ML070370225: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:February 5, 2007Mr. Robert ChristmanManager of Training and Development Entergy Nuclear Operations, Inc.
{{#Wiki_filter:February 5, 2007 Mr. Robert Christman Manager of Training and Development Entergy Nuclear Operations, Inc.
Indian Point Energy Center 295 Broadway, Suite 2 P.O. Box 249 Buchanan, NY 10511-0249
Indian Point Energy Center 295 Broadway, Suite 2 P.O. Box 249 Buchanan, NY 10511-0249


==Dear Mr. Christman:==
==Dear Mr. Christman:==


The purpose of this letter is to inform you of the individual examination results for yourapplicants on the initial written examination conducted on November 17, 2006, and the walkthrough (overall) and/or simulator operating tests administered the week of November 6, 2006 at your facility. This meets the intent of Section E.1 of the Examination Standards (ES 501) in NUREG 1021. Eleven individuals were administered the examination and ten passed. However, we will not be issuing a license for one of the applicants who passed
The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on November 17, 2006, and the walkthrough (overall) and/or simulator operating tests administered the week of November 6, 2006 at your facility. This meets the intent of Section E.1 of the Examination Standards (ES 501) in NUREG 1021. Eleven individuals were administered the examination and ten passed. However, we will not be issuing a license for one of the applicants who passed
- as explained in Section ES-501, paragraph D.3.c. - because any written examination with a passing grade of 82 (74 for SRO-only) percent or below is normally held for review until those applicants who failed the examination have had an opportunity to appeal their license denials. Also, we will not be issuing a license for one applicant (as explained in Section ES-501, paragraph D.3.c.) until you certify in writing that he has acquired all the training and experience for which he was previously granted a waiver. This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.Enclosure 1 is the completed ES-501-2, Power Plant Licensing Examination Results Summary,and is a summary of overall examination results.Enclosure 2 contains the individual results ES-303-1 and 303-2, Operator License ExaminationReport, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent ofthe overall pass status. The applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398.Enclosure 3 is a copy of the licenses.
- as explained in Section ES-501, paragraph D.3.c. - because any written examination with a passing grade of 82 (74 for SRO-only) percent or below is normally held for review until those applicants who failed the examination have had an opportunity to appeal their license denials.
R. Christman-2-Thank you for your cooperation in this matter. Please refer any questions you have to me at(610) 337-5046.Sincerely,/RA/Marvin D. Sykes, ChiefOperations Branch Division of Reactor SafetyDocket No. 50-286License No. DPR-64
Also, we will not be issuing a license for one applicant (as explained in Section ES-501, paragraph D.3.c.) until you certify in writing that he has acquired all the training and experience for which he was previously granted a waiver. This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398. is a copy of the licenses.
 
R. Christman                                   Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Sincerely,
                                            /RA/
Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety Docket No. 50-286 License No. DPR-64


==Enclosures:==
==Enclosures:==
: 1. ES-501-2, Power Plant Licensing Examination Results Summary
: 1. ES-501-2, Power Plant Licensing Examination Results Summary
: 2. ES-303-1 and 303-2, Individual Examination Results
: 2. ES-303-1 and 303-2, Individual Examination Results
: 3. Licensescc w/licenses:
: 3. Licenses cc w/licenses:
Mr. Fred DacimoSite Vice President Entergy Nuclear Operations, Inc.
Mr. Fred Dacimo Site Vice President Entergy Nuclear Operations, Inc.
Indian Point Energy Center 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Distribution: w/o enclosures:Master Exam FileSUNSI Review Complete:           DMS               (Reviewer's Initials
Indian Point Energy Center 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249
)ADAMS PKG: ML060800062DOCUMENT NAME:C:\FileNet\ML070370225.wpdAfter declaring this document "An Official Agency Record" it will without enclosures be released to the Public.To receive a copy of this document, indicate in the box:
 
" C" = Copy without attachment/enclosure   " E" = Copy with attachment/enclosure   " N" = No copyOFFICERI/DRS/OBRI/DRS/OBRI/DRS/OBNAMECJBixler CJBDMSilk DMSMDSykes MDSDATE01/16 /07 01/12/0702/05/07OFFICIAL RECORD COPY}}
Distribution: w/o enclosures:
Master Exam File SUNSI Review Complete:                     DMS                 (Reviewers Initials)
ADAMS PKG: ML060800062 DOCUMENT NAME:
C:\FileNet\ML070370225.wpd After declaring this document An Official Agency Record it will without enclosures be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE              RI/DRS/OB                RI/DRS/OB                RI/DRS/OB NAME                CJBixler CJB              DMSilk DMS                MDSykes MDS DATE                01/16 /07                   01/12/07                02/05/07 OFFICIAL RECORD COPY}}

Revision as of 09:46, 23 November 2019

NRC Indian Point 3 Exam Results Letter W/O Encl. Dated 2/5/2007
ML070370225
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 02/05/2007
From: Marvin Sykes
Operations Branch I
To: Christman R
Entergy Nuclear Operations
Sykes, Marvin D.
References
Download: ML070370225 (3)


Text

February 5, 2007 Mr. Robert Christman Manager of Training and Development Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 2 P.O. Box 249 Buchanan, NY 10511-0249

Dear Mr. Christman:

The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on November 17, 2006, and the walkthrough (overall) and/or simulator operating tests administered the week of November 6, 2006 at your facility. This meets the intent of Section E.1 of the Examination Standards (ES 501) in NUREG 1021. Eleven individuals were administered the examination and ten passed. However, we will not be issuing a license for one of the applicants who passed

- as explained in Section ES-501, paragraph D.3.c. - because any written examination with a passing grade of 82 (74 for SRO-only) percent or below is normally held for review until those applicants who failed the examination have had an opportunity to appeal their license denials.

Also, we will not be issuing a license for one applicant (as explained in Section ES-501, paragraph D.3.c.) until you certify in writing that he has acquired all the training and experience for which he was previously granted a waiver. This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398. is a copy of the licenses.

R. Christman Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely,

/RA/

Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety Docket No. 50-286 License No. DPR-64

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses cc w/licenses:

Mr. Fred Dacimo Site Vice President Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249

Distribution: w/o enclosures:

Master Exam File SUNSI Review Complete: DMS (Reviewers Initials)

ADAMS PKG: ML060800062 DOCUMENT NAME:

C:\FileNet\ML070370225.wpd After declaring this document An Official Agency Record it will without enclosures be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler CJB DMSilk DMS MDSykes MDS DATE 01/16 /07 01/12/07 02/05/07 OFFICIAL RECORD COPY