ML17229A091: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 6: Line 6:
| number = ML17229A097
| number = ML17229A097
| issue date = 06/10/1996
| issue date = 06/10/1996
| title = Forwards SG Run Time Analysis for Cycle 14 of Plant,Unit 1, Which Includes Responses to NRC RAI Dtd 960726 & Util Contractor Repts Which Demonstrates That All Significant Parameters of Draft Reg Guide Have Been Met
| title = Rev 0 to TP-9419-CSE96-2104, Steam Generator Tube In-Situ Hydrostatic Pressure Test Tool Hydro Chamber Pressure Determination.
| author name = Ford J, Orsulak R
| author name = Ford J, Orsulak R
| author affiliation = ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
| author affiliation = ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Line 21: Line 21:
| number = ML17229A096
| number = ML17229A096
| issue date = 06/12/1996
| issue date = 06/12/1996
| title = Forwards SG Run Time Analysis for Cycle 14 of Plant,Unit 1, Which Includes Responses to NRC RAI Dtd 960726 & Util Contractor Repts Which Demonstrates That All Significant Parameters of Draft Reg Guide Have Been Met
| title = Rev 0 to TR-9419-CSE96-1101, Test Rept - SG Tube In-Situ Hydrostatic Pressure Test Tool Hydro Chamber Pressure Determination.
| author name = Fink G, Ford J, Orsulak R
| author name = Fink G, Ford J, Orsulak R
| author affiliation = ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
| author affiliation = ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Line 36: Line 36:
| number = ML17229A095
| number = ML17229A095
| issue date = 10/24/1996
| issue date = 10/24/1996
| title = Forwards SG Run Time Analysis for Cycle 14 of Plant,Unit 1, Which Includes Responses to NRC RAI Dtd 960726 & Util Contractor Repts Which Demonstrates That All Significant Parameters of Draft Reg Guide Have Been Met
| title = Rev 0 to 00000-OSW-16, In-Situ Pressure Test Results for St Lucie Unit 1 Spring 1996 Outage.
| author name =  
| author name =  
| author affiliation = ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
| author affiliation = ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Line 51: Line 51:
| number = ML17229A094
| number = ML17229A094
| issue date = 08/30/1996
| issue date = 08/30/1996
| title = Forwards SG Run Time Analysis for Cycle 14 of Plant,Unit 1, Which Includes Responses to NRC RAI Dtd 960726 & Util Contractor Repts Which Demonstrates That All Significant Parameters of Draft Reg Guide Have Been Met
| title = Rev a to SAIC 05-5049-05-6734-500, Steam Generator Degradation Specific Mgt Leakage Limit Calculation for St Lucie Unit 1.
| author name = Johnson R, Otis M
| author name = Johnson R, Otis M
| author affiliation = SCIENCE APPLICATIONS INTERNATIONAL CORP. (FORMERLY
| author affiliation = SCIENCE APPLICATIONS INTERNATIONAL CORP. (FORMERLY
Line 66: Line 66:
| number = ML17229A093
| number = ML17229A093
| issue date = 10/31/1996
| issue date = 10/31/1996
| title = Forwards SG Run Time Analysis for Cycle 14 of Plant,Unit 1, Which Includes Responses to NRC RAI Dtd 960726 & Util Contractor Repts Which Demonstrates That All Significant Parameters of Draft Reg Guide Have Been Met
| title = Analysis of Odscc/Iga at Tubesheet & Tube Support Locations at St Lucie Unit 1.
| author name =  
| author name =  
| author affiliation = APTECH ENGINEERING SERVICES
| author affiliation = APTECH ENGINEERING SERVICES
Line 81: Line 81:
| number = ML17229A092
| number = ML17229A092
| issue date = 10/24/1996
| issue date = 10/24/1996
| title = Forwards SG Run Time Analysis for Cycle 14 of Plant,Unit 1, Which Includes Responses to NRC RAI Dtd 960726 & Util Contractor Repts Which Demonstrates That All Significant Parameters of Draft Reg Guide Have Been Met
| title = Steam Generator Run Time Analysis,Cycle 14, for St Lucie Unit 1
| author name =  
| author name =  
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.

Latest revision as of 05:32, 8 March 2020

Forwards SG Run Time Analysis for Cycle 14 of Plant,Unit 1, Which Includes Responses to NRC RAI Dtd 960726 & Util Contractor Repts Which Demonstrates That All Significant Parameters of Draft Reg Guide Have Been Met
Date released: 01/25/2018 Download: ML17229A091


Rev 0 to TP-9419-CSE96-2104, Steam Generator Tube In-Situ Hydrostatic Pressure Test Tool Hydro Chamber Pressure Determination.
ML17229A097
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/10/1996
From: Jennifer Ford, Orsulak R
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To:
References
Download: ML17229A097 (30)
Rev 0 to TR-9419-CSE96-1101, Test Rept - SG Tube In-Situ Hydrostatic Pressure Test Tool Hydro Chamber Pressure Determination.
ML17229A096
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/12/1996
From: Fink G, Jennifer Ford, Orsulak R
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To:
References
Download: ML17229A096 (17)
Rev 0 to 00000-OSW-16, In-Situ Pressure Test Results for St Lucie Unit 1 Spring 1996 Outage.
ML17229A095
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/24/1996
From:
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To:
References
Download: ML17229A095 (24)
Rev a to SAIC 05-5049-05-6734-500, Steam Generator Degradation Specific Mgt Leakage Limit Calculation for St Lucie Unit 1.
ML17229A094
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/30/1996
From: Rachel Johnson, Otis M
SCIENCE APPLICATIONS INTERNATIONAL CORP. (FORMERLY
To:
References
Download: ML17229A094 (34)
Analysis of Odscc/Iga at Tubesheet & Tube Support Locations at St Lucie Unit 1.
ML17229A093
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/31/1996
From:
APTECH ENGINEERING SERVICES
To:
References
Download: ML17229A093 (80)
Steam Generator Run Time Analysis,Cycle 14, for St Lucie Unit 1
ML17229A092
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/24/1996
From:
FLORIDA POWER & LIGHT CO.
To:
References
Download: ML17229A092 (62)
Forwards SG Run Time Analysis for Cycle 14 of Plant,Unit 1, Which Includes Responses to NRC RAI Dtd 960726 & Util Contractor Repts Which Demonstrates That All Significant Parameters of Draft Reg Guide Have Been Met
ML17229A090
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/24/1996
From: Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17229A090 (5)