IR 05000325/2012009: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000324/2012009]]
| number = ML12275A158
| issue date = 10/01/2012
| title = IR 05000325-12-009 & 05000324-12-009, 09/27/2012, Brunswick, Units 1 & 2, Assessment Follow-Up Letter
| author name = Musser R A
| author affiliation = NRC/RGN-II/DRP/RPB4
| addressee name = Annacone M
| addressee affiliation = Carolina Power & Light Co
| docket = 05000324, 05000325
| license number = DPR-062, DPR-071
| contact person =
| document report number = IR-12-009
| document type = Letter
| page count = 6
}}
 
{{IR-Nav| site = 05000325 | year = 2012 | report number = 009 }}
 
=Text=
{{#Wiki_filter:
[[Issue date::October 1, 2012]]
 
Carolina Power & Light Company ATTN: Mr. Michael Annacone Vice President Brunswick Steam Electric Plant Southport, NC 28461
 
SUBJECT: ASSESSMENT FOLLOW-UP LETTER - BRUNSWICK STEAM ELECTRIC PLANT-UNITS 1 AND 2 - NRC INSPECTION REPORT 05000325/2012009 AND 05000324/2012009
 
==Dear Mr. Annacone:==
As a result of its continuous review of plant performance, which was completed on September 27, 2012, the U.S. Nuclear Regulatory Commission (NRC) updated its assessment of Brunswick Steam Electric Plant Units 1 and 2. The NRC's evaluation consisted of a review of inspection results. This letter informs you of the NRC's assessment of your facility, and supplements, but does not supersede, the mid-cycle letter issued on September 4, 2012.
 
On June 21, 2012, the NRC completed a supplemental inspection pursuant to Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area" (Inspection Report 05000325/2012008 and 05000324/2012008). After reviewing Brunswick Steam Electric Plant Units 1 and 2 performance in addressing the White finding associated with the degradation of the external flood barrier for the emergency diesel generator fuel oil tank rooms, the NRC concluded that your actions met the objectives of the Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area". Therefore, the White finding is considered closed. As a result, the NRC determined the performance at Brunswick Steam Electric Plant Units 1 and 2 to be in the Licensee Response Column of the Reactor Oversight Process Action Matrix as of October 1, 2012.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rmadams.html (the Public Electronic Reading Room). Please contact me at 404-562-4603 with any questions you may have regarding this letter.
 
Sincerely,/RA/ Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No. 50-325, 50-324 License No. DPR-71, DPR-62 cc w/encl. (see page 3) Please contact me at 404-562-4603 with any questions you may have regarding this letter.
 
Sincerely,/RA/ Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No. 50-325, 50-324 License No. DPR-71, DPR-62 cc w/encl. (see page 3) `
 
XG PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X G NON-SENSITIVE ADAMS: XG Yes ACCESSION NUMBER:_________________________ XG SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE JDW1 JSD RXM1 NAME JWorosilo JDodson RMusser DATE 9/28/2012 10/1/2012 10/1/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME:: G:\DRPII\RPB4\BRUNSWICK\REPORTS\2012 REPORTS\12-009\BRUNSWICK 2012 ASSESSMENT FOLLOW-UP LETTER 2012009.DOCX cc w/encl: Plant General Manager Brunswick Steam Electric Plant Progress Energy Electronic Mail Distribution Edward L. Wills, Jr. Director Site Operations Brunswick Steam Electric Plant Electronic Mail Distribution J. W. (Bill) Pitesa Senior Vice President Nuclear Operations Duke Energy Corporation Electronic Mail Distribution Lara S. Nichols Deputy General Counsel Duke Energy Corporation Electronic Mail Distribution M. Christopher Nolan Director - Regulatory Affairs General Office Duke Energy Corporation Electronic Mail Distribution Annette H. Pope Manager, Support Services Brunswick Steam Electric Plant Progress Energy Carolinas, Inc.
 
Electronic Mail Distribution Lee Grzeck Supervisor - Licensing/Regulatory Programs (Acting)
Brunswick Steam Electric Plant Progress Energy Carolinas, Inc. Electronic Mail Distribution
 
Randy C. Ivey Manager, Nuclear Oversight Brunswick Steam Electric Plant Progress Energy Carolinas, Inc. Electronic Mail Distribution
 
Paul E. Dubrouillet Manager, Training Brunswick Steam Electric Plant Electronic Mail Distribution
 
Joseph W. Donahue Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution
 
David T. Conley Senior Counsel Legal Department Progress Energy Electronic Mail Distribution John H. O'Neill, Jr. Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128
 
Peggy Force Assistant Attorney General State of North Carolina P.O. Box 629 Raleigh, NC 27602 Chairman North Carolina Utilities Commission Electronic Mail Distribution
 
Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326
 
Anthony Marzano Director Brunswick County Emergency Services Electronic Mail Distribution
 
Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211
 
(cc w/encl continued next page) cc w/enclosure continued. W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Warren Lee Emergency Management Director New Hanover County Department of Emergency Management 230 Government Center Drive Suite 115 Wilmington, NC 28403 Letter to Michael from Randall A. Musser dated October 1, 2012.
 
SUBJECT: BRUNSWICK STEAM ELECTRIC PLANT - NRC INTEGRATED INSPECTION REPORT 05000325/2012 AND 05000324/2012 Distribution w/encl: C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC R. Pascarelli, NRR RidsNrrPMBrunswick Resource
}}

Latest revision as of 22:44, 18 February 2018