February 5, 2007 Mr. Robert Christman Manager of Training and Development Entergy Nuclear Operations, Inc.
Indian Point Energy Center 295 Broadway, Suite 2 P.O. Box 249 Buchanan, NY 10511-0249
Dear Mr. Christman:
The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on November 17, 2006, and the walkthrough (overall) and/or simulator operating tests administered the week of November 6, 2006 at your facility. This meets the intent of Section E.1 of the Examination Standards (ES 501) in NUREG 1021. Eleven individuals were administered the examination and ten passed. However, we will not be issuing a license for one of the applicants who passed
- as explained in Section ES-501, paragraph D.3.c. - because any written examination with a passing grade of 82 (74 for SRO-only) percent or below is normally held for review until those applicants who failed the examination have had an opportunity to appeal their license denials.
Also, we will not be issuing a license for one applicant (as explained in Section ES-501, paragraph D.3.c.) until you certify in writing that he has acquired all the training and experience for which he was previously granted a waiver. This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398. is a copy of the licenses.
R. Christman Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Sincerely,
/RA/
Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety Docket No. 50-286 License No. DPR-64
Enclosures:
- 1. ES-501-2, Power Plant Licensing Examination Results Summary
- 2. ES-303-1 and 303-2, Individual Examination Results
- 3. Licenses cc w/licenses:
Mr. Fred Dacimo Site Vice President Entergy Nuclear Operations, Inc.
Indian Point Energy Center 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249
Distribution: w/o enclosures:
Master Exam File SUNSI Review Complete: DMS (Reviewers Initials)
ADAMS PKG: ML060800062 DOCUMENT NAME:
C:\\FileNet\\ML070370225.wpd After declaring this document An Official Agency Record it will without enclosures be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler CJB DMSilk DMS MDSykes MDS DATE 01/16 /07 01/12/07 02/05/07 OFFICIAL RECORD COPY