Docket Numbers: 05000315 and 05000316
Docket Numbers:
 
05000315 and 05000316
License Numbers: DPR-58 and DPR-74
License Numbers:
 
DPR-58 and DPR-74
Report Numbers: 05000315/2021003; 05000316/2021003; 07200072/2021001
Report Numbers:
 
05000315/2021003; 05000316/2021003; 07200072/2021001
Enterprise Identifier: I-2021-003-0077; I-2021-001-0162
Enterprise Identifier:
 
I-2021-003-0077; I-2021-001-0162
Licensee: Indiana Michigan Power Company
Licensee:
 
Indiana Michigan Power Company
Facility: Donald C. Cook Nuclear Plant
Facility:
 
Donald C. Cook Nuclear Plant
Location: Bridgman, MI
Location:
 
Bridgman, MI
Inspection Dates: July 01, 2021 to September 30, 2021
Inspection Dates:
 
July 01, 2021 to September 30, 2021
Inspectors: R. Baker, Senior Operations Engineer S. Bell, Health Physicist R. Edwards, Senior Health Physicist M. Jones, Project Engineer J. Mancuso, Resident Inspector J. Neurauter, Senior Reactor Inspector P. Zurawski, Senior Resident Inspector
Inspectors:
 
R. Baker, Senior Operations Engineer
Approved By: Néstor J. Féliz Adorno, Chief Branch 4 Division of Reactor Projects
S. Bell, Health Physicist
 
R. Edwards, Senior Health Physicist
Enclosure
M. Jones, Project Engineer
J. Mancuso, Resident Inspector
J. Neurauter, Senior Reactor Inspector
P. Zurawski, Senior Resident Inspector
Approved By:
Néstor J. Féliz Adorno, Chief
Branch 4
Division of Reactor Projects


=SUMMARY=
=SUMMARY=
Line 81: Line 88:
: (1) The inspectors evaluated the adequacy of the overall preparations to protect the following risk significant systems from impending severe thunderstorms on July 21, 2021:
: (1) The inspectors evaluated the adequacy of the overall preparations to protect the following risk significant systems from impending severe thunderstorms on July 21, 2021:


Switchyard Main transformer Unit 1 Emergency Diesel Generators (EDGs)
Switchyard
 
Main transformer
 
Unit 1 Emergency Diesel Generators (EDGs)
 
Unit 1/2 safety related batteries with the failure of #13 circulating water discharge valve
Unit 1/2 safety related batteries with the failure of #13 circulating water discharge valve


Line 87: Line 99:
===Partial Walkdown Sample (IP Section 03.01) (7 Samples)===
===Partial Walkdown Sample (IP Section 03.01) (7 Samples)===
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
: (1) 2AB Fuel Oil Transfer Pump and breaker with 1AB EDG Fuel Oil Transfer Pump work during 1AB critical maintenance project on July 22, 2021.
(1)2AB Fuel Oil Transfer Pump and breaker with 1AB EDG Fuel Oil Transfer Pump work during 1AB critical maintenance project on July 22, 2021.
: (2) Unit 1 Essential Service Water (ESW) during east Containment Spray System (CTS)
: (2) Unit 1 Essential Service Water (ESW) during east Containment Spray System (CTS)
Heat Exchanger ESW outlet valve maintenance on August 4, 2021.
Heat Exchanger ESW outlet valve maintenance on August 4, 2021.
Line 127: Line 139:


===Ultimate Heat Sink (IP Section 03.04) (1 Sample)===
===Ultimate Heat Sink (IP Section 03.04) (1 Sample)===
: (1) c. Review performance testing of service water system and ultimate heat sink e. Perform a walkdown and review documentation for the service water intake structure
(1)c. Review performance testing of service water system and ultimate heat sink e. Perform a walkdown and review documentation for the service water intake structure


==71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance==
Line 144: Line 156:
==71111.12 - Maintenance Effectiveness==
==71111.12 - Maintenance Effectiveness==
Maintenance Effectiveness (IP Section 03.01) (2 Samples 1 Partial)
Maintenance Effectiveness (IP Section 03.01) (2 Samples 1 Partial)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
: (1) Evaluation of 1AB 4-Year critical maintenance on July 19, 2021.
: (1) Evaluation of 1AB 4-Year critical maintenance on July 19, 2021.


(2) (Partial)
(2)
(Partial)
Evaluation of the #13 Circulating Water Pump Discharge Valve on July 28, 2021.
Evaluation of the #13 Circulating Water Pump Discharge Valve on July 28, 2021.
: (3) Evaluation of the Train B Reserve Feed on September 27, 2021.
: (3) Evaluation of the Train B Reserve Feed on September 27, 2021.


Quality Control (IP Section 03.02) (1 Partial)
Quality Control (IP Section 03.02) (1 Partial)
The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:
The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:
 
(1)
(1) (Partial)
(Partial)
Evaluation of the east Diesel Fire Pump following maintenance on September 27, 2021.
Evaluation of the east Diesel Fire Pump following maintenance on September 27, 2021.


Aging Management (IP Section 03.03) (1 Partial)
Aging Management (IP Section 03.03) (1 Partial)
The inspectors evaluated the effectiveness of the aging management program for the following SSCs that did not meet their inspection or test acceptance criteria:
The inspectors evaluated the effectiveness of the aging management program for the following SSCs that did not meet their inspection or test acceptance criteria:
 
(1)
(1) (Partial)
(Partial)
Evaluation of the Fire Protection Aging Management Program on September 29, 2021.
Evaluation of the Fire Protection Aging Management Program on September 29, 2021.


Line 191: Line 201:
==71111.18 - Plant Modifications==
==71111.18 - Plant Modifications==
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
The inspectors evaluated the following temporary or permanent modifications:
: (1) Moisture Separator Reheater Expansion Bellows 2-XJ-113-4 and 2-XJ-113-5, change inner liner thickness from 1/8" to 1/4" on July 8, 2021.
: (1) Moisture Separator Reheater Expansion Bellows 2-XJ-113-4 and 2-XJ-113-5, change inner liner thickness from 1/8" to 1/4" on July 8, 2021.
Line 197: Line 206:
==71111.19 - Post-Maintenance Testing==
==71111.19 - Post-Maintenance Testing==
Post-Maintenance Test Sample (IP Section 03.01) (7 Samples 1 Partial)
Post-Maintenance Test Sample (IP Section 03.01) (7 Samples 1 Partial)
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
: (1) Unit 2 Control Rod testing in Mode 3 on July 7, 2021.
: (1) Unit 2 Control Rod testing in Mode 3 on July 7, 2021.
Line 205: Line 213:
: (5) Unit 1 west RHR following planned maintenance on August 17, 2021.
: (5) Unit 1 west RHR following planned maintenance on August 17, 2021.
: (6) Unit 1 CD EDG Room ventilation on August 31, 2021.
: (6) Unit 1 CD EDG Room ventilation on August 31, 2021.
: (7) 12 AB Train B Auxiliary Reserve Feed on September 30, 2021.


(8) (Partial)
(7)12 AB Train B Auxiliary Reserve Feed on September 30, 2021.
 
(8)
(Partial)
Unit 2 Containment Chiller 'C' evaluation begun on September 30, 2021.
Unit 2 Containment Chiller 'C' evaluation begun on September 30, 2021.


Line 221: Line 231:
{{IP sample|IP=IP 71111.22|count=4}}
{{IP sample|IP=IP 71111.22|count=4}}
: (1) U2 Turbine Overspeed Test on July 8, 2021.
: (1) U2 Turbine Overspeed Test on July 8, 2021.
: (2) 1-OHP-4030-156-017T; Unit 1 Turbine Driven AFW Pump Surveillance Test on July 14, 2021.
 
(2)1-OHP-4030-156-017T; Unit 1 Turbine Driven AFW Pump Surveillance Test on July 14, 2021.
: (3) Nuclear Instrumentation Power Range Channel Operational Test on September 9, 2021.
: (3) Nuclear Instrumentation Power Range Channel Operational Test on September 9, 2021.
: (4) Unit 2 west Motor Driven AFW Pump Surveillance Test on September 16, 2021.
: (4) Unit 2 west Motor Driven AFW Pump Surveillance Test on September 16, 2021.
Line 254: Line 265:
The inspectors evaluated the internal dosimetry program implementation.
The inspectors evaluated the internal dosimetry program implementation.
: (1) The inspectors reviewed the following:
: (1) The inspectors reviewed the following:
Whole Body Counts
Whole Body Counts
* Individual ACAD 28532, September 25, 2021
* Individual ACAD 28532, September 25, 2021
* Individual ACAD 19879, November 5, 2021
* Individual ACAD 19879, November 5, 2021
* Individual ACAD 19879, November 6, 2021
* Individual ACAD 19879, November 6, 2021 In-Vitro Internal Monitoring
 
In-Vitro Internal Monitoring
* Urinalysis and Dose Assessment, Sample 20-001, May 5, 2020
* Urinalysis and Dose Assessment, Sample 20-001, May 5, 2020
* Urinalysis and Dose Assessment, Sample 20-002, May 5, 2020
* Urinalysis and Dose Assessment, Sample 20-002, May 5, 2020 Dose Assessments Performed Using Air Sampling and Derived Air Concentration-Hour Monitoring
 
Dose Assessments Performed Using Air Sampling and Derived Air Concentration-Hour Monitoring
* None were available during the inspection period.
* None were available during the inspection period.


Line 282: Line 288:


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
 
The inspectors verified licensee performance indicators submittals listed below:
 
MS08: Heat Removal Systems (IP Section 02.07)===
MS08: Heat Removal Systems (IP Section 02.07)===
{{IP sample|IP=IP 71151|count=2}}
{{IP sample|IP=IP 71151|count=2}}
Line 300: Line 303:
==71152 - Problem Identification and Resolution==
==71152 - Problem Identification and Resolution==
Annual Follow-up of Selected Issues (IP Section 02.03) (1 Partial)
Annual Follow-up of Selected Issues (IP Section 02.03) (1 Partial)
 
(1)
(1) (Partial)
(Partial) AR 2021-5596; Unit 2 Manual Reactor Trip due to Degrading Vacuum on July 8, 2021.
AR 2021-5596; Unit 2 Manual Reactor Trip due to Degrading Vacuum on July 8, 2021.


===71153 - Follow-Up of Events and Notices of Enforcement Discretion Event Follow-up (IP Section 03.01)===
===71153 - Follow-Up of Events and Notices of Enforcement Discretion Event Follow-up (IP Section 03.01)===
Line 309: Line 311:


==OTHER ACTIVITIES==
==OTHER ACTIVITIES==
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 60855 - Operation of an ISFSI The inspectors evaluated the licensees Independent Spent Fuel Storage Installation (ISFSI)cask loading activities on July 26 through July 30, 2021. Specifically, the inspectors observed the following activities during the loading of cask 47:
 
Heavy lifts of the loaded transfer cask from the spent fuel pool to the cask processing area


60855 - Operation of an ISFSI
Closure welding and non-destructive evaluations


The inspectors evaluated the licensees Independent Spent Fuel Storage Installation (ISFSI)cask loading activities on July 26 through July 30, 2021. Specifically, the inspectors observed the following activities during the loading of cask 47:
Canister processing including forced helium dehydration and backfill with helium


Heavy lifts of the loaded transfer cask from the spent fuel pool to the cask processing area Closure welding and non-destructive evaluations Canister processing including forced helium dehydration and backfill with helium Stack-up and download of the Multi-Purpose Canister (MPC) from the HI-TRAC into the storage cask (HI-STORM)
Stack-up and download of the Multi-Purpose Canister (MPC) from the HI-TRAC into the storage cask (HI-STORM)
Radiological field surveys


The inspectors performed walkdowns of the ISFSI pad, including performing independent radiation surveys, and walkdowns of the ISFSI haul path and vertical cask transporter.
Radiological field surveys The inspectors performed walkdowns of the ISFSI pad, including performing independent radiation surveys, and walkdowns of the ISFSI haul path and vertical cask transporter.


The inspectors evaluated the following:
The inspectors evaluated the following:
Spent fuel selected for loading into dry cask storage during this loading campaign Selected corrective action program action requests Selected 72.48 screenings and evaluations
 
Spent fuel selected for loading into dry cask storage during this loading campaign
 
Selected corrective action program action requests
 
Selected 72.48 screenings and evaluations


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Observation: Unit 1 Circulating Water Flow Was Degraded Requiring a Power 71153 Reduction The inspectors responded to, and monitored, licensee actions for an unexpected plant condition involving the Unit 1 Circulating Water Pump. At approximately 0500 on July 21, 2021 the Unit 1 Control Room heard a loud boom and saw a
Observation: Unit 1 Circulating Water Flow Was Degraded Requiring a Power Reduction 71153 The inspectors responded to, and monitored, licensee actions for an unexpected plant condition involving the Unit 1 Circulating Water Pump. At approximately 0500 on July 21, 2021 the Unit 1 Control Room heard a loud boom and saw a


===.8 lowering of vacuum===
===.8 lowering of vacuum===
Line 342: Line 350:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type Designation Description or Title Revision or
Inspection
Procedure Date
Procedure
60855 Corrective Action AR-2018-7995 12-SFS-SYS-012 Upper Vent Gap 08/10/2018
Type
Documents AR-2018-8358 Potential of Stored N2 Bottles to Impact ISFSI 08/23/2018
Designation
AR-2018-8439 Validate Temperature Range for Penetrant Testing 08/27/2018
Description or Title
AR-2018-9288 Multi-Purpose Canister 463 (MPC-463) 10/01/2018
Revision or
AR-2018-9810 Dry Cask Operations: Forced Helium Dehydration Blower 10/18/2018
Date
AR-2019-0045 212CR-0017 Rev. 0 Requires Revision 01/02/2019
AR-2018-7995
AR-2019-1737 ISFSI UPS Trouble Alarms 11/26/2019
2-SFS-SYS-012 Upper Vent Gap
AR-2019-1451 FCR-54927-002 Presented Incorrect ISFSI Location for 02/13/2019
08/10/2018
AR-2018-8358
Potential of Stored N2 Bottles to Impact ISFSI
08/23/2018
AR-2018-8439
Validate Temperature Range for Penetrant Testing
08/27/2018
AR-2018-9288
Multi-Purpose Canister 463 (MPC-463)
10/01/2018
AR-2018-9810
Dry Cask Operations: Forced Helium Dehydration Blower
10/18/2018
AR-2019-0045
2CR-0017 Rev. 0 Requires Revision
01/02/2019
AR-2019-1737
ISFSI UPS Trouble Alarms
11/26/2019
AR-2019-1451
FCR-54927-002 Presented Incorrect ISFSI Location for
Casks
Casks
AR-2019-5576 Whining Sound Coming From VCT 05/28/2019
2/13/2019
AR-2019-7291 ISFSI Cask B2 West Temp and Delta Temp Failed 07/28/2019
AR-2019-5576
AR-2019-9174 URI Closure Actions - ISFSI Operations - Temporary 09/30/2019
Whining Sound Coming From VCT
05/28/2019
AR-2019-7291
ISFSI Cask B2 West Temp and Delta Temp Failed
07/28/2019
AR-2019-9174
URI Closure Actions - ISFSI Operations - Temporary
Shielding
Shielding
AR-2020-0842 ISFSI Temperature Monitoring 01/27/2020
09/30/2019
AR-2020-3838 AR 2018-4056 Actions - Review in Light of 2020 CAP 06/06/2020
AR-2020-0842
ISFSI Temperature Monitoring
01/27/2020
AR-2020-3838
AR 2018-4056 Actions - Review in Light of 2020 CAP
Standard
Standard
AR-2020-5722 Receipt Inspection Process for HI-STORM Casks 07/16/2020
06/06/2020
AR-2021-1453 Ice Build-up on ISFSI Casks 02/13/2021
AR-2020-5722
AR-2021-2117 Dry Fuel Storage (ISFSI) Combustible Controls - OE 03/08/2021
Receipt Inspection Process for HI-STORM Casks
#250795
07/16/2020
Engineering 0000057055 DC Cook Dry Cask Loading Campaign 4 0
AR-2021-1453
Changes 0000057896 Modify Wall Penetration with Capped Conduit for Dry Cask 0
Ice Build-up on ISFSI Casks
2/13/2021
Corrective Action
Documents
AR-2021-2117
Dry Fuel Storage (ISFSI) Combustible Controls - OE  
#250795
03/08/2021
0000057055
DC Cook Dry Cask Loading Campaign 4
Engineering
Changes
0000057896
Modify Wall Penetration with Capped Conduit for Dry Cask
Cables
Cables
Miscellaneous Cook 10 CFR 72.212 Evaluation Report 4
Cook 10 CFR 72.212 Evaluation Report
Cook ISFSI 10 CFR Part 72 Regulatory Compliance Report 3
Cook ISFSI 10 CFR Part 72 Regulatory Compliance Report
HI-STORM 100 CoC 1014 Amendment 5 0
HI-STORM 100 CoC 1014 Amendment 5
HI-STORM 100 CoC 1014 Amendment 9 1
HI-STORM 100 CoC 1014 Amendment 9
HI-STORM 100 FSAR 7
HI-STORM 100 FSAR
HI-STORM 100 FSAR 13
HI-STORM 100 FSAR
2018-0253-00 72.48 Screening 0
2018-0253-00
2018-0263-00 72.48 Screening 0
2.48 Screening
60855
Miscellaneous
2018-0263-00
2.48 Screening


Inspection Type Designation Description or Title Revision or
Inspection
Procedure Date
Procedure
2018-0265-00 72.48 Screening 0
Type
2018-0265-00 50.59 Screening 0
Designation
2018-0268-00 72.48 Screening 0
Description or Title
2018-0270-00 72.48 Screening 0
Revision or
2018-0270-00 50.59 Screening 0
Date
2018-0271-00 72.48 Screening 0
2018-0265-00
2018-0276-00 72.48 Screening 0
2.48 Screening
2018-0287-00 72.48 Screening 0
2018-0265-00
2018-0288-00 72.48 Screening 0
50.59 Screening
2018-0301-00 72.48 Screening 0
2018-0268-00
2018-0312-00 72.48 Screening 0
2.48 Screening
2019-0196-00 72.48 Screening 0
2018-0270-00
2019-0215-00 72.48 Screening 0
2.48 Screening
2019-0321-00 72.48 Screening and Evaluation 0
2018-0270-00
20-0173-00 72.48 Screening 0
50.59 Screening
20-0181-00 50.59 Screening 0
2018-0271-00
20-0182-00 72.48 Screening 0
2.48 Screening
20-0188-00 72.48 Screening 0
2018-0276-00
21-0007-00 72.48 Screening 0
2.48 Screening
21-0011-00 72.48 Screening 0
2018-0287-00
21-0090-00 72.48 Screening 0
2.48 Screening
21-0099-00 72.48 Screening 0
2018-0288-00
21-0110-00 72.48 Screening 0
2.48 Screening
NUPIC Audit NUPIC Joint Audit of Holtec International 07/08/2019
2018-0301-00
2.48 Screening
2018-0312-00
2.48 Screening
2019-0196-00
2.48 Screening
2019-0215-00
2.48 Screening
2019-0321-00
2.48 Screening and Evaluation
20-0173-00
2.48 Screening
20-0181-00
50.59 Screening
20-0182-00
2.48 Screening
20-0188-00
2.48 Screening
21-0007-00
2.48 Screening
21-0011-00
2.48 Screening
21-0090-00
2.48 Screening
21-0099-00
2.48 Screening
21-0110-00
2.48 Screening
NUPIC Audit
24753
24753
NDE Reports Helium Leak Test Report for MPC 582 07/29/2021
NUPIC Joint Audit of Holtec International
918221-582-01 Liquid Penetration Examination 07/27/2021
07/08/2019
918221-582-02 Liquid Penetration Examination 07/27/2021
Helium Leak Test Report for MPC 582
918221-582-03 Liquid Penetration Examination 07/28/2021
07/29/2021
918221-582-04 Liquid Penetration Examination 07/28/2021
918221-582-01
Procedures 12-EHP-4051-Fuel Selection and Sequence Development for Dry Cask 6
Liquid Penetration Examination
DCO-300 Storage
07/27/2021
2-MHP-4030- New and Spent Fuel Crane Operability Verification 5
918221-582-02
Liquid Penetration Examination
07/27/2021
918221-582-03
Liquid Penetration Examination
07/28/2021
NDE Reports
918221-582-04
Liquid Penetration Examination
07/28/2021
2-EHP-4051-
DCO-300
Fuel Selection and Sequence Development for Dry Cask
Storage
Procedures
2-MHP-4030-
New and Spent Fuel Crane Operability Verification


Inspection Type Designation Description or Title Revision or
Inspection
Procedure Date
Procedure
Type
Designation
Description or Title
Revision or
Date
048-046
048-046
2-OHP-4051-Dry Cask Operations Pre-Campaign Support Activities 6
2-OHP-4051-
DC0-003
DC0-003
2-OHP-4051-Dry Cask Operations Work Area Ambient Air Temperature 3
Dry Cask Operations Pre-Campaign Support Activities
DCO-004 Monitoring
2-OHP-4051-
2-OHP-4051-MPC Lid Recovery from Item Stuck in Lift Hole 1
DCO-004
Dry Cask Operations Work Area Ambient Air Temperature
Monitoring
2-OHP-4051-
DCO-005
DCO-005
2-OHP-4051-Dry Cask Operations Post-Campaign Support Activities 0
MPC Lid Recovery from Item Stuck in Lift Hole
2-OHP-4051-
DCO-006
DCO-006
2-OHP-4051-Transport Operations 27
Dry Cask Operations Post-Campaign Support Activities
2-OHP-4051-
DCO-100
DCO-100
2-OHP-4051-Goldhofer Operations 3
Transport Operations
2-OHP-4051-
DCO-101
DCO-101
2-OHP-4051-MPC Preparation for Loading 23
Goldhofer Operations
2-OHP-4051-
DCO-200
DCO-200
2-OHP-4051-MPC Loading Operations 29
MPC Preparation for Loading
2-OHP-4051-
DCO-300
DCO-300
2-OHP-4051-MPC Boron Sampling 1
MPC Loading Operations
2-OHP-4051-
DCO-301
DCO-301
2-OHP-4051-MPC Welding, Blowdown, Drying and Backfill 32
MPC Boron Sampling
2-OHP-4051-
DCO-400
DCO-400
2-OHP-4051-Transfer Operations 28
MPC Welding, Blowdown, Drying and Backfill
2-OHP-4051-
DCO-500
DCO-500
2-OHP-4051-Dry Cask Operations Response to Abnormal Conditions 14
Transfer Operations
2-OHP-4051-
DCO-600
DCO-600
2-OHP-4051-MPC Unloading 11
Dry Cask Operations Response to Abnormal Conditions
2-OHP-4051-
DCO-700
DCO-700
2-OHP-4051-MPC Gas Sampling 4
MPC Unloading
2-OHP-4051-
DCO-701
DCO-701
2-OHP-4051-Completed Dry Cask Storage Lifting Device Inspections 07/06/2021
MPC Gas Sampling
2-OHP-4051-
DCO-805
DCO-805
GQP-9.2 High Temperature Liquid Penetrant Examination and 0
Completed Dry Cask Storage Lifting Device Inspections
07/06/2021
GQP-9.2
High Temperature Liquid Penetrant Examination and
Acceptance Standards for Welds, Base Materials, and
Acceptance Standards for Welds, Base Materials, and
Cladding
Cladding
Inspection Type Designation Description or Title Revision or
 
Procedure Date
Inspection
MHI-5025 Control and Inspection of Rigging and Lifting Equipment 22
Procedure
PI-CNSTR-OP-Closure Welding of Holtec Multi-Purpose Canisters - HI-4
Type
HLTC-H-01 STORM 100, HI-STAR 100, HI-STORM FW & UMAX
Designation
Description or Title
Revision or
Date
MHI-5025
Control and Inspection of Rigging and Lifting Equipment
PI-CNSTR-OP-
HLTC-H-01
Closure Welding of Holtec Multi-Purpose Canisters - HI-
STORM 100, HI-STAR 100, HI-STORM FW & UMAX
Systems
Systems
PMP-4051-DCO-72.212 Evaluation Report Control 5
PMP-4051-DCO-
2
2
Self-Assessments NRC ISFSI Inspection GT 2021-0894 Outage Management
2.212 Evaluation Report Control
NOS-18-07 Nuclear Oversight Audit, Spent Fuel Storage 09/25/2018
NRC ISFSI Inspection GT 2021-0894 Outage Management
NOS-18-09 Nuclear Oversight Audit, Security 02/05/2019
NOS-18-07
NOS-18-09 Nuclear Oversight Audit, Security Supplement 02/05/2019
Nuclear Oversight Audit, Spent Fuel Storage
NOS-19-06 NIEP Evaluation Report for Cook 08/20/2019
09/25/2018
NOS-19-09 Nuclear Oversight Audit, Security 12/17/2019
NOS-18-09
NOS-20-08 Nuclear Oversight Audit, Security 12/10/2020
Nuclear Oversight Audit, Security
Work Orders 55530757-01 12-QM-80, Auxiliary Building 650 Elevation 1 Ton New and 10/26/2019
2/05/2019
NOS-18-09
Nuclear Oversight Audit, Security Supplement
2/05/2019
NOS-19-06
NIEP Evaluation Report for Cook
08/20/2019
NOS-19-09
Nuclear Oversight Audit, Security
2/17/2019
Self-Assessments
NOS-20-08
Nuclear Oversight Audit, Security
2/10/2020
55530757-01
2-QM-80, Auxiliary Building 650 Elevation 1 Ton New and
Spent Fuel Handling Crane
Spent Fuel Handling Crane
55542402-01 12-QM-3E, Auxiliary Building 150/20 Ton East Overhead 01/25/2021
10/26/2019
55542402-01
2-QM-3E, Auxiliary Building 150/20 Ton East Overhead
Crane
Crane
55547080-01 12-QM-80, Auxiliary Building 650 Elevation 1 Ton New and 03/11/2021
01/25/2021
55547080-01
2-QM-80, Auxiliary Building 650 Elevation 1 Ton New and
Spent Fuel Handling Crane
Spent Fuel Handling Crane
55547080-08 12-QM-80, Auxiliary Building 650 Elevation 1 Ton New and 03/09/2021
03/11/2021
Work Orders
55547080-08
2-QM-80, Auxiliary Building 650 Elevation 1 Ton New and
Spent Fuel Handling Crane
Spent Fuel Handling Crane
71111.01 Procedures 12-OHP-4022-Severe Weather 23
03/09/2021
2-OHP-4022-
001-010
001-010
PWP-5055-SWM-Severe Weather Guidelines 11
Severe Weather
71111.01
Procedures
PWP-5055-SWM-
001
001
71111.04 Procedures 1-OHP-4021-032-Operating DG2AB Subsystems 35
Severe Weather Guidelines
1-OHP-4021-032-
008AB
008AB
1-OHP-4021-032-Operating DG1CD Subsystems 42
Operating DG2AB Subsystems
1-OHP-4021-032-
008CD
008CD
2-OHP-4021-Operation of the Essential Service Water System 75
Operating DG1CD Subsystems
2-OHP-4021-
019-001
019-001
2-OHP-4030-256-West Motor Driven Auxiliary Feedwater System Test 17
Operation of the Essential Service Water System
2-OHP-4030-256-
017W
017W
OP-2-5151D-76 Flow Diagram Emergency Diesel Generator 'CD' Unit No. 1 76
West Motor Driven Auxiliary Feedwater System Test
Inspection Type Designation Description or Title Revision or
71111.04
Procedure Date
Procedures
71111.05 Engineering EC-0000050518 Install Tool and Equipment Storage Cage and Related 0
OP-2-5151D-76
Changes Appurtenances in the EDG Fuel Oil Pump Rooms
Flow Diagram Emergency Diesel Generator 'CD' Unit No. 1
Fire Plans Fire Zone 17C Corridor to Auxiliary Feed Pump Rooms Both Units Elev. 38
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Engineering
Changes
EC-0000050518
Install Tool and Equipment Storage Cage and Related
Appurtenances in the EDG Fuel Oil Pump Rooms
Fire Plans
Fire Zone 17C
Corridor to Auxiliary Feed Pump Rooms Both Units Elev.
591'
591'
Miscellaneous Fire Hazard Analysis 14
Fire Hazard Analysis
21-009-A Fire Drill Progression and Cue Sequence 09/16/2021
Miscellaneous
Procedures 12-FPP-2270- Fire Detection Instrument Channel Functional Test 6
21-009-A
066-055 (U-1 Zones 7, 6, 22, 24, and U-2 Zones 2, 15, 16, 20)
Fire Drill Progression and Cue Sequence
2-FPP-4030- Inspection of Fire Dampers Protecting Safety-Related Areas19
09/16/2021
2-FPP-2270-
066-055
Fire Detection Instrument Channel Functional Test  
(U-1 Zones 7, 6, 22, 24, and U-2 Zones 2, 15, 16, 20)
2-FPP-4030-
066-021
066-021
2-FPP-4030- Inspection of Fire Dampers Protecting Safety-Related Areas22
Inspection of Fire Dampers Protecting Safety-Related Areas
2-FPP-4030-
066-021
066-021
2-FPP-4030- Inspection of Fire Dampers Protective Safety-Related Areas20
Inspection of Fire Dampers Protecting Safety-Related Areas
2-FPP-4030-
066-021
066-021
2-FPP-4030- Technical Requirements Manual Fire Door Inspection 31
Inspection of Fire Dampers Protective Safety-Related Areas
2-FPP-4030-
066-026
066-026
2-FPP-4030- Fire Detection Instrumentation Channel Operational Test, 18
Technical Requirements Manual Fire Door Inspection
066-206 (U-1 Zones 25, 27 (Subzone 2) and U-2 Zone 31
2-FPP-4030-
(Subzone 2) and Shared Zone 26)
066-206
2-IHP-6040-266-U2 Diesel Generator Oil Pump and Valve Room CO2 Fire 12/17/2019
Fire Detection Instrumentation Channel Operational Test,  
004 Suppression
(U-1 Zones 25, 27 (Subzone 2) and U-2 Zone 31
2-IHP-6040-266-Unit 2 Diesel Generator Oil Pump and Valve Room CO2 Fire 2
(Subzone 2) and Shared Zone 26)
004 Suppression Test
2-IHP-6040-266-
PMP-2270-DOR-Control of Station Doors 41
004
U2 Diesel Generator Oil Pump and Valve Room CO2 Fire
Suppression
2/17/2019
2-IHP-6040-266-
004
Unit 2 Diesel Generator Oil Pump and Valve Room CO2 Fire
Suppression Test
Procedures
PMP-2270-DOR-
001
001
Work Orders 55515383-01 Unit 2 Control Room Fire Damper Inspection and Testing 10/07/2019
Control of Station Doors
55525556-01 Safety Related Fire Damper Inspection and Testing 03/23/2020
55515383-01
55529834-01 Unit 1 Control Room Fire Damper Inspection and Testing 09/22/2020
Unit 2 Control Room Fire Damper Inspection and Testing
55537567-01 2-EFR-Fire-Zone-16, Unit 2 Control Room Fire Zone #16 09/10/2020
10/07/2019
55537568-01 1-EFT-Fire-Zone-22, Unit 1 Control Room Fire Zone #22 0
55525556-01
55550094-01 1-EFR-Fire-Zone-25, 'E' & 'W' ESW PP Room & Traveling 02/07/2021
Safety Related Fire Damper Inspection and Testing
03/23/2020
55529834-01
Unit 1 Control Room Fire Damper Inspection and Testing
09/22/2020
55537567-01
2-EFR-Fire-Zone-16, Unit 2 Control Room Fire Zone #16
09/10/2020
55537568-01
1-EFT-Fire-Zone-22, Unit 1 Control Room Fire Zone #22
71111.05
Work Orders
55550094-01
1-EFR-Fire-Zone-25, 'E' & 'W' ESW PP Room & Traveling
Screen Upper MCC Room (System 3 Cabinet #12-SYS-SW)
Screen Upper MCC Room (System 3 Cabinet #12-SYS-SW)
Fire Zone #26
Fire Zone #26
71111.06 Procedures PMP-5091-FLD-Flood Protection Program Implementation 8
2/07/2021
Inspection Type Designation Description or Title Revision or
71111.06
Procedure Date
Procedures
PMP-5091-FLD-
Flood Protection Program Implementation
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
001
001
71111.07T Calculations 09-0299-TR-002 D.C. Cook Unit 1 ESW System Waterhammer Mitigation 2
09-0299-TR-002
D.C. Cook Unit 1 ESW System Waterhammer Mitigation
Analysis and Resulting Loads
Analysis and Resulting Loads
MD-12-CCW-Component Cooling Water (CCW) Surge Tan Volume 0
MD-12-CCW-
0815-N
0815-N
MD-12-ESW-106-Assessment of Increased Lake Water Temperature on 12
Component Cooling Water (CCW) Surge Tan Volume
N Safety Related and Non-Safety Related Systems
MD-12-ESW-106-
MD-12-ESW-113-GL 89-13 Heat Exchanger Inspection Partial Tube Blockage 1
N
N Acceptance Criteria
Assessment of Increased Lake Water Temperature on
MD-12-ESW-117-Providing Unit 2 CCW System Makeup Flow from the Unit 1 0
Safety Related and Non-Safety Related Systems
N ESW System
MD-12-ESW-113-
MD-12-HV-018-N Auxiliary Feed Water Pump Room and Hallway Heat Load 2
N
GL 89-13 Heat Exchanger Inspection Partial Tube Blockage
Acceptance Criteria
MD-12-ESW-117-
N
Providing Unit 2 CCW System Makeup Flow from the Unit 1
ESW System
MD-12-HV-018-N
Auxiliary Feed Water Pump Room and Hallway Heat Load
Calculation
Calculation
MD-12-MSC-068-Tube Plugging Allowances for Safety Related Heat 10
MD-12-MSC-068-
N Exchangers
N
TH-00-05 Auxiliary Feed Water Pump Room Heat-Up Temperatures 5
Tube Plugging Allowances for Safety Related Heat
Corrective Action 2015-14961 Inability of CCW System to Supply Makeup 11/17/2015
Exchangers
Documents 2015-15069 Inadequate Basis for CCW Misc. Header ISI Class 11/19/2015
Calculations
TH-00-05
Auxiliary Feed Water Pump Room Heat-Up Temperatures
2015-14961
Inability of CCW System to Supply Makeup
11/17/2015
2015-15069
Inadequate Basis for CCW Misc. Header ISI Class
Boundaries
Boundaries
2017-6004 Blockage at 1-WPX-731 and 1-WPX-735 06/15/2017
11/19/2015
20-1998 Identified Errors in Calc DC-D-12-PW-03 and 02/27/2020
2017-6004
Blockage at 1-WPX-731 and 1-WPX-735
06/15/2017
Corrective Action
Documents
20-1998
Identified Errors in Calc DC-D-12-PW-03 and
DC-D-12-PW-05
DC-D-12-PW-05
Corrective Action 2021-8080 Patina on 1-HV-AFP-EAC Copper FIns 09/27/2021
2/27/2020
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Engineering 2015-0479-01 Compensatory Action in Support of CCW Passive Failure 2
21-8080
Changes EC-55155 U1 East MDAFP Room Cooler Replacement 0
Patina on 1-HV-AFP-EAC Copper FIns
EC-55754 Install Mechanical Jumper to Connect Essential Service 06/25/2018
09/27/2021
2015-0479-01
Compensatory Action in Support of CCW Passive Failure
EC-55155
U1 East MDAFP Room Cooler Replacement
EC-55754
Install Mechanical Jumper to Connect Essential Service
Water (ESW) to Component Cooling Water (CCW)
Water (ESW) to Component Cooling Water (CCW)
SS-SE-2018-Temporary Configuration Change 06/25/2018
06/25/2018
Engineering
Changes
SS-SE-2018-
209-00
209-00
Miscellaneous 1-HE-15E CCW HX Eddy Current Test Report 10/15/2017
Temporary Configuration Change
1-0HP-4030-119-East ESW Train Flow Verification 10/05/2020
06/25/2018
Inspection Type Designation Description or Title Revision or
1-HE-15E CCW HX Eddy Current Test Report
Procedure Date
10/15/2017
71111.07T
Miscellaneous
1-0HP-4030-119-
East ESW Train Flow Verification
10/05/2020
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2FV
2FV
1-0HP-4030-119-West ESW Train Flow Verification 09/29/2020
1-0HP-4030-119-
2FV
2FV
Procedures 12-0HP-5030- Supplying ESW to CCW for Makeup Using a Temporary 06/16/2020
West ESW Train Flow Verification
016-001 Configuration Change
09/29/2020
PMP-5041-TCC-Temporary Configuration Change 08/23/2021
2-0HP-5030-
016-001
Supplying ESW to CCW for Makeup Using a Temporary
Configuration Change
06/16/2020
Procedures
PMP-5041-TCC-
001
001
Work Orders 55522409 West Motor Driven Auxiliary Feed Pump Room Cooler 08/12/2019
Temporary Configuration Change
(Pre-Cooler) Inspection
08/23/2021
55527680 East Essential Service Water Pump PP-7E Disch Stn 10/16/2019
55522409
55530492 Heat Exchanger Inspection (West Component Cooling 09/21/2020
West Motor Driven Auxiliary Feed Pump Room Cooler
(Pre-Cooler) Inspection
08/12/2019
55527680
East Essential Service Water Pump PP-7E Disch Stn
10/16/2019
55530492
Heat Exchanger Inspection (West Component Cooling
Water HX)
Water HX)
55530990 Heat Exchanger Inspection Report (East) 10/01/2020
09/21/2020
55531408 Unit #1 Screenhouse Diving, Inspections and Repairs 01/23/2020
55530990
55539780 U-2 Screenhouse: Inspect, Clean, Repair Trash Racks 04/16/2021
Heat Exchanger Inspection Report (East)
55539887 CCW Valves Seat Leakage Test Surveillance 04/25/2021
10/01/2020
55552710 East Essential Service Water Pump PP-7E Disch Str 01/20/2021
55531408
71111.11Q Miscellaneous RQ-S-4602-U2-Period 4602 U2 Training Scenario 2 0
Unit #1 Screenhouse Diving, Inspections and Repairs
01/23/2020
55539780
U-2 Screenhouse: Inspect, Clean, Repair Trash Racks
04/16/2021
55539887
CCW Valves Seat Leakage Test Surveillance
04/25/2021
Work Orders
55552710
East Essential Service Water Pump PP-7E Disch Str
01/20/2021
RQ-S-4602-U2-
T2
T2
RQ-S-4603-U1-Period 4603 U1 Training Scenario 2 0
Period 4602 U2 Training Scenario 2
Miscellaneous
RQ-S-4603-U1-
T2
T2
Procedures 1-OHP-4021-001-Reactor Start-Up 68
Period 4603 U1 Training Scenario 2
1-OHP-4021-001-
2
2
1-OHP-4021-002-Pressurizer Pressure and Level Control Operation 22
Reactor Start-Up
1-OHP-4021-002-
007
007
2-OHP-4021-001-Reactor Start-Up 68
Pressurizer Pressure and Level Control Operation
71111.11Q
Procedures
2-OHP-4021-001-
2
2
71111.12 Corrective Action AR 2021-6321 Loud Bang and One Inch Loss of Vacuum in U1 Main 0
Reactor Start-Up
Documents Condenser
Corrective Action
Engineering Engineering White Paper - T11A 1AB EDG Unexpected 0
Documents
Evaluations Load Pickup
AR 2021-6321
Miscellaneous 14606200 Issue Ticket; WO 55543325 07/26/2021
Loud Bang and One Inch Loss of Vacuum in U1 Main
25 Usage Ticket; WO 5554985601; CAT ID 044304870004, 09/27/2021
Condenser
Engineering
Evaluations
Engineering White Paper - T11A 1AB EDG Unexpected
Load Pickup
14606200
Issue Ticket; WO 55543325
07/26/2021
71111.12
Miscellaneous
25
Usage Ticket; WO 5554985601; CAT ID 044304870004,
044225865104, & 044225865204
044225865104, & 044225865204
Inspection Type Designation Description or Title Revision or
09/27/2021
Procedure Date
Inspection
28 Usage Ticket; WO 5554985602 (Various CAT IDs) 09/30/2021
Procedure
3731 Usage Ticket; WO 5554985602 (Various CAT IDs) 09/30/2021
Type
3732 Usage Ticket; WO 5554985602 (Various CAT IDs) 09/30/2021
Designation
3831 Usage Ticket; WO 5554985602 (Various CAT IDs) 09/30/2021
Description or Title
3909 Usage Ticket; WO 5554985602 (Various CAT IDs) 09/30/2021
Revision or
3913 Usage Ticket; WO 5554985602 (Various CAT ID 09/30/2021
Date
28
Usage Ticket; WO 5554985602 (Various CAT IDs)
09/30/2021
3731
Usage Ticket; WO 5554985602 (Various CAT IDs)
09/30/2021
3732
Usage Ticket; WO 5554985602 (Various CAT IDs)
09/30/2021
3831
Usage Ticket; WO 5554985602 (Various CAT IDs)
09/30/2021
3909
Usage Ticket; WO 5554985602 (Various CAT IDs)
09/30/2021
3913
Usage Ticket; WO 5554985602 (Various CAT ID
2350035104)
2350035104)
4081 Usage Ticket; WO 5554985602 (Various CAT IDs) 09/30/2021
09/30/2021
Procedures 12-IHP-5021-Battery Cell/Bank Replacement 39
4081
Usage Ticket; WO 5554985602 (Various CAT IDs)
09/30/2021
Procedures
2-IHP-5021-
EMP-006
EMP-006
Work Orders 55543325-01 12-EDFP-BATT-2, East Diesel Driven Fire Pump PP-145E 09/28/2021
Battery Cell/Bank Replacement
55543325-01
2-EDFP-BATT-2, East Diesel Driven Fire Pump PP-145E
Diesel OME-215E Battery #2
Diesel OME-215E Battery #2
55549856-01 Engine Driven Fire Pump Diesel Inspection 09/27/2021
09/28/2021
55549856-02 Engine Drive Fire Pump Diesel Inspection 09/27/2021
55549856-01
55552368 1-MOE-150-AB-EN 05/17/2021
Engine Driven Fire Pump Diesel Inspection
55562958 DG1AB Slow Speed Strt 07/15/2021
09/27/2021
55564155 Loud Bang and Sudden Loss of Vacuum in U1 Main 07/21/2021
55549856-02
Engine Drive Fire Pump Diesel Inspection
09/27/2021
55552368
1-MOE-150-AB-EN
05/17/2021
55562958
DG1AB Slow Speed Strt
07/15/2021
55564155
Loud Bang and Sudden Loss of Vacuum in U1 Main
Condenser 1-WMO-13
Condenser 1-WMO-13
C10002275001 12-12AB-Bus-Duct; Investigate Loop Feed Enclosure 09/28/2021
07/21/2021
C10002275002 Replace Bus Bars for Loop Feed Enclosure 09/29/2021
C10002275001
C10002275015 12-12AB-Bus-DUCT; Insulate Bus Bars per EC-1000136 09/30/2021
2-12AB-Bus-Duct; Investigate Loop Feed Enclosure
71111.13 Corrective Action AR 2021-6963 Rod Misalignment 2-OHP-4030-202-015 08/11/2021
09/28/2021
C10002275002
Replace Bus Bars for Loop Feed Enclosure
09/29/2021
Work Orders
C10002275015
2-12AB-Bus-DUCT; Insulate Bus Bars per EC-1000136
09/30/2021
Corrective Action
Documents
Documents
Miscellaneous Unit 1/2 Online Risk for Cycle 119, Week 12 1
AR 2021-6963
Unit 1/2 Online Risk for Cycle 119, Week 05 0
Rod Misalignment 2-OHP-4030-202-015
Risk Management Plan for Replacing Reference Leg Backfill 09/21/2021
08/11/2021
Unit 1/2 Online Risk for Cycle 119, Week 12
Unit 1/2 Online Risk for Cycle 119, Week 05
Miscellaneous
Risk Management Plan for Replacing Reference Leg Backfill
Train Filter
Train Filter
Procedures 46.000.046 Operation PF the Reference Leg Backfill System 43
09/21/2021
71111.15 Corrective Action AR 2021-6142 Potential Invalid U1/U2 TDAFP Surveillances 0
71111.13
Documents AR 2021-6156 Valve Leaking 0
Procedures
AR 2021-6195 Track U-1 TDAFP Comprehensive Surveillance 0
46.000.046
AR 2021-6199 #24 Accumulator Level is Slowly Lowering 0
Operation PF the Reference Leg Backfill System
AR 2021-6963 Rod Misalignment 2-OHP-4030-212-015 08/11/2021
AR 2021-6142
 
Potential Invalid U1/U2 TDAFP Surveillances
Inspection Type Designation Description or Title Revision or
AR 2021-6156
Procedure Date
Valve Leaking
AR 2021-7549 Elevated Fire Protection Leak Rate 09/04/2021
AR 2021-6195
AR 2021-7760 12 RCP Motor Upper Thrust Bearing Temp Decreased 09/16/2021
Track U-1 TDAFP Comprehensive Surveillance
AR 2021-6199
#24 Accumulator Level is Slowly Lowering
71111.15
Corrective Action
Documents
AR 2021-6963
Rod Misalignment 2-OHP-4030-212-015
08/11/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
AR 2021-7549
Elevated Fire Protection Leak Rate
09/04/2021
AR 2021-7760
RCP Motor Upper Thrust Bearing Temp Decreased
Degrees F
Degrees F
AR 2021-7879 High Unseat Torque on 1-WMO-702 0
09/16/2021
AR 2021-7953 As Found Condition from 2-DR-320 Work 0
AR 2021-7879
AR 2021-8026 Fault of 12AB Train B Reserve Feed 0
High Unseat Torque on 1-WMO-702
AR 2021-8040 CRID3 Abnormal Annunciator Received 0
AR 2021-7953
Corrective Action AR 2021-7742 #24 Accumulator Level is Lowering 0.5ft<Superscript in 09/14/2021
As Found Condition from 2-DR-320 Work
Documents Final>3 Per Day
AR 2021-8026
Fault of 12AB Train B Reserve Feed
AR 2021-8040
CRID3 Abnormal Annunciator Received
Corrective Action
Documents
Resulting from
Resulting from
Inspection
Inspection
Engineering MD-01-ESW-079-Torque Setup Calculation for 1-WMO-702 and 1-WMO-702 2
AR 2021-7742
Evaluations N
#24 Accumulator Level is Lowering 0.5ft<Superscript in
Procedures 12-FPP-4030- Inspection of Fire Doors, Frames, and Their Hardware 24
Final>3 Per Day
066-022 Protecting Safety-Related Areas
09/14/2021
71111.18 Engineering EC-0000058171 2-XJ-113-4 and 2-XJ-113-5 Change Inner Liner 0
Engineering
Changes Thickness from 1/8" to 1/4"
Evaluations
Work Orders 55504799-01 Lube 1-HV-DGS-2 Motor 08/31/2021
MD-01-ESW-079-
71111.19 Procedures 1-OHP-4030-108-E.C.C.S. Valve Operability Test - Train B 31
N
Torque Setup Calculation for 1-WMO-702 and 1-WMO-702
Procedures
2-FPP-4030-
066-022
Inspection of Fire Doors, Frames, and Their Hardware
Protecting Safety-Related Areas
Engineering
Changes
EC-0000058171
2-XJ-113-4 and 2-XJ-113-5 Change Inner Liner
Thickness from 1/8" to 1/4"
71111.18
Work Orders
55504799-01
Lube 1-HV-DGS-2 Motor
08/31/2021
1-OHP-4030-108-
053B
053B
1-OHP-4030-117-East Residual Heat Removal Train Operability Test 16
E.C.C.S. Valve Operability Test - Train B
050E Modes 1-4
1-OHP-4030-117-
2-OHP-5030-012-Control Rod Testing in Mode 3 9
050E
East Residual Heat Removal Train Operability Test
Modes 1-4
Procedures
2-OHP-5030-012-
001
001
Work Orders 55519395 1-HV-DGS-2, Clean Supply Fan Blades, Hub, Motor and 08/31/2021
Control Rod Testing in Mode 3
55519395
1-HV-DGS-2, Clean Supply Fan Blades, Hub, Motor and
Housing
Housing
55519395 MTH: 1-HV-DGS-2, Perform PMT 08/31/2021
08/31/2021
55521873-01 MTH: 1-HV-DOX-1; Repair 3 Inch Tear in Suction Flex Joint08/21/2021
55519395
55524378 MTH: 1-HV-DGX-2; Perform Clean and Inspect 08/31/2021
MTH: 1-HV-DGS-2, Perform PMT
55524378-01 MTH: 1-HV-DOX-1; Perform Clean and Inspect 08/31/2021
08/31/2021
55534102-02 MTE: 1-IMO-320-ACT, As-Found/As-Left Diagnosis 08/17/2021
55521873-01
55543607-01 1-HV-DGS-FD-2, Clean Fire Damper 08/31/2021
MTH: 1-HV-DOX-1; Repair 3 Inch Tear in Suction Flex Joint
55549787 MTI, 1-IHP-6030-IMP-388 08/17/2021
08/21/2021
55550884-1 MTE: 1-IMO-320-ACT, Perform Full Actuator PM 08/17/2021
55524378
Inspection Type Designation Description or Title Revision or
MTH: 1-HV-DGX-2; Perform Clean and Inspect
Procedure Date
08/31/2021
55550885-01 MTI, Calibrate Over Current Relays for Breaker 1-T11A4 08/17/2021
55524378-01
55551111-01 1-88X1-DGX-2 Pick Up/Drop Out Testing on HFA Relay 09/01/2021
MTH: 1-HV-DOX-1; Perform Clean and Inspect
55551112-01 1-88X1-DGS-2, Pick Up/Drop Out Testing on HFA Relay 09/01/2021
08/31/2021
55551120-01 MTH: 1-HV-DG-FLT-2, Perform PM 08/31/2021
55534102-02
55551121-01 1-HV-DDP-CD2, Clean/Inspect and Lubricate 08/31/2021
MTE: 1-IMO-320-ACT, As-Found/As-Left Diagnosis
55551122-01 1-HV-DDP-CD1, Clean/Inspect and Lubricate 08/31/2021
08/17/2021
55552856-01 1-IMO-322-ACT/Perform External PM 08/17/2021
55543607-01
55558746-01 MTH: 1-HV-DGS-4, Lubricate Motor/Fan Bearings 08/31/2021
1-HV-DGS-FD-2, Clean Fire Damper
55558765-01 MTE: 1-CMO-429, As Found/As Left Diagnostics 08/17/2021
08/31/2021
C10002275009 1-BLSK-12AB-1; Megger/DLRO/Hi-Pot 09/30/2021
55549787
WO 5553410303 West RHR Heat Exchanger, 1-HE-17W Discharge Cross-Tie 07/26/2021
MTI, 1-IHP-6030-IMP-388
08/17/2021
71111.19
Work Orders
55550884-1
MTE: 1-IMO-320-ACT, Perform Full Actuator PM
08/17/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
55550885-01
MTI, Calibrate Over Current Relays for Breaker 1-T11A4
08/17/2021
55551111-01
1-88X1-DGX-2 Pick Up/Drop Out Testing on HFA Relay
09/01/2021
55551112-01
1-88X1-DGS-2, Pick Up/Drop Out Testing on HFA Relay
09/01/2021
55551120-01
MTH: 1-HV-DG-FLT-2, Perform PM
08/31/2021
55551121-01
1-HV-DDP-CD2, Clean/Inspect and Lubricate
08/31/2021
55551122-01
1-HV-DDP-CD1, Clean/Inspect and Lubricate
08/31/2021
55552856-01
1-IMO-322-ACT/Perform External PM
08/17/2021
55558746-01
MTH: 1-HV-DGS-4, Lubricate Motor/Fan Bearings
08/31/2021
55558765-01
MTE: 1-CMO-429, As Found/As Left Diagnostics
08/17/2021
C10002275009
1-BLSK-12AB-1; Megger/DLRO/Hi-Pot
09/30/2021
WO 5553410303
West RHR Heat Exchanger, 1-HE-17W Discharge Cross-Tie
Shutoff
Shutoff
WOT: 55551763-MTM, 1-QR-3581, Replace Air Hoses Per EC-57947 09/02/2021
07/26/2021
WOT: 55562107-MTM, 1-OME-34W, Adjust Packing on Inlet and Outlet 08/25/2021
WOT: 55551763-
MTM, 1-QR-3581, Replace Air Hoses Per EC-57947
09/02/2021
WOT: 55562107-
MTM, 1-OME-34W, Adjust Packing on Inlet and Outlet
Valves
Valves
71111.20 Procedures PMP-4010-TRP-Reactor Trip Review (Unit 2 right Moisture Separator 22
08/25/2021
001 Reheater 'B' Crossover Expansion Joint Failure/Steam Leak)
PMP-4010-TRP-
PMP-4010-TRP-Reactor Trip Review 22
001
Reactor Trip Review (Unit 2 right Moisture Separator
Reheater 'B' Crossover Expansion Joint Failure/Steam Leak)
71111.20
Procedures
PMP-4010-TRP-
001
001
71111.22 Procedures 1-OHP-4030-156-Turbine Driven Auxiliary Feedwater System Test 29
Reactor Trip Review
1-OHP-4030-156-
17T
17T
2-IHP-213-231R Nuclear Instrumentation Power Range Channel Operational 14
Turbine Driven Auxiliary Feedwater System Test
2-IHP-213-231R
Nuclear Instrumentation Power Range Channel Operational
Test and Calibration Including Peripherals
Test and Calibration Including Peripherals
2-OHP-4021-050- Turbine Generator Normal Start-up and Operation 68
2-OHP-4021-050-
001
001
PMP-2291-WMP-Work Management Process Flowchart 61
Turbine Generator Normal Start-up and Operation
Procedures
PMP-2291-WMP-
001
001
Work Orders 55548077-01 2-IHP-4030-213-231R: Perform Channel Calibration for 09/09/2021
Work Management Process Flowchart
71111.22
Work Orders
55548077-01
2-IHP-4030-213-231R: Perform Channel Calibration for
2-N-41
2-N-41
71114.06 Miscellaneous September 13, 2021, Training Drill Scenario Manual 0
09/09/2021
EP-S-21EE 2021 Exercise 0
September 13, 2021, Training Drill Scenario Manual
71124.03 Corrective Action AR 2019-11268 SCBA Test Data 11/11/2019
71114.06
 
Miscellaneous
Inspection Type Designation Description or Title Revision or
EP-S-21EE
Procedure Date
21 Exercise
Documents AR 2020-0050 Fire Hawk Fit #204 Found Degraded During Shiftly 12/30/2019
71124.03
Corrective Action
AR 2019-11268
SCBA Test Data
11/11/2019
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
AR 2020-0050
Fire Hawk Fit #204 Found Degraded During Shiftly
Inspection
Inspection
AR 2020-5005 Airhawk Kits #25, 26, and 27 Need Replacement Parts 06/19/2020
2/30/2019
AR 2020-6220 Degraded Ultra Elite Mask 08/05/2020
AR 2020-5005
Miscellaneous MSA Air Hawk SCBA Annual Inspection and Flow Tests for 07/20/2020 -
Airhawk Kits #25, 26, and 27 Need Replacement Parts
Units DW223132, DW307027, DW119025, and DW119012. 07/16/2020.
06/19/2020
Grade D Quarterly Air Analysis Tests (First Quarter 2020 Various
Documents
AR 2020-6220
Degraded Ultra Elite Mask
08/05/2020
MSA Air Hawk SCBA Annual Inspection and Flow Tests for
Units DW223132, DW307027, DW119025, and DW119012.
07/20/2020 -
07/16/2020.
Miscellaneous
Grade D Quarterly Air Analysis Tests (First Quarter 2020
Through First Quarter 2021) for the SCBA Compressor
Through First Quarter 2021) for the SCBA Compressor
Located in the Lakeside Administration Building
Located in the Lakeside Administration Building
Procedures EPP-2080-ERO-Emergency Response Resource Readiness 23
Various
EPP-2080-ERO-
001
001
FPP-2281-RES-Maintenance and Repair of Respiratory Devices 18
Emergency Response Resource Readiness
Procedures
FPP-2281-RES-
201
201
Work Orders 55523038-01 1-HV-AES-1 Engineered Safety Ventilation Surveillance 01/15/2020
Maintenance and Repair of Respiratory Devices
71124.04 Corrective Action AR 2020-0554 Member of the Public Area DLR Missing 01/15/2020
Work Orders
Documents AR 2020-3169 Requirements of 12-THP-6010-RPP-101 04/09/2020
55523038-01
AR 2020-3684 Multi-Pack Dosimetry Exchange 04/30/2020
1-HV-AES-1 Engineered Safety Ventilation Surveillance
AR 2020-8045 SRD to DLR Discrepancy 10/20/2020
01/15/2020
AR 2021-6250 Dosimeter Alarm Received on One of Two SRDs 07/16/2021
AR 2020-0554
Corrective Action AR 2021-6328 Procedure Gap in 12-THP-6010-RPP-104 07/21/2021
Member of the Public Area DLR Missing
Documents AR 2021-6329 Procedure 12-THP-6010-RPP-104 07/21/2021
01/15/2020
AR 2020-3169
Requirements of 12-THP-6010-RPP-101
04/09/2020
AR 2020-3684
Multi-Pack Dosimetry Exchange
04/30/2020
AR 2020-8045
SRD to DLR Discrepancy
10/20/2020
Corrective Action
Documents
AR 2021-6250
Dosimeter Alarm Received on One of Two SRDs
07/16/2021
AR 2021-6328
Procedure Gap in 12-THP-6010-RPP-104
07/21/2021
Corrective Action
Documents
Resulting from
Resulting from
Inspection
Inspection
Miscellaneous Mirion Technologies Technical Basis Document 2.01
AR 2021-6329
Procedure 12-THP-6010-RPP-104
07/21/2021
Mirion Technologies Technical Basis Document
TLD 760 & Genesis (Badge Type 16)
TLD 760 & Genesis (Badge Type 16)
Declared Pregnant Worker Dosimetry Records Various
2.01
TLD Data for Monitoring Period of 07/01/2020 through 07/01/2020 -
Declared Pregnant Worker Dosimetry Records
10/31/2020 10/31/2020
Various
TLD Discrepancy Reports for TLD Monitoring Period Various
TLD Data for Monitoring Period of 07/01/2020 through
10/31/2020
07/01/2020 -
10/31/2020
TLD Discrepancy Reports for TLD Monitoring Period
07/01/2020 through 10/31/2020
07/01/2020 through 10/31/2020
RP-10-03 Comparison of Ambient Radiation Levels in Storage 0
Various
Miscellaneous
RP-10-03
Comparison of Ambient Radiation Levels in Storage
Location of Control TLDs vs. In-Use TLD Population When
Location of Control TLDs vs. In-Use TLD Population When
Not Being Worn
Not Being Worn
Procedures 12-THP-6010- Preparation and Control of Exposure Records and Reports 18
71124.04
Inspection Type Designation Description or Title Revision or
Procedures
Procedure Date
2-THP-6010-
Preparation and Control of Exposure Records and Reports
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
RPP-101
RPP-101
2-THP-6010- Personnel Dosimetry Use in Varying Radiation Fields 22
2-THP-6010-
RPP-104
RPP-104
2-THP-6010- Members of the Public and Controlled Area Monitoring 7
Personnel Dosimetry Use in Varying Radiation Fields
RPP-105 Program
2-THP-6010-
2-THP-6010- Dose Monitoring for Declared Pregnant Workers (DPW) 6
RPP-105
Members of the Public and Controlled Area Monitoring
Program
2-THP-6010-
RPP-121
RPP-121
NISP=RP-010 Nuclear Industry Standard Process Radiological Job 1
Dose Monitoring for Declared Pregnant Workers (DPW)
NISP=RP-010
Nuclear Industry Standard Process Radiological Job
Coverage
Coverage
71124.08 Radiation SW-VSDS-M-Radiological Survey of Radioactive Waste Demineralizer 06/15/2021
SW-VSDS-M-
Surveys 20210615-7 Room
210615-7
SW-VSDS-M-Radiological Survey of the 587' Elevation Drumming Room 06/21/2021
Radiological Survey of Radioactive Waste Demineralizer
Room
06/15/2021
71124.08
Radiation
Surveys
SW-VSDS-M-
210621-1
210621-1
71151 Miscellaneous Performance Indicator OR01 Validation Reports for Fourth Various
Radiological Survey of the 587' Elevation Drumming Room
06/21/2021
Performance Indicator OR01 Validation Reports for Fourth
Quarter 2020 through Second Quarter 2021
Quarter 2020 through Second Quarter 2021
MSPI Derivation Reports - Heat Removal Systems 0
Various
(07/01/2020 through 06/30/2021) - Unit 1
MSPI Derivation Reports - Heat Removal Systems  
MSPI Derivation Reports - Heat Removal Systems 0
(07/01/2020 through 06/30/2021) - Unit 1
(07/01/2020 through 06/30/2021) - Unit 2
MSPI Derivation Reports - Heat Removal Systems  
MSPI Derivation Reports - Residual Heat Removal Systems 0
(07/01/2020 through 06/30/2021) - Unit 2
(07/01/2020 through 06/30/2021) - Unit 1
MSPI Derivation Reports - Residual Heat Removal Systems  
MSPI Derivation Reports - Residual Heat Removal Systems 0
(07/01/2020 through 06/30/2021) - Unit 1
(07/01/2020 through 06/30/2021) - Unit 2
MSPI Derivation Reports - Residual Heat Removal Systems  
Operational Narrative Logs (07/01/2020 through 06/30/2021) 0
(07/01/2020 through 06/30/2021) - Unit 2
- Unit 1 & 2
Miscellaneous
Procedures PMP-7110-001 Reactor Oversight Program Performance Indicators and 20
Operational Narrative Logs (07/01/2020 through 06/30/2021)  
- Unit 1 & 2
71151
Procedures
PMP-7110-001
Reactor Oversight Program Performance Indicators and
Monthly Operating Report Data
Monthly Operating Report Data
71152 Corrective Action AR 2021-5596 Unit 2 Manual Reactor Trip Due to Leak on Right Moisture 06/22/2021
AR 2021-5596
Documents Separator Reheater
Unit 2 Manual Reactor Trip Due to Leak on Right Moisture
AR 2021-5769 Expansion Bellows Line Design Capacity Exceeded 06/28/2021
Separator Reheater
Engineering EC-58171 2-XJ-113-4 and 2-XJ-113-5 - Change Liner Thickness from 0
06/22/2021
Changes 1/8 to 1/4"
Corrective Action
Work Orders 55563182-07 Replace BR Primary Bellows 2-XJ-113-4 and 2-XJ-113-5 06/27/2021
Documents
55563331-06 Replace AL Primary Bellows 2-XJ-113-13 and 2-XJ-113-14 07/01/2021
AR 2021-5769
Inspection Type Designation Description or Title Revision or
Expansion Bellows Line Design Capacity Exceeded
Procedure Date
06/28/2021
55563352-06 Replace CL Primary Bellows 2-XJ-113-17 and 2-XJ-113-18 07/01/2021
Engineering
71153 Operability ODMI 1-21-004 Operational Decision Maker (Unit 1 Main Turbine 4
Changes
Evaluations Condensers & Main Feedwater Pump Turbine Condensers
EC-58171
2-XJ-113-4 and 2-XJ-113-5 - Change Liner Thickness from
1/8 to 1/4"
55563182-07
Replace BR Primary Bellows 2-XJ-113-4 and 2-XJ-113-5
06/27/2021
71152
Work Orders
55563331-06
Replace AL Primary Bellows 2-XJ-113-13 and 2-XJ-113-14
07/01/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
55563352-06
Replace CL Primary Bellows 2-XJ-113-17 and 2-XJ-113-18
07/01/2021
ODMI 1-21-004
Operational Decision Maker (Unit 1 Main Turbine
Condensers & Main Feedwater Pump Turbine Condensers
Experiencing Degraded Vacuum)
Experiencing Degraded Vacuum)
ODMI 1-21-005 Operational Decision Maker (Unit 1 Circulating Water Pump 1
ODMI 1-21-005
#13 Discharge Valve Failure)
Operational Decision Maker (Unit 1 Circulating Water Pump  
ODMI 1-21-005 Unit 1 Circulating Water System has Reduced Flow 1
#13 Discharge Valve Failure)
Operability
Evaluations
ODMI 1-21-005
Unit 1 Circulating Water System has Reduced Flow
Following Failure of 1-WMO-13 (Discharge Valve)
Following Failure of 1-WMO-13 (Discharge Valve)
Procedures 1-OHP-4021-057-Circulating Water System Operation 55
71153
Procedures
1-OHP-4021-057-
001
001
 
Circulating Water System Operation
25
55
}}
}}

Latest revision as of 21:13, 27 November 2024

Integrated Inspection Report 05000315/2021003; 05000316/2021003; and 07200072/2021001
ML21298A242
Person / Time
Site: Cook, 07200072  American Electric Power icon.png
Issue date: 10/26/2021
From: Nestor Feliz-Adorno
Reactor Projects Region 3 Branch 4
To: Gebbie J
Indiana Michigan Power Co
References
IR 2021001
Download: ML21298A242 (27)


Text

SUBJECT:

DONALD C. COOK NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000315/2021003; 05000316/2021003; AND 07200072/2021001

Dear Mr. Gebbie:

On September 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Donald C. Cook Nuclear Plant. On October 12, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Néstor J. Féliz Adorno, Chief Branch 4 Division of Reactor Projects Docket Nos. 05000315 and 05000316 License Nos. DPR-58 and DPR-74

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000315 and 05000316

License Numbers:

DPR-58 and DPR-74

Report Numbers:

05000315/2021003; 05000316/2021003; 07200072/2021001

Enterprise Identifier:

I-2021-003-0077; I-2021-001-0162

Licensee:

Indiana Michigan Power Company

Facility:

Donald C. Cook Nuclear Plant

Location:

Bridgman, MI

Inspection Dates:

July 01, 2021 to September 30, 2021

Inspectors:

R. Baker, Senior Operations Engineer

S. Bell, Health Physicist

R. Edwards, Senior Health Physicist

M. Jones, Project Engineer

J. Mancuso, Resident Inspector

J. Neurauter, Senior Reactor Inspector

P. Zurawski, Senior Resident Inspector

Approved By:

Néstor J. Féliz Adorno, Chief

Branch 4

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Donald C. Cook Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period at rated thermal power. On July 27, 2021, Unit 1 was shut down to Mode 3 to repair a circulating water discharge valve issue and was returned to full power on August 2, 2021, where it remained through the end of the inspection quarter. Unit 2 was shut down at the beginning of the inspection period due to a steam leak related to the main turbine. After repairs, Unit 2 returned to full power on July 10, 2021, where it remained through the end of the inspection quarter.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident and regional inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week, increasing the amount of time on site as local COVID-19 conditions permitted.

As part of their onsite activities, resident inspectors conducted plant status activities as described in IMC 2515, Appendix D; observed risk significant activities; and completed on site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect the following risk significant systems from impending severe thunderstorms on July 21, 2021:

Switchyard

Main transformer

Unit 1 Emergency Diesel Generators (EDGs)

Unit 1/2 safety related batteries with the failure of #13 circulating water discharge valve

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (7 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)2AB Fuel Oil Transfer Pump and breaker with 1AB EDG Fuel Oil Transfer Pump work during 1AB critical maintenance project on July 22, 2021.

(2) Unit 1 Essential Service Water (ESW) during east Containment Spray System (CTS)

Heat Exchanger ESW outlet valve maintenance on August 4, 2021.

(3) Unit 1 AB EDG with Unit 1 CD EDG out of service on August 31, 2021.
(4) Unit 2 west Motor Driven Auxiliary Feedwater (AFW) Pump following surveillance on September 16, 2021.
(5) Unit 1 east ESW during Unit 1 west ESW during maintenance on September 20, 2021.
(6) Unit 1 CD EDG Jacket Water Pump #2 on September 22, 2021.
(7) West Diesel and Electric Fire Pumps during east Diesel Fire Pump maintenance window on September 27, 2021.

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the Unit 1 Circulating Water Pumps and Motor Control Centers due to #13 Circulating Water Pump Discharge Valve failure on July 21, 2021.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (9 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire Zone 13; 2AB Diesel Oil Pump Room, Unit 2, elevation 587'-0" on July 21, 2021.
(2) Fire Zone 30; Diesel Fire Pump House on July 21, 2021.
(3) Fire Zone 54; Unit 2 Main Control Room on July 27, 2021.
(4) Fire Zone 29A; ESW Pump 1E, elevation 591' on July 31, 2021.
(5) Fire Zone 29B; ESW Pump 1W, elevation 591' on July 31, 2021.
(6) Fire Zone 53; Unit 1 Main Control Room on August 1, 2021.
(7) Fire Zone 40A; Unit 1 east 4kV Room on August 31, 2021.
(8) Fire Zone 47B; Unit 2 west 4kV Room on August 31, 2021.
(9) Fire Zone 17C; Corridor to AFW Pump Rooms, Unit 1 & Unit 2, elevation 591' on September 22, 2021.

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the onsite Fire Brigade training and performance during an announced fire drill on September 16, 2021.

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1) Units 1 and 2 ESW due to #13 Circulating Water Pump Discharge Valve failure and debris transport risk due to impending severe weather on July 22, 2021.

71111.07T - Heat Sink Performance Heat Exchanger (Service Water Cooled) (IP Section 03.02)

The inspectors evaluated heat exchanger/sink performance on the following:

(1) Unit 1 Component Cooling Water Heat Exchanger, cooled by Service Water
(2) Unit 1 Motor Driven Auxiliary Feedwater Room Cooler Heat Exchanger, cooled by Service Water

Ultimate Heat Sink (IP Section 03.04) (1 Sample)

(1)c. Review performance testing of service water system and ultimate heat sink e. Perform a walkdown and review documentation for the service water intake structure

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (1 Sample)

(1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered from March 8, 2021 through April 16, 2021.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples)

(1) The inspectors observed and evaluated licensed operator performance in the Control Room during a Unit 2 restart after a forced outage on July 6, 2021.
(2) The inspectors observed and evaluated licensed operator performance in the Control Room during a Unit 1 restart after a forced outage on July 31, 2021.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (2 Samples)

(1) The inspectors observed and evaluated RQ-S-4602-U1-T1 on July 15, 2021.
(2) The inspectors observed and evaluated RQ-S-4603-U1-T2 on August 4, 2021.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples 1 Partial)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Evaluation of 1AB 4-Year critical maintenance on July 19, 2021.

(2)

(Partial)

Evaluation of the #13 Circulating Water Pump Discharge Valve on July 28, 2021.

(3) Evaluation of the Train B Reserve Feed on September 27, 2021.

Quality Control (IP Section 03.02) (1 Partial)

The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:

(1)

(Partial)

Evaluation of the east Diesel Fire Pump following maintenance on September 27, 2021.

Aging Management (IP Section 03.03) (1 Partial)

The inspectors evaluated the effectiveness of the aging management program for the following SSCs that did not meet their inspection or test acceptance criteria:

(1)

(Partial)

Evaluation of the Fire Protection Aging Management Program on September 29, 2021.

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) East Residual Heat Removal (RHR) and CTS work window on August 2, 2021.
(2) Unit 2 Control Rod Drive (CRD) failure to pass surveillance on August 11, 2021.
(3) Risk management with Unit 1 CD EDG out of service on August 31, 2021.
(4) Unit 1 online risk due to west ESW work on September 20, 2021.

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (11 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Action Request (AR) 2021-6142; Potential invalid Unit 1/2 Turbine Driven Auxiliary Feedwater Pump (TDAFP) surveillances on July 14, 2021.
(2) AR 2021-6156; Unit 2 west Motor Drive Auxiliary Feedwater Pump (MDAFP) Valve leaking on July 14, 2021.
(3) AR 2021-6199; 24 Accumulator Level is Slowly Lowering on July 15, 2021.
(4) AR 2021-6963; Unit 2 CRD Failure to Pass Surveillance on August 11, 2021.
(5) AR 2021-7549; Elevated Fire Protection Leak Rate on September 4, 2021.
(6) AR 2021-7742; Lowering Accumulator levels on Unit 2 on September 14, 2021.
(7) AR 2021-7760; 12 Reactor Coolant Pump Motor Bearing Temperature Step Change on September 16, 2021.
(8) AR 2021-7953; 2CD Door on September 23, 2021.
(9) AR 2021-8026; Unit 1 and 2 12AB Train B Reserve Feed Failure on September 24, 2021.
(10) AR 2021-8040; Unit 2 CRID3 Abnormal Annunciator Received on September 26, 2021.
(11) AR 2021-7879; High Unseat Torque on 1-WMO-702 on September 27, 2021.

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Moisture Separator Reheater Expansion Bellows 2-XJ-113-4 and 2-XJ-113-5, change inner liner thickness from 1/8" to 1/4" on July 8, 2021.

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (7 Samples 1 Partial)

The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:

(1) Unit 2 Control Rod testing in Mode 3 on July 7, 2021.
(2) Unit 1 RHR Pump Discharge Cross-Tie Valve 1-IMO-324-ACT on July 26, 2021.
(3) East RHR after maintenance window on August 3, 2021.
(4) Unit 1 east ESW after initial surveillance failure on August 9, 2021.
(5) Unit 1 west RHR following planned maintenance on August 17, 2021.
(6) Unit 1 CD EDG Room ventilation on August 31, 2021.

(7)12 AB Train B Auxiliary Reserve Feed on September 30, 2021.

(8)

(Partial)

Unit 2 Containment Chiller 'C' evaluation begun on September 30, 2021.

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (2 Samples)

(1) The inspectors evaluated the Unit 2 forced outage main steam leak from July 1 to July 6, 2021.
(2) The inspectors evaluated Unit 1 forced outage #13 Cooling Water Pump Discharge Valve failure activities from July 27 to July 31, 2021.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) U2 Turbine Overspeed Test on July 8, 2021.

(2)1-OHP-4030-156-017T; Unit 1 Turbine Driven AFW Pump Surveillance Test on July 14, 2021.

(3) Nuclear Instrumentation Power Range Channel Operational Test on September 9, 2021.
(4) Unit 2 west Motor Driven AFW Pump Surveillance Test on September 16, 2021.

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (2 Samples)

The inspectors evaluated:

(1) Emergency Planning Drill on September 13, 2021.
(2) Emergency Planning Drill on September 21,

RADIATION SAFETY

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation

Permanent Ventilation Systems (IP Section 03.01) (1 Sample)

The inspectors evaluated the configuration of the following permanently installed ventilation systems:

(1) Units 1 and 2 Auxiliary Building Ventilation System (1-HV-AES-1, Unit 1 Auxiliary Building Ventilation Engineered Safety Features (ESF) Exhaust Fan #1; 1-HV-AES-2, Unit 1 Auxiliary Building Ventilation ESF Exhaust Fan #2; 2-HV-AES-1, Unit 2 Auxiliary Building Ventilation ESF Exhaust Fan #1; and 2-HV-AES-2, Unit 2 Auxiliary Building Ventilation ESF Exhaust Fan #2)

Use of Respiratory Protection Devices (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated the licensees use of respiratory protection devices. This included the observation of a quantitative mask fit and the periodic evaluation of respirator donning and removal.

Self-Contained Breathing Apparatus for Emergency Use (IP Section 03.04) (1 Sample)

The inspectors evaluated the licensees use and maintenance of self-contained breathing apparatuses (SCBAs).

(1) The inspectors observed the condition of the MSA Air Hawk SCBAs and of the SCBA compressor located in the Administration Building.

71124.04 - Occupational Dose Assessment

Source Term Characterization (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated licensee performance as it pertains to radioactive source term characterization.

External Dosimetry (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the external dosimetry program implementation.

Internal Dosimetry (IP Section 03.03) (1 Sample)

The inspectors evaluated the internal dosimetry program implementation.

(1) The inspectors reviewed the following:

Whole Body Counts

  • Individual ACAD 28532, September 25, 2021
  • Individual ACAD 19879, November 5, 2021
  • Individual ACAD 19879, November 6, 2021 In-Vitro Internal Monitoring
  • Urinalysis and Dose Assessment, Sample 20-001, May 5, 2020
  • Urinalysis and Dose Assessment, Sample 20-002, May 5, 2020 Dose Assessments Performed Using Air Sampling and Derived Air Concentration-Hour Monitoring
  • None were available during the inspection period.

Special Dosimetric Situations (IP Section 03.04) (1 Sample)

The inspectors evaluated the following special dosimetric situation:

(1) Licensees implementation of requirements to manage radiation protection of declared pregnant workers. Three individual records from 2019 through 2021 were reviewed.

71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &

Transportation

Radioactive Material Storage (IP Section 03.01)

(1) Inspectors observed the licensees performance in controlling, labeling and securing radioactive materials. This included the materials stored within the Radioactive Materials Building (RMB).

Radioactive Waste System Walkdown (IP Section 03.02) (1 Sample)

(1) Inspectors walked down accessible portions of the solid radioactive waste systems and evaluated system configuration and functionality.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS08: Heat Removal Systems (IP Section 02.07)===

(1) Unit 1 (July 1, 2020 through June 30, 2021)
(2) Unit 2 (July 1, 2020 through June 30, 2021)

MS09: Residual Heat Removal Systems (IP Section 02.08) (2 Samples)

(1) Unit 1 (July 1, 2020 through June 30, 2021)
(2) Unit 2 (July 1, 2020 through June 30, 2021)

OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)

(1) October 1, 2020 through June 30, 2021

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (1 Partial)

(1)

(Partial) AR 2021-5596; Unit 2 Manual Reactor Trip due to Degrading Vacuum on July 8, 2021.

71153 - Follow-Up of Events and Notices of Enforcement Discretion Event Follow-up (IP Section 03.01)

(1) The inspectors evaluated AR 2021-6321; Circulating Water Flow is Degraded and Required a Power Reduction on July 21,

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 60855 - Operation of an ISFSI The inspectors evaluated the licensees Independent Spent Fuel Storage Installation (ISFSI)cask loading activities on July 26 through July 30, 2021. Specifically, the inspectors observed the following activities during the loading of cask 47:

Heavy lifts of the loaded transfer cask from the spent fuel pool to the cask processing area

Closure welding and non-destructive evaluations

Canister processing including forced helium dehydration and backfill with helium

Stack-up and download of the Multi-Purpose Canister (MPC) from the HI-TRAC into the storage cask (HI-STORM)

Radiological field surveys The inspectors performed walkdowns of the ISFSI pad, including performing independent radiation surveys, and walkdowns of the ISFSI haul path and vertical cask transporter.

The inspectors evaluated the following:

Spent fuel selected for loading into dry cask storage during this loading campaign

Selected corrective action program action requests

Selected 72.48 screenings and evaluations

INSPECTION RESULTS

Observation: Unit 1 Circulating Water Flow Was Degraded Requiring a Power Reduction 71153 The inspectors responded to, and monitored, licensee actions for an unexpected plant condition involving the Unit 1 Circulating Water Pump. At approximately 0500 on July 21, 2021 the Unit 1 Control Room heard a loud boom and saw a

.8 lowering of vacuum

in the Unit 1 Main Condenser. Immediate operational actions stabilized vacuum with no other immediate risk significant plant impacts. Operations prepared for, and executed, an approximate 10 percent down power on Unit 1 while dispatched Operations and Maintenance personnel performed field investigation. Inspectors observed licensee implementation of its Failure Investigation Process (FIP) for further investigation of cause and resolution of the issue. The FIP team concluded the cause was related to a failure of the #13 Circulating Water Pump Discharge Valve, 1-WMO-13. Inspectors reviewed the resulting short and longer-term actions. Specifically, the licensee developed an ODMI for monitoring Circulating Water Pump #13 parameters, developed a temporary change to install a pressure gauge to monitor #13 Circulating Water Pump Discharge pressure, and planned for the repair/replacement of the discharge valve as part of a forced outage. The licensee documented the event within its corrective action program via AR 2021-6321, Circulating Water Flow is Degraded and Required a Power Reduction. Additionally, the inspectors determined immediate licensee actions were reasonable given the overall safety significance of the issue. Based on the inspector's review, no concerns were identified with the immediate licensee actions. Since resolution of the issue required a forced outage, inspectors monitored those activities through Inspection Procedure 71111.20, Refueling and Other Outage Activities.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On October 12, 2021, the inspectors presented the integrated inspection results to Mr. J. Gebbie, Senior Vice President, and other members of the licensee staff.

On July 22, 2021, the inspectors presented the radiation protection baseline inspection results to Mr. J. Gebbie, Senior Vice President, and other members of the licensee staff.

On August 4, 2021, the inspectors presented the operation of an ISFSI inspection results to Mr. S. Lies, Site Vice President, and other members of the licensee staff.

On September 30, 2021, the inspectors presented the ultimate heat sink inspection results to Mr. S. Lies, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR-2018-7995

2-SFS-SYS-012 Upper Vent Gap

08/10/2018

AR-2018-8358

Potential of Stored N2 Bottles to Impact ISFSI

08/23/2018

AR-2018-8439

Validate Temperature Range for Penetrant Testing

08/27/2018

AR-2018-9288

Multi-Purpose Canister 463 (MPC-463)

10/01/2018

AR-2018-9810

Dry Cask Operations: Forced Helium Dehydration Blower

10/18/2018

AR-2019-0045

2CR-0017 Rev. 0 Requires Revision

01/02/2019

AR-2019-1737

ISFSI UPS Trouble Alarms

11/26/2019

AR-2019-1451

FCR-54927-002 Presented Incorrect ISFSI Location for

Casks

2/13/2019

AR-2019-5576

Whining Sound Coming From VCT

05/28/2019

AR-2019-7291

ISFSI Cask B2 West Temp and Delta Temp Failed

07/28/2019

AR-2019-9174

URI Closure Actions - ISFSI Operations - Temporary

Shielding

09/30/2019

AR-2020-0842

ISFSI Temperature Monitoring

01/27/2020

AR-2020-3838

AR 2018-4056 Actions - Review in Light of 2020 CAP

Standard

06/06/2020

AR-2020-5722

Receipt Inspection Process for HI-STORM Casks

07/16/2020

AR-2021-1453

Ice Build-up on ISFSI Casks

2/13/2021

Corrective Action

Documents

AR-2021-2117

Dry Fuel Storage (ISFSI) Combustible Controls - OE

  1. 250795

03/08/2021

0000057055

DC Cook Dry Cask Loading Campaign 4

Engineering

Changes

0000057896

Modify Wall Penetration with Capped Conduit for Dry Cask

Cables

Cook 10 CFR 72.212 Evaluation Report

Cook ISFSI 10 CFR Part 72 Regulatory Compliance Report

HI-STORM 100 CoC 1014 Amendment 5

HI-STORM 100 CoC 1014 Amendment 9

HI-STORM 100 FSAR

HI-STORM 100 FSAR

2018-0253-00

2.48 Screening

60855

Miscellaneous

2018-0263-00

2.48 Screening

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2018-0265-00

2.48 Screening

2018-0265-00

50.59 Screening

2018-0268-00

2.48 Screening

2018-0270-00

2.48 Screening

2018-0270-00

50.59 Screening

2018-0271-00

2.48 Screening

2018-0276-00

2.48 Screening

2018-0287-00

2.48 Screening

2018-0288-00

2.48 Screening

2018-0301-00

2.48 Screening

2018-0312-00

2.48 Screening

2019-0196-00

2.48 Screening

2019-0215-00

2.48 Screening

2019-0321-00

2.48 Screening and Evaluation

20-0173-00

2.48 Screening

20-0181-00

50.59 Screening

20-0182-00

2.48 Screening

20-0188-00

2.48 Screening

21-0007-00

2.48 Screening

21-0011-00

2.48 Screening

21-0090-00

2.48 Screening

21-0099-00

2.48 Screening

21-0110-00

2.48 Screening

NUPIC Audit

24753

NUPIC Joint Audit of Holtec International

07/08/2019

Helium Leak Test Report for MPC 582

07/29/2021

918221-582-01

Liquid Penetration Examination

07/27/2021

918221-582-02

Liquid Penetration Examination

07/27/2021

918221-582-03

Liquid Penetration Examination

07/28/2021

NDE Reports

918221-582-04

Liquid Penetration Examination

07/28/2021

2-EHP-4051-

DCO-300

Fuel Selection and Sequence Development for Dry Cask

Storage

Procedures

2-MHP-4030-

New and Spent Fuel Crane Operability Verification

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

048-046

2-OHP-4051-

DC0-003

Dry Cask Operations Pre-Campaign Support Activities

2-OHP-4051-

DCO-004

Dry Cask Operations Work Area Ambient Air Temperature

Monitoring

2-OHP-4051-

DCO-005

MPC Lid Recovery from Item Stuck in Lift Hole

2-OHP-4051-

DCO-006

Dry Cask Operations Post-Campaign Support Activities

2-OHP-4051-

DCO-100

Transport Operations

2-OHP-4051-

DCO-101

Goldhofer Operations

2-OHP-4051-

DCO-200

MPC Preparation for Loading

2-OHP-4051-

DCO-300

MPC Loading Operations

2-OHP-4051-

DCO-301

MPC Boron Sampling

2-OHP-4051-

DCO-400

MPC Welding, Blowdown, Drying and Backfill

2-OHP-4051-

DCO-500

Transfer Operations

2-OHP-4051-

DCO-600

Dry Cask Operations Response to Abnormal Conditions

2-OHP-4051-

DCO-700

MPC Unloading

2-OHP-4051-

DCO-701

MPC Gas Sampling

2-OHP-4051-

DCO-805

Completed Dry Cask Storage Lifting Device Inspections

07/06/2021

GQP-9.2

High Temperature Liquid Penetrant Examination and

Acceptance Standards for Welds, Base Materials, and

Cladding

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

MHI-5025

Control and Inspection of Rigging and Lifting Equipment

PI-CNSTR-OP-

HLTC-H-01

Closure Welding of Holtec Multi-Purpose Canisters - HI-

STORM 100, HI-STAR 100, HI-STORM FW & UMAX

Systems

PMP-4051-DCO-

2

2.212 Evaluation Report Control

NRC ISFSI Inspection GT 2021-0894 Outage Management

NOS-18-07

Nuclear Oversight Audit, Spent Fuel Storage

09/25/2018

NOS-18-09

Nuclear Oversight Audit, Security

2/05/2019

NOS-18-09

Nuclear Oversight Audit, Security Supplement

2/05/2019

NOS-19-06

NIEP Evaluation Report for Cook

08/20/2019

NOS-19-09

Nuclear Oversight Audit, Security

2/17/2019

Self-Assessments

NOS-20-08

Nuclear Oversight Audit, Security

2/10/2020

55530757-01

2-QM-80, Auxiliary Building 650 Elevation 1 Ton New and

Spent Fuel Handling Crane

10/26/2019

55542402-01

2-QM-3E, Auxiliary Building 150/20 Ton East Overhead

Crane

01/25/2021

55547080-01

2-QM-80, Auxiliary Building 650 Elevation 1 Ton New and

Spent Fuel Handling Crane

03/11/2021

Work Orders

55547080-08

2-QM-80, Auxiliary Building 650 Elevation 1 Ton New and

Spent Fuel Handling Crane

03/09/2021

2-OHP-4022-

001-010

Severe Weather

71111.01

Procedures

PWP-5055-SWM-

001

Severe Weather Guidelines

1-OHP-4021-032-

008AB

Operating DG2AB Subsystems

1-OHP-4021-032-

008CD

Operating DG1CD Subsystems

2-OHP-4021-

019-001

Operation of the Essential Service Water System

2-OHP-4030-256-

017W

West Motor Driven Auxiliary Feedwater System Test

71111.04

Procedures

OP-2-5151D-76

Flow Diagram Emergency Diesel Generator 'CD' Unit No. 1

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Engineering

Changes

EC-0000050518

Install Tool and Equipment Storage Cage and Related

Appurtenances in the EDG Fuel Oil Pump Rooms

Fire Plans

Fire Zone 17C

Corridor to Auxiliary Feed Pump Rooms Both Units Elev.

591'

Fire Hazard Analysis

Miscellaneous

21-009-A

Fire Drill Progression and Cue Sequence

09/16/2021

2-FPP-2270-

066-055

Fire Detection Instrument Channel Functional Test

(U-1 Zones 7, 6, 22, 24, and U-2 Zones 2, 15, 16, 20)

2-FPP-4030-

066-021

Inspection of Fire Dampers Protecting Safety-Related Areas

2-FPP-4030-

066-021

Inspection of Fire Dampers Protecting Safety-Related Areas

2-FPP-4030-

066-021

Inspection of Fire Dampers Protective Safety-Related Areas

2-FPP-4030-

066-026

Technical Requirements Manual Fire Door Inspection

2-FPP-4030-

066-206

Fire Detection Instrumentation Channel Operational Test,

(U-1 Zones 25, 27 (Subzone 2) and U-2 Zone 31

(Subzone 2) and Shared Zone 26)

2-IHP-6040-266-

004

U2 Diesel Generator Oil Pump and Valve Room CO2 Fire

Suppression

2/17/2019

2-IHP-6040-266-

004

Unit 2 Diesel Generator Oil Pump and Valve Room CO2 Fire

Suppression Test

Procedures

PMP-2270-DOR-

001

Control of Station Doors

55515383-01

Unit 2 Control Room Fire Damper Inspection and Testing

10/07/2019

55525556-01

Safety Related Fire Damper Inspection and Testing

03/23/2020

55529834-01

Unit 1 Control Room Fire Damper Inspection and Testing

09/22/2020

55537567-01

2-EFR-Fire-Zone-16, Unit 2 Control Room Fire Zone #16

09/10/2020

55537568-01

1-EFT-Fire-Zone-22, Unit 1 Control Room Fire Zone #22

71111.05

Work Orders

55550094-01

1-EFR-Fire-Zone-25, 'E' & 'W' ESW PP Room & Traveling

Screen Upper MCC Room (System 3 Cabinet #12-SYS-SW)

Fire Zone #26

2/07/2021

71111.06

Procedures

PMP-5091-FLD-

Flood Protection Program Implementation

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

001

09-0299-TR-002

D.C. Cook Unit 1 ESW System Waterhammer Mitigation

Analysis and Resulting Loads

MD-12-CCW-

0815-N

Component Cooling Water (CCW) Surge Tan Volume

MD-12-ESW-106-

N

Assessment of Increased Lake Water Temperature on

Safety Related and Non-Safety Related Systems

MD-12-ESW-113-

N

GL 89-13 Heat Exchanger Inspection Partial Tube Blockage

Acceptance Criteria

MD-12-ESW-117-

N

Providing Unit 2 CCW System Makeup Flow from the Unit 1

ESW System

MD-12-HV-018-N

Auxiliary Feed Water Pump Room and Hallway Heat Load

Calculation

MD-12-MSC-068-

N

Tube Plugging Allowances for Safety Related Heat

Exchangers

Calculations

TH-00-05

Auxiliary Feed Water Pump Room Heat-Up Temperatures

2015-14961

Inability of CCW System to Supply Makeup

11/17/2015

2015-15069

Inadequate Basis for CCW Misc. Header ISI Class

Boundaries

11/19/2015

2017-6004

Blockage at 1-WPX-731 and 1-WPX-735

06/15/2017

Corrective Action

Documents

20-1998

Identified Errors in Calc DC-D-12-PW-03 and

DC-D-12-PW-05

2/27/2020

Corrective Action

Documents

Resulting from

Inspection

21-8080

Patina on 1-HV-AFP-EAC Copper FIns

09/27/2021

2015-0479-01

Compensatory Action in Support of CCW Passive Failure

EC-55155

U1 East MDAFP Room Cooler Replacement

EC-55754

Install Mechanical Jumper to Connect Essential Service

Water (ESW) to Component Cooling Water (CCW)

06/25/2018

Engineering

Changes

SS-SE-2018-

209-00

Temporary Configuration Change

06/25/2018

1-HE-15E CCW HX Eddy Current Test Report

10/15/2017

71111.07T

Miscellaneous

1-0HP-4030-119-

East ESW Train Flow Verification

10/05/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2FV

1-0HP-4030-119-

2FV

West ESW Train Flow Verification

09/29/2020

2-0HP-5030-

016-001

Supplying ESW to CCW for Makeup Using a Temporary

Configuration Change

06/16/2020

Procedures

PMP-5041-TCC-

001

Temporary Configuration Change

08/23/2021

55522409

West Motor Driven Auxiliary Feed Pump Room Cooler

(Pre-Cooler) Inspection

08/12/2019

55527680

East Essential Service Water Pump PP-7E Disch Stn

10/16/2019

55530492

Heat Exchanger Inspection (West Component Cooling

Water HX)

09/21/2020

55530990

Heat Exchanger Inspection Report (East)

10/01/2020

55531408

Unit #1 Screenhouse Diving, Inspections and Repairs

01/23/2020

55539780

U-2 Screenhouse: Inspect, Clean, Repair Trash Racks

04/16/2021

55539887

CCW Valves Seat Leakage Test Surveillance

04/25/2021

Work Orders

55552710

East Essential Service Water Pump PP-7E Disch Str

01/20/2021

RQ-S-4602-U2-

T2

Period 4602 U2 Training Scenario 2

Miscellaneous

RQ-S-4603-U1-

T2

Period 4603 U1 Training Scenario 2

1-OHP-4021-001-

2

Reactor Start-Up

1-OHP-4021-002-

007

Pressurizer Pressure and Level Control Operation

71111.11Q

Procedures

2-OHP-4021-001-

2

Reactor Start-Up

Corrective Action

Documents

AR 2021-6321

Loud Bang and One Inch Loss of Vacuum in U1 Main

Condenser

Engineering

Evaluations

Engineering White Paper - T11A 1AB EDG Unexpected

Load Pickup

14606200

Issue Ticket; WO 55543325

07/26/2021

71111.12

Miscellaneous

25

Usage Ticket; WO 5554985601; CAT ID 044304870004,

044225865104, & 044225865204

09/27/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

28

Usage Ticket; WO 5554985602 (Various CAT IDs)

09/30/2021

3731

Usage Ticket; WO 5554985602 (Various CAT IDs)

09/30/2021

3732

Usage Ticket; WO 5554985602 (Various CAT IDs)

09/30/2021

3831

Usage Ticket; WO 5554985602 (Various CAT IDs)

09/30/2021

3909

Usage Ticket; WO 5554985602 (Various CAT IDs)

09/30/2021

3913

Usage Ticket; WO 5554985602 (Various CAT ID

2350035104)

09/30/2021

4081

Usage Ticket; WO 5554985602 (Various CAT IDs)

09/30/2021

Procedures

2-IHP-5021-

EMP-006

Battery Cell/Bank Replacement

55543325-01

2-EDFP-BATT-2, East Diesel Driven Fire Pump PP-145E

Diesel OME-215E Battery #2

09/28/2021

55549856-01

Engine Driven Fire Pump Diesel Inspection

09/27/2021

55549856-02

Engine Drive Fire Pump Diesel Inspection

09/27/2021

55552368

1-MOE-150-AB-EN

05/17/2021

55562958

DG1AB Slow Speed Strt

07/15/2021

55564155

Loud Bang and Sudden Loss of Vacuum in U1 Main

Condenser 1-WMO-13

07/21/2021

C10002275001

2-12AB-Bus-Duct; Investigate Loop Feed Enclosure

09/28/2021

C10002275002

Replace Bus Bars for Loop Feed Enclosure

09/29/2021

Work Orders

C10002275015

2-12AB-Bus-DUCT; Insulate Bus Bars per EC-1000136

09/30/2021

Corrective Action

Documents

AR 2021-6963

Rod Misalignment 2-OHP-4030-202-015

08/11/2021

Unit 1/2 Online Risk for Cycle 119, Week 12

Unit 1/2 Online Risk for Cycle 119, Week 05

Miscellaneous

Risk Management Plan for Replacing Reference Leg Backfill

Train Filter

09/21/2021

71111.13

Procedures

46.000.046

Operation PF the Reference Leg Backfill System

AR 2021-6142

Potential Invalid U1/U2 TDAFP Surveillances

AR 2021-6156

Valve Leaking

AR 2021-6195

Track U-1 TDAFP Comprehensive Surveillance

AR 2021-6199

  1. 24 Accumulator Level is Slowly Lowering

71111.15

Corrective Action

Documents

AR 2021-6963

Rod Misalignment 2-OHP-4030-212-015

08/11/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR 2021-7549

Elevated Fire Protection Leak Rate

09/04/2021

AR 2021-7760

RCP Motor Upper Thrust Bearing Temp Decreased

Degrees F

09/16/2021

AR 2021-7879

High Unseat Torque on 1-WMO-702

AR 2021-7953

As Found Condition from 2-DR-320 Work

AR 2021-8026

Fault of 12AB Train B Reserve Feed

AR 2021-8040

CRID3 Abnormal Annunciator Received

Corrective Action

Documents

Resulting from

Inspection

AR 2021-7742

  1. 24 Accumulator Level is Lowering 0.5ft<Superscript in

Final>3 Per Day

09/14/2021

Engineering

Evaluations

MD-01-ESW-079-

N

Torque Setup Calculation for 1-WMO-702 and 1-WMO-702

Procedures

2-FPP-4030-

066-022

Inspection of Fire Doors, Frames, and Their Hardware

Protecting Safety-Related Areas

Engineering

Changes

EC-0000058171

2-XJ-113-4 and 2-XJ-113-5 Change Inner Liner

Thickness from 1/8" to 1/4"

71111.18

Work Orders

55504799-01

Lube 1-HV-DGS-2 Motor

08/31/2021

1-OHP-4030-108-

053B

E.C.C.S. Valve Operability Test - Train B

1-OHP-4030-117-

050E

East Residual Heat Removal Train Operability Test

Modes 1-4

Procedures

2-OHP-5030-012-

001

Control Rod Testing in Mode 3

55519395

1-HV-DGS-2, Clean Supply Fan Blades, Hub, Motor and

Housing

08/31/2021

55519395

MTH: 1-HV-DGS-2, Perform PMT

08/31/2021

55521873-01

MTH: 1-HV-DOX-1; Repair 3 Inch Tear in Suction Flex Joint

08/21/2021

55524378

MTH: 1-HV-DGX-2; Perform Clean and Inspect

08/31/2021

55524378-01

MTH: 1-HV-DOX-1; Perform Clean and Inspect

08/31/2021

55534102-02

MTE: 1-IMO-320-ACT, As-Found/As-Left Diagnosis

08/17/2021

55543607-01

1-HV-DGS-FD-2, Clean Fire Damper

08/31/2021

55549787

MTI, 1-IHP-6030-IMP-388

08/17/2021

71111.19

Work Orders

55550884-1

MTE: 1-IMO-320-ACT, Perform Full Actuator PM

08/17/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

55550885-01

MTI, Calibrate Over Current Relays for Breaker 1-T11A4

08/17/2021

55551111-01

1-88X1-DGX-2 Pick Up/Drop Out Testing on HFA Relay

09/01/2021

55551112-01

1-88X1-DGS-2, Pick Up/Drop Out Testing on HFA Relay

09/01/2021

55551120-01

MTH: 1-HV-DG-FLT-2, Perform PM

08/31/2021

55551121-01

1-HV-DDP-CD2, Clean/Inspect and Lubricate

08/31/2021

55551122-01

1-HV-DDP-CD1, Clean/Inspect and Lubricate

08/31/2021

55552856-01

1-IMO-322-ACT/Perform External PM

08/17/2021

55558746-01

MTH: 1-HV-DGS-4, Lubricate Motor/Fan Bearings

08/31/2021

55558765-01

MTE: 1-CMO-429, As Found/As Left Diagnostics

08/17/2021

C10002275009

1-BLSK-12AB-1; Megger/DLRO/Hi-Pot

09/30/2021

WO 5553410303

West RHR Heat Exchanger, 1-HE-17W Discharge Cross-Tie

Shutoff

07/26/2021

WOT: 55551763-

MTM, 1-QR-3581, Replace Air Hoses Per EC-57947

09/02/2021

WOT: 55562107-

MTM, 1-OME-34W, Adjust Packing on Inlet and Outlet

Valves

08/25/2021

PMP-4010-TRP-

001

Reactor Trip Review (Unit 2 right Moisture Separator

Reheater 'B' Crossover Expansion Joint Failure/Steam Leak)

71111.20

Procedures

PMP-4010-TRP-

001

Reactor Trip Review

1-OHP-4030-156-

17T

Turbine Driven Auxiliary Feedwater System Test

2-IHP-213-231R

Nuclear Instrumentation Power Range Channel Operational

Test and Calibration Including Peripherals

2-OHP-4021-050-

001

Turbine Generator Normal Start-up and Operation

Procedures

PMP-2291-WMP-

001

Work Management Process Flowchart

71111.22

Work Orders

55548077-01

2-IHP-4030-213-231R: Perform Channel Calibration for

2-N-41

09/09/2021

September 13, 2021, Training Drill Scenario Manual

71114.06

Miscellaneous

EP-S-21EE

21 Exercise

71124.03

Corrective Action

AR 2019-11268

SCBA Test Data

11/11/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR 2020-0050

Fire Hawk Fit #204 Found Degraded During Shiftly

Inspection

2/30/2019

AR 2020-5005

Airhawk Kits #25, 26, and 27 Need Replacement Parts

06/19/2020

Documents

AR 2020-6220

Degraded Ultra Elite Mask

08/05/2020

MSA Air Hawk SCBA Annual Inspection and Flow Tests for

Units DW223132, DW307027, DW119025, and DW119012.

07/20/2020 -

07/16/2020.

Miscellaneous

Grade D Quarterly Air Analysis Tests (First Quarter 2020

Through First Quarter 2021) for the SCBA Compressor

Located in the Lakeside Administration Building

Various

EPP-2080-ERO-

001

Emergency Response Resource Readiness

Procedures

FPP-2281-RES-

201

Maintenance and Repair of Respiratory Devices

Work Orders

55523038-01

1-HV-AES-1 Engineered Safety Ventilation Surveillance

01/15/2020

AR 2020-0554

Member of the Public Area DLR Missing

01/15/2020

AR 2020-3169

Requirements of 12-THP-6010-RPP-101

04/09/2020

AR 2020-3684

Multi-Pack Dosimetry Exchange

04/30/2020

AR 2020-8045

SRD to DLR Discrepancy

10/20/2020

Corrective Action

Documents

AR 2021-6250

Dosimeter Alarm Received on One of Two SRDs

07/16/2021

AR 2021-6328

Procedure Gap in 12-THP-6010-RPP-104

07/21/2021

Corrective Action

Documents

Resulting from

Inspection

AR 2021-6329

Procedure 12-THP-6010-RPP-104

07/21/2021

Mirion Technologies Technical Basis Document

TLD 760 & Genesis (Badge Type 16)

2.01

Declared Pregnant Worker Dosimetry Records

Various

TLD Data for Monitoring Period of 07/01/2020 through

10/31/2020

07/01/2020 -

10/31/2020

TLD Discrepancy Reports for TLD Monitoring Period

07/01/2020 through 10/31/2020

Various

Miscellaneous

RP-10-03

Comparison of Ambient Radiation Levels in Storage

Location of Control TLDs vs. In-Use TLD Population When

Not Being Worn

71124.04

Procedures

2-THP-6010-

Preparation and Control of Exposure Records and Reports

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

RPP-101

2-THP-6010-

RPP-104

Personnel Dosimetry Use in Varying Radiation Fields

2-THP-6010-

RPP-105

Members of the Public and Controlled Area Monitoring

Program

2-THP-6010-

RPP-121

Dose Monitoring for Declared Pregnant Workers (DPW)

NISP=RP-010

Nuclear Industry Standard Process Radiological Job

Coverage

SW-VSDS-M-

210615-7

Radiological Survey of Radioactive Waste Demineralizer

Room

06/15/2021

71124.08

Radiation

Surveys

SW-VSDS-M-

210621-1

Radiological Survey of the 587' Elevation Drumming Room

06/21/2021

Performance Indicator OR01 Validation Reports for Fourth

Quarter 2020 through Second Quarter 2021

Various

MSPI Derivation Reports - Heat Removal Systems

(07/01/2020 through 06/30/2021) - Unit 1

MSPI Derivation Reports - Heat Removal Systems

(07/01/2020 through 06/30/2021) - Unit 2

MSPI Derivation Reports - Residual Heat Removal Systems

(07/01/2020 through 06/30/2021) - Unit 1

MSPI Derivation Reports - Residual Heat Removal Systems

(07/01/2020 through 06/30/2021) - Unit 2

Miscellaneous

Operational Narrative Logs (07/01/2020 through 06/30/2021)

- Unit 1 & 2

71151

Procedures

PMP-7110-001

Reactor Oversight Program Performance Indicators and

Monthly Operating Report Data

AR 2021-5596

Unit 2 Manual Reactor Trip Due to Leak on Right Moisture

Separator Reheater

06/22/2021

Corrective Action

Documents

AR 2021-5769

Expansion Bellows Line Design Capacity Exceeded

06/28/2021

Engineering

Changes

EC-58171

2-XJ-113-4 and 2-XJ-113-5 - Change Liner Thickness from

1/8 to 1/4"

55563182-07

Replace BR Primary Bellows 2-XJ-113-4 and 2-XJ-113-5

06/27/2021

71152

Work Orders

55563331-06

Replace AL Primary Bellows 2-XJ-113-13 and 2-XJ-113-14

07/01/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

55563352-06

Replace CL Primary Bellows 2-XJ-113-17 and 2-XJ-113-18

07/01/2021

ODMI 1-21-004

Operational Decision Maker (Unit 1 Main Turbine

Condensers & Main Feedwater Pump Turbine Condensers

Experiencing Degraded Vacuum)

ODMI 1-21-005

Operational Decision Maker (Unit 1 Circulating Water Pump

  1. 13 Discharge Valve Failure)

Operability

Evaluations

ODMI 1-21-005

Unit 1 Circulating Water System has Reduced Flow

Following Failure of 1-WMO-13 (Discharge Valve)

71153

Procedures

1-OHP-4021-057-

001

Circulating Water System Operation

55