoming Bkr at l

= 11 o' clock.

j l

i 13 Select syre.hroscope to "0FF".

OV AP-770 REV 25 (MC)

PAGE 49 of 87 EDGA

Applicable carry-over steps:

S 3.131E letdown flow restoration is desired, LHf3 CONCURRENTLY...

3.40 lE EDG-1B load > 3175 KW for 24 hrs, JM N ensure TBP-2 stopped.

i f

l l

I O

e r

l i

1 O

(_,

AP-770 REV 25 (MC)

PAGE 50 of 87 EDGA

r 3.0 FOLLOW-UP ACTIONS (CONT'D)

ACTIONS DETAILS l

3.44 JI EDG-1A is running in 1

Maintain -1.5 to +1.5 MVAR by parallel with offsite adjusting "EDG A EXC VOLT l

power, ADJUST" IliM unload and shutdown EDG-1A.

2 1E EDG-1A load is > 1200 KW, I!iW adjust "EDG A SPEED" to reduce load to = 1200 KW.

3

)LHM load has been reduced to I

= 1200 KW for 3 to 5 minutes, Ilim adjust "EDG A SPEED" to reduce EDG-1A load to = 200 KW.

l 4

Open Bkr 3209 5

Depress EDG-1A "STOP" push

button, f

f

\\

3.45 jf A ES 4160V BUS is 1

Place EFP-1 in normal after energized from an offsite

stop, source, l

MD EFP-1 is NOT required, 2

Notify PP0 to obtain key 11 from THEN restore EFP-1 to Control Room, standby condition.

3 Notify PPO to ensure EFIC trip i

modules reset:

Cabinet A, Module A-4-10, "EF-100-ZY" (A EFIC Room) l Cabinet B, Module B-4-10, "EF-200-ZY" (B EFIC Room) l l

O AP-770 REV 25 (MC)

PAGE 51 of 87 EDGA l

I I

Applicable carry-over steps:

3.13 E letdown flow restoration is desi. ed, JffE CONCURRENTLY...

O e'

3.40 E EDG-1B load > 3175 KW for 24 hrs, J3f3 ensure TBP-2 stopped.

O h

O AP-770 REV 25 (MC)

PAGE 52 of 87 EDGA

3.0 FOLLOW-UP ACTIONS (CONT'D) i ACTIONS DETAILS l

3.46 1E B ES 4160V BUS is 1

Ensure plant conditions are supplied from EDG-1B, stable.

THEN sync in offsite power supply.

2 Ensure HPI is bypassed or reset.

l 3

Depress "4160V ESB UV RESET" l

push button.

4 Notify PPO to obtain key 94 from Control Room.

l 5

While maintaining frequency, notify PP0 to select EDG-1B

" SPEED DR0OP" (119 ft AB B EDG Engine Room) to 60 in increments of 10 l

6 Select "EDG B EXC VOLT ADJ SELECT" to " CONT RM".

7 Notify PP0 to select "B EDG lpQ (119 ft AB B EDG Control Room).

Unit-Parallel" switch to " PAR."

8 Adjust "EDG B EXC VOLT ADJUST" to maintain EDG B voltage 4150 to 4250 volts.

l 9

Select synchroscope for Bkr to I

be paralleled to "0N".

l l

l 10 Adjust "EDG B EXC VOLT ADJUST" l

to match incoming and running voltages.

11 Adjust "EDG B SPEED" to establish synchroscope moving slow in the " FAST" direction.

12 Close oncoming Bkr at

= 11 o' clock.

13__ Select synchroscope to "0FF".

Ov AP-770 REV 25 (MC)

PAGE 53 of 87 EDGA I

O i.

l I

l l

l l

f BLANK PAGE n-e e

i l

i i

i t

[.

I l

e k..

)

1 AP-770 REV 25 (MC)

PAGE 54 of 87 EDGA i

l i

i l

3.0 FOLLOW-UP ACTIONS (CONT'D)

O-l V ACTIONS DETAILS l

3.47 J1 EDG-1B is running in 1

Maintain -1.5 to +1.5 MVAR by l

parallel with offsite adjusting "EDG B EXC VOLT

~

i

power, ADJUST".

I IEN unload and shutdown i

EDG-18.

2 jf EDG-1B load is > 1200 KW, IM H adjust "EDG B SPEED" to i

reduce load to = 1200 KW.

3 W EN load has been reduced to

_= 1200 KW for 3 to 5 minutes, IMH adjust "EDG B SPEED" to reduce EDG B load to = 200 KW.

l 4

Open Bkr 3210 1

5 Depress EDG B "STOP" push button.

l a

O-

- Notify PP0 to restore EDGs 3.48 to ES standby in accordance with OP-707, l

Operation of the ES l

Emergency Diesel Generators, Section 4.13, l

OperatiQn of EDG, l

and EXJt this proradure.

l l

O AP-770 REV 25 (MC)

PAGE 55 of 87 EDGA

t O

l t

l i

BLANK PAGE 1

1 I

u-t 1

l l

l i

1 I

l l

'q.*

AP-770 REV 25 (MC)

PAGE 56 of 87 EDGA

7-5.0 ENCLOSURE 1 RECOVERY OF AffULTED ES BUS ACTIONS DETAILS 1.1 Notify Maintenance to repair fault.

i 1

1.2 W!iB fault is repaired, o Reset lockouts for the affected bus:

THEN prepare to

-energize the affected A ES Bus B ES Bus 86B-3205 86B-3206 86B-3207 868-3208 l

l 868-3211 86B-3212 i

1.3 J1 affected EDG is NOT

  • Notify PP0 to reset the affected EDG
running, lockout:

l I!!@ reset affected EDG i

i lockout.

"86B-3209 A EDG LOCK 0UT RELAY" l

(A ES 4160V SWGR Room)

"868-3210 B EDG LOCK 0UT RELAY" (B ES 4160V SWGR Room) l l

l l

AP-770 REV 25 (MC)

PAGE 57 of 87 EDGA l

1 Of Ds f\\

BLANK PAGE

)

i I

a

\\

l i

T AP-770 REV 25 (MC)

PAGE 58 of 87 EDGA

i 5.0 ENCLOSURE 1 RECOVERY OF A FAULTID ES BUS (CONT'D)

ACTIONS DETAILS 1.4 IE affected ES bus is NOT 1

Dispatch PP0 to the affected EDG energized, 4160V ES Bus SWGR Room.

E EDG is running, A

ItiG reset the affected 2

Place and maintain the affected EDG lockout.

EDG Output Bkr in the open position:

Bkr 3209 Bkr 3210 3

Notify PPO to reset the affected EDG lockout:

"868-3209 A EDG LOCK 0UT RELAY" (A ES 4160V SWGR Room)

"868-3210 B EDG LOCK 0UT RELAY" (B ES 4160V SWGR Room) l 4

Close affected EDG Output Bkr:

. (Q 1

_./

Bkr 3209 Bkr 3210 l

i l

O AP-770 REV 25 (MC)

PAGE 59 of 87 EDGA

l' u

l BLANK PAGE l

l l

l 1

I s.

AP-770 REV 25 (MC)

PAGE 60 of 87 EDGA l

t

5.0 ENCLOSURE 2 FAILED EDG RECOVERY l OV ACTIONS DETAILS j

2.1 Prevent EDG from starting

  • Select EDG " CONTROL" switch to during recovery efforts.

"At Engine" for failed EDG (119 ft AB A(B) EDG Engine Room).

i l

2.2 Ensure condition causing failure of EDG is corrected.

1 1

2.3 Prepare for EDG restart.

1 Ensure 86 lockout is reset for affected EDG:

"868-3209 A EDG LOCK 0UT RELAY" (A ES 4160V SWGR Room)

"86B-3210 B EDG LOCKOUT RELAY" (B ES 4160V SWGR Room) 2 Reset EDG "86 DG" Lockout

(

(119 ft AB A(B) EDG Control Room).

3 Depress the " RESET" push button (119 ft AB A(B) EDG Engine Room).

4 Wait at least 2 minutes to allow the shutdown relays to reset.

2.4 Start the recovered EDG.

1 Notify Control Room EDG is being started.

i 2

Select EDG " CONTROL" switch to J

I

" Normal" (119 ft AB A(B) EDG l

Engine Room).

l l

O AP-770 REV 25 (MC)

PAGE 61 of 87 EDGA

O G

BLANK PAGE O

(.

1 I

O

,.e.

AP-770 REV 25 (MC)

PAGE 62 of 87 EDGA i

i i

5.0 ENCLOSURE 3 MVP RESTART

/~~()i ACTIONS DETAILS l

3.1 Prepare MVP for restart.

1 IE the bus is being supplied by l

the EDG, JJiG ensure adequate EDG margin l

l exists for MVP and required i

cooling water pumps.

(Rule 5 EDG Control) 2 Ensure MU control valves are closed:

l MUV-16 l

_ MVV-31 3

Establish MVP cooling water supply.

4 Ensure MVP recirc to MUT valves are open:

l MVV-53 l

MVV-257 5 Ensure MVP main lube oil pump is running:

MVP-2A MVP-2B MVP-2C 6 Ensure MVP main gear oil pump is running:

MVP-4A i

MVP-4B MVP-4C l

l i

'(

AP-770 REV 25 (MC)

PAGE 63 of 87 EDGA

O O

BLANK PAGE O

(~

~.

i l

l O

.-c:

AP-770 REV 25 (MC)

PAGE 64 of 87 EDGA

i 5.0 ENCLOSURE 3 MVP RESTART (CONT'D)

O-ACTIONS DETAILS 3.2 Select all MVPs to normal j

after stop.

__ MVP-1A j

i

_ MVP-1B MVP-1C i

l 3.3 E an A Train MVP will be 1

E MVP-lC is NOT ES selected,

started, THEN notify PPO to select THEN ensure suction

" PUMP 3C" on 4160V ES BUS 3B-5 l

alignment to MUT.

3 E MUT level is 2 55 in, THEN ensure MUV-73 is closed.

l 4

E MUT level is < 55 in, THEN ensure MUV-73 is open.

5 Ensure the following are open:

\\

MUV-69 MUV-58 l

3.4 E a B Train MVP will be 1

E MVP-1A is EI ES selected,

started, It@ notify PP0 to select Ilg ensure suction

" PUMP 3A" on 4160V ES BUS 3A-10 alignment to MUT.

2 Ensure MUV-69 is closed.

I 3

E MUT level is 2 55 in, I

l lH_E.tf ensure MUV-58 is closed.

l 4

IE MUT 1evel is < 55 in, IllEti ensure MUV-58 is open.

l 5 Ensure the following are open:

_ MUV-62 MUV-73 AP-770 REV 25 (MC)

PAGE 65 of 87 EDGA

O O

O BLANK PAGE O

e AP-770_

REV 25 (MC)'

PAGE 66 of 87 EDGA

l 5.0 ENCLOSURE 3 MUP RESTART (CONT'D)

ACTIONS DETAILS 3.5 Start ES selected MVP l

aligned to MUT.

[ Rule 5,EDGControl) 3.6 Maintain PZR level using MUV-31 3.7 Maintain MUT level e Cycle appropriate BWST to MVP valve 55 to 100 in.

to maintain MUT level 55 to 100 in:

MUV-73 i

l MUV-58 oV 3.8 Restore RCP seal 1

Throttle open MUV-16 to obtain injection.

3 gpm seal injection per RCP 1

over 2 minutes.

2 Note the time that RCP seal injection was established at 3 gpm:

3 Hli@ 2 10 min after the time noted in detail 2, I113 throttle open MUV-16 to establish 6 gpm per RCP.

4 Note the time that RCP seal injection was established at 6 gpm:

5 WHEN 2 10 min after the time noted in detail 4, THEN throttle open MUV-16 to establish 10 gpm per RCP.

O AP-770 REV 25 (MC)

PAGE 67 of 87 EDGA

I l

v.

)

4 l

l l

l l

l l

t l

l l

l BLANK PAGE f-(

l i

l l

i l

l l

s g.

~.

AP-770 REV 25 (MC)

PAGE 68 of 87 EDGA l

i

5.0 ENCLOSURE 4 A ES 4160V BUS SUPPLY TO SUPPORT EOUIPMENT OV ACTIONS DETAILS l

4.1 IE 480V REACTOR AUX BUS 3A is energized, j

1 JE!i GO TO Step 4.7 in l

this enclosure.

i l

l l

4.2 Ensure 480V REACTOR AUX BUS 3A feeder Bkrs are open.

Bkr 3305

_ Bkr 3395 1

4.3 Place IAP-1A in

" PULL TO LOCK".

i 4.4 Prepare associated

  • Notify SP0 to ensure all Bkrs on the electrical equipment.

following are open:

_ 480V REACTOR AUX BUS 3A (Unit 480V SWGR Room)

,__ 480V PZR HTR MCC 3A (119 ft IB by east door) 4.5 WE!i notified that all e Close the following Bkrs:

Bkrs on 480V REACTOR AUX BUS 3A AND 480V PZR HTR Bkr 3321 MCC 3A are open, THEN energize 480V REACTOR

_ Bkr 3395 AUX BUS 3A.

4.6 Energize 480V PZR HTR MCC

  • Notify SP0 to close 480V REACTOR AUX 3A.

BUS 3A-1C " Breaker 3355 Feed to PZR j

Htr MCC 3A" (Unit 480V SWGR Ro:,m).

O AP-770 REV 25 (MC)

PAGE 69 of 87 EDGA f

O O

1 BLANK PAGE t

(.

^

O G.

AP-770 REV 25 (MC)

PAGE 70 of 87 EDGA

5.0 ENCLOSURE 4 A ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT (CONT'D)

ACTIONS DETAILS 4.7 IE PZR Htrs are required, 1

Ensure EDG-1A margin is THEN energize PZR control available for 252 KW, power and 2 groups of Htrs.

(Rule 5, EDG Control]

2 Notify SP0 to close the following Bkrs (119 ft IB by east door):

480V PZR HTR MCC 3A-1A "PZR HEATER CONTROL TRANSFORMER A-1" 1

480V PZR HTR MCC 3A-2A "PZR l

HEATER CONTROL TRANSFORMER A-2" 3 Notify SP0 to close 2 of the l

following Bkrs (119 ft IB by east door):

480V PZR HTR MCC 3A-4A "PZR HEATER SCR GROUP 1" j

480V PZR HTR MCC 3A-lc "PZR HEATER GROUP 7" q

480V PZR HTR MCC 3A-2C "PZR HEATER GROUP 8" l

l 480V PZR HTR MCC 3A 3C "PZR l

HEATER GROUP 9" 4

JE additional PZR Htrs are

required, l

.A_NQ additional EDG margin exists i

for 126 KW per heater group to l

be energized, JH1H notify SP0 to close an l

additional Bkr on 480V PZR HTR l

MCC 3A (119 ft IB by east door).

i a

O AP-770 REV 25 (MC)

PAGE 71 of 87 EDGA I

O O

BLANK PAGE O

' dp 1

i O

t.

AP-770 REV 25 (MC)

PAGE 72 of 87 EDGA

l 5.0 ENCLOSURE 4 A ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT (CONT'D)

ACTIONS DETAILS l

4.8 JF Non-lE battery charge 1

Ensure EDG-1A margin is I

is required, available for 80 KW.

l eg DPBC-lG available, l

THEN place DP8C-1G in

[ Rule 5, EDG Control]

service.

2 Notify SP0 to close 480V PZR HTR I

l MCC 3A-3A "DPBC-lG C BATTERY CHARGER" (119 ft IB Ly east f

door).

3 Notify SP0 to align DPBC-lG (95 ft TB Battery Charger Room):

i i

Open DPDP 1C-13 "DPBC-Il P, PN Feed from I Battery Charger".

Close DPDP 1C-4 "DPBC-lG P, PN i

Feed from G Battery Charger".

O l

I I

l O

AP-770 REV 25 (MC)

PAGE 73 of 87 EDGA j

i

O O

l BLANK PAGE Q

(~

3,1

  • AP-770 REV 25 (MC)

PAGE 74 of 87 EDGA

[

5.0 ENCLOSURE _1 A ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT (CONT'D)

ACTIONS DETAILS 4.9

.I_f Non-lE battery charge 1

Ensure EDG-1A margin is l

I is required, available for 80 KW.

l AND either of the following is NOT (Rule 5, EDG Control) available:

2 Notify SP0 to close 480V PZR HTR l

DPBC-lG MCC 3A-38 "DPXS-lC FEED TO l

DPBC-ll" (119 ft IB by east DPBC-lH door).

IEEN place DPBC-II in 3

1E DPBC-)G is NOT available, service.

THEN notify SP0 to align DPBC-II (95 ft TB Battery Charger Room):

Open DPDP 1C-4 "DPBC-lG P, PN Feed from G Battery Charger".

l Open DPDP IC-14 "DPBC-II PN, N Feed from I Battery Charger".

Close DPDP 1C-13 "DPBC-II P, PN Feed from I Battery Charger".

Select DPXS-lC "DPBC-II Transfer Switch" to " POWER l

FROM PZR HTR MCC 3A".

4 JF DPBC-lH is NOT available, THEN notify SP0 to align DPBC-11 (95 ft TB Battery Charger Room):

l Open DPDP 1C-13 "DPBC-II l

P, PN Feed from I Battery Charger".

j Open DPDP 1C-5 "DPBC-lH PN, N Feed from H Battery Charger".

Close DPDP 1C-14 "DPBC-II PN, N Feed from I Battery Charger".

Select DPXS-lC "DPBC-II Transfer Switch" to " POWER FROM PZR HTR MCC 3A".

O AP-770 REV 25 (MC)

PAGE 75 of 87 EDGA

1

?

b

,k 1

l I

l i

l l

i 1

l BLANK PAGE 1<

k

?

1 l

i I

l i

l

?

l t

l l

l O

.m AP-770 REV 25 (MC)

PAGE 76 of 87 EDGA

l l

1 5.0 ENCLOSURE 5 B ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT l

ACTIONS DETAILS l

5.1 1E 480V REACTOR AUX BUS 3B is energized, l

THEN GO TO Step 5.8 in I

this enclosure.

l l

5.2 Ensure 480V feeder and Cross-Tie Bkrs are open.

Bkr 3399 Bkr 3393 Bkr 3394 Bkr 3306 Bkr 3396 Bkr 3312 lQ 1lV

__,Bkr 3392 j

l l

l 5.3 Place IAP-1B in

" PULL TO LOCK".

l l

l 5.4 Prepare associated e Notify SP0 to ensure all Bkrs on the l

electrical equipment.

following are open:

i 480V PLANT AUX BUS (Unit 480V SWGR Room) 480V REACTOR AUX BUS 3B (Unit 480V SWGR Room) 480V PZR HTR MCC 3B (119 ft IB by East door)

AP-770 REV 25 (MC)

PAGE 77 of 87 EDGA i

I i

I l

l lv i.

4 1

4 BLANK PAGE

.1

(

(.

I i

1 l

i OV C'

AP-770 REV 25 (MC)

PAGE 78 of 87 EDGA I

L

f 5.0 ENCLOSURE 5 8 ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT (CONT'D)

ACTIONS DETAILS 5.5 WHEN notified that all e Close the following Bkrs:

Bkrs on the following are l

open:

Bkr 3222 480V PLANT AUX BUS 3 Bkr 3312 480V REACTOR AUX BUS 38 480V PZR HTR MCC 3B l

It[EE energize 480V PLANT AUX BUS.

t i

i l

5.6 Energize 480V REACTOR AUX e Close the following Bkrs:

i BUS 3B.

Bkr 3392 l

Bkr 3396 O

I l

5.7 Energize 480V PZR HTR MCC e Notify SP0 to close 480V REACTOR AUX 38.

BUS 3B-1C " Breaker 3356 Feed to PZR Htr MCC 3B" (Unit 480V SWGR Room).

l l

O AP-770 REV 25 (MC)

PAGE 79 of 87 EDGA 1

l

)

O O

BLANK PAGE f

L 1

l l

l l

l l

I v

(..

AP-770 REV 25 (MC)

PAGE 80 of 87 EDGA 1

5.0 ENCLOSURE 5 8 ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT (CONT'D)

ACTIONS DETAILS 5.8 E PZR Htrs are required, 1

Ensure EDG-1B margin is I!!Q energize PZR control available for 252 KW.

power and 2 groups of t

Htrs.

[ Rule 5, EDG Control) 1 2 Notify SP0 to close the following l

Bkrs at 480V PZR HTR MCC 3B (119 ft IB by East door):

480V PZR HTR MCC 38-1A "PZR HEATER CONTROL TRANSFORMER B-1" 480V PZR HTR MCC 3B-1B "PZR HEATER CONTROL TRANSFORMER B-2" l

3 Notify SP0 to close 2 of the l

following Bkrs at 480V PZR HTR MCC 1

3B (119 ft 13 by east door):

480V PZR HTR MCC 38-2A "PZR j

HEATER SCR GROUP 2" 480V PZR HTR MCC 3B-3A "PZR HEATER SCR GROUP 5" 480V PZR HTR MCC 3B-4A "PZR HEATER SCR GROUP 6" 480V PZR HTR MCC 3B-10 "PZR l

HEATER GROUP 10" 480V PZR HTR MCC 38-2C "PZR HEATER GROUP 11" 480V PZR HTR MCC 3B-3C "PZR HEATER GROUP 12" 480V PZR HTR MCC 38-4C "PZR HEATER GROUP 13" 4

E additional PZR Htrs are

required, AND additional EDG margin exists or 126 KW per heater group to be energized, THEN notify SP0 to close an additional Bkr on 480V PZR HTR MCC 3B (119 ft IB by east door).

O AP-770 REV 25 (MC)

PAGE 81 of 87 EDGA l

i l

l

G p..g l

l BLANK PAGE J-r.

1 l

lO

~~

AP-770 REV 25 (MC)

PAGE 82 of 87 EDGA l

i 5.0 ENCLOSURE 5 B ES 4160V BUS SUPPLY TO SUPPORT E0VIPMENT (CONT'D)

I ACTIONS DETAILS 1

l 5.9 IE Non-lE battery recharge 1

Ensure EDG-1B margin is l

is required, available for 80 KW.

l AND DPBC-1H is available, l

IEW place DPBC-lH in

[ Rule 5, EDG Control) service.

2 Notify SP0 to close 480V PZR HTR MCC 38-3BL "DPBC-1H H BATTERY l

CHARGER" (119 ft IB by east door).

3 Notify SP0 to align DPBC-lH (95 ft TB Battery Charger Room):

Open DPDP 1C-14 "DPBC-Il PN, N Feed from I Battery Charger".

Close DPDP 1C-5 "DPBC-lH PN, N Feed from H Battery Charger".

l lO AP-770 REV 25 (MC)

PAGE 83 of 87 EDGA i

O O

l I

l l

l l

BLANK PAGE f

c I

i

\\

l g..

Q.'

AP-770 REV 25 (NC)

PAGE 84 of 87 EDGA

i 5.0 ENCLOSURE 5 B ES 4160V BUS SUPPLY TO SUPPORT EQUIPMENT (CONT'D) l ACTIONS DETAILS l

5.10 JE Non-lE battery charge 1

Ensure EDG-1B margin is j

l is required, available for 80 KW.

l AND either of the T6Tlowing is NOT (Rule 5, EDG Control) available:

I 2

Notify SP0 to close 480V PZR HTR l

DPBC-1G MCC 3B-3BL "DPBC-lH H BATTERY CHARGER" (119 ft IB by east DPBC-lH door).

j l

THEN place DPBC-11 in 3

If DPBC-1G is NOT available, service.

THE notify SP0 to align DPBC-ll l

ft TB Battery Charger Room):

Open DPDP IC-4 "DPBC-1G P, PN Feed from G Battery Charger".

Open DPDP 1C-14 "DPBC-II l

PN, N Feed from I Battery l

Charger".

Close DPDP 1C-13 "DPBC-11 P, PN Feed from i Battery Charger".

Select DPXS-lC "DPBC-ll l

Transfer Switch" to " POWER FROM PZR HTR MCC 3B".

4 "F DPBC-lH is NOT available, t

lei notify SP0 to align DPBC-ll L95 ft TB Battery Charger Room):

Open DPDP 1C-13 "DPBC-11 P, PN Feed from I Battery 4

Charger".

Open DPDP 1C-5 "DPBC-lH PN, N Feed from H Battery Charger".

Close DPDP 1C-14 "DPBC-ll PN, N Feed from ! Battery l

Charger".

Select DPXS-lC "DPBC-ll Transfer Switch" to " POWER FROM PZR HTR MCC 3B".

O l

AP-770 REV 25 (MC)

PAGE 85 of 87 EDGA l

1 0

i l

l 8

BLANK PAGE fI

,-s l

i i

i l

(..

t..,

w' AP-770 REV 25 (MC)

PAGE 86 of 87 EDGA

l Load range in KW

't Maximum load 3474 l

Table 1:

30 min 3376 to 3474 EDG Ratings 200 hr 3176 to 3375 2000 hr 2826 to 3175 Continuous 0 to 2825 twJ l

t-U AP 770 REV 25 (MC)

PAGE 87 of 87 (LAST PAGE)

EDGA