IR 05000280/2006001: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Surry Inspection / Activity Plan 03/01/2006-09/30/2007 | {{#Wiki_filter:Page 1 of 2 Surry 03/02/2006 10:39:55 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB3-ISI - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 05/01/2006 05/05/2006 Baseline Inspections EB3SGISI - U1 STEAM GENERATOR ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 05/08/2006 05/12/2006 Baseline Inspections EB3-HS - HEAT SINK 2 1, 2 IP 7111107B Heat Sink Performance 05/22/2006 05/26/2006 Baseline Inspections EB2-TFP - TRIENNIAL FP PRE-INSPECTION VISIT 4 1, 2 IP 7111105T Fire Protection [Triennial] 05/16/2006 05/18/2006 Baseline Inspections ISFSI-PT - 60854 - PREOP TESTING OF AN ISFSI 2 1, 2 IP 60854 Preoperational Testing Of An ISFSI 06/05/2006 06/09/2006 Other Routine EB2-TFP - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 IP 7111105T Fire Protection [Triennial] 06/12/2006 06/16/2006 Baseline Inspections EB2-TFP - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 IP 7111105T Fire Protection [Triennial] 06/26/2006 06/30/2006 Baseline Inspections PSB1-RP - RP PUBLIC PREINSPECTION VISIT/ ISFSI 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 07/10/2006 07/12/2006 Baseline Inspections PSB1-RP - RP PUBLIC BASELINE 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/31/2006 08/04/2006 Baseline Inspections EB3-MR - MR EFFECTIVENESS 2 1, 2 IP 7111112B Maintenance Effectiveness 08/28/2006 09/01/2006 Baseline Inspections PS2-EP - EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/23/2006 10/27/2006 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/30/2006 11/03/2006 Baseline Inspections EB3SGISI - U2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 11/06/2006 11/10/2006 Baseline Inspections This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Enclosure | ||
Page 2 of 2 Surry 03/02/2006 10:39:55 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 1 2 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 11/12/2006 11/17/2006 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 03/05/2007 03/09/2007 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 06/11/2007 06/15/2007 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 06/11/2007 06/15/2007 Baseline Inspections PS2-EP - EP EXERCISE 3 1, 2 IP 7111401 Exercise Evaluation 07/09/2007 07/13/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/09/2007 07/13/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/09/2007 07/13/2007 Baseline Inspections PI&R - PROBLEM IDENTIFICATION & RESOLUTION 4 1, 2 IP 71152B Identification and Resolution of Problems 09/24/2007 09/28/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT/ISFSI 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/24/2007 09/26/2007 Baseline Inspections This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures. | |||
}} | }} | ||
Revision as of 21:38, 23 November 2019
| ML060610422 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 03/02/2006 |
| From: | Division Reactor Projects II |
| To: | |
| Shared Package | |
| ML060610416 | List: |
| References | |
| IR-06-001 | |
| Download: ML060610422 (2) | |
Text
Page 1 of 2 Surry 03/02/2006 10:39:55 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB3-ISI - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 05/01/2006 05/05/2006 Baseline Inspections EB3SGISI - U1 STEAM GENERATOR ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 05/08/2006 05/12/2006 Baseline Inspections EB3-HS - HEAT SINK 2 1, 2 IP 7111107B Heat Sink Performance 05/22/2006 05/26/2006 Baseline Inspections EB2-TFP - TRIENNIAL FP PRE-INSPECTION VISIT 4 1, 2 IP 7111105T Fire Protection [Triennial] 05/16/2006 05/18/2006 Baseline Inspections ISFSI-PT - 60854 - PREOP TESTING OF AN ISFSI 2 1, 2 IP 60854 Preoperational Testing Of An ISFSI 06/05/2006 06/09/2006 Other Routine EB2-TFP - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 IP 7111105T Fire Protection [Triennial] 06/12/2006 06/16/2006 Baseline Inspections EB2-TFP - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 IP 7111105T Fire Protection [Triennial] 06/26/2006 06/30/2006 Baseline Inspections PSB1-RP - RP PUBLIC PREINSPECTION VISIT/ ISFSI 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 07/10/2006 07/12/2006 Baseline Inspections PSB1-RP - RP PUBLIC BASELINE 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/31/2006 08/04/2006 Baseline Inspections EB3-MR - MR EFFECTIVENESS 2 1, 2 IP 7111112B Maintenance Effectiveness 08/28/2006 09/01/2006 Baseline Inspections PS2-EP - EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/23/2006 10/27/2006 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/30/2006 11/03/2006 Baseline Inspections EB3SGISI - U2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 11/06/2006 11/10/2006 Baseline Inspections This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Enclosure
Page 2 of 2 Surry 03/02/2006 10:39:55 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 1 2 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 11/12/2006 11/17/2006 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 03/05/2007 03/09/2007 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 06/11/2007 06/15/2007 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 06/11/2007 06/15/2007 Baseline Inspections PS2-EP - EP EXERCISE 3 1, 2 IP 7111401 Exercise Evaluation 07/09/2007 07/13/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/09/2007 07/13/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/09/2007 07/13/2007 Baseline Inspections PI&R - PROBLEM IDENTIFICATION & RESOLUTION 4 1, 2 IP 71152B Identification and Resolution of Problems 09/24/2007 09/28/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT/ISFSI 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/24/2007 09/26/2007 Baseline Inspections This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.