{{#Wiki_filter:April 27, 2022
{{#Wiki_filter:April 27, 2022  
Mr. David P. Rhoades
Senior Vice President
Constellation Energy Generation, LLC
President and Chief Nuclear Officer (CNO)
Constellation Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 -
INTEGRATED INSPECTION REPORT 05000277/2022001 AND
05000278/2022001
Dear Mr. Rhoades:
On March 31, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection
at Peach Bottom Atomic Power Station, Units 2 and 3.  On April 22, 2022, the NRC inspectors
discussed the results of this inspection with Mr. David Henry, Site Vice President, and other
members of your staff.  The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public
Inspections, Exemptions, Requests for Withholding.
Sincerely,
Jonathan E. Greives, Chief
Projects Branch 4
Division of Operating Reactor Safety
Docket Nos.  05000277 and 05000278
License Nos.  DPR-44 and DPR-56
Enclosure:
As stated 
cc w/ encl:  Distribution via LISTSERV
Jonathan E.
Greives
Digitally signed by Jonathan E.
Greives
Date: 2022.04.27 10:00:29
-04'00'


Mr. David P. Rhoades
Senior Vice President
Constellation Energy Generation, LLC
President and Chief Nuclear Officer (CNO)
Constellation Nuclear
4300 Winfield Road
Warrenville, IL 60555


SUBJECT:                                                        PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 -
ML22117A036
                      INTEGRATED INSPECTION REPORT 05000277/2022001 AND
x
                      05000278/2022001
SUNSI Review
x
Non-Sensitive
Sensitive
x
Publicly Available
Non-Publicly Available
OFFICE RI/DORS
RI/DORS
RI/DORS
NAME
SRutenkroger
LCasey
JGreives
DATE
4/27/22
4/26/22
4/27/22


Dear Mr. Rhoades:
Enclosure
U.S. NUCLEAR REGULATORY COMMISSION
Inspection Report
Docket Numbers: 
05000277 and 05000278
License Numbers: 
DPR-44 and DPR-56
Report Numbers:
05000277/2022001 and 05000278/2022001
Enterprise Identifier: I-2022-001-0050
Licensee:
Constellation Energy Generation, LLC
Facility:
Peach Bottom Atomic Power Station, Units 2 and 3
Location:
Delta, PA 17314
Inspection Dates:
January 1, 2022 to March 31, 2022
Inspectors:
S. Rutenkroger, Senior Resident Inspector
P. Boguszewski, Resident Inspector 
 
Approved By:
Jonathan E. Greives, Chief
Projects Branch 4
Division of Operating Reactor Safety


On March 31, 2022,                        the U.S. Nuclear Regulatory Commission (NRC) completed an inspection
at Peach Bottom Atom ic Power Station, Units 2 and 3.  On April 22, 2022                          , the NRC inspectors
2
discussed the results of this inspection                          with Mr. David Henry, Site Vice President, and other
members of your staff.   The results of this inspection are documented in the enclosed report          .
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees
performance by conducting an integrated inspection at Peach Bottom Atomic Power Station,  
Units 2 and 3, in accordance with the Reactor Oversight ProcessThe Reactor Oversight
Process is the NRCs program for overseeing the safe operation of commercial nuclear power
reactors.  Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.  
List of Findings and Violations
No findings or violations of more than minor significance were identified.  
Additional Tracking Items
None.  


No findings or violations of more than minor significance were identified during this inspection.
3
PLANT STATUS
Unit 2 began the inspection period at rated thermal power (RTP). On March 8, 2022, operators
reduced power to approximately 35 percent RTP in order to enter the drywell to repair a
nitrogen leak on a main steam isolation valve. Following repairs, the unit was returned to RTP
on March 9, 2022. The unit remained at or near RTP for the remainder of the inspection period.
Unit 3 began the inspection period at rated thermal power (RTP). On March 4, 2022, operators
reduced power to approximately 73 percent RTP for a rod pattern adjustment and returned to
RTP the following day. The unit remained at or near RTP for the remainder of the inspection
period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in
effect at the beginning of the inspection unless otherwise noted.  Currently approved IPs with
their attached revision histories are located on the public website at http://www.nrc.gov/reading-
rm/doc-collections/insp-manual/inspection-procedure/index.html.  Samples were declared
complete when the IP requirements most appropriate to the inspection activity were met
consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection
Program - Operations Phase.  The inspectors performed activities described in IMC 2515,
Appendix D, Plant Status, conducted routine reviews using IP 71152, Problem Identification
and Resolution, observed risk significant activities, and completed on-site portions of IPs.  The
inspectors reviewed selected procedures and records, observed activities, and interviewed
personnel to assess licensee performance and compliance with Commission rules and
regulations, license conditions, site procedures, and standards. 
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)
The inspectors evaluated readiness for seasonal extreme weather conditions prior to the
onset of seasonal cold temperatures for the following systems:
(1)
Emergency diesel generators (EDGs), emergency service water (ESW), motor and
diesel driven fire pumps, and the diverse and flexible coping strategies (FLEX)
portable pumps during the week of January 10, 2022
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following
systems/trains:
(1)
Unit 2 'A' and 'C' core spray (CS) during 'B' CS logic system functional testing on
January 12, 2022
(2)
Unit common, 'E-3' EDG during 'E-1' EDG maintenance on January 31 and 
February 1, 2022


This letter, its enclosure, and your response (if any) will be                                                              m ade available for public inspection
and copying at http://www.nrc.gov/reading-                       rm /a dam s.h tm l and                     at the NRC Public Document
4
Room in accordance with Title              10 of the Code of                                                          Federal Regulations  2.390, Public
Inspections, Exemptions, Requests for Withholding.
(3)
Unit 2 'B' CS during 'E-1' EDG maintenance on February 2, 2022
(4)
Unit common, 'E-3' EDG with degraded alarm cable on March 20, 2022
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)  
The inspectors evaluated the implementation of the fire protection program by conducting a
walkdown and performing a review to verify program compliance, equipment functionality,
material condition, and operational readiness of the following fire areas:  
(1)
Unit common, cable spreading and computer rooms, PF-78H, on February 24, 2022
(2)
Unit 2 emergency battery and switchgear rooms, PF-127, on February 24, 2022
(3)
Unit 3 emergency battery and switchgear rooms, PF-117, on February 24, 2022
(4)
Unit 3 'B' CS, PF-13A, on March 28, 2022
(5)
Unit common, hydrogen cylinder storage and radwaste enclosure, PF-150, on 
March 20, 2022
(6)
Unit 2 high-pressure coolant injection pump (HPCI) room, PF-59, on March 29, 2022
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the:
(1)
Unit common, administration building pipe tunnel leak on February 18, 2022
71111.07A - Heat Exchanger/Sink Performance
Annual Review (IP Section 03.01) (1 Sample)
The inspectors evaluated readiness and performance of:
(1)
Unit common, 'E-1' EDG lube oil cooler and air coolant cooler two-year cleaning and
inspection and eddy current testing on January 31 and February 1, 2022
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)
(1 Sample)
(1)
The inspectors observed and evaluated licensed operator performance in the main
control room during quarterly Unit 3 control rod testing on February 20, 2022
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
(1)
The inspectors observed and evaluated licensed operator requalification training in  
the simulator on February 7, 2022


                                                                    Sincerely,
5
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (1 Sample)
The inspectors evaluated the effectiveness of maintenance to ensure the following
structures, systems, and components (SSCs) remain capable of performing their intended
function:
(1)
Unit 2 standby liquid control system on February 18, 2022
Quality Control (IP Section 03.02) (1 Sample)
The inspectors evaluated the effectiveness of maintenance and quality control activities to
ensure the following SSC remains capable of performing its intended function:
(1)
Unit common, 'E-3' EDG cable replacements from March 20, 2022, through 
March 25, 2022
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (8 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the
following planned and emergent work activities to ensure configuration changes and
appropriate work controls were addressed:
(1)
Unit 2 'C' residual heat removal planned maintenance on January 3, 2022
(2)
Unit common, EDG planned cardox system testing on January 5, 2022
(3)
Unit common, 'E-1' EDG planned maintenance on January 31, 2022
(4)
Unit common, 'E-3' EDG ventilation logic test on February 9, 2022
(5)
Unit common, 'E-3' EDG tagged out of service for anticipated maintenance on 
March 7, 2022
(6)
Unit common, 'E-3' EDG unavailability on March 7, 2022
(7)
Unit common, 'E-3' EDG and 'B' ESW pump unavailable for cable replacements on
March 14, 2022
(8)
Unit common, 'E-3' EDG and 'B' ESW risk informed completion time implementation
on March 18, 2022
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (6 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the
following operability determinations and functionality assessments:
(1)
Unit common, 'E-1' EDG air coolant pump backlash readings out of tolerance on
January 31, 2022
(2)
Unit common, 'E-1' EDG stator air gap measurements exceeded allowable tolerance
on February 1, 2022
(3)
Unit common, 'E-3' EDG low tube oil temperature on February 1, 2022


6
(4)
Unit common, 'E-3' EDG trip on high crankcase pressure during slow start
surveillance testing on February 15, 2022
(5)
Unit common, 'E-4' EDG ventilation damper fresh air configuration on 
February 25, 2022
(6)
Unit common, 'E-3' EDG conduit and cable conditions, including water intrusion and
over-tensioning on March 15 through March 19, 2022
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) 
(1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
(1)
Unit common, 'E-3' EDG cable replacement from March 20, 2022, through 
March 25, 2022
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)
The inspectors evaluated the following post-maintenance testing activities to verify system
operability and/or functionality:
(1)
Unit common, 'E-1' EDG replacement of contacts supporting jacket coolant and lube
oil heaters on February 1, 2022
(2)
Unit common, 'E-1' EDG following planned maintenance on February 4 and 
February 5, 2022
(3)
Unit 2 local leak rate testing of personnel hatch following containment entry on
March 9, 2022
(4)
Unit common, 'E-3' EDG control cable replacements following completion of cable
pulls and cable terminations on March 19, 2022
(5)
Unit common, 'E-3' EDG penetration seal replacements on March 14 through 
March 20, 2022
(6)
Unit common, 'E-3' EDG maintenance window final testing following control cable
replacements and crankcase vacuum orifice replacement on March 21, 2022
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance testing activities to verify system operability
and/or functionality:
Surveillance Tests (other) (IP Section 03.01) (1 Sample)
(1)
Unit common, 'E-3' EDG run on February 15, 2022
Inservice Testing (IP Section 03.01) (2 Samples)
(1)
Unit 3 HPCI and unit cooler functional in-service test on March 1, 2022
(2)
Unit common, E-4 EDG slow start full load and in-service test on February 25, 2022


7
RCS Leakage Detection Testing (IP Section 03.01) (1 Sample)
(1)
Unit 3 monitored for increased drywell unidentified leakage as of January 31, 2022
71114.06 - Drill Evaluation
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) 
(1 Sample)
(1)
The inspectors observed a full scope emergency preparedness drill conducted on
February 14, 2022
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01) (2 Samples)
(1)
Unit 2 for the period January 1, 2021, to December 31, 2021
(2)
Unit 3 for the period January 1, 2021, to December 31, 2021
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02)
(2 Samples)
(1)
Unit 2 for the period January 1, 2021, to December 31, 2021
(2)
Unit 3 for the period January 1, 2021, to December 31, 2021
IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (2 Samples)
(1)
Unit 2 for the period January 1, 2021, to December 31, 2021
(2)
Unit 3 for the period January 1, 2021, to December 31, 2021
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
*
On April 22, 2022, the inspectors presented the integrated inspection results to 
Mr. David Henry, Site Vice President, and other members of the licensee staff.


                                                                    Jonathan E. Greives, Chief
                                                                    Projects Branch 4
8
                                                                    Division of Operating Reactor Safety
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.01
Corrective Action
Documents
4471280
4401855
Procedures
AO 29.2
 
Discharge Canal to Intake Pond Cross-Tie Gate Operation,
Frazil Ice Mitigation, and Icing Condition Operations
Revision 34
CC-PB-118
 
Peach Bottom Implementation of Diverse and Flexible
Coping Strategies (FLEX) and Spent Fuel Pool
Instrumentation Program
Revision 14
FSG-003
Pre-Staging FLEX Equipment
Revision 2
71111.04
Corrective Action
Documents
4442542
4445073
4464924
4468814
71111.05
Miscellaneous
Barrier Breach
Permit No. 22-
029
Barrier Breach
Permit No. 22-
053
FSI #00015076
FSI #00015285
Procedures
PF-117
Unit 3 Turbine Building, Emergency Battery Switchgear
Rooms, Elevation 135'-0"
Revision 11
PF-127
Unit 2 Turbine Building, Emergency Battery Switchgear
Rooms, Elevation 135'-0"
Revision 11
PF-150
Hydrogen Cylinder Storage & Radwaste Enclosure
Revision 7
PF-78H
Turbine Building Common, Cable Spreading and Computer
Rooms, Elevation 150'-0"
Revision 9
71111.07A Miscellaneous
0AE377
Lube Oil Cooler Final Report 
02/2022
0AE378
Air Coolant Cooler Final Report
02/2022
71111.12
Corrective Action
Documents
AR 4485805
Corrective Action
AR 4486635


Docket Nos05000277 and 05000278
License Nos.                           DPR-                           44 and DPR-56
9
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Documents
Resulting from
Inspection
4486620
Miscellaneous
Engineering
Change Request
635851
71111.13
Corrective Action
Documents
4486302
AR 04477072
Corrective Action
Documents
Resulting from
Inspection
4475037
4475047
Miscellaneous
RICT Record,
WW-2211
'E-3' EDG and 'B' ESW RICT for 'E-3' EDG Cable
Replacement
   
Procedures
ER-AA-600-1052
Risk Management Support of RICT
Revision 001
OP-AA-108-118
Risk Informed Completion Time
Revision 2
WC-AA-101
On-Line Work Control Process
Revision 32
WC-AA-101-1006
On-Line Risk Management and Assessment
Revision 4
71111.15
Corrective Action
Documents
IR 4474937
IR 4475171
IR 4475245
IR 4478230
IR 4480707
IR 4484847
4486620
4486635
Miscellaneous
Technical
Evaluation
636000
Procedures
M-052-001
Diesel Generator Maintenance
Revision 11
SO52A.8.A
Diesel Generator Daily Shutdown Inspection
Revision 66
Work Orders
05067200
71111.19
Corrective Action
Documents
4475362
IR 4486620


Enclosure:
As stated
10
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
IRs
4475899
4476115
4476116
4475914
4476053
Operability
Evaluations
RT-O-052-251-2
E-1 Diesel Generator Inspection Post-Maintenance
Functional Test
Revision
38A
Procedures
M-056-001
480 Volt Motor Control Center Circuit Breaker Assembly and
Cubicle Terminal Maintenance
Revision 36
ST-I-052-251-2
 
E-1 Diesel Generator Inspection Post-Maintenance
Instrumentation and Logic Test
Revision 9
ST-O-052-411-2
E-1 Diesel Generator Fast Start and Full Load
Revision 24
Work Orders
05227164
05228431
05228481
05228708
4688253
5019993
5019994
5057721
5176138
71111.22
Corrective Action
Documents
04478230
IR 4481499
Procedures
ST-O-023-300-3
HPCI Pump, Valve, and Flow and Unit Cooler Functional and
In-Service Test Without Vibration Data Collection
Revision 21
ST-O-052-314-2
 
'E-4' Diesel Generator Slow Start Full Load and IST Test
 
Revision 23
Work Orders
05205860
05228030
WR 01511354
WO 04250947
71114.06
Corrective Action
Documents
IRs 4478221
4478227


cc w/ encl: Distribution via LISTSERV
   
 
11
                          ML22117A036
   
      x                                                SUNSI Review        x            Non-Sensitive                                                                          x            Publ Available
Inspection  
 
Procedure
                                                                                        Sensite                                                                                            n              -Publ Avaible
Type
 
Designation
 
Description or Title  
                                                                                                                                                                             
Revision or  
 
Date  
 
4479208
 
   
 
Corrective Action  
 
Documents
 
Resulting from  
    OFFICE                  RI/DORS                                                                                                              RI/DORS                                                                                                                          RI/DORS
Inspection  
    ME                                            SRenkroger                                                                                                                                                                                                                                        JGrv
IR 4479134
    TE                        /                                    /                                              /
 
 
                                                                                           
                                                                                          U.S. NUCLEAR REGULATORY COMMISSION
                                                                                                                                            Inspection Report
 
 
Docket Numbers:                                                                                    05000277 and 05000278
 
 
License Numbers:                                                DPR-                            44 and DPR -56
 
 
Report Numbers:                                                                      05000277/2022001 and 05000278/2022001
 
 
Enterprise Identifier:                        I-2022-                                            001-0050
 
 
Licensee:                                                                                                                                                                                                                Constellation Energy Generation, LLC
 
 
Facility:                                                                                                                                                                                                                                                Peach Bottom Atomic Power Station, Units 2 and 3
 
 
Location:                                                                                                                                                                                                                      Delta, PA 17314
 
 
Inspection Dates:                                                                              January 1, 2022  to March 31, 2022
 
 
Inspectors:                                                                                                                                                                                    S. Rutenkroger, Senior Resident Inspector
                                                                                                                                                                                                                                                                                                                                                                              P. Boguszewski, Resident Inspector
 
 
Approved By:                                                                                                                                          Jonathan E. Greives, Chief
                                                                                Projects Branch 4
                                                                                Division of Operating Reactor Safety
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                                                                                                                                                                                                                                                            Enclosure
                                                                            SUMMARY
 
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licens        ees
performance by conducting an                              integrated inspection at Peach Bottom Atomic Power Station,
Units 2 and 3,                        in accordance with the Reactor Oversight Process.  The Reactor Oversight
Process is the NRCs program for overseeing the safe operation of commercial nuclear power
reactors.  Refer to https://www.nrc.gov/reactors/operating/oversight.html                for more information.
 
                                                          List of Findings and Violations
 
No findings or violations of more than minor significance      were identified.
 
                                                              Additional Tracking Items
 
None.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                                                      2
PLANT STATUS
 
Unit 2 began the inspection period at rated thermal power (RTP). On March 8, 2022, operators
reduced power to approximately 35 percent RTP in order to enter the drywell to repair a
nitrogen leak on a main steam isolation valve. Following repairs, the unit was returned to RTP
on March 9, 2022. The unit remained at or near RTP for the remainder of the inspection period.
 
Unit 3 began the inspection period at rated thermal power (RTP). On March 4, 2022, operators
reduced power to approximately 73 percent        RTP for a rod pattern adjustment and returned to
RTP the following day. The unit remained at or near RTP for the remainder of the inspection
period.
 
INSPECTION SCOPES
 
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)              in
effect at the beginning of the inspection unless otherwise noted.  Currently approved IPs with
their attached revision histories are located on the public website at          http://www.nrc.gov/reading -
rm /doc-collections/insp-manual/inspection-                                            procedure/index.html .  Samples were declared
complete when the IP requirements most appropriate to the inspection activity were met
consistent with Inspection Manual Chapter (IMC) 2515, Light    -Water Reactor Inspection
Program - Operations Phase.      The inspectors performed activities described in IMC 2515,
Appendix D, Plant Status, conducted routine reviews using IP 71152, Problem Identification
and Resolution ,  observed risk significant activities, and completed on-                                                                                                  site portions of IPs.    The
inspectors reviewed selected procedures and records, observed activities, and interviewed
personnel to assess licensee performance and compliance with Commission rules and
regulat ions, license conditions, site procedures, and standards      .
 
REACTOR SAFETY
 
71111.01  - Adverse Weather Protection
 
Seasonal Extreme Weather Sample (IP Section 03.01)      (1 Sample)
 
  The inspectors evaluated readiness for seasonal extreme weather conditions prior to the
  onset of seasonal cold temperatures for the following systems:
 
  (1)    Emergency diesel generators (EDGs), emergency service water (ESW), motor and
          diesel driven fire pumps, and the diverse and flexible coping strategies (FLEX)
          portable pumps during the week of January 10, 2022
 
71111.04  - Equipm ent Alignment
 
Partial Walkdown Sample (IP Section 03.01)    (4 Samples)
 
  The inspectors evaluated system configurations during partial walkdowns of the following
  systems/trains:
 
  (1)    Unit 2 'A' and 'C' core spray (CS) during 'B' CS logic system functional testing on
          January 12, 2022
  (2)    Unit common, 'E-3' EDG during 'E-1' EDG maintenance on January 31 and
          February 1, 2022
 
                                                  3
    (3)    Unit 2 'B' CS during 'E-1' EDG maintenance on February 2, 2022
    (4)    Unit common, 'E-3' EDG with degraded alarm cable on March 20, 2022
 
71111.05  - Fire Protection
 
Fire Area Walkdown and Inspection Sample (IP Section 03.01)        (6 Sam ples)
 
    The inspectors evaluated the implementation of the fire protection program by conducting a
    walkdown and performing a review to verify program compliance, equipment functionality,
    material condition, and operational readiness of the following fire areas:
 
    (1)    Unit common, cable spreading and computer rooms, PF                  -78H, on February 24, 2022
    (2)    Unit 2 emergency battery and switchgear rooms, PF              -127, on February 24, 2022
    (3)    Unit 3 emergency battery and switchgear rooms, PF              -117, on February 24, 2022
    (4)    Unit 3 'B' CS, PF-13A, on March 28, 2022
    (5)    Unit common, hydrogen cylinder storage and radwaste enclosure, PF                    -150, on
            March 20, 2022
    (6)    Unit 2 high-pressure coolant injection pump (HPCI) room, PF                -59, on March 29, 2022
 
71111.06  - Flood Protection Measures
 
Inspection Activities - Internal Flooding (IP Section 03.01)    (1 Sample)
 
    The inspectors evaluated internal flooding mitigation protections in the:
 
    (1)    Unit common, administration building pipe tunnel leak on February 18, 2022
 
71111.07A  - Heat Exchanger/Sink Performance
 
Annual Review (IP Section 03.01)  (1 Sample)
 
    The inspectors evaluated readiness and performance of:
 
    (1)    Unit common, 'E-1' EDG lube oil cooler and air coolant cooler two                -year cleaning and
            inspection and eddy current testing on January 31 and February 1,                  2022
 
71111.11Q  - Licensed Operator Requalification Program and Licensed Operator Performance
 
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)
(1 Sample)
 
    (1)    The inspectors observed and evaluated licensed              operator performance in the main
            control room during quarterly Unit 3 control rod testing on February 20, 2022
 
Licensed Operator Requalification Training/Examinations (IP Section 03.02)          (1 Sample)
 
    (1)    The inspectors observed and evaluated            licensed operator requalification training in
            the simulator on February 7, 2022
 
 
 
 
                                                          4
 
71111.12  - Maintenance Effectiveness
 
Maintenance Effectiveness (IP Section 03.01)      (1 Sample)
 
  The inspectors evaluated the effectiveness of maintenance to ensure the following
  structures, systems, and components (SSCs) remain capable of performing their intended
  function:
 
  (1)    Unit 2 standby liquid control system  on February 18, 2022
 
Quality Control (IP Section 03.02)    (1 Sample)
 
  The inspectors evaluated the effectiveness of maintenance and quality control activities to
  ensure the following SSC remains capable of performing its intended function:
 
  (1)    Unit common, 'E-3' EDG cable replacements from March 20, 2022, through
          March 25, 2022
 
71111.13  - Maintenance Risk Assessments and Emergent Work Control
 
Risk Assessment and Management Sample (IP Section 03.01)      (8 Sam ples)
 
  The inspectors evaluated the accuracy and completeness of risk assessments for the
  following planned and emergent work activities to ensure configuration changes and
  appropriate work controls were addressed:
 
  (1)    Unit 2 'C' residual heat removal planned maintenance on January 3, 2022
  (2)    Unit common, EDG planned cardox system testing on January 5, 2022
  (3)    Unit common, 'E-1' EDG planned maintenance on January 31, 2022
  (4)    Unit common, 'E-3' EDG ventilation logic test on February 9, 2022
  (5)    Unit common, 'E-3' EDG tagged out of service for anticipated maintenance on
          March 7, 2022
  (6)    Unit common, 'E-3' EDG unavailability on March 7, 2022
  (7)    Unit common, 'E-3' EDG and 'B' ESW pump unavailable for cable replacements on
          March 14, 2022
  (8)    Unit common, 'E-3' EDG and 'B' ESW risk informed completion time implementation
          on March 18, 2022
 
71111.15  - Operability Determinations and Functionality Assessments
 
Operability Determination or Functionality Assessment (IP Section 03.01)        (6 Samples)
 
  The inspectors evaluated the licensee's justifications and actions associated with the
  following operability determinations and functionality assessments:
 
  (1)    Unit common, 'E-1' EDG air coolant pump backlash readings out of tolerance on
          January 31, 2022
  (2)    Unit common, 'E-1' EDG stator air gap measurements exceeded allowable tolerance
          on February 1, 2022
  (3)    Unit common, 'E-3' EDG low tube oil temperature on February 1, 2022
 
 
                                              5
  (4)    Unit common, 'E-3' EDG trip on high crankcase pressure during slow    start
          surveillance testing on February 15, 2022
  (5)    Unit common, 'E-4' EDG ventilation damper fresh air configuration on
          February 25, 2022
  (6)    Unit common, 'E-3' EDG conduit and cable conditions, including water intrusion and
          over-tensioning on March 15 through March 19, 2022
 
71111.18  - Plant Modifications
 
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)
(1 Sample)
 
  The inspectors evaluated the following temporary or permanent modifications:
 
  (1)    Unit common, 'E-3' EDG cable replacement from March 20, 2022      , through
          March 25, 2022
 
71111.19  - Post-Maintenance Testing
 
Post-Maintenance Test Sample (IP Section 03.01)    (6 Sam ples)
 
  The inspectors evaluated the following post      -maintenance testing  activities to verify system
  operability and/or functionality:
 
  (1)    Unit common, 'E-1' EDG replacement of contacts supporting jacket coolant and lube
          oil heaters on February 1, 2022
  (2)    Unit common, 'E-1' EDG following planned maintenance on February 4 and
          February 5, 2022
  (3)    Unit 2 local leak rate testing of personnel hatch following containment entry on
          March 9, 2022
  (4)    Unit common, 'E-3' EDG control cable replacements following completion of cable
          pulls and cable terminations on March 19, 2022
  (5)    Unit common, 'E-3' EDG penetration seal replacements on March 14 through
          March 20, 2022
  (6)    Unit common, 'E-3' EDG maintenance window final testing following control cable
          replacements and crankcase vacuum orifice replacement on March 21, 2022
 
71111.22  - Surveillance Testing
 
The inspectors evaluated the following surveillance testing activities to verify system operability
and/or functionality:
 
Surveillance Tests (other) (IP Section 03.01)      (1 Sample)
 
  (1)    Unit common, 'E-3' EDG run on February 15, 2022
 
Inservice Testing (IP Section 03.01)    (2 Sam ples)
 
  (1)    Unit 3 HPCI and unit cooler functional in-service test on March 1, 2022
  (2)    Unit common, E-4 EDG slow start full load and in-service test on February 25, 2022
 
 
                                                6
 
RCS Leakage Detection Testing (IP Section 03.01)      (1 Sample)
 
    (1)    Unit 3 monitored for increased drywell unidentified leakage as of January 31, 2022
 
71114.06  - Drill Evaluation
 
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)
(1 Sample)
 
    (1)    The inspectors observed a full scope emergency preparedness drill conducted on
          February 14, 2022
 
OTHER ACTIVITIES  -            BASELINE
 
71151  - Performance Indicator Verification
 
The inspectors verified licensee performance indicators submittals listed below:
 
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)          (2 Sam ples)
 
    (1)    Unit 2 for the period January 1, 2021, to December 31, 2021
    (2)    Unit 3 for the period January 1, 2021, to December 31, 2021
 
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02)
(2 Samples)
 
    (1)    Unit 2 for the period January 1, 2021, to December 31, 2021
    (2)    Unit 3 for the period January 1, 2021, to December 31, 2021
 
IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (2                          Samples)
 
    (1)    Unit 2 for the period January 1, 2021, to December 31, 2021
    (2)    Unit 3 for the period January 1, 2021, to December 31, 2021
 
INSPECTION RESULTS
 
No findings were identified.
 
EXIT MEETINGS AND DEBRIEFS
 
The inspectors verified no proprietary information was retained or documented in this report.
 
    *                                    On April 22, 2022, the inspector s presented the                        integrated inspection  results to
        Mr. David Henry, Site Vice President, and other members of the licensee staff.
 
 
 
 
 
 
 
 
 
                                                    7
DOCUMENTS REVIEWED
 
Inspection  Type              Designation        Description or Title                                       Revision or
Procedure                                                                                                      Date
71111.01    Corrective Action  4471280
            Docum ents          4401855
            Procedures        AO 29.2            Discharge Canal to Intake Pond Cross-Tie Gate Operation,    Revision 34
                                                    Frazil Ice Mitigation, and Icing Condition Operations
                                CC-PB-118          Peach Bottom Implementation of Diverse and Flexible        Revision 14
                                                    Coping Strategies (FLEX) and Spent Fuel Pool
                                                    Instrumentation Program
                                FSG-003              Pre-Staging FLEX Equipment                                  Revision 2
71111.04    Corrective Action  4442542
            Docum ents        4445073
                                4464924
                                4468814
71111.05    Miscellaneous      Barrier Breach
                                Perm it No. 22-
                                029
                                Barrier Breach
                                Perm it No. 22-
                                053
                                FSI #00015076
                                FSI #00015285
            Procedures        PF-117              Unit 3 Turbine Building, Emergency Battery Switchgear      Revision 11
                                                    Rooms, Elevation 135'-0"
                                PF-127              Unit 2 Turbine Building, Emergency Battery Switchgear      Revision 11
                                                    Rooms, Elevation 135'-0"
                                PF-150              Hydrogen Cylinder Storage & Radwaste Enclosure              Revision 7
                                PF-78H              Turbine Building Common, Cable Spreading and Computer      Revision 9
                                                    Rooms, Elevation 150'-0"
71111.07A  Miscellaneous      0AE377              Lube Oil Cooler Final Report                                02/2022
                                0AE378              Air Coolant Cooler Final Report                            02/2022
71111.12    Corrective Action  AR 4485805
            Docum ents
            Corrective Action  AR 4486635
 
                                                              8
Inspection  Type              Designation        Description or Title                                      Revision or
Procedure                                                                                                    Date
            Docum ents        4486620
            Resulting from
            Inspection
            Miscellaneous      Engineering
                              Change  Request
                              635851
71111.13    Corrective Action 4486302
            Docum ents        AR 04477072
            Corrective Action 4475037
            Docum ents        4475047
            Resulting from
            Inspection
            Miscellaneous      RICT Record,      'E-3' EDG and 'B' ESW RICT for 'E-3' EDG Cable
                              WW-2211            Replacement
            Procedures        ER-AA-600-1052    Risk Management Support of RICT                            Revision 001
                              OP-AA-108-118      Risk Informed Completion Time                              Revision 2
                              WC-AA-101          On-Line Work Control Process                              Revision 32
                              WC-AA-101-1006      On-Line Risk Management and Assessment                    Revision 4
71111.15    Corrective Action  IR 4474937
            Docum ents        IR 4475171
                              IR 4475245
                              IR 4478230
                              IR 4480707
                              IR 4484847
                              4486620
                                4486635
            Miscellaneous      Technical
                              Evaluation
                              636000
            Procedures        M-052-001          Diesel Generator Maintenance                              Revision 11
                              SO52A.8.A          Diesel Generator Daily Shutdown Inspection                Revision 66
            Work Orders        05067200
71111.19    Corrective Action  4475362
            Docum ents        IR 4486620
 
                                                            9
 
Inspection  Type              Designation        Description or Title                                      Revision or
Procedure                                                                                                      Date
                              IRs
                              4475899
                              4476115
                              4476116
                              4475914
                                4476053
            Operability        RT-O-052-251-2      E-1 Diesel Generator Inspection Post-Maintenance        Revision
            Evaluations                            Functional Test                                            38A
            Procedures        M-056-001          480 Volt Motor Control Center Circuit Breaker Assembly and Revision 36
                                                  Cubicle Terminal Maintenance
                              ST-I-052-251-2      E-1 Diesel Generator Inspection Post-Maintenance        Revision 9
                                                  Instrumentation and Logic Test
                              ST-O-052-411-2      E-1 Diesel Generator Fast Start and Full Load            Revision 24
            Work Orders        05227164
                              05228431
                              05228481
                              05228708
                              4688253
                              5019993
                              5019994
                              5057721
                                5176138
71111.22    Corrective Action  04478230
            Docum ents        IR 4481499
            Procedures        ST-O-023-300-3      HPCI Pump, Valve, and Flow and Unit Cooler Functional and  Revision 21
                                                  In-Service Test Without Vibration Data Collection
                              ST-O-052-314-2      'E-4' Diesel Generator Slow Start Full Load and IST Test  Revision 23
 
            Work Orders        05205860
                                05228030
                              WR 01511354
                              WO 04250947
71114.06    Corrective Action  IRs 4478221
            Docum ents        4478227
 
                                                            10
 
Inspection Type                Designation        Description or Title                                          Revision or
Procedure                                                                                                          Date
                                  4479208
            Corrective Action    IR 4479134
            Docum ents
            Resulting from
            Inspection
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                              11
}}
}}

Latest revision as of 17:20, 27 November 2024

Integrated Inspection Report 05000277/2022001 and 05000278/2022001
ML22117A036
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/27/2022
From: Jon Greives
Division of Operating Reactors
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
Greives J
References
IR 2022001
Download: ML22117A036 (13)


See also: IR 05000277/2022001

Text

April 27, 2022

Mr. David P. Rhoades

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Officer (CNO)

Constellation Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 -

INTEGRATED INSPECTION REPORT 05000277/2022001 AND

05000278/2022001

Dear Mr. Rhoades:

On March 31, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection

at Peach Bottom Atomic Power Station, Units 2 and 3. On April 22, 2022, the NRC inspectors

discussed the results of this inspection with Mr. David Henry, Site Vice President, and other

members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public

Inspections, Exemptions, Requests for Withholding.

Sincerely,

Jonathan E. Greives, Chief

Projects Branch 4

Division of Operating Reactor Safety

Docket Nos. 05000277 and 05000278

License Nos. DPR-44 and DPR-56

Enclosure:

As stated

cc w/ encl: Distribution via LISTSERV

Jonathan E.

Greives

Digitally signed by Jonathan E.

Greives

Date: 2022.04.27 10:00:29

-04'00'

ML22117A036

x

SUNSI Review

x

Non-Sensitive

Sensitive

x

Publicly Available

Non-Publicly Available

OFFICE RI/DORS

RI/DORS

RI/DORS

NAME

SRutenkroger

LCasey

JGreives

DATE

4/27/22

4/26/22

4/27/22

Enclosure

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Numbers:

05000277 and 05000278

License Numbers:

DPR-44 and DPR-56

Report Numbers:

05000277/2022001 and 05000278/2022001

Enterprise Identifier: I-2022-001-0050

Licensee:

Constellation Energy Generation, LLC

Facility:

Peach Bottom Atomic Power Station, Units 2 and 3

Location:

Delta, PA 17314

Inspection Dates:

January 1, 2022 to March 31, 2022

Inspectors:

S. Rutenkroger, Senior Resident Inspector

P. Boguszewski, Resident Inspector

Approved By:

Jonathan E. Greives, Chief

Projects Branch 4

Division of Operating Reactor Safety

2

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting an integrated inspection at Peach Bottom Atomic Power Station,

Units 2 and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight

Process is the NRCs program for overseeing the safe operation of commercial nuclear power

reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

3

PLANT STATUS

Unit 2 began the inspection period at rated thermal power (RTP). On March 8, 2022, operators

reduced power to approximately 35 percent RTP in order to enter the drywell to repair a

nitrogen leak on a main steam isolation valve. Following repairs, the unit was returned to RTP

on March 9, 2022. The unit remained at or near RTP for the remainder of the inspection period.

Unit 3 began the inspection period at rated thermal power (RTP). On March 4, 2022, operators

reduced power to approximately 73 percent RTP for a rod pattern adjustment and returned to

RTP the following day. The unit remained at or near RTP for the remainder of the inspection

period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection

Program - Operations Phase. The inspectors performed activities described in IMC 2515,

Appendix D, Plant Status, conducted routine reviews using IP 71152, Problem Identification

and Resolution, observed risk significant activities, and completed on-site portions of IPs. The

inspectors reviewed selected procedures and records, observed activities, and interviewed

personnel to assess licensee performance and compliance with Commission rules and

regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness for seasonal extreme weather conditions prior to the

onset of seasonal cold temperatures for the following systems:

(1)

Emergency diesel generators (EDGs), emergency service water (ESW), motor and

diesel driven fire pumps, and the diverse and flexible coping strategies (FLEX)

portable pumps during the week of January 10, 2022

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following

systems/trains:

(1)

Unit 2 'A' and 'C' core spray (CS) during 'B' CS logic system functional testing on

January 12, 2022

(2)

Unit common, 'E-3' EDG during 'E-1' EDG maintenance on January 31 and

February 1, 2022

4

(3)

Unit 2 'B' CS during 'E-1' EDG maintenance on February 2, 2022

(4)

Unit common, 'E-3' EDG with degraded alarm cable on March 20, 2022

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a

walkdown and performing a review to verify program compliance, equipment functionality,

material condition, and operational readiness of the following fire areas:

(1)

Unit common, cable spreading and computer rooms, PF-78H, on February 24, 2022

(2)

Unit 2 emergency battery and switchgear rooms, PF-127, on February 24, 2022

(3)

Unit 3 emergency battery and switchgear rooms, PF-117, on February 24, 2022

(4)

Unit 3 'B' CS, PF-13A, on March 28, 2022

(5)

Unit common, hydrogen cylinder storage and radwaste enclosure, PF-150, on

March 20, 2022

(6)

Unit 2 high-pressure coolant injection pump (HPCI) room, PF-59, on March 29, 2022

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1)

Unit common, administration building pipe tunnel leak on February 18, 2022

71111.07A - Heat Exchanger/Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1)

Unit common, 'E-1' EDG lube oil cooler and air coolant cooler two-year cleaning and

inspection and eddy current testing on January 31 and February 1, 2022

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)

(1 Sample)

(1)

The inspectors observed and evaluated licensed operator performance in the main

control room during quarterly Unit 3 control rod testing on February 20, 2022

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1)

The inspectors observed and evaluated licensed operator requalification training in

the simulator on February 7, 2022

5

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following

structures, systems, and components (SSCs) remain capable of performing their intended

function:

(1)

Unit 2 standby liquid control system on February 18, 2022

Quality Control (IP Section 03.02) (1 Sample)

The inspectors evaluated the effectiveness of maintenance and quality control activities to

ensure the following SSC remains capable of performing its intended function:

(1)

Unit common, 'E-3' EDG cable replacements from March 20, 2022, through

March 25, 2022

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (8 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the

following planned and emergent work activities to ensure configuration changes and

appropriate work controls were addressed:

(1)

Unit 2 'C' residual heat removal planned maintenance on January 3, 2022

(2)

Unit common, EDG planned cardox system testing on January 5, 2022

(3)

Unit common, 'E-1' EDG planned maintenance on January 31, 2022

(4)

Unit common, 'E-3' EDG ventilation logic test on February 9, 2022

(5)

Unit common, 'E-3' EDG tagged out of service for anticipated maintenance on

March 7, 2022

(6)

Unit common, 'E-3' EDG unavailability on March 7, 2022

(7)

Unit common, 'E-3' EDG and 'B' ESW pump unavailable for cable replacements on

March 14, 2022

(8)

Unit common, 'E-3' EDG and 'B' ESW risk informed completion time implementation

on March 18, 2022

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (6 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the

following operability determinations and functionality assessments:

(1)

Unit common, 'E-1' EDG air coolant pump backlash readings out of tolerance on

January 31, 2022

(2)

Unit common, 'E-1' EDG stator air gap measurements exceeded allowable tolerance

on February 1, 2022

(3)

Unit common, 'E-3' EDG low tube oil temperature on February 1, 2022

6

(4)

Unit common, 'E-3' EDG trip on high crankcase pressure during slow start

surveillance testing on February 15, 2022

(5)

Unit common, 'E-4' EDG ventilation damper fresh air configuration on

February 25, 2022

(6)

Unit common, 'E-3' EDG conduit and cable conditions, including water intrusion and

over-tensioning on March 15 through March 19, 2022

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)

(1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1)

Unit common, 'E-3' EDG cable replacement from March 20, 2022, through

March 25, 2022

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the following post-maintenance testing activities to verify system

operability and/or functionality:

(1)

Unit common, 'E-1' EDG replacement of contacts supporting jacket coolant and lube

oil heaters on February 1, 2022

(2)

Unit common, 'E-1' EDG following planned maintenance on February 4 and

February 5, 2022

(3)

Unit 2 local leak rate testing of personnel hatch following containment entry on

March 9, 2022

(4)

Unit common, 'E-3' EDG control cable replacements following completion of cable

pulls and cable terminations on March 19, 2022

(5)

Unit common, 'E-3' EDG penetration seal replacements on March 14 through

March 20, 2022

(6)

Unit common, 'E-3' EDG maintenance window final testing following control cable

replacements and crankcase vacuum orifice replacement on March 21, 2022

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance testing activities to verify system operability

and/or functionality:

Surveillance Tests (other) (IP Section 03.01) (1 Sample)

(1)

Unit common, 'E-3' EDG run on February 15, 2022

Inservice Testing (IP Section 03.01) (2 Samples)

(1)

Unit 3 HPCI and unit cooler functional in-service test on March 1, 2022

(2)

Unit common, E-4 EDG slow start full load and in-service test on February 25, 2022

7

RCS Leakage Detection Testing (IP Section 03.01) (1 Sample)

(1)

Unit 3 monitored for increased drywell unidentified leakage as of January 31, 2022

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)

(1 Sample)

(1)

The inspectors observed a full scope emergency preparedness drill conducted on

February 14, 2022

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01) (2 Samples)

(1)

Unit 2 for the period January 1, 2021, to December 31, 2021

(2)

Unit 3 for the period January 1, 2021, to December 31, 2021

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02)

(2 Samples)

(1)

Unit 2 for the period January 1, 2021, to December 31, 2021

(2)

Unit 3 for the period January 1, 2021, to December 31, 2021

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (2 Samples)

(1)

Unit 2 for the period January 1, 2021, to December 31, 2021

(2)

Unit 3 for the period January 1, 2021, to December 31, 2021

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On April 22, 2022, the inspectors presented the integrated inspection results to

Mr. David Henry, Site Vice President, and other members of the licensee staff.

8

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Corrective Action

Documents

4471280

4401855

Procedures

AO 29.2

Discharge Canal to Intake Pond Cross-Tie Gate Operation,

Frazil Ice Mitigation, and Icing Condition Operations

Revision 34

CC-PB-118

Peach Bottom Implementation of Diverse and Flexible

Coping Strategies (FLEX) and Spent Fuel Pool

Instrumentation Program

Revision 14

FSG-003

Pre-Staging FLEX Equipment

Revision 2

71111.04

Corrective Action

Documents

4442542

4445073

4464924

4468814

71111.05

Miscellaneous

Barrier Breach

Permit No. 22-

029

Barrier Breach

Permit No. 22-

053

FSI #00015076

FSI #00015285

Procedures

PF-117

Unit 3 Turbine Building, Emergency Battery Switchgear

Rooms, Elevation 135'-0"

Revision 11

PF-127

Unit 2 Turbine Building, Emergency Battery Switchgear

Rooms, Elevation 135'-0"

Revision 11

PF-150

Hydrogen Cylinder Storage & Radwaste Enclosure

Revision 7

PF-78H

Turbine Building Common, Cable Spreading and Computer

Rooms, Elevation 150'-0"

Revision 9

71111.07A Miscellaneous

0AE377

Lube Oil Cooler Final Report

02/2022

0AE378

Air Coolant Cooler Final Report

02/2022

71111.12

Corrective Action

Documents

AR 4485805

Corrective Action

AR 4486635

9

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

Resulting from

Inspection

4486620

Miscellaneous

Engineering

Change Request

635851

71111.13

Corrective Action

Documents

4486302

AR 04477072

Corrective Action

Documents

Resulting from

Inspection

4475037

4475047

Miscellaneous

RICT Record,

WW-2211

'E-3' EDG and 'B' ESW RICT for 'E-3' EDG Cable

Replacement

Procedures

ER-AA-600-1052

Risk Management Support of RICT

Revision 001

OP-AA-108-118

Risk Informed Completion Time

Revision 2

WC-AA-101

On-Line Work Control Process

Revision 32

WC-AA-101-1006

On-Line Risk Management and Assessment

Revision 4

71111.15

Corrective Action

Documents

IR 4474937

IR 4475171

IR 4475245

IR 4478230

IR 4480707

IR 4484847

4486620

4486635

Miscellaneous

Technical

Evaluation

636000

Procedures

M-052-001

Diesel Generator Maintenance

Revision 11

SO52A.8.A

Diesel Generator Daily Shutdown Inspection

Revision 66

Work Orders

05067200

71111.19

Corrective Action

Documents

4475362

IR 4486620

10

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

IRs

4475899

4476115

4476116

4475914

4476053

Operability

Evaluations

RT-O-052-251-2

E-1 Diesel Generator Inspection Post-Maintenance

Functional Test

Revision

38A

Procedures

M-056-001

480 Volt Motor Control Center Circuit Breaker Assembly and

Cubicle Terminal Maintenance

Revision 36

ST-I-052-251-2

E-1 Diesel Generator Inspection Post-Maintenance

Instrumentation and Logic Test

Revision 9

ST-O-052-411-2

E-1 Diesel Generator Fast Start and Full Load

Revision 24

Work Orders

05227164

05228431

05228481

05228708

4688253

5019993

5019994

5057721

5176138

71111.22

Corrective Action

Documents

04478230

IR 4481499

Procedures

ST-O-023-300-3

HPCI Pump, Valve, and Flow and Unit Cooler Functional and

In-Service Test Without Vibration Data Collection

Revision 21

ST-O-052-314-2

'E-4' Diesel Generator Slow Start Full Load and IST Test

Revision 23

Work Orders

05205860

05228030

WR 01511354

WO 04250947

71114.06

Corrective Action

Documents

IRs 4478221

4478227

11

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

4479208

Corrective Action

Documents

Resulting from

Inspection

IR 4479134